HomeMy WebLinkAbout03-16 PC Staff ReportCONDITIONAL USE PERMIT #03-16
Cellco Partnership d/b/a Verizon Wireless
Staff Report for the Planning Commission
Prepared: June 1, 2016
Staff Contact: Mark Cheran, Zoning Administrator
This report is prepared by the Frederick County Planning Staff to provide information to the
Planning Commission and the Board of Supervisors to assist them in making a decision on
this request. It may also be useful to others interested in this zoning matter.
Reviewed Action
Planning Commission: 06/15/16 Pending
Board of Supervisors: 07/27/16 Pending
EXECUTIVE SUMMARY: This is a request for a Conditional Use Permit to enable the
construction of a 150-foot, Monopole Telecommunications Facility with a 50 x 50 foot
equipment compound and setback waiver. Should the Planning Commission find the use to be
appropriate, Staff would suggest the following conditions:
1. All review agency comments and requirements shall be complied with at all times.
2. The tower shall be available for collocating personal wireless services providers.
3. A minor site plan shall be approved by Frederick County.
4. The tower shall be removed by the Applicant or property owner within twelve (12)
months of abandonment of operation.
5. In the event a telecommunications tower is not erected within twelve (12) months of the
approval of this Conditional Use Permit, the CUP will be deemed invalid.
6. Any expansion or modification of this use will require a new Conditional Use Permit.
In addition, should the Planning Commission find the waiver to the required setback is
acceptable; a motion to recommend approval of setback reduction of 65’ to allow the tower to be
100’ from the identified property would be appropriate.
Following this public hearing, it would be appropriate for the Planning Commission to offer
a recommendation concerning this application to the Board of Supervisors.
Page 2
CUP #03-16, Cellco Partnership d/b/a Verizon Wireless
June 1, 2016
LOCATION: This property is located at 143 Greenwood Road
MAGISTERIAL DISTRICT: Redbud
PROPERTY ID NUMBER: 55-A-79
PROPERTY ZONING & PRESENT USE: Zoned: RA (Rural Areas)
Land Use: Church
ADJOINING PROPERTY ZONING & PRESENT USE:
North: B2 (General Business) Use: Motorcycle Dealer
South: RP (Residential Performance) Use: Residential
East: RP (Residential Performance) Use: Residential
West: RP (Residential Performance) Use: Residential
PROPOSED USE: This is a request for a Conditional Use Permit to enable the construction of
a 150-foot, Monopole Telecommunications Facility with a 50 x 50 foot equipment compound.
REVIEW EVALUATIONS:
Virginia Department of Transportation: The application for a site plan for this property
appears to have little measurable impact on Route 656, the VDOT facility which would provide
access to the property. Present entrance is adequate for the proposed improvements. Should
business ever expand in the future, entrance may need to be upgraded.
Frederick County Inspections: Structure shall comply with The Virginia Uniform Statewide
Building Code and Section 312, use group U (Utility and Miscellaneous) of The International
Building Code 2012.
Per the Section 102.3 of the Virginia Uniform Statewide Building Code, 2012 edition.
Section 102.3 VUSBC exempts equipment, related wiring, and poles and tower supporting the
related wiring installed by a provider of publicly regulated utility service. The exemption shall
apply only if under applicable federal and state law the ownership and control of the equipment
and wiring is by the service provider or its affiliates. Such exempt equipment and wiring shall be
located on either public right-of-way or private property for which the service provider has rights
of occupancy and entry; however, the structures, including their service equipment, housing or
Page 3
CUP #03-16, Cellco Partnership d/b/a Verizon Wireless
June 1, 2016
supporting such exempt equipment and wiring shall be subject to the USBC. The installation of
equipment and wiring exempted by this section shall not create an unsafe condition prohibited by
the USBC.
Prefabricated shelters/canopy exceeding 150 sq. ft. requires a building permit. Plans submitted
shall be sealed by a Virginia Registered Design Professional.
Please note the requirements in Chapter 17 of the IBC for special inspections for this type of
structure (soil, concrete, bolts, etc.).
Soil investigations/testing is required due to the potential sink holes located on site prior to
placement of concrete slap.
Winchester-Frederick County Health Department: The Frederick County Health Department
has no objection to this project since no existing well or onsite sewage disposal system sites will
be affected by the construction.
