HomeMy WebLinkAbout11-05 Impact AnalysisCarpers Valley
A. Introduction
CARPERS VALLEY REZONING
IMPACT.,ANALYSIS STATEMENT
June 2005
Impact Analysis Statement
This report has been prepared for the purpose of assessing the impact on
Frederick County by the conditional rezoning of six parcels totaling
approximately 281.5 acres, which are owned by JGR Three, LLC, Richard G.
and Donna C. Dick, Constance L. Tjoumas, Gregory L. Coverstone, Cynthia
Ann Pappas; Ellen LLC, LCR LLC, MDC Three LLC, Susan Sanders LLC,
Liberty Hill LLC, Thomas A. Dick, Timothy J. Dick, and Michael E. Dick
respectively. The parcels are identified as 64 -A -82, 83, 83A, 86, 87, and 87A.
The subject acreage is located on the south side of Millwood Pike (Route
50/17) across from The Ravens and Miller Heights subdivisions, and adjacent
to the JIC Industrial Park, Winchester Regional Airport, and the U.S. Army
Corps of Engineers Transatlantic Division Headquarters facility.
The site is currently zoned RA, and includes the existing Carper's Valley Golf
Club. This application proposes the rezoning of the 281.5 acre assemblage
to the R4 (Residential Planned Community) District.
The site is intended as a mixed use residential and employment center
anchored by roughly 100 acres initially reserved for the development of
federal government facilities. These significant employment uses will be
complemented by moderate to high density residential uses, all of which will
be developed in a functionally and aesthetically unified manner. Attainment
of such an integrated development program will occur through the application
of uniform design guidelines and the implementation of a multi -modal
transportation network, both of which will be proffered by the Applicants (see
the attached draft Proffer Statement).
The proposed rezoning will establish a neighborhood unique to Frederick
County, because of its explicit provision for a balanced mix of mutually
supportive uses in an area already served by public facilities and a good road
system. The presence of significant employment uses within the project will
catalyze a synergistic relationship between land uses that will enhance the
economic vitality of the area and achieve a more sustainable form of
development than has been the historic pattern in that area.
The Comprehensive Policy Plan identifies the planned use of the site as a mix
of business /office and transitional land uses. The mixed use employment
center concept' proposed with this rezoning is consistent with this land use
vision, and provides for its realization in an efficient and dynamic manner that
Page 1 of 12 Rev. 6/24/05
Carpers Valley
Impact Analysis Statement
is preferable to the single use pattern that has predominated within the Urban
Development Area (UDA).
The Applicants believe that the proposed rezoning includes proffers that will
appropriately and effectively mitigate the impacts of this development
program and assure its completion in the manner envisioned by the
Applicants and by the County. The mixed use employment center land use
envisioned for the site is compatible with the surrounding community and
consistent with the land use policies of the Comprehensive Policy Plan. As
such, the Applicants submit that this rezoning request merits favorable
consideration and approval.
B. Comprehensive Policy Plan
The properties included with this rezoning request are all located within the
boundaries of the Route 50 East Corridor Land Use Plan. The properties are
located wholly within the Urban Development Area (UDA), and the Sewer and
Water Service Area (SWSA). The Route 50 East Corridor Land Use Plan
envisions the area comprised by the subject parcels as developing with
business /office and transitional land uses. The properties are also located
within the boundaries of the Airport Support Area, which is intended to ensure
the long term viability of Winchester Regional Airport by encouraging the
development of compatible land uses in areas impacted by airport operations.
The proposed development program provides for a mix of employment,
general commercial, and moderate to high density residential land uses,
which will be developed in an integrated "walkable" setting. The majority of
the project acreage will be reserved for employment and commercial land
uses, with the remainder of the site planned for residential development.
The proposed development of employment and commercial land uses is
clearly in keeping with the applicable business /office land use designation.
Such uses are planned at several locations within the project, although the
most notable location is an approximately 100 -acre area adjacent to the
existing Corp of Engineers facility The Applicants propose to make this
portion of the property available for a sufficient time that they may include
such federal government facilities as the United States General Services
Administration (GSA) is actively seeking to locate in the Winchester- Frederick
County area. Additional acreage is reserved for commercial uses adjacent to
the shared boundary with Winchester Regional Airport. The proposed
employment use and commercial areas will thus ensure the establishment of
compatible, and complementary, land uses adjacent to the Airport thereby
satisfying the objectives of the Airport Support Area. Residential uses will be
Page 2 of 12 Rev. 6/24/05
Carpers Valley
Impact Analysis Statement
appropriately buffered from the Airport so as to avoid the all- too common
conflicts between Airport operations and nearby homes.
Residential uses are proposed to extend north and east from the planned
employment and commercial areas to the project boundary formed by
Millwood Pike (U.S. Route 50/17). The residential component of the
neighborhood will total no more than 750 market rate units of varying types
consistent with the R4 zoning district, as well as at least 35 units of much
needed affordable workforce housing. The planned residential uses will serve
as a distinct transition from the intensity of employment uses and airport
operations to the lower density suburban residential uses located on the
opposite side of Millwood Pike. The Route 50 East Corridor Land Use Plan
does not expressly identify either the intended composition or boundaries of
the designated transitional area, and the moderate to high density residential
uses proposed with this application will facilitate a reasonable transition of
uses along the corridor, and further provide the neighborhood with the land
use mix necessary to promote around the clock vitality.
The Applicants have proffered to reserve 10 acres for dedication to Frederick
County for use as a National Guard Armory facility. The provision of this land
will facilitate the retention of this important public facility in the Winchester
Frederick County area, particularly in view of Congressman Wolf's recent
success in obtaining substantial funding for a new facility. Upon its ultimate
relocation to the site, the Armory would provide a valuable neighborhood
amenity as a gathering and recreational space for residents and employees
alike, as well as an improved facility for an element of America's national
defense system that has taken on exceptional importance in the past decade.
The recreational needs of neighborhood residents will be further served by a
network of "hiker /biker" trails and other community recreation facilities, to
include a neighborhood swimming pool, tennis courts, and dog park.
The applicable land use policies of the Comprehensive Policy Plan promote
the establishment of business /office and transitional land uses on the subject
parcels. The proposed rezoning of the site to the R4 district is intended to
permit the development of a mixed use employment center, which will include
substantial areas for business and employment uses as well as
complementary residential uses. Such complementary uses will provide an
effective transition to established uses in the surrounding community.
Moreover, the configuration of land uses on the site will ensure compatibility
of the project with airport operations in keeping with the objectives of the
Airport Support Area.
Page 3 of 12 Rev. 6'24/05
Carpers Valley
C. Suitability of the Site
1. Site Background and History
Impact Analysis Statement
The proposed rezoning of the subject acreage from RA (Rural Areas), to R4
(Residential Planned Community) is consistent with the land use policies of
the Comprehensive Policy Plan.
The original Frederick County zoning map (U.S.G.S. Winchester Quadrangle)
identifies the subject parcels as being zoned R -1 (Residential Limited). The
parcels were re- mapped from R -1 to A -2 (Agricultural General) pursuant to
the County's comprehensive downzoning initiative (Zoning Amendment
Petition #011 -80), which was adopted on October 8, 1980. The County's
agricultural zoning districts were subsequently combined to form the RA
(Rural Areas) District upon adoption of an amendment to the Frederick
County Zoning Ordinance on May 10, 1989. The corresponding revision of
the zoning map resulted in the re- mapping of the subject property and all
other A -1 and A -2 zoned land to the RA District.
Location and Access
The subject parcels are located on the south side of Millwood Pike (Route
50/17 East) across from The Ravens and Miller Heights subdivisions and
adjacent to the Prince Frederick Office Park and the Winchester Regional
Airport. The VDOT functional classification system identifies Millwood Pike as
a major arterial roadway. The land uses abutting the subject site to the east
and west are industrial and office, respectively, with the Winchester Regional
Airport adjacent to the south and single family residential uses located across
Millwood Pike to the north. The site is currently accessible via Millwood Pike
and Prince Frederick Drive.
3. Site Suitability
The subject parcels contain identified environmental features to include areas
of flood plain, wetlands, and steep slopes. But such features are minimal and
manageable through the zoning and site engineering process. In all cases,
disturbance will be limited in accordance with applicable regulatory standards.
Flood Plain
Flood plain data for the subject parcels is delineated on the Flood Insurance
Study Map for Frederick County prepared by the U.S. Department of Housing
and Urban Development, Community Panel #510063- 0115B, effective date
July 17, 1978. The majority of the site is located in Flood Zone C, which
denotes areas of minimal flooding outside of the 100 -year flood plain. Flood
Page 4 of 12 Rev. 6/24/05
Carpers Valley
Zone A, 100 -year flood plain, exists coincident with Sulfur Spring Run, which
traverses the frontage of the site, roughly parallel to Route 50. This portion of
the site is not planned for development except for road and utility crossings
thereby ensuring limited impact to the identified flood plain area.
Wetlands
The National Wetlands Inventory Map identifies four wetland features on the
site, all of which are man -made ponds associated with the existing golf course
use.
