Loading...
HomeMy WebLinkAbout03-18 CommentsMC CART HY &AKE RS,, ATTORNEYS AND COUNSELLORS AT LAW January 22, 2018 Board of Zoning Appeals of Frederick County, Virginia Via hand delivery 107 N. Kent Street Winchester, Virginia 22601 RE: Lot 72, Plat 4, Section 23, Shawnee Land Subdivision, Frederick County PIN 491302 123 72 (the "Property") Dear Members of the Board: This firm represents Rockwood 72, LLC ("Rockwood"), the owner of the above - referenced Property. This letter will serve to summarize the basis for Rockwood`s appeal. I. Rockwood's Status as an Aggrieved Party For the reasons stated herein, Rockwood is an aggrieved party for the purposes of Section 15.2-2311 of the Code of Virginia (1950, as amended). "In order for a petitioner to be `aggrieved,' it must affirmatively appear that such person had some direct interest in the subject matter of the proceeding that he seeks to attack." Virginia Beach Beautification Com'n v. Board of Zoning Appeals of City of Virginia Beach, 231 Va. 415, 419, 344 S.E.2d 899, 902 (1986). As set forth herein, the adverse decision rendered by the County gives Rockwood a direct interest in this matter and standing to pursue this appeal. II. Timeline of Relevant Events By letter dated May 22, 2017, the County advised Rockwood of a complaint it had received on April 19, 2017, regarding the construction of the Tower, This May 22, 2017 letter advised Rockwood of inspection requirements from the Virginia Uniform Statewide Building Code which the County believes were applicable to the construction of the Tower and asked Rockwood to submit any documentation it believed exempted the Tower from said requirements. A true copy of this May 22, 2017 letter is attached hereto as Exhibit 1. Thereafter, on or about May 31, 2017, Beau Correll, Esquire, who represented Rockwood at that time, met with Mark Fleet, County Building Code Official, and Erin Swisshelm, Esquire, Assistant County Attorney. During this meeting, Mr. Fleet and/or Ms. Swisshelm, on behalf of the County, agreed to stay enforcement action and advised Mr. Correll of four items that Rockwood would need in order to have the Tower approved: 1. Building/electrical permits; 2. Statement of intent from Michael Wolff, President of a local amateur radio group; 3. Opinion from structural engineer on foundation and fall radius; and 4. Engineering design documents. 302 W. Boscawen St., Winchester, VA 22601 I T: 540.722.2181 I F: 540.722.2381 l mccarthyakers.corn Offices throughout Northern Virginia and the Shenandoah Valley Board of Zoning Appeals of Frederick County, Virginia January 22, 2018 Page 2 These four elements were presented to Mr. Correll as mere formalities and that there would be no problem with getting the proper approval provided these steps were followed. Mr. Fleet and/or Ms. Swisshelm also advised Mr. Correll that because the Tower is not for commercial use, a conditional use permit is not required. Mr. Correll is available to testify at the hearing of this matter to provide the Board with his summary of what transpired at this meeting. On June 13, 2017, Rockwood contacted Mr. Fleet by e-mail to determine what it would need to submit for approval of the Tower. By e-mail on June 14, 2017, Mr. Fleet advised that Rockwood would need "an engineer designed set of plans, a plot of the property showing the location on the property[,] ... a completed permit application[, and] ... an engineer's evaluation of the foundation that was put in place." A true copy of this e-mail correspondence is attached hereto as Exhibit 2. After receiving word from the County regarding which documents were needed, Rockwood set about engaging the proper professionals it needed in order to fulfill the County's requirements. Rockwood was delayed slightly in this process due to the schedule of its chosen engineer, Blue Ridge Design, Inc. ("BRD"). Rockwood ultimately met with BRD's engineer, Ned Cleland, on July 14, 2017, to review all documents pertinent to the Tower and the County's requirements. Rockwood engaged BRD's services and requested that Mr. Cleland contact Mr. Fleet to advise that BRD would be involved in the Tower project to provide the required engineering documentation. By letter dated July 18, 2017, Mr. Fleet advised Rockwood that it had five (5) days to submit the application for the building permit or else the matter would be turned over to the County Attorney for legal action. A true copy of this letter is attached hereto as Exhibit 3. In response, Rockwood contacted Mr. Fleet by e-mail on July 24, 2017, to advise of the delays in retaining BRD's services and of the status of the work on Rockwood's end. A true copy of this e-mail correspondence is attached hereto as Exhibit 4. In light of the circumstances detailed in Rockwood's e-mail of July 24, 2017, Mr. Fleet agreed to grant an extension to August 31, 2017. BRD's engineering work with respect to the Tower and the Property was conducted in August 2017. BRD submitted its evaluation report to Mr. Fleet on or about August 29, 2017; thereafter, Mr. Fleet contacted Rockwood to request a building permit application with a deadline of September 29, 2017. Rockwood, after incorporating BRD's engineering work, submitted its building permit application (#0000727-2017) on or about September 25, 2017, a true copy of which is attached hereto as Exhibit 5. In response to the building permit application, by letter dated October 26, 2017, Mark R. Cheran, Zoning Administrator, advised Rockwood of two alleged violations of the County Zoning Ordinance's provisions on setbacks — one for the Tower and one for an accessory building located on the Property. A true copy of this letter is attached hereto as Exhibit 6. Rockwood appealed this decision to the BZA on November 27, 2017. �I Board of Zoning Appeals of Frederick County, Virginia January 22, 2018 Page 3 Thereafter, Rockwood received another letter from Mr. Cheran dated December 21, 2017, which purported to withdraw his decision of October 26, 2017, thereby rendering moot Rockwood's appeal of that decision. A true copy of this letter is attached hereto as Exhibit 7. Mr. Cheran's withdrawal of his prior decision purports to be based on fact that an amateur radio tower "is not a permitted use in the R-5 zoning district" as laid out in Section 165-502.04 of the Frederick County Zoning Ordinance (the "Ordinance"). Mr. Cheran's letter of December 21, 2017, is itself an administrative determination (the "Decision") and is the decision Rockwood is appealing in this proceeding. III. Legal Argument and Conclusion The Decision relies exclusively on Section 165-502.04 of the Ordinance for the finding of violation on the part of Rockwood, stating that because an amateur radio tower is not listed as a permitted use in that Section, a building permit cannot be issued and the Tower must be removed. Section 165-502.04 of the Ordinance outlines the permitted uses for lots zoned R-5 primarily by reference to Section 165-402.02, which outlines permitted uses for the RP district. Neither section addresses specific personal structures that are precluded on lots zoned R-5, but instead outlines general categories of uses. Section 165-402.02 specifically states that accessory structures, of which the Tower is one, are permitted. Furthermore, as outlined above, Mr. Fleet, as the County's Building Code Official, made certain representations to Rockwood and its attorney, Beau Correll, Esquire, regarding the procedure for obtaining proper approval from the County for the Tower. Chief among these representations was the statement that a building permit would be issued, that only the items enumerated above would be necessary to obtain approval for the Tower, and that these items were mere formalities in light of the fact that the Tower had already been constructed. At no point during any of the discussions with Mr. Fleet and other County representatives was the issue of setbacks mentioned. Rockwood and its representatives, both verbally and in writing, requested the list of items needed for final approval of the Tower. In response, Mr. Fleet advised of the documents enumerated above and listed in the attached Exhibit 2, with the representation that these items were all that were needed to gain final approval of the Tower. Given the representations of its building code official, Mr. Fleet, that the required items were mere formalities and the lack of discussion regarding