Loading...
PC 11-01-17 Meeting Agenda AGENDA FREDERICK COUNTY PLANNING COMMISSION The Board Room Frederick County Administration Building Winchester, Virginia November 1, 2017 7:00 P.M. CALL TO ORDER TAB 1) Adoption of Agenda: Pursuant to established procedures, the Planning Commission should adopt the Agenda for the meeting ................................................................ (no tab) 2) September 6, 2017 Meeting Minutes .............................................................................. (A) 3) Committee Reports .................................................................................................. (no tab) 4) Citizen Comments ................................................................................................... (no tab) PUBLIC HEARINGS 5) Rezoning #04-17 for Carbaugh Business Center, submitted by Stowe Engineering, PLC, to rezone two parcels of land that total 107.21+/- acres from the RA (Rural Areas) District to the M1 (Light Industrial) District with proffers. The site has an address of 831 Shady Elm Road (Route 651) and is located on the eastern side of Shady Elm Road, approximately 1.11 miles southwest of the intersection of Shady Elm Road and Apple Valley Road (Route 652). The eastern portion of the site is bounded by the CSX Railroad. The properties are identified by Property Identification Numbers 74-A-68 and 74-A-69 and are located within the Back Creek Magisterial District. Mrs. Perkins ..................................................................................................................... (B) 6) Ordinance Amendment to the Frederick County Code – Chapter 165 Zoning ARTICLE II SUPPLEMENTARY USE REGULATIONS; PARKING; BUFFERS; AND REGULATIONS FOR SPECIFIC USES, Part 203 – Buffers and Landscaping §165-203.02. Buffer and screening requirements. Revision to the Frederick County Zoning Ordinance to modify requirements for residential separation buffers in the RP (Residential Performance) Zoning District. Mr. Klein .......................................................................................................................... (C) ACTION ITEMS 7) Conditional Use Permit #07-17 for Caroline (Dixie) Scheulen, submitted for construction of a special event facilities. The property is located at 283 Barracks Lane, Winchester, Virginia and is identified with Property Identification Number 52- A -261 in the Back Creek Magisterial District. Mr. Klein .......................................................................................................................... (D) 8) 2017-2022 Capital Improvement Plan (CIP). The CIP is a prioritized list of capital projects requested by various County Departments and Agencies. The Plan is created as an informational component of the 2035 Comprehensive Plan. Mrs. Perkins ..................................................................................................................... (E) INFORMATION/DISCUSSION ITEMS 9) Master Development Plan #05-17 for Abrams Chase submitted by Painter –Lewis, PLC, on behalf of Abrams Chase. This application seeks to develop 3.24 acres of land zoned RP (Residential Performance) with 13 units age restricted single family. The subject properties are located on Senseny Road (Route 657) 500’ west of intersection with Channing Drive, in Shawnee Magisterial District, and are identified by Property Identification Numbers 65-A- 27A and 65-A-28A. Please note this item is presented for informational purposes only. Mr. Klein .......................................................................................................................... (F) 10) Annual Review of Bylaws and Roles and Responsibilities Mr. Ruddy ........................................................................................................................ (G) Other Adjourn -2- Commonly Used Planning Agenda Terms Meeting format Citizen Comments – The portion of the meeting agenda offering an opportunity for the public to provide comment to the Planning Commission on any items not scheduled as public hearing items. Public Hearing– A specific type of agenda item, required by State law, which incorporates public comment as a part of that item prior to Planning Commission or Board of Supervisors action. Public hearings are held for items such as: Comprehensive Plan policies and amendments; Zoning and Subdivision Ordinance amendments; and Rezoning and Conditional Use Permit applications. Following the Public Hearing, the Planning Commission will take action on the item (see below). Action Item–There are both public hearing and non-public hearing items on which the Planning Commission takes action. Depending on the actual item, the Planning Commission may approve, deny, table, or forward a recommendation to the Board of Supervisors regarding the agenda item. No public comment is accepted during the Action Item portion of the agenda. Information/Discussion Item– The portion of the meeting agenda where items are presented to the Planning Commission for information and discussion. The Planning Commission may offer comments and suggestions, but does not take action on the agenda item. No public comment is accepted during the Information/Discussion Item portion of the agenda. Planning Terminology Urban Development Area or UDA – The UDA is the county’s urban growth boundary identified in the Comprehensive Plan in which more intensive forms of residential development will occur. The UDA is an area of the county where community facilities and public services are more readily available and are provided more economically. Sewer and Water Service Area or SWSA – The SWSA is the boundary identified in the Comprehensive Plan in which public water and sewer is or can be provided. The SWSA is consistent with the UDA in many locations; however the SWSA may extend beyond the UDA to promote commercial, industrial, and institutional land uses in area where residential land uses are not desirable. Land Use – Land Use is the nomenclature which refers to the type of activity which may occur on an area of land. Common land use categories include: agricultural, residential, commercial, and industrial. Zoning District - Zoning district refers to a specific geographic area that is subject to land use standards. Frederick County designates these areas, and establishes policies and ordinances over types of land uses, density, and lot requirements in each zone. Zoning is the main planning tool of local government to manage the future development of a community, protect neighborhoods, concentrate retail business and industry, and channel traffic. Rezoning – Rezoning is the process by which a property owner seeks to implement or modify the permitted land use activities on their land. A rezoning changes the permitted land use activities within the categories listed above under Land Use. Conditional Use Permit or CUP - A CUP allows special land uses which may be desirable, but are not always appropriate based on a location and surrounding land uses. The CUP requested use, which is not allowed as a matter of right within a zoning district, is considered through a public hearing process and usually contains conditions to minimize any impacts on surrounding properties. Ordinance Amendment – The process by which the County Code is revised. Often the revisions are the result of a citizen request with substantial justification supporting the change. Amendments ultimately proceed through a public hearing prior to the PC forwarding a recommendation to the Board of Supervisors. County Bodies Involved Board of Supervisors or BOS - Frederick County is governed by an elected Board of Supervisors composed of seven members, one from each magisterial district, and one chairman-at-large. The Board of Supervisors is the policy-making body of the county. Functions of the Board of Supervisors related to planning include making land use decisions, and establishing growth and development policies. Planning Commission or PC - The PC is composed of 13 members, two from each magisterial districts and one at-large, appointed by the Board of Supervisors. The Planning Commission serves in an advisory capacity to the Board of Supervisors which then takes final action on all planning, zoning, and land use matters. Comprehensive Plans and Programs Committee or CPPC – The CPPC is a major committee of the PC whose primary responsibility is to formulate land use policies that shape the location and timing of development throughout the County. Included in the work are studies of specific areas to develop guidelines for future land use within those areas. The CPPC also considers requests for amendments to the Comprehensive Plan. Decisions by CPPC are then forwarded to the PC for consideration. Development Review and Regulations Committee or DRRC – The DRRC is the second major committee of the PC whose primary responsibilities involve the implementation of the Comprehensive Plan in the form of Zoning and Subdivision ordinance requirements. Requests to amend the ordinances to the DRRC are made by the Board of Supervisors, Planning Commission, local citizens, businesses, or organizations. DRRC decisions are also forwarded to the PC for consideration. A Frederick County Planning Commission Page 3463 Minutes of September 6, 2017 MEETING MINUTES OF THE FREDERICK COUNTY PLANNING COMMISSION Held in the Board Room of the Frederick County Administration Building at 107 North Kent Street in Winchester, Virginia on September 6, 2017 PRESENT: June M. Wilmot, Chairman/Member at Large; Robert S. Molden, Opequon District; Gary R. Oates, Stonewall District; William H. Cline, Stonewall District; J. Rhodes Marston, Back Creek District; Lawrence R. Ambrogi, Shawnee District; Kevin Kenney, Gainesboro District; Charles E. Triplett, Gainesboro District; Roderick B. Williams, County Attorney. ABSENT: Roger L. Thomas, Vice Chairman/Opequon District; H. Paige Manuel, Shawnee District; Christopher M. Mohn, Red Bud District; Greg L. Unger, Back Creek District. STAFF PRESENT: Michael T. Ruddy, Director; Candice E. Perkins, Assistant Director; Shannon L. Conner, Administrative Assistant. CALL TO ORDER Chairman Wilmot called the September 6, 2017 meeting of the Frederick County Planning Commission to order at 7:00 p.m. Chairman Wilmot commenced the meeting by inviting everyone to join in a moment of silence. RESOLUTION OF APPRECIATION Chairman Wilmot recognized Charles F. Dunlap with a Resolution of Appreciation for serving on the Planning Commission representing the Red Bud Magisterial District. On behalf of the Planning Commission, Chairman Wilmot expressed their gratitude to Mr. Dunlap and recognized his many years of faithful service. ADOPTION OF AGENDA Upon motion made by Commissioner Oates and seconded by Commissioner Cline, the Planning Commission unanimously adopted the agenda for this evening’s meeting. MINUTES Upon motion made by Commissioner Oates and seconded by Commissioner Marston, the Planning Commission unanimously adopted the minutes from the June 7, 2017 and August 2, 2017 meetings. ------------- Frederick County Planning Commission Page 3464 Minutes of September 6, 2017 COMMITTEE REPORTS Transportation Committee – Mtg. 08/28/17 Commissioner Oates reported the committee discussed six (6) items at their August meeting and are as follows: 1. Revenue Sharing Policy Update a. There are major changes that adversely affect Frederick County in our ability to gain funding for projects; available funding from the state has been reduced from $10 million to $5 million per year. 2. Smartscale Program Update a. A major proposed change by the stat is a reduction in the number of applications a locality can submit to four (4) projects; that is about half the number of projects we typically submit in years past. b. A second huge obstacle that is proposed is a project with proffered dollars will not be eligible for funding; this may not allow us to receive matching funds from the state. 3. VDOT Arterial Preservation Program a. This is a new program that VDOT is implementing although it is still being developed; this impacts all of our arterial roads such as Routes 11, 522, 7, and 50, it will make new entrances, intersections, and stop lights even harder to obtain. 4. Route 37 and Shady Elm Road Access Management Discussion a. VDOT is exploring a limited access break for the property lying between Route 11, 37, and I-81 that is south of Gander Mountain; the MPO has studied this twice in the past and is not supportive. 5. County Project Updates a. Snowden Bridge Blvd in Graystone Industrial Park – rain storms have washed out some shoulders and the County is working to fix these; it is expected the road will be taken in the VDOT system this fall. b. Tevis Street Extension at Airport Road and I-81 – the bridge design over I-81 is ongoing and reviewed and expected to be approved by the end of the year; the round-about plans have been submitted for review and expected to be approved in the spring; bids will go out before next summer. c. Renaissance Drive – Property owner agreements have been received and the Board is evaluating the status of revenue sharing funds before beginning the design; the railroad crossing is being worked on between the County and CSX. d. Valley Mill Road Realignment – A private partner has restated they do not wish to continue to continue the project; Staff is exploring ways to transfer matching funds obtained from the state to other projects. Frederick County Planning Commission Page 3465 Minutes of September 6, 2017 e. Jubal Early Drive Extension and the interchange onto Route 37 – The County has advanced the project as far as it can without an agreement from the developer; to date, the developer has not committed to a revenue sharing agreement. Development Review and Regulations Committee – Mtg. 08/24/17 Commissioner Kenney reported the committee held discussion of a request to modify requirements for residential separation buffers in the RP (Residential Performance) District. He noted also discussed was a request to add solar (photovoltaic) power generating facilities to the use list for the RA (Rural Areas) District. Historic Resources Advisory Board – Mtg. 08/15/17 Commissioner Cline reported the Board reviewed a Rezoning Application for Carbaugh Properties. Frederick Water – Mtg. 08/15/17 Commissioner Oates reported the Board adopted the 2017 Sewer Master Plan which is forecasted out for 30 years. Board of Supervisors Report – Mtg. 08/09/17 Board of Supervisors’ Liaison, Supervisor Blaine Dunn reported the Board scheduled a Public Hearing for the Abandonment of Gold Orchard Road (Route 708). City of Winchester – Mtg. 08/15/17 Commissioner Loring, Winchester City Planning Commission Liaison, reported the commission reviewed six (6) CUP’s and an ordinance amendment pertaining to signs. ------------- CITIZEN COMMENTS Chairman Wilmot called for citizen comments on any subject not currently on the Planning Commission’s agenda or any item that is solely a discussion item for the Commission. No one came forward to speak and Chairman Wilmot closed the citizen comments portion of the meeting. ------------- Frederick County Planning Commission Page 3466 Minutes of September 6, 2017 PUBLIC HEARING 2017–2022 Capital Improvement Plan (CIP). The CIP is a prioritized list of capital projects requested by various County Department and Agencies. The Plan is created as an informational component of the 2035 Comprehensive Plan. Action – Postponed by Majority Vote Candice E. Perkins, Assistant Director reported the CIP is a document that consists of a schedule for major capital expenditures for the County for the ensuing five years and also a category for long term projects that are 6+ years out. Ms. Perkins noted the inclusion of projects to the CIP is in no way an indication that Frederick County will be undertaking these projects: the CIP is stric tly advisory; the CIP is intended for use as a capital facilities planning document, not for requesting funding allocations. Ms. Perkins continued it is possible that particular projects may not be funded during the year that is indicated in the CIP; the status of any project becomes increasingly uncertain the further in the future it is projected. Ms. Perkins reported the CIP is a document that is updated annually, with each cycle projects are removed from the plan as they are completed or as prioritie s change. She noted the monetary amounts shown within the CIP tables were compiled December 2016 – January 2017; some of these figures may have changed. Ms. Perkins noted updated figures will be gathered during the next CIP cycle (2018-2022). Ms. Perkins continued the CIP has been modified from its previous version to improve its presentation and utility and these modifications reflect input provided by members of the Planning Commission and Board of Supervisors. Ms. Perkins referenced the tables within the CIP have been broken down into three (3) separate tables and the three (3) tables reflect projects that are County funded versus projects funded by other sources (state/federal). Ms. Perkins explained this year’s CIP continues to reinforce the connection between the CIP, the 2035 Comprehensive Plan, and future rezoning applications. She reported the total number of projects is 75 from Schools, Parks and Recreation, Regional Library, Transportation, Winchester Regional Airport, County Administration, and Fire and Rescue. Ms. Perkins reported there are three (3) tables: General government expenditures (schools, parks, library, administration, fire and rescue); Airport; Transportation. Ms. Perkins concluded the CPPC endorsed the 2017-2022 CIP on in March, 2017 and determined the CIP is in conformance with the 2035 Comprehensive Plan at which time it was forwarded to the Planning Commission and Board of Supervisors. The Planning Commission discussed this item in April, 2017. Commissioner Oates inquired as to why the CIP is now a five (5) year document when typically it has been for one (1) year. Ms. Perkins explained the name has been tweaked to reflect a five (5) year document and it will continue to be reviewed annually. Commissioner Oates asked if the CIP will continue to be reviewed in December and January of each year. Mr. Ruddy explained it is anticipated the CPPC and Planning Commission will be reviewing the document in December and then moving it to the Board of Supervisors possibly around the time of the budget presentation; however we will wait for direction from the Board of Supervisors. Frederick County Planning Commission Page 3467 Minutes of September 6, 2017 Commissioner Oates inquired what the purpose is of adopting this CIP now and it only being applicable for three (3) months. Ms. Perkins explained it is likely this document will be in effect until spring 2018 and an updated CIP is needed on the books as soon as possible. Mr. Ruddy reported the intent is to make sure the information received regarding the format of the CIP was reflected in the n ew structure and everyone was comfortable with; as we continue to move forward. Commissioner Oates continued to wonder why the need to adopt this now, if this were to be tabled for 90 days it could line up with the new cycle and some information on this one is out of date. Mr. Ruddy noted any obvious changes could be made before it goes to the Board of Supervisors for Public Hearing. Commissioner Kenney commented he agrees with Commissioner Oates and inquired when the new cycle would begin for the CIP. Ms. Perkins explained comments will be gathered this fall from County agencies to prepare for the new cycle. Mr. Ruddy noted once this CIP is adopted by the Board of Supervisors that would end the current cycle and allow the start of the new one. Chairman Wilmot commented it is her understanding this was an effort to develop a platform now and to move forward later. Ms. Perkins stated that is correct; with the new format and the Board of Supervisors comments it is to solidify a good format and a new process for the CIP. Commissioner Oates commented he would prefer it be called 2017-2018 CIP since it is a yearly plan and why call it a five (5) year plan if it is being updated each year. Chairman Wilmot called for anyone who wished to speak regarding this Public Hearing to come forward at this time. No one came forward to speak and Chairman Wilmot closed the public comment portion of the hearing. Chairman Wilmot noted she sees the need to move this forward as it looks and reads great; a job well done. Commissioner Marston asked Commissioner Oates his reasoning for wanting to table the CIP for 45 days. Commissioner Oates explained County agencies are in the process of updating their numbers and updated information should be provided at that point by tabling. Commissioner Triplett made a motion to recommend approval; there was not a second to the motion. Commissioner Oates made a motion to table the 2018-2022 Capital Improvement Plan (CIP) for 45 days. This motion was seconded by Commissioner Kenney and passed by majority vote. BE IT RESOLVED, the Frederick County Planning Commission does hereby recommend tabling the 2017–2022 Capital Improvement Plan (CIP) for 45 days. YES: Oates, Kenney, Marston, Ambrogi, Molden, Cline NO: Triplett, Wilmot (Note: Commissioners Manuel, Mohn, Thomas, and Unger were absent from the meeting) ------------- Frederick County Planning Commission Page 3468 Minutes of September 6, 2017 ADJOURNMENT No further business remained to be discussed and a motion was made by Commissioner Oates to adjourn the meeting. This motion was seconded by Commissioner Cline and unanimously passed. The meeting adjourned at 7:35 p.m. Respectfully submitted, ____________________________ June M. Wilmot, Chairman ____________________________ Michael T. Ruddy, Secretary B REZONING APPLICATION #04-17 CARBAUGH BUSINESS CENTER Staff Report for the Planning Commission Prepared: October 23, 2017 Staff Contact: Candice E. Perkins, AICP, CZA, Assistant Director John Bishop, AICP, Assistant Director–Transportation Reviewed Action Planning Commission: 11/01/17 Pending Board of Supervisors: 12/13/17 Pending PROPOSAL: To rezone two parcels of land that total 107.21+/- acres from the RA (Rural Areas) District to the M1 (Light Industrial) District with proffers. LOCATION: The site has an address of 831 Shady Elm Road (Route 651) and are located on the southeastern side of Shady Elm Road, approximately 1.11 miles southwest of the intersection of Shady Elm Road and Apple Valley Road (Route 652). The southeastern portion of the site is bounded by the CSX Railroad. EXECUTIVE SUMMARY & STAFF CONCLUSION FOR THE 11/01/17 PLANNING COMMISSION MEETING: This is an application to rezone two parcels of land that total 107.21+/- acres from the RA (Rural Areas) District to the M1 (Light Industrial) District with proffers. The subject properties are located within the limits of the Sewer and Water Service Area (SWSA) and are within the limits of the Kernstown Area Plan of the 2035 Comprehensive Plan. The Comprehensive Plan identifies these properties with an industrial land use designation which is generally consistent with the requested M1 zoning. With this rezoning, the Applicant has proffered that this project will contribute to transportation improvements in the vicinity of the site that have been identified as important to the overall transportation solution for this general area. The Applicant has proffered to participate in the cost of transportation improvements to Renaissance Drive (up to a maximum of $1,080,000.00), right-of-way dedications for Renaissance Drive and Shady Elm Road, limits on the number of access points for the site, and proffers for inter-parcel connections for all new parcels. The Applicant has also provided proffers for the screening of loading docks, landscaping, signage, documentation of the Carbaugh House and monetary proffers for fire and rescue purposes. Following the required public hearing, a recommendation regarding this rezoning application to the Board of Supervisors would be appropriate. The Applicant should be prepared to adequately address all concerns raised by the Planning Commission. Rezoning #03-17 Carbaugh Business Center October 23, 2017 Page 2 This report is prepared by the Frederick County Planning Staff to provide information to the Planning Commission and the Board of Supervisors to a ssist them in making a decision on this application. It may also be useful to others interested in this zoning matter. Unresolved issues concerning this application are noted by staff where relevant throughout this staff report. Reviewed Action Planning Commission: 11/01/17 Pending Board of Supervisors: 12/13/17 Pending PROPOSAL: To rezone two parcels of land that total 107.21+/- acres from the RA (Rural Areas) District to the M1 (Light Industrial) District with proffers. LOCATION: The site has an address of 831 Shady Elm Road (Route 651) and are located on the southeastern side of Shady Elm Road, approximately 1.11 miles southwest of the intersection of Shady Elm Road and Apple Valley Road (Route 652). The southeastern portion of the site is bounded by the CSX Railroad. MAGISTERIAL DISTRICT: Back Creek PROPERTY ID NUMBER: 74-A-68 and 74-A-69 PROPERTY ZONING: RA (Rural Areas) District PRESENT USE: Vacant/Agricultural ADJOINING PROPERTY ZONING & PRESENT USE: North: M1 (Light Industrial) District Use: Vacant RA (Rural Areas) District Residential, Agriculture South: RA (Rural Areas) District Use: Residential, Agriculture East: B3 (Industrial Transition) District Use: Commercial RA (Rural Areas) District Railroad West: RA (Rural Areas) District Use: Residential, Agriculture Rezoning #03-17 Carbaugh Business Center October 23, 2017 Page 3 REVIEW EVALUATIONS: Virginia Dept. of Transportation (VDOT): Please see the attached