Loading...
HomeMy WebLinkAbout05-14 CommentsNO NTGOMERY rilfg -e v S,tg`ff e &o, po if November 11, 2014 Re Rezon-ing CB Ventures --Aylor Road County of 'Frederick' Department of Pu-blic'Works 1,07 N. Kent St, Winchester, VA 22$01-51000 Dear Mn Strawsnyder, Per- your attached comment letter dated June 30, 2014, we have made the following revisions. sibns. 1. Suitability ofthe Sit'O: discussion has been,expanded as requested. An Environmental' 8fteAssOssment was, performed before the isell Of property to, CB'Venture& No contamination was -fbund. I have, attached a copy of thereport,for your use, 2. Refer to Drainage' noted. and adjusted. 3. Refer%to Solid Waste, Disposal Facilities:, noted and, adjusted. Thank you f9r.your help'intIli-s,process, If you have any questions,, give mesa call. Sincer I Y, Ben C. Mont e PE 4-�t- 41C'� c ®G COUNTY of FREDERICK u Deparient o f Public Works . 5407645 -5643 FAX: 5407678 -0652 June 30, 2014 Mr: Ben. Viontgomery P.E. Montgomery neoruig Group; Inc E - -- — 132, SaddlebackLane Winchester, Virginia 22602 RE: Rezoning Request for .1033 Aylor Road Lots °TM# 74((A)) — 104and 105 ` Frederick County; Virginia Dear 'Mr. Montgomery::, We have completed: our revieww of your proposed rezoning request - for'the subject lots at 1033': . Aylor Road,and' offer the following comments: I. Refer to Suitability of the Site: Expand: the:discussion,to.indicate'that lot 105'was' once occupied bya gas ,station. The 'disposition of the underground "fuel storage tanks> should beaddressed im the discussion. 2. Refer to Drainage: Any future4rainage design shall be performed in =accordance with- Frederick County's recently adopted stormwater. ordinance #143. Also, any future stormwater designs should mimmizeany flows directed toward the existing residential development: 3. Refer to "Solid Waste :Disposal Facilities: The discussion'. should indicate-that the 0" roperty owner will,be responsible for solid waste dis osal_includin haulm p g g and; disposal. Frederick County does norprovide thisservice for commercial property. I can.be reachedat722 -8214 if you should' have =any questions regarding the above comments. Sincerely; OAA" I C. H trawsnyder," Jr., ,_E: Director -of Public Works HES /rls cc: Planning and Development file 1,07 North.Kent'Street, SecondFloor, Suite 200 a. Winchester -, Virginia 226,01 -5.000 II - ,x 4 i 4 F COUNTY of FREDERICK Department of Public Works 540/665 -5643 FAX: 540/678.0682 Novemb :er 14,, 2014. .Mr. Ben Montgomery,P.E , 1VTontgomer,y Engineering Group, :Inc_ I.N Saddleback Lane Winchester, V'rgmia 22602 RE: Rezoning Request Sor CB Ventures, •LLC — Aylor Road Frederick,County, Virgm a - :Dear Mr. Montgomery: Your letter dated November 1,'2014 has adequatcly,addressedour review comments dated June 30; 2014. Therefore, we;grant.our approval.of`fhe;,proposed "rezoning of lots TM# 74 ((A))' - 104 and LOS aocated on AylorRoad inTrederick County, Virginia. Sincerely, Harvey E., S.trawSnyder, Jr:, ,P.E: 1) re.ctor`of-Public Works RESXrts, cc: `Planning and,�Devetopmenf 107 Worth Kent Street, Second Floor, -Suite 200 o Winchester, Virginia 22'601. 7500.0 Mail to: Hand deliver to:` Frederick County Fire, Marshal Frederick County Fire & Rescue Dept:. 1800 Coverstone Drive- Attn: Fire Marshal Winchester, Virginia.22602 Public Safety Building (540) 665 -6350 1800 Coverstone,Drive Winchester, Virginia Applicant: PleaseBl out the information as accurately as.poss<ble m order to assist the Frederick County RireMarshal:with;his his-'r'e-v'ie'w'. Attach a;copy of your application. form, location:map,vroff_ er statement,, . •� impact analys><s, and anvother pertinent information. Applicants Name: Montgomery°Engineering Group, Inc. TelepliOne: 540-974 -7382 - 132 Saddleback Lane Mailing Address:. _ Winchester, VA 22602 beri @MEGinc:biz: Location of. property: 1,033 Aylor Rd:, Stephens City, ,VA 22655: (TM #74 - (Ni -1'64 & 105) Current zoning: Zonin g re q n ested; B2 Acrea g0 2.42 Fire Marshal's Comments: Fire Marshal's,Signature &;Date: l - Notice to,Fire:Marshal Flease,Return This Form.to the Applicant -22 RECEhVED JUN 2.3 2014 Control number Date received Date reviewed, Date Revised RZ 14 - 0002 6/23/2014 762014' Project Name Applicant 103,3 Aylor Rd4 jots) - Montgomery Engineering Group„ Inc. Address City State Zip Applicant Phone 132,Saddleback Ln , ,; _ Winchester VA 22602 540- 974-7382 Type,Application TaxJD Number, Fire =District: Rescue District. Rezoning '14-A46424,10.5 11 11 Current'Zoning Election District 131 Recommendations Opequon Automatic Sprinkler System Automatic Fire:Alarm'System Residential.Sprinkler`System Yes Yes No Other recommendation R " R@q!E,j(re.menis Emergency'Vehicle?Access Hydrant Location Fire Lane,Required 1 Adequate Adequater `Yes Siamese Location Roadway /Aisleway Width Special Hazards Not-Identified. ,Adequate No Emergency Vehicle.Access`Comments Access:Comments Mike Rudd; From: Rod Williams I Sent: Thursday, December 04, 2014;4:18. PM To: Mike Ruddy :Subject: RE: CB; Ventures example proffer language. Attachments: CB Ventures - proffer review to Montgomery 2014.12.pdf Mike., I am sending my latest comment letter (attached) on this. I did not necessarily want to ''suggest there all of the language, but if you want to follow up with them, if`they seemed open to that, !and subject to my changes /comments below, I have no problem with that. 'eel Site Development. 1. Property Access. ,Pro.perty access shall be via the two new entrances shown on GDP from Relocated Aylor Road, as approved by VDOT. Temporary access to the property may, in the interim, be via entrances on the iexsting portion of Aylor Road, as approved by VDOT, until such time the right of way for the future �Aylor Road realignment improvement project is `constructed. This temporary access may cross the area identified for right of way dedication,. ImproVements necessary to utilize the two new entrances shown on the GDP after the conveyance shall be the responsibility of the Applicant, Clearly show new entrances on GDP and label. COMMENTS: The first change relates to the fact that the access really changes upon ;construction, not conveyance. Re the italicized sentence;] am not sure it is fair (or (perhaps it is unclear — add "internal ", to "improvement's " ?). 2. Right of way dedication. ;The Right of 'Way for the future Aylor Road Realignment improvement: project 'shown on GDP shall. be conveyed for the development of said road to the Commonwealth of Virginia 90 days of 'a written request from either VDOT or Frederick County..All site development shall occur on the area outside of the area identified for future right of way dedication. The only exception to this requirement being the temporary access identified in Proffer 1. -, Clearly show area of right of way dedication on GDP and label. ;COMMENTS;: About the italicized senten`ce,. I know that we try to do:'this with 37, but I `think that where there is actually a proffer to dedicate that effectively limits the owner from building in that area. 3. Lighting. M �rvu �Ime November 1,, 2.014 Re; Rezoning CB Ventures — Aylor Road Frederick County Sanitation Authority ;. PO Box 1877. Winchester, VA 22604 =837.7 Dear Mr. Weindel" - Per your attached corriment letter .dated June 6, 2014 and clarification email dated September 81; 2014, we have made the following revisions. 1. The. plan submitted did not clearly indicate the carwash shown is an existing, caiwash. The: plan has been changed to reflect this current condition. This, carwash may or may not be a, part of future, developments. 2. 