Loading...
HomeMy WebLinkAbout24-17 Site PlanCS0001 BY NO . DA T E RE V I S I O N S CA R M E U S E N A T U R A L C H E M I C A L S BE R M A E X T E N S I O N MC C U N E R O A D MI D D L E T O W N , V I R G I N I A 16 9 6 O R A N D A R O A D ST R A S B U R G , V I R G I N I A 2 2 6 5 7 CA R M E U S E N A T U R A L C H E M I C A L S CO V E R S H E E T CRMU1602 1"= JDS RAM SHEET OF1 7 ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATE; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM. AL L D I M E N S I O N S M U S T B E V E R I F I E D B Y C O N T R A C T O R AN D O W N E R M U S T B E N O T I F I E D O F A N Y DI S C R E P A N C I E S B E F O R E P R O C E E D I N G W I T H W O R K PREPARED FOR: OWNER/DEVELOPER CARMEUSE NATURAL CHEMICALS 1696 ORANDA ROAD STRASBURG, VIRGINIA 22657 (540) 465-5161 CARMEUSE NATURAL CHEMICALS BERM A EXTENSION ¬ SITE PLAN ¬ FREDERICK COUNTY, VIRGINIA FEBRUARY 16, 2017 REVISED SUBMISSION DATE LOCATION MAP Scale: 1" = 2000'                             CALL 1-800-552-7001 CALL BEFORE YOU DIG ALWAYS CALL 811 BEFORE YOU DIG IN VIRGINIA SECTION 56-265.17 REQUIRES THREE WORKING DAYS NOTICE TO UTILITIES BEFORE YOU EXCAVATE, DRILL OR BLAST VIRGINIA UTILITY PROTECTION SERVICE, INC. TICKET NUMBER(S):  PREPARED BY: PENNONI ASSOCIATES INC. 117 East Piccadilly Street Winchester, VA 22601 T 540.667.2139 F 540.665.0493 P T M NOM AEW L O C G FOH R I V A I N I R O F F SSIONA L E N G I N E EE R APPROVED BY FREDERICK COUNTY ZONING ADMINISTRATOR TMP 83-A-109, 90-A-5 ZONED: RA, EM PROPOSED USE: QUARRY Sheet List Table Sheet Number Sheet Title 1 COVER SHEET 2 NOTES AND LEGENDS 3 EXISTING CONDITIONS MAP 4 BERM GRADING & EROSION & SEDIMENT CONTROL 5 DRAINAGE PLAN 6 BERM LANDSCAPE PLAN 7 MISCELLANEOUS DETAILS #24-17 SITE PLAN #24-17 RE V I S E D P E R P L A N N I N G C O M M E N T S 6- 2 3 - 1 7 1 JD S SITE PLAN #24-17 CS0002 BY NO . DA T E RE V I S I O N S CA R M E U S E N A T U R A L C H E M I C A L S BE R M A E X T E N S I O N MC C U N E R O A D MI D D L E T O W N , V I R G I N I A 16 9 6 O R A N D A R O A D ST R A S B U R G , V I R G I N I A 2 2 6 5 7 CA R M E U S E N A T U R A L C H E M I C A L S CRMU1602 1"= JDS RAM SHEET OF2 7 ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM. AL L D I M E N S I O N S M U S T B E V E R I F I E D B Y C O N T R A C T O R AN D O W N E R M U S T B E N O T I F I E D O F A N Y DI S C R E P A N C I E S B E F O R E P R O C E E D I N G W I T H W O R K                             NO T E S A N D L E G E N D S P T M NOM AEW L O C G FOH R I V A I N I R O F F SSIONA L E N G I N E EE R BERM A-TYPICAL SECTION EROSION AND SEDIMENT CONTROL NARRATIVE PROJECT DESCRIPTION THIS SITE IS LOCATED IN SOUTHEASTERN FREDERICK COUNTY, VIRGINIA NORTH OF CEDAR CREEK, WEST OF ROUTE 