Soils and Steep Slopes
Impact Analysis Statement
The General Soil Map of the Soil Survey of Frederick County, Virginia
indicates that the soils comprising the subject parcels fall under the Weikert-
Berks- Blairton soil association, which is the predominant association on land
located east of Interstate 81. As per map sheet #36 of the Soil Survey, the
site is comprised of nine distinct soil types. With the exception of a pit area
containing fill materials, all of the soil types identified on the site are suitable
for development. It is noted that the Weikert- Berks Blairton soil association
presents some limitations to site development due to a seasonal high water
table, depth to bedrock, and slope. These characteristics and any
implications for site development are manageable through the site
engineering process.
Steep slopes (areas of 50% slope or greater) exist along the frontage of the
site and adjacent to two ravines that drain the site to Sulphur Spring Run.
Some disturbance of these areas will be necessary to implement proffered
transportation improvements, as well as to implement the planned stormwater
management system. Pursuant to the Zoning Ordinance, any such
disturbance or re- grading shall be limited to no more than 25% of the area
comprised of steep slopes. The location and scope of the steep slopes
identified on the site do not compromise the suitability of the site for
development.
D. Transportation
The Carpers Valley project will be served by a multi -modal transportation
network designed to safely and efficiently accommodate automobile, bicycle
and pedestrian traffic. The transportation improvement program proffered
with this application will interconnect the various uses planned within the
project, and further integrate the project with the surrounding community. The
implementation of this program will occur in phases structured to coincide
Page 5 of 12 Rev. 6124/05
Carpels Valley
Impact Analysis Statement
with the introduction of land uses on the site, as specified by the Proffer
Statement (see attached).
A traffic impact analysis (TIA) was prepared for this application using
composite data collected from other studies in the area, as well as actual
traffic counts. Using trip generation figures from the I.T.E. Trip Generation
Manual, 7 Edition the TIA projects that the proposed development will
produce 12,917 vehicle trips per day (VPD). The TIA further indicates that
study area roads and intersections have the capacity to accommodate the
trips generated by this project at acceptable and manageable level of service
conditions.
The external road system serving the site is comprised of Millwood Pike
(Route 50/17 East) and Prince Frederick Drive (Route 781). Millwood Pike is
a four lane major arterial roadway and Prince Frederick Drive is a two lane
minor collector road. The TIA indicates that signalization will be required at
the intersection of Costello Drive and Prince Frederick Drive at project build
out. Moreover, signalization will be necessary at the intersection of Victory
Road and Millwood Pike, which will be required with or without the
introduction of project generated traffic into the corridor. The Applicants have
addressed these external system requirements by proffering to participate in
funding these signal improvements.
The internal transportation improvement program proffered by the Applicants
will effectively tie the project into the existing external system and provide the
framework for internal access and mobility. A major collector road
(Coverstone Drive) is proposed to extend through the site from Millwood Pike
to Prince Frederick Drive. This collector road will consist of four travel lanes
within an 80 -foot right of way and will be developed in two principal phases
corresponding with development of the planned land bays. Moreover, this
application provides for the future extension of the collector road to relocated
US Route 522, which will provide a direct means of access to this arterial
roadway from the County's planned public safety building.
Direct project access from Millwood Pike will be limited to an entrance aligned
with Sulphur Spring Road (Route 655). This entrance will provide principal
access to Land Bay 1, which is planned to contain residential uses consisting
of mixed housing types, and will further serve as a secondary access point for
employment related traffic destined for Land Bay 2. The intersection of
Sulphur Spring Road and Millwood Pike is currently controlled by a three -way
traffic signal. This signal will be upgraded by the Applicants to a four -way
signal upon construction of the entrance.
Page 6 of 12 Rev. 6/24/05
Carpers Valley
E. Sewage Conveyance and Water SuppIV
Impact Analysis Statement
The existing golf course is served by an 8" sewer line that ties into the 12"
sewer main located on the south side of Millwood Pike along the frontage of
the site. This infrastructure will be expanded pursuant to Frederick County
Sanitation Authority (FCSA) requirements to serve the entire site and enable
gravity flow to the existing main. The Abrams Creek interceptor will convey
effluent from the project for treatment at the Opequon Water Reclamation
Facility.
A 12" water main currently extends through the central portion of the site.
The proposed development would connect directly to this existing line
pursuant to FCSA requirements. Sufficient water capacity exists to serve the
domestic and fire protection demands of the project.
Project build -out will consist of a maximum of 750 market rate dwelling units
and approximately 950,000 square feet of office and /or general commercial
uses. Using the standard water consumption rates for single family
attached /multi family residential uses and general commercial /office uses',
the proposed development is projected to consume approximately 302,500
GPD (gallons per day) of water and produce equivalent sewer flows.
F. Site Drainage
The site naturally drains north to Sulphur Spring Run via several pronounced
drainage divides. It is anticipated that low impact development techniques
together with good erosion control practice will mitigate adverse stormwater
discharge impacts. The preservation of riparian buffers containing existing
vegetation will provide significant mitigation of nutrient losses. Actual
specification of temporary and permanent facilities will be provided with final
engineering and will comply with all County, State and Federal regulations.
G. Solid Waste Disposal Facilities
Solid waste from the project will be deposited in the Frederick County landfill
following collection via private carrier(s) contracted by the homeowner's
association (I1OA) for the residential portion of the project and by the
individual commercial /employment users.
Water consumption /sewage generation rates: single family attached /multi- family residential uses
150 GPD /dwelling unit; office /general commercial uses 200 GPD /1,000 square feet of gross floor
area.
Page 7 of 12 Rev. 6/24/05
Carpers Valley
H. Historic Sites and Structures
The Frederick County Rural Landmarks Survey includes one structure located
on the site, which is identified as the Heishland House 34- 1176). However,
this structure is neither included on the list of potentially significant resources
nor is it identified as eligible for eventual inclusion on the state or national
register of historic places. Moreover, pursuant to the National Park Service
Study of Civil War Sites in the Shenandoah Valley of Virginia, the subject site
is not included in any battlefield study area and does not contain any core
battlefield resources.
Impact on Community Facilities
The Frederick County Fiscal Impact Model was run by planning staff to
project the fiscal impact on community facilities attributable to the proposed
rezoning. The output module generated by this analysis indicated that the
proposed land uses would result in a net positive fiscal impact at project build
out. Nevertheless, the Applicants have proffered to provide a per unit
monetary contribution to ensure that the unique impacts to particular public
facilities are appropriately addressed. Specifically, the Applicants have
proffered to contribute $2,637 per market rate unit at the time of building
permit issuance. The total contribution is proffered to be allocated as follows:
Fire and Rescue:
Public Schools:
Recreation Parks
Library:
Administration:
TOTAL:
J. Modifications
$422.00 per unit
$1,714.00 per unit
$343.00 per unit
$79.00 per unit
$79.00 per unit
$2,637 per unit
Impact Analysis Statement
An escalator clause is included with the proffer statement to mitigate the
effects of inflation on the value of the proffered monetary contributions. This
provision stipulates that any monetary contributions proffered by the applicant
that are paid after 30 months from the date of rezoning approval will be
adjusted pursuant to the Urban Consumer Price Index (CPI -U).
Per Section 165 -72.0. of the Frederick County Zoning Ordinance, an
applicant for R4 zoning may request modifications to provisions of the Code
of Frederick County governing physical development. Such modifications
may be sought to enable implementation of a design and /or land use concept
beneficial to the community that would not otherwise be permitted by existing
Page 8 of 12 Rev. 6/24/05
Carpers Valley
Current Standard:
Proposed Standard:
Impact Analysis Statement
ordinances. The following modifications are requested with this rezoning
application:
1. Modification of Section 165 -68 of the Frederick County Zoning Ordinance
governing the procedure for R4 rezoning petitions.
A master development plan (MDP), meeting all
requirements of Article XVIII of the Zoning
Ordinance, shall be submitted with an application
for R4 zoning. The master development plan
review procedures described by Article XVII must
also be completed concurrently with or following
the consideration of the rezoning.
A generalized development plan (GDP) identifying
major land bays and the proffered transportation
network shall be submitted with the rezoning
application in lieu of a master development plan
(MDP). A complete MDP application will be
submitted to Frederick County for review following
rezoning approval, pursuant to the criteria of
Article XVIII of the Zoning Ordinance.
Justification: The R4 District requirements stipulate that a complete
Master Development Plan (MDP) shall be submitted with an application for
R4 zoning. The MDP is a plan document that is used to evaluate
conformance with ordinance and other technical requirements applicable
to land development, and has historically served as a bridge between the
conceptual nature of a rezoning application and the more precise
documents required for subdivision and site plan approvals. As such, it
serves a valuable role in applying engineering detail to the generalized
land use and infrastructure framework established through the proffer
statement of an approved rezoning. This two part process ensures that
the rezoning evaluation is focused on policy conformance and impact
mitigation, and not overwhelmed by the technical minutiae associated with
the MDP.
