52AC_SilverLakeProfferRevisionC; RESOLUTION Action: PLANNING COMMISSION: December 4, 2013 - Recommended Approval BOARD OF SUPERVISORS: December 11, 2013 91 APPROVED ❑ DENIED AN ORDINANCE AMENDING THE ZONING DISTRICT MAP REZONING #06-13 PROFFER REVISION OF SILVER LAKE, LLC WHEREAS, Rezoning #06-13 Proffer Revision of Silver Lake, LLC, submitted by Greenway Engineering, Inc., to revise the proffers associated with Rezoning 401-09 relating to the relocation of the site provided for the development of a new fire and rescue facility and support facilities, was considered. The proffer revision, proffers originally dated November 25, 2008, with final revision dated November 4, 2013, is replacing the previous fire and rescue site which was located along Northwestern Pike and Silver Lake Road with the new location which will front on Corporate Place Drive near the intersection of National Lutheran Boulevard. The properties are located on the north side of Northwestern Pike (ITS Route 50 West); west of' Retail Boulevard, and east of Poor House Road (Route 654), and is identified by Property ldenti'iication Numbers 52 -A -C, 52 -A -50A, 52-A-52 and 52-A-63 in the Gainesboro Magisterial District. WHEREAS, the Planning Commissior, held a public meeting On this rezoning on December 412013 and forwarded a recommendation of approval; and WHEREAS, the Board of Supervisors held a public meeting on this rezoning on December 11, 2013, and WHEREAS, the Frederick County Board of Supervisors finds the approval of this rezoning to be in the best interest of the public health, safety, welfare, and in conformance with the Comprehensive Policy Plan; NOW, THEREFORE, BE IT ORDAINED by the Frederick County Board of Supervisors that Chapter 165 of the Frederick County Code. Zoning, is amended to revise the proffers associated with Rezoning #01-09 relating to the relocation of the site provided for the development of a new fire and rescue facility and support facilities. The proffer revision, originally dated November 25, 2008, with final revision dated November 4, 2013, is replacing the previous fire and rescue site which was located along Northwestern Pike and Silver Lake Road with the new location which will front on Corporate Place Drive near the intersection of National Lutheran Boulevard. PDRes. #38-13 This ordinance shall be in effect on the date of adoption. Passed this 11th day of December, 2013 by the following recorded vote - Richard C. Shickle, Chairman Aye Gary A. Lofton Aye Robert A. Hess Aye Robert W. Wells Aye Gene E. Fisher Ave Charles S. DeHaven, Jr. Aye Christopher E. Collins Aye /Rild�r, Jr. ck County Administrator Y iXGIN1A: FR1 DERWK COUNTY.SCIF. This instrument of writing was produced to me on 12-19-24/3 at 1'5? 57 A- M and with certificate acknowledgement thereto annexed was admitted to record. Tar imposed by Sec. 58.1-802 of and 58.1-801 have been paid, if assessablm 41e,ew Clerk PDRes. #38-13 Greenway Engineering N., %-,mber 25, 2008; Revised January 6, 2009; Revised January 27, 2009; Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; Revised March 13, 2009; Revised March 30, 2009; Revised November 4, 2013 SILVER LAKE, LLC PROFFER STATEMENT REZONING: RZ #01-09 Rural Areas District (RA) to Business General District (B2) and MS Medical Support District (MS) PROPERTY: 238.96± acres; Tax Parcels #52 -((A)) -C, 52 -((A)) -50A, 52-((A))-52, and 52-((A))- 63 (here -in after the "Property") RECORD OWNER: Silver Lake, LLC, James R. Wilkins, III, Manager APPLICANT: Silver Lake, LLC (here -in after the "Applicant") PROJECT NAME: Round Hill Commercial Center & The Village at Orchard Ridge — A National Lutheran Home Community ORIGINAL DATE OF PROFFERS: November 25, 2008 REVISION DATE: November 4, 2013 Preliminary Matters Pursuant to Section 15.2-2296 Et. Seq. of the Code of Virginia, 1950, as amended, and the provisions of the Frederick County Zoning Ordinance with respect to conditional zoning, the undersigned Applicant hereby proffers that in the event the Board of Supervisors of Frederick County, Virginia, shall approve conditional zoning amendments to Rezoning Application #01-09, which rezoned 370.02± -acres from the Rural Areas (RA) District to establish 238.96± acres of B-2, Business General District (Tax Map Parcels 52 -((A)) -C, 52 -((A)) -50A, 52-((A))-52, 52-((A))-63) and 131.06± -acres of MS, Medical Support District (Tax Map Parcel 52-((A))-50); development of the subject property shall be done in conformity with the terms and conditions set forth herein, except to the extent that such terms and conditions may be subsequently amended or revised by the Applicant and such be approved by the Frederick County Board of Supervisors in accordance with the said Code and Zoning Ordinance. The conditional zoning amendments within this document are intended to apply to the 238.96± acres of B-2, Business General District, while the 131.06± -acres of MS, Medical Support District will comply with the conditions approved as part of Rezoning Application #01-09 on April 22, 2009, identified as Section B. MS, Medical Support District Area. In the event that the conditional zoning amendments are not granted, then these proffers shall be deemed withdrawn and have no effect whatsoever. These proffers shall be binding upon this Applicant and their legal successors, heirs, or assigns. File #49285/Silver Lake LLC Rezoning O CD is Greenway Engineering Noy. mber 25, 2008; Revised January 6, 2009; Revised January 27, 2009; 2 ` Revised Februany 16, 2009; Revised February 19, 2009; Revised March 2, 2009; Revised March 13, 2009; Revised March 30, 2009; Revised November 4, 2013 C� PROFFER STATEMENTc-� A. Generalized Development Plan I. The Applicant hereby proffers to submit a Generalized Development Plan (the "GDP") for the Property. The purpose of the GDP is to identify the general location of the B-2, Business General District and MS, Medical Support District areas, the general location of the proposed future Fire and Rescue Station area, the general location of the proposed future passive open space area, the general location of the 50 -foot green strip enhancement area, the general location of the 10 -foot asphalt trail system, and the general location of the phased transportation improvements areas within and adjacent to the Property. 