Loading...
HomeMy WebLinkAbout02-14 Comments (3)December 1, 2014 Mr. Thomas Moore Lawson Lawson and,silek, P.L.C. V.0. Box 2740 Winchester, Virginia 22604 COUNTY of FREDERICK Department of Plannirig and Development 540/665 -.5651 Fax: 540/ 665 -6395" RE; Rezoning #02 -14 of the; Heritage Commons Project, (former Russell 150) Property Identification Number (PIN): 63 -A -.150, 64 -A10, 64 -A -12 Dear Mr. Lawson: Staff is currently finalising. the staff report for this application, which 'is scheduled for a public hearing before the Board of Supervisors on December- 10, 2014. While the staff report will be outlining a number of concerns still present with the rezoning application (which have been provided" to you in previous correspondence),, there are two primary impacts that are present with_ this rezoning application that staff feels. need to be reiterated. The Heritage Commons rezoning application fails to. address the impacts to the Frederick County Public School System and the transportation impacts. . 1. Fiscal Impacts: The negative fiscal impacts associated with the residential uses proposed,on`the, property have not been satisfactorily addressed. 2. Transportation Concerns: The proffer statement does not provide for the construction of any of the necessary roadways within the Heritage Commons development. The roadway construction proffers continue to remain solely reliant upon:: "a revenue sharink zfgreement (developer- county agreement) that does not..yet exist, and there are no proffered commitments that guarantee that the developer will construct roads prior to development of residential' and commercial uses. Fiscal Impacts The negative "fiscal impacts associated with the residential uses proposed on the property have not been satisfactorily addressed. The Market and Fiscal Impacts Analysis (MFIA); authored by S. Patz and Associates; dated" August 2014 and revised November 3, 2014 is based on the development's proposal of 1,200 housing units and 700,000 square feet of commercial development, including a new Frederick County office building. The 1,200 housing units include 1,050 apartments and, 150 townhouses. The commercial space is modeled on: 220,000 square feet (county office and developer sponsored 70,000square foot building); 380,000 square feet office and 100,000 407 North Kent Street, Suite 202 • Winchester, Virginia 2260;1= 5000 Page 2 Mr. Thomas, Moore Lawson RE Rezoning of Heritage Commons December, 1, 2014 square feet retail. The applicant's M,FIA evaluates on- site.and off -site revenue and expenses at build -out, build -out is projected to occur over a 15-year period. The applicant's MFIA projects anannual net fiscal benefit of'$3,:173,610 at build-out. The phasing proffer does not achieve what the.Patz model is utilizing,to achieve thei positive fiscal gain. As written; the proffer would allow the construction of 600 multifamily residential units and 184 townhouses with the ,construction of' 1004000, square feet of commercial, area. This phasing proffer.is not consistent with the Patz suggested phased approach to maintain economic balance, nor does this phasing, proffer guarantee to offset impacts, from residential uses. If the applicant wants to rely on the outcome of the Patz study, the applicant should be,proffering to ,implemient the Patz study: As written, the phasing proffer provides little if any benefit to the County.. County Development.fmpact Model. The County's Development Impact Model (DIM) is utilized, to project the capital fiscal impacts that a residential development will place on the county over a 20 -year period. Through an .extensive review, in 2013%2014, the DI_K policy- was reaffirmed that the DIM projection would consider residential capital fiscal impacts, and would not consider credits for commercial components of a- development proposal. On June. 25, 2014, the Board of Supervisors adopted the updated DIM.for use in Fy2014. The following is a breakdown of the projected impacts per dwelling unit. for each capital facility: Capital facility Town home Apartment Fire and Rescue $4.12 $418 General Government $33 $33 ---- ._ .............. ......... _ Public Safety $0 $0 Library $379 $ 3;79 _ ..- Parks and Recreation. $1,332 $1,332 _ ....... . .. ..._...._ ................_ ........ _—= - — School Construction $11,2 81 $16j535 tal $`13,437 $12,697 When applied' to, the residential mix used in the Patz report (1,050. apartments and 150 townhouses), the DIM projects negative capital fiscal impacts of $15,347,400. This projection solely, considers capital fiscal impacts; the DIM projects that operational fiscal Page.3 Mr,-.Thornast Moore, Lawson RE: Rezoning of Heritage,Commons Deceinber 1, 2014 impacts are generally "mush .greater and collectively exceed the tax revenue generated by the multifamily residential use by a factor of 2 :1. In _applying the, DIM using the phasing proffer, the DIM projects that 300 multifamily and 50;000 square feet commercial could result in a projected annual negative impact of $400;000. Transportation Concerns; The proffer statement does not, provide for the construction of any of the necessary roadways within the Heritage Commons development, The 'roadway construction proffers continue to remain solely reliant'upon a revenue. sharing agreement that does not ,yet exist. At, a minimum, staff would suggest an additional proffer that-would restrict development without an executed revenue sharing agreement between the County and the applicant. The current proffer; should clarify that development will not occur ahead of implementation of the transportation system. While some concurrent development :as the transportation system is being constructed would be sensible, protections should be in place so that significant development could not occur ahead of key roadway connections being in place, particularly the bridge over 1 =81. The proffers lack a comrnitment to construct the road network, and a phased approach when the network would be constructed. This could result in the. development of residential and commercial unitswithou't realizing 'the. construction of any of the necessary road network. Without, the outside agreement, the proffers contain ,no. commitments that thedeveloper will construct the;necessary °road. improvements: Please contact staff 'Should you have any questions. Sincerely, G Cadce Eins, AIGP SeniorP;lanner CEP /pd John Bishop, AICP Deputy Director — Transportation - - • � A� ` `_ .,.� . - of FI�EI)EIZICK - s Department of Planning and Development; A;� - 540/665.,5651 - 1738 FAX 540/ 665 = 6395' - November 1 "7, 201'4 Mr Thomas „Moor`e: Lawson! :Lawson and, SiI& P L:C. -P O: B'ox 2740 ' Winchestef Nifgiiiia 22604 _ ` RK! Rezoning, #02` -i4 of tlie:Heritdee.Commons� Project'(former. Russell 150) - °” • = mber P= N ) 6A '50" 6A10 64 -A, hdentifationN 1Pro P Dear" Mr,:, Lawson' r A I have had -the opportunity to, reiew he revised proffer for the Heritage Commons project' - dated .Septembe "r J7 2013;. -;and revised November 1.2201'4,.. Staffracknowledges °,that. many, _of r: the Issues di`seussed' at our; meeting on;Mond`ayLL N`ouember 10, 20:1:4. have _been. addressed in ` =. the vreyi ede profferµ however,: there are; additional .concerns stioll present with this ,rezoning "a pplication;. aSfafflsreview cornrnents,are listed ,,below for'•your.cogsid'eration; Rezoning•Comnf &nts ` l.a Agency Comments Many of ''the `Review, Agency concerns and Corn ents:.,re,ma n - - unad,'dressed,,specificall VDOT, FC:PaS, Parks and k; creation, County.Attorney and.. Public Works., Y . 2 Phasin and, Tm act; 'on Gommuni g y _.,.P ty Facilities Th_ e ° negati•ve, _f scab impacts t. associated wrth `the 'residential uses proposed on the, property have not been - satisfactorily addressed 'The applicant's Market:and Fiscal Impi cf.Analysls (MF,IA) by S. Patz. & Assocla'tes shows; a posrti.ve fiscal gain; however, the Pat`z report utilizes full;. build -out, 'of the:.';commercial and residential landbays to achkwe this' figure (15 + / -. years, 1;200 market. rate : residential ?units and `700,000sf of- commercial) The phasing proffer doesz not achieve `what he Patz model is utlizmg? to achieve the positive: fiscal igain. The MFIA also fails ;to have addressed concerns, rased -by the' `Commissioner ofthe: Revenue and the:Treasurer, sor i`ts. results are questionable. 3;. Access, to .Landlay Z As currently. depicted, ,access tos_this• l'andbay will solely be; :. „ .. from `Route 522 9 `'The ,land use, table shows that `this area (the! largest 'landbay within' 4 tj*,developmeni)' could be up to, 90% residential' an& is' proffered to contain all ,the' . townhouses. Staff has .concerns 1thaf all the residential units couId,`be constructed' y �p ):_ within this landba lus commercial ,and there wi_h be no access to Warrior °Drive acid the main transportation network within the° development:,, 4: Compliance with. the 2030 Comprehen "sve Plan The land: uses shown;' within ' e .A i landl aysr 3. and 7 are, i,Q, ,. pported by the `2_030 Cgmprehens�ue Plan. � The' proffers' . ,107 North Kent Street,, Suite, 202`_.+ Winchester, -Virginia, 22601;500,0'. x z Mr Tl'omas Moore Lawso7 RRE_ Re'zoAft of Heritage Commons - November 17 2014 o show landbay 3 with mixed residential and commercial land uses; the Comprehen "sire Plan: designates this area• for employment land uses ' The proffers show landbay 7.; _ > ' (53 -95 acres) with, the. ability to deuelo,p with° 1001 commercial_ uses: The Comprehensive Plan shows the entire area, that`: encompasses landbay .7 as ,high .. density res denhal„ 1­ ntroducing; comvmercial; uses 'info, 'landbay- 7 i' not` supported. by the�2030 Comprehenswe'Rlan: 1156 Mixed Use'Deyelopment- The proposed R*, zoning being ,sought with th►s rezoning ' app] ggion would.enable, a miX use�,,devel'opmenf however, there are no ;assurances within the °proffer statement 'that a core /town center area will be provided As profferedthe development would be4a,tradttonal residential and;commere►al project, w►thAthe uses being elearhy separate from- one'another, Transportation dCommentst 6;- Remoual� of $1,000,000 cash. proffer -U transportation: The Russe11.1;50 TIA, .upon which this application fs rel1ant;and references with' °the tr►ps limitation proffer, noted significant offsiie'impacts in *additibm.to those that led',to` the proffered need's of the Warrior 'Drive connection to; the south, connection to the, north ,toward the;.Glaize property,,,a. nd connection'to the' Cfty y>>_a a bridge Doer I-_ &1 TW!ss led ,to a $1;000,00:0, cash.. *offer which; f's °not in thecurrent; package _ 7, Develo "pment ahead :of. transportation. - The current proffer' sho'u'ld clarify that ,_ v deuel`opmeint will;. not occur - ahead of implementation of the transportation; - system. Wh'i:le -some concurrent:developmerntas the:, transportation; sysfen is being constructed - would be; sensible; protections +sho'ul'd be; i'n place'soI at signi`fican`t -development = _ could not, ahead" of ke.. badwa connections .bei'n m lace - Y" Y g.. p particularly the - - x badge over.] 81: 8 WarrJor'•Dr-;iv Consider- adding performance ,triggers :tied,to' development for t he- • Warrior, ,Dr,i'ute rrevenue. shar�n agreement. :Currently the proffer gives no `when" regarding = how' yth s w�li be implemented -'. The, County: cans ,,apply for additional revenue= sharing funds4for th�s:pro�ect.as eafIv!as November 2015'. _ r E .. - - 9 Revenue' _Sharin Agr.:eemenf: . The roadway` consfruction gproffem. remain sol . g e1y n.. reliant, upon a revenue,,`shar�ng: agreerrient.,that does not'yet ,ex "_st:, -'The County- draft was rejeeted andm 4;W YO on a' subsequeniAraft, from tlie° applicant on 10/29/1,4.. Ho wever,.no_,thmgfurth J,fi, been heard;at'ihe staff;,evel v t this, point _- . _ the proffers du not address what happens if the proffered ;;agreement does not maferialize:, At _k minimum, staff wouIdRsuggesf an ,addrttona] proffer ,that;, would '� rest rict='deuelopment without.: an executed, revenue sharing a'greemenf between `the County andthe appl�cant- . u 3•: s r10. Narrative comments in the proffer., statement -Staff would continue to ,note that .. a, September 2'4,, 20J 4 • COUNTY of FREDERICK' .. = Depar,;tment of "Planning; and :Development 540/665-568i FAX: 5:40/665 =63. S Mr.,. Thomas Moore Lawson E Lawson and Silek, P.L C. R.O. Box 2740 Wirichesfer, Virginia 226.04 RE Rezoning #02,14:.6f the�Wri•tage Commons Project.(former Russell 150) Property y Ide'ntifi'cation Number (PIN) • 63' 7A =150; 64- A -40, 64 -A42 Dear'Mr. Lawson: This letter contains my com ments ,on the, updated proffer statement 60v, the above noted rezoning. received. in this office on 0018%204.4 at approximately 4:--00-. P--m-, and -with a revision date. of September, IS, _20,14; Thank you `for, the opportunity `to comment- Please note that I am commenting ,from,the transportation perspective. My .comments are as follows: 1. The version 1. received did "not initially, ave a °GDP which 'was referenced in the proffers:. However; a .GDP (unchanged from the_original)' was received in our office on September 23,, 2014 and. I swill consider that `asY the GDP being, referenced.,: lfffitisome reason ths`is incorrect,`I can modifymy =commentsas needed. 2'. Regarding. the. GDP,` as I noted ;at the work `session on Septemher 3,; 20 °14, it denotes several; entrances: that have ,not been modeled or; evaluated' and 'should be removed from this graphic: Proposed entrances should -stand ion their own, merits relative to the preval - mg,,,D:OT,staridatds fordesign Arid safety asw ell as local planning_: °and should not bejp ro ffo les-s h at is ' Bemg.proffered is "more restrictive than: "the current,stdndard. I do not have concern with the "updated general' aI" rimerit thatis shown. ,y 3`.. WY ile residential un ts',are capped ;''there is no such limitation of office° and, commercial. This lea- ds me' to be' °concerned that this appl'icat'ion may not °be' iii ' oin"pl ance• with Chapter 527 I" ha ,Ve,requesied a determination on "this "from VDOT. To avoid this issue, I would recommend proffering. a development cap that would keep trip generation m' line with what was :considered at, the previous rezoning. The currenf `narrative in, the third ara ra h of section 4.does `not accom lisp 'this: Ri ht now state what''the author 's mte ; retation of w g -that paragraph only seems to Eo P rp hat studies have said, and what the applicant's engineer',Iias said, and doesn't really appear'to profferanytling. As such; it likely'should not be in the proffer., statement, but would more appropriately be: included' in another portion of the•applicat'on 107 Nortt;Kerit,Street Suite 202 Winchester;. Virginia 22601 -5000 v 1V1rM Thomas; Moore Lawson Re Rezoning Heritage:Commons: September 24;:2014 4. As noted on Septerribe "r 3,,. 