HomeMy WebLinkAbout07-05 Impact AnalysisWhereas on 04/28/2005 the Frederick County Board of Supervisors approved the
Sempeles rezoning of 101.92 acres from RA (Rural Areas) to M -1 (Industrial Light)
District and whereas said rezoning was based on a Transportation Impact Analysis by
P.H.R.A. dated 02/16/2002 and 05/09/03, which indicates a transportation impact for the
101.92 M -1 acres of 6693 Average Daily Trips, 2012 build out, for large trucks, and
whereas the Sempeles hereby agree to limit the ADT for large trucks to 4678 ADT,
subject to the rezoning of the Manning Property to B -3 (Industrial Transition). (RZ# 07-
05), and whereas the Sempeles have already proffered to provide a traffic impact analysis
(TIA) with each site plan for an industrial use on the site, said TIA to govern this
covenant, now, therefore, in consideration of $10.00 and other valuable consideration, the
receipt and sufficiency of which is hereby acknowledged, we the undersigned owners of
Parcels 34 -A -2, 34 -A -4, agree to reduce the transportation impact of large trucks, for the
101.92 acres zoned M -1, from the current 6693 ADT for large trucks to a revised
maximum of 4678 ADT for large trucks. Said ADT reduction is contingent on the
rezoning of the Manning Property to B -3 (Industrial Transition), RZ #07 -05.
r
Transportation Impact Covenants, Sempeles Property
Parcel Identification Number 34 -A -2, 34 -A -4
Stonewall Magisterial District
Carol T. Sempeles
Date: (s or
STATE OF VIRGINIA
County of Frederick, to -wit:
I, Amy E. Roach, a Notary Public in and for the State and
jurisdiction aforesaid, do hereby certify that George M. Sempeles and
Carol T. Sempeles whose names are signed to the foregoing Transportation
Impact Covenants, dated this 15 day of June, 2005 have personally
appeared before me and acknowledged the same in my State and
jurisdiction aforesaid.
Given under my hand this 15th day of June, 2005
My Commission expires: 07/31/08
Notar'f Public
OUTPUT,ULE
APPLICANT: Arogas Net Fiscal Impact
LAND USE TYPE B3 Duck Stop Costs of Impact Credit` Credits to be Taken for Future Taxes Paid (NPV) Total Potential Adjustment For
REAL EST VAL
FIRE el RESCUE 51.400.324 Required (entered in Ctu. Budget Cur, Budget Cap, Future CIP/ Tax Credits Revenue- Net Capital Net Cost Per
1 Capital Faciltiies col sum only) Oper Cap Equip Expend /Debt S. Taxes Other JUnadiusted) Cost Balance Facilities Impact Dwelling Unit
Fire and Rescue Department 53,032
Elementary Schools Sp $0 50 $3,032 #DIV /0!
Middle Schools Sp
High Schools 50
50 50 $0 50 50 #DIV /0!
Parks and Recreation SO
50 50
$0 $0 #DIV /0!
Public Library 50
Sheriff's Offices SO $436 50 50 50 50 #DIV /0!
Administration Building SO 50 50 S4 50 50 #D /0!
50 #DIV /0!
Other Miscellaneous Facilities 50 $1,046 $1,155 $2,201 52,201 50 #DIV /0!
SUBTOTAL 53,032 51,482 51,155 50 52,637 $2,637 $395 #DIV /0!
LESS: NET FISCAL IMPACT 5451,143 5451,143 $451,143
NET CAP. FACILITIES IMPACT 1$451,143) #DIVIO!
METHODOLOGY: 1. Capital facilities requirements are input to the first column as calculated in the model.
2. Net Fiscal Impact NPV from operations calculations is input in row total of second column
(zero if negative); included are the one -time taxes /fees for one year only at full value.
3. NPV of future oper cap equip taxes paid in third column as calculated in fiscal impacts.
4. NPV of future capital expenditure taxes paid in fourth col as calculated in fiscal impacts.
5. NPV of future taxes paid to bring current county up to standard for new facilities, as
calculated for each new facility.
6. Columns three through five are added as potential credits against the calculated capital
facilities requirements. These are adjusted for percent of costs covered by the revenues
from the project (actual, or as ratio to avg. for all residentiat development).
NO FE. PI offer calculations do not include include interest because they are cash payments up front. Credits do include interest if the projects are debt financed.
