HomeMy WebLinkAbout11-06 CommentsJanuary 11, 2007
Dear Evan:
Sincerely,
C tiV
Mr. Evan Wyatt, AICP
Greenway Engineering
151 Windy Hill Lane
Winchester, VA 22602
RE: REZONING #11 -06, ABRAM'S CHASE
Candice E. Perkins, AICP
Planner II
CEP/bad
Attachment
COUNT
107 North Kent Street, Suite 202 Winchester, Virginia 22601 -5000
cc: Philip A. Lemieux, Red Bud Magisterial District Supervisor
Gregory Kerr and Christopher Mohn, Red Bud Magisterial District Commissioners
Jane Anderson, Real Estate
Commissioner of Revenue
Harvest Communities, Inc., 147 Creekside Lane, Winchester, VA 22602
Department of Planning and Development
540/665 -5651
FAX: 540 /665 -6395
This letter serves to confirm action taken by the Frederick County Board of Supervisors at their
meeting of January 10, 2007. The above referenced application was approved to rezone 3.25 acres
from RA (Rural Areas), District to RP (Residential Performance) District with proffers, to
accommodate 13 single family detached residential units on small lots. The subject properties front
on the north side of Senseny Road (Route 657) adjacent to the Parkwood Manor Subdivision, and are
identified with Property Identification Numbers 65 -A -27A and 65 -A -28A in the Red Bud Magisterial
District.
The proffer that was approved as a part of this rezoning application is unique to this property and is
binding regardless of ownership. Enclosed is a copy of the adopted proffer statement for your
records.
Please do not hesitate to contact this office if you have any questions regarding the approval of this
rezoning application.
REZONING APPLICATION #11 -06
ABRAM'S CHASE
Staff Report for the Board of Supervisors
Prepared: December 27, 2006
Staff Contact: Candice E. Perkins, Planner II
This report is prepared by the Frederick County Planning Staff to provide information to the
Planning Commission and the Board of Supervisors to assist them in making a decision on this
application. It may also be useful to others interested in this zoning matter. Unresolved issues
concerning this application are noted by staff where relevant throughout this staff report.
Reviewed Action
Planning Commission: September 20, 2006 Tabled for 90 days by Planning
Commission
Planning Commission: December 20, 2006 Recommended Approval
Board of Supervisors: January 10, 2007 Pending
PROPOSAL: To rezone 3.25 acres from RA (Rural Areas) District to RP (Residential Performance)
District with proffers, to accommodate 13 single family detached residential units on small lots.
LOCATION: The property fronts on the north side of Senseny Road (Route 657) adjacent to the
Parkwood Manor Subdivision.
MAGISTERIAL DISTRICT: Red Bud
PROPERTY ID NUMBERS: 65 -A -27A and 65 -A -28A
PROPERTY ZONING: RA (Rural Areas) District.
PRESENT USE: Residential and Vacant
ADJOINING PROPERTY ZONING PRESENT USE:
North: RP (Residential Performance)
South: RA (Rural Areas)
East: RP (Residential Performance)
West: RA (Rural Areas)
Use: Lynnehaven Subdivision Open Space
Use: Agricultural
Use: Parkwood Manor Subdivisions
Use: Residential
PROPOSED USES: 13 single family small lot homes (4 units /acre density)
Rezoning #11-06 Abram's Chase
December 27, 2006
Page 2
REVIEW EVALUATIONS:
Fire Marshal: Plan approval recommended.
Sanitation Authority: No comments.
Virginia Dept. of Transportation: The documentation within the application to rezone this property
appears to have little measurable impact on Route 656. This route is the VDOT roadway which has
been considered as the access to the property referenced. VDOT is satisfied that the transportation
proffers offered in the Abram's Chase Subdivision rezoning application dated March 1, 2006 addresses
transportation concerns associated with this request. Before development, this office will require a
complete set of construction plans detailing entrance designs, drainage features, and traffic flow data
from the I.T.E. Trip General Manual, Sixth Edition for review. VDOT reserves the right to comment on
all right -of -way needs, including right -of -way dedications, traffic signalization, and off -site roadway
improvements and drainage. Any work performed on the State's right -of -way must be covered under a
and use permit. This permit is issued by this office and requires an inspection fee and surety bond
coverage.
Greenwood Volunteer Fire Company: Agreed to.
Public Works Department: Refer to Wetlands, Page 3: A detailed wetlands delineation study will be
required with the master development plan submittal. Refer to Site Drainage, Page 7: During the
subdivision design phase, it will be necessary to route the 100 -year storms through the existing drainage
swales to determine the impact on the proposed development. Any stormwater ponds shall be
constructed above the maximum 100 -year storm level. Refer to Solid Waste Disposal, Page 7: The
narrative references the close proximity to the Greenwood Citizens' Convenience Center. This site has
been scheduled to be closed within the next two years. Therefore, we recommend that curbside trash
pickup be provided by the developer or Home Owners' Association. This requirement should be
included in the analysis and proffer statement.
Frederick Winchester Service Authority: There is adequate water and sewer capacity to serve this
rezoning request.
Department of Parks Recreation: As of this review, a minimum of three recreational units are
required for this development. However, if a waiver is approved. an appropriate value for recreational
amenities must be determined. The proposed asphalt walkway to adjacent property should meet
Frederick County Standards. Plan appears to offer the appropriate amount of open space. The proposed
monetary proffer for Parks and Recreation appears to address the impact Abram's Chase will have on
this department's capital facility needs.
Frederick County Public Schools: Based on the information provided, it is anticipated that the
proposed 14 single family homes will yield two high school students, two middle school students and
five elementary school students for a total of nine new students upon build -out. Significant residential
growth in Frederick County has resulted in the schools serving this area having student enrollments
nearing or exceeding the practical capacity for a school. Even with only nine new students upon build-
Rezoning #11-06 Abram's Chase
December 27, 2006
Page 3
out, the cumulative impact of this project and others, coupled with the number of approved,
undeveloped residential Tots in the area, will necessitate the future construction of new school facilities
to accommodate increased student enrollments.
Winchester Regional Airport: While the proposed development lies within the airport[s Part 77
surfaces and airspace, it appears that the proposed site plan should not impact operations at the
Winchester Regional Airport. Residents should be forewarned that due to the proximity of the site to
the Winchester Airport, they may experience noise from over flight of aircraft arriving to and departing
from the airport from the northeast.
Frederick County Attorney: It is my opinion that the Proffer Statement is generally in a fornt to meet
the requirements of the Frederick County Zoning Ordinance and the Code of Virginia, subject to the
following comments: 1. Proffer A provides that the property will develop in substantial conformity
with the attached Generalized Development Plan (GDP). The GDP was not attached to the copy ofthe
Proffer Statement provided to me. Therefore, this review is provided without a review of the GDP. 2.
Proffer B limits the dwelling units to "14 single family detached residential dwelling units on small
lots It is assumed that this is a reference to the "single family small lot" type of development
identified in Section 165 -65F of the Zoning Ordinance. 3. Proffer C proposes to provide tot lot
equipment, park benches, and an asphalt pedestrian walkway as community recreational facilities in lieu
of a community center, of the community center is waived by the Frederick County Board of
Supervisors. However, my review of Section 165- 64(A)(1) indicates that the Board of Supervisors can
waive the community center requirement of Section 165 -64(A) in proffered age- restricted single family
small lot subdivisions that contain less than 50 lots. However, there is nothing in the proffer provided
to me to indicate that this development is to be an age- restricted development. Accordingly, 1 question
whether the waiver provision applies, so as to permit the elimination of the community center for this
small lot housing development. 4. Proffers D(1) and D(2) provide for the construction of a right turn
and taper lane and for the dedication of right -of -way. However, neither proffer establishes a timing
requirement for the construction and dedication. A timing requirement satisfactory to the County
should be included in each proffer. 5. In Proffer E the first clause is redundant and should be deleted.
The proffer should commence as the other proffers have commenced with the language "the Applicant
will pay... It should be noted that I have not reviewed the substance of the proffers as to whether the
proffers are suitable and appropriate for the rezoning of this specific property, or whether other proffers
would be appropriate, as it is my understanding that that review will be done by the staff and the
Planning Commission.
Historic Resources Advisory Board: Upon review of the proposed rezoning, it appears that the
proposal does not significantly impact historic resources and it is not necessary to schedule a formal
review ofthe rezoning application by the HRAB. According to the Rural Landmarks Survey, there are
no significant historic structures located on the properties nor are there any possible historic districts in
the vicinity. It was also noted that the National Park Service Study of Civil War Sites in the
Shenandoah Valley does not identify any core battlefields that this proposed rezoning would directly
impact.
Planning Department: Please see attached letter dated April 12, 2006 fron] Candice E. Perkins,
Planner II
Rezoning 11 Abram's Chase
December 27, 2006
Page 4
Planning Zoning:
1) Site History
The original Frederick County Zoning Map (U.S.G.S. Stephenson Quadrangle) identifies the
parcel as being zoned A -2 Agricultural. The County's A -1 and A -2 agricultural zoning districts
were combined to form the RA (Rural Areas) District upon adoption of an amendment to the
Frederick County Zoning Ordinance on May 10, 1989. The corresponding revision of the zoning
map resulted in the re- mapping of the subject property and all other A -1 and A -2 zoned land to
the RA (Rural Areas) District. Parcels 65 -A -27A and 65 -A -28A maintain this RA zoning
classification.
2) Comprehensive Policy Plan
The Frederick County Comprehensive Policy Plan is an official public document that serves as
the community's guide for making decisions regarding development, preservation, public
facilities and other key components of community life. The primary goal of this plan is to
protect and improve the living environment within Frederick County. It is in essence a
composition of policies used to plan for the future physical development of Frederick County.
[Comprehensive Policy Plan, p. 1 -1]
Land Use
The parcels comprising this rezoning application are located within the County's Urban
Development Area (UDA) and Sewer and Water Service Area (SWSA). The Urban
Development Area defines the general area in which more intensive forms of residential
development will occur. In addition, the Eastern Frederick County Long Range Land Use Plan
Map identifies this general area with future residential land uses.