2014 the proffer continues to lack fhet detail; assurances; and performance triggers thati were included in the existing proffer., The _existing proffer is very specific in regards to' Teus, St, Airport Rd, Warnor Drive; arid.the bridge over I -81;. This proposed"roffer relies instead on`,the GDP, which does riot include an appropriate level of detail and does not have any per-formance,;triggers: While it -is ,clear that, the: applicant, intend "s !t6 enter into •agreement with °thee County for revenue. sharing, there is, no protection should theappticant and County be unable to come to terms., .I would note.that. the existing proffer package guarantees the ,roads, detail's the roadways and performance tri'ggers;, and notes ,that the -roads 'will be- built.even if the CDA T's, unable to do ,so. 5. This proposed proffer has `no mention: of fihe currently proffered bridge over -I -81 _.. 6.: The proffered $1,000;000 m. funds toward the irat sportation system has been removed as previously " "" noted on September "3; °2014. 7. Paragraph 1 of section 4 continues to place the° .County into `the' position of agreeing that what is `being. proposed is substantially s milar'to what is already ", offered. As noted on September 3, 2014, ibis is inappropriate. Thank you for the opportunity to comment: If L can be of further assistance, please do not, hesitate to contact me. Sincere .JohnA "Bishop;;AIC�% Deputy Director - :Transportation JAB/pd �C J C911 gW4J f�,� COUNTY of FREDERICK Department.of.Planning ,, and Development 540/665 =5651 J38 FAX: 540/,665 =639,5 September 23, 2014 Mr. Thomas Moore Lawson Lawson and Silek, P.L.C. P.O., Box. 2740 Winchester, Virginia 22601. RE: Rezoning #02- 14,of'the Heritage Commons Project (former Russell 150) Property Identification Number (PIN): 63- A450, 64 -A10 64 -A -12' .Second Comments Dear Mr. Lawson: I have had the opportunity to review the' revised proffer for the. Heritage Commons project , dated September .7, 2.013 and revised September 18; 2014. Staffs review comments are listed below for your consideration. A revised modification document and GDP were not provided with this submittal and therefore staff s. previous comment letter dated =September 12, •20.13 should also, be�referenced. Rezoning Comments 1. Proffer 2 Uses, 'Density and Mix. As stated in staff's September 12, 20-13 comment letter, `the; proffer should show a maximum and; minim- um °percentage of commercial and residential acreage being proposed, with this rezoning. This area is proposed to consist of business /commercial and residential land uses and therefore, B3 (Ind'ustrial Transition) uses should be prohibited on the site. 2. Impact on Community Facilities. As previously stated in staff s September 12, 2013 comment letter, as part of your rezoning package a market and fiscal impact analysis was submitted, that showed' a positive fiscal gain; however, there is no proffered phasing or requirement that the commercial portion be constructed before the residential. The development impact.model projects a negative °impact of $1.3,062 per single family attached unit and $11,330 "per nititifamily unit on County capital facilities. - Therefore, based on the unit cap of proffer '2C, the potential 'impact the residential units will have on County .facilities is $13:9 million. The ,development should not• utilize the future potential tax contributions of the. commercial .landbayss to offset the residential landbays without phasing the commercial to 'be built in conjunction with the residential. 107 North Kent Street, Suite 202 • Winchester, Virginia 2260;1= ,5000. N1 Page 2- . Mr.'Thomas-Moore Lawson RE ::Rezoning °of Heritage Commons, :September .23, 20,14 3. Updated Fiscal Impact Analysis.. Staff was advised that the Fiscal Impact Analysis was updated -to ;address inaccuracies in the input data. To date. staff has not'received a copy of this updated document. 4. Monetary Proffers, Omitted from New- 'Rezon'ing. As stated in staff's September 12, '201'3 comment letter, it should be clarified why the new rezoning application has removed- the following - previously proffered monetary proffers: 0 $ 0,000 to Fire. and Rescue $3,000 per unit for Schools • $2,500:HOA.start:upproffer • 1 million for the general transportation fund ($3',500 per residential unit) 5. Proffer 6 — Recreational Amenities. As previously stated 'in staff's September 12, 2013 comment letter; this proffer speaks in general terms of what could be constructed as recreational amenities for the project, but does not commit to construct anything. Unless the: owner is proffering a specific amenity, the proffer should be eliminated and the. recreational unit type would be specified at the MDP stage. The proffer also states- that walking, trails, and sidewalks will be provided within, the community; the trail. locations should be located on the GDP. Please note that sidewalks along roadways are -required by County Code, 6. Proffer 6 — Phasing. The revised phasing proffer states that the applicant would need to apply for and receive a building; permit for 50,000sf of commercial in Order to construct the first 300 multifamily units. The proffer also states that this 50,000sf truct he 600 or would eater mult famil onunits ted before the applicant . th greater y This proffer does not. guarantee the construction, of any commercial square footage to offset impacts from the first 300 residential units ;. it simply guar anteesahat a'building permit for a commercial use would be obtained. A more appropriate proffer should address acquisition of a Certificate of Occupancy for the commercial use. As written, the proffer would allow the construction of 599 multifamily `units and 184 townhouses prior- to any commercial development being constructed. This ;is not consistent- with the - Patz suggested phased approach to maintain economic balance; nor does this phasing proffer guarantee to offset "impacts from residential uses. As written, the, phasing proffer provides little if any benefit to the County and.development. - 7. Mixed Use ,Development. The proposed R4 ,zoning being sought with this rezoning .application would enable a.mixed use development; however;' #here: are no assurances within the proffer 4 statement that a, core /town center area will be provided. As proffered, the development would be a traditional residential and commercial project, with the uses being clearly separate from one another. `Page -3 Mr , ThoinaslVloore.= Lawson. - RE Rezoning of Heritage Coinihons Sept0inber 23; -20 ] 4 Other 8; Transportation Commnts e. Please note that transportation comments on. the rezoning application fromti John, Bishop, Deputy Director, of Transportation; are being provided to you in'a `separate letter:, 9. Agency Comment's Please ° rovide updated k p- agency: comments from the. following (based on the 'updated proffer ;statement) Virginia Department of ti Transportation, Frederick.County.Departmeni of Public Worlcs Frederick County Fire Marshall, Frederick County= Department of Parks and Recreation, Frederick County Sanitation Authority, Frederick. Winchester'Health;Departrnent' Frederick, _ County Public. Schools, the local Fire and Rescue: Company and.° "the. Frederick- Winchester Service' Authority. Once attorney comments, are :received 'by. the Planning Department, they will'be forwarded to your offce Attorney comments are re quired for scheduling of the. rezoning application. Please feel free to coritact me, w ith questions. regarding this, application:: Sincerely, r Candice E. Per ins, vCP' ;Senior Planner CEP /pd :.i t COUNTY of FREDERICK Dpartmentof Planri-inIg and DeveAqpmehf 540/ 665-5651 Fax: 540/ 665-6395 Deternberl, 2014 Mr.Thomas Moore Lawson LaWson,ahcl Silek.,, P.L.C. P:O, Box 2740 Winchester,'Vi.rginia 226104 RE Rezoni-ingIO2-1401h,e Heritage "Commons , Project (formes Russell 150) Pro perty� I do fitific-a-06-on-, Number 64-7x1oj'64,A-12 Dear Mr. Laws6ftt Staff is currentl" y fina-1 izihg t he staff re port for,th is a0pli- c tio4, Which is� scheduled for a public hearing before, the Board of 5uoervisors on-'December 10, 20:14., Whilel the staff report will; be outlining a number of "concerns ,still present with the, rewriiqg,appjication (Which have beeii proyidiA. to. •yjbu ii! 'previous correspondence), there are two pri-mary, impacts that are p rese nt,with-thi's rezo ni ng ,a ppl icatio n that-staff,fee fs:neecl to. be reiterated.. The, Heritage, Comm g fails tul;acldress,the, impacts Io the Frederick -,.Qns mNlRin- County, Public School Sysiom,aild theAtzins'portMiori iftipatts% 1. Fiscal Impacts: The negative fiscal impacts as�sOclated, Wifk the reside-ritial Uses proposed on the peooefty°have not been satisfactorily addressed. 2. Transportation Cdh'cernsn, The proffer statem-ent, does, 'aot.,, provide for the construction' of any the necessary; roadways sWithln the, -Heritage Commons c of development. The roadway construction proffers ,continue to remain ;solely reliant uDon, a revenue, s . harin,4:ap-rLsement�(diavelooer-countv agr , eementYthaf,dues not.vet exist, and,there are no °proff e L d.conmithents. fhat.guaranto&lh'at the developer Wil[ccibsttact roads prior Ito' develdoment:o-f comme 1, r _ cialr Uses. Fiscatimpacts The negative fiscal` imoajcts associated With 'the residential.'Usles, proposed ',66the property have061- been The Market and, �Fistal,lh pocts,,Anal is IOF/A)!,aUth6ned by S. Vatz 'a'rid AssbeiJtos; :clated August 2014 and revised-November 3, 2014 is based on the develop ment's proposal of 11qusiinig, units and'700.600 square` feet; cif commercial, cle,,Velbp,ment, including a new Fire-de'r.1, i Gk-:COtinty Offi ce, bbildirig. The 1 ;`200. Kid-u-sibg units in-c1 a L-:,l, 050 , d.0 a rth) eb ts a n c1l 50 townho-uses.. The commercial -soace,is:modplEA on: 220000 scloare feet (county office and developer sponsored 701000square faQi building); 390j600 .'sjuare feet office 'and 100,060 107 North Kent Stred, Suite'202 * Winchester; Virgt'qi*4 22601-5000 Page :2 Mr. Thomas Moore Lawson RE_1 Re- n" - 'q f V_ eg itage Gomirnbns. Rec6mber l, 2014- ,square feet, retail,. The' -a F . IA evaluates On-site and off7site, revenue and expenses p I icaft s p . , M fof bUild-out; build-out is :projected to,occur, over :a - 15-year period: The applicant's M. FIA projects an annual net fJ scat benefit .of$,3j173 610,4t: Wld=dul. The, phasing proff6r.does, not a-chievewllzit the Patz rnodeC is utilizih Kto,achipyelhe positive fiscal gain. As written, the pfqff,er- would allow the c-bristwctibn- of''60G multifamify resid6ritial units 'and 194 townhouses with the construction of 10Q -000° square 'feet of commercial, area. This, phasing, prpffee`is,rfot consistent with the Pdti,siiggfested phased approach . to hidintain. economic, balance; ; nor does this phasing` prpffer. -gyarante t offset �e, 0. — I impqcts-frpmresidentidl uses. !f�ihe'applitantwant�s,tiDr�e�V he outedinLe of the Patz ph t 'study,, the applicant" should be proffering to implement the,Patz study As written, the p , f I I - �t­ - - #Y-1 I phasing proffer provides. little if any bene.fit,to the Co 'Untyr County' Development, Impact Model The County's DeVO4pment Impact Model (DIM,) is ut,1112ed to project the .capital fiscal impacts that a 'residential 7 ial deVe 160 MY efit will . lace on the counky, over, a.,20 par period, P -Y Through an extensive review j'.n_,- fhe'01M, ,reaffirmed' that ;the DIM projection Would On's,ider"residehii'al capital fiscal impacts ,,.a'hdwouId. not consider credits for commercial components of'a development proposal.. On June. 25 2014; the 'Board of Supervisors adopted the updatp,d,O1M'f6,r Use in FY2614-. The following is ,a breakdown of the: projected impacts per dwelling Unit, for each, capital 'facility! Capital faitilitV, 'Town home Apprtirrient Fire and Rescue $412' General Government .... . ...... . rublic6af,E0 $0 .. ....... .. .. .... Library $379 F..; ............. . .. 1:1 Parks and Recreation; - , $1,3'32 School "Construction 11 281. 10535' To.ta 11 $1311437 $1-12,6_97 When applied to the residential ,mix used in the Pattrepor t (1;050 apartments and .150 townhouses );, the DIM' This octs 'negative capital fiscal, impacts of 34 400. projection solely considers capital fiscal irripads_! the -DIM projects, that operational fiscal' Page r 'fh6hw� W ., s Moofe, Lawson RE:Rezoningof'Heritage Cbm D&eh)bier,-�,l 2014 impacts are ge'herally, rbuthi,'great& a,nd col],ETt1ye1 I y''exce.e4thO tax, reVRnu&generated by the multifamily resiclenti& use by ajActor-cif'21. je�cts. that 0, M",Ulthmily and In applying the DIM using the phasing proffer; 'the DIM 'pro 39 5QYQQQ square feet commercial, 'could result in a -projected annualc negative impact of $400,,,000. Transportation Concerns:' The proffer statement does ­1n&f_ provide—for the construction Of any .of the necessary roadways Within the Heritage Commons development-. The, roadway construction proffers continue to remain,solely,'-reli'ant. upon a'revenue. sharing,agreemeht that dbes.noi yet exist. At a :minimum,, staff,'Wo,'Uld suggest a'n O'c1clitidnal. proffer that would restrict development without an executed reVenu&sharing agreement between the COURT_y'a_rid the, applicant. The current proffer slibuld clarify I thait`­deVeIqpm6ntt will hotloccur4head ofimplementat-ion, of the transportatio.rj. system. 'While -some concurrent ,'dey Q p rin '0 nt as the transportation system is being constructed would„ be sensible, protections sho.-61d be in place so that significant d6velooment,could not occur ahead of key roaft ayfco,n_nec_ti6n,s beiLng,.jn place:, particul-arl'ythe, b,riclge over 1 =81: The proffer& lack, a commitment to construct, the :ro -ad network,, and ;a phased approach when the. network, would 'be: corisitucted. This could result 1h the development of residential and cdffrylerdal units Without realizing the:'constructi'6,n of,anylpf"the necessary road :network. Without the putsicte_,qgreement; the peoffo&' contain no commitments that the'deyeto provemehft. Please contact staff rsbould you'llh-ave any questions. Sincerely,,, Candice E., Perkins; 'A -1 C P John Bishop, AICP o Senior Planner Deputy Director — Transportation CEP /pd bcci John k , -. Riley; in.-5 Co.-'hty Admilnistrdt6r. Frederick County B6a.rd of"Su'peryisors 5. ,,Pam Deeter'. To;' Charles S DeHayen. (cdehayen " " @crosslink.net) Subjects: ;Heritage Commons' Project _- Attachments SKMBT_PLAN14120114581.pdf r Good'afternoon'; i ha.ve attached. a letter frorSi Candice Perkins and John -Bishop addressing concerns; over the Heritage ii Cornmons, Project, The'letter will be emailed;to Mr. Ty' Lawson. If you'have °any questions, please contact this office. Pam,. Deeter Fredenck:County Planning Dept. 1VA Kent '..Street,'Suite,202 Winchester, VA 22601 540= 665 - 5651 1 Pam Deeter - _ 3 _ Toc John Riley; .Richard,C 'Shickle (rs'hickle @gmail.com); Gary Lofton (gary @garyloftonsorg);. Robeit.Hess (rhess @co.frederickeva us); Robert`W: Wells (robertwel(s946 @.comcasf:net); Chris Collins; Gene E fish (gfisher @.visualii'nk.c ' " Subjects: Heritage Commons; Proiect = Attachments: SKMBT_PLAN14 -1 01145$1.pdf Good afternoon, d `have attached.;a, letter from Candice Perkins and John Bishop;addressing :concerns over the Her,itage? Commons Project. . Tjl e: letter .will be mailed to: Mr. Ty Lawson'- Ifyou questions, please contact the this office Pam, Deeter Frederick' County. Planning Dept. '107 "N. Kent.Street, Suite 202 Winchester, "VA.22601 5-40- 665 -5651 I h I . Pam D'eeter- _ From: Nl ccosoft 0ut1ook` Robert Hess Sent Monday; December O1 2'01-4,1-17? 