2. The Applicant hereby proffers to develop the Property in substantial conformity with the proffered GDP, prepared by Greenway Engineering dated October 24, 2013. The GDP is recognized to be a conceptual plan and may be adjusted by the Applicant to accommodate final design and engineering constraints without the need of new conditional rezoning approval by the Frederick County Board of Supervisors, provided that the adjustments do not eliminate or substantially relocate the areas described in Section Al of this proffer statement. B. MS, Medical Support District Area The Applicant hereby proffers to develop, or cause for the development of a Continuing Care Retirement Community (the "CCRC") on the portion of the Property proposed to be zoned MS, Medical Support District, and to exclude all other MS, Medical Support District land uses not expressly permitted within Section 165-504.02(B)(7) of the Frederick County Zoning Ordinance. 2. The Applicant hereby proffers to Iimit the maximum residential density within the CCRC to eight units per acre. The maximum residential density total shall include all independent living units, assisted care living units, and skilled nursing care units. The location and totals for the residential units specified in this section shall be provided on the Master Development Plan for the Property. 3. Where buffer areas are required and mature woodlands are in place, the Applicant will request approval of the use of these woodland features to satisfy the buffer requirement during the consideration of the Master Development Plan. 4. The Applicant proffers to provide initial access to the CCRC via National Lutheran Boulevard as described in Section D(2)(f) of the proffer statement, and further proffers to provide a maximum of two commercial entrances on National Lutheran Boulevard to provide access to the CCRC. File #4928S/Silver Lake LLC Rezoning Greenway Engineering Nu.cmber 25, 2008; Revised January 6, 2009; Revised January 27, 2009; 3 Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; O Revised March 13, 2009; Revised March 30, 2009; Revised November 4, 2013 (-D iv C. B2, Business General District Area 1. The Applicant hereby proffers to prohibit the ;;llowi,�g land uses curi=eiitly allowed within the B2 District: ➢ Truck Stops Golf Driving Ranges ➢ Outdoor Batting Cages ➢ Model Home Sales ➢ Self -Service Storage Facilities ➢ Adult Retail Establishments 2. The Applicant hereby proffers to prohibit individual full service commercial entrances to all allowed B2 District land uses that intersect Northwestern Pike (U.S. Route 50 West) and Poorhouse Road (Route 654); however, right -in or right -out only access to B2 District land uses that intersect Northwestern Pike shall be permitted if approved by VDOT and/or Frederick County. 3. The Applicant hereby proffers to establish a green strip along the Property frontage adjacent to the Northwestern Pike corridor that is 50 feet in width. Parking lots and access drives shall be prohibited within the 50 -foot green strip, except for access drives permitted as described in Section C(2) above. The entire Property frontage of the 50 -foot green strip shall be enhanced with street trees that are a minimum of 2 -inch caliper at planting and spaced a maximum of 30 feet on center, ornamental shrubs that are a minimum three -gallon container at planting, as well as an asphalt bicycle and pedestrian facility that is 10 feet wide. The installation of the street trees, ornamental shrubs, and bicycle and pedestrian facility located within the 50 -foot green strip shall be required as specified in Section C(8) of the proffer statement. 4. The Applicant hereby proffers to establish street tree plantings along both sides of National Lutheran Boulevard and Trader Drive throughout the limits of the B2 District property. All street trees shall be a minimum of two-inch caliper at time of planting and spaced a maximum 40 feet on center. The street trees shall be located outside of the public right-of-way. 5. The Applicant hereby proffers to establish a linear passive open space area in the general location identified on the proffered GDP, which will be enhanced with a 10 -foot asphalt trail system between National Lutheran Boulevard and Northwestern Pike as specified in Section C(8) of the proffer statement. 6. The Applicant hereby proffers to provide for inter -parcel connectors between all adjoining commercial and office land uses unless prohibited by topographic conditions. File #49285/Silver Lake LLC Rezoning Greenway Engineering November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; 4 Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; Revised March 13, 2009; Revised March 30, 2009; Revised November 4, 2013 7. The Applicant hereby proffers to include an additional row of evergreen treesCD CD within all required buffer and screening areas adjacent to land primarily used for -- residential purposes in the RA District in which accessory uses are proposed {-;= within the active portion of the buffer area. 8. The Applicant hereby proffers to design and construct, or cause for the construction of an asphalt bicycle and pedestrian facility that is ten -feet wide. This location of this facility is identified on the proffered GDP and will be located outside of public right-of-way limits. This facility will be developed as follows: ➢ The 10 -foot asphalt trail located along the south side of the Phase 1 segment of National Lutheran Boulevard shall be developed