44A75_AdamsCommercialCenterAMENDMENT Action: PLANNING COMMISSION: January 17, 2009 - Recommended Approval BOARD OF SUPERVISORS: January 28, 2009 'A APPROVED ❑ DENIED AN ORDINANCE AMENDING THE ZONING DISTRICT MAP REZONING 415 -08 OF ADAMS COMMERCIAL CENTER WHEREAS, Rezoning #15 -08 of Adams Commercial Center, submitted by Greenway Engineering, to revise proffers dated April 17, 2008 with final revision date of January 8, 2009, associated with Rezoning #02 -05 for 28.10 acres of land zoned B3 (Industrial Transition) was considered. This revision is intended to remove the previously proffered uses on the site. The property fronts on the west side of Martinsburg Pike (Route 11 North), opposite the intersection with Stephenson Road (Route 664), in the Stonewall Magisterial District, and is identified by Property Identification Number 44 -A -75. WHEREAS, the Planning Commission held a public hearing on this rezoning on January 7,2009; and WHEREAS, the Board of Supervisors held a public hearing on this rezoning on January 28, 2009; and WHEREAS, the Frederick County Board of Supervisors finds the approval of this rezoning to be in the best interest of the public health, safety, welfare, and in conformance with the Comprehensive Policy Plan; NOW, THEREFORE, BE IT ORDAINED by the Frederick County Board of Supervisors that Chapter 165 of the Frederick County Code, Zoning, is amended to revise the proffers concerning Rezoning #02 -05. This revision is intended to remove the previously proffered uses on the site, as described by the application and attached conditions voluntarily proffered in writing by the applicant and the property owner. PDRes #01 -09 This ordinance shall be in effect on the date of adoption. Passed this 28th day of January, 2009 by the following recorded vote:. Richard C. Shickle, Chairman Aye Gary A. Lofton -Ajr3F = Gary W. Dove A ye Bill M. Ewing Aye Gene E. Fisher Aye Charles S. De. Jr. Aye Philip A. Lemieux Aye A COPY ATTEST John R/11:ey, Jr. Frederick Count- Administrator rDRes. ,e01 -09 Greenway Engineering April 17, 2008; Adams Development Group, Inc. Rezoning Revised July 29,2008; Revised August 12, 2008; Revised October 1, 2008; Revised December 9, 2008; Revised January 8, 2009 PROPOSED PROFFER STATEMENT REZONING: RZ #15 -08 Industrial Transition District (B3) with Proffers to Industrial Transition District (B3) with Revised Proffers PROPERTY: 28.10 acres + / -; Tax Parcel #44- ((.A)) -75 RECORD OWNER: Adams Development Group, Inc., Robert C. Adams, President APPLICANT: Adams Development Group (here -in after "the Applicant ") PROJECT NAME: Adams Commercial Center ORIGINAL DATE OF PROFFERS: April 17, 2008 REVISION DATE: January 8, 2009 Preliminary Matters Pursuant to Section 15.2 -2296 Et. Seq. of the Code of Virginia, 1950, as amended, and the provisions of the Frederick County Zoning Ordinance with respect to conditional zoning, the undersigned Applicant hereby proffers that in the event the Board of Supervisors of Frederick County, Virginia, shall approve Rezoning Application #15 -08 for the rezoning of 28.10± acres from the Industrial Transition (B3) District with Proffers to the Industrial Transition (B3) District with Revised Proffers, development of the subject property shall be done in conformity with the terms and conditions set forth herein, except to the extent that such terms and conditions may be subsequently amended or revised by the Applicant and such be approved by the Frederick County Board of Supervisors in accordance with the said Code and Zoning Ordinance. In the event that such rezoning is not granted, then these proffers shall be deemed withdrawn and have no effect whatsoever. These proffers shall be binding upon this Applicant and their legal successors, heirs, or assigns. Approval of this proffer statement does not eliminate previously approved proffers associated with current Tax Map Parcels 44- ((A)) -75B, 44- ((A))-75C, 44- ((A)) -75D, 44- ((A)) -75E and 44- ((A)) -75F; which were approved under the conditions set forth in RZ #02 -05 approved by the Frederick County Board of Supervisors on April 13, 2005. The subject property, more particularly described as the lands owned by Adams Development Group, Inc. being all of Tax Map Parcel 44- ((A)) -75 and further described by Boundary Survey Plat prepared by Richard A. Edens, L.S., dated April 24, 2007 and recorded as Instrument No. 070007323 (see attached Boundary Survey Plat). File ri3949 /EAW 1 Greenway Engineering April 17,2008; Adams Development