11 AND SOUTH OF CHAPEL ROAD ADJACENT TO THE NORTHEASTERN END OF THE EXISTING CARMEUSE QUARRY OPERATION. THE EXTENSION OF THE EXISTING BERM IS WHOLLY CONTAINED WITHIN THE EXISTING CARMEUSE PROPERTY. THE LAND DISTURBANCE FOR THIS PROJECT IS 4.03 ACRES. EXISTING SITE CONDITIONS THE EXISTING SITE AREA IS LOCATED ON TWO SEPARATE PARCELS CONTAINING 539.45 AND 258.86 ACRES EACH. A SMALL PORTION IS LOCATED ON THE 258.86 ACRE PARCEL AT THE END OF THE EXISTING BERM AND THE MAJORITY IS LOCATED ON THE 539.45 ACRE PARCEL. THE SITE IS CURRENTLY VACANT WITH AREAS OF VEGETATION AND FEW TREES. THE SITE GENERALLY DRAINS FROM EAST TO WEST. SLOPES TYPICALLY RANGE FROM 5.0% TO 8% WITH ELEVATIONS RANGING FROM 680.0 TO 700.0 ADJACENT PROPERTY THE IMMEDIATE SITE IS BOUNDED BY VACANT FARM LAND AND THE QUARRY OPERATION. OFF-SITE AREAS THERE ARE NO OFF-SITE AREAS ASSOCIATED WITH THE PROJECT. SOILS THE USDA SOIL SURVEY MAPS THE PREDOMINANT SOILS FOR THIS SITE ARE 6C CARBO-OAKLET SILT LOAMS WITH 2 TO 15% SLOPES (HSG C) AND 32C OAKLET SILT LOAM WITH 7 TO 15% SLOPES (HSG C). THE SOILS HAVE SLOW PERMEABILITY, MEDIUM TO MODERATELY RAPID RUNOFF, HIGH SHRINK-SWELL POTENTIAL AND SEVERE EROSION HAZARD. SEE THE COVER SHEET FOR SOILS MAPPING. CRITICAL AREAS CRITICAL AREAS, IF ANY, ARE MARKED BY A STAR AND CONSIST OF 3:1 SLOPES OR GREATER. THESE SLOPES HAVE THE POTENTIAL FOR GREATER EROSION AND SHALL BE IMMEDIATELY STABILIZED AFTER REACHING FINAL GRADE. EROSION AND SEDIMENT CONTROL MEASURES UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CONSTRUCTED AND MAINTAINED ACCORDING TO THE MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. STRUCTURAL MEASURES SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES SHOWN ON THE PLANS INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND-DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. PHASE I: NO CONSTRUCTION ENTRANCE IS REQUIRED AS ALL TRAFFIC SHALL BE COMPLETELY CONTAINED WITHIN THE SITE. SILT FENCE WITH WIRE SUPPORT (3.05) SHALL BE INSTALLED AS SHOWN ON THE PLANS TO FILTER RUNOFF FROM DISTURBED AREAS BEFORE IT LEAVES THE SITE. TEMPORARY DIVERSION DIKES (3.09) SHALL BE INSTALLED TO DIVERT RUNOFF FROM UPSLOPE AREAS TO A STABILIZED OUTLET SUCH AS A SEDIMENT TRAP OR SEDIMENT BASIN. DIVERSION DIKES SHALL BE LINED WITH EC-2 FOR STABILIZATION. INLET AND OUTLET PROTECTION (3.08 & 3.18) SHALL BE PLACED AT THE ENDS OF ALL PROPOSED CULVERTS TEMPORARY SEEDING (3.31) AND/OR PERMANENT SEEDING (3.32) SHALL BE PLACED ON ALL CRITICAL SLOPES (3:1 OR GREATER) AND AS NEEDED TO STABILIZE DISTURBED AREAS. PHASE II: ALL CONTROLS INSTALLED IN PHASE I SHOULD REMAIN UNTIL THE SITE IS STABILIZED. PERMANENT MATTING, TEMPORARY SEEDING (3.31) AND/OR PERMANENT SEEDING (3.32) SHALL BE PLACED ON ALL CRITICAL