17' PIVI' Subject:, Delivered: Heritage Commons Project 1.60r'message has been delivered to the following recipients:, Rober "t�Hess +(rhess(a?'fcva.us) <mailto.rhessCa):fcva.us> Subject: Heritage "Commons Projecf 1- .Pam.. Deeter Fr,_om: Microsoft Outlook To: Chris Collins; John Riley" Monday, December dl, 2014 3:17 "PM Subject: Delivered: Herifalge:Cdmm, ohs `Project Your m6s_s.age has been, delivered to the follovJmg:,reci,pients? Chris ^Coili'ns (ccollins @fcva.us) <mailto;ccollins @fcva:us> John Riley (riley @fcva.us) <mai Ito, riley @fcva:us> Subject: Heritagei Commons Pro eef 1 ' Pam Deeter From: Mail Delivery System < MAILER = DAEMON @co.frederick:va.us> rshickle@ gmaiLeom ;,ObertweIls946 @comcasi.net; gfish,er @yisuallink.com; _ ,gary @'garylofton.org Sent: Monday; December,01, 2014.3 °17 PM; Slit jeet:; Relayed: Heritage�Corn- m -on -s Project Delivery tothe "se recipients or groups is complete,.but no delivery notification was sent by °the destination server: r, lhickle @gmail com, robertwells9469,comcast. net' gfisher @.visuallink.com ga ry @ga rylofto n. org 'S'ubject: Heritage Commons'Project i. Pam Di efer* ' _ From.:, Mail, Delivery'Sy "stem eM'AILER= DAEMON @co._frederick va us> To cdehaven @crosslink.net Sent:- Monday;, December Ol, 2014 3:1`9 'PM Subject: Relayed" Heritage, Commons Project De(ivery;to.these recipients or groups "is com'plefe; but'no:delivery,notifieation was sent by the destination,serve_r. cd'ehaven@crosslink.net Subject., Heritage Corrimons P"roje"ct T Pam 6ieter From: cdehaven @crosslink.net To, Part Deeter Sent: Monday; Recember. -01, 2014 "3 :36'PM Subject: Read: Heritage Commons Project Y6ur message To: 'Subject: Read.: Heritage Commons Project Sent: Monday, December 0l, 2014 334:26 PM,(.U:TC= 05:00) Eastern'Time (.US &:Canada) was read on Monday,'Decerr bert0l; 20143:36:11 PM.(UTC= 05:0.0) EasternTime�(US'& Canada). Pam ,DeOol From: John- Riley To = Parn Deeter Sent:: Monday, December Ol, 2014 4:14: PM ' Subject :+ Read`_ Heritage Commons Project Your,fnessage T,o: °John Riley- Sub . ect:, Heritage Commons,P'roject Sent: Monday, December 01,.2014 „3:17:02 PM (UTC 05 :.00) Eastern Time (US &,Canada) was read on Monday, December 01, 20'144-113:45 RM (UT:C- 05:00) .Eastern Time (0$ & Canada). Pam Deeter, From: Robert H'es's Toy Parn,Deeter . Sent;: Monday, December O1, 2014 9`.53 PM Subject: Read: Heritage Commons Project `Your message To ,- Ro'bert Hess Subject: Heritage Commons Proje�ct Sent: Mond"a. ,;December 01 2014 3:17:02 P,M UTC= 05:00 Eastern °Time US' &'Canada , Y ( ) ( ) was read on Monday, Decerriber..01, 2614 9:52,:44 PM (UTC- 05:00) Eastern °Time (US 8, Canada). 1' December 1, 2014 Mr. Thomas Moore Lawson Lawson and Silek, P.L.C. P.O. Box 2740 Winchester, Virginia 22604 B HLE COPY COUNTY of FREDERICK Department. of Planning and Development 540/ 665 - 5651. Fax: 540/ 665- 6395' RE: Rezoning. #02 -14 of the Heritage Commons. Project (former Russell 150) Property Identification Number (PIN) :A63 -A -150; 64 -A10, 64 -A -12 Dear Mr. Lawson: Staff is currently finalizing the ;staff report for this application,. which is. scheduled for a public hearing before the :Board of Supervisors 'on December 10, 2014. While the staff report, will be outlining a number of concerns still present with the rezoning application (which have been provided to you in previous correspondence), there are two primary impacts that are present with this rezoning application that staff feels need to be reiterated. The Heritage Commons; rezoning application fails to .address the impacts to the Frederick County Public School System and the transportation impacts. 1. Fiscal Impacts: The negative fiscal impacts associated with ,the residential uses proposed on the property have not been satisfactorily addressed. 2. Transportation Coftern"s: The proffer statement °does not provide for the construction of any of the ,necessary roadways within the Heritage Commons development. The roadway construction proffers continue to remain solely reliant upon a revenue ,sharing`agreement (developer- county apreement) that'does not vet exist and there are no proffered commitments that guarantee that the developer will construct roads prior to development of residential and commercial uses. Fiscal Impacts The negative fiscal `impacts associated with the residential uses proposed on the property have. not °been satisfactorily, addressed. The Market and Fiscal''t ipacts Analysis (MFIA) authored by S. Patz and Associates, dated August 2014 a.nd revised November 3, 2014 is based on the developme_n,t s proposal of 1,200 housing units an"d 700,000 square feet of commercial development, including a new Frederick County office building. The 1;200 housing units ^i'nclu de 1,050 apartments and 150 townhouses, `The.commercial space is modeled on: 220,000 square, feet (coun'ty office; and, developer sponsored 70,000square foot building); 380,000 square feet office; and 100,000 107 North Kent Street, Suite 202 * Winchester, Virginia 2260,1 -5000 Rage 2 Mr. Thomas Moore Lawson RE: Rezoning•of Heritage Commons December 1, 2014 square feet retail. The applicant's MFIA evaluates on -site and.off -site revenue and expenses at build -out; build -out is projected to occur over a 1'5 -year period'. The applicant's MFIA projects an annual net fiscal benefit of $3,173,610 at build-out. The phasing proffer does not achieve what the Patz modef is utilizing to achieve the positive fiscal gain. As written, the proffer would allow the coristruttion of 600 multifamily residential units and 184 townhouses with the construction of 100,000 square feet of commercial area. This phasing proffer is not consistent with th.e.Patz suggested phased approach to maintain economic balance, nor does this phasing proffer guarantee to' offset impacts from residential uses. If the' applicant wants to rely on the outcome of the Patz study, the applicant should .be proffering to implement.. the Patz study. As written, the phasing proffer provides little if any benefit to the County: County 'Development °Impact Model The, County's Development Impact Model (DIM.) is utilized to, project the capital fiscal impacts that a residential development will place on the county over a 20-.year period. Through an extensive review in 2013/2014, the DIM policy was reaffirmed that the DIM projection would consider residential capital fiscal impacts and would not consider credits for commercial components of a, development proposal. On June 25, 2014, the Board of Supervisors adopted the updated DIM for use in FY2014. The following is a breakdown of'th& projected impacts per dwelling unft for each capital facility. Capital facility Town home Apartment Fire and Rescue $412 $418 General Government $33 $33 Public Safety $0 $0 1. `Library $379 $379 Parks and Recreation $1,332 $1,3132 School Construction $11,281 S10,535 Total $13,437 $12,697 When applied to the residential, mix used in the ;Patz report (1,050 %apartments, sand_ 150 townhouses), the DIM projects negative capital fiscal impacts of $15,347,400. This projection solely considers capital fiscal impacts; the DIM projects that operational fiscal ,Page 3, Mr. Thomas Moore Lawson R- Rezoning of Heritage Commons December 1, 2014 impacts are generally much greater and collectively exceed the tax revenue generated by the, multifamily residential -use, by a factor of 21. In applying the DIM using the "phasing proffer, the DIM projects that 300 multifamily and 50,000 square feet commercial could result in a projected annual negative impact of $400,000. Transportation Concerns: The proffer statement does 'not provide for the construction of any, of the necessary roadways within the..Heritage Commons development. The roadway construction proffers continue to remain solely, reliant upon'a revenue sharing agreement that does not vet exist. At a minimum, staff would suggest an additional proffer that would restrict development without an executed revenue sharing agreement between the Countyand the applicant. The current proffer should clarify 't hat- development will not occur ahead of implementation of the transportation system. While some concurrent development as the transportation system is being constructed would be. sensible, protections should be in place so that significant development, could not occur ahead of key roadway connections being in place, particularly the bridge over I -81. The proffers lack a commitment to construct the. road network, and a phased approach When the network would be constructed. This could result in 'the development of residential and commercial units without realizing the construction of any of the necessary road network. Without the outside'agreerrent; the,proffers contain no-commitments that the developer will construct the necessary road improvements. Please,contact staff should you have any questions. Sincerely, Candice E. Perkins, AICP' John Bishop, AICP .Senior Planner Deputy Director— Transportation CEP /pd bcc: John R. Riley, Jr,., County Administrator Frederick County.Board of Supervisors December 1, 2014 Mr.. Thomas: Moore Lawson. Lawson. and Silek, P:L.C., P.O. goX 2740 Winchester, Virginia 22604 COUNTY of .'FREDERICK Department of Planning and Development 540% 665 -5651 Fax: 540/ 665 -63g5 RE Rezoning402 -14 of'the Heritage Commons Project (former Russell' 150) Property Identification Number (PIN) :63 -A- 150 „64 -A10; 64-A.42 Dear Mr. Lawson :; Staff is currently finalizing the ;staff report, for this application, Which is-scheduled for a public hearing before, the Board of S`upervisors on; December 10, 2014. While the staff report Will be outlining a `number of ,concerns still present with the rezoning; application (Which have been 'provided 'to you in previous .correspondence), there, 'are two primary im "pacts that are present'with this rezoning applicat_i,on that stafffeels need to be reiterated. The Heritage Commons rezoning application fails to ,address'the impacts to; the Frederick County Public School System and th_e transportation impacts... 1. Fiscal Impacts; The: negative fiscal impacts associated with ;the residential uses. proposed on the proper,y have not been satisfactorily addressed., 2.1 Transportation .Concerns: The proffer statement does not provide, for the construction of any of the ;necessary roadways within the'. Heritage Commons'. development.-The roadway construction proffers continue, to .remain solely, reliant upon a revenue shariIri a0eerhent (developer. = county agreement) that does not vet exist and' there are no proffered commitments that guarantee that the developer will construct roads, prior to development of residential andcommercial uses. Fiscal impacts The' negative "fiscal impacts associated with the residential uses proposed .onlhe Property° hav6�hot'been satisfactorily addressed: The. Md4et,and.;Fiscal Impacts Analysis (MFIA); authored by S. Patz and Associates, dated August: 2014j;and revised ;November 3, 2014 is based on the development's proposal of 1,200 housing` units and 700,0100 square feet of commercial development, including a new Frederick County office building' The 1,200 housing units include 1,050;apartments and 150 townhouses. The commercial space;is modeled on: 220, 000squarefeet (county office and developer sponsored 70000square foot building); 380,000 s-quarefeet - f fice; and '100,000 10.7.North Kent Street, Suite202 • 'Winchester, Virginia 22601- 5:0:00 Page 2= Mr. Thbmas Mbore-, Lawson" RE :;Rezoning of. 'Heritage - Qdrfirb.dlhs D'eternberl, 20A ,square feetretail. The applicants:MFIA,evaluates on-site, and off-site revenue and expenses at bUilcl-dUt', build-oUt is, projected to,,Oc-cUr over a "15- ear period. The applicant's MFIA projects awannual netfiscal bene fi it of $3,173,610 at build -out. . The phasing, proffer cloes,nOtachieve –h-atthePatz m6del'is-litili2in , g. to, achieve the positive, fiscal gai - ri. . As Written.,-, the 'proffer would allow the cogstructiop of 600 multifamily residential. "units and 184 townhbqses With the construction., 'Of' 100,000 square feet of commercial urea., This,.phasing, proffer is, not consistent with -the Patz sagVested phased approach; -o maintain ec.onorriicbolaripe, nor does this phasing proffer ggarantlee to off set impacts from residefitidl., Uses. lf,Ie .0pplitant'Ndrts, to rely on the outcome of ,the Pain study,, the,, oppikant, should beproffqing to implement the, Pdtz study: As Written, the phasing proffer Ord ides Little itany benefit to the County. County Developmentilryipact-Model` The County's D'evelo'pment Impact Model (DIM) is -ufilized, to project 'the 'capital fiscal impact$ that 0 residential developmentr Will place on the -county oVelt 6 20-year period.. Through, an extensive; review ,in '2013/2014j the.; DIM policy was reaffirmed that the ,DIM 'projection would consider residential capital. fiscal impacts and' would" not consider credits for,cornme-rciail- components of a development proposal. 'Oh, June: 25 2014, the Board of . - _ _ components , I ­ I -, -- ­ i 1 1 Supervisors; adopted the updated DIM f•r use in.FY-2014.; The ;following is a brea.kdown. cf the projected, impacts per dwelling unit for each capital facility., Capital facility Town Home. Apartment Fire and' Rescue $4,12 6'erieral Gbv,'iEThrh`On_t $_33 $33 Public'Safe'ty $0 $0 Library ..... - - -- — --------- $379 $`375 •When applied .',.,to ,,fhe'rL-sjoentioI mix. used in the Patz report, (1,050 apartments and 150 townhouses),,, the ,DIM pro ft ets hegati0e capital fiscal imptlets: of $1 347,,400. This projection solely considers c @pita fiscal impacts; the DIM projects op erational fiscal P_age`3 Mr Thomas Moore Lawson. RE- Reioningof Heritage:C6mmons Tiecember;i=,.2014 'impacts Are generally much greater and collectively exceed the tax revenue: generated by the rnultifamily`residential use by,aJactor of 2:1. In applying.'the DIM using the phasing proffer; the DIM, projects' that 30a multifamily and' 50,000 square feet commercial could result in a projected lahnoal ; negative impact of $400,000. Transportation Concerns: The proffer ;statement does not provide for the construction; of any of the necessary roadways within the Hentage .Commons 'develop"ment. The roadway, construction, proffers continue to remain - solely reliant.uaon�a revenue sharine;a>?reementIthat,does not vet exist. At a minimum; staff would Rsuggest, an a`d'ditional; proffer that would restrict development without an executed revenue; sharing ag "reen'ent between the County and the. applica "nt. The current proffer shout, "d clarify that- development will notooccur ahead.of implementation of the transportation. system. While some concurrent development °as the transportation. system is being constructed, would be sensible, protections should' be: in place, so that significant development could not occur ahead of'key "roadWaiy co "nnections being in place, particularly the, bridge over 1 -81. The proffers lack a commitment to construct:' the, road network, and a' 'phased approach when the network would be constructed. Thi's could' result: in the 'development of residential and commercial units without realizing the. construction of any of the necessary road .network. Wit'ho'ut they outside agreement, the: proffers contain _no -commitments that, the developer will construct"the necessary.raad improvements. Plea se,contact;staff shouldyou,' have any questions. Sincerely, Candice E Per ins,;AICP Johrr Bi`sho'p; AICP' SenidrPlanner Deputy Director — Transportation CEP/pd: w , •� .