Loading...
HomeMy WebLinkAbout02-17 Impact Analysis Statement IMPACT ANALYSIS STATEMENT EXPRESS OIL CHANGE & TIRE ENGINEERS DEVELOPMENT Shawnee Magisterial District Frederick County, Virginia TM 64-A-1F August 15, 2016 Current Owner: Titan’s Corporation Contact Person: Evan Wyatt, Director of Land Planning Greenway Engineering, Inc. 151 Windy Hill Lane Winchester, VA 22602 540-662-4185 Greenway Engineering August 15, 2016 Express Oil & Tire Engineers Rezoning File #3484E Impact Analysis Statement/EAW 2 EXPRESS OIL CHANGE & TIRE ENGINEERS DEVELOPMENT INTRODUCTION This report has been prepared for the purpose of assessing the impact on Fredrick County by the proffered rezoning of a 0.604±-acre subject property owned by Titan’s Corporation, and identified as Tax Map Parcel 64-A-1F. The subject property is located on the west side of Front Royal Pike (U.S. Route 522 South) approximately 1,000’ south of the Interstate 81 Exit 313 northbound on-ramp, and is currently zoned B-2, Business General District. The Applicant proposes to rezone the 0.604±-acre subject property to B-3 Industrial Transition District with proffers to allow for the development of an Express Oil Change and Tire Engineers facility that is approximately 4,850 square feet with 3 service bays and 3 oil change bays along the commercial corridor. Basic information Location: Fronting on the west side of Front Royal Pike (U.S. Route 522 South); approximately 1,000’ south of the Interstate 81 Exit 313 northbound on-ramp. Magisterial District: Shawnee District Property ID Numbers: 64-A-1F Current Zoning: B-2, Business General District Current Use: Undeveloped Proposed Zoning: B-3, Industrial Transition District Proposed Use: Express Oil Change & Tire Engineers Facility Total Rezoning Area: 0.604±-acres with proffers for the subject property COMPREHENSIVE POLICY PLAN Urban Development Area The Urban Development Area (UDA) defines the general area in which residential, commercial, industrial and institutional land use development is encouraged in the County. Greenway Engineering August 15, 2016 Express Oil & Tire Engineers Rezoning File #3484E Impact Analysis Statement/EAW 3 The 0.604±-acre subject property is currently located within the UDA; therefore, expansion of the UDA boundary to accommodate the proposed development of commercial land use is not required for this rezoning application. Sewer and Water Service Area The Sewer and Water Service Area (SWSA) is generally consistent with the UDA, but also extends outside of the UDA to accommodate areas of the County in which commercial and industrial land use development is only desired. The 0.604±-acre subject property is currently located within the SWSA; therefore, expansion of the SWSA boundary to accommodate the proposed development of commercial land use is not required for this rezoning application. Comprehensive Plan Conformity The 0.604±-acre subject property is located in the UDA and the SWSA and is within the study area boundary of the Senseny/Eastern Frederick Urban Area Study. The Senseny/Eastern Frederick Urban Area Study is a large-area plan that identifies land uses, transportation networks, and other matters that are recommended for consideration for future land use and development within this geographic area of the County. The 0.604±-acre subject property is identified for B2/B3 commercial land use; therefore, the proposed B-3, Industrial Transition District rezoning is in conformance with the land use recommendations of the Comprehensive Policy Plan. The B-3, Industrial Transition District rezoning is proposed to allow for the development of the Express Oil Change and Tire Engineers facility, which has been determined not to be a permitted stand-alone land use within the B-2, Business General District. The Express Oil Change and Tire Engineers facility is an appropriate commercial land use along a major commercial corridor. SUITABILITY OF THE SITE Access The 