PC 02-15-17 Meeting Agenda AGENDA
FREDERICK COUNTY PLANNING COMMISSION
The Board Room
Frederick County Administration Building
Winchester, Virginia
February 15, 2017
7:00 P.M. CALL TO ORDER TAB
1) Adoption of Agenda: Pursuant to established procedures, the Planning Commission
should adopt the Agenda for the meeting ................................................................ (no tab)
2) December 7, 2016 and January 4, 2017 Meeting Minutes ............................................. (A)
3) Committee Reports .................................................................................................. (no tab)
4) Citizen Comments ................................................................................................... (no tab)
PUBLIC HEARING
5) Rezoning #02-17 for Express Oil Change & Tire Engineers, submitted by Greenway
Engineering, Inc., to rezone 0.604+/- acres from the B2 (General Business) District to
the B3 (Industrial Transition) District with proffers. The property is located on the west
side of Front Royal Pike (Route 522 South) and immediately south of the IHOP
Restaurant approximately 1,000’ south of the Interstate 81 Exit 313, in the Shawnee
Magisterial District, and is identified by Property Identification Number 64-A-1F.
Mrs. Perkins ..................................................................................................................... (B)
ACTION ITEM
6) Rezoning #01-17 DMJ Holding L.L.C. submitted by Painter-Lewis, P.L.C., to revise
proffers associated with Rezoning #05-09. This minor proffer amendment proposes to
remove a proffer which currently prohibits fast food restaurants with drive through
service windows. If approved the site would permit the construction of fast food
restaurants with drive through service windows if all other requirements are met. All
other proffers remain the same. The properties are located at the northwest corner of the
intersection of Route 50 and Route 781 (Custer Avenue) in the Shawnee Magisterial
District, and are identified by Property Identification Numbers 64A-4-16A, 64A-4-16,
64A-4-17, 64A-4-18, 64-A-4-19 and 64A-4-20.
Mrs. Perkins ..................................................................................................................... (C)
INFORMATION/DISCUSSION ITEMS
7) Master Development Plan #01-17 for Freedom Manor submitted by Pennoni
Associates Inc. on behalf of Freedom Manor, L.L.C. This application seeks to develop
47.54 acres of land zoned RP (Residential Performance) with 90 units single family
detached and 100 units single family attached. The subject properties are located east and
adjacent to Papermill Road (Route 644) and approximately 2,300 feet north/west of the
existing signalized intersection of Front Royal Pike (Route 522) and Papermill Road
(Route 644) in the Shawnee Magisterial District, and are identified by Property
Identification Numbers 64-A-19, 64-A-20, and 64-A-23. Please note this item is
presented for informational purposes only.
Mr. Klein .......................................................................................................................... (D)
8) Master Development Plan #03-17 for Southern Hills Phase II submitted by Greenway
Engineering, Inc., on behalf of Arcadia Communities, L.L.C. This application seeks to
develop 40.36 acres of land zoned RP (Residential Performance) and B2 (General
Business) with up to 130 units single family detached cluster and right-of-way reserve
area. The subject properties is located south of Stephens City, east side of Town Run Lane
(Route 1012) in the Opequon Magisterial District, and is identified by Property
Identification Number 85D-1-1-95. Please note this item is presented for informational
purposes only.
Mr. Klein .......................................................................................................................... (E)
9) Annual Report
Other
Adjourn
-2-
Commonly Used Planning Agenda Terms
Meeting format
Citizen Comments – The portion of the meeting agenda offering an opportunity for the public to provide
comment to the Planning Commission on any items not scheduled as public hearing items.
Public Hearing– A specific type of agenda item, required by State law, which incorporates public comment as
a part of that item prior to Planning Commission or Board of Supervisors action. Public hearings are held for
items such as: Comprehensive Plan policies and amendments; Zoning and Subdivision Ordinance amendments;
and Rezoning and Conditional Use Permit applications. Following the Public Hearing, the Planning
Commission will take action on the item (see below).
Action Item–There are both public hearing and non-public hearing items on which the Planning Commission
takes action. Depending on the actual item, the Planning Commission may approve, deny, table, or forward a
recommendation to the Board of Supervisors regarding the agenda item. No public comment is accepted during
the Action Item portion of the agenda.
Information/Discussion Item– The portion of the meeting agenda where items are presented to the Planning
Commission for information and discussion. The Planning Commission may offer comments and suggestions,
but does not take action on the agenda item. No public comment is accepted during the Information/Discussion
Item portion of the agenda.
Planning Terminology
Urban Development Area or UDA – The UDA is the county’s urban growth boundary identified in the
Comprehensive Plan in which more intensive forms of residential development will occur. The UDA is an area
of the county where community facilities and public services are more readily available and are provided more
economically.
Sewer and Water Service Area or SWSA – The SWSA is the boundary identified in the Comprehensive Plan
in which public water and sewer is or can be provided. The SWSA is consistent with the UDA in many
locations; however the SWSA may extend beyond the UDA to promote commercial, industrial, and institutional
land uses in area where residential land uses are not desirable.
Land Use – Land Use is the nomenclature which refers to the type of activity which may occur on an area of
land. Common land use categories include: agricultural, residential, commercial, and industrial.
Zoning District - Zoning district refers to a specific geographic area that is subject to land use standards.
Frederick County designates these areas, and establishes policies and ordinances over types of land uses,
density, and lot requirements in each zone. Zoning is the main planning tool of local government to manage the
future development of a community, protect neighborhoods, concentrate retail business and industry, and
channel traffic.
Rezoning – Rezoning is the process by which a property owner seeks to implement or modify the permitted
land use activities on their land. A rezoning changes the permitted land use activities within the categories
listed above under Land Use.
Conditional Use Permit or CUP - A CUP allows special land uses which may be desirable, but are not always
appropriate based on a location and surrounding land uses. The CUP requested use, which is not allowed as a
matter of right within a zoning district, is considered through a public hearing process and usually contains
conditions to minimize any impacts on surrounding properties.
Ordinance Amendment – The process by which the County Code is revised. Often the revisions are the result
of a citizen request with substantial justification supporting the change. Amendments ultimately proceed
through a public hearing prior to the PC forwarding a recommendation to the Board of Supervisors.
County Bodies Involved
Board of Supervisors or BOS - Frederick County is governed by an elected Board of Supervisors composed of
seven members, one from each magisterial district, and one chairman-at-large. The Board of Supervisors is the
policy-making body of the county. Functions of the Board of Supervisors related to planning include making
land use decisions, and establishing growth and development policies.
Planning Commission or PC - The PC is composed of 13 members, two from each magisterial districts and one
at-large, appointed by the Board of Supervisors. The Planning Commission serves in an advisory capacity to the
Board of Supervisors which then takes final action on all planning, zoning, and land use matters.
Comprehensive Plans and Programs Committee or CPPC – The CPPC is a major committee of the PC whose
primary responsibility is to formulate land use policies that shape the location and timing of development
throughout the County. Included in the work are studies of specific areas to develop guidelines for future land
use within those areas. The CPPC also considers requests for amendments to the Comprehensive Plan.
Decisions by CPPC are then forwarded to the PC for consideration.
Development Review and Regulations Committee or DRRC – The DRRC is the second major committee of the
PC whose primary responsibilities involve the implementation of the Comprehensive Plan in the form of
Zoning and Subdivision ordinance requirements. Requests to amend the ordinances to the DRRC are made by
the Board of Supervisors, Planning Commission, local citizens, businesses, or organizations. DRRC decisions
are also forwarded to the PC for consideration.
A
Frederick County Planning Commission Page 3393
Minutes of December 7, 2016
MEETING MINUTES
OF THE
FREDERICK COUNTY PLANNING COMMISSION
Held in the Board Room of the Frederick County Administration Building at 107 North Kent Street in
Winchester, Virginia on December 7, 2016.
PRESENT: June M. Wilmot, Chairman/Member at Large; Roger L. Thomas, Vice
Chairman/Opequon District; Robert S. Molden, Opequon District; Gary R. Oates, Stonewall District;
William H. Cline, Stonewall District; Lawrence R. Ambrogi, Shawnee District; H. Paige Manuel,
Shawnee District; Greg L. Unger, Back Creek District; Charles F. Dunlap, Red Bud District; Christopher
M. Mohn, Red Bud District; Kevin Kenney, Gainesboro District; Charles E. Triplett, Gainesboro District;
Roderick B. Williams, County Attorney.
ABSENT: J. Rhodes Marston, Back Creek District
STAFF PRESENT: Michael T. Ruddy, Director; Candice E. Perkins, Assistant Director; and Shannon
L. Conner, Administrative Assistant.
CALL TO ORDER
Chairman Wilmot called the December 7, 2016 meeting of the Frederick County
Planning Commission to order at 7:00 p.m. Chairman Wilmot commenced the meeting by inviting
everyone to join in a moment of silence.
ADOPTION OF AGENDA
Upon motion made by Commissioner Oates and seconded by Commissioner Thomas, the
Planning Commission unanimously adopted the amended agenda for this evening’s meeting.
MINUTES
Upon motion made by Commissioner Oates and seconded by Commissioner Manuel, the
Planning Commission unanimously adopted the minutes from the October 19, 2016 meeting.
Frederick County Planning Commission Page 3394
Minutes of December 7, 2016
COMMITTEE REPORTS
Transportation Committee – Mtg. 11-28-16
Commissioner Oates reported the committee discussed the following at their November
meeting: 2035 Comprehensive Plan Update; Welltown Road and Rest Church Road traffic concerns
update; Warren County Truck Restriction request for Reliance Road; County projects update.
City of Winchester – Mtg. 11-15-16 and 12-6-16
Dr. Richard Fieo, Winchester City Planning Commission Liaison, reported the
Commission recommended approval for several items including: Conditional Use Permit for Ateethi
Services LLC for extended stay lodging; Preliminary Subdivision for Ricketts Business Center, LLC;
Conditional Use Permit submitted by Acme Real Estate Holdings LLC for a pet daycare center;
Conditional Use Permit for Bapa Hospitality LLC for extended stay lodging; and an Ordinance to rezone
2.34 acres of land at 217 East Southwerk Street from Medium Density Residential District to Medium
Density Residential District with Planned Unit Development Overlay.
Board of Supervisors – Mtg. 11-9-16
Board of Supervisors’ Liaison, Supervisor Blaine Dunn reported the Board approved the
following items at their meeting: CUP #12-16 for Alma and Ronald Carter (off premise farm market);
REZ #11-16 for Southern Hills Phase 2 (proffer amendment). The Board also discussed and Ordinance
Amendment for Indoor Recreation in the M1 District and an Ordinance Amendment for Minor Site Plan
Threshold.
-------------
CITIZEN COMMENTS
Chairman Wilmot called for citizen comments on any subject not currently on the
Planning Commission’s agenda or any item that is solely a discussion item for the Commission. No one
came forward to speak and Chairman Wilmot closed the citizen comments portion of the meeting.
-------------
PUBLIC HEARING
Ordinance Amendment to the Frederick County Code – Chapter 144 Subdivision of Land,
ARTICLE V – DESIGN STANDARDS, §144-31. Rural Subdivision. Revision to the Frederick
County Subdivision of Land to reduce the right-of-way width mandatory to create a family lot
subdivision per the Code of Virginia.
Action – Recommend Approval
Frederick County Planning Commission Page 3395
Minutes of December 7, 2016
Assistant Director, Candice E. Perkins reported this is a proposed amendment to the
Subdivision Ordinance to update the minimum ROW (Right-of-Way) width necessary to create a family
division lot. She noted the current Ordinance requires a 50’ ROW. Ms. Perkins continued, the Code of
Virginia states that a 20’ROW is the maximum that can be required and the Frederick County Ordinance
has been revised to reflect a 20’ ROW requirement.
Ms. Perkins reported the DRRC discussed this amendment at their August 2016 meeting
and agreed with the proposed change. She concluded the Planning Commission discussed and agreed
with this at their October 5, 2016 meeting and the Board of Supervisors discussed and agreed at their
October 26, 2016 meeting.
Chairman Wilmot called for anyone who wished to speak regarding this Public Hearing
to come forward at this time. No one came forward to speak and Chairman Wilmot closed the public
comment portion of the hearing.
Upon motion made by Commissioner Dunlap, and seconded by Commissioner Cline
BE IT RESOLVED, the Frederick County Planning Commission does hereby unanimously recommend
approval of the Ordinance Amendment to the Frederick County Code – Chapter 144 Subdivision of Land,
ARTICLE V – DESIGN STANDARDS, §144-31 Rural Subdivision. Revision to the Frederick County
Subdivision of Land to reduce the right-of-way width mandatory to create a family lot subdivision per the
Code of Virginia.
(Note: Commissioner Marston was absent from the meeting)
Ordinance Amendment to the Frederick County Code – Chapter 165 Zoning, ARTICLE IX
NONCONFORMING USES, STRUCTURES, AND SIGNS, Part 901- Nonconforming Uses,
Structures, and Signs, §165-901.01 Continuation of pre-existing uses, structures, and signs. Off-
Street Parking, Loading and Access, §165-202.01 Off-Street Parking; Parking Lots. Revisions to
the Frederick County Zoning Ordinance to increase the timeframe a nonconforming use can be
discontinued before it is deemed abandoned per the Code of Virginia.
Action – Recommend Approval
Assistant Director, Candice E. Perkins reported this is a proposed amendment to the
Zoning Ordinance as it pertains to the discontinuance of nonconforming uses. She explained currently the
Ordinance states that if a nonconforming use is discontinued for a period exceeding one year it is deemed
abandoned. Ms. Perkins continued the Code of Virginia, states that a two year period is required before a
use can be deemed abandoned and this revision is proposed to change the Zoning Ordinance requirement
to two years in conformance with the Code of Virginia.
Ms. Perkins concluded the DRRC discussed this amendment at their August 2016
meeting and agreed with the proposed change. The Planning Commission discussed and agreed with the
change at their October 5, 2016 meeting; and the Board of Supervisors discussed and agreed with the
proposed changes at their October 26, 2016 meeting.
Chairman Wilmot called for anyone who wished to speak regarding this Public Hearing
to come forward at this time. No one came forward to speak and Chairman Wilmot close d the public
comment portion of the hearing.
Frederick County Planning Commission Page 3396
Minutes of December 7, 2016
Upon motion made by Commissioner Oates, and seconded by Commissioner Manuel
BE IT RESOLVED, the Frederick County Planning Commission does hereby unanimously recommend
approval of the Ordinance Amendment to the Frederick County Code – Chapter 165 Zoning, ARTICLE
IX NONCONFORMING USES, STRUCTURES, AND SIGNS, Part 901- Nonconforming Uses,
Structures, and Signs, §165-901.01 Continuation of pre-existing uses, structures, and signs. Off-Street
Parking, Loading and Access, §165-202.01 Off-Street Parking; Parking Lots. Revisions to the Frederick
County Zoning Ordinance to increase the timeframe a nonconforming use can be discontinued before it is
deemed abandoned per the Code of Virginia.
(Note: Commissioner Marston was absent from the meeting)
Ordinance Amendment to the Frederick County Code – Chapter 165 Zoning, ARTICLE VI
BUSINESS AND INDUSTRIAL ZONING DISTRICTS, Part 603 – B2 General Business District,
§165-603.02 Allowed Uses. Revisions to the Frederick County Zoning Ordinance to eliminate
Motorcycle Repair in the B2 (General Business) District and allow this use in the B2, M1, and M2
Districts.
Action – Recommend Approval
Assistant Director, Candice E. Perkins reported this is a proposed amendment to the
Zoning Ordinance to remove motorcycle repair from the B2 (General Business) District and include it in
the M1 (Light Industrial) and M2 (Industrial General) Districts. Ms. Perkins explained currently,
motorcycle repair is permitted in the B2 (General Business) and B3 (Industrial Transition) Districts. She
noted this change would bring this use in line with automobile repair, which is permitted in the B3, M1,
and M2 Districts.
Ms. Perkins concluded the DRRC discussed this item at their August 2016 meeting; the
Planning Commission discussed at their October 5, 2016 meeting; and the Board of Supervisors discussed
this at their October 26, 2016 meeting.
Chairman Wilmot called for anyone who wished to speak regarding this Public Hearing
to come forward at this time. No one came forward to speak and Chairman Wilmot closed the public
comment portion of the hearing.
Upon motion made by Commissioner Unger, and seconded by Commissioner Ambrogi
BE IT RESOLVED, the Frederick County Planning Commission does hereby unanimously recommend
approval of the Ordinance Amendment to the Frederick County Code – Chapter 165 Zoning, ARTICLE
VI BUSINESS AND INDUSTRIAL ZONING DISTRICTS, Part 603 – B2 General Business District,
§165-603.02 Allowed Uses. Revisions to the Frederick County Zoning Ordinance to eliminate
Motorcycle Repair in the B2 (General Business) District and allow this use in the B2, M1, and M2
Districts.
(Note: Commissioner Marston was absent from the meeting)
Ordinance Amendment to the Frederick County Code – Chapter 165 Zoning, ARTICLE II
SUPPLEMENTARY USE REGULATIONS, PARKING, BUFFERS, AND REGULATIONS FOR
SPECIFIC USES, Part 204 – Additional Regulations for Specific Uses §165-204.24. Commercial
Frederick County Planning Commission Page 3397
Minutes of December 7, 2016
Recreations Indoor, ARTICLE I GENERAL PROVISIONS, AMENDMENTS, AND
CONDITIONAL USE PERMITS, Part 101 – General Provisions §165-101.02 Definitions and word
usage, ARTICLE VI BUSINESS AND INDUSTRIAL ZONING DISTRICTS, Part 605 – OM Office
- Manufacturing Park District, §165-605.03.1 Conditional Uses. Revisions to the Frederick County
Zoning Ordinance to include indoor recreation as a conditional use in the M1 (Light Industrial)
Zoning District.
Action – Recommend Approval
Assistant Director, Candice E. Perkins reported this is an amendment to the Zoning
Ordinance to allow commercial indoor recreation as a conditional use in the OM (Office-Manufacturing)
District and the M1 (Light Industrial) District. Ms. Perkins noted currently the use is permitted in the B2
and B3 Districts by-right. Ms. Perkins continued, Staff has drafted supplemental use regulations for
parking and pickup areas and additional requirements could be added during the Conditional Use Permit
process if necessary.
Ms. Perkins concluded the DRRC discussed this item at their September 2016 meeting;
the Planning Commission discussed the item on October 19, 2016; and the Board of Supervisors
discussed this item at their November 9, 2016 meeting.
Commissioner Thomas inquired why we decided to go the CUP (Conditional Use Permit)
route, was it the parking requirement. Ms. Perkins explained it is due to a number of factors; the M1 is
very widely distributed for uses, therefore it may be completely permissible at one site, and then not at
another site. She continued Staff wanted to make sure we had an opportunity for adjoiner notifications as
well as the ability to assess this on a case by case basis.
Chairman Wilmot called for anyone who wished to speak regarding this Public Hearing
to come forward at this time. No one came forward to speak and Chairman Wilmot closed the public
comment portion of the hearing.
Upon motion made by Commissioner Unger, and seconded by Commissioner Mohn
BE IT RESOLVED, the Frederick County Planning Commission does hereby recommend approval of
Ordinance Amendment to the Frederick County Code – Chapter 165 Zoning, ARTICLE II
SUPPLEMENTARY USE REGULATIONS, PARKING, BUFFERS, AND REGULATIONS FOR
SPECIFIC USES, Part 204 – Additional Regulations for Specific Uses §165-204.24. Commercial
Recreations Indoor, ARTICLE I GENERAL PROVISIONS, AMENDMENTS, AND CONDITIONAL
USE PERMITS, Part 101 – General Provisions §165-101.02 Definitions and word usage, ARTICLE VI
BUSINESS AND INDUSTRIAL ZONING DISTRICTS, Part 605 – OM Office - Manufacturing Park
District, §165-605.03.1 Conditional Uses. Revisions to the Frederick County Zoning Ordinance to
include indoor recreation as a conditional use in the M1 (Light Industrial) Zoning District.
YES: Wilmot, Thomas, Unger, Ambrogi, Manuel, Cline, Molden, Kenney, Triplett, Dunlap, Mohn
NO: Oates
(Note: Commissioner Marston was absent from the meeting)
Ordinance Amendment to the Frederick County Code – Chapter 165 Zoning, ARTICLE VIII
DEVELOPMENT PLANS AND APPROVALS, Part 802 – Site Plans, §165-802.03 Site Plan and
Illustrative Sketch Plan Contents. Revisions to the Frederick County Zoning Ordinance to increase
Frederick County Planning Commission Page 3398
Minutes of December 7, 2016
the disturbed area permissible to be considered a minor site plan from 5,000 square feet to 10,000
square feet.
Action – Recommend Approval
Assistant Director, Candice E. Perkins reported this is an amendment to the Zoning
Ordinance to modify the standards for the submittal of a minor site plan. She explained the current
threshold for a minor site plan is “a revision that increases an existing structure area by 20% or less and
does not exceed 5,000 square feet of disturbed area”. Ms. Perkins continued, this proposed amendment
would increase the threshold from 5,000 square feet to 10,000 square feet to be consistent with the
requirements for a land disturbance permit.
Ms. Perkins concluded the DRRC discussed this at their September 2016 meeting; the
Planning Commission discussed at their October 19, 2016 meeting; and the Board of Supervisors
discussed it at their November 9, 2016 meeting.
Chairman Wilmot called for anyone who wished to speak regarding this Public Hearing
to come forward at this time. No one came forward to speak and Chairman Wilmot closed the public
comment portion of the hearing.
Upon motion made by Commissioner Dunlap, and seconded by Commissioner Cline
BE IT RESOLVED, the Frederick County Planning Commission does hereby unanimously recommend
approval of Ordinance Amendment to the Frederick County Code – Chapter 165 Zoning, ARTICLE VIII
DEVELOPMENT PLANS AND APPROVALS, Part 802 – Site Plans, §165-802.03 Site Plan and
Illustrative Sketch Plan Contents. Revisions to the Frederick County Zoning Ordinance to increase the
disturbed area permissible to be considered a minor site plan from 5,000 square feet to 10,000 square feet.
(Note: Commissioner Marston was absent from the meeting)
ACTION ITEM
Rezoning #12-16 Snowden Bridge Station, submitted by GreyWolfe, Inc., to revise the proffers
associated with Rezoning #03-05 for North Stephenson, Inc. This revision relates to the
transportation section. The properties are located on the eastern side of Martinsburg Pike (Route
11), western side of CSX, northern side of Redbud Road, and southern side of Snowden Bridge
Boulevard in the Stonewall Magisterial District and is identified with Property Identification
Numbers 43C-3-5, 43C-3-7A, 43-A-151, and 43-A-152.
Action – Recommend Approval
Assistant Director, Candice E. Perkins reported this is a request to revise the proffers
from Rezoning #03-05 for North Stephenson, Inc. for four parcels of land that total 59.2 acres. The
properties are located on the eastern side of Martinsburg Pike (Route 11), western side of CSX, northern
side of Redbud Road, and southern side of Snowden Bridge Boulevard. Ms. Perkins presented mapping
of the property. She continued this minor proffer amendment seeks to amend a transportation proffer that
previously dedicated right-of-way for the construction of a public roadway for the realignment of Redbud
Road. Ms. Perkins concluded the proffer amendment seeks to make the dedication a private access
easement and would bring this proffer in alignment with #04-16 which was approved in June of
2016 making the eastern portion of this roadway private.
Frederick County Planning Commission Page 3399
Minutes of December 7, 2016
Commissioner Unger inquired why make this a private road. Ms. Perkins noted the
public road is no longer needed.
Upon motion made by Commissioner Cline, and seconded by Commissioner Mohn
BE IT RESOLVED, the Frederick County Planning Commission does hereby unanimously recommend
approval of Rezoning #12-16 Snowden Bridge Station, submitted by GreyWolfe, Inc., to revise the
proffers associated with Rezoning #03-05 for North Stephenson, Inc. This revision relates to the
transportation section. The properties are located on the eastern side of Martinsburg Pike (Route 11),
western side of CSX, northern side of Redbud Road, and southern side of Snowden Bridge Boulevard in
the Stonewall Magisterial District and is identified with Property Identifica tion Numbers 43C-3-5, 43C-3-
7A, 43-A-151, and 43-A-152.
(Note: Commissioner Marston was absent from the meeting)
INFORMATION/DISCUSSION
2035 Comprehensive Plan – Transportation Chapter Update
Assistant Director, Candice E. Perkins reported the Planning Commission discussed the
2035 Update on November 2, 2016; at that time Staff was awaiting updates from VDOT regarding
Chapter 5 – Transportation. Ms. Perkins continued Staff has received those comments from VDOT and
incorporated those revisions into the plan. Ms. Perkins highlighted the changes to the Transportation
Chapter which include: State Code compliance Text; Planning Assumptions Text; Needs Assumption
Text; Recommendations; Additional Graphics and Maps. Ms. Perkins concluded the Transportation
Committee discussed the edits to the chapter at their meeting on November 28, 2016 and have endorsed
the edits.
CPPA #01-2016, Leonard Property SWSA Expansion
Commissioner Oates and Commissioner Manuel would abstain from all discussion on
this item for a possible conflict of interest.
Assistant Director, Candice E. Perkins reported this is a request to expand the boundary
of the Sewer and Water Service Area (SWSA) to include 43.77 acres of land. She continued the
properties are currently zoned RA (Rural Areas); however the Southern Frederick Land Use Plan
designates these parcels for future mixed use commercial/office and industrial uses. Ms. Perkins
explained the proposed text addition to the Southern Frederick Area Plan. The properties are located on
the eastern side of White Oak Road (Route 636) in the Shawnee Magisterial District and she provided
location mapping of the properties. Ms. Perkins continued the Eastern Road Plan calls for White Oak
Road between Tasker Road and Route 277 to be in improved two lane roadway. While this improvement
has partially taken place for the northern portion of the roadway near Tasker Road, the southern portion of
White Oak Road to the south remains a winding and narrow roadway which may be difficult and costly to
improve. Ms. Perkins reported the area plan identifies improvements to White Oak Road in this area
which may include its realignment near the Wrights Run stream crossing, passing to the east of and
behind the existing residences fronting White Oak Road.
Frederick County Planning Commission Page 3400
Minutes of December 7, 2016
Commissioner Thomas referred to the mapping presented; he inquired how soon the
SWSA will be going further down Route 277. Ms. Perkins explained; future studies would need to be
completed to determine this. Commissioner Unger asked if the Sanitation Authority has taken a look at
the CPPA. Ms. Perkins noted the Sanitation Authority has reviewed this item. Commissioner Mohn
noted at the CPPC meeting in November 2016 Mr. Eric Lawrence , Executive Director of Frederick
County Sanitation Authority was present and was comfortable with the basic readiness of the system.
Ms. Perkins noted this CPPA is being included in the 2035 Comprehensive Plan Update –
Appendix I, and will be discussed by the Board of Supervisors on December 14, 2016.
Annual Review of Bylaws and Roles and Responsibilities
Director, Michael T. Ruddy presented a brief overview of documents for the Bylaws and
Roles and Responsibilities. He continued as discussed during the November 2, 2016 Planning
Commission meeting, proposed revisions that have been forwarded to Staff have been incorporated into
the draft and ultimately the updated documents will be presented at the Planning Commission’s first
meeting in 2017 for adoption.
Mr. Ruddy highlighted two revisions: the tabling language to be changed to “postpone”;
and revised proffers has been changed from 14 days to 8 days. Commissioner Oates inquired if reducing
the number of days on the revised proffers will affect advertising. Mr. Ruddy explained this revision will
not affect advertising and it was more of a concern to the preparation of agendas.
Cancelation of the regular meeting on December 21, 2016
Chairman Wilmot announced there were no pending items for the Planning
Commission’s December 21, 2016 meeting. A motion was made by Commissioner Thomas to cancel the
December 21, 2016 meeting of the Planning Commission. This motion was seconded by Commissioner
Oates and unanimously passed.
ADJOURNMENT
No further business remained to be discussed and a motion was made by Commissioner
Thomas to adjourn the meeting. This motion was seconded by Commissioner Oates and unanimously
passed. The meeting adjourned at 7:40 p.m.
Respectfully submitted,
____________________________
June M. Wilmot, Chairman
____________________________
Michael T. Ruddy, Secretary
B
REZONING APPLICATION #02-17
EXPRESS OIL CHANGE & TIRE ENGINEERS
Staff Report for the Planning Commission
Prepared: February 6, 2017
Staff Contact: Candice E. Perkins, AICP, CZA, Assistant Director
Reviewed Action
Planning Commission: 02/15/17 Pending
Board of Supervisors: 03/08/17 Pending
PROPOSAL: To rezone 0.604+/- acres from the B2 (General Business) District to the B3 (Industrial
Transition) District with proffers. The Applicant is seeking to rezone the site to the B3 District to
enable the construction of an express oil and tire facility.
LOCATION: The site is located on the west side of Front Royal Pike (Route 522 South) and immediately
south of the IHOP Restaurant approximately 1,000’ south of the Interstate 81 Exit 313.
EXECUTIVE SUMMARY & STAFF CONCLUSION FOR THE 02/15/17 PLANNING
COMMISSION MEETING:
This is an application to rezone a total of 0.604+/- acres of land from the B2 (General Business) District
to the B3 (Industrial Transition) District with proffers. The Applicant is seeking to rezone the site to
the B3 District to enable the construction of an express oil and tire facility. Staff would note that this
proposed use has not been proffered; the applicant has excluded a number uses in the proffer statement
(such as landscape services, warehousing, utility facilities, and trailer parking).
This property is located within the Sewer and Water Service Area (SWSA) and is located within the
limits of the Senseny/Eastern Frederick Land Use Plan of the 2035 Comprehensive Plan. The
Comprehensive Plan identifies this property with a commercial land use designation which is consistent
with the current zoning and the requested zoning of the subject property.
Access to the property is proposed via a new right-in/right-out entrance onto Front Royal Pike (Route
522); this proposed new entrance will be shared with the adjacent IHOP Restaurant. An interparcel-
connection with the IHOP Restaurant is also planned that will allow vehicles to access the existing
traffic signal located at Front Royal Pike (Route 522)/Travel Lodge Drive. The necessary easements to
facilitate these access points will be recorded prior to review by the Board of Supervisors. The
Applicant has also provided a monetary contribution of $0.10 per building square foot for Fire and
Rescue.
A recommendation regarding this rezoning application to the Board of Supervisors would be
appropriate. The Applicant should be prepared to adequately address all concerns raised by the
Planning Commission.
Rezoning #02-17 Express Oil Change & Tire Engineers
February 6, 2017
Page 2
This report is prepared by the Frederick County Planning Staff to provide information to the
Planning Commission and the Board of Supervisors to assist them in making a decision on this
application. It may also be useful to others interested in this zoning matter. Unresolved issues
concerning this application are noted by staff where relevant throughout this staff report.
Reviewed Action
Planning Commission: 02/15/17 Pending
Board of Supervisors: 03/08/17 Pending
PROPOSAL: To rezone 0.604+/- acres from the B2 (General Business) District to the B3 (Industrial
Transition) District with proffers. The Applicant is seeking to rezone the site to the B3 District to
enable the construction of an express oil and tire facility.
LOCATION: The site is located on the west side of Front Royal Pike (Route 522 South) and immediately
south of the IHOP Restaurant approximately 1,000’ south of the Interstate 81 Exit 313.
MAGISTERIAL DISTRICT: Shawnee
PROPERTY ID NUMBER: 64-A-1F
PROPERTY ZONING: B2 (General Business)
PRESENT USE: Vacant
ADJOINING PROPERTY ZONING & PRESENT USE:
North: B2 (General Business) District Use: Commercial
South: B2 (General Business) District Use: Commercial
East: B2 (General Business) District Use: Commercial
West: B2 (General Business) District Use: Commercial
Rezoning #02-17 Express Oil Change & Tire Engineers
February 6, 2017
Page 3
REVIEW EVALUATIONS:
Virginia Dept. of Transportation: The documentation within the application to rezone this property
appears to have little measurable impact on Route 522. This route is the VDOT roadway which has
been considered as the access to the property referenced.
VDOT is satisfied that the transportation/access management proffers offered in the Express Oil
Change & Tire Engineers rezoning application dated September 9, 2016 addresses transportation
concerns associated with the request. It should be noted that to ensure the right in/right out, the
entrance design will require a median device be constructed to prevent a left turn in/out of the proposed
entrance.
Before development this office will require a complete set of construction plans detailing designs,
drainage features and traffic flow data for review.
Frederick County Fire Marshall: Plan approved.
Frederick County Sanitation Authority: No comment.
Frederick County Department of Public Works: Please see letter from Harvey E. Strawsnyder, Jr.,
P.E., Director dated October 5, 2016.
Frederick County Attorney: Please see letter from Roderick B. Williams, County Attorney dated
October 11, 2016.
Winchester Regional Airport: Due to FAA Federal regulation owner/develop will be required to file
with the FAA for an airspace study as part of the site plan process for all buildings prior to construction
with a separate filing for temporary construction equipment exceeding height of structure. Rezoning is
compatible with airport operations.
City of Winchester: The City of Winchester can readily provide water and sanitary sewer service to
this parcel and has no concerns about the proposed rezoning and development.
Planning & Zoning:
1) Site History
The original Frederick County Zoning Map (U.S.G.S. Winchester City Quadrangle) identifies
this property as being zoned B2 (General Business) District.
2) Comprehensive Policy Plan
The 2035 Comprehensive Plan is the guide for the future growth of Frederick County.
Rezoning #02-17 Express Oil Change & Tire Engineers
February 6, 2017
Page 4
The 2035 Comprehensive Plan is an official public document that serves as the Community's
guide for making decisions regarding development, preservation, public facilities and other key
components of Community life. The primary goal of this plan is to protect and improve the
living environment within Frederick County. It is in essence a composition of policies used to
plan for the future physical development of Frederick County.
The Area Plans, Appendix I of the 2035 Comprehensive Plan, are the primary implementation
tool and will be instrumental to the future planning efforts of the County.
Land Use
This property is located within the Sewer and Water Service Area (SWSA) and is located within
the limits of the Senseny/Eastern Frederick Land Use Plan of the 2035 Comprehensive Plan.
The Comprehensive Plan identifies this property with a commercial land use designation which
is consistent with the current zoning and the requested zoning of the subject property.
Transportation and Site Access
Access to the property is proposed via a new right-in/right-out entrance onto Front Royal Pike
(Route 522); this proposed new entrance will be shared with the adjacent IHOP Restaurant. An
interparcel-connection with the IHOP Restaurant is also planned that will allow vehicles to
access the existing traffic signal located at Front Royal Pike (Route 522)/Travel Lodge Drive.
The necessary easements to facilitate these access points will be recorded prior to review by the
Board of Supervisors.
3) Proffer Statement – Dated September 9, 2016
A. Land Use Restrictions – The Owner has prohibited the following uses:
Landscape and Horticultural Service
Local and Suburban Transit Services
Motor Freight Transportation and Warehousing
Transportation by Air
Utility Facilities and their Accessory Uses
Drive In Motion Picture Theaters
Tractor Truck and Trailer Parking
B. Access Management:
1. The Owner has proffered to limit new commercial entrance access to the property to a
right in/right-out only partial access.
2. The Owner proffers to construct interparcel connectivity between the property and
parcel 64-A-2 (IHOP) to facilitate access to the Front Royal Pike (Route 522)/Travel
Lodge Drive signalized entrance.
C. Monetary Contribution to Offset Impact of Development:
1. The Applicant has proffered $0.10 per developed square foot for County and Fire
Rezoning #02-17 Express Oil Change & Tire Engineers
February 6, 2017
Page 5
Rescue services; payable at occupancy permit.
EXECUTIVE SUMMARY & STAFF CONCLUSION FOR THE 02/15/176 PLANNING
COMMISSION MEETING:
This is an application to rezone a total of 0.604+/- acres of land from the B2 (General Business) District
to the B3 (Industrial Transition) District with proffers. The Applicant is seeking to rezone the site to
the B3 District to enable the construction of an express oil and tire facility. Staff would note that this
proposed use has not been proffered; the Applicant has excluded a number uses in the proffer statement
(such as landscape services, warehousing, utility facilities, trailer parking).
This property is located within the Sewer and Water Service Area (SWSA) and is located within the
limits of the Senseny/Eastern Frederick Land Use Plan of the 2035 Comprehensive Plan. The
Comprehensive Plan identifies this property with a commercial land use designation which is consistent
with the current zoning and the requested zoning of the subject property.
Access to the property is proposed via a new right-in/right-out entrance onto Front Royal Pike (Route
522); this proposed new entrance will be shared with the adjacent IHOP Restaurant. An interparcel-
connection with the IHOP Restaurant is also planned that will allow vehicles to access the existing
traffic signal located at Front Royal Pike (Route 522)/Travel Lodge Drive. The necessary easements to
facilitate these access points will be recorded prior to review by the Board of Supervisors. The
Applicant has also provided a monetary contribution of $0.10 per building square foot for Fire and
Rescue.
A recommendation regarding this rezoning application to the Board of Supervisors would b e
appropriate. The Applicant should be prepared to adequately address all concerns raised by the
Planning Commission.
64 A 1F
250FRONTROYAL PIKE
251FRONTROYAL PIKE
156DELCOPLAZA
199FRONTROYAL PIKE
210FRONTROYAL PIKE
241GARBER LN
200FRONTROYAL PIKE
170FRONTROYAL PIKE
158FRONTROYAL PIKE
160FRONTROYAL PIKE
FRON
T
R
O
Y
A
L
P
I
K
E
Applications
Parcels
Sewer and Water Service Area
Building Footprints
B1 (Neighborhood Business District)
B2 (General Business District)
B3 (Industrial Transition District)
EM (Extractive Manufacturing District)
HE (Higher Education District)
M1 (Light Industrial District)
M2 (Industrial General District)
MH1 (Mobile Home Community District)
MS (Medical Support District)
OM (Office - Manufacturing Park)
R4 (Residential Planned Community District)
R5 (Residential Recreational Community District)
RA (Rural Areas District)
RP (Residential Performance District)
I
Note:Frederick County Dept ofPlanning & Development107 N Kent StSuite 202Winchester, VA 22601540 - 665 - 5651Map Created: January 23, 2017Staff: cperkins
Winchester
FRON
T
R
O
Y
A
L
P
I
K
E
COS
T
E
L
L
O
D
R
DELCO
P
L
Z
MILLW
O
O
D
P
I
K
E
GA
R
B
E
R
L
N
WINDY HILL LN
REZ # 02 - 17Express Oil Change and Tire EngineersPIN:64 - A - 1FRezoning from B2 to B3
0 110 22055 Feet
REZ # 02 - 17Express Oil Change and Tire EngineersPIN:64 - A - 1FRezoning from B2 to B3
§¨¦81
01522
§¨¦81
REZ #02-17
64 A 1F
250FRONTROYAL PIKE
251FRONTROYAL PIKE
156DELCOPLAZA
199FRONTROYAL PIKE
210FRONTROYAL PIKE
241GARBER LN
200FRONTROYAL PIKE
170FRONTROYAL PIKE
158FRONTROYAL PIKE
160FRONTROYAL PIKE
FRON
T
R
O
Y
A
L
P
I
K
E
Applications
Parcels
Sewer and Water Service Area
Building Footprints
I
Note:Frederick County Dept ofPlanning & Development107 N Kent StSuite 202Winchester, VA 22601540 - 665 - 5651Map Created: January 23, 2017Staff: cperkins
Winchester
FRON
T
R
O
Y
A
L
P
I
K
E
COS
T
E
L
L
O
D
R
DELCO
P
L
Z
MILLW
O
O
D
P
I
K
E
GA
R
B
E
R
L
N
WINDY HILL LN
REZ # 02 - 17Express Oil Change and Tire EngineersPIN:64 - A - 1FRezoning from B2 to B3
0 110 22055 Feet
REZ # 02 - 17Express Oil Change and Tire EngineersPIN:64 - A - 1FRezoning from B2 to B3
§¨¦81
01522
§¨¦81
REZ #02-17
64 A 1F
250FRONTROYAL PIKE
251FRONTROYAL PIKE
156DELCOPLAZA
199FRONTROYAL PIKE
210FRONTROYAL PIKE
241GARBER LN
200FRONTROYAL PIKE
170FRONTROYAL PIKE
158FRONTROYAL PIKE
160FRONTROYAL PIKE
FRON
T
R
O
Y
A
L
P
I
K
E
Applications
Parcels
Sewer and Water Service Area
Building Footprints
Long Range Land Use
Residential
Neighborhood Village
Urban Center
Mobile Home Community
Business
Highway Commercial
Mixed-Use
Mixed Use Commercial/Office
Mixed Use Industrial/Office
Industrial
Warehouse
Heavy Industrial
Extractive Mining
Commercial Rec
Rural Community Center
Fire & Rescue
Historic
Institutional
Planned Unit Development
Park
Recreation
School
Employment
Airport Support Area
B2 / B3
Residential, 4 u/a
High-Density Residential, 6 u/a
High-Density Residential, 12-16 u/a
Rural Area
Interstate Buffer
Landfill Support Area
Natural Resources & Recreation
Environmental & Recreational Resources
I
Note:Frederick County Dept ofPlanning & Development107 N Kent StSuite 202Winchester, VA 22601540 - 665 - 5651Map Created: January 23, 2017Staff: cperkins
Winchester
FRON
T
R
O
Y
A
L
P
I
K
E
COS
T
E
L
L
O
D
R
DELCO
P
L
Z
MILLW
O
O
D
P
I
K
E
GA
R
B
E
R
L
N
WINDY HILL LN
REZ # 02 - 17Express Oil Change and Tire EngineersPIN:64 - A - 1FRezoning from B2 to B3
0 110 22055 Feet
REZ # 02 - 17Express Oil Change and Tire EngineersPIN:64 - A - 1FRezoning from B2 to B3
§¨¦81
01522
§¨¦81
REZ #02-17
IMPACT ANALYSIS STATEMENT
EXPRESS OIL CHANGE &
TIRE ENGINEERS DEVELOPMENT
Shawnee Magisterial District
Frederick County, Virginia
TM 64-A-1F
August 15, 2016
Current Owner: Titan’s Corporation
Contact Person: Evan Wyatt, Director of Land Planning
Greenway Engineering, Inc.
151 Windy Hill Lane
Winchester, VA 22602
540-662-4185
Greenway Engineering August 15, 2016 Express Oil & Tire Engineers Rezoning
File #3484E Impact Analysis Statement/EAW
2
EXPRESS OIL CHANGE &
TIRE ENGINEERS DEVELOPMENT
INTRODUCTION
This report has been prepared for the purpose of assessing the impact on Fredrick County by
the proffered rezoning of a 0.604±-acre subject property owned by Titan’s Corporation, and
identified as Tax Map Parcel 64-A-1F. The subject property is located on the west side of
Front Royal Pike (U.S. Route 522 South) approximately 1,000’ south of the Interstate 81 Exit
313 northbound on-ramp, and is currently zoned B-2, Business General District. The
Applicant proposes to rezone the 0.604±-acre subject property to B-3 Industrial Transition
District with proffers to allow for the development of an Express Oil Change and Tire
Engineers facility that is approximately 4,850 square feet with 3 service bays and 3 oil
change bays along the commercial corridor.
Basic information
Location: Fronting on the west side of Front Royal Pike (U.S.
Route 522 South); approximately 1,000’ south of the
Interstate 81 Exit 313 northbound on-ramp.
Magisterial District: Shawnee District
Property ID Numbers: 64-A-1F
Current Zoning: B-2, Business General District
Current Use: Undeveloped
Proposed Zoning: B-3, Industrial Transition District
Proposed Use: Express Oil Change & Tire Engineers Facility
Total Rezoning Area: 0.604±-acres with proffers for the subject property
COMPREHENSIVE POLICY PLAN
Urban Development Area
The Urban Development Area (UDA) defines the general area in which residential,
commercial, industrial and institutional land use development is encouraged in the County.
Greenway Engineering August 15, 2016 Express Oil & Tire Engineers Rezoning
File #3484E Impact Analysis Statement/EAW
3
The 0.604±-acre subject property is currently located within the UDA; therefore, expansion
of the UDA boundary to accommodate the proposed development of commercial land use is
not required for this rezoning application.
Sewer and Water Service Area
The Sewer and Water Service Area (SWSA) is generally consistent with the UDA, but also
extends outside of the UDA to accommodate areas of the County in which commercial and
industrial land use development is only desired. The 0.604±-acre subject property is
currently located within the SWSA; therefore, expansion of the SWSA boundary to
accommodate the proposed development of commercial land use is not required for this
rezoning application.
Comprehensive Plan Conformity
The 0.604±-acre subject property is located in the UDA and the SWSA and is within the
study area boundary of the Senseny/Eastern Frederick Urban Area Study. The
Senseny/Eastern Frederick Urban Area Study is a large-area plan that identifies land uses,
transportation networks, and other matters that are recommended for consideration for future
land use and development within this geographic area of the County. The 0.604±-acre
subject property is identified for B2/B3 commercial land use; therefore, the proposed B-3,
Industrial Transition District rezoning is in conformance with the land use recommendations
of the Comprehensive Policy Plan. The B-3, Industrial Transition District rezoning is
proposed to allow for the development of the Express Oil Change and Tire Engineers facility,
which has been determined not to be a permitted stand-alone land use within the B-2,
Business General District. The Express Oil Change and Tire Engineers facility is an
appropriate commercial land use along a major commercial corridor.
SUITABILITY OF THE SITE
Access
The 0.604±-acre subject property is located on the west side of Front Royal Pike (U.S. Route
522 South), approximately 250 feet south of the Front Royal Pike/Travel Lodge Drive
signalized intersection. Access to the subject property is planned to be provided with a
shared right-in/right-out commercial entrance; as well as through an inter-parcel connection
with the IHOP property that will provide access to the signalized intersection to facilitate
protected left turn movements onto Front Royal Pike.
Flood Plains
The 0.604±-acre subject property does not contain areas of floodplain as demonstrated on
FEMA NFIP Map #51069C0216D, Effective Date September 2, 2009; as well as information
from the Frederick County GIS Database.
Greenway Engineering August 15, 2016 Express Oil & Tire Engineers Rezoning
File #3484E Impact Analysis Statement/EAW
4
Wetlands
The 0.604±-acre subject property does not contain wetland areas as demonstrated on the
National Wetlands Inventory (NWI) Map information from the Frederick County GIS
Database.
Soil Types
The 0.604±-acre subject property contains one soil type as demonstrated by the Soil Survey
of Frederick County, Virginia and the Frederick County GIS Database. The following soil
type is present on site:
3B Blairton Silt Loams 2-7% slope
3C Blairton Silt Loams 2-15% slope
The Blaitron Silt Loam soil type is identified as a prime agricultural soil and has severe wet
properties. The existing commercial land uses that have been constructed along the east and
west sides of the Front Royal Pike (Route 522 South) commercial corridor contain the same
soil type, and the subject property is not conducive for agricultural land use per the
Comprehensive Policy Plan. The soil type is conducive for commercial development of the
subject property.
Other Environmental Features
The 0.604±-acre subject property does not contain areas of steep slope, lakes or ponds or
natural stormwater retention areas as defined by the Frederick County Zoning Ordinance.
There are no known environmental features present that create development constraints for
the proposed commercial development project.
SURROUNDING PROPERTIES
Adjoining property zoning and present use:
North: B-2, Business General District Use: Restaurant (IHOP)
South: B-2, Business General District Use: Office
East: B-2, Business General District Use: Pool Hall; Retail/Grocery
(Delco Plaza & Costco)
West: B-2, Business General District Use: Restaurant (Cracker Barrel)
Greenway Engineering August 15, 2016 Express Oil & Tire Engineers Rezoning
File #3484E Impact Analysis Statement/EAW
5
TRANSPORTATION
The 0.604±-acre subject property is located on the west side of Front Royal Pike (U.S. Route
522 South), approximately 250 feet south of the Front Royal Pike/Travel Lodge Drive
signalized intersection. Subsequent to final rezoning approval, the contract purchaser
proposes to construct an Express Oil Change & Tire Engineers facility that is approximately
4,850 square feet with 3 service bays and 3 oil change bays. Access to the subject property is
proposed to be developed with a right-in/right-out commercial entrance on Front Royal Pike
that is intended to be shared with the IHOP Restaurant; as well as an inter-parcel connection
with the IHOP restaurant that will allow for vehicles to access the existing traffic signal at the
Front Royal Pike/Travel Lodge Drive intersection to facilitate protected left traffic
movement.
Greenway Engineering has met with VDOT representatives to discuss the proposed right -
in/right-out commercial entrance and has been advised that VDOT does not object to this
access point. However, VDOT advised that the property owner will need to prepare and
submit an access management exception request as a component of the Site Plan before the
right-in/right-out commercial entrance can be approved for construction. Additionally,
Titans Corporation has an agreement with Lennox, LLC (IHOP Restaurant property owner)
that provides for an ingress/egress easement across Tax Map Parcel 64-A-2 that will allow
for vehicles to access the existing traffic signal at the Front Royal Pike/Travel Lodge Drive
intersection to facilitate protected left traffic movement. Greenway Engineering has prepared
an exhibit that identifies the proposed location of the right-in/right-out commercial entrance
and the approximate location of the ingress/egress easement through the Lennox, LLC
property as information with this request.
In order to assess the potential traffic impacts for the proposed Express Oil Change & Tire
Engineers facility, Greenway Engineering has analyzed the Frederick County Zoning
Ordinance to determine the highest and best land use within the B-2, Business General
District that is not otherwise permitted in the B-3, Industrial Transition District and has
determined that General Merchandise Stores (SIC 53) would be the appropriate land use to
compare to the proposed Express Oil Change & Tire Engineers facility (SIC 75).
Additionally, Greenway Engineering analyzed traffic study data from the Institute of Traffic
Engineers (ITE) Manual, 9th Edition specific to Shopping Center (820) and Quick
Lubrication Vehicle Shop (941). The following analysis compares traffic volumes for the
Weekday AM and PM Peak Hours, the Saturday Peak Hours, and the Sunday Peak Hours
assuming 4,850 square feet of Shopping Center (820) land use and 6 service bays of Quick
Lubrication Vehicle Shop (941) land use specific to the ITE traffic study data:
B-2, Business General Land Use
ITE (820) Weekday AM Peak: Q = 0.96 VPD per 1,000 square feet gross floor area
Q = 0.96 VPD x 4.85 (4,850 sq.ft./1,000 sq.ft.)
Q = 4.65 or 5 VPD
Greenway Engineering August 15, 2016 Express Oil & Tire Engineers Rezoning
File #3484E Impact Analysis Statement/EAW
6
ITE (820) Weekday PM Peak: Q = 3.71 VPD per 1,000 square feet gross floor area
Q = 3.71 VPD x 4.85 (4,850 sq.ft./1,000 sq.ft.)
Q = 17.99 or 18 VPD
ITE (820) Saturday Peak: Q = 4.82 VPD per 1,000 square feet gross floor area
Q = 4.82 VPD x 4.85 (4,850 sq.ft./1,000 sq.ft.)
Q = 23.37 or 24 VPD
ITE (820) Sunday Peak: Q = 3.12 VPD per 1,000 square feet gross floor area
Q = 3.12 VPD x 4.85 (4,850 sq.ft./1,000 sq.ft.)
Q = 15.13 or 16 VPD
B-3, Industrial Transition Land Use
ITE (941) Weekday AM Peak: Q = 3.0 VPD per service position
Q = 3.0 VPD x 6 service position
Q = 18 VPD
ITE (941) Weekday PM Peak: Q = 4.0 VPD per service position
Q = 4.0 VPD x 6 service position
Q = 24 VPD
ITE (941) Saturday Peak: Q = 7.0 VPD per service position
Q = 7.0 VPD x 6 service position
Q = 42 VPD
ITE (941) Sunday Peak: Q = 4.5 VPD per service position
Q = 4.5 VPD x 6 service position
Q = 27 VPD
The ITE projected traffic volumes identified above indicate that the proposed Express Oil
Change & Tire Engineers facility (941) has the potential to increase traffic volumes during
the weekday peak hours between 6-13 VPD and by approximately 11-18 VPD during the
weekend peak hours compared to the Shopping Center (820) land use. These calculations
demonstrate a fairly low increase in potential traffic volumes during these time frames
(approximately 0.75-1.75 VPD every 15 minutes during the weekday peak hours and
approximately 1.5-2.25 VPD every 15 minutes during the weekend peak hours). The
proposed Express Oil Change & Tire Engineers facility will result in a minor increase in
peak hour traffic volume that can be accommodated by the existing transportation
infrastructure. The proposed access management plan provides for safe and efficient ingress
Greenway Engineering August 15, 2016 Express Oil & Tire Engineers Rezoning
File #3484E Impact Analysis Statement/EAW
7
and egress for the subject site, which sufficiently mitigates impacts to the transportation
network for this rezoning request.
SEWAGE CONVEYANCE AND TREATMENT
The 0.604±-acre subject property is located within the Sewer and Water Service Area
(SWSA); therefore, the property is entitled to be served by public sewer based on County
Policy. The City of Winchester is the provider of public sewer service within this area of the
County, which is managed by the City of Winchester Public Services Department.
The City of Winchester has an existing 8-inch gravity sewer line that adjoins the western
boundary of the subject property within a 20-foot easement that is accessible to the property.
All commercial land uses on the west side of Front Royal Pike (US Route 522 South) within
proximity of the subject property convey sewer effluent through the 8-inch gravity sewer line
that goes under Interstate 81 to a manhole located on the Apple Blossom Mall parcel, which
then gravities to the Abram’s Creek sewer transmission line that connects to the Opequon
Wastewater Treatment Facility.
Based on comparable discharge patterns, the City of Winchester Public Services Department
has determined that 75 gallons/day per 1,000 square feet of commercial development is an
appropriate calculation for estimating the sewer demand for commercial land uses.
Q = 75 gallons/day per 1,000 square feet commercial
Q = 75 GPD x 4.85 (4,850 sq.ft./1,000 sq.ft.)
Q = 363.75 GPD
TOTAL: Q = 365 GPD projected sewer demand
The Opequon Wastewater Treatment Facility has a total capacity of 12.6 MGD, of which
7.125 MGD is allocated to the City of Winchester. The City of Winchester currently
averages approximately 5.0 MGD of the allocated capacity and has approximately 2.125
MGD of allocated capacity available for future development projects. The projected 365
GPD for the proposed project represents 0.02% of available treatment capacity; therefore, the
proposed rezoning can be sufficiently accommodated by public sewer service through a
system with adequate conveyance, capacity and treatment.
WATER SUPPLY
The 0.604±-acre subject property is located within the Sewer and Water Service Area
(SWSA); therefore, the property is entitled to be served by public water based on County
Policy. The City of Winchester is the provider of public water service within this area of the
County, which is managed by the City of Winchester Public Services Department.
Greenway Engineering August 15, 2016 Express Oil & Tire Engineers Rezoning
File #3484E Impact Analysis Statement/EAW
8
The City of Winchester has an existing 12-inch water transmission located on the east side of
Front Royal Pike that provides public water service to the commercial land uses on the west
side of Front Royal Pike (US Route 522 South). An 8-inch water is looped off of the 12-inch
water transmission line that adjoins the western boundary of the subject property within a 20-
foot easement that is accessible to the property. Additionally, a 6-inch water line has been
installed on the subject property off of the 8-inch water line loop.
Based on comparable discharge patterns, the City of Winchester Public Services Departmen t
has determined that 75 gallons/day per 1,000 square feet of commercial development is an
appropriate calculation for estimating the water demand for commercial land uses.
Q = 75 gallons/day per 1,000 square feet commercial
Q = 75 GPD x 4.85 (4,850 sq.ft./1,000 sq.ft.)
Q = 363.75 GPD
TOTAL: Q = 365 GPD projected water demand
The City of Winchester obtains potable water from the North Fork of the Shenandoah River,
which is treated at the Percy D. Miller Water Treatment Plant located near Middletown. The
Percy D. Miller Water Treatment Plant can treat approximately 10 MGD of potable water
daily, which is transmitted to serve all properties in the City of Winchester; as well as some
properties in Frederick County. The City has sufficient water capaci ty to serve these
properties; as well as sell excess capacity to the Frederick County Sanitation Authority to
supplement other water systems in Frederick County. Greenway Engineering met with the
City of Winchester Public Services Director to discuss the proposed development project and
was advised that the City has adequate capacity to serve this project and that the existing 8 -
inch water loop provides adequate pressure and fire flow for all commercial land uses within
this portion of the County. Therefore, the proposed rezoning can be sufficiently
accommodated by public water service through a system with adequate conveyance,
capacity, pressure, and fire flow.
SITE DRAINAGE
The topographic relief on the 0.604±-acre subject property generally follows a southwestern
pattern, which directs drainage towards the rear of the property adjacent to the Cracker Barrel
site. Greenway Engineering prepared an ALTA Survey for the 0 .604±-acre subject property,
which identifies a 20-foot drainage easement on the property that has been improved with a
drop inlet and storm sewer line that ties into the overall drainage system constructed during
the development of the Cracker Barrel site. This stormwater collection system conveys
stormwater to a regional stormwater management facility that was constructed during the
development of the Cracker Barrel site; therefore, development of the subject property will
utilize this regional facility.
Greenway Engineering August 15, 2016 Express Oil & Tire Engineers Rezoning
File #3484E Impact Analysis Statement/EAW
9
The 0.604±-acre subject property is exempt from local stormwater quality treatment
requirements due to the size of the parcel; therefore, there should be not stormwater
management quality measures to mitigate. Greenway Engineering will work with the County
Engineer during the Site Development Plan process to identify stormwater volumes from the
proposed development of the subject property to ensure that there are no detrimental impacts
to the regional stormwater management facility and to adjoining properties. The stormwater
management plan and erosion and sedimentation control plan will be designed in
conformance with all applicable state and local regulations; therefore, site drainage and
stormwater management impacts to adjoining properties and the community will be
mitigated.
SOLID WASTE DISPOSAL
The impact on solid waste disposal facilities associated with the development of the proposed
Express Oil Change & Tire Engineers facility on the 0.604± acre subject property can be
projected from an average annual commercial consumption of 5.4 cubic yards per 1,000
square feet of structural area (Civil Engineering Reference Manual, 4th edition). The
Applicant proposes to develop an Express Oil Change & Tire Engineers facility that is
approximately 4,850 square feet with 3 service bays and 3 oil change bays ; therefore, solid
waste disposal impacts are based on the following figures that provide the increase in average
annual solid waste volume based on the development of this facility:
AAV = 5.4 cu. yd. per 1,000 sq. ft. commercial
AAV = 5.4 cu. yd. x 4.85 (4,850 sq.ft./1,000 sq. ft.)
AAV = 26.19 cu. yd. at build-out, or 18.33 tons/yr. at build-out
The Municipal Solid Waste area of the Regional Landfill has a current remaining capacity of
13,100,000 cubic yards of air space. The projected commercial development will generate
approximately 18.33 tons of solid waste annually on average. This represents a 0.009%
increase in the annual solid waste received by the Municipal Solid Waste area of the
Regional Landfill, which currently averages 200,000 tons per year. Solid waste produced by
the commercial development will be disposed at the Regional Landfill by a commercial
waste hauler; therefore, the County will receive tipping fees associated with this land use to
mitigate this impact. The Regional Landfill has adequate capacity to accommodate the solid
waste impacts associated with this proposal.
HISTORICAL SITES AND STRUCTURES
The Frederick County Rural Landmarks Survey identifies the Garber Farm (#34-424) within
close proximity of the 0.604±-acre subject property. The Garber Farm was inventoried as
part of the overall report; however, the property was not recommended for inclusion on the
list of potentially significant properties in the final report. The Garber Farm has been
Greenway Engineering August 15, 2016 Express Oil & Tire Engineers Rezoning
File #3484E Impact Analysis Statement/EAW
10
subdivided into multiple properties, which are developed as commercial and residential land
uses along Garber Lane (Route 763), and as commercial land uses along Front Royal Pike
(US Route 522 South).
The National Park Service Study of Civil War Sites in the Shenandoah Valley identifies t he
0.604±-acre subject property as being located within the First Winchester study area
boundary, and within close proximity of the First Winchester core battlefield area boundary.
The final report identifies all land within the study area boundary that is located in the
southeastern quadrant of Interstate 81 Exit 313 as having lost integrity due to the existing
commercial and residential land use development patterns; as well as the construction of
Interstate 81.
The development of commercial land use on the 0.604±-acre subject property is consistent
with other properties in this area of the County. The Senseny/Eastern Frederick Urban Area
Study does not identify this area of the County as historic or as developmentally sensitive
area. The proposed rezoning of the property will not create negative impacts associated with
historic properties and historic resources.
OTHER POTENTIAL IMPACTS
The commercial development of the 0.604±-acre subject property will provide new economic
development opportunities for Frederick County, which has been determined by the County’s
Development Impact Model to be positive in the consideration of fiscal impacts to County
Capital Facilities. It is recognized that the development of commercial land use has the
potential to increase service demands on fire and rescue services; therefore, the Applicant’s
Proffer Statement provides a monetary contribution of $0.10 per developed building square
foot to the County to provide additional revenues that are specifically directed to fire and
rescue services. There are no other identified potential impacts above those discussed in this
Impact Analysis Statement that would be detrimental to surrounding properties or to the
County from the rezoning and development of the 0.604±-acre subject property.
FRON
T
R
O
Y
A
L
P
I
K
E
MILL
W
O
O
D
P
I
K
E
FRON
T
R
O
Y
A
L
P
I
K
E
£¤50
£¤17
§¨¦81
§¨¦81
£¤522
£¤522
rs763
CO
S
T
E
L
L
O
D
R
DELC
O
P
L
Z
GA
R
B
E
R
L
N
Virginia Geographic Information Network (VGIN)
Map Data Source: Frederick County, Va. GIS Department, 2016 Data; 2015 Aerial Photos Courtesy of VGIN/VITA (http://gismaps.vita.virginia.gov/arcgis/rest/services VBMP2015/VBMP2015_WGS); Greenway Engineering
AE
R
I
A
L
O
V
E
R
V
I
E
W
SH
A
W
N
E
E
M
A
G
I
S
T
E
R
I
A
L
D
I
S
T
R
I
C
T
EX
P
R
E
S
S
O
I
L
C
H
A
N
G
E
&
T
I
R
E
E
N
G
I
N
E
E
R
S
FR
E
D
E
R
I
C
K
C
O
U
N
T
Y
,
V
I
R
G
I
N
I
A
DA
T
E
:
2
0
1
6
-
0
7
-
2
8
PR
O
J
E
C
T
I
D
:
3
4
8
4
E
DE
S
I
G
N
E
D
B
Y
:
D
W
E
SC
A
L
E
:
1
I
n
c
h
=
2
0
0
F
e
e
t
Legend
TM 64-A-1F
Parcel Boundary
Winchester City Limits
200 0 200
Feet
µ
EX
P
R
E
S
S
O
I
L
C
H
A
N
G
E
&
T
I
R
E
E
N
G
I
N
E
E
R
S
RE
Z
O
N
I
N
G
AE
R
I
A
L
O
V
E
R
V
I
E
W
RE
Z
O
N
I
N
G
F R O N T R O Y A L P I K E
MILLWOOD PIKE
F R O N T R O Y A L P I K E
£¤50
£¤17
§¨¦81
§¨¦81
£¤522
£¤522
rs795
rs797
rs763
COSTELLO DR
P R I C E D R
T U L A N E D R
H A R V A R D D R
PRINCETON DR
WINDY HILL LN
DELCO PLZ
G A R B E R L N
R Y C O L N
Map D ata Source: Frederick County, Va. GIS Department, 2016 Data; Greenway Engineering
Z O N
I N G A N D L O C A T I O N M A P
S H A W N E E M A G I S T E R I A L D I S T R I C T
E X P R E S S O I L C H A N G E & T I R E E N G I N
E E R S
F R E D E R I C K C O U N T Y , V I R G I N I A
D A T E : 2 0 1 6 -0 7 -2 8
P R O J E C T I D : 3 4 8 4 E
D E S I G N E D B Y : D W E
S C A L E :
1 I n c h = 3 0 0 F e e t
Le gend
TM 6 4-A-1 F
Pa rce l Bou ndary
Winche ster City L imits
Frederick Co unty Z oning
B2 (Busine ss, G en era l Distrist)
B3 (Busine ss, Ind ustrial Transitio n District)
HE (Highe r Educa tion Dis trict)
M2 (In du strial, G e nera l District)
RA (R ura l Area D istrict)
RP (Re sid ential, Pe rfo rman ce Distr ict)
300 0 300
Feet
µ
E X P R E S S O I L C H A N G E
& T I R E E N G I N E E R S
R E Z O N I N G
Z O N I N G A N D L O C A T I O N M A P
R E Z O N I N G
SITE
Winc hes ter
£¤50
£¤17
§¨¦81
£¤11
ËÊ37
ËÊ37
£¤522
£¤522
ËÊ7
LOCATION MAP
8 in.
12 in
.
8 in.
6 in.
8 in.
6 i
n
.
8 in.
8 in.
8 in.
8 in
.
6 in.
12 i
n
.
1
5
i
n
.
10 in.
4 in
.
8 in.
1
0
i
n
.
8
i
n
.
8 i
n
.
8 in.
4 in.6 i
n
.
12 i
n
.
8 i
n
.
8 in
.
8 in.
10 in.
8 in.
8
i
n
.
8 in.
12 i
n
.
15 in.
8 in.
8 in.
8
i
n
.
8 in.
8
i
n
.
8 in.
6 in.
8 in.
8 in.
8 in.
8 in.
8 in
.
12 in.
8 i
n
.
12 in.
10
i
n
.
6 in
.
2 in.
8 in.
4 in.
12
i
n
.
14 in
.
16 in.
10 in
.
6 in.
6 in
.
8 in
.
6 in.
8 in.
8 in.
4 i
n
.
8
i
n
.
8 i
n
.
6
i
n
.
6 in.
8
i
n
.
12
i
n
.
4 in.
6 in
.
8 in
.
12 in.
6
i
n
.
4 in.
8 in.
16 in
.
8 in
.
8 in
.
6 in.
6 i
n
.
16
i
n
.
6 in.
6 in.
2 in.
6 i
n
.
8
i
n
.
6 in.
6 in.
6
i
n
.
8
i
n
.
8 in.
6 in.
6 i
n
.
12
i
n
.
6 in
.
8 in.
2
i
n
.
12 i
n
.
8 in.
6 in.
8 in
.8 in.
8 in
.
6 i
n
.
4
i
n
.
12 in.8 in.
6 in.
10
i
n
.
8 i
n
.
6 in.
8 i
n
.
8
i
n
.
8
i
n
.
8
i
n
.
8
i
n
.
8
i
n
.
8
i
n
.
8 in
.
8 in.
8 in.
8 in.
16 in.
8
i
n
.
12 in.
6 i
n
.
10 in.
6 in.
8 in
.
8 in
.
10 in.
6 in.
12
i
n
.
12 in.
8
i
n
.
8 in.
6 in
.
6 in.
6 in
.
8 in
.
8 in.
8
i
n
.
1
2
i
n
.
6 in
.
16 in.
8 in
.
8
i
n
.
1
2
i
n
.
6 in.
MALL RD
LEGGE
B
L
V
D
E JUB
A
L
E
A
R
L
Y
D
R
FR
O
N
T
A
G
E
R
D
MI
L
L
W
O
O
D
A
V
E
E JUBAL EARLY DR
FRO
N
T
R
O
Y
A
L
P
I
K
E
MILL
W
O
O
D
P
I
K
E
FRON
T
R
O
Y
A
L
P
I
K
E
£¤50
§¨¦81
§¨¦81
£¤522
£¤522
rs781
rs795rs797
rs796
rs763
P
E
M
B
R
I
D
G
E
D
R
COS
T
E
L
L
O
D
R
Y
A
L
E
D
R
ETNA
M
S
T
PRIN
C
E
F
R
E
D
E
R
I
C
K
D
R
PU
R
D
U
E
D
R
K
E
S
W
I
C
K
C
T
HARVARD DR
PR
I
C
E
D
R
TU
L
A
N
E
D
R
LUDLO
W
D
R
WINDY HILL LN
MAR
G
A
T
E
C
T
Map Data Source: Frederick County, Va. GIS Department 2016 Data; City of Winchester GIS Department 2016 Data; FCSA Water & Sewer Courtesy of FCSA, January 2016; Greenway Engineering
WA
T
E
R
-
S
E
W
E
R
-
S
W
S
A
-
U
D
A
M
A
P
SH
A
W
N
E
E
M
A
G
I
S
T
E
R
I
A
L
D
I
S
T
R
I
C
T
EX
P
R
E
S
S
O
I
L
C
H
A
N
G
E
&
T
I
R
E
E
N
G
I
N
E
E
R
S
FR
E
D
E
R
I
C
K
C
O
U
N
T
Y
,
V
I
R
G
I
N
I
A
DA
T
E
:
2
0
1
6
-
0
7
-
2
8
PR
O
J
E
C
T
I
D
:
3
4
8
4
E
DE
S
I
G
N
E
D
B
Y
:
D
W
E
SC
A
L
E
:
1
I
n
c
h
=
5
0
0
F
e
e
t
Legend
TM 64-A-1F
Parcel Boundary
Winchester City Limits
Sewer-Water Service Area (SWSA)
Urban Development Area (UDA)
Water Line (City)
Sewer Line (City)
Water Line (FCSA)
Sewer Line (FCSA)
500 0 500
Feet
µ
EX
P
R
E
S
S
O
I
L
C
H
A
N
G
E
&
T
I
R
E
E
N
G
I
N
E
E
R
S
RE
Z
O
N
I
N
G
WA
T
E
R
-
S
E
W
E
R
-
S
W
S
A
-
U
D
A
M
A
P
RE
Z
O
N
I
N
G
NOTE:Parcel 64-A-1F is inside boththe SWSA and the UDA.
700
725
700
700
7 2 5
7 0 0
700 7 2 5
7 2 5
700
A b r a m s C r e e k
7 0 0
6 7 5
725
7 2 5
7 0 0
7 0 0
67
5
7 2 5
6 7 5
7 0 0
675
6 7 5
F R O N T R O Y A L P I K E
MILLWOOD PIKE
F R O N T R O Y A L P I K E
£¤50
£¤17
§¨¦81
§¨¦81
7 2 5
7 0 0
7 0 0
7 0 0
7 2 5
7 0 0
700
7 2 5
725
7 2 5
£¤522
£¤522
rs795
rs797
rs763
COSTELLO DR
P R I C E D R
T U L A N E D R
H A R V A R D D R
PRINCETON DR
WINDY HILL LN
DELCO PLZ
G A R B E R L N
R Y C O L N
Map D ata Source: Frederick County, Va. GIS Department, 2016 Data; U.S. Fish & Wildlife Service (National Wetlands Inventory: https://www.fws.gov/wetlands/Data/Data-Download.html); Greenway Engineering
E N V I R O N M E N T A L F E A T U R E S M A P
S H A W N E E M A G I S T E R I A L D I S T R I C T
E X P R E S S O I L C H A N G E & T I R E E N G I N
E E R S
F R E D E R I C K C O U N T Y , V I R G I N I A
D A T E : 2 0 1 6 -0 7 -2 8
P R O J E C T I D : 3 4 8 4 E
D E S I G N E D B Y : D W E
S C A L E :
1 I n c h = 3 0 0 F e e t
Le gend
TM 6 4-A-1 F
Pa rce l Bou ndary
Winche ster City L imits
Lake or Pon d
Wetlan d (N WI)
100 Year Floodp lain
Stream
5 Foot Intermediate Contours
25 Foot Index Contours
300 0 300
Feet
µ
E X P R E S S O I L C H A N G E
& T I R E E N G I N E E R S
R E Z O N I N G
E N V I R O N M E N T A L F E A T U R E S M A P
R E Z O N I N G
3C
3B
F R O N T R O Y A L P I K EFRON T R O Y A L P I K E
§¨¦81
§¨¦81
£¤522
£¤522
Map D ata Source: Frederick County, Va. GIS Department, 2016 Data; Greenway Engineering
S O I L S M A P
S H A W N E E M A G I S T E R I A L D I S T R I C T
E X P R E S S O I L C H A N G E & T I R E E N G I N
E E R S
F R E D E R I C K C O U N T Y , V I R G I N I A
D A T E : 2 0 1 6 -0 7 -2 8
P R O J E C T I D : 3 4 8 4 E
D E S I G N E D B Y : D W E
S C A L E :
1 I n c h = 1 0 0 F e e t
Le gend
TM 6 4-A-1 F
Pa rce l Bou ndary
Winche ster City L imits
NRCS Soils
3B:B LAIRTON SILT LOA M, 2 TO 7 P ERCE NT SLO PES
3C:B LAIRTON SILT LO AM, 7 TO 15 PERC ENT SLO PES
100 0 100
Feet
µ
E X P R E S S O I L C H A N G E
& T I R E E N G I N E E R S
R E Z O N I N G
S O I L S M A P
R E Z O N I N G
m
m
mmmmmmmmm
mmmm
m
m
m
m
m
!à!à
!à
!à
!à
!à
!à
!à
!à
!à!à
!à
!à
!à!à
!à
!à!à!à
!à!à
!à
!à
!à!à
!à
!à
!à
!à
!à
!à
!à
!à
!à
!à
!à!à!à
!à
!à
!à!à
!à
!à
!à
!à
!à
!à
!à
!à!à
!à
!à
!à
!à
!à
!à
!à
!à
!à
!à
[e [e[e[e[e [e[e[e[e [e [e [e[e [e [e[e[e [e [e[e[e [e[e [e [e [e[e [e [e[e[e[e [e
[e
[e
[e
[e
[e
[e
[e
[e[e[e[e[e[e[e[e
[e
[e
[e
[e
[e[e
[e
[e [e [e [e[e [e[e[e [e [e[e[e [e[e[e[e[e [e [e
[e
[e
[e
[e
[e
[e
[e
[e[e [e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e[e
[e
[e
[e[e
[e
[e
[e
[e
[e [e
[e
[e
[e
[e
[e
[e
[e
[e
[e[e[e[e[e[e[e[e [e
[e
[e
[e[e[e[e [e[e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e [e [e[e[e[e[e [e [e[e [e[e[e[e[e[e[e[e[e[e[e[e[e[e[e[e[e[e[e[e[e[e[e[e [e[e [e[e [e[e [e [e [e[e [e [e [e [e[e [e[e[e[e [e [e [e [e [e[e [e[e[e [e[e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e[e
[e
[e
[e[e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e
[e[e[e
[e
[e
[e
[e
[e[e
[e
[e
[e
[e
[e
[e
[e[e
[e
[e
[e[e[e[e[e[e
[e[e
[e
[e[e
[e
[e
[e
[e
[e
[e[e[e
[e
[e
[e
[e[e[e
[e
[e
[e
[e
[e
[e
[e
[e[e [e [e[e [e[e[e
[e
[e
[e
[e
[e [e[e
[e
[e
[e
[e
L E G G E B L V D
M A L L R D
P A P E R M I L L R D
S P L E A S A N T V A L L E Y R D
S L O U D O U N S T
W JUBAL EARLY DR
ADAMS DR
E J U B A L E A R LY D R
WEEMS LN
E TEVIS ST
F R O N T A G E R D
PATSY CLINE BLVD
M
I
L
L
W
O
O
D
A
V
E
A P P L E B L O S S O M D R
MILLW
O
O
D AVE
A
D
A
M
S
D
R
E JUBAL EARLY DR
S P L E A S A N T V A L L E Y R D
S P L E A S A N T V A L L E Y R D
MILL
W
O
O
D AV
E
34-424 Garber Farm
First Winchester
Third Winchester
Second Kernstown
F
R
O
N
T
R
O
Y
A
L
P
I
K
E
MILLWOOD PIKE
F R O N T R O Y A L P I K E
§¨¦81
§¨¦81
£¤522
rs776
rs781
rs795
rs778
rs782
rs657
rs797
rs796
rs780rs763
D
A
R
B
Y
D
R
P
E
M
B
R
I
D
G
E
D
R
COSTELLO DR
K
I
N
R
O
S
S
D
R
Y
A
L
E
D
R D E W B E R R Y D R
F
L
A
N
A
G
A
N
D
R
O
A
K
R
I
D
G
E
L
N
E
T
N
A
M
S
T
CUSTER AVE
SENSENY RD
P R I N C E F R E D E R I C K D R
PRINCETON DR
H
U
NTERSRID
GE R
D
COVERSTONE DR
K
E
S
W
I
C
K
C
T
I N V E R L E E W A Y
H A R V A R D D R
KILLA
N
E
Y CT
FAIRFIELD DR
B
R
A
M
B
L
E
C
T
P R I C E D R
L U D L O W D R
ORKNEY DR
TEY CT
WINDY HILL LN
M A R G A T E C T
D
O
N
E
G
A
L
C
T
STANLEY CIR
D U N E R C T
Map D ata Source: Frederick County, Va. GIS Department, 2016 Data; Greenway Engineering
H I S T O R I C F E A T U
R E S M A P
S H A W N E E M A G I S T E R I A L D I S T R I C T
E X P R E S S O I L C H A N G E & T I R E E N G I N
E E R S
F R E D E R I C K C O U N T Y , V I R G I N I A
D A T E : 2 0 1 6 -0 7 -2 8
P R O J E C T I D : 3 4 8 4 E
D E S I G N E D B Y : D W E
S C A L E :
1 I n c h = 8 0 0 F e e t
Le gend
TM 6 4-A-1 F
Pa rce l Bou ndary
Winche ster City L imits
Ý Cemete ries
[e Rural_L andmarks
!à CWCamps
m CWForts
Civil War Battl efi elds
First Winchester
Third Winchester
Second Kern stown
800 0 800
Feet
µ
E X P R E S S O I L C H A N G E
& T I R E E N G I N E E R S
R E Z O N I N G
H I S T O R I C F E A T U R E S M A P
R E Z O N I N G
C
REZONING APPLICATION #01-17
DMJ HOLDING, L.L.C.
Staff Report for the Planning Commission
Prepared: February 6, 2017
Staff Contact: Candice E. Perkins, AICP, CZA, Assistant Director
Reviewed Action
Planning Commission: 02/15/17 Pending
Board of Supervisors: 03/08/17 Pending
PROPOSAL: To revise proffers associated with Rezoning #05-09. This minor proffer amendment
proposes to remove a proffer which currently prohibits fast food restaurants with drive through service
windows. If approved, the site would permit the construction of fast food restaurants with drive through
service windows if all other requirements are met. All other proffers remain the same.
LOCATION: The properties are located at the northwest corner of the intersection of Route 50 and
Route 781 (Custer Avenue).
EXECUTIVE SUMMARY & STAFF CONCLUSION FOR THE 02/15/17 PLANNING
COMMISSION MEETING:
This is an application to amend the proffers from Rezoning #05-09 for 2.85 acres of land. This minor
proffer amendment seeks to remove a proffer which currently prohibits fast food restaurants with drive
through service windows. If approved, the site would permit the construction of fast food restaurants
with drive through service windows if all other requirements and conditions are met.
The properties are located within the UDA and SWSA and are designated as an area of commercial land
use by the Eastern Frederick County Long Range Land Use Plan. The site is located in the area covered
by the Senseny Eastern Frederick Urban Area Study. The land use plan identifies, more specifically, a
commercial designation with a transition back into the surrounding residential land uses.
Staff would note that the approved proffer currently limits any future use(s) to those that will not
generate in excess of 200 vehicle trips per hour during any hour. This proffer remains unchanged from
the 2009 approval. It should be noted that a fast food restaurant with a drive through would max out the
hourly trip cap which would leave the remainder of the property undevelopable.
A recommendation regarding this rezoning application to the Board of Supervisors would be
appropriate. The Applicant should be prepared to adequately address all concerns raised by the
Planning Commission.
Rezoning # 01-17 DMJ Holdings, LLC
February 6, 2017
Page 2
This report is prepared by the Frederick County Planning Staff to provide information to the
Planning Commission and the Board of Supervisors to assist them in making a decision on this
application. It may also be useful to others interested in this zoning matter. Unresolved issues
concerning this application are noted by staff where relevant throughout this staff report.
Reviewed Action
Planning Commission: 02/15/17 Pending
Board of Supervisors: 03/08/17 Pending
PROPOSAL: To revise proffers associated with Rezoning #05-09. This minor proffer amendment
proposes to remove a proffer which currently prohibits fast food restaurants with drive through service
windows. If approved, the site would permit the construction of fast food restaurants with drive through
service windows if all other requirements are met. All other proffers remain the same.
LOCATION: The properties are located at the northwest corner of the intersection of Route 50 and
Route 781 (Custer Avenue).
MAGISTERIAL DISTRICT: Shawnee
PROPERTY ID NUMBERS: 64A-4-16A, 64A-4-16, 64A-4-17, 64A-4-18, 64A-4-19, and 64A-4-20
PROPERTY ZONING: B2 (General Business) District
PRESENT USE: Vacant
ADJOINING PROPERTY ZONING & PRESENT USE:
North: RP (Residential Performance) Use: Residential
South: B2 (General Business) Use: Commercial Car Lot
East: B2 (General Business) Use: Vacant
West: RP (Residential Performance) Use: Residential
Rezoning # 01-17 DMJ Holdings, LLC
February 6, 2017
Page 3
REVIEW EVALUATIONS:
Virginia Dept. of Transportation: Our District Planning Section has reviewed the DMJ Holdings,
LLC Rezoning and Proffer Amendment and offer the following recommendations:
The rezoning application for the DMJ Holdings LLC Proffer Amendment dated August 15, 2016
generally utilized the previously approved proffers with minor edits to permit fast food restaurant with
drive through use on the property. The transportation improvements proffers as developed from the
recommendations of the previously submitted TIA in 2009 have been maintained with the Proffer #2
“Limitation of Future Development”, which is unchanged from the originally approved proffers, set a
property development cap of 200 site generated trips per hour during any hour of the day (based on ITE
trip rates). The proposed fast food with drive through lane use (ITE code 934) with a 4,000 square feet
gross floor area will exceed this cap in the AM peak hour of the generator. Therefore, as the proffers
are currently written, if the proposed fast food land use is developed, the remainder of the property will
be undevelopable in the future. Please advise.
Should the Applicant choose to revise the proffers to permit additional development of the property,
given the age of the original TIA and change in development intensity, VDOT Staunton District
Planning recommends the preparation of an updated TIA to support the proffer amendment.
During the June 28, meeting between VDOT and the developer/property owner at the Edinburg
Residency, coordination with the adjacent property owner (additional B2 zoning) to realign/improve
Custer Avenue and Pembridge Avenue in order to improve access opportunities to the commercially
zoning properties was discussed. Did this outreach take place and were improvements considered?
Frederick County Attorney: Please see attached letter from Roderick B. Williams, County Attorney,
dated September 12, 2016.
Planning & Zoning:
1) Site History
The original Frederick County Zoning map (USGS Winchester Quadrangle) depicts the zoning
for the five parcels which comprise the proposed rezoning as R2 (Residential Limited) District.
On February 14, 1990, the R-2 District zoning classification was modified to RP (Residential
Performance), during the comprehensive amendment to the County’s Zoning Ordinance. On
October 14, 2009 the Board of Supervisors approved Rezoning #05-09 which rezoned the
properties to the B2 (General Business) District with proffers.
2) Comprehensive Policy Plan
The 2030 Comprehensive Plan is the guide for the future growth of Frederick County.
The 2030 Comprehensive Plan is an official public document that serves as the Community's
guide for making decisions regarding development, preservation, public facilities and other key
Rezoning # 01-17 DMJ Holdings, LLC
February 6, 2017
Page 4
components of community life. The primary goal of this plan is to protect and improve the
living environment within Frederick County. It is in essence a composition of policies used to
plan for the future physical development of Frederick County.
The Area Plans, Appendix I of the 2030 Comprehensive Plan, are the primary implementation
tool and will be instrumental to the future planning efforts of the County.
Land Use.
The properties are located within the UDA and SWSA and are designated as an area of
commercial land use by the Eastern Frederick County Long Range Land Use Plan. The site is
located in the area covered by the Senseny Eastern Frederick Urban Area Study. The land use
plan identifies, more specifically, a commercial designation with a transition back into the
surrounding residential land uses.
Transportation and Access.
Site access is proposed to be provided from two locations. Primary access to the site is via
Route 50 and a secondary access point is proposed to be provided from Route 781 (Custer
Avenue) via a modified commercial entrance onto Route 781 generally using the existing right-
of-way across the properties frontage. The Route 50 entrance would be in the form of a right in
right out only entrance, the Route 781 entrance would be right in only.
Staff would note that the proffer currently limits any future use(s) to those that will not generate
in excess of 200 vehicle trips per hour during any hour. This proffer remains unchanged from
the 2009 approval. VDOT has expressed concern that a fast food restaurant with a drive thru
would max out the hour trip cap which would leave the remainder of the property
undevelopable.
3) Proffer Statement – Dated March 24, 2009; revised December 6, 2016:
1. Generalized Development Plan (unchanged)
Proffers 2-8 remain unchanged
9. The Owner agrees to prohibit the following uses (as listed in the Frederick County
Zoning Ordinance) on the property:
1. Car washes
2. Fast food restaurants with drive through service window (removed)
3. Automotive dealers with outdoor display and gasoline service stations
4. Model home sales offices
5. Amusement and recreational services operated outdoors
6. Self-storage storage facilities
7. Adult retail
Proffer 10 remains unchanged
Rezoning # 01-17 DMJ Holdings, LLC
February 6, 2017
Page 5
EXECUTIVE SUMMARY & STAFF CONCLUSION FOR THE 02/15/17 PLANNING
COMMISSION MEETING:
This is an application to amend the proffers from Rezoning #05-09 for 2.85 acres of land. This minor
proffer amendment seeks to remove a proffer which currently prohibits fast food restaurants with drive
through service windows. If approved the site would permit the construction of fast food restaurants
with drive through service windows if all other requirements and conditions are met.
The properties are located within the UDA and SWSA and are designated as an area of commercial land
use by the Eastern Frederick County Long Range Land Use Plan. The site is located in the area covered
by the Senseny Eastern Frederick Urban Area Study. The land use plan identifies, more specifically, a
commercial designation with a transition back into the surrounding residential land uses.
Staff would note that the approved proffer currently limits any future use(s) to those that will not
generate in excess of 200 vehicle trips per hour during any hour. This proffer remains unchanged from
the 2009 approval. It should be noted that a fast food restaurant with a drive through would max out the
hourly trip cap which would leave the remainder of the property undevelopable.
A recommendation regarding this rezoning application to the Board of Supervisors would be
appropriate. The Applicant should be prepared to adequately address all concerns raised by the
Planning Commission.
64A 416A
64A 4 18
64A 4 19
64A 4 20
64A 4 17
64A 4 16
1230MILLWOODPIKE
1230MILLWOODPIKE
1191MILLWOODPIKE
1181MILLWOODPIKE
130ETNAM ST
1173MILLWOODPIKE
128ETNAM ST
126ETNAM ST
107CLARENDON CT
105CLARENDON CT
127ETNAM ST
106CLARENDON CT
124ETNAM ST
106PURDUE DR
125ETNAM ST
104CLARENDON CT
103CLARENDON CT
122ETNAM ST
123ETNAM ST
102CLARENDON CT
E
T
N
A
M
S
T
MILLW
O
O
D
P
I
K
E
Applications
Parcels
Sewer and Water Service Area
Building Footprints
B1 (Neighborhood Business District)
B2 (General Business District)
B3 (Industrial Transition District)
EM (Extractive Manufacturing District)
HE (Higher Education District)
M1 (Light Industrial District)
M2 (Industrial General District)
MH1 (Mobile Home Community District)
MS (Medical Support District)
OM (Office - Manufacturing Park)
R4 (Residential Planned Community District)
R5 (Residential Recreational Community District)
RA (Rural Areas District)
RP (Residential Performance District)
I
Note:Frederick County Dept ofPlanning & Development107 N Kent StSuite 202Winchester, VA 22601540 - 665 - 5651Map Created: January 10, 2017Staff: cperkins
MILLW
O
O
D
P
I
K
E
E
T
N
A
M
S
T
RYC
O
L
N
CUSTER AVE
F
L
A
N
A
G
A
N
D
R
P
E
M
B
R
I
D
G
E
D
R
PUR
D
U
E
D
R
PRINC
E
T
O
N
D
R
PRIN
C
E
F
R
E
D
E
R
I
C
K
D
R
0150
REZ # 01 - 17DMJ Holdings, LLCPINs:64A - 4 - 16, 64A - 4 - 16A, 64A - 4 - 1764A - 4 - 18, 64A - 4 - 19, 64A - 4 - 20Proffer Amendment
0 100 20050 Feet
REZ # 01 - 17DMJ Holdings, LLCPINs:64A - 4 - 16, 64A - 4 - 16A, 64A - 4 - 17,64A - 4 - 18, 64A - 4 - 19, 64A - 4 - 20Proffer Amendment
REZ #01-17
REZ #01-17
REZ #01-170150
REZ #01-17
REZ #01-17
REZ #01-17
64A 416A
64A 4 18
64A 4 19
64A 4 20
64A 4 17
64A 4 16
1230MILLWOODPIKE
1230MILLWOODPIKE
1191MILLWOODPIKE
1181MILLWOODPIKE
130ETNAM ST
1173MILLWOODPIKE
128ETNAM ST
126ETNAM ST
107CLARENDON CT
105CLARENDON CT
127ETNAM ST
106CLARENDON CT
124ETNAM ST
106PURDUE DR
125ETNAM ST
104CLARENDON CT
103CLARENDON CT
122ETNAM ST
123ETNAM ST
102CLARENDON CT
E
T
N
A
M
S
T
MILLW
O
O
D
P
I
K
E
Applications
Parcels
Sewer and Water Service Area
Building Footprints
I
Note:Frederick County Dept ofPlanning & Development107 N Kent StSuite 202Winchester, VA 22601540 - 665 - 5651Map Created: January 10, 2017Staff: cperkins
MILLW
O
O
D
P
I
K
E
E
T
N
A
M
S
T
RYC
O
L
N
CUSTER AVE
F
L
A
N
A
G
A
N
D
R
P
E
M
B
R
I
D
G
E
D
R
PUR
D
U
E
D
R
PRINC
E
T
O
N
D
R
PRIN
C
E
F
R
E
D
E
R
I
C
K
D
R
0150
REZ # 01 - 17DMJ Holdings, LLCPINs:64A - 4 - 16, 64A - 4 - 16A, 64A - 4 - 1764A - 4 - 18, 64A - 4 - 19, 64A - 4 - 20Proffer Amendment
0 100 20050 Feet
REZ # 01 - 17DMJ Holdings, LLCPINs:64A - 4 - 16, 64A - 4 - 16A, 64A - 4 - 17,64A - 4 - 18, 64A - 4 - 19, 64A - 4 - 20Proffer Amendment
REZ #01-17
REZ #01-17
REZ #01-170150
REZ #01-17
REZ #01-17
REZ #01-17
64A 4 20
64A 416A
64A 4 18
64A 4 19
64A 4 17
64A 4 16
1230MILLWOODPIKE147RYCO LN
1160MILLWOODPIKE
1186MILLWOODPIKE
1191MILLWOODPIKE
1181MILLWOODPIKE
1173MILLWOODPIKE
130ETNAM ST
128ETNAM ST
1163MILLWOODPIKE
107CLARENDON CT 126ETNAM ST 131ETNAM ST
105CLARENDON CT 127ETNAM ST
106CLARENDON CT
124ETNAM ST
106PURDUE DR
125ETNAM ST
104CLARENDON CT
103CLARENDON CT
122ETNAM ST
123ETNAM ST
102CLARENDON CT 115PEMBRIDGE DR
E
T
N
A
M
S
T
MILLW
O
O
D
P
I
K
E
Applications
Parcels
Sewer and Water Service Area
Building Footprints
Long Range Land Use
Residential
Neighborhood Village
Urban Center
Mobile Home Community
Business
Highway Commercial
Mixed-Use
Mixed Use Commercial/Office
Mixed Use Industrial/Office
Industrial
Warehouse
Heavy Industrial
Extractive Mining
Commercial Rec
Rural Community Center
Fire & Rescue
Historic
Institutional
Planned Unit Development
Park
Recreation
School
Employment
Airport Support Area
B2 / B3
Residential, 4 u/a
High-Density Residential, 6 u/a
High-Density Residential, 12-16 u/a
Rural Area
Interstate Buffer
Landfill Support Area
Natural Resources & Recreation
Environmental & Recreational Resources
I
Note:Frederick County Dept ofPlanning & Development107 N Kent StSuite 202Winchester, VA 22601540 - 665 - 5651Map Created: January 10, 2017Staff: cperkins
MILLW
O
O
D
P
I
K
E
E
T
N
A
M
S
T
RYC
O
L
N
CUSTER AVE
F
L
A
N
A
G
A
N
D
R
P
E
M
B
R
I
D
G
E
D
R
PUR
D
U
E
D
R
PRINC
E
T
O
N
D
R
PRIN
C
E
F
R
E
D
E
R
I
C
K
D
R
0150
REZ # 01 - 17DMJ Holdings, LLCPINs:64A - 4 - 16, 64A - 4 - 16A, 64A - 4 - 1764A - 4 - 18, 64A - 4 - 19, 64A - 4 - 20Proffer Amendment
0 130 26065 Feet
REZ # 01 - 17DMJ Holdings, LLCPINs:64A - 4 - 16, 64A - 4 - 16A, 64A - 4 - 17,64A - 4 - 18, 64A - 4 - 19, 64A - 4 - 20Proffer Amendment
REZ #01-17
REZ #01-17
REZ #01-17
0150
REZ #01-17REZ #01-17
REZ #01-17
D
MASTER DEVELOPMENT PLAN #01-17
Freedom Manor
Staff Report for the Planning Commission
Prepared: February 6, 2017
Staff Contact: M. Tyler Klein, AICP, Planner
This report is prepared by the Frederick County Planning Staff to provide information to the
Planning Commission and the Board of Supervisors to assist in the review of this application. It may
also be useful to others interested in this zoning matter.
Reviewed Action
Planning Commission: 02/15/17 Pending
Board of Supervisors: 03/08/17 Pending
PROPOSAL: To develop 47 acres of land zoned RP (Residential Performance) District with 90 single-
family detached clustered units and 100 single-family attached (townhome) units (total density of 5.47
units/acre). This Master Development Plan (MDP) also included proffered improvements including site
access, connectivity, recreational units and amenities.
MAGISTERIAL DISTRICT: Shawnee
PROPERTY ID NUMBERS: 64-A-19, 64-A-20, and 64-A-23
LOCATION: The properties are located east and adjacent to Papermill Road (Route 644) and
approximately 2,300 feet north/west of the existing signalized intersection of Front Royal Pike (Route
522) and Papermill Road (Route 644).
PROPERTY ZONING & PRESENT USE:
Zoned: RP (Residential Performance) Use: Vacant
ZONING & PRESENT USE OF ADJOINING PROPERTIES:
North: RP (Residential Performance) Use: Vacant (Madison Village)
RA (Rural Areas) Vacant/Agricultural
South: RA (Rural Areas) Use: Shenandoah Memorial Park
East: RP (Residential Performance) Use: Residential
RA (Rural Areas) Residential
West: RA (Rural Areas) Use: Residential/Vacant/Agricultural
STAFF CONCLUSIONS FOR THE 02/15/17 PLANNING COMMISSION MEETING:
The Master Development Plan for Freedom Manor appears to be consistent with the requirements of
Article VIII, Master Development Plan, of the Frederick County Zoning Ordinance, and this MDP is in
a form that is administratively approvable. This MDP is also in conformance with the proffers for the
approved Rezoning #11-15. All of the issues brought forth by the Planning Commission should be
appropriately addressed by the Applicant.
MDP #01-17 Freedom Manor
February 6, 2017
Page 2
It appears that the application meets all requirements. Following presentation of the application to the
Planning Commission and the Board of Supervisors, and the incorporation of your comments, staff is
prepared to proceed to approval of the application.
REVIEW EVALUATIONS:
Virginia Department of Transportation: A VDOT review has been conducted for the Freedom Manor
Master Development Plan dated June 8, 2016, received in this office on June 27, 2016. We have no
objection to the Master Plan and find it acceptable. Please provide a signed set of drawing in electronic
pdf format for our records. We look forward to the opportunity to review the project in further detail,
during the Site Plan submission process.
Frederick County Fire Marshal: Plans approved.
Frederick County Public Works: Your letter dated December 5, 2016 and corresponding revised
plans have adequately addressed our previous review comments dated August 8, 2016.
It should be noted that we will comment on the stormwater management plan for the entir e development
at the time of the site plan submittal. We will expect that quality as well as quantity will be addressed in
the design of the stormwater plan for the proposed development.
Frederick County Inspections: No comments required at this time, shall comment on site plan review.
Frederick County Parks and Recreation: Plan appears to meet Parks and Recreation requirements.
Virginia Department of Health: Health Department has no objection so long as there is no negative
impact to wells or drainfields.
Frederick County Public School: We offer no comments at this time.
Frederick County GIS: The revised road names are accepted as designed.
Planning & Zoning:
A) Master Development Plan Requirement
A Master Development Plan is required prior to development of this property. Before a MDP
can be approved, it must be reviewed by the Planning Commission, Board of Supervisors and all
relevant review agencies. Approval may only be granted if the MDP conforms to all
requirements of the Frederick County Zoning and Subdivision Ordinances. The purpose of the
MDP is to promote orderly and planned development of property within Frederick County that
suits the characteristics of the land, is harmonious with adjoining property and is in the best
interest of the general public.
B) Site History
The original Frederick County Zoning Map (U.S.G.S. Winchester Quadrangle) identifies this
property as being zoned R-1 (Residential Limited). The parcels were re-mapped from R-1 to A-
MDP #01-17 Freedom Manor
February 6, 2017
Page 3
2 (Agricultural General) pursuant to the County’s comprehensive downzoning initiative (Zoning
Amendment Petition #011-80), which was adopted on October 8, 1980. The County’s
agricultural zoning districts were subsequently combined to form the RA (Rural Areas) District
upon adoption of an amendment to the Frederick County Zoning Ordinance on May 10, 1989.
The corresponding revision of the zoning map resulted in the re -mapping of the subject property
and all other A-1 and A-2 zoned land to the RA District. Parcel 64-A-19 and a portion of parcel
64-A-20 were originally slated to be part of the Westwood Subdivision (Section B) and appear to
retain their R-1/RP zoning designation.
In 2002, Rezoning #07-02, Doris F. Casey, was submitted to the County for a request for the
development of 70 single family detached residential lots on 30.31 acres with access being via
Route 522. At that time, the property had frontage on Route 522. Ultimately, the Board of
Supervisors denied Rezoning #07-02 on December 17, 2002. On August 20, 2003 a Minor Rural
Subdivision (Family Division) was approved creating the 26.87 acre parcel for PIN 64-A-23. On
September 14, 2005 the Board of Supervisors approved Rezoning #09-05 of Freedom Manor
which rezoned parcel 64-A-23 from the RA District to the RP District with proffers. This
rezoning was approved for 70 single-family dwellings on 26.87 acres of land.
In 2015, Rezoning #11-15, Freedom Manor, was submitted to the County to request rezoning of
33.6819 acres from the RP (Residential Performance) District and 13.8596 from the RA (Rural
Areas) District to the RP (Residential Performance) District with proffers. This application
would enable the construction of up to 300 residential units. The Board of Supervisors approved
Rezoning #11-15 on December 30, 2015.
C) Site Suitability & Project Scope
Comprehensive Plan:
The 2030 Comprehensive Plan is an official public document that serves as the Community's
guide for making decisions regarding development, preservation, public facilities and other key
components of community life. The primary goal of this Plan is to protect and improve the
living environment within Frederick County. It is in essence a composition of policies used to
plan for the future physical development of Frederick County.
Land Use Compatibility:
The parcels comprising this MDP Application are located within the County’s Urban
Development Area (UDA) and Sewer and Water Service Area (SWSA). The UDA defines the
general area in which more intensive forms of residential development will occur. In addition,
the Freedom Manor Development is located within the Senseny/Eastern Frederick Urban Area
Plan of the 2030 Comprehensive Plan. The Senseny/Eastern Frederick Urban Area Plan
designates the area where this site is located with a residential land use (4 units per acre density)
and a high-density residential land use (12-16 units per acre).
Per the approved rezoning, Phase I of the project consists of approximately 34 acres and is
limited to 100 single-family detached residential units (or a maximum 6 units/acre). Phase II of
the project consists of approximately 13.5 acres and is limited to a maximum of 200 single-
family attached or multi-family units (or a maximum of 10 units/acre). The MDP depicts 100
single-family detached units (proposed density at 3.28 units/acre) and 90 single-family attached
MDP #01-17 Freedom Manor
February 6, 2017
Page 4
townhome units (proposed density at 7.65 units/acre). The proposed unit mix is under the
approved totals for each unit type.
Site Access and Transportation:
Access, as shown on the MDP, will be provided to the site via a roundabout intersection with
Papermill Road and will be constructed by the Applicant, and access through inter-parcel
connections to the northwest through the Madison Village Development. The transportation
network also includes a 10’ pedestrian trail along Papermill Road and Davis Drive (also
connecting into Madison Village) and the internal public roads shown on the GDP and a trail that
runs the length of the common boundary with the Shenandoah Memorial Park.
STAFF CONCLUSIONS FOR THE 02/15/17 PLANNING COMMISSION MEETING:
The Master Development Plan for Freedom Manor, LLC is consistent with the requirements of Article
VIII, Master Development Plan, of the Zoning Ordinance, and this MDP is in a form that is
administratively approvable. All of the issues brought forth by the Planning Commission should be
appropriately addressed by the Applicant.
It appears that the application meets all requirements. Following presentation of the application to the
Planning Commission and the Board of Supervisors, and the incorporation of your comments, staff is
prepared to proceed to approval of the application.
SOUTHVIEWSubdivision
GLAZEDEVELOPMENTSubdivision WESTWOODSubdivision
CHAPEL HILLSubdivision
BUFFLICKHEIGHTSSubdivision
01522
ST644
64 A 25
64 A 24
64 3 A
64 A 35
64 A 36
64 3 A1
64D 4 7
64D 4 6
64D4 5
64 A 23
64D4 4
64 A 23A
64D4 3
64D4 1
64D4 2
64 2 D
63D2 15
63D 2 17
64D A 30 64 2 D263D2 13
63 A 146
63D2 963D2 11
63D 2 14
64D 81 1A
63D 1 7
63D 2 12
63D2 863D2 10
64 A 19 64D 1B A 64D 2A 6 64D2 A 5 64D 2A 4 64D2 A 3 64D 2 2 64D 2A 1
64D A 28 64D A 27 64D8 1 1
64D 81 2
63D 1 5
63D 1 6
63D 1 3
63D 1 4
63 A 145
64 A 20
64D 2A 7 64D2 A 15
64D A 23 64D A 24 64D A 25 64D A 26
64D 81 86A
64D 81 86
64D 81 85
63D 1 2
64 A21A
64D2 A 8 64D 2A 14 64D 3 A
64D 3 B 64D A 21
64DA 22 64D A 20
64D 81 69
63 A146A 64D 2A 9
64D2 A 13 64D A 19 64D 81 70
64D 2A 10
64D 2A 11 64D 2A 12 64D A 16 64D A 18 64D 81 68
64D A 15
64D A 12
64D A 17
64 2 C
64D 81 67
64D 81 66
64D A 10
64 2 A2 64 2 B2
63 A 124
64D A 14
64D A 8 64D A 9 64 2 A1 64 2 A3
64 A 18
64D A 7 64D A 6
64D A 5 64 2 A 64 2 A3
64D A 364D A 4
64 A 18A
64 A 41
64 A 42
64D A 2
64D A 1
64C 2 1
64 A 43
64 A 44
W
E
S
T
W
O
O
D
C
I
R
HARRISO
N
L
N
BENTLEYAVE
WESTWOOD DR
F
R
O
N
T
R
O
Y
A
L
P
I
K
E
P
A
P
E
R
M
I
L
L
R
D
Applications
Parcels
Building Footprints
B1 (Neighborhood Business District)
B2 (General Business District)
B3 (Industrial Transition District)
EM (Extractive Manufacturing District)
HE (Higher Education District)
M1 (Light Industrial District)
M2 (Industrial General District)
MH1 (Mobile Home Community District)
MS (Medical Support District)
OM (Office - Manufacturing Park)
R4 (Residential Planned Community District)
R5 (Residential Recreational Community District)
RA (Rural Areas District)
RP (Residential Performance District)
I
Note:Frederick County Dept ofPlanning & Development107 N Kent StSuite 202Winchester, VA 22601540 - 665 - 5651Map Created: January 10, 2017Staff: tklein
Winchester
P
A
P
E
R
M
I
L
L
R
D
F
R
O
N
T
R
O
Y
A
L
P
I
K
E
EVENDALE LN
VINE LN
JUSTES DR
CALDW
E
L
L
L
N
BENTLE
Y
A
V
E
LAURELWOOD DR
LONGCROFT RD
MDP # 01 - 17Freedom ManorPINs:64 - A - 19, 64 - A - 20, 64 - A - 23
0 420 840210 Feet
MDP # 01 - 17Freedom ManorPINs:64 - A - 19, 64 - A - 20, 64 - A - 23
MDP #01-17
MDP #01-17
MDP #01-17
SOUTHVIEWSubdivision
GLAZEDEVELOPMENTSubdivision WESTWOODSubdivision
CHAPEL HILLSubdivision
BUFFLICKHEIGHTSSubdivision
01522
ST644
64 A 25
64 A 24
64 3 A
64 A 35
64 A 36
64 3 A1
64D 4 7
64D 4 6
64D4 5
64 A 23
64D4 4
64 A 23A
64D4 3
64D4 1
64D4 2
64 2 D
63D2 15
63D 2 17
64D A 30 64 2 D263D2 13
63 A 146
63D2 963D2 11
63D 2 14
64D 81 1A
63D 1 7
63D 2 12
63D2 863D2 10
64 A 19 64D 1B A 64D 2A 6 64D2 A 5 64D 2A 4 64D2 A 3 64D 2 2 64D 2A 1
64D A 28 64D A 27 64D8 1 1
64D 81 2
63D 1 5
63D 1 6
63D 1 3
63D 1 4
63 A 145
64 A 20
64D 2A 7 64D2 A 15
64D A 23 64D A 24 64D A 25 64D A 26
64D 81 86A
64D 81 86
64D 81 85
63D 1 2
64 A21A
64D2 A 8 64D 2A 14 64D 3 A
64D 3 B 64D A 21
64DA 22 64D A 20
64D 81 69
63 A146A 64D 2A 9
64D2 A 13 64D A 19 64D 81 70
64D 2A 10
64D 2A 11 64D 2A 12 64D A 16 64D A 18 64D 81 68
64D A 15
64D A 12
64D A 17
64 2 C
64D 81 67
64D 81 66
64D A 10
64 2 A2 64 2 B2
63 A 124
64D A 14
64D A 8 64D A 9 64 2 A1 64 2 A3
64 A 18
64D A 7 64D A 6
64D A 5 64 2 A 64 2 A3
64D A 364D A 4
64 A 18A
64 A 41
64 A 42
64D A 2
64D A 1
64C 2 1
64 A 43
64 A 44
W
E
S
T
W
O
O
D
C
I
R
HARRISO
N
L
N
BENTLEYAVE
WESTWOOD DR
F
R
O
N
T
R
O
Y
A
L
P
I
K
E
P
A
P
E
R
M
I
L
L
R
D
Applications
Parcels
Building Footprints
I
Note:Frederick County Dept ofPlanning & Development107 N Kent StSuite 202Winchester, VA 22601540 - 665 - 5651Map Created: January 10, 2017Staff: tklein
Winchester
P
A
P
E
R
M
I
L
L
R
D
F
R
O
N
T
R
O
Y
A
L
P
I
K
E
EVENDALE LN
VINE LN
JUSTES DR
CALDW
E
L
L
L
N
BENTLE
Y
A
V
E
LAURELWOOD DR
LONGCROFT RD
MDP # 01 - 17Freedom ManorPINs:64 - A - 19, 64 - A - 20, 64 - A - 23
0 420 840210 Feet
MDP # 01 - 17Freedom ManorPINs:64 - A - 19, 64 - A - 20, 64 - A - 23
MDP #01-17
MDP #01-17
MDP #01-17
E
MASTER DEVELOPMENT PLAN #03-17
Southern Hills Phase II
Staff Report for the Planning Commission
Prepared: February 6, 2017
Staff Contact: M. Tyler Klein, AICP, Planner
This report is prepared by the Frederick County Planning Staff to provide information to the
Planning Commission and the Board of Supervisors to assist in the review of this application. It
may also be useful to others interested in this zoning matter.
Reviewed Action
Planning Commission: 02/15/17 Pending
Board of Supervisors: 03/08/17 Pending
PROPOSAL: To develop 37.79 acres of land zoned RP (Residential Performance) District with
130 single-family detached (SFD) units. This Master Development (MDP) also includes 2.56 acres
of land zoned B2 (General Business) District of right-of-way reservation for a future major
collector road (Southern Warrior Drive Extension).
MAGISTERIAL DISTRICT: Opequon
PROPERTY ID NUMBERS: 85D-1-1-95
LOCATION: The site is located east of Town Run Lane (Route 1012) approximately 0.6 miles
south of the intersection with Fairfax Pike (Route 277) and Town Run Lane.
PROPERTY ZONING & PRESENT USE:
Zoned: RP (Residential Performance) Use: Vacant
B2 (General Business)
ZONING & PRESENT USE OF ADJOINING PROPERTIES:
North: B2 (General Business) Use: Vacant
South: RP (Residential Performance) Use: Residential
East: RP (Residential Performance) Use: Vacant/Open Space
West: RA (Rural Areas) Use: Vacant/Agricultural
STAFF CONCLUSIONS FOR THE 02/15/17 PLANNING COMMISSION MEETING:
The Master Development Plan for Southern Hills – Phase II appears to be consistent with the
requirements of Article VIII, Master Development Plan, of the Frederick County Zoning
Ordinance, and this MDP is in a form that is administratively approvable. The MDP is also in
conformance with the proffers for the approved Rezoning #11-16. All of the issues brought forth
by the Planning Commission should be appropriately addressed by the Applicant.
It appears that the application meets all requirements. Following presentation of the application to
the Planning Commission and the Board of Supervisors, and the incorporation of your comments,
staff is prepared to proceed to approval of the application.
MDP #03-17 Southern Hills Phase II
February 6, 2017
Page 2
REVIEW EVALUATIONS:
Virginia Department of Transportation: A VDOT review has been conducted for the Southern
Hills Phase II Master Development Plan with a revision date of January 4, 2017. Based off the
review of the submittal, the requested “MDP” meets our minimum requirements and therefore is
approved by our office. We offer the following general comments:
Our review and comments are general in nature. Should details be overlooked during the review
or conditions in the field exist such that additional measures are warranted, such measures shall be
completed to the satisfaction of the Department.
Frederick County Fire Marshal: MDP approved provided hydrant locations complies with
Frederick County Codes which can be viewed online and fire apparatus access complies with the
2012 Fire Prevention Code.
Frederick County Public Works: Indicate the limits and topography at the soil stock pile located
at the northern end at Westchester Drive. The contours shown on the proposed master plan do not
reflect the existing topographic conditions.
Frederick County Inspections: No comments required at this time. Comments will be made at
time of subdivision lot review.
Frederick County Parks and Recreation: Plan appears to meet Parks and Recreation
requirements.
Frederick County Sanitation Authority: Approved.
Frederick County Public School: We have reviewed the Southern Hills Phase II Master
Development Plans submitted to us on November 30, 2016. We offer no comments.
Frederick County GIS: I have reviewed the changes you have made to the street suffixes as
requested in our comments dated December 9, 2017. The revisions you have made have been
accepted. The street names “Nathan Dr” and “Savannah Way” are approved for use in the
Southern Hills Subdivision as shown on this design plan. No more revisions are required at this
time; however, should the road layout be altered please resubmit plans to our office for suffix
revision comments.
Town of Stephens City: No impact to Town of Stephens City.
Planning & Zoning:
A) Master Development Plan Requirement
A Master Development Plan (MDP) is required prior to development of this property.
Before an MDP can be approved, it must be reviewed by the Planning Commission, Board
of Supervisors and all relevant review agencies. Approval may only be granted if the MDP
conforms to all requirements of the Frederick County Zoning and Subdivision Ordinances.
The purpose of the MDP is to promote orderly and planned development of property within
MDP #03-17 Southern Hills Phase II
February 6, 2017
Page 3
Frederick County that suits the characteristics of the land, is harmonious with adjoining
property and is in the best interest of the general public.
B) Site History
On July 11, 2001, the Board of Supervisors approved Rezoning #01-01 to rezone 105 acres
from RA (Rural Areas) District to RP (Residential Performance) District to enable the
construction of 250 single-family residential lots. Frederick County administratively
approved MDP #09-03 on June 28, 2004 for the Southern Hills project which enabled the
subdivision of the project. The Phase I subdivision final plats for the creation of 95 single-
family residential lots was approved on June 16, 2006. Revised MDP #16-06 for Phase I
was approved in February 2007 for up to 88 single-family detached (SFD) and 232 single-
family attached (SFA) residential uses and commercial uses.
In 2016, Rezoning #11-16, Southern Hills – Phase II, was submitted to the proffers
associated with Rezoning #22-06 for 40.36 acres (37.79 acres of Residential Performance
and 2.57 acres of General Business) Zoning Districts to allow for the construction of up to
130 single-family detached (SFD) units. This requested rezoning changed the housing type
mix to include only SFD units and decrease the total units by 102. The Board of
Supervisors approved Rezoning #11-16 on November 9, 2016.
C) Site Suitability & Project Scope
Comprehensive Plan:
The Frederick County Comprehensive Policy Plan is an official public document that
serves as the Community's guide for making decisions regarding development,
preservation, public facilities and other key components of community life. The primary
goal of this plan is to protect and improve the living environment within Frederick County.
It is in essence a composition of policies used to plan for the future physical development
of Frederick County.
Land Use Compatibility:
The South Frederick Area Plan of the Comprehensive Plan identifies this property with
residential and commercial land use designations. The current RP (Residential
Performance) and B2 (General Business) Districts zoning designations are supported by the
Comprehensive Plan.
The Master Development Plan for Phase II is generally consistent with the original Master
Development Plan in terms of area of development and limits of disturbance and the
approved proffers with the most recent Rezoning #11-16.
Phase II of the project will be developed in a manner that provides areas of open space
preservation and active recreational land uses consistent with the original Master
Development Plan. The Ewing Family Cemetery is incorporated into the design of the
MDP and access is provided consistent with the proffer addressing this feature. The
inclusion of the right-of-way dedication for the extension of Warrior Drive is located
correctly. Adjacent to the future right-of-way, the MDP provides for the appropriate
buffering, screening.
MDP #03-17 Southern Hills Phase II
February 6, 2017
Page 4
Site Access and Transportation:
Access, as shown on the MDP, will be provided to the site via an access drive from Town
Run Lane (VA Route 1012), and will connect Southern Hills – Phase I to the south via
Westchester Drive. Sidewalks will be included on either side of the internal streets for
pedestrian connectivity within the development, and a 10’ trail along Town Run Lane.
The Southern Frederick Area Plan depicts a new minor arterial road which is located within
the commercial portion of Southern Hills – Phase II. The right-of-way for the new arterial
(the future Southern Warrior Drive Extension) is reserved as shown on the MDP.
STAFF CONCLUSIONS FOR THE 02/15/17 PLANNING COMMISSION MEETING:
The Master Development Plan for Southern Hills – Phase II appears to be consistent with the
requirements of Article VIII, Master Development Plan, of the Frederick County Zoning
Ordinance, and this MDP is in a form that is administratively approvable. The MDP is also in
conformance with the proffers for the approved Rezoning #11-16. All of the issues brought forth
by the Planning Commission should be appropriately addressed by the Applicant.
It appears that the application meets all requirements. Following presentation of the application to
the Planning Commission and the Board of Supervisors, and the incorporation of your comments,
staff is prepared to proceed to approval of the application.
SOUTHERNHILLSSubdivision
MEADOWSEDGESubdivision
STEPHENS RIDGESubdivision
§¨¦81
§¨¦81
ST1012
ST1012
85 A 60
85 A 134 85 A137D85 A137C
85D 1 195A
85D1 1 13
85D 11 14 85D 11 15
85D 11 16
85D 11 17
85D 11 18
85D 11 19
85D 11 20 85D 11 21 85D 11 22
85D 11 23 85D 11 24 85D 11 25
85D 11 26
85 A 139
85D 11 11 85D 11 12
85 A 140
85 A137E 85D1 1 9 85D 11 10
85 A 137 85D1 1 685D1 1 7 85D1 1 8
85D1 1 51
85D1 1 52
85D 11 50
85D 11 49
85D 11 48 85D 11 47 85D 11 46 85D 11 31
85D 11 30
85D 11 29
85D 11 28 85D1 1 27
85D1 1 485D1 1 5 85D 11 53
85D 11 41 85D 11 42
85D 11 43
85D 11 44 85D 11 45 85D 11 32
85D 11 1 85D1 1 2
85D 11 3
85D 11 66 85D 11 65 85D 11 54
85D1 1 55
85D 11 33
85D1 1 34
85D 11 64
85D1 1 56 85D 11 40
85D 11 39
85D 11 38
85D 11 37
85D 11 36
85D1 1 35 85D 11 95B
85D 11 81 85D 11 80
85D 11 79
85D 11 67
85D1 1 68
85D 11 63
85D 11 95
85D 11 62 85D1 1 57
85D 11 82
85D1 1 78 85D1 1 69 85D 11 59 85D 11 58
85D 11 83 85D1 1 77 85D1 1 70
85D1 1 71 85D 11 61
85D 11 60
85 A 59
85D 11 84
85D 11 85 85D1 1 7585D1 1 76
85D1 1 72
85D 11 86 85D1 1 74
85D1 1 87 85D1 1 73
85D1 1 88
85D 11 95B
85D 11 89
85D 11 90
85D1 1 91
85D 11 92
85 A 141
85 A 141
85D 11 93
85D1 1 94
85 A 138
85 A 142
85 A142A
85 A142A
85E 11 26A
85C 291A
85C 2 90
85C 2 9185C 2 89
85C 249A85C 2 5885C 2 59
85C 2 8585C 2 86
NO
R
W
I
C
H
C
T
PE
A
C
E
A
N
D
PLE
N
T
Y
L
N
WAKEFIELD CT
WES
T
C
H
E
S
T
E
R
D
R
G
A
R
D
E
N
G
A
T
E
D
R
HAYVENHURST CT
TO
W
N
R
U
N
L
N
Applications
Parcels
Building Footprints
B1 (Neighborhood Business District)
B2 (General Business District)
B3 (Industrial Transition District)
EM (Extractive Manufacturing District)
HE (Higher Education District)
M1 (Light Industrial District)
M2 (Industrial General District)
MH1 (Mobile Home Community District)
MS (Medical Support District)
OM (Office - Manufacturing Park)
R4 (Residential Planned Community District)
R5 (Residential Recreational Community District)
RA (Rural Areas District)
RP (Residential Performance District)
I
Note:Frederick County Dept ofPlanning & Development107 N Kent StSuite 202Winchester, VA 22601540 - 665 - 5651Map Created: January 23, 2017Staff: tklein
Stephens City
VALL
E
Y
P
I
K
E
TOW
N
R
U
N
L
N
FAMIL
Y
D
R
GARDEN G
A
T
E
D
R
TRU
N
K
D
R
HAYVENHURST CT
C
A
M
P
B
E
L
L
L
N
§¨¦81
§¨¦81
MDP # 03 - 17Southern Hills Phase 2PIN:85D - 1 - 1 - 95
0 420 840210 Feet
FAIRFAX PIKE
MDP # 03 - 17Southern Hills Phase 2PIN:85D - 1 - 1 - 95
MDP #03-17
SOUTHERNHILLSSubdivision
MEADOWSEDGESubdivision
STEPHENS RIDGESubdivision
§¨¦81
§¨¦81
ST1012
ST1012
85 A 60
85 A 134 85 A137D85 A137C
85D 1 195A
85D1 1 13
85D 11 14 85D 11 15
85D 11 16
85D 11 17
85D 11 18
85D 11 19
85D 11 20 85D 11 21 85D 11 22
85D 11 23 85D 11 24 85D 11 25
85D 11 26
85 A 139
85D 11 11 85D 11 12
85 A 140
85 A137E 85D1 1 9 85D 11 10
85 A 137 85D1 1 685D1 1 7 85D1 1 8
85D1 1 51
85D1 1 52
85D 11 50
85D 11 49
85D 11 48 85D 11 47 85D 11 46 85D 11 31
85D 11 30
85D 11 29
85D 11 28 85D1 1 27
85D1 1 485D1 1 5 85D 11 53
85D 11 41 85D 11 42
85D 11 43
85D 11 44 85D 11 45 85D 11 32
85D 11 1 85D1 1 2
85D 11 3
85D 11 66 85D 11 65 85D 11 54
85D1 1 55
85D 11 33
85D1 1 34
85D 11 64
85D1 1 56 85D 11 40
85D 11 39
85D 11 38
85D 11 37
85D 11 36
85D1 1 35 85D 11 95B
85D 11 81 85D 11 80
85D 11 79
85D 11 67
85D1 1 68
85D 11 63
85D 11 95
85D 11 62 85D1 1 57
85D 11 82
85D1 1 78 85D1 1 69 85D 11 59 85D 11 58
85D 11 83 85D1 1 77 85D1 1 70
85D1 1 71 85D 11 61
85D 11 60
85 A 59
85D 11 84
85D 11 85 85D1 1 7585D1 1 76
85D1 1 72
85D 11 86 85D1 1 74
85D1 1 87 85D1 1 73
85D1 1 88
85D 11 95B
85D 11 89
85D 11 90
85D1 1 91
85D 11 92
85 A 141
85 A 141
85D 11 93
85D1 1 94
85 A 138
85 A 142
85 A142A
85 A142A
85E 11 26A
85C 291A
85C 2 90
85C 2 9185C 2 89
85C 249A85C 2 5885C 2 59
85C 2 8585C 2 86
NO
R
W
I
C
H
C
T
PE
A
C
E
A
N
D
PLE
N
T
Y
L
N
WAKEFIELD CT
WES
T
C
H
E
S
T
E
R
D
R
G
A
R
D
E
N
G
A
T
E
D
R
HAYVENHURST CT
TO
W
N
R
U
N
L
N
Applications
Parcels
Building Footprints
I
Note:Frederick County Dept ofPlanning & Development107 N Kent StSuite 202Winchester, VA 22601540 - 665 - 5651Map Created: January 23, 2017Staff: tklein
Stephens City
VALL
E
Y
P
I
K
E
TOW
N
R
U
N
L
N
FAMIL
Y
D
R
GARDEN G
A
T
E
D
R
TRU
N
K
D
R
HAYVENHURST CT
C
A
M
P
B
E
L
L
L
N
§¨¦81
§¨¦81
MDP # 03 - 17Southern Hills Phase 2PIN:85D - 1 - 1 - 95
0 420 840210 Feet
FAIRFAX PIKE
MDP # 03 - 17Southern Hills Phase 2PIN:85D - 1 - 1 - 95
MDP #03-17
F
COUNTY of FREDERICK
Department of Planning and Development
540/ 665-5651
Fax: 540/ 665-6395
107 North Kent Street, Suite 202 Winchester, Virginia 22601-5000
MEMORANDUM
TO: Planning Commission
FROM: Michael T. Ruddy, AICP - Director
RE: 2016 Annual Report presentation
DATE: February 7, 2017
At the upcoming Frederick County Planning Commission meeting, staff will present the
recently compiled Annual Report of the Planning Department for 2016. Staff will provide
an overview of the key facts and figures contained within the report and will be available
to answer any additional comments the Commission may have.
The Annual Report for 2016 will then be forwarded to the Board of Supervisors. The
report will be available on your I-pads following the Planning Commission meeting.
Please contact me if you have any questions or would like to provide additional input.
MTR/dlw