The proffering of a detailed MDP "locks" an applicant into a development
plan that cannot be changed without filing a subsequent rezoning petition
for amendment of the approved proffers, regardless of the purpose or
scope of the necessary change. Alterations to the routes of internal
streets, stormwater management facilities, and layout of uses within land
bays would require approval of the Board of Supervisors through the
rezoning process, whereas a project subject to a typical "non- proffered"
Page 9 of 12 Rev. 6/24/05
Carpers Valley
MDP may often complete such modifications through an administrative
process. Such changes are almost certain to be necessary for a given
project to respond to evolving regulatory and market conditions over the
course of the development cycle.
The plan proposed with this application represents a dynamic concept that
will require flexibility in all phases of the development process to
successfully implement. The Applicants are committed to developing a
project that is both innovative and viable, and thus recognize that the
design process cannot end at the time of rezoning. but must continue as
an ongoing exercise open to emergent information and ideas. A proffered
generalized development plan (GDP) will provide appropriate assurances
to the community regarding the fundamental physical components of the
proposed development while ensuring sufficient flexibility for the
Applicants to achieve superior project design.
The requested modification would allow submission of a proffered
Generalized Development Plan (GDP) at the time of rezoning in lieu of the
complete MDP. The GDP will identify the relationship of the project site
and the proposed development to the surrounding transportation network
and adjoining land uses. Moreover, the GDP will provide a general layout
for the proposed development, organizing the entire acreage into land
bays identified for either residential or employment/commercial land uses,
as well as the proffered transportation network. The GDP will further
delineate the approximate size of each land bay as well as the planned
housing types for residential land bays. The Applicants will submit an
MDP application for review subsequent to rezoning approval, at which
time greater detail concerning land bay development will be provided.
2. Modification to Section 165 -71 of the Frederick County Zoning Ordinance
governing the mixture of housing types required within a planned
community.
Current Standard:
Proposed Standard:
Impact Analysis Statement
No more than 40% of residentially designated
areas of a planned community may develop with
any of the following housing types: duplexes,
multiplexes, atrium houses, weak -link townhouses,
townhouses or garden apartments or any
combination of those housing types.
The residentially designated areas of a mixed use
employment center may develop with any
combination of housing types permitted by the
Frederick County Zoning Ordinance and the
Page 10 of 12 Rev. 6/24/05
Carpers Valley
Impact Analysis Statement
approved proffer statement without limitation to the
percentage or ratio of any given housing type.
Justification: The proposed rezoning is sought to enable development of a
mixed use employment center, which is a type of planned community
development that is not expressly accommodated by the Zoning
Ordinance. The R4 district, however, is the only Frederick County zoning
category that is suitable for the development of a mix of land uses
pursuant to a single zoning category, where innovative design concepts
and standards may be created and applied. However, the R4 district is
oriented toward a predominantly residential development program (as
implied by its formal title Residential Planned Community) and its
requirements for a mixture of housing types as stated above befits a
project intended to develop with residential uses over a majority of its land
area.
In contrast, the land use program for a mixed use employment center
emphasizes reservation of greater amounts of land for commercial and
business uses, which results in less area available to locate the residential
density necessary to achieve a balanced mix of land uses within the
project. The ordinance requirement promotes a residential mix dominated
by single family detached housing types. Such housing types are less
conducive to the limited residential areas of a mixed use employment
center given the greater land area required for individual lots.
The development of single family attached and multi family dwellings as
the predominant housing types in Carpers Valley is necessary to
complement and catalyze the business and commercial uses on the site.
Moreover, the availability of such housing in a planned community setting
within walking distance of employment, shopping, and commercial uses
will provide a positive although presently non existent choice for current
and future County residents.
3. Modification of Section 165 -72.D. of the Frederick County Zoning
Ordinance governing the maximum areas permitted for commercial or
industrial uses.
Current Standard: No more than 50% of the gross area of the
planned community shall be used for commercial
and industrial purposes.
Proposed Standard: No more than 60% of the gross area of the
planned community shall be used for business and
commercial purposes.
Page 11 of 12 Rev. 6/24/05
A Phased Traffic Impact Analysis of
Carpers Valley
Located in:
Frederick County, Virginia
Prepared for:
Miller Smith
8401 Greensboro Drive
Suite 300
McLean, VA
22102
Prepared by:
June 23, 2005
Patton Harris Rust Associates, pc
End neers. Surveyors. Planners. Lmdsccpe Architects,
300 Foxorofi Avenue. Suite 200
Martinsburg, West Virginia 25401
T -f- T 304.264.271 1
F 304.254.3671
Carpers Valley 0
Impact Analysis Statement
Justification: The proposed rezoning is sought to enable development of a
mixed use employment center, which is a type of planned community not
currently accommodated by the Frederick County Zoning Ordinance. The
R4 district is the only zoning category that is available to develop a mix of
land uses pursuant to a single zoning category wherein innovative design
standards may be applied. However, the R4 district is intended to
facilitate development of a principally residential project complemented by
relatively small areas of commercial and /or industrial uses. In contrast,
the land uses intended to predominate within a mixed use employment
center are business and commercial uses, with residentially designated
areas comprising a lesser amount of the total and area.
The mixed use employment center concept advanced through this
rezoning application requires the amount of land designated for
commercial and business uses to exceed the 50% limit of the R4 district.
The essential components of the proposed mixed use development
program are the employment and commercial uses planned for the site,
which may require significant acreage depending upon the ultimate users.
However, to ensure a mix of mutually supportive land uses, a minimum
amount of land needs to be reserved for residential uses. The modified
standard proposed with this application will facilitate development of a mix
of land uses in a planned community setting consistent with the intent of
the R4 district, but with the notable distinction of elevating business and
commercial land uses to the forefront of the planned development
program.
Page 12 of 12 Rev. 6/24/05
OVERVIEW
Report Summary
Patton Harris Rust Associates, pc (PHR +A) has prepared this document to
present the traffic impacts associated with the proposed Carpers Valley development
located along the south side of Route 50 (Millwood Pike), between Prince Frederick Drive
and Victory Road, in Frederick County, Virginia. The proposed development will be built
out in two (2) transportation phases by the year 2010. Phase 1 (2008 partial built -out)
assumes a residential development of 487 multi family units and 263 townhouse units with
access provided via Coverstone Drive (future roadway). Additionally, PHR +A has
provided analysis for two (2) alternative land use scenarios for Phase 2 (2010 full built
out): Scenario #1 assumes 1,200,000 square feet of office plus total residential
development, and Scenario #2 assumes 620,000 square feet of retail plus total residential
development. Primary access to the office /retail development is provided via Prince
Frederick Drive. Figure 1 is provided to illustrate the location of the proposed Carpers
Valley development with respect to the surrounding roadway network.
Methodology
The traffic impacts accompanying the Carpers Valley development were obtained
through a sequence of activities as the narratives that follow document:
Assessment of background traffic including other planned projects in the area of
impact,
Calculation of trip generation for the proposed Carpers Valley development,
Distribution and assignment of the Carpers Valley generated trips onto the completed
roadway network,
Analysis of capacity and level of service using the latest version of the highway
capacity software, HCS -2000, for existing and future conditions.
P I I 4 1
A Phased Traffic Impact Analysis of Carpers Valley
Project Number: 13415 -1 -0
June 23,2005
Page 1
EXISTING CONDITIONS
PHR +A conducted AM and PM peak hour manual turning movement counts at the
intersections of Route 50/Uictory Road, Route 50 /Sulphur Springs Road, Route 50/ Prince
Frederick Drive, Victory Road/Arbor Court, Route 522 /Costello Drive and Prince
Frederick Drive /Costello Drive. ADT (Average Daily Traffic) was established along each
of the study area roadway links using a "k" factor (the ratio of PM peak hour traffic
volumes to 24 -hour traffic volumes) of 8.4% based on the published Virginia Department
of' Transportation (VDOT) traffic count data.
Figure 2 shows the existing ADT and AM/PM peak hour traffic volumes at key
locations throughout the study area network. Figure 3 shows the respective existing lane
geometry and AM/PM peak hour levels of service. All traffic count data and HCS -2000
levels of service worksheets are included in the Appendix section of this report.