0.604±-acre subject property is located on the west side of Front Royal Pike (U.S. Route 522 South), approximately 250 feet south of the Front Royal Pike/Travel Lodge Drive signalized intersection. Access to the subject property is planned to be provided with a shared right-in/right-out commercial entrance; as well as through an inter-parcel connection with the IHOP property that will provide access to the signalized intersection to facilitate protected left turn movements onto Front Royal Pike. Flood Plains The 0.604±-acre subject property does not contain areas of floodplain as demonstrated on FEMA NFIP Map #51069C0216D, Effective Date September 2, 2009; as well as information from the Frederick County GIS Database. Greenway Engineering August 15, 2016 Express Oil & Tire Engineers Rezoning File #3484E Impact Analysis Statement/EAW 4 Wetlands The 0.604±-acre subject property does not contain wetland areas as demonstrated on the National Wetlands Inventory (NWI) Map information from the Frederick County GIS Database. Soil Types The 0.604±-acre subject property contains one soil type as demonstrated by the Soil Survey of Frederick County, Virginia and the Frederick County GIS Database. The following soil type is present on site: 3B Blairton Silt Loams 2-7% slope 3C Blairton Silt Loams 2-15% slope The Blaitron Silt Loam soil type is identified as a prime agricultural soil and has severe wet properties. The existing commercial land uses that have been constructed along the east and west sides of the Front Royal Pike (Route 522 South) commercial corridor contain the same soil type, and the subject property is not conducive for agricultural land use per the Comprehensive Policy Plan. The soil type is conducive for commercial development of the subject property. Other Environmental Features The 0.604±-acre subject property does not contain areas of steep slope, lakes or ponds or natural stormwater retention areas as defined by the Frederick County Zoning Ordinance. There are no known environmental features present that create development constraints for the proposed commercial development project. SURROUNDING PROPERTIES Adjoining property zoning and present use: North: B-2, Business General District Use: Restaurant (IHOP) South: B-2, Business General District Use: Office East: B-2, Business General District Use: Pool Hall; Retail/Grocery (Delco Plaza & Costco) West: B-2, Business General District Use: Restaurant (Cracker Barrel) Greenway Engineering August 15, 2016 Express Oil & Tire Engineers Rezoning File #3484E Impact Analysis Statement/EAW 5 TRANSPORTATION The 0.604±-acre subject property is located on the west side of Front Royal Pike (U.S. Route 522 South), approximately 250 feet south of the Front Royal Pike/Travel Lodge Drive signalized intersection. Subsequent to final rezoning approval, the contract purchaser proposes to construct an Express Oil Change & Tire Engineers facility that is approximately 4,850 square feet with 3 service bays and 3 oil change bays. Access to the subject property is proposed to be developed with a right-in/right-out commercial entrance on Front Royal Pike that is intended to be shared with the IHOP Restaurant; as well as an inter-parcel connection with the IHOP restaurant that will allow for vehicles to access the existing traffic signal at the Front Royal Pike/Travel Lodge Drive intersection to facilitate protected left traffic movement. Greenway Engineering has met with VDOT representatives to discuss the proposed right - in/right-out commercial entrance and has been advised that VDOT does not object to this access point. However, VDOT advised that the property owner will need to prepare and submit an access management exception request as a component of the Site Plan before the right-in/right-out commercial entrance can be approved for construction. Additionally, Titans Corporation has an agreement with Lennox, LLC (IHOP Restaurant property owner) that