NOTES: Model Run Date 11/15/04 MTR
INDEX: "1.0" If Cap, Equip Included
INDEX: "1,0" if Rev -Cost Bal, "0.0" if Ratio to Co Avg
PLANNING DEPT PREFERENCE;
1.0
Project Description: Assumes 8,400 square foot Service Station on 12.178 acres zoned B3 District,
Due M cn anging conditions associated with development in the County, the results of this
Output Module may not be valid beyond a period of 90 days from the model run date.
0.0 Rev -Cost Bat
1.0 1.0 Ratio to Co Avg
1.000
1.342
501 #DIV /0!
Manning Property
A. Location and Site Background
Impact Analysis Statement 06 May 2005
The following Impact Analysis Statement is provided in summary form for the property
known as the "Manning Property The property is located in the Stonewall Magisterial
District. The property is located along US Route 11, Martinsburg Pike with 1 -81
frontage, approximately 350 feet south of the intersection of US Route 11 and Virginia
Secondary Route 669. The property has approximately 1380 feet of frontage on US
Route 11. The property is located between US Route 11 and Interstate 81 with
approximately 1440 feet along the interstate. The parcels to be rezoned total 12.178+/
acres. Approximately 9.442 acres of the property is currently zoned General Industry
(M -2). Approximately 2.736 acres of the property is currently zoned Rural Areas
(RA).
The requested rezoning is to change the current 12.178 acres from General Industry
(M -2) and Rural Areas (RA) to industrial Transitional (B -3) and Interstate Overlay (IA).
In addition to the B -3 use, the IA zoning is requested to allow an interstate road sign on
the site.
There are no residential units proposed as part of this rezoning. Four residential
structures will be removed and incorporated into the project. A site development plan for
the proposed use has been prepared in accord with all local and state regulations.
The portion of the property proposed for rezoning is located outside of the Urban
Development Area (UDA), but inside the Sewer and Water Service Area (SWSA).
Analysis of environmental and physical characteristics of this property to be
rezoned indicates that there is opportunity for development as envisioned for the B-
3 use. There are no environmental features that limit the development.
Sewer and water service will be provided by the Frederick County Sanitation
Authority. All appropriate utilities are available to the site for the proposed zoning
and use.
The rezoning of the 12.178 acres of the property fits within the guidelines of
present planned policy for the area. In summary:
The Northeast Land Use Plan identifies this property as being planned for
a business development use, and envisions "commercial land uses which
cater to the interstate traveler."
The property is located along an important transportation corridor.
The proposed use results in a decrease in traffic impact compared to a by-
right traffic impact under the current M -2 zoning. The proposed
rezoning /use also is accompanied with proffers for infrastructure
improvements to US Route 11 between Woodbine Rd. and Rest Church
Rd.
Manning Property
Impact Analysis Statement 06 May 2005
Detailed traffic studies have been conducted as part of the site development
process for County and VDOT reviews.
The property is located within an interstate interchange area.
Environmental limitations are identified allowing for the commercial
development as envisioned.
Fiscal impacts are recognized and remain very positive for the proposed
change of zoning.
Comprehensive Plan, Northeast Frederick Land Use Plan
The single most important consideration in the proposed downzoning is the Frederick
County Northeast Land Use Plan (NELUP).
Chapter 165 from the Zoning Code states in the very first paragraph under Intent,
purpose; "it is intended that this chapter provide one means to achieve the goals set forth
in the Frederick County Comprehensive Plan."
The Northeast Land Use Plan is the culmination of "two visioning meetings in January
2000 at the Stonewall Elementary School, votes on identified issues by participants and
comments associated with a prepared questionnaire. The Comprehensive Plans and
Programs Sub Committee (CPPS) utilized this information to establish objectives for the
Northeast Frederick Land Use Plan." Through the years there have been multiple public
discussions and hearings on the Northeast Land Use Plan; Planning Commission
approval, Board of Supervisor approval, Planning Staff recommendation and much input
from land use law experts and citizens.
In late 2003, Frederick County again amended the Northeast Land Use Plan to
accommodate the Sempeles Rezoning consisting of 112.27 acres located east and
adjacent to Martinsburg Pike (Route 11 North) and north and adjacent to Woodbine Road
(Route 669). This amendment was approved in order to "Relocate a Planned Major
Collector Road (Woodbine) and to propose Business Land Use" (in lieu of M -1 use).
The present RA and M -2 zoning of the 12.178 -acre site conflicts with the policies of the
adopted Northeast Land Use Plan:
1. "Proposed industrial land uses should be developed within master planned
areas which discourage individual lot access on the Martinsburg Pike (Rt. 11
North) corridor. "Adjacent to railroads."
