January 20, 2017
Frederick County Manning Department
Attn: Candice Pclkins, Deputy Director
10 / North Kent Street
Winchester, VA 22601
RE: Express Oil Change & l ire .Engineers Rezu1>ing — Review Agencies Comment Response Letter
Dear Candice:
tine purpose of this letter is to pruvide you with a comprehensive comment responNu letter that
addresses the Express Oil Change & 'fire Engineers culm iruts rmvived from the various review
agencies. Thu cumprehcnsive comment response letter is structured to provide fur the specific review
agency, the date the comment was reeeivcd, a►�d hifurmatimi pertaining to each review comment. This
infurmatiun is intended to explain how specific comments have bccn addlcsscd by the rczujiing
application or advise why the spuuific cummcnt was nut included in the prottered development
program for the commercial redevelopment project.
Frederick -Winchester Service Authority — Comment dated Octuber 3, 2016
Jr
No Comments.
t rederick County Public Wurks Department — Comment dated October 5, 2016
•: Provide a copy of the agreement between properry ow"Vfs that provides the ingress -egress
easement agreement.
COMMENT RESPONSE: A deed of easement has been prepared bctwcen the Titans, Inc.
property wid the Lennox, LLC property that includes intci-paled connectivity and a shared
right-in/rigrit-out entrance ontu Fiunt Ruyal Pike (US Route 522). A Memorandum of
Understanding has bccn executed by both parties and by CPRA, Inc (IHOP Tenant) advising
that this deed of easement is under review by all panics. Additionally, a letter has been
included from Greenway Engineering advising that the deed of easement document will be
legally rccurded prior to lezuning consideration by the hoard of Supervisuls, which has bccn
deemed to be an acceptable approach by the Planning Dr-palt111c11t.
Engineers Suivcyurs Plam,crs t iiviruuuiclutal Scientists Laboratory
1 cicyrlune J4u-b62-41 SJ Pax )4t)- /22-9.)A
www.grecilwayeiig.com
Vivjcct;F3484tVhA W
❖ Include a copy of the deed of dedication which highlights the stormwater management system
that was constructed during the developutritt of rhe C.acke, ua,rel site. The capacity of this
systern will need to be verified during the site elan design process.
COMMENT RESPONSE: A copy of UB 556 Fu 692 identifying deed of dedication for the
regional stormwater management system has becn pruvided. This negiunal stormwa[cn
managcmcut system was installed during the development of the Cracker Barrel site and the
subject property has existing stormwater pipe development on-site that ties into this systern.
Information pertaining to the uaat,auity of this system will be venified during the situ plan design
prucess.
Frederick County Transportation — Comment dated October 5, 2016
❖ A Traffic Impact Analysis will not be necessary for this project.
COMMENT RESPONSE: Information that was preparea for consideration of the 'Fratfic
Impact Analysis waiver has becnn pruvided as past of the review agency comments package.
Frederick County Fire Marshal — Cummunt dated Octuber 6, 2016
-C� Rezoning Approved.
Frederick Planning Department — Comment dated October 11, 2016
P, ajfe, L;2 should be completed prior to the rezoning being submitted to ensure that the inter -
parcel connection is available and to ensure that the limited commr.riril efirlu11ce identified in
the application can be constructed.
COMMENT RESPONSE: A deed of easement has been prepared between the Titans, Inc.
property and the Lennox, LLC property that includes into-t,a<ucl uumncuLivity and a shaiCd
right-inhight-out entrance onto Front Royal Pike (US Route 522). A Memorandum of
understanding has been executed by both parties and by CFRA, Ino (IHOP Tenant) advising
that this deed of easement is under review by all parties. Additionally, a tetter has been
included from Greenway Euginnceninng advising that the deed of easement document will be
legally recorded prior to rezoning consideration by the Board of Supervisors, which haN becnn
dccmcd to be an auucptable apptuach by the Planning Department.
Frederick Cuunty Attorney — Comment dated October 11, 2016
❖ Proffer B2 identifies the existing agreement for inter parcel access; however, there is no
legally recorded agreurnunt Within the County land records, nor does the proffer statement
provide an exhibit identifying the location of the inter parcel access.
Frojecu #3484E/EA W 2
COMMENT RESPONSE: A deed of easement has been prepared between the Titans, Inc.
property and the Lennox, LLC property that includes inter-paiccl wnncctivity and a shared
iight-ii,/right-uut cntraicC unto Front Royal Pike (US Route 521,). A Memorandum of
Understanding has been executed by buth I,atics and by CFRA, Inc (IHOP Tenant) advising
that this d, -cd of Casement is under review by all parties. Additionally, a letter has becrn
included frum Grcemway Engineering advising that the deed of casement document will be
legally recorded prior to rezoning consideration by the Board of Supervisurs, which has been
der -mud to be an acccptablc aappruach by the Planning Department.
City of Winchester Public Utilitieni — Uum,uent dated October 12, 2016
The City of Winchester can readily provide water and sanitary sewer to this parcel and ha3 no
concerns about the proposed rezoning and development.
VDO'1' — Comment dated November 8, 2016
VDOT is satisfied that the transportationlaccess management proffers offered in the rezoning
application addresses transportation concerns associated with this request. It should be noted
That to ensure the r ighr-111/r ight-out, the entrance design will require a median device to be
constructed to prevent a left turn in/out of the proposed entrance.
Winchester Regional Airport — Comment dated November 11, 2016
❖ Rezoning is compatible with airport operations. The developer will be required to file FFA
documents for airspace study comphunre as part of the site plan process.
Please advise me if you have any questions regarding the information in this lcttei. Greenway
engineering will provide a copy of all review agency win ments identified in this letter as part of the
rczvniiig application filing.
Sincerely,
p' • n
Evan Wyatt, Dileaw of Lwid Planning
Greenway Engineering, Inc.
Cu: Titans, Inu.
Daypop, Inc.
Rvjctt #3484E/EAW 3