Loading...
PC 04-15-15 Meeting Agenda AGENDA FREDERICK COUNTY PLANNING COMMISSION The Board Room Frederick County Administration Building Winchester, Virginia April 15, 2015 7:00 P.M. CALL TO ORDER TAB 1) Adoption of Agenda: Pursuant to established procedures, the Planning Commission should adopt the Agenda for the meeting ................................................................ (no tab) 2) March 18, 2015 Minutes .................................................................................................. (A) 3) Committee Reports .................................................................................................. (no tab) 4) Citizen Comments ................................................................................................... (no tab) PUBLIC HEARING 5) Ordinance Amendment to the Frederick County Code – Chapter 165 Zoning, Article V – Planned Development Districts, Part 501 – R4 Residential Planned Community District, §165-501.03 Permitted Uses. Revision to the Frederick County Zoning Ordinance to include the OM (Office Manufacturing Park) District to the permitted uses in the R4 District. Mrs. Perkins .................................................................................................................... (B) 6) Ordinance Amendment to the Frederick County Code – Chapter 165 Zoning, Article II Supplementary Use Regulations, Parking, Buffer, and Regulations for Specific Uses, Part 202 – Off-Street Parking, Loading and Access, §165-202.01 Off- Street Parking; Parking Lots. Revisions to the Frederick County Zoning Ordinance to include the use of permeable paving systems for parking lots. Mrs. Perkins ..................................................................................................................... (C) -2- INFORMATION/DISCUSSION ITEMS 7) Master Development Plan #01-15 for Graystone Commerce Center, submitted by Stowe Engineering, PLC to develop 271.40 acres of land M1 (light Industrial) District with industrial uses. The subject properties are located on the north side of Redbud Road (Route 661), the east side of the CSX Railroad, the west side of Milburn Road (Route 662), and the south of McCann’s Road (Route 838) in the Stonewall Magisterial District, and are identified by Property Identification Numbers 43-A-158, 44-A-26, and 44-A-27. Please note this item is presented for informational purposes only. Mrs. Perkins ..................................................................................................................... (D) 8) 2035 Comprehensive Plan Update Timeline Mr. Ruddy ........................................................................................................................ (E) 9) 2015 PC Retreat Summary Mr. Lawrence .................................................................................................................... (F) Other Adjourn Commonly Used Planning Agenda Terms  Meeting format  Citizen Comments – The portion of the meeting agenda offering an opportunity for the public to provide  comment to the Planning Commission on any items not scheduled as public hearing items.    Public Hearing– A specific type of agenda item, required by State law, which incorporates public comment as a  part of that item prior to Planning Commission or Board of Supervisors action. Public hearings are held for  items such as: Comprehensive Plan policies and amendments; Zoning and Subdivision Ordinance  amendments; and Rezoning and Conditional Use Permit applications. Following the Public Hearing, the  Planning Commission will take action on the item (see below).     Action Item–There are both public hearing and non‐public hearing items on which the Planning Commission  takes action. Depending on the actual item, the Planning Commission may approve, deny, table, or forward a  recommendation to the Board of Supervisors regarding the agenda item.  No public comment is accepted  during the Action Item portion of the agenda.    Information/Discussion Item– The portion of the meeting agenda where items are presented to the Planning  Commission for information and discussion.  The Planning Commission may offer comments and suggestions,  but does not take action on the agenda item.  No public comment is accepted during the  Information/Discussion Item portion of the agenda.    Planning Terminology  Urban Development Area or UDA – The UDA is the county’s urban growth boundary identified in the  Comprehensive Plan in which more intensive forms of residential development will occur. The UDA is an area  of the county where community facilities and public services are more readily available and are provided more  economically.      Sewer and Water Service Area or SWSA – The SWSA is the boundary identified in the Comprehensive Plan in  which public water and sewer is or can be provided.  The SWSA is consistent with the UDA in many locations;  however the SWSA may extend beyond the UDA to promote commercial, industrial, and institutional land uses  in area where residential land uses are not desirable.    Land Use – Land Use is the nomenclature which refers to the type of activity which may occur on an area of  land. Common land use categories include: agricultural, residential, commercial, and industrial.    Zoning District ‐ Zoning district refers to a specific geographic area that is subject to land use standards.  Frederick County designates these areas, and establishes policies and ordinances over types of land uses,  density, and lot requirements in each zone. Zoning is the main planning tool of local government to manage  the future development of a community, protect neighborhoods, concentrate retail business and industry, and  channel traffic.  Rezoning – Rezoning is the process by which a property owner seeks to implement or modify the permitted  land use activities on their land.  A rezoning changes the permitted land use activities within the categories  listed above under Land Use.    Conditional Use Permit or CUP ‐ A CUP allows special land uses which may be desirable, but are not always  appropriate based on a location and surrounding land uses. The CUP requested use, which is not allowed as a  matter of right within a zoning district, is considered through a public hearing process and usually contains  conditions to minimize any impacts on surrounding properties.     Ordinance Amendment – The process by which the County Code is revised.  