SLOPES (3:1 OR GREATER) AND AS NEEDED TO STABILIZE DISTURBED AREAS. VEGETATIVE MEASURES PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN (7) DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN (7) DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN FOURTEEN (14) DAYS. PERMANENT SOIL STABILIZATION SHALL BE APPLIED TO ALL AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN SIX (6) MONTHS. TOPSOIL THAT HAS BEEN STOCKPILED SHALL BE SURROUNDED WITH SILT FENCE AND PROTECTED BY MULCH AND/OR TEMPORARY VEGETATION IMMEDIATELY AFTER GRADING. ALL EARTH BERMS, DIVERSIONS AND SEDIMENT TRAP EMBANKMENTS ARE TO BE MACHINE-COMPACTED, IMMEDIATELY SEEDED AND MULCHED (HAY MULCH OR STRAW) FOR TEMPORARY AND/OR PERMANENT VEGETATIVE COVER WITHIN FIVE (5) DAYS AFTER GRADING. MANAGEMENT STRATEGIES CONSTRUCTION SHALL BE SEQUENCED SUCH THAT GRADING OPERATIONS WILL BEGIN AND END AS QUICKLY AS POSSIBLE. THE SITE SUPERINTENDENT SHALL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL MEASURES. MAINTENANCE OF THESE MEASURES THROUGHOUT THE PROJECT ARE CRITICAL TO THE EFFECTIVENESS OF THE PROGRAM. AFTER AREAS ABOVE CONTROLS HAVE BEEN STABILIZED, THE CONTROLS SHALL BE CLEANED UP AND REMOVED. ALL CUT AND FILL SLOPES ARE TO BE SEEDED AND MULCHED WITHIN FIVE (5) DAYS OF COMPLETION OF GRADING. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED. DRAINAGE SWALES SHALL BE STABILIZED WITH CHECK DAMS UNTIL VEGETATION HAS BEEN WELL ESTABLISHED, AT WHICH TIME THE CHECK DAMS SHALL BE REMOVED. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME, OR SLOPE DRAIN STRUCTURE. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT-LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: a)NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. b)EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. c)EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF-SITE PROPERTY. d)MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION. e)RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS. f)APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOILS AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. DEVICES LISTED ABOVE ARE CONSIDERED MINIMUM EROSION AND SEDIMENT CONTROLS. ADDITIONAL CONTROL MEASURES MAY BE NECESSARY DUE TO CONTRACTOR PHASING OR OTHER UNFORESEEN CONDITIONS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ADDITIONAL MEASURES TO THOSE SHOWN, AS NEEDED, IN ORDER TO CONTROL EROSION AND CONTAIN SEDIMENT ON SITE. ALL MEASURES SHALL BE INSTALLED ACCORDING TO THE STANDARDS AND SPECIFICATIONS IN THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK.(VESCH) ANY CHANGES MADE TO THIS PLAN MUST BE RESUBMITTED FOR APPROVAL WITHOUT EXCEPTION. MAINTENANCE ALL CONTROL MEASURES SHALL BE INSPECTED DAILY BY THE SITE SUPERINTENDENT OR HIS REPRESENTATIVE AND WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN 0.5 INCHES OF RAIN PER 24 HOUR PERIOD. ANY DAMAGED STRUCTURAL MEASURES ARE TO BE REPAIRED BY THE END OF THE DAY. SEEDED AREAS SHALL BE CHECKED REGULARLY TO ENSURE THAT A GOOD STAND OF GRASS IS MAINTAINED. ALL AREAS SHALL BE FERTILIZED AND RESEEDED AS NEEDED UNTIL GRASS IS ESTABLISHED. TRAPPED SEDIMENT IS TO BE REMOVED AS REQUIRED TO MAINTAIN 50% TRAP EFFICIENCY AND DISPOSED OF BY SPREADING ON SITE. GRAVEL OUTLETS SHALL BE CHECKED REGULARLY FOR SEDIMENT BUILD-UP. IF THE GRAVEL OUTLET IS CLOGGED BY SEDIMENT, IT SHALL BE REMOVED AND CLEANED OR REPLACED IMMEDIATELY. THE CONTRACTOR IS RESPONSIBLE FOR KEEPING EXISTING PUBLIC ROADS IN A CLEAN, DUST AND MUD FREE, CONDITION AT ALL TIMES. PERMANENT STABILIZATION ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH PERMANENT SEEDING IMMEDIATELY FOLLOWING FINAL GRADING. SEEDING SHALL BE DONE ACCORDING TO STANDARD AND SPECIFICATION NO. 3.32 OF THE VESCH. PERMANENT STABILIZATION IS DEFINED AS 90% UNIFORM COVERAGE ON THE ENTIRE SITE, ABILITY TO INHIBIT EROSION AND MATURE ENOUGH TO SURVIVE, INCLUDING 2-3 INCH CUTTINGS. PHASES OF LAND DISTURBANCE ACTIVITIES 1. MANDATORY PRE-CONSTRUCTION CONFERENCE SHALL BE SCHEDULED AS REQUIRED BY REGULATIONS. 2. CLEARING AND GRUBBING FOR SEDIMENT CONTROL DEVICES ONLY. 3. INSTALLATION OF ALL PHASE I EROSION & SEDIMENT CONTROL DEVICES. 4. OBTAIN COUNTY INSPECTOR APPROVAL. 5. ROUGH GRADE SITE. 6. RESTORATION AND STABILIZATION OF DISTURBED AREAS. 7. REMOVE ALL EROSION & SEDIMENT CONTROL MEASURES WITH THE APPROVAL OF THE INSPECTOR. RE V I S E D P E R P L A N N I N G C O M M E N T S 6- 2 3 - 1 7 1 JD S 15E 13C 39B 39B 14B 36 40B 32B 5C 36 39B 39C 32C 5C 6C 5C 32B GENSTAR STONE PRODUCTS COMPANY DB 628 PG 721 M c C U N E R O A D V A . S E C . R T E . 7 5 7 433.4 ACRES M c C U N E R O A D V A . S E C . R T E . 7 5 7 EX. NON-EXCLUS I V E 200' INGRESS/EG R E S S R A I L R O A D and SPOIL BERM E A S E M E N T (DB 864 PG 1691 ) TAX MAP 90-A, PCLS 2, 4, 5, 7, 8 and 9 6ƒ : 1  ƒ       :          6   ƒ       ( CS0201 BY NO . DA T E RE V I S I O N S CA R M E U S E N A T U R A L C H E M I C A L S BE R M A E X T E N S I O N MC C U N E R O A D MI D D L E T O W N , V I R G I N I A 16 9 6 O R A N D A R O A D ST R A S B U R G , V I R G I N I A 2 2 6 5 7 CA R M E U S E N A T U R A L C H E M I C A L S EX I S T I N G C O N D I T I O N S M A P CRMU1602 1"= JDS RAM SHEET OF3 7 ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM. AL L D I M E N S I O N S M U S T B E V E R I F I E D B Y C O N T R A C T O R AN D O W N E R M U S T B E N O T I F I E D O F A N Y DI S C R E P A N C I E S B E F O R E P R O C E E D I N G W I T H W O R K 00 250'500' NOR T H                             