provides for an ingress/egress easement across Tax Map Parcel 64-A-2 that will allow for vehicles to access the existing traffic signal at the Front Royal Pike/Travel Lodge Drive intersection to facilitate protected left traffic movement. Greenway Engineering has prepared an exhibit that identifies the proposed location of the right-in/right-out commercial entrance and the approximate location of the ingress/egress easement through the Lennox, LLC property as information with this request. In order to assess the potential traffic impacts for the proposed Express Oil Change & Tire Engineers facility, Greenway Engineering has analyzed the Frederick County Zoning Ordinance to determine the highest and best land use within the B-2, Business General District that is not otherwise permitted in the B-3, Industrial Transition District and has determined that General Merchandise Stores (SIC 53) would be the appropriate land use to compare to the proposed Express Oil Change & Tire Engineers facility (SIC 75). Additionally, Greenway Engineering analyzed traffic study data from the Institute of Traffic Engineers (ITE) Manual, 9th Edition specific to Shopping Center (820) and Quick Lubrication Vehicle Shop (941). The following analysis compares traffic volumes for the Weekday AM and PM Peak Hours, the Saturday Peak Hours, and the Sunday Peak Hours assuming 4,850 square feet of Shopping Center (820) land use and 6 service bays of Quick Lubrication Vehicle Shop (941) land use specific to the ITE traffic study data: B-2, Business General Land Use ITE (820) Weekday AM Peak: Q = 0.96 VPD per 1,000 square feet gross floor area Q = 0.96 VPD x 4.85 (4,850 sq.ft./1,000 sq.ft.) Q = 4.65 or 5 VPD Greenway Engineering August 15, 2016 Express Oil & Tire Engineers Rezoning File #3484E Impact Analysis Statement/EAW 6 ITE (820) Weekday PM Peak: Q = 3.71 VPD per 1,000 square feet gross floor area Q = 3.71 VPD x 4.85 (4,850 sq.ft./1,000 sq.ft.) Q = 17.99 or 18 VPD ITE (820) Saturday Peak: Q = 4.82 VPD per 1,000 square feet gross floor area Q = 4.82 VPD x 4.85 (4,850 sq.ft./1,000 sq.ft.) Q = 23.37 or 24 VPD ITE (820) Sunday Peak: Q = 3.12 VPD per 1,000 square feet gross floor area Q = 3.12 VPD x 4.85 (4,850 sq.ft./1,000 sq.ft.) Q = 15.13 or 16 VPD B-3, Industrial Transition Land Use ITE (941) Weekday AM Peak: Q = 3.0 VPD per service position Q = 3.0 VPD x 6 service position Q = 18 VPD ITE (941) Weekday PM Peak: Q = 4.0 VPD per service position Q = 4.0 VPD x 6 service position Q = 24 VPD ITE (941) Saturday Peak: Q = 7.0 VPD per service position Q = 7.0 VPD x 6 service position Q = 42 VPD ITE (941) Sunday Peak: Q = 4.5 VPD per service position Q = 4.5 VPD x 6 service position Q = 27 VPD The ITE projected traffic volumes identified above indicate that the proposed Express Oil Change & Tire Engineers facility (941) has the potential to increase traffic volumes during the weekday peak hours between 6-13 VPD and by approximately 11-18 VPD during the weekend peak hours compared to the Shopping Center (820) land use. These calculations demonstrate a fairly low increase in potential traffic volumes during these time frames (approximately 0.75-1.75 VPD every 15 minutes during the weekday peak hours and approximately 1.5-2.25 VPD every 15 minutes during the weekend peak hours). The proposed Express Oil Change & Tire Engineers facility will result in a minor increase in peak hour traffic volume that can be accommodated by the existing transportation infrastructure. The proposed access management plan provides for safe and efficient ingress Greenway Engineering August 15, 2016 Express Oil & Tire Engineers Rezoning File #3484E Impact Analysis Statement/EAW 7 and egress for the subject site, which sufficiently mitigates impacts to the transportation network for this rezoning request. SEWAGE CONVEYANCE AND TREATMENT The 0.604±-acre subject property is located within the Sewer and Water Service Area (SWSA); therefore, the property is