Loading...
PC 06-15-16 Meeting Agenda AGENDA FREDERICK COUNTY PLANNING COMMISSION The Board Room Frederick County Administration Building Winchester, Virginia June 15, 2016 7:00 P.M. CALL TO ORDER TAB 1) Adoption of Agenda: Pursuant to established procedures, the Planning Commission should adopt the Agenda for the meeting ................................................................ (no tab) 2) Committee Reports .................................................................................................. (no tab) 3) Citizen Comments ................................................................................................... (no tab) PUBLIC HEARING ITEMS 4) Conditional Use Permit #03-16 for Verizon Wireless Commercial Telecommunication Facility - submitted to construct a wireless telecommunications consisting of a 150 foot monopole with capacity for a least 3 carriers (Applicant included) and 50 x 50 foot equipment compound base. The property is located at Grace Brethren Church at 143 Greenwood Road and is identified with Property Identification Number 55-A-79 in the Redbud Magisterial District. Mr. Cheran ..................................................................................................................... (A) 5) Rezoning #04-16 for Snowden Bridge Station submitted by GreyWolfe, Inc., to rezone 11.340 acres from the M1 (Light Industrial) District to the B2 (General Business) District, and 2.629 acres from the M1 (Light Industrial) District to the B3 (Industrial Transition) District with proffers. The properties are located on the southeastern side of Martinsburg Pike (Route 11) and southern side of Snowden Bridge Boulevard in the Stonewall Magisterial District, and are identified by Property Identification Numbers 43C-3-2, 43C-3-3, 43C-3-4, 43C-3-4A, 43-A-150, 43-A-151A and 43-A-151B. Mrs. Perkins ..................................................................................................................... (B) 6) Rezoning #05-16 for CB Ventures LLC. submitted by Greenway Engineering, to rezone 3.75+/- acres from the B3 (Industrial Transition) District to the B2 (General Business) District, and 1.23+/- acres from the B2(General Business) District to the B2 (General Business) District with proffers. The property is located on the south side of Martinsburg Pike (US Route 11) and the northeast side of Amoco Lane (Route 839) at the southwest quadrant of Interstate 81 Exit 317 in the Stonewall Magisterial District, and is identified by Property Identification Number 43-A-48A. Mrs. Perkins ..................................................................................................................... (C) ACTION ITEM 7) Rezoning #06-16 Sempeles Property submitted by Pennoni, to revise proffers associated with Rezoning #02-04. This revision relates to the “on site development” sections of the proffers for the M1 (Light Industrial) District zoned portion of the site. The Applicant is requesting to revise the proffers to allow the use of tilt-up concrete walls and to remove proffers that have been completed. The property is located adjacent to Martinsburg Pike (Route 11), approximately 250 feet north of the intersection of Woodbine Road (Route 669) and Martinsburg Pike in the Stonewall Magisterial District, and is identified by Property Identification Number 34-A-4. Mrs. Perkins ..................................................................................................................... (D) Other Adjourn -2- Commonly Used Planning Agenda Terms Meeting format Citizen Comments – The portion of the meeting agenda offering an opportunity for the public to provide comment to the Planning Commission on any items not scheduled as public hearing items. Public Hearing– A specific type of agenda item, required by State law, which incorporates public comment as a part of that item prior to Planning Commission or Board of Supervisors action. Public hearings are held for items such as: Comprehensive Plan policies and amendments; Zoning and Subdivision Ordinance amendments; and Rezoning and Conditional Use Permit applications. Following the Public Hearing, the Planning Commission will take action on the item (see below). Action Item–There are both public hearing and non-public hearing items on which the Planning Commission takes action. Depending on the actual item, the Planning Commission may approve, deny, table, or forward a recommendation to the Board of Supervisors regarding the agenda item. No public comment is accepted during the Action Item portion of the agenda. Information/Discussion Item– The portion of the meeting agenda where items are presented to the Planning Commission for information and discussion. The Planning Commission may offer comments and suggestions, but does not take action on the agenda item. No public comment is accepted during the Information/Discussion Item portion of the agenda. Planning Terminology Urban Development Area or UDA – The UDA is the county’s urban growth boundary identified in the Comprehensive Plan in which more intensive forms of residential development will occur. The UDA is an area of the county where community facilities and public services are more readily available and are provided more economically. Sewer and Water Service Area or SWSA – The SWSA is the boundary identified in the Comprehensive Plan in which public water and sewer is or can be provided. The SWSA is consistent with the UDA in many locations; however the SWSA may extend beyond the UDA to promote commercial, industrial, and institutional land uses in area where residential land uses are not desirable. Land Use – Land Use is the nomenclature which refers to the type of activity which may occur on an area of land. Common land use categories include: agricultural, residential, commercial, and industrial. Zoning District - Zoning district refers to a specific geographic area that is subject to land use standards. Frederick County designates these areas, and establishes policies and ordinances over types of land uses, density, and lot requirements in each zone. Zoning is the main planning tool of local government to manage the future development of a community, protect neighborhoods, concentrate retail business and industry, and channel traffic. Rezoning – Rezoning is the process by which a property owner seeks to implement or modify the permitted land use activities on their land. A rezoning changes the permitted land use activities within the categories listed above under Land Use. Conditional Use Permit or CUP - A CUP allows special land uses which may be desirable, but are not always appropriate based on a location and surrounding land uses. The CUP requested use, which is not allowed as a matter of right within a zoning district, is considered through a public hearing process and usually contains conditions to minimize any impacts on surrounding properties. Ordinance Amendment – The process by which the County Code is revised. Often the revisions are the result of a citizen request with substantial justification supporting the change. Amendments ultimately proceed through a public hearing prior to the PC forwarding a recommendation to the Board of Supervisors. County Bodies Involved Board of Supervisors or BOS - Frederick County is governed by an elected Board of Supervisors composed of seven members, one from each magisterial district, and one chairman-at-large. The Board of Supervisors is the policy-making body of the county. Functions of the Board of Supervisors related to planning include making land use decisions, and establishing growth and development policies. Planning Commission or PC - The PC is composed of 13 members, two from each magisterial districts and one at-large, appointed by the Board of Supervisors. The Planning Commission serves in an advisory capacity to the Board of Supervisors which then takes final action on all planning, zoning, and land use matters. Comprehensive Plans and Programs Committee or CPPC – The CPPC is a major committee of the PC whose primary responsibility is to formulate land use policies that shape the location and timing of development throughout the County. Included in the work are studies of specific areas to develop guidelines for future land use within those areas. The CPPC also considers requests for amendments to the Comprehensive Plan. Decisions by CPPC are then forwarded to the PC for consideration. Development Review and Regulations Committee or DRRC – The DRRC is the second major committee of the PC whose primary responsibilities involve the implementation of the Comprehensive Plan in the form of Zoning and Subdivision ordinance requirements. Requests to amend the ordinances to the DRRC are made by the Board of Supervisors, Planning Commission, local citizens, businesses, or organizations. DRRC decisions are also forwarded to the PC for consideration. A CONDITIONAL USE PERMIT #03-16 Cellco Partnership d/b/a Verizon Wireless Staff Report for the Planning Commission Prepared: June 1, 2016 Staff Contact: Mark Cheran, Zoning Administrator This report is prepared by the Frederick County Planning Staff to provide information to the Planning Commission and the Board of Supervisors to assist them in making a decision on this request. It may also be useful to others interested in this zoning matter. Reviewed Action Planning Commission: 06/15/16 Pending Board of Supervisors: 07/27/16 Pending EXECUTIVE SUMMARY: This is a request for a Conditional Use Permit to enable the construction of a 150-foot, Monopole Telecommunications Facility with a 50 x 50 foot equipment compound and setback waiver. Should the Planning Commission find the use to be appropriate, Staff would suggest the following conditions: 1. All review agency comments and requirements shall be complied with at all times. 2. The tower shall be available for collocating personal wireless services providers. 3. A minor site plan shall be approved by Frederick County. 4. The tower shall be removed by the Applicant or property owner within twelve (12) months of abandonment of operation. 5. In the event a telecommunications tower is not erected within twelve (12) months of the approval of this Conditional Use Permit, the CUP will be deemed invalid. 6. Any expansion or modification of this use will require a new Conditional Use Permit. In addition, should the Planning Commission find the waiver to the required setback is acceptable; a motion to recommend approval of setback reduction of 65’ to allow the tower to be 100’ from the identified property would be appropriate. Following this public hearing, it would be appropriate for the Planning Commission to offer a recommendation concerning this application to the Board of Supervisors. Page 2 CUP #03-16, Cellco Partnership d/b/a Verizon Wireless June 1, 2016 LOCATION: This property is located at 143 Greenwood Road MAGISTERIAL DISTRICT: Redbud PROPERTY ID NUMBER: 55-A-79 PROPERTY ZONING & PRESENT USE: Zoned: RA (Rural Areas) Land Use: Church ADJOINING PROPERTY ZONING & PRESENT USE: North: B2 (General Business) Use: Motorcycle Dealer South: RP (Residential Performance) Use: Residential East: RP (Residential Performance) Use: Residential West: RP (Residential Performance) Use: Residential PROPOSED USE: This is a request for a Conditional Use Permit to enable the construction of a 150-foot, Monopole Telecommunications Facility with a 50 x 50 foot equipment compound. REVIEW EVALUATIONS: Virginia Department of Transportation: The application for a site plan for this property appears to have little measurable impact on Route 656, the VDOT facility which would provide access to the property. Present entrance is adequate for the proposed improvements. Should business ever expand in the future, entrance may need to be upgraded. Frederick County Inspections: Structure shall comply with The Virginia Uniform Statewide Building Code and Section 312, use group U (Utility and Miscellaneous) of The International Building Code 2012. Per the Section 102.3 of the Virginia Uniform Statewide Building Code, 2012 edition. Section 102.3 VUSBC exempts equipment, related wiring, and poles and tower supporting the related wiring installed by a provider of publicly regulated utility service. The exemption shall apply only if under applicable federal and state law the ownership and control of the equipment and wiring is by the service provider or its affiliates. Such exempt equipment and wiring shall be located on either public right-of-way or private property for which the service provider has rights of occupancy and entry; however, the structures, including their service equipment, housing or Page 3 CUP #03-16, Cellco Partnership d/b/a Verizon Wireless June 1, 2016 supporting such exempt equipment and wiring shall be subject to the USBC. The installation of equipment and wiring exempted by this section shall not create an unsafe condition prohibited by the USBC. Prefabricated shelters/canopy exceeding 150 sq. ft. requires a building permit. Plans submitted shall be sealed by a Virginia Registered Design Professional. Please note the requirements in Chapter 17 of the IBC for special inspections for this type of structure (soil, concrete, bolts, etc.). Soil investigations/testing is required due to the potential sink holes located on site prior to placement of concrete slap. Winchester-Frederick County Health Department: The Frederick County Health Department has no objection to this project since no existing well or onsite sewage disposal system sites will be affected