P T M NOM AEW L O C G FOH R I V A I N I R O F F SSIONA L E N G I N E EE R EXISTING BERM A EXISTING RAILROAD TRACKS EXISTING FACILITY AND CONVEYORS PROPOS E D B E R M A E X T E N S I O N ALL SOILS INFORMATION PROVIDED WAS OBTAINED FROM THE NATURAL RESOURCES CONSERVATION SERVICE (NRCS) WEB SOIL SURVEY 2.0, FREDERICK COUNTY, VIRGINIA. SITE PLAN #24-17 RE V I S E D P E R P L A N N I N G C O M M E N T S 6- 2 3 - 1 7 1 JD S 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 0+00 1+00 2+00 2+13 0+00 1+00 2+00 2+39 24" RC P P I P E INV. O U T = 6 8 6 . 1 5 24" R C P P I P E INV. I N = 6 9 0 . 1 6 24" RC P P I P E INV. O U T = 6 8 2 . 0 7 24" R C P P I P E INV. I N = 6 8 4 . 6 0 6   ƒ       ( LOD OP LOD CIP CIP DD DD CD SF SF BERM A PROFILE EXTENSION HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 680 685 690 695 700 705 710 715 720 680 690 700 710 720 37+00 68 6 . 4 68 6 . 0 38+00 68 6 . 4 68 6 . 0 70 0 . 2 4 39+00 68 5 . 3 70 0 . 8 1 68 4 . 6 70 1 . 3 8 40+00 68 4 . 8 70 1 . 9 6 68 5 . 0 70 2 . 5 3 41+00 68 4 . 6 70 3 . 1 0 68 4 . 3 70 3 . 6 7 42+00 68 5 . 7 70 4 . 2 4 68 8 . 0 70 4 . 8 1 43+00 68 9 . 9 70 5 . 3 9 69 0 . 8 70 5 . 8 1 44+00 69 1 . 1 70 6 . 0 7 69 1 . 1 70 6 . 3 3 45+00 69 1 . 6 70 6 . 5 8 69 0 . 8 70 6 . 4 1 46+00 68 9 . 5 70 6 . 2 3 68 8 . 5 70 6 . 0 6 47+00 68 9 . 0 70 5 . 8 8 69 0 . 2 70 5 . 9 0 48+00 69 0 . 7 70 7 . 0 7 69 1 . 7 70 8 . 2 3 49+00 69 3 . 3 70 9 . 4 0 69 4 . 9 71 0 . 5 7 50+00 69 5 . 9 71 1 . 7 4 69 6 . 5 71 2 . 9 1 51+00 69 7 . 7 69 8 . 3 52+00 69 7 . 4 FINISHED GRADE ALONG BERM A EXTENSION EXISTING GRADE ALONG BERM A 1.14% 0.51%-0.36% 2.34% 3 : 1 G R A D E ST A 3 8 + 2 8 . 9 9 EL E V 7 0 0 . 0 0 ST A 4 3 + 2 6 . 7 6 EL E V 7 0 5 . 6 9 ST A 4 5 + 0 0 . 9 6 EL E V 7 0 6 . 5 9 ST A 4 7 + 4 2 . 5 8 EL E V 7 0 5 . 7 2 STA 50+50 ELEV 712.91 ST A 5 0 + 9 5 . 9 2 EL E V 6 9 7 . 6 3 EXISTING GRADE STA:46+46.64 STORM PIPE #2 AT BERM CENTERLINE STA:41+10.47 STORM PIPE #1 AT BERM CENTERLINE CS1501 BY NO . DA T E RE V I S I O N S CA R M E U S E N A T U R A L C H E M I C A L S BE R M A E X T E N S I O N MC C U N E R O A D MI D D L E T O W N , V I R G I N I A 16 9 6 O R A N D A R O A D ST R A S B U R G , V I R G I N I A 2 2 6 5 7 CA R M E U S E N A T U R A L C H E M I C A L S BE R M G R A D I N G & E R O S I O N & S E D I M E N T C O N T R O L CRMU1602 1"= JDS RAM SHEET OF4 7 ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM. AL L D I M E N S I O N S M U S T B E V E R I F I E D B Y C O N T R A C T O R AN D O W N E R M U S T B E N O T I F I E D O F A N Y DI S C R E P A N C I E S B E F O R E P R O C E E D I N G W I T H W O R K 00 50'100' NOR T H                             P T M NOM AEW L O C G FOH R I V A I N I R O F F SSIONA L E N G I N E EE R BERM A-TYPICAL SECTION EXISTING