during the construction of this road segment as specified in Section D(2)(f) of the proffer statement. The 10 -foot asphalt trail located along the south side of the Phase 2 segment of National Lutheran Boulevard shall be developed during the construction of this road segment as specified in Section D(3)(e) of the proffer statement. ➢ The 10 -foot asphalt trail located along the passive open space area shall be developed on or before the completion of the commercial development permitted under the Phase I Transportation Program as specified in Section D(2)(a) of the proffer statement. ➢ The 10 -foot asphalt trail located along the southern boundary of the Property identified as Area 1 on the GDP shall be developed during the construction of the Phase 1 segment of National Lutheran Boulevard as specified in Section D(2)(f) of the proffer statement. ➢ The 10 -foot asphalt trail located along the southern boundary of the Property identified as Area 2 on the GDP shall be developed prior to the issuance of the occupancy permit issued for the first commercial building permit located in the land bay between National Lutheran Boulevard and Trader Drive. ➢ The 10 -foot asphalt trail located along the southern boundary of the Property identified as Area 3 on the GDP shall be developed prior to the issuance of the occupancy permit issued for the first commercial building permit located in the land bay between Trader Drive and the eastern boundary of the Property. 9. The Applicant hereby proffers to establish an Architectural Review Board (ARB) for the purpose of reviewing structural elevations, site landscaping and signage for all commercial sites to ensure compatibility with the restrictive covenant documents for the B2 District property. The restrictive covenant documents shall be provided to Frederick County prior to the subdivision of land within the B2 District, or prior to the approval of any site development plan within the B2 District. The restrictive covenant documents shall include, but not be limited to, the following design elements: File #4928S/Silver Lake LLC Rezoning Greenway Engineering November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; 5 Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; CD March 13, 2009; Revised March 30, 2009; Revised November 4, 2013 ➢ BuiIding materials for all exterior walls and rooflines. ➢ Materials for all monument freestanding business signs. The materials for the base of all monument freestanding business signs shall be consistent throughout the B2 District. ➢ Screening of all loading areas from adjoining properties external to the B2 District. ➢ Screening of outdoor dumpster pad areas with building materials consistent with the primary structure. ➢ Common area maintenance agreements. D. Transportation Enhancements 1. The Applicant has submitted a Traffic Impact Analysis (TIA), prepared by Patton, Harris, Rust and Associates, dated November 25, 2008 for the 370.02± acre Property. The TIA identifies improvements to the regional transportation network to account for background undeveloped projects and the Applicant's proposal through four phases of development. The Applicant hereby proffers to design and construct, or cause for the construction of improvements to the regional transportation network as a phased development program that is described in this section of the proffer statement. Additionally, the phased development program is identified in illustrative form on the proffered GDP. It is recognized that the phased transportation improvements proffered herein will be constructed as described in this section; however, the exact location and limits of these improvements will be determined by VDOT and/or Frederick County during the approval of engineering design plans. It is further recognized that the location of the regional transportation network improvements identified in illustrative form on the proffered GDP are general in nature and may be relocated to accommodate VDOT engineering design plan approval without the need for conditional zoning amendment to the GDP or the proffer statement. 2. The Applicant hereby proffers the following Phase 1 Transportation Program: a. The Applicant shall be entitled to develop the CCRC and a maximum of 180,000 square feet of commercial land use within Phase 1. However, the Applicant can deviate from this land use mix assuming the total trip generation for site plans within this phase of the transportation program (based on the ITE 7`h Edition Trip Generation Report) do not exceed the total trip generation specified in the November 25, 2008 Traffic Impact Analysis Report for Phase 1. It is recognized that the Applicant shall complete all Phase 1 transportation improvements prior to the approval of any Site Plan that exceeds 180,000 square feet of commercial land use or equivalent trip generation as noted above on the B2 portion of the Property. File #4928S/Silver Lake LLC Rezoning CD Greenway Engineering November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; 6 iD Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; Revised March 13, 2009; Revised March 30, 2009; Revised November 4, 2013 CJ�! b. The Applicant shall dedicate all right-of-way necessary for the Phase 1 improvements that will occur on the Property to VDOT or Frederick County. The Applicant will attempt to design all off-site improvements within public right-of-way; however, if necessary it is recognized that VDOT and/or Frederick County will assist the Applicant with right-of- way necessary to implement proffered off-site transportation improvements. The Applicant agrees to assume all costs associated with right-of-way acquisition if assistance from VDOT and/or Frederick County is required. c. The Applicant shall execute, or cause for the execution of a traffic signalization agreement with VDOT to fully fund new traffic signalization at the intersection of