Loading...
HomeMy WebLinkAbout04-06 Impact AnalysisOrrick Commons A. Introduction ORRICK COMMONS REZONING IMPACT ANALYSIS STATEMENT November 2005 impact Analysis Statement This report has been prepared for the purpose of assessing the impact on Frederick County by the conditional rezoning of the 55.67 acre property identified as parcel 55 -A -201. The subject acreage is owned by the Orrick Cemetery Company, Inc. and is located in the Northeast quadrant of the intersection of Senseny Road (Route 657) and Greenwood Road (656) with frontage along both roadways. The site is currently zoned RA (Rural Areas). This application proposes the rezoning of the 55.67 acre parcel to a roughly 60/40 split of residential and commercial which equates to 33.61 acres of RP (Residential Performance) and 22.06 acres of B2 (Business General). The site is intended as a mixed use commercial and age restricted residential center anchored by a Food Lion shopping center (Exhibit A). The proposed 158,000 square feet of commercial uses will be complemented by a mixture of single family and multi family age restricted residential uses totaling a maximum of 184 units per ordinance requirements, all of which will be developed in a functionally and aesthetically unified manner. The proposed rezoning will establish a high quality senior housing development and provide commercial space that is greatly needed for the residential uses that prevail along the Senseny Road corridor. The presence of significant commercial uses within the project will result in a synergistic relationship between land uses that will enhance the economic vitality of the area and achieve a more sustainable form of development than has been the historic pattern in the area. The Comprehensive Policy Plan identifies the planned use of the site as residential land uses. While the proposed rezoning includes both residential and commercial components, it is evident that a retail center at the intersection of two major collectors is in the best interest of the County, most notably the residents that reside within the vicinity of the site. The proposed rezoning utilizes complimentary land uses to provide a development that is preferable in such a key location to the single use pattern that has predominated within the Urban Development Area (UDA). The proposed rezoning includes proffers that will appropriately and effectively mitigate the impacts of this development program and assure its completion Page 1 of 7 Rev. 3 /10/06 Orrick Commons Impact Analysis Statement in the manner envisioned by the Applicant. The mixed use commercial center land use envisioned for the site is compatible with the surrounding community and is in the best interest of the County at large. As such, the Applicants submit that this rezoning request merits favorable consideration and approval. B. Comprehensive Policy Plan The Eastern Frederick County Long Range Land Use Plan is the sole document depicting the planned land uses for the subject acreage. This document envisions suburban residential land uses North of Senseny Road and South of Valley Mill Road from the Winchester City Limits to the proposed location of the future Route 37 bypass. While this area is responsible for capturing a large amount of residential growth in the County, it fails to provide a space for the retail and service needs of this new growth. The Frederick County Comprehensive Policy Plan identifies that retail and service areas need to be located with easy access to sufficient markets and to have good visibility from major throughfares. Additionally, the Comprehensive Plan identifies a need to insure the quality of commercial areas through the use of performance and design standards. The applicant is confident that the proffered design guidelines for the commercial component of the proposed development will create a commercial center of exceptional quality. The proposed rezoning would allow a commercial development program that would develop in a manner that is harmonious with the goals of the Comprehensive Policy Plan. The current Comprehensive Plan identifies the average density of the Urban Development Area (UDA) should not exceed 3 dwelling units per acre. The overall density of the site shall be dictated by the requirements set forth in the Frederick County Zoning Ordinance. The 33.61 acres that represent the residentially zoned portion of the project would be allowed 5.5 dwelling units per acre. Historically, the UDA as a whole has developed well below the 3 unit/acre threshold, allowing for some areas of higher density when appropriate. This proposal utilizes a mixed use concept where higher densities are more fitting, providing for a mixture of housing types in close proximity to retail and service areas. The proposed development program would include age restricted condominiums serving as a transitional area between