Transportation
The Frederick County Eastern Road Plan provides guidance regarding future arterial and
collector road connections in the eastern portion of the County by identifying needed
connections and locations. Plans for new development should provide for the right -of -ways
necessary to implement planned road improvements and new roads shown on the road plan
should be constructed by the developer when warranted by the scale, intensity, or impacts of the
development. Existing roads should be improved as necessary by adjacent development to
implement the intentions of the plan (Comprehensive Plan 7 -6).
Senseny Road is identified as an improved major collector road and should be addressed
accordingly. In addition, Senseny Road is recognized in the Frederick County Bicycle Plan with
a short term designation for bicycle accommodations. Access to the site would be via a new
public street that would be stubbed out at the western property line as indicated on the
Generalized Development Plan. A 10' asphalt bicycle /pedestrian is also being constructed
along the frontage of the property.
Rezoning #111-06 Abram's Chase
December 27, 2006
Page 5
3) Site Suitabilitv /Environment
The site does not contain any environmental features that would either constrain or preclude site
development. There are no identified areas of steep slopes, floodplains, wetlands or woodlands.
According to the Soil Survey of Frederick County, the site contains the following soil types;
Clearbrook Channerry Silt Loams and Weikert-Berks Channery Silt Loams.
4) Potential Impacts
A. Transportation
Traffic Impact Analysis.
The applicant's transportation analysis is minimal due to the limited scope of the proffered
development plan. Based upon the ITE Trip Generation Manual, the fourteen lot single family
detached residential project will generate approximately 134 vehicle trips per day.
The applicant is proffering to construct an internal public street with a temporary turnaround
that will be designed to provide for inter parcel connectivity to Tax Map Parcel 65 -A -25B to the
west. The applicant's proffer statement includes a commitment making the required frontage
improvements to Route 657, Senseny Road, including the necessary right- of-way dedication to
provide for 45 feet from the existing Senseny Road centerline. Commitments for the frontage
improvements have been provided in the proffers include lane widening of Senseny Road to
achieve the full section of Senseny Road across the frontage of this property and bicycle and
pedestrian accommodations. This site will also offer access to the adjacent parcel (65 -A -26)
should it choose to utilize the new public street within the Abrams Chase Subdivision.
Staff Note: It is noted that recent single family rezonings in this area have proffered a
transportation contribution per dwelling unit (Senseny Road Rentals, Senseny Village) to
help with road improvements in addition to a proffer to construct the Senseny Road
expansions on their property (Orrick ($2,854), Senseny Road Rentals(S5,000)). The
previously reviewed application contained a transportation proffer of S1,000 per unit for
improvements to Senseny Road. This rezoning has been revised to provide the
improvements to Senseny Road but has removed the 51,000 transportation contribution
from the proffers.
Consideration should be made for the location of the road shown on the GDP. This
rezoning will establish the location of the road for future developments.
B. Sewer and Water
Presently sewer service is available via an eight inch main that is located along the northern
portion of the subject site. This sewer line will direct effluent from the Abram's Chase
Subdivision to the new Frederick County Sanitation Authority regional pump that will convey
effluent to the Opequon Wastewater Treatment Plant. The proposed 14 lot development would
Capital facility
Single Family
Fire and Rescue
$720
General Government
$320
Public Safety
$658
Library
$267
Parks and Recreation
$2,136
School Construction
$19,189
Total
$23,290
Rezoning #11-06 Abram's Chase
December 27, 2006
Page 6
add approximately 3,100 gallons per day to the public sewer conveyance system, increasing the
demand at the Opequon Plant by 0.15
Water supply will be provided by way of an eight inch water line along the north side of
Senseny Road that adjoins the subject site. Potable water is provided to this area of Senseny
Road through a series of water transmission lines whose source is the Stephens City quarry
system. Water demand of this project is estimated to be 3,850 gallons per day.
C. Community Facilities
The Frederick County Development Impact Model is a tool that is used to identify the capital
costs associated with various types of development proposals presented to the County. The
projected costs to Fire and Rescue, Public Schools, Parks and Recreation, Library, Sheriff's
Office and for the Administration Building have been calculated and provided to the applicant
for their consideration. The impacts associated with entirely residential projects are fixed at
$23,290.00 for single family detached residential dwellings. This application addresses
community facility impacts and needs by proffering a payment in the amount of $23,290.00 per
residential unit to mitigate the impact to the identified community facilities.
For your information. the following is the breakdown of the projected impacts per dwelling
unit for each capital facility taken from the Development Impact Model.
5) Proffer Statement— Dated March 1, 2006 (Revised December 21, 2006)
A) Generalized Development Plan
The applicant has proffered to develop the property in substantial conformance with the
GDP provided in the rezoning application. The GDP shall identify the general location
of the additional travel lane and turn lane on Senseny Road, the 10' bicycle /pedestrian
facility, the internal road system with inter parcel connectivity, the general location of
the residential lots and the open space /buffer areas.
Rezoning 11 -06 Abram's Chase
December 27, 2006
Page 7
B) Residential Land Use
The applicant proffers to develop a maximum of 13 single family detached residential
units on small lots.
Staff Note: With the single family small lot designation, this project could develop
lots as small as 3,750 square feet.
C) Transportation Enhancements
1. The applicant will construct an internal pubic street with a temporary turnaround
that will be designed to provide for Interparcel connectivity to Tax Map Parcel 65-
A-25B.
2. The applicant will construct a new westbound travel lane on Senseny Road that is
12' in width and is located along the property frontage within the public right -of-
way. The new westbound travel lane shall be designed to connect Parkwood Drive
tot eh entrance serving the Property. This improvement shall be bonded and
constructed concurrently with the internal public street serving the property.
3. The applicant will construct a right -turn and taper lane within the public right-of-
way to the entrance serving the property. This improvement shall be bonded and
constructed concurrently with the internal public street serving the property.
4. The applicant will dedicate right -of -way sufficient to provide for 45 feet from the
existing Senseny Road centerline of record to allow for future road improvements by
others.
5. The applicant will construct a 10 foot asphalt bicycle /pedestrian facility along the
entire frontage of the property.
6. The applicant will provide for a curb cut along the Interparcel public street serving
the property to allow for ingress /egress for Tax Map Parcel 65- A -26A. The
applicant shall establish an ingress /egress easement for the benefit of 65 -A -26A that
shall be incorporated into the final plat and deed for the Abrams Chase Subdivision.
Additionally, an easement shall be provided at this general location for the benefit
of Tax Map Parcel 65-A-26A to allow for public water and sewer connections to the
Abrams Chase public water and sewer lines at the expense of others.
D) Monetary Contribution
A monetary contribution in the amount of $23,290.00 to Frederick County, to be
provided at the time each residential lot is platted, is proffered in an effort to
mitigate the impacts associated with this development on community facilities.
PLANNING COMMISSION SUMMARY AND ACTION OF THE 09/20/06 MEETING:
Members of the Commission asked the applicant if he had considered an inter parcel connector at the
Rezoning #11-06 Abram's Chase
December 27, 2006
Page 8
cul -de -sac to the east or the possibility of acquiring the vacant lot on Parkwood Circle for an inter
parcel connector. The applicant replied that not only was there a drainage area through the location to
the east. but it would compromise the area they had planned for their recreational amenities; he said the
other open area on the site was designated for stormwater detention. The applicant said he had not
pursued the possibility of purchasing the vacant lot on Parkwood Circle.
Considering how much of the property was within a floodplain, a member of the Commission raised the
possibility that housing sites could be lost or the road location may have to be moved. The applicant
responded that the results of a site- distance study they conducted eliminated any leeway in the location
of the road. The applicant assured the Commission that a wetlands study would be conducted at the
MDP stage, as requested by the County's engineer.
One citizen spoke in opposition to the rezoning; she did not believe the proposed development
supported the County's vision for good planning, She did not think this site, nor the other surrounding
vacant parcels, should be a continuation of the less- than desirable type of development this area has
been experiencing.
The Planning Staff pointed out that the inter parcel connection is required by the zoning ordinance and
was a non debatable issue, unless waived by the Board of Supervisors. Staff noted that the ordinance
also requires a waiver of the community center to be done at the MDP or subdivision stage. In addition,
Staff noted the inappropriateness of the applicant adjusting the cash proffer contribution at this point in
the process. Regarding the entrance separation along Senseny Road, Staff commented that the 200 feet
proposed by the applicant did not meet the desired separation of 500 feet, which is recommended in
VDOT's subdivision design manual.
Commission members said they were having difficulty finding any redeeming values in the proposal
from a planning standpoint. They were concerned this project may set a precedent for similar
developments in this area. They were concerned about the possibility of having six cul -de -sacs within a
1,200 -foot distance, each with 134 trips per day, along Senseny Road, which already had traffic
problems. Although there were questions whether approving this rezoning represented good planning, a
concern was raised about the future of this particular area, which seemed to be a conglomeration of
small parcels. The question of how the parcels in this area could be integrated to create good planning
was raised. The possibility of a solution through the UDA Study was suggested. Members of the
Commission wanted to give the applicant more time to address some of the issues in order to make the
project work. By a majority vote. the Commission tabled the rezoning for 90 days.
YES (TO TABLE): Unger, Watt, Manuel, Morris, Oates, Light, Wilmot, Kriz, Triplett, Kerr, Mohn
NO: Thomas
(Note: Commissioner Ours was absent from the meeting.)
STAFF UPDATE FOR THE 12/20/2006 PLANNING COMMISSION MEETING:
The applicant provided staff with a revised proffer statement and GDP which have addressed the issues
raised at the September 20, 2006 Planning Commission. The issues from the meeting and the
Rezoning #11 -06 Abram's Chase
December 27, 2006
Page 9
applicant's solutions are as follows:
1. The previously reviewed application only provided right -of -way for future improvements to
Senseny Road; it did not provide any improvements or the bicycle /pedestrian lane. The revised
application provides the right -of -way, the improvements to Senseny Road (new westbound
travel lane and right turn/taper lane) as well as the ten foot asphalt bicycle /pedestrian facility
along the entire frontage of the property.
