CONDITIONAL USE PERMIT #06-07
MUNDY SAND, LLC
Staff Report for the Planning Commission
Prepared: September26, 2007
Staff Contact: Mark R. Cheran, Zoning and Subdivision Administrator
This report is prepared by the Frederick County Planning Staff to provide information to the
Planning Commission and the Board of Supervisors to assist them in making a decision on this
request. It may also be useful to others interested in this zoning matter.
Reviewed Action
Planning Commission: 10/17/07 Pending
Board of Supervisors: 11/14/07 Pending
LOCATION: This property is located near Brill Road (Route 603) and Gravel Springs, along
the eastern foot of Paddy Mountain.
MAGISTERIAL DISTRICT: Back Creek
PROPERTY ID NUMBERS: 69-A-7
PROPERTY ZONING & PRESENT USE:
Zoned: RA (Rural Areas)
Land Use: Sand Mining Operation
ADJOINING PROPERTY ZONING & USE:
North: RA (Rural Areas) Land Use: Agricultural
South: RA (Rural Areas) Land Use: Agricultural
East: RA (Rural Areas) Land Use: Agricultural
West: RA (Rural Areas) Land Use: Agricultural
PROPOSED USE: Sand Mine Operation
CUP #06-07, Mundy Sand, LLC
September 26, 2007
Page 2
REVIEW EVALUATIONS:
Virginia Department of Transportation: The application for a Conditional Use Permit for this
property appears to have little measurable impact on Route 603, the VDOT facility which would
provide access to the property. Existing entrance is adequate for proposed use. However, brush and
foliage need to be cut to obtain required sight distance. Failure to do so may mean the loss of
commercial entrance privilege. Should use ever expand in the future, the entrance may have to be
upgraded to VDOT commercial standards.
Frederick County Fire Marshall: Plan approval recommended.
Frederick County Inspections: The temporary scales trailer shall comply with The Virginia
Uniform Statewide Building Code, Section 304 Use Group B (Business) of the International
Building Code/2003 and The Virginia Industrialized Building Code. Other code that applies is
ICC/ANSI A117-2003 Accessible and Usable Buildings and Facilities. Please submit a site plan
showing the accessibility to the structure at the time of permit application. Please include
manufactures foundation and anchoring information along with the VA registration number.
Sanitation Authority: We do not serve this area.
Frederick-Winchester Health Department: Health Department has no objections to the request.
Winchester Regional Airport: No comment.
City of Winchester: No comments.
Planning and Zoning: The Frederick County Zoning Ordinance allows for the mining of sand in
the RA (Rural Areas) Zoning District with an approved Conditional Use Permit (CUP). This
property is subject to the conditions of CUP #005-88, approved by the Frederick County Board of
Supervisors on May 10, 1989. Currently, this operation has been permitted and licensed by the
Division of Mineral Mining (DMM), part of the Virginia Department of Mines, Minerals and Energy
and meets all of the requirements of this agency. All of the mining operations will be conducted on
17 acres of a 174 acre parcel approximately 300 feet or more from any adjoining properties. The
applicant is requesting to amend CUP #005-88, by deleting the following conditions:
1. This is a five-year permit to be reviewed annually by the staff, the Planning Commission
and the Board of Supervisors.
2. If the use, occupancy or ownership of the property changes, this conditional use permit
shall expire and a new conditional use permit will be required.
CUP #06-07, Mundy Sand, LLC
September 26, 2007
Page 3
The above-referenced conditions are no longer required by Frederick County for Conditional Use
Permits (CUP).
STAFF CONCLUSIONS FOR THE 10/03/07 PLANNING COMMISSION MEETING:
Should the Planning Commission find this use appropriate, Staff would recommend the following
conditions:
1. All review agency comments and the Frederick County Zoning Ordinance requirements shall
be complied with at all times.
2. The mining operation shall meet all requirements of the Virginia Department of Mineral
Mining, along with sediment, erosion, runoff and spillage controls needed to allow the
setback from Gravel Springs Run to be placed at 50 feet.
3. The mining operation shall meet the landscaping and screening performance standards;
supplementary regulations; height, area and bulk regulations; and site plan requirements
contained in the requirements for the EM (Extractive Manufacturing) District.
4. The EM (Extractive Manufacturing) site plan shall be reviewed and approved
administratively by staff. (Please note this condition has been met.)
5. Mining shall be limited to the 17.191 acre area described on the provided plat.
6. No mining excavation shall occur within 200 feet of the boundaries of the adjoining property
not owned by the applicant or within 50 feet of Gravel Springs Run.
7. Daylight hours of operation only. No Sunday operations.
8. The Zoning Administrator may require enclosure of crusher, if adverse impact occurs.
9. Wash water from sand washing shall be filtered before entering surface water.
10. Only portable crushers are to be used on site.
Following the requisite public hearing, it would be appropriate for the Planning Commission to
offer a recommendation concerning this application to the Board of Supervisors.