email from Matthew Smith, P.E., dated September 7, 2017. Frederick County Fire Marshall: Approved Frederick Water: Please see the attached letter from Eric R. Lawrence, Executive Director dated August 18, 2017. Frederick County Department of Public Works: A comprehensive review shall occur at time of site plan submission. We offer no additional comments at this time. Virginia Department of Health: This Health Department has reviewed the request for comments for the Rezoning of property located at 831 Shady Elm Road, in the Back Creek Magisterial District, Tax Map #74-A-68 & 74-A-69 from RA to M1. Based upon information provided by the Applicant, this Health Department has no objection to the rezoning of the subject property. However, it is the recommendation of this Health Department that any know or discovered sewage disposal systems or private water wells on the property be properly abandoned, per Health Department Regulations or best practice policies. In the event that it is determined that there are sewage disposal systems or private water wells on the property, please notify this Health Department immediately for proper abandonment procedures. Frederick County Planning Department: Please see the attached letter from Candice E. Perkins, Assistant Director dated August 7, 2017. Frederick County Transportation Comments: Please see the attached letter from John A. Bishop, Assistant Director-Transportation dated August 7, 2017. Historic Resources Advisory Board: The Historic Resources Advisory Board (HRAB) recommended approval of the Rezoning with the condition that the Applicant perform an intensive level survey on the historic structure located on-site (Henry Carbaugh House - #34-1040) prior to its demolition. Planning & Zoning: 1) Site History The original Frederick County Zoning Map (U.S.G.S. Winchester Quadrangle) depicts the subject properties as being zoned A-2 (Agricultural General) District. The County’s agricultural zoning districts were subsequently combined to form the RA (Rural Areas) District upon adoption of an amendment to the Frederick County Zoning Ordinance on May 10, 1989. Rezoning #03-17 Carbaugh Business Center October 23, 2017 Page 4 2) Comprehensive Plan The 2035 Comprehensive Plan is the guide for the future growth of Frederick County. The 2035 Comprehensive Plan is an official public document that serves as the Community's guide for making decisions regarding development, preservation, public facilities and other key components of Community life. The primary goal of this plan is to protect and improve the living environment within Frederick County. It is in essence a composition of policies used to plan for the future physical development of Frederick County. The Area Plans, Appendix I of the 2035 Comprehensive Plan, are the primary implementation tool and will be instrumental to the future planning efforts of the County. Land Use The subject properties are located within the limits of the Sewer and Water Service Area (SWSA) and are within the limits of the Kernstown Area Plan of the 2035 Comprehensive Plan. The Kernstown Area Plan identifies these properties with an industrial land use designation as outlined in the Shady Elm Economic Development Area, which is generally consistent with the requested M1 zoning designation. The Shady Elm Economic Development Area is designed to be a significant area of industrial and commercial opportunity that is fully supportive of the County Economic Development Authority’s targeted goals and strategies. The intent of the industrial designation is to further enhance the County’s commercial and industrial areas and to provide focus to the County’s future regional employment centers. Transportation and Site Access The Eastern Road Plan of the 2035 Comprehensive Plan and the Kernstown Area Plan both call for the extension of a new major collector roadway though parcel 74-A-68, which is adjacent to the Artillery Business Center Development which was rezoned in 2007 and revised in 2015. This new major collector roadway, Renaissance Drive, has been constructed from Valley Pike (Route 11) to the limits of the CXS railroad. The Comprehensive Plan calls for this roadway to be extended to Shady Elm Road. The plan also calls for Shady Elm Road to be improved four lane divided collector roadway. Site access to the subject property will be provided via two entrances on Renaissance Drive. 3) Site Suitability/Environment: The site is not located within or near any 100-year floodplains. The site has some wetlands in the form of two small farm ponds and a spring. The spring feeds one of the ponds and drains via a culvert under the CSX railroad; the Applicant intends on preserving the spring and lower pond while removing the upper pond. There are no areas of mature woodlands. The site does contain 46 acres of prime agricultural farmland and 59 acres of farmland of statewide importance. Rezoning #03-17 Carbaugh Business Center October 23, 2017 Page 5 4) Potential Impacts: Existing Residential Uses: This application recognizes the existing residential land uses that are zoned RA (Rural Areas) District that are located adjacent to and across Shady Elm Road from the Carbaugh Property by providing buffering and landscape screening (full screen) consistent with the Zoning Ordinance to screen the development and loading docks from Shady Elm Road. This buffer consists of 100’ of distance (75’ active/25’ inactive), a 6’ berm and 3 plants per 10 linear feet. Historic Resources: The Study of Civil War Sites in the Shenandoah Valley published by National Park Service Study of Civil War Sites in the Shenandoah Valley does not identify a core battlefield on the site. The battle maps for the 1st and 2nd Battles of Kernstown show that troops might have marched across the subject property on their way to the battles, no fighting is recorded on the property. The Historic Resources Advisory Board recommended that the Applicant conduct an intensive level survey on the historic structure located on-site (Henry Carbaugh House - #34- 1040) prior to its demolition; the Applicant included this in their proffer statement. Frederick County Transportation Comments: The Applicant’s Transportation Impact Analysis assumes 46.9 acres of light manufacturing and 46.9 acres of warehousing uses. This results in average weekday vehicle trips totaling 4,820 which the Applicant proposes to address via transportation proffers of right-of-way and funding toward the Renaissance Drive project. The proffered funding amount allows the County to fully match revenue sharing funds that have been awarded to the project. 5) Proffer Statement – Dated October 6, 2017 Site Improvements: 1. The owner agrees to participate in the cost of transportation improvements in the nearby area, up to a maximum of $1,080,000.00. Such payment shall be made either within 30 calendar days after the start of the Renaissance Drive extension or prior to the issuance of the certificate of occupancy for all buildings developed on the Property, whichever comes first. 2. The owner agrees to dedicate 60’ of right-of-way along Shady Elm Road, 10’ of which shall be used for construction of a pedestrian trail. 3. The owner agrees to dedicate 20’ of right-of-way along its northeast boundary for the extension of Renaissance Drive from Valley Pike to Shady Elm Road. 4. The owner agrees to grant to Frederick County an 80’ grading/slope easement for the construction and maintenance of a bridge over the CSX rail line that will be part of the extension of the Renaissance Drive. 5. The owner agrees to limit the number of commercial entrances for the property to a maximum of two along Renaissance Drive. a. In the event that the property is developed prior to the completion of Renaissance Drive, the owner may build a portion of the road from Shady Elm Road to the first entrance to the site to enable use of the site. Rezoning #03-17 Carbaugh Business Center October 23, 2017 Page 6 b. In the event that Frederick County requests that the owner not build a portion of the extension, the owner may build a temporary entrance onto Shady Elm Road for commercial use. The temporary entrance will be permanently closed immediately after Renaissance Drive is available for use by the applicant. 6. The owner proffers to provide for inter-parcel connections for all new lots to provide access to the access points on Renaissance Drive. Building Restrictions: The development of the subject Property shall include the following building restrictions: 1. All loading docks shall be screened from view from all adjacent properties in the RA (Rural Areas) Zoning District that are located west of Shady Elm Road. The owner will utilize a 100’ Category C (full Screen) buffer. 2. Individual business signs will be prohibited along Shady Elm Road. 3. The owner will perform an intensive level survey on the Henry Carbaugh House prior to its demolition. Landscape Design Features 1. The owner shall provide street trees planted 50’ on center adjacent to the Renaissance Drive road extension. Monetary Contributions to Offset Impact of Development: The owner proffers to pay $30,000.00 prior to the issuance of the Certificate of Occupancy for the first structure constructed on the property for fire and rescue purposes. EXECUTIVE SUMMARY & STAFF CONCLUSION FOR THE 11/01/17 PLANNING COMMISSION MEETING: This is an application to rezone two parcels of land that total 107.21+/- acres from the RA (Rural Areas) District to the M1 (Light Industrial) District with proffers. The subject properties are located within the limits of the Sewer and Water Service Area (SWSA) and are within the limits of the Kernstown Area Plan of the 2035 Comprehensive Plan. The Comprehensive Plan identifies these properties with an industrial land use designation which is generally consistent with the requested M1 zoning. With this rezoning, the Applicant has proffered that this project will contribute to transportation improvements in the vicinity of the site that have been identified as important to the overall transportation solution for this general area. The Applicant has proffered to participate in the cost of transportation improvements to Renaissance Drive (up to a maximum of $1,080,000.00), right-of-way dedications for Renaissance Drive and Shady Elm Road, limits on the number of access points for the site, and proffers for inter-parcel connections for all new parcels. The Applicant has also provided proffers for the screening of loading docks, landscaping, signage, documentation of the Carbaugh House and monetary proffers for fire and rescue purposes. Following the required public hearing, a recommendation regarding this rezoning application to the Board of Supervisors would be appropriate. The Applicant should be prepared to adequately address all concerns raised by the Planning Commission. §¨¦81 ST651 ST649 ST651 74 A 69 74 A 68 579SPRINGDALE RD 634SPRINGDALE RD 371SPRINGDALE DR 4330VALLEYPIKE 4324VALLEYPIKE 4273VALLEYPIKE 115SPRINGDALE RD 507SPRINGDALE RD 117SPRINGDALE RD 124SPRINGDALE RD 140SPRINGDALE RD 4227VALLEYPIKE 142MUSKET DR421SPRINGDALE RD 385SPRINGDALE RD 385SPRINGDALE RD 222SPRINGDALE RD 136MUSKET DR 834SHADYELM RD 400SPRINGDALE RD 364SPRINGDALE RD 224SPRINGDALE RD 4200VALLEYPIKE 970SHADYELM RD 1043SHADYELM RD 316SPRINGDALE RD 4184VALLEYPIKE 111MUSKET DR 131MUSKET DR 1006SHADYELM RD 4118VALLEYPIKE 4141VALLEYPIKE 126MARATHON DR 983SHADYELM RD 4168VALLEYPIKE 4110VALLEYPIKE 4095VALLEYPIKE 957SHADYELM RD 141SKYJES LN 4050VALLEYPIKE 183SKYJES LN161SKYJES LN 121SKYJES LN 4046VALLEYPIKE 4046VALLEYPIKE 4006VALLEYPIKE 180SKYJES LN 164SKYJES LN 138SKYJES LN 251PROSPERITY DR 125PROSPERITY DR 113HOCKMAN CT 201PROSPERITY DR 171HOCKMAN CT 147HOCKMAN CT 133HOCKMAN CT 553SHADYELM RD 240PROSPERITY DR 220PROSPERITY DR 161PROSPERITY DR 191HOCKMAN CT 114HOCKMAN CT 170PROSPERITY DR 166HOCKMAN CT130HOCKMAN CT 750SHADYELM RD 210PROSPERITY DR 180PROSPERITY DR 3862VALLEYPIKE 190HOCKMAN CT188HOCKMAN CT 690SHADYELM RD 561SHADYELM RD 100DEVELOPMENT LN 160INDUSTRIAL DR 225SOLDIERSREST LN 121DEVELOPMENT LN229SOLDIERSREST LN 110INDUSTRIAL DR 161INDUSTRIAL DR DEST I N Y DR MUSK E T D R DEVE L O P M E N T L N MILL LN VAL L E Y PIK E IND U S T R I A L D R RENAISS A N C E D R SKYJES L N SO L D I E R S R E S T L N H O C K M A N C T NAR R O W L N PRO S P E R I T Y D R SHA D Y E L M R D SPRINGDALE R D Applications Sewer and Water Service Area Parcels Building Footprints B1 (Neighborhood Business District) B2 (General Business District) B3 (Industrial Transition District) EM (Extractive Manufacturing District) HE (Higher Education District) M1 (Light Industrial District) M2 (Industrial General District) MH1 (Mobile Home Community District) MS (Medical Support District) OM (Office - Manufacturing Park) R4 (Residential Planned Community District) R5 (Residential Recreational Community District) RA (Rural Areas District) RP (Residential Performance District) I Note:Frederick County Dept ofPlanning & Development107 N Kent StSuite 202Winchester, VA 22601540 - 665 - 5651Map Created: October 10, 2017Staff: cperkins VAL L E Y P I K E SPRING D A L E R D SHA D Y E L M R D TAS K E R R D PRO S P E R I T Y D R SKYJES LN SUL K Y D R §¨¦81 0111 0137 0137 REZ # 04 - 17Carbaugh Business CenterPINs:74 - A - 68, 74 - A - 69Rezoning from RA to M1Zoning Map 0 840 1,680420 Feet REZ # 04 - 17Carbaugh Business CenterPINs:74 - A - 68, 74 - A - 69Rezoning from RA to M1Zoning Map 0111 REZ #04-17 REZ #04-17 §¨¦81 ST651 ST649 ST651 74 A 69 74 A 68 579SPRINGDALE RD 634SPRINGDALE RD 371SPRINGDALE DR 4330VALLEYPIKE 4324VALLEYPIKE 4273VALLEYPIKE 115SPRINGDALE RD 507SPRINGDALE RD 117SPRINGDALE RD 124SPRINGDALE RD 140SPRINGDALE RD 4227VALLEYPIKE 142MUSKET DR421SPRINGDALE RD 385SPRINGDALE RD 385SPRINGDALE RD 222SPRINGDALE RD 136MUSKET DR 834SHADYELM RD 400SPRINGDALE RD 364SPRINGDALE RD 224SPRINGDALE RD 4200VALLEYPIKE 970SHADYELM RD 1043SHADYELM RD 316SPRINGDALE RD 4184VALLEYPIKE 111MUSKET DR 131MUSKET DR 1006SHADYELM RD 4118VALLEYPIKE 4141VALLEYPIKE 126MARATHON DR 983SHADYELM RD 4168VALLEYPIKE 4110VALLEYPIKE 4095VALLEYPIKE 957SHADYELM RD 141SKYJES LN 4050VALLEYPIKE 183SKYJES LN161SKYJES LN 121SKYJES LN 4046VALLEYPIKE 4046VALLEYPIKE 4006VALLEYPIKE 180SKYJES LN 164SKYJES LN 138SKYJES LN 251PROSPERITY DR 125PROSPERITY DR 113HOCKMAN CT 201PROSPERITY DR 171HOCKMAN CT 147HOCKMAN CT 133HOCKMAN CT 553SHADYELM RD 240PROSPERITY DR 220PROSPERITY DR 161PROSPERITY DR 191HOCKMAN CT 114HOCKMAN CT 170PROSPERITY DR 166HOCKMAN CT130HOCKMAN CT 750SHADYELM RD 210PROSPERITY DR 180PROSPERITY DR 3862VALLEYPIKE 190HOCKMAN CT188HOCKMAN CT 690SHADYELM RD 561SHADYELM RD 100DEVELOPMENT LN 160INDUSTRIAL DR 225SOLDIERSREST LN 121DEVELOPMENT LN229SOLDIERSREST LN 110INDUSTRIAL DR 161INDUSTRIAL DR DEST I N Y DR MUSK E T D R DEVE L O P M E N T L N MILL LN VAL L E Y PIK E IND U S T R I A L D R RENAISS A N C E D R SKYJES L N SO L D I E R S R E S T L N H O C K M A N C T NAR R O W L N PRO S P E R I T Y D R SHA D Y E L M R D SPRINGDALE R D Applications Sewer and Water Service Area Parcels Building Footprints I Note:Frederick County Dept ofPlanning & Development107 N Kent StSuite 202Winchester, VA 22601540 - 665 - 5651Map Created: October 10, 2017Staff: cperkins VAL L E Y P I K E SPRING D A L E R D SHA D Y E L M R D TAS K E R R D PRO S P E R I T Y D R SKYJES LN SUL K Y D R §¨¦81 0111 0137 0137 REZ # 04 - 17Carbaugh Business CenterPINs:74 - A - 68, 74 - A - 69Rezoning from RA to M1Location Map 0 840 1,680420 Feet REZ # 04 - 17Carbaugh Business CenterPINs:74 - A - 68, 74 - A - 69Rezoning from RA to M1Location Map 0111 REZ #04-17 REZ #04-17 0111 §¨¦81 ST651 ST651 ST651 ST649 74 A 69 74 A 68 634SPRINGDALE RD 371SPRINGDALE DR 4330VALLEYPIKE 4273VALLEYPIKE 579SPRINGDALE RD 4324VALLEYPIKE 507SPRINGDALE RD 115SPRINGDALE RD 117SPRINGDALE RD 124SPRINGDALE RD 140SPRINGDALE RD 421SPRINGDALE RD 385SPRINGDALE RD 385SPRINGDALE RD 4227VALLEY PIKE 136MUSKET DR 142MUSKET DR 834SHADYELM RD 224SPRINGDALE RD 222SPRINGDALE RD 970SHADYELM RD 400SPRINGDALE RD 1043SHADYELM RD 364SPRINGDALE RD 316SPRINGDALE RD 4184VALLEYPIKE 4200VALLEYPIKE 131MUSKET DR 1006SHADYELM RD 4118VALLEY PIKE 111MUSKET DR 983SHADYELM RD 4168VALLEYPIKE 4125VALLEYPIKE 957SHADYELM RD 141SKYJES LN 4050VALLEYPIKE 183SKYJES LN 161SKYJES LN 121SKYJES LN 4046VALLEYPIKE 4046VALLEYPIKE 180SKYJES LN 164SKYJES LN 138SKYJES LN 251PROSPERITY DR4006VALLEYPIKE 201PROSPERITY DR 147HOCKMAN CT133HOCKMAN CT113HOCKMAN CT 553SHADYELM RD 240PROSPERITY DR 161PROSPERITY DR 191HOCKMAN CT 171HOCKMAN CT 220PROSPERITY DR 166HOCKMAN CT 114HOCKMAN CT 130HOCKMAN CT 210PROSPERITY DR 180PROSPERITY DR 190HOCKMAN CT 750SHADYELM RD 690SHADYELM RD 188HOCKMAN CT 561SHADYELM RD 100DEVELOPMENT LN 160INDUSTRIAL DR 225SOLDIERSREST LN 110INDUSTRIAL DR 121DEVELOPMENT LN 229SOLDIERSREST LN 161INDUSTRIAL DR 227SOLDIERSREST LN 121INDUSTRIAL DR MUSK E T D R MILL LN DEVE L O P M E N T LN RENAI S S A N C E D R VAL L E Y PIKE SKYJES L N H O C K M A N C T PRO S P E R I T Y D R NAR R O W L N IND U S T R I A L D R S O L D I E R S R E S T L N SHA D Y E L M R D SPRINGDAL E R D Applications Sewer and Water Service Area Parcels Building Footprints Long Range Land Use Residential Neighborhood Village Urban Center Mobile Home Community Business Highway Commercial Mixed-Use Mixed Use Commercial/Office Mixed Use Industrial/Office Industrial Warehouse Heavy Industrial Extractive Mining Commercial Rec Rural Community Center Fire & Rescue Sensitive Natural Areas Institutional Planned Unit Development Park Recreation School Employment Airport Support Area B2 / B3 Residential, 4 u/a High-Density Residential, 6 u/a High-Density Residential, 12-16 u/a Rural Area Interstate Buffer Landfill Support Area Natural Resources & Recreation Environmental & Recreational Resources I Note:Frederick County Dept ofPlanning & Development107 N Kent StSuite 202Winchester, VA 22601540 - 665 - 5651Map Created: October 10, 2017Staff: cperkins VAL L E Y P I K E SPRING D A L E R D SHA D Y E L M R D TAS K E R R D PRO S P E R I T Y D R SKYJES LN SUL K Y D R §¨¦81 0111 0137 0137 REZ # 04 - 17Carbaugh Business CenterPINs:74 - A - 68, 74 - A - 69Rezoning from RA to M1Long Range Land Use Map 0 925 1,850462.5 Feet REZ # 04 - 17Carbaugh Business CenterPINs:74 - A - 68, 74 - A - 69Rezoning from RA to M1Long Range Land Use Map REZ #04-17 REZ #04-17 C COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 MEMORANDUM TO: Frederick County Planning Commission FROM: M. Tyler Klein, AICP, Planner SUBJECT: Ordinance Amendment – Residential Separation Buffer Waiver – Public Hearing DATE: October 20, 2017 This is a proposed amendment to Chapter 165 – Zoning Ordinance to modify the requirement for residential separation buffers in the RP (Residential Performance) Zoning District. Currently, residential separation buffers are required to adequately buffer different housing types from dissimilar housing types within adjacent separate developments. Staff has drafted a revision to the Zoning Ordinance to modify the required residential separation buffer between single-family detached (SFD) units, townhome units, single- family small lot (attached and detached) units and townhome units. The modification would change the required buffer category from a Category B Type Buffer to a Category A Type Buffer. The intent of this modification is to provide flexibility for smaller infill - type lots in the RP Zoning District, ensuring the desired housing densities are sited where they are planned for as part of the County’s 2035 Comprehensive Plan’s Long Range Land Use Plan (LRLUP). This item was proposed through a request from a private developer and discussed by the Development Review and Regulations Committee (DRRC) at their April 27, May 25, July 27, and August 24, 2017 regular meetings. The Planning Commission discussed this item at the June 7, 2017 meeting. The DRRC agreed with the proposed changes from their August 24, 2017 meeting, and the item was forwarded to the Planning Commission for discussion on September 20, 2017. The Board of Supervisors discussed this item at their October 11, 2017 meeting. The Board of Supervisors expressed concern with reducing the buffer distance between certain housing types, noting the perceived incompatibility of townhomes with single- family detached residences. The Board of Supervisors sent the item forward for public hearing. The attached document shows the existing ordinance with the proposed change supported by the DRRC (with bold italic for text added). This proposed amendment is being presented to the Planning Commission as a public hearing item. Staff is seeking a recommendation from the Planning Commission. The recommendation from the Planning Commission will be forwarded to the Board of Supervisors. Attachment: 1. Revised ordinance with additions shown in bold underlined italics. MTK/pd Article II SUPPLEMENTARY USE REGULATIONS; PARKING; BUFFERS; AND REGULATIONS FOR SPECIFIC USES Part 203. Buffers and Landscaping § 165-203.02. Buffer and screening requirements. C. Residential separation buffers. Residential separation buffers shall be established to adequately buffer different housing types from dissimilar housing types within adjacent separate developments. The requirements for residential separation buffers are as follows: (1) When placed adjacent to one another, developments with different housing types shall provide the following residential separation buffers: Minimum Residential Separation Buffer Area Required Proposed Use/Development Adjoining Existing Use/Development 1 2 3 4 5 1. Single-family detached - - A B B 2. Single-family zero lot line or small lot - - A B B 3. Multiplex or Townhouse A A - B B 4. Garden apartment or multifamily buildings C C B - A 5. Age-restricted multifamily C C C - - D CONDITIONAL USE PERMIT #07-17 Caroline (Dixie) Scheulen - Special Event Facility Staff Report for the Planning Commission Prepared: October 20, 2017 Staff Contact: M. Tyler Klein, AICP, Planner This report is prepared by the Frederick County Planning Staff to provide information to the Planning Commission and the Board of Supervisors to assist them in making a decision on this request. It may also be useful to others interested in this zoning matter. Reviewed Action Planning Commission: 09/20/17 Public Hearing Held; Postponed Planning Commission: 11/01/17 Public Meeting Board of Supervisors: 12/13/17 Pending EXECUTIVE SUMMARY: This is a request for a Conditional Use Permit (CUP) for a special event facility in the RA (Rural Areas) Zoning District. Should the Planning Commission find this application for a special event facility to be appropriate, Staff recommends that the following conditions be attached to the CUP: 1. All review agency comments shall be complied with at all times. 2. An engineered site plan, in accordance with the requirements of Article VIII of the Fredrick County Zoning Ordinance, shall be submitted to and approved by Frederick County prior to the establishment of the use. Building permits are also required for all buildings and structures. 3. Events shall start no earlier than 10 a.m. and all events and related activities shall conclude by midnight. 4. All outside music shall conclude by 9 p.m. Music may continue indoors until the conclusion of the event. 5. All lighting shall be downcast to avoid glare onto adjacent properties and residences. 6) Access to the site shall be provided to Woodchuck Lane (Route 654) via Barracks Lane (private internal access drive). The Applicant shall relocate Barracks Lane on PIN 52-A- 261 to ensure the access drive to the event center is not immediately adjacent to the southern property boundary of Parcel 52-A-280A in general conformance with the layout below: Page 2 CUP #07-17, Caroline Dixie Scheulen – Special Event Facility October 20, 2017 7) In the future, should the owner of parcel 52-A-261 be able to secure private access to Cather Lane (Route 711), Round Hill Road (Route 803), or Woodchuck Lane (Route 654) through a recorded deed of easement or written consent from the property owner, a new CUP would not be required to implement such access. 8) Events may accommodate up to and not to exceed 280 persons. 9) One (1) monument style sign with a maximum sign area not to exceed 50 square feet (SF) and not to exceed 10 feet (FT) in height is permitted. 