HomeMy WebLinkAbout05-18 CommentsSubject
Date.-
From:
ate:From:
To:
Cc:
Mr. Oates,
R & J Land Devlopment Warehouse #2 Site Plan Approval;`
2/26/2018 11:05:31 AM Eastern Standard Time
Timothy.Rhodes@vdot.virginia.gov 1
GreyWolfelnc@aol.com +T
§aJ
Rhonda.Funkhouser@VDOT.Virginia.gov, Matthew. Smith@vdot.virginia.gov,
Gregory. Hoffman @VDOT.Virginia. gov, jbishop gco.frederick.va.us, tklein@fcva.us,
Clifton.Balderson@VDOT.Virginia.gov
DEPARTMENT OF TRANSPORTATION
Staunton/Edinburg Land Development
14031 Old Valley Pike
Edinburg, VA 22824
A VDOT review has been conducted for the R & J Land Development Warehouse # 2 Site Plan with a
signature date of February 16, 2018. Based off of the review of the Drawings, all of the previous
VDOT comments have been addressed and the Site Plan is approved by our office. Please ensure
that all applicable agencies have the most recent set of approved Drawings.
We offer the following general comments:
• Our review and comments are general in nature. Should details be overlooked during plan
review or conditions in the field exist such that additional measures are warranted, such
measures shall be completed to the satisfaction of the department.
• Materials used and methods of construction shall adhere to the current observed VDOT Road
and Bridge Specifications, Road and Bridge Standards, Manual on Uniform Traffic Control
Devices, and Land Use Permit Special Provisions.
• A preconstruction conference shall be held by the engineer and/or the developer with the
attendance of the contractor, various County agencies, utility companies, and VDOT prior to
initiation of work.
• All drainage is to be carried within the right-of-way in ditch lines or gutters along the street to a
pipe or drainage easement.
• Any construction related changes to the approved plan must come through the design engineer
to VDOT for approval. Please allow a minimum of 5 business days for VDOT review.
• A Land Use Permit shall be obtained before any work is performed on the State's right-of-way.
The permit is issued by this office and may require application fees, the salary & expenses of a
State assigned inspector, and surety bond coverage.
If you have any questions or need further information, please do not hesitate to contact me.
Sincerely,
Timothy Rhodes
� li(} 1—Land Development Engineer
Clarke, Frederick, Shenandoah & Warren Counties
14031 Old Valley Pike
Edinburg, VA. 22824
(540)-984-5630
ial)t I I t w 1-d I i PLAN CONI \11- J:s
Pi t)h-c Nk orks olli [II e it I
Ro,
. . . ...... .
CIO omic nnd:01'
1 . LIA VVI II ell ICA,
ad, ev 1
��f )6-,
-- i k I - ; f I R. i I X A. 4,lt N 1 ) ;, I la i i s "4 R, N :� 7.11- r k; , i r" N I t "1.:f,' , %. I, `
Rf-
-r Requiivd
q
u
v.4
. ...........
ad, ev 1
��f )6-,
-- i k I - ; f I R. i I X A. 4,lt N 1 ) ;, I la i i s "4 R, N :� 7.11- r k; , i r" N I t "1.:f,' , %. I, `
Rf-
-r Requiivd
REQUEST FOR SITE PLAN COMMENTS
Frederick County Inspections
Department Comment
Mail to:
Frederick County Inspections Department
Attn: Building Official
107 North Kent Street,
Winchester, Virginia 22601
Hand deliver to:
Frederick County Inspections Dept.
107 North Kent Street, 2nd Floor
Winchester, Virginia 22601
Phone: (540) 665-5650
_.. _.. .
Applicant: It is your responsibility to complete this form as accurately as possible in order to assist the agency with their
review. Please attach two (2) copies of the Site PIan with this sheet.
Applicant's Name: GreyWolfe, Inc. - Gary R. Oates, LS -B, PE
Mailing Address:
1073 Redbud Road
Winchester, Virginia, 22603
Telephone: 540-667-2001
Name of development and/or description of the request:
R & J Development, LLC - Warehouse #2 - 10,875 sf warehouse with parking
Location of Property:
Wes -Luke Drive off of Jeffs Way - See 3625 Martinsburg Pike in the Clear Brook Business Park - Frederick County, VA
Inspections Department Comments:
:rEIVEU
VWita,?t^ip
_. _..._. _......... __..._ _... ... _ ._.....
-FREDERICK COUNTY INSPECTIONS DEPARTMENT USE ONLY -
Date Received�D 2 Review Number 1 2 3 4 5 (circle one)
Date Reviewed III to t'i
Revision Required r�, ate Approved 1�1 i 1-7
Signature & Date:
** Please Return Form to Applicant**
18
Buildings shall comply with The Virginia Uniform Statewide Building Code and Sections 311, S
Storage) and Section 304, B -Business of the International Building Code/2012. Other Code that
applies are the International Mechanical Code for air change, The ICC ANSI Al 17.1-3-09
Accessible and Usable Buildings and Facilities, 2012 Virginia Plumbing Code (VPC), 2012
International Energy Code and 2012 International Fire Code.
Building shall comply with height and area as allowed per T503 with the applicable increases.