Often the revisions are the result  of a citizen request with substantial justification supporting the change. Amendments ultimately proceed  through a public hearing prior to the PC forwarding a recommendation to the Board of Supervisors.    County Bodies Involved  Board of Supervisors or BOS ‐ Frederick County is governed by an elected Board of Supervisors composed of  seven members, one from each magisterial district, and one chairman‐at‐large. The Board of Supervisors is the  policy‐making body of the county. Functions of the Board of Supervisors related to planning include making  land use decisions, and establishing growth and development policies.    Planning Commission or PC ‐ The PC is composed of 13 members, two from each magisterial districts and one  at‐large, appointed by the Board of Supervisors. The Planning Commission serves in an advisory capacity to the  Board of Supervisors which then takes final action on all planning, zoning, and land use matters.     Comprehensive Plans and Programs Committee or CPPC – The CPPC is a major committee of the PC whose  primary responsibility is to formulate land use policies that shape the location and timing of development  throughout the County.  Included in the work are studies of specific areas to develop guidelines for future land  use within those areas. The CPPC also considers requests for amendments to the Comprehensive Plan.   Decisions by CPPC are then forwarded to the PC for consideration.    Development Review and Regulations Committee or DRRC – The DRRC is the second major committee of the  PC whose primary responsibilities involve the implementation of the Comprehensive Plan in the form of  Zoning and Subdivision ordinance requirements. Requests to amend the ordinances to the DRRC are made by  the Board of Supervisors, Planning Commission, local citizens, businesses, or organizations.  DRRC decisions  are also forwarded to the PC for consideration.     A DRAFT Frederick County Planning Commission Page 3193 Minutes of March 18, 2015 MEETING MINUTES OF THE FREDERICK COUNTY PLANNING COMMISSION Held in the Board Room of the Frederick County Administration Building at 107 North Kent Street in Winchester, Virginia on March 18, 2015. PRESENT: June M. Wilmot, Chairman/Member at Large; Roger L. Thomas, Vice Chairman/Opequon District; Robert S. Molden, Opequon District; Gary R. Oates, Stonewall District; J. Stanley Crockett, Stonewall District; Lawrence R. Ambrogi, Shawnee District; Greg L. Unger, Back Creek District; J. Rhodes Marston, Back Creek District; Charles E. Triplett, Gainesboro District; Kevin Kenney, Gainesboro District; Christopher M. Mohn, Red Bud District; Charles F. Dunlap, Red Bud District; Robert Hess, Board of Supervisors Liaison. ABSENT: H. Paige Manuel, Shawnee District STAFF PRESENT: Eric R. Lawrence, Planning Director; John Bishop, Deputy Director Transportation; Mark R. Cheran, Zoning & Subdivision Administrator; Candice E. Perkins, Senior Planner; David Burke, Zoning Inspector; Kirstin Twardon, GIS Analyst; and Shannon Conner, Administrative Assistant. ----------- CALL TO ORDER Chairman Wilmot called the March 18, 2015, meeting of the Frederick County Planning Commission to order at 7:00 p.m. Chairman Wilmot commenced the meeting by inviting everyone to join in a moment of silence. ------------- ADOPTION OF AGENDA Upon motion made by Commissioner Oates and seconded by Commissioner Crockett, the Planning Commission unanimously adopted the agenda for this evening’s meeting. ------------- DRAFT Frederick County Planning Commission Page 3194 Minutes of March 18, 2015 MINUTES Upon motion made by Commissioner Oates and seconded by Commissioner Thomas, the Planning Commission unanimously adopted the minutes of their February 18, 2015 meeting. ------------- COMMITTEE REPORTS Comprehensive Plans Programs Committee (CPPC) – 3/09/15 Mtg. Commissioner Mohn reported there was a continued discussion regarding the Kernstown Area Plan. Frederick County Sanitation Authority (FCSA) – 3/17/15 Mtg. Commissioner Unger reported total customer base for water is 14,285 and the total for sanitary is 13,797. The rainfall total for February 2015 was 1.5 inches which was down a little. Water usage at the Diehl Plant was 2.4 mgd; water usage at the Anderson Plant was 1.8 mgd; 1.1 mgd was purchased from the City. The daily average use is 4.2 mgd which has increased slightly. The elevation at the Diehl Plant dropped approximately 5 feet to 645 and the Anderson Plant elevation remained the same. Mr. Unger noted numerous leaks were discovered and repaired thus reflecting a 2% water loss compared to previous months ranging from 10-13%. He also noted the test well at Lake Frederick is moving forward and drilling equipment is in place. Historical Resources Advisory Board (HRAB) – 3/17/15 Mtg. Chairman Wilmot reported the HRAB recommended two rezonings for approval with conditions: the McCann Slaughter Properties located on Martinsburg Pike and Old Charlestown Road; and the Blackburn Property located on Apple Valley Road. Winchester Planning Commission – 3/17/15 Mtg. Commissioner Loring reported at their meeting there was one site plan review which was a minor renovation. The second half of their annual retreat was conducted at the meeting as well. DRAFT Frederick County Planning Commission Page 3195 Minutes of March 18, 2015 Board of Supervisors Report – 2/25/15 and 3/11/15 Mtgs. Board of Supervisors’ Liaison, Supervisor Robert Hess, reported the Board of Supervisors met on February 25, 2015 at which time a Public Hearing was held regarding the Capital Improvements Plan (CIP) and was approved. Also approved following a Public Hearing was the CPPA #01-14, Blain Properties Sewer and Water Service Area (SWSA) inclusion. At the March 11, 2015 meeting Mr. Hess reported a request was approved by the Board of Supervisors from the applicant of REZ #05-14 CB Ventures, LLC to postpone the rezoning to a later date in order to give the applicant and the adjacent property owners’ additional opportunity to discuss the request. Mr. Hess also reported discussion resumed from two previous postponements on REZ #02-14 Heritage Commons LLC. He noted after a lengthy discussion the Board of Supervisors voted to disapprove this rezoning request. ------------- Citizen Comments Chairman Wilmot called for citizen comments on any subject not currently on the Planning Commission’s agenda or any item that is solely a discussion item for the Commission . No one came forward and Chairman Wilmot closed the citizen comments portion of the meeting. ------------- PUBLIC HEARING Discontinuance and Abandonment – Gold Orchard Road (Route 708) – This is a proposal