10) Any expansion or modification of this use will require the approval of a new CUP. Following this public meeting, it would be appropriate for the Planning Commission to offer a recommendation concerning this application to the Board of Supervisors. Page 3 CUP #07-17, Caroline Dixie Scheulen – Special Event Facility October 20, 2017 LOCATION: This approximately 135-acre property is located at 283 Barracks Lane, Winchester, Virginia, immediately south of Route 50 (Northwestern Pike) and Round Hill Road and immediately west of Woodchuck Lane. MAGISTERIAL DISTRICT: Back Creek PROPERTY ID NUMBER: 52-A-261 PROPERTY ZONING & PRESENT USE: Zoned: RA (Rural Areas) Land Use: Agriculture/Open Space ADJOINING PROPERTY ZONING & PRESENT USE: North: RA (Rural Areas) Use: Agricultural/Vacant South: RA (Rural Areas) Use: Residential/Agricultural East: RP (Residential Performance) Use: Residential West: RA (Rural Areas) Use: Residential/Agricultural PROPOSED USE: This is a request for a Conditional Use Permit (CUP) to enable the establishment of a special event center for weddings and other similar type events in the RA (Rural Areas) Zoning District. Improvements to the property will include construction of a 5,000-square foot (SF) event center (including restrooms, kitchen and storage), a 600 SF detached bridal suite, a concrete patio and gazebo. The Applicant intends to develop this project in phases. REVIEW EVALUATIONS: Virginia Department of Transportation: (10-11-17 VDOT Comment Letter) The existing entrance (Barracks Lane) meets the minimum sight distance requirements for a commercial entrance/street connection. Moving the entrance east along the property frontage on Woodchuck Lane would present more challenges to overcome, foremost obtaining substantial permanent sight distance easements from the neighbor across the street and the neighbor to the east. The Round Hill Road option isn’t a great location either with the undesirable skew of the railroad tracks which are located in the functional area of the intersection. (06-30-17 VDOT Comment Letter) The application for the Conditional Use Permit for this property appears to have a measurable impact on Route 803 (Round Hill Road), the VDOT facility which would provide access to the property. Prior to operation of the bu siness a commercial entrance must be constructed to our standards to allow for safe egress and ingress of the property. Any work performed on the State’s right-of-way must be covered under a land use permit. The Page 4 CUP #07-17, Caroline Dixie Scheulen – Special Event Facility October 20, 2017 permit is issued by this office and requires an inspection fee and surety coverage. Frederick County Inspections: Please see attached comments from Mark Fleet, Building Code Official dated August 17, 2017. Winchester-Frederick County Health Department: Please see attached letter from Herbert Cormier, Environment Health Supervisor, Lord Fairfax Health District dated June 1, 2017. Frederick Water: No comments. Frederick County Fire Marshall: Please see attached comments from Kenneth Scott, Jr., Fire Inspector, Fire & Rescue dated June 5, 2017. City of Winchester: No comments. Winchester Regional Airport: No comments. Historic Resources Advisory Board: Please see attached letter from Candice E. Perkins, AICP, Assistant Director/Staff to HRAB, dated June 23, 2017. Planning and Zoning: This application is for a Conditional Use Permit (CUP) to permit the establishment of a special event facility for private events such as weddings. A special event facility is a permitted use in the RA (Rural Areas) Zoning District with an approved CUP. The Zoning Ordinance defines “special event facility” as a facility or site utilized for events that are typically conducted on a single day but which may be conducted for up to three consecutive days, for which attendance is permitted only by invitation or reservation; special events include, but are not limited to, meetings, conferences, banquets, dinners, weddings and private parties. This proposed use will take place on a 135.8-acre property, which is currently being used for agricultural purposes (raising of cattle and farming hay). The special event facility will be accessed via Barracks Lane (a private drive), from Woodchuck Lane (State Route 654), a state-owned roadway. The Applicant intends to use a portion of the site for the proposed special event facility, while maintaining the remainder of the site as productive agricultural land. The Applicant proposes to erect an approximately 5,000 square foot (SF, 50’ x 100’) one-story event center, which includes a kitchen, permanent restrooms, banquet hall and storage, a separate approximately 600 SF bridal suite, and an outdoor concrete patio and gazebo. This facility may accommodate events up to 280 persons (note: actual occupancy, not to exceed 280 persons, will be determined at time of site plan). The Applicant states the design and architecture of the proposed event center and accessory buildings will be consistent with structures found in the County’s rural areas. The Applicant also intends phase construction of the facility and accessory structures. All buildings relating to the proposed use, a special event facility, would require building permits and would not be eligible for an agricultural exemption. Page 5 CUP #07-17, Caroline Dixie Scheulen – Special Event Facility October 20, 2017 The property is surrounded by RA (Rural Areas) and RP (Residential Performance) zoned property, which includes open space, agricultural uses, and single-family detached residences. The 2035 Comprehensive Policy Plan of Frederick County (Comprehensive Plan) identifies this area of the County as “rural” and is to remain agricultural in nature and is not part of any land use study. The Board of Supervisors added “special event facilities” to the conditional use list for the County’s Rural Areas Zoning District in May 2017 to support additional opportunities for agribusiness and agritourism. The proposed use is consistent with the goals and strategies expressed in the 2035 Comprehensive Plan and the surrounding properties. STAFF CONCLUSIONS FOR THE 09/20/17 PLANNING COMMISSION MEETING: Should the Planning Commission find this use appropriate, Staff would suggest the following conditions be placed on the CUP: 1. All review agency comments shall be complied with at all times. 2. An engineered site plan, in accordance with the requirements of Article VIII of the Fredrick County Zoning Ordinance, shall be submitted to and approved by Frederick County prior to the establishment of the use. Building permits are also required for all buildings and structures. 3. Events shall start no earlier than 10 a.m. and all events and related activities shall conclude by midnight. 4. Events may accommodate up to and not to exceed 280 persons. 5. One (1) monument style sign with a maximum sign area not to exceed 50 square feet (SF) and not to exceed 10 feet (FT) in height is permitted. 6. Any expansion or modification of this use will require the approval of a new CUP. PLANNING COMMISSION SUMMARY AND ACTION OF THE 09/20/17 MEETING: The Planning Commission held a public hearing on September 20, 2017. Planning Staff provided an overview of the proposed use, noting the Applicant had satisfied all County requirements and comments from review agencies. The Applicant, Mrs. Caroline “Dixie” Scheulen also spoke, noting her desire to open a special event facility for weddings at 238 Barracks Lane, and to maintain the rural character of the property, and be a good neighbor along Woodchuck Lane. Mrs. Claire Boyd, the property owner and co-applicant, also spoke on the merits of the application, and a demand for a wedding venue to support visitors from Northern Virginia, and nearby stat es, in addition to local residents. Page 6 CUP #07-17, Caroline Dixie Scheulen – Special Event Facility October 20, 2017 During the public hearing, several members of the public spoke in opposition of the proposed special event facility, citing concerns regarding traffic along Woodchuck Lane, vehicle safety entering and leaving the site, noise from live music, outdoor lighting shining onto adjacent homes and trash. Planning Staff responded to several of the concerns raised by the public, specifically vehicle access, safety, noise, and lighting: Vehicle Access & Safety: As evaluated by the Virginia Department of Transportation (VDOT) as part of the CUP application, Barracks Lane is the preferred point-of-access due to appropriate sight distance onto Woodchuck Lane, and from Woodchuck Lane onto Round Hill Road (old Route 50). Barracks Lane is also a private drive on the Applicants property. Staff noted one solution may be the relocation of Barracks Lane along the property frontage and away from the neighboring residence, however, this would require an additional review from VDOT to ensure it would be appropriate. Other alternative vehicle access evaluated by VDOT and Planning Staff included: shared private access to existing Cather Lane to Round Hill Road; shared private access across the old Round Hill Volunteer Fire Station property to Round Hill Road; and proposed private access across an adjacent owner’s property to Round Hill Road. Staff noted that under the County’s Zoning Ordinance’s “Supplemental Use Regulations for Special Event Facilities,” shared access across adjacent property would also require the Applicant to have written consent from those owners to utilize a private easement and as such these other points of access may not be feasible. Staff further stated that VDOT had informally commented that these alternatives also may present issues with site distance onto Round Hill Road. The Planning Commission directed Staff to work with the Applicant, and VDOT, to consider relocation of Barracks Lane east along the property frontage to have less impact on an adjacent property. Noise: Staff noted noise was evaluated during the CUP application. The proposed buildings would need to adhere to the Virginia (VA) Statewide Building Code requirements, and a Condition had been included regarding hours of operation. Staff also noted the location of the proposed building was more than 1,300 FT from the nearest residence. The Planning Commission directed Staff to work with the Applicant to further restrict outdoor music, as applicable, to not adversely impact adjacent residences. Lighting: Staff noted outdoor lighting would be evaluated during review of the site plan application, and that the County’s Zoning Ordinance contained provisions for outdoor lighting standards. Staff also noted the location of the proposed building was more than 1,300 FT from the nearest residence. The Planning Commission directed Staff to work with the Applicant to further restrict outdoor lighting, as applicable, to not adversely impact adjacent residences. Page 7 CUP #07-17, Caroline Dixie Scheulen – Special Event Facility October 20, 2017 The Planning Commission continued to discuss the merits of the application, and concerns raised by members of the public. The Planning Commission voted 8-3-1 (Commissioners Marston, Ambrogi & Manual objecting; Commissioner Oates absent) to postpone action for 30-days on the CUP application, and requested Staff work to with the Applicant to include additional Conditions of Approval to address comments and concerns raised during the public hearing and Planning Commission discussion. Staff noted the application would come back to the Planning Commission at the November 1, 2017 meeting. STAFF CONCLUSIONS FOR THE 11/01/17 PLANNING COMMISSION MEETING: Following the Planning Commission Public Hearing and discussion on September 20, Staff sought additional written comments from VDOT (attached, dated 10-11-17) regarding the proposed point- of-access using Barracks Lane, and alternative points-of-access. Per VDOT’s comments, the current location of the Barracks Lane ingress from and egress to Woodchuck Lane is preferred as it meets sight distance requirements for vehicle safety. Alternative points-of-access (i.e. to Round Hill Road through the old Round Hill Volunteer Fire Station property or relocating Barracks Lane to the east) have restricted lines of sight which may impede vehicle safety exiting the property and would require the Applicant to acquire sight distance easements from neighboring properties. Additional points-of-access evaluated by Staff included: Cather Lane (State Roadway 711), direct access to Round Hill Road (State Roadway 803) or another connection to Woodchuck Lane (Route 654). Cather Lane is currently an unpaved roadway, of minimal width, with an un-signalized railroad crossing. Based on Staff’s research, it does not appear the Applicant’s property has direct access to Cather Lane through a private access agreement or recorded deed -of-easement. Direct access from the subject property to Round Hill Road, or to Woodchuck Lane at a different location, would require the Applicant to obtain ownership of adjacent private property or written permission from the adjoining property owner to access the state road network. As required under the County’s Zoning Ordinance “Supplemental Use Regulations for Special Event Facilities” (Section §165- 204.03(E)), special event facilities that share a private access easement with another property owner/s must show the easement allows a use of this type or written permission must be obtained by the sharing parties. To address comments identified at the September 20th Planning Commission Public Hearing, Staff has drafted additional conditions (see numbers 4, 5, 6, & 7 below). These new conditions further prohibit outdoor music after 9 p.m.; would require any outdoor lighting to be downcast to avoid glare onto adjacent properties and residences; and would realign the internal access drive (Barracks Lane) to avoid traffic passing directly by and vehicle headlights shining directly onto an adjacent residence. Further, Staff has included a condition to allow a new point-of-access without requiring a new CUP should the Applicant be able to secure a deed of easement or written consent from an adjacent property owner for use. Page 8 CUP #07-17, Caroline Dixie Scheulen – Special Event Facility October 20, 2017 Should the Planning Commission find this use appropriate, Staff would suggest the following conditions be placed on the CUP: 1. All review agency comments shall be complied with at all times. 2. An engineered site plan, in accordance with the requirements of Article VIII of the Fredrick County Zoning Ordinance, shall be submitted to and approved by Frederick County prior to the establishment of the use. Building permits are also required for all buildings and structures. 3. Events shall start no earlier than 10 a.m. and all events and related activities shall conclude by midnight. 4) All outside music shall conclude by 9 p.m. Music may continue indoors until the conclusion of the event. 5) All lighting shall be downcast to avoid glare onto adjacent properties and residences. 6) Access to the site shall be provided to Woodchuck Lane (Route 654) via Barracks Lane (private internal access drive). The Applicant shall relocate Barracks Lane on PIN 52-A- 261 to ensure the access drive to the event center is not immediately adjacent to the southern property boundary of Parcel 52-A-280A in general conformance with the layout below: 7) In the future, should the owner of parcel 52-A-261 be able to secure private access to Cather Lane (Route 711), Round Hill Road (Route 803), or Woodchuck Lane (Route 654) through a recorded deed of easement or written consent from the property owner, a Page 9 CUP #07-17, Caroline Dixie Scheulen – Special Event Facility October 20, 2017 new CUP would not be required to implement such access. 8) Events may accommodate up to and not to exceed 280 persons. 9) One (1) monument style sign with a maximum sign area not to exceed 50 square feet (SF) and not to exceed 10 feet (FT) in height is permitted. 10) Any expansion or modification of this use will require the approval of a new CUP. Following this public meeting, it would be appropriate for the Planning Commission to offer a recommendation concerning this application to the Board of Supervisors. CATHER LOTSSubdivision 0150 ST803 ST654 ST803 52 A 261 760WOODCHUCK LN 285FOXMEADOW LN 622WOODCHUCK LN 435WOODCHUCK LN 561WOODCHUCK LN 600WOODCHUCK LN 492WOODCHUCK LN 238CATHER LN 474WOODCHUCK LN 454WOODCHUCK LN 430WOODCHUCK LN 388WOODCHUCK LN404WOODCHUCK LN 374WOODCHUCK LN 352WOODCHUCK LN 364WOODCHUCK LN 328WOODCHUCK LN340WOODCHUCK LN 314WOODCHUCK LN 304WOODCHUCK LN 290WOODCHUCK LN 275WOODCHUCK LN 583ROUNDHILL RD 218WOODCHUCK LN 210WOODCHUCK LN 200CATHER LN 200WOODCHUCK LN 190WOODCHUCK LN 161WOODCHUCK LN235CATHER LN 775ROUNDHILL RD 158WOODCHUCK LN 180WOODCHUCK LN 221CATHER LN 137WOODCHUCK LN 615ROUNDHILL RD 599ROUNDHILL RD 571ROUNDHILL RD 551ROUNDHILL RD 729ROUNDHILL RD 120WOODCHUCK LN126WOODCHUCK LN 109WOODCHUCK LN 769ROUNDHILL RD 749ROUNDHILL RD759ROUNDHILL RD 739ROUNDHILL RD 745ROUNDHILL RD 622ROUNDHILL RD 134MOUNTVISTA DR 572ROUNDHILL RD 170MOUNTVISTA DR 973ROUNDHILL RD 961ROUNDHILL RD 945ROUNDHILL RD 933ROUNDHILL RD 911ROUNDHILL RD 121PINGLEY LN 684ROUNDHILL RD 123PINGLEY LN 668ROUNDHILL RD 132PINGLEY LN 140SINGHASS RD 953ROUNDHILL RD 873ROUNDHILL RD 837ROUNDHILL RD 789ROUNDHILL RD 799ROUNDHILL RD 110POORHOUSE RD 712ROUNDHILL RD 696ROUNDHILL RD 135PINGLEY LN 164PINGLEY LN 178MOUNTVISTA DR 1035ROUNDHILL RD 995ROUNDHILL RD 844ROUNDHILL RD 105POORHOUSE RD 127POORHOUSE RD 2693NORTHWESTERNPIKE 2691NORTHWESTERNPIKE 163PINGLEY LN 175PINGLEY LN 182PINGLEY LN 189MOUNTVISTA DR 1121ROUNDHILL RD 1059ROUNDHILL RD 1006ROUNDHILL RD 978ROUNDHILL RD 3021NORTHWESTERNPIKE 161TRINITY LN 161TRINITY LN 161TRINITY LN 928ROUNDHILL RD 872ROUNDHILL RD 858ROUNDHILL RD 160POORHOUSE RD 162POORHOUSE RD 119PINGLEY LN 185PINGLEY LN 2633NORTHWESTERNPIKE 1038ROUNDHILL RD 3073NORTHWESTERNPIKE 3015NORTHWESTERNPIKE 2957NORTHWESTERNPIKE 2793NORTHWESTERNPIKE 2755NORTHWESTERNPIKE 2727NORTHWESTERNPIKE 2641NORTHWESTERNPIKE 3111NORTHWESTERNPIKE 3079NORTHWESTERNPIKE 2911NORTHWESTERNPIKE 2835NORTHWESTERNPIKE BARRACKS LN SING H A S S R D PINGLE Y L N PO O R H O U S E R D MOUNTVISTA DR NORTHWESTERNPIKE C A T H E R L N ROUND HILL RD WOO D C H U C K L N Applications Parcels Building Footprints I Note:Frederick County Dept ofPlanning & Development107 N Kent StSuite 202Winchester, VA 22601540 - 665 - 5651Map Created: August 21, 2017Staff: tklein Round Hill ROUND HILL R D SING H A S S R D WOO D C H U C K L N L A Y C I R 0150 CUP # 07 - 17Caroline "Dixie" ScheulenPIN:52 - A - 261 Special Events FacilitiesLocation Map 0 840 1,680420 Feet CUP # 07 - 17Caroline "Dixie" ScheulenPIN:52 - A - 261Special Events FacilitiesLocation Map CUP #07-17 CATHER LOTSSubdivision 0150 ST803 ST654 ST803 52 A 261 760WOODCHUCK LN 285FOXMEADOW LN 622WOODCHUCK LN 435WOODCHUCK LN 561WOODCHUCK LN 600WOODCHUCK LN 492WOODCHUCK LN 238CATHER LN 474WOODCHUCK LN 454WOODCHUCK LN 430WOODCHUCK LN 388WOODCHUCK LN404WOODCHUCK LN 374WOODCHUCK LN 352WOODCHUCK LN 364WOODCHUCK LN 328WOODCHUCK LN340WOODCHUCK LN 314WOODCHUCK LN 304WOODCHUCK LN 290WOODCHUCK LN 275WOODCHUCK LN 583ROUNDHILL RD 218WOODCHUCK LN 210WOODCHUCK LN 200CATHER LN 200WOODCHUCK LN 190WOODCHUCK LN 161WOODCHUCK LN235CATHER LN 775ROUNDHILL RD 158WOODCHUCK LN 180WOODCHUCK LN 221CATHER LN 137WOODCHUCK LN 615ROUNDHILL RD 599ROUNDHILL RD 571ROUNDHILL RD 551ROUNDHILL RD 729ROUNDHILL RD 120WOODCHUCK LN126WOODCHUCK LN 109WOODCHUCK LN 769ROUNDHILL RD 749ROUNDHILL RD759ROUNDHILL RD 739ROUNDHILL RD 745ROUNDHILL RD 622ROUNDHILL RD 134MOUNTVISTA DR 572ROUNDHILL RD 170MOUNTVISTA DR 973ROUNDHILL RD 961ROUNDHILL RD 945ROUNDHILL RD 933ROUNDHILL RD 911ROUNDHILL RD 121PINGLEY LN 684ROUNDHILL RD 123PINGLEY LN 668ROUNDHILL RD 132PINGLEY LN 140SINGHASS RD 953ROUNDHILL RD 873ROUNDHILL RD 837ROUNDHILL RD 789ROUNDHILL RD 799ROUNDHILL RD 110POORHOUSE RD 712ROUNDHILL RD 696ROUNDHILL RD 135PINGLEY LN 164PINGLEY LN 178MOUNTVISTA DR 1035ROUNDHILL RD 995ROUNDHILL RD 844ROUNDHILL RD 105POORHOUSE RD 127POORHOUSE RD 2693NORTHWESTERNPIKE 2691NORTHWESTERNPIKE 163PINGLEY LN 175PINGLEY LN 182PINGLEY LN 189MOUNTVISTA DR 1121ROUNDHILL RD 1059ROUNDHILL RD 1006ROUNDHILL RD 978ROUNDHILL RD 3021NORTHWESTERNPIKE 161TRINITY LN 161TRINITY LN 161TRINITY LN 928ROUNDHILL RD 872ROUNDHILL RD 858ROUNDHILL RD 160POORHOUSE RD 162POORHOUSE RD 119PINGLEY LN 185PINGLEY LN 2633NORTHWESTERNPIKE 1038ROUNDHILL RD 3073NORTHWESTERNPIKE 3015NORTHWESTERNPIKE 2957NORTHWESTERNPIKE 2793NORTHWESTERNPIKE 2755NORTHWESTERNPIKE 2727NORTHWESTERNPIKE 2641NORTHWESTERNPIKE 3111NORTHWESTERNPIKE 3079NORTHWESTERNPIKE 2911NORTHWESTERNPIKE 2835NORTHWESTERNPIKE BARRACKS LN SING H A S S R D PINGLE Y L N PO O R H O U S E R D MOUNTVISTA DR NORTHWESTERNPIKE C A T H E R L N ROUND HILL RD WOO D C H U C K L N Applications Parcels Building Footprints B1 (Neighborhood Business District) B2 (General Business District) B3 (Industrial Transition District) EM (Extractive Manufacturing District) HE (Higher Education District) M1 (Light Industrial District) M2 (Industrial General District) MH1 (Mobile Home Community District) MS (Medical Support District) OM (Office - Manufacturing Park) R4 (Residential Planned Community District) R5 (Residential Recreational Community District) RA (Rural Areas District) RP (Residential Performance District) I Note:Frederick County Dept ofPlanning & Development107 N Kent StSuite 202Winchester, VA 22601540 - 665 - 5651Map Created: August 21, 2017Staff: tklein Round Hill ROUND HILL R D SING H A S S R D WOO D C H U C K L N L A Y C I R 0150 CUP # 07 - 17Caroline "Dixie" ScheulenPIN:52 - A - 261 Special Events FacilitiesZoning Map 0 840 1,680420 Feet CUP # 07 - 17Caroline "Dixie" ScheulenPIN:52 - A - 261Special Events FacilitiesZoning Map CUP #07-17 E COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 MEMORANDUM TO: Frederick County Planning Commission FROM: Candice E. Perkins, AICP, CZA, Assistant Director DATE: October 23, 2017 RE: Public Meeting: 2017-2022 Capital Improvements Plan (CIP) The Capital Improvements Plan (CIP) is a document that consists of a schedule of major capital expenditures for the County for the ensuing five-year period, as well as, a category for long term projects (6 + years out). Staff would note that this update to the CIP has been modified from its previous version to improve its presentation and utility, and to reflect input provided by members of the Planning Commission and Board of Supervisors. The plan is intended to assist the Board of Supervisors in preparation of the County budget. In addition to determining priorities for capital expenditures, the County must also ensure that projects contained within the CIP conform to the Comprehensive Plan. Specifically, the projects are reviewed with considerations regarding health, safety, and the general welfare of the public, and the policies of the Comprehensive Plan. When the CIP is adopted, it becomes a component of the Comprehensive Plan. Frederick County approved the 2035 Comprehensive Plan on January 25, 2017. The inclusion of projects on the CIP is in no way an indication that Frederick County will be undertaking these projects. The CIP is strictly advisory; it is intended for use as a capital facilities planning document, not for requesting funding allocations. Once adopted, project priorities and cost estimates may change throughout the year based on changing circumstances. It is also possible that particular projects may not be funded during the year that is indicated in the CIP. The status of any project becomes increasingly uncertain the further in the future it is projected. The CIP is also updated annually, and projects are removed from the plans as they are completed or as priorities change. Please note that the monetary amounts shown within the tables were compiled December 2016-January 2017; some of these figures may have changed. Updated figures will be gathered during the next CIP cycle (2018-2023). CIP Components The CIP provides project recommendations from various County Agencies and tables that outline the projects and cost estimates for the projects. Within the tables, columns for each year show the funding needs that would be requested in the corresponding budget cycle. In addition, those projects that are long range projects have been placed at the end of the CIP table, outside of the five-year window. 2017-2022 CIP October 23, 2017 Page 2 The CIP includes a total of 75 projects, including several new projects. Projects within the CIP are for: Schools, Parks and Recreation, Regional Library, Transportation, Winchester Regional Airport, County Administration, and Fire and Rescue. Background – Discussions On March 20, 2017, the Comprehensive Plans and Programs Committee (CPPC) met with County Department and Agency representatives to discuss their individual capital improvement project requests, including new projects and modifications to previous requests, associated with the 2017-2018 CIP. The role of the CPPC in the CIP process was to ensure that the various departmental project requests are in conformance with the County’s Comprehensive Plan. The evaluation and prioritization of departmental projects was presented by Frederick County Public Schools, Parks and Recreation, and Staff. Also provided was a projected cost for each project as required by the Code of Virginia. Following the CPPC discussion, the Committee endorsed the CIP and endorsed its conformance with the County’s Comprehensive Plan. The CPPC forwarded the CIP to the Planning Commission for discussion. The Planning Commission discussed the CIP on April 5, 2017 meeting; at that meeting the Planning Commission stated that the CIP conformed with the Comprehensive Plan and sent the document forward to the Board of Supervisors. The Planning Commission held a public hearing for the CIP on September 6, 2017; the CIP was tabled for 45 days due to the monetary figures within the CIP. Staff has initiated the update of this information for the upcoming CIP cycle which will be presented to the Planning Commission at a future date. In the meantime, direction has also been provided to move the 2017-2022 CIP on to the Board of Supervisors at this time. Conclusion It is the role of the Planning Commission to affirm that the projects contain within the 2017- 2022 CIP are in conformance with the 2035 Comprehensive Plan. Staff is seeking a decision from the Planning Commission on the conformance of the included projects within the 2035 Comprehensive Plan. Following the November 1, 2017 Planning Commission meeting, the CIP will be scheduled for public hearing at the December 13, 2017 Board of Supervisors meeting. Please find attached the Draft 2017-2022 CIP with applicable text, tables and maps. If adopted, the CIP and included maps will ultimately become a component of the Comprehensive Plan, which would satisfy the review requirement of Section 15.2 -2232 of the Code of Virginia, which states that no public facility shall be constructed unless said facility is a “feature shown” within a jurisdiction’s comprehensive plan. Please contact the Planning Department should you have any questions regarding this information. CEP/pd Attachments Adopted by the Frederick County Board of Supervisors TBD, 2017 Recommended by the Frederick County Planning Commission TBD, 2017 FREDERICK COUNTY, VIRGINIA 2017-2022 CAPITAL IMPROVEMENT PLAN TABLE OF CONTENTS INTRODUCTION……………………………...