setbacks, we believe that the County is estopped from now arguing that the Tower is not permitted. Rockwood expended significant time and resources While the estoppel argument detailed above is our client's primary basis for arguing that the adverse decision be overturned on appeal, we also believe that the fact that the Tower is not a commercial tower and is for amateur use only should count in Rockwood's favor. Rockwood acknowledges that Section 165-201.03 of the Frederick County Zoning Ordinance does not distinguish between commercial and amateur radio towers (as it appears to for "telecommunication facilities"). However, this tower is designed to be used by amateur radio enthusiasts throughout Frederick County and the surrounding areas and not by any commercial Board of Zoning Appeals of Frederick County, Virginia January 22, 2018 Page 4 groups. Attached hereto as Exhibit 8 is an e-mail letter from Michael Wolff, President of the Blue Avalanche Communication Group and a member of many other local and national amateur radio organizations, in support of the Tower and what it represents to the area. As the Board no doubt is aware, FCC regulations offer robust protection for owners to erect amateur radio antenna structures. FCC regulations protect owners' ability to erect amateur radio facilities "at heights and dimensions sufficient to accommodate amateur service communications." 1 State and local regulation "must not preclude amateur service communications. Rather, it must reasonably accommodate such communications and must constitute the minimum practicable regulation" to meet the government's purpose.2 On behalf of our client, thank you for your consideration of this matter. We look forward to addressing these matters at an upcoming hearing of the Board. �Very truly yours, Matthew S. Akers MSA/aph Enclosures as stated cc: Client 1 47 C.F.R. § 97.15, available at https://www.law.cornell.edu/cfr/text/47/97.15 2 Id.; see also PR13-1, 101 FCC 2d 952 (1985), available at https://www.fcc.gov/wireless[bureau-divisions/mobility- division/amateur-radio-service/prb- 1- 1985 EXHIBIT 1 COUNTY of FREDERICK Inspections Department Marie A. Fleet, Building official 540-665-5650 Certified Fax 540-6780682 May 22, 2017 Rockwood 72, LLC 2979 Valley Avenue Winchester, Va. 22601 Re: Shawneeland lot 72, Tax map number 49€302-123-72 Dear Property Owner, On April 19, 2017 our office received a complaint that a radio tower had been constructed without the proper permits or inspections. Upon arrival it was noted by our code enforcement inspectors that a tower had been constructed. Vrginia'Undbrm Statew€de ftltdlhg ode, Section 3.438.1 When applications are required. Application for a permit 'shall' be=made, to the building official and'a permit shall be obtained prior to the cohr menc'ement of - any d'f•the fofiomi!69�activities, except ihat4ppli6ations for -emergency construction, alterations or equipment replacement shall be submitted by the end of the first working day that follows the day such work commences. In addition, the'iuilding official may authorize work to commence pending the receipt of an application or the issuance of a permit. 1. Construction or demolition of a building or structure, installations or alterations involving (€) the removal or addition of any wall, partition or portion thereof, (ii) any structural component, (fil) the repair or replacement of any required component of a fire or smoke rated assembly, (iv) the alteration of any required means of egress system, (v) water supply and distribution system, sanitary drainage system or vent system, (vi) electric wiring, (vii) fire protection system, mechanical systems or fuel supply systems or (viii) any equipment regulated by the USBC. 2. For change of occupancy, application for a permit shall be made when a new certificate of occupancy is required under Section 103.3. 3. Movement of a lot tine that increases the hazard to or decreases the level of safety of an -existing building or structure in comparison to the building code under which such building or structure was constructed. 4. Removal or disturbing of any, asbestos containing materials during the construction or demolition of a building -or structure, including additions: UNIFORM STATEWIDE BUILDING CODE, 5ECbON 113 INSPECTIONS 113.3; Minimum inspections: The following minimum inspections shall be conducted, by the building official when`applicable tdihe construction or permit: ' Page Iof2 1. inspection of footing excavations and reinforcement material for concrete footings prior to the placement of concrete. 2. Inspection of foundation systems during phases of construction necessary to assure compliance with this code. 3. Inspection of preparatory work prior to placement of concrete. 4. Inspections of structural members and fasteners prior to concealment. 5. Inspection of electrical, mechanical and plumbing materials, equipment and systems prior to concealment. 6. Inspection of energy conservation material prior to concealment. 7. Final inspection. If you feel your this tower Is exempt under The Virginia uniform Statewide building code section 102,3 exemptions, please submit documentation to verify the tower meets the exemption within ten (10) days fromthe-receipt of this -letter -or apply forthe•proper permits and,scheduie the properinspections. Please°be aware that the above Is subject to appeal under Section 119 of the Virginia Uniform Statewide Building Code. If you have any questions, please do not hesitate to contact me. Sincerely, Mark A. deet Building Code Official CC; Mark Cheran; Gary Lofton Page 2 of 2 EXHIBIT 2 Andrew P. Hill From: David Williamson<dwilliamson@CustomComputersVA.com> Sent: Wednesday, November 22, 2017 2:16 PM To: Andrew P. Hill Subject: FW: Tower From: Mark Fleet [mai to.mfieet fcva.us] Sent: Wednesday, June 14, 2017 2:04 PM To: David Williamson Subject: Tower Mr. Williamson, You will need an engineer designed set of plans, a plot of the property showing the location on the property as well as a completed permit application. Since the project was started before any permits were issued you will also need an engineer's evaluation of the foundation that was put in place with no footing inspection. Mark A. Fleet Building Code Official Frederick County, Va. 107 N. Kent St. Winchester, Va. 22601 (540)665-5650 1 EXH IBIT 3 Certified Second Notice July 18, 2017 Rockwood 72, LLC 2979 Valley Avenue Winchester, Va. 22601 Re: Shawneeland lot 72, Tax map number 491302-123-72 Dear Property Owner, -viii i of FREDERICK Inspections Department Pular k A. Fleet, Building Official 540-665-5650 Fax 540-678-0682 On April 19, 2017 our office received a complaint that a radio tower had been constructed without the proper permits or inspections. Upon arrival it was noted by our code enforcement inspectors that a tower had been constructed. Virginia uniform Statewide Building Code, Section 108.1 When applications are required. Application for a permit shall be made to the building official and a permit shall be obtained prior to the commencement of any of the following activities, except that applications for emergency construction, alterations or equipment replacement shall be submitted by the end of the first working day that follows the day such work commences. In addition, the building official may authorize work to commence pending the receipt of an application or the issuance of a permit. 1. Construction or demolition of a building or structure. Installations or alterations involving (i) the removal or addition of any wall, partition or portion thereof, (ii) any structural component, (iii) the repair or replacement of any required component of a fire or smoke rated assembly, (iv) the alteration of any required means of egress system, (v) water supply and distribution system, sanitary drainage system or vent system, (vi) electric wiring, (vil) fire protection system, mechanical systems or fuel supply systems or (viii) any equipment regulated by the USBC. 2. For change of occupancy, application for a permit shall be made when a new certificate of occupancy is required under Section 1.03.3. 3. Movement of a lot line that increases the hazard to or decreases the level of safety of an existing building or structure in comparison to the building code under which such building or structure was constructed. 