to abandon Gold Orchard Road (Route 708), from .02 miles north of Carpers Pike (Route 259), until the end of State Maintenance, per §33.1-151, Code of Virginia, 1950, as amended. Action – Recommend Approval Commissioner Oates and Commissioner Kenny said they would abstain from all discussion on this item due to a possible conflict of interest. Deputy Director Transportation, John Bishop reported over time the majority of properties fronting Gold Orchard Road (Route 708) have come under the ownership of one individual, Mr. Cordell Watt. Mr. Bishop noted that Mr. Watt is attempting to secure his property which cannot be accomplished due to the road running through th e center of the property and the road dead ends as well. Mr. Bishop also noted the Transportation Committee considered this request on January 26, 2015 at which time approval was recommended. Upon motion made by Commissioner Unger and seconded by Commissioner Thomas DRAFT Frederick County Planning Commission Page 3196 Minutes of March 18, 2015 BE IT RESOLVED, the Frederick County Planning Commission does hereby unanimously recommend approval of Discontinuance and Abandonment of Gold Orchard Road (Route 708), from .02 miles north of Carpers Pike (Route 259), until the end of State Maintenance, per §33.1-151, Code of Virginia, 1950, as amended. (Note: Commissioner Manuel was absent from the meeting.) ------------- OTHER Cancelation of the regular meeting on April 1, 2015 Chairman Wilmot announced there were no pending items for the Planning Commission’s April 1, 2015 meeting. A motion was made by Commissioner Thomas to cancel the April 1, 2015 meeting of the Planning Commission. This motion was seconded by Commissioner Crockett and unanimously passed. ------------- ADJOURNMENT No further business remained to be discussed and a motion was made by Commissioner Oates to adjourn the meeting. This motion was seconded by Commissioner Molden and unanimously passed. The meeting adjourned at 7:15 p.m. Respectfully submitted, ____________________________ June M. Wilmot, Chairman ____________________________ Eric R. Lawrence, Secretary B COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 MEMORANDUM TO: Frederick County Planning Commission FROM: Candice E. Perkins, AICP, Senior Planner SUBJECT: Public Hearing- Addition of the OM District to the R4 District Permitted Uses DATE: March 31, 2015 Staff has prepared a revision to the Zoning Ordinance to include the OM (OM Office- Manufacturing Park) Zoning District in the permitted uses list of the R4 (Residential Planned Community) Zoning District. Currently the R4 allows RP, B1, B2, B3 and M1 Zoning Districts as permitted uses. All uses proposed within an R4 community must be specified at the rezoning stage and approved on a Master Development Plan. Staff has included a minor ordinance amendment that includes the OM District in the permitted use list within the R4 District. The DRRC discussed this item at their January 2015 meeting; the committee agreed with the addition and sent the item forward for review by the Planning Commission. The Plan ning Commission discussed this item at their February 18, 2015 meeting; and agreed with the changes and sent the item forward for review by the Board of Supervisors. The Board of Supervisors discussed the request at their March 11, 2015 meeting; the Board sent the item forward for public hearing. The attached document shows the existing ordinance with the proposed changes. This item is presented for public hearing. A recommendation from the Planning Commission on this proposed Zoning Ordinance text amendment is sought. Please contact me if you have any questions. Attachment: 1. Revised ordinance with additions shown in bold underlined italics. CEP/pd Attachment 1 OM District Chapter 165 ARTICLE V - PLANNED DEVELOPMENT DISTRICTS Part 501 – R4 Residential Planned Community District § 165-501.01 Intent. The intention of the Residential Planned Community District is to provide for a mixture of housing types and uses within a carefully planned setting. All land to be contained within the Residential Planned Community District shall be included within an approved master development plan. The layout, phasing, density and intensity of development is determined through the final approval of the master development plan by the County. Special care is taken in the approval of the master development plan to ensure that the uses on the land are arranged to provide for compatibility of uses, to provide environmental protection and to avoid adverse impacts on surrounding properties and facilities. The district is intended to create new neighborhoods with an appropriate balance between residential, employment and service uses. Innovative design is encouraged. Special care is taken in the approval of R4 developments to ensure that necessary facilities, roads and improvements are available or provided to support the R4 development. Planned community developments shall only be approved in conformance with the policies in the Comprehensive Plan. § 165-501.02 Rezoning procedure. In order to have land rezoned to the R4 District, a master development plan, meeting all requirements of Article VIII of this chapter, shall be submitted with the rezoning application. The rezoning shall be reviewed and approved following the rezoning procedures described by this chapter, including procedures for impact analysis and conditional zoning. In adopting the rezoning, the master development plan submitted will be accepted as a condition proffered for the rezoning. The master development plan review procedures described by Article VIII must also be completed concurrently with or following the consideration of the rezoning. A. Impact analysis. Impact analysis, as required by this chapter, shall be used to evaluate all potential impacts, including impacts on surrounding lands, the environment and on public facilities and services. B. Land dedication. Land shall be dedicated in planned community developments for roads and facilities necessary to serve the development as described by the Comprehensive Plan, the Capital Improvements Program and adopted road improvement programs. C. Addition of land. The Board of Supervisors may approve the addition of land to an approved planned community through the procedures set forth in this chapter for the original approval of a planned community development. Attachment 1 OM District § 165-501.03 Permitted uses. All uses are allowed in the R4 Residential Planned Community District that are allowed in the following zoning