A Phased Traffic Impact Analysis of Corners Valley
Proj ecr Number. 13415 -1 -0
June 23, 2005
Page 2
Figure 1 Vicinity Map: Carpers Valley in Frederick County, Virginia
A Phased Traffic Impact Analysis of Carpers Valley
Project Number: 13415 -1 -0
June 23, 2005
Page 3
verage!DailyXTrips��1;
Existing Traffic Conditions
A Phased Traffic Impact Analysis of Carpers Valley
Project Number: 13415 -1 -0
June 23, 2005
Page 4
P
r Figure 3
Or Signalized
Intersection
LOS-
Signalized
e` Intersection
LOS =C(C)
Unsignalized
Intersection
�`Je P
50
No Scale
'p. °;P Q o
m Q SITE o S
p '�P Interse
h� Ck* LOS =B(B)
c
Sul hu
gs
SITE
In
1
1:2
1
`e 19. C9
/rn
Denotes stop sign control
Denotes traffic signal control
Denotes Unsignalized Critical Movement
AM Peak Hour (PM Peak Hour)
Ro
Unsignalized
Y. Intersection
J
Existing Lane Geometry and Levels of Service
A Phased Traffic Impact Analysis of Corners Valley
Project Number: 13415-1 -0
June 23, 2005
Page 5
Code Land Use
Amount
In
AM Peak Hour
Out Total
In
PM Peak Hour
Out Total
ADT
Ravens Subdivision
210 Single Family Detached
315 units
57
172
230
193
109
302
3,150
Total
57
172
230
193
109
302
3,150
PHASE 1 TRAFFIC ANALYSES (2008)
Phase 1 assumes a residential development of 487 multi family units and 263
townhouse units. Access to the residential development is provided via Coverstone Drive
(future roadway)
2008 BACKGROUND CONDITIONS
Based on VDOT (Virginia Department of Transportation) historical average daily
traffic data (between years 2001 and 2003) for Route 50 (Millwood Pike) within the
vicinity of the site, a growth rate of less than one percent (1 was calculated. PHR +A,
however, applied a conservative annual growth rate of four percent (4 per year to the
existing traffic volumes along Route 50, Route 522 and Sulphur Springs Road (shown in
Figure 2) to obtain 2008 base conditions. Additionally PHRA incorporated all trips
relating to the Ravens development located along Route 50 opposite to the porposed
Carpers Valley site. Using the 7 Edition of ITE's Trip Generation Report, PHR +A has
provided Table 1 to summarize the 2008 "other development" trip generation.
Figure 4 shows the 2008 background ADT and AM/PM peak hour traffic volumes
at key locations throughout the study area network. Figure 5 shows the respective 2008
background lane geometry and AM/PM peak hour levels of service. All HCS -2000 levels
of service worksheets are included in the Appendix section of this report.
Table 1
2008 "Other Development"
Trip Generation Summary
Of the 565 units proposed for the Ravens Subdivison development, only 315 SFD's were considered since 250 SFD's were
occupied when the existing traffic counts were conducted.
A Phased Traffic Impact Analysis of Carpers Valley
Project Number: 13415 -1-0
June23, 2005
Page 6
er age piilygTiip
Phase 1: 2008 Background Traffic Conditions
A Phased Traffic Impact Analysis of Carpers Valley
Project Number: 13415 -1 -0
June 23, 2005
Page 7
P
Figure 5
P 1
a
(r
c
Signalized
Intersection
LOS=C(C)
Unsignalized
Intersection
Unsignalized
Intersection
7
l G 50
L Signalized
Intersection
LOS =B(C)/
No Scale
c-
Q C
`'8
SITE
OL e!
Se0
`o eO
SITE
Signalized
Inte
C161 LOS =B(B)
Sul .hur .5..;
Roa
\IUnsignalized
C y Intersection
l
Signalized "Suggested
Intersection
LOS =B(C) Signalization
aa.
Denotes stop sign control
g Denotes traffic signal control
Denotes Unsignalized Critical Movement
AM Peak Hour (PM Peak Hour)
Phase 1 :2008 Background Lane Geometry and Levels of Service
A Phased Traffic Impact Analysis of Carpers Valley
Project Number: 13415 -1 -0
June 23, 2005
Page 8
Code
Land Use
Amount
In
AM Peak Hour
Out Total
In
PM Peak Hour
Out Total
ADT
Land Bay 1
220
Apartment
487 units
48
194
242
186
100
286
3,077
230
Townhouse/Condo
263 units
19
93
112
89
44
133
2,288
Total
67
287
354
275
144
418
5,365
TRIP GENERATION
Using the 7th Edition of the Institute of Transportation Engineers' (ITE) Trip
Generation Report. PHR +A has prepared Table 2 to summarize the trip generation for the
proposed Carpers Valley development.
TRIP DISTRIBUTION AND TRIP ASSIGNMENT
The distribution of trips, shown in Figure 6, was based upon local travel patterns
for the roadway network surrounding the proposed Carpers Valley site. Figure 7 shows
the respective development generated AM/PM peak hour trips and ADT assignments at
key locations throughout the study area network
2008 BUILD -OUT CONDITIONS
Table 2
Carpers Valley Development Phase ((Residential)
Trip Generation Summary
The Carpers Valley assigned trips (Figure 7) were added to the 2008 background
traffic volumes (Figure 4) to obtain 2008 build -out conditions. Figure 8 shows the 2008
build -out ADT and AM/PM peak hour traffic volumes at key locations throughout the
study area network. Figure 9 shows the respective 2008 build -out lane geometry and
AM/PM peak hour levels of service. All HCS -2000 levels of service worksheets are
included in the Appendix section of this report.
A Phased Traffic Impact Analysis of Carpers Valley
Project Number: 13415 -1 -0
June 23, 2005
Page 9
No Scale
G
r
0
522
10%
5%
30%
5%
C
'e4
D
G`
SITE
a
SITE
5 %O
m
Sul
hur
c Roy
45%
PHIA
Figure 6
PI F 1
I
Phase 1: Trip Distribution Percentages (Residential)
A Phased Traffic Impact Analysis of Careers Valley
Project Number: 13415 -1 -0
June 23, 2005
Page 10
P II Pw i
Phase 1:Development- Generated Trip Assignments
A Phased Traffic Impact Analysis of Carpers Valley
Project Number: 13415 -1 -0
June 23, 2005
Page 11
—P RA
Figure 8
P H Y
Phase 1: 2008 Build -out Traffic Conditions
A Phased Traffic impact Analysis of Careers Valley
Project Number: 13415 -1 -0
June 23, 2005
Page 12
No Scale
eft) �C d� Cosre��o
Signalized r n e ct
Inte ion C
rseion
IAS =C(C)
Unsignalized
Intersection
C Signalized
Intersection
LOS =C(C)
0
SITE
SITE
Signalized'. ••Suggested
Intersection Improvements"
LOS=C(C) NB -0^ Leg
R
Uasignatized
r
Signalized "Suggested
Intersection Improvements"
LOS_C(C) Signalisation
Denotes stop sign control
Denotes traffic signal control
Denotes Unsignalized Critical Movement
AM Peak Hour (PM Peak Hour)
PHl�
F Figure 9
Phase 1: 2008 Buildout Lane Geometry and Levels of Service
A Phased Traffic Impact Analysis of Carvers Valley
Project Number: 13415 -1 -0
June 23, 2005
Page 13
Code Land Use
Amount
In
AM Peak Hour
Out Total
In
PM Peak Hour
Out Total
ADT
Ravens Subdivision
210 Single- Family Detached
315 units
57
172
230
193
109
302
3.150
Total
57
172
230
193
109
302
3,150
PHASE 2 TRAFFIC ANALYSES (2010)
PHR +A has provided analysis for two (2) alternative land use scenarios for Phase 2
(2010 full built -out): Scenario #1 assumes 1,200,000 square feet of office plus total
residential development, and Scenario #2 assumes 620,000 square feet of retail plus total
residential development. Primary access to the office /retail development is provided via
Prince Frederick Drive.
2010 BACKGROUND CONDITIONS
Based on VDOT (Virginia Department of Transportation) historical average daily
traffic data (between years 2001 and 2003) for Route 50 (Millwood Pike) within the
vicinity of the site, a growth rate of less than one percent (1 was calculated. PHR +A,
however, applied a conservative annual growth rate of four percent (4 per year to the
existing traffic volumes along Route 50, Route 522 and Sulphur Springs Road (shown in
Figure 2) to obtain 2010 base conditions. Additionally, PHRA incorporated all trips
relating to the Ravens development located along Route 50 opposite to the porposed
Carpers Valley site. Using the 7` Edition of ITE s Trip Generation Report, PHR +A has
provided Table 3 to summarize the 2010 "other development" trip generation.
Figure 10 shows the 2010 background ADT and AM/PM peak hour traffic volumes
at key locations throughout the study area network. Figure 11 shows the respective 2010
background lane geometry and AM/PM peak hour levels of service. All HCS -2000 levels
of service worksheets are included in the Appendix section of this report.
Table 3
2010 'Other Development"
Trip Generation Summary
Of the 565 units proposed for the Ravens Subdivison development, only 315 SFD's were considered since 250 SFD's were
occupied when the existing traffic counts were conducted.
7 r
A Phased Tragic Impact Analysis of Carpers Valley
Project Number: 13415 -1 -0
lune 23, 2005
Page 14
No Scale
a.
P
Figure 10
4(8
SITE
Su ur,s pnngs Road
SITE
g
Is "p
1
o
41 b^ T-0-';',
4L`
t o
V
1. L11
Phase 2: 2010 Background Traffic Conditions
h
i`verage D_a`ilkTfip §y.
AM Peak Hour(PM Peak Hour)
A Phased Traffic Impact Analysis of Careers Valley
Project Number: 13415 -1 -0
June 23, 2005
Page 15
No Scale
a
x,4 i( J '4.
C
Signalized tell
Intersection
LOS =C(C)
e
e
Q L� Signalized
Intersection
LOS =C(C)
SITE
a
U" Unsignalized `s 9
C intersection
o cc
SITE
1
**.f.:4., la
icy
Unsignalized
1 Intersection
P
r4
.C 11�r
1 1
QC)
50
o� 4
0
0
Signalized n
Int
GIC' LOS =B(B)
i•• Sul.huur S.