Group, Inc. Rezoning Revised July 29,2008; Revised August 12, 2008; Revised October 1, 2008; Revised December 9, 2008; Revised January 8, 2009 A.) Generalized Development Plan The .Applicant hereby proffers to develop the 28.10± acre property in substantial conformance with the attached Generalized Development Plan — Adams Rezoning 28.10± Acre property, dated January 8, 2009 and approved as part of the rezoning application. B.) Vehicle Per Day (VPD) and Land Use Restrictions 1.) Conditional Rezoning Application #02 -05 limited traffic generation for permitted land uses to a maximum of 4,603 VPD based on ITE Trip Generation 7 th Edition volumes. The Applicant hereby proffers to restrict development of the 28.10± acre property to an amount to be determined during Site Plan approval, not to exceed a maximum of 2,900 VPD. The Applicant acknowledges that the maximum 2,900 VPD may be further reduced for the 28.10± acre property should additional development occur on tax parcel( - 44 7 ((A )) -75B, 4 4- ((A)) - 75C, 44- ((A))-75D, 44- ((A)) -75E and 44- ((A)) -75F-) 2.) The Applicant hereby proffers to prohibit the following B -3 District land uses within 28.10± acre property: ➢ Amusement and recreational services operated indoors ➢ Automotive dealers and gasoline service stations ➢ Drive -in motion picture theaters ➢ Food stores ➢ Local and suburban transit and interurban highway passenger transportation. ➢ Business associations; membership organizations; and labor unions ➢ Model home sales offices ➢ Motor freight transportation, excluding warehousing and storage ➢ Restaurants ➢ Transportation by air ➢ Transportation services ➢ Truck stops C.) Transportation 1.) Access to Martinsburg Pike (US Route 11) Direct access to Martinsburg Pike (US Route 11) will be provided through a single shared commercial entrance to provide ingress and egress for the 28.10± acre property and all parcels previously subdivided from tax parcel 44- ((A)) -75. This shared commercial entrance has been constructed to align with the existing File #3949/EAW 2 Greenway Engineering April 17,2008; Adams Development Group, Inc. Rezoning Revised July 29,2008; Revised August 12, 2008; Revised October 1, 2008; Revised December 9, 2008; Revised January 8, 2009 commercial entrance to the APAC site located on the opposite side of Martinsburg Pike. 2.) Turn lane — Martinsburg Pike (US Route 11) The Applicant has constructed a right -turn deceleration lane at the entrance on Martinsburg Pike (US Route 11). The Applicant will be responsible for the relocation of the right -turn deceleration lane should this be required as a result of the future Martinsburg Pike transportation plan improvements. 3.) Additional Right -of -way Dedication in the interest of future area transportation plan improvements, the applicant hereby proffers to dedicate to the Commonwealth of Virginia twenty (20) feet of additional right -of -way on the Martinsburg Pike (US Route 11) frontage of the property. This right -of -way commitment has been initiated by the Applicant through dedication to Frederick County as evident in Deed Instrument No. 050017512. 4.) Corridor Improvements, Signalization In recognition of offsite transportation impacts, the Applicant hereby proffers to contribute a share of the cost of signalization improvements in the area of Interstate - 81 Exit 321. The Virginia Department of Transportation (VDOT) will determine the appropriate location for signalization improvements and will determine when this improvement is warranted. When determined by VDOT, the Applicant will enter into a signalization agreement with VDOT that will provide a one -time contribution towards the cost of signalization in an amount to be determined by VDOT based upon the traffic volume generated by the developed portion of the subject property. 5.) Corridor Improvements, Bicycle and Pedestrian Facility The Applicant hereby proffers to construct an asphalt bicycle and pedestrian facility that is 10 feet in width and located within the 20 -foot green strip identified in Section F of this proffer statement. The Applicant shall construct this bicycle and pedestrian facility on the north side of the single shared commercial entrance prior to the issuance of a building occupancy permit for the first site plan on the north side of that entrance, and shall construct this bicycle and pedestrian facility on the south side of the single shared commercial entrance prior to the issuance of a building occupancy permit for the first site plan on the south side of that entrance. No portion of the asphalt bicycle and pedestrian facility will be constructed with the 20 -foot right -of- way dedication area identified in Section C(3) of this proffer statement. 