by the construction. Frederick County Sanitation Authority: The request would not require service from FCSA. FCSA offers no additional comments. Frederick County Fire Marshall: Plans approved. City of Winchester: No comments. Winchester Regional Airport: Please see attached letter from Serena Manuel, Executive Director dated March 2, 2016. Frederick County HRAB Comments: Please see attached letter from Candice Perkins, Assistant Director dated May 24, 2016. Planning and Zoning: The 2030 Comprehensive Policy Plan of Frederick County (“Comprehensive Plan”) provides guidance when considering any land use action. This proposed 150-foot monopole-type commercial telecommunication facility is located on a 22.6 +/- acre property that is zoned RA (Rural Areas). The property is located within the UDA and SWSA as identified within the Comprehensive Plan, and is located within the Senseny Road/ Eastern Frederick Area Plan. These plans identify this area remain residential in character. This proposed site is located within the vicinity of the Third Battle Field of Winchester area. The Frederick County Zoning Ordinance allows for commercial telecommunication facilities in the RA (Rural Areas) Zoning District with an approved Conditional Use Permit (CUP). The properties immediately adjacent to this proposed Conditional Use Permit (CUP) are currently zoned RP (Residential Performance) Zoning District. The zoning ordinance requires that all Page 4 CUP #03-16, Cellco Partnership d/b/a Verizon Wireless June 1, 2016 proposed telecommunication facilities be subject to additional performance standards in order to promote orderly economic development and mitigate the negative impacts to adjoining properties, residential properties, land use patterns, scenic areas and properties of significant historic value. The Frederick County Historic Resources Advisory Board (HRAB) has reviewed this proposed use in relationship to its location within the Third Battle Field of Winchester area. (See HRAB comments.) Furthermore, the Frederick County Zoning Ordinance requires an Applicant to provide confirmation that an attempt was made to collocate on an existing telecommunication facility, and possible collocation structures. The Applicant has provided an inventory of existing telecommunication facilities, and no other telecommunication facility or possible collocation opportunity structures exist in this area. Should this facility be approved this commercial telecommunication facility will be positioned to provide the existing and future land uses in this area of the County with telecommunication needs. Waiver: This proposed telecommunication tower is required to be setback from the property line 165 ft. (tower is 150 ft. in height the RA Zoning District height maximum is 35’, 150’-35’ = 115’) The normal setback (50’) per RA Zoning District plus one foot for every foot over the maximum height of the district (35’) this telecommunication 115’ higher than is allowed in the district (50’+115’= 165’). The site plan notes this tower at 100’ from the property line and the setbacks cannot be met. The Applicant is requesting a waiver to reduce the required setback as set forth in Section 165 - 204.19 of the zoning ordinance. The Applicant has provided documentation from a certified Virginia engineer with verification that the tower is designed and will be constructed in a manner that, should the tower collapse for any reason, the collapsed tower will be contained in an area around the tower, with a radius equal to or lesser than the setback, measured from the center line of the base of the tower. Should this waiver be granted, the result will be a 65 foot setback reduction. (165’-100’=65’). STAFF CONCLUSIONS FOR THE 06/15/16 PLANNING COMMISSION MEETING: Should the Planning Commission find this use appropriate, Staff would suggest the following conditions be placed on the CUP: 1. All review agency comments and requirements shall be complied with at all times. 2. The tower shall be available for collocating personal wireless services providers. 3. A minor site plan shall be approved by Frederick County. Page 5 CUP #03-16, Cellco Partnership d/b/a Verizon Wireless June 1, 2016 4. The tower shall be removed by the Applicant or property owner within twelve (12) months of abandonment of operation. 5. In the event a telecommunications tower is not erected within twelve (12) months of the approval of this Conditional Use Permit, the CUP will be deemed invalid. 6. Any expansion or modification of this use will require a new Conditional Use Permit In addition, should the Planning Commission find the waiver to the required setback is acceptable; a motion to recommend approval of setback reduction of 65’ to allow the tower to be 100’ from the identified property would be appropriate. Following this public hearing, it would be appropriate for the Planning Commission to offer a recommendation concerning this application to the Board of Supervisors. 017 55 A 79 265GREENWOOD RD271GREENWOOD RD 112FREEDOMCIR 110FREEDOMCIR 107FREEDOMCIR109FREEDOMCIR 107TUCKS CIR 109TUCKSCIR 106TUCKSCIR 108TUCKSCIR 133ASBURY RD 135ASBURY RD 122BATTLEFIELD DR 101CANNONCIR 202ASBURY RD 102REBELSCIR 204ASBURY RD 208ASBURY RD103REBELS CIR 102SETTLERSCIR 104SETTLERSCIR 103SETTLERSCIR105SETTLERSCIR 259GREENWOOD RD 251GREENWOOD RD 108FREEDOMCIR 111TUCKSCIR 110TUCKSCIR 120BATTLEFIELD DR 123BATTLEFIELD DR 210ASBURY RD 104ARTILLERY RD 241GREENWOOD RD 106FREEDOMCIR 105FREEDOMCIR 114BATTLEFIELD DR116BATTLEFIELD DR 118BATTLEFIELD DR 203ASBURY RD 205ASBURY RD 207ASBURY RD 209ASBURY RD 212ASBURY RD 214ASBURY RD 104FREEDOMCIR 103FREEDOMCIR 112BATTLEFIELD DR 121BATTLEFIELD DR 124WALLS CIR 125WALLS CIR 211ASBURY RD 216ASBURY RD 231GREENWOOD RD 102FREEDOMCIR 101FREEDOMCIR 110BATTLEFIELD DR 117BATTLEFIELD DR 119BATTLEFIELD DR 123WALLSCIR 103WALLS CIR 100WALLSCIR 102PIONEERS RD 106BATTLEFIELD DR 113BATTLEFIELD DR115BATTLEFIELD DR 122WALLSCIR 117WALLSCIR 105WALLS CIR 102WALLSCIR 101WINNSCIR 100BATTLEFIELD DR 109BATTLEFIELD DR 111BATTLEFIELD DR 120WALLSCIR 109WALLSCIR 104WALLS CIR 103WINNSCIR 100WINNS CIR104PIONEERS RD 105BATTLEFIELD DR 107BATTLEFIELD DR 118WALLSCIR 108WALLSCIR 106WALLS CIR 105WINNSCIR 106PIONEERS RD 101BATTLEFIELD DR103BATTLEFIELD DR 116WALLSCIR 114WALLSCIR 112WALLSCIR 110WALLSCIR 107WINNSCIR 108WINNS CIR 108PIONEERS RD 110PIONEERS RD 189GREENWOOD RD 109WINNS CIR 110WINNS CIR 112PIONEERS RD 111WINNSCIR 114PIONEERS RD 181GREENWOOD RD 113WINNSCIR 115WINNSCIR116PIONEERS RD 167GREENWOOD RD175GREENWOOD RD 118PIONEERS RD 159GREENWOOD RD 2196BERRYVILLEPIKE 117PIONEERS RD 120PIONEERS RD 112PIKESIDE DR 112PIKESIDE DR 2178BERRYVILLEPIKE 121PIONEERS RD 122PIONEERS RD 2140BERRYVILLEPIKE 125PIONEERS RD 124PIONEERS RD 2118BERRYVILLEPIKE 126PIONEERS RD 142GREENWOOD RD 2126BERRYVILLEPIKE 129PIONEERS RD 128PIONEERS RD 118GREENWOOD RD 2098BERRYVILLEPIKE131PIONEERS RD 132PIONEERS RD 135PIONEERS RD133PIONEERS RD 136PIONEERS RD 134PIONEERS RD 151MERLOT DR 250FIRSTWOODS DR 250FIRSTWOODS DR 126MORGANMILL RD 153MERLOT DR 127MORGANMILL RD 140MORGANMILL RD 155MERLOT DR 139MORGANMILL RD 157MERLOT DR 154MORGANMILL RD 159MERLOT DR 149MORGANMILL RD 161MERLOT DR 163MORGANMILL RD 165MERLOT DR 163MERLOT DR S E T T L E R S C I R PIKESIDE LN ASBURY RD W I N N S C I R FRE E D O M C I R P I O N E E R S R D W A L L S C I R FIRSTWOODS DR BATTLEF I E L D D R MO R G A N MIL L R D BERRYVIL L E PIKE GR E E N W O O D R D Applications Parcels Building Footprints B1 (Business, Neighborhood District) B2 (Business, General Distrist) B3 (Business, Industrial Transition District) EM (Extractive Manufacturing District) HE (Higher Education District) M1 (Industrial, Light District) M2 (Industrial, General District) MH1 (Mobile Home Community District) MS (Medical Support District) OM (Office - Manufacturing Park) R4 (Residential Planned Community District) R5 (Residential Recreational Community District) RA (Rural Area District) RP (Residential Performance District) I Note:Frederick County Dept ofPlanning & Development107 N Kent StSuite 202Winchester, VA 22601540 - 665 - 5651Map Created: March 14, 2016Staff: mcheran BERRYVILLE PI K E ASBURY RD GRE E N W O O D R D MERLOT DR MORLYN DR PIO N E E R S R D D O G W O O D R D MO R G A N M I L L R D BATT L E F I E L D D R A R T I L L E R Y R D W A L L S C I R 017 017 CUP # 03 - 16Grace Brethren ChurchPIN:55 - A - 79Cell Partnership for Verizon Wireless Tower 0 320 640160 Feet CUP #03-16 CUP # 03 - 16Grace Brethren ChurchPIN:55 - A - 79Cell Partnership for Verizon Wireless Tower B REZONING APPLICATION #04-16 SNOWDEN BRIDGE STATION Staff Report for the Planning Commission Prepared: May 31, 2016 Staff Contact: Candice E. Perkins, AICP, CZA, Assistant Director Reviewed Action Planning Commission: 06/15/16 Pending Board of Supervisors: 07/27/16 Pending PROPOSAL: Rezoning #04-16 for Snowden Bridge Station submitted by GreyWolfe, Inc., to rezone 11.340 acres from the M1 (Light Industrial) District to the B2 (General Business) District, and 2.629 acres from the M1 (Light Industrial) District to the B3 (Industrial Transition) District with proffers. LOCATION: The properties are located on the southeastern side of Martinsburg Pike (Route 11) and southern side of Snowden Bridge Boulevard. EXECUTIVE SUMMARY & STAFF CONCLUSIONS FOR THE 06/15/16 PLANNING COMMISSION MEETING: This is an application to rezone a total of 13.9 acres of land from the M1 (Light Industrial) District to the B2 (General Business) and B3 (Industrial Transition) Districts with proffers. This property is located within the Sewer and Water Service Area (SWSA) and is located within the limits of the Northeast Land Use Plan of the 2030 Comprehensive Plan. The Comprehensive Plan identifies these properties with an industrial land use designation which is consistent with the current zoning of the properties. In general, the proposed commercial zoning is inconsistent with the current land use supported by the Comprehensive Plan. However, considering the visibility of this site, its location on Martinsburg Pike and the I-81 interchange and the amount of commercial land in close proximity to this site, the requested commercial may be acceptable. With this rezoning, the Applicant has proffered to limit the number of restricted entrances on Martinsburg Pike to two and one on Snowden Bridge Boulevard and limit the maximum vehicle trips for the site to 6,303. The entrance locations shown on the proffered GDP are conceptual in nature – the proffer states that the final design and location of these entrances will need to be approved by VDOT and the County. The Applicant has also proffered a 10’ right-of-way dedication for Martinsburg Pike as well as corridor enhancements such as a split rail fence, and increased parking setbacks. The Applicant has also provided a monetary contribution of $0.10 per building square foot for Fire and Rescue. Following the required public hearing, a recommendation regarding this rezoning application to the Board of Supervisors would be appropriate. The Applicant should be prepared to adequately address all concerns raised by the Planning Commission. Rezoning #04-16 Snowden Bridge Station May 31, 2016 Page 2 This report is prepared by the Frederick County Planning Staff to provide information to the Planning Commission and the Board of Supervisors to assist them in making a decision on this application. It may also be useful to others interested in this zoning matter. Unresolved issues concerning this application are noted by staff where relevant throughout this staff report. Reviewed Action Planning Commission: 06/15/16 Pending Board of Supervisors: 07/27/16 Pending PROPOSAL: Rezoning #04-16 for Snowden Bridge Station submitted by GreyWolfe, Inc., to rezone 11.340 acres from the M1 (Light Industrial) District to the B2 (General Business) District, and 2.629 acres from the M1 (Light Industrial) District to the B3 (Industrial Transition) District with proffers. LOCATION: The properties are located on the southeastern side of Martinsburg Pike (Route 11) and southern side of Snowden Bridge Boulevard. MAGISTERIAL DISTRICT: Stonewall PROPERTY ID NUMBERS: 43C-3-2, 43C-3-3, 43C-3-4, 43C-3-4A, 43-A-150, 43-A-151A, and 43-A- 151B PROPERTY ZONING: M1 (Light Industrial) PRESENT USE: Industrial, Residential and Vacant ADJOINING PROPERTY ZONING & PRESENT USE: North: B2 (General Business) District Use: Commercial South: M1 (Light Industrial) District Use: Industrial/Vacant East: M1 (Light Industrial) District Use: Vacant/Snowden Bridge Boulevard West: M1 (Light Industrial) District Use: Industrial/Vacant Rezoning #04-16 Snowden Bridge Station May 31, 2016 Page 3 REVIEW EVALUATIONS: Virginia Dept. of Transportation: Please see the attached email from Matthew Smith dated May 6, 2016. Please see Applicant’s response dated May 15, 2016. Frederick-Winchester Service Authority: No comments Frederick County Sanitation Authority: Please see the attached letter from Eric Lawrence dated April 9, 2016. Public Works Department: Public Works has no comments on the proposed rezoning. Frederick County Fire Marshall: Plans approved Winchester Regional Airport: Rezoning is compatible with airport operations and should not impact continued operations of airport. Frederick County Attorney: Please see the attached letter from Roderick B. Williams dated April 26, 2016. See Applicant’s response dated May 15, 2016. Frederick County Planning Department: Please see attached letters from Candice Perkins dated April 5, 2016 and John Bishop dated May 10, 2016. Please see Applicant’s response dated May 15, 2016. Planning & Zoning: 1) Site History: The original Frederick County zoning map (U.S.G.S. Winchester, VA Quadrangle) identifies the majority of the subject property as being zoned A-2 (Agriculture General). The County’s agricultural zoning districts were combined to form the RA (Rural Areas) District upon adoption of an amendment to the Frederick County Zoning Ordinance on May 10, 1989. The corresponding zoning map resulted in the re-mapping of this portion of the subject property and all other A-1 and A-2 rezoned land to the RA District. The remainder of the property was identified as being zoned R-3. The R-3 (Residential General) District zoning classification was modified to RP (Residential Performance) District on February 14, 1990, during the comprehensive amendment to the County’s Zoning Ordinance. The subject properties were rezoned to the M1 (Light Industrial) Zoning District with rezoning #03-05 for North Stephenson which was approved by the Board of Supervisors on April 27, 2005. 