44A75_AdamsDevelopmentGroupProfferRevisionAMENDMENT
Action:
PLANNING COMMISSION: March 16, 2005 - Recommended Approval
BOARD OF SUPERVISORS: April 13, 2005 ❑ APPROVED ❑ DENIED
AN ORDINANCE AMENDING
THE ZONING DISTRICT MAP
REZONING #02-05 OF ADAMS DEVELOPMENT GROUP
WHEREAS, Rezoning #02-05 of Adams Development Group, was submitted by Greenway
Engineering to revise proffers attached to Rezoning #11-04. This revision adds wholesale with accessory
retail, building materials and lumber stores to the allowed uses. This property fronts on the west side of
Martinsburg Pike (Route 11 North), opposite the intersection with Stephenson Road (Route 664), in the
Stonewall Magisterial District, and is identified by Property Identification Number (PIN}� 5-.—
PINs 44—A -75B, 44—A -75C, 44—A -75D, 44—A -75E, and 44 —A -75F.
WHEREAS, the Planning Commission held a public hearing on this rezoning on March 16,2005; and
WHEREAS, the Board of Supervisors held a public hearing on this rezoning on April 13, 2005; and
WHEREAS, the Frederick County Board of Supervisors finds the approval of this rezoning to be in
the best interest of the public health, safety, welfare, and in conformance with the Comprehensive
Policy Plan;
NOW, THEREFORE, BE IT ORDAINED by the Frederick County Board of Supervisors that the
proffer revision adding wholesale with accessory retail, building materials and lumber stores to the
allowed uses attached to Rezoning 411-04, as described by the Proffer Statement submitted by the
applicant and the property owner, is approved.
PDRes # 10-05
This ordinance shall be in effect on the date of adoption.
Passed this 13th day of April, 2005 by the following recorded vote:
Richard C. Shickle, Chairman Aye Barbara E. Van Osten Aye
Gina A. Forrester Aye Gary Dove Aye
Lynda J. Tyler Aye Bill M. Ewing Aye
Gene Fisher Aye
A COPY ATTEST
John R. ey, Jr.
FredericR County Administ ator
PDRes # 10-05
Greenway Engineering
February 18, 2005 'Adams Development Group, Inc.
Rezoning
PROPOSED PROFFER STATEMENT
REZONING: RZ# 02-05
Industrial Transition District (133) with Proffers to Industrial
Transition District (133) with Revised Proffers
PROPERTY: 59.71 acres +/-;
Tax Parcel #44-((A))-75
RECORD OWNER: Adams Development Group, Inc., Robert C. Adams, President
APPLICANT: Adams Development Group (here -in after "the Applicant")
PROJECT NAME: Adams Commercial Center
ORIGINAL DATE
OF PROFFERS:
REVISION DATE:
Preliminary Matters
June 21, 2004
February 18, 2005
Pursuant to Section 15.2-2296 Et. Seq. of the Code of Virginia, 1950, as amended, and
the provisions of the Frederick County Zoning Ordinance with respect to conditional
zoning, the undersigned Applicant hereby proffers that in the event the Board of
Supervisors of Frederick County, Virginia, shall approve Rezoning Application # 0-1- - PS"
for the rezoning of 59.71 -acres from the Industrial Transition (133) District with Proffers
to the Industrial Transition (133) District with Revised Proffers, development of the
subject property shall be done in conformity with the terms and conditions set forth
herein, except to the extent that such terms and conditions may be subsequently amended
or revised by the Applicant and such be approved by the Frederick County Board of
Supervisors in accordance with the said Code and Zoning Ordinance. In the event that
such rezoning is not granted, then these proffers shall be deemed withdrawn and have no
effect whatsoever. These proffers shall be binding upon this Applicant and their legal
successors, heirs, or assigns.
The subject property, more particularly described as the lands owned by Adams
Development Group, Inc. being all of Tax Map Parcel 44-((A))-75 and further described
by Boundary Survey Plat prepared by Edward W. Dove, L.S., dated July 29, 2003 (see
attached Boundary Survey Plat).
File #3949/EAW
Greenway Engineering February 18, 2005 Adams Development Group, Inc.
Rezoning
A.) Generalized Development Plan
The Applicant hereby proffers to develop the 59.71 -acre property in substantial
conformance with a Generalized Development Plan approved as part of the rezoning
application. The Generalized Development Plan is intended to delineate the general
location and relationship of land bay uses.
B.) The following maximum building square footages are proffered for the land uses
identified below. The building square footages are established to ensure that the
vehicle per day (VPD) generation for the permitted land uses will not exceed 4,603
VPD based on ITE Trip Generation 7U' Edition volumes.
1. Office
2. Building Materials & Lumber Store
3. Wholesale
4. Warehouse
5. Self-service storage facility
TOTAL BUILDING AREA
C.) Transportation
1.) Access to Martinsburg Pike (US Route 11)
120,000 square feet
25,000 square feet
150,000 square feet
120,000 square feet
140,000 square feet
555,000 square feet
Direct access to Martinsburg Pike (US Route 11) will be provided through a single
shared commercial entrance to provide ingress and egress for all uses within this site.
This shared commercial entrance will be located so as to align with the existing
commercial entrance to the APAC site located on the opposite side of Martinsburg
Pike.
2.) Turn lane — Martinsburg Pike (US Route 11)
The Applicant hereby proffers to install a right -turn deceleration lane at the entrance
on Martinsburg Pike (US Route 11).
3.) Additional Right-of-way Dedication
In the interest of future area transportation plan improvements, the applicant hereby
proffers to dedicate to the Commonwealth of Virginia twenty (20) feet of additional
right-of-way on the Martinsburg Pike (US Route 11) frontage of the property.