- ..COUNTY of FREDERICK , A 1<0 - - _ . ' - - Departmentof, Planning and-�Development ® 540/.665 -5654 17778 38 kµ _ :FNX: 540/665= :6395 . _ � - ` _ -. - November it,-2U 14 Mr. Thomas oore- Lawson M f `Lawson and- Silek, P.L.C'. P.O. Box 27.4'0 : - r Winchester, Virginia 22604 RE =:- Rez6ning. #02 -14 of the - Heritage Commons'Eroject'(former Russell.150 } Property Identification Number (PIN): -.63 -A- 150,,64 -A1;0; 64 =A -12 Dear Mr. Lawson; A -1: have had t4e.'opp6rtu6ityto,r6iew -,the revised proffer. for the Heritage Commons project - 'dated - September 7;,2013 and revised November -12; 201'4. ° Staff•ackriowledges that many of . the- issues discussed at burmeeting on Monday; .November 10,, 2014 have been- addressed in . - the revised proffer -;, however; there ,are .additional concerns still present with this rezoning r application. Staff s; review comments' are listed below, for, your .consideration-. Rezoning Comments 1 Agency Comments. Many of'the=Review Agency concerns' and comments rerriain unaddressed, .speci'fically VDOT, F.CPS, Parks and Recreation, County Attorney and Public Works, - 2; Phasing and IM, aci on.- Community Facilities., The negative fiscal ; impacts, associated with.. the residential .uses ;proposed on 'the, property have ;not been satisfactorily addressed: The applicant,s•Market and. Fiscal Impact Ana, lysis,(MFIA) b S. Patz &Associates 'shows - y a positive fiscal gain;: however, 'the . Patz report utilizes full, build -out. of the commercial. and .residential landbays to achieve this. figure (,15 +/ years, I ;200 market rate residential units, and 700 OOOsf of`commercial). -The` phasing proffer does not iathieve what the Patz,, model is utilizing to achieve the positive f seal. gain. - The MFIA also ;fails to have addressed concerns raised by the Commissioner'of;the Revenue!and,the'Treasurer =so;;its results-are questionable: -. 3. Access, W.Landbay 7. ;As currently depicted, access to this landbay will solely. be . from Route 522., The.land use. table shows that this area (the^ largest landbay, within- - ahe- development) could be. up to 90 %e residential and' is `proffered to contain all the townhouses': -Staff'has concerns that all' the, residential units could be constructed within ,this laridbay .,(Olus. corh.m0rcial)t and there wilhbe no access to Warrior,Deive and-the main transportation network within the - development. _ 4: Complap`ce with the 2030 Comprehensive Plan: The .land uses shown within Iandbay_s.3 and 7 are not supported_:by the 12030' Co'mpreliensive Plan, The proffers 107 North Kent Street, Suite 202. Winchester; Virginia 22601 = 5000° i - Page.2 _ Mr. 'Thomas Moore Lawson WE Rezoning of;Herhage Commons November 1'7,'20'14 ... ;.' show landb "ay 3,_ With mixed residential and commercial land uses, the' Comprehensive Plan designates "this; area ;for employment .land ;uses. The proffers show landbay 7 (53.95 acres) with the :abi.lity to develop with 1.00% ,commercial uses." .The, Comprehensive 'Plan shows the. entire area 'that encompasse' landbay, 7 as high density.residentW'. lntroduc ng` commercial uses into landbay'? is: not, supported by - the "2030 Comprehensive. Plan. b 5. Mixed,'Use Development." The proposed R4 zoning being ,sought with this rezoning; application would. enable a mixed use development; however; there are no assurances - withi;n' the, proffer statement that a core /town center area will be:_ provided,, As - proffered; the development would be a traditional residential and commerc'W. project,. _ with the "uses''being clearly -separate, from one another: .- - Transportation Comments 6. Remouat,of $? 0.00 OOO cash proffer trans ortation.;..'The Russell 150 TiA u on p. P , -p which this application ;is reliant. and references.with the, trips , -limitatioi proffer,moted . sigriificani .offsite impacts. in ,addition to those that ,led to the proffered. needs of.the Warrior Drive connection to the south, connection.to the north toward the Glaize• ;..: . property; and, connection. to the City via abridge over 1 -81 This led to a $ f,00.0,Q00 cash proffer which 'is not in the current package;: 7: Development ahead, of transportation. The: current proffer 'should clarify that development Will not occur .ahead of i hip l'ementation of'the transportation system.. Wh'i'le some concurrent development as the transportation system is being, constructed would'be sensible; rotections should lie in lace so that. significant de p p ve[opment - could not gccur nn ahead- of'key roadway connections being in place; particularly `the bridge. overj_81.: _ 8. Warrior Drive. - Consider adding •performance; triggers .tied. to development for the; Warrior :Drive revenue' sharing agreement. Currently the, proffer ,gives no `when.' regarding how this will; be" implemented..- The:` Counfy can; apply, for additional revenue 'sharing funds for this project" as early ;as November 2015: . Revenue ;Sharing Agreement: The - roadway , construction proffers t- remain solely . reliant upon a revenue —sharing ring agreement that does not yet .exist: 'The' County draft W as _rejected and °staff rendered eomment:on "a'subsequent draft. from 'the :applicanton 10/29/44. E Ioweuer. ngthing:`further has been heard.at the -staff level:: At thi's point; :the proffers `do, ,not. address; .what happens. if' the proffered agreerent does riot 'materialize: At a minirr►um staff ;would suggest.an additional proffer that would } . restrict. development :without; an : executed -.revenue sharing agree erne' nt between the.. County and the applicant. 10. Narrative :comments in the proffer statement.. Staff would_ continue: to,'note:,that - Vag e -�. Mr.,TKbmas.Moofe Lawson WE Rezoning of Her`iwa e;Coinnions November-13 2014; ,'' the narrative comments'in the proffer statement, that are not actual proffers _should, be: ;removed' and such comments conf ned" ,to 'your. write. up and /or presentation fo the ...,_. _ - .. Board. - - _-Modification D`oeuinenf 11. 1VTodifica6o.n - #5. ' The decrease.of open space:from 310 to: 10 %'seems excessive.; The minimum open space for. ;B2. .zoned developmentsi`s 1'S %and the:mini'mum`for mixed 1. y widen tial'. ;development" is :30 %. The; pstif cation for' the mod'Ificat on _states that.. rooftop green spaces and amenities could be provided, however there - are. no proffers or,guarahtees, that these',types of amenities will `be provided. 'This "modif cation has .the, potential to, create a community with, no,ouidoor areas for recreation and /or open s ace: p G Please note, that open. spaces do not have -to be green areas, they_can consist: of central.-Plazas and square's and therefore a protfer`to provide these types of amenities isoencouraged to _justify -any open-space modifications. The modification needs, to include the total acreage contained within the stream valley,' and within the developed portions of the; property. It' does• not appear.' that "the justification" provided'.supports _ the° request, for ahe reduction'. 12. MWifieati'ons. -_ The:.rezoding package indicate•§ that there is a desire to; build residential. units connected to iwmmefcizd ,uni"ts (either on the second or- higher floors or attached) As :discussed the, modification' document - should be updated - to, also a11ow uses'and setbacks currently' allowed in the TN 0' er'lay'Distr`ict. Please contact staff should°yo,,u have any questions.. 'Sincerely, . n ice,E: Perkins AICP J.ohn:Bishop; AICP. ` Senior Planner f "Deputy Director - Transportation CEP /pd ,John, R. Riley, Jr.,, County Administrator - Frederick County Board' of'Supervisors 2. Pam Deeter T,o John Riley; Richard'C'. Shickle (rsh'i'ckle @gmaiLcom); Gar"'Lofton (gary@garylofton.org); Robert Hess (chess @co.frederickva.us) Robert W.'Wells (robertwells946 @comcast.net); Chris Collins--,Gene E. Fisher (gfisher @visuallink.com) Subject: Heritage Commons Attachments: S KM BT-,_PLAN 14111714'560:pdf` Good afternoon, Please disregard previous email. I have attached a letter from Candice Perkinsand`John' Bishop with comments concerning revised proffer statement. Pam Deeter Frederick County Planning Dept. 107 N. Kent,Street, _Suite 202 Winchester, VA 22601 5407-665 -5651 1 Pam Deeter To Charles�S. DeHaven (cclehaYen'.4crosslifik.het) Subject- Heritage Commons Attalchmenfs:� SK-MBT-PLAN141117145601.,pdf. Good,afternoon I have attached a letter from Candice Perkins and John Bishop address the revised proffers. :Pam Deeter ,Frederick County Planning Dept. N'. Kent'Street, Suite 202 Winchester, VA 2,2601 540-,665-5651 Pam Deeter From: Mail Delivery System < MAILER- DAEMON@'c6.fred'er.ick:va.us> To: robe.rtwe,lls946@comcast.net; Tshickle @'gr- hail.com; ga y @,garylofton.org gfisher @Visuallink.com Sent: Monday, November 17, 2014 3:00'PM Subject;., Relayed: Heritage Commons Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: .robe rtweIIs946 @comcast. net rshi'ckle @gmail.com gary, @garylofton.org ,gfisher; @visual li'nk.com ;Subject:, Heritage Commons m 1 Pam Deeter. From: Mail Delivery System <'MAILER- DAEMON, @co.fredeeick.va.us> To:, cdehaven @crosslinkAet Sent: Monday,.November 17, 2014 3:01 PM Suopj ct.- Relayed: Pam Deeter From:' MAILER- .DAEMON @admin, on.i:com To: cdehaven@crosslink.net Sent Monday; November 17, 3,:02 PM Subject: "Delivered: Heritage Commons Your message has been delivered`to the following recipients: cdeha:ven @crosslink.net Subject: Heritage Commons 1 1 . u Pam, Deeter From: Microsoft Outlook To: Chris Collins; John Riley Sent Monday, November 17, 2014 3:00: P.M Subject: Delivered: Heritage Commons Your message has been delivered to the following recipients: Chris Collins (ccollins @fcva.us) <mailtosccollins @fcva . us> John Riley (jriley @fcva.us) <mailto:iriley @fcya.us> Subject Heritage Commons 1 COUNTY 4'. FREI)VAICk pepar, ment of Planning and, Development, 5401, 6.65 -5651 xujlyl 'FAX: 5401665-6395, Noverriber X17, 20 " -14� r Mr. Thorfias Moore. Lawson; Lawson And 'Silek;,P L`C'. P:Q. BoX`2740 Wmchester,`Virgir, is 22604: RE':' Rezoning , #02.14 of the;Heritage Commons Proleet (fo_r > >mer Russell 150) Properiy'Ident fieat on-Nuinber (PIN): 63-A-150'9,64 .A10, 64 -A42 Dear Mr: 'LaWsonc. . r f� I have had the opportunity to review the revised pr'offer�for the.Heritage Commons project; dated "September 7; 201'3° and'reuised November" 12,'2014', . Staff Acknowledges that many of the Issues discussed at our meeting on Monday, November 10, 2014 hav "e been addressed in :the revised ,proffer; however, there are additional 'concerns still present with this rezoning !application. 'Staff s,'review .comments are fisted belo "w for „}your consideration. F Rezonmg'Comments, 1.. Agency Comments Many of the ReyJew Agency concerns and comments' remain - unaddressed, specifically VDQT,'FCPS, P,,arks arid, Recreation; County Attorney and Public Works. 2. Phasing and. In paet on Community. Raclin s� The ,fie`gative fiscal impacts , associated with the ,residential -uses:. proposed Jib,n the; p "roperty have not been satisfactoril "y addressed: `'The applicant's Mar "ket and F�scal.Impact Analysis (MPIA) by Patz; & Assoc�afes shows a positive: fiscal. gain;' however, `the Satz. report utilizes "full build=out-,of the commercial Arid residential. Jan . I bay- `ta achieve this figure (15 +/- years; •1,200 units and'700;000sf of commercial)'. The phasing: proffer .does= not achieve what the Patz model ls iitilizingJa, achieve the positive fiscal gain; T11e .MFIA also fails ta:have addressed concerns raised "li,y'the Co'mmissionerof the Revenue and the; Treasur "er, so its results, are ,questionable: 3; Access. to Landliay 7 As .currently depicted, access to. th-s 1 "4ndbay will solely be'. from'Roufe 522 The land'use table shows that t1i�s area_%(the largest Iandbay, within.. the development), .could be up to 90% residential' and is proffered to contain all the townhouses_ Staff has concerns that all the residential umtsi could be constructed W4. hin this 1'andbay (plus; commercial)' and there will be no aeee "ss to Warrior; Drive and�the malnFltransporta`tion network °within the development: 4. ,Coin 'Hance with, 'the ,4030 Comprehensive Plain. The land' uses shown' °wit-hip p Undbays 3'and 7 ;are notsupported by the -2030 omprehensiwL Plana The proffers . _ .. SFr T07 North'Kent Street uit Se 202 Winste cheVir iiia:22601- 500.0: A { Page 2 Mr. Thomas Moore Lawson { RE: Rezoning of Heritage Commons November 17, 2014 show landbay 3 with mixed residential and Commercial land uses; the Comprehensive Plan designates this area, for employment land uses.. The. proffers show landbay 7 (53.95 acres) with the ability to develop with I'00% commercial uses. The Comprehensive: Plan, shows the entire area that.. encompasses landbay 7 as high density residential. Introducing commercial uses onto 'landbay 7 is not supported by the 2030 Comprehensive Plan. 5. Mile at on would en ble a mixed useode�eRo me i'ng being sought with this rezoning pp , ` _ p nt however,. there are no assurances within the proffer statement that a core /town center area, will be provided. As proffer'ed,.the development would-be a traditional residen_ tial and commercial project, with the.. uses being clearly separate from one another. Transportation Comments 6. Removal of'$1,000 ;000 cash proffer,to transportation. The Russell 1,50 TIA, upon which this application is reliant and references with,the.trips limitation proffer, noted significant offsite impacts, in addition to those that„'l'ed' to the proffered needs of the Warrior Drive. connection to the south, con'necti'on. to the north toward the Glaize property, and connection'to the City via a. bridge over I41. This led to a $1,000,000 cash proffer which is not in-the current package. 7. Development ahead of transportation. The current proffer should clarify that development will not occur 'ahead of implementation of the transportation system. While some concurrent development. as the transportation system is being.constructed would be sensible; r`otections should be, in so that significant: development p plate. could not occur ahead of keyy roadway connectionsi being in place, particularly 'the bridge over 1 -81. 8. Warrior. Drive. Consider adding performance triggers tied to development for the Warrior Drive revenue sharing agreement. Currently the proffer gives no `'when' regarding how this will be implemented. The County can apply for additional revenue sharing funds for this project as early as-November 20115. 0. Revenue'Sharing Agreement. The roadway construction proffers remain solely reliant upon a revenue sharing agreement that does not yet exist. The, County draft was rejected and ;staff-tendered comment on a subsequent draft from the applicant on 10%29/14. However, nothing further has been heard at the staff'level. At this point, the proffers . ,.do not address . what happens if the pro "ffered agreement does not materialize. At a minimum, staff would suggest an additional "proffer that would restrict development without an executed revenue sharing agreement. between the County and the applicant. 