2) Comprehensive Policy Plan: The 2030 Comprehensive Plan is the guide for the future growth of Frederick County. The 2030 Comprehensive Plan is an official public document that serves as the community's guide for making decisions regarding development, preservation, public facilities and other key Rezoning #04-16 Snowden Bridge Station May 31, 2016 Page 4 components of community life. The primary goal of this plan is to protect and improve the living environment within Frederick County. It is in essence a composition of policies used to plan for the future physical development of Frederick County. The Area Plans, Appendix I of the 2030 Comprehensive Plan, are the primary implementation tool and will be instrumental to the future planning efforts of the County. Land Use The 2030 Comprehensive Plan identifies these properties with an industrial land use designation. In general, the proposed commercial zoning is inconsistent with the current land use supported by the Comprehensive Plan. However, considering the visibility of this site, its location on Martinsburg Pike and the I-81 interchange and the amount of commercial land in close proximity to this site, the requested commercial may be acceptable. Transportation and Site Access According to the Applicant’s Impact Analysis Statement, the site could generate up to 6,303 daily trips if developed with restaurants and the existing warehouse based on the existing M1 zoning of the site. The Applicant further stated that the site would generate a lower volume of 5,572 trips per day if developed with a mix of warehouse/hotel/restaurant/gasoline station. Therefore the Applicant has proffered that the site would not exceed 6,303 vehicle trips per day. As depicted on the Applicant’s GDP, the site would be accessed via one right-in /right-out and one right-in only on Martinsburg Pike, as well as one right-in only off of Snowden Bridge Boulevard. The entrance locations shown on the proffered GDP are conceptual in nature – the proffer states that the final design and location of these entrances will need to be approved by VDOT and the County. The site would also have access to Ezra Lane, which is proposed to be constructed as a private road (Rezoning #03-05 called for Ezra Lane to become a public street). 3) Site Suitability/Environment The subject property does not contain any areas of floodplain, wetlands or other environmental features. This area is, however, known for karst topography and special attention should be paid during development for potential sinkholes and related impacts. 4) Potential Impacts: A. Sewer and Water The property owner previously constructed a sanitary force main, gravity lines with manholes and a pump station which has been dedicated to the FCSA. The Applicant’s Impact Analysis Statement projects that the site would require 14,000 gallons per day of water. The Sanitation Authority has indicated that there are currently adequate water and sewer services available for the site. B. Use According to the Applicant’s Impact Analysis Statement, the preferred option for Rezoning #04-16 Snowden Bridge Station May 31, 2016 Page 5 development consists of a gas station, restaurants, hotel, pharmacy and small market. It should be noted that these uses are not proffered. The Applicant has only proffered a maximum number of vehicles per day for the site. 5) Proffer Statement, Dated March 22, 2016, revised May 17, 2016: 1. Transportation- vehicle trips per day shall not exceed 6,303, to be determined at site plan stage. a. The owners have proffered to construct one right-in only entrance on Snowden Bridge Boulevard as shown on the GDP. Final design and location to be approved by VDOT and the County. b. The owners have proffered to construct one right-in/right-out entrance and one right-out entrance onto Martinsburg Pike as shown on the GDP. Final design and location to be approved by VDOT and the County. c. The owners have proffered a private road (Ezra Lane) within the property as shown on the GDP. This road shall serve as the internal road system for development. Neighboring parcels (43C-5-15, 16, 17, 43C-6-A) and the Electric Substation will also be granted access over Ezra Lane should Redbud Road be closed. This proffer takes the place of proffer 1g that was proffered with Rezoning #03-05. d. The parcel to the south (43C-3-5) shall be granted an inter-parcel connection– the location shall be determined at site plan approval. e. The owner proffers a dedication of 10’ along Route 11 for right-of-way improvement. 2. Corridor Enhancements along Route 11 – Martinsburg Pike: a. Construction of a split rail fence with a 36” hedge within the front building setback. b. The parking setback along Route 11 shall be consistent with the front building setback per the Zoning Ordinance. c. Only one freestanding monument style sign shall be allowed along the Martinsburg Pike frontage. 3. Fire and Rescue – Monetary Contributions: a. The owners have proffered a cash contribution to Fire and Rescue of $0.10 per building square foot. STAFF CONCLUSIONS FOR THE 06/15/16 PLANNING COMMISSION MEETING: This is an application to rezone a total of 13.9 acres of land from the M1 (Light Industrial) District to the B2 (General Business) and B3 (Industrial Transition) Districts with proffers. This property is located within the Sewer and Water Service Area (SWSA) and is located within the limits of the Northeast Land Use Plan of the 2030 Comprehensive Plan. The Comprehensive Plan identifies these properties with an industrial land use designation which is consistent with the current zoning of the properties. In general, the proposed commercial zoning is Rezoning #04-16 Snowden Bridge Station May 31, 2016 Page 6 inconsistent with the current land use supported by the Comprehensive Plan. However, considering the visibility of this site, its location on Martinsburg Pike and the I-81 interchange and the amount of commercial land in close proximity to this site, the requested commercial may be acceptable. With this rezoning, the Applicant has proffered to limit the number of restricted entrances on Martinsburg Pike to two and one on Snowden Bridge Boulevard and limit the maximum vehicle trips for the site to 6,303. The entrance locations shown on the proffered GDP are conceptual in nature – the proffer states that the final design and location of these entrances will need to be approved by VDOT and the County. The Applicant has also proffered a 10’ right-of-way dedication for Martinsburg Pike as well as corridor enhancements such as a split rail fence, increased parking setbacks. The Applicant has also provided a monetary contribution of $0.10 per building square foot for Fire and Rescue. Following the required public hearing, a recommendation regarding this rezoning application to the Board of Supervisors would be appropriate. The Applicant should be prepared to adequately address all concerns raised by the Planning Commission. 0111 43C 3 4A 43C 3 4 43C 3 3 43C 3 2 43 A 150 220EZRA LN 220EZRA LN 185REDBUD RD 361MILBURN RD 1724MARTINSBURGPIKE 1734MARTINSBURGPIKE 1744MARTINSBURGPIKE 1912MARTINSBURGPIKE 112MARKET ST 163NULTON LN 111MERCHANT ST 1840MARTINSBURGPIKE 149NULTON LN 141NULTON LN 111MERCHANT ST 1854MARTINSBURGPIKE 1864MARTINSBURGPIKE 191MARKET ST 1876MARTINSBURGPIKE EZRA L N SN O W D E N B R I D G E B L V D MARTINS B U R G PIKE Applications Parcels Sewer and Water Service Area Building Footprints B1 (Business, Neighborhood District) B2 (Business, General Distrist) B3 (Business, Industrial Transition District) EM (Extractive Manufacturing District) HE (Higher Education District) M1 (Industrial, Light District) M2 (Industrial, General District) MH1 (Mobile Home Community District) MS (Medical Support District) OM (Office - Manufacturing Park) R4 (Residential Planned Community District) R5 (Residential Recreational Community District) RA (Rural Area District) RP (Residential Performance District) I Note:Frederick County Dept ofPlanning & Development107 N Kent StSuite 202Winchester, VA 22601540 - 665 - 5651Map Created: May 19, 2016Staff: cperkins RED B U D R D SNO W D E N B R I D G E B L V D M A R K E T S T ME R C H A N T S T 0111 REZ # 04 - 16Snowden Bridge StationPINs:43 - A - 150, 43 - A - 151A, 43 - A - 151B,43C - 3 - 2, 43C - 3 - 3, 43C - 3 - 4,43C - 3 - 4ARezoning from M1 to B2 and B3 0 250 500125 Feet REZ # 04 - 16Snowden Bridge StationPINs:43 - A - 150, 43 - A - 151A, 43 - A - 151B,43C - 3 - 2, 43C - 3 - 3, 43C - 3 - 4, 43C - 3 - 4ARezoning from M1 to B2 and B3 43 A 151B 1754MARTINSBURGPIKE REZ #04-16 REZ #04-16 REZ #04-16 §¨¦81 43 A 151A REZ #04-16 REZ #04-16 REZ #04-16 REZ #04-16 0111 43C 3 4A 43C 3 4 43C 3 3 43C 3 2 43 A 150 220EZRA LN 220EZRA LN 185REDBUD RD 361MILBURN RD 1724MARTINSBURGPIKE 1734MARTINSBURGPIKE 1744MARTINSBURGPIKE 1912MARTINSBURGPIKE 112MARKET ST 163NULTON LN 111MERCHANT ST 1840MARTINSBURGPIKE 149NULTON LN 141NULTON LN 111MERCHANT ST 1854MARTINSBURGPIKE 1864MARTINSBURGPIKE 191MARKET ST 1876MARTINSBURGPIKE EZRA L N SN O W D E N B R I D G E B L V D MARTINS B U R G PIKE Applications Parcels Sewer and Water Service Area Building Footprints I Note:Frederick County Dept ofPlanning & Development107 N Kent StSuite 202Winchester, VA 22601540 - 665 - 5651Map Created: May 19, 2016Staff: cperkins RED B U D R D SNO W D E N B R I D G E B L V D M A R K E T S T ME R C H A N T S T 0111 REZ # 04 - 16Snowden Bridge StationPINs:43 - A - 150, 43 - A - 151A, 43 - A - 151B,43C - 3 - 2, 43C - 3 - 3, 43C - 3 - 4,43C - 3 - 4A Rezoning from M1 to B2 and B3 0 250 500125 Feet REZ # 04 - 16Snowden Bridge StationPINs:43 - A - 150, 43 - A - 151A, 43 - A - 151B,43C - 3 - 2, 43C - 3 - 3, 43C - 3 - 4, 43C - 3 - 4ARezoning from M1 to B2 and B3 43 A 151B 1754MARTINSBURGPIKE REZ #04-16 REZ #04-16 REZ #04-16 §¨¦81 43 A 151A REZ #04-16 REZ #04-16 REZ #04-16 REZ #04-16 0111 43C 3 4A 43C 3 4 43C 3 3 43C 3 2 43 A 150 185REDBUD RD 220EZRA LN 220EZRA LN 361MILBURN RD 1724MARTINSBURGPIKE 1734MARTINSBURGPIKE 1744MARTINSBURGPIKE 1912MARTINSBURGPIKE 151MARKET ST 112MARKET ST 163NULTON LN 111MERCHANT ST 1840MARTINSBURGPIKE 141NULTON LN 149NULTON LN 1854MARTINSBURGPIKE 191MARKET ST 111MERCHANT ST 1864MARTINSBURGPIKE 1876MARTINSBURGPIKE EZRA L N SN O W D E N B R I D G E B L V D MARTIN S B U R G PIKE Applications Parcels Sewer and Water Service Area Building Footprints Long Range Land Use Residential Neighborhood Village Urban Center Mobile Home Community Business Highway Commercial Mixed-Use Mixed Use Commercial/Office Mixed Use Industrial/Office Industrial Warehouse Heavy Industrial Extractive Mining Commercial Rec Rural Community Center Fire & Rescue Historic Institutional Planned Unit Development Park Recreation School Employment Airport Support Area B2 / B3 Residential, 4 u/a High-Density Residential, 6 u/a High-Density Residential, 12-16 u/a Rural Area Interstate Buffer Landfill Support Area Natural Resources & Recreation Environmental & Recreational Resources I Note:Frederick County Dept ofPlanning & Development107 N Kent StSuite 202Winchester, VA 22601540 - 665 - 5651Map Created: May 19, 2016Staff: cperkins RED B U D R D SNO W D E N B R I D G E B L V D M A R K E T S T ME R C H A N T S T 0111 REZ # 04 - 16Snowden Bridge StationPINs:43 - A - 150, 43 - A - 151A, 43 - A - 151B,43C - 3 - 2, 43C - 3 - 3, 43C - 3 - 4,43C - 3 - 4A Rezoning from M1 to B2 and B3 0 280 560140 Feet REZ # 04 - 16Snowden Bridge StationPINs:43 - A - 150, 43 - A - 151A, 43 - A - 151B,43C - 3 - 2, 43C - 3 - 3, 43C - 3 - 4, 43C - 3 - 4ARezoning from M1 to B2 and B3 43 A 151B 1754MARTINSBURGPIKE REZ #04-16 REZ #04-16 REZ #04-16 §¨¦81 43 A 151A REZ #04-16 REZ #04-16 REZ #04-16REZ #04-16 C REZONING APPLICATION #05-16 CB VENTURES Staff Report for the Planning Commission Prepared: June 1, 2016 Staff Contact: Candice E. Perkins, AICP, CZA, Assistant Director Reviewed Action Planning Commission: 06/15/16 Pending Board of Supervisors: 07/27/16 Pending PROPOSAL: Rezoning #05-16 for CB Ventures LLC. submitted by Greenway Engineering, to rezone 3.75+/- acres from the B3 (Industrial Transition) District to the B2 (General Business) District, and 1.23+/- acres from the B2(General Business) District to the B2 (General Business) District with proffers. This property also has an existing IA (Interstate Area Overlay) District designation which permits one interstate overlay sign this is a high rise sign that allows certain uses such as gasoline stations, restaurants and hotels to be seen from the interstate. LOCATION: The property is located on the