Loading...
HomeMy WebLinkAbout03-18 ApplicationSITE PLAN APPLICATION - Office Use Only- Date Application Received: I- t k_, W) Application Dees Received: ° Receipt #: i + ` Initials: �✓ 3 I. Project Title: WCS - Brooke Road Facility - Freezer Warehouse Addition 2. Location of Property 188 Brooke Road (Street address) Winchester, VA 22603 3. Applicant/Designer: Name: GreyWolfe, Inc. - Gary R. Oates, LS -B, PE Telephone: 667-2001 Address: 1073 Redbud Road, Winchester, Virginia, 22603 4. Property Owner (if different than above): Name: Winchester Cold Storage, Inc. Address: 605 North Loudoun Street Winchester, Virginia 22601 5. Property Information: a. Property Identification Number: b. Total acreage of the parcel to be developed: C. Total disturbed area of the parcel: d. Present Use: e. Proposed Use: f. Magisterial District(s) JV, 1 0 8 Telephone: (540) 662-4151 54-(A)-3 16.887 2 acres Office - Warehouse same with addition of freezer warehouse Stonewall 6. Site Plan Type: a. Is this an original or new site plan? b. Is this a revised site plan? If yes provide all previous site plan numbers: C. Is this a minor site plan? If yes provide al I previous site plan numbers: 7 Zoning Information: Yes II✓ No ❑_ Yes ❑ No V Yes ❑ No #46-88 a. Current Zoning: M-1 b. Was this property Rezoned? Yes ❑ No C. If yes provide the rezoning number for this property: d. Are there any proffers for this property? Yes No e. Has a MDP been approved for this property? Yes ❑ No f. If yes provide the MDP number for this property: 8. Adjoining property zoning and use: ZONING M-1 M-1 M-2 M-1 I have read the material included in this package and understand what is required by the Frederick County Planning Department. I also understand that all required material will be complete prior to the submission of my site plan. Signature: -- Date: I- /V -1,4J G USE North Industrial East Vacant Lot South Industrial West Vacant Lot ZONING M-1 M-1 M-2 M-1 I have read the material included in this package and understand what is required by the Frederick County Planning Department. I also understand that all required material will be complete prior to the submission of my site plan. Signature: -- Date: I- /V -1,4J G