Northwestern Pike (U.S. Route 50) and Poor House Road (Route 654). The traffic signalization agreement shall be executed within six months of final non -appealable rezoning approval, or prior to approval of the first Site Plan for the property, whichever occurs first. d. The Applicant shall design and construct, or cause for the execution of a traffic signalization agreement with VDOT to fully fund new traffic signalization with pedestrian actualization at the intersection of Northwestern Pike (U.S. Route 50) and the relocated National Lutheran Boulevard. The Applicant shall provide additional funding necessary to provide for pre-emption control for this traffic signal if the County requests the land for the new fire and rescue facility provided in Section E(1) of the proffer statement. In the event the County does not request the land for the new fire and rescue facility, the additional funding for traffic signal pre-emption control shall be made available for pre-emption control for the traffic signal at the intersection of Northwestern Pike and Poor House Road that is described in Section D(2)(c) of the proffer statement. The traffic signalization agreement shall be executed within one year of final non -appealable rezoning approval, or prior to approval of the first Site Plan for the property, whichever occurs first. The Applicant shall reserve the right to preempt this agreement by initiating a signal warrant study and signal design plans in accordance with VDOT standards for approval to install traffic signalization at this intersection. e. The Applicant shall design and construct, or cause for the construction of improvements to the median crossing including a westbound right turn lane and left turn lane and an eastbound left turn lane on Northwestern Pike at the intersection of the relocated National Lutheran Boulevard. These improvements shall be completed prior to the issuance of the first occupancy permit for the land use utilizing National Lutheran Boulevard for access to Northwestern Pike. f. The Applicant shall design and construct, or cause for the construction of improvements to National Lutheran Boulevard within the Property to File #4928S/Silver Lake LLC Rezoning Greenway Engineering November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; 7 Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; Revised March 13, 2009; Revised March 30, 2009; Revised November 4, 2013 C provide for a road section that is constructed to a 40 mph geometric design C standard and provides right-of-way for a future roundabout at the �J , intersection with Trader Drive, and left turn lanes and right turn lanes at all internal collector street intersections and at commercial entrances as required by VDOT. Additionally, the Applicant shall design and construct, or cause for the construction of separate right and left turn lanes on National Lutheran Boulevard at the intersection of Northwestern Pike. National Lutheran Boulevard shall be developed as a four -lane divided urban road section between Northwestern Pike and the future roundabout, and as a two-lane road section between the future roundabout and the limits of Phase 1 with dedicated right-of-way to Frederick County to allow for a four -lane urban road section. The construction of the two-lane road section shall include a raised median section necessary to transition from the roundabout into the urban road section design. These improvements shall be completed prior to the issuance of the first occupancy permit for the land use utilizing National Lutheran Boulevard for access to Northwestern Pike. Furthermore, the Applicant agrees to design and construct, or cause for the construction of the four -lane urban section between the future roundabout and the limits of Phase 1 if this improvement is warranted based on future traffic counts as described in Section D(6). g. The Applicant shall design and construct, or cause for the construction of modifications to, or the elimination of the median crossing on Northwestern Pike identified as Median Crossing A on the proffered GDP. VDOT shall determine the requirements for modification, or elimination and shall advise the Applicant in writing of the requirements associated with this improvement. The Applicant shall complete these improvements in conjunction with construction activities associated with National Lutheran Boulevard as described in Section D(2)(f) of the proffer statement. h. The Applicant shall design and construct, or cause for the construction of improvements to the southbound off ramp at the Route 37 interchange with Northwestern Pike to provide for a free flow right turn lane onto Northwestern Pike. The Applicant shall complete the Route 37 interchange improvements described in this section prior to the approval of any Site Plan that exceeds 180,000 square feet of commercial land use or equivalent trip generations as described in Section D(2)(a) of the proffer statement on the B2 portion of the Property. i. In the event that VDOT and Frederick County determine that a monetary contribution for regional transportation improvements to the Route 37 corridor between the Northwestern Pike interchange and the North Frederick Pike interchange is desired, the Applicant agrees to provide a File #49285/Silver Lake LLC Rezoning Greenway Engineering November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; 8 O Revised February 16, 2009; Revised February 19, 2009; Revised March 2,2009; CD Revised March 13, 2009; Revised March 30, 2009; Revised November 4, 2013 monetary contribution in lieu of the improvement described in Section 'j 2(h). This monetary contribution shall be equivalent to the amount associated with the improvement described in that section based upon an engineering estimate agreed upon by VDOT, Frederick County and the Applicant that will be prepared on or before the build out of the Phase 1 transportation improvements. The Applicant agrees to provide this monetary contribution to Frederick County within 30 days of written request by the County, and further agrees to allow for this monetary contribution to be utilized as matching funds by Frederick County for qualifying transportation improvements programs or grants. 