RAILROAD TRACKS TIE NEW BERM EXTENSION INTO EXISTING BERM PLAN VIEW AT 1"=60' PROPOSED BERM A EXTENSION PROVIDE POSITIVE DRAINAGE @ MINIMUM 2% SLOPE TO PROPOSED CULVERT. OUTLET PROTECTION STANDARD EC-1 TYPE A D=6" L=15 FT. W=17 FT. OUTLET PROTECTION STANDARD EC-1 TYPE A D=6" L=15 FT. W=17 FT. BOTH SIDES OF BERM A EXTENSION SIDESLOPES TO BE COVERED WITH EC-2 SITE PLAN #24-17 RE V I S E D P E R P L A N N I N G C O M M E N T S 6- 2 3 - 1 7 1 JD S 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 60+00 61+00 62+00 63+00 64+00 0+00 1+00 2+00 2+13 0+00 1+00 2+00 2+39 24" RC P P I P E INV. O U T = 6 8 6 . 1 5 24" RC P P I P E INV. IN = 6 9 0 . 1 6 24" RC P P I P E INV. O U T = 6 8 2 . 0 7 24" RC P P I P E INV. IN = 6 8 4 . 6 0 6ƒ     :           6   ƒ       ( LOD LOD CS9001 BY NO . DA T E RE V I S I O N S CA R M E U S E N A T U R A L C H E M I C A L S BE R M A E X T E N S I O N MC C U N E R O A D MI D D L E T O W N , V I R G I N I A 16 9 6 O R A N D A R O A D ST R A S B U R G , V I R G I N I A 2 2 6 5 7 CA R M E U S E N A T U R A L C H E M I C A L S SI T E D R A I N A G E P L A N CRMU1602 1"= JDS RAM SHEET OF5 7 ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM. AL L D I M E N S I O N S M U S T B E V E R I F I E D B Y C O N T R A C T O R AN D O W N E R M U S T B E N O T I F I E D O F A N Y DI S C R E P A N C I E S B E F O R E P R O C E E D I N G W I T H W O R K 00 100'200' NOR T H                             P T M NOM AEW L O C G FOH R I V A I N I R O F F SSIONA L E N G I N E EE R EXISTING RAILROAD TRACKS TIE NEW BERM EXTENSION INTO EXISTING BERM PROPOSED BERM A EXTENSION SITE PLAN #24-17 RE V I S E D P E R P L A N N I N G C O M M E N T S 6- 2 3 - 1 7 1 JD S 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 0+00 1+00 2+00 2+13 0+00 1+00 2+00 2+39 24" RC P P I P E INV. O U T = 6 8 6 . 1 5 24" RC P P I P E INV. I N = 6 9 0 . 1 6 24" R C P P I P E INV. O U T = 6 8 2 . 0 7 24" RC P P I P E INV. I N = 6 8 4 . 6 0 6   ƒ       ( CS6002 BY NO . DA T E RE V I S I O N S CA R M E U S E N A T U R A L C H E M I C A L S BE R M A E X T E N S I O N MC C U N E R O A D MI D D L E T O W N , V I R G I N I A 16 9 6 O R A N D A R O A D ST R A S B U R G , V I R G I N I A 2 2 6 5 7 CA R M E U S E N A T U R A L C H E M I C A L S BE R M L A N D S C A P E P L A N CRMU1602 1"= JDS RAM SHEET OF6 7 ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM. AL L D I M E N S I O N S M U S T B E V E R I F I E D B Y C O N T R A C T O R AN D O W N E R M U S T B E N O T I F I E D O F A N Y DI S C R E P A N C I E S B E F O R E P R O C E E D I N G W I T H W O R K 00 60'120' NO R T H                             P T M NOM AEW L O C G FOH R I V A I N I R O F F SSIONA L E N G I N E EE R EXISTING RAILROAD TRACKS TIE NEW BERM EXTENSION INTO EXISTING BERM PLAN VIEW AT 1"=60' SITE PLAN #24-17 RE V I S E D P E R P L A N N I N G C O M M E N T S 6- 2 3 - 1 7 1 JD S DRAINAGE PIPE 1 PROFILE HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 675 680 685 690 695 700 705 710 675 680 690 700 710 -0+25 0+00 69 2 . 