Building shall comply with IBC/USBC 903.2.9 for sprinkler requirements if
Group S -I fire areas used for the storage of commercial trucks where the fire area exceed 5000
sq ft, as well as, S-1 fire areas in excess of 5, GOOK sq ft and used for commercial truck repair
garage shall be provided with an NFFA sprinkler system. Additionally, an oil water separator
shall be installed as required per USBC/VPC
Quantity of hazardous material quantities and limitations shall be as required/limited under
T307.1(1) to prevent the structure from falling into an H -Hazardous use group
At least one parking area is required to be a Van Accessible space as required in USBC Sec
1106. Accessible parking and unloading requires a minimum of 8' parking, and a minimum of
8' ofstriped unloading area. Unloading area shall have a maximum 2% slope. Van accessible
signage shall be provided as required per USBC Sec 1106.8.
Accessible route to main entrance shall not exceed 5% (1:20) slope. At least 60% of all
entrances shall be accessible. Landings at doors shall not exceed 1:48 slope and thresholds shall
not exceed 'h". Entrance door appear to be in compliance with location, quantity, etc.
All required exits shall be accessible and meet the requirements of IBC Section 1007
Building shall comply with 2012 Virginia Energy Code. All systems shall be included in the
evaluation of the building performance.
All structural plans submitted for permit application shall be sealed by a VA Design Professional.
Please note the requirements in Chapter 17 of the IBC for special inspections for this type of
structure (soil, concrete, bolts, etc.)
s:\site plan comments\2012\s-1 storage, r & j.doe
ant. l'-
Apokawl !n— - Car, it (Does. LS -P. Flia
Mading NIt! rc-�s: , 10
nirct
mut. L L C SwuNcum 02 - 'AM W rawwwo wM pws -
Fie hhuhM Chmmem:
.... . ..... - . ........... — ....... . ...
(Q FlUE St WMI %L INE ONLA -
�,u --ci I 1 4 -5 i.-i:'A:
Please Return Im o"; t"
RVQI TS J`
[OR tiff E ITAN COMMENTS
VrcdcrivkCourv� FircAloribalConument
Mad tu:
lk
, , 1 -, -, h e� -;
:}t1_
ant. l'-
Apokawl !n— - Car, it (Does. LS -P. Flia
Mading NIt! rc-�s: , 10
nirct
mut. L L C SwuNcum 02 - 'AM W rawwwo wM pws -
Fie hhuhM Chmmem:
.... . ..... - . ........... — ....... . ...
(Q FlUE St WMI %L INE ONLA -
�,u --ci I 1 4 -5 i.-i:'A:
Please Return Im o"; t"
Ftederick Counti-
Dt,purtmenf of Fire and Rescwe
ff"ce of,'h e Fire I To r.�- b a I
Tf 16
fJ �`o i'vIV.- ('54,0) 47A -^-d ,i:1 Ejn a ii:
Plan Review &
Seto Nan -1 -0-23-17
IA -C
uke M
Addrpsn R
d
App', xm r)t IkI �7, rr! e & t n L te t
f -11 r_tt
Wlarehovsp #2
Grev.Nodf-, !rc..
A dic t i u at
ir N �`,A
7d f, f4 U
Fite 't-ant-,fs
P P
ialn Approl:of
Art; p p r cj^,, r ce
Comm -wits
Ar ca a i� hil -.[.;t. n ii' f at 19 2 s, a eiv e vP. r< I r 1 q. 1,F " T a e
Aeczn yolkpw,
rye viwwod %3,y: Kenneth,
r3rook
UatFo Reviewed
11,'2}, 01 1 11
VA 226 24
8 FREDERICK WATER
FREDERICK
WATER SITE FLAN RE JE -W C® -Ii ENTS
PO Box 1877, Winchester, VA 22604-8377
315 Tasker Road, Stephens City, VA 22655
Project ®
Applicant
540.868.1061 voice
540.868.1429 fax
-11V101
REVIEW STATUS attention F. UTIU � VT!/3
review number V __
correct &r resubmit approved as not d number of items to be corrected
approved You may submit ,just cover sheet and the revised sheets.
DRAWINGS
h
send me by % U
1. print of sheets !�
2. two CDs: each disc shall contain the following plan sheets
141-
a) One CD (containing all of the above noted sheets) shall be in PDF format. Each sheet shall be ill its
own file and be in landscape orientation. Each file shall be titled with the project name and appropriate
sheet number.
b) One CD shall be in DWG format; (1) in Model Space, (2) in state plane coordinate system NAD 83, (3)
compatible with AutoCAD 2006.
c) Each of the two CDs shall be labeled with its format and project name, and placed in its own paper CD
envelope.
EASEMENTS
CY / N A copy of the recorded onsite FW easements) is/are required.
Y 9 A copy of the recorded offsite FW easement(s) is/are required.
o The easement document shall contain a plat and both shall be signed by the Frederick Water_
o The Frederick Water requires specific language in its deed of easement.
o Visit our website www.freclerickw_ater.com to obtain a copy of the form.
o A copy of the recorded deed(s) of easement shall be received before service will be authorized.
OTHER
Y /® This project also requires DEQ - Valley Region Office approval.
Y 0 This project also requires VDII — Lexington Field Office approval.
6/ N This project also requires VDH — Lexington Field Office — Project Sumunary Report. BY DATE FOR
DRAWINGS ABOVE, see VDH website for form
Y.N This project has a sewer pump station that FW will own. Title to the pump station site shall be granted
to the Frederick Water in fee supple absolute. Also, (1) a copy of DEQ's Certificate to Construct, (2) a
copy of DEQ's Certificate to Operate, and (3) two copies of the FW approved O R M manual are
required. These documents must be received before service will be authorized. (4) Work cannot
commence that would connect to FW facilities or require FW inspections until the contract is returned
1 t this office.
'f}
Date: L�,j' � �(/ �G� � �/(/► lz".;� L..
Earl W. Wiley — Engineering Assistant JAN 18