4. Removal or disturbing of any asbestos containing materials during the construction or demolition of a building or structure, including additions. UNIFORM STATEWIDE BUILDING CODE, SECTION 313 INSPECTIONS Page 1 of 2 113.3 Minimum inspections. The following minimum inspections shall be conducted by the building official when applicable to the construction or permit: 1. Inspection of footing excavations and reinforcement material for concrete footings prior to the placement of concrete. 2. Inspection of foundation systems during phases of construction necessary to assure compliance with this code. 3. Inspection of preparatory work prior to placement of concrete. 4. Inspections of structural members and fasteners prior to concealment. S. Inspection of electrical, mechanical and plumbing materials, equipment and systems prior to concealment. 6. Inspection of energy conservation material prior to concealment. 7. Final inspection. This office hereby directs you to apply for the proper permits within five (5) days upon receipt of this letter, Failure to comply will result in this matter being forwarded to the County Attorney for appropriate legal action. Respectfully, ,f Mark A. Fleet Building Code Official CC: Mark Cheran; Gary Lofton Page 2 of 2 EXHIBIT 4 Andrew P. Hill From: David Williamson<dwilliamson@CustomComputersVA.com> Sent: Wednesday, November 22, 2017 2:16 PM To: Andrew P. Hill Subject: FW: Re: Tax Map 49602-123-72 Attachments: 0158_170724134937_001.pdf Importance: High ... . From: David Williamson Sent: Monday, July 24, 2017 2:20 PM To: mfleet@fcva.us Cc: beau@correllfirm.com; Cleland, Ned Subject: Re: Tax Map 49602-123-72 importance: High Mr. Fleet et al, I am in receipt of your letter dated July 18, 2017. As was stated in your previous email to me on June 14, 2017, "You will need an engineer designed set of plans, a plot of the property showing the location on the property as well as a completed permit application. Since the project was started before any permits were issued you will also need an engineer's evaluation of the foundation that was put in place with no footing inspection." On June 27, 20171 sent an email to Betty Cleland with Blue Ridge Design, a local structural engineering firm that I have used for other previous projects. The purpose of my email was to engage their firm for the purposes highlighted above from your email correspondence. On July 4, 2017 1 received a reply from Mrs. Cleland, informing me that due to staff vacations and her husband, Ned Cleland, being out of the country for another project, it would be a little while before someone would be available to meet with, and potentially assist on this project. I replied to her email on July 5, 2017 and thanked her for the reply and asked her what the next step would be and told her I felt most comfortable engaging their firm since I knew the quality of work produced. On July 6, 20171 received a reply back from her with the following information: From., Cleland, Betty mailto:bfclelancl brd-inc.c `rrrn Sent" Thursday, July 06, 2017 11:48 AM To: David Williamson Subject RE: Structural analysis David, I just spoke Leith Ned and if you want him to do this, he will try to get to itthis month. Since l do not check my email x drned@brd-inc.com He will address this asap. Betty I then sent an email directly to Ned Cleland on July 13, 2017, requesting a meeting at his earliest available time. He replied back to me on July 14, 2017 with the following information: 1 ---- Original message ------ From: "Cleland, Nevi" <d ed.+&brd-inc.com> Date: 2017/071114 7:09 AM (GMT -05:00 To: David Willianmson <d-"illiamson CustomcogiputersVA com> Subject: RE: Structural analysis David, I amn traveling to a project this morning, and I expect to be back in the office by 2:30, so vve could meet after th On Monday. I have an opening alter 3:30. I can schedule for any time on Tuesday, Ned NL Cleland, Ph.D., P.E. Flue Ridge Design, Inc. Glenrock Rouse 3 Fest Piccadilly St, 3111 Floor Winchester, 'VA 22601 540-723-0900 office I then replied back to Mr. Cleland on July 14, 2017 stating that I would come to his office later that same afternoon. I then arrived at his office around 413M on Friday, July 14, 2017, for our in-person meeting. I brought the following to that meeting to provide to him: 1. A copy of notices sent from Frederick County. 2. A copy of the complete FOIA request on this complaint. 3. A copy of the email from you, Mark Fleet, stating what was required to proceed. 4. A copy of a confidential email I received from my attorney, Beau Correll, summarizing his meeting with you and your attorney on May 31, 2017. 5. Information pertaining to the concrete footing and application process for installation of the tower. At that time I also asked Mr. Cleland to send a notification to your office that I had engaged him and his firm for the purposes of completing the required structural analysis information that was to be a prerequisite to me being able to apply for a building permit. So, one week later, Friday July 21, 2017, i receive the certified letter from your office, attached to this email, stating I had 5 days to apply for a building permit or your office was turning the matter over to the County Attorney for legal action. As I have clearly outlined above, I have done everything in my power to move this in the direction requested by your office on May 31, 2017. If you wish for me to come apply for a building permit before the required structural E analysis work has been completed, I will come down to your office and file the application, however, I will not have the structural analysis data to accompany it. Mr. Fleet, how would you like me to proceed at this point? Mr. Cleland, would you please send an official notification to Mr. Fleet's office, if you have not already done so, informing his office that I have already engaged your firm to work on this project? Mr. Correll, if you feel i have missed anything pertinent to this matter, please feel free to contact me offline to discuss and advise as needed. Thank you all for your time and attention to this matter. Regards, Hp a rt David Williamson Rockwood 72, LLC 2979 Valley Avenue Winchester, VA 22601.-2631 r (revised 8/34/17) ---� —�- PERMIT # APPLICATION FOR PERMIT (please complete the .Deck Application: Permit if applying for a deck only) Owner's Ntxe t rn nr, Address; tJ A -Al 1 TF -\f .1M3 Phone Number: . Owner's are allowed to act as their owl, contractor provided DPOR Title 54 Owner Contractor Definition is met. "Contractor's Name: Address. I liv1AG iV "111 Q1. *NOTE: If you have never obtained permits in Frederick County please attach a copy of your state contractor's license. Any jobs over $25,000 will also need a Frederick County Business License unless you are building in the Town of Middletown or the Town of Stephens City. You would then need that town's business license. All businesses in Frederick County are required to have a Frederick County Business Licenses regardless of the job value, LOCATION OFJOBSITE Subdivision: _ `Sf,�-�sz�-� Lot Number-� Street Address: Tax Map Identification Number of the Property: ... Directions to the job site: --- SETBACKS (Please indicate the actual distance measured from the structure to the property lines Front � _r .__ _ Rear kit LeiI t~ t7--5/ p p' Y ) Right -- '1' 1 E OF I'E�i7ee I'L" ISIG FOR;Y, ulldi�igElectricalMechanical Plumbing 1)N`I' " �J t er P'n of s formation Aet plans can be secured upon request. PERMIT FOR: I hereby agree to cdinA with all Ordinance as adoviedibi the C tm Applicant (print) Applicant is: Contractor *Agents, please: note that a signed at *Agent Name (print) *Agent Address (print) Name for Sign Of the Virginia Uniforin Statewide Building Code and the Zoning .:-- c. Owner Agent* Engineer/Architect r from the owner or contractor must be attached. 