'We determined that the worst case "land' use4rom a water 1 sewer standpoint would be a ,Hotel., Our calculations indicate water usage forthe maximum size hotel that would fit on Jot to'be 38;000 sf.with an average monthly usage between 200,000-and 300,000 gallons per;month. That has: beers, added toi the Impact Analysi's Statement., The current; line sizes will work for`this quantity., 3: Should a wastewater collector be used, that °would be a part oNhe Site. Plan Review process and not to be included, here., Thank you for your help In this.process.. If-you have any questions, 'give me a call. Sincerely, Ben G. Montgomery ,PE' Ben Montgomery From: Earl Wiley <ewiley @fcsa- water.com> Sent: Monday, September 08; 2014,9:52 AM To: Ben Montgomery Cc: Uwe Weindel Subject: RE` 1033 Aylor Road. Rezoning Ben, Uwe has requested that you provide the flow data expected from the site as well as any info on any manufacturer's info on.any oil separator for a car wash operation you expect to use. Also, will a waste water collector-for reuse be used? Regards, Earl Frederick County Sanitation Authority From: Ben Montgomery [mailto:ben@)meginc.bizI Sent: Wednesday, September 03, 2014 10:07 PM To; Earl Wiley; Uwe Weindel Subject: RE: 1033 Aylor Road Rezoning Earl, I received comments on the above referenced rezoning application from Mr. WeindeL I have added what I think could ,be his email address to send to him as well, but not sure if I have-the correct address. Please forward if I did not. Mr. Weindel,. In your comments you asked for technical analysis of the existing sewer system and existing water"system'to be :served. I frankly have never done this type of analysis. I can easily produce an estimate of water demand and potential waste supply needed. I would need your help to give me the current water and sewer flow rates. I would also need your help to properly make this determination either by you personally or if you have an example of a previous calculation that met your requirement please forward to me. Would you have time to discuss this matter ?` Email is the best way to reach me, but I will return your call if I am not available should you call. Thank you, Ben C. Montgomery, PE Montgomery'Engineering Group, Inc: (540) 974 -7382 cell www.MEGinc.biz From: Earl Wiley [ mailto :ewilgy(afcsa- water.com] Sent: Thursday, June 05, 2014 1:25 PM To: Ben C. Montgomery Subject: 1033 Aylor Road Ben, Please find attached, an overall map and site drawings. Also; this is the best email address to use for me. Regards, Earl W. Wiley Engineering Assistant 540.868.1061 Extension 15 Frederick County Sanitation Authority Physical Address: 315 Tasker Road, Stephens City VA.22655 Mailing. Address: P.O. Box 1877, Winchester VA.22604 Websitea www:fcsa- water.com s Post Office Boa 187.7 Winchester Virginia 22604 -8377 June 6, 2014 Mr. Ben C. Montgomery Montgomery Engineering Group, Inc. 132 Saddleback Lane Winchester, Virginia 22602 Ref: Rezoning Plan Comments 1033 Aylor Road Tax Map # 75 -A -1:04 & 105 Dear Sir: Pli: — (540)868 =1061 Fax — (540)868 -1429. wwwAsa- water.com Uwe E. Weindel, P.E. Engineer - Director Per your request, a review of proposed rezoning plan has been performed. The Frederick County Sanitation Authority offers comments limited to the anticipated impact/effect upon the Authority's public water and sanitary sewer system and the demands thereon. The parcel is in the water and sanitary .sewer area served by the Authority. Based on- the location both water service and sanitary sewer service, is available within a reasonable distance from the site: Sanitary sewer treatment capacity at the waste water treatment plant is also presently available. Sanitary sewer conveyance capacity and, layout will be contingent on the applicant performing a technical analysis of the existing sanitary sewer system within the area to be served and the ability of the existing conveyance system to accept additional load d. Likewise, water distribution capacity will require the applicant to perform a technical analysis of the existing system_ within the area to be served to determine available capacity. Water and sanitary sewers are°to'be constructed in accordance with the