HomeMy WebLinkAbout06-17 PC Staff ReportREZONING APPLICATION #06-17
K & J INVESTMENTS, LC
Staff Report for the Planning Commission
Prepared: January 5, 2018
Staff Contact: Candice E. Perkins, AICP, CZA, Assistant Director
Reviewed Action
Planning Commission: 01/17/18 Pending
Board of Supervisors: 02/14/18 Pending
PROPOSAL: To rezone 2.459+/- acres from the RA (Rural Areas) District to the B2 (General
Business) District with proffers, 0.936+/- acres of land zoned RP (Residential Performance) District to
the B2 (General Business) District with proffers, and 0.488+/- acre of land zoned M1 (Light Industrial)
to the B2 (General Business) with proffers.
LOCATION: The subject properties are located at the northeast corner of the intersection of Martinsburg
Pike (Route 11) and Snowden Bridge Boulevard.
EXECUTIVE SUMMARY & STAFF CONCLUSION FOR THE 01/707/18 PLANNING
COMMISSION MEETING:
This is an application to rezone a total of 3.9 acres of land to the B2 (General Business) District with
Proffers. The site is located within the Sewer and Water Service Area (SWSA) and is located within
the limits of the Northeast Land Use Plan of the 2035 Comprehensive Plan. The property is located
within the Sewer and Water Service Area (SWSA). The 2035 Comprehensive Plan identifies these
properties with a commercial land use designation. In general, the proposed commercial zoning is
consistent with the current land use supported by the Comprehensive Plan.
With this rezoning, the Applicant has proffered to limit the number of restricted entrances on
Martinsburg Pike and Snowden Bridge Boulevard and provide internal access via Ezra Lane and Nulton
Lane. The site shall not exceed 3,441 average trips per day. The Applicant has also proffered a 20’
right-of-way dedication for Martinsburg Pike.
The application also provides corridor enhancements such as a split rail fence, and increased parking
setbacks and signage and a monetary contribution of $0.10 per building square foot for Fire and Rescue.
A recommendation regarding this rezoning application to the Board of Supervisors would be
appropriate. The Applicant should be prepared to adequately address all concerns raised by the
Planning Commission.
Rezoning #06-17 K & J Investments, LC
January 5, 2018
Page 2
This report is prepared by the Frederick County Planning Staff to provide information to the
Planning Commission and the Board of Supervisors to assist them in making a decision on this
application. It may also be useful to others interested in this zoning matter. Unresolved issues
concerning this application are noted by staff where relevant throughout this staff report.
Reviewed Action
Planning Commission: 01/17/18 Pending
Board of Supervisors: 02/14/18 Pending
PROPOSAL: To rezone 2.459+/- acres from the RA (Rural Areas) District to the B2 (General
Business) District with proffers, 0.936+/- acres of land zoned RP (Residential Performance) District to
the B2 (General Business) District with proffers, and 0.488+/- acre of land zoned M1 (Light Industrial)
to the B2 (General Business) with proffers.
LOCATION: The subject properties are located at the northeast corner of the intersection of Martinsburg
Pike (Route 11) and Snowden Bridge Boulevard.
MAGISTERIAL DISTRICT: Stonewall
PROPERTY ID NUMBER: 43-A-147, 43-A-148, 43-A-149 and 43-A-151C
PROPERTY ZONING: RA (Rural Areas) District, RP (Residential Performance) District and zoned
M1 (Light Industrial) District
PRESENT USE: Residential and Vacant
ADJOINING PROPERTY ZONING & PRESENT USE:
North: B2 (General Business) District Use: Commercial
RP (Residential Performance) District Residential
South: B2 (General Business) District Use: Commercial
B3 (Industrial Transition) District Use: Industrial/Commercial
East: RP (Residential Performance) District Residential
M1 (Light Industrial) District Vacant
West: B2 (General Business) District Use: Commercial
B3 (Industrial Transition) District Commercial/Industrial
Rezoning #06-17 K & J Investments, LC
January 5, 2018
Page 3
REVIEW EVALUATIONS:
Virginia Dept. of Transportation: Please see email from Matthew Smith, dated September 5, 2017.
Frederick County Sanitation Authority: Please see letter from Eric R. Lawrence, AICP, Executive
Director dated August 9, 2017.