……………………………….. 1 PROJECT RECOMMENDATIONS……………..………..………………….2 Frederick County Public Schools…………………….……... 2 Frederick County Parks and Recreation ..………………. 2 Handley Regional Library .………………….………….……….3 Transportation Committee……………………………………. 3 Winchester Regional Airport………………………….……….4 County Administration .……………………………..…………..4 Fire & Rescue………...……………………………….………………5 2017-2022 CAPITAL PROJECTS MAPS 2017-2022 Capital Projects………………………………………6 2017-2022 Frederick County Public Schools….…….…..7 2017-2022 Parks and Recreation ………………..…..………8 2017-2022 Transportation Projects………………..………..9 CIP TABLE EXPLANATIONS………………………………………….………10 PROJECT FUNDING……………………………………………………………. 10 2017-2022 CAPITAL IMPROVEMENT PROJECTS TABLE….….…11 APPENDIX - PROJECT DESCRIPTIONS Frederick County Public Schools…………………………... 16 Frederick County Parks and Recreation ……………….…21 Handley Regional Library……………………………………….. 31 Transportation Committee……………………………………..33 Winchester Regional Airport………………………………. 40 County Administration……………………………………….. 44 Fire and Rescue……………..……………………………………….48 1 CAPITAL IMPROVEMENTS PLAN FREDERICK COUNTY FY 2017-2022 INTRODUCTION Section §15.2-2239 of the Code of Virginia assigns the responsibility for preparation of plans for capital outlays to the local Planning Commissions. The Capital Improvements Plan (CIP) consists of a schedule for major capital expenditures for the County for the ensuing five years. The CIP is updated annually. Projects are removed from the plans as they are completed or as priorities change. The plan is intended to assist the Board of Supervisors in preparation of the County budget. In addition to determining priorities for capital expenditures, the County must also ensure that projects contained within the CIP conform to the Comprehensive Plan. Specifically, the projects are reviewed with considerations regarding health, safety, and the general welfare of the public , and the policies of the Comprehensive Plan. Once the CIP is adopted, it becomes a component of the 2035 Comprehensive Plan and provides a link between the documents and potential proffered contributions made with future rezoning projects. The inclusion of projects to the CIP is in no way an indication that Frederick County will be undertaking these projects. The CIP is strictly advisory; it is intended for use as a capital facilities planning document, not for requesting funding allocations. Once adopted, project priorities may change throughout the year based on changing circumstances. It is also possible that particu lar projects may not be funded during the year that is indicated in the CIP. The status of any project becomes increasingly uncertain the further in the future it is projected. 2 PROJECT RECOMMENDATIONS Frederick County Public Schools Frederick County Public Schools continue to commence and complete capital projects that have been priorities from previous years. The joint top capital improvement priority for the Schools is the construction of the 4th High School. The new high school has been requested to relieve overcapacity issues at the high school level and in anticipation of projected student population growth. Additions and renovations to Armel Elementary School is the second highest priority, followed by the construction of the 12 th Elementary School as the third highest priority. The second and third priorities are in recognition of the anticipated community growth in these two general locations. Other schools included for renovation projects include Robert E. Aylor Middle School, Apple Pie Ridge Elementary School, Bass Hoover Elementary School, and James Wood High School. This year’s CIP also includes requests to improve the parking lot and construct a softball field at Sherando High School, Route 522 North transportation improvements for the Gainesboro Campus and plans to renovate and expand the current administration building on Amherst Street. Parks & Recreation Swimming improvements continue to be a focus for Parks and Recreation. The indoor aquatic facility continues to be proposed as a high priority of the Parks and Recreation Department. In recent years this project has been moved up to the De partment’s second priority in recognition of Frederick County Public Schools 4 th High School land opportunity. The upgrade of pool amenities at the swimming pools at both parks will include the addition of water slides and a spray ground. This project is expected to increase pool attendance by 30 percent while providing recreational opportunities for both the Sherando and Clearbrook Park service areas. The majority of the recommended projects are planned for the County’s two regional parks (Sherando & Clearbrook). However, a new project, the Frederick Heights Park has been identified in recognition of improvements requested to allow public access to underutilized park land. Other projects include the Snowden Bridge Park and continued improvements to the Rose Hill Park. 3 The effort of the Parks and Recreation Department and their identification of their comprehensively planned parks including community, neighborhood, and district parks, further emphasize the connection between the CIP, Comprehensive Plan, and potential proffered contributions made with rezoning projects. Projects planned for Sherando Park include: upgrade of baseball lighting, upgrade pool amenities, a softball complex, a socce r complex, maintenance compound and office, skateboard park, parking and multi-purpose fields with trail development, picnic area with a shelter, and an access road with parking and trails. The projects planned for the Clearbrook Park include, upgrade of baseball lighting, upgrading pool amenities, a new open play area, a tennis/basketball complex, and shelter with an area for stage seating. A project that continues to be a high priority for Parks and Recreation is the Abrams Creek Greenway Trail. This facility would provide recreational opportunities for residents of this corridor along with the surrounding communities and was emphasized in the Senseny/Eastern Frederick Urban Areas Plan completed during 2012 . This project will provide trails with bicycle, walking and jogging opportunities, which ranks #1 in the 2007 Virginia Outdoors Plan survey for all outdoor recreational activities. Handley Regional Library The Handley Regional Library recommends three projects. The library’s top priority is a new library branch in the Gainesboro area. The two remaining projects request that funding be provided for new library branches throughout the County which include the areas of Senseny/Greenwood Road and Route 522 South, both of which are anticipated to be located within the UDA (Urban Development Area) in locations consistent with recently approved area plans; the Senseny/Eastern Frederick Area Plan, and the Southern Frederick Area Plan. Transportation Committee The Transportation Committee continues to provide project requests for the CIP. Virginia State Code allows for transportation projects to be included within a locality's CIP. Funding for transportation project requests will likely come from developer s and revenue sharing. Implementation of transportation projects does not take away funding for generalized road improvements. The Transportation Committee has requested funding for 22 projects. The 22 requests include projects that entail widening of major roads; key extensions of roads that help provide better networks, bicycle and pedestrian improvements, a nd the addition of turn lanes at current unsafe intersections. The inclusion of the Eastern Road Plan Improvements item once again emphasizes the 4 connection between the CIP and potential proffered contributions made with rezoning projects which are aimed at mitigating potential transportation impacts identified in the Comprehensive Plan. The major change to the transportation project list in recent years CIP’s is the classification of the projects into funded and unfunded priorities. Winchester Regional Airport Funding for airport projects is derived through a complex formula where the federal and state governments contribute a majori ty of the funding, with Frederick County and the other jurisdictions providing the remaining funding. The construction of a new general aviation terminal to support future airport operations and associated parking improvements continues to be number one in the CIP, followed by the Fuel Storage Facility. The Airport has recently completed a major improvement of their runway. With this project moving from the CIP, The Airport Authority is now focusing their CIP efforts on taxiway improvements and property acquisition in support of airport development to meet Federal Aviation requirements for general aviation facilities. The vast majority of the funding for these improvements came from the FAA and VDA . The number of projects that are included in this CIP has been consolidated in recent years as the Airport Authority is further aligning the County’s CIP with the one provided to the Virginia Department of Aviation. County Administration With the potential necessary relocation of the Clearbrook citizen convenience center in the future, the number one priority is a new facility proposed as a replacement for the current convenience site at another location in the immediate vicinity to the existing convenience site. The other requests from Public Works are for the expansion/relocation of both the Albin and the Gore Refuse Sites to allow for a trash compactor, which will reduce operational costs, by compacting trash before it reaches the landfill. The joint County Administration and School Administration Building that was included in recent CIP’s remains in this year’s project list along with the future replacement of the Joint Judicial Center. 5 Previously, an item was added to enhance the connection between the CIP and proffered contributions made to mitigate the impacts of development projects. This item, General Government Capital Expenditures, is an item that addresses those general government capital expenditures that may fall below the established $100,000 departmental threshold. This is similar to the approach previously taken for Fire and Rescue Capital Equipment. Fire and Rescue has its own section. Fire and Rescue The top project for the Fire and Rescue component remains the creation of Fire & Rescue Station #22 in the vicinity of Route 277, with the ability to provide an annex facility for other County-related offices. The collaboration of this project with other commu nity users and a land use planning effort was a key element of the Southern Frederick Land Use Plan. Fire and Rescue has also inc luded a project which provides for the capital apparatus needs of this facility. Fire & Rescue has once again requested the creation of Station #23, a new facility located in the vicinity of Crosspointe, and a Fire & Rescue Regional Training Center. Such a Regional Public Safety Training Center potentially consisting of an administrative b uilding, multi-story burn building, multi-story training tower, vehicle driving range, shooting range, and numerous other training props. This project will incorporate emergency medical services, fire, hazardous materials, rescue, law enforcement, industrial, and educ ational institutions located within the region. Fire and Rescue Volunteer Company Capital Equipment Requests Previously, a project consisting of a revolving fund in the amount of $1,000,000 for the benefit of Fire and Rescue Services was established. It is the intention of this capital expenditure fund to be for the purpose of purchasing additional and replacement capital equipment fire and rescue vehicles and equipment that may fall below the guidelines established by the Finance Commit tee. It was determined that the inclusion of such a project would be beneficial in ensuring that this significant capital expense is identified in the County’s capital planning and budget process. This project is primarily for the benefit of the individual Volunteer Fire and Rescue Companies. This year’s CIP does contain requests that do meet this guideline. Individual Fire and Rescue Companies previously identified their own capital requests which have been added to the CIP in a l ump sum amount. Each of the capital requests meet the $100,000 guideline established by the Finance Committee. §¨¦81 §¨¦66 §¨¦81 0137 01259 01277 0155 0150 0111 01127 01522 017017 0150 0111 0150 01522 01522 0111 0137 0150 33 3 1 1 2 3 2 4 2 1 1 0 10,000 20,0005,000 Feet02.5 51.25 Miles V 2017 - 2022Frederick CountyCapital Imp rovements Plan2017 - 2022Capital ImprovementsSpecific or Approximate Locations 1 Clearbrook Convenience Site2 Albin Convenience Site Expansion3 Gore Convenience Site Expansion County Administration Airport 1 Library Branch - Gainesboro2 Library Branch - Senseny & Greenwood3 Library Branch - Rt 522 South Library 1 Fire & Rescue Station 222 Clearbrook Fire Station Relocation3 Fire & Rescue Station 234 Fire & Rescue Station 24 Fire & R escue ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! Elementary School 12th Elementary School,at Snowden Bridge Middle School The Willows Fourth High School Elementary School Elementary School Elementary School Multi-Use Campus Villages at Artrip SHS MHS JWHS FCMS JWMS REAMS ABMS Buildings & Grounds Old Transportation Facility Administration Senseny Road Dowell J. Howard New Transportation Facility GBES SWES RRES APRES EES AES BHES MTES OVES IHES GMES 0155 0111 0111 01259 0111 01277 01522 01127 01522 0150 01522 01522 0150 017 015220137 0150 01522 01522 0137 §¨¦81 §¨¦81 §¨¦81 Win ches ter Midd leto wn Ste phe nsCity !High Schools !Middle Schools !Elementary Schools !Support FacilitiesPotential School Facility Locations Potential School LocationsPurchased LandProffered LandPotential ProfferUrban D evelopment AreaSWSA V 0 2 41 MilesNote:Created by Frederick County Department ofPlanning & Development Map represents the Capital Improvement Requests submitted by Frederick County School Board3/8/17 School LocationsAre MostAppropriateWithin the U DA 2017 - 2022Frederick CountyCapital Imp rovements Plan Existing and Potential School Locations [k [k §¨¦81 £¤55 £¤50£¤259 £¤522 £¤522 £¤277 £¤522 £¤50 £¤11 £¤37 £¤11 £¤37 §¨¦81 ClearbrookPark SherandoPark Rose HillPark Snowden BridgePark Frederick HeightsPark Gore Armel Albin Round Hill Stephenson Gainesboro Shawneeland Clear Brook Star Tannery Cross Junction Reynolds Store V 0 1.5 30.75 Miles Note:Created by Frederick County Department ofPlanning & Development Map represents the Capital Improvement Requests submitted by The Dept of Parks & Recreation3/8/2017 Proposed Parks DistrictCommunityNeighborhoodAbrams C reek TrailExisting County Parks District ParkCommunity Park [k Neighborhood ParkPublically Accessible Land FederalStateBattlefieldNon-ProfitLocal ParkTuscarora TrailSchool !y Public Boat LaunchUrban Development Area 2017 - 2022Frederick CountyCapital Imp rovements Pl anNew Parks/Rec Locations National Forest EAST NE WEST Winchester Stephens City Middletown 0111 0111 0111 0111 01277 01522 01522 0150 017 0137 01522 0150 0137 §¨¦81 §¨¦81 §¨¦81 §¨¦81 §¨¦81 Winche ster Steph ensCity 0 1 20.5 Miles Frederick County Dept ofPlanning & Development107 N Kent StWinchester, VA 22601www.fcva.us3/8/17 V 2017 - 2022Frederick CountyCapital Imp rovement PlanTransportation Projects 6 6 6 6 2 8 11 18 4 3 5 121615 99 14 14 14 10 2017 - 2022Capital Improvement PlanTransportation Projects $+17 $+13 $+19 ðñò""307 7 ðñò""310 1 $+20 $+21 Funded Priorities 1. I-81 EXIT 310 IMPROVEMENTSðñò""310 2. ROUTE 277 WID ENING & SAFETY IMPROVEMENTS (PH 1) 3. EAST TEVIS ST EXTENSION &BRIDGE OVER I-814. RENAISSAN CE DR, PHASE 2 5. SULPHUR SPRINGS RD IMPROVEMENT FROM ROUTE 50 TO LAND FILL Unfun ded Prio rities 22. EASTERN ROAD PLANIMPROVEMENTS22 21. SENSENY R D; TURN LANES AT CR ESTLEIGH DR$+21 20. PAPERMILL RD; RT TURNLANE EXTENSION AT ROUTE 522$+20 19. ROUTE 277; RT TURN LANE EXTENSION AT WARRIOR DR$+19 18. WARRIOR DR EXTENSIONFROM ROUTE 37 16. IN VERLEE WAY; C ONNECTION FROM SENSENY RD TO ROUTE 50 15. SENSENY R D WIDENIN G 14. ROUTE 11 N OF WINCHESTER WIDENING TO WV LINE 13. BR UCETOWN RD/HOPEWELL RD; ALIGNMENTAND INTERSECTION$+13 12. CHANNING DR EXTENSION TO ROUTE 50 11. WARRIOR DR EXTENSION TO NEW EXIT 307 10. ROUTE 11 N WID ENING FROMSNOWDEN BRIDGE BLVD TOOLD C HARLESTOWN RD 9. REDBUD RD & EXIT 307 RAMPREALIGNMENTS 8. ROUTE 277 WID ENING & SAFETY IMPROVEMENTS (PH 2) 7. I-81 EXIT 307 RELOCATIONðñò""307 6. CONTIN UE ROUTE 37 PLANNING & ENGINEERING WOR K 17. FOX DR; INSTALL TURNLANES ONTO ROU TE 522$+17 10 THE CIP TABLES - CONTENT DESCRIPTIONS The Capital Improvements Plan tables, on the following four pages, contains a list of the capital improvement projects proposed for the ensuing five years. A description of the information in this table is explained below. Projects Ranked by Department - The priority rating assigned by each agency or department for their requested projects. County Contribution - The estimated dollar value that will be contributed for each project. This value is listed by individual fiscal years and by total contributions over the five-year period. The total contribution column, located to the right of the fiscal year columns, does not include debt service projections. Notes - Indicates the footnotes that apply to additional funding sources for particular projects. Total Project Costs - The cost for each project, including the County allocations and other funding sources. PROJECT FUNDING The projects included in Table 1 have a total projected cost to the County of $247,794,039, this figure excludes Airport request and transportation projects as these are primarily funded through other sources. While the CIP is primarily used to cover the next five years, much of the project costs have been identified beyond the next five years.  School projects are funded through a combination of loans from the Virginia Public School Authority and the Virginia Literary Fund.  Funding for Parks and Recreation Department projects will come from the unreserved fund balance of the County. The Parks and Recreation Commission actively seeks grants and private sources of funding for projects not funded by the County.  The inclusion of transportation projects to the CIP is in no way an indication that Frederick County will be undertaking these projects. Funding projects will continue to come from a combination of state and federal funds , developer contributions, and revenue sharing.  Airport projects will be funded by contributions from the federal, state, and local governments. The local portion may include contributions from Frederick, Clarke, Shenandoah, Warren Counties, and the City of Winchester. Contribution Per Fiscal Year Projects - Ranked by Department 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 2022+ Long Range Comprehensive Plan Projects County Contributions Notes Total Project Costs Department Ensuing Fiscal Year Year 2 Year 3 Year 4 Year 5 Beyond Year 6+ Public Schools Please refer to the map identifying future school sites for additional school sites located throughout the County. Fourth High School $31,000,000 $29,500,000 $21,500,000 $9,400,000 $91,400,000 $91,400,000 Armel Elementary School $5,100,000 $2,900,000 $8,000,000 $8,000,000 Addition and Renovation Elementary School #12 $20,500,000 $11,900,000 $32,400,000 $32,400,000 Robert E. Aylor Middle School Addition and Renovation TBD TBD TBD James Wood High School Upgrades TBD TBD TBD Sherando High School Parking Lot & Softball Field Improvements TBD TBD TBD Route 522 North Super Street at Gainesboro Campus TBD TBD TBD Apple Pie Ridge Elementary Phase 2 Renovation TBD TBD TBD Bass Hoover Elementary Phase 2 Renovation TBD TBD TBD Administration Office TBD TBD TBD Total $0 $56,600,000 $44,300,000 $21,500,000 $9,400,000 $0 $131,800,000 $131,800,000 Parks & Recreation Sherando North West Sherando Park $671,000 $671,000 $671,000 Indoor Aquatic Facility $480,000 $10,820,000 $11,300,000 $11,300,000 Frederick Heights Park $197,000 $197,000 $197,000 Clearbrook & Sherando Water Slide/Spray Ground $624,000 $624,000 $624,000 Abrams Creek Greenway Trail $61,000 $1,200,000 $1,200,000 $1,200,000 $3,661,000 $3,661,000 Snowden Bridge Park Development $300,000 $4,250,000 $4,550,000 $4,550,000 Rose Hill Playground $100,000 $100,000 $100,000 Sherando Area 4 North Park Development $176,000 $1,473,000 $1,649,000 $1,649,000 Baseball Field Lighting Upgrade $1,300,000 $1,300,000 $1,300,000 Sherando Area 3 North Park Development $2,121,000 $2,121,000 $2,121,000 Community Park $1,970,000 $1,970,000 $1,970,000 Neighborhood Parks (6)$831,000 $4,155,000 $4,986,000 $4,986,000 District Parks (4)$3,934,000 $7,869,000 $11,803,000 $11,803,000 Community Center Sherando South Sherando Park Development $2,035,000 $2,035,000 $2,035,000 Fleet Trip Vehicles $9,067,000 $9,067,000 $9,067,000 Sherando Area 1 North Park Development $1,153,000 $1,153,000 $1,153,000 Sherando Area 2 North Park Development $529,000 $529,000 $529,000 Indoor Ice Rink $307,000 $307,000 $307,000 Clearbrook Clearbrook Park Development $524,000 $524,000 $524,000 Total $671,000 $5,359,000 $20,544,000 $14,201,000 $4,917,000 $12,331,000 $524,000 $58,547,000 $58,547,000 Table 1 - 2017-2022 Capital Improvement Plan Requests Contribution Per Fiscal Year Projects - Ranked by Department 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 2022+ Long Range Comprehensive Plan Projects County Contributions Notes Total Project Costs Regional Library Gainesboro Library $155,023 $1,465,736 $128,275 $1,749,034 $1,749,034 Senseny/Greenwood Library TBD TBD TBD Route 522 South Library TBD TBD TBD Total $0 $155,023 $1,465,736 $128,275 $0 $0 $1,749,034 $1,749,034 County Administration Clearbrook Convenience Site $540,650 $540,650 E $540,650 Albin Convenience Site $30,000 $540,650 $570,650 $570,650 Relocation/Expansion Gore Site $30,000 $358,105 $388,105 $388,105 General Government Capital Expenditures $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000 E $1,000,000 County/School Board Administration Building TBD TBD E TBD Joint Judicial Center TBD New Facility E $0 Total $200,000 $770,650 $770,650 $558,105 $200,000 $0 $2,499,405 $2,499,405 Fire & Rescue Fire & Rescue Station #22 (277)$400,000 $1,500,000 $1,500,000 $3,400,000 $3,400,000 F&R Station #22 (277) Apparatus $100,000 $805,000 $905,000 $905,000 Fire & Rescue Station #23 $550,000 $2,150,000 $1,000,000 $3,700,000 $3,700,000 Regional Training Center $75,000 $100,000 $1,250,000 $10,000,000 $9,500,000 $10,250,000 $31,175,000 $31,175,000 Total $0 $1,125,000 $4,555,000 $3,750,000 $10,000,000 $9,500,000 $10,250,000 39,180,000 $39,180,000 Fire & Rescue Company Capital Requests Fire & Rescue Capital Equipment $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000 E $1,000,000 Fire & Rescue Company Requests $13,018,600 $13,018,600 E $13,018,600 including capital equipment requests Total $871,000 $64,009,673 $71,635,386 $40,137,380 $24,517,000 $21,831,000 $246,794,039 $247,794,039 Other Funding Sources:E= Partial funding anticipated through development & revenue sources TBD= To be Determined Contribution Per Fiscal Year Projects - Ranked by Agency 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 2022+ Long Range Comprehensive Plan Projects County Contributions Notes Total Project Costs Ensuing Fiscal Year Year 2 Year 3 Year 4 Year 5 Beyond Year 6+ Funded Priorities I-81 Exit 310 Improvements $49,121,000 $49,121,000 E $49,121,000 Route 277, Fairfax Pike, Widening and Safety Improvements (ph 1)$38,000,000 $38,000,000 E $38,000,000 East Tevis Street Extension and Bridge over 81 $15,000,000 $15,000,000 E $15,000,000 Rennaisance Drive, Phase 2 $5,300,000 $5,300,000 E $5,300,000 Sulpher Springs Road Improvement project $5,000,000 $5,000,000 E $5,000,000 Unfunded Priorities Route 37 Engineering & Construction $300,000,000 $300,000,000 E $300,000,000 I-81 Exit 307 Relocation $60,000,000 $60,000,000 E $60,000,000 Route 277, Fairfax Pike, Widening and Safety Improvements (ph 2)$25,500,000 $25,500,000 E $25,500,000 Redbud Road Realignment and Exit 317 Ramp realignment $11,500,000 $11,500,000 E $11,500,000 Widening of Route 11 North (ph 1)$28,500,000 $28,500,000 E $28,500,000 Warrior Drive Extension (south)$23,200,000 $23,200,000 E $23,200,000 Channing Drive Extension $20,600,000 $20,600,000 E $20,600,000 Brucetown/Hopewell Realign.$3,000,000 $3,000,000 E $3,000,000 Widening of Route 11 North (ph2)$47,800,000 $47,800,000 E $47,800,000 Senseny Road Widening $22,800,000 $22,800,000 E $22,800,000 Inverlee Way $10,200,000 $10,200,000 E $10,200,000 Fox Drive $250,000 $250,000 E $250,000 Warrior Drive Extension (Crosspointe south)$12,000,000 $12,000,000 E $12,000,000 Route 277 right turn extension Warrior Drive $500,000 $500,000 E $500,000 Papermill Road right turn lane extension Route 522 $500,000 $500,000 E $500,000 Senseny Road turn lanes/improvements Crestleigh Drive $2,600,000 $2,600,000 E $2,600,000 Eastern Road Plan Improvements TBD TBD E TBD Total $112,421,000 $0 $0 $0 $0 $0 $568,950,000 $681,371,000 $681,371,000 Other Funding Sources: E= Partial funding anticipated through development & revenue sources Table 2 - Transportation Projects - CIP Requests The inclusion of transportation projects to the CIP is in no way an indication that Frederick County will be undertaking these projects. Funding projects will continue to come from a combination of state and federal funds, developer contributions, and revenue sharing Contribution Per Fiscal Year Projects - Ranked by Agency 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 2022+ Long Range Comprehensive Plan Projects County Contributions Notes Total Project Costs Ensuing Fiscal Year Year 2 Year 3 Year 4 Year 5 Beyond Year 6+ New General Avaiation Terminal $380,000 $3,330,000 A,B $3,710,000 Fuel Storage Facility Design/Construction $1,000,000 A,B $1,000,000 North Side Svc Road $400,000 A,B $400,000 Taxiway "A" Relocation Design/Construction $200,000 $4,650,000 $1,250,000 $1,250,000 $2,300,000 A,B $9,650,000 Land Parcel 64-A-64 $275,000 A,B $275,000 Land Parcel 64-A-60 $275,000 A,B $275,000 Land Parcel 64-A-59 $300,000 A,B $300,000 Land Parcel 64B-A-52 $300,000 A,B $300,000 Total $0 $2,130,000 $8,980,000 $1,250,000 $1,250,000 $2,300,000 $0 $15,910,000 A= Partial funding from VA Dept. of Aviation B= Partial funding from FAA Table 3 - Winhester Reginal Airport CIP Requests *Airport projects will be funded by contributions from the federal, state, and local governments. The local portion may include contributions from Frederick, Clarke, Shenandoah, and Warren Counties, and the City of Winchester. 