2,
The internal public road within previously shown has a cul -de -sac and did not provide inter
parcel connectivity to the adjacent property. The revised proffers and GDP now show the
internal public street stubbing out at the western property line. The applicant has also provided
an area for a smaller adjacent parcel that fronts on Senseny Road to connect into the new public
street within the Abrams Chase Subdivision if they choose.
3. The previously reviewed application contained a request for a waiver of the community center
requirement and the proffers had specific recreational unit figures and amenities that would be
applicable if the community center was waived. The waiver cannot be sought at the rezoning
stage and needs to come at the MPD or Subdivision stage. The waiver and the recreational
amenity proffer have been removed from the application. The revised GDP currently does not
provide a location for the required recreational area which is required to be shown.
PLANNING COMMISSION SUMMARY AND ACTION OF THE 12/20/06 MEETING:
One adjoining property owner spoke with concerns that the access turn might damage a sewer line for
the existing mobile home. The applicant stated the access turn on Senseny Road will be completely
within the existing right -of -way, plus there is additional right -of -way dedication on the applicant's
property.
Planning staff pointed out that the applicant had addressed the issues raised at the September 20, 2006
Planning Commission meeting and had addressed staff's concerns as well; it was noted that
consideration should be made for the location of the Interparcel connection to the adjacent property to
the west as the road location shown on the GDP will establish the road location for future
developments.
No issues of concern were raised and the Commission recommended approval of the rezoning with the
proffers offered by the following majority vote:
YES (to approve): Unger, Manuel, Morris, Oates, Ours, Kriz, Triplett, Kerr, Mohn, Wilmot
NO: Light
(Note: Commissioners Thomas and Watt were absent from the meeting.)
Rezoning #11-06 Abram's Chase
December 27, 2006
Page 10
STAFF CONCLUSIONS FOR 01/10/07 BOARD OF SUPERVISORS MEETING:
The land use proposed in this application is generally consistent with the Comprehensive Policy Plan, as
described in the Eastern Frederick County Long Range Land Use Plan. The applicant has addressed the
issues that were discussed by the Planning Commission and has addressed staff's concerns.
Consideration should be made for the location of the road that is shown on the GDP as this rezoning
will establish the location of the road for future developments.
Following the required public hearing, a decision regarding this rezoning application by the
Board of Supervisors would be appropriate. The applicant should be prepared to adequately
address all concerns raised by the Board of Supervisors.
war a
F�r `Lu 7 .w
gWailA
°eJ a� ey,4;
a sp
4:0122 go
04'114 Tar
m
40 4 4 s t e
aF it0�, -a s 1 ��I
pr,r
o O p V e,O
l e
al iae
.44* !.leOO
Us OO o �Qe
ta
r Wi
011 04i afa 1 l,� 1" I j I�
NI 3/4
LYNNENAVEN
/ttAttwl
Minn,
411 111, 4
sulfa IMP
il''- O m
l
TTA
C LK G EM TERV DMPPNV. INL P c
V
ail i t I it
Wait
NT.
lap
'rr
I
pp p �1 ZS t,�
Ar r eine Aw
I.
1
Pk i
,Q.QG_� d� I 0 In
r �y Il e��v` ww O a cb
kiirlitil aka*
kcal WP stessiratisti fe
ij
4' ANDERSON FARM. LIL 14;14; T /f .07
o P•Pg' I
t7 EFG
VES
•pl JME B V5 A 55
9 r NJS
ILL
J �y
1 V y
¢2 O
�44
EEG INVEST ENTS, LLL
I
°v
4
o
E®'.
=r �✓r C l ice
q
2)::::";;;P::::71-Ca
9�EZ 11 06
Abrams Chase
Location Map
(65 A 27A, 28A)
o ins ®a
�4 =T�
.u®/° %�st
Y 1•rl
r
Feet
:1;!:!4
c4„.,s, Y
RS/
",,e e
go
v--
ti am,
Q� ®o3� MOW
QQES� �.�472aii
41) e� O'
JIM
n Ir
IL I S A
4
1
o e
�l .4p
r L o o
V
fie••
v oo cv -I>
et. o o
y. pi
IN
o te a 'I
ino
V ♦iI C I
��,r,
1�
Q r 4
!•i °O�; O See 55 A sn
�p O LYNNEHAVEN,LL
da
r i
rairi
DA f
♦o iI r 4.41 u s
!a1
11111
B2 DRRILK L EM tERV LDM4ANY. INL
U i 1
trip
I�Ij,�
ni lair
o
o
D
v
657
tia
av�e��r° o a�,.- off i
F
�eYY a �-e +Rn.. ve Sense .O/ 7 L i
�o um u ye
--Pi
`yI�
\040
44 II if
on
a
114/0,t
ais� ERR o 7
z
ANDERSON FARM. LLL t� �D
Rr ro`♦ r
0
CD_ itt
I,
a
t3 �QT/ J 1 L 4!
RM, LLL )y
1111111 allir
OO
,t
l
,1145
ERA INVEST ENTS, at
4V
(.5 A I3A
SHUMAN SOHN E it
2 a•
4 ,,;,�j,
�W /�rifi
Abrams Chase
o o Zoning Map
°o o -.d 'A. o m, d o..d (65 A 27A, 28A)
o o
So
A
4
t j
Fee,
y
I •te oo�aa�o
a o
o c o' o t, -Akj i
a a ir �1 1ire
rob,
saw
O s
hi.
r e o A >ov
LYNNEHAVEN, Lc
���a�i S ri
m ini
VAT
mil n il
4' P Valli
l.�
GK LEM IERY GOWANV, D.G. r Q a4�
le
l ibSia
r��
All"
g el
p ire
till
reatir,od
Ilitb
Ave e
I
ir, vni n
et)),/
gate
4 40,
�e 11•ati y.
hall Ito
O Ci ta
4'4 1
4* v. btz* Ltajw itip 4 4 '1/4 F ilik 'ICZ
O
55 A i5
`�i•
ANDERSON FARM, LLG 4
ai
0. .444,
EF
AI N�EST a 05 A 55
f NTS_ ELL GRDUR uL
411113/4 late
o f
Q
45 A 14
GREENWOOD FARM, uL
+gef.
j�
G�
•5
5 ,y
0
E EEG INVEST NTS, uL
f
45 A I �i O
$HUMAN 7DHN HN E /1
n
47,Lii`°`a a
l�
-r es oa. wo„ ..e,.,� REZ 11 06
w Abram's Chase
Lantluse Maps
a w .,D_ (65 A 27A, 28A)
0 12520 125 0
407
t .�1
Mr QtV iiii
Feet
r'. a+ey y u'4-u- }C�
/t "M •ry`Y tt l l 16
�t Q Li kenS:Wdy �i s:rK `'yt rp ga
6
m scot „tip, vy� j7a�
a -rs',� 1 4 >e "la "�i 'f
i s ';ri
�1j. „A
5 �1
.s
yh'F r du
-it,. k i• /r
4I" :R��via'Yd
�a
1 ws!
x 1
t 1`, t'f
7 i'
.a 1- s d o
r l p t
7
y- �..r. w4
r
A "lc;
'l i '�G
m "'czar �.ri
ii• r'S"?�$'6,�
atm
:f
L�`F. r w -I''''s
t om 1 .I V LL
4 co t- S �o 4.p.
a�✓ A
w s •L�rs d
r
Ii
n r a`
s 4 l
YC,
a` tr./
a q
;a ke "A `d. ti 0
s yf 6 t f
t' }K yyY�� -Ft7�
F 4 %ti
"4�, +Y�
a tr �v i
'l1 w o yy f4
W a l'I
f
c-•e s
i 4'•
§t@
.f
5 y 4
''R
Q om
a, l 4 fi�
'r
jet
y tQ -e 1
Y 9 6" ft? 't 9
A wt.,
LYF NEHAVEN,IL
eC it
r'
Ira
t J
1 4 .1
A *�ri f ca
otnC'" -A
s i r
Ir
l 4
y/ 7 40 r
n DRW X 1 4 ,+.i. r. ^x' 1 .fl
`„7 Y1 ,YS .`Kr'
l 1 1 J r 1 t N t� ,Aj'3
9 r f �kN C 1'7
i� l 440
v as
t j=; r 1cJ
65] e
A' ,X r 1 V ,J �,p
l
55K 1 r 1
af
s `�z I 114 awt'
k I
‘1' 1 s` i
-a++ yT f
'I
6
,.y' ✓�.'a�r,,.� c m Af,
Gi o i .F *d
e ,1., t
lc:
f
Sef "it'
1 e 3
`d
r�?'
ry
,G ib
4� i
it
e 1 1<t
Iao
Mj Y
9
T t
td
?'j°< 1
.K
vF ^r F
Y
1 a l w
,D l a 4n
'iO4,/ «v im !nr
4S'�1” el b
K I
e r f Y Y H.l' q(�
t
(�"r
wti
iu r
j "I-‘S
1 J' .xy.4
7 a v F`
r
�P
A"
x.a a Ae
yr A `°Ma
l �e -r m `m r
®i 'IC .i� r
wf 4M
C
..k
6
L5 1
yi@
a yy CC e.
Aw
i `HIS
'v i
y f1 p��1f
Y
HE r B ��C'ff77 �1 R �YtT R`.n
t'^tie
J �'�..1 L1t
Q s Y "2&► y, .z$
A
n" r `°ti 'T
rELLYup.
s. A c q' 3jt ry rp t
$t
fd r t
r
�.5- r
GREENWODD FARM L“. DO E�+f a F >r W I
a a 'i' ar o- lr 4p
1 1•
f
3 'r r J a 4 V t u} I 'i
ry,S�Y I �`a -1 i S.,
6541N
ti; alt
r r- �y
S fi
h S?�
T E.NT$
1 S v J
A•. I3 A z
I T
j !+S
r '".vyx S HA 1 M A N SDHN E iT: I t f it t t;
:R.