3. The Applicant hereby proffers the following Phase 2 Transportation Program: a. The Applicant shall be entitled to develop the CCRC and a maximum of 350,000 square feet of commercial land use and 105,000 square feet of office land use within Phase 2 that is a cumulative total of Phase 1 — Phase 2. However, the Applicant can deviate from this land use mix assuming the total trip generation for site plans within this phase of the transportation program (based on the ITE 7`" Edition Trip Generation Report) do not exceed the total trip generation specified in the November 25, 2008 Traffic Impact Analysis Report for Phase 2. It is recognized that the Applicant shall complete all Phase 2 transportation improvements prior to the approval of any Site Plan that exceeds 350,000 square feet of commercial land use and 105,000 square feet of office land use or equivalent trip generation as noted above on the B2 portion of the Property. b. The Applicant shall dedicate all right-of-way necessary for the Phase 2 improvements that will occur on the Property to VDOT or Frederick County. The Applicant will attempt to design all off-site improvements within public right-of-way; however, if necessary it is recognized that VDOT and/or Frederick County will assist the Applicant with right-of- way necessary to implement proffered off-site transportation improvements. The Applicant agrees to assume all costs associated with right-of-way acquisition if assistance from VDOT and/or Frederick County is required. c. The Applicant shall design and construct, or cause for the execution of a traffic signalization agreement with VDOT to fully fund new traffic signalization with pedestrian actualization at the intersection of Northwestern Pike (U.S. Route 50) and Trader Drive. The traffic signalization agreement shall be executed prior to the issuance of the first occupancy permit for the land use utilizing Trader Drive for access to Northwestern Pike. The Applicant shall reserve the right to preempt this agreement by initiating a signal warrant study and signal design plans in File #4928S/Silver Lake LLC Rezoning Greenway Engineering November 25, 2008; Revised January 6, 2009; Revised January 27, 2009, 9 0 Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; CD Revised March 13, 2009; Revised March 30, 2009; Revised November 4, 2013 accordance with VDOT standards for approval to install traffic signalization at this intersection. d. The Applicant shall design and construct, or cause for the construction of improvements to Trader Drive to include a two-lane urban road section with a raised median to the first available commercial entrance that is constructed to a 40 mph geometric design standard and provides for the construction of the roundabout at the intersection with National Lutheran Boulevard, and left turn lanes and right turn lanes at all commercial entrances as required by VDOT. Additionally, the Applicant shall design and construct, or cause for the construction of a median crossing including a westbound right turn lane and left turn lane and an eastbound left turn lane on Northwestern Pike at the intersection of Trader Drive. These improvements shall be completed prior to the approval of any Site Plan that exceeds 350,000 square feet of commercial land use and 105,000 square feet of office land use or equivalent trip generation as described in Section D(3)(a) of the proffer statement on the B2 portion of the Property, with the exception of the median crossing and turn lane improvements on Northwestern Pike which shall be completed with the Trader Drive intersection improvements on Northwestern Pike. Additionally, the Applicant shall dedicate right-of-way to Frederick County to allow for a four -lane urban road section for Trader Drive, and further agrees to design and construct, or cause for the construction of the four -lane urban road section if this improvement is warranted based on future traffic counts as described in Section D(6). e. The Applicant shall design and construct, or cause for the construction of improvements to National Lutheran Boulevard to provide for a two-lane urban road section that is constructed to a 40 mph geometric design standard and provides for left turn lanes and right turn lanes at all internal collector street intersections and at commercial entrances as required by VDOT, which continues from the terminus of National Lutheran Boulevard constructed in Phase 1 to a connection at the intersection of Retail Boulevard. The Applicant shall complete these improvements prior to the approval of any Site Plan that exceeds 350,000 square feet of commercial land use and 105,000 square feet of office land use or equivalent trip generation as described in Section D(3)(a) of the proffer statement on the B2 portion of the Property. Additionally, the Applicant shall dedicate right-of-way to Frederick County to allow for a four -lane urban road section for National Lutheran Boulevard and further agrees to design and construct, or cause for the construction of the four -lane urban section if this improvement is warranted based on future traffic counts as described in Section D(6). f. The Applicant shall design and construct, or cause for the construction of modifications to, or the elimination of the median crossings on File #4928S/Silver Lake LLC Rezoning CD Greenway Engineering November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; 10 C) Revised February 16, 2009; Revised February I9, 2009; Revised March 2, 2009; --� Revised March 13, 2009; Revised March 30, 2009; Revised November 4, 2013 