R oad
Unsignalized
Intersection
Signalized Suggested
Intersection Improvements"
LOS =B(C). Signalization
lG
Denotes stop sign control
Denotes traffic signal control
Denotes Unsignalized Critical Movement
AM Peak Hour (PM Peak Hour)
-P
F Figure 11
PIP*
Phase 2:2010 Background Lane Geometry and Levels of Service
A Phased Traffic Impact Analysis of Carpers Valley
Project Number: 13415-1-0
June 23, 2005
Page 16
Code
Land Use
Amount
AM Peak Hour
In Out Total
PM Peak Hour
In Out Total
ADT
Land Bay 1
Land Bay 1
220
Apartment
487 units
48
194
242
186
100
286
3,077
230
Townhouse/Condo
263 units
19
93
112
89
44
133
2.288
2,288
Sub Total
67
287
354
275
144
418
5,365
Land Bay 2
820
Retail
620,000 SF
285
182
468
1,002
1,085
2,087
22,233
9,040
Total
353
469
822
1,276
1,229
1506
27,598
Code
Land Use
Amount
AM Peak Hour
In Out Total
In
PM Peak Hour
Out Total
ADT
Land Bay 1
220
Apartment
487 units
48
194
242
186
100
286
3,077
230
Townhouse /Condo
263 units
19
93
112
89
44
133
2,288
Sub Total
67
287
354
275
144
418
5,365
Land Bay 2
710
Office
1,200,000 SF
1,205
164
1,369
242
1,181
1,423
9,040
Total
1,272
451
1,724
516
1,325
1,841
14,405
TRIP GENERATION
Using the 7th Edition of the Institute of Transportation Engineers' (ITE) Trip
Generation Report, PHR +A has prepared Table 4a and Table 4b to summarize the trip
generation for the proposed Carpers Valley development Phase 2, Scenario #1 and
Scenario #2, respectively.
Table 4a
Carpers Valley Development Phase 2 Scenario #1 (Residential Office)
Trip Generation Summary
TRIP DISTRIBUTION AND TRIP ASSIGNMENT
The distribution of trips, shown in Figure 12, was based upon local travel patterns
for the roadway network surrounding the proposed Carpers Valley site. Figures 13a and
13b shows the respective development generated AM/PM peak hour trips and ADT
assignments at key locations throughout the study area network for Phase 2, Scenario #1
and Scenario #2, respectively.
Table 4b
Carpers Valley Development Phase 2 Scenario #2 (Residential Retail)
Trip Generation Summary
A Phased Traffic Impact Analysis of Carvers Valley
Project Number: 13415-1 -0
June 23, 2005
Page 17
2010 BUILD -OUT CONDITIONS
The Carpers Valley assigned trips (Figures 13a and 13b) were added to the 2010
background traffic volumes (Figure 10) to obtain 2010 build -out conditions. Figures 14a
and 14b shows the 2010 build -out ADT and AM/PM peak hour traffic volumes at key
locations throughout the study area network. Figures 15a and 15b shows the respective
2010 build -out lane geometry and AM/PM peak hour levels of service. All HCS -2000
levels of service worksheets are included in the Appendix section of this report.
A Phased Traffic Impact Analysis of Carpers Valley
Project Number: 13415 -1-0
June 23, 2005
Page 18
PHffir4
Phase 2: Trip Distribution Percentages
A Phased Traffic Impact Analysis of Carvers Valley
Project Number: 13415-1 -0
June 23,2005
Page 19
F H l
Figure13a
PH, A l
Phase 2, Scenario #1: Development- Generated Trip Assignments
A Phased Tragic Impact Analysis of Carvers Valley
Project Number: 13415 -1 -0
June 23, 2005
Page 20
F H l
Figure 13b
P
Phase 2, Scenario #2: Development- Generated Trip Assignments
A Phased Traffic Impact Analysis of Carpers Valley
Project Number: 13415 -1 -0
June23,2005
Page 21
aH
Figure 14a
Phase 2, Scenario #1: 2010 Build -out Traffic Conditions
A Phased Traffic Impact Analysis of Carpers Valley
Project Number: 13415 -1 -0
June 23, 2005
Page 22
PITS
A
Phase 2, Scenario #2: 2010 Build -out Traffic Conditions
A Phased Traffic Impact Analysis of Carpers Valley
Project Number: 13415 -1 -0
June 23, 2005
Page 23
No Scale
z
Stgnalzed,
Intersection
"Suggested
Improvements"
Signalization
NB 1 Left
/n o
Signalized
Intersection
LOS =B(C)
Unsignalized
Intersection
SITE
STOP
Signalized'
Intersection
LOS =C(C)
"Suggested
Improvements"
NB 4^ Leg
WB 1 Left
EB I Right
Denotes stop sign control
Denotes traffic signal control
Denotes Unsignalized Critical Movement
AM Peak Hour (PM Peak Hour)
Sul
Signalized!'
Intersection'.
LOS=C(C)
"Suggested
Improvements"
NB 4^ Leg
WB- I Left
hurl
gs
Signalized'-
Intersection'.
LOS =C(C)'..
‘it Unsignalized
4,% Intersection
J.
"Suggested
Improvements"
Signalization
p H RA
F igure 15a Phase 2,Scenario #1: 2010 Buildout Lane Geometry and Levels of Service
P E 4 1
A Phased Traffic Impact Analysis of Carpers Valley
Project Number: 13415 -1 -0
June 23, 2005
Page 24
CONCLUSION
P H i
The traffic impacts associated with the proposed Carpers Valley development are
acceptable and manageable. All intersections, assuming suggested improvements, will
maintain levels of service to "C" or better during 2008 and 2010 build -out conditions. The
following describes the off -site roadway improvements recommended for each of the study
area intersections:
2008 Background Conditions (Phase 1)
Route 50 Victory Road: In order to achieve acceptable levels of service,
this intersection will require traffic signalization.
2008 Builtout Conditions (Phase 1)
Route 50 Victory Road: In order to achieve acceptable levels of service,
this intersection will require traffic signalization.
Route 50 Sulphur Springs Road: In order to achieve acceptable levels of
service, this intersection will require a westbound left turn -lane and
eastbound right turn -lane along with the fourth leg (Coverstone Drive).
2010 Background Conditions (Phase 2)
Route 50 Victory Road: In order to achieve acceptable levels of service,
this intersection will require traffic signalization for both Scenarios #1 and
#2.
2010 Builtout Conditions (Phase 2)
Prince Frederick Drive Costello Drive: In order to achieve acceptable
levels of service, this intersection will require traffic signalization as well as
an northbound left turn -lane (currently there is one shared lane) for both
Scenarios #1 and #2
Route 50 Sulphur Springs Road: In order to achieve acceptable levels of
service, this intersection will require a westbound left turn-lane and
eastbound right turn-lane along with the fourth leg (Coverstone Drive) for
both Scenarios #1 and #2
Route 50 Victory Road: In order to achieve acceptable levels of service,
this intersection will require traffic signalization for both Scenarios #1 and
#2.
Route 50 Prince Frederick Drive: In order to achieve acceptable levels of
service, this intersection will require a westbound left turn-lane and
eastbound right turn -lane along Route 50 for both Scenarios #1 and #2.
Additionally, a northbound right turn-lane is required along Prince
Frederick Drive for Scenario #2.
A Phased Traffic Impact Analysis of Carpers Valley
Project Number: 13415 -1 -0
June. 2005
Page 26
No Scale
Siymwzed!
Intersection
LOS B(C)t'
P
"Suggested
Improvements"
Signalization
NB I Left
P
.!Signalized' "Suggested
Intersection Improvements"
NB a" Leg
WB 1 Left
EB 1 Right
LOS =C(C)'
'Signalized!.
Intersection
:LOS—C(C)!,,
S u l bur S Roa
Signalized'':,
Intersection,
"Suggested
Improvements"
NB 4 Leg
WB -1 Left
EB 1 Riaht
Unsignalized
Cp Intersection
"Suggested
Improvements"
Signalization
Denotes stop sign control
Denotes traffic signal control
Denotes Unsignalized Critical Movement
AM Peak Hour (PM Peak Hour)
F igure 15b Phase 2,Scenario #2: 2010 Buildout Lane Geometry and Levels of Service
A Phased Traffic Impact Analysis of Carpers Valley
Project Number: 13415 -1 -0
Lune 23, 2005
Page 25
Capers Valley
A. Introduction
CARPERS VALLEY REZONING
IMPACT ANALYSIS STATEMENT
June 2005
Impact Analysis Statement
This report has been prepared for the purpose of assessing the impact on
Frederick County by the conditional rezoning of six parcels totaling
approximately 281.5 acres, which are owned by JGR Three, LLC, Richard G.
and Donna C. Dick, Constance L. Tjoumas, Gregory L. Coverstone, Cynthia
Ann Pappas, Ellen LLC, LCR LLC, MDC Three LLC, Susan Sanders LLC,
Liberty Hill LLC, Thomas A. Dick, Timothy J. Dick, and Michael E. Dick
respectively. The parcels are identified as 64 -A -82, 83, 83A, 86, 87, and 87A.