2. "Proposed industrial, commercial development should only occur if
impacted road systems function at a Level of Service (LOS) Category C or
better." Current by -right traffic impact for the 9.442 M -2 acres exceeds the
proposed impact for the rezoned project. A LOS of C cannot be achieved
Manning Property
Impact Analysis Statement 06 May 2005
under the current M -2 zoning, given the by -right traffic impact and the by-
right access for some uses, without Rt. 11 infrastructure improvements.
This proposed B -3 rezoning and use is in hamiony with the Frederick County Northeast
Land Use Plan and its adopted policies governing land use and zoning issues.
1. Policies
"Ensure that public water and sewer development proposals"
"Ensure that adequate LOS for all road systems are maintained or are
achieved as a result of future development proposals"
"Provide for interstate business development opportunities on the eastern
sides of Interstate 81 interchanges."
"Concentrate business uses at strategic locations along the Rt. 11 North
Corridor."
"Discourage random industrial land uses along Rt. 11 that are
incompatible with adjacent existing land uses."
2. Transportation
"Identify appropriate locations for signalized intersections to maintain or
improve LOS" (Woodbine Road, VA Sec Rt. 669)
"Encourage the expansion of Rt. 11 to a four -lane roadway"
"Minimizing new driveways and intersections with Rt. 11 North"
The Northeast Land Use Plan is site specific, and use specific:
"Business and Commercial land uses are proposed along the Martinsburg
Pike corridor east side of I -81, Exit 323,
"It is envisioned that commercial land uses which cater to the interstate
traveler will be developed along the I -81 interchange area."
"The development of business and commercial land uses is encouraged at
designated signalized road intersection." (Rest Church, Woodbine)
Manning Property
B. Site Suitability
The site is well suited for development. According to the 2000 Frederick County
Comprehensive Policy Plan, the property is within the Interstate Interchange Area. The
revised Northeast Land Use Plan (adopted August 12, 2003) labels this property as being
planned for a business use. The proximity of the property to US Route 11 and Interstate
81 makes it a highly desirable site for B -3 /IA zoning.
100 Year Flood Plain
A portion of the parcel is within the designated areas of the 100 -year flood. This area is
located along Duncan Run, which forms the southern property line. No buildings or
pavement are planned within the flood area. A portion of the stormwater retention pond
will be within the flood area.
Wetlands
Wetlands have been identified on the site. There will be no disturbance of wetlands.
Steep Slopes
The property generally slopes to the south and east. The land is situated between two
major highways and is gently sloping toward US Route 11 and Duncan Run. Slopes are
less than 15
Mature Woodlands
The site contains no mature woodlands.
Soils
There are no critical soil areas on the site
Impact Analysis Statement 06 May 2005
Comprehensive Planning
The property is located with frontage along 1 -81, near an existing interchange, is
compatible with IA zoning policies and procedures and is within the Frederick County
Sanitation Authority's Sewer and Water Service Area.
The planned rezoning is compatible with all Frederick County comprehensive planning
and land use designations and policies. The Frederick County Northeast Land Use Plan
has designated this area for future business development. The planned use of this
property is also consistent with Comprehensive Planning guidelines regarding ideal
interchange development patterns along I -81.
Note: The current RA and M -2 zoning of the property is in conflict with the
Frederick County Northeast Land Use Plan. A heavy industry zoning district
is not envisioned and made part of the Northeast Land Use Plan. B -3 zoning,
as proposed, brings this property into conformance with the currently
adopted Northeast Land Use Plan and envisioned land use.
c
oc a O
as 2 s
v
2
MINE
ED
a)
0
I0
0
0
o N
V Fri!- T
N
0
0
‘Iirrirginia/West r ginia Line
Current Zoning
of
Interchange 323
Whitehall
0 0.050.1
Zoning
B2 IRA
B3 I IM1
EM I 1 M2
Key Features
Interstate 81 Duncan Run
US Route 11 VA/WV Line
0t•='•= SWSA Line
Woodbine Road (Sec. Rt. 669)
Rest Church Rd. (Sec. Rt. 669)
Triad Engineering, Inc.
www.triad winc.com
1:10,000
ors
SCALE
0.2 0.3
0.4
^%bv, M riv 3 tx i R t e4Ly yS
Miles
1 1000 DATE:I0AUG04
Virginia/West Virginia Line
Current Land Use
of
Interchange 323
Whitehall
Land Use
0 0.050.1
Commercial
Industrial
Residential
Vacant
Key Features
Interstate 81
US Route 11
a. SWSA Line
Woodbine Road (Sec. Rt. 669)
--a Rest Church Rd. (Sec. Rt. 669)
Triad Engineering, Inc.
www.triad winc.com
Duncan Run
VA/WV Line
SCALE
0.2 0.3
0.4
1:10,000
Miles
1" 1000'
DATE: 10AUGO4
4.