Northwestern Pike identified as Median Crossing B and Median Crossing C on the proffered GDP. VDOT shall determine the requirements for modification, or elimination and shall advise the Applicant in writing of the requirements associated with this improvement. The Applicant shall complete these improvements in conjunction with construction activities associated with Trader Drive as described in Section D(3)(d) of the proffer statement. g. The Applicant shall design and construct, or cause for the construction of improvements to the northbound off ramp at the Route 37 interchange with Northwestern Pike to provide for a second right turn. The Applicant shall complete the Route 37 interchange improvements described in this section prior to the approval of any Site Plan that exceeds 350,000 square feet of commercial land use and 105,000 square feet of office land use or equivalent trip generation as described in Section D(3)(a) of the proffer statement on the B2 portion of the Property. h. The Applicant shall design and construct, or cause for the construction of improvements at the Route 37 interchange with Northwestern Pike to provide for a third westbound thru lane on Northwestern Pike under the Route 37 bridge structure continuing east to the transition for the Route 37 northbound on-ramp, to include the relocation of the existing Route 37 northbound on-ramp. The Applicant shall complete the Route 37 interchange improvements described in this section prior to the approval of any Site Plan that exceeds 350,000 square feet of commercial land use and 105,000 square feet of office land use or equivalent trip generation as described in Section D(3)(a) of the proffer statement on the B2 portion of the Property. i. In the event that VDOT and Frederick County determine that a monetary contribution for regional transportation improvements to the Route 37 corridor between the Northwestern Pike interchange and the North Frederick Pike interchange is desired, the Applicant agrees to provide a monetary contribution in lieu of the improvements described in Section 3(g) and 3(h). This monetary contribution shall be equivalent to the amount associated with the improvement described in those sections based upon an engineering estimate agreed upon by VDOT, Frederick County and the Applicant that will be prepared on or before the build out of the Phase 2 transportation improvements. The Applicant agrees to provide this monetary contribution to Frederick County within 30 days of written request by the County, and further agrees to allow for this monetary contribution to be utilized as matching funds by Frederick County for qualifying transportation improvements programs or grants. In the event that regional transportation improvements to the Route 37 corridor between the Northwestern Pike interchange are constructed prior File #4928S/Silver Lake LLC Rezoning Greenway Engineering No Member 25, 2008; Revised January 6, 2009; Revised. January 27, 2009; 11 00 Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; Revised March 13, 2009; Revised March 30, 2009; Revised November 4, 2013 rl�o CD to the completion of the Phase 2 Transportation Program, the Applicant agrees to provide a monetary contribution equivalent to the amount associated with the improvement described in this section to be utilized unconditionally by Frederick County for other transportation improvements. This monetary contribution shall be provided to Frederick County within 60 days of written request by the County. 4. The Applicant hereby proffers the following Phase 3 Transportation Program: a. The Applicant shall be entitled to develop the CCRC and a maximum of 490,000 square feet of commercial land use and 350,000 square feet of office land use within Phase 3 that is a cumulative total of Phase 1 — Phase 3. However, the Applicant can deviate from this land use mix assuming the total trip generation for site plans within this phase of the transportation program (based on the ITE 7`" Edition Trip Generation Report) do not exceed the total trip generation specified in the November 25, 2008 Traffic Impact Analysis Report for Phase 3. It is recognized that the Applicant shall complete all Phase 3 transportation improvements prior to the approval of any Site Plan that exceeds 490,000 square feet of commercial land use and 350,000 square feet of office land use or equivalent trip generation as noted above on the B2 portion of the Property. b. The Applicant shall dedicate all right-of-way necessary for the Phase 3 improvements that will occur on the Property to VDOT or Frederick County. The Applicant will attempt to design all off-site improvements within public right-of-way; however, if necessary it is recognized that VDOT and/or Frederick County will assist the Applicant with right-of- way necessary to implement proffered off-site transportation improvements. The Applicant agrees to assume all costs associated with right-of-way acquisition if assistance from VDOT and/or Frederick County is required. c. The Applicant shall design and construct, or cause for the construction of improvements to National Lutheran Boulevard to provide for a second right turn lane on National Lutheran Boulevard at the intersection of Northwestern Pike. These improvements shall be completed prior to the approval of any Site Plan that exceeds 490,000 square feet of commercial land use and 350,000 square feet of office land use or equivalent trip generation as described in Section D(4)(a) of the proffer statement on the B2 portion of the Property. d. The Applicant shall design and construct, or cause for the construction of a two-lane urban road that is constructed to a 40 mph geometric design standard and provides for roundabout design at the intersection with National Lutheran Boulevard, and left turn lanes and right turn lanes at all File #49285/Silver Lake LLC Rezoning Greenway Engineering