7
9
CO
Y
s. r rV
d
.0":4
m +J�r
=1�
A r# [e
s ``�thil
Rood c.nten 1� y
®.„_.m, 0s w. m::a' IR�G� }T 11 O6
Abram's Chase
Aerial Map../
A- 27A,28A)
(41k
izsz
Fee.
I. Applicant:
REZONING APPLICATION FORM
FREDERICK COUNTY, VIRGINIA
To be completed by Planning Staff c 0
Fee Amount Paid 33'7S
Zoning Amendment Number r Date Receive o /41d
PC Hearing Date q hDdc4 BOS Hearing Date /1/4'0/0
The following information shall he provided by the applicant:
All parcel identification numbers, deed book and page numbers may be obtained from the
Office of the Commissioner of Revenue, Real Estate Division, 107 North Kent
Street, Winchester.
Name: Greenwav Engineering
Address: 151 Windy I -Iill Lane
Winchester. VA 22602
2. Property Owner (if different from above)
Name: Harvest Communities, Inc.
Address: 147 Creekside Lane
Winchester, VA 22602
3. Contact person if other than above
Name: Evan Wyatt. AICP
Telephone: (540) 662 -4185
Telephone: (540) 678 -1462
Telephone: (540) 6624185
4. Checklist: Check the following items that have been included with this
application.
Location map X Agency Comments X
Plat X Fees X
Deed to Property X Impact Analysis Statement X
Verification of taxes paid X Proffer Statement X
PARCEL II) NUMBER
USE
ZONING
55K- 1 -1 -24A
Open Space
RP
65 -A -15
Agricultural
RA
65 -A -25B
Residential
RA
65 -A -26A
Residential
RA
65B -9 -7
Residential
RP
65B -9 -7A
Residential
RP
65B -9 -8
Residential
RP
65B -9 -9
Residential
RP
65B -9 -10
Residential
RP
5. The Code of Virginia allows us to request full disclosure of ownership in
relation to rezoning applications.
Please list below all owners or parties in interest of the land to be rezoned:
Harvest Communities. Inc.. Stuart Butler, President
6. A) Current Use of the Property:
B) Proposed Use of the Property:
7. Adjoining Property:
Residential
Residential
8. Location: The property is located at (give exact located based on nearest road
and distance from nearest intersection, using road names and route number):
Fronting on the north side of Senseny Road (Route 657). adjacent to the Parkwood
Manor Subdivision.
Acres
Current Zoning
Zoning Requested
3.25+
RA District
RP District
3.25+
Total Acreage to be rezoned
Information to be Submitted for Capital Facilities Impact Model
In order for the Planning Staff to use its capital facilities impact model, it is necessary for
the applicant to provide information concerning the specifics of the proposed use.
Otherwise, the planning staff will use the maximum possible density or intensity scenario
for the proposed Zoning District as described on Page 9 of the application package.
9. Parcel Identification /Location: Parcel Identification Number
Districts
Magisterial: Red Bud High School: Millbrook
Fire Service: Greenwood VFR Middle School: Admiral Byrd
Rescue Service: Greenwood VFR Elementary School: Senseny Road
10. Zoning Change: List the acreage included in each new zoning category
being requested.
11. The following information should be provided according to the type of
rezoning proposed:
Single Family homes: 14
Non Residential Lots:
Number of Units Proposed
Townhome: Multi Family
Mobile I -tome: Hotel Rooms:
Square Footage of Proposed Uses
Office Service Station:
Retail: Manufacturing:
Restaurant: Warehouse:
Other
12. Signature:
I (we), the undersigned, do hereby respectfully make application and petition the
Frederick County Board of Supervisors to amend the zoning ordinance and to change
the zoning map of Frederick County, Virginia. I (we) authorize Frederick County
officials to enter the property for site inspection purposes.
I (we) understand that the sign issued when this application is submitted must be
placed at the front property line at least seven days prior to the Planning Commission
public hearing and the Board of Supervisors' public hearing and maintained so as to
be visible from the road right -of -way until the hearing.
I (we) hereby certify that this application and its accompanying materials are true and
accurate to the bet of my (our) knowledge.
Applicant(s):
Date: SI L110(o
Department of Planning Development, County of Frederick, Virginia,
107 North Kent Street, Suite 202 Winchester, Virginia 22601
Phone 540 -665 -5651 Facsimile 540 665 -6395
Planning office, County of Frederick, Virginia, 107 Kent Street, Winchester, Virginia 22601
Phone 540- 665 -5651 Facsimile 540- 665 -6395
Know All Men By These Presents: That I (We)
(Name) Harvest Communities, Inc.
(Address) 147 Creekside Lane, Winchester, VA 22602
the owner(s) of all those tracts or parcels of land "Property conveyed to me (us), by deed recorded in the
Clerk's Office of the Circuit Court of the County of Frederick, Virginia, by
Instrument No. 050028946 on Page and is described as
Parcel: 65 Lot: 27A Block: A Section: Subdivision:
Parcel: 65 Lot: 28A Block: A Section: Subdivision:
do hereby make, constitute and appoint:
(Name) Greenway Engineering (Phone) (540) 662 -4185
(Address) 151 Windy Hill Lane Winchester, VA 22601
To act as my true and lawful attorney -in -fact for and in my (our) name, place and stead with full power and
authority I (we) would have if acting personally to file planning application for my (our) above described
Property, including:
Rezoning (Including proffers)
Conditional Use Permits
Master Development Plan (Preliminary and Final)
Subdivision
Site Plan
Comprehensive Policy Plan Amendment
My attorney -in -fact shall have the authority to offer proffered conditions and to make amendments to
previously approved proffered conditions except as follows:
This au thorization shall expire one year from the day it is signed, or until it is otherwise rescinded or
modified.
In withessithere
i e V
as
Signatur
Notary Public
Special Limited Power of Attorney
County of Frederick, Virginia
Frederick Planning Web Site: www.co.frederick.va.us
State of Virginia, City
(Phone) (540) 678 -1462
of Frederick, To -wit:
I, Donna L. Meliso, a Notary Public in and for the jurisdiction aforesaid, certify that the person(s) who
signed to the foregoing instrument and who I (are) known to me, personally appeared before me and has
acknow ged the same
before me in the jurisdiction aforesaid this25Ui day of 200
OC -11 142.X 0 4 q J My Commission Expires: February 29 2008
LEGEND
LOT AREA
OPEN SPACE BUFFER
PUBLIC R.O.W AREA
10' BICYCLE PEDESTRIAN FACILITY
50' ROAD EFFICIENCY,BUFFER
i
INGRESS EGRESS EASEMENT AREA
PACE
o pESS
r
0 n.�
DO 40 0
SCALE. 1' BO'
Bo
160
z
za
N
an d
m
N J
W
in la
S O
0
N
4
cc
m
4
DAIS WAITER ICK
SCAM 1 BD•
OSSIGNED BY: e@1
z
z
ad
hi W
flZ ND. a
r v
--LEGEND
[r
3
0
/l.
ABE
F W ,gmnm
a\\\\\\ \a\\ \aa\`� \'a0U �\@a a@n ael\\%nmmm
s mm uuwuucym m�mvmm U nav u�...
n\mnRUranmmmmmTmmnmmn\'"'"---n—
1
SENSENY ROAD
e
v
P
lap2*
yaw
O
nn
sr
el r
ban
o p
aria\
SENSENY_ROAD
N I II with
ifts
Isms
immul 'rte' _alj
alw a r Fa
ABRAMS CHASE SUBDIVISION
CONCEPTUAL PUBLIC R.O.W. LAYOUT
CONCEPTUAL 10' BICYCLE PEDESTRIAN FACILITY
CONCEPTUAL 50' ROAD EFFICIENCY BUFFER
ORRICK DEVELOPMENT
g
0
900 1.50 0
300
$GN.Ei r DOd
W
CC
a
d
O y u
O e
O O o
g _I 6
G a g
On g p
C W B
W z
y 0
a
W
H
DAYS 110.8LER 2006
SCAM I 500'
0/SIGNED or eon
K
Legend
Q Abram's Chase Parcels
SWSA
UDA
Parcel Boundaries
1
2
l
LI
ir
l iss
4
1
All
r
em
4
1
-4
�N
41
s
Iota
LA
I
Stb
4
1 t
In
4
1�
4
4
1
u
0
Thy
A
440
14
1
fr
ofe
IOW
ft
h i
SWSA
at
ar:so
anis
Pe
a
1 I
k
VS
L
s irt*
4
Iff
AV. ser
S
%a,
wrAw
4
of
lir
S Q L
'0
I.
11
0•
1,000 500
40
Feet
01 1,000
2,000
z
0
\W
z
CD
cc
Z
0
0
0
U
uJ
w
0
w
w
w
0
m
0
0)
w
0
SWSA UDA
L1 T1_I 1178
3,
0
u
Legend
Abram's Chase Parcels
5 ft. Contours
Streams
Lakes Ponds
Parcel Boundaries
I
i
I
I
Environmental Features
7/
1—
cc 2
H
co
E
_J
E
1.1.1 Z
(1) 0
00
0
C)
DLLJ
al 0
0 I-U
11.1 CC
S
i Soils
1B, BERKS CHANNERY SILT LOAM, 2 TO 7 PERCENT SLOPES
3B, BLAIRTON SILT LOAM, 2 TO 7 PERCENT SLOPES
Abram's Chase Parcels
Parcel Boundaries
Legend
41C, WEIKERT -BERKS CHANNERY SILT LOAMS,
41 D, WEIKERT -BERKS CHANNERY SILT LOAMS,
41 E, WEIKERT -BERKS CHANNERY SILT LOAMS,
9B, CLEARBROOK CHANNERY SILT LOAM, 2 TO
9C, CLEARBROOK CHANNERY SILT LOAM, 7 TO
7 TO 15 PERCENT SLOPES
15 TO 25 PERCENT SLOPES
25 TO 65 PERCENT SLOPES
7 PERCENT SLOPES
15 PERCENT SLOPES
0 v
0
0
N
7
Q
N
L
U
W
J
A.�
cE t,T\Cn
1.