15 APPENDIX PROJECT DESCRIPTIONS 16 Frederick County Public Schools Project Priority List PRIORITY 1 - Fourth High School Description: The fourth high school project will serve students grades 9-12, have a program capacity of 1,725 students, and will address anticipated growth in high school student enrollment in the school division. The site is located at the end of Juste s Drive behind Admiral Byrd MS. This school is designed for collaborative education, similar to the new Frederick County MS, with a variety of learning spaces to meet the needs of a variety of learning styles and to impart skills necessary in today’s working world. Capital Cost: $91,400,000 Justification: This project will address expected growth in high school student enrollment in the school division over the next several years. We project that enrollment in the high schools by the fall of 2020 will be 4,246 students. High school progr am capacity is currently 4,050 students. To relieve overcro wding in the high schools, we need to construct the fourth high school in Frederick County to open in that time frame. Construction Schedule: Construction will take 48 months PRIORITY 2 - Armel Elementary School Addition and Renovation Description: Armel ES opened in 1991 and has served continuously as a K-5 elementary school since that time. The school contains 70,281 square feet and has a program capacity of 590 students. As of October 31, 2016, the school has 606 students. Eight classrooms will be added to Armel ES, to accommodate the additional growth at Lake Frederick. The existing facility will be updated as needed and core areas partially renovated to serve the additional students. Capital Cost: $8,000,000 Justification: Armel Elementary School is in good condition; however, growth in the attendance zone will need to be addressed through the addition of classrooms to the facility. An attendance rezoning was completed three years ago as part of the implementation of full-day kindergarten. Addressing the growth issue at Armel was studied as a part of this rezoning. Four areas were identified to be rezoned to another school to offset the additional growth at Lake Frederick. None of the four options provided a complete and satisfactory solution. One option would have put Armel outside of its own attendance zone. A second would have split a neighborhood and sent some of the neighborhood to a school further away. A third would have simply relocated the gro wth issue to another school. The fourth option was adopted, but only moved ~50 students, a temporary reprieve from growth pressures. Construction Schedule: 30 months 17 PRIORITY 3 - New 12th Elementary School Description: The 12th ES will have a floor area of approximately 100,000 square feet and will be located in Snowden Bridge. The facility will be designed to accommodate a student membership of 600. Capital Cost: $32,400,000 Justification: The 12th ES project will address anticipated growth in student enrollment in the school division in ge neral and in the Stonewall and Redbud Run Elementary School attendance zones in specific over the next several years. Construction Schedule: 30 months PRIORITY 4 - Robert E. Aylor Middle School Addition and Renovation Description: Robert E. Aylor Middle School opened in 1969 as a junior high. The school contains 113,643 square feet and has a program capacity of 850 students serving grades 6 -8. The building is in acceptable condition; however, several major areas need to be addressed in a renovation. Major areas of this renovation project include the following: reorganization and addition of classroom and storage space to better equip the building to support collaborative education, complete replacement of fire ala rm and communication systems, upgrade of electrical and plumbing, and complete replacement of mechanical systems. Other areas to be addressed are security and reorganization of asphalted areas. Capital Cost: $TBD Justification: Robert E. Aylor Middle School is 47 years old and renovations are needed to a number of areas to ensure the economical and efficient operation of the school for years to come. The school was constructed as a junior high, where the s chool was arranged by department. Modern instruction requires that the school be arrang ed by grade and that a variety of learning spaces be provided (classroom, low intensity labs, high intensity labs, small collaborative spaces, large collaborative space s, etc.) to meet the needs of a variety of learning styles and to impart skills necessary in today’s working world. Construction Schedule: 48 Months PRIORITY 5 - James Wood High School Upgrades Description: James Wood High School opened in 1980 and has served as a high school since that time. The school contains 234,095 square feet and has a program capacity of 1,400 students. Currently, the building serves grades 9 -12. The building is in good condition; however, several major areas need to be addressed in a renovation. Major areas to be included in this renovation project 18 are increased electrical service and distribution to support technology, technology cabling, hardware and its installation, upgrade of plumbing and mechanical systems, and modification of instructional areas to support modern instructional delivery. Capital Cost: $TBD Justification: James Wood High School is 36 years old. Renovations and technological upgrades are needed to a number of areas to ensure effective, economical, and efficient operation of the school for years to come. This school will be renovated to be m ore like the 4th HS, the new Frederick County MS, and the renovated Aylor MS, with a variety of learning spaces to meet the needs of a variety of learning styles and to impart skills necessary in today’s working world. Construction Schedule: 36 Months PRIORITY 6 - Sherando High School Parking Lot and Softball Field Improvements Description: This project is being undertaken to address several traffic safety concerns identified over the years at Sherando High School and to address equity issues (there is no softball field at SHS). Two studies of the site have been conducted, and a master plan created. Concerns exist for pedestrians, school buses, student drivers, parents, and staff. Rearrangement of the site and the flow of traffic on the site are necessary to address these needs. Capital Cost: $TBD Justification: This is a two-part project. For transportation safety, concerns exist on the school site at Sherando High School during arrival and dismissal. The students, many of their parents, and the staff necessary to serve them are exposed to these safety concerns on a daily basis. The flow of traffic at arrival is so slow that at times vehicles on Route 277 back up past Double Church Road. For the softball field, SHS does not have a softball field on site, instead using a softball field in neighboring Sherando Park. This represents an equity issue between boys and girls sports and is contrary to FCPS’ standpoint of equity between boys and girls sports. Construction Schedule: 30 Months PRIORITY 7 - Route 522 North Super Street at Gainesboro Campus Description: The entrance off of Route 522 serves both Frederick County Middle School and Gainesboro Elementary School. As part of the design of FCMS, both a Traffic Impact Assessment and a Signal Warrant w ere prepared. The conclusion of the Signal Warrant was that the intersection met one warrant. However, VDOT requires that intersections meet two warrants in order to qualify for a traffic signal. This project is to provide a solution other than a traffi c signal to address safety concerns. The exact form of that solution is still undecided. 19 Capital Cost: $TBD Justification: Although the Signal Warrant concluded that the intersection does not qualify for a traffic signal, safety concerns still continue. Visibility over the hill crest northbound is limited. The crossover is narrower than a bus is long, and visibility for left turners who are located in the crossover is nil when a large vehicle is in the northbound left turn lane. Construction Schedule: 24 Months PRIORITY 8 - Apple Pie Ridge Elementary School Phase 2 Renovation Description: Apple Pie Ridge Elementary School opened in 1974 and has served continuously as an elementary school since that time. The school contains 65,120 square feet and has a program capacity of 528 students. Currently, the building serves grades K-5. The building is in good condition; however, several major areas need to be addressed, including open classroom space, ADA compliance, energy conservation, security, and upgrades of fire alarm, electrical, plumbing, and mechanical systems. Capital Cost: TBD Justification: Apple Pie Ridge Elementary School is 42 years old and renovation is needed to a number of areas to ensure the economical and efficient operations of the school for years to come. Construction Schedule: 36 months PRIORITY 9 - Bass-Hoover Elementary School Phase 2 Renovations Description: Bass-Hoover Elementary School opened in 1975. The school contains 70,569 square feet and has a program capacity of 656 students. Currently, the building serves grades K-5. The building is in good condition; however, several major areas need to be addressed. Renovations will address several major issues, including open classroom space, ADA compliance, energy conservation, security, and upgrades of fire alarm, electrical, plumbing, and mechanical systems. A building addition, Phase 1, has been done to maintain program capacity and prepare the building for full-day kindergarten. Capital Cost: TBD Justification: Bass-Hoover Elementary School is 41 years old and renovation is needed to a number of areas to ensure the effective, economical, and efficient operations of the school for years to come. Construction Schedule: 36 months 20 PRIORITY 10 - Administrative Office Description: Frederick County Public Schools’ administration has been located at the old Kline Elementary School building since 1983. Before the building was converted to offices, it had served as a school since 1961. The facility contains 27,992 squa re feet, including the 5,000 square foot Annex and the 2,400 square foot Finance Addition, but not including the four modular classroom units that are used for offices and work space. Capital Cost: TBD Justification: The 55 year old Administrative Offices building does not have enough office and meeting space, needs technology upgrades, and improvements to the mechanical, plumbing and electrical systems to meet modern code. Meeting space is at a premium, as we have only 2 sizeable meeting rooms. There are also building security and asbestos issues. Existing issues will become more pressing and new issues will appear as the district (and therefore the staff) grows. Construction Schedule: 30 months 21 Parks & Recreation Department Project Priority List PRIORITY 1 - North West Sherando Park Development Description: This project involves the development of an Access Road, Parking, Shelter, Restroom, Playground, and Open Play Field in the North West area of Sherando Park, off Warrior Drive. Improvements to include: Entrance and access road (335 lf) off Warrior Drive, 46 paved parking spaces, adult fitness park, restrooms, shelter and playground. Capital Cost: $671,000 Justification: This facility would provide recreational opportunities for the Sherando Park service area and the entire Frederick County community. This project will provide access to new recreation amenities trails with walking and jogging opportunities. Walking and jogging rank #1 in the 2011 Virginia Outdoors Plan survey and 2012 Parks and Recreation Community Survey for all outdoor recreational activities. This project is intended to meet the needs of the community as identified in the 2012 Frede rick County Parks and Recreation Community Survey. Sherando Park, currently owned by Frederick County, offers the best location for this development. This project, being located at Sherando Park, is necessary to meet the needs of our service area. Construction Schedule: Completion in FY 17-18. PRIORITY 2 - Indoor Aquatic Facility – Competitive/Training Pool Description: The Parks and Recreation Commission has engaged in conversation with FCPS to site the facility at the 4 th High School campus. Land on the site has been set aside for this purpose. The approximately 35,000sf building will likely house a 10 lane competitive pool, 6 lane warm water teaching pool, meeting rooms, shower and changing rooms, and facilities support areas. The above facility would meet the swimming needs of the community, including HS level swim teams. Capital Cost: $11,300,000 Justification: There are no public indoor public pools in Frederick County. By constructing the indoor pool, it would permit the department to meet competition needs, instructional needs, citizen programming provide a nucleus to attract new businesses to the community. This project is intended to meet the needs of the community as identified in the 2012 Frederick County Parks and Recreation Community Survey. This facility would be available to all area residents. The construction of this project will prov ide a facility to offer competitive scholastic programs and year round recreational programming for the residents of Frederick Coun ty. Construction Schedule: Completion in FY 18-19. 22 PRIORITY 3 - Frederick Heights Park Description: Development to include entrance, 14 space parking lot and a ½ mile paved shared use path. Capital Cost: $197,000 Justification: This project will allow public access to an underutilized Frederick County park. Providing a walking trail in the Redbud District this project will address the #1 identified public recreation need – multi-use trails. This facility would be open and available to all area residents. Construction Schedule: Completion in FY 18. PRIORITY 4 - Water Slide Spray Ground Description: Upgrade the outdoor swimming pools at both Clearbrook and Sherando Parks. Upgrade would involve the removal of the diving boards and the installation of one 50' water slide and one 75' water slide at each pool. The upgrade would also i nclude the addition of a spray ground with 10-12 features at each pool. Capital Cost: $624,000 Justification: To provide recreational opportunities for the Clearbrook Park and Sherando Park service area. Frederick County Parks and Recreation Department operates two outdoor swimming pools at the regional parks. These facilities are over 20 years old and were constructed with two diving boards as the main feature for each pool. Swimming pool attendance has trended decline in recent years and users are requesting different water features. The addition of two water slides and a spray ground to each pool facility will appeal to families and younger children, increasing pool attendance by an estimated 30%. With the increase in attendance and potentially fees to comparable facilities, the County could realize an additional $24,000 in revenue annually. Clearbrook and Sherando Parks, currently owned by Frederick County, offer the best site and location for the development of t his facility. With the upgrade to the existing swimming pool facilities, the County would not have to incur costs for property acquisition or infrastructure development and increase the recreational opportunities at the regional parks. Construction Schedule: FY 17-18. PRIORITY 5 - Abrams Creek Greenway Trail Description: 10’ wide asphalt multi-use bicycle/pedestrian trail along Abrams Creek from Senseny Road to Channing Drive. It is estimated that the trail will have (6) three bridges (stream crossings) and will be approximately 2.6 miles in length. As ou tlined in 23 this form, the project is divided into 3 phases. Phase 1 from Senseny Road to Woodstock Lane. Phase 2 from Woodstock Lane to Woody’s Place, and Phase 3 from Woody’s Place to Channing Drive. Capital Cost: $3,661,000 Justification: This facility would provide recreational opportunities for residents of this corridor along with the surrounding communities. This project will provide trails with bicycle, walking and joggings opportunities, which ranks #1 in the 2007 Virginia Outdoors Plan survey for all outdoor re creational activities. This project is intended to meet the needs of the community as identified in the 2012 Frederick County Parks and Recreation Community Survey. Construction Schedule: Completion in FY 18-19. PRIORITY 6 - Snowden Bridge Park Development Description: Snowden Bridge Park, situated on land proffered by the Snowden Bridge development utilizes park and school land for the provision of an active recreation park. The above park is to include three (3) baseball fields suitable for little leag ue play. Lighting, restroom and parking are part of the park concept. Capital Cost: $4,500,000 Justification: The overall park design is informed by the Snowden Bridge (formerly Stephenson Village) rezoning proffer of 2003. The proffer indicates the provided land to be used for baseball and/or soccer field development in anticipation of the population increase generated by the development. The Parks and Recreation Commission adopted a site plan for the property in 2015 showing parking and three (3) ba seball fields. Construction Schedule: Completion in FY 18-19. PRIORITY 7 - Rose Hill Park Playground Description: The Rose Hill Park playground is part of the development vision, and the last capital items to finish the Rose Hill Park project. It is intended to provide a challenging play area for youth while remaining sensitive in design to the historic nature of the property. Capital Cost: $100,000 Justification: This facility would provide recreational opportunities for the Rose Hill Park service are a and the entire Frederick County community. This project is intended to fulfil the County’s agreement with the Glass Glen Burnie Museum (Museum of the 24 Shenandoah Valley) in the development vision for the park. The playground will meet the needs of the c ommunity as identified in the 2012 Frederick County Parks and Recreation Community Survey. Construction Schedule: Completion in FY 17-18. PRIORITY 8 - Sherando Park North – Area 4 Development Description: This project completes the development vision for the SE area of Sherando Park located north of Route 277. This vision is expressed in the 2016 North Sherando Park Master Plan update. Included are softball fields to complete the complex , a shared use trail segment, roadway and parking. Capital Cost: $1,620,000 Justification: This facility would provide recreational opportunities for the entire Frederick County area. In addition to its use as a recreational facility, it will be used by the Frederick County school system. Presently, there are ten softball/baseball fields within the County’s regional park system. Eight of ten existing fields must serve a dual purpose of facilitating youth baseball as well as youth and adult softball programs. With the increased usage of these fields, it has become mor e difficult to facilitate these programs. This project is needed in order for the Parks and Recreation Department to accommodate the existing demand of youth baseball and adult softball programs. This project is intended to meet the needs of the communit y as identified in the 2012 Frederick County Parks and Recreation Community Survey. Sherando Park, currently owned by Frederick County, represents the very best site for softball field development. The fact that the County will not have to acquire proper ty for this facility means that the most costly aspect of this development has already been completed. Sherando Park also provides a location that is situated in the fastes t growing area of the County and is adjacent to Sherando High School. Joint use of facilities between the park and school system has facilitated school activities and recreation programs. Construction Schedule: Completion in FY 17-18 PRIORITY 9 - Baseball Field Lighting Upgrade Description: Upgrade the ballfield lighting at both Clearbrook and Sherando Parks Baseball facilities. The upgrade would involve the removal of the 30/20 FC (footcandle) level fixtures, lamps, and wood poles and replace with 50/30 FC (footcandle) level fixtu res, lamps and steel poles on (4) four fields at Clearbrook Park and (4) four fields at Sherando Park. This upgrade is required by Little League International on all little league fields. Capital Cost: $1,300,000 25 Justification: The Parks and Recreation Commission is recommending the ballfield light syst em be upgraded to achieve the recommended 50/30 footcandle level lighting on the playing surface. This will facilitate the provision of recreational oppor tunities at Sherando and Clearbrook parks for the service areas which include all Frederick County re sidents. The field light fixtures are over twenty-five years old and are affixed to poles, the majority being over thirty-five years old. Construction Schedule: FY 18-19. PRIORITY 10 - Sherando Park North – Area 3 Development Description: This project completes the development vision for the SW area of Sherando Park located north of Route 277. This vision is expressed in the 2016 North Sherando Park Master Plan update. Included are rectangular play fields, a shared use t rail segment, roadway and parking, playground, restroom, and maintenance building. Capital Cost: $2,120,000 Justification: This facility would provide recreational opportunities for the entire Frederick County area. In addition to its use as a recreational facility, it will be used by the Frederick County school system. With the development of Area 4 (CIP item #8) two rectangular play fields will be displaced. The development of area 3 not only addresses this direct result, but also address es additional identified needs of the community. Construction Schedule: FY 18-19. PRIORITY 11 - Community Park Description: The Community Park project includes the acquisition of approximately thirty-five acres. Developed amenities will ultimately be determined by the specific site, however typical development would include: Acquisition of Parkland (35 acres)  Paved & Gravel Paths  Playground  Tot lot  Shelters  Lighted Basketball & Tennis courts  Open Play Fields  Toilets  Parking 26  Shade Trees & Turf Capital Cost: $1,970,000 Justification: This project would be used by the entire Frederick County area. To reduce the gap between the amount of existing parkland and the amount of parkland needed to meet the minimum standard for our service area, as recommended by the 2007 Virginia Outdoors Plan. This project is intended to meet the needs of the community as identified in the 2012 Frederick County Parks and Recreation Community Survey. Potential acreage for parkland would be located close to population density, east of Winchester, Redbud / Shawnee District area. The location of this project would provide developed parkland to create more accessible recreational facilities and opportunities to the residents Frederick County. Construction Schedule: FY 19-20. PRIORITY 12 – Neighborhood Parks Description: The Neighborhood project includes the acquisition of three sites of approximately ten acres and the subsequent development of these sites. Developed amenities will ultimately be determined by the specific site, however typical developm ent would include: Acquisition of Parkland (10 acres per site)  Paved Path  Playground  Shelter  Hard Surface Courts  Open Play Fields  Parking Capital Cost: $2,495,000 Justification: This project would be used by the entire Frederick County area. To reduce the gap between the amount of existing parkland and the amount of parkland needed to meet the minimum standard for our service area, as recommended by the 2007 Virginia Outdoors Plan. This project is intended to meet the needs of the community as identified in the 2 012 Frederick County Parks and Recreation Community Survey. Potential acreage for parkland would be located in the Urban Development Area or Rural 27 Community Centers. The location of this project would provide parkland developed to create more accessible recreational facilities and opportunities to the residents of Frederick County. Construction Schedule: Completion in FY 18-19. PRIORITY 13 – District Parks Description: Acquisition of Parkland:  Northeastern Frederick County 150-200 acres  Western Frederick County 150-200 acres  Eastern Frederick County 150-200 acres Capital Cost: $9,067,000 Justification: This project would be used by the entire Frederick County area. To reduce the gap between the amount of existing parkland and the amount of parkland needed to meet the minimum standard for our service area, as recommended by the Virginia Outdoors Plan. This project is intended to meet the needs of the community as identified in the 2012 Frederick County Parks and Recreation Community Survey. Potential acreage for parkland would be located in all parts of Frederick County. The location of this project would provide parkland which could be developed to create more accessible recreational facilities and opportunities t o the residents of Frederick County. Construction Schedule: Land acquisition FY 20/21 with the remainder beyond FY 22. PRIORITY 14 – Community Center Description: The Field House project would be approximately 44,000 square feet and include an indoor area large enough to accommodate a 1/16 mile track and a minimum of two basketball courts. This court area would also be designed for utilization by indoor soccer, baseball, softball, wrestling, volleyball, tennis and badminton with the installation of in -floor sleeves and drop curtains or partitions. This area could also be used for special events such as dances, proms, music festivals, garden and home, outdoor, craft, antique, quilt, or boat shows, thus providing a flexible facility for a multitude of activities to take place at one time. The facility would also house a fitness center, multi-purpose rooms, office, storage, and locker rooms. Capital Cost: $9,067,000 Justification: Since its inception, the Parks and Recreation Department has relied significantly on the use of the county public schools to house recreation programs. This arrangement was adequate when the department first started out, however the 28 department currently offers over 250 sections of programs, creating a situation where the department is limited in its abilit y to meet the programming and facility needs of the County residents. A Community Center facility will facilitate the department to meet citizen programming demands and provide the area with a facility to attract new businesses to the community. This facili ty would be available to all area residents and is intended to meet the needs of the community as identified in the 2012 Frederick Cou nty Parks and Recreation Community Survey. The Department and the community has benefitted from the co -location of recreation and school facilities, however community size warrants a separate facility dedicated to recreation use. The construction of this project will provide a facility the Department will be able to offer year round recreational programming to the residents of Frederick County. This facility could be built in conjunction with or as an attachment to the Indoor Aquatic Facility. Construction Schedule: Completion in FY 20-21. PRIORITY 15 - Sherando Park North – Area 3 Development Description: This project completes the development vision for the area of Sherando Park located south of Route 277. This vision is expressed in the 2002 Sherando Park Master Plan update. Included are rectangular play fields, skate park, roadway and par king, and restroom. Capital Cost: $2,035,000 Justification: This facility would provide recreational opportunities for the entire Frederick County area. In addition to its use as a recreational facility, it will be used by the Frederick County school system. Construction Schedule: Completion in FY 21-22. PRIORITY 16 - Fleet Trip Vehicles Description: The Parks and Recreation Department needs to upgrade the current vehicle fleet to offer a comprehensive package of trips for Frederick County citizen’s recreation needs. The addition of the below vehicles would replace the current 1994 bus and 1999 van. These are necessary to adequately offer trip packages and provide reliable transportation for program participants. Bus #1 – 40-50 Passenger Bus, Bus #2 – 30-40 Passenger Bus, Van #1 – 12 Passenger Van. Capital Cost: $307,000 Justification: To offer a comprehensive package of trips where the population of Frederick County could begin to rely on the Parks and Recreation Department to meet their trip needs. Construction Schedule: Completion in FY 21-22. 