the age restricted single family units and the commercial portion of the property. While the overall density of the site is slightly greater than the number stipulated by the Comprehensive Policy Plan, it recognizes the now prevailing notion that the County's UDA should become more urban in character in order to capture new growth in an area that can be easily served by public infrastructure and Page 2 of 7 Rev. 3/10/06 Orrick Commons C. Suitability of the Site 1. Site Background and History 2. Location and Access 3. Site Suitability Impact Analysis Statement services. Additionally, the proposed transition of multifamily to single family residential uses provides for a more appropriate transition from the commercial area to the single family use that prevails in the surrounding area. The proposed rezoning of the subject acreage from RA to RP and B2 is generally consistent with the land use policies of the Comprehensive Policy Plan. The original Frederick County zoning map (U.S.G.S. Stephenson Quadrangle) identifies the subject parcels as being zoned A -2 (Agricultural General). The County's agricultural zoning districts were combined to form the RA (Rural Areas) District upon adoption of an amendment to the Frederick County Zoning Ordinance on May 10, 1989. The corresponding revision of the zoning map resulted in the re- mapping of the subject property and all other A -1 and A -2 zoned and to the RA District. The subject parcel is located North of Senseny Road and East of Greenwood Road at the intersection of these two roadways. The Property contains approximately 340 feet of road frontage along Greenwood Road and approximately 815 feet of road frontage along Senseny Road. Two tax parcels, 55 -A -197 and 55 -A -198, are located adjacent to the site and comprise the remaining road frontage of Senseny and Greenwood at their intersection. Bounding the site to the North is the recently approved Steeplechase subdivision (formerly Briarwood III) and the Briarwood Subdivision. Bounding the site to the East is the Lynnehaven Subdivision. Access to the site will be provided at both Senseny and Greenwood. Access will also be provided with a connection to Loganberry Drive in Steeplechase. Additionally, Farmington Boulevard will travel through the site along the Northern boundary as it connects Channing Drive and Greenwood Road. A small area of wetlands and an intermittent stream are the only identified environmental features on the site. These features are minimal and manageable through the zoning and site engineering process. In all cases, disturbance will be limited in accordance with applicable regulatory standards. Page 3 of 7 Rev. 3/10/06 Orrick Commons Impact Analysis Statement Flood Plain Flood plain data for the subject parcels is delineated on the Flood Insurance Study Map for Frederick County prepared by the U.S. Department of Housing and Urban Development, Community Panels #510063 -0115B and #510063- 0120B, effective date July 17, 1978. The site is located entirely in Flood Zone C, which denotes areas of minimal flooding outside of the 100 -year flood plain. Wetlands The National Wetlands Inventory Map identifies a single wetland feature on the site, a small pond. In addition, an intermittent stream channel is located on the northwest corner of the property. A riparian buffer, as required by the Frederick County Zoning Ordinance, will prevent impacts to the stream channel. All wetlands associated with the stream channel shall be delineated at the master plan phase of the project. Soils and Steep Slopes The General Soil Map of the Soil Survey of Frederick County, Virginia indicates that the soils comprising the subject parcels fall under the Weikert- Berks- Blairton soil association, which is the predominant association on land located east of Interstate 81. The characteristics of this soil association and any implications for site development are manageable through the site engineering process. No areas of steep slopes (areas of 50% slope or greater) exist on the Property. The subject site has topographic characteristics that make it ideal for the proposed development program. D. Transportation The Orrick Commons project will be served by a multi -modal transportation network designed to safely and efficiently accommodate automobile and pedestrian traffic. The transportation improvement program proffered with this application will interconnect the various uses planned within the project, and further integrate the project with the surrounding community. A traffic impact analysis (TIA) was prepared for this application using composite data collected from other studies in the area, as well as actual traffic counts. Using trip generation figures from the I.T.E. Trip Generation Manual, 7th Edition, the TIA projects that the proposed development will Page 4 of 7 Rev. 3/10/06 Orrick Commons Impact Analysis