entitled to be served by public sewer based on County Policy. The City of Winchester is the provider of public sewer service within this area of the County, which is managed by the City of Winchester Public Services Department. The City of Winchester has an existing 8-inch gravity sewer line that adjoins the western boundary of the subject property within a 20-foot easement that is accessible to the property. All commercial land uses on the west side of Front Royal Pike (US Route 522 South) within proximity of the subject property convey sewer effluent through the 8-inch gravity sewer line that goes under Interstate 81 to a manhole located on the Apple Blossom Mall parcel, which then gravities to the Abram’s Creek sewer transmission line that connects to the Opequon Wastewater Treatment Facility. Based on comparable discharge patterns, the City of Winchester Public Services Department has determined that 75 gallons/day per 1,000 square feet of commercial development is an appropriate calculation for estimating the sewer demand for commercial land uses. Q = 75 gallons/day per 1,000 square feet commercial Q = 75 GPD x 4.85 (4,850 sq.ft./1,000 sq.ft.) Q = 363.75 GPD TOTAL: Q = 365 GPD projected sewer demand The Opequon Wastewater Treatment Facility has a total capacity of 12.6 MGD, of which 7.125 MGD is allocated to the City of Winchester. The City of Winchester currently averages approximately 5.0 MGD of the allocated capacity and has approximately 2.125 MGD of allocated capacity available for future development projects. The projected 365 GPD for the proposed project represents 0.02% of available treatment capacity; therefore, the proposed rezoning can be sufficiently accommodated by public sewer service through a system with adequate conveyance, capacity and treatment. WATER SUPPLY The 0.604±-acre subject property is located within the Sewer and Water Service Area (SWSA); therefore, the property is entitled to be served by public water based on County Policy. The City of Winchester is the provider of public water service within this area of the County, which is managed by the City of Winchester Public Services Department. Greenway Engineering August 15, 2016 Express Oil & Tire Engineers Rezoning File #3484E Impact Analysis Statement/EAW 8 The City of Winchester has an existing 12-inch water transmission located on the east side of Front Royal Pike that provides public water service to the commercial land uses on the west side of Front Royal Pike (US Route 522 South). An 8-inch water is looped off of the 12-inch water transmission line that adjoins the western boundary of the subject property within a 20- foot easement that is accessible to the property. Additionally, a 6-inch water line has been installed on the subject property off of the 8-inch water line loop. Based on comparable discharge patterns, the City of Winchester Public Services Departmen t has determined that 75 gallons/day per 1,000 square feet of commercial development is an appropriate calculation for estimating the water demand for commercial land uses. Q = 75 gallons/day per 1,000 square feet commercial Q = 75 GPD x 4.85 (4,850 sq.ft./1,000 sq.ft.) Q = 363.75 GPD TOTAL: Q = 365 GPD projected water demand The City of Winchester obtains potable water from the North Fork of the Shenandoah River, which is treated at the Percy D. Miller Water Treatment Plant located near Middletown. The Percy D. Miller Water Treatment Plant can treat approximately 10 MGD of potable water daily, which is transmitted to serve all properties in the City of Winchester; as well as some properties in Frederick County. The City has sufficient water capaci ty to serve these properties; as well as sell excess capacity to the Frederick County Sanitation Authority to supplement other water systems in Frederick County. Greenway Engineering met with the City of Winchester Public Services Director to discuss the proposed development project and was