O
g 4 %i
g 44
4 4 4
41 44
u SO
4 4
.4
e
Future Zoning
and
Land Use
Zoning
B2
B3
RA
0 0.05 0.1
Key Features
Interstate 81 Duncan Run
US Route 11 VANW Line
SWSA Line
Woodbine Road (Sec. Rt. 669)
Rest Church Rd. (Sec. Rt. 669)
Triad Engineering, Inc.
www.triad winc.com
1:10,000
M1
M2
EM
SCALE
0.2
ICI
0.3
0.4
1 1000
Land Use.
Residential
Commercial
Industrial
Miles
DATE: 1OAUG2004
Current Zonsn of the MannNn Pro ert
noway
RA Zoning
M -2 Zoning
-M^- Duncan Run
US Route 11
Interstate 81
0 125 250
1:3,600
Scale
500
750
1,000
1
1" 300'
Feet
Triad Engineering, Inc.
www.triad winc.com
Proposed Zoning of the Manning Property
I
Duncan Run
q
1 B-3 Zoning
SITE
gf MEW
4 I 12.178 Acres as
with IA
Woodbine Road
VA Sec. Rt. 669
Rest Church Road
VA Sec. Rt. 669
St nt ft a n ilitirata
aft
Site -'s-- Duncan Run
US Route 11 Interstate 81
0 125 250
1:3,600
SCALE
500
750
1,000
1" 300'
Feet
Triad Engineering, Inc.
www.triad- winc.com
Manning Property
C. Surrounding Properties
Impact Analysis Statement 06 May 2005
The site to be rezoned is bordered on the north by the Exxon convenience store/service
station zoned RA. To the east of the site is US Route 11, Martinsburg Pike, with single
family residential homes located on the eastern side of US Route 11 across from a portion
of the site's frontage.
Also to the east is the Sempeles property, recently rezoned to include 100 acres of
Industrial (M -I) and 10 acres of Commercial (B -2). To the south of the site is vacant land
zoned RA which borders an auto body shop, recently rezoned to B -3. Along the western
side of the property is the northbound lane and exit ramp of Interstate 81. West of 1 -81 is
the Flying J, which was rezoned to B -3 circa 1996.
Manning Property
D. Traffic
Impact Analysis Statement 06 May 2005
According to the most recent Traffic Impact Analysis of the property prepared by Mr.
John Callow of PHR +A. dated July 20, 2004, the traffic impacts associated with the
property development and its projected build -out are acceptable and manageable. All
study area intersections maintain acceptable levels of service "C" or better for 2005
build -out conditions.
The planned truck entrance to the site will have its centerline aligned with the centerline
intersection of Woodbine Road (VA Sec. Route 669) and US Route II. The applicant
has proffered terms and conditions regarding the design of this commercial entrance and
its signalization.
The property will have 1380 feet of frontage on US Route 11 (Martinsburg Pike), for
access. US Route 11 links with Rest Church Road (VA Sec. Route 669), approximately
350 feet north of the site. US Route 11 is a three -lane road that has an 80 -foot right -of-
way. Rest Church Road is a four -lane road with an approximate 60 -foot right -of -way
width and taper; there is an additional right -of -way at 1 -81 and US Route 11. The
intersection of US Route 11 and Rest Church Road is signaled, with a dedicated turning
lane in both directions on US Route 11. Rest Church Road intersects with 1 -81 (Exit 323)
approximately 250 feet from US Route 11. The applicant has proffered terms and
conditions regarding the frontage along US Route 11.
A complete Traffic Impact Analysis has been prepared and reviewed with VDOT. A
copy is attached and made part of this application.
I N D I A N A R E A D Y M I X E D C O N C R E T E A S S O C I A T I O N
�E t
IlNDUSI'RIAL CONCRETE PARKING LoT PAVING
MR. FUEL #6
ORMCA
INDIANA READY MIXED
CONCRETE ASSOCIATION