'Agent Contact Number and daytime telephone number ions on the'nermit anti/or construction documents. Permit Application Page Two BUILDING INFORMATION NEEDED FOR PERMITS WATER SUPPLY/SEWAGE DISPOSAL SYSTEM ❑Public Water/Sewer System, ❑Private Well/Septic MECHANICS LIEN AGENT: Mechanics Lien Agent: Address: yes— no (if yes, please complete below) ' Phone Number SIDNTLAL JOB VALUE: []New One & Two Family Dwelling 1]New Mobile/Manufacturer Horne ❑New Modular/Industrialized Home EIResidential Remodeling OResidential Addition 11 s1denti 1 Demo on requh%:s a letter from the utility providers (gas/electric) confirming the electric/gas has been removed) Master Plan Num • (if applicable) Building Size (Dimer; ' nsj – Total Square Footage of i ing Space First Floor Second Floor Bonus Room Total Square Footage ofBaseme Unfinished Square Footage Finished Square Footage Number of Stories _ Number of Bedrooms Number of Bathrooms Total Number of Rooms Garage ❑Detached OAttached Size of Gat c Deck 1 -- Length Widths _ Total Square Footage Deck 2 – Length Width Total Square Footage Porch – L,ength Width Total Square Footage Masonry Chirnney/Fireplaces MOBILE 140 S Make Model Year erial Number Length dth _ Number ber of Bedrooms Number of Bathrooms _,_______ Type of Heat COMMERCIAL. JOB VALUE: ❑New ❑Addition ❑Remot1ing ❑Demolition (requires a letter from the utividers (gas/electric) confirming the electric/gas has been removed, Additionally, Demolition/Additions/Remodeling permits on buildings constructed prior to January 1, 19$5 requires Asbestos affidavit) Total Square Footage of Building Building Size _ Number of Stories Number of Bathrooms Total Number of Rooms Use Group Occupant Load Upon request, Technical Review Committee meetings for projects with site plans and pre -permit evaluations of existing structures prix to renovations, additions and change of use are available Permit Application Page Three SIGNS (please provide the following information for each sign) JOB VALUE TOTAL Type of Sign ❑Wall Sign Size (Dimensions) Square Footage of Front of Structure (if wall sign) QFreestanding` (provide height measured from ground to top of sign) � feet Sign Size (Dimensions) (*Freestanding signs require a plat/drawing showing the location of the sign and the distance from the property line/roadway(s) Marking & Listing Number "1LECTRICAL PERMIT JOB VALUE: RESIDENTIAL Amp Service?, New R— Upgrade ❑Reconnection For Additions/Remodeling:�Nun�b of Switchc§� Lights Receptacles Size of sub -panel if adding one COMMERCIAL, (please list equipment below and provide 2 sets of plans*) JOB VALUE:"` Amp Service Number of Switches Lights Receptacles (Quantities are required foi• permit submittal and shall be received prior to review of plans) Size of sub -panel if adding one DFire Alarm (please provide 4 sets of plans* and equipment specifications) (Commercial - List all equipment, motors, and wiring — attached sheet if needed) PLUMBING PERMIT: JOB VALUE: �� _ ❑Residential 0 Commercial (please provi e 2 sets of the plans` for Commercial applications (list number of fixtures by each) Bath Sink/BasinsDishwasher Floor Drains Fountains Garbage Disposal M Grease Traps Laundry Tub Lawn Faucets Sewer Pump Sewer Service Shower Stall Kitchen Sinks Sump Pumps Whirlpools Tubs Urinals Wash Machine Toilet/Water Closet Water Heater Water Service Well Pump Other MECHANICAL PERMIT JOB VALUE: ORE, SIDENTIAL ® COMAJXRCI (list number of fixtures & provide 2 sets of plans*) Neat Pump Gas Furnace A C UnitGas Piping Gas Range _ Gas Logs Gas Water Heater Other Size of Tanks Under 500 Gal. _ Sprinkler System (list type) (please provide 4 sets of plans* and equipment specifications) (list all equipment giving Btu's and tons) *!`MOTE: All commercial jobs for building, signs, electrical, plumbing and mechanical will need to submit 2 sets of pians. Please separate plans by trade. Sprinkler plans and fire suppression systems require 4 sets. Residential building permits for residential permits will need to submit 1 set of plans. LOT nPLAT 4 SECnON 23 SHAWNEE -LAND BACK CREEK,, DISTRICT A=27,44" FOX IN -ST. 1,0-7793� FRSDERCK COUNTY, �ARG,,JN[A v, REcovia.. PLAT, DO 3,76 PG tip, IRF N 3W-11 tRF ROUCKWOOD TRML-60' R,/'W ik r LLC- -------------- ti CDF, SURV EYP.11-4- STOPMER 0--- PURMNA-C' US, ND AN -YM RIGSSTIREEZA30WINCURVIRM .0"-Z MINE 2"w..0 Lie. Ma 2. 7JUIVE 27. JUNP 2.7, AW',O-- TUU T li AM tura UVA OR 2XCRQACSWqP-WS '5T Vr ME aAV' TOM CAVU9,91 071MR rH-,kg W, 77.42' RF LOT 72 70"MA SQ.. FT I ob! '1Y: lie iz REcovia.. PLAT, DO 3,76 PG tip, IRF N 3W-11 tRF ROUCKWOOD TRML-60' R,/'W ik r LLC- -------------- ti CDF, SURV EYP.11-4- STOPMER 0--- PURMNA-C' US, ND AN -YM RIGSSTIREEZA30WINCURVIRM .0"-Z MINE 2"w..0 Lie. Ma 2. 7JUIVE 27. JUNP 2.7, AW',O-- TUU T li AM tura UVA OR 2XCRQACSWqP-WS '5T Vr ME aAV' TOM CAVU9,91 071MR rH-,kg 3 West Piccadilly Street, V Floor Winchester, VA 22601` 5Ck723-0600 , 540-723-0901 tax BLUE R IDGE E s I G , INC, TO: David Williamson, Rockwood 11 LLC From Ned Cleland Daft August 29, 2017 Re: Ham Radio Tower I have made an evaluation of the foundation and anchorage of the latticed tower as placed on Lot 72 on North Mountain. The following is a summary of that evaluation. I have attached documents and calculations that were used or developed with my evaluation of the tower base support. I visited the site to make measurements and to verify conditions and to make measurements of the foundation and anchorage on Monday, August 28th. photo 1 shows the foundation view from the northwest comer. The base measures 10'-3p by 11'-10' in plan. I understand that the total thickness is four feet. An e-mail from Craig Holman dated May 10, 2017, the weight of the tower base was stated to be 06,000 ltks„ which would be equivalent to 3.62 ft. depth, s0 the base is checked for this range. There are piles of spoil from the excavation that are consistent with the size of the excavation, and also show that the base is weathered shale with some well - distributed clay fines. I also verged the field -installed base anchor size (e in, dia.) and locations to permit evaluation of the anchorage to concrete, 1 have revleYtled tI a drawings and prepared calculations for the tower wind loads. The first six pages of the attached material are the drawings with layout and member sizes of the tower sections that were assembled to farm your tower. I have used these to determine the exposed areas for wind loading. The assembly of five sections of 20 ft. length makes the tower, These segments are labeled 7N, 6N, 5N, 4N, and 3N. The drawings provide the diameter of the three comer pipes and the angle leg widths or rod diameters for the cross bracing for each of the three tower faces. The sizes are increased based on ASCE 7 wind resistance factors based on section shapes and a ratio, E, of net area to gross area and include a factor for the effects of the resistance of the tower faces at angle with a fiat face. The second six pages are from my evaluation of the location of the tower lot from the tax maps and from Google Earth. I use the Google Earth location to determine the topographic elevations to determine the effects of placement downhill from the North Mountain ridge on the wind loading. With the longitude and latitude of the site determined, I used the new ASCI* 7 Hazards assessment program to determine the design wind speed and ice accretion for the site. I used a low hazard category for wind speed since this structure is isolated and has low risk for loss of life or damage to property from failure. Pages from the Hazard Report are also attached. The ice accretion for this site is 1 in., but the wind speed associated with the ice event is only 30 mph and so the enlarged exposure area does not control the wind design loading. ASCE 7 includes the calculation of a topographic factor for conditions where the location of the structure may cause higher pressure. I used topographic data derived from the Google Earth program, and verged with the ASCE 7 Hazard Tool to determine the ridge and valley distance and elevations on both sides of the ridge. I verified the offset of the ridge peak from the tower site when I visited the site. The governing value for the topographic effect was 2,84, increasing the base wind pressure to 82.6 psf on the effective exposed areas of each tower, segment. This wind force calculation gives a base shear of 7,892 lbs. and an ultimate base overturning moment of 211.5 ft. -kips. From this moment calculation and the spacing of the legs, the calculated potential uplift ultimate force at each leg is 37,200 lbs. You have provided an e-mail staffing that the anchor holes were drilled 18 in, and the anchors were installed with Epcon C6+ structural epoxy in accordance with the manufacturer's written instructions. Product data for this material indicates 22.6 kips per rod with 7'/ in. embedment in 2,000 psi concrete. This indicates that the design strength of the epoxy bond for four anchors is 67.9 kips, including a strength reduction factor of 0.75. For anchorage to concrete, the epoxy bond strength may not be the controlling limit to the base