advised that the City has adequate capacity to serve this project and that the existing 8 - inch water loop provides adequate pressure and fire flow for all commercial land uses within this portion of the County. Therefore, the proposed rezoning can be sufficiently accommodated by public water service through a system with adequate conveyance, capacity, pressure, and fire flow. SITE DRAINAGE The topographic relief on the 0.604±-acre subject property generally follows a southwestern pattern, which directs drainage towards the rear of the property adjacent to the Cracker Barrel site. Greenway Engineering prepared an ALTA Survey for the 0 .604±-acre subject property, which identifies a 20-foot drainage easement on the property that has been improved with a drop inlet and storm sewer line that ties into the overall drainage system constructed during the development of the Cracker Barrel site. This stormwater collection system conveys stormwater to a regional stormwater management facility that was constructed during the development of the Cracker Barrel site; therefore, development of the subject property will utilize this regional facility. Greenway Engineering August 15, 2016 Express Oil & Tire Engineers Rezoning File #3484E Impact Analysis Statement/EAW 9 The 0.604±-acre subject property is exempt from local stormwater quality treatment requirements due to the size of the parcel; therefore, there should be not stormwater management quality measures to mitigate. Greenway Engineering will work with the County Engineer during the Site Development Plan process to identify stormwater volumes from the proposed development of the subject property to ensure that there are no detrimental impacts to the regional stormwater management facility and to adjoining properties. The stormwater management plan and erosion and sedimentation control plan will be designed in conformance with all applicable state and local regulations; therefore, site drainage and stormwater management impacts to adjoining properties and the community will be mitigated. SOLID WASTE DISPOSAL The impact on solid waste disposal facilities associated with the development of the proposed Express Oil Change & Tire Engineers facility on the 0.604± acre subject property can be projected from an average annual commercial consumption of 5.4 cubic yards per 1,000 square feet of structural area (Civil Engineering Reference Manual, 4th edition). The Applicant proposes to develop an Express Oil Change & Tire Engineers facility that is approximately 4,850 square feet with 3 service bays and 3 oil change bays ; therefore, solid waste disposal impacts are based on the following figures that provide the increase in average annual solid waste volume based on the development of this facility: AAV = 5.4 cu. yd. per 1,000 sq. ft. commercial AAV = 5.4 cu. yd. x 4.85 (4,850 sq.ft./1,000 sq. ft.) AAV = 26.19 cu. yd. at build-out, or 18.33 tons/yr. at build-out The Municipal Solid Waste area of the Regional Landfill has a current remaining capacity of 13,100,000 cubic yards of air space. The projected commercial development will generate approximately 18.33 tons of solid waste annually on average. This represents a 0.009% increase in the annual solid waste received by the Municipal Solid Waste area of the Regional Landfill, which currently averages 200,000 tons per year. Solid waste produced by the commercial development will be disposed at the Regional Landfill by a commercial waste hauler; therefore, the County will receive tipping fees associated with this land use to mitigate this impact. The Regional Landfill has adequate capacity to accommodate the solid waste impacts associated with this proposal. HISTORICAL SITES AND STRUCTURES The Frederick County Rural Landmarks Survey identifies the Garber Farm (#34-424) within close proximity of the 0.604±-acre subject property. The Garber Farm was inventoried as part of the overall report; however, the