6.) Right -of -Way Reservation The Applicant hereby proffers to reserve a 50 -foot wide strip of land between Yardmaster Court and tax parcel 44 -1 -D to allow for the construction of a future File #39491EAW 3 Greenway Engineering April 17,2008; Adams Development Group, Inc. Rezoning Revised July 29,2008; Revised August 12, 2008; Revised October I, 2008; Revised December 9, 2008; Revised January 8, 2009 public street connection by others. The general location of this reservation area shall be provided on the Generalized Development Plan; however, it is recognized that this location can be shifted without the need of conditional zoning approval. All costs associated with establishing this future public street shall be borne by the owner of tax parcel 44 -1 -D, or by others than the Applicant. D.) North Buffer The applicant hereby proffers to utilize a minimum six foot high earthen berm, rather than a fence, as the opaque element within the one - hundred foot wide Category "C" full screen adjacent to tax parcels 44- ((A)) -76A, 44- ((A)) -76B, 44- ((A)) -76C and 44- ((A))- 76D as depicted on the proffered GDP. E.) South Buffer The applicant hereby proffers to utilize a minimum six foot high fence, rather than earthen berm, as the opaque element within the one - hundred foot wide Category "C" full screen adjacent to tax parcels 44- ((A)) -70, 44- ((A)) -72, 44- ((A)) -73, and 44- ((1)) -D as depicted on the proffered GDP. F.) Corridor Appearance Enhancements The Applicant hereby proffers to enhance the appearance of the Martinsburg Pike (U.S. Route 11) corridor through the implementation of a low -level earth berm and landscaping along the frontage of the subject property. This enhancement will be located within a 20- foot wide green strip that is located immediately adjacent to and on the west side of the dedicated 20 -foot right -of -way strip, which will contain an earth berm that is 2 -feet in height with staggered low -lying shrubs and a single row of deciduous flowering trees that are a minimum of 1 I/2 caliper and planted on 30 -foot centers. This corridor appearance enhancement will be designed to ensure that sight distance is not negatively impacted at the commercial entrance to the subject property, will be developed in substantial conformance with the Corridor Appearance Enhancement Exhibit dated January 8, 2009, and will be installed by the Applicant consistent with the construction of the bicycle and pedestrian facility as described in Section C5 of the proffer statement. G.) Monetary Contribution to Offset Impact of Development The undersigned owner of the above - described property hereby voluntarily proffers that in the event rezoning application #15 -08 is approved, the undersigned will pay to the Treasurer of Frederick County, Virginia the following amount: $ .0151 building square foot File #3949/EAW 4 Greenway Engineering April 17,2008; Adams Development Group, Inc. Rezonin Revised My 29,2008; Revised August 12, 2008; Revised October I, 2008; Revised December 9, 2008; Revised January 8, 2009 This payment is intended to offset the additional cost to Frederick County, and more specifically Frederick County Fire and Rescue, due to an increased demand on public services. The proffer increments will be paid prior to issuance of the building occupancy permits. H.) Signatures The conditions proffered above shall be binding upon the heirs, executors, administrators, assigns and successors in the interest of the Applicant and owner. In the event the Frederick County Board of Supervisors grants this rezoning and accepts the conditions, the proffered conditions shall apply to the land rezoned in addition to other requirements set forth in the Frederick County Code. Respectfully Submitted: ADAMS DEVELOPEMNT GROUP, INC. By: Z / / / /0f Robert C. Adams, President Date Commonwealth of Virginia, City /County of To Wit: The foregoing instrument was acknowledged before me this I9 day of 20 by '- Zo bZ4 �' C- S \ otary Public My Commission Expires..1 I I zoo Y ItlR:1f31.2171 I:M ���f /llllllt�� 5 cs z oc W W Z_ a z W z ss o,• W _ om a �H z 0 m S w a M EN MARK a SMITH NMO22037 ' Qa 0 Uj Fry Z U \ W Uj o J O N a Q W U' = z a w 3 � v N m z " 0 .40 o N I= N W W z CC W y� C7 g a 0 a DATE BIIGW09 SCALE NTS DESIGNED BY. TEAM Flu N0. 390