anchorage, The anchorage strength also depends on the strength of the bolts and the depth of anchorage and strength of the concrete into which the anchors are set. The approximate strength of the four anchor rods at each corer base limited by steel (A35 or A307 threaded rods) is 76.5 0 Page 2 kips. For the rods embedded at 7 % in. for comparison with the epoxy strength rating, the concrete break-out strength would be 29.5 kips in 3,000 psi concrete. With 9 in, embedment, the design strength is 37.4 kips, which is greater than the ultimate load. The holes were reported to be drilled 18 in, for anchorage. Installation greater than 9 in. is sufficient. The base is 10'-3" by 11'-10" in plan. For a total thickness of four feet, the base weight would be 72,800 lbs. Using the short width of the base for the critical condition, the resistance to overturning with a 10% reduction in effective base dead load is 336 ft. -kips, about 1.6 times the ultimate base moment. For the service load moment, the overturning safety factor is greater than 2.5. The maximum calculated ultimate bearing pressure under the edge of the footing is 1.95 ksf. The service load maximum is 1,16 ksf. For a base weight 66,000 lbs., the minimum resistance to overturning with 10@ dead load reduction is 304 ft. -kips, about 1.44 times the ultimate base moment. For the service load moment, the overturning safety factor is about 2.4. The maximum calculated ultimate bearing pressure under the edge of the footing is 2.13 ksf. The service load maximum is 1.12 ksf. The soil pressure calculations give bearing pressures greater than allowed for unclassified soil, but the weathered shale base in evidence at the side would have a significantly higher allowable bearing value. The moment from the tower base adds stress tot eh base concrete. i understand that the footing base is reinforced, but i have not seen the size or placement of the steel. Based on an analysis of the section as plain concrete, the maximum ultimate stress for the moment is 61 psi, tension and compression. Following the chapter in ACI 318 for plain concrete, the maximum tension stress is limited to 164 psi for 3,000 psi compression strength concrete and 134 psi for 2,000 psi concrete. The loading, then, is well within the code limits. Based on my site inspection, analysis, and evaluation, the concrete footing and field - installed anchorage to concrete meet the requirements of the building code for loading imparted by the radio tower. 0 Page 3 om4m TieciCnr eoq �etaf LASS7 orRtAo "KIl"M vnalctttc AA { (n n:) *o► I if wo. T., L NA57+ ARE IA Af�TRt.NN�WiTH,I°PP,CiAfO ATBlT742121�, "FRUC�CRFLCV:.S 11, 4. Au.AhTTla7A IMSTA{y{TjpA15 MST EE +I'AOlMOPO TOPOGptggO GAF.,'iXI1.3YF' Ig{ 1 iCi TriYj01ES5, SES^6C Ix wIiK 40CAi AF9 ru TCJrui NOES 10. r- ADITf7" 8t7(]pG �t�TpAG Ak0 Z. TG1iE31 ZES;Gys ,iatg ALLtTVNBE T AAS'ASI.RE SYI(METATC}Lq,Y #.h^.t{; cMr3hE iv.� 'w-LkiAlL55EE OH0.YlfJ10 SK720301, IL RM TAK4S) TOP OETA9SSM ORAY1VKia SKpov?. i 17E55 .�istE ChE HB'481ETOTM A'D TrJ Ii Ali17N81'S Wmi 3Y" TOP semChN At0YRtfL fY;Tu(PTT"m TAPEAFA TOP. 1R VKTS TO.T6 iEE78El:7f TP, OA£ [7E Lti FAQ1 FA{g. t AU T -AVS E PP1MOEp WTlTl gg alGGTS AKD A TAP9{Ep li ALL Tvwwks WTTN lw"Tw SECflpra MMM TOP. 5. 4Y�I1dOFTC.IQT'11+51'lE SSMPAT$.Y, 6. ASSEMe.Y OaAA'WUS$AAD Si1fCAalltYXAVM2f91+ WrRf (PM 47m) N%�ED TOP. :4, iDR ST® BOOT LE(AtlS SEE ORaM'fMI 8641254. DETAILS ARe SUPPL`EOVd7T: Tl�TOwEft, 7. CISiom OES76T5 fop S'T6-9*CV; APFUC.AMNS ;S. WAfOUt1�T.".1fi 0ETAQ555f OA6WRIG Owf-0E¢38 &YN5.t2 i5. fOR AHRiCR5ANtr °JUfif SM M7,WA:'ON SEE DPAW-11G ARE AVALLMLE UPM T, N{3RfE'tiS 056419 A'Dt8JJ41M. & ikSfAit WARNW MTS (V!N AUG} AI A wMktT �gpxtis �am3 3 T74s[SOft e .0 urs ,+ss Tt�4tLFA �'iPtrNT.M ERES.nm PROFJI 4M Pa G 90 HPE! 3-%r- W ICE Af -4A SI£S'ATTen9vaiv BAS4971,+1AYlT�,f[1 �� TOP WA N1A SZ SxJlP ffA'i;X t4 Vf;3ABHM>tl 9arTw u+-C6rm+) a yr sra r x s x a�+• t►1M: sad e4c.y3• f26cuTn7 i. Lm PART&IMIR165TOMAT TME 97T7VM of 64ai LEG M1WM= KL7JClFDATflf W7CftOFTME MCTZC;MLOA AASS@gtY. L iM€S==SAiSASEiCC':9t6':EiMKIMM ASSEMBLY FORANCHOR WLTS. MMM ARE 9API. Dem TSE NCNOR WLTS. '+ ORSMCIG 5 "TSA o 3 m9*55EM3T FUF3P 5f1 OILY, L flDMDHL 1'!ETM1t fQIRiM1YiJPiS IUSE QYiA f'00. R9'ERHtCE a/RY AFQ SM4L M1YiT � 9165TiiU':Ev SCR TI{<RSLW 9F3T sial uN.F55 aTxfALwcssAwRe+Ea tH Ro196 CIADVCT6, PSAiIc �O TPS83A74S A 1 Y b w Y. RAtif�%ATL` a a .kt TV" AM t i H vTEw ae SECTSJM ASSMY OETAAS K RSSY miss MZ A3202U smnOM ASMMSLY PJM- 7"165 BILL OF MAT9ML xtM MMMb. 4T' DEN.11tP'rtOM HT 2 Ur'SVO-7*ZM2u5kMSWF . (P'Ji91mm-Im 2 VIIMS i {AG 54IbM SST0 Ni 46h5LtiP (notsimmm S KT2 tr 8RA(E [S SSTT USz17A5.T1` it .30.3 lj � M72 6 11oKZt'65S7YU 3SL13x6A3 (I,J�]j 9 Ffl3 6 AUtp tb TSTJ u3X17z635' (139Cfi6cij 6 MN 6 WLka C6SRr LL5XIM6.W (L SdXT9x31 T M1 6 !MA[l P6557Tu.&xtJx497 P-AAb4mOj f 6 SIOp{TG T$ 9gL7AA -x 1•SMf6i— -TMUM 9 310111 12ITJT SAGA-1ALpW iM16} 10 iiGS7FP 16 °J6,YM2YSTEPFJlHN/iAV Cyu�iTaS i. Lm PART&IMIR165TOMAT TME 97T7VM of 64ai LEG M1WM= KL7JClFDATflf W7CftOFTME MCTZC;MLOA AASS@gtY. L iM€S==SAiSASEiCC':9t6':EiMKIMM ASSEMBLY FORANCHOR WLTS. MMM ARE 9API. Dem TSE NCNOR WLTS. '+ ORSMCIG 5 "TSA o 3 m9*55EM3T FUF3P 5f1 OILY, L flDMDHL 1'!ETM1t fQIRiM1YiJPiS IUSE QYiA f'00. R9'ERHtCE a/RY AFQ SM4L M1YiT � 9165TiiU':Ev SCR TI{<RSLW 9F3T sial uN.F55 aTxfALwcssAwRe+Ea tH Ro196 CIADVCT6, PSAiIc �O TPS83A74S A 1 Y b w Y. RAtif�%ATL` a a .kt TV" AM t i H vTEw ae SECTSJM ASSMY OETAAS K RSSY miss MZ A3202U Af, T t1sx_ _a�w1 TOP K/A Dur R.N dij:•XA ut•x .�iFk.1i3DEt rap(mTwl WA fau 5'XS"X °H`[P/N:$A) 1'•61hS'iLT7Em+1 .� CEG PAAT N,IAg@j ISSTAMPW AS THE BOTTOM OFF1.0f LWANTHLST BE LOaam A7 THE6 rMH OF 7%ESECMN FOR PROPER ASSMy_ L STEP BOLTS ORE PRp om ON i LEG ONLY, 3. RAVM BOOTS ARE FOR AANGE PLATES ATTNE W"Of4 OF 71$SE-aM DRAViM 15 kT.5. ANO IS FOR ASSEYsL7 P.CiP0SE5 My_ 5. MD.ipNAL WTRtc EQUTfXMTS ARa fS0.4tl FDR AEFaR81e<ONCTMASwR,L BYcyR BE 9JBST:TLTEDK1RTiEDESOtiEt� szs MESS or-eRwsf APPROVED RgiN PROIX+CTS, F,AT4T O�G f 1 TUMERA7Q5 0 a A- waxc saw FEaeNeaeotd7ff TttL nnaF eua:n� SECrWN ASSR{&Y DMLS FCR SSV 6N A78020D SECTION ASSEkfBLY AjN: �N BILL OF KATERIA! PARTNO. Qtr 1 VL34> 2 LEQ&wwsw2m275SE.N5 [P3PE512m 5T5s3. � ! iEGZAfEN25i?2tr'RS8Ett5 IP1PESiam7,3DI D Not i ;w 6 T)5566Tt,iSk1'37 S' !CAGE 055%7 Li.5>c T9X<.6P jL {C st".ij 3 wa 6 WA a DSurtt.3x:ty 6 DSSSsyµ,SicSDAS.Tr {t3dJ3AD1 j13 r3f T N55 d 21a�1 E lRRSF7�'fiaTtT;S%:T3X5.2II' n 'TA��Y7/2101•T/44C56A325 i'*3dtg j!fii7 j % - iiL63'9l 12 'TAY.I'S}676ATRx6'dA3SS ptiG*Q tc 5/8!78 ;6 8tlf-'t'R$YS'�"J'ltfX{T(D$r; {S4iEa1r`9I .� CEG PAAT N,IAg@j ISSTAMPW AS THE BOTTOM OFF1.0f LWANTHLST BE LOaam A7 THE6 rMH OF 7%ESECMN FOR PROPER ASSMy_ L STEP BOLTS ORE PRp om ON i LEG ONLY, 3. RAVM BOOTS ARE FOR AANGE PLATES ATTNE W"Of4 OF 71$SE-aM DRAViM 15 kT.5. ANO IS FOR ASSEYsL7 P.CiP0SE5 My_ 5. MD.ipNAL WTRtc EQUTfXMTS ARa fS0.4tl FDR AEFaR81e<ONCTMASwR,L BYcyR BE 9JBST:TLTEDK1RTiEDESOtiEt� szs MESS or-eRwsf APPROVED RgiN PROIX+CTS, F,AT4T O�G f 1 TUMERA7Q5 0 a A- waxc saw FEaeNeaeotd7ff TttL nnaF eua:n� SECrWN ASSR{&Y DMLS FCR SSV 6N A78020D Ar r E43YATm ym i. OARt tAm!QEk [5 SiMt»r,.' TNElR317CNOt fACJl CEG R10!I4A Ob WGT@ AT SME EOT"or THE SEMON FOR FRCWW Asofty. L fW4GEL _Ts ARE IOaRAMGC- PAID AI'ffWTTO! 17 Tit SK![._ 7. ORA51SNi S kr.S. AM t5ACp p4N/3$IRIY RA4V'$AQY. 4. NCK 4E MCEq=kW5 AREGFM FOR RF38iDKEGRCYAM UOU for EE$[t,STfTttt FM Im O'-9CIM vzu UJR,= ONC W3E NfROYW BY K""tlXiM m Bam RMeRit.f'SlNlitl iEt 4itA the 44iY3y17Z',RS?}"{R/rr NsoiT I,Yjos*m1 301TD1t .Nt4. tMs+ �{ti'XAIR'kSx P,Nt 5:845$ Y6'C1EZ:tmj sECilcxl ASSWBLY PIN.- SN SILL OF MA7ER_i4L ... iiK4 ►xRTt41X, Q>Y '(T"titk t +F.7di i ttf�i.":+'+'3V5M5=4,4fR7A'C PNt k�Cl;rta4+5%J 7 R6 7 t+ktrftYRGS33gD aRt.,AYxL4d fE�9S 3 k41 3 �AL:�'. &xS3elID ltAR a7RLit f1:DiGe� ' 4 M2 5 Im X ttt[;t',1=YRtrSYACfitttt.EK:3S {l+tRRculi;Kn+[ 3 O:tGS3Y M dRR AJ1C3.27 . i11NL1TGi t4M/nj 3 NSt3 D144S,^J7DtuR,tOtf} 3 FAO1{mR T wa 3 RtitE04iG3St'361AM1i3✓d.21 [tAR file jsroq 3 rei 9 Ib73 Y lfMG$tiRnuM.rs3Y.iA t6A1t 3WIkfi1 MRCEG74ov RO Low =Z29 110"I 1d '15, X tRRt{O:RGN.+,9A tLVt.QDR.Xttmoivw.l U S6Tt ) IItKI`Ui,A..+A'j RO I:N d7327t 'iAl.RliP 1w eq 12 AS14 7 iRtE€WS7S+k0'Sut.d3k333 is+dl?11D 74mz} . . n ml f Itl!RWA53t%00 MD's 1411533 t9WE£ OPQSW;Mm;;(117,75 iAAMRI tlR1w} :x .M47. Ib MLt S AL1riRt40 WA,*i1'2v RM$6 .a 3 lRNSt7ttA SSi001tAR.lM" pp tw"I (7 MS 7 44T/,'EOIK3.,^ 7miAfOtb3s3 14Y1k.1t50;fNR�t. Sb 1614 3 WKEam S1YRO1tXR ?47 tAut RlIT i:Tw1 r3 %sv s eR,rttr.Acasrtto4w.wua1 taArtfiorsTtx{ to mu 3 tt srra+oua maw aotaawl 2t Saa 1 DR7EE ouG�Rp iAR tDtz�s (liSRRADitlM'it 7.F � ) ptM'EtHlp^".