property was not recommended for inclusion on the list of potentially significant properties in the final report. The Garber Farm has been Greenway Engineering August 15, 2016 Express Oil & Tire Engineers Rezoning File #3484E Impact Analysis Statement/EAW 10 subdivided into multiple properties, which are developed as commercial and residential land uses along Garber Lane (Route 763), and as commercial land uses along Front Royal Pike (US Route 522 South). The National Park Service Study of Civil War Sites in the Shenandoah Valley identifies t he 0.604±-acre subject property as being located within the First Winchester study area boundary, and within close proximity of the First Winchester core battlefield area boundary. The final report identifies all land within the study area boundary that is located in the southeastern quadrant of Interstate 81 Exit 313 as having lost integrity due to the existing commercial and residential land use development patterns; as well as the construction of Interstate 81. The development of commercial land use on the 0.604±-acre subject property is consistent with other properties in this area of the County. The Senseny/Eastern Frederick Urban Area Study does not identify this area of the County as historic or as developmentally sensitive area. The proposed rezoning of the property will not create negative impacts associated with historic properties and historic resources. OTHER POTENTIAL IMPACTS The commercial development of the 0.604±-acre subject property will provide new economic development opportunities for Frederick County, which has been determined by the County’s Development Impact Model to be positive in the consideration of fiscal impacts to County Capital Facilities. It is recognized that the development of commercial land use has the potential to increase service demands on fire and rescue services; therefore, the Applicant’s Proffer Statement provides a monetary contribution of $0.10 per developed building square foot to the County to provide additional revenues that are specifically directed to fire and rescue services. There are no other identified potential impacts above those discussed in this Impact Analysis Statement that would be detrimental to surrounding properties or to the County from the rezoning and development of the 0.604±-acre subject property. FRON T R O Y A L P I K E MILL W O O D P I K E FRON T R O Y A L P I K E £¤50 £¤17 §¨¦81 §¨¦81 £¤522 £¤522 rs763 CO S T E L L O D R DELC O P L Z GA R B E R L N Virginia Geographic Information Network (VGIN) Map Data Source: Frederick County, Va. GIS Department, 2016 Data; 2015 Aerial Photos Courtesy of VGIN/VITA (http://gismaps.vita.virginia.gov/arcgis/rest/services VBMP2015/VBMP2015_WGS); Greenway Engineering AE R I A L O V E R V I E W SH A W N E E M A G I S T E R I A L D I S T R I C T EX P R E S S O I L C H A N G E & T I R E E N G I N E E R S FR E D E R I C K C O U N T Y , V I R G I N I A DA T E : 2 0 1 6 - 0 7 - 2 8 PR O J E C T I D : 3 4 8 4 E DE S I G N E D B Y : D W E SC A L E : 1 I n c h = 2 0 0 F e e t Legend TM 64-A-1F Parcel Boundary Winchester City Limits 200 0 200 Feet µ EX P R E S S O I L C H A N G E & T I R E E N G I N E E R S RE Z O N I N G AE R I A L O V E R V I E W RE Z O N I N G F R O N T R O Y A L P I K E MILLWOOD PIKE F R O N T R O Y A L P I K E £¤50 £¤17 §¨¦81 §¨¦81 £¤522 £¤522 rs795 rs797 rs763 COSTELLO DR P R I C E D R T U L A N E D R H A R V A R D D R PRINCETON DR WINDY HILL LN DELCO PLZ G A R B E R L N R Y C O L N Map D ata Source: Frederick County, Va. GIS Department, 2016 Data; Greenway Engineering Z O N I N G A N D L O C A T I O N M A P S H A W N E E M A G I S T E R I A L D I S T R I C T E X P R E S S O I L C H A N G E & T I R E E N G I N E E R S F R E D E R I C K C O U N T Y , V I R G I N I A D A T E : 2 0 1 6 -0 7 -2 8 P R O J E C T I D : 3 4 8 4 E D E S I G N E D B Y : D W E S C A L E : 1 I n c h = 3 0 0 F e e t Le gend TM 6 4-A-1 F Pa rce l Bou ndary Winche ster City L imits Frederick Co unty Z oning B2 (Busine ss, G en era l Distrist) B3 (Busine ss, Ind ustrial Transitio n District) HE (Highe r Educa tion Dis trict) M2 (In du strial, G e nera l District) RA (R ura l Area D istrict) RP (Re sid ential, Pe rfo rman ce Distr ict) 300 0 300 Feet µ E X P R E S S O I L C H A N G E & T I R E E N G I N E E R S R E Z O N I N G Z O N I N G A N D L O C A T I O N M A P R E Z O N I N G SITE Winc hes ter £¤50 £¤17 §¨¦81 £¤11 ËÊ37 ËÊ37 £¤522 £¤522 ËÊ7 LOCATION MAP 8 in. 12 in . 