south side of Martinsburg Pike (US Route 11) and the northeast side of Amoco Lane (Route 839) at the southwest quadrant of Interstate 81, Exit 317. EXECUTIVE SUMMARY & STAFF CONCLUSIONS FOR THE 06/15/16 PLANNING COMMISSION MEETING: This is an application to rezone a total of 4.98 acres of land from the B2 (General Business) and B3 (Industrial Transition) Districts to the B2 District with proffers to accommodate commercial uses. This property is located within the Sewer and Water Service Area (SWSA) and is located within the limits of the Northeast Land Use Plan of the 2030 Comprehensive Plan. The Northeast Land Use Plan identifies this property with a commercial land use designation. In general, the proposed commercial zoning is consistent with the current land use supported by the Comprehensive Plan. With this rezoning, the Applicant has proffered to construct upgrades to Amoco Lane (Route 839) within the limits of the existing right-of-way to the limits of their southeastern most commercial entrance and to also provide inter-parcel connection into the adjacent Sheetz property that is currently under construction. The Applicant has also proffered to design and construct a sewer pump station, provide for landscaping on the properties fronting Amoco Lane and provide a monetary contribution of $0.05 per building square foot for Fire and Rescue. A few elements of the rezoning application have been identified that should be carefully evaluated to ensure that they fully address the impacts associated with this rezoning request. The Planning Commission should pay particular attention to the Amoco Lane upgrades, the Sanitation Authority comments and the buffering proposed with this development. Confirmation of the issues identified in the staff report, and any issues raised by the Planning Commission, should be addressed prior to a recommendation by the Planning Commission. Following the required public hearing, a recommendation regarding this rezoning application to the Board of Supervisors would be appropriate. The Applicant should be prepared to adequately address all concerns raised by the Planning Commission. Rezoning #05-16 CB Ventures June 1, 2016 Page 2 This report is prepared by the Frederick County Planning Staff to provide information to the Planning Commission and the Board of Supervisors to assist them in making a decision on this application. It may also be useful to others interested in this zoning matter. Unresolved issu es concerning this application are noted by staff where relevant throughout this staff report. Reviewed Action Planning Commission: 06/15/16 Pending Board of Supervisors: 07/27/16 Pending PROPOSAL: Rezoning #05-16 for CB Ventures LLC. submitted by Greenway Engineering, to rezone 3.75+/- acres from the B3 (Industrial Transition) District to the B2 (General Business) District, and 1.23+/- acres from the B2(General Business) District to the B2 (General Business) District with proffers. This property also has an existing IA (Interstate Area Overlay) District designation which permits one interstate overlay sign this is a high rise sign that allows certain uses such as gasoline stations, restaurants and hotels to be seen from the interstate. LOCATION: The property is located on the south side of Martinsburg Pike (US Route 11) and the northeast side of Amoco Lane (Route 839) at the southwest quadrant of Interstate 81, Exit 317. MAGISTERIAL DISTRICT: Stonewall PROPERTY ID NUMBERS: 43-A-48A PROPERTY ZONING: B2 (General Business) and B3 (Industrial Transition) Districts PRESENT USE: Vacant ADJOINING PROPERTY ZONING & PRESENT USE: North: B2 (General Business) Use: Commercial South: B2 (General Business) Use: Commercial & Residential East: M1 (Light Industrial Use: Industrial & Interstate I81 West: B2 (General Business) Use: Commercial Rezoning #05-16 CB Ventures June 1, 2016 Page 3 REVIEW EVALUATIONS: Frederick-Winchester Service Authority: Will there be boundaries established for service area of pumping station and will pumping station be designed with capacity in place for that service area. Frederick County Sanitation Authority: Please see the attached letter from Eric Lawrence dated March 23, 2016. Public Works Department: We have completed our review of the proposed rezoning application for CB Ventures, LLC and offer the following comments: Refer to the Impact Analysis, Suitability of the Site, Other Environmental Features: The entire site is underlain by limestone with pronounced karst features. Indicate if a study has been performed or will be performed to locate any potential sinkhole areas. Refer to the Impact Analysis, Sewage Conveyance and Treatment: The narrative indicate that the Applicant will be responsible for the design and construction of a new sewer system that will include gravity lines, a pump station and a force main to the Red Bud Pump Station. The proffer statement, paragraph D. Sewer Pump Station, should be expanded to include the design and construction of the force main. In addition, the Applicant should be responsible for obtaining the easements required to construct the force main. A geotechnical study may be required along the proposed alignment because of the presence of existing sinkholes. Frederick County Fire Marshall: Plans approved. Winchester Regional Airport: The proposed rezoning is compatible with airport operations. Site plans will be reviewed individually. Virginia Dept. of Transportation: VDOT has completed the review of the subject rezoning; our comments are found below: The entrance location shown on the GDP for Amoco Lane has not been evaluated by VDOT. We recommend the entrance location shown on the GDP be removed or shown as “potential entrance – final design and location to be determined at the time of site plan submission and requires VDOT approval”. We recommend Proffer C.1 be revised to included Amoco Lane improvements along the entire frontage rather than only to their entrance. We recommend the proffer include sidewalk and drainage in addition to the curb and gutter. We recommend right-of-way width along property frontage with Amoco Lane match the existing width of right-of-way at the intersection along Sheetz frontage. (uniformity on Amoco Lane). Frederick County Attorney: Please see the attached letter from Roderick B. Williams dated March 4, Rezoning #05-16 CB Ventures June 1, 2016 Page 4 2016. Frederick County Planning Department: Please see attached letters from Candice Perkins dated March 22, 2016 and John Bishop dated April 22, 2016. Planning & Zoning: 1) Site History: The original Frederick County zoning map (U.S.G.S. Winchester, VA Quadrangle) depicts the zoning of the subject parcel as being split zoned B2 (General Business) District and B3 (Industrial Transition) District – this zoning is consistent with the present day zoning on the property. This property also has an existing IA (Interstate Area Overlay) District designation which permits one interstate overlay sign. The IA (Interstate Area Overlay) District is intended to provide commercial businesses within an identified area the ability to utilize business signs that are in excess of the limits specified elsewhere in the Zoning Ordinance. This flexibility is provided to inform the traveling public of business service opportunities at specific interstate interchange areas. IA Overlay signs are permitted for hotels, restaurants and gasoline stations. 2) Comprehensive Policy Plan: The 2030 Comprehensive Plan is the guide for the future growth of Frederick County. The 2030 Comprehensive Plan is an official public document that serves as the community's guide for making decisions regarding development, preservation, public facilities and other key components of community life. The primary goal of this plan is to protect and improve the living environment within Frederick County. It is, in essence, a composition of policies used to plan for the future physical development of Frederick County. The Area Plans, Appendix I of the 2030 Comprehensive Plan, are the primary implementation tool and will be instrumental to the future planning efforts of the County. Land Use The 2030 Comprehensive Plan and the Northeast Frederick Land Use Plan provide guidance on the future development of this property. The property is located within the SWSA. The 2030 Comprehensive Plan identifies this property with a commercial land use designation. In general, the proposed commercial zoning is consistent with the current land use supported by the Comprehensive Plan, subject to the following comments. Transportation and Site Access According to the Applicant’s Impact Analysis Statement, the preferred option for commercial development includes a hotel and two restaurants. These uses could generate a total traffic volume impact of 4,365 daily trips. It should be noted that the property currently has a commercial zoning designation that could result in a greater traffic volume impact with it’s by- Rezoning #05-16 CB Ventures June 1, 2016 Page 5 right use allowances (the site could currently develop with all restaurant uses) than what is currently proposed; therefore a Transportation Impact Analysis (TIA) was not required for this application. Access to this site will be provided via Amoco Lane (Route 839) and through an inter-parcel connection into the Sheetz property that is currently under construction. There will be no direct access to Martinsburg Pike. The Applicant has proffered to design and construct improvements to Amoco Lane within the existing right-of-way to include pavement mill and overlay to the exiting centerline from the limits of the pavement mill and overlay improvements performed by Parcel 43-A-48 (Sheetz property); and for the installation of curb and gutter along the frontage for the property to the limits of the southeastern most commercial entrance serving the property that is developed along Amoco Lane. Staff would note that there is potential for the site’s entrance to be at the northwestern edge of the property and therefore minimal Amoco Lane improvements would be constructed. The Applicant should consider upgrading Amoco Lane along the frontage of their property. Staff Note: Staff and VDOT recommend that the Amoco Lane improvements be extended along the entire Amoco Lane frontage and R-O-W expansion for Amoco Lane. 3) Site Suitability/Environment: The subject property does not contain any areas of floodplain, wetlands or other environmental features. This area is, however, known for karst topography and special attention should be paid during development for potential sinkholes and related impacts. 4) Potential Impacts: A. Sewer and Water The Applicant’s Impact Analysis Statement projects that the development would require 22,000 gallons per day of water; the FCSA has adequate water supply and pressure to serve the property up to a maximum anticipated flow of 50,000 gallons per day. The Applicant’s Impact Analysis Statement projects that the development could produce up to 22,000 gallons per day of sewage flow. This area currently does not have sewer infrastructure constructed to serve the property. The Applicant has proffered to design an on-site gravity sewer system that will tie into a new sewer pump station located in the southeastern end of the subject property that will also be constructed by the Applicant. This pump station will direct effluent from this area to an existing 8-inch sewer force main located approximately 700 feet south of the subject property. The new pump station is anticipated to be designed for 40 gpm with a peak capacity of approximately 52,750 gpd. Staff Comment: The FCSA requested that this proffer be expanded to include a SCADA (Supervisory Control and Data Acquisition) system that is coordinate with other pump stations on this force main. Rezoning #05-16 CB Ventures June 1, 2016 Page 6 B. Use According to the Applicant’s Impact Analysis Statement, the preferred option for commercial development includes a hotel and two restaurants. It should be noted that these uses are not proffered. The Applicant has restricted six uses as outlined in proffer A (see below); however it is unlikely that the majority of these uses would be developed on this property. C. Landscaping and Buffering This property is located in a developing area that contains a number of established residential properties. Special attention should be provided to ensure that the impacts to the adjacent residential properties are considered. The site currently has a row of established trees along Amoco Lane. The Applicant has proffered to provide a landscape buffer on the residential lots across Amoco Lane if desired by the property owners; however there is no commitment to keep the existing vegetation. Staff Comment: Consideration should be given to maintaining the existing mature evergreen and deciduous trees located along Amoco Lane. Utilizing the existing vegetation, and supplementing if necessary, would be preferable to removal and replacement. 4) Proffer Statement, Dated February 1, 2016, revised May 9, 2016: A) Land Use Restrictions - The Applicant has proffered to prohibit the following uses:  Truck Stops  Golf Driving Ranges and Miniature Golf Courses  Social Services  Commercial Batting Cages Operated Outdoors  Fire and Rescue Services  Fire and Rescue Stations  Adult Retail The Applicant has also proffered to prohibit metal building construction on the property. B) Transportation Enhancements: 1) The Applicant has proffered to design and construct improvements to Amoco Lane within the existing right-of-way to include pavement mill and overlay to the exiting centerline from the limits of the pavement mill and overlay improvements performed by Parcel 43-A-48 (Sheetz property); and for the installation of curb and gutter along the frontage for the property to the limits of the southeastern most commercial entrance serving the property that is developed along Amoco Lane. Improvement shall be completed prior to the issuance of a certificate of occupancy. 