r )0 P
SOMaG\- )1)-7-11.: 7c i
Li „y
1
i 1
1 I m
i O 1 t'��
H -t 1
m /�l
7 1 l m 7
T -F v.�
r. Nu) r i A m Z
'ern STAFFORD R D V o I v t
I I 11 V1 1 7 ---t--- -1 j r
z I
r^ 1 I p _1 1
U
i7
N -1
U 0
W —L
a
w
F:
gagg
Legend
Abram's Chase Parcels
Parcel Boundaries
Zoning
B2 (Business, General District)
RA (Rural Areas District)
RP (Residential Performance District)
7
m
m
z
0
0
o
A
I P O
AI
r
i M1 1
O. J
O
1 /:C/0 i f—/ =r i
l� I �AA
t iLYS W Y_
m
t Or
\_:,7„;'
7 tie
Location and Zoning Map
I SS A(, oft A 1 I.z
N✓ O
1 1• 0 �P G o? r
7
Li- l r y U y 7 b 7�/ TWIN y a K i �Q r v �G� l''' r m L J s 07 T m 7 i /A� gy J 1 ,T -J v 1 Y 7
',,KMA R T E t T 1:::::::::71,/:
1 1
7/ 7" 1 g M Ner f g -r o
G CT
,t, MURPHY, 1 T 1 1[t,� 7 0 y l y /p
T ✓a KAYF K �R
T
G R i II� 2 r--/---- 'rte ��y
j V' ,G i/ i v i i L l i T t I S NY,iN p R I CJ
K.,/ 4-i; r- N �eR= t- r/ 0 7 S EN 1�i y G`E r)4 rte
t Q y y 7;5
J j 7 4 y _DF /i�_H ��F �,v 7y
m� v e w Imo T N L -/F4LC Cr� ���_I I 1 -O�
.)))))-.44,),),y)/ 9 '_J ZT7 1 L7' /7-5-_,,,, I I
J
O Q g. 4_,4 l! 7\-...A/Sts, i l i
�4 j O yh yl l1 A/ \i,\'5,:-2,,,L O Y 1 N �7/ N R D\
Ir. 7 l� r- ,1 /'mi
Cr
--4 A
C<
J/ 1P,
m
RF Z A z i K A
t a
y
800 400
Feet
800
1,600
z
0
m
w
0
U
U
cC
co
m
2r
Z_
tc
cc
z
0
U
0
w
W
u
W
LL
0
En
d
a
This report is prepared by the Frederick County Planning Staff to provide information to the
Planning Commission and the Board of Supervisors to assist them in making a decision on this
application. 11 may also be useful to others interested in this zoning matter. Unresolved issues
concerning this application are noted by staff where relevant throughout this staff report.
Reviewed Action
Planning Commission: September 20, 2006 Tabled for 90 days by Planning
Commission
Planning Commission: December 20, 2006 Pending
Board of Supervisors: January 10, 2007 Pending
PROPOSAL: To rezone 3.25 acres from RA (Rural Areas) District to RP (Residential Performance)
District with proffers, to accommodate 14 single family detached residential units on small lots.
LOCATION: The property fronts on the north side of Senseny Road (Route 657) adjacent to the
Parkwood Manor Subdivision.
MAGISTERIAL DISTRICT: Red Bud
PROPERTY ID NUMBERS: 65 -A -27A and 65 -A -28A
PROPERTY ZONING: RA (Rural Areas) District.
PRESENT USE: Residential and Vacant
ADJOINING PROPERTY ZONING PRESENT USE:
North: RP (Residential Performance)
South: RA (Rural Areas)
East: RP (Residential Performance)
West: RA (Rural Areas)
REZONING APPLICATION #11 -06
ABRAM'S CHASE
Staff Report for the Planning Commission
Prepared: October 13, 2006
Staff Contact: Candice E. Perkins, Planner II
Use: Lynnehaven Subdivision Open Space
Use: Agricultural
Use: Parkwood Manor Subdivisions
Use: Residential
PROPOSED USES: 14 single family small lot homes (4.3 units /acre density)
Rezoning 1 1 -06 Abram's Chase
October 13, 2006
Page 2
REVIEW EVALUATIONS:
Fire Marshal: Plan approval recommended.
Sanitation Authority: No comments.
Virginia Dept. of Transportation: The documentation within the application to rezone this property
appears to have little measurable impact on Route 656. This route is the VDOT roadway which has been
considered as the access to the property referenced. VDOT is satisfied that the transportation proffers
offered in the Abram's Chase Subdivision rezoning application dated March 1, 2006 addresses
transportation concerns associated with this request. Before development, this office will require a
complete set of construction plans detailing entrance designs, drainage features, and traffic flow data
from the I.T.E. Trip General Manual, Sixth Edition for review. VDOT reserves the right to comment on
all right -of -way needs, including right-of-way dedications, traffic signalization, and off-site roadway
improvements and drainage. Any work performed on the State's right -of -way must be covered under a
land use permit. This permit is issued by this office and requires an inspection fee and surety bond
coverage.
Greenwood Volunteer Fire Company: Agreed to.
Public Works Department: Refer to Wetlands, Page 3: A detailed wetlands delineation study will be
required with the master development plan submittal. Refer to Site Drainage, Page 7: During the
subdivision design phase, it will be necessary to route the 100 -year storms through the existing drainage
swales to determine the impact on the proposed development. Any stormwater ponds shall be
constructed above the maximum 100 -year storm level. Refer to Solid Waste Disposal, Page 7: The
narrative references the close proximity to the Greenwood Citizens' Convenience Center. This site has
been scheduled to be closed within the next two years. Therefore, we recommend that curbside trash
pickup be provided by the developer or Home Owners' Association. This requirement should be
included in the analysis and proffer statement.
Frederick- Winchester Service Authority: There is adequate water and sewer capacity to serve this
rezoning request.
Department of Parks Recreation: As of this review, a minimum of three recreational units are
required for this development. However, if a waiver is approved, an appropriate value for recreational
amenities must be determined. The proposed asphalt walkway to adjacent property should meet
Frederick County Standards. Plan appears to offer the appropriate amount of open space. The proposed
monetary proffer for Parks and Recreation appears to address the impact Abram's Chase will have on
this department's capital facility needs.
Frederick County Public Schools: Based on the information provided, it is anticipated that the
proposed 14 single family homes will yield two high school students, two middle school students and
five elementary school students for a total of nine new students upon build -out. Significant residential
growth in Frederick County has resulted in the schools serving this area having student enrollments
nearing or exceeding the practical capacity for a school. Even with only nine new students upon build-
Rezoning 1 1 Abram's Chase
October 13, 2006
Page 3
out, the cumulative impact of this project and others, coupled with the number ofapproved, undeveloped
residential lots in the area, will necessitate the future construction of new school facilities to
accommodate increased student enrollments.
Winchester Regional Airport: While the proposed development lies within the airports Part 77
surfaces and airspace, it appears that the proposed site plan should not impact operations at the
Winchester Regional Airport. Residents should be forewarned that due to the proximity ofthe site to the
Winchester Airport, they may experience noise from over flight of aircraft arriving to and departing from
the airport from the northeast.
Frederick County Attorney: it is my opinion that the Proffer Statement is generally in a form to meet
the requirements of the Frederick County Zoning Ordinance and the Code of Virginia, subject to the
following comments: 1. Proffer A provides that the property will develop in substantial conformity with
the attached Generalized Development Plan (GDP). The GDP was not attached to the copy of the Proffer
Statement provided to me. Therefore, this review is provided without a review ofthe GDP. 2. Proffer B
limits the dwelling units to "14 single family detached residential dwelling units on small lots It is
assumed that this is a reference to the "single family small lot" type of development identified in Section
165 65F of the Zoning Ordinance. 3. Proffer C proposes to provide tot lot equipment, park benches, and
an asphalt pedestrian walkway as community recreational facilities in lieu of a community center, of the
community center is waived by the Frederick County Board of Supervisors. However, my review of
Section 165 64(A)(]) indicates that the Board of Supervisors can waive the community center
requirement of Section 165 -64(A) in proffered age- restricted single family small lot subdivisions that
contain less than 50 lots. However, there is nothing in the proffer provided to me to indicate that this
development is to be an age restricted development. Accordingly, I question whether the waiver
provision applies, so as to permit the elimination of the community center for this small lot housing
development. 4. Proffers D(1) and D(2) provide for the construction ofa right turn and taper lane and for
the dedication of right -of -way. However, neither proffer establishes a timing requirement for the
construction and dedication. A timing requirement satisfactory to the County should be included in each
proffer. 5. In Proffer E the first clause is redundant and should be deleted. The proffer should
commence as the other proffers have commenced with the language "the Applicant will pay... It
should be noted that 1 have not reviewed the substance of the proffers as to whether the proffers are
suitable and appropriate for the rezoning of this specific property, or whether other proffers would be
appropriate, as it is my understanding that that review will be done by the staff and the Planning
Commission.
Historic Resources Advisory Board: Upon review of the proposed rezoning, it appears that the
proposal does not significantly impact historic resources and it is not necessary to schedule a formal
review of the rezoning application by the HRAB. According to the Rural Landmarks Survey, there are
no significant historic structures located on the properties nor are there any possible historic districts in
the vicinity. It was also noted that the National Park Service Study of Civil War Sites in the Shenandoah
Valley does not identify any core battlefields that this proposed rezoning would directly impact.
Planning Department: Please see attached letter dated April 12, 2006 from Candice E. Perkins,
Planner II.
Rezoning #11- 06— Abram's Chase
October 13, 2006
Page 4
Planning Zoning:
1) Site History
2) Comprehensive Policy Plan
The original Frederick County Zoning Map (U.S.G.S. Stephenson Quadrangle) identifies the
parcel as being zoned A -2 Agricultural. The County's A -1 and A -2 agricultural zoning districts
were combined to form the RA (Rural Areas) District upon adoption of an amendment to the
Frederick County Zoning Ordinance on May 10, 1989. The corresponding revision ofthe zoning
map resulted in the re- mapping of the subject property and all other A -1 and A -2 zoned land to
the RA (Rural Areas) District. Parcels 65 -A -27A and 65 -A -28A maintain this RA zoning
classification.