29 PRIORITY 17 – Sherando Park North – Area 1 Development Description: This project completes the development vision for the NW area of Sherando Park located north of Route 277. This vision is expressed in the 2016 North Sherando Park Master Plan update. Included are multi-use trail, mountain bike trails, restrooms, pavilions, bike pump track, dog parks, roadway and parking. Capital Cost: $2,414,000 Justification: This facility would provide recreational opportunities for the entire Frederick County area. In addition to its use as a recreational facility, it will be used by the Frederick County school system. This project is intended to meet the needs of the community as identified in the 2012 Frederick County Parks and Recreation Comm unity Survey. Construction Schedule: FY - long term planning item. PRIORITY 18 – Sherando Park North – Area 2 Development Description: This project completes the development vision for the NE area of Sherando Park located north of Route 277. This vision is expressed in the 2016 North Sherando Park Master Plan update. Included are multi -use trail, mountain bike trails, restrooms, pavilions, roadway and parking. Capital Cost: $2,273,000 Justification: This facility would provide recreational opportunities for the entire Frederick County area. This project is intended to meet the needs of the community as identified in the 2012 Frederick County Parks and Recreation Community Survey. Construction Schedule: FY - long term planning item. PRIORITY 19 - Indoor Ice Rink Description: The Ice Rink project would be approximately 40,000 square feet and include an indoor area large enough to accommodate a single 200’ x 85’ ice rink, locker rooms, party/meeting rooms, and concession area and would need approxi mately 10 acres to construct. This facility should be located on property owned or proffered to the County. The ice rink may be co -located with other compatible uses should opportunities arise, reducing the acreage demand. Capital Cost: $6,180,000 Justification: There are no public indoor ice rinks in Frederick County and county residents currently must travel over one hour to use an indoor ice facility. By constructing the indoor ice rink, it would permit the department to meet competition needs, instructional needs, citizen programming and leisure demands as well as provide a nucleus to attract new businesses to the 30 community. This facility would be available to all area residents. The construction of this project will provide a facility to offer year round recreational programming for the residents of Frederick County. This project is intended to meet the needs of the community as identified in the 2012 Frederick County Parks and Recreation Community Survey. The Indoor Ice Rink facility should be located in an area convenient to the major transportation corridors of the County. However, as an alternative, one of the two county regional parks could be used to house the facility, since these locations are already identified as centers for recreation p rograms and activities. Construction Schedule: FY - long range capital project. PRIORITY 20 – Clearbrook Park Development Description: This project completes the development vision for Clearbrook Park. This vision is expressed in the 1987 Clearbrook Park Master Plan. Included are; Croquet, shuffleboard, volleyball, updating concession, parking shelter renovation, tennis co urts, basketball courts, shelter, shelter/stage, lake renovation, and associated landscaping. Capital Cost: $1,559,000 Justification: This facility would provide recreational opportunities for the entire Frederick County area. Construction Schedule: FY - long range planning objective. 31 Handley Regional Library Project Priority List PRIORITY 1 - Northern Frederick County – Gainesboro Library Branch Description: Construction of a 4,000 to 5,000 square foot branch library, either as a stand -alone facility or co-located with a planned Frederick County facility (e.g. the new middle school). Initial parking should be for at least 50 vehi cles. The proposed location would be on Rt. 522 in the Gainesboro District, but this could change depending on patterns of library use and on whether donated land could be located or if co-located with a Frederick County project already in the early planning stage. This projected branch would fit per discussions with FCPS on existing property and was outlined in a document prepared by FCPS students two years ago. Capital Cost: $1,749,034 Justification: This branch would serve citizens living in this growing area. In 2014-2015 Frederick County citizens of all ages checked out 471,957 items. 41,034 Frederick County residents have library cards and averaged 63.7 % of all materials checked out of the regional system. 2,956 Frederick County residents, adults and children, registered for library cards for the first time in 2015 - 2016. Of Frederick County residents over five years of age (when you can get a library card), approximately 52.8 % of the total hav e library cards. This new branch would bring the level of library usage up closer to the national average level of 58%. This population group in the Gainesboro District is not close to a library in the regional system. The Library will provide materials and programming for citizens from toddlers to senior citizens. It will provide recreational and educational materials. It will be a prime source for homework help since it will be open nights and on weekends when school libraries are closed. The library will supply compute r access via Wi-Fi, rental tablets and hotspots, via desktop/laptop computers for word processing, as well as other office applications and for Internet usage. There will be a meeting room of 425 square feet in which area groups can meet. Construction Schedule: Completion in FY 21/22 PRIORITY 2 - Frederick County Library Branch – Senseny/Greenwood Description: Construction of a 10,000 sq.ft. branch library with expansion possible to 15,000 square feet. Initial park ing should be for a minimum of 65 vehicles. The proposed location is yet to be determined and is dependent on future development. The first step of the project would be the acquisition of the land of 5 to 8 acres. Capital Cost: TBD Justification: This branch would serve citizens living in this growing area. In 2014-2015 Frederick County citizens of all ages checked out 471,957 items. 41,034 Frederick County residents have library cards and averaged 63.7 % of all materials checked out 32 of the regional system. 2,956 Frederick County residents, adults and children, registered for library cards for the first time in 2015 - 2016. Of Frederick County residents over five years of age (when you can get a library card), approximately 52.8 % of the total hav e library cards. This new branch would bring the level of library usage up closer to the national average level of 58%. This population group in the Redbud/Shawnee District is not close to a library in the regional system. The Library will provide materials and programming for citizens from toddlers to senior citizen s. It will provide recreational and educational materials. It will be a prime source for homework help since it will be open nights and on weekends when school libraries are closed. The library will sup ply computer access via Wi-Fi, rental tablets and hotspots, via desktop/laptop computers for word processing, as well as other office applications and for Internet usage. There will be a meeting room of 425 square feet in which area groups can meet. Construction Schedule: TBD PRIORITY 3 - Frederick County Library Branch - Route 522 South Description: Construction of a 7,000 sq.ft. branch library with expansion possible to 10,000 square feet. Initial parking should be for a minimum of 35 vehicles. The proposed location is yet to be determined and is dep endent on future development. The first step of the project would be the acquisition of the land of 3 to 4 acre or collocated with the new High School projected to b e built in the same area. Capital Cost: TBD Justification: This branch would serve citizens living in this growing area. In 2014-2015 Frederick County citizens of all ages checked out 471,957 items. 41,034 Frederick County residents have library cards and averaged 63.7 % of all materials checked out of the regional system. 2,956 Frederick County residents, adults and children, registered for library cards for the first time in 2015 - 2016. Of Frederick County residents over five years of age (when you can get a library card), approximately 52.8 % of the total hav e library cards. This new branch would bring the level of library usage up closer to the national average level of 58%. This population group in the Opequon District is not close to a library in the regional system. The Library will provide materials and programming for citizens from toddlers to senior citizens. It will provide recreational and educational materials. It will be a prime source for homework help since it will be open nights and on weekends when school libraries are closed. The library will supply compute r access via Wi-Fi, rental tablets and hotspots, via desktop/laptop computers for word processing, as well as other office applications and for Internet usage. There will be a meeting room of 425 square feet in which area groups can meet. Construction Schedule: TBD 33 Transportation Committee Project Priority List Funded Priorities PRIORITY 1 - Interstate 81, Exit 310 Improvements Description: Construct improvements to Exit 310 interchange. Capital Cost: $49,121,000 Justification: This is a regional transportation improvement that will address congestion in many areas of the County and address coming development to the surrounding areas. Construction Schedule: TBD PRIORITY 2 - Route 277 Widening and Safety Improvements (Ph 1) Description: Construct a 4-lane divided roadway beginning at I-81 and continuing to Sherando Park. Project would include realignment of Aylor Road to align with Stickley Drive. Capital Cost: $38,000,000 Justification: This is a regional transportation improvement that will address congestion in the Southern Frederick area and address development to the surrounding areas. Construction Schedule: TBD PRIORITY 3 - East Tevis Street Extension and Bridge over I-81 Description: Construct a 4-lane divided roadway beginning at Route 522 and going west approximately 0.2 miles to connect to the road network being constructed by the Russell 150 Development. Project includes bridge over Interstate 81. Capital Cost: $15,000,000 Justification: This is a regional transportation improvement that will addres s congestion in many areas of the County and address development to the surrounding area. The location is as identified by joint planning efforts between the County, VDOT, and the developer. Construction Schedule: TBD 34 PRIORITY 4 - Renaissance Drive, Phase 2 Description: Construct a connector road and Railroad Crossing between Route 11 and Shady Elm Drive. Capital Cost: $5,300,000 Justification: This is a transportation improvement that will address congestion at key points along Route 11 and Apple Valley Drive. This project is identified in Secondary Road Improvements Plan. Construction Schedule: Entering design phase, expected to go to bid by Spring 2018. PRIORITY 5 - Sulphur Springs Road Intersection improvement and widening from Route 50 to the Landf ill Description: Widen Sulphur Spring Road from the intersection with Route 50 to the regional landfill, add paved shoulders for pedestrians and bicycles, improve the intersection at Route 50. Capital Cost: $5,000,000 Justification: This project will address capacity and safety improvements to the corridor. This project is identified in Secondary Road Improvements Plan. Construction Schedule: Entering design and right-of- way underway. Unfunded Priorities PRIORITY 6 - Planning, Engineering, Right-of-Way and Construction Work for Route 37 Description: This project would be to continue work on the Eastern Route 37 extension. More specifically, to update the Environmental Impact Statement to the point of a new Record of Decision and to update the 1992 d esign plans to address the current alignment, engineering guidelines, and possible interchange improvements. In addition, this allows for advanced engineering, right-of-way purchase and construction. Capital Cost: $300,000,000 + Justification: This project moves the County closer to completion of a transportation improvement that would benefit the entire County and surrounding localities. Construction Schedule: TBD 35 PRIORITY 7 - Interstate 81, Exit 307 Relocation Description: Construct a relocated Exit 307 interchange. Capital Cost: $60,000,000 Justification: This is a regional transportation improvement that will address congestion in many areas of the County and address coming development to the surrounding areas. Construction Schedule: TBD PRIORITY 8 - Route 277 Widening and Safety Improvements (Ph 2) Description: Construct a 4-lane divided roadway beginning at I-81 and continuing to Sherando Park. Project would include realignment of Aylor Road to align with Stickley Drive. Capital Cost: $25,500,000 Justification: This is a regional transportation improvement that will address congestion in the Southern Frederick area and address development to the surrounding areas. Construction Schedule: TBD PRIORITY 9 - Redbud Road Realignment and Exit 317 Ramp Realignment Description: Realign Redbud Road from its current location through development land in the vicinity of Route 11 north and Snowden Bridge Boulevard and Relocate the I-81 Exit 317 NB ramp to the current location of the Redbud Road/Route 11 interse ction. Capital Cost: $11,500,000 Justification: This is a transportation improvement that will have significant impact on Eastern Frederick County. This project is identified in the adopted Eastern Road Plan. Construction Schedule: TBD PRIORITY 10 - Route 11 North Widening to 6 Lanes from Snowden Bridge Boulevard to Old Charlestown Road Description: Route 11 North of Snowden Bridge Boulevard is currently primarily a two lane roadway. This project would widen that facility to a 6 lane divided roadway with turn lanes where appropriate. Capital Cost: $28,500,000 36 Justification: This is a transportation improvement that will provide a significant capacity upgrade to address congestion on the Route 11 Corridor. This project is identified in the adopted Eastern Road Plan. Construction Schedule: TBD PRIORITY 11 - Warrior Drive Extension Description: Construct a 4-lane divided roadway beginning at Route 277 where Warrior Drive intersects from the north and continuing that roadway south and west to intersect with I-81 at the location of the relocated Exit 307 interchange. Capital Cost: $23,200,000 Justification: This is a regional transportation improvement that will address congestion in the Southern Frederick area and address development to the surrounding areas. Construction Schedule: TBD PRIORITY 12 - Channing Drive Extension Description: Construct a 4-lane divided roadway beginning at Senseny Road where Channing Drive intersects from the north and continuing that roadway south to intersect with Route 50 East at Independence Drive. Capital Cost: $20,600,000 Justification: This project has been identified in the Eastern Road Plan, and will address congestion in Eastern Frederick County and address development to the surrounding areas. Construction Schedule: TBD PRIORITY 13 - Brucetown Road/Hopewell Road Alignment and Intersection Improvements Description: Realign Brucetown Road to meet Hopewell Road at Route 11. Improvements to this intersection will address comprehensive planned development’s traffic generation in the area. Capital Cost: $3,000,000 Justification: This is a transportation improvement that will have significant impact on the Route 11 corridor. The location is identified by joint planning efforts between the County and VDOT. Construction Schedule: TBD 37 PRIORITY 14 - Widening of Route 11 North to the West Virginia State Line Description: Improve Route 11 to a divided 4 and 6-lane facility as detailed in the Eastern Road Plan. Capital Cost: $47,800,000 Justification: This is a regional transportation improvement that will address congestion over a large area of the County and address development to the surrounding area. This project improves the safety for the traveling public by reducing congestion and improving the flow of traffic. Construction Schedule: TBD PRIORITY 15 - Senseny Road Widening Description: Widen Senseny Road to a 4-lane divided roadway. This project is not dependent upon, but is being coordinated with the implementation of Route 37, Channing Drive, and development in th e area. Capital Cost: $22,800,000 Justification: This is a transportation improvement that will have significant impact on Eastern Frederick County. This project is identified in the adopted Eastern Road Plan. Construction Schedule: TBD PRIORITY 16 - Inverlee Way Description: Construct a 4-lane divided roadway beginning at Senseny Road and going south to Route 50 East. This project is being planned in conjunction with improvements to Senseny Road and surrounding development. Capital Cost: $10,200,000 Justification: This is a regional transportation improvement that will address congestion and provide an additional needed link between Senseny Road and Route 50 East. Construction Schedule: TBD PRIORITY 17 - Fox Drive Description: Add additional turning lane(s) to Fox Drive where it intersects with Route 522 North. Capital Cost: $250,000 38 Justification: This is a transportation improvement that will address congestion at this intersection. Construction Schedule: TBD PRIORITY 18 - Warrior Drive Extension from Route 37 Crosspointe south to existing terminus Description: 4 lane roadway from the Route 37 extension in the Crosspoint Development south to the existing terminus of Warrior Drive. Capital Cost: $12,000,000 Justification: This improvement would be concurrent with a Route 37 extension and would provide significant congestion relieve at Exit 307 as well as Tasker Road at Exit 310 Construction Schedule: TBD PRIORITY 19 - Route 277 right turn lane extension at Warrior Drive Description: Extend right turn lane for eastbound 277 at the intersection of Rt 277 and Warrior Drive. Installation of sidewalk for pedestrian safety and installation of pedestrian pedestal. Capital Cost: $500,000 Justification: This improvement would be a significant safety upgrade to this intersection. Construction Schedule: TBD PRIORITY 20 - Papermill Road right turn lane extension at Route 522 Description: Extend right turn bay of Papermill Road (Route 644) where it intersects with Route 522 to alleviate turn bay spillover that is taking place. Capital Cost: $500,000 Justification: This improvement would be a significant safety upgrade to this intersection. Construction Schedule: TBD PRIORITY 21 - Senseny Road Turn lanes at the intersection of Senseny Road and Crestleigh Dri ve 39 Description: Improvements to the intersection of Senseny Road (657) and Crestleigh Drive to include turn lanes and potential signalization. This project would add left and right turn lanes to Senseny Road at the intersection of Crestleigh and potenti ally a full signalization of the intersection. Capital Cost: $2,600,000 Justification: This improvement would be a significant safety upgrade to this intersection. Construction Schedule: TBD PRIORITY 22 - Frederick County Eastern Road Plan Description: This project is intended to address all of the planned transportation improvements in the County Comprehensive Plan, Eastern Road Plan that are not noted individually above. Capital Cost: $TBD Justification: This project prepares the County for future development by addressing the projects needed to support that development in a manner consistent with the Comprehensive Plan. Construction Schedule: N/A 40 Winchester Regional Airport Project Priority List PRIORITY 1 - New General Aviation Terminal Building, Site Work and Parking Lot - Design/Build Description: The Winchester Regional Airport proposes to construct a new general aviation terminal building. The new facility will be constructed in a new location slightly south of the existing terminal building. Capital Cost: $3,710,000 Justification: Since its opening in the early 1990s, the general aviation terminal building for the Winchester Regional Airport has had only limited interior work completed. Interior repairs are necessary due to extensive usage and some damage from water leaking from the roof prior to its replacement in the spring of 2006 by necessity. The heating and cooling systems are approaching 25 years in age and are nearing the end of their useful life. The exterior of the terminal building is made from Drivet that has failed in many areas and is generally in fair to poor condition. In addition, the windows are not energy efficient and several of t he window seals have failed. In 2008, a study was completed to examine needs and costs to renov ate the existing terminal building. After review of the study, the WRAA determined it would be more economical to build a new energy efficient building slightly east o f the existing terminal. The proposed location of the project will allow enough room to build out a new transient apron during the taxiway relocation project. Construction Schedule: TBD - scheduled depending on availability of State funding program. PRIORITY 2 - Fuel Storage Facility Description: Construct new fuel storage facility for expansion and to meet DEQ and EPA requirements. Capital Cost: $1,000,000 Justification: When the taxiway “A” midfield section is relocated it will cause an encroachment into the current fuel farm site. The current site does not allow for future expansion or upgrades to meet DEQ and/or EPA regulations. Construction Schedule: TBD - Start of project is dependent upon FAA and/or Virginia Department of Aviation funding program. PRIORITY 3 - Northside Service Road Description: This project proposes to construct a two lane service road around the end of Runway 14. The road will be approximately 1/2 to 3/4 miles in length so that vehicles stay clear of navigational aid critical areas. It is proposed that the road will be 2 lanes. 