HomeMy WebLinkAbout13-03 BOS Staff Report410 ooh CONDITIONAL USE PERMIT #13-03
aw �� SHARED TOWERSIWHITE TAIL LANE TOWER
k Staff Report for the Planning Commission Meeting
w Prepared: January 29, 2004
»a Staff Contact: Mark Cheran, Planner I
This report is prepared by the Frederick County Planning Staff to provide information to the
Planning Commission and the Board of Supervisors to assist them in making a decision on this
request. It may also be useful to others interested in this zoning matter.
Reviewed Action
Planning Commission: 01/21/04 Recommended Approval
Board of Supervisors: 02/11/04 Pending
LOCATION: This property is located on White Tail Lane off of North Frederick Pike (Route
522).
MAGISTERIAL DISTRICT: Gainesboro
PROPERTY ID NUMBER: 19-A-27
PROPERTY ZONING & PRESENT' USE: RA (Rural Areas) Zoning District
Land Use: Residential
ADJOINING PROPERTY ZONING & USE: RA (Rural Areas)
Land Use: Residential and Agricultural
PROPOSED USE: 195 -foot tall lattice -type telecommunications facility.
Planning and Zoning: This application is a request to revise a condition previously
placed on Conditional Use Permit 416-02. The condition stated that:
"5. In the event a telecommunications tower is not erected within twelve (12) months
of the approval of this Conditional Use Permit, then the CUP will be deemed
invalid."
CUP # 13-03
January 29, 2004
Page 2
Conditional Use Permit #16-02 was approved by the Board of Supervisors on January 23, 2002.
Therefore, Condition #5 requires that the tower be erected by January 22, 2004. The applicant
does. not believe that the tower will be erected by the anniversary date of the CUP approval, and
has requested that this condition be revised to allow for an additional 12 months.
Background
In late 2001, the applicant ("Shared Towers, Inc.") submitted four (4) Conditional Use Permit
applications for telecommunication towers to be constructed along the Route 522 North corridor.
Shortly after Shared Towers, Inc. submitted the CUP applications, another applicant (SBA
Properties/Triton PCS) submitted three (3) CUP requests for competing sites along the corridor.
Both applicants provided documentation illustrating that the existing telecommunication network
along the Route 522 North corridor was inadequate, and that additional towers were warranted.
The Board of Supervisors ultimately granted the CUP tower requests to Shared Towers, Inc.
following extensive discussions with both Shared Towers, Inc. and SBA Properties/Triton PCS.
A condition was placed on the approved Shared Towers, Inc. requests stating that the towers
were to be constructed within a 12 -month period. It was believed that if the tower was not
constructed, this condition would enable the County to reevaluate the applicant's proposal, as
well as the applications submitted by SBA Properties/Triton PCS.
At the request of SBA Properties/Triton PCS, Board action on their three (3) Conditional Use
Permit applications had been deferred. These three applications were withdrawn by the
applicant on October 29, 2002.
Site Plan
One condition placed on the approved Conditional Use Permit (CUP #16-02) was that a site plan
be submitted and approved by the County. This site plan illustrates the tower's location on the
property, setbacks, screening, and access. The site plan associated with CUP # 16-02 for the
White Tail Lane Tower was approved on May 14, 2002. Approval of the site plan enabled the
construction of a 195 -foot lattice telecommunications tower.
STAFF CONCLUSIONS FOR THE 01-21-04 PLANNING COMMISSION MEETING:
Staff believes that this application for a Commercial Telecommunication Facility has adequately
addressed the requirements of the Zoning Ordinance in that need for this facility, based on a lack
of coverage and capacity in this part of the County, has been demonstrated. Should the Planning
Commission choose to recommend approval of this application, essentially granting the
applicant an extension of 12 months to construct the tower, the following conditions of approval
would be appropriate:
CUP # 13-03
January 29, 2004
Page 3
All Zoning Ordinance requirements and review agency comments shall be
addressed and complied with at all times.
2. The tower shall be available for co -locating personal wireless services providers.
A minor site plan shall be approved by the County.
4. The tower shall be removed by the applicant or property owner within twelve (12)
months of abandonment of operation
In the event a telecommunications tower is not erected within twelve (12) months
of the approval of this Conditional Use Permit, then the CUP will be deemed
invalid.
6. A certified Virginia engineer shall provide verification that the tower is designed,
and will be constructed, in a manner that, should the tower collapse for any reason,
the collapsed tower will be contained in an area around the tower, with a radius
equal to or lesser than the setback, measured from the center line of the base of the
tower.
PLANNING COMMISSION SUMMARY & ACTION FOR 01/21/04 MEETING:
The applicant's representative stated that this is the fourth tower in a series of four proposed by
Shared Towers, Inc. through a series of conditional use permits targeted for the Rt. 522 corridor,
between Winchester and West Virginia. He provided the following information: the first tower,
Hunting Ridge Tower, has been completed; the second tower, the Cross Junction Tower, is currently
under construction with a completion date of late January or early February, 2004; the third tower,
the Reynolds Store Tower, has been issued a building permit; and the fourth tower, the White Tail
Lane Tower, has received an approved site plan; however, Shentel has not yet made a commitment
for this tower, nor has a building permit been applied for. The applicant's representative said there
was not a specific target date for construction and the applicant wants to be assured of users before
making an investment; he added that everything remains the same, they are merely seeking
additional time to construct.
There were no public comments. The Commission had no outstanding issues and believed the time
extension was appropriate with the conditions recommended by the staff. The Planning Commission
unanimously recommended approval with the following conditions:
1. All Zoning Ordinance requirements and review agency comments shall be addressed and
complied with at all times.
2. The tower shall be available for co -locating personal wireless services providers.
CUP # 13-03
January 29, 2004
Page 4
3. A minor site plan shall be approved by the County.
4. The tower shall be removed by the applicant or property owner within 12 months of
abandonment of operation.
In the event a telecommunications tower is not erected within 12 months of the approval of
this conditional use permit, then the conditional use permit will be deemed invalid.
6. A certified Virginia engineer shall provide verification that the tower is designed, and will
be constructed, in a manner that, should the tower collapse for any reason, the collapsed
tower will be contained in an area around the tower, with a radius equal to or lesser than the
setback, measured from the center line of the base of the tower.
(Please note: Commissioner Rosenberry was absent from the meeting.)