The subject acreage is located on the south side of Millwood Pike (Route
50/17) across from The Ravens and Miller Heights subdivisions, and adjacent
to the JIC Industrial Park, Winchester Regional Airport, and the U.S. Army
Corps of Engineers Transatlantic Division Headquarters facility.
The site is currently zoned RA, and includes the existing Carper's Valley Golf
Club. This application proposes the rezoning of the 281.5 acre assemblage
to the R4 (Residential Planned Community) District.
The site is intended as a mixed use residential and employment center
anchored by roughly 100 acres initially reserved for the development of
federal government facilities. These significant employment uses will be
complemented by moderate to high density residential uses, all of which will
be developed in a functionally and aesthetically unified manner. Attainment
of such an integrated development program will occur through the application
of uniform design guidelines and the implementation of a multi -modal
transportation network, both of which will be proffered by the Applicants (see
the attached draft Proffer Statement).
The proposed rezoning will establish a neighborhood unique to Frederick
County, because of its explicit provision for a balanced mix of mutually
supportive uses in an area already served by public facilities and a good road
system. The presence of significant employment uses within the project will
catalyze a synergistic relationship between land uses that will enhance the
economic vitality of the area and achieve a more sustainable form of
development than has been the historic pattern in that area.
The Comprehensive Policy Plan identifies the planned use of the site as a mix
of business /office and transitional land uses. The mixed use employment
center concept proposed with this rezoning is consistent with this land use
vision, and provides for its realization in an efficient and dynamic manner that
Page 1 of 14 Rev. 6/24/05
Carpers Valley
Impact Analysis Statement
is preferable to the single use pattern that has predominated within the Urban
Development Area (UDA).
The Applicants believe that the proposed rezoning includes proffers that will
appropriately and effectively mitigate the impacts of this development
program and assure its completion in the manner envisioned by the
Applicants and by the County. The mixed use employment center land use
envisioned for the site is compatible with the surrounding community and
consistent with the land use policies of the Comprehensive Policy Plan. As
such, the Applicants submit that this rezoning request merits favorable
consideration and approval.
B. Comprehensive Policy Plan
The properties included with this rezoning request are all located within the
boundaries of the Route 50 East Corridor Land Use Plan. The properties are
located wholly within the Urban Development Area (UDA), and the Sewer and
Water Service Area (SWSA). The Route 50 East Corridor Land Use Plan
envisions the area comprised by the subject parcels as developing with
business /office and transitional land uses. The properties are also located
within the boundaries of the Airport Support Area, which is intended to ensure
the long term viability of Winchester Regional Airport by encouraging the
development of compatible land uses in areas impacted by airport operations.
The proposed development program provides for a mix of employment,
general commercial, and moderate to high density residential land uses,
which will be developed in an integrated "walkable" setting. The majority of
the project acreage will be reserved for employment and commercial land
uses, with the remainder of the site planned for residential development.
The proposed development of employment and commercial land uses is
clearly in keeping with the applicable business /office land use designation.
Such uses are planned at several locations within the project, although the
most notable location is an approximately 100 -acre area adjacent to the
existing Corp of Engineers facility The Applicants propose to make this
portion of the property available for a sufficient time that they may include
such federal government facilities as the United States General Services
Administration (GSA) is actively seeking to locate in the Winchester- Frederick
County area. Additional acreage is reserved for commercial uses adjacent to
the shared boundary with Winchester Regional Airport. The proposed
employment use and commercial areas will thus ensure the establishment of
compatible, and complementary, land uses adjacent to the Airport thereby
satisfying the objectives of the Airport Support Area. Residential uses will be
Page 2 of 14 Rev. 6/24/05
Carpers Valley
Impact Analysis Statement
appropriately buffered from the Airport so as to avoid the all- too common
conflicts between Airport operations and nearby homes.
Residential uses are proposed to extend north and east from the planned
employment and commercial areas to the project boundary formed by
Millwood Pike (U.S. Route 50/17). The residential component of the
neighborhood will total no more than 750 market rate units of varying types
consistent with the R4 zoning district, as well as at least 35 units of much
needed affordable workforce housing. The planned residential uses will serve
as a distinct transition from the intensity of employment uses and airport
operations to the lower density suburban residential uses located on the
opposite side of Millwood Pike. The Route 50 East Corridor Land Use Plan
does not expressly identify either the intended composition or boundaries of
the designated transitional area, and the moderate to high density residential
uses proposed with this application will facilitate a reasonable transition of
uses along the corridor, and further provide the neighborhood with the land
use mix necessary to promote around the clock vitality.
The Applicants have proffered to reserve 10 acres for dedication to Frederick
County for use as a National Guard Armory facility. The provision of this land
will facilitate the retention of this important public facility in the Winchester
Frederick County area, particularly in view of Congressman Wolf's recent
success in obtaining substantial funding for a new facility. Upon its ultimate
relocation to the site, the Armory would provide a valuable neighborhood
amenity as a gathering and recreational space for residents and employees
alike, as well as an improved facility for an element of America's national
defense system that has taken on exceptional importance in the past decade.
The recreational needs of neighborhood residents will be further served by a
network of "hiker /biker" trails and other community recreation facilities, to
include a neighborhood swimming pool, tennis courts, and dog park.
The applicable land use policies of the Comprehensive Policy Plan promote
the establishment of business /office and transitional land uses on the subject
parcels. The proposed rezoning of the site to the R4 district is intended to
permit the development of a mixed use employment center, which will include
substantial areas for business and employment uses as well as
complementary residential uses. Such complementary uses will provide an
effective transition to established uses in the surrounding community.
Moreover, the configuration of land uses on the site will ensure compatibility
of the project with airport operations in keeping with the objectives of the
Airport Support Area.
Page 3 of 14 Rev. 6/24/05
Capers Valley
The proposed rezoning of the subject acreage from RA (Rural Areas), to R4
(Residential Planned Community) is consistent with the land use policies of
the Comprehensive Policy Plan.
C. Suitability of the Site
1. Site Background and History
Impact Analysis Statement
The original Frederick County zoning map (U.S.G.S. Winchester Quadrangle)
identifies the subject parcels as being zoned R -1 (Residential Limited). The
parcels were re- mapped from R -1 to A -2 (Agricultural General) pursuant to
the County's comprehensive downzoning initiative (Zoning Amendment
Petition #011 -80), which was adopted on October 8, 1980. The County's
agricultural zoning districts were subsequently combined to form the RA
(Rural Areas) District upon adoption of an amendment to the Frederick
County Zoning Ordinance on May 10, 1989. The corresponding revision of
the zoning map resulted in the re- mapping of the subject property and all
other A -1 and A -2 zoned land to the RA District.
2. Location and Access
The subject parcels are located on the south side of Millwood Pike (Route
50/17 East) across from The Ravens and Miller Heights subdivisions and
adjacent to the Prince Frederick Office Park and the Winchester Regional
Airport. The VDOT functional classification system identifies Millwood Pike as
a major arterial roadway. The land uses abutting the subject site to the east
and west are industrial and office, respectively, with the Winchester Regional
Airport adjacent to the south and single family residential uses located across
Millwood Pike to the north. The site is currently accessible via Millwood Pike
and Prince Frederick Drive.
3. Site Suitability
The subject parcels contain identified environmental features to include areas
of flood plain, wetlands, and steep slopes. But such features are minimal and
manageable through the zoning and site engineering process. In all cases,
disturbance will be limited in accordance with applicable regulatory standards.
Flood Plain
Flood plain data for the subject parcels is delineated on the Flood Insurance
Study Map for Frederick County prepared by the U.S. Department of Housing
and Urban Development, Community Panel #510063- 0115B, effective date
July 17, 1978. The majority of the site is located in Flood Zone C, which
denotes areas of minimal flooding outside of the 100 -year flood plain. Flood
Page 4 of 14 Rev. 6/24/05
Cmpers Valley
Impact Analysis Statement
Zone A, 100 -year flood plain, exists coincident with Sulfur Spring Run, which
traverses the frontage of the site, roughly parallel to Route 50. This portion of
the site is not planned for development except for road and utility crossings
thereby ensuring limited impact to the identified flood plain area.
Wetlands
The National Wetlands Inventory Map identifies four wetland features on the
site, all of which are man -made ponds associated with the existing golf course
use.
Soils and Steep Slopes
The General Soil Map of the Soil Survey of Frederick County, Virginia
indicates that the soils comprising the subject parcels fall under the Weikert-
Berks-Blairton soil association, which is the predominant association on land
located east of Interstate 81. As per map sheet #36 of the Soil Survey, the
site is comprised of nine distinct soil types. With the exception of a pit area
containing fill materials, all of the soil types identified on the site are suitable
for development. It is noted that the Weikert- Berks Blairton soil association
presents some limitations to site development due to a seasonal high water
table, depth to bedrock, and slope. These characteristics and any
implications for site development are manageable through the site
engineering process.
Steep slopes (areas of 50% slope or greater) exist along the frontage of the
site and adjacent to two ravines that drain the site to Sulphur Spring Run.