41 Capital Cost: $400,000 Justification: The approved airport layout plan shows new development occurring on the northside of the runway. By having aircraft ground operations and storage on both sides of the airfield (north and south), ground vehicle traffic requiring access to both sides of the airfield will be generated. The traffic will include fueling truck operations and personnel activities for general maintenance. The FAA encourages the construction of service roads around aircraft activity areas, especially the runways, to prevent unauthorized ground vehicle access to aircraft movement areas and to promote a safer operating environment. The service road, located on the west side of the airport (Runway 14 end) will accomplish these goals. Construction Schedule: Completion in FY 18-19 PRIORITY 4 - Taxiway (A) Relocation Description: The relocation of Taxiway "A" is part of the overall Airport upgrade to meet safety design standards for a Group III airport. This relocation will improve the serviceability and safety of the airport in regards to ground operations for larger jet aircraft. Due to the complex task of relocating the entire 5,500' taxiway, the project has been broken down into two phases - Phase I will begin at the 32 approach end of the runway and continue to the terminal build ing located midfield. Phase II will continue from the terminal building to the approach end of runway 14. The project will be broken down into sections within the phases based on pavement conditions, demand and availability of funding from the Federal Av iation Administration. Capital Cost: $9,650,000 Justification: The relocation of Taxiway A is necessary to increase the Airport’s ability to accommodate larger aircraft. This project also will improve the serviceability of the Airport for larger aircraft wishing to use the airport. Construction Schedule: Completion in FY 19+ PRIORITY 5 - Land Acquisition – Bufflick Road – Parcels 64-A-64 Description: The Winchester Regional Airport Authority proposes to acquire parcel 64 -A-64 on Bufflick Road. This parcel is critical to airport development because of the close proximity within or near the airport primary surfaces. Capital Cost: $275,000 Justification: Under the FAA Part 77 Surface Requirements and the Code of Virginia 15.2, the airport is required to o wn fee simple property located within the primary surfaces. There are currently more than 120 based aircraft at the Winchester Regional Air port. The owners and passengers of these aircraft will have the benefit of increased safety on the airport once the parcels are acquired and vertical obstructions are minimized. 42 Construction Schedule: Completion in FY 17-18 PRIORITY 6 - Land Acquisition – Bufflick Road – Parcel 64-A-60 Description: The Winchester Regional Airport Authority proposes to acquire Parcel 64-A-60 (Cooper, David) on Bufflick Road to meet FAA design standards for Runway 14 Safety Area. This parcel is critical to airport development because of the close proximity within or near the airport primary surfaces. Capital Cost: $275,000 Justification: Under the FAA Part 77 Surface Requirements and the Code of Virginia 15.2e, the airport is required to own fee simple property located within the Primary Surfaces. There are currently more than 120 aircraft based at the Winchester Regional Air port. The owners and passengers of these aircraft will have the benefit of increased safety on the airport once the parcels are acquired and vertical obstructions are minimized. Construction Schedule: Completion in FY 17-18 PRIORITY 7 - Land Acquisition – Bufflick Road – Parcel 64 A 59 Description: The Winchester Regional Airport Authority p roposes to acquire Parcel 64-A-59 (Kyle) on Bufflick Road to meet FAA design standards for Runway 14 Safety Area. This parcel is critical to airport development because of the close proximity within or near the airport primary surfaces. Capital Cost: $300,000 Justification: Under the FAA Part 77 Surface Requirements and the Code of Virginia 15.2e, the airport is required to own fee simple property located within the Primary Surfaces. There are currently more than 120 aircraft based at the Winchester Regional Airport. The owners and passengers of these aircraft will have the benefit of increased safety on the airport once the parcels are acq uired and vertical obstructions are minimized. Construction Schedule: Completion in FY 18-19 PRIORITY 8 - Land Acquisition – Bufflick Road – Parcel 64-A-52 Description: The Winchester Regional Airport Authority proposes to acquire Parcel 64 -A-52 (Lee) on Bufflick Road to meet FAA design standards for Runway 14 Safety Area. This parcel is critical to airport development because of the close proximity within or near the airport primary surfaces. 43 Capital Cost: $300,000 Justification: Under the FAA Part 77 Surface Requirements and the Code of Virginia 15.2e, the airport is required to own fee simple property located within the Primary Surfaces. There are currently more than 120 aircraft based at the Winchester Regional Air port. The owners and passengers of these aircraft will have the benefit of increa sed safety on the airport once the parcels are acquired and vertical obstructions are minimized. Construction Schedule: Completion in FY 18-19 44 County Administration Project Priority List PRIORITY 1 - Clearbrook Convenience Site Relocation Description: The current two-acre facility is situated on quarry land and is the beneficiary of a no-cost lease which ended December 31, 2015. The owner, Carmeuse Lime & Stone, has asked that the County vacate its property by the end of 2017. The original lease agreement was negotiated between the County and the previous quarry owner, O-N Minerals Co., which planned to long wall mine below the surface. Due to Carmeuse’s intention to use an open pit approach during its expansion, the convenien ce site will be forced to relocate to another parcel in the Clear Brook/Stephenson community. In order to provide uninterrupted service to the citizens of this area, it is imperative that land acquisition, design and construction begin immediately. Capital Cost: $540,650 Justification: Planned quarry expansion will mandate that the current facility be relocated, preferably on County-owned land in the Clear Brook/Stephenson community. For residents in this area, the next closest convenience site is located on Indian Hollow Road in Albin, a distance of seven miles. The Albin location is already the County’s most heavily used facility at an average of 16,270 vehicles trips each month. Logistically, the Albin facility cannot accommodate as many as 500 additional vehicles traveling from the Clear Brook community to deposit refuse and recycling. Although the landfill is an option and has sufficient capacity, it is locat ed 13 miles away from the current Clear Brook facility. Construction Schedule: Construction beginning in FY 17 PRIORITY 2 - Albin Convenience Site Relocation Description: The relocation of the Albin citizens’ convenience site to property located within the Sunnyside/Albin community is projected for FY 18/19. A fenced two-acre site is proposed between North Frederick Pike and Indian Hollow Road on County-owned property in close proximity to the existing site, ideally on a portion of the former FCPS transportation facility. The projec t will require several months to complete including fencing, earthwork, retaining walls, electric, equipment, lighting, paving and landscaping. Capital Cost: $570,650 Justification: During August of 2016, 16,270 vehicles visited the Albin facility, making it the single most utilized solid waste facility outside of the landfill. Usage continues to rise each year as the site serves a geographic area extending from Sunnyside to Cedar Creek Grade westward to Gainesboro. It is easily accessible from Route 37 and North Frederick Pike. 45 The total number of vehicles using the facility, an average of 651 p er day, represents an eight percent increase over 2016. On Fridays and weekends, this number can exceed 800 vehicles. As trash disposal and the resulting traffic continue to increase, the pres ent infrastructure will be unable to safely serve the public. During holidays, the site requires two attendants in order to efficiently move traffic. However, lines still back out onto Indian Hollow Road during holidays and some weekends, creating a hazard noted sev eral times by the Sheriff’s Office. For residents living between Cedar Creek Grade and Apple Pie Ridge Road, curbside pickup is costly, prompting heavy utilization of the convenience site which attracts a mix of users from the suburbs and rural community. A number of users are those from the more western end disposing of their trash when traveling into Winchester. Avid recyclers from Westminster -Canterbury, Shenandoah University, Shenandoah’s Pharmacy School and SU students living in nearby townhomes also frequent the facility. Construction Schedule: Construction beginning in FY 18/19 PRIORITY 3 - Gore Refuse Site Relocation/Expansion Description: The project will expand refuse capacity in the Gore community by installing a surplus trash compactor. Installation of a compactor at Gore will drive down collection costs at the site where trash is now collected in 10 8 -yard boxes. In order to accomplish this, and account for improved traffic flow and the construction of compactor and recycling staging areas, the sit e will be expanded onto an adjoining parcel owned by the County. Capital Cost: $388,105 Justification: A total of 3,140 vehicles utilized the facility during the month of August 2016. On a typical Saturday, usage peaks at 156 vehicles. The project will pay for itself in lower refuse collection costs through compaction of solid waste before transport. Also, with a compactor in place, refuse will be contained in an enclosed receiver can, reducing blowing litter and odor and vectors , all of which can be a problem when using open coll ection cans. The project will also provide much-needed capacity during heavy flow times such as weekends and holidays. All 10 containers now fill to capacity during Saturdays and Sundays. Numerous times, the site has closed early on Sundays when capacity is reached. A 40-yard roll-off container is used during holidays to contain excess trash and pulled multiple times, another additional expense. An upgraded site will meet the current and future solid waste needs of the Gore community. Construction Schedule: Construction beginning in FY 19/20 PRIORITY 4 - General Government Capital Expenditures 46 Description: This project consists of a revolving fund in the amount of $1,000,000 for the benefit of General Governmental Capital Expenditures. It is the intention of this capital expenditure fund to be for the purpose of purchasing capital equipment for governmental agencies and to allow for improvements to general governmental facilities. Such expenditures may be less than th e established $100,000 departmental threshold. It was determined that the inclusion of such a project would be beneficial in ensuring that this significant capital expense is identified in the County’s capital planning and budget process. This project is for the benefit of the County Governmental Entities participating in the CIP but does not include individual Volunteer Fire and Rescue Companies. Capital Cost: $1,000,000 Justification: The inclusion of this capital expenditure fund for the purpose of purchasing capital equipment for governm ental agencies and to allow for improvements to general governmental facilities will enable the County to meet the requirements of the Code of Virginia with regards to the collection and disbursement of cash proffers accepted on behalf of the governmental entities. Construction Schedule: N/A PRIORITY 5 - County/School Board Administration Building Description: This project consists of a County/School Board Administration Building, to be located generally in the County’s Urban Development Area. The Joint Administrative Office Complex project is for a new 150,000 square foot office building shared with the County Schools Administration. The Schools’ portion would be 50,000 square feet. Capital Cost: TBD Justification: The inclusion of this capital facility will allow for improvements to general governmental facilities and services for the benefit of the residents of Frederick County and will meet the increasing need for office space, meeting space, and governmen t services in an accessible location. Construction Schedule: TBD PRIORITY 6 - Joint Judicial Center New Facility Description: This new project consists of a new future Joint Judicial Center Facility to be located generally in the City of Winchester or in the County’s Urban Development Area. Capital Cost: TBD Justification: The inclusion of this capital facility will allow for improvements to general governmental facilities and services for the benefit of the residents of Frederick County and will meet the increasing need for office space, meeting s pace, and government 47 services in an accessible location. The need for this project has been established through ongoing communication with the court system and the City of Winchester. Construction Schedule: TBD 48 Fire & Rescue Project Priority List PRIORITY 1 Fire & Rescue Station #22 / Annex Facilities (Route 277) Description: Construct a two bay Fire and Rescue Station with satellite Sheriff’s office and the potential for office and meeting room space for the County and community. The station will be located in the area of Fairfax Pike, White Oak Road, and Tasker Road to provide service for the heavy growth area east of Stephens City. An approximate three -acre site will be needed to accommodate this facility. The fire station will be approximately a 10,000 sq ft facility to house an engine and ambulance. Those who would occupy the facility will determine the size of the satellite office and meeting room space. This facility is specifically identified in the Route 277 Triangle and Urban Center Land Use Plan approved in 2008. Capital Cost: $3,400,000 Justification: This development is scheduled to be an active adult resort gated community with age restrictions on 80% of the homes above 55 and the other 20% above 45. The developer‘s master plan will allow for 2,130 individual dwelling units using a mix of housing types. Construction Schedule: Completion in FY 16-17 PRIORITY 2 Fire & Rescue Station #22 / Apparatus (Route 277) Description: Purchase one (1) custom pumper equipped and one (1) custom Type I Advanced Life Support (A.L.S.) capable ambulance equipped to be assigned to Fire and Rescue Station 22. Capital Cost: $905,000 Justification: This fire and rescue apparatus will be assigned to Fire and Rescue Station 22 located on Fairfax Pike East in the Stephens City area of Frederick County. The pumper will be built to N.F.P.A. 1901 specifications and equipped with all of th e required and necessary equipment to function as a Class A Pumper. The ambulance will be built to the Federal KKK -A-1822E specifications and equipped with all of the required and necessary equipment to function as an Advanced Life Support ambulance. 49 This fire and rescue apparatus is needed due to the fact that the Fire and Rescue Department currently owns one (1) pumper an d one (1) ladder truck that are twenty (20) plus years of age and already assigned to other functions. The currently owned fire and rescue apparatus would not endure the demands placed on it while being assigned to a high call volume. Construction Schedule: Completion in FY 16-17 PRIORITY 3 Fire & Rescue Station #23 / New Facility (Crosspointe) Description: This project consists of a 10,000 square foot fire station to accommodate 4 pieces of emergency equipment, and to house living and sleeping areas for staff. This project also has the potential for office and meeting room space for the County and community with an additional 2,000 square feet of building area. A two and ½ acre parcel should be sufficient for building, p arking and amenities for approximately 20 to 30 persons. The project is located at Crosspointe Center at the end of current R oute 37 South, an area of proposed high density residential development, and commercial development. Capital Cost: $3,700,000 Justification: The proposed location at the South end of Route 37 provides for quick and easy access to Interstate 81 North and South at the 310 Exit. Access and response on Route 37 will be greatly enhanced from Interstate 81 to Route 50 West in the Northbound Lane. Currently Stephens City and Round Hill Volunteer Fire and Rescue Companies serve the area. This location also provides easy access to Route 11 and the Kernstown area along with access to Middle Road and Subdivisions of Brookneil, Stonebrook, and Jacksons Woods. These subdivisions have large single family homes in an area of Frederick County outside of the UDA. Water supplies are scarce in these areas and a rapid response from this proposed facility will likely reduce property da mage from fire and response times for Medical Emergencies. Major collector roads such as Tasker Road and Warrior Drive along with the proposed extension of Route 37 and new roadways in the development will provide quick access to additional homes and businesses in areas including Front Royal Pike, Papermill Road. These roadway construction efforts will provide for an increased level of quality emergency service to the citizens in this entire area. Construction Schedule: To be determined. 50 PRIORITY 4 Fire & Rescue Regional Training Center Description: Construct a Regional Public Safety Training Center potentially consisting of an administrative building, multi-story burn building, multi-story training tower, vehicle driving range, shooting range, and numerous other training props. This project will incorporate emergency medical services, fire, hazardous materials, rescue, law enforcement, industrial, and educational institutions located in Clarke County, Frederick County, Shenandoah County, Warren County, Winchester City, State Agencies, Federal Agenci es, and potentially jurisdictions within the State of West Virginia. Capital Cost: $31,175,000 Justification: This project will facilitate realistic training in today’s modern environment for emergency services and industrial personnel located throughout the Northern Shenandoah Valley and expanding into the State of West Virginia. This project will reinforce existing training programs in those respective agencies and jurisdictions as well as facilitate training that is cu rrently not available within the Northern Shenandoah Valley which causes students and instructors to travel into the Washington Metropolitan region. The number of potential personnel being trained at this Training Center is potentially in the thousands based upon t raining statistics provided in July 2007 by the participating agencies. Construction Schedule: Completion in FY 20-21 Fire & Rescue Company Capital Project Requests Capital Equipment Fire & Rescue – Vehicles & Equipment Description: This new project consists of a revolving fund in the amount of $1,000,000 for the benefit of Fire and Rescue Services. It is the intention of this capital expenditure fund to be for the purpose of purchasing additional and replacement capital e quipment fire and rescue vehicles and equipment. It was determined that the inclusion of such a project would be beneficial in ensuring that this significant capital expense is identified in the County’s capital planning and budget process. This project is primarily for the benefit of the individual Volunteer Fire and Rescue Companies. Capital Cost: $1,000,000 51 Justification: The inclusion of this capital expenditure fund for the purpose of purchasing additional and replacement capital equipment fire and rescue vehicles and equipment will enable the County to meet the r equirements of the Code of Virginia with regards to the collection and disbursement of cash proffers accepted on behalf of the fire and rescue companies. Construction Schedule: N/A Individual Fire & Rescue Company Capital and Capital Equipment Requests. The individual Fire and Rescue Companies requests have been added to the CIP. The individual Fire and Rescue Companies have identified their own capital requests which have been recognized in the CIP by way of a total project category. The projects are in no particular order. (This information may be found on the County’s website www.fcva.us/planning) F MASTER DEVELOPMENT PLAN #05-17 Abrams Chase Staff Report for the Planning Commission Prepared: October 13, 2017 Staff Contact: M. Tyler Klein, AICP, Planner This report is prepared by the Frederick County Planning Staff to provide information to the Planning Commission and the Board of Supervisors to assist in the review of this application. It may also be useful to others interested in this zoning matter. Reviewed Action Planning Commission: 11/01/17 Pending Board of Supervisors: 12/13/17 Pending PROPOSAL: The Applicant seeks to develop 3.25 acres of land zoned RP (Residential Performance) District with 13 single-family detached (SFD) age-restricted unit. This Master Development Plan (MDP) also includes 0.64 acres dedicated to public right-of-way for improvements along Senseny Road. The Applicant also is seeking a waiver for the community center requirement specified in Section 165- 204.08(A) in single-family small lot subdivision that contain less than 25 lots. MAGISTERIAL DISTRICT: Shawnee PROPERTY ID NUMBERS: 65-A-27A and 65-A-28A LOCATION: The properties are located west approximately 400 feet west of Channing Drive, immediately west of Parkwood Circle, and north of Senseny Road (Route 657). PROPERTY ZONING & PRESENT USE: Zoned: RP (Residential Performance) Use: Residential/Vacant ZONING & PRESENT USE OF ADJOINING PROPERTIES: North: RP (Residential Performance) Use: Residential/Open Space South: RA (Rural Areas) Use: Agricultural/Vacant East: RP (Rural Performance) Use: Residential West: RA (Rural Areas) Use: Residential STAFF CONCLUSIONS FOR THE 11/01/17 PLANNING COMMISSION MEETING: The Master Development Plan for Abrams Chase appears to be consistent with the requirements of Article VIII, Master Development Plan, of the Frederick County Zoning Ordinance, and this MDP is in a form that is administratively approvable. The MDP is also in conformance with the proffers for the approved Rezoning #04-15. Also, Staff finds the request for a waiver of the community center requirement as appropriate, as the proposed subdivisions contains less than 25 lots and the Applicant will provide equivalent recreational value within the development. All of the issues brought forth by the Planning Commission should be appropriately addressed by the Applicant. MDP #05-17 Abrams Chase October 20, 2017 Page 2 It appears that the application meets all requirements. Following presentation of the application to the Planning Commission and the Board of Supervisors, and the incorporation of your comments, staff is prepared to proceed to approval of the application. REVIEW EVALUATIONS: Virginia Department of Transportation: A VDOT review has been conducted for the Abram’s Chase Master Development Plan Revision signature dated 8/23/2017. We have no objection to the plan. Please send one electronic set of the plans to this office for file. Frederick County Fire Marshal: MDP approved provided that the turnaround be changed to meet Frederick County Fire Prevention Code. Frederick County Public Works: We offer no additional comments at this time. A comprehensive review should occur at subdivision plan submission. Frederick County Inspections: No comments required at this time. Comments shall be provided at the time of subdivision lot review. Frederick County Parks and Recreation: Plan appears to meet or exceed Parks and Recreation requirements. Virginia Department of Health: Please see attached letter dated August 31, 2017 from Herbert Cormier, Environmental Health Supervisor. Frederick Water: Approved as noted. Planning & Zoning: A) Master Development Plan Requirement A Master Development Plan is required prior to development of this property. Before a MDP can be approved, it must be reviewed by the Planning Commission, Board of Supervisors and all relevant review agencies. Approval may only be granted if the MDP conforms to all requirements of the Frederick County Zoning and Subdivision Ordinances. The purpose of the MDP is to promote orderly and planned development of the property within Frederick County that suits the characteristics of the land, is harmonious with adjoining property and is in the best interest of the general public. The Applicant also is seeking a waiver for the community center requirement specified in Section 165-204.08(A) in single-family small lot subdivision that contain less than 25 lots. In lieu of a community center, the Applicant intends to fulfill the required recreation uni ts for the development with an outdoor pavilion for the public with other amenities to-be-determined at time of the subdivision design plan. B) Site History On January 10, 2007, the Board of Supervisors approved Rezoning #11-06 to rezone 3.25 acres from RA (Rural Areas) District to RP (Residential Performance) District to enable the construction of single-family residential lots with proffered improvements. On July 8, 2015, the MDP #05-17 Abrams Chase October 20, 2017 Page 3 Board of Supervisors approved Rezoning #04-15 modify the proffers approved with Rezoning #11-06 to restrict the residential uses to age-restricted residential uses and to reduce the monetary contributions for proffered improvements given the change to age-restricted units. C) Site Suitability & Project Scope Comprehensive Plan: The 2035 Comprehensive Policy Plan is an official public document that serves as the Community's guide for