FCS.A standards specifications.. Dedicated easements may be requires and based on the layout vehicular access will need to be incorporated into the final design.. All easements :should be, free from any encumbrance including permanent structures (fences, signs, etc.) and landscaping (trees, shrubs, etc.). Please be aware that the Authority does not review or comment upon proffers and/or conditions proposed or submitted by the applicant in support of or in conjunction with this application, nor does the Authority assume or undertake any responsibility to review or comment upon any amended proffers and/or conditions which the Applicant may hereafter provide to Frederick County. Thank you; Uwe E. Weindel, PE . Engineer - Director WATER'S NORTH IT Rezoning Comments Frederick - Winchester Service Authority Hand deliver to: Ma— ail to. Ered -Winc Service Authority Fred -Wind Service Authority �,�: Jesse W. Moffett Attn: Jesse W. Moffett, Executive Director 107 North Kent Street P.O. Box 43 Winchester, Virginia Winchester, Virginia.22604 (540) 722 -3579 Applicant: Please fill out the information as accurately as possible in order assist the Fred Winc Service p proffer' statemehV _.. - Authority with tlieif review. Attach a copy -of your application`form location ma , impact' analysis, and any!other pertinent information. Applicant's Name: Montgomery Engineering Group,. Inc. Telephone: -----974 -- Mailing Address: 132 Saddleback Lane Winchester, VA 22602 ben @MEGinc.biz Location of property: 1033 Ayior Rd. i Stephens City, VA 22655` j (TM #74 - -((A)) - 104 & 105) i Current zoning: 81 Zoning requested: B2 Acreage: 2.42 FFF,red-Winc Service Authority's Comments: tjo Fred -Winc Service A ty'sr ®� �`•yyJ��. Signature & Date: Notice to, Fred -Winc Service Authority - Please Return .Form to Applicant 33 MONTGOMERY £Ngineering �r�up, �hc. �4 November 1., 2014 Re: 'Rezoning CB Ventures — Aylor Road County.;of Frederick: County Attorney i 1.07 M -Kent St, - Winchester;, VA.22601 -5000 Dear Mr, Per °your atfached, comment letter dated August 14, 2014, we hare, made the following revision "s. 1;.; Change made,asspecified. 2.. Change ,me de as.-so e-cifi6d. & Note for date changed . °to;reflectcurrent;drawing revision: Statement added concerning entrances'. 4. Land uses that will not be allowed. per the proffer statement have been added. 5. This proffer 'is affective when VDOT begins the,Aylor Road realignment and. ends upon . changes,to'the VDQT 6 Year Plan•Where` the: realignment Is n0 longer being considered; Statement,added to -that effect, Proffer is:torthe Commonwealth as stated. 6. No Comment 7. Signature lines added. Signatures shall be made at time of acceptance by ;County Attorney.; Thank you foryour help in this process. ,If'you have any questions; give mega call, V ly, ontgomery, PE i COUNTY of FREDERICK Roderick B. Williams County Attorney 540/722-8383 Fax 540/667-0370 E-mail: rwillia@co.fredefick.va.us August: 14, 2014 VIA E-MAIL — benOMEGifie.biz AND REGULAR MAIL Mr. -Benjamin C. Montgomery 1-01-1190rlic;Ty A-Algineeprig thou p' Inc. 132 Saddleback Lane' Winchester, Virginia 22.602 Re: Rezoning Application — CB Ventures, LLC Parcel.Numbers 74 -A -104 and 74 -A -105, consisting of 2.42± acres (the Properties") Proffer Statement dated May 121, 2014 Dear Mr. Montgomery: You -have. submitted to Frederick County for review the above'referenced proposed proffer statement (the "Proffer Statement") for the proposed rezoning of the Properties, in the Opequon Magisterial District, from the 131 (Neighborhood Business) District to the B2 (General Business) District, subject to proffers. lhave-now reviewed the Proffer Statement and it is my opinion that the Proffer Statement would be in a form to meet the requirements of the Frederick County Zoning Ordinance and the Code of Virginia, and would be legally sufficient: as a, proffer statement, subject to the following comments: I First. * introductory paragraph - The,: last sentence defines the term "rezoning ", but to be C')r-isistei-at With tlhe° e'arner language in the Paragriph.'i"ihe'defin*ition-sh"o'u'l'd--'b'-'e*^"t-h�a't-o-* the term "final rezoning"- 2. Second introductory p4ra . graph — The term "Applicant" should also include the current owner of the Property. 