Loading...
HomeMy WebLinkAbout39-17 ApplicationSITE PLAN APPLICATION - Office Use Only- --, 'Date Application Received. 10' I ((e' i ] Application #: Fees Received: Receipt #: Initials: 1. Project Title: Brooke Road Warehouse 2. Project Description: Project consists of a new 62,640 sq. ft. warehousing facility with associated parking, truck docks, and truck court. 3. Location of Property: Site is identified as TM 54-1-D and is located on the east side of West Brooke (Street address) Road (Rte. 1320) in the Fort Collier Industrial Park. Current address is 186 West Brooke Road, Winchester, VA 22604 4. Applicant/Designer: Name: Dice Engineering, PLC Telephone: (540) 974-5157 Primary Point of Contact: Dennie Dunlap email: ddunlap@dice-eng.com Address: 101 Shelby Ct., Winchester, VA 22602 5. Property Owner (if different than above): Name: Shockey Realty Company, L.C. "Telephone: (304) 263-7129 Address: P.O. Box 2530 Winchester, VA 22604 6. Property Information: a. Property Identification Number: TM 54-1-D b. Total acreage of the parcel to be developed: 8.42 C. Total disturbed area of the parcel: 3.30 d. Present Use: Industrial C. Proposed Use: Industrial f. Magisterial District(s) Stonewall 8 7. Site Plan Type: a. Is this an original or new site plan? Yes, No L� b. Is this a revised site plan? Yes No LL If yes provide all previous site plan numbers: C. Is this a minor site plan? Yes F-1 No Z If yes provide all previous site plan numbers: SP #09-04 8. Zoning Information: a. Current Zoning: M1 b. Was this property Rezoned? Yes No C. If yes provide the rezoning number for this property: d. Are there any proffers for this property? Yes No 7 e. Has a MDP been approved for this property? Yes No f. If yes provide the MDP number for this property: 9. Adjoining property zoning and use: USE North Industrial East Industrial SOUth Industrial West Industrial M1 M1 M1 M1 7llATTRTfl I have read the material included in this package and understand what is required by the Frederick County Planning Department. I also understand that all required material will be complete prior to the submission of my site plan. Signature: C) 0 P� Name (Printed): Dennie Dunlap Date: October 16, 2017 9