The Frederick County Comprehensive Policy Plan is an official public document that serves as
the community's guide for making decisions regarding development, preservation, public
facilities and other key components of community life. The primary goal of this plan is to protect
and improve the living environment within Frederick County. It is in essence a composition of
policies used to plan for the future physical development of Frederick County. [Comprehensive
Policy Plan, p. 1 -1]
Land Use
The parcels comprising this rezoning application are located within the County's Urban
Development Area (UDA) and Sewer and Water Service Area (SWSA). The Urban Development
Area defines the general area in which more intensive forms of residential development will
occur. In addition, the Eastern Frederick County Long Range Land Use Plan Map identifies this
general area with future residential and uses.
Transportation
The Frederick County Eastern Road Plan provides guidance regarding future arterial and
collector road connections in the eastern portion ofthe County by identifying needed connections
and locations. Plans for new development should provide for the right -of -ways necessary to
implement planned road improvements and new roads shown on the road plan should be
constructed by the developer when warranted by the scale, intensity, or impacts of the
development. Existing roads should be improved as necessary by adjacent development to
implement the intentions of the plan (Comprehensive Plan 7 -6).
Senseny Road is identified as an improved major collector road and should be addressed
accordingly. In addition, Senseny Road is recognized in the Frederick County Bicycle Plan with a
short term designation for bicycle accommodations. Access to the site would be via a new street
that would be in the form of a cul -de -sac as indicated on the Generalized Development Plan.
Rezoning #11-06 Abram's Chase
October 13, 2006
Page 5
3) Site Suitability /Environment
4) Potential Impacts
A. Transportation
The site does not contain any environmental features that would either constrain or preclude site
development. There are no identified areas of steep slopes, floodplains, wetlands or woodlands.
According to the Soil Survey of Frederick County, the site contains the following soil types;
Clearbrook Channerry Silt Loams and Weikert-Berks Channery Silt Loams.
Traffic Impact Analysis.
The applicant's transportation analysis is minimal due to the limited scope of the proffered
development plan. Based upon the ITE Trip Generation Manual, the fourteen lot single family
detached residential project will generate approximately 134 vehicle trips per day. Senseny Road
in this area has a variable right -of -way. The applicant has proffered to dedicate necessary right
of -way as well as build a right turn and taper lane within the Senseny Road right -of -way.
Staff Note: The applicant has proffered to dedicate right -of -way sufficient to provide for 45
feet from the existing Senseny Road centerline. This project should be implementing the
Senseny Road expansion plans (proposed four lanes), including construction of the additional
lane and curb and gutter along the frontage of their site. The inclusion of the right turn taper
lane should be in addition and outside of the road expansion area. This rezoning has not
addressed this improvement.
Transportation Program.
The applicant will be constructing a new street to provide access to the fourteen lot subdivision
which will traverse through the center of the subject site. The location of the access point onto
Senseny Road is approximately two hundred feet from the closest road, Parkwood Drive. Also
provided by the applicant in the proffer statement is a commitment to provide a monetary
contribution in the amount of $1,000.00 per residential lot to address transportation general needs
in the vicinity of this project.
Staff Note: It is noted that recent single family rezonings in this area have provided a
transportation proffer of $5,000 per dwelling unit (Senseny Road Rentals, Senseny Village) to
help with road improvements as well as a proffer to construct the Senseny Road expansions on
their property (Orrick, Senseny Road Rentals). This rezoning proposal has not addressed the
transportation impact similar to other recent rezonings.
Recent projects along Senseny Road have proposed the construction of additional lanes along
Senseny Road as well as the implementation of a ten foot wide hiker /biker trail along the north
side of Senseny Road. This approach should be a consistent consideration as projects are
proposed along the Senseny Road corridor. While this project has reserved the right -of -way for
Senseny Road, it has not proffered to construct the road improvements (improvements to he
completed by others) and has not proposed the inclusion of a ten foot path as requested.
Staff Note: This project also does not provide an interparcel connection to the adjacent
Capital facility
Single Family
Fire and Rescue
$720
General Government
$320
Public Safety
$658
Library
$267
Parks and Recreation
$2,136
School Construction
$19,189
Total
$23,290
Rezoning #11-06 Abram's Chase
October 13,2006
Page 6
B. Sewer and Water
property to the west which could facilitate additional entrances onto Senseny Road should
those parcels choose to redevelop in the future. The cul -de -sac associated with this project
should stub out to the western lot or a connection from this road should be provided.
Presently sewer service is available via an eight inch main that is located along the northern
portion of the subject site. This sewer line will direct effluent from the Abram's Chase
Subdivision to the new Frederick County Sanitation Authority regional pump that will convey
effluent to the Opequon Wastewater Treatment Plant. The proposed 14 lot development would
add approximately 3,100 gallons per day to the public sewer conveyance system, increasing the
demand at the Opequon Plant by 0.15
Water supply will be provided by way of an eight inch water line along the north side of Senseny
Road that adjoins the subject site. Potable water is provided to this area of Senseny Road
through a series of water transmission lines whose source is the Stephens City quarry system.
Water demand of this project is estimated to be 3,850 gallons per day.
C. Community Facilities
The Frederick County Development Impact Model is a tool that is used to identify the capital
costs associated with various types of development proposals presented to the County. The
projected costs to Fire and Rescue, Public Schools, Parks and Recreation, Library, Sheriff's
Office and for the Administration Building have been calculated and provided to the applicant for
their consideration. The impacts associated with entirely residential projects are fixed at
823,290.00 for single family detached residential dwellings. This application addresses
community facility impacts and needs by proffering a payment in the amount of $23,290.00 per
residential unit to mitigate the impact to the identified community facilities.
For your information, the following is the breakdown of the projected impacts per dwelling
unit for each capital facility taken from the Development Impact Model.
Rezoning #11-06 Abram's Chase
October 13, 2006
Page 7
5) Proffer Statement— Dated March 1, 2006 and Revised August 21, 2006
A) Generalized Development Plan
The applicant has proffered to develop the property in substantial conformance with the
GDP provided in the rezoning application.
B) Residential Land Use
The applicant proffers to develop a maximum of 14 single family detached residential
units on small lots.
Staff Note: With the single family small lot designation, this project could develop lots
as small as 3, 750 square feel.
C) Recreational Amenities
The applicant proffers to develop a community recreational area that will be located as
shown on the GDP. This area will contain tot lot equipment valued at a minimum of
$35,000, park benches, and an asphalt pedestrian walkway. The recreational amenities
provided with this proffer are in -lieu of a community center building if waived by the
Board of Supervisors.
Staff Note: As stated in the last sentence of the proffer, in order to implement this
proffer, the applicant would need to apply for and receive a waiver of the community
center requirement for single family small lot developments per §165- 64A(1) of the
Frederick County Zoning Ordinance. This waiver would need to be sought during
Master Development stage.
Staff Note: The $35,000 amount included in the proffer is the prorated amount for
the community center should the Board of Supervisors waive the recreational
community center and allow the applicant to prorate the requirement of three
recreational units for each 30 dwellings. If the waiver is not granted by the Board,
the applicant would be required to provide a community center. The inclusion of this
proffer is not appropriate since it is limiting the dollar amount ofthe recreational unit
(if the project is not built immediately the dollar amount per recreational unit is
limited, even if the recreational unit amount increases per county requirements). It
seems inappropriate to discuss recreational values at this point since the community
center is not permitted for consideration until the MDP phase.
D) Transportation Enhancements
1. The applicant will construct a right -turn and taper lane within the public right -of -way
that connects Parkwood Drive to the cul -de -sac serving the property. This
improvement shall be bonded and constructed concurrently with the internal cul -de-
sac serving the property.
2. The applicant will dedicate right-of-way sufficient to provide for 45 feet from the
Rezoning 1 1 Abrams Chase
October 13, 2006
Page 8
existing Senseny Road centerline of record to allow for future road improvements by
others.
3. The applicant proffers to provide $1,000 for each residential lot that will be paid to
Frederick County at the time of building permit issuance. This monetary contribution
is available to Frederick County to be used towards future improvements to the
Senseny Road corridor.
Staff Note: It is noted that recent single family rezonings in this area have provided a
transportation proffer of $5,000 per dwelling unit (Senseny Road Rentals, Senseny Village) to
help witlt road improvements as well as a proffer to construct the Senseny Road expansions on
their property (Orrick, Seuseny Road Rentals).
E) Monetary Contribution
A monetary contribution in the amount of $23,290.00 to Frederick County, to be provided
at the time each residential lot is platted, is proffered in an effort to mitigate the impacts
associated with this development on community facilities.
6) Waivers
The applicant has requested that the Board of Supervisors provide this development with a
waiver of the community center requirement for single family small lot developments in
accordance with §165-64A(1) of the Frederick County Zoning Ordinance. This section of the
ordinance allows the Board of Supervisors to waive the community center requirement in single
family small lot subdivisions that contain less than 25 lots.
STAFF CONCLUSIONS FOR 09/20/06 PLANNING COMMISSION MEETING:
While the land use proposed in this application is generally consistent with the Comprehensive Policy
Plan, as described in the Eastern Frederick County Long Range Land Use Plan, this application fails to
address and mitigate various issues of transportation and recreation. Elements of the rezoning
application have been identified that should be carefully evaluated to ensure that they fully address the
goals of the County. Specifically, this applicant has not addressed the Senseny Road improvements, the
construction of a bike /pedestrian facility and the recreational requirements of this development. The
applicant should be prepared to address theses issues. Please note that two recommendations are
required for this application, one for the waiver and one for the rezoning.
PLANNING COMMISSION SUMMARY AND ACTION OF THE 09/20/06 MEETING:
Members of the Commission asked the applicant if he had considered an inter parcel connector at the
cul -de -sac to the east or the possibility of acquiring the vacant lot on Parkwood Circle for an inter parcel
connector. The applicant replied that not only was there a drainage area through the location to the east,
but it would compromise the area they had planned for their recreational amenities; he said the other
open area on the site was designated for stormwater detention. The applicant said he had not pursued the
possibility of purchasing the vacant lot on Parkwood Circle.