File #3949/EAW 2
Greenway Engineering February 18, 2005 Adams Development Group, Inc.
Rezoning
4.) Corridor Improvements, Signalization
In recognition of offsite transportation impacts, the Applicant hereby proffers to
contribute a prorated share of the cost of signalization improvements in the area of
Interstate -81 Exit 321. The Virginia Department of Transportation (VDOT) will
determine the appropriate location for signalization improvements and will determine
when this improvement is warranted. The Applicant will enter into a signalization
agreement with VDOT that will provide a one-time contribution towards the cost of
signalization in a prorated amount to be determined by VDOT based upon the traffic
volume generated by the developed portion of the subject property.
D.) Outdoor Storage Buffer
The Applicant hereby proffers to preserve a continuous strip of existing vegetation on
the west side of the Winchester and Western Railroad, as identified on the
Generalized Development Plan, to screen the outdoor storage area from the MH -1
property to the southwest. The Applicant will preserve a minimum depth of fifty (50)
feet of the existing vegetation adjacent to that approximately 242 foot portion of the
property line shared with the MH -1 zoned property to the south. Should such existing
vegetation be deemed insufficient screen by the Zoning Administrator at the time of
site plan review, the vegetative area will be supplemented with additional landscaping
and/or opaque structures as needed to meet ordinance standards.
E.) North Buffer
The applicant hereby proffers to utilize a minimum six foot high earthen berm, rather
than a fence, as the opaque element within the one -hundred foot wide Category "C" full
screen adjacent to properties to the northeast.
F.) South Buffer
The applicant hereby proffers to utilize a minimum six foot high fence, rather than
earthen berm, as the opaque element within the one -hundred foot wide Category "C" full
screen adjacent to properties to the south.
File 43949/EAW
Greenway Engineering February 18, 2005 Adams Development Group, Inc.
Rezoning
G.) Corridor Appearance Enhancements
The applicant hereby proffers to enhance the appearance of the Martinsburg Pike (U.S.
Route 11) corridor through the implementation of a low-level earth berm and landscaping
along the frontage of the subject property. This enhancement will be located within a 20 -
foot wide green strip that is located immediately adjacent to and on the west side of the
dedicated 20 -foot right-of-way strip, which will contain an earth berm that is 2 -feet in
height with low-lying shrubs and a single row of deciduous flowering trees that are a
minimum of 1 %2 caliper and planted on 30 -foot centers. This corridor appearance
enhancement will be designed to ensure that sight distance is not negatively impacted at
the commercial entrance to the subject property, and will be provided in conjunction with
the installation of the commercial entrance.
H.) Stormwater Quality Measures
The applicant hereby proffers that all commercial site plans submitted to Frederick
County are designed to implement best management practices (BMP) to promote
stormwater quality measures. A statement will be provided on each commercial site plan
identifying the party or parties responsible for maintaining these BMP facilities as a
condition of site plan approval. The Applicant will ensure that the south buffer fence is
located on the northern side of the stormwater management area channel and will utilize
plantings recommended for riparian zones by the Virginia Department of Forestry to
further protect and enhance this area.
I.) Monetary Contribution to Offset Impact of Development
The undersigned owner of the above-described property hereby voluntarily proffers
that in the event rezoning application #OZ -0 s is approved, the undersigned will pay to
the Treasurer of Frederick County, Virginia the following amount:
$ .015/ building square foot
This payment, potentially totaling $8,325 is intended to offset the additional cost to
Frederick County, and more specifically Frederick County Fire and Rescue, due to an
increased demand on public services. The proffer increments will be paid at the time
of the building occupancy permits.
File #3949/EAW 4
Greenway Engineering February 18, 2005 Adams Development Group, Inc.
Rezoning
J.) Signatures
The conditions proffered above shall be binding upon the heirs, executors, administrators,
assigns and successors in the interest of the Applicant and owner. In the event the
Frederick County Board of Supervisors grants this rezoning and accepts the conditions,
the proffered conditions shall apply to the land rezoned in addition to other requirements
set forth in the Frederick County Code.
Respectfully Submitted:
ADAMS DEVELOPEMNT GROUP, INC.
By:
Robert C. Adams, President Date
Commonwealth of Virginia,
City/County of Fre-denla Ono r1 ETo Wit:
-h
The foregoing instrument was acknowledged before me this ) g-iday of Ve- r
20 05by
�6rDD-r� C—
My Commission Expires
File #3949/EAW
S
Notary Public
INICINTY MAP
SCALE 1- - ¢000'
® NORTH BUFFER AREA
® SOUTH BUFFER AREA
vPD / /
AREA 4 AADT TABULATION
Z
BUILDING AREA
SQUARE FOOTAGE
OFFICE
120,000
1,372
SELF-SERVICE STORAGE
140000
350
BUILDING MATERIALS/
LUMBER STORE
25,000
1,290
WHOLESALE
150,000
1010
WAREHOUSE
120,000
5%
TOTALS
555,000
4,568
I FAR, - 0.21
/r�
�n ZONED 1
1,
A FFIC I,
AREH USE,
W OLE LE WITH
A CES ORY RETAIL
UILD G MATERIAL
& MBER STORES
AIL,
LUMBER
° °" e° w. w
rI 1
ELF-STO GE
1
SWM CHANNEL
& WETLANDS
PRESERVATION AF
I
r
1
n cwuee � r
wrn �
e e'°ne"emeNluL I
Nu: xex�Lw°"rx I.
OFFICE
i DOT
' DEDICATION �
I FOR
\ FUTURE RT. 11
\ WIDENING
E.)
AC till
Z
i
I L _ W t7
U
ZE 8>
;