Frederick County Sanitation Authority: The request would not require service from FCSA.
FCSA offers no additional comments.
Frederick County Fire Marshall: Plans approved.
City of Winchester: No comments.
Winchester Regional Airport: Please see attached letter from Serena Manuel, Executive
Director dated March 2, 2016.
Frederick County HRAB Comments: Please see attached letter from Candice Perkins,
Assistant Director dated May 24, 2016.
Planning and Zoning: The 2030 Comprehensive Policy Plan of Frederick County
(“Comprehensive Plan”) provides guidance when considering any land use action. This proposed
150-foot monopole-type commercial telecommunication facility is located on a 22.6 +/- acre
property that is zoned RA (Rural Areas). The property is located within the UDA and SWSA as
identified within the Comprehensive Plan, and is located within the Senseny Road/ Eastern
Frederick Area Plan. These plans identify this area remain residential in character. This proposed
site is located within the vicinity of the Third Battle Field of Winchester area.
The Frederick County Zoning Ordinance allows for commercial telecommunication facilities in
the RA (Rural Areas) Zoning District with an approved Conditional Use Permit (CUP). The
properties immediately adjacent to this proposed Conditional Use Permit (CUP) are currently
zoned RP (Residential Performance) Zoning District. The zoning ordinance requires that all
Page 4
CUP #03-16, Cellco Partnership d/b/a Verizon Wireless
June 1, 2016
proposed telecommunication facilities be subject to additional performance standards in order to
promote orderly economic development and mitigate the negative impacts to adjoining
properties, residential properties, land use patterns, scenic areas and properties of significant
historic value. The Frederick County Historic Resources Advisory Board (HRAB) has reviewed
this proposed use in relationship to its location within the Third Battle Field of Winchester area.
(See HRAB comments.)
Furthermore, the Frederick County Zoning Ordinance requires an Applicant to provide
confirmation that an attempt was made to collocate on an existing telecommunication facility,
and possible collocation structures. The Applicant has provided an inventory of existing
telecommunication facilities, and no other telecommunication facility or possible collocation
opportunity structures exist in this area. Should this facility be approved this commercial
telecommunication facility will be positioned to provide the existing and future land uses in this
area of the County with telecommunication needs.
Waiver:
This proposed telecommunication tower is required to be setback from the property line 165 ft.
(tower is 150 ft. in height the RA Zoning District height maximum is 35’, 150’-35’ = 115’) The
normal setback (50’) per RA Zoning District plus one foot for every foot over the maximum
height of the district (35’) this telecommunication 115’ higher than is allowed in the district
(50’+115’= 165’). The site plan notes this tower at 100’ from the property line and the setbacks
cannot be met.
The Applicant is requesting a waiver to reduce the required setback as set forth in Section 165 -
204.19 of the zoning ordinance. The Applicant has provided documentation from a certified
Virginia engineer with verification that the tower is designed and will be constructed in a manner
that, should the tower collapse for any reason, the collapsed tower will be contained in an area
around the tower, with a radius equal to or lesser than the setback, measured from the center line
of the base of the tower. Should this waiver be granted, the result will be a 65 foot setback
reduction. (165’-100’=65’).
STAFF CONCLUSIONS FOR THE 06/15/16 PLANNING COMMISSION MEETING:
Should the Planning Commission find this use appropriate, Staff would suggest the following
conditions be placed on the CUP:
1. All review agency comments and requirements shall be complied with at all times.
2. The tower shall be available for collocating personal wireless services providers.
3. A minor site plan shall be approved by Frederick County.
Page 5
CUP #03-16, Cellco Partnership d/b/a Verizon Wireless
June 1, 2016
4. The tower shall be removed by the Applicant or property owner within twelve (12)
months of abandonment of operation.
5. In the event a telecommunications tower is not erected within twelve (12) months of the
approval of this Conditional Use Permit, the CUP will be deemed invalid.
6. Any expansion or modification of this use will require a new Conditional Use Permit
In addition, should the Planning Commission find the waiver to the required setback is
acceptable; a motion to recommend approval of setback reduction of 65’ to allow the tower to be
100’ from the identified property would be appropriate.
Following this public hearing, it would be appropriate for the Planning Commission to offer a
recommendation concerning this application to the Board of Supervisors.