Rezoning 1411-06 Abram's Chase
October 13,2006
Page 9
Considering how much of the property was within a floodplain, a member of the Commission raised the
possibility that housing sites could be lost or the road location may have to be moved. The applicant
responded that the results ofa site distance study they conducted eliminated any leeway in the location of
the road. The applicant assured the Commission that a wetlands study would be conducted at the MDP
stage, as requested by the County's engineer.
One citizen spoke in opposition to the rezoning; she did not believe the proposed development supported
the County's vision for good planning. She did not think this site, nor the other surrounding vacant
parcels, should be a continuation of the less- than desirable type of development this area has been
experiencing.
The Planning Staff pointed out that the inter parcel connection is required by the zoning ordinance and
was a non debatable issue, unless waived by the Board of Supervisors. Staff noted that the ordinance
also requires a waiver of the community center to be done at the MDP or subdivision stage. In addition,
Staff noted the inappropriateness of the applicant adjusting the cash proffer contribution at this point in
the process. Regarding the entrance separation along Senseny Road, Staff commented that the 200 feet
proposed by the applicant did not meet the desired separation of 500 feet, which is recommended in
VDOT's subdivision design manual.
Commission members said they were having difficulty finding any redeeming values in the proposal
from a planning standpoint. They were concerned this project may set a precedent for similar
developments in this area. They were concerned about the possibility of having six cul -de -sacs within a
1,200 -foot distance, each with 134 trips per day, along Senseny Road, which already had traffic
problems. Although there were questions whether approving this rezoning represented good planning, a
concern was raised about the future of this particular area, which seemed to be a conglomeration of small
parcels. The question of how the parcels in this area could be integrated to create good planning was
raised. The possibility of a solution through the UDA Study was suggested. Members of the
Commission wanted to give the applicant more time to address some of the issues in order to make the
project work. By a majority vote, the Commission tabled the rezoning for 90 days.
YES (TO TABLE): Unger, Watt, Manuel, Morris, Oates, Light, Wilmot, Kriz, Triplett, Kerr, Mohn
NO: Thomas
(Note: Commissioner Ours was absent from the meeting.)
REZONING APPLICATION #11 -06
ABRAM'S CHASE
Staff Report for the Planning Commission
Prepared: September 5, 2006
Staff Contact: Candice E. Perkins, Planner 11
This report is prepared by the Frederick County Planning Staff to provide information to the
Planning Commission and the Board of Supervisors to assist then in making a decision on this
application. It may also be useful to others interested in this zoning matter. Unresolved issues
concerning this application are noted by staff where relevant throughout this staff report.
Planning Commission:
Board of Supervisors:
Reviewed
September 20, 2006
October 11, 2006
Action
Pending
Pending
PROPOSAL: To rezone 3.25 acres from RA (Rural Areas) District to RP (Residential Performance)
District with proffers, to accommodate 14 single family detached residential units on small lots.
LOCATION: The property fronts on the north side of Senseny Road (Route 657) adjacent to the
Parkwood Manor Subdivision.
MAGISTERIAL DISTRICT: Red Bud
PROPERTY ID NUMBERS: 65 -A -27A and 65 -A -28A
PROPERTY ZONING: RA (Rural Areas) District.
PRESENT USE: Residential and Vacant
ADJOINING PROPERTY ZONING PRESENT USE:
North: RP (Residential Performance)
South: RA (Rural Areas)
East: RP (Residential Performance)
West: RA (Rural Areas)
Use:
Use:
Use:
U se:
PROPOSED USES: 14 single family small lot homes (4.3 units /acre density)
Lynnehaven Subdivision Open Space
Agricultural
Parkwood Manor Subdivisions
Residential
Rezoning #11-06 Abram's Chase
September 5, 2006
Page 2
REVIEW EVALUATIONS:
Fire Marshal: Plan approval recommended.
Virginia Dept. of Transportation: The documentation within the application to rezone this property
appears to have little measurable impact on Route 656. This route is the VDOT roadway which has
been considered as the access to the property referenced. VDOT is satisfied that the transportation
proffers offered in the Abram's Chase Subdivision rezoning application dated March 1, 2006 addresses
transportation concerns associated with this request. Before development, this office will require a
complete set of construction plans detailing entrance designs, drainage features, and traffic flow data
from the 1.T.E. Trip General Manual, Sixth Edition for review. VDOT reserves the right to comment on
all right -of -way needs, including right -of -way dedications, traffic signalization, and off -site roadway
improvements and drainage. Any work performed on the State's right -of -way must be covered under a
land use permit. This permit is issued by this office and requires an inspection fee and surety bond
coverage.
Greenwood Volunteer Fire Company: Agreed to.
Public Works Department: Refer to Wetlands, Page 3: A detailed wetlands delineation study will be
required with the master development plan submittal. Refer to Site Drainage, Page 7: During the
subdivision design phase, it will be necessary to route the 100 -year storms through the existing drainage
swales to determine the impact on the proposed development. Any stormwater ponds shall be
constructed above the maximum 100 -year storm level. Refer to Solid Waste Disposal, Page 7: The
narrative references the close proximity to the Greenwood Citizens' Convenience Center. This site has
been scheduled to be closed within the next two years. Therefore, we recommend that curbside trash
pickup be provided by the developer or I -tome Owners' Association. This requirement should be
included in the analysis and proffer statement.
Frederick- Winchester Service Authority: There is adequate water and sewer capacity to serve this
rezoning request.
Sanitation Authority: No comments.
Department of Parks Recreation: As of this review, a minimum of three recreational units are
required for this development. However, if a waiver is approved, an appropriate value for recreational
amenities must be determined. The proposed asphalt walkway to adjacent property should meet
Frederick County Standards. Plan appears to offer the appropriate amount of open space. The proposed
monetary proffer for Parks and Recreation appears to address the impact Abram's Chase will have on
this department's capital facility needs.
Frederick County Public Schools: Based on the information provided, it is anticipated that the
proposed 14 single family homes will yield two high school students, two middle school students and
five elementary school students for a total of nine new students upon build -out. Significant residential
growth in Frederick County has resulted in the schools serving this area having student enrollments
Rezoning 411-06 Abram's Chase
September 5, 2006
Page 3
nearing or exceeding the practical capacity for a school. Even with only nine new students upon build
out, the cumulative impact of this project and others, coupled with the number of approved,
undeveloped residential lots in the area, will necessitate the future construction of new school facilities
to accommodate increased student enrollments.
Winchester Regional Airport: While the proposed development lies within the airport[s Part 77
surfaces and airspace, it appears that the proposed site plan should not impact operations at the
Winchester Regional Airport. Residents should be forewarned that due to the proximity of the site to
the Winchester Airport, they may experience noise from over flight of aircraft arriving to and departing
from the airport from the northeast.
Frederick County Attorney: It is my opinion that the Proffer Statement is generally in a fonn to meet
the requirements of the Frederick County Zoning Ordinance and the Code of Virginia, subject to the
following comments: 1. Proffer A provides that the property will develop in substantial conformity
with the attached Generalized Development Plan (GDP). The GDP was not attached to the copy of the
Proffer Statement provided to me. Therefore, this review is provided without a review of the GDP. 2.
Proffer B limits the dwelling units to "14 single family detached residential dwelling units on small
lots It is assumed that this is a reference to the "single family small lot" type of development
identified in Section 165 -65F of the Zoning Ordinance. 3. Proffer C proposes to provide tot lot
equipment, park benches, and an asphalt pedestrian walkway as community recreational facilities in lieu
of a community center, of the community center is waived by the Frederick County Board of
Supervisors. However, my review of Section 165- 64(A)(1) indicates that the Board of Supervisors can
waive the community center requirement of Section 165 -64(A) in proffered age- restricted single family
small lot subdivisions that contain less than 50 lots. However, there is nothing in the proffer provided
to me to indicate that this development is to be an age- restricted development. Accordingly, I question
whether the waiver provision applies, so as to permit the elimination of the community center for this
small lot housing development. 4. Proffers D(1) and D(2) provide for the construction of a right turn
and taper lane and for the dedication of right -of -way. However, neither proffer establishes a timing
requirement for the construction and dedication. A timing requirement satisfactory to the County
should be included in each proffer. 5. In Proffer E the first clause is redundant and should be deleted.
The proffer should commence as the other proffers have commenced with the language "the Applicant
will pay... It should be noted that I have not reviewed the substance of the proffers as to whether the
proffers are suitable and appropriate for the rezoning of this specific property, or whether other proffers
would be appropriate, as it is my understanding that that review will be done by the staff and the
Planning Commission.
Historic Resources Advisory Board: Upon review of the proposed rezoning, it appears that the
proposal does not significantly impact historic resources and it is not necessary to schedule a formal
review of the rezoning application by the I -IRAB. According to the Rural Landmarks Survey. there are
no significant historic structures located on the properties nor are there any possible historic districts in
the vicinity. It was also noted that the National Park Service Study of Civil War Sites in the
Shenandoah Valley does not identify any core battlefields that this proposed rezoning would directly
impact.
Planning Department: Please see attached leper dated April 12, 2006 from Candice E. Perkins,
Rezoning #I 1 -06 Abram's Chase
September 5, 2006
Page 4
Planner 11.
Planning Zoning:
1) Site History
The original Frederick County Zoning Map (U.S.G.S. Stephenson Quadrangle) identifies the
parcel as being zoned A -2 Agricultural. The County's A -1 and A -2 agricultural zoning districts
were combined to form the RA (Rural Areas) District upon adoption of an amendment to the
Frederick County Zoning Ordinance on May 10, 1989. The corresponding revision of the zoning
neap resulted in the re- mapping of the subject property and all other A -1 and A -2 zoned land to
the RA (Rural Areas) District. Parcels 65 -A -27A and 65 -A -28A maintain this RA zoning
classification.
2) Comprehensive Policy Plan
The Frederick County Comprehensive Policy Plan is an official public document that serves as
the community's guide for making decisions regarding development, preservation, public
facilities and other key components of community life. The primary goal of this plan is to
protect and improve the living environment within Frederick County. It is in essence a
composition of policies used to plan for the future physical development of Frederick County.
