Loading...
HomeMy WebLinkAbout11-02 PC Staff ReportPC REVIEW: 10/16/02 BOS REVIEW: 11/13/02 CONDITIONAL USE PERMIT #11-02 SHENANDOAH GAS COMPANY Telecommunications Facility LOCATION: This property is located at 350 Hillandale Lane. MAGISTERIAL DISTRICT: Shawnee PROPERTY ID NUMBED: 63-2-A PROPERTY ZONING & PRESENT USE: Zoned M1 (Light Industrial) District; Land Use: ADJOINING PROPERTY ZONING & USE: Zoned M1 (Light Industrial) District, Land Uses: Commercial and Agricultural PROPOSED USE: 120 -foot monopole -type telecommunications facility REVIEW EVALUATIONS: Virginia Dept. of Transportation: The application for a conditional use permit for this property appears to have little measurable impact on Route 847, the VDOT facility which would provide access to the property. Existing entrance is adequate for proposed use; however, should use ever expand in the future, the entrance may have to be upgraded to VDOT minimum commercial standards. Inspections Department: Structure shall comply with The Virginia Uniform Statewide Building Code and Section 312, Use Group U (Utility and Miscellaneous) of The BOCA National Building Code/ 1996. Structural plans submitted for permit application shall be sealed by a Virginia -licensed design professional. Please note the requirements in Chapter 17, Special Inspections, for this type structure, soils, concrete, bolts, etc. CUP #11-02, Shenandoah Gas Co. Page 2 October 7, 2002 Fire and Rescue: Emergency vehicle access is adequate; no additional comments. Plan approval is recommended. Winchester Regional Airport: Please see attached letter from Serena R. Manuel, Executive Director, dated 10/03/02. Planning and Zoning: The Frederick County Zoning Ordinance allows for Commercial Telecommunication Facilities in the M1 (Light Industrial) Zoning District with an approved Conditional Use Permit. The Frederick County Zoning Ordinance specifies that a CUP for a commercial telecommunication tower may be permitted provided that residential properties, land use patterns, scenic areas and properties of significant historic values are not negatively impacted. Furthermore, additional performance standards shall apply to the CUP review in order to promote orderly economic development and mitigate the negative impacts to adjoining properties. The proposed telecommunication facility will be located on a 10.9 -acre site located on Hillandale Lane, adjacent to Interstate 81. The property is owned by Washington Gas and the applicant proposes to build a 120 -foot monopole -type telecommunication facility. The proposed facility would replace two existing structures on the property. These two structures include a 42 -foot lattice tower and a 110 -foot monopole tower, and make up Shenandoah Gas's internal communication system. The two structures are outdated and do not provide enough capacity for the company. Expansion of the existing towers is not feasible and the gas company would also like to upgrade technologically. The proposed telecommunications facility would also be designed to accommodate commercial telecommunication carriers and would be constructed to support an extension to 180 feet high. However, this CUP application is only for a 120 -foot monopole tower. Another CUP application would be necessary for extension of the tower. The proposed setbacks for this facility are approximately 300 feet from Hillandale Lane, 152 from the rear property line, 337 feet from the right property line, and 595 from the side property line. Therefore, the proposed location of the structure would comply with the setback requirements even if it was eventually built to 180 -feet. The applicant has provided an explanation why it is not possible to utilize existing structures and has adequately illustrated the need for a telecommunication facility to serve Shenandoah Gas business operations. The zoning ordinance requires appropriate landscaping and opaque screening to ensure that equipment buildings and other accessory structures are not visible from adjoining properties and roadways; this will be addressed at the time of site plan review. CUP #11-02, Shenandoah Gas Co. Page 3 October 7, 2002 STAFF CONCLUSIONS FOR THE 10-16-02 PLANNING COMMISSION MEETING: Staff believes that this application for a Commercial Telecommunication Facility has adequately addressed the requirements of the Zoning Ordinance. Should the Planning Commission find this use appropriate, the following conditions of approval would be appropriate: All Zoning Ordinance requirements and review agency comments shall be addressed and complied with at all times. 2. The tower shall be available for co -locating personal wireless services providers. 3. A minor site plan shall be approved by the County. 4. The tower shall be removed by the applicant or property owner within twelve (12) months of abandonment of operation. Existing towers on the site shall be removed within three (3) months after construction of the proposed tower, to allow time for transfer of existing communication equipment to the new tower. 6. In the event a telecommunication tower is not erected within twelve (12) months of the approval of this Conditional Use Permit, then the Conditional Use Permit will be deemed invalid. 0:\Agendas\COMMENTS\CUP's\2002\Shenandoah Gas Co.. wpd