Loading...
HomeMy WebLinkAboutRutherfordCrossingPg73US FOUNDRY COlIER 110CA11') 7--91 6" MICKxZ-0" SQUARFB)IGE-NERAL CON7RACTOR 118 BEND CLEANOUTDETAIL concrete pad V-6" dia. x 6" deep MMEMEM 0 ®m R nPop.mil 1-Inrk-fill 50�1��14 Valvco, Inc valve box assembly: lid: Figure No. 7 marked'WATER' top section: Figure No, 7S26TO bottom section: Figure No. 1BOB24 varies to property line finished grade X, \< 35 NY, U 4" stone 4" stone V roadway box 2" SCH 80 PVC screw type FIP cap 2" brass 2" service saddle nipple, 2" long 2" corp.stop 2" SCH 80 PVC FIP x FIP PJ coupling 48" female solvent weld coupling brick base 24" ... stone MIP/ PJ__ coup ling ...... 0 L —7 \1,7*7, _"., H 80 PVC 1--l- 2" SC ........... ....... 2" SCH PVC solvent 2" SCH 80 PVC MIP weld 900 bend with 211 CTS polyethylene 2" ball valve curb- x female solvent 1/8" weep hole tubing (PET) 200 psi stop wl 2" gate weld coupling w/ SS inserts at all valve operating nut connections FLUSHING / SAMPLING ASSEMBLY G:\20225---NVRetail\02—Rutherford Crossinq\ Presentation\ 202 25— 02 FCSA Details (73-­74),c1wg Oct 11, 2007 STANDARD 91 ....... .... .......... .. ....... - ...... ...... .......... ......... ......... . 8" . and painted yellow a) E icase in 3" diameter SCH4) /X� 24" select ewalk. ........... > back-fill tD s p; wire to be taped to top PET at 10 foot intervals; come up into meter box; wrap around bottom of angle ball valve; Ic rminate with '12" tail piece]. 8 811 CONFORMS TO THE UNIFORM STATEWIDE BUILDING CODE concrete - _77 61' N\/\ backfill encasem t 1 1/2" and 2" METER INSTALLATION . . ......... 61' 1/2 O.D. W Z Memo 6" 50�1��14 Valvco, Inc valve box assembly: lid: Figure No. 7 marked'WATER' top section: Figure No, 7S26TO bottom section: Figure No. 1BOB24 varies to property line finished grade X, \< 35 NY, U 4" stone 4" stone V roadway box 2" SCH 80 PVC screw type FIP cap 2" brass 2" service saddle nipple, 2" long 2" corp.stop 2" SCH 80 PVC FIP x FIP PJ coupling 48" female solvent weld coupling brick base 24" ... stone MIP/ PJ__ coup ling ...... 0 L —7 \1,7*7, _"., H 80 PVC 1--l- 2" SC ........... ....... 2" SCH PVC solvent 2" SCH 80 PVC MIP weld 900 bend with 211 CTS polyethylene 2" ball valve curb- x female solvent 1/8" weep hole tubing (PET) 200 psi stop wl 2" gate weld coupling w/ SS inserts at all valve operating nut connections FLUSHING / SAMPLING ASSEMBLY G:\20225---NVRetail\02—Rutherford Crossinq\ Presentation\ 202 25— 02 FCSA Details (73-­74),c1wg Oct 11, 2007 STANDARD 91 6" treated 211x 4" with top 6" painted blue — 1" coupling (PJ X FIP) and MIP plastic plug on 61 tail piece 2411-_ meter box finished and cover grade 36" ------sidewalk 361 meter by ..... . x, % 12 1811-2111 3611 Xy, -4 X, 38 4 811-10" 3" min. stone X surrounding \Z> Dox 1 CTS polyethylene �7 tubing (PET) 200 12" psi with SS inserts ........... ��45` at all connections V V.. . Opposite Side V ....... M, __m 8" min. saddle with -, C V. V ......... -.7777=—. 12 gauc e solid insulated . . .... copper Nire for line tracing, stone 6" taped a '10 foot intervals Same Side INSTALLATION NOTES: 1. Exact location of meter box assenbly to be approved prior to installation. general backfill and painted yellow a) E icase in 3" diameter SCH4) /X� st,eet, to one foot beyond sic ewalk. ........... > nd copper wire (for line tracing) from corp. stop to into the meter box [wrap wire around corp. "i tD s p; wire to be taped to top PET at 10 foot intervals; come up into meter box; wrap around bottom of angle ball valve; Ic rminate with '12" tail piece]. 8 811 CONFORMS TO THE UNIFORM STATEWIDE BUILDING CODE concrete - .......... 7 24" select V concrete 0 backfill encasem t 1 1/2" and 2" METER INSTALLATION X .8- 61' 1/2 O.D. W Z sw , F- W stone 6" D UJ CONCRETE ARCH ---aeneral backfill Z + Z 811 ..... ..... . ... ....... 