8 in. 6 in. 8 in. 6 i n . 8 in. 8 in. 8 in. 8 in . 6 in. 12 i n . 1 5 i n . 10 in. 4 in . 8 in. 1 0 i n . 8 i n . 8 i n . 8 in. 4 in.6 i n . 12 i n . 8 i n . 8 in . 8 in. 10 in. 8 in. 8 i n . 8 in. 12 i n . 15 in. 8 in. 8 in. 8 i n . 8 in. 8 i n . 8 in. 6 in. 8 in. 8 in. 8 in. 8 in. 8 in . 12 in. 8 i n . 12 in. 10 i n . 6 in . 2 in. 8 in. 4 in. 12 i n . 14 in . 16 in. 10 in . 6 in. 6 in . 8 in . 6 in. 8 in. 8 in. 4 i n . 8 i n . 8 i n . 6 i n . 6 in. 8 i n . 12 i n . 4 in. 6 in . 8 in . 12 in. 6 i n . 4 in. 8 in. 16 in . 8 in . 8 in . 6 in. 6 i n . 16 i n . 6 in. 6 in. 2 in. 6 i n . 8 i n . 6 in. 6 in. 6 i n . 8 i n . 8 in. 6 in. 6 i n . 12 i n . 6 in . 8 in. 2 i n . 12 i n . 8 in. 6 in. 8 in .8 in. 8 in . 6 i n . 4 i n . 12 in.8 in. 6 in. 10 i n . 8 i n . 6 in. 8 i n . 8 i n . 8 i n . 8 i n . 8 i n . 8 i n . 8 i n . 8 in . 8 in. 8 in. 8 in. 16 in. 8 i n . 12 in. 6 i n . 10 in. 6 in. 8 in . 8 in . 10 in. 6 in. 12 i n . 12 in. 8 i n . 8 in. 6 in . 6 in. 6 in . 8 in . 8 in. 8 i n . 1 2 i n . 6 in . 16 in. 8 in . 8 i n . 1 2 i n . 6 in. MALL RD LEGGE B L V D E JUB A L E A R L Y D R FR O N T A G E R D MI L L W O O D A V E E JUBAL EARLY DR FRO N T R O Y A L P I K E MILL W O O D P I K E FRON T R O Y A L P I K E £¤50 §¨¦81 §¨¦81 £¤522 £¤522 rs781 rs795rs797 rs796 rs763 P E M B R I D G E D R COS T E L L O D R Y A L E D R ETNA M S T PRIN C E F R E D E R I C K D R PU R D U E D R K E S W I C K C T HARVARD DR PR I C E D R TU L A N E D R LUDLO W D R WINDY HILL LN MAR G A T E C T Map Data Source: Frederick County, Va. GIS Department 2016 Data; City of Winchester GIS Department 2016 Data; FCSA Water & Sewer Courtesy of FCSA, January 2016; Greenway Engineering WA T E R - S E W E R - S W S A - U D A M A P SH A W N E E M A G I S T E R I A L D I S T R I C T EX P R E S S O I L C H A N G E & T I R E E N G I N E E R S FR E D E R I C K C O U N T Y , V I R G I N I A DA T E : 2 0 1 6 - 0 7 - 2 8 PR O J E C T I D : 3 4 8 4 E DE S I G N E D B Y : D W E SC A L E : 1 I n c h = 5 0 0 F e e t Legend TM 64-A-1F Parcel Boundary Winchester City Limits Sewer-Water Service Area (SWSA) Urban Development Area (UDA) Water Line (City) Sewer Line (City) Water Line (FCSA) Sewer Line (FCSA) 500 0 500 Feet µ EX P R E S S O I L C H A N G E & T I R E E N G I N E E R S RE Z O N I N G WA T E R - S E W E R - S W S A - U D A M A P RE Z O N I N G NOTE: Parcel 64-A-1F is inside both the SWSA and the UDA. 700 725 700 700 7 2 5 7 0 0 700 7 2 5 7 2 5 700 A b r a m s C r e e k 7 0 0 6 7 5 725 7 2 5 7 0 0 7 0 0 67 5 7 2 5 6 7 5 7 0 0 675 6 7 5 F R O N T R O Y A L P I K E MILLWOOD PIKE F R O N T R O Y A L P I K E £¤50 £¤17 §¨¦81 §¨¦81 7 2 5 7 0 0 7 0 0 7 0 0 7 2 5 7 0 0 700 7 2 5 725 7 2 5 £¤522 £¤522 rs795 rs797 rs763 COSTELLO DR P R I C E D R T U L A N E D R H A R V A R D D R PRINCETON DR WINDY HILL LN DELCO PLZ G A R B E R L N R Y C O L N Map D ata Source: Frederick County, Va. GIS Department, 2016 Data; U.S. Fish & Wildlife Service (National Wetlands Inventory: https://www.fws.gov/wetlands/Data/Data-Download.html); Greenway Engineering E N V I R O N M E N T A L F E A T U R E S M A P S H A W N E E M A G I S T E R I A L D I S T R I C T E X P R E S S O I L C H A N G E & T I R E E N G I N E E R S F R E D E R I C K C O U N T Y , V I R G I N I A D A T E : 2 0 1 6 -0 7 -2 8 P R O J E C T I D : 3 4 8 4 E D E S I G N E D B Y : D W E S C A L E : 1 I n c h = 3 0 0 F e e t Le gend TM 6 4-A-1 F Pa rce l Bou ndary Winche ster City L imits Lake