�ytA.0 f+6.Qk%7.4T t5Yt74Rt 33araj 77 Mgt .7 ttWCtWArRSaI'rtO PYtJt2.49 t 7Atf 1dtlmt 24 NW 3 tit/Y:SSYNd Ntlld%X.^3Q Ar7k tEtiit.1 i3 24Lbt8.�. 1i. tg47gSY lf'3%77f�tsC*t3 tFT342E1 2b .2f� tr bKN,t34�51"113X&W�� PWOMRATE y 0 - . V4`frJt nmfta"^TOWER AMTS• {f{ 1 � iioo c: w •unn asa�t a,wcl wa nXt.vle%vs,�tt>vM OETA SMSSY 5N A IA ii{+ Mhd1PT 1$ SUKfp AT `,y+p 40RPt OF DO UG AAC MtbT OE WGTMAT TW l6TTM GF f!E SECT7pN:Of( PRpPpI A55ETf9l,Y. L FsJNKE e0t7s Attt fOc RIME r}TES A7?E 90TRk110 TME SMIOM. 7. 1. KWU5 $A .p D m �3l �' � WA axrzYr{rp+: sy st=tr =558+�,r� 8UTT0�! 7Yh WA #22`Y<-3fL'it 1�A%3ki RPOKrs roevt sf» rtavwtusi.swr VXTI sf AS5MY DETAILS Fm $Y fH AMID IA wSECTION AMMOLY P#tW 3wN ALL i1F MATERIU sAlrrlee. QYT -gy � Y4 1 A'Ti dW:O'SNM Vip_o6�t+oG ' }1�iKGt i# Of>;TASST IjTlltiiE AT25 [MIY'+SI v A, LEG AMn CSVAPPMAC TM[B'IYF MORbMASS AM6l4JSf BE i w4f IIT SME ffO7 R iK Tl¢ S:f:'IOM }tlR RNN[9'FRASSEMaLY. z :UWGE bXTS AM FORRAMSERATES ATTM$ SOTTM OFTME Si:tIM L OR WVZLS&TS AND 1S FOR ASSEMY PLAPO'SM ONLY. ♦. ND"DmtgEmxFfi11N/It%tRA4E MY" FOR AWBOACE WYAM AWLL LEG O.O.-15176' ROTaIRM9T77Uf8/fM TW nr.OUFD SiiES Lp@IS3 OTMWW EN"adW Bi RO1Wpoom 5. 11,4E PRATE R64t 5199 ^. P0RG4.Z4S{o1319Y Y17Pq A.A IY3tvFftAYtS f 1 ! SKTMfSSMY E51RfATLO4 vSen > DEMS RUE SSV 3M stA AW sy Bdtxx i &EEFiT i aron TOP 3NA SR'1Qsr 3"Ar$;Nlr(?8e I* rF'S4Y'sut ma x. t+1`.wri:T eoTTOM tY,A Ifz"+TO S'IvSS7Xi SE I'M- TAax] �M,r- 401 0 170 "j �- 170 PZ #49BO 123 72 0 'Outten lame Nues.Addrfts azaae VA Ptnvcat Aft"S I OM wi .k s a � w. 2�1� I' Asa: M*WNOFmm�s Location: No Address At this Location ASCE 7 Hazards Report Risk Categon : Standard Version: Elevation: 2223 ft ! ASCE;SEI 7-16 Lan:Q Soil Class: g _ Estimated (see Section Long:: - -78.378.35793 11.4.3) Elevation Reference Datum: North American Vertical Datum nf 14AA IMAVIr, aR Results: Wind Speed: 103 Vmph Data Source: ASCE/SEI 7-16, Fig, 26.5-1A Date A cessed: 7ue Aug 15 2017 Value provided Is 3 -second gust wind speeds at 33 ft above ground for Exposure C Category, based on linear interpolation between contours. Wind speeds are interpolated in accordance with the 7-16 Standard. Wind speeds correspond to approximately a 15% probability of exceedance in 50 years (annual exceedance probability = 0.00333, MRI = 300 years). Mountainous terrain, gorges, ocean promontories, and special wind regions should be examined for unusual wind conditions, ttili9}`;CCd71J�1��11.. � e Page 1 of 4 iue Aug 15 2017 r ASCM.0 AP, WAMSt7 M OF CMC ENONEEM Ice Results: Ice Thickness: 1.001n. Concurrent Temperature: 15 F Gust Speed: 30 mph Data Source: Standard ASCE/SEI 7-16, Figs. 10.2 through 10-8 Date Accessed: Tue Aug 15 2017 ice thicknesses on structures in exposed locations at elevations higher than the surrounding terrain and in valleys and gorges may exceed the mapped values. Values provided are equivalent radial ice thicknesses due to freezing rain with concurrent 3 -second gust speeds, for a 500 -year mean recurrence interval, and temperatures concurrent with ice thicknesses due to freezing rain. Thicknesses for ice accretions caused by other sources shall be obtained from local meteorological studies. ice thicknesses in exposed locations at elevations higher than the surrounding terrain and in valleys and gorses may exceed the mapped values. Snows Results: Case Study Required Elevation. Data Source: Date Accessed: 2223.0 ft ASCE/SEI 7-16, Fig. 7-1 Tue Aug 15 2017 In "Case Study" areas, site-specific case studies are required to establish ground snow loads. Extreme local variations In ground snow loads in these areas preclude mapping at this scale. Ground snow load determination for such sites shall be based on an extreme value statistical analysis of data available In the vicinity of the site using a value with a 2 percent annual probability of being exceeded (50 -year mean recurrence interval). Values provided are ground snow loads. in areas designated "case study required," extreme local variations in ground snow loads preclude mapping at this scale. Numbers in parentheses represent the upper elevation limits in feet for the ground snow load values presented. Site-specific case studies are required to establish ground snow loads at elevations not covered, httos'!lasce7hazardtool nlinel Page 3 of 4 Tua Aug 15 2017 et 9 q+ 6 F:, 4 y ^� Q� 4t' v�Orkwod t 5VIk) f AP dun 51 u dr �F tci ivx`Y Af � i btc3rsF Xjl�� � Rs S i t David Williamson From: noreply@homedepot.com Sent: Wednesday, September 27, 2017 8:08 AM To: David Williamson Subject: Order Status Update Please keep this email for your records. Please add HomeDelraot@hornedepot eon to your address book. Learn how. .,.°` Order Status Update N10re .y<iViI1i1. more O FREE SHIPPING' + 1; FREE IN STORE PICK UP Order Number: H4618-33115 Dear DAVID, Your Order Status Has Changed We have a status update for one or more items on your order. Please review your order details and keep this email for your records. Product Description S01 EDGELEY RTF MATTE WHITE storeSKU# 1001529201 Qty Fulfillment + 4& FREE RETURNS" Order Date: 09123/2017 2.00 1 PROFESSIONAL CABINET SOI. Ship to Location: 2350 LEGGE BLVD WINCHESTER, VA 22601 (540) 723-0619 Status In production Expected Arrival I 1111112017 Check your order history online at any time. Thank you again for visiting hot�tedepot Ggtrt. Sincerely, The Home Depot WINCHESTER #4618 2350 LEGGE BLVD WINCHESTER, VA 22601 (540) 723-0619 1 CLICK T4 VIEW YOUR Get Tort VWtis S Sadtros for Your Local _ t',; Store Save Big with Our e# Fj,4 CENTER Sinop Top Online Prornotion:I on Popular Products for Your Horner and Garden SAVING CENTER LQgAL AD STORE FINDER THE HOME DEPOT CREDIT CARD MANAGE MY SETTINGS Please do not reply to this email. To contact us, please call the store at (540) 723-0619. For all other store -related customer service needs: In the U.S., call 1 -800 -HOME -DEPOT (8AM to 8PM ET, Monday through Friday, 9AM to 6PM ET, Saturday and 12 PM to 6 PM ET, Sunday) View our return gaiicy. Local store prices may vary from those displayed. Products shown as available are normally stocked but inventory levels cannot be guaranteed, NOTE:AII offers may not be available in all areas. Products are currently only available for delivery to street addresses in the 48 contiguous United States. Select parcel Items can ship to Alaska & Hawaii, We cannot ship to APO/FPO, P.O.Boxes or U.S. Territories. Prices are in U.S. dollars and are subject to change without notice. 2012 Homer TLC, Inc, All rights reserved. Privacy & Security Statement iu rn ol'I:"Iti` K: 11, lit!4 irttrrrnI r=r,t�)iI is (mfidetnIi's # and fit a;r nett slit' n: i•r tr7 (Jd. it rs; inters c ?:, ! C); y a t:4.oi::i� stn thtrt5d(trr.^s;rr-: i�cr.e_.:>�. S{r!'+!�;:• unpk;01orl'-w"' !) yc,c! at C: rca.Ov..: inlenied rt.,.6 "ra, ¢tnp disdo (ue, Copy#nif. di;tlit aior, or arty ix1:01l taken (r on i;i; %3 t" r,:; 1;2:3x; i;•. : iftfilen ,+arias.,erl 0 OUr Cironl, any opinions. pr lCSvir(? gCulaine(I Irt this, t-rimil ;)r� st(bXwt to tho lerrnS and M'11'-`100_ 'i; t.i,Kn I_)�(,(a ((;oris of busiloest, orclienl Yho Home D(?rJet (jisr,?ta!nl3 all respol,5ii,iiity 8(16 i;.;f':#it✓ 7;,a ii'.%,;,::•;:!-•,;.: ,. . a! ;for (at,y tla,tn 4c* Of #osse:> ansinrt from any 011'013, virus( -t; V raw0ra?t,, tr00J i -I h(usrs, t;.tr, c.:, r,;i:c:r :ai 9a l '.t. tt.tt. \tl.ii,ie 7.?r.t J'•: i:Qrltiitr!f r{ H7 tills t31t3C#lrnb)tf Einrd :it)cll nUl tai: IinlJik; for (##?'t:Ct, lrldlte;C#, oOnS:'fjtJBnilt]( Pr C�l'Jr (tial L a7:3C�F#; !r:.,rNlt'L'i *ii r C::i't _i%'. .. tttGS.>rrdG r.>r:,#c <##rrcit;n,nt. (ht r:9it)irSttYtiQ>: in ll:i . ItltGrf Gl f�r7YRl) is Ctl) d#dt?nt#Fol a!1r� (stay i7 J #tCj;t{!y r!t(Vtleg�d !i 2s. IntGtidEd 5!'i,(!l;' #fir oleo adJresseez ACf;r;(ij ;%J �+:tF. !..i;,• ! ;, t unut;i#u?fua d if ;enj ara not the iriteniled rP,cipiFitt, rtny rfiSClOSitrt?, t�%)pying. cjoS{r butlon or hnv ilC,l;of) Nak(3n or onlWe(I to N' tove:+ ti, i:(:i; ma; he (n il�WAIAt. wttt'tn F ;rlresced 10 Our clients any opinions or a(lvice cr nnfa nGd in lht5 Email ## tate; s! )b}cr..i tc) thr Irr(ms :a,rd r ;, r i; r, I1(e { rtwt," Oopof lerrn;; of b(7 drlesa or client erirgagameni hlllrt # 10 I lo;li De;pr,t dis:"#Sine> :a{! rr,•Spt)n3ibil(ly n(r.; rt:bt!i#., fr:. t!.