Some disturbance of these areas will be necessary to implement proffered
transportation improvements, as well as to implement the planned stormwater
management system. Pursuant to the Zoning Ordinance, any such
disturbance or re- grading shall be limited to no more than 25% of the area
comprised of steep slopes. The location and scope of the steep slopes
identified on the site do not compromise the suitability of the site for
development.
D. Transportation
The Carpers Valley project will be served by a multi -modal transportation
network designed to safely and efficiently accommodate automobile, bicycle
and pedestrian traffic. The transportation improvement program proffered
with this application will interconnect the various uses planned within the
project, and further integrate the project with the surrounding community. The
implementation of this program will occur in phases structured to coincide
Page 5 of 14 Rev. 6/24/05
Carpers Valley
Impact Analysis Statement
with the introduction of land uses on the site, as specified by the Proffer
Statement (see attached).
A traffic impact analysis (TIA) was prepared for this application using
composite data collected from other studies in the area, as well as actual
traffic counts. Using trip generation figures from the I.T.E. Trip Generation
Manual, 7th Edition, the TIA projects that the proposed development will
produce 12,917 vehicle trips per day (VPD). The TIA further indicates that
study area roads and intersections have the capacity to accommodate the
trips generated by this project at acceptable and manageable level of service
conditions.
The external road system serving the site is comprised of Millwood Pike
(Route 50/17 East) and Prince Frederick Drive (Route 781). Millwood Pike is
a four lane major arterial roadway and Prince Frederick Drive is a two lane
minor collector road. The TIA indicates that signalization will be required at
the intersection of Costello Drive and Prince Frederick Drive at project build
out. Moreover, signalization will be necessary at the intersection of Victory
Road and Millwood Pike, which will be required with or without the
introduction of project generated traffic into the corridor. The Applicants have
addressed these external system requirements by proffering to participate in
funding these signal improvements.
The internal transportation improvement program proffered by the Applicants
will effectively tie the project into the existing external system and provide the
framework for internal access and mobility. A major collector road
(Coverstone Drive) is proposed to extend through the site from Millwood Pike
to Prince Frederick Drive. This collector road will consist of four travel lanes
within an 80 -foot right of way and will be developed in two principal phases
corresponding with development of the planned land bays. Moreover, this
application provides for the future extension of the collector road to relocated
US Route 522, which will provide a direct means of access to this arterial
roadway from the County's planned public safety building.
Direct project access from Millwood Pike will be limited to an entrance aligned
with Sulphur Spring Road (Route 655). This entrance will provide principal
access to Land Bay 1, which is planned to contain residential uses consisting
of mixed housing types, and will further serve as a secondary access point for
employment related traffic destined for Land Bay 2. The intersection of
Sulphur Spring Road and Millwood Pike is currently controlled by a three -way
traffic signal. This signal will be upgraded by the Applicants to a four -way
signal upon construction of the entrance.
Page 6 of 14 Rev. 6/24/05
Carpers Valley
E. Sewage Conveyance and Water Supply
The existing golf course is served by an 8" sewer line that ties into the 12"
sewer main located on the south side of Millwood Pike along the frontage of
the site. This infrastructure will be expanded pursuant to Frederick County
Sanitation Authority (FCSA) requirements to serve the entire site and enable
gravity flow to the existing main. The Abrams Creek interceptor will convey
effluent from the project for treatment at the Opequon Water Reclamation
Facility.
A 12" water main currently extends through the central portion of the site.
The proposed development would connect directly to this existing line
pursuant to FCSA requirements. Sufficient water capacity exists to serve the
domestic and fire protection demands of the project.
Project build -out will consist of a maximum of 750 market rate dwelling units
and approximately 950,000 square feet of office and /or general commercial
uses. Using the standard water consumption rates for single family
attached /multi family residential uses and general commercial /office uses',
the proposed development is projected to consume approximately 302,500
GPD (gallons per day) of water and produce equivalent sewer flows.
F. Site Drainage
Impact Analysis Statement
The site naturally drains north to Sulphur Spring Run via several pronounced
drainage divides. It is anticipated that low impact development techniques
together with good erosion control practice will mitigate adverse stormwater
discharge impacts. The preservation of riparian buffers containing existing
vegetation will provide significant mitigation of nutrient losses. Actual
specification of temporary and permanent facilities will be provided with final
engineering and will comply with all County, State and Federal regulations.
G. Solid Waste Disposal Facilities
Solid waste from the project will be deposited in the Frederick County landfill
following collection via private carrier(s) contracted by the homeowner's
association (HOA) for the residential portion of the project and by the
individual commercial /employment users.
H. Historic Sites and Structures
1 Water consumption/sewage generation rates: single family attached/multi- family residential uses
150 GPD /dwelling unit; office /general commercial uses 200 GPD /1,000 square feet of gross floor
area.
Page 7 of 14 Rev. 6/24/05
Carpers Valley
TOTAL: $2,637 per unit
The Frederick County Rural Landmarks Survey includes one structure located
on the site, which is identified as the Heishland House 34- 1176). However,
this structure is neither included on the list of potentially significant resources
nor is it identified as eligible for eventual inclusion on the state or national
register of historic places. Moreover, pursuant to the National Park Service
Study of Civil War Sites in the Shenandoah Valley of Virginia, the subject site
is not included in any battlefield study area and does not contain any core
battlefield resources.
Impact on Community Facilities
The Frederick County Fiscal Impact Model was run by planning staff to
project the fiscal impact on community facilities attributable to the proposed
rezoning. The output module generated by this analysis indicated that the
proposed land uses would result in a net positive fiscal impact at project build
out. Nevertheless, the Applicants have proffered to provide a per unit
monetary contribution to ensure that the unique impacts to particular public
facilities are appropriately addressed. Specifically, the Applicants have
proffered to contribute $2,637 per market rate unit at the time of building
permit issuance. The total contribution is proffered to be allocated as follows:
Fire and Rescue: $422.00 per unit
Public Schools: $1,714.00 per unit
Recreation Parks: $343.00 per unit
Library: $79.00 per unit
Administration: $79.00 per unit
Impact Analysis Statement
An escalator clause is included with the proffer statement to mitigate the
effects of inflation on the value of the proffered monetary contributions. This
provision stipulates that any monetary contributions proffered by the applicant
that are paid after 30 months from the date of rezoning approval will be
adjusted pursuant to the Urban Consumer Price Index (CPI -U).
J. Modifications
Per Section 165 -72.0. of the Frederick County Zoning Ordinance, an
applicant for R4 zoning may request modifications to provisions of the Code
of Frederick County governing physical development. Such modifications
may be sought to enable implementation of a design and /or land use concept
beneficial to the community that would not otherwise be permitted by existing
ordinances. The following modifications are requested with this rezoning
application:
Page 8 of 14 Rev. 6/24/05
Carpers Valley
Impact Analysis Statement
1. Modification of Section 165 -68 of the Frederick County Zoning Ordinance
governing the procedure for R4 rezoning petitions.
Current Standard:
Proposed Standard:
A master development plan (MDP), meeting all
requirements of Article XVIII of the Zoning
Ordinance, shall be submitted with an application
for R4 zoning. The master development plan
review procedures described by Article XVII must
also be completed concurrently with or following
the consideration of the rezoning.
A generalized development plan (GDP) identifying
major land bays and the proffered transportation
network shall be submitted with the rezoning
application in lieu of a master development plan
(MDP). A complete MDP application will be
submitted to Frederick County for review following
rezoning approval, pursuant to the criteria of
Article XVIII of the Zoning Ordinance.
Justification: The R4 District requirements stipulate that a complete
Master Development Plan (MDP) shall be submitted with an application for
R4 zoning. The MDP is a plan document that is used to evaluate
conformance with ordinance and other technical requirements applicable
to land development, and has historically served as a bridge between the
conceptual nature of a rezoning application and the more precise
documents required for subdivision and site plan approvals. As such, it
serves a valuable role in applying engineering detail to the generalized
land use and infrastructure framework established through the proffer
statement of an approved rezoning. This two part process ensures that
the rezoning evaluation is focused on policy conformance and impact
mitigation, and not overwhelmed by the technical minutiae associated with
the MDP.
The proffering of a detailed MDP "locks" an applicant into a development
plan that cannot be changed without filing a subsequent rezoning petition
for amendment of the approved proffers, regardless of the purpose or
scope of the necessary change. Alterations to the routes of internal
streets, stormwater management facilities, and layout of uses within land
bays would require approval of the Board of Supervisors through the
rezoning process, whereas a project subject to a typical "non- proffered"
MDP may often complete such modifications through an administrative
process. Such changes are almost certain to be necessary for a given
Page 9 of 14 Rev. 6/24/05
Carpers Valley
Current Standard:
Proposed Standard:
Impact Analysis Statement
project to respond to evolving regulatory and market conditions over the
course of the development cycle.
The plan proposed with this application represents a dynamic concept that
will require flexibility in all phases of the development process to
successfully implement. The Applicants are committed to developing a
project that is both innovative and viable, and thus recognize that the
design process cannot end at the time of rezoning, but must continue as
an ongoing exercise open to emergent information and ideas. A proffered
generalized development plan (GDP) will provide appropriate assurances
to the community regarding the fundamental physical components of the
proposed development while ensuring sufficient flexibility for the
Applicants to achieve superior project design.