or Pon d Wetlan d (N WI) 100 Year Floodp lain Stream 5 Foot Intermediate Contours 25 Foot Index Contours 300 0 300 Feet µ E X P R E S S O I L C H A N G E & T I R E E N G I N E E R S R E Z O N I N G E N V I R O N M E N T A L F E A T U R E S M A P R E Z O N I N G 3C 3B F R O N T R O Y A L P I K EFRON T R O Y A L P I K E §¨¦81 §¨¦81 £¤522 £¤522 Map D ata Source: Frederick County, Va. GIS Department, 2016 Data; Greenway Engineering S O I L S M A P S H A W N E E M A G I S T E R I A L D I S T R I C T E X P R E S S O I L C H A N G E & T I R E E N G I N E E R S F R E D E R I C K C O U N T Y , V I R G I N I A D A T E : 2 0 1 6 -0 7 -2 8 P R O J E C T I D : 3 4 8 4 E D E S I G N E D B Y : D W E S C A L E : 1 I n c h = 1 0 0 F e e t Le gend TM 6 4-A-1 F Pa rce l Bou ndary Winche ster City L imits NRCS Soils 3B:B LAIRTON SILT LOA M, 2 TO 7 P ERCE NT SLO PES 3C:B LAIRTON SILT LO AM, 7 TO 15 PERC ENT SLO PES 100 0 100 Feet µ E X P R E S S O I L C H A N G E & T I R E E N G I N E E R S R E Z O N I N G S O I L S M A P R E Z O N I N G m m mmmmmmmmm mmmm m m m m m !à!à !à !à !à !à !à !à !à !à!à !à !à !à!à !à !à!à!à !à!à !à !à !à!à !à !à !à !à !à !à !à !à !à !à !à!à!à !à !à !à!à !à !à !à !à !à !à !à !à!à !à !à !à !à !à !à !à !à !à !à [e [e[e[e[e [e[e[e[e [e [e [e[e [e [e[e[e [e [e[e[e [e[e [e [e [e[e [e [e[e[e[e [e [e [e [e [e [e [e [e [e[e[e[e[e[e[e[e [e [e [e [e [e[e [e [e [e [e [e[e [e[e[e [e [e[e[e [e[e[e[e[e [e [e [e [e [e [e [e [e [e [e[e [e [e [e [e [e [e [e [e [e [e [e [e [e [e [e [e[e [e [e [e[e [e [e [e [e [e [e [e [e [e [e [e [e [e [e [e[e[e[e[e[e[e[e [e [e [e [e[e[e[e [e[e [e [e [e [e [e [e [e [e [e [e [e [e[e[e[e[e [e [e[e [e[e[e[e[e[e[e[e[e[e[e[e[e[e[e[e[e[e[e[e[e[e[e[e [e[e [e[e [e[e [e [e [e[e [e [e [e [e[e [e[e[e[e [e [e [e [e [e[e [e[e[e [e[e [e [e [e [e [e [e [e [e [e [e [e [e[e [e [e [e[e [e [e [e [e [e [e [e [e [e [e [e [e [e [e [e [e [e [e [e [e [e [e [e [e [e [e [e [e [e [e [e [e [e [e[e[e [e [e [e [e [e[e [e [e [e [e [e [e [e[e [e [e [e[e[e[e[e[e [e[e [e [e[e [e [e [e [e [e [e[e[e [e [e [e [e[e[e [e [e [e [e [e [e [e [e[e [e [e[e [e[e[e [e [e [e [e [e [e[e [e [e [e [e L E G G E B L V D M A L L R D P A P E R M I L L R D S P L E A S A N T V A L L E Y R D S L O U D O U N S T W JUBAL EARLY DR ADAMS DR E J U B A L E A R LY D R WEEMS LN E TEVIS ST F R O N T A G E R D PATSY CLINE BLVD M I L L W O O D A V E A P P L E B L O S S O M D R MILLW O O D AVE A D A M S D R E JUBAL EARLY DR S P L E A S A N T V A L L E Y R D S P L E A S A N T V A L L E Y R D MILL W O O D AV E 34-424 Garber Farm First Winchester Third Winchester Second Kernstown F R O N T R O Y A L P I K E MILLWOOD PIKE F R O N T R O Y A L P I K E §¨¦81 §¨¦81 £¤522 rs776 rs781 rs795 rs778 rs782 rs657 rs797 rs796 rs780rs763 D A R B Y D R P E M B R I D G E D R COSTELLO DR K I N R O S S D R Y A L E D R D E W B E R R Y D R F L A N A G A N D R O A K R I D G E L N E T N A M S T CUSTER AVE SENSENY RD P R I N C E F R E D E R I C K D R PRINCETON DR H U NTERSRID GE R D COVERSTONE DR K E S W I C K C T I N V E R L E E W A Y H A R V A R D D R KILLA N E Y CT FAIRFIELD DR B R A M B L E C T P R I C E D R L U D L O W D R ORKNEY DR TEY CT WINDY HILL LN M A R G A T E C T D O N E G A L C T STANLEY CIR D U N E R C T Map D ata Source: Frederick County, Va. GIS Department, 2016 Data; Greenway Engineering H I S T O R I C F E A T U R E S M A P S H A W N E E M A G I S T E R I A L D I S T R I C T E X P R E S S O I L C H A N G E & T I R E E N G I N E E R S F R E D E R I C K C O U N T Y , V I R G I N I A D A T E : 2 0 1 6 -0 7 -2 8 P R O J E C T I D : 3 4 8 4 E D E S I G N E D B Y : D W E S C A L E : 1 I n c h = 8 0 0 F e e t Le gend TM 6 4-A-1 F Pa rce l Bou ndary Winche ster City L imits Ý Cemete ries [e Rural_L andmarks !à CWCamps m CWForts Civil War Battl efi elds First Winchester Third Winchester Second Kern stown 800 0 800 Feet µ E X P R E S S O I L C H A N G E & T I R E E N G I N E E R S R E Z O N I N G H I S T O R I C F E A T U R E S M A P R E Z O N I N G