24" select backfill 6" treated 211x 4" with top 6" painted blue — 1" coupling (PJ X FIP) and MIP plastic plug on 61 tail piece 2411-_ meter box finished and cover grade 36" ------sidewalk 361 meter by ..... . x, % 12 1811-2111 3611 Xy, -4 X, 38 4 811-10" 3" min. stone X surrounding \Z> Dox 1 CTS polyethylene �7 tubing (PET) 200 12" psi with SS inserts ........... ��45` at all connections V V.. . Opposite Side V ....... M, __m 8" min. saddle with -, C V. V ......... -.7777=—. 12 gauc e solid insulated . . .... copper Nire for line tracing, stone 6" taped a '10 foot intervals Same Side INSTALLATION NOTES: 1. Exact location of meter box assenbly to be approved prior to installation. 2. Watei service crossing street: and painted yellow a) E icase in 3" diameter SCH4) PVC or SDR21 pipe. The piping shall run from one fool: beyond sidewalk, across the st,eet, to one foot beyond sic ewalk. b) Ir stall 12 gauge solid insulat nd copper wire (for line tracing) from corp. stop to into the meter box [wrap wire around corp. "i tD s p; wire to be taped to top PET at 10 foot intervals; come up into meter box; wrap around bottom of angle ball valve; Ic rminate with '12" tail piece]. angle ball valve; terminate with 12" tail piece]. THIS WATER SE[II/ICE CONFORMS TO THE UNIFORM STATEWIDE BUILDING CODE 5/811 f 3/411,3/4" AND 1" METER INSTALLATION MAR 06 concrete pad 18" dia. x 6" deep----, finished grade 41' stone------./ m screw type 48" min. adjustable — concrete pad 18" concrete pad 18" dia. x 6" deep t j finished grade dia. x 6" deep 14" thru 36" imw trench width as required 0 i" dia. schedule 40 steel pipe filled with concrete - or our approved equal: 31 and painted yellow Cr F— b) in traffic area - model no, H1 R2424 finished 2. Water service crossing street shall be encased in . ...... grade all nr, to one foot beyond sidewalk. 3. Install 12 gauge solid insulated copper wire (for line tracing) from corp. stop to into the meter box [ wrap wire around corp. stop; wire to be taped to top of PET at '10 foot intervals; come up into meter box; wrap around bottom of 0 angle ball valve; terminate with 12" tail piece]. 18" dia. CUTOt T DETAIL concrete 0 THIS WATER SERVICE CONFORMSTO THE UNIFORM STATEWIDE BUILDING CODE encasem t 1 1/2" and 2" METER INSTALLATION X .8- tq Q 11111 T 1811 EM 48" min. 31 NOTE: Weep holes shall not be subject to being submerged. If installation is in an area having a high groundwater table, the Authority's engineer shall be contacted for hydrant relocation cast in place access 2" custom setter door, centered in (meter by FCSA) top (see note 1) - meter interface unit (see note 4) varies at property line ---2' max. — -- _standard flat top (see note 2) for 4 diameter manhole concrete pad 18" dia. x 6" deep finished grade 4 4" stone roadway box 4 2" CTS olyethylene 27" 3' riser section for 4' p -2911 diameter manhole tubing (PET) 200 psi 4d 12" with cutouts w/ SS inserts at all connections '-7 \--- saddle with corporation stop -water main ball valve Curb stop with PJ 4 solid Support blocks 6" stone bedding Linder custom setter 12 gauge solid insulated copper wire for line tracing, PJ X FIP Coupling and taped at 10 foot intervals MIP Plastic plug (CTS) both ends with 2" NOTES: gate valve operating nut 1. Access door shall be by Halliday Products top of manhole at grade in pavement areas unless otherwise directed (top shall be set 24" finished grade 24" rnin. min. above grade in undeveloped areas) clear opening square skid pad 6" thick around manhole frame in developed areas 3/4" x 2" butyl 4 joint sealant adjustment rings 35" max. (11 " max.) ./- __ 24" min. in undeveloped areas .4 3/4" concrete anchor 4 bolts (4 each) 7\ 4 concrete ASTMC-1 50 finished 4000 psi grade 4 exterior of all sections to have waterproof coating 4 A_ 1 nominal size butyl joint -steel reinforced --sealant applied between polypropylene steps joints and on exterior side 'ZZ�Zy :4 of joints joints are to be sealed with "0" ring gasket 44 variable 511 pipe to manhole connection to be by flexible sleeve invert channel to provide a B &-0" min. smooth transition in to out,-­-­--- for all connections Z-O" max, 4 4'-0" max. 4 precast invert or grout 4 j top of bench to be — ------ same elevation as top bottom to form channel -- - - -- °'' D/ 611 of pipe 44 4, 4 4 4 8 • �4 4 6" bedding stone ... ... .. - ..... 