Frederick County Department of Public Works: A comprehensive review shall occur at the time of
site plan submission. An existing stormwater BMP was constructed with the Snowden Bridge
Boulevard and is owned by Frederick County. If this facility could provide benefit to developer to
achieve stormwater requirements, we could work with them on shared use and transfer of ownership for
their use and maintenance.
Frederick County Fire Marshall: Plan approved.
Frederick County Attorney: I have reviewed the revised proffer statement and this confirms that the
County Attorney comments have been addressed.
Winchester-Frederick County Health Department: The Health Department has reviewed the
request for comments for the Rezoning of property belonging to K & J investments, LC, from RA
(2.459 acres); RP (0.936 acres); & M1 (0.499 acres); to B2 (3.9 acres; designated as Tax Map # 43-A-
147, 43-A-148, 43-A-149, & 43-A-151C. This Health Department has no objections to the rezoning of
the above listed property. Based upon information provided by the Applicant, the future use of the
property will include a proposed convenience store, and a proposed fast food restaurant, which will be
served by public water and sewer. The Applicant describes the property as an open field with one single
family home, In the event that construction or development of the property may impact any existing
private water supply (well), or sewage disposal system, the Applicant is requested to consult with the
Health Department for proper abandonment practices in regards to septic components (septic tanks,
pump tanks), or existing wells. Application for a well abandonment permit must be made through this
Health Department prior to any construction that may impact an existing private water system (well).
Winchester Regional Airport: Rezoning is compatible with airport operations.
Frederick County Department of Park & Recreation: Appears to meet Parks and Recreation
requirements.
Planning & Zoning:
1) Site History
The original Frederick County zoning map (U.S.G.S. Winchester, VA Quadrangle) identifies
the majority of the subject property as being zoned R-3 (Residential General). The R-3
(Residential General) District zoning classification was modified to RP (Residential
Performance) District on February 14, 1990, during the comprehensive amendment to the
County’s Zoning Ordinance. Parcel 43-A-151C was rezoned to the M1 (Light Industrial)
Rezoning #06-17 K & J Investments, LC
January 5, 2018
Page 4
Zoning District with Rezoning #03-05 for North Stephenson which was approved by the Board
of Supervisors on April 27, 2005.
2) Comprehensive Plan
The 2035 Comprehensive Plan is the guide for the future growth of Frederick County.
The 2035 Comprehensive Plan is an official public document that serves as the Community's
guide for making decisions regarding development, preservation, public facilities and other key
components of Community life. The primary goal of this plan is to protect and improve the
living environment within Frederick County. It is in essence a composition of policies used to
plan for the future physical development of Frederick County.
The Area Plans, Appendix I of the 2035 Comprehensive Plan, are the primary implementation
tool and will be instrumental to the future planning efforts of the County.
Land Use
The 2035 Comprehensive Plan and the Northeast Frederick Land Use Plan provide guidance on
the future development of this property. The property is located within the Sewer and Water
Service Area (SWSA). The 2035 Comprehensive Plan identifies these properties with a
commercial land use designation. In general, the proposed commercial zoning is consistent
with the current land use supported by the Comprehensive Plan.
Transportation and Site Access
As depicted on the Applicant’s GDP, the site would be accessed via one right-in/right-out
entrance on Snowden Bridge Boulevard, one full entrance on Ezra Lane and a right-in/right-out
entrance on Martinsburg Pike which would be accessed via Nulton Lane.
With this rezoning, the Applicant has proffered to extend Ezra Lane as a public road from
Snowden Bridge Boulevard to the edge of the site. Ezra Lane is proposed to connect to Nulton
Lane which is a private road which would serve as part of the internal road system for the
proposed development. These roadways will also serve as interparcel connections to the
adjacent properties.
The entrance locations shown on the proffered GDP are conceptual in nature – the proffer states
that the final design and location of these entrances will need to be approved by VDOT and the
County. The Applicant also proffered that the site would not exceed 3,441 vehicle trips per day.
3) Proffer Statement – Dated May 22, 2017, Revised October 27, 2017:
1. Transportation - Vehicle Trips per Day shall not exceed the current by-right trips of 3,441
AADT.