2) The Applicant has proffered to provide inter-parcel connection to Parcel 43-A- 48 (Sheetz property) that will continue into the property from the limits of the Rezoning #05-16 CB Ventures June 1, 2016 Page 7 inter-parcel connection stub within the 3’ easement on the adjoining property. Improvement shall be completed prior to the issuance of a certificate of occupancy. C) Sewer Pump Station: The Applicant has proffered to design and construct a sewer pump station and sewer collection system with capacity sufficient to provide public sewer service for the buildout of the property; as well as the existing residential land uses and the existing commercial land use on the southwest side of Amoco Lane. D) Off-Site Residential Buffer: The Applicant has proffered to provide a landscape buffer consisting of a single row of evergreen trees on the properties fronting along Amoco Lane that are improved as residential land use if desired by the property owner. Plantings shall occur after site plan approval during the next appropriate planting season. Monetary Contributions to Offset Impact of Development. A monetary contribution of $0.05 per developed building square foot for County Fire and Rescue Services. STAFF CONCLUSIONS FOR THE 06/15/16 PLANNING COMMISSION MEETING: This is an application to rezone a total of 4.98 acres of land from the B2 (General Business) and B3 (Industrial Transition) Districts to the B2 District with proffers to accommodate commercial uses. This property is located within the Sewer and Water Service Area (SWSA) and is located within the limits of the Northeast Land Use Plan of the 2030 Comprehensive Plan. The Northeast Land Use Plan identifies this property with a commercial land use designation. In general, the proposed commercial zoning is consistent with the current land use supported by the Comprehensive Plan. With this rezoning, the Applicant has proffered to construct upgrades to Amoco Lane (Route 839) within the limits of the existing right-of-way to the limits of their southeastern most commercial entrance and to also provide inter-parcel connection into the adjacent Sheetz property that is currently under construction. The Applicant has also proffered to design and construct a sewer pump station, provide for landscaping on the properties fronting Amoco Lane and provide a monetary contribution of $0.05 per building square foot for Fire and Rescue. A few elements of the rezoning application have been identified that should be carefully evaluated to ensure that they fully address the impacts associated with this rezoning request. The Planning Commission should pay particular attention to the Amoco Lane upgrades, the Sanitation Authority comments and the buffering proposed with this development. Confirmation of the issues identified in the staff report, and any issues raised by the Planning Commission, should be addressed prior to a recommendation by the Planning Commission. Following the required public hearing, a recommendation regarding this rezoning application to the Board of Supervisors would be appropriate. The Applicant should be prepared to adequately address all concerns raised by the Planning Commission. 0111 §¨¦81 §¨¦81 ST661 43 A 48A 141PRECISION DR 172PACTIVWAY 208AMOCO LN 198AMOCO LN 188AMOCO LN 178AMOCO LN 168AMOCO LN 148AMOCO LN 1518MARTINSBURGPIKE 140AMOCO LN 1544MARTINSBURGPIKE 1574MARTINSBURGPIKE 1571MARTINSBURGPIKE 1593MARTINSBURGPIKE 1601MARTINSBURGPIKE PACTIV WAY MARTINS B U R GPIKE AMO C O L N Applications Parcels Sewer and Water Service Area Building Footprints B1 (Business, Neighborhood District) B2 (Business, General Distrist) B3 (Business, Industrial Transition District) EM (Extractive Manufacturing District) HE (Higher Education District) M1 (Industrial, Light District) M2 (Industrial, General District) MH1 (Mobile Home Community District) MS (Medical Support District) OM (Office - Manufacturing Park) R4 (Residential Planned Community District) R5 (Residential Recreational Community District) RA (Rural Area District) RP (Residential Performance District) I Note:Frederick County Dept ofPlanning & Development107 N Kent StSuite 202Winchester, VA 22601540 - 665 - 5651Map Created: May 23, 2016Staff: cperkins RED B U D R D PACTIV WAY AMO C O L N WE L L T O W N R D PREC I S I O N D R C R O W N L N 0111 REZ # 05 - 16CB Ventures, LLCPIN:43 - A - 48ARezoning from B2, B3 to B2 0 210 420105 Feet REZ # 05 - 16CB Ventures, LLCPIN:43 - A - 48ARezoning from B2, B3 to B2 REZ #05-16 §¨¦81 §¨¦81 0111 §¨¦81 §¨¦81 ST661 43 A 48A 141PRECISION DR 172PACTIVWAY 208AMOCO LN 198AMOCO LN 188AMOCO LN 178AMOCO LN 168AMOCO LN 148AMOCO LN 1518MARTINSBURGPIKE 140AMOCO LN 1544MARTINSBURGPIKE 1574MARTINSBURGPIKE 1571MARTINSBURGPIKE 1593MARTINSBURGPIKE 1601MARTINSBURGPIKE PACTIV WAY MARTINS B U R GPIKE AMO C O L N Applications Parcels Sewer and Water Service Area Building Footprints I Note:Frederick County Dept ofPlanning & Development107 N Kent StSuite 202Winchester, VA 22601540 - 665 - 5651Map Created: May 23, 2016Staff: cperkins RED B U D R D PACTIV WAY AMO C O L N WE L L T O W N R D PREC I S I O N D R C R O W N L N 0111 REZ # 05 - 16CB Ventures, LLCPIN:43 - A - 48ARezoning from B2, B3 to B2 0 210 420105 Feet REZ # 05 - 16CB Ventures, LLCPIN:43 - A - 48ARezoning from B2, B3 to B2 REZ #05-16 §¨¦81 §¨¦81 0111 §¨¦81 §¨¦81 ST661 43 A 48A 141PRECISION DR 172PACTIVWAY 208AMOCO LN 198AMOCO LN 188AMOCO LN 178AMOCO LN 168AMOCO LN 148AMOCO LN 140AMOCO LN 1518MARTINSBURGPIKE 1544MARTINSBURGPIKE 1574MARTINSBURGPIKE 1571MARTINSBURGPIKE 1593MARTINSBURGPIKE 1601MARTINSBURGPIKE PACTIV WAY MARTINS B U R G PIKE AMO C O L N Applications Parcels Sewer and Water Service Area Building Footprints Long Range Land Use Residential Neighborhood Village Urban Center Mobile Home Community Business Highway Commercial Mixed-Use Mixed Use Commercial/Office Mixed Use Industrial/Office Industrial Warehouse Heavy Industrial Extractive Mining Commercial Rec Rural Community Center Fire & Rescue Historic Institutional Planned Unit Development Park Recreation School Employment Airport Support Area B2 / B3 Residential, 4 u/a High-Density Residential, 6 u/a High-Density Residential, 12-16 u/a Rural Area Interstate Buffer Landfill Support Area Natural Resources & Recreation Environmental & Recreational Resources I Note:Frederick County Dept ofPlanning & Development107 N Kent StSuite 202Winchester, VA 22601540 - 665 - 5651Map Created: May 23, 2016Staff: cperkins RED B U D R D PACTIV WAY AMO C O L N WE L L T O W N R D PREC I S I O N D R C R O W N L N 0111 REZ # 05 - 16CB Ventures, LLCPIN:43 - A - 48ARezoning from B2, B3 to B2 0 210 420105 Feet REZ # 05 - 16CB Ventures, LLCPIN:43 - A - 48ARezoning from B2, B3 to B2 REZ #05-16 §¨¦81 §¨¦81 PROFFER STATEMENT CB VENTURES, LLC COMMERCIAL DEVELOPMENT Stonewall Magisterial District Frederick County, Virginia TM 43-((A))-48A May 9, 2016 Current Owner: CB Ventures, LLC Contact Person: Evan Wyatt, Director of Land Planning Greenway Engineering, Inc. 151 Windy Hill Lane Winchester, VA 22602 FREDERICK COUNTY SANITATION AUTHORITY Post Office Box 1877 PH (540) 868-1061 Eric R. Lawrence Winchester Virginia 22604-8377 Fax (540) 868-1429 Executive Director www.fcsa-water.com   WATER’S WORTH IT   March 23, 2016 Evan Wyatt Greenway Engineering 151 Windy Hill Lane Winchester, VA 22602 RE: Rezoning Application Comment CB Ventures LLC Commercial Tax Map Numbers: 43-A-48A 3.75 acres Dear Mr. Wyatt: Thank you for the opportunity to offer review comments on the CB Ventures LLC Commercial rezoning application package, dated February 1, 2016. The Frederick County Sanitation Authority (FCSA) offers comments limited to the anticipated impact/effect upon the Authority’s public water and sanitary sewer system and the demands thereon. The project parcels are in the sewer and water service area (SWSA) and are served by FCSA. Based on the project’s location both water and sanitary sewer services are available within a reasonable distance from the site. Sanitary sewer treatment capacity at the wastewater treatment plant is also presently available for the application’s impact statement anticipated 22,000 gpd. Sanitary sewer conveyance from the site to the existing FCSA sewer system may be challenged due to limited available capacities in the nearby sewer force mains. The October 28, 2015 letter from FCSA to the property owner – Orr Partners, referenced in the project’s Impact Analysis Statement, certainly offers a potential sewer conveyance solution; the solution was valid as of the writing of the letter. This solution involves the use of a SCADA system to coordinate introduction of wastewater flows into the sewer force main. The applicant’s proffer, dated February 1, 2016, to construct a sewer pump station that will serve the site, and be designed with excess capacity to serve adjacent properties, is appreciated. In order to fully implement the solution of the October letter, this pump station should also include Page 2 RE: CB Ventures LLC Commercial Mr. Evan Wyatt March 23, 2016 a SCADA system that is coordinated with other pump stations on this force main. The proffer was silent on the SCADA system component. Please keep in mind that sewer conveyance capacities and water supplies change daily, and with new customer connections bring additional flows. This letter does not guarantee system capacities to accommodate your development proposal. Water and sanitary sewers are to be constructed in accordance with the FCSA standards specifications. Dedicated easements may be required and based on the layout vehicular access will need to be incorporated into the final design. Thank you for the opportunity to offer review comments. Sincerely, Eric R. Lawrence, AICP Executive Director Attached: October 28. 2015 letter Cc: Michael T. Ruddy, AICP, County Planning Department IMPACT ANALYSIS STATEMENT CB VENTURES, LLC COMMERCIAL DEVELOPMENT Stonewall Magisterial District Frederick County, Virginia TM 43-((A))-48A May 9, 2016 Current Owner: CB Ventures, LLC Contact Person: Evan Wyatt, Director of Land Planning Greenway Engineering, Inc. 151 Windy Hill Lane Winchester, VA 22602 540-662-4185 Greenway Engineering February 1, 2016 CB Ventures, LLC Commercial Rezoning Revised May 9, 2016 File #2022C Impact Statement/EAW 2 CB VENTURES, LLC COMMERCIAL DEVELOPMENT INTRODUCTION This report has been prepared for the purpose of assessing the impact on Fredrick County by the proffered rezoning of a 4.98±-acre subject property owned by CB Ventures LLC, and identified as Tax Map Parcel 43-A-48A. The subject property is located in the southwest quadrant of Interstate 81 Exit 317, on the south side of Martinsburg Pike (U.S. Route 11) and the northwest side of Amoco Lane (Rt. 839). Tax Map Parcel 43-A-48A is split-zoned, with of 1.23± acres of B-2, Business General District and 3.75± acres of B-3, Industrial Transition District land area. The Applicant proposes to rezone the 4.98±-acre subject property to B-2, Business General District with proffers to allow for the redevelopment of the 4.98±-acre subject property for highway commercial land use. Basic information Location: Fronting on the south side of Martinsburg Pike (U.S. Route 11) and the northwest side of Amoco Lane (Rt. 839), at the southwest quadrant of Interstate 81 Exit 317. Magisterial District: Stonewall District Property ID Numbers: 43-A-48A Current Zoning: B-2, Business General District (1.23± acres) B-3, Industrial Transition District (3.75± acres) Current Use: Undeveloped Proposed Zoning: 4.98±-acres with proffers for the subject property Proposed Use: Commercial (Hotel and Restaurant Preferred Option) Total Rezoning Area: 4.98±-acres with proffers for the subject property Greenway Engineering February 1, 2016 CB Ventures, LLC Commercial Rezoning Revised May 9, 2016 File #2022C Impact Statement/EAW 3 COMPREHENSIVE POLICY PLAN Urban Development Area The Urban Development Area (UDA) defines the general area in which residential, commercial, industrial and institutional land use development is encouraged in the County. The 4.98±-acre subject property is currently located within the UDA; therefore, expansion of the UDA boundary to accommodate the proposed development of commercial land use is not required for this rezoning application. Sewer and Water Service Area The Sewer and Water Service Area (SWSA) is generally consistent with the UDA, but also extends outside of the UDA to accommodate areas of the County in which commercial and industrial land use development is only desired. The 4.98±-acre subject property is currently located within the SWSA; therefore, expansion of the SWSA boundary to accommodate the proposed development of commercial land use is not required for this rezoning application. Comprehensive Plan Conformity The 4.98±-acre subject property is located in the UDA and the SWSA and is within the study area boundary of the Northeast Frederick Land Use Plan. The Northeast Frederick Land Use Plan is a large-area plan that identifies land uses, transportation networks, and other matters that are recommended for consideration for