3. Second introductory paragraph — In the reference to the Generalized Development Plan 11 ("GDP"), the revision date of the plan accompanying the materials, submitted bears a revision date,of May 30, 2014 and not May 13, 2014. Also, the Proffer Statement,does not state a time or event by which a reductioii to the two entrances- shown on the GDP will occur and by which the additional entrances will I be closed. 1 14 107 North Kent Street Winchester, Virginia 22601 Mr. Benjamin C. Montgomery August 14,,2014' Page.2 4. Proffer 1 — The proffer does not actually,state an obligation, as it simply reiterates the premise of the rezoning application that the requested rezoning is to the B2 District and therefore to allow such uses. Y. 5. Proffer 2: a. The proffer does not state a specific time or event by which the dedication of . the right-of-way for the Aylor Road realignment will occur. b. Staff should be aware, that the obligation to dedicate the, right -of -way is ineffective if new development does not occur on the Properties. c. The.'proffer - should clarify that the right -of -way dedication would be either to the Commonwealth or the County, as appropriate. d. Staff should be aware that the right -of -way dedication does not necessarily address the,impacts of a 30 %.increase in vehicle trips to /from,the Properties, as identified'in the impact analysis accompanying the application materials: For instance, the proffer does not provide for any turn lanes. The relocation of Aylor Road does not necessarily increase the capacity of that facility itself, as opposed to allowing greater functionality of the intersections along Route 277, including the intersection with Aylor Road. 6. * Staff 'should be aware that the impact analysis accompanying the application materials asserts that the county's tax base "will increase with only minimal service requirements Staff may wish to ,undertake independent. analysis. 7. Signature — The signature should indicate that it is.on behalf of CB Ventures, LLC as owner of the Properties and state the capacity /title of the person signing. At present, the signature is only that of.Mr. Craun in his personal capacity and: would not be effective to bind CB Ventures, LLC. I have notreviewed the substance of the proffers, as to whether the proffers are suitable and Approp .- or'diis c s it.is my.tinderstandifi& that, th_at- review will be...- done by staff and the Planning Commission. Sincerel yours, Roderick B. Williams County Attorney cc: Michael Ruddy; AICP, Deputy Director of Planning and. Development (via e-mail) Rezoning Comments Town of Stephens City. Mail to: Hand deliver to: Town of Stephens City Town of Stephens City . Attn: Town Manager Attn: Town Manager P.O. Box 250 Stephens City Town.Hall Stephens City, Virginia 22655 1033 Locust Street (540) 869 -3087 Stephens City, Virginia Applicant: Please fill out the information as accurately as possible in.order to assist the Town of Stephens City with their review Attach. a_ copy of your application form, location map, proffer statement:iinpact analysis, and any= oth�rpertinent�inforination : "' -- -� � '' Applicants Name: Montgomery Engineering Group, Inc. Telephone: 540 -974 -7382 Mailing Address: 132 Saddleback Lane Winchester, VA 22602 ben @MEGinc.biz Location of property: 1033 Aylor Rd. Stephens City, VA 22655 (TM #74 - ((A)) - 104 & 105) Current zoning: B1 Zoning requested: B2 Acreage: 2.42 Town of Stephen City's Comments: Town of Stephens City's Signature & Date: m-.- -- G /y Notice to the Town of Stephens City - Please Return Form to Applicant 28