77_77- ...... .......... ........ NOTES: 1. Manhole sections shall have an external coating of approved polymer film water proofing prior to installation 2. If adjustment elevation exceeds two inches use concrete adjustment rings with a exterior coating of water proofing. 3. Final slope adjustment of manhole frame shall be by shims and non-shrink grout. 4. Skid pad to be placed around manholes located in shoulders of roads, 5. Flat top shall be used it height from invert out to rim is four feet or less. Frame to be flush in top. 6. There shall be a 0.20 foot drop in elevation through the manhole, STANDARD MANHOLE -13- MAI MIX or our approved equal: a) in non-traffic area - model no, Sl R3030 Cr F— b) in traffic area - model no, H1 R2424 Now= C0 2. Water service crossing street shall be encased in . ...... SCH 40 PVC or SDR 21 pipe. The piping shall run from one foot beyond sidewalk, across street, all nr, to one foot beyond sidewalk. 3. Install 12 gauge solid insulated copper wire (for line tracing) from corp. stop to into the meter box [ wrap wire around corp. stop; wire to be taped to top of PET at '10 foot intervals; come up into meter box; wrap around bottom of 0 angle ball valve; terminate with 12" tail piece]. 4, Meter interface unit requires 1 3/4" diameter hole. CUTOt T DETAIL (typical) 0 THIS WATER SERVICE CONFORMSTO THE UNIFORM STATEWIDE BUILDING CODE 0 F_ 1 1/2" and 2" METER INSTALLATION .8- top of manhole at grade in pavement areas unless otherwise directed (top shall be set 24" finished grade 24" rnin. min. above grade in undeveloped areas) clear opening square skid pad 6" thick around manhole frame in developed areas 3/4" x 2" butyl 4 joint sealant adjustment rings 35" max. (11 " max.) ./- __ 24" min. in undeveloped areas .4 3/4" concrete anchor 4 bolts (4 each) 7\ 4 concrete ASTMC-1 50 finished 4000 psi grade 4 exterior of all sections to have waterproof coating 4 A_ 1 nominal size butyl joint -steel reinforced --sealant applied between polypropylene steps joints and on exterior side 'ZZ�Zy :4 of joints joints are to be sealed with "0" ring gasket 44 variable 511 pipe to manhole connection to be by flexible sleeve invert channel to provide a B &-0" min. smooth transition in to out,-­-­--- for all connections Z-O" max, 4 4'-0" max. 4 precast invert or grout 4 j top of bench to be — ------ same elevation as top bottom to form channel -- - - -- °'' D/ 611 of pipe 44 4, 4 4 4 8 • �4 4 6" bedding stone ... ... .. - ..... 77_77- ...... .......... ........ NOTES: 1. Manhole sections shall have an external coating of approved polymer film water proofing prior to installation 2. If adjustment elevation exceeds two inches use concrete adjustment rings with a exterior coating of water proofing. 3. Final slope adjustment of manhole frame shall be by shims and non-shrink grout. 4. Skid pad to be placed around manholes located in shoulders of roads, 5. Flat top shall be used it height from invert out to rim is four feet or less. Frame to be flush in top. 6. There shall be a 0.20 foot drop in elevation through the manhole, STANDARD MANHOLE -13- MAI MIX F- Z Cr F— 0 Now= C0 0 ■ t CQ 0 Cr Z X J 0 2 0 F_ X C0 tq Q W Z sw F- W D UJ aD CC O,, . Z + Z lu 0 F- Z Cr F— Now= C0 CO) own ■ 0 Cr Z X J W 0 F_ X C0 W LLI F- W D Z Cr. CC O,, . PROJ. NO.: 20225-02 SHEET 73 OF 103