future land use and development within this geographic area of the County. The 4.98±-acre subject property is identified for business land use; therefore, the proposed B-2, Business General District rezoning is in conformance with the Comprehensive Policy Plan. The Applicant’s preferred commercial development plan for hotel and restaurant land use for the proposed B-2, Business General District rezoning is appropriate based on the proximity of the subject property to the Interstate 81 Exit 317 interchange and Martinsburg Pike (US Route 11 North). SUITABILITY OF THE SITE Access The 4.98±-acre subject property is located on the south side of Martinsburg Pike (U.S. Route 11), approximately 400 feet west of the Interstate 81 Exit 317 interchange. Access to the subject property will be provided with full access entrances along Amoco Lane (Route 839) and through an inter-parcel connection with the Sheetz Convenience Store that will allow for access to this site and access to a right-out only entrance along Martinsburg Pike. Greenway Engineering February 1, 2016 CB Ventures, LLC Commercial Rezoning Revised May 9, 2016 File #2022C Impact Statement/EAW 4 Flood Plains The 4.98±-acre subject property does not contain areas of floodplain as demonstrated on FEMA NFIP Map #51069C0209D, Effective Date September 2, 2009; as well as information from the Frederick County GIS Database. Wetlands The 4.98±-acre subject property does not contain wetland areas as demonstrated on the National Wetlands Inventory (NWI) Map information from the Frederick County GIS Database. Soil Types The 4.98±-acre subject property contains one soil type as demonstrated by the Soil Survey of Frederick County, Virginia and the Frederick County GIS Database. The following soil type is present on site: 32B Oaklet Silt Loams 2-7% slope The Oaklet Silt Loam is identified as a prime agricultural soil and has high shrink/swell properties. The portion of the subject site proposed to be rezoned was previously developed as an 84 Lumber Retail Center and Lumber Yard and developed properties within close proximity of the site have the same soil type. The site soil type is conducive for commercial redevelopment of the subject property. Other Environmental Features The 4.98±-acre subject property does not contain areas of steep slope, lakes or ponds or natural stormwater retention areas as defined by the Frederick County Zoning Ordinance. The subject property is located in the geographic portion of the County that is underlain by karst geology. The Owner has not performed a study to locate sinkholes to date; however, geotechnical analysis of the development areas on the project site will be performed in conjunction with the construction phase of the commercial redevelopment project. There are no known environmental features present that create development constraints for the proposed commercial development project. SURROUNDING PROPERTIES Adjoining property zoning and present use: North: B-2, Business General District Use: Hotel, Restaurant and Convenience Store Greenway Engineering February 1, 2016 CB Ventures, LLC Commercial Rezoning Revised May 9, 2016 File #2022C Impact Statement/EAW 5 South: B-2, Business General District Use: Residential and Unimproved East: M-1, Light Industrial District Use: Unimproved West: B-2, Business General District Use: Residential, Unimproved and Convenience Store TRANSPORTATION The Applicant’s preferred option for commercial development includes a hotel and two restaurants. The County’s Zoning Ordinance allows restaurants in the B-2 District and the B- 3 District; however, hotels are only allowed in the B-2 District. Greenway Engineering coordinated with the County Transportation Planning Director to identify potential traffic impacts associated with the Applicant’s preferred commercial development option to obtain a determination regarding the need for a traffic impact analysis (TIA) for the rezoning application process. Greenway Engineering utilized traffic projection data from the ITE Manual - 9th Edition for a 100 room hotel and two fast food restaurants with drive-thru window service, resulting in a total traffic volume impact of 4,365 daily trips. The fast food restaurants with drive-thru window service account for 3,472 daily trips of the total traffic volume; therefore, the 892 daily trips for the hotel that are projected by the ITE Manual represent the traffic impacts associated with the rezoning application. The development of an additional by-right restaurant within the subject property would result in a greater traffic volume impact than would otherwise occur if a hotel was developed. The County Transportation Planning Director reviewed the land use and traffic analysis and advised that a TIA would not be necessary for the rezoning application process. Greenway Engineering previously worked with VDOT and the County Transportation Planning Director on behalf of Sheetz to process an access management exception request for the redevelopment of their convenience store and gasoline canopy. The access management exception request, which received formal approval by VDOT on August 14, 2014, calls for the elimination of several existing entrances, the creation of a right-in/right-out entrance and a separate right-out entrance, and the provision for inter-parcel access for the benefit of the subject property. Frederick County recently approved a Site Development Plan for this project and Sheetz has commenced construction, which will incorporate these access management improvements. The Applicant’s Proffer Statement provides for the design and construction of inter-parcel access that will be accomplished during the Site Development Plan that adjoins this ingress/egress easement for the Sheetz project that will provide this connection. Additionally, VDOT has approved a public improvement plan for Sheetz that implements curb and gutter improvements along the Amoco Lane frontage; as well as the milling and overlay of Amoco Lane from the Sheetz property line to the centerline of Amoco Lane. The Applicant’s Proffer Statement provides for the design and construction of identical improvements along the Amoco Lane frontage of the subject property through the Greenway Engineering February 1, 2016 CB Ventures, LLC Commercial Rezoning Revised May 9, 2016 File #2022C Impact Statement/EAW 6 limits of the first commercial entrance that will be accomplished during the first Site Development Plan that is submitted to Frederick County. The rezoning of the subject property will allow for the development of a hotel facility, which is not a permitted land use in the current zoning district. The hotel facility traffic generation will result in a reduction of vehicle trips that would otherwise be permitted as by-right development for this portion of the property. The Applicant’s Proffer Statement commits to improvements to Amoco Lane that will complete pavement and drainage enhancements from the Sheetz property to the limits of the southeastern most commercial entrance; as well as incorporating inter-parcel connectivity to allow for vehicular access to the new convenience store and gasoline pumps, and for right-turn access to Martinsburg Pike for Interstate 81 and U.S. Route 11 traffic movement. The proposed application and proffer statement sufficiently mitigates transportation impacts associated with this conditional rezoning request. SEWAGE CONVEYANCE AND TREATMENT The 4.98±-acre subject property is located within the Sewer and Water Service Area (SWSA); therefore, the property is entitled to be served by public sewer based on County Policy. The Frederick County Sanitation Authority (FCSA) is the provider of public sewer service within this area of the County, but does not currently have sewer infrastructure within or adjacent to the property. FCSA has issued a letter dated October 28, 2015 in reference to this property that states the FCSA and the Frederick Winchester Service Authority have adequate capacity at the wastewater treatment plant to accommodate the maximum proposed sanitary flows and that the Red Bud Pump Station can also accommodate the added flows from the development of this property. Greenway Engineer has worked with FCSA to determine the appropriate approach for the development of sewer infrastructure to provide sewer service to the subject property with available capacity for adjoining properties along Amoco Lane (Route 839). Greenway Engineering has utilized 2015 FCSA water meter data with an applied 1.5 calculation factor of safety for the Applicant’s preferred development option of hotel and restaurant land use, and has included calculated flows for the Goldstar Motors and existing residential uses along Amoco Lane. These calculations project a conservative sewer demand flow of 22,000 gpd for the existing land uses and for the commercial buildout of the subject property. Greenway Engineering will design an on-site gravity sewer system that collects effluent from the commercial land uses proposed to be developed on the subject site, which will also allow for off-site land uses to connect to this system. The on-site gravity sewer system will tie into a new sewer pump station that will be located in the southern end of the subject property that will direct effluent from this area to an existing 8-inch sewer force main located approximately 700 feet south of the subject property. The sewer new pump station is anticipated to be designed for 40 gpm with a peak capacity of approximately 52,750 gpd. The proposed sewer design will accommodate existing and proposed land uses located on the subject property and along Amoco Lane and has been submitted to FCSA for review and approval. Greenway Engineering February 1, 2016 CB Ventures, LLC Commercial Rezoning Revised May 9, 2016 File #2022C Impact Statement/EAW 7 The proposed buildout of commercial land use on the subject property is projected to increase sewer flows at the Opequon Wastewater Treatment Facility by approximately 22,000 gpd, which accounts for the future connection of existing commercial and resid ential land uses along Amoco Lane. The Applicant will be responsible for the design and construction of a new sewer system that will include gravity lines, a pump station and a force main to connect to the Red Bud Pump Station. The FCSA has determined that this approach is appropriate for addressing sewer impacts associated with this rezoning proposal; therefore, the Applicant has adequately addressed sewer impacts associated with this proposal. WATER SUPPLY The 4.98±-acre subject property is located within the Sewer and Water Service Area (SWSA); therefore, the property is entitled to be served by public water based on County Policy. The Frederick County Sanitation Authority (FCSA) is the provider of public water service within this area of the County and has an existing 10” water line located along Martinsburg Pike (US Route 11 North) and Amoco Lane (Route 839) that provides public water to the property. FCSA has issued a letter dated October 28, 2015 in reference to this property that states the FCSA has adequate water supply and pressure to serve the property up to a maximum anticipated flow of 50,000 gpd. Greenway Engineer has worked with FCSA to determine water and sewer demands required for the Applicant’s preferred development option of hotel and restaurant land use. Greenway Engineering has utilized 2015 FCSA water meter for these land uses and has applied a 1.5 calculation factor of safety to develop a conservative water demand projection of 22,000 gpd for the buildout of the subject property. The projected water demand of 22,000 gpd falls well below the available water supply identified by FCSA for this site; therefore, there is adequate supply and pressure that will be available for the buildout of commercial land use for the proposed development project. SITE DRAINAGE The topographic relief on the 4.98±-acre subject property generally follows a north to south pattern, which directs drainage from Martinsburg Pike (US Route 11 North) and Amoco Lane (Route 839) towards the rear of the property adjacent to Interstate 81. The subject site was previously developed as an 84 Lumber Retail Center and Lumber Yard, which did not create adverse stormwater impacts to adjoining properties. The commercial development of the subject property will incorporate stormwater management design that is anticipated to include a small stormwater detention pond on the eastern portion of the site near the Interstate 81 southbound on-ramp, and a small stormwater detention pond on the rear portion of the site near the Interstate 81 southbound on-ramp. Stormwater quality measures will be evaluated during the Site Development Plan process and will be achieved through on -site quality measures, nutrient credits, or a combination of both. The stormwater quantity and Greenway Engineering February 1, 2016 CB Ventures, LLC Commercial Rezoning Revised May 9, 2016 File #2022C Impact Statement/EAW 8 quality measures will be designed in conformance with all applicable state and local regulations; therefore, site drainage and stormwater management impacts to adjoining properties and the community will be mitigated. SOLID WASTE DISPOSAL The impact on solid waste disposal facilities associated with the redevelopment of the 4.98± subject site can be projected from an average annual commercial consumption of 5.4 cubic yards per 1,000 square feet of structural area (Civil Engineering Reference Manual, 4th edition). The