districts: RP Residential Performance District B1 Neighborhood Business District B2 Business General District B3 Industrial Transition District OM OM Office-Manufacturing Park District M1 Light Industrial District C COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 MEMORANDUM TO: Frederick County Planning Commission FROM: Candice E. Perkins, AICP, Senior Planner SUBJECT: Public Hearing - Permeable Paving Systems for Parking Lots DATE: March 31, 2015 Staff has received a request to revise the Frederick County Zoning Ordinance to allow the use of permeable paving systems for the construction of parking areas within all zoning districts. This request is due to the new stormwater regulations and the need for additional options for dealing with stormwater onsite. Currently the ordinance only allows for their use within overflow parking areas. Staff has prepared a revision that would move the option for permeable paving systems out of the section for overflow parking areas and into the area for allowed surface materials. The DRRC discussed this item at their January 2015 meeting; the committee agreed with the revision and sent the item forward for review by the Planning Commission. The Planning Commission discussed this item at their February 18, 2015 meeting; and agreed with the changes and sent the item forward for review by the Board of Supervisors. The Board of Supervisors discussed the request at their March 11, 2015 meeting; the Board sent the item forward for public hearing with minor changes. The attached document shows the existing ordinance with the proposed changes. This item is presented for public hearing. A recommendation from the Planning Commission on this proposed Zoning Ordinance text amendment is sought. Please contact me if you have any questions. Attachments: 1. Revised ordinance with additions shown in bold underlined italics. CEP/pd Attachment 1 Permeable Pavers Chapter 165- Zoning Article II SUPPLEMENTARY USE REGULATIONS, PARKING, BUFFERS, AND REGULATIONS FOR SPECIFIC USES Part 202 – Off-Street Parking, Loading and Access § 165-202.01 Off-street parking; parking lots. Off-street parking shall be provided on every lot or parcel on which any use is established according to the requirements of this section. This section is intended to ensure that parking is provided on the lots to be developed and to ensure that excess parking in public street rights-of-way does not interfere with traffic. D. Parking lots. Parking spaces shared by more than one dwelling or use, required for any use in the business or industrial zoning district or required for any institutional, commercial or industrial use in any zoning district shall meet the following requirements: (1) Surface materials. In the RP Residential Performance District, the R4 Residential Planned Community District, the R5 Residential Recreational Community District, the MH1 Mobile Home Community District, the B1 Neighborhood Business District, the B2 Business General District, the B3 Industrial Transition District, the OM Office-Manufacturing Park District, the M1 Light Industrial District, the M2 Industrial General District MS Medical Support District, RA (Rural Areas) District and the HE (Higher Education) District, parking lots shall be paved with concrete, bituminous concrete, or similar materials. (2) Such surface materials shall provide a durable, dust and gravel-free, hard surface. a. The Zoning Administrator may allow for the use of other hard-surface materials for parcels located outside of the Sewer and Water Service Area if the site plan provides for effective stormwater management and efficient maintenance. In such cases, parking lots shall be paved with a minimum of double prime-and-seal treatment or an equivalent surface. b. In the RA (Rural Areas) District parking lots with (10) or fewer spaces shall be permitted to utilize gravel surfaces. c. Reinforced grass systems, permeable paving systems, or other suitable materials may be used for overflow parking areas, low volume access ways in all Zoning Districts and for agricultural uses in the RA (Rural Areas) District. Parking areas utilizing these materials shall have defined travel aisles and designated parking bays. These materials shall only be utilized with approval of the Frederick County Zoning Administrator and the Director of Public Works. d. The Zoning Administrator may approve alternative surface materials for parking lots for parcels located inside of the Sewer and Service Area when necessary to implement low impact development design and where approved by the Director of Public Works; such materials may include but are not limited to perm eable paving systems. D MASTER DEVELOPMENT PLAN #01-15 Graystone Commerce Center Staff Report for the Planning Commission Prepared: March 31, 2015 Staff Contact: Candice E. Perkins, AICP, Senior Planner This report is prepared by the Frederick County Planning Staff to provide information to the Planning Commission and the Board of Supervisors to assist in the review of this application. It may also be useful to others interested in this zoning matter. Reviewed Action Planning Commission: 04/15/15 Pending Board of Supervisors: 04/22/15 Pending PROPOSAL: To develop 271.40 acres zoned M1 (Light Industrial) District with industrial land uses. MAGISTERIAL DISTRICT: Stonewall PROPERTY ID NUMBERS: 43-A-158, 44-A-26, and 44-A-27 LOCATION: The properties are located on the north side of Redbud Road (Rt. 661), the east side of the CSX Railroad, the west side of Milburn Road (Rt. 662), and the south side of McCanns Road (Rt. 838). PROPERTY ZONING & PRESENT USE: Zoned: M1 Use: Undeveloped ZONING & PRESENT USE OF ADJOINING PROPERTIES: North: RA (Rural Areas) Use: Agricultural/Vacant South: RA (Rural Areas) Use: Agricultural/Residential/Historic East: RA (Rural Areas) Use: Agricultural (Agricultural District) R4 (Residential Planned Community) Vacant (Snowden Bridge) West: RA (Rural Areas) Use: Agricultural/Vacant M1 (Light Industrial) Industrial/Vacant STAFF CONCLUSIONS FOR THE 04/15/15 PLANNING COMMISSION MEETING: The Master Development Plan for the Graystone Commerce Center depicts appropriate land uses and appears to be consistent with the requirements of Article VIII, Master Development Plan, of the Zoning Ordinance, and this MDP is in a form that is administratively approvable. The MDP is also in conformance with the proffers for Rezoning #03-12. All of the issues brought forth by the Planning Commission should be appropriately addressed by the applicant. It appears that the application