Loading...
HomeMy WebLinkAbout38-17 ApplicationSITE PIAN APPLICATION -Office Use Only - Date Application Received: 1 t, 1 io 1 --- I Application #: 3S- I� r--9 Fees Received: OT70 ` Receipt#: iso y I %_ lnitial.s k , L Project Title: Perry Engineering Temporary parking and Outdoor Storage 2. Project Description: Construction of asphalt pad for construction worker parking during development of the FBI site, to become outdoor storage after FBI site is complete 3. Location of Properly: 64 A 158 Route 50 east, Perry Engineering/Winchester Building Supply (Street address)1945 Millwood Pike Winchester, VA 22602 4. Applicant/Designer: Name: Stowe Engineering, PLC Primary Point of Contact: Tim Stowe Address: 103 Heath Court Winchester, VA 22602 5. Property Owner (if different than above): Name: Perry Properties/Mike Perry Address: 1945 Millwood Pike Winchester, VA 22602 6. Property Information: a. Property Identification Number: b. Total acreage of the parcel to be developed: C. Total disturbed area of the parcel: d. Present Use: e. Proposed Use: f. Magisterial District(s) 8 Telephone: 540.686.7373 email: timstowe@stowecompanies.com Telephone: 540.667.4310 64 A 158 44.97 21.15 Construction company Construction company Shawnee 7. Site Plan Type: a. Is this an original or new site plan? Yes V No b. Is this a revised site plan? Yes T1 No If yes provide all previous site plan numbers: C. Is this a minor site plan? YesF1 No I r i If yes provide all previous site plan numbers: 8. Zoning Information: a. Current Zoning: M1 b. Was this property Rezoned? Yes No C. If yes provide the rezoning number for this property: / d. Are there any proffers for this property? Yes No e. Has a MDP been approved for this property? Yes F1 No f. If yes provide the MDP number for this property: 9. Adjoining property zoning and use: USE ZONING North undeveloped RA East FBI site B2 South Commercial B2 West construction company storage RA I have read the material included in this package and understand what is required by the Frederick County Planning Department. I also unde stan h t all required will be complete prior to the submission of my site plan. Signature: -. Name (Printed): Tim Stowe Date: 10-6-17 X