>: t I_fn < ° r i.i?IiiE:?filgnT 21tti{ ir,t a It di3tlta(jE8 or trxF;sos s}risinq from :any inrfc^C;n,lr;IC•S; rg)': r)r•;: "i)vsrs; f,! tn. worms. hojan #uu :�;y. ;;tr_ or otilcr •;r" U t ad, tr,:! i i,;,,! trlined in INS S1turhme nt an(t Shall (lot tib Hah#es fw dire t• inair(i0'' U:n�r•(it.)1',ntl&# n[ 2i17f!Qr,'3� 1?J;'r'4.�F •n rod-t:,.;7iC• • . { r: „•. ;i! _ t, r.: IIS In. "t "t . 2 EXHIBIT 6 Department of Planning and Development 540/ 665-5651 Fax: 540/ 6656395 CERTIFIED MAIL October 26, 2017 Rockwood 72 LLC Attn: David Williamson 2979 Valley Avenue Winchester, VA 22601 RE: Property Identification Number (PIN): 49B02-123-72 Zoning District: R-5 (Residential .Recreational Community) Dear Mr. Williamson: This letter is in response to Building .Permit #0000727-2017" applied for on September 29, 2017, and submitted to this office regarding an amateur radio tower. This tower was constructed on, the above -referenced property without a building permit. The building permit application stated the building setbacks for this tower to be: front 37 ft., rear 143 ft., right side 23 ft., and left side 49 ft. These setbacks for the 100 -foot tower are in violation of the Fre;dezick County Zoning Ordinance for the R-5 Zoning Dist?ict. Furthermore, the building permit application has included a house location survey that shows the outbuilding at 10 ft. along Ashwood Trail. This outbuilding is in violation of the setbacks for the R-5 Zoning District - In accordance with Section 165201.03 B. (1). Height limitations; exceptions of the Frederick County Zoning Ordinance, allows for radio transmission towers within the R-5 Zoning District. Provided that subsection (8) of Section 165-201.03 B. is met: If any of t the above exceptions exceed the height limitation of the proposed zoning district, the structure shall be required to be set back the normal setback or required buffer distance plus one foot for- every foot over the maximum allowed height of that zoning district. The minimum setbacks for this structure are: 90ft. front, 90ft, right side, 70ft. left side, and 1.05 ft. rear. Therefore, this structure ronstifffes a v1h)lation of Section 165-201.0313. (8) of the Frederick County Zoning Ordinanoo. In accordance with Section 165-502.04 A. Permitted uses of the R-5 Zoning District. allows for accessory stt-u.ctures (outbuilding) within the district, provided that the setbacks of the RP (Residential Performance) Zoning District are met. The setbacks for ' 107 North Kent Street, Suite 202 Winchester, Virginia 22601-5000 Page 2 Rockwood 72 LLC Re: PIN 491302-12-72 October 26, 2017 accessory structures along a right-of-way is 35 feet. Therefore, this accessory structure constitutes a violation. of Section 165-502.04 A. of the Frederick Zoning Ordinance. This office will allow thirty (30) days from the date of this Ietter to resolve this violation. Specifically, the resolution of this violation maybe accomplished by removing the two structures or placing the structures at the correct setbacks and resubmitting a building perinit for review and approval by Frederick County. Failure to comply with the Zoning Ordinance will result in a criminal complaint being fled against you. You have the right to appeal this notice of violation within thirty (30) days of the date of this letter lin accordance with Section 15.2-2311 of the Code of Virginia. This decision shall be final and unappealable if it is notappealed within thirty (30) days. Should you 1 choose to appeal, the appeal must be filed with the Zoning Administrator and. the Board of Zoning Appeals (BZA) in accordance with Article X, Section 165.1001.02 (A), of the Frederick County Zoning Ordinance. This provision requires the submission of an application form, a written statement setting forth the decision being appealed, the date of decision, the grounds for appeal, how the appellant is an aggrieved party, any other information you may want to submit, and a $300.00 filing fee ($250.00 filing fee and a $50.00 refundable sign deposit). Once the appeal application is accepted, it will be scheduled for public hearing and decision before the BZA. Please contact me regarding any questions that you may have at (540) 665-5651x.:. Sincerely, Mark R. Cheran Zoning Administrator MRCldlw cc: Mark Fleet, Building Official EXHIBIT 7 COUNTY of FREDERICK Department of Planning and Development 540/ 665-565I Fax: 540/ 665-6395 VIA EMAIL & CERTIFIED MAIL Matthew S. Akers, Esquire McCarthy & Akers 302 West Boscawen Street Winchester, VA 22601 makers@mccarthyakers.com mccarthyakers.eom Re: Property Identification Number (PIN): 49B02-123-72 ("Property") Zoning District R.-5 (Residential Recreational Community) Dear Mr. Akers: This is sent to you as counsel for Rockwood 72, LLC. After further review of Building Permit #0000727-2017 application, I have determined that a building permit cannot be issued for the construction of an amateur radio tower ("Tower") on the Property, as the Tower is not a permitted use in the R-5 zoning district (Section 165-502.04. Permitted Uses). The tower must be removed from the property. Accordingly, my administrative determination dated October 26, 2017 is hereby withdrawn, and the appeal of that administrative determination filed by you on behalf of Rockwood 72, LLC is therefore moot. A check for $250.00 will be returned to you by separate correspondence as a refund of the filing fee which was paid with the appeal. Rockwood 72, LLC has the right to appeal this administrative determination that the Tower is not a permitted use in the R-5 District and must be removed from the property within thirty (30) days of the date of this letter in accordance with Section 15.2- 2311 of the Code of Virginia. This decision shall be final and unappealable if it is not appealed within thirty (30) days. Should you choose to appeal, the appeal must be filed with the Zoning Administrator and the Board of Zoning Appeals (BZA) in accordance with Article X, Section 165-1001.02 (A), of the Frederick County Zoning Ordinance. This provision requires the submission of an application form, a written statement setting forth the decision being appealed, the date of decision, the grounds for appeal, how the appellant is an aggrieved party, any other information you may want to submit, and a 107 North Kent Street, Suite 202 e Winchester, Virginia 22601-5000 Matthew S. Akers, Esquire December 21, 2017 Page 2 $250.00 filing fee. Once the appeal application is accepted, it will be scheduled for public hearing and decision before the BZA. Sincerely, Mark R. Cheran Zoning Administrator MRC/dlw EXHIBIT 8 Andrew P. Hill From: David Williamson <custamcomputersva@gmail.com> Sent: Wednesday, November 22, 2017 2:21 PM To: Andrew P. Hill %c: David Williamson Subject: Fwd: Interest in use of Rockwood Trail Facility for Amateur Radio Repeaters Attachments: Projected KG4Y coverages from KG4Y Home Site.pdf; Projected KG4Y coverage from Rockwood Trail Site.pdf ---------- Forwarded message ---------- From: Michael Wolff <mi uel Iobos@ ahoo.conv Date: Mon, May 29, 2017 at 3:22 PM Subject: Interest in use of Rockwood Trail Facility for Amateur Radio Repeaters To: David Williamson <customcom utersva@g_mail.conv Cc: k4uss@arrl.net David, Thank you for reaching out to me and sharing your vision for the use of Winchester Wireless sites at high elevations in the county for the additional purpose of acting as amateur radio relay station locations. I, as the owner and operator of an amateur UHF repeater, am excited about the prospect of locating my repeater station and components at a location so well-suited at providing service coverage across Frederick and Clarke Counties in Virginia, as well as Jefferson, and a significant portion of Berkeley Counties in West Virginia, which would allow it to essentially blanket the northern Shenandoah Valley with coverage. I did take the opportunity yesterday to ride by the site and see the progress that has been made to -date on it. I was quite pleased with what I saw, and I also collected some GPS data at the location that enabled me to have some inputs into the tools used to calculate predictable coverage from that location. Speaking of which, I have included predicted coverage maps generated from on-line tools to show the projected difference in coverage from the repeater operating at the existing location (at my home in Frederick County east of Winchester) versus using such a well-suited location as the facility at Rockwood Trail. I can certainly get into some deeper level of detail