meets all requirements. Following presentation of the application to the Planning Commission and the Board of Supervisors, and the incorporation of your comments, staff is prepared to proceed to approval of the application. MDP #01-15Graystone Commerce Center March 31, 2015 Page 2 REVIEW EVALUATIONS: Virginia Department of Transportation: We have reviewed the Preliminary Master Development Plan for Graystone Commerce Center dated February 18, 2015 and we offer the following comment:  VDOT is currently in the preliminary engineering stage for designing the relocation of Redbud Road to connect to Snowden Bridge Boulevard. At this time, the ultimate alignment of Redbud Road has not been determined and may differ from what is proposed on the above-referenced MDP. Frederick County Fire Marshal: Plan approved. Frederick County Public Works: Plan approved Frederick County Inspections: Any removal or demolition of existing structures shall have an asbestos inspection/abatement and require demolition permit. Additional comments shall be made at the site plan submittal phase. Frederick County Sanitation Authority: Please see attached letter dated February 26, 2015, Uwe E. Weindel, PE. Planning & Zoning: A) Master Development Plan Requirement A master development plan is required prior to development of this property. Before a master development plan can be approved, it must be reviewed by the Planning Commission, Board of Supervisors and all relevant review agencies. Approval may only be granted if the master development plan conforms to all requirements of the Frederick County Zoning and Subdivision Ordinances. The purpose of the master development plan is to promote orderly and planned development of property within Frederick County that suits the characteristics of the land, is harmonious with adjoining property and is in the best interest of the general public. B) Site History The original Frederick County zoning map (U.S.G.S. Stephenson Quadrangle) identifies the subject parcels as being zoned A-2 (Agricultural General). The County’s agricultural zoning districts were combined to form the RA (Rural Areas) District upon adoption of an amendment to the Frederick County Zoning Ordinance on May 10, 1989. The corresponding revision of the zoning map resulted in the re-mapping of the subject properties and all other A-1 and A-2 zoned land to the RA District. The subject properties were rezoned with proffers to the M1 District with Rezoning #09-09 and a proffer revision was approved with Rezoning #03-12. C) Site Suitability & Project Scope Comprehensive Policy Plan: MDP #01-15Graystone Commerce Center March 31, 2015 Page 3 The 2030 Comprehensive Plan is an official public document that serves as the community's guide for making decisions regarding development, preservation, public facilities and other key components of community life. The primary goal of this plan is to protect and improve the living environment within Frederick County. It is in essence a composition of policies used to plan for the future physical development of Frederick County. Land Use Compatibility: The North East Land Use Plan, Appendix I of the 2030 Comprehensive Plan, recognizes that this property is planned for industrial land uses. The parcels comprising this MDP application are also located within the County’s Sewer and Water Service Area (SWSA). Site Access and Transportation: Access to this site will be via a connection to Snowden Bridge Boulevard that would align with an access point already approved with the North Stephenson, Inc., rezoning application. The initial segment of Snowden Bridge Boulevard has been constructed and aligns at a signalized intersection of Martinsburg Pike across from the Rutherford Crossing Shopping Center. The MDP shows the location of Snowden Bridge Boulevard that runs through the property, along with the three access points proposed on the road, the Route 37 corridor area, and the proffered area for the relocation of Redbud Road. Per the proffers, the applicant has proffered a 350’ Route 37 corridor study area and an area for an 800’ wide interchange. This study area is available for eight years following the rezoning approval (revised in 2012); the purpose of the study area is to give “Frederick County with an opportunity to determine a final alignment for Route 37 throughout the limits of the Property through the final engineering design sufficient for this purpose”. Following the determination of the final alignment, the applicant shall dedicate the right-of-way to Frederick County. Should the final alignment not be made within the eight year timeframe, the applicant may extend the timeframe or dedicate a 225’ wide right-of-way dedication for Route 37. Direct access is prohibited (except for emergency services) on Milburn Road, Redbud Road and McCann’s Road. Snowden Bridge Boulevard through the Graystone property shall be a public street, however; per the proffers, the internal streets shall be private and their locations shall be determined at the site plan stage. STAFF CONCLUSIONS FOR THE 04/15/15 PLANNING COMMISSION MEETING: The Master Development Plan for the Graystone Commerce Center depicts appropriate land uses and appears to be consistent with the requirements of Article VIII, Master Development Plan, of the Zoning Ordinance, and this MDP is in a form that is administrati vely approvable. The MDP is also in conformance with the proffers for Rezoning #03-12. All of the issues brought forth by the Planning Commission should be appropriately addressed by the applicant. MDP #01-15Graystone Commerce Center March 31, 2015 Page 4 It appears that the application meets all requirements. Following presentation of the application to the Planning Commission and the Board of Supervisors, and the incorporation of your comments, staff is prepared to proceed to approval of the application. THIRD WINCHESTERBATTLEFIELDSubdivision GRUBERSubdivision HUNTSBERRYSubdivision SNOWDENBRIDGESubdivision RUTHERFORDSFARMSubdivision MILBURNSUBDIVISIONSubdivision 0111 §¨¦81 §¨¦81 EZRA L N CAVALIE R L N MIL T O N RA Y D R MARQ U I S C T MCC A N N S R D MART I N S B U R G P I K E SN O W D E N BRI D G E BLV D MIL B U R N R D RE D B U D R D 55 A 155 A 3 55 A 3B 55 A 3C 55 A 3D 43 A100D 43 A100G 43 A 102 43 A 106 43 A 108 43 A112A 43 A 118 43 A120 43 A 127 43 A 130 43 A132B43 A134B43 A 136 43 A 138 43 A 142 43 A 147 43 A 149 43 A 151 43 A 156 43C 3 2 43C 3 3 43C 3 8A 44 A 17 44 A 25B 44 A 27 44 A 28 44 A 28B 44 A 28D 54 A 86 55 A 1A 43 A 98A 43 A 99 43 A100F 43 A100J 43 A100L 