Applicant’s preferred option for commercial development includes a hotel and two restaurants; therefore, solid waste disposal impacts are based on the following figures that provide the increase in average annual solid waste volume based on the development of 70,000 square-feet of commercial land use: AAV = 5.4 cu. yd. per 1,000 sq. ft. commercial AAV = 5.4 cu. yd. x 70 (1,000 sq. ft.) AAV = 378 cu. yd. at build-out, or 264.6 tons/yr. at build-out The Municipal Solid Waste area of the Regional Landfill has a current remaining capacity of 13,100,000 cubic yards of air space. The projected commercial development will generate approximately 265 tons of solid waste annually on average. This represents a 0.13% increase in the annual solid waste received by the Municipal Solid Waste area of the Regional Landfill, which currently averages 200,000 tons per year. Solid waste produced by the commercial development will be disposed at the Regional Landfill by a commercial waste hauler; therefore, the County will receive tipping fees associated with this land use to mitigate this impact. The Regional Landfill has adequate capacity to accommodate the solid waste impacts associated with this proposal. HISTORICAL SITES AND STRUCTURES The Frederick County Rural Landmarks Survey does not identify structures deemed to be historically significant on the 4.98±-acre subject property, nor does the survey identify properties within proximity of this site that are deemed potentially significant . The National Park Service Study of Civil War Sites in the Shenandoah Valley identifies t he 4.98±-acre subject property as being located within the Second Winchester – Stephensons Depot study area boundary; however, the subject property is located well outside of the defined core battlefield area and is also defined as having lost integrity due to existing development patterns. Therefore, the commercial development plan for the property will not create negative impacts associated with historic resources. Greenway Engineering February 1, 2016 CB Ventures, LLC Commercial Rezoning Revised May 9, 2016 File #2022C Impact Statement/EAW 9 OTHER POTENTIAL IMPACTS The commercial development of the 4.98±-acre subject property will provide new economic development opportunities for Frederick County, which has been determined by the County’s Development Impact Model to be positive in the consideration of fiscal impacts to County Capital Facilities. It is recognized that the development of commercial land use has the potential to increase service demands on fire and rescue services; therefore, the Applicant’s Proffer Statement provides a monetary contribution of $0.05 per developed building square foot to the County to provide additional revenues that are specifically directed to fire and rescue services. Additionally, the Applicant’s Proffer Statement offers to provide off-site evergreen landscaping enhancements for existing residential lots along Amoco Lane if desired by the individual property owners even though their properties are currently zoned B2, Business General District. 43 A 48A C o n s o l i d a t e d R R M A R T I N S B U R G P I K E M A R T I N S B U R G P I K E §¨¦81 §¨¦81 £¤11 rs661 rs839 rs661 R E D B U D R D AMOCO LN W E L L T O W N R D PACTIV WAY P R E C I S I O N D R Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CN ES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, andthe GIS User Community Map D ata Source: Frederick County, Va. GIS Department, 2015 Data; Aerial Photos from ESRI (http://services.arcgisonline.com/ArcGIS/rest/services [World Imagery]) A E R I A L O V E R V I E W S T O N E W A L L M A G I S T E R I A L D I S T R I C T C B V E N T U R E S , L L C P R O P E R T Y F R E D E R I C K C O U N T Y , V I R G I N I A D A T E : 2 0 1 6 -0 1 -0 7 P R O J E C T I D : 2 0 2 2 C D E S I G N E D B Y : D W E S C A L E : 1 I n c h = 1 5 0 F e e t Le gend CB Ventures, LLC Prope rty, TM 43 -A-48 A Po rtio n o f 43-A-48A To Be Rezon ed Pa rce l Bou ndary 150 0 150 Feet µ C B V E N T U R E S , L L C P R O P E R T Y C O M M E R C I A L R E Z O N I N G A E R I A L O V E R V I E W C O M M E R C I A L R E Z O N I N G 43 A 48A C o n s o l i d a t e d R R C o n s o l i d a t e d R R M A R T I N S B U R G P I K E M A R T I N S B U R G P I K E §¨¦81 §¨¦81 £¤11 rs661 rs839 rs661 R E D B U D R D AMOCO LN W E L L T O W N R D M E R C E D E S C T PACTIV WAY P R E C I S I O N D R C R O W N L N Map D ata Source: Frederick County, Va. GIS Department, 2015 Data L O C A T I O N A N D Z O N I N G S T O N E W A L L M A G I S T E R I A L D I S T R I C T C B V E N T U R E S , L L C P R O P E R T Y F R E D E R I C K C O U N T Y , V I R G I N I A D A T E : 2 0 1 6 -0 1 -0 7 P R O J E C T I D : 2 0 2 2 C D E S I G N E D B Y : D W E S C A L E : 1 I n c h = 2 0 0 F e e t Le gend CB Ventures, LLC Prope rty, TM 43 -A-48 A Po rtio n o f 43-A-48A To Be Rezon ed Pa rce l Bou ndary Frederick County Zoning B2 (Business, Gen eral D istrist) B3 (Business, Industrial Tran sition District) M1 (Industrial, Light D istrict) RA (R ural A rea District) RP (Resid ential, Performance District) 200 0 200 Feet µ C B V E N T U R E S , L L C P R O P E R T Y C O M M E R C I A L R E Z O N I N G L O C A T I O N A N D Z O N I N G C O M M E R C I A L R E Z O N I N G SITE Winchester §¨¦81 §¨¦81 £¤11 ËÊ37ËÊ37 LOCATION MAP 43 A 48A I n s i d e S W S A I n s i d e U D A Inside SWSA Outside SWSA O u t s i d e S W S A O u t s i d e U D A 1 2 i n . 2 in. 0 in. 6 in. 1 0 i n . 8 i n . 1 6 i n . 20 in. 12 in. 6 i n . 1 0 i n . 2 0 i n . 8 i n . 2 0 i n . 6 i n . 1 2 i n .8 in. 2 0 i n . 2 0 i n . 8 in. 8 i n . 1 2 i n . 8 i n . 8 i n . 20 in. 6 i n . 20 in. 12 in. 8 in. 8 in. 1 2 i n . 6 i n . 6 i n . 8 in. 8 in. 8 i n . 1 2 i n . 1 0 i n . 1 0 i n . 8 i n . 1 2 i n . 8 i n . 8 i n . 8 i n . 2 0 i n . 6 in. 8 i n . 12 in. 8 i n . 8 i n . 1 2 i n . 8 i n . 8 i n . 8 i n . 1 0 in. 1 0 i n . 12 in. 12 in. 20 in. 8 i n . 1 0 in . 8 in. 10 in. 8 i n . 1 2 i n . 8 in. 8 in. 8 in. 8 in. 10 in. 1 0 i n . 1 2 i n . 8 i n . 8 in. 2 0 i n . 8 i n . 8 i n . 12 in. 8 in. 12 in. 1 2 i n . 8 in. 8 i n . 12 in. 8 in. 8 in. 12 in. 8 i n . 2 0 i n . 2 0 i n . 1 2 i n . 10 in. 8 in. 8 i n . 8 i n . 8 in. 6 in. 8 in. 8 i n . 8 i n . 1 2 i n . 12 in. 1 0 i n . 1 2 i n . 1 2 i n . 8 i n . 1 2 i n . 10 in. 8 in. 1 2 i n . 8 i n . 1 0 i n . 12 in. 1 0 i n . 1 2 in. 8 in. 8 i n . 2 0 i n . 12 in. 12 in. 12 in. 8 in. 12 in. 8 i n . 1 2 i n . 1 2 i n . 12 in. 12 in. 8 i n . 1 0 i n . 1 2 i n . 8 i n . 3 i n . 8 i n . 12 in. 0 i n . 6 i n . 2 i n . 2 in. 12 in. 8 i n . 3 in. 6 i n . 8 i n . M A R T I N S B U R G P I K E §¨¦81 §¨¦81 £¤11 ËÊ37 ËÊ37 rs661 rs732 rs861 rs839 rs661 R E D B U D R D L E N O I R D R W E L L T O W N R D M A R K E T S T CIVES LN PACTIV WAY SNOWDEN BRIDGE BLVD NULTON LN E Z R A L N P R E C I S I O N D R C R O W N L N Map D ata Source: Frederick County, Va. GIS Department, 2015 Data; 2016 Water & Sewer Data Courtesy of FCSA S W S A M A P S T O N E W A L L M A G I S T E R I A L D I S T R I C T C B V E N T U R E S , L L C P R O P E R T Y F R E D E R I C K C O U N T Y , V I R G I N I A D A T E : 2 0 1 6 -0 1 -0 7 P R O J E C T I D : 2 0 2 2 C D E S I G N E D B Y : D W E S C A L E : 1 I n c h = 5 0 0 F e e t Le gend CB Ventures, LLC Prope rty, TM 43 -A-48 A Po rtio n o f 43-A-48A To Be Rezon ed Pa rce l Bou ndary Se wer Water Service Area (SWSA) Se wer L ine Wa ter Lin e 500 0 500 Feet µ C B V E N T U R E S , L L C P R O P E R T Y C O M M E R C I A L R E Z O N I N G S W S A M A P C O M M E R C I A L R E Z O N I N G 43 A 48A 695 7 1 0 7 0 5 6 9 0695 690 710 7 1 0 7 1 0 705 7 1 0 7 1 0 7 0 5 7 0 5 700 7 0 0 700700 7 0 0 7 0 0 7 0 0 7 0 0 7 0 0 7 2 5 675 7 0 0 7 2 5 7 0 0 7 0 0 7 0 0 7 0 0 7 0 0 7 0 0 7 0 0 C o n s o l i d a t e d R R C o n s o l i d a t e d R R M A R T I N S B U R G P I K E M A R T I N S B U R G P I K E §¨¦81 §¨¦81 £¤11 rs661 rs839 rs661 R E D B U D R D AMOCO LN W E L L T O W N R D MERCEDES CT PACTIV WAY P R E C I S I O N D R C R O W N L N Map D ata Source: Frederick County, Va. GIS Department, 2015 Data E N V I R O N M E N T A L F E A T U R E S S T O N E W A L L M A G I S T E R I A L D I S T R I C T C B V E N T U R E S , L L C P R O P E R T Y F R E D E R I C K C O U N T Y , V I R G I N I A D A T E : 2 0 1 6 -0 1 -0 7 P R O J E C T I D : 2 0 2 2 C D E S I G N E D B Y : D W E S C A L E : 1 I n c h = 2 0 0 F e e t Le gend CB Ventures, LLC Prope rty, TM 43 -A-48 A Po rtio n o f 43-A-48A To Be Rezon ed Pa rce l Bou ndary Lake or Pon d Wetlan d 100 Year Floodp lain Stream 5 Foot Intermediate Contours 25 Foot Index Contours 200 0 200 Feet µ C B V E N T U R E S , L L C P R O P E R T Y C O M M E R C I A L R E Z O N I N G E N V I R O N M E N T A L F E A T U R E S C O M M E R C I A L R E Z O N I N G 43 A 48A 6C 32B 6C M A R T I N S B U R G P I K E M A R T I N S B U R G P I K E §¨¦81 §¨¦81 £¤11 £¤11 rs839 rs661 rs661 AMOCO LN R E D B U D R D W E L L T O W N R D PACTIV WAY Map D ata Source: Frederick County, Va. GIS Department, 2015 Data S O I L S M A P S T O N E W A L L M A G I S T E R I A L D I S T R I C T C B V E N T U R E S , L L C P R O P E R T Y F R E D E R I C K C O U N T Y , V I R G I N I A D A T E : 2 0 1 6 -0 1 -0 7 P R O J E C T I D : 2 0 2 2 C D E S I G N E D B Y : D W E S C A L E : 1 I n c h = 1 0 0 F e e t Le gend CB Ventures, LLC Prope rty, TM 43 -A-48 A Po rtio n o f 43-A-48A To Be Rezon ed Pa rce l Bou ndary NRCS Soils 6C:C ARB O-OAKLE T SILT LOA MS, V ERY ROC KY, 2 TO 15 PERC ENT SL OPES 32B:O AKLE T SILT LOAM , 2 TO 7 PE RCEN T SLOP ES 100 0 100 Feet µ C B V E N T U R E S , L L C P R O P E R T Y C O M M E R C I A L R E Z O N I N G S O I L S M A P C O M M E R C I A L R E Z O N I N G m m m m mmmm mmm mm mm m m m m m à à à à à à à à à à à à à àà à ààà à à à à à à à à à à à à à à à à ààà à à à à à à à à à à à à à à à à à à à à à à à 43 A 48A Third Winchester Third Winchester 34-955 34-727 C o n s o l i d a t e d R R B a l t i m o r e & O h i o R R C o n s o l i d a t e d R R C o n s o l i d a t e d R R C o n s o l i d a t e d R R Baltimore & Ohio RR B a l t i m o r e & O h i o R R C o n s o l i d a t e d R R Baltimore & Ohio RR B a l t i m o r e & O h i o R R M A R T I N S B U R G P I K E §¨¦81 §¨¦81 £¤11 ËÊ37 ËÊ37 rs661 rs732 rs839 rs861 rs862 rs661 R E D B U D R D L E N O I R D R MCGHEE RD W E L L T O W N R D M A R K E T S T AMOCO LN PARK CENTER DR CIVES LN MERCHANT ST PACTIV WAY SNOWDEN BRIDGE BLVD NULTON LN E Z R A L N P R E C I S I O N D R C R O W N L N FULL HOUSE DR Map D ata Source: Frederick County, Va. GIS Department, 2015 Data H I S T O R I C F E A T U R E S S T O N E W A L L M A G I S T E R I A L D I S T R I C T C B V E N T U R E S , L L C P R O P E R T Y F R E D E R I C K C O U N T Y , V I R G I N I A D A T E : 2 0 1 6 -0 1 -0 7 P R O J E C T I D : 2 0 2 2 C D E S I G N E D B Y : D W E S C A L E : 1 I n c h = 5 0 0 F e e t Le gend CB Ventures, LLC Prope rty, TM 43 -A-48 A Po rtio n o f 43-A-48A To Be Rezon ed Pa rce l Bou ndary à Civil War En ca mp me nt m Civil War Fort Cemete ry Rura l Landmark [e 34-727 Rutherford's Farm [e 34-955 Valley School Civil War Battl efi elds Third Winchester Core A rea 500 0 500 Feet µ C B V E N T U R E S , L L C P R O P E R T Y C O M M E R C I A L R E Z O N I N G H I S T O R I C F E A T U R E S C O M M E R C I A L R E Z O N I N G 43 A 48 43 A 48A 43 A 47 43 A 49 43 A 50 43 A 50A 43 A 46 4 3 C 4 7 4 3 C 4 3 4 3 C 4 8 4 3 C 4 1 4 3 C 4 543C 4 4 4 3 C 4 2 4 3 C 4 6 43C 4 10 M A R T I N S B U R G P I K E M A R T I N S B U R G P I K E §¨¦81 §¨¦81 £¤11£¤11 rs661 rs839 rs661 R E D B U D R D AMOCO LN W E L L T O W N R D PACTIV WAY P R E C I S I O N D R Map D ata Source: Frederick County, Va. GIS Department, 2015 Data A D J O I N I N G P R O P E R T I E S M A P S T O N E W A L L M A G I S T E R I A L D I S T R I C T C B V E N T U R E S , L L C P R O P E R T Y F R E D E R I C K C O U N T Y , V I R G I N I A D A T E : 2 0 1 6 -0 1 -0 7 P R O J E C T I D : 2 0 2 2 C D E S I G N E D B Y : D W E S C A L E : 1 I n c h = 1 5 0 F e e t Le gend CB Ventures, LLC Prope rty, TM 43 -A-48 A Po rtio n o f 43-A-48A To Be Rezon ed Ad join ing & Sub ject Prope rtie s Pa rce l Bou ndary 150 0 150 Feet µ C B V E N T U R E S , L L C P R O P E R T Y C O M M E R C I A L R E Z O N I N G A D J O I N I N G P R O P E R T I E S M A P C O M M E R C I A L R E Z O N I N G CB VENTURES, LLC PROPERTY Adjoining Properties Listing Tax Map Number Owner Mailing Address City & State ZIP Acres 0 0 43 A 46 PINE MOTOR COMPANY INC 2224 WILSON BLVD WINCHESTER, VA 22601 0.71 43 A 47 PINE MOTOR CO INC 2224 WILSON BLVD WINCHESTER, VA 22601 1.83 43 A 48 KREMER PROPERTIES INC, C/O SHEETZ #309 ATTN JODY BARTKO 5700 6TH AVE ALTOONA, PA 16602 2.34 43 A 48A CB VENTURES LLC 415 CECIL ST WINCHESTER, VA 22601 4.98 43 A 49 WELLTOWN PIKE LLC 2150 S LOUDOUN ST WINCHESTER, VA 22601 1.46 43 A 50 AADESH LLC 1593 MARTINSBURG PIKE WINCHESTER, VA 22603 1.4 43 A 50A RDM HOSPITALITY LLC 1601 MARTINSBURG PIKE WINCHESTER, VA 22603 3.38 43C 4 1 DUNIVAN DAVID E 140 AMOCO LN WINCHESTER, VA 22603 0.5 43C 4 2 SALES JERRY A, SALES THERESA L 117 WESTWOOD CIR WINCHESTER, VA 22602 0.57 43C 4 3 ISLAMIC SOCIETY OF WINCHESTER PO BOX 4440 WINCHESTER, VA 22604 0.57 43C 4 4 GREENE JOHN B SR, GREENE REBECCA R 168 AMOCO LN WINCHESTER, VA 22603 0 43C 4 5 BROY ROBERT EUGENE TRUSTEE, BROY SUE ANN TRUSTEE 758 BOOM RD BERRYVILLE, VA 22611 0.5 43C 4 6 SHANHOLTZ DAVID L, SHANHOLTZ LA RHONDA T 188 AMOCO LN WINCHESTER, VA 22603 0.57 43C 4 7 JOBE MARY A 8960 N FREDERICK PIKE CROSS JUNCTION, VA 22625 0.75 43C 4 8 JOBE MARY A 8960 N FREDERICK PIKE CROSS