Rezoning #06-17 K & J Investments, LC
January 5, 2018
Page 5
a. The owners hereby proffer to construct no more than one "right-in/right-out only"
entrance/exit" on Snowden Bridge Blvd (Route 883) as shown on the GDP. Final design
and location to be approved by VDOT and the County of Frederick.
b. The owners hereby proffer to improve the existing "right-in/right-out only" entrance/exit
onto Martinsburg Pike (Route 11) at Nulton Lane as shown on the GDP. Final design to
be approved by VDOT and the County of Frederick. No other entrances will be
constructed on Route 11.
c. The owners hereby proffer a public road, designed and constructed to VDOT standards,
to be known as Ezra Lane within their property as shown on the GDP. This will serve as
the internal road system for the development. Furthermore, neighboring parcels will be
also be granted an access easement over Ezra Lane. Said road is already proffered for
construction in Rezoning #12-16; however, construction will be by the owners should
development occur within this rezoning first.
d. The owners hereby proffer to construct no more than one full entrance/exit onto Ezra
Lane as shown on the GDP. Final design and location to be approved by VDOT and the
County of Frederick.
e. The owners hereby proffer a private road to be known as Nulton Lane within their
property as shown on the GDP. This will serve as the internal road system, built to
County standards for commercial drive aisles, for the development. Furthermore,
neighboring parcels identified as the 43-(A)-141, 142, and 143, and 43 (C) 2 1 will be
also be granted an access easement over Nulton Lane. Easements shall be granted when
requested by the County of Frederick.
f. The owners hereby proffer an additional 20' strip of land along Route 11 as shown on
the GDP for right-of-way improvements including a 5’ sidewalk. The dedication and
improvements will occur with the approval of the first site plan.
g. The owners hereby proffer to enter into a signalization agreement with the Virginia
Department of Transportation for the warrant study and installation of a traffic signal at
the intersection of Snowden Bridge Boulevard and Ezra Lane, prior to the approval of
the first site plan. It is understood that the owner’s participation will be pro-rated based
on his portion of the total traffic volume in the intersection. Agreement shall be
executed prior approval of first site plan.
2. Corridor Enhancement along Route 11 - Martinsburg Pike
a. The owners hereby proffer to construct split-rail fence with a 36" hedge within the front
building setback.
b. The owners hereby proffer the parking setback along Route 11 shall be coincidence
Rezoning #06-17 K & J Investments, LC
January 5, 2018
Page 6
with the 50’ front building setback.
c. The owner hereby proffers only one freestanding monument style tenant sign along the
frontage of Martinsburg Pike. No additional freestanding signage will be allowed along
Martinsburg Pike.
3. Fire & Rescue - Monetary Contributions
a. The owners hereby proffer a cash contribution to Frederick County for Fire and Rescue
purposes, of $0.10 per building square foot to be disbursed to the Frederick County Fire
and Rescue Department, to be paid prior to occupancy permit. The term "building
square foot" shall be the combined floor area for each story.
EXECUTIVE SUMMARY & STAFF CONCLUSION FOR THE 01/17/18 PLANNING
COMMISSION MEETING:
This is an application to rezone a total of 3.9 acres of land to the B2 (General Business) District with
Proffers. The site is located within the Sewer and Water Service Area (SWSA) and is located within
the limits of the Northeast Land Use Plan of the 2035 Comprehensive Plan. The property is located
within the Sewer and Water Service Area (SWSA). The 2035 Comprehensive Plan identifies these
properties with a commercial land use designation. In general, the proposed commercial zoning is
consistent with the current land use supported by the Comprehensive Plan.
With this rezoning, the Applicant has proffered to limit the number of restricted entrances on
Martinsburg Pike and Snowden Bridge Boulevard and provide internal access via Ezra Lane and Nulton
Lane. The site shall not exceed 3,441 average trips per day. The Applicant has also proffered a 20’
right-of-way dedication for Martinsburg Pike.
The application also provides corridor enhancements such as a split rail fence, and increased parking
setbacks and signage and a monetary contribution of $0.10 per building square foot for Fire and Rescue.
A recommendation regarding this rezoning application to the Board of Supervisors would be
appropriate. The Applicant should be prepared to adequately address all concerns raised by the
Planning Commission.