43 A 103 43 A 105 43 A 119 43 A 121 43 A 123 43 A 128 43 A134A 43 A 135 43 A 139 43 A 140 43 A 143 43 A 144 43 A 148 43 A 150 43 A 152 43C 2 1 43C 2 3 43C 3 9 43C 5 15 44 A 23 44 A 25 44 A 25A 44 A 26 44 A 28H 44 A 28I 44 A 40 54 A 88 54 A 88A 55 A 6 43 A 98 43 A 99A 43 A 100 43 A100A 43 A100C 43 A100E 43 A100I 43 A100K 43 A 104 43 A107 43 A 109 43 A113 43 A 122 43 A 125 43 A 129 43 A 134 43 A 145 43 A 154 43 A155 43C 3 4 43C 3 543C 3 6 43C 5 17 44 A 21 44 A 22 44 A 28A 44 A 28C 54 A 89C 55 A 2 55 A 3A 55 A 3E 43 A100B 43 A100H 43 A 11043 A 111 43 A 112 43 A 112B 43 A 11543 A 116 43 A 133 43 A 137 43 A 141 43 A 146 43 A 157 43 A 158 43 A 159 43 A159A 43C 1 B 43C 2 2 43C 6 A 44 A 19 44 A 20 44 A 24 44 A 29 44 8 5 44D 1 244D 2 344D 2 5 44 8 3 44 8 4 44 8 6 44D 1 1 44D 2 4 44D 3 744D3 8 44 A 28E 44 A 28F 44 A 28G 44 A 30 44 A 31A 44 8 7 Applications Parcels Future Rt 37 Bypass Building Footprints B1 (Business, Neighborhood District) B2 (Business, General Distrist) B3 (Business, Industrial Transition District) EM (Extractive Manufacturing District) HE (Higher Education District) M1 (Industrial, Light District) M2 (Industrial, General District) MH1 (Mobile Home Community District) MS (Medical Support District) OM (Office - Manufacturing Park) R4 (Residential Planned Community District) R5 (Residential Recreational Community District) RA (Rural Area District) RP (Residential Performance District) I Note:Frederick County Dept ofPlanning & Development107 N Kent StSuite 202Winchester, VA 22601540 - 665 - 5651Map Created: March 30, 2015Staff: cperkins Stephenson REDBUD R D MIL B U R N R D WE L L T O W N R D MART I N S B U R G P I K E AMOC O L N MDP # 01 - 15Graystone Commerce CenterPINs:43 - A - 158, 44 - A - 25, 44 - A - 26 MDP # 01 - 15Graystone Commerce CenterPINs:43 - A - 158, 44 - A - 25, 44 - A - 26 0 1,000 2,000500 Feet §¨¦81 MDP 01-15 MDP 01-15 MDP 01-15 0111 E COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 107 North Kent Street, Suite 202  Winchester, Virginia 22601-5000 MEMORANDUM TO: Planning Commission FROM: Michael T. Ruddy, AICP, Deputy Director RE: 2030 Comprehensive Plan 5-year Update Schedule DATE: April 1, 2015 The Frederick County Planning Commission and the Comprehensive Plans and Programs Committee (CPPC) will be undertaking the 5-year review and update of the 2030 Comprehensive Plan over the next 12 months. It is the goal to complete the update by this time next year, spring 2016. To assist in achieving this targeted goal, the following three-phase approach to the schedule outline is provided for your information. Phase 1. July/August/September – CPPC review and update of Appendix II; Background Analyses and Supporting Studies.  Overview & Demographic Analysis (July)  Economic Analysis (August)  Land Use Analysis; including SWSA needs analysis with FCSA strategies, and C&I analysis of the 25/75 Ratio throughout the County (September) During each of the above months, Staff will prepare a draft update to the relevant parts of Appendix II and present them to the CPPC for their review and endorsement during the corresponding month. This phase of the Update is to be completed by September 30, 2015. Phase 2. October/November/December – CPPC and Blue Ribbon Group review and update of key sections of the Plan, including;  Residential Development, Business Development, Transportation, and Natural Resources, Historical Resources, and Public Facilities. Memo: 2030 Comprehensive Plan 5-year Update Schedule April 1, 2015 Page 2. During this Phase, Staff will work with the Blue Ribbon Panel to evaluate and update the above elements of the plan to ensure that the plan is accurate and relevant, and proactive in its approach to meeting the future needs of the Community. The Blue Ribbon Panel will be made up of community members, in a similar approach to how the 2030 Plan was created. At the conclusion of this phase, a draft version of the 2030 Comprehensive Plan will be available. This phase of the Update is to be completed by December 31, 2015. Phase 3. January/February – Planning Commission Review of 2035 Update, followed by Board of Supervisors direction to move forward with additional public outreach. March – Community Meetings April/May – Public Hearing Process and Approval Please contact me if you have any questions or would like to provide additional input. MTR/dlw F 2015 Frederick County Planning Commission Annual Retreat Meeting Summary Frederick County Board Room, Winchester VA Wednesday March 18, 2015 Meeting Attendees: Planning Commissioners Present: June M. Wilmot, Chairman/Member at Large; Roger L. Thomas, Vice Chairman/Opequon District; Greg L. Unger, Back Creek District; J. Rhodes Marston, Back Creek District; Lawrence R. Ambrogi, Shawnee District; Gary R. Oates, Stonewall District; J. Stanley Crockett, Stonewall District; Charles E. Triplett, Gainesboro District; Kevin Kenney, Gainesboro District; Christopher M. Mohn, Red Bud District; Charles F. Dunlap, Red Bud District; Robert S. Molden, Opequon District. Board of Supervisors Present: Charles S. DeHaven Jr., Stonewall District; Robert Hess, Gainesboro District; Gary Lofton, Back Creek District. Other Guest/Attendees: Mark Loring, City of Winchester; Patrick Barker, Executive Director, Frederick County Economic Development Authority. Planning Staff Present: Eric R. Lawrence, Planning Director; Michael T. Ruddy, Deputy Director - Land Use; John A. Bishop, Deputy Director - Transportation; Mark R. Cheran, Zoning and Subdivision Administrator; Candice E. Perkins, Senior Planner; Kirstin N. Twardon, GIS Analyst; and Shannon L. Conner, Administrative Assistant. State of Development in the Community Overview: The national economy appears to be headed in a positive direction as it slowly recovers from the recession of the past decade. Frederick County’s economy is following suit, and possibly is healthier than the majority of communities throughout the commonwealth. The Planning Commission will review development activity from the past few years, project future development trends, and discuss policies that are/should be in place to accommodate growth over the next 5-10 years. The Planning Commission should ask itself: Are we prepared to properly manage this projected growth? Materials and statistics discussed were barometers indicating how healthy our local economy is. The future of residential, commercial, and industrial growth in the community and how we might prepare to accommodate this growth was also discussed. An overview of the positive and negative fiscal impacts of growth was provided. Key points include:  July 1, 2014 population estimate of 82,059 – 4.8% change since 2010 census (state average 4.1%)  Based on population estimates – Virginia is the 13th largest county in Virginia  New residential lot creation has increased significantly in 2014; up 70% over previous year now at 374 new residential lots created  2014 was a healthy year for residential construction – 454 permits issued, 40% higher than 2011  New home sale prices are increasing  Where are houses being constructed? 