November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; 12 Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; O Revised March 13, 2009; Revised March 30, 2009; Revised November 4, 2013 CD commercial entrances as required by VDOT, which will provide for a -- connection between National Lutheran Boulevard and Poor House Road (Route 654). The Applicant will coordinate with the owner of tax parcel 52-((A))-47 to obtain right-of-way for this improvement as a first option for development of the two-lane urban road connection. In the event that the first option cannot be achieved, the Applicant shall design and construct, or cause for the construction of the two-lane urban road connection between National Lutheran Boulevard and Poor House Road on the Property. The general location of the two-lane road connection associated with both options will be provided on the proffered GDP; however, it is recognized that this location may shift without the need for conditional rezoning approval. The Applicant shall complete this improvement prior to the approval of any Site Plan that exceeds 490,000 square feet of commercial land use and 350,000 square feet of office land use or equivalent trip generation as described in Section D(4)(a) of the proffer statement on the B2 portion of the Property. 5. The Applicant hereby proffers the following Phase 4 Transportation Program: a. The Applicant shall be entitled to develop the CCRC and a maximum of 583,050 square feet of commercial land use and 494,600 square feet of office land use within Phase 4 that is a cumulative total of Phase 1 — Phase 4. However, the Applicant can deviate from this land use mix assuming the total trip generation for site plans within this phase of the transportation program (based on the ITE 7t' Edition Trip Generation Report) do not exceed the total trip generation specified in the November 25, 2008 Traffic Impact Analysis Report for Phase 4. It is recognized that the Applicant shall complete all Phase 4 transportation improvements prior to the approval of any Site Plan that exceeds 530,000 square feet of commercial land use and 440,000 square feet of office land use or equivalent trip generation as noted above on the B2 portion of the Property. In the event that the Applicant would desire to develop commercial or office land uses that exceed the maximum square feet or total trip generation specified in this phase of the transportation program, a new traffic impact analysis report shall be prepared with each site plan to determine any additional transportation improvements required to mitigate the impacts created solely by that project, which will be implemented as a condition of site plan approval. b. The Applicant shall dedicate all right-of-way necessary for the Phase 4 improvements that will occur on the Property to VDOT or Frederick County. The Applicant will attempt to design all off-site improvements within public right-of-way; however, if necessary it is recognized that VDOT and/or Frederick County will assist the Applicant with right-of- way necessary to implement proffered off-site transportation improvements. The Applicant agrees to assume all costs associated with File #49285/Silver Lake LLC Rezoning Greenway Engineering November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; 13 Q Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; Revised March 13, 2009; Revised March 30, 2009; Revised November 4, 2013 *�) right-of-way acquisition if assistance from VDOT and/or Frederick P County is required. c. The Applicant shall design and construct, or cause for the construction of improvements to Trader Drive to provide for a second left turn lane on Trader Drive at the intersection of Northwestern Pike. These improvements shall be completed prior to the approval of any Site Plan that exceeds 530,000 square feet of commercial land use and 440,000 square feet of office land use or equivalent trip generation as described in Section D(5)(a) of the proffer statement on the B2 portion of the Property. d. The Applicant shall design and construct, or cause for the construction of improvements to provide for a third westbound thru lane on Northwestern Pike from the eastern boundary of the Property to National Lutheran Boulevard. Additionally, the Applicant shall be responsible for the relocation, construction, and right-of-way dedication (if necessary) of the existing right turn lanes on Northwestern Pike at the National Lutheran Boulevard and Trader Drive intersections. The Applicant shall complete these improvements prior to the approval of any Site Plan that exceeds 530,000 square feet of commercial land use and 440,000 square feet of office land use or equivalent trip generation as described in Section D(5)(a) of the proffer statement on the B2 portion of the Property. 6. The Applicant hereby proffers to conduct annual traffic counts that will be provided to VDOT and Frederick County to determine if the 8,000 ADT volume is achieved to require the expansion of National Lutheran Boulevard and Trader Drive to four -lane urban road sections, as provided for in Sections D(2)(f), D(3)(d), and D(3)(e) of the proffer statement. The annual traffic counts shall begin in the first calendar year that the Phase 2 transportation improvements are completed and shall continue until the warrants are met for widening both street systems. VDOT and Frederick County may allow for annual traffic counts to be delayed in calendar years in which there is no development activity on the Property. When required, traffic counts will be conducted at the National Lutheran Boulevard and Trader Drive intersections with Northwestern Pike, on National Lutheran Boulevard at the eastern boundary of the Property, and on the two-lane road connector between National Lutheran Boulevard and Poor House Road at the western boundary of the Property. If warrants are met based on the annual