HomeMy WebLinkAbout12-03 BOS Staff Reportlog COG CONDITIONAL USE PERMIT #12-03
SHARED TOWERS/REYNOLDS STORE TOWER
Staff Report for the Board of Supervisors
Prepared: January 13, 2004
1J38 Staff Contact: Mark Cheran, Planner I
This report is prepared by the Frederick County Planning Staff to provide information to the
Planning Commission and the Board of Supervisors to assist them in making a decision on this
request. It may also be useful to others interested in this zoning matter.
Reviewed Action
Planning Commission: 01/07/04 Recommended Approval
Board of Supervisors: 01/28/04 -P-�
LOCATION: This subject property is located at 8840 North Frederick Pike.
MAGISTERIAL DISTRICT: Gainesboro
PROPERTY ID NUMBER: 11-A-39
PROPERTY ZONING & PRESENT' USE: RA (Rural Areas) Zoning District
Land Use: Residential
ADJOINING PROPERTY ZONING & USE: RA (Rural Areas) Zoning District
Land Use: Residential, Agricultural, Cemetery, Church and Vacant
PROPOSED USE: 195 foot tall lattice tower structure inside a 100 foot by 100 foot leased area
for ground equipment/shelters to be placed on concrete pads. All equipment and lattice will be
secured by a fence.
REVIEW EVALUATIONS:
Virginia Dept. of Transportation: The application for a conditional use permit for this
property appears to have little measurable impact on Rt. 522, the VDOT facility which would
provide access to the property. Existing entrance is adequate for proposed use. However,
should use ever expand in the future, the entrance may have to be upgraded to VDOT
minimum standards.
Inspections Department: Structures shall comply with The Virginia Uniform Statewide
C.U.P. #12-03
Shared Towers/Reynolds Store Tower
Page 2
Building Code and Section 312, Use Group r T (Utility) of The BOCA National Building
Code/1996. Please note Chapter 17 of BOCA for special inspection requirements for this
type structure (concrete/bolt testing, etc.)
Fire Marshal: Maintenance of roadway for emergency vehicle access. 14.5 foot vertical
clearance and entire width per NFPA. Roadway requirements allow for enhancement of
Rural Fire Protection in Wildland Fire Control. Plan approval is recommended.
Winchester Regional Airport: Please see attached letter from Serena R. Manuel,
Executive Director, dated 10/22/01.
Health Department: No comment
Public Works/Engineering: Disturbance of more than 10,000 s.f will require an erosion
and sediment control plan and a land disturbance permit. This land disturbance include
access roads and site development.
Planning and Zoning: The Frederick County Zoning Ordinance allows for Commercial
Telecommunication Facilities in the RA (Rural Areas) Zoning District with an approved
Conditional Use Permit. The Frederick County Zoning Ordinance specifies that a CUP for
a commercial telecommunication tower may be permitted provided that residential
properties, land use patterns, scenic areas and properties of significant historic values are not
negatively impacted. Furthermore, additional performance standards shall apply to the CUP
review in order to promote orderly economic development and mitigate the negative impacts
to adjoining properties.
The applicant proposes to build a 195 -foot lattice -type telecommunication facility that is
designed to accommodate commercial telecommunication carriers. The proposed facility will
be located on a 105 -acre site located on Route 522. The applicant has provided an inventory
of existing telecommunication facilities in the area, and staff would concur that there are no
existing facilities or appropriate structures available for collocation in this general area. The
maps provided within the application analyzing coverage need in this area appear to be
sufficient to determine the adequacy of the search area, and the existing coverage and
capacity of the licensee holder in the vicinity of the proposed facility. As shown on the
maps, the coverage needs will be met by a facility in this location. The applicant will be
required to provide lighting to comply with the requirements of the Winchester Regional
Airport Authority. The lights shall comply to FAA standards as noted in the letter submitted
by the Director of the Airport Authority. The Frederick County Zoning Ordinance requires
that these lights be shielded from ground view to mitigate illumination to neighboring
properties and right-of-ways. Buffer and screening requirements will be determined at site
plan review.
C.U.P. #12-03
Shared Towers/Reynolds Store Tower
Page 3
The setbacks for this proposed commercial telecommunication facility will be approximately
271 feet from the road right-of-way, 463 feet side setback, and 1,000 feet rear setback. The
applicant is requesting the ability to utilize lattice -type material construction pursuant to
Section 165-48.6(B)2 of the Zoning Ordinance. The Zoning Ordinance requires that new
commercial telecommunication facilities be of monopole -type construction. The Planning
Commission may allow lattice -type construction for new commercial telecommunication
facilities that are located outside of the Urban Development Area, and are not adjacent to
properties that are identified as historic areas. The proposed site is located outside of the
UDA and is not in close proximity to any identified historic areas. Therefore, allowing a
lattice -type tower would be in conformance with the intent of the Zoning Ordinance. This
proposed commercial telecommunication facility will be in conformance with Section 704
of the Telecommunication Act of 1996. In evaluating this application, it has been
demonstrated that there is a need for the infrastructure within the area of the County
identified. Staff would recommend that Conditional Use Permit #13-02 be deemed invalid
if approval is granted for Conditional Use Permit # 12-03.
STAFF CONCLUSIONS FOR THE 01-07-04 PLANNING COMMISSION MEETING:
Staff believes that this application for a Commercial Telecommunication Facility has adequately
addressed the requirements of the Zoning Ordinance in that need for this facility, based on a lack of
coverage and capacity in this part of the County, has been demonstrated. An allowance for a lattice -
type tower construction, may be appropriate. Should the Planning Commission choose to
recommend approval of this application, the following conditions of approval would be appropriate:
1. All Zoning Ordinance requirements and review agency comments shall be addressed and
complied with at all times.
2. The tower shall be available for co -locating personal wireless services providers.
3. A site plan shall be approved by the County.
4. The tower shall be removed by the applicant or property owner within twelve (12) months
of abandonment of operation.
5. A certified Virginia engineer shall provide verification that the tower is designed, and will be
constructed, in a manner that, should the tower collapse for any reason, the collapsed tower will be
contained in an area around the tower, with a radius equal to or lesser than the setback, measured
from the center line of the base of the tower.
6. In the event a telecommunications tower is not erected within twelve (12) months of the approval
of this Conditional Use Permit, then the CUP will be deemed invalid.
(All members of the Commission were present.)