and explanation of why the difference, but the key factors are: 1. line -of -site radio wave propagation— the vastly dominant mode of radio wave propagation at the frequencies that such repeaters typically operate 2. height above average terrain (HAAT) — determines the distance to the radio horizon which is the theoretical limit of propagation distance for line -of -site propagation mode Of course, there are other clubs, and other stand-alone VHF and UHF analog FM amateur repeaters situated along the North Mountain ridge at a variety of locations, and many of them have been there for years. To date, I have not been able to figure out how to approach any of these site owners and negotiate an agreement to allow co -location of my repeater. One of the things that differentiates my repeater, making it worthwhile to put in such a location is that I have equipped it with the necessary pieces to link it to the Internet. This repeater offers the ability to function in analog FM mode, as well as a newer modulation technique (C4FM) allowing digital signal transmission, removing much noise with similar coverage characteristics. Further, the digital signaling protocols allow users of the system to control linkage to other repeaters and talk groups leveraging VoIP over the Internet. As far as I am aware, none of the repeaters scattered across the North Mountain ridge offer this at this time. Of course, for this to work, the repeater will require an internet connection available wherever it is located. The bandwidth needed to operate in this mode is typically less than 1 Mbps, using UDP packets for voice and signaling delivery. This repeater is branded as part of Yaesu's System FUSION, and the Internet Linking product is Yaesu's WIRES -X. I know that there are a number of amateur radio operators in the Shenandoah Valley that have Yaesu System FUSION capable radios, and would benefit from the experience of using the system with WIRES -X to link across the world via this repeater. One of the nice things about this repeater, is it will also work in analog FM mode, which has been the method of operation since the deployment of amateur radio repeaters started becoming common in the 1960s and 1970s. I would be remiss if I did not include one of the key purposes that many amateur radio repeaters serve — emergency communications. As fun as all of these things are for the amateur radio community, many of us choose to give back and make ourselves available as communication support resources to the various local, state and federal first responder and incident management entities. There are two widely recognized amateur radio - related organizations known nationwide for providing volunteer communication service response to disasters — RACES (Radio Amateur Civil Emergency Service), and ARES (Amateur Radio Emergency Service). RACES is spelled -out and defined in the Communications Act of 1934, where ARES is a sub -organization within the American Radio Relay League (the ARRL — best characterized as a national amateur radio advocacy organization that has been around for over 100 years now). Some of the amateurs in this area are affiliated with ARES, but I haven't heard. much with regard to RACES in this part of Virginia. Organizationally, I can tell you that ARES has groups organized with leadership down to the county level, as I happen to know some of the office holders in this area for that organization. Full disclosure — I am a life member of the American Radio Relay League, and an ARES volunteer for both Frederick and Clarke Counties. Let me know if you have questions or wish more details on. what any of this means. My intention is to register my repeater as an official ARES emergency repeater with coverage of Clarke, Frederick, and Jefferson Counties (the map projection shows coverage from Rockwood Trail over those counties as very good) Additionally, one of the area amateur radio clubs of which l happen to be a member in good standing (The Blue Avalanche Communication Group — I happen to be the current president of that club), has a VHF repeater on the air not too far from the Rockwood Trail. location, but it is not in as good of working order as we had hoped would become the case in its current location. This repeater was designated as an ARES repeater, so we are hopeful that moving this repeater (also a Yaesu FUSION capable repeater, but currently without WIRES -X), with it's VHF frequencies, would cover any holes that my UHF repeater might leave for the projected coverage area. Options are always a good thing, and redundancy of systems typically means improved availability of services. 1, and the Blue Avalanche Communications Group, are excited at the prospect of using the Rockwood Trail site to host two repeaters and associated equipment. In order for this to function as intended, here's what we envision happening — We would provide the equipment necessary to for the repeaters to operate. at the co -locate with the commercial interests at the facility, including the repeaters, duplexers, antennae and interconnecting cabling, and would arrange for the delivery and installation of said equipment. We would need for you: 1. Space on the tower for two side -mounted antennas with sufficient clearance to avoid interference or hazards 2. Space in the shelter for our equipment (i.e. 19" rack -mount relay rack or 4 -post IT style cabinet) 3. Electric power to run the equipment (standard, common household AC power @ 120 VAC single phase, total current draw not to exceed 5 Amps) 4. Internet. access via an Ethernet connection (10/100/1000 on copper), with bandwidth up to approximately 1 Mbps 5. Reasonable access control / security to the site to prevent unauthorized / unlicensed persons from gaining control of amateur radio apparatus (i.e. locked shelter / unauthorized climber prevention on tower) 6. Reasonable access arrangements for our technical people to get to the equipment for maintenance / repair activities Further, if you were to find that co -locating amateur radio services is possible at other locations, we'd be very interested to explore those possibilities as well. Diversity and redundancy of such facilities can be the difference between being able to communicate or not with critical stations in the wake of a disaster. Thank you again for reaching out to us and sharing your vision with me of additional uses of your sites! I am looking forward to moving forward with you on transforming the vision into reality. Best Regards and Happy Memorial Day, Michael Wolff President — Blue Avalanche Conununication Group Amateur Radio Station KG4Y Radio Mobile Online Coverage report Description KG4Y to Mobile w/ Comet SBB-5 at I meter a Frebove around* ar innry Base Name Latitude Latitude 444.55 MHz KG4Y 39.18126051 0 -78.10268372 0 390 10'52.54"N 0780 06'09.66"W FM09WE UTM (WGS84) 17S E750264 N4340891 Elevation 18$.4 m Base Antenna Height 13 m Base Antenna Gain Base Antenna Type Base Antenna Azimuth 7.2 dB i omni Base Antenna Tilt 00 Mobile Antenna Height Mobile Antenna Gain 1.0 m 5.5 dBi Tx Power Tx Line Loss 20,00000 W 2.2 dB Rx Line Loss Rx Threshold 2.2 dB 0.500 gV (-113.0 dBm) Required Reliability 80% Sty Ong signal maj Weak signal field ITeiC! Weak signal covered area 12.0 dB 1I.6BµV/m 23.6 dBpV/m 238 Strong signal covered area 1226 km2 Weak signal population reached 188949 non I- n reached Landeover used Two rays method used 92409 Yes Yes User ID Radio coverage 1D kg4y RMEC9A8322C310 2 Generated on 5/29/2017 12: 18: i $ PM Radio Mobile Online Coverage report Description UHF Repeater V-1-- — Base ..e..,,.._-- Base Name Latitude Longitude Latitude QRA UTM GS84 444.55 MHz Rockwood 39.19995136 ° -78.35794687 0 390 11' 59.82"N 078° 2 i' 28.61 "W FM09TE __ 17S E728151 N4342292 Elevation 679.3 m Base Antenna Height 30 m Base Antenna Gain 6.0 dBi Base Antenna Type _ omni Base Antenna Azimuth 00 Base Antenna Tilt 00 Mobile Antenna Height Mobile Antenna Gain 1.0 m 3.0 dBi Tx Power Tx Line Lass 20.00000 W 1.0 dB Rx Line Loss Rx Threshold 1.0 dB 0,500 gV (-113.0 dBm) Required Reliability 70% Weak signal field Strong signal field Weak signal covered area Strong signal covered area Weak signal population reached Strong signal population reached Landcover used ..... Two rays method used 10.0 dB 14.1 dBµV/m 24.1 dBµV/m 10666 km2 6209 km2 850018 pop 384787 pop Yes Yes User ID kg4y Radio coverage ID RM84B3928D9820 0 Generated on 5/29/2017 12:15:43 PM