traffic counts, the Applicant shall prepare and submit construction plans for approval by VDOT and Frederick County within six months of written notice that warrants are met. The Applicant shall commence construction of these improvements within six months of final plan approval. E. Fire and Rescue Enhancements 1. The Applicant hereby proffers to provide, or cause for the provision of land to Frederick County for the development of a new fire and rescue station and File #49285/Silver Lake LLC Rezoning Greenway Engineering November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; 14 O Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; Q Revised March 13, 2009; Revised March 30, 2009; Revised November 4, 2013 �J support facilities on or before April 21, 2014. The Applicant shall dedicate a site fronting on Corporate Place that is located near the intersection of National Lutheran Boulevard, which is a minimum of three acres and a maximum of four acres in size, with the final size of this site being determined upon approval of the Site Plan for the new fire and rescue station facility. The Applicant shall prepare and provide Frederick County with the dedication plat for this site and necessary right-of-way along Corporate Place on or before April 21, 2014 provided that a Site Plan has been approved for the new fire and rescue station. Additionally, if Frederick County does not commence construction of a new fire and rescue station within one year following the dedication of the site, this land shall be conveyed back to the Applicant to allow for further economic development. In the event Frederick County elects not to develop this site as a new fire and rescue station, the Applicant shall provide a monetary contribution to Frederick County in the amount of $100,000.00 for the development of a new fire and rescue station or for the expansion of an existing fire and rescue station at another location. 2. The Applicant hereby proffers to provide, or cause for the provision of a monetary contribution to Frederick County in the amount of $1,000,000.00 for the development of a new fire and rescue station or for the expansion of an existing fire and rescue station. This monetary proffer is intended to mitigate impacts to fire and rescue services associated with the development of the CCRC on the MS District portion of the Property. The $1,000,000.00 monetary contribution shall be provided to Frederick County on or before April 21, 2014 to assist with the development of the new fire and rescue station or for the expansion of an existing fire and rescue station. However, the date for the $1,000,000.00 monetary contribution payment may be extended if a Site Plan for a new fire and rescue station or for the expansion of an existing fire and rescue station has not been approved on or before April 21, 2014. If the latter occurs, the $1,000,000.00 monetary contribution shall be provided to Frederick County within 30 days of the date of final Site Plan approval for the new fire and rescue station or for the expansion of an existing fire and rescue station. 3. The Applicant hereby proffers to design and construct, or cause for the construction of all necessary road improvements to provide access to the new fire and rescue station, as well as all utilities necessary for the new fire and rescue station located on the Property. These infrastructure improvements shall be provided by the Applicant in advance of the Phase 1 or Phase 2 transportation program improvements to facilitate the construction of the new fire and rescue station should this occur in advance of the commercial development within these transportation phases. The Applicant shall work with Frederick County, upon notice by the County, to ensure that the design, bonding and construction of these infrastructure improvements is coordinated during the preparation of the Site Plan for the new fire and rescue station on the Property. File #49285/Silver Lake LLC Rezoning Greenway Engineering November 25, 2008; Revised January 6, 2009; Revised January 27, 2009; 15 Revised February 16, 2009; Revised February 19, 2009; Revised March 2, 2009; Revised March 13, 2009; Revised March 30, 2009; Revised November 4, 2013 F. Simnatures The conditions proffered above shall be binding upon the heirs, executors, administrators, assigns and successors in the interest of the Applicants and owners. In the event the Frederick County Board of Supervisors grants this rezoning and accepts the conditions, the proffered conditions shall apply to the land rezoned in addition to other requirements set forth in the Frederick County Code. Respectfully Submitted: By: Date: E� Commonwealth of Virginia, City ounty f �V-e c(e � Cts' To Wit: The foregoing instrument was acknowledged before me thisV day of NOVCM �kk (i 200 by 0,Me5 lMA My Commission Expires �-00 2-'11 2-0 ! L RE�c i `jL1(L t�$ ZGfi (o l C) i0 File #4928S/Silver Lake LLC Rezoning Q" %�d Notary Public CD Q 11f m Aca I z 7 i = =�i mmi 71 Cz m M so o Cr O mm r M n i1 93rrx i0 A c 1� O ZN r r �m Y z A O i 6 � Z �I m z i ■• �O zz NA710NA! ® 111 Z 1 I� so, I GENERALIZED DEVELOPMENT PLAN j GREENWAY ENGINEERING I61 11i°dy Hi8 Iem r K SILVER LAKE DEVELOPMENT ��.� ,�, �h-t-• WIrgi.0 22602 .may ro Ukh.— 540-662-4185 GAINESBORO MAGISTERIAL DISTRICTG19 rex 540-722-0526 FREDERICK COUNTY. VA S—y°m www.gee°wnyeag'c°m �1 •-,- 1 ,' y z. i - o d o GENERALIZED DEVELOPMENT PLAN � GREENWAY ENGINEERING °r 161 W-dy HW laoo K SILVER LAKE DEVELOPMENT "'°°hetet. ViqOufa 2M2 Telephone filo--882-1166 GAINESBORO MAGISTERIAL DISTRICT eo0—°� rex filo vzz—e6ze FREDERICK COUNTY, VA it 7 0 Il' _ .' oar mno WOE 9 I Z-1 Z v �N 1 •-,- 1 ,' y z. i - o d o GENERALIZED DEVELOPMENT PLAN � GREENWAY ENGINEERING °r 161 W-dy HW laoo K SILVER LAKE DEVELOPMENT "'°°hetet. ViqOufa 2M2 Telephone filo--882-1166 GAINESBORO MAGISTERIAL DISTRICT eo0—°� rex filo vzz—e6ze FREDERICK COUNTY, VA