[Comprehensive Policy Plan, p. 1 -11
Land Use
The parcels comprising this rezoning application are located within the County's Urban
Development Area (UDA) and Sewer and Water Service Area (SWSA). The Urban
Development Area defines the general area in which more intensive forms of residential
development will occur. In addition, the Eastern Frederick County Long Range Land Use Plan
Map identifies this general area with future residential land uses.
Transportation
The Frederick County Eastern Road Plan provides guidance regarding future arterial and
collector road connections in the eastern portion of the County by identifying needed
connections and locations. Plans for new development should provide for the right -of -ways
necessary to implement planned road improvements and new roads shown on the road plan
should be constructed by the developer when warranted by the scale, intensity, or impacts of the
development. Existing roads should be improved as necessary by adjacent development to
implement the intentions of the plan (Comprehensive Plan 7 -6).
Senseny Road is identified as an improved major collector road and should be addressed
accordingly. In addition, Senseny Road is recognized in the Frederick County Bicycle Plan with
a short term designation for bicycle accommodations. Access to the site would be via a new
street that would be in the form of a cul -de -sac as indicated on the Generalized Development
Plan.
Rezoning #11-06 Abramn's Chase
September 5, 2006
Page 5
3) Site Suitability /Environment
4) Potential Impacts
A. Transportation
The site does not contain any environmental features that would either constrain or preclude site
development. There are no identified areas of steep slopes, floodplains, wetlands or woodlands.
According to the Soil Survey of Frederick County, the site contains the following soil types;
Clearbrook Channerry Silt Looms and Weikert -Berks Channery Silt Loams.
Traffic Impact Analysis.
The applicant's transportation analysis is minimal due to the limited scope of the proffered
development plan. Based upon the 1TE Trip Generation Manual, the fourteen lot single family
detached residential project will generate approximately 134 vehicle trips per day. Senseny
Road in this area has a variable right -of -way. The applicant has proffered to dedicate necessary
right -of -way as well as build a right turn and taper lane within the Senseny Road right -of -way.
Staff Note: The applicant has proffered to dedicate right -of -way sufficient to provide for 45
feet from the existing Senseny Road centerline. This project should be implementing the
Senseny Road expansion plans (proposed four lanes), including construction of the
additional lane and curb and gutter along the frontage of their site. The inclusion of the
right tarn taper lane should be in addition and outside of the road expansion area. This
rezoning has not addressed this improvement.
Transportation Program.
The applicant will be constructing a new street to provide access to the fourteen lot subdivision
which will traverse through the center of the subject site. The location of the access point onto
Senseny Road is approximately two hundred feet from the closest road, Parkwood Drive. Also
provided by the applicant in the proffer statement is a commitment to provide a monetary
contribution in the amount of $1,000.00 per residential lot to address transportation general
needs in the vicinity of this project.
Staff Note: It is noted that recent single family rezonings in this area have provided a
transportation proffer of $5,000 per dwelling unit (Senseny Road Rentals, Senseny Village) to
help with road improvements as well as a proffer to construct the Senseny Road expansions
on their property (Orrick, Senseny Road Rentals). This rezoning proposal has not addressed
the transportation impact similar to other recent rezonings.
Recent projects along Senseny Road have proposed the construction of additional lanes along
Senseny Road as well as the implementation of a ten foot wide hiker /biker trail along the north
side of Senseny Road. This approach should be a consistent consideration as projects are
proposed along the Senseny Road corridor. While this project has reserved the right -of -way for
Senseny Road, it has not proffered to construct the road improvements (improvements to be
completed by others) and has not proposed the inclusion of a ten foot path as requested.
Staff Note: This project also does not provide an interparcel connection to the adjacent
Capital facility
Single Family
Fire and Rcscue
$720
General Government
$320
Public Safety
$658
Library
$267
Parks and Recreation
$2,136
School Construction
$19,189
Total
$23,290
Rezoning #11-06 Abram's Chase
September 5, 2006
Page 6
B. Sewer and Water
Staff Note: This project also does not provide an interparcel connection to the adjacent
property to the west which could facilitate additional entrances onto Senseny Road should
those parcels choose to redevelop in the fixture. The cul -de -sac associated with this project
should stub out to the western lot or a connection from this road should be provided.
Presently sewer service is available via an eight inch main that is located along the northern
portion of the subject site. This sewer line will direct effluent from the Abram's Chase
Subdivision to the new Frederick County Sanitation Authority regional pump that will convey
effluent to the Opequon Wastewater Treatment Plant. The proposed 14 lot development would
add approximately 3,100 gallons per day to the public sewer conveyance system, increasing the
demand at the Opequon Plant by 0.15
Water supply will be provided by way of an eight inch water line along the north side of
Senseny Road that adjoins the subject site. Potable water is provided to this area of Senseny
Road through a series of water transmission lines whose source is the Stephens City quarry
system. Water demand of this project is estimated to be 3,850 gallons per day.
C. Community Facilities
The Frederick County Development Impact Model is a tool that is used to identify the capital
costs associated with various types of development proposals presented to the County. The
projected costs to Fire and Rescue, Public Schools, Parks and Recreation, Library, Sheriff's
Office and for the Administration Building have been calculated and provided to the applicant
for their consideration. The impacts associated with entirely residential projects are fixed at
$23,290.00 for single family detached residential dwellings. This application addresses
community facility impacts and needs by proffering a payment in the amount of $23,290.00 per
residential unit to mitigate the impact to the identified community facilities.
For your information, the following is the breakdown of the projected impacts per dwelling
unit for each capital facility taken from the Development Impact Model.
Rezoning #I 1 Abram's Chase
September 5, 2006
Page 7
5) Proffer Statement Dated March 1, 2006 and Revised August 21, 2006
A) Generalized Development Plan
The applicant has proffered to develop the property in substantial conformance with the
GDP provided in the rezoning application.
8) Residential Land Use
The applicant proffers to develop a maximum of 14 single family detached residential
units on small lots.
C) Recreational Amenities
The applicant proffers to develop a community recreational area that will be located as
shown on the GDP. This area will contain tot lot equipment valued at a minimum of
$35,000, park benches, and an asphalt pedestrian walkway. The recreational amenities
provided with this proffer are in -lieu of a community center building if waived by the
Board of Supervisors.
StaffNote: With the single family small lot designation, this project could develop lots
as small as 3,750 square feet.
Staff Note: As stated in the last sentence of tlee proffer, in order to implement this
proffer, the applicant would need to applyfor and receive a waiver of the community
center requirement for single family small lot developments per §165- 64A(1) of the
Frederick County Zoning Ordinance. This waiver would need to be sought during
Master Development stage.
Staff Note: The $35,000 amount included in the proffer is the prorated amount for
the community center should the Board of Supervisors waive the recreational
community center and allow the applicant to prorate the requirement of three
recreational units for each 30 dwellings. If the waiver is not granted by the Board,
the applicant would be required to provide a community center. The inclusion of
this proffer is not appropriate since it is limiting the dollar amount of the
recreational unit (if the project is not built immediately the dollar amount per
recreational unit is limited, even ift lhe recreational unit amount increases per county
requirements). It seems inappropriate to discuss recreational values at this point
since the community center is not permitted for consideration until the MDP please.
Transportation Enhancements
1. The applicant will construct a right -turn and taper lane within the public right-of-
way that connects Parkwood Drive to the cul -de -sac serving the property. This
improvement shall be bonded and constructed concurrently with the internal cul -de-
sac serving the property.
Rezoning #11-06 Abram's Chase
September 5, 2006
Page 8
2. The applicant will dedicate right -of -way sufficient to provide for 45 feet from the
existing Senseny Road centerline of record to allow for future road improvements by
others.
3. The applicant proffers to provide $1,000 for each residential lot that will be paid to
Frederick County at the time of building permit issuance. This monetary
contribution is available to Frederick County to be used towards future
improvements to the Senseny Road corridor.
Staff Note: It is noted that recent single family rezonings in this area have provided a
transportation proffer of $5,000 per dwelling unit (Senseny Rond Rentals, Senseny Village) to
help with road improvements as well as a proffer to construct the Senseny Road expansions
on their property (Orrick, Senseny Road Rentals).
13) Monetary Contribution
A monetary contribution in the amount of $23,290.00 to Frederick County, to be
provided at the time each residential lot is platted, is proffered in an effort to mitigate
the impacts associated with this development on community facilities.
6) Waivers
The applicant has requested that the Board of Supervisors provide this development with a
waiver of the community center requirement for single family small lot developments in
accordance with 165- 64A(1) of the Frederick County Zoning Ordinance. This section of the
ordinance allows the Board of Supervisors to waive the community center requirement in single
family small lot subdivisions that contain less than 25 lots.
STAFF CONCLUSIONS FOR 09/20/06 PLANNING COMMISSION MEETING:
While the land use proposed in this application is generally consistent with the Comprehensive Policy
Plan, as described in the Eastern Frederick County Long Range Land Use Plan, this application fails to
address and mitigate various issues of transportation and recreation. Elements of the rezoning
application have been identified that should be carefully evaluated to ensure that they fully address the
goals of the County. Specifically, this applicant has not addressed the Senseny Road improvements, the
construction of a bike /pedestrian facility and the recreational requirements of this development. The
applicant should be prepared to address theses issues. Please note that two recommendations are
required for this application, one for the waiver and one for the rezoning.
Following the requirement for a public hearing, a recommendation
by the Planning Commission to the Board of Supervisors concerning this rezoning
application would be appropriate. The applicant should be prepared to adequately
address all concerns raised by the Planning Commission.
HARVEST 'PROPERTIES, INC.
"PROJECT ACCOUNT'
320 HANDLEY BLVD.
WINCHESTER, VA 22601
A72
1 I/ SI-737r
P_A97&"="7
THE
MARATHON
BANK
FOR PO Box 28, St
4-5 nu 22655
00000 I. 7 20 17.0 L 110 5 3 2 La:
DATE
ES