The requested modification would allow submission of a proffered
Generalized Development Plan (GDP) at the time of rezoning in lieu of the
complete MDP. The GDP will identify the relationship of the project site
and the proposed development to the surrounding transportation network
and adjoining land uses. Moreover, the GDP will provide a general layout
for the proposed development, organizing the entire acreage into land
bays identified for either residential or employment/commercial land uses,
as well as the proffered transportation network. The GDP will further
delineate the approximate size of each and bay as well as the planned
housing types for residential land bays. The Applicants will submit an
MDP application for review subsequent to rezoning approval, at which
time greater detail concerning land bay development will be provided.
2. Modification to Section 165 -71 of the Frederick County Zoning Ordinance
governing the mixture of housing types required within a planned
community.
No more than 40% of residentially designated
areas of a planned community may develop with
any of the following housing types: duplexes,
multiplexes, atrium houses, weak -link townhouses,
townhouses or garden apartments or any
combination of those housing types.
The residentially designated areas of a mixed use
employment center may develop with any
combination of housing types permitted by the
Frederick County Zoning Ordinance and the
approved proffer statement without limitation to the
percentage or ratio of any given housing type.
Page 10 of 14 Rev. 6/24/05
Carpers Valley
Impact Analysis Statement
Justification: The proposed rezoning is sought to enable development of a
mixed use employment center, which is a type of planned community
development that is not expressly accommodated by the Zoning
Ordinance. The R4 district, however, is the only Frederick County zoning
category that is suitable for the development of a mix of land uses
pursuant to a single zoning category, where innovative design concepts
and standards may be created and applied. However, the R4 district is
oriented toward a predominantly residential development program (as
implied by its formal title Residential Planned Community) and its
requirements for a mixture of housing types as stated above befits a
project intended to develop with residential uses over a majority of its land
area.
In contrast, the land use program for a mixed use employment center
emphasizes reservation of greater amounts of land for commercial and
business uses, which results in less area available to locate the residential
density necessary to achieve a balanced mix of land uses within the
project. The ordinance requirement promotes a residential mix dominated
by single family detached housing types. Such housing types are less
conducive to the limited residential areas of a mixed use employment
center given the greater land area required for individual lots.
The development of single family attached and multi family dwellings as
the predominant housing types in Carpers Valley is necessary to
complement and catalyze the business and commercial uses on the site.
Moreover, the availability of such housing in a planned community setting
within walking distance of employment, shopping, and commercial uses
will provide a positive although presently non existent choice for current
and future County residents.
3. Modification of Section 165 -72.D. of the Frederick County Zoning
Ordinance governing the maximum areas permitted for commercial or
industrial uses.
Current Standard: No more than 50% of the gross area of the
planned community shall be used for commercial
and industrial purposes.
Proposed Standard: No more than 60% of the gross area of the
planned community shall be used for business and
commercial purposes.
Page I 1 of 14 Rev. 6/24/05
Capers Palley
Impact Analysis Statement
Justification: The proposed rezoning is sought to enable development of a
mixed use employment center, which is a type of planned community not
currently accommodated by the Frederick County Zoning Ordinance. The
R4 district is the only zoning category that is available to develop a mix of
land uses pursuant to a single zoning category wherein innovative design
standards may be applied. However, the R4 district is intended to
facilitate development of a principally residential project complemented by
relatively small areas of commercial and /or industrial uses. In contrast,
the land uses intended to predominate within a mixed use employment
center are business and commercial uses, with residentially designated
areas comprising a lesser amount of the total land area.
The mixed use employment center concept advanced through this
rezoning application requires the amount of land designated for
commercial and business uses to exceed the 50% limit of the R4 district.
The essential components of the proposed mixed use development
program are the employment and commercial uses planned for the site,
which may require significant acreage depending upon the ultimate users.
However, to ensure a mix of mutually supportive land uses, a minimum
amount of land needs to be reserved for residential uses. The modified
standard proposed with this application will facilitate development of a mix
of land uses in a planned community setting consistent with the intent of
the R4 district, but with the notable distinction of elevating business and
commercial land uses to the forefront of the planned development
program.
Page 12 of 14 Rev. 6/24/05
Capers Valley
Current Standard:
Proposed Standard:
Impact Analysis Statement
MDP may often complete such modifications through an administrative
process. Such changes are almost certain to be necessary for a given
project to respond to evolving regulatory and market conditions over the
course of the development cycle.
The plan proposed with this application represents a dynamic concept that
will require flexibility in all phases of the development process to
successfully implement. The Applicants are committed to developing a
project that is both innovative and viable, and thus recognize that the
design process cannot end at the time of rezoning, but must continue as
an ongoing exercise open to emergent information and ideas. A proffered
generalized development plan (GDP) will provide appropriate assurances
to the community regarding the fundamental physical components of the
proposed development while ensuring sufficient flexibility for the
Applicants to achieve superior project design.
The requested modification would allow submission of a proffered
Generalized Development Plan (GDP) at the time of rezoning in lieu of the
complete MDP. The GDP will identify the relationship of the project site
and the proposed development to the surrounding transportation network
and adjoining land uses. Moreover, the GDP will provide a general layout
for the proposed development, organizing the entire acreage into land
bays identified for either residential or employment/commercial land uses,
as well as the proffered transportation network. The GDP will further
delineate the approximate size of each land bay as well as the planned
housing types for residential land bays. The Applicants will submit an
MDP application for review subsequent to rezoning approval, at which
time greater detail concerning land bay development will be provided.
2. Modification to Section 165 -71 of the Frederick County Zoning Ordinance
governing the mixture of housing types required within a planned
community.
No more than 40% of residentially designated
areas of a planned community may develop with
any of the following housing types: duplexes,
multiplexes, atrium houses, weak -link townhouses,
townhouses or garden apartments or any
combination of those housing types.
The residentially designated areas of a mixed use
employment center may develop with any
combination of housing types permitted by the
Frederick County Zoning Ordinance and the
Page 10 of 14 Rev. 6/24/05
Carpers Valley
Impact Analysis Statement
approved proffer statement without limitation to the
percentage or ratio of any given housing type.
Justification: The proposed rezoning is sought to enable development of a
mixed use employment center, which is a type of planned community
development that is not expressly accommodated by the Zoning
Ordinance. The R4 district, however, is the only Frederick County zoning
category that is suitable for the development of a mix of land uses
pursuant to a single zoning category, where innovative design concepts
and standards may be created and applied. However, the R4 district is
oriented toward a predominantly residential development program (as
implied by its formal title Residential Planned Community) and its
requirements for a mixture of housing types as stated above befits a
project intended to develop with residential uses over a majority of its land
area.
In contrast, the land use program for a mixed use employment center
emphasizes reservation of greater amounts of land for commercial and
business uses, which results in less area available to locate the residential
density necessary to achieve a balanced mix of land uses within the
project. The ordinance requirement promotes a residential mix dominated
by single family detached housing types. Such housing types are less
conducive to the limited residential areas of a mixed use employment
center given the greater land area required for individual lots.
The development of single family attached and multi family dwellings as
the predominant housing types in Carpers Valley is necessary to
complement and catalyze the business and commercial uses on the site.
Moreover, the availability of such housing in a planned community setting
within walking distance of employment, shopping, and commercial uses
will provide a positive although presently non existent choice for current
and future County residents.
3. Modification of Section 165 -72.D. of the Frederick County Zoning
Ordinance governing the maximum areas permitted for commercial or
industrial uses.
Current Standard: No more than 50% of the gross area of the
planned community shall be used for commercial
and industrial purposes.
Proposed Standard: No more than 60% of the gross area of the
planned community shall be used for business and
commercial purposes.
Page 11 of 14 Rev. 6/24/05
Capers Valley
Impact Analysis Statement
Justification: The proposed rezoning is sought to enable development of a
mixed use employment center, which is a type of planned community not
currently accommodated by the Frederick County Zoning Ordinance. The
R4 district is the only zoning category that is available to develop a mix of
land uses pursuant to a single zoning category wherein innovative design
standards may be applied. However, the R4 district is intended to
facilitate development of a principally residential project complemented by
relatively small areas of commercial and /or industrial uses. In contrast,
the land uses intended to predominate within a mixed use employment
center are business and commercial uses, with residentially designated
areas comprising a lesser amount of the total land area.
The mixed use employment center concept advanced through this
rezoning application requires the amount of land designated for
commercial and business uses to exceed the 50% limit of the R4 district.
The essential components of the proposed mixed use development
program are the employment and commercial uses planned for the site,
which may require significant acreage depending upon the ultimate users.
However, to ensure a mix of mutually supportive land uses, a minimum
amount of land needs to be reserved for residential uses. The modified
standard proposed with this application will facilitate development of a mix
of land uses in a planned community setting consistent with the intent of
the R4 district, but with the notable distinction of elevating business and
commercial land uses to the forefront of the planned development
program.
Page 12 of 14 Rev. 6/24/05