68% of new residential permits within the UDA  70% of new residential construction will be within the UDA (5 year projection)  2,500 SF/TH projected to be constructed in the UDA  Does Student Generator Ratio (SGR) matter? Yes, based on Development Impact Model (DIM)  Development Impact Model (DIM) o Utilized to project fiscal impacts on capital facilities during rezoning process o Designed to also look at entire picture o DIM is a Direct economic model o The building community prefers to use In-Direct modeling  Direct Modeling – we use and is fiscally conservative, considers personal property and real estate tax rate  In-Direct Modeling – move liberal in its projections, considers all; projected tax, contributions, groceries, gas, food, etc…  Do residential uses pay their way? Typically not  Students are largest reason for fiscal impacts from residential uses  If residential uses create negative fiscal impacts how are these offset? Through land use planning and the promotion of C/I (commercial/industrial)  Maintaining/respecting the C/I in the Comprehensive Plan is vital. Efforts should be exercised to avoid losing C/I to residential land uses. Economic Development Presentation: How do we get from Good to Great?  The good over the past 3 years o $296 million in new capital investments o Over 1,220 new jobs  Where does this place Frederick County among Virginia localities – Top 10%  What is the economic outlook for 2015 – top tier in Virginia Getting to Great  What are the driving factors Frederick County can proactively influence? o Skilled labor o Incentives o Availability of land o Expedited or fast track permitting  Turn key business sites with minimal risk o Contiguous land bays o Access o Utilities  Green Energy Facility o What is needed to maximize this? WATER  Targeted businesses – annual net revenue key factor Discussion/Responses:  Is there anything in sight for more land coming available? Not at this point, need to be consistent and solid with land use plan  Have any industries steered away from Frederick County because of the water issue? The Regional Commission continues to discuss the need for a water study therefore we need to work together with surrounding communities to accomplish this  Are we prepared to manage the projected growth? o Not proactively moving toward the 75% residential/25% commercial and industrial o Need a plan on how to make Frederick County more attractive o Stigma that we are reactive rather than proactive o Infrastructure continues to be an issue – water and roads need to be in place to attract new industry  Transportation and fees associated with it continues to be an obstacle  Agency comments take a long time to receive back for rezonings, would like to see EDA involved in this process at some point  Industrial takes years to see a return rather than residential that shows a much quicker return – need to come to common ground on this Commission Operations Overview: The Planning Commission has always encouraged improvement to the operations of the Planning Commission’s business, with an emphasis on improving efficiency, knowledge sharing, public outreach, use of technology, and decision making. The Planning Commission discussed existing policies and processes utilized in how it conducts business and promote community participation. Application Process/Materials  Goal to improve efficiency o Communication between PC, staff, and applicant o Explanation/Review of applicant’s proposal  Time to standardize readiness for PC review o Recently reviewed proffer deadlines o Get rest in order so that everyone knows what the rules are o Client, engineer, lawyers will know when the application is ready for review by the PC  Application clarifications o If it does not meet the requirements it will not be processed o Need agency reviews and applicant response  Staff report/agenda package flow o Summary of still outstanding issues prepared by staff o Summary of changes to application by applicant (prepared by staff) o Staff report written (and subsequently not modified, or date changed) o Response by applicant to staff summary letter, listing each item and providing response which can be concurrence, modification, or different opinion and why o Summary letter by staff to applicant of application items needing attention o Application Reshape Communications with the Public  Use technology for advertisements/input o Constantly changes o Not everyone has it  Continue to use local media  Web information/video  Channel 16 text/video No-Meeting Meetings  Development consultants  Use for preliminary idea development  Utilize technology to promote community involvement at a project’s onset  Accommodate more citizen participation o Work around individual schedules not ours  Implementing the use of technology should expand to community involvement and valuable participation Staff Briefings  Utilize Briefing Sessions more frequently when there are no agenda items scheduled Discussion/Responses:  Applications need to provide more detail of what exactly the applicant may have in mind for the property, this would be helpful in making decisions and would speed up the process, possibly incorporate a Generalized Development Plan  Keep the staff report simple – applicant did or did not meet suggested requirements  Must do a better job communicating with the public County wide  Possibly include map in advertisements  Press release may be possible to include a map  Word of mouth goes a long way  Need citizens to participate and get involved  Get young people involved, setting meeting times will not be successful, like to do it on their own time  Set up committee, possibly something web based or technologically accomplished  Post applications online and available for comments Comprehensive Planning Overview: The Planning Commission discussed the currently ongoing Kernstown Area Plan study, as well as discussed the process to undertake updating the 2030 Comprehensive Plan by July 2016. The Code of Virginia, 15.2-2230, states “At least once every five