Statement produce 11,789 vehicle trips per day (VPD). The TIA further indicates that study area roads and intersections have the capacity to accommodate the trips generated by this project at acceptable and manageable level of service conditions. The external road system serving the site is comprised of Senseny Road (Route 657) and Greenwood Road (Route 656). The applicant has proffered a maximum of one entrance on each of these roadways to enhance the safety of the corridor and to increase the aesthetic appeal of the development. The TIA indicates that traffic signals would be required at the entrance on Senseny Road as well as Greenwood Road in order to maintain the guideline level of service "C" as indicated by the Comprehensive Plan. The primary entrance for the site shall be designated by a boulevard style entrance on Senseny Road. The applicant has proffered both the boulevard style entrance and traffic signal with associated turn lanes at this location. Additionally, the Applicant has proffered to enter into a signalization agreement with the Virginia Department of Transportation for the signalization of the commercial area's secondary entrance on Greenwood Road. Development of the site will allow for the construction of Farmington Boulevard through the residential portion of the property to provide a link between Greenwood Road and Channing Drive. The Applicant has proffered traffic calming measures along Farmington Boulevard to ensure the safety of the residential development for pedestrians. Signalization will also be necessary at the intersection of Channing Drive and Senseny Road, which will be required with or without the introduction of project generated traffic. Rezoning 15 -99 for the Channing Land Bays provides for signalization at the intersection of Channing and Senseny. The Eastern Road Plan calls for Greenwood Road and Senseny Road to be improved major collectors. In addition to proffering the right -of -way necessary for the ultimate construction of a major collector road in both locations, the Applicant has proffered to construct the right turn lane for West bound Senseny from the proposed entrance on Senseny Road to the intersection of Senseny and Greenwood. This lane will ultimately become a portion of the second West bound through lane for Senseny Road. Lastly, the Applicant has proffered a monetary contribution of $500 per dwelling unit to be contributed towards future improvements of Senseny and Greenwood Roads. E. Sewage Conveyance and Water Supply Water and sanitary sewer facilities are available via the the Lynnehaven Subdivision to the East. The majority of the site will be served via gravity flow Page 5 of7 Rev. 3/10/06 Orrick Commons Impact Analysis Statement from west to east. This infrastructure will be expanded pursuant to Frederick County Sanitation Authority (FCSA) requirements to serve the entire site. Project build -out will consist of a maximum of 184 age restricted units as currently allowed by ordinance and approximately 158,000 square feet of office and /or general commercial uses. Using the standard water consumption rates for single family attached /multi family residential uses and general commercial /office uses', the proposed development is projected to consume approximately 59,200 GPD (gallons per day) of water and produce equivalent sewer flows. F. Site Drainage The vast majority of the site naturally drains north and northeast, eventually draining into Abrams Creek. It is anticipated that low impact development techniques together with good erosion control practice will mitigate adverse stormwater discharge impacts. The preservation of riparian buffers containing existing vegetation will provide significant mitigation of nutrient losses. Actual specification of temporary and permanent facilities will be provided with final engineering and will comply with all County, State and Federal regulations. G. Solid Waste Disposal Facilities Solid waste from the project will be deposited in the Frederick County landfill following collection via private carrier(s) contracted by the homeowner's association (HOA) for the residential portion of the project and by the individual commercial /employment users. H. Historic Sites and Structures The Frederick County Rural Landmarks Survey does not identify any structures of historic importance on the subject site. Moreover, pursuant to the National Park Service Study of Civil War Sites in the Shenandoah Valley of Virginia, the subject site is not included in any battlefield study area and does not contain any core battlefield resources. I. Impact on Community Facilities The Applicant has proffered that a minimum of 55,000 square feet of commercial space shall be constructed prior to occupancy of the first residential dwelling unit. The Applicant has proffered the following amounts Water consumption/sewage generation rates: single family attached /multi- family residential uses 150 GPD /dwelling unit; office /general commercial uses 200 GPD /1,000 square feet of gross floor area. Page 6 of 7 Rev. 3/10/06 Orrick Commons' as determined by the $500 /unit dedicated Greenwood Roads: Fire and Rescue: General Government: Public Safety: Parks and Recreation: Library: Frederick County Impact Model in addition to the towards future improvements to Senseny and $508 $227 $468 $1,519 $190 Total: $2,912 Impact Analysis Statement Page 7 of 7 Rev. 3/10/06 41) 7 EX. POND 0 7 (WETLANDS) 1 1 I I I I 1 1 1 1 1 I I I I I 1 1 o. Ex. Greenwood Fire Rescue CATE M4 DATE a SIGN EX. INTERMITTANT STREAM (WETLA NDS) SEA e ROAD Patton Hanle Rust Associates,“ Engineer& Surveyor& Planner& Landscape ArcMtectt ir[nIr Sn. t S oo P HR A ENVIRONMENTAL FEATURES PLAN ORRICK COMMONS FREDERICK COUNTY, VIRGINIA GRIPH/CSCALE 1 C CIIIDGCD SKr OF 1 p Nan 15. 2005 Patton Harris Rust Associates, pc Engineers. Surveyors. Ranners. Landscape Architects. pRA Mar insbur g West Virgin Avenue, 5n 254001 APR Martinsburg, West a 2541 Phone: 304.264.2711 Fax. 304.264.3671 PL.!. 6 2006 To: Susan Eddy Organization /Company: Frederick County Planning Department Memorandum From: Michael Glickman, PE (VA PE Number: 0402 038666) Date: April 05, 2006 An Addendum to: Project Name /Subject: A Traffic Impact Analysis of the Orrick Paramount Properly PHR +A Project file Number: 13783 -1 -0 Patton Harris Rust Associates (PHR +A) has prepared this memorandum as an addendum to A Traffic Impact Analysis of the Orrick Paramount Property, by PHR +A, dated October 11, 2005. The purpose of this memorandum is to present trip generation analyses for the "newly proposed" Orrick Paramount development and to document any impacts that are beyond those concluded in the October 2005 submission The "newly proposed" development would include 75 age restricted detached residential units, 100 age- restricted attached residential units, a 10,000 square foot daycare facility, 50,000 square feet of office, 66,000 square feet of retail, a 15,000 square foot pharmacy with drive -thru, a 5,000 square foot bank, and a 12,000 square foot restaurant. Based upon the rates and equations published in the 7 Edition of the Institute of Transportation Engineers' (ITE) Trip Generation Report, Tables 1 and 2 are provided to summarize the "originally proposed" (October 2005 study) and the "newly proposed" trip generation results for the Orrick Paramount development, respectively. Table 3 provides the trip differential between Tables 1 and 2 According to Table 3, the "newly proposed" development would increase the AM peak hour trips by 70 vehicles, decrease the PM peak hour trips by 55 vehicles and decrease the Average Daily Trips (ADT) by 242 vehicles. Since the trip generation would be reduced during the PM peak hour and that is considered to be the "worst- case" or "design hour" condition, it is the conclusion of PHR +A that the overall levels of service for the study area intersections would remain the same or improved as compared to the original October 2005 study. Code Land Use Amount AM Peak Hour In Out Total In PM Peak Hour Out Total ADT 251 Elderly Housing Detach 75 units 8 14 22 24 16 40 424 252 Elderly Housing Attach 100 units 4 4 8 7 4 11 348 565 Day Care 6,000 SF 41 36 77 32 36 68 476 710 Office 25,000 SF 54 7 62 18 89 107 459 820 Retail 80.200 SF 84 53 137 260 281 541 5,884 881 Pharmacy w/ DT 15.000 SF 23 17 40 63 66 129 1.322 912 Drive -in Bank 6,000 SF 41 33 74 137 137 274 1,351 932 1 -1 -f Restaurant 6,000 SF 36 33 69 40 26 66 763 932 1 -1-1 Restaurant 6,000 SF 36 33 69 40 26 66 763 Total 327 231 558 622 680 1,302 11,789 Code Land Use Amount AM Peak Hour In Out Total In PM Peak Flour Out Total ADT 251 Elderly Housing Detach 75 units 8 14 22 24 16 40 424 252 Elderly I lousing Attach 100 units 4 4 8 7 4 11 348 565 Day Care 10,000 SF 68 60 128 45 51 96 793 710 Office 50,000 SF 95 13 108 23 112 135 782 820 Retail 66,000 SF 74 48 122 228 247 476 5.184 881 Pharmacy w/ DT 15,000 SF 23 17 40 63 66 129 1,322 912 Drive -in Bank 5,000 SF 35 27 62 114 114 229 1,169 932 1-1 -f Restaurant 12,000 SF 72 66 138 80 51 131 1.526 Total 378 249 627 585 661 1,247 11,547 Trip Generation Condition AM Peak Hour In Out Total In PM Peak Hour Out Total ADT "Newly Proposed" Development 378 249 627 585 661 1,247 11,547 "Originally Proposed" Development 327 231 558 622 680 1,302 11,789 Trip Differential +51 +18 +70 -36 -19 -55* -242 Patton Harris Rut Associates, pc Table 1 "Originally Proposed" Development: Orrick Paramount Trip Generation Summary Memorandum To: Susan Eddy Page 2 of 2 Represents the worst -case peak hour condition Table 2 "Newly Proposed" Development: Orrick Paramount Trip Generation Summary Table 3 Newly Proposed Vs Originally Proposed Trip Generation Comparison: Orrick Paramount Engineers Surveyors Planners Landscape Architects