making decisions regarding development, preservation, public facilities and other key components of community life. The primary goal of this Plan is to protect and improve the living environment within Frederick County. It is in essence a composition of policies used to plan for the future physical development of Frederick County. Land Use Compatibility: The Senseny/Eastern Frederick Urban Area Plan (SEFUAP) of the 2035 Comprehensive Plan identifies this property with residential and commercial land use designations. The current RP (Residential Performance) District designation is supported by the Comprehensive Plan for this area of the County. The Master Development Plan for Abrams Chase is also generally consistent with the approved proffers with the most recent Rezoning #04-15, providing the required open space, access, sidewalks/trail section and future inter-parcel connection. Site Access and Transportation: Access, as shown on the MDP, will be provided to the site via Senseny Road. Future inter-parcel access (to Tax Map Parcel 65-A-25B) is provided to the west, should those properties develop into residential subdivisions; and a turnaround is provided for residents. Sidewalks will be included on either side of the internal street for pedestrian connectivity within the development, and a 10’ trail will be provided along the property frontage on Senseny Road. The right-of-way for the future condition of Senseny Road as a four-lane roadway is also reserved along the properties frontage as shown on the MDP. STAFF CONCLUSIONS FOR THE 11/01/17 PLANNING COMMISSION MEETING: The Master Development Plan for Abrams Chase appears to be consistent with the requirements of Article VIII, Master Development Plan, of the Frederick County Zoning Ordinance, and this MDP is in a form that is administratively approvable. The MDP is also in conformance with the proffers for the approved Rezoning #11-06. Also, Staff finds the request for a waiver of the community center requirement as appropriate, as the proposed subdivisions contains less than 25 lots and the Applicant will provide equivalent recreational value within the development. All of the issues brought forth by the Planning Commission should be appropriately addressed by the Applicant. It appears that the application meets all requirements. Following presentation of the application to the Planning Commission and the Board of Supervisors, and the incorporation of your comments, staff is prepared to proceed to approval of the application. ST657 65 A 15 65 A 15A 65 A 16 65 A 35C 65 A 34 55K 11 24A 55K 11 24A 55K 11 24A 65B 9 1 65B 9 10 65 A 28A 65B 9 2 65 A 25B 65 A 26A 65B 9 9 65 A 25A 65 A 27A 65B 9 3 65 A 25 65B 9 8 65B 9 4 65 A 24 65B 9 7A 65B 9 5 65B 9 7 65B 9 6 55K 11 7 55K 11 6 55K 11 5 55K 11 9 55K 1 1 8 55K 11 4 CHA N N I N G D R SENSENY R D PARK W O O D C I R Applications Parcels Building Footprints B1 (Neighborhood Business District) B2 (General Business District) B3 (Industrial Transition District) EM (Extractive Manufacturing District) HE (Higher Education District) M1 (Light Industrial District) M2 (Industrial General District) MH1 (Mobile Home Community District) MS (Medical Support District) OM (Office - Manufacturing Park) R4 (Residential Planned Community District) R5 (Residential Recreational Community District) RA (Rural Areas District) RP (Residential Performance District) I Note:Frederick County Dept ofPlanning & Development107 N Kent StSuite 202Winchester, VA 22601540 - 665 - 5651Map Created: September 15, 2017Staff: tklein SENSENY RD CHAN N I N G D R MALO Y D R G R E E N W O O D R D ROSS M A N N B L V D WOODROW RD SUN S E T D R LYNN E H A V E N D R BR O A D A V E MADIG A N L N TEA B E R R Y D R WAYFARIN G D R ARD E Y T H L N ROS S U M L N DIX I E B E L L E D R VAN GOGH T E R WAL E S C T MDP # 05 - 17Abrams ChasePINs:65 - A - 27A, 65 - A - 28A 0 130 26065 Feet MDP # 05 - 17Abrams ChasePINs:65 - A - 27A, 65 - A - 28A MDP #05-17 MDP #05-17 ST657 65 A 15 65 A 15A 65 A 16 65 A 35C 65 A 34 55K 11 24A 55K 11 24A 55K 11 24A 65B 9 1 65B 9 10 65 A 28A 65B 9 2 65 A 25B 65 A 26A 65B 9 9 65 A 25A 65 A 27A 65B 9 3 65 A 25 65B 9 8 65B 9 4 65 A 24 65B 9 7A 65B 9 5 65B 9 7 65B 9 6 55K 11 7 55K 11 6 55K 11 5 55K 11 9 55K 1 1 8 55K 11 4 CHA N N I N G D R SENSENY R D PARK W O O D C I R Applications Parcels Building Footprints I Note:Frederick County Dept ofPlanning & Development107 N Kent StSuite 202Winchester, VA 22601540 - 665 - 5651Map Created: September 15, 2017Staff: tklein SENSENY RD CHAN N I N G D R MALO Y D R G R E E N W O O D R D ROSS M A N N B L V D WOODROW RD SUN S E T D R LYNN E H A V E N D R BR O A D A V E MADIG A N L N TEA B E R R Y D R WAYFARIN G D R ARD E Y T H L N ROS S U M L N DIX I E B E L L E D R VAN GOGH T E R WAL E S C T MDP # 05 - 17Abrams ChasePINs:65 - A - 27A, 65 - A - 28A 0 130 26065 Feet MDP # 05 - 17Abrams ChasePINs:65 - A - 27A, 65 - A - 28A MDP #05-17 MDP #05-17 G PLANNING COMMISSION BYLAWS County of Frederick, Virginia Proposed for Consideration At the November 1, 2017 Planning Commission ARTICLE I - AUTHORIZATION 1-1 The Frederick County Planning Commission is established by and in conformance with Chapter 21 of the Code of Frederick County, and in accord with the provisions of Section 15.2-2210 of the Code of Virginia (1950), as amended. 1-2 The official title of this body shall be the Frederick County Planning Commission, hereinafter referred to as the "Commission". ARTICLE II - PURPOSE 2-1 The primary purpose of the Commission is to advise the Frederick County Board of Supervisors and to carry out all duties and functions described by the Code of Virginia, as amended. ARTICLE III - MEMBERSHIP 3-1 The membership of the Commission shall be determined by the Frederick County Board of Supervisors as specified in Chapter 21 of the Code of Frederick County. Methods of appointment and terms of office shall be determined by Chapter 21 of the Code of Frederick County. 3-2 Within the first month of initial appointment, new Commissioner appointees shall: 1) participate in an orientation to familiarize themselves with the operations of the Department and the Commission, and 2) meet with planning staff representatives in an effort to review and better understand specific agenda items by no later than their second Planning Commission meeting. Page 2 Planning Commission Bylaws Proposed for consideration at the November 1, 2017 ARTICLE IV - OFFICERS 4-1 Officers of the Commission shall consist of a chairman, vice-chairman and secretary. The chairman and vice-chairman must be voting members of the Commission. The secretary shall be a member of the Commission or a county employee. 4-2 Selection 4-2-1 The officers shall be elected by the voting members of the Commission at the first meeting of the calendar year. 4-2-2 Nomination of officers shall be made from the floor. Elections of officers shall follow immediately. A candidate receiving a majority vote of the entire voting membership shall be declared elected. 4-3 Duties 4-3-1 The Chairman shall: 4-3-1-1 Preside at meetings. 4-3-1-2 Appoint committees. 4-3-1-3 Rule on procedural questions. A ruling on a procedural question by the chairman shall be subject to reversal by a two-thirds majority vote of the members present. 4-3-1-4 Report official communications. 4-3-1-5 Certify official documents involving the authority of the Commission. 4-3-1-6 Certify minutes as true and correct copies. 4-3-1-7 Carry out other duties as assigned by the Board of Supervisors and the Commission. 4-3-2 The Vice-Chairman shall: 4-3-2-1 Assume the full powers of the chairman in the absence or inability of the chairman to act. 4-3-2-2 When acting as chair, the vice-chairman shall carry out other duties as Page 3 Planning Commission Bylaws Proposed for consideration at the November 1, 2017 assigned by the Board of Supervisors and the Commission Chairman. 4-3-3 The Secretary shall: 4-3-3-1 Ensure that attendance is recorded at all meetings. 4-3-3-2 Ensure that the minutes of all Commission meetings are recorded. 4-3-3-3 Notify members of all meetings. 4-3-3-4 Prepare agendas for all meetings. 4-3-3-5 Maintain files of all official Commission records and reports. Official records and reports may be purged in accordance with applicable state codes. 4-3-3-6 Give notice of all Commission meetings, public hearings and public meetings. 4-3-3-7 Provide to the Board of Supervisors reports and recommendations of the Commission. 4-3-3-8 Attend to the correspondence necessary for the execution of the duties and functions of the Commission. 4-4 Term of Office 4-4-1 Officers shall be elected for a one-year term or until a successor takes office. Vacancies shall be filled for an unexpired term by a majority vote of the Commission. In such cases, the newly elected officer shall serve only until the end of the calendar year or until a successor takes office. 4-5 Temporary Chairman 4-5-1 In the event of the absence of both the chairman and the vice-chairman from any meeting, the Commission shall designate from among its members a temporary chairman who shall act for that meeting in the absence of the chairman or vice- chairman. Page 4 Planning Commission Bylaws Proposed for consideration at the November 1, 2017 ARTICLE V - COMMITTEES 5-1 The Commission shall establish committees necessary to accomplish its purpose. 5-2 In establishing committees, the Commission shall describe the purpose for each committee. 5-3 Members of the committees shall be appointed by the chairman and will serve for a term of one year. The chairman may request recommendations from the Commission or committee members on committee appointments. 5-4 Commission members, employees of the County, and citizen volunteers may be members of the committee. 5-5 The chairman and vice-chairman of the Planning Commission shall be ex-officio members of every committee. 5-6 The committees will elect a chairman and vice-chairman annually. These officers shall be current Commission members and should represent different Magisterial Districts, if possible. 5-7 The committees may operate as a committee of the whole or by executive committee, with current and past Commission members serving as members of the executive committee. 5-8 The committees may establish standing subcommittees whose activities will be a specific responsibility of the parent committee. One executive committee member will serve as liaison to the standing subcommittee and will assist staff in managing its activities. Membership will be comprised of past Commission members and citizens. Membership will be appointed by the chairman of the Committee with concurrence by the Commission Chairman. 5-9 The committees may establish working groups to assist in specific, carefully-defined tasks for a limited period of time. Important considerations for membership on the working group are skills and experience necessary to assist in providing acceptable solutions. Membership will be appointed by the Chairman of the Committee with concurrence by the Commission Chairman. Page 5 Planning Commission Bylaws Proposed for consideration at the November 1, 2017 ARTICLE VI – COMMISSION MEETINGS 6-1 At the first meeting of each calendar year, the Commission shall fix the date, time, and place of all its regular meetings for the ensuing calendar year, and shall fix the day on which a regular meeting shall be continued should the Chairman declare that weather or other conditions make it hazardous for members to attend. 6-2 Special meetings may be called by the chairman or by the secretary after due notice and publication by the secretary. 6-3 Notice of all meetings shall be sent by the secretary with an agenda at least five calendar days before the meeting. 6-4 All meetings of the Commission shall be open to the public except for Closed Sessions held in accordance with the provision specified under Section 2.2-3711(A) of the Code of Virginia, 1950, as amended. ARTICLE VII - VOTING 7-1 A majority of voting members shall constitute a quorum. No action shall be taken or motion made unless a quorum is present. 7-2 No action of the Commission shall be valid unless authorized by a majority vote of those present and voting. ARTICLE VIII - OPERATING RULES 8-1 Order of Business for a regular meeting 8-1-1 Call to Order. 8-1-2 Adoption of the Agenda. 8-1-3 Consideration of Minutes. 8-1-4 Committee Reports. 8-1-5 Citizen Comments on Items not on the Agenda. Page 6 Planning Commission Bylaws Proposed for consideration at the November 1, 2017 8-1-6 Public Hearings. 8-1-7 Action Items. 8-1-8 Information/Discussion Items 8-1-9 Other. 8-1-10 Adjournment. 8-2 Minutes 8-2-1 The Commission shall keep minutes of each meeting. The chairman and secretary shall sign all minutes following approval by the Commission certifying that the minutes are true and correct. Minutes made available to the public prior to formal approval by the Commission shall be clearly identified as a draft version of the meeting. 8-3 Procedures 8-3-1 Parliamentary procedure in the Commission meetings shall be governed by Robert's Rules of Order, except where otherwise specified in these procedures. 8-3-2 Whenever an agenda item involves a recommendation to the Board of Supervisors, the Commission shall continue to consider the item until a definite recommendation is made. If a motion has been made and defeated, additional, different motions may be made concerning the item under consideration. 8-3-3 The initial motion on an agenda item shall be made by a member representing the application’s Magisterial District. If both District representatives are absent or decline to make the initial motion, then any other Commissioner may act. 8-3-4 Business items on the agenda shall be considered using the following procedures: 8-3-4-1 Report by County Staff. 8-3-4-2 Presentation by Applicant. 8-3-4-3 Citizen Comment. 8-3-4-4 Applicant Response. Page 7 Planning Commission Bylaws Proposed for consideration at the November 1, 2017 8-3-4-5 Staff Summary. 8-3-4-6 Discussion by Commission. 8-3-4-7 Motion and Action by Commission. 8-3-5 Public comment shall be allowed in all cases required by the Code of Virginia, 1950, as amended, or the Code of Frederick County. In other cases, the chairman may allow public comment. 8-3-6 The Commission members may ask questions of clarification and information after the staff report, applicant presentation, and/or citizen comment. 8-3-7 Petitions, displays, documents or correspondence presented at a meeting may be made part of the official record of the meeting by motion of the Commission and are to be kept on file by the secretary. Such items need not be made part of the published minutes. 8-3-8 Public Hearings 8-3-8-1 The Commission shall hold public hearings on all items for which hearings are required by the Code of Virginia, 1950, as amended, or by the Code of Frederick County. Such public hearing shall be advertised and notifications provided as required by the Code of Virginia, 1950, as amended. 8-3-8-2 The Chairman may establish special rules for any public hearing at t he beginning of said hearing. These rules may include limitations on the time of staff report, applicant presentation and citizen comment. 8-3-8-3 In addition to those required by law, the Commission may hold public hearings on any matter, under the purview of the Commission, which it deems to be in the public interest. In such cases, the public hearings shall follow all procedures described for public hearing in these bylaws. 8-3-8-4 The 90-day period (Section 165-102.03 of the Frederick County Zoning Ordinance) for the Planning Commission to make a rezoning recommendation to the Board will start after the first Commission meeting following the referral of the amendment to the Commission. 8-3-9 Tabling Page 8 Planning Commission Bylaws Proposed for consideration at the November 1, 2017 8-3-9-1 The Planning Commission shall have the authority to postpone agenda items 45- calendar days (less if reaching the limits of Section 165-102.03) for any one of the following: A) The agenda item does not meet the requirements of the Code of Virginia, 1950, as amended. B) The agenda item does not meet the requirements of the Code of Frederick County. C) Insufficient information has been provided for the agenda item. D) Revised proffers have been received from the applicant less than eight (8) calendar days of the advertised Planning Commission meeting. E) Issues or concerns that arise during formal discussion of the agenda item warrant additional information or study. F) The applicant provides the Frederick County Planning Department with a written request to postpone the agenda item. G) The Frederick County Planning Department is advised of an emergency situation that prevents attendance by the applicant. H) The applicant fails to appear at the meeting in which the application has been advertised to appear. 8-3-9-2 The applicant shall be permitted to request that an agenda item be postponed from a scheduled Planning Commission meeting one time. The Planning Commission shall table the application for a specific period of time to ensure that the requirements of Section 165-102.03 of the Frederick County Zoning Ordinance are not exceeded unless the applicant requests a waiver from this requirement. In no case shall an application be postponed for more than 12 months from the time the complete application was received by the Zoning Administrator or applicable staff. 8-3-9-3 An application that has been postponed for an unspecified period of time shall be re-advertised for consideration by the Planning Commission once the following steps have been completed: Page 9 Planning Commission Bylaws Proposed for consideration at the November 1, 2017 A) The applicant has requested in writing that the agenda item be considered by the Planning Commission. B) The applicant has provided all required information to the Frederick County Planning Department which addresses all concerns of the Planning Commission. 8-3-10 Work sessions 8-3-10-1 The Commission may hold work sessions at which the procedural rules of these bylaws shall not apply. 8-3-10-2 Work sessions shall be held after the adjournment of regular meetings or at the time and place set by the Commission and/or the Board of Supervisors. 8-3-10-3 Notice of work sessions shall be sent to the Planning Commissioners at least five days before the session. 8-3-10-4 The chairman shall lead the session and require orderly behavior and discussion. 8-3-10-5 No actions shall be taken or motions made at a work session. 8-3-10-6 Work sessions shall be open to the public. Public comment is not required at a work session. 8-3-10-7 The secretary shall keep a general record of all work sessions and the items discussed. 8-3-11 Adjournment 8-3-11-1 In no case shall the Commission consider any new items after 10:30 P.M. and the meeting shall be adjourned by 11:00 P.M. In the instance that an item begun before 10:30P.M. has not been acted on by the 11:00 P.M. hour, the Commission may, by majority vote, lift the adjournment time until a recommendation has been made, or such time, after 11:00 P.M., as the Commission may fix. ARTICLE IX - AMENDMENTS Page 10 Planning Commission Bylaws Proposed for consideration at the November 1, 2017 9-1 These bylaws may be amended by a majority vote of the entire voting membership after thirty days prior notice at any time during the calendar year. 9-2 The Planning Commission shall conduct an annual review of these bylaws each calendar year to ensure their accuracy. 9-3 At the first meeting of the calendar year, the By-Laws will be adopted. FREDERICK COUNTY PLANNING COMMISSION ROLES AND RESPONSIBILITIES Proposed for Consideration At the November 1, 2017 Planning Commission This document has been prepared to assist Frederick County Planning Commissioners in understanding what their role and responsibilities are in the myriad of activities that they accept as a member of the Planning Commission. This compilation is a companion document to the Commission’s By-Laws. APPLICATION COMMUNICATIONS There are three primary sources of information gathered by and weighed by the Planning Commission in order to make quality planning recommendations to the Board of Supervisors. They are ex-parte communications, staff reports and public input. Ex-Parte Communications: Individual meetings between Commissioners and an applicant/developer regarding a specific application shall follow the Virginia Freedom of Information Act. During this discussion or at any other time prior to action taken by the Commission on the application, a Planning Commissioner should make no commitments or endorsements. Any new written materials provided by the applicant to any one Commissioner shall be made available to all commissioners and staff by the applicant prior to the application appearing on the agenda. To not do so may result in the application being tabled at the Planning Commission public hearing. Staff Application Briefings/Work Sessions: Prior to the first public hearing being held, staff will hold a briefing for the Planning Commissioners, with an invitation extended to the Board of Supervisors to participate, regarding any application deemed sufficiently complicated / controversial to warrant detailed explanation. The purpose is to apprise the Commissioners regarding the details of the application, both those items that meet the ordinance and those that do not. This provides the opportunity for the Commissioners to have a common understanding of the application prior to the public hearing. The decision to hold a briefing on a specific application will be made jointly by the Director of Planning and the Chairman of the Planning Commission. In addition to complexity, the application shall be basically complete prior to scheduling the briefing. The Planning Commission may request a work session for an application which, after the first public hearing is concluded, is subsequently postponed. The purpose of the work Page 2 Planning Commission Roles and Responsibilities Proposed November 1, 2017 session is to discuss amongst each other and with staff details of the application, any revised proffers provided or anticipated by the applicant, and other improvements which could be made to the application. For either a briefing or a work session: -The applicant should attend, but will not have an active role. -The format of a Planning Commission work session as identified in paragraph 8- 3-10 of the Commission’s By-Laws will be used. -In no case will the legal timeline for consideration before the Planning Commission be changed. Public Hearing/Meeting: Efficient and effective public hearings are an essential part of enabling the Commission to make reasoned recommendations to the Board of Supervisors. Every attempt will be made to obtain focused and broad representation of opinion or information from the public. When possible, specific time limitations will not be used. However, both rules of order as well as time constraints most appropriate for the specific application will be implemented when there is either large interest in or controversy regarding an application. One constant during this process on both the part of the public, the applicant and the Commission itself is civility and respect for information offered or a differing opinion. Deviation from this behavior is unacceptable. COMMISSIONER DEVELOPMENT: Each Commissioner shall be committed to preparing for and keeping knowledge current in order to do the most effective job for the community. New initial appointees should strive to obtain Planning Commissioner certification from an acceptable training program within the first year of appointment. This training is supported by the Planning Department budget. Further continuing education through many offerings should be pursued and will be supported by the Planning budget as possible. These opportunities should be shared amongst the number of Commissioners who are serving. Examples include PlanVirginia Page 3 Planning Commission Roles and Responsibilities Proposed November 1, 2017 annual meeting, other special offerings as well as the American Planning Association’s readings and meetings. A library is maintained by the Planning office. COMMISSIONER ATTENDANCE Commissioners are expected to participate in 80% of the regularly scheduled meetings per year. Members who cannot attend a meeting due to illness, business, and other governmental or family reasons should notify the Commission Chairman and/or staff Administrative Assistant prior to the scheduled meeting in order for the absence to be noted. It may affect quorum considerations. Especially essential is preparation and readiness for each of the Commission’s meetings in order to use not only the Commission’s but the staff’s and public’s time wisely. COMMISSION COMMITTEE ASSIGNMENTS: Appointments to a Commission committee or liaison assignments are made by the chairman and shared by the membership. Generally, they involve a once per month meeting. CONFLICT OF INTEREST: Each Commissioner needs to be familiar with Commonwealth of Virginia information on conflict of interest. If a Commissioner is unsure if there is conflict, the County Attorney is the correct resource. Upon determination that there is or might be perceived to be a conflict, the Commissioner should state immediately after the agenda item is read that recusal action is necessary (with, preferably, stating the reason) then step down from the dais until the item is concluded. PUBLIC REPRESENTATION: Commissioners are citizens, too. If there is a public item that is of interest, the Commissioner should participate, but not identify themselves as members of the Frederick County Planning Commission unless acting in an official capacity and directed to do so. Implied endorsements by the Commission should be avoided.