years the comprehensive plan shall be reviewed by the local planning commission to determine whether it is advisable to amend the plan”. The 2030 Comprehensive Plan was adopted July 14, 2011, so it would be appropriate to have completed this state-mandated review, and have recommendations for action by the Board in July 2016. The Kernstown Area Plan looks to update/renew/expand the land use and transportation plans for the Kernstown area, generally located along Route 11, south of the City of Winchester and North of the Town of Stephens City, and west of I-81. This effort will utilize the previously adopted area plans (Southern Frederick Land Use Plan and Route 11 South Corridor Plan) as a basis to build upon and would integrate the C/I opportunities and the areas of mixed use with future transportation plans. The efforts of this study discussed included the draft mapping and the approach to the Historic Resources, Natural Resources, and Community Facilities portion of the Kernstown Area Plan. Maps provided were aerial, current land use, transportation with trails, and historic and natural resources map. Key points presented were: Land Use:  Urban Areas/Rural Areas further defined  C/I emphasis  Limited new residential  Potential Neighborhood Village within the existing UDA Transportation:  Complete streets  Route 11 design split North/South of Shady Elm Drive  Road adjustment in rural areas west of Bartonsville – emphasis on Renaissance Drive and east/west road north of Stephens City Historical Resources, Natural Resources, and Community Facilities:  Currently working with local high school students to create a plan/project for this – currently finished phase 1 Presented an overview/update of the 2030 Comprehensive Plan including these key notes:  Use of No-meetings, committee meetings, and Commission Briefing sessions  Incorporate all updates and revisions since July 2011  Analysis and update of Comprehensive Plan elements such as o SWSA and FCSA coordination Discussion/Responses:  The 2030 Comprehensive Plan needs to be reviewed and the proper adjustments made  A lot of things have happened since the adoption of the plan and it needs to be refreshed  Ongoing concern with FCSA, often no comments are supplied, need to be a more integral part of the process  Comprehensive Plans and Programs Committee needs representative from FCVA such as a Planner  More specific comments from FCSA, seem to be missing the planning step  Comprehensive Plan needs to show/reflect major water sources  Point taken that FCSA involvement needs to be elevated  Establish a base point, see what has been implemented, what has been handled, and what’s hanging in the balance  Recruitment for committees Planning Activity Accomplishments in 2014 and Projects for 2015 Overview: This session offered an overview of the more significant planning and development activities of the past year, some pending planning projects that are still in development stages, and a window into activities the Planning Commission will see in 2015. The Planning Commission had an opportunity to identify additional planning projects that should be undertaken in 2015. Planning projects ongoing and new include: Long Range Planning Projects: 2030 Comprehensive Plan “five year review”:  Update of Appendix II – background analyses and supporting studies for the anticipated 2035 Comprehensive Plan  Establish a review process that incorporates key community stakeholders in the planning process  Provide a series of recommended updates for policies contained within the plan o Improve coordination between Comprehensive Plan and the future infrastructure requirements of sewer and water Finalize the development of the Urban Center design plans:  Endorse the detailed land use studies and creative design plans for the selected Urban Centers which are identified in the area plans Kernstown Area Plan:  Update/renew/expand the land use and transportation plans for the Kernstown area Develop Rural Village Plans:  Conduct land use studies and plans for the defined Rural Village  Will evaluate opportunities for enhancements to the existing Rural Village, which could include TDR receiving areas and public utilities  Areas include Gainesboro Rural Village and Albin Rural Village Evaluate and implement Affordable/Workforce Housing initiatives:  Evaluate the need for a program and requirements in development proposals  Could evaluate how such a program could be incorporated and the projected need in our community Comprehensive Plan Update:  Very important part in the upcoming year Current Planning Projects:  Inclusion of Farm Breweries per the Code of Virginia and the desire to include distilleries  Revisit the commercial and industrial conversion from the SIC (Standard Industrial Classification) to the NAICS (North American Industrial Classification System)  Develop design standards for commercial corridors within the county, primarily those leading into Winchester  Develop a new residential district for the Rural Community Centers (RCC’s)  Revised Homeowner’s association ordinance Transportation Planning Projects:  County Managed Road Construction Program, how can we be more efficient and make sure we are doing the best we can  Further the planning, design, right-of-way acquisition and construction of Route 37  Ongoing monitoring and review of Route 37 right-of-way needs to include research of opportunities to preserve right-of-way while working with property owners to allow development  Update the Eastern Road Plan (on TC agenda)  Create a listing of top areas of safety concerns (on TC agenda)  Investigate creation of a quantitative process for project priority setting  Data gathering and maintenance  More focus put on freight Discussion/Responses:  Is there more support now for NAICS? This is an ongoing process, a thought is to use categories to make this conversion more simple, appreciate all input  How is the Round Hill Land Use Plan different from the other Rural Community Center Plans? Uncertain as Round Hill is the first of its kind, if it works then test it on others  Some of the Homeowners Associations have stringent guidelines, possibly develop a policy manual or some type of brochure as guidance  Need to do a better job selecting our partners in regards to Transportation  Missing opportunities with freight, Route 522 not being utilized to its potential  Time is “right” for focusing on freight and it’s benefits to the County  Is it difficult for everyone in Virginia to tap into VDOT funds? Always been difficult in this area