JUNCTION, VA 22625 0.75 43C 4 10 JOBE MARY A 8960 N FREDERICK PIKE CROSS JUNCTION, VA 22625 0.11 Source: Frederick County GIS, 2015 Data Sorted by Tax Map Number D REZONING APPLICATION #06-16 SEMPELES PROPERTY Staff Report for the Planning Commission Prepared: June 6, 2016 Staff Contact: Candice E. Perkins, AICP, CZA, Assistant Director Reviewed Action Planning Commission: 06/15/16 Pending Board of Supervisors: 06/22/16 Pending PROPOSAL: To revise proffers associated with Rezoning #02-04. This revision relates to the “on site development” sections of the proffers for the M1 (Light Industrial) District zoned portion of the site. The Applicant is requesting to revise the proffers to allow the use of tilt-up concrete walls and to remove proffers that have been completed. LOCATION: The site is located adjacent to Martinsburg Pike (Route 11), approximately 250 feet north of the intersection of Woodbine Road (Route 669) and Martinsburg Pike. EXECUTIVE SUMMARY & STAFF CONCLUSION FOR THE 06/15/16 PLANNING COMMISSION MEETING: This request to amend the proffer statement for the Sempeles Property (Whitehall Commerce Center) to allow the use of concrete tilt-up walls within the M1 (Light Industrial) Zoned portion of the property. The site was originally rezoned in 2004 to the M1 District and the B2 (General Business) District with proffers. Those proffers limited the façade materials to concrete masonry (CMU) brick, architectural block, dryvit or other simulated stucco, real or simulated wood or glass. The Applicant has also updated the proffer to remove improvements that have been previously completed. It should be noted that this proffer amendment only applies to the M1 zoned parcel, the parcels that were rezoned to the B2 District will still be covered by the 2004 proffer statement. The industrial zoning for the property continues to be consistent with the land use identified in the 2030 Comprehensive Plan and the Northeast Land Use Plan and the property is within the Sewer and Water Service Area (SWSA). The impacts associated with the change of use are very limited; no additional impacts to Frederick County or the surrounding property owners are anticipated. A recommendation regarding this rezoning application to the Board of Supervisors would be appropriate. The Applicant should be prepared to adequately address all concerns raised by the Planning Commission. Rezoning # 06-16 June 6, 2016 Page 2 This report is prepared by the Frederick County Planning Staff to provide information to the Planning Commission and the Board of Supervisors to assist them in making a decision on this application. It may also be useful to others interested in this zoning matter. Unresolved issues concerning this application are noted by staff where relevant throughout this staff report. Reviewed Action Planning Commission: 06/15/16 Pending Board of Supervisors: 06/22/16 Pending PROPOSAL: To revise proffers associated with Rezoning #02-04. This revision relates to the “on site development” sections of the proffers for the M1 (Light Industrial) District zoned portion of the site. The Applicant is requesting to revise the proffers to allow the use of tilt-up concrete walls and to remove proffers that have been completed. LOCATION: The site is located adjacent to Martinsburg Pike (Route 11), approximately 250 feet north of the intersection of Woodbine Road (Route 669) and Martinsburg Pike. MAGISTERIAL DISTRICT: Stonewall PROPERTY ID NUMBERS: 34-A-4 PROPERTY ZONING: M1 (Light Industrial)) District PRESENT USE: Vacant ADJOINING PROPERTY ZONING & PRESENT USE: North: Berkeley County, WV Use: Vacant/Residential South: RA (Rural Areas) Use: Residential M1 (Light Industrial) Use: Industrial East: B2 (General Business) Use: Commercial/Vacant RA (Rural Areas) Use: Residential West: RA (Rural Areas) Use: Residential/Agricultural Rezoning # 06-16 June 6, 2016 Page 3 REVIEW EVALUATIONS: Planning & Zoning: 1) Site History The original Frederick County zoning map (U.S.G.S. Inwood Quadrangle) identifies the subject parcel as being zoned A-2 (Agricultural General). The County’s agricultural zoning districts were combined to form the RA (Rural Areas) District upon adoption of an amendment to the Frederick County Zoning Ordinance on May 10, 1989. The corresponding revision of the zoning map resulted in the re-mapping of the subject properties and all other A-1 and A-2 zoned land to the RA District. On April 28, 2004 the Board of Supervisors approved Rezoning #02-04 for the Sempeles Property, which rezoned the property to the M1 (Light Industrial) District with proffers. 2) Comprehensive Policy Plan The 2030 Comprehensive Plan is the guide for the future growth of Frederick County. The 2030 Comprehensive Plan is an official public document that serves as the community's guide for making decisions regarding development, preservation, public facilities and other key components of community life. The primary goal of this plan is to protect and improve the living environment within Frederick County. It is in essence a composition of policies used to plan for the future physical development of Frederick County. The Area Plans, Appendix I of the 2030 Comprehensive Plan, are the primary implementation tool and will be instrumental to the future planning efforts of the County. Land Use. The 2030 Comprehensive Plan and the Northeast Frederick Land Use Plan identify this property with an industrial land use designation. The current M1 (Light Industrial) Zoning of the subject property is supported by the Comprehensive Plan. The property is also located within the (Sewer and Water Service Area (SWSA)). 3) Proffer Statement – Dated June 2, 2016:  Street Improvements: Proffers “a” and “c” have been removed as they have been completed.  Landscape Design Features: the bulleted proffer has been deleted as it applies to the B2 zoned properties still covered by the 2004 proffer.  On Site development: Proffer “a” has been modified to allow “tilt-up concrete walls” to the permitted façade materials.  Monetary Contribution to Offset Impacts of Development: This proffer has been removed as the monetary proffer has already been paid. Rezoning # 06-16 June 6, 2016 Page 4 EXECUTIVE SUMMARY & STAFF CONCLUSION FOR THE 06/15/16 PLANNING COMMISSION MEETING: This request to amend the proffer statement for the Sempeles Property (Whitehall Commerce Center) to allow the use of concrete tilt-up walls within the M1 (Light Industrial) Zoned portion of the property. The site was originally rezoned in 2004 to the M1 District and the B2 (General Business) District with proffers. Those proffers limited the façade materials to concrete masonry (CMU) brick, architectural block, dryvit or other simulated stucco, real or simulated wood or glass. The Applicant has also updated the proffer to remove improvements that have been previously completed. It should be noted that this proffer amendment only applies to the M1 zoned parcel, the parcels that were rezoned to the B2 District will still be covered by the 2004 proffer statement. The industrial zoning for the property continues to be consistent with the land use identified in the 2030 Comprehensive Plan and the Northeast Land Use Plan and the property is within the Sewer and Water Service Area (SWSA). The impacts associated with the change of use are very limited; no additional impacts to Frederick County or the surrounding property owners are anticipated. A recommendation regarding this rezoning application to the Board of Supervisors would be appropriate. The Applicant should be prepared to adequately address all concerns raised by the Planning Commission. J. WAYNEADAMSSubdivision 0111 §¨¦81 §¨¦81 ST669 BERKELEY COUNTYWEST VIRGINIA 34 A 4 4428MARTINSBURGPIKE 276WOODBINE RD 4442MARTINSBURGPIKE 331WOODBINE RD 4462MARTINSBURGPIKE 4469MARTINSBURGPIKE 4470MARTINSBURGPIKE 4478MARTINSBURGPIKE 4491MARTINSBURGPIKE4489MARTINSBURGPIKE4481MARTINSBURGPIKE 208WOODBINE RD4496MARTINSBURGPIKE 4504MARTINSBURGPIKE 154WOODBINE RD 160WOODBINE RD 174WOODBINE RD 184WOODBINE RD 200WOODBINE RD 4514MARTINSBURGPIKE 140WOODBINE RD 146WOODBINE RD 3191WOODSIDE RD 4532MARTINSBURGPIKE 4535MARTINSBURGPIKE 4547MARTINSBURGPIKE4543MARTINSBURGPIKE 4553MARTINSBURGPIKE 4552MARTINSBURGPIKE 4568MARTINSBURGPIKE 4578MARTINSBURGPIKE 4586MARTINSBURGPIKE 4600MARTINSBURGPIKE 4610MARTINSBURGPIKE 4622MARTINSBURGPIKE 4692MARTINSBURGPIKE 4663MARTINSBURGPIKE 4713MARTINSBURGPIKE 4740MARTINSBURGPIKE 1441RESTCHURCH RD 4768MARTINSBURGPIKE4754MARTINSBURGPIKE 4781MARTINSBURGPIKE 4784MARTINSBURGPIKE 4804MARTINSBURGPIKE 4810MARTINSBURGPIKE 4822MARTINSBURGPIKE 4836MARTINSBURGPIKE REST CHURC H R D MAR T I N S B U R G PIK E WOODBINE R D Applications Parcels Sewer and Water Service Area Building Footprints B1 (Business, Neighborhood District) B2 (Business, General Distrist) B3 (Business, Industrial Transition District) EM (Extractive Manufacturing District) HE (Higher Education District) M1 (Industrial, Light District) M2 (Industrial, General District) MH1 (Mobile Home Community District) MS (Medical Support District) OM (Office - Manufacturing Park) R4 (Residential Planned Community District) R5 (Residential Recreational Community District) RA (Rural Area District) RP (Residential Performance District) I Note:Frederick County Dept ofPlanning & Development107 N Kent StSuite 202Winchester, VA 22601540 - 665 - 5651Map Created: June 6, 2016Staff: cperkins WOODBINE RD REST CHURCH RD WOO D S I D E R D ZA C H A R Y A N N L N 0111 REZ # 06 - 16Sempeles PropertyPIN:34 - A - 4Proffer Amendment 0 590 1,180295 Feet REZ # 06 - 16Sempeles PropertyPIN:34 - A - 4Proffer Amendment REZ #06-16 §¨¦81 BERKELEY COUNTYWEST VIRGINIA J. WAYNEADAMSSubdivision 0111 §¨¦81 §¨¦81 ST669 BERKELEY COUNTYWEST VIRGINIA 34 A 4 4428MARTINSBURGPIKE 4442MARTINSBURGPIKE 276WOODBINE RD 331WOODBINE RD 4470MARTINSBURGPIKE 4462MARTINSBURGPIKE 4491MARTINSBURGPIKE4481MARTINSBURGPIKE 4478MARTINSBURGPIKE 4496MARTINSBURGPIKE 4504MARTINSBURGPIKE 154WOODBINE RD160WOODBINE RD166WOODBINE RD 174WOODBINE RD 184WOODBINE RD200WOODBINE RD 208WOODBINE RD 4514MARTINSBURGPIKE 4532MARTINSBURGPIKE 140WOODBINE RD 146WOODBINE RD 3191WOODSIDE RD 4535MARTINSBURGPIKE 4543MARTINSBURGPIKE 4552MARTINSBURGPIKE 4547MARTINSBURGPIKE 4553MARTINSBURGPIKE 4568MARTINSBURGPIKE 4578MARTINSBURGPIKE 4586MARTINSBURGPIKE 4592MARTINSBURGPIKE 4600MARTINSBURGPIKE 4610MARTINSBURGPIKE 4622MARTINSBURGPIKE 4692MARTINSBURGPIKE 4663MARTINSBURGPIKE 4713MARTINSBURGPIKE 4740MARTINSBURGPIKE 1441RESTCHURCH RD 4754MARTINSBURGPIKE 4781MARTINSBURGPIKE 4768MARTINSBURGPIKE 4804MARTINSBURGPIKE4784MARTINSBURGPIKE 4822MARTINSBURGPIKE4810MARTINSBURGPIKE 4836MARTINSBURGPIKE REST CHURC H R D MAR T I N S B U R G PIKE WOODBINE R D Applications Parcels Sewer and Water Service Area Building Footprints I Note:Frederick County Dept ofPlanning & Development107 N Kent StSuite 202Winchester, VA 22601540 - 665 - 5651Map Created: June 6, 2016Staff: cperkins WOODBINE RD REST CHURCH RD WOO D S I D E R D ZA C H A R Y A N N L N 0111 REZ # 06 - 16Sempeles PropertyPIN:34 - A - 4Proffer Amendment 0 590 1,180295 Feet REZ # 06 - 16Sempeles PropertyPIN:34 - A - 4Proffer Amendment REZ #06-16 §¨¦81 BERKELEY COUNTYWEST VIRGINIA WHITEHALLBUSINESS PARKSubdivision 0111 §¨¦81 §¨¦81 ST669 ST669 BERKELEY COUNTYWEST VIRGINIA 34 A 4 351ZACHARYANN LN 280WOODBINE RD 276WOODBINE RD 4364MARTINSBURGPIKE 4374MARTINSBURGPIKE 4382MARTINSBURGPIKE 1420RESTCHURCH RD 4392MARTINSBURGPIKE 4407MARTINSBURGPIKE 4400MARTINSBURGPIKE 4441MARTINSBURGPIKE 4420MARTINSBURGPIKE 4442MARTINSBURGPIKE 331WOODBINE RD 321ZACHARYANN LN 4455MARTINSBURGPIKE 4470MARTINSBURGPIKE 4462MARTINSBURGPIKE 4491MARTINSBURGPIKE 4469MARTINSBURGPIKE 4481MARTINSBURGPIKE 4478MARTINSBURGPIKE 4489MARTINSBURGPIKE 4496MARTINSBURGPIKE 4504MARTINSBURGPIKE 154WOODBINE RD 166WOODBINE RD 174WOODBINE RD 184WOODBINE RD200WOODBINE RD 208WOODBINE RD 4514MARTINSBURGPIKE 4532MARTINSBURGPIKE 140WOODBINE RD 3191WOODSIDE RD 4535MARTINSBURGPIKE 1530RESTCHURCH RD 4547MARTINSBURGPIKE 4543MARTINSBURGPIKE 4553MARTINSBURGPIKE 4552MARTINSBURGPIKE 4578MARTINSBURGPIKE4568MARTINSBURGPIKE 4592MARTINSBURGPIKE 4610MARTINSBURGPIKE 4622MARTINSBURGPIKE 4692MARTINSBURGPIKE 4663MARTINSBURGPIKE 4713MARTINSBURGPIKE 4740MARTINSBURGPIKE 1441RESTCHURCH RD 1345RESTCHURCH RD 4754MARTINSBURGPIKE 4781MARTINSBURGPIKE 4768MARTINSBURGPIKE 4784MARTINSBURGPIKE 4804MARTINSBURGPIKE 4810MARTINSBURGPIKE 4836MARTINSBURGPIKE REST CHURC H R D ZA C H A R Y AN N L N MA R T I N S B U R G PIK E WOODBINE RD Applications Parcels Sewer and Water Service Area Building FootprintsLong Range Land Use Residential Neighborhood Village Urban Center Mobile Home Community Business Highway Commercial Mixed-Use Mixed Use Commercial/Office Mixed Use Industrial/Office Industrial Warehouse Heavy Industrial Extractive Mining Commercial Rec Rural Community Center Fire & Rescue Historic Institutional Planned Unit Development Park Recreation School Employment Airport Support Area B2 / B3 Residential, 4 u/a High-Density Residential, 6 u/a High-Density Residential, 12-16 u/a Rural Area Interstate Buffer Landfill Support Area Natural Resources & Recreation Environmental & Recreational Resources I Note:Frederick County Dept ofPlanning & Development107 N Kent StSuite 202Winchester, VA 22601540 - 665 - 5651Map Created: June 6, 2016Staff: cperkins WOODBINE RD REST CHURCH RD WOO D S I D E R D ZA C H A R Y A N N L N 0111 REZ # 06 - 16Sempeles PropertyPIN:34 - A - 4Proffer Amendment 0 750 1,500375 Feet REZ # 06 - 16Sempeles PropertyPIN:34 - A - 4Proffer Amendment REZ #06-16 §¨¦81 BERKELEY COUNTYWEST VIRGINIA