10. Narrative comments in the proffer statement. Staff would continue to note that Page 3 W. Thomas Mop —re Lawson RE =: Rezoning of Heritage.Commons November 17; 20.14 the narrative comments in the proffer statement that.are not actual proffers should be removed'. and such comments confined to your write up and /or presentation to the Board. Modification Document 11. Modification; #5: The decrease of open space from' 30 to 10 %seems excessive. The minimum open space for B2 zoned developments 'is �15 %: and. the minimum, for mixed . residential development is 30 %. The justification° for the modification states that rooftop green :spaces and amenities could ber provided,, however there are no proffers or guarantees that these:: types of amenities will be prodded. This modification has the potential to create' a community with no outdoor,areas for,recreation and /or open space. Please note that,.open spaces do not have to ;be,green areas, they can consist, of central' plazas and.. squares and'there fore a .proffer. to provide these types of amenities is encouraged' to justify any ,open space modifications. The modification needs to include the total acreage'contained' "thin the stream valley and 'within the developed portions of the property. It does not appear- that the,justificafion provided supports the request for the•reduction.; 12 -. Modifications. The, rezoning package indicates `that there is a desire to build residential units connected to commercial. units (either on the second or higher floors or attached). As discussed the modification document should be updated to also allow uses and setbacks currently allowed in the TNDB Overlay District. Please contact staff should you have any questions. Sincerely, 166—E. P MCP Senior Planner CEP /pd u . 4<v4, _ C ®UN�TX of ,F1tEDERICK Department of Plann nd ing a Development 5 401,605- 5651, 1738 _ . - - - - - FAX,:-5461,665 4345 September r ' Mr Thorna "Moore: Lawson. Lawson arid, Silek� P O Box 2740 Winchester, Virginia 22601 Rezoning: #02 14°0 the Heritage Commons Project (former Russell 150) ;Property Identifi'cation Number (PI:N) 0 A_1 65 44 -AM'64 A -12 Saecorid Comments' , 'Dear,lVlr.. Lawson';; - - . I have:, had ^,the opportunity to review the revised` .proffer for the: Herifage . Comrnoris; project dated September 7 20:13 and revised September 18 201.4 S aff'srevtew. L = comments are listed below for your consideration. A revised modification document and: . GDR were not provided with this submt'ttal ;and therefore staff 's preu_i`ous comment letter n dated September 12; 20'f33, hould. also dbe refeienccd. - a ' 1, Proffer 2. Uses,,iDensty and.,M A stated in staff's September 1,2,'20,13 s - A comment letter;`the proffer should show,a ri aximm,and rriinimurrrpercentage� of o :corrimefcial and residential acreage; being proposed wiii--tliis� rezoning Tlii`s area `,is, proposed to :consi`st of business' / commercial ` and resrderitial wand ,uses~ and w therefore,. B3 (Indus trial: Transition) uses should be proh bited.:on the site. r 2 < Impact on'•:Community :Fac`ilities ° As previously stated, m staff's September. 12, -' 20`13' coriiment letter, as `part' of yoitr.- rezoning package a market and' ftscal`- impact' analysis was submitted that.• showed ':positive f seal ,gam, However, ''there is rio p proffered = phasing,; or requirement .that, the commercial porfion, be constructed before the residential The developmeit,- mpaet,modelprojects:a negatt've impact'. " of $1`3,062,;per single: family attached unit and $'11,339; per multifamily unit on :County capital facilities: Therefore; based on the unit cap of .proffer 2C, the " pottential impact' he� :residential 'units will'„ have pn County facth =ties 9: y ;million The development should,.not ufilize`.tlie ,future =potential -tax ,co_ ntributions' of the commercial.`:landbays, :to> offset; the-, residential landbays: without phasing fhe_ °- - - - > - eOn metotaf to be .built in conjunction with the residential: 107 North Dent Street, Suite 202; Wanchesfer Virginia 2260.1 -5000 Mr Thomas §Moore Lawson w ` RE Rezoning of Heritage Cbmmons +. ` September 23_; 201,4 • _ - - � . . A Updated Fiscal Impact Analysis:. Staff was :advised that the; .F.iscal` Impact; Analysis -,was updated to address inaccuracies in the input data. To -date staff.has not received a copy of tliisupd "aced document: r. ,4.' Monetary Proffers - Omitted from New .R'ezonmg. As, stated in, °staffs` . September 42, 20'13 comment; letter„�t should be ,clarifi�e'd why the new rezoning . appl'catrori has removed the�following previously proffered monetary proffers: - - ,$ L0,000, to, Fire, Land Rescue $3,000. pgvunrt_for School`s; ' $2,506 HOA start up ;proffer 1 million for'the,general transport ation fund ($3;500 per residential `umt) 5, ;Proffer 6: — Recreatio.nal Amenities. As °previously stated m staff _s September ` 12; 20:13 comment letter,; this - proffer speaks in general terms of whaf :could.'be constructed, as ,.,.recreational ameni ties for the 'project but does not commit >4b.'' . "CO nstruct anything. Unless the owner- is•-proffering, a specific: amenity., the: proffer ,- :should, be, eliminated. aiid :th6� ox4 -recreational un t type,would.be specified,at °the; by stage. The proffer, also states ,that walking trails and sidewalks will be provided within, the ;community;. the' trail'locatio-ns should be located on the;.GDP. Please - nofe that sidewalks aloh' oadways are required by `County Code, 6...' :Proffer 6 —Phasing. The revised, phasing; proffer ,states that: the applicant-would. need to apply for aril Freceive a buildirig`pern it .for 50;000sf fof commercial in order'to construct ,the first 100 -nu units: The, proffer also states. that this ;. w S0,'000sf of commercial :•area would need to be; constructed -before the applicant: could- construct the 600`" of greater ;multifamily units. This proffer does not'. guaraneee the construction- of any, commercial square footage to offset :impact's from: the first 300'.residentral units, it simply, guarantees that,ia.bmldrng perrnrtfor a"commercial use: - -would be obtained; A more appropriate proffer should. address acquisition; of a Certificate of Occupancy- for the commercial "use. As, written, the ' proffer would allow the construction of 599' multifamily- ;units arid- 184 . townhouses prior to any: commercial development being .constructed.. This rs not 4 consistent Withg the. PAZ' suggested ,phased - approach to° maintain economic balance,, nor' do - thi - phasmg proffer guarantee to offset.rmpacts from residential uses As written,.'the phasing proffer provides little if any benefit to the County, and 'developmentr. 7:Y °.Mixed Use :.Deevelopment. The,�,propos _ d; R4-_ zoning being sought with 'this rezoning. applrcati'on would enable a> mixed' use development; 'ho "wever,, there are no assurances wrthm the; proffer - staternenti that a coreltowri, center:ared` will.`be 4 rov ded. As coffered' the develo meet- would:. be; a traditio -nal resident' al.'and p. p p commercial:project, with;the °u ses being cl`e'arly separate from one another': s Mr Thomas Moore Lawson RE Reonmgo.,f Heritage Commons September 23; 2014. _ 'Other. 8.: Trans oetatioi p" Comriments: Please note that: transportation cornrnents: on the rezoning: application from,..'John Bishop, Deputy _Director of, Transportation; are - being provided to, you in ;a,kp&ute.letter, - 9 - Agency C omments. Please provide updated agency�.comments from. the,, following '(based .on. the °updated .proffer,-. ,siatemerA 'Virginia Department of Transportation, Fr,ederiek County Department of Public Works, Frederick, County Fire Marshall; Frederick County Department. of ,Parks and Recreation, Frederick y n tation;Authonty, Frederick = Winchester Health.D,.epartment; Frederick. Count Sa County Public Schools;, the local F {ire and:`Rescue, Company and ;the Frederick Winchester-; Service ..Authority. Once attorney" comments are received. 'by `the' Planning'Department, they will beyforwarded to :.yd' ":,offce.; ,Attorney corrimerits "are required for- .scheduling ofthe',rezoning�applcation. Please°feel freeto contact me, with questions: regarding this.,40plicatibry., . Sincerel'y,, Candice E. 6; 1 ICP` Senior Rlanner 'CEP /pd. "bcc; John. R, Riley; _ Frederick Cotnty.Board,of Supervisors! T C a L 10;PL irkihs nd_ From:, Ca.ndice Perkins S'nU Wednesclay; October- 15 �,'2014:9:215 AM - To ThoTas Laiwspn' Cc Admin.; Admin. E . 11; John Bishop;. , 1 ft�Law . rence- Subject; Heritage Cc.m.mons Ty, Following up Qnr Eric's ema-il -an.d.-Y6,ur-,e-mail,and,letter'dated October _10,2014,:'W'e:are currently Working on the Heritage, Commons staff report for the November 5 th t meeting. SincejHe staff report must be finalized early next week, We will not be issuing.another round of Written comments'for the revised proffers. Also, at this time wL-,o n'ly,have signed and'notarized proffees dated September 2013 (revised I August 7, 2014). If you 9. wou.1d like to have, the. proffers, with',the revision. dat.e.of Octob&,9, 2014 included with; the, agenda Olease,submit a signed and no6rizecl'copy (,with a squa-re footage cap on sheet 7'ancl,all Exhibits) by-Friday. Let me know if you have any questions. _Qandice PerkiyS', AICP Senior.Planner Frederick CountV D6partment of P lanning:&. Development 107 North Kent'Street Winchester, Virginia 22601 (540)'665-5651. (540) 665-6395 (fax) cperkins@feVa.us WWW.fcva.us From: Edo Lawrence Sent: Tuesday, October 14,,2,014 10:54 AM To': 'Thomas Lawson'; anclite,Pci rkins Cc: Admin.-'- Aclrnins 1 !Subjedt: Heritage, Commons ' HiTy., This coming Friday, October ctob&r 1.7 !h cui--off foe a—rfy pFdffer-revisions to be included. in the Novemb r 5, 2014 PC rneeting agenda., Candic& will,nle,ed.to have her st-aff repo 0 inoleted by Monday,,October 2 01h, So that we ta6 distributed lffie agenda to the. Planning Corn, mission by rnid-4eek. Thanks. -Eric Rom: Thomas Lawson'[mailto tI6Wsoh(cbIsOIc;com] Sent:, Friday, Oct6ber­jd, *2bi* i­05 Pm. To: Eric-, LaWrence,",John 'Bishop; Candice Rerkins; Joe \/Vild& Cc: Adm.in.-.; A_aPitn': 1, Subjiect:- Heritade., Common's Please see. the-atta. G heo. Thank yo'u. �v Thomas Moore•Lawson, Esquire Lawson and Silek, P.L:C: P.O: Box, 2740 Winchester, `VA 22604: Oh: 540 = 665 -0050. Faxv 540 -722 -4051 Email: tlawson(blsplctcom The informeition,contained' in this message: is' information' intended only for the`Use of individual or entity named above, and may be-attorney /client privileged and confidential: 'If the reader of'this message is not the intended recipient, you are hereby:riotified that.any dissemination„ disteibution or copying of this communication is strictly prohibited. If you have "received this communication in error, 'please'immediately'notify us by telephone and return the original message to us at the above address. i i I I 2 LAWSON AND STLEK, ,P.L.C;. 120, EXETER, DRIVE, SUITE :200 POST oFFICE!Boxi2740. WINCHESTFR; VA 12664 TELEPHONE: (540),665 =0050 FACSIPi1LE:;(540)'722' -4051 • T'HOMASD'100RL LA }VSON_• TLAWSONn.LSPLC.COM October 10, 2014 Eric R. ,Lawrence, AICP, Director John A. Bishop, AICP,. Deputy Director- Transportation Candice Perkins, AICP, Senior Planner County of Frederick Department of Planning & Development 107 N, Kent Street Winchester, VA 22601 Mr. Joe, C. Wilder Deputy Director of Public Works County offrederick Department of Public Works 107 N: Kent Street Winchester, VA 22601 Re: Heritage Commons `Rezoning Application Our File.No. 1.050,:"001 i VIA E-MAIL Dear Candice and Gentlemen: As promised enclosed plea_ se find 'red-lined 'proffersfor Heritage Commons. We are still working on the maximum square footage of commercial /off ce and industrial, but before we put these in final I would very much. like to have your comments and thoughts and that we all focus on the comments that we heard in our neeting of Wednesday with; VDOT and Frederick County. As we discussed I will make myself available :at your earliest opportunity to review this `language. My goal is to :get these proffers out to 'the .reviewing agencies, possibly by next Tuesday. Thank,you for your continued assistance and cooperation. I look forward to hearing from you. Ve : tru ours, Th . Moore Lawson 1 TML.: j k: Enclosure cc: R 1.50 SPE, LLC Heritage Commons;, LLC FROG' I'AWYALADDRESS:P.O.BOx602,FRON-I RO) 'AIgVIROI]IA22630,TEL4:PIIONFi( 540 )635= 9415%FACSMILE:(540)6349421 E- MAIL:JSILEK L\N:SON'AC6MLEH.CO)I LAW$0N AND SILEK; P.L.C. - - 120 EXETER.D ft] 1'F.y:Su1TEL200 _.w.' P,OS'rOFI ?ICE,BOk274Q WINCHESTER, V_A:22604 Te).Ee11oNE: (540) 665, 050. 11 ACSID111:Et.(540)'7224051 - TH0n1AS'1%100RE_L ANVSON,• TLAWSON Q1.LSPLC:C0N1 October 7, 2014 Eric, R: Lawrence; AICP, Director:' Frederick County Department of Planning R Developtneiit 1,07 North Kent Street ` Winchester, VA 22601 Re:.: Heritage Commons Rezoning Application Our.File No. 1050.001 VIA E -MAIL Dear Eric: As 'you know-, we' have .now, received comments from 'VDOT, which were 'the final agency comments.: In' fact; in addition to the colnlnents we received on. September 1'8;..2013, we received additional „comments •on October 1,.'20'14; as well as - supplemental comments on October 3, 2014. We have responded'to all-with In y1etter dated'yesterday. Also,. I greatly 'appreciated our, meeting of Friday. to sort'�out, some misconceptions about the transportation component, :of this rezonin Per our discussion, I will see that we include a. p ` p g..., cross= section of the 'road; which is being designed by Frederick County and VDOT through the engineering services provided; to: -them. by Pennoni Associates. Just yesterday, I' received .a copy of that cross- section. from Ron. Mislowsky of ,Pennoni; who advised he had been •instructed to• give us .a. copy of -the same by: John Bishop on Friday. We would hope "that as the Planning Comniission and. Board. of Supervisors review the proposed road network that'-they will now better understand the road section that- is :being proposed across the Heritage. Commons'` property and Abe able to °put'�together' why our reply comments confirm that this road section 'is: being designed` pursuant 'to the road sharing ;agreement by and- between .Frederick County and VDOT. If you :believe more needs to be done to the rezoning application and proffers ;to drive, this; point home then please lef me know.. I look °forward. to presenting this; rezoning to they Planning Commission on November 5, 2014. ,One additional thought°we ,have is that: in order •to allow for advertising and; if necessary, a second, hearing by' either the Planning- Commission or Board of Supervisors; would it - be' advisable, to advertise public hearings for Phis application for' `the Board of Supervisors' meeting FROYF ROYALAl111RESS: P.O. BOS_ 602,. FROM' ROi', 1., VIRi: INlA22630;TP1l.PIIO \'E:(540)635 -9415 FACSIMILE: (540)635-9421 F.- NAII: :JSILEKGLLA %N'SONANDSII,LK.CO \7 ;t- Eric, R. Lawrence, AICP, Director October 7, 2414 Page 2 on November 12?, If by chance _the Pl'anning' Commission would, like a second.`hearing then perhaps we could, advertise this for a second `Planning Conunission on December 3. After, you have had`a chance to'thirik about this, please let`me know if you think this would be advisable. Thank you for your continued assistance and cooperation. `Very my rs, Thomas Moore. Lawson TMLjk cc: R 150 SPE, LLC Heritage Commons, LLC Mr. John R. 'Riley; Jr., Frederick'County Administrator Roderick B. Wrllianis, Esquire, County Attorney " John A. Bishop, AICP; Deputy Director- Transportation Ms. June Wilmot; ChainnanNember at -Large; Frederick County Planning Commission Se j,'from.'iPhorie� -Begin forwarded; message:. . From EII'en Murphy <emurphy @fcya:us> Dab ;Ocfober 6; 2014.at,7 11 52 AM E -DT' TO:- 1 of i'as Law "son' <tlawson @Isplc:com> Cc:,Eric Laverence ; <elawrenc@fcva.us> Subject; RE Heritage Commons Ty -dl have;hesitated emailing..you bat decid' tl a. response was .in order'.. Because- little .was changed from the last'distribution;Thave decided not to send an iternized:,Isting-,of problemswith the proposal. Needless to say,.although'I was thank6d,at the general discussiort'meeting my suggestions were ignored. The -PPTR instill.in�error and other issues do not seem changed; Thank you for keeping, me in thejoop, however. Ellen El1en.,E. MLlrphy,,mcoR Commissi'oner'of'the Revenue. Fred,enck-founty; Vrrginia 107-`,,Norfh;Ken't Street; - W,inchesfer VA 22601 Office 540.665.5681 01(ect- 540:722- .8334 Fax 540 67.`6487 6 eMurphV@fcVa:us' From Thomas Lawson mailto alawson @Isplc:com] ',sgnt 'Thursday;. September 18;'.2014,4_ :88'PM TW-Blen Murphy Cca,Admin.�; Adnin.;1 Subject: Heritage Commons Please see the attached;. , Thank you Thomas Moore Lawson%;, ;Esquire` Lawson' and, $ale_ k P L G: P:O. Bb) <27'40 1A/fthesfer, vk2 -2604 Ph: 540= 665 - 0050:° Fax: '540- 7227- 40.51 Email tlawson(a)_lsplc:com T.he° information contained, in this, message :is�. information 'infended:'only.forlhe °use of- individual, oren.'tity named above „and may, be a'ttorney,Lclient privileged, and. confidential If the, reader of his, message °is not the intended rec'ipien't, you are�here'by'notified` that any, dissemination, distribution or copying - of.this communication'is:sthctly prohibited. lf'- you'have received, this- communication 'i'n error, please immediately notify us!, by telephone and .return.the: original messageto.us at the above ",ad'dr.ess. y } , Candice F'erklns Subject; :` . FW;'Heeita;ge Commons From: Thomas Lawson [mailto:tlawson @lsplc:com] Sent:' Tuesday„ September 30, '2014 3::4x7 PM To Eric Lawrence Cc:_june .wilmot @ver.izon,,'net; `John Riley; Admim; Admin. 1 Subject: Re_ Heritage Commons I just reeeived,a voicemail.from Lloyd Ingram `advi'sin,gwe will have VDOT's comment: tomorrow I understand you have already started',the adverti'sing.process for O.ct 15 hearing. Kindly proceed with .the original scheduling and have thi's heard'at the 4Oct 1`5, Bearing. Thank ;,you,, Ty,-Lawson Sent: from my, iPhone On Sep 34 2014, at 3.34 PAM,; Enc�Law ,rence� <el'awrenc f6a.us >, vrdie. Ty= June and 1'h, rnef to discuss the sched,uli'ng of`your applicafionr As:'noted. in an'e. -mail to you earliertoday, the;'ite,m will not be,hea_rd'by'tli,e Planning Commission on.C►ctober 1.5th, .We - will strive to accommoda te the °application.at the`NovemberI ' Planning Commission if'we:are'in receipt of the r o- utstanding"agency co "m"ments and applicant responses by 5.00 R,IVI op Octobe:r,10, 2014. I understand that you are in possession of °fhe County °Attorney comment, so the remaining documents "so.ught; - the 4 to the UDOT'comment and a pplicant:res onse and y our'response CountY Aftorre Comm "ent s. Once;we;are.in; receipt of- these. remaining; documents, we will'strive,ffget toA' e Planning Commission in November,. and then have a PC.:cecommendation for the 'Board's consideration at their'Decembee mee,ileig, -.Eric d _ From T,homas,Lawson [mailto tlaws6hOlspic.com] Sent Tuesday; :September 30, 2014 .1:15 PM: To Eric Lawrence, Ca., wilmot@Verizon het,.]bhn Riley; Admin.,; Admin. 1 Subject. "RE:. Heritage, Commons, Eric; m° res once to ail,; I 'have also received just this morning the County Attorney's comment p A Y your e m letter and, _as promised; 1 will.agiye you° a response within 24 hours. .1 ',have also called Lloyd Ingram at VDOT °and .left him a yoieemail' asking for'VDOT's supplemental' comment, letter This is 'in. addition to earlier a mails from me asking for VDOT's! comments. :f know, you already have: in.' -your file: VDOT's comments to the first submission. Frankly,, I)ec4osta the proposed', road! l'- t has not, changed J :do not :. ' exp'ect;si nificantly ch`an'ged comm6ht' ,from VDOT. _ I V1/ifh rega`rtl to ameeting with John Riley L have already spoken with him., this.mo�ning' after receiving ;your e:;mail and:haue also spoken with June Wiln' t. June' advised she would`follow'up or have•a meeting with, . you so we. can get the ,hebri'ng, schedule sorted out. I do understand the desire of the Planning t :, Commission and•BoardLLof Supervisors' members to r.'eceive' agency comments and supplemental`agencq,. commenfs It is: n'ot appropriate however; pto hold ups an; applicant because: the °agencies-. are. slow to provide theit1suppl6mental comments.,'This ' i`s especially,true when4e..are -dealing with a time sensitive: matter h.would therefore request that you,all follow the ,Frederick Cou "nty. °ordinance .and proceed `with " the. Planning Commission heafing.on; October, 15 By using the` 15th we give'the Planning 'Commission and /or Board of SuperVisoIrs,rthe opportunity °,for a follow up hearing if.`. they, deem ''it .neces"sary'., I most ' �certainly'.'d'o not:want.to''.,putthe "Planning Comm,ission'or Board >of Superv,isors in a spot where`they:feel they'ha�eno.additional time to: looks at an application: T'hankss'for-your assistance and` cooperation., • ' . Tay. From . Eric 'Lawrence [rriailto:elawreneoafcva.us]` Sent Tuesdayi. September 3Q,� ;2014 1t ,43 AM To: "Thomas Lawson' Cc: iune.wilmot @veri2on:net;,John Riley; Admin.;, Admin..'1 Subject: RE Heritage Commons Ty l am in °re_ceipt; of agency,comet ;ents.an. your. responses f.rom:'RIanning ;, County Transpo"rt"ation, Schools, Parks and ,Recreatio,n, and Public Works Thank you: :for forwarding As,noted previously, I'm still awaiting completion of`commerit and response for U,,DOT and County Attorney. } Jo'h'n,,is. not ;in the office.today, o schedultng,:a meeting with him,will need to�wait until he returns. -Eric: From° Thomas. Lawson. [rnailto tlawsb'r!OIsbIc:com] t Sent:'Tuesd'ay, September 30, ;2014 ,9;:;12.AM To `= Eric'Lawrence Cc: =june wiIMot@verizor anet, John Riley, Admin ; A :dmin.'1 Subject: FW.; Heritage ,Commons r Eric: " 1 am in receipt of your e =mail . For the.reasons stated in iiiy �prey'ioUs e =mail and voicemails th a is hot, accepfable.. More; impp ;rtantl`y „this doves not comply'with,Frederick County ordinance: Please let me know when you and JohnTRtley, re available,for a meeting. For timing reasons, his matter must be heard on Octo,be "{',15th,: `There may be some, issue. with you ;receiving ;my e rna_ils; therefore; I:am having; all of the comments that _I have. received as`well as.my written responses ,whi,& 'we re:'e:= mai led .to °you yesterday'h- and,= deliv eced this morning; From. Thomas Lawson „[rnailto tlawson@I`splc:com]' Sent : Monday,; September 29,!`2014 3:53 PM l To:elawrenc@fcva us, ;�coerkins@fcva.us7., Subject:- Heritage: Commons; , a Ca'idice_ and Eric: z, r Attached please; find our responses to -the a enc review comments we ha e received sofa h, Thanks,; TY Tlaomas`1Vloore:Lawson,.Esquire Lawson and Si'lek, P.'L.C:; P".0". Box :274;0 Winchester, VAIZ604, Phone-, -54 -665-0,05.0 Fax: 'S40- 722 -495:1 E =mail: tlawson@1splc com The, inforhTdfion contained 4ii'lhi's'message is information intended,only for -the use of the, individual or'entity named. above; and maybe attorney /el�ent- pri -vile,'ged and conf`dential, If th-e reader. of'this message,is not the: intended recipient, you arebhereby notif ed, th'at any dissemination, distribution or copying of "this. communi;cat is strictly prohibited If you have received this communication in error, please immediately notify us by telephone,and.- refurri°the original message to u.s at the -,aboue'address. Thank you. No virus `found; in this message; 'Checked.by AVG www au � cone, Version: 2014:0.4765 % Virus;D.atabase:.4025 /8299 - Release Date: D9 %3'0/14 q F i 1 1 ' i Candice. Perkins From! Eric' LaWrencei Sent: Wednesday, sday, October 01, 2014,8:49 AM To Candice Perkins suploct FW: Heritage Commons Fir6irn. Thomas. Lawson '[rna i Ito tIawsbnVgb Iso1c. tom]- Sent: Tuesday, September 30,- 2014 1!-15 PIVI To: Eric Lawrence Cc: june.wiImot(5)verizon.n*et, John. Riley,, Admin.; Admin. 1 SUbjecf: RE: Heritage Cbrnmons Eric, in response to yo6r e-mail, I -have also received just this morning the County Attorney's comment letter and, as promised, I will give you -a response within "24 hours.- I have .,also ciailled.Lloyd Ingram- at VDOT,abd left him -a vdicemail. aski6g for - VDOT's supplemental, comment letter. I This is in addition to earlier e-mails, from me asking for VDOT's comments;, I know you already- have in 'YciOr file VDOT's comments to the first $.ubmissi6n. Frankly, because the proposed road layout has not changed, I do not expiect significantly, changed, comments from VIDOT. With regard to a meeting with, John Riley, 1, have already spoken with him th(q, morning after receiving your e -mail. and have" also -spoken with June Wilmot. June e-bbvised she would'foll6w up or have af ryf6efing with you so we can get the hearing schedule sorted' out. I do-understand the desire of the Planning Corn- mission and Board of Supervisors''members to receive agency comments and supplemental a - gency comments. I It is'not appropriate, however, to hold up an applicant because-the, agencies, are slow :to -. provide ,th6ir -supplemental ,corn comments-. .7his i s, especially true when we are dealing n . g w I ith a,time sensitive matter. I would, therefore, request that you all follow the Frederick County ordinance and proceed with 'the Planning Commission he6i�ing.,oh October-15. By using the 15th we :give Planning Commission and/or Board of Supervisors the opportunity for a 'fo'*llow up hearing if the y 1 deem it necessary: I most certainly do not want., to put, the J or Board Planning ommission' -of Supervisors in a spot where they feel they have no additional time to look at an ' ng application. I Thanks for your assistance and cooperation. . Ty From: Eric Lawrence [mailtoielawrenc(diftVa.us] i Sent: Tuesday, September 30, 201411:43 AM To: 'Thdmaslawson' Cc: iunemilmoMbverizon.ne ,-John Riley;, Admin4 Admin. I Subject: RE: Herita'oe Cbmrrions Ty- I am in receipt of'agency-commentsand your rdspbrses from: Planning,.County Transportation, Schools, Parks and Recreation, and Public Works. Thank-,you for forwarding,. As,hoted previously, I'm sti-Il?awa,i,tihg,cor-hol,etidn-of-comment and response for VDOT and County Attorney., John is not:i , n the, office toda.y,,5oq scheduling meeting,with him will need.to wait until lie returns. -Eric --son( Feom* Thomas'Lawsoh [rhailtbt'aw Nspkxom] Sent: Tuesday, .September 30; 2014 , 9;12 - „AM To `TEri& Lawrence Cc June.wilmot@verizon.net .John Riley;.Admin. Admin. 1 Subject: FW Heritage Commons Eric: I 'a. m in 'receiptof your e- mail.. For the reasons stated in my previous e-mail and voiceniails this is not acceptable. More importantly, this'does: not comply with Frederick County ordinance. Please let me know when you and John Riley are avail- ableJor a meeting. for timing reasons this matter must be heard' on october'15th. There may be some issue with you receiving my °e- mails; therefore; I.am having all,of the: comments that I have received as-well as my written responses which were e- mailed to you,yesterday hand- 'delivered'this morning. Ty From: Thomas Lawson [mailtoalawson@isplc:com] Sent: Monday, September 29, 2014 3:_51 PM -To: elawrenc(a)fcva us; .cperkins @fcva us Subject: Heritage Commons Candice and, Eric: Attached please find, our responses to the° agency review comments we have- received so far. i Thanks, Ty Thomas Moore Lawson, Esquire Lawson and Silek, `P.L.C:. P.O. Box 2740 Winchester VA 22604 Phone: ;540 -665 -0050 Fax: 540 ° =722. -4.051 E- mail,: tlawson@lsplo.com The information- contained in this message is, information,intended only -.for the use, of the. individual or entity named above, and may be attorney /client privileged and confidential. If ',the reader of this message is not the intended recipient, you ate hereby notif ed that any dissemination, distribution .or copying of this communication is strictly prohibited`: If-you have received this communication in error,; please immediately notify.us by telephone, and return the; original message to us,at the above address. Thank you:. No- virus found;in this message: Checked by. AVG - www.qvg.&om- Version-. .2014.0.4765,/ Virus Database: 4025/8299.- Release Date: 09/30/14 I FYI..., 'H&,itage Emmons will notble heard . Ahe,PC oh'O,ct 15'. 'Wef strivefor,November 5th. I understand ,that 'VDOT is workin&on, their:comments,. but we have yet to,rece,iv'lejthem, nor has TV had a-ch'arice to respond to the VIDOT issues. From Eric, Lawrence Se nt:'T 6 esday, September 30' 2014.8:53 AM Tw 7hoipa§ LaWmn', ilCc: ; Uune'WilmOV;John Riley ,$4bjoct: RE-,`Herifatje Comnmons Good morning Ty. ,As,of'clo'se of businessiyesterday-I we had necessary reviqw"Ogency qpmments and your responses. Therefore; this:application will not b&hearcl by,the-'Pla.nnin&.Commissiqn on October 15;,2014, The two not yet .received iagency comments are,VDOT and Caunty,'Atto'rn.ey. 'The application Iication hastee n te Otpf- V- e y. scheduled r the NOnningCbmmiss ionl& n, x agenda on,,November5,2014: We would need 1he.re m-'diaing review pge.nc 't-orhjm "ys (VIDO, T and County Attorney) ps;well,as'your responses _opse�.- byFdday,' October 10;, 2Q14 at 5:00 PIVI in ; -t6 place thi's application I on theN vern 8-A ber,: Planning Commission agenda. cl -T ha n k, y6u. -'Eric. ricLawr FeWn"E' ,Lawrence; tient: Fr,[(I.qy, Seotember 26, 201-4',1Q:17 AM To_.,-'Thomas Lawson' Cc `June Wilmot' ,-,John Riley - ubject: RE:' Heritage - Commons Good morning T 'y' Thank y o q..fo r t - h e,voice a"i I update 1,understand vou con finueto pu--rs ge, age'r qy,cqmmpp t and pro 'id' ap Olicant, nZspon ses to.sa i i6, an! effort. to �;sati�sffy'fhe e'xpedatiorts'M scheduI6.this; iterri,for the , Oc" -t- h Pla -me tober 15- Planning nin,g Cbmm'ission.,pgend'a*., :Sfaffh?ks,submitted th Jegal'advertisement for .October 150'mee'ting, buivill.cancel'the advertisement .,should-we'notbe 'in receipt of the prereq pi'silte age,oda. maf &,ja Is by 4:00 PV: Monday, September 30. 'This offers you addifi6nal; time t6.obtair and. respond to the: agency comments., Staff 'has,e nco 0 raged1h eage ncies to provide you w 'iI t h j thee iii)c _o mmen f s,n h' O pes o f', - CPm ­ I efl' 0 J he application haferiaKfor inclusion on the Pcagenda. Thank you; =Eric Candice Pe:rk_ins From: Eric Lawrence . Sent: Tuesday, September=3% 2014;9:51 AM 'To: Rod Williams; Candice. Perkins Subject: Fwd:.Heritage.Common.& Impact analysis Sent.from iPhone Beginforwarded message: From: Ellen Murphy<emurphy @fcva.u0, Date: September 30, 2014 at,9;46a - -11 AM EDT To: Bill Orndoff <borndoff@feva.us>, Eric Lawrence <elawrenC fcva:us> Cc: Wayne Corbett <wcorbett @fcva :us> ;..John Riley <jriley @fcva:us >, Jane Anderson <jandersoPfcva.us> Subject: REi Heritage Commons Impact analysis, Bottom line - they thanked ;me for my input but paid'little attention to it. Proposal`still has holes! PPTR is wrong again and number of vehclesper residents in non - large family apartments or condos is overstated. There are - typos; and math errors in several places. A large.math`error in the:graph on Pg 42. Page 25 has a population in 2012 lower than in 2010,andthis is not correct by Federal and.Weldon Cooper`web sites _ typing or rrath'error but veryunprofessional. Large number ofjobs touted includes,a large amount of °only part -time such as Joe's restaurant:at 150 ? ? ?, 1 have several other ! concerns but wantto talk to Joh-nfirst before voicing them..:.,..... Ellen Ellen E. Murphy, MOOR Commissioner of the � Frederick County, Virginia 107 North Kent Street' Winchester VA 22601 Office: 540:665.5681 Direct: 540.722.8334 Fax: 540.667.6:487 emurphy @fcva.us From: Bill OYndoff Sent: Monday, Septembe'r.29, 2014.4:04 PM To: Eric Lawrence; Ellen ,Murphy Cc:, Wayne Corbett Subject: RE: Heritage Commons Impact analysis Eric-. Nothing in the.calculation_s for.PPTRA has changed or can change. The Commonwealth of Virginia only,remits'to Frederick County $.12,. &M per year. Therefore; there, is: no additional. PPTRA money coming into the County'. Lock,ed'in at $12,,7. Bottom line; if we have; an increase in assess. values and vehicle numbers, the amount pf;pptra is reduced per'vehicle. I will defer;to Ellen Murphy on the details of vehicle numbers' etc:• Bill C..WiII. am 0rndoff, Jr. MGT Office of Treasurer _ 1 County of Fred, "erick, VA Winchester, VA 22604 Phoney 5'40:665.5'607 ' I From: 'EricJLaWrence Sent Friday, September 26, 2014 2:41 PM To: >,Ellien. Murphy; Biil 0rndoffi , Cc Wayne Corbett Subject: Heritage Commons Impact;analyss Hi Ellen and Bill., Atfached is the upd'a_ted`im ;pa eta nalysis by Stu; Patz, this was ;created for f,he Heritage; Commonsrezo,ning L received; °this analysis ear=lier today I-forwaW this to you as a folloWu ,OpAo your x M commen"ts'offered in late August Thanks;;. - :Eric .. i - • Eric Lawrence, A1.CR ;Director., Department -of Planning andZevelopment ;Frederick, County, Virg_ inia 107 N. Kent - :Street Winchester, Virginia 221601 540.665:5651 540':665,,6395 fax, elawrenc @fcva:us i w.ww.fcva.us /planning; 1 - i :Z Candice Perkins From: EricLawrence Sent: 'Monday, September Q9,2014 4U PM: To: Candice Perkins, Subjedt:'. FW:-- Heritag&Com,mons Impact analysis From: Bill Orhdoff Sent: , Monday, Septernber. 29; 2014 4104 PM To: Eric Lawrence; Ellen Murphy Cc:VOyne Corbett SUbject: RE., Heritage Commons Impactanal,ysis Eric Nothing in the calculations for PPTRA,has changed or can change. The Commonwealth of Virginia only remits to Frederick County $ 12,&M per year. Tberefore.,there is no additional 1313TRArrioney, coming 'into the County. Locked inat$12..7. Bolitorn,line, ifwe have :a�q increa . se in assess values and vehicle numbers,.the amount of pptra is reduced. per vehicle. I will deferto Ellen Murphy pq=.thecletails of vehicle, numbers etc. Bill C. William Orncicff, Jr. MGT ,Office. of Treasurer County ofiFrederick, VA P.Q. Box, 225 Winchester, VA-22604 Phone 540.665:5607 From: Eric Lawrence Sent: Friday; September 26j, 2014 2:41 PM' To:'Ellen Murphy; Bill Orncloff Cc: Wayne Corbett Subject; Heritage Commons Impact. analysis Hi Ellen and Bill. Attached is the updatecl impact analysis _jj� s by Stu Patz; this was created for the Heritage -Commons rezoning., I received this analysis,earliertod'ay..] forwardthis-to,you,as a fol-llow-up to your comments offered injate August. Thanks. Eric Eric L.awrence',:.AICP Director, Depart rnbht:bf'.Planning and Development Frederick County, Virginia 107 N. Kent Street Winchester, Virginia -22601 540.665.5651 540.665.6395,falx . �lawrenc@fcva.us. www.fcva.us/Plannjng J , 1 , � � • � it • •• �. Can•di'ce: Perkins From: Thomas Lawson [tlawson@Isplc•.com]_ Sent: Monday; September 29, 2014 1:0:36'AM To: Eric.Lawrence; Candice Perkins - ' Cc: Adrhiri.; Admin. 1 Subject; Heritage, Commons Candice-and. Eric, To keep you up to date this is td let you know�thavas of this morr ing we have `received all agency supplemental comments otherahan those.froni VDOT'and the County Attorney:, Asa practical- .matter, :I assume VDOT's,comments have been addressed by Frederick County's.Transportation's, Public, Works',and Planning's comments. I understand from your previous 'memo that`you areaooking for supplemental comments-,frorn all agencies-before you move forward with the, scheduling of the Planning Commission hearing. As I understanclAhe zoning ordinance, however; what is'required of an applicant. into apply for agency comments. iri fact, we have received agencycomments and what we are working on I are supplemental comments. I would, therefore, requestwe proceed•with the.October15 Planning Commission hearing, and I will :comfnit on behalf.of the applit- nt'to delivet responses,to any °agency comments that are received within 24 hours of receipt.. Thank you for all of your help in this matter. As °always, if'you have an' questions,'please do not hesitate to contact me. f r Ty Thomas Moore, Lawson,' Esquire Lawson and Silek, P.L.C. P.O; Box 2740 Winchester, VA 22604 Ph: 540 -665 -0050 Fax; 540 =722 -4051 Email- tlawson(a5lsplc:com the information contained in this 'message is; information intended onlyforthe u"se.of individual or entity named above, and, may be attorney /client privileged and confidential. If the: reader - of this message, is} not-the intended recipient, you are hereby notified that any dissemination, distribution or:copying ofAhis communication 'is strictly prohibited. If you have received this communication in error,-' please, immediately notify Gs bytelephone. and; return the original message torus at ' the above address. i ' ELEPHONE (54%665-005W �, rACSIMILE._(54O) 722 = 4051, - THOMAS NIOORF" 1 AWSON . 77,AWSON tnt.IsSPLGCOM September Z6;20.`1;4,, ,John A.:Bishop, AICP_: Deputy Director Transportation County of:Fred'erick Department of'Plannirig dnd:Deuel'opment 10,7 North.,Kent Street; :Suite, `202, Winchester; VA 22601 Re: Heritage Commons Rezoning Application Our File No: 1'059:001 V'IA_ I- MAIL.AND HAND= DELIVERY .Dear John ,am in receipt., of your comments; to the revised ,proffers. dated September- I' , 20'1 +4• , relating fo- the above-referenced matter. In responsei to. your numbered ,comments received by letter dated' September'24, 2014, I'provi"de the Olbwing. elopment 1 You are correct; the Generalized Dev , P" ,) hasz n. of been revised, with the September '18, 2014;proffer,revlslons r • 2. With •regard to ;your comment about the : entranees 6fl.eeted'.on the GDP,, all need, to' `be reminded that the, road,, and bridge network ,running across not only the,.Heritage Commons ro • ert, , `but p p y also across the ad�oining „(Glalze) property. Is being conducted as Joint project- between. VDOT !and :Fred`erick County with the, Frederick County Engineer having the primary role: ,of' ,.coOrdinating the work on..the project, .'including, but not` "limned =to;, the, design nand engineering The - Applicant has intentionally engaged Pennoni & Associates.to prepare exhibits, such, asfle GDP;, because that engineering, firm is the ,firm °that has, been selected by Frederick; County and approved by VDO_T to design and engineer the above referenced road','network Any . entrances ;reflected, in -the GDP are; therefore; shared with' the design ,team workrr g With Frederick County and'VDOT To ;the`aextent any1urther consideration of those - entrances 'nee ' s IQ'' oecur, .the Applicant believes that is being conducted `by the Frederick County %VDOT design. team as ,the work progresses: Certainly, the Applicant will defer to .that process with regard to the ;location of 'entrances provided :that there is reasonable access to'the ApplrcantS p operty. Likewise,. the suggestfon that° all ;entrances shown on the GDP should `be4emoved from. the a graphic snot appropriate Clearly the purpose ,of thin road network, is not only to ;allow through, traffic, to and from the.Grty,of Wincliesfer °and Rt. 522•,, bu`t also to access the Heriiage;Commons .property: .. ,FRONT,R6YALADDRE55 P O,BOX 602 FRONT ROYAI:, VIRGINIA 22630JELEPHONE: (540 )635 - 9415 • FACSIMILEi (5401635 9A21:� E- MAII:: JSILEK(rt)LAWSONANDSILEN.COAi. John A shop;Deputy Director - Transportation September 26, 16,44. Page, 2 3 , The . Applicant understands . that 'Frederick', County Deputy Director of Transportation is requesting,:a determination from VDOT' as to what, if anything„ ought to be required *.by way of "further' traffic study,:.. As "asoon ,as that - information ;lids 'been provided from VOOT,; we assume that, wit'l' be fo.r`.warded,;to the Applicant. The Applicant does appreciate the suggestion thduihere be a development cap in .or'der'to: " ..keep• trip, generation iri.lrne'with. what was' considered at• the previous; rezoning: The Applicant subm'its,; however; that 'the development types ands mixas submitted and included in the rezoning appl'icati'on should bey all that, is', requried The' Applicant has iritentionally restricted' resrd'enfial ;unit development, to no pp include' uses such" as office and greater than l ,200, butanot ca ed the commercial,, which would ' retail because those uses are very positivefrom a, .fiscal arid tax revenue perspective to,.Frederick; County. The, Applicant'. also ';submit=s that the, sgnifcaiit .road ,network 'being installed across'its ,property and across+- the'aad�oinirig property is morethan adequate to accommodate the of ut, which is :described. in, the `rezon rigi application, Indeed, the " p ential maximum build o Applicant is aware that. VDOT has conducted several traffic studies of it's own,that has.. resulted in'the, new -road :alignment;. which i's4reflecied in the GDP to include :a duals lane 4traffic circle and; . further still, than =this road' network lids been designed to accommodate a detour of trips which, is to occur when the,Pt.'S:0 6rid`ge�'ihat,•cr6sses I -81 is:removed and reconstructed. To this end, the Applicant is curious =as.to what "beneft °a traffic studywould prov <,ide :because ifethis.road` network has; already been,Aeeerned io be satisfactory to VDOT what purpose, would another traffic study serve? • °Certainly it :would "not,serv"e� to allow .for' "the installation Of,,, -a' lesser, road' network given the: °fact, that Frederrck:County and. VD.OT have decided' on the ne "twork as,,depicted on the GDP.: The Applicant commits to ;contiriu`rng `to work with, the Frederick; County Deputy Director of _. p Trans ortatim on these issue e bonduct d writh the orh nal�rezorir n has been a thorough review of.' he traffic •studies that wer g" g; and the subseoueni traffic studies commissioned 'by•VDOT that there has, been ,more than adequate study of this "road. network- and that if more than adequately addresses, impacts from not; .only this proposed development; butaN6ihe impacts t} at'would come from''the regionrasa whole; 4% References o, `the existing; rezoning ;and proffer approved` in 2005 cr -fakes 'the evaluation "of ;this proposed rezoning. unnecessarily confusing and" cl altenging.- As •stated 'iii: ` response to previous co nmerits, the ;existing rezoriiri An r off &f is;f it a'm ch differentp roject with different, aspects ; - all; ofwhrch :for a., multitude of reasons are not` buildable A_ sit relates to transportation; the existing proffer de "scribes a road; network that'VDOT has d'etcrmined "s unacceptable: filierefoie; to make ;references to an existmgt proffer that; calls for specifc road" installations as °set forth fri'the 200.5 proffers `is not especially helpful because VDOT does not approve.of said. road alignm "ents, and' configurations. Instead,;the Applicant -has proffered`to pay. the ;Frederick County ,hate of the road project. described as part of -the cost sfi &in - agreement 11 With, VDOT It should `be' pointed .out that as 'the; final ;design work is completed .there will be more de "fi'riit "ion given. to all parties•'and the :Applicant, as to, what the °exact final costs will be and the,, mechanism for the payment' of same The Applicant does, agree thatIhe exact terms of said t 1 agreement will: be the subject of a separate agreement .between the .Applicant` and. Frederick County: 5: The Applicant is not ;sure. what:_is :meant; by this. comment', about the bridge: over, I- 81 As,.ihe Applicanpt unpde ytands the.cosgt shari (roject.for the' road improvements across the Henta e Commons• ro erf and .tYie, nei" hborm" Glaize) property, rt i`ncludes a bridge which cross- es; 141 'arid ,conn`ects to Tevis Street in they City where another, project has been committed. to and which, Q uld"aftach Tevi`s Street to 'the biidge. This is' again, a fl 't a prior proffer. a AIl'+.need `to'be reminded that there are no CDA,:funds ,to pay "tor any fran§portafi:on improveirients on the Heritage Commoii5 property. The. Applicant has committed to paying Fi`ederiek County's share •of"the cost sharing agreement with VDOT to construct the :road. - network; which is depicted on. -the: GDPI: •The .final cost of said project ;is ;not ,.yet known, but rt �s, anticipated to' be in ;excess; of $.10,000 „000: `The Applicant's commitment, to' pay Frederick. County's 'share of same s, 'for _a sign fipa . amount of money: To commit further _still to pay additional sums, let.: additional' $1,00..0,'000; is not possible. F_ur'ther still, given th_e fact„ that a �signifcant transportation -network is .being installed on the Applicant's property,.which. is being designed.to address notonly the @impacts .from the Heritage Commons property;.bu "t also from,the region as.a whole, the Applicant does not :understand why it. would. be expected " to ,pay - additional tsu-m to,address- "impacts: "' . '7 Please see'prior comments to• references approved din 2005'. Thank you for your continued assistanc& and coo;peration.. I ,; affer you have reviewed this le €ter you have any,o, er comments ,or concerns, please, do not hesitate to contact rne. September 24, 201:4 Mr. Thomas.M'oorelawson Lawson and Silek, R.L.C. P.U. 13ox °,2740, Winchester; Virginia; 22604 . L RE: Rezoning #02 -14 of the:Heritage Commons Project;( former RussOl.150) Property Identification = Number (PIN), 63' -A- 150,,64 -A40, 64',A 12 Dear Ivlr. Lawson-,_ This letter .contains my cornments, on the updated proffer_. statement for ` lie above: noted rezoning ec reived' in this office, on 09118/,2Ql'4 'at approximately 4.00,;p:m. and with a "revision date of Septeinijer 1$ 2014, Thank } ou for °the opportuni "t} to cominen. Please note that I am commenting from .the; trans' ^grtation ;perspectiVe.. _ Nly continents are as!follows; 11 . The, version I' received. did not initially have -a GDP which w _ s, referenced .in the ,proffers.. However,,a GON!inehanged fro n.the.original)'wasrecejved in our office on September 23, -2014 and I wil'1 coifMdef.Ahat as the GDP being referenced..If for some reason this is incorrect, I cAn modify my comments as needed, 2. Regarding the GDP, ,as I-noted ';at "the: work session ,on September 3, "2014, it denotes several,entrances that 'have, not been modeled or evaluated and "should`be removed from this graphic. Proposed entrances, should stand, on. their own, merits relative 'to the prevailing VDQT standards for design and safety as well,as. local pfanning and should not hesproffzred,,uriless what, •isbeing proffered is morei, restrictive than'tl e current standard. 1 do: not have tconcern with,,the updated ;general alignment that is drown; 3. While residential. units are capped; "there is no such limitation" of ciftce and' .commercial.. Tfihii lead's me'-to 1 e; concemed that this application may . not be in compliance with Chapter °527,.: l haNfe requc;sted a deterinination on tliis,:fr"ohi VDOT. To avoid this _issue, l would recommend proffering a development cap that would 'keep trip, generation iri line. with what was cgns�dered at 'the -,rezoning. "The current; narrative in the third paragraph" of "section 4 does not accomplish this.. Rigllt.,now,tlat °paragraph only seems to asiate whatAhe author's .interprdtation of what studies have said ;; and what the app cant engineer hasssaid, and doesri''t really appear to proffer anything. As. "_such, it, likely should . not be .in .the 'proffer statement;,'but would` more ,appropriote y be, included in- another portion:of the,zpplication. l.t? i4o�rth Event .Street, fi to 202 LN'i e esr&r,.Ytrgibia ?2601;- 000 i i 4: ,As noted on "September 3; 2014 'the proffer continues to lack ;the��detafl, assurances, and ;per =forinance. triggers thaf Were rr eluded in the existing proffer: The existing proffer is` very, specific iii regards to'TotiisrSt, Airport Rd;'Wafrior Drive,, and. the bridge over 18:1. This - proposed' prof %r relies instead on. the, GDP, whieh does not include; Ali appropriate :level of detail' and does not" have 'any' rforr ance triggers'. While_:it is clear. that, the applicant intends to,enter into agreement -.with ihe;County for:re ,Veriue sharing, -there is,no protection, should the'. applicant; and; County' be, unable,tto con�e=to: terms. t wou.l`d' note; that 'the existing proffer, package, guarantees the roads, detai'l`s `the roadways,, and perforinanee triggers, and notes that the: roads_ will, be. built even r f the CD,4,rs unable to do so: 5. " fhis, proposed' proffer has 'no :mention of the currentiy proffered'bridge ove r 1-81. 6: The proffered -$1 006 000'iri &nds:'toward the transportation �systernhas been removed as previously"nowd on September 3; `2014. 7. 'Paragraph I -,of,secO.m 4 eonflaues.to place the 'County -into the, position of agreeing that what is being, proposed rs substantially siinrlarEtQ. w} at: is,already proffered. As noted on September 3, 2014, this rs inappropriate: Thank you for.,the opportunity, to comment. _If I can be of further. , assistance; please do. not hesitate to contact me John-A-. Bishop, Ut. l - ion L7eputy Director `1 rarsportat e. { LAWS' N AND 12WEXETERaUR1YE, 5urrh 20W . POST ryICE,OoX iNq' W(CIIE fb1,VA42G04. 1 EcEPHONt. "(540) GGS -0050 FACSIMILE: (5:41.OW22405L i Homs 8,106kr I mSON • rLAWSONnu i sPLC.com, September 2`6,,20;1,4 E6c;R.;La,Wrence, AICP, Director Candice Perki,is AICP,; 'Seni'or Planner Frederick County Departmeni- dUlanning, - Development 1077 Nortl.Kent'Street Winchester, VA 2260.1 _Re Heritage'Commons Rezoning Application Our -File No 1.050:001. . VIA.E7 My AIL AND HAND - DELIVERY Dear Candice and Eric; "'am in "receipt of PlanniffZ Staff';s comments. to :the xevised. proffers 'dated 'September' 18, 2014, relating to- the above - referenced matter. In. response to;y,,our numbered comments, received., ,6y'lettendatc4 `September 23; 2014;, I proyide the following: The Apphcant, has, intentionally incorporated` by reference a. chart ,reflecting the ininimurn and maximum percentae)m nercial and residental',Aeve-lopment proposed:wthin each, land bay. The mix for all of`thd§, e`R and baysi have ranges. We will not:kriow the precise mix until actual build = out..: Certainly one can, conduct, -a calculation for m,i- nimums and rnax;imunis of residential', and; comm-- &6 f for the entire Heritage Commons' slte,,jand by,odr calculati6ns1, ti e; range of�cominercial development sis 3 =5% to 76 %, and the, range of residential development is 15% to 56 %: The Applicant prefers, however,; and thinks it rmakes,'mole =sense if we tie it to the specific l and .,baysas is,.conta nedIn the incorporated table The; last comment fro>:n Staff -was that B:: =3 uses should beprohlbrted..To .the contrary and at this point the Appli'cant. wants to preserve with aas, ,much optlom as possible the'.abrlty to deliver .colrimerclal uses as.'a.,:rnix and to blend' in With, ihe: residential It�should; be noted there are d'esi'gn standard's fhat are, lzeing proffered as part of hiis rezoning: so in'the- event -any commercial; including, `but not limited to, B ,3 is installed, it will need :td fully comply with design standards so the use'will be hanrionious with surrounding developinerit., FRONT ROVAL`ADDRESS P.O. ROX 602; FRONT ROYA4'VIRGINIA 22630;TELEPRONE: (540)635= 941 5'FACSIAtiLE:1540�6359421�•.E- MAIL: JSILEKnLAWSUNANDSILEK:COSI, -aw 11C E:rid,k. L 're e,I AICP,xDirector Candice Perkins,AIC P. -Senior Plan"ner September 26.10-14 Page, 2 .;'With- regpLrd `W -comments about' impacts on community facilities, Staff s `initial statement is correct that "the 'Market and Fiscal ;Impact, Analysis shows a positive fiscal gaih',,to Frederick County. As 'a result,; there, is no: negative: irn pqqt on fkil Staff' comment; seems be-, more focused on the, mix: of , the res@6ri-tfal versus commercial - . All' 1 would be well - to remember that; the rriulti-family,residen'tial, according. to the Stu Patz Impact AhAIysi-s;r.esult§ i"ha n6t,;pbsitiv&° fi§,cdl impact. Asa f&sult,,even if fotdistussioft's sake fiscal impact only still b6, ,a net' positive act -to the County and;, the-refafg, to COWityyfacillib6, As. y0b:'hay.e noted, we -have xevi'seJ the proffer to provide ihatthore -W*i,ll".b,6A,'m--i-iii"mtiiil6f5OOOO square; f&etbf"c-oftiitbti--i*al.spac.6devel-o-p-ed.�for every SW rnulti=farnily .re'si-deiiiia'l,,-u7niis: This, .ofcourse,, enlJahC&sand. adds 'to 1 the, positive fiscal rn act: 3,. Iq, response to ihjls, comment; I enclose copy of the. updated. Stu -Patz, report, 4assume , I assume tbe;refeKqqce to the removal of proffers is referring to monetary- proffers thai,'were,of, erect ,,with the -X005,.,rezoni'na,. Please understand that tbTs, Atmlicant- is not, in. any way •related, to the: former. :appfi"cani,'*,and .the former applicant no longer has any interest, in this proppr-ty. Further still; the :prior. rezoning; has numerous aspects associated with it- including, but notl limited to; ffie� fact thdtJtprofR-rs, a road ",network and, systems that are no longer acceptable to I in VDOT 'and' also provided -for -.a fundiri I g, mechanism through A, 0offimUnity Development Authority;,, "which'has since been amended as a result of a hilure of th&.original financi'ng 'Staff t"called � f6f in the rezoning, s�herhe. is correct that there are'no rhoridtary proffer payments submitted for the'' A, the Applicant - understands it,, the suggested Heritage- Commons community,. s monetary 8 m address negative - impacts''to the County that. would occur as a y ­ ro_ffer&,wcr&create result.- of, a pypppsM_ developrqent, As stated above, the proposed Heritage Commons development has &xief,positi've -fiscal impact. to :means that the proposed. Applicant would dp_;velopment-5hould:;not. require, a, supplemental prdff&rpayffi0ht., The App agree that, under the,-prior rezoning of 20,05-1he development proposed , therein WbU-'ld "haw,had, negative fiscal 'i'm pact's -and, therefore, would call "for monetary payffiefits. - Asz stated aibbv6, ho:wev6r-, the community .proposed with, this, rezoning; bears little, -a:ny,. reserriblarfcd, to, the rezoniha, that was. submitted ,arid; approved. in 29Q5, The co nMpnt,M. the proffer r suggest� that there isno 66mmitnefit.tb c on struefing amdriifies.,' In point: offdct,.the trails amaspedific commitment 'itmeilt Applicant m icAnt offel,running f ',poli nCs along the side of he �str'eani,chanhel and also proviiding� the po-ss-ibilify at. the A wa discreti6n•6f�ingtallihg;,A,�§ec'ond,,6iib:' . Staff hks pointed out that sidewalks 4lon ,oad systems are required by tbb is ..-thii there will be in nt,yV,iCj5de'. It i believed and, therefore,, anticipated addition 'to sidewalks a rhulti­m6dal, indl 'provided Us! a result' Of the.,deve-lopment of -the road 0 hi , 'c ! h network; W is curr&titly, being, designed by,Frederick County's Engineer and its. engineering firm -'PQ . prioni, Associates. The Applicant is not in 'a the spec p Q,. lifi cs d said , bsition to,committ 0 ,Tp.ad network as in -m prk and' other related items,, such, ulti; odal. frdilsj wdlkways, bike paths, etc. IC , ' &ecause the Ap fii 'c- ant d e _s not control said design. U J Eric R.:Lawrence, -A1CP, ,Director; Candice:: Perkins, AICP; Senior Planner September 26, 2-014 `Page 3 In addition to the above, the m arkei rate multi:`famrl, units. that have been approved a_ ll include separate. recreational amenities for each multi76mily project„ The definition of market; s rate• mult'i'- fvnily, units includes significant investm_eiit in ,amenities for the occupants of said market rate communities such as work out facilities, ppols and' meeting and, social areas within a. clubhouse type structure. Those- :facilities will be. present and wif be- more than adequate 'to address; the recreational' needs�ot the r residents. 6.. The Applicant s*, pleased° that Stdif, has revibwed, the_ proffer, which commits to constrticting 50,000 square feet of commercial for every 3,O,&Jnult= _fami1y resi "dential units. To the; extent there is any confusion..'o this ;,commitment; the Applicanf'will be pleased to rephrase; but it is ,clear'hat the intent of the proffer .is to, deli -ver a"m'inimuni of 501,000 :square feet, of commercial development .fo "r every K3,00 multi= family residers "tial units: To restate, the commitment, the. Applicant is „further willing to commit, that asecond, block of 300.multi- family .residential units will', only be cbristrucfed iaften 50,600 square feet, of commercial '.has been constructed. Further in thus paragraph there is a: comment Arawing from "the Stu 'Patz Impact Analysis suggesting, that as a result, of Staff's review �of said analysis that there needs to be a proffei;ed ,guaranteed offset to add`r_ess `impacts ,from: residential: uses. In point of fact, the multi - family, .residential' uses per, the Stu patz, report provide a, positive economic impact to Frederick County and; therefore, the Applicant .does not understand: the suggestion that there needs to be a guarantee: to'"offset" ,said positive impact; 7. Slaff:has correctly pointed out that., the mix of, developmentthat''is> sought by the, Applicant at the : Heritaage Commons; site, has iio specifics cs to it and that there is no guarantee to a mix. that will result m a, ,, "coreltown cente -,area "' The commitrtient, however; is'hat therer will be a guaranteed mix: of residential and commercial within ,the land bays and as:,proffered. Whethei they wi t be,delivered in the ,.form' of,a `core %town center urea" :ism6t.- a: t-:of this proffer: Indeed, the Applicant is _leery of making such ,a commitrnenfi because: those are not defined term`s and may,-`in fact,, be subject to .interpretatiori., The App l car t bel eves arid. subrri is that . it is far better - therefore, to proffer that within the Heritage '(V mons ,site there will =,be commercial and residential m close ,proximity which will allow for .an, opportunity to lwe; work and tplay in the carne laiidbay - We received updated ' otnments;from Mr. Bishop and will respon'd aceordii gly, As we previously advised', we Band- delivered and e= mailed revised_ Proffers to the agencies. that were requested for supplemental comment by I'annirig on September 18, 2014 To date; we have only received :responses /comments. fro ;Parks "& Recreation, Planning, Fredeiick County Public Schools, and Transportation: Wo -have responded 'it! `writing to all departments., We, wi11;, of course, respond;to any other comments that, in be received fron the other agencies; ,Cp, Offector, Candice P', t.k,,i"n's,.,•A-I-CP, Senior Planner September 26, 201.4 Pap- 4 Thank you for your continued assistance and, cooppratiom If, after you have reviewed this lettef, commens,orcone,6rhs,oldasd:dbii0thd§itat�-'tO cbiitdi�t,,.me. ,yb:uhdv-,&;ariybther, -t 'TM'L,.jk Enclosure cc: R 1.50 SPE,'LiL-C Heritage Commons,; LLC' 1 Septeriiber 2a3, 20'14 Mr. ThOmas..Moore Lawson. Lawson and,Silek,>P.L.C. P:O.. Box 270 V�?.inchester� V�rgii�la ?26;01 R. E'6: Rezonin`g ,, . h ` of the_Heritage Commons Project (fortiier°Russeft 150) F �ProPer'ty `Identification Number (PlN): 63 -A -150; 64- A10,.64- A -:1'2 Second Comments: _ Dear Mr. 'Lawson:: ` I have had pp y , d: proffer for ,ihe Heritage Commons d °the o ortw t to..revie.,w the revise ,,project dated September£ 7 2043 and revised September. 48, 2014:.• Staffs review, comments ate Jilted . 1.6 tfor your. consideration. A revised.. modification docriment and . GDP. were riot provided with this submittal' and therefore staff s °previous comment letter dated September 12 201 '3 should, also be referenced': Rezoning Comments 1. Proffer 2 Uses, -':Density and Mix. As 'stated in staffs September f1,204-3 comment letter,'the proffer should ''show a maximum arid.mmimurn ,percentage; of commercial and xesidential acreage being proposed. with.'this"Tezoning_ This -area . Js proposed °to consist pf business /,commercial. and residential land uses .and therefore „B3` (' Industrial Transition) uses should'beprohibited on the .site.. 2. Impact,•;ow Community Facilities. As previously statedin•"staff 's September 12, 2013 corriment letter, as part of'yourrezoning, package, a market and fiscal impact •analysis was submitted that showed a positive fiscal gai-k jiowever, there is no: proffered ';pha "sing, or ,requirement that "the commercial portion be; constructed before the residential. The deye:loprnent irnbact,model projects a.,negatiue impact of $.13 062' pqr ;single, family attached unit and $11,339 per multifamily unit on County, capiial facilities. Therefore; based :on they unit :cap of proffer, 2C, the potential . ini,paet the residential. "units will have on County facihfies is $119 million. 'l lie,development sh uld,not utilize; the .future potential tax contributions of the: cori mercial landbays to offset the residential` landbays without phasing :the . comnaerci'al to be: buiIt- fin, conjuncti0n,with'the residential. 1i07rNorto Kent Street, Suite 202 * � nchesteri'Virghiia 226101' - it )0 Page 2' M'Ffl'horr�asNoore Lawson 'kL: 'kezohW'cif I-I& lfage�Commom September 2�jl_'�'6_14 I UpdhItOd Fiscal Jifipiid Anal Y A , s. Staff` was adv!sed,thqi the Fiscal impact - Apalys�is wasvpdAiW to , address inaccuracies in the jripiit; data. To date staff has not received a,cppy'ofthis updated d6cuinerit. 4. Monetar-v Proffers Om.itte from' NeW Rei6hih 9W As stated in staff s September 7 11,2O 1,3 comment letter, it, should be clarified v-vhy the new -rezoning application.hasremovedth proffered monetary proffers: • $t0,000 io.fir& ghd'Rescue • $3;0.0.0 per .d it for Schools. $2,566 HOA sta&u W: proffq- I million:for tlic, general transportation fund.($3,,,S-0"O"lper,residential. unit) 5. Proffer,:6 —,R'eicreati'onal',A-metiiiies,. As p . