Loading...
64A416A_DMJHoldingsLLCProfferAmendmentAMENDMENT F Action: PLANNING COMMISSION: March 15, 2017 BOARD OF SUPERVISORS: April 12, 2017 Recommended Approval - F1 APPROVED ❑ DENIED AN ORDINANCE AMENDING THE ZONING DISTRICT MAP REZONING #01-17 DMJ HOLDING, L.L.C. WHEREAS, REZONING #01-17 DMJ Holding, L.L.C., submitted by Painter -Lewis, P.L.C., to remove a proffer which currently prohibits fast food restaurants with drive through service windows, with a final revision date of December 16, 2016 was considered. If approved, the site would permit the construction of fast food restaurants with drive through service windows if all other requirements are met. All other proffers remain the same. The properties are located at the northwest corner of the intersection of Route 50 and Route 781 (Custer Avenue), in the Shawnee District and is identified by Property Identification Nos. 64A -4-16A, 64A04-16, 64A-4-17, 64A-4-18, 64A-4-19 and 64A-4-20; and WHEREAS, the Planning Commission held a public hearing on this rezoning on March 15, 2017 and recommended approval; and WHEREAS, the Board of Supervisors held a public hearing on this rezoning on April 12, 2017; and WHEREAS, the Frederick County Board of Supervisors finds the approval of this rezoning to be in the best interest of the public health, safety, welfare, and in conformance with the Comprehensive Policy Plan; NOW, THEREFORE, BE IT ORDAINED by the Frederick County Board of Supervisors, that Chapter 165 of the Frederick County Code, Zoning, is amended to amend the proffers from Rezoning #05-09 to permit the construction of fast food restaurants with drive through service windows if all other requirements are met with a final revision date of December 16, 2016. All other proffers remain the same. The conditions voluntarily proffered in writing by the Applicant and the Property Owner is attached. PDRes #13-17 M. I C' This ordinance shall be in effect on the date of adoption. f Passed this 12th day of April, 2017 by the following recorded vote: Charles S. DeHaven, Jr., Chairman Aye Gary A. Lofton Aye Bill M. Ewing Aye Robert W. Wells Aye Gene E. Fisher Aye Judith McCann -Slaughter Aye Blaine P. Dunn Aye A COPY ATTEST l&a4l AA�� /Brenda G. Garton Frederick County Administrator vltttllNlA: FK.3DF.RICK C0UNTY.SC ,- This instrument of writing was produced to me on - l8- /7 at 4f and with certificate acknowledgement thereto annexed was admitted to a.,cord. Tax imposed by Sec. 58.1-802 of $ /V l , and 55.1-801 have been paid, if assessable Ile, 6ca / , Clerk PDRes #13-17 BOS Res. #067-17 170003811 DMJ HOLDINGS, L.L.C. WINCHESTER METALS, INC. ROUTE 50 & CUSTER AVENUE Amended Proffer Statement Original Rezoning #: 05-09 Property: 2.85 acres PARCEL ID's: 64A -4-16A, 64A-4-16, 64A-4-17, 64A-4-18, 64A-4-19, 64A-4-20 Owner: DMJ Holdings, L.L.C. Winchester Metals, Inc. Mr. Mark Phelps 195 Ebert Road Winchester, Virginia 22603 Project Name: DMJ Holdings, L.L.C. Route 50 & Custer Avenue Shawnee Magisterial District Original Date of Proffers: March 24, 2009 Revision Date: June 1, 2009 July 1, 2009 August 15, 2016 December 6, 2016 Prepared by: PAINTER-LEWIS, P.L.C. 817 Cedar Creek Grade, Suite 120 Winchester, VA 22601 Tel.: (540) 662-5792 email: office@painterlewis.com Job Number: 1603018 PROFFER STATEMENT - - PARCEL ID's: 64A -4-16A, 64A-4-16, 64A-4-17, 64A-4-18, 64A-4-19, 64A-4-20 Pursuant to the applicable provisions of the Frederick County Zoning Ordinance, the undersigned owner proffers that in the event that the Board of Supervisors of Frederick County shall approve Rezoning Application # for the rezoning of parcels TM#'s 64A -4-16A, 64A-4-16, 64A-4-17, 64A-4-18, 64A-4-19, 64A-4-20 from RP to B2, the use and development of the subject property shall be in strict conformance with the following conditions set forth in this proffer except to the extent that such conditions may be subsequently amended or revised by the owner and such are approved by the Board of Supervisors in accordance with the Code of Virginia and the Frederick County Zoning Ordinance. These proffers shall be binding on the owner and their legal successors or assigns. Ue7-81dN=1r1ri 1.) Generalized Development Plan The owner agrees to proffer the Generalized Development Plan (GDP) dated 07/01/09, identified as "Generalized Development Plan DMJ Holdings, L.L.C." and which is attached to the proffer statement, for the purpose of identifying the general configuration of the proposed parcel after consolidation, the location and form of the site access, the approximate location of interparcel access easements, and construction improvements to Route 781, Custer Avenue and Route 50, Millwood Pike. Please refer to the attached drawing named "GDP". 2.) Limitation of Future Development The owner agrees to limit any future use(s) of the parcel to those uses which will not generate in excess of 200 vehicle trips per hour during any hour. The determination of trip numbers will be accomplished during the site plan review based on the proposed use(s). Trip counts will be determined using the Institute of Traffic Engineers Trip Generation Manual, 9t" Edition. 3.) Improvements to Route 50 and Route 781 The owner will make the necessary road frontage improvements, as required by the Virginia Department of Transportation, to Route 50, Millwood Pike, and Route 781, Custer Avenue, in support of the proposed development. The improvements will be designed and submitted for approval to the Virginia Department of Transportation and Frederick County during the site plan review process. Construction of the improvements will be completed prior to the occupancy of any new building on the site. The improvements will include: a) The design and construction of a right turn lane westbound on Route 50 with the appropriate length and taper ending in a right in/right out commercial entrance serving as the primary access to the site; b) The design and construction of a right turn lane southbound on Route 781 from a proposed right in only entrance to its intersection with Route 50; c) The design and construction of a raised median between travel lanes on Route 781 to prevent left turn movements into the right in only entrance described in "b" above; page 2 PROFFER STATEMENT PARCEL ID's: 64A -4-16A, 64A-4-16, 64A-4-17, 64A-4-18, 64A-4-19, 64A-4-20 d) The design and construction of additional vehicle storage area in the existing left �. turn lane on eastbound Route 50; e) The design and construction of bicycle facilities along Route 50 in front of the site; (71 f) The design and construction of pedestrian � facilities linking Pembridge Avenue with proposed facilities in the Route 50 right of way. 4.) Inter -parcel Circulation and Access The owner agrees to provide easements which will permit access through the site from all points of right of way ingress and egress to and from the site to the parcels which share a common boundary line to the east and west. The approximate locations of the access points are shown on the GDP. The easements will be defined during the site plan process and recorded by the owner upon approval by Frederick County and prior to the issuance of the first building permit issued for the site. 5.) Monetary Contribution to Frederick County Service Organizations The owner will donate or will cause to be paid to the Treasurer of Frederick County for Fire and Rescue purposes the sum of $2,000.00 for impacts to fire and rescue services. This sum will be paid upon the receipt of the first building permit issued for the site, subsequent to the approval of this rezoning. 6.) Monetary Contributions The owner agrees to provide $5,000.00, for future transportation improvements within the Route 781 and Route 50 rights-of-way. This sum will be paid to the Treasurer of Frederick County prior to the occupancy of any structure on the property. 7.) Building Design New buildings shall be constructed using architectural styles and materials which are compatible with the surrounding neighborhood. Design elements shall be compatible with Frederick County and will respect the continuity and character of the existing architectural fabric of the surrounding community. All building fagades shall be limited to one or a combination of the following materials: cast stone, stone, brick, glass, wood, stucco, or other high quality, long lasting masonry materials. Metal panels shall be prohibited as a construction material for buildings. Roof materials shall be standing seam metal, architectural shingle, or other high quality material. Flat roofs shall be permitted only to the extent that rooftop mechanical units are screened from the view of adjacent residences. Building height shall be limited to 35 feet as defined in the Frederick County Zoning Ordinance. 8.) Parcel Lighting The owner recognizes that the illumination associated with future uses and improvements on the parcel could have an impact on the adjacent properties. In order to preclude any negative impacts, the owner agrees to regulate the overall illumination level emanating from the parcel. At the same time, it is necessary to assure that public safety concerns will be satisfied from night time activity associated with future uses of the parcel. page 3 PROFFER STATEMENT PARCEL ID's: 64A -4-16A, 64A-4-16, 64A-4-17, 64A-4-18, 64A-4-19, 64A-4-20 1. Pole -mounted and wall -mounted luminaries shall meet the Illuminating Engineering Society (IES) criteria for "cut off' fixtures where the candela per 1000 lamp lumens does not numerically exceed 25 at or above an angle of 90 degrees above ^adir. Pole -mounted and wall -amounted luminaries shall not exceed a height of 18 feet as measured from the adjacent ground surface. 2. Front -lighted, freestanding signs shall be lighted from the top, and aimed and/or shielded so that no more that 100 candelas per 1,000 lamp lumens are emitted above a line that is struck through the lamp center and extends at an angle of 80 degrees relative to nadir after the luminaries are in their finally -focused position. 3. Internally and rear -lighted freestanding signs shall be limited to the illumination of the sign letters or characters only. No luminous backgrounds shall be permitted. 9.) Parcel Usage The owner agrees to prohibit the following uses (as listed in the Frederick County Zoning Ordinance) on the property: 1. Car Washes; 2. (Fast food restaurants with drive through service window) REMOVE 3. Automotive dealers with outdoor display areas and gasoline service stations; 4. Model home sales offices; 5. Amusement and recreational services operated outdoors; 6. Self-service storage facilities; 7. Adult retail 10.) Preservation of Existing Vegetation Mature vegetation exists along the boundary between the parcel and adjacent residential lots. During the site plan process, the owner will identify existing vegetation within the 25' inactive buffer which can reasonably be preserved and incorporated into the screening requirements as described by the Frederick County Zoning Ordinance. Any such vegetation will be shown within a "non -disturbance" area depicted on subsequent site plans. page 4 PROFFER STATEMENT —, PARCEL ID's: 64A -4-16A, 64A-4-16, 64A-4-17, 64A-4-18, 64A-4-19, 64A-4-20 c- l The conditions proffered above shall be binding on the heirs, executors, administrators, assigns, and successors in the interest of the owner. In the event that the Frederick County Board of Supervisors grant this rezoning and accepts these proffers, then these proffers shall apply to the land rezoned in addition to the other requirements of the Frederick County Code. Respectfully submitted by: City/County of���- - K , Commonwealth Of Virginia. The foregoing instrument was acknowledged before me this day of 20 -, Notary Public Notary Registration number: My commission expires: c On Behalf of Winchester Metals, Inc. City/County oft; �= c , Commonwealth Of Virginia. The foregoing instrument was acknowledged before me this U'zta day of 20 Notary Public Notary Registration number: My commission expires: 1 page 5 1111110"',I ••.P�, A VANSXc.,. - ..'isky Pie`/ � �7o MY COMMISSION n NUMBER ' Q 7532024 On Behalf of DMJ Holdings; L. C. City/County of���- - K , Commonwealth Of Virginia. The foregoing instrument was acknowledged before me this day of 20 -, Notary Public Notary Registration number: My commission expires: c On Behalf of Winchester Metals, Inc. City/County oft; �= c , Commonwealth Of Virginia. The foregoing instrument was acknowledged before me this U'zta day of 20 Notary Public Notary Registration number: My commission expires: 1 page 5 1111110"',I ••.P�, A VANSXc.,. - ..'isky Pie`/ � �7o MY COMMISSION n NUMBER ' Q 7532024 I PE -7 C.I.: NA U) DRAWN BY: JOB NO.: P -L Y SCALE: 1 1 "=100.0* Q 1 cn I u m o z / Q L •- O Z 'J J 1. a o Z a U W of o -U ao > 1 o wW� ��W 1 -' im V) w d I ;mom ¢aw zU WmZC.�� Q - / 07]ww z J < U > Ul U 1LLJ x ufQ ' U Z Q J 1 O u)in� f w 1 Lf) N CN Li F- \ � Z z O QO 0] F- LLJ o W a of >�\zj-/- \ J wi= �x z aw cn 7 7- Q�Q C7 �Owe �V_ U Z_ Ld 4 �0 — 817 Cedor Creek Grade, Suite 120 #'- Winchester, Virginia 22601 Telephone (540)662-5792 CONSULTING Facsimile (540)662-5793 ENGINEERS Emoil office@pointerlewis.com PROJECT: I GENERALIZED DEVELOPMENT PLAN DMJ HOLDINGS, L.L.C. FREDERICK COUNTY" VIRGINIA. SURVEY: C.I.: NA Ni DRAWN BY: JOB NO.: P -L 0812002 SCALE: DATE: 1 "=100.0* 7/1/09 SHEET