0 69 2 . 0 0 69 0 . 1 69 0 . 1 3 1+00 68 8 . 9 68 8 . 9 0 68 7 . 0 68 7 . 0 0 2+00 68 5 . 2 68 5 . 1 8 DRAINAGE PIPE 2 PROFILE HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 675 680 685 690 695 700 705 710 675 680 690 700 710 -0+25 0+00 68 8 . 7 68 8 . 6 6 68 7 . 1 68 7 . 1 1 1+00 68 5 . 6 68 5 . 5 6 68 4 . 2 68 4 . 1 5 2+00 68 2 . 4 68 2 . 4 3 2+25 68 2 . 0 68 1 . 9 6 120 L F 2 4 " R C P @ 3 . 3 5 % 3: 1 2 : 1 BERM A EXTENSION BERM A EXTENSION 127 LF 2 4 " R C P @ 2 . 0 0 % 3:1 2 : 1 INV. OUT=682.07 INV. IN= 684.60 INV. OUT=686.15 INV. IN= 690.16 STA:0+66.21 ELEV:684.60 TOP OF BERM A EXTENSION STA:1+92.88 ELEV:682.07 STA:1+68.62 ELEV:686.15 STA:0+49.09 ELEV:690.16 -6 . 9 3 % TOP OF BERM A EXTENSION CS6001 BY NO . DA T E RE V I S I O N S CA R M E U S E N A T U R A L C H E M I C A L S BE R M A E X T E N S I O N MC C U N E R O A D MI D D L E T O W N , V I R G I N I A 16 9 6 O R A N D A R O A D ST R A S B U R G , V I R G I N I A 2 2 6 5 7 CA R M E U S E N A T U R A L C H E M I C A L S CRMU1602 1"= JDS RAM SHEET OF7 7 ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM. AL L D I M E N S I O N S M U S T B E V E R I F I E D B Y C O N T R A C T O R AN D O W N E R M U S T B E N O T I F I E D O F A N Y DI S C R E P A N C I E S B E F O R E P R O C E E D I N G W I T H W O R K                             MI S C E L L A N E O U S D E T A I L S P T M NOM AEW L O C G FOH R I V A I N I R O F F SSIONA L E N G I N E EE R Compacted Soil SOURCE: VA. DSWC 4.5' min. 18" min. Flow PLATE 3.09-1 PLATE. 3.08-1 NOTES: 1. APRON LINING MAY BE RIPRAP, GROUTED RIPRAP, GABION 2. La IS THE LENGTH OF THE RIPRAP APRON AS CALCULATED 3. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER, BUT NOT KEY IN 6"-9"; RECOMMENDED FOR ENTIRE PERIMETER KEY IN 6"-9"; RECOMMENDED FOR ENTIRE PERIMETERSECTION A-A PLAN VIEW SECTION A-A BASKET, OR CONCRETE. USING PLATES 3.18-3 AND 3.18-4. LESS THAN 6 INCHES. Source: Va. DSWC d o A FILTER CLOTH FILTER CLOTH L a PLAN VIEW A od o3d 0 % Plate 3.18-1 PIPE OUTLET TO WELL 0 % d DEFINED CHANNEL A (MIN.)o3d AREA WITH NO DEFINED A CHANNEL PIPE OUTLET TO FLAT L a d STORM PIPE PROFILES 2 ACRES OR LESS OF DRAINAGE AREA: 2-10 ACRES OF DRAINAGE AREA: (DOWNSTREAM VIEW) (DOWNSTREAM VIEW) FILTER CLOTH (OPTIONAL) COARSE AGGREGATE VDOT #1 SOURCE: VA. DSWC FLOW 6" FILTER CLOTH (OPTIONAL) COARSE AGGREGATE VDOT #1 FLOW 6" PLATE. 3.20-1 CLASS I RIPRAP 2: 1 3' 3' 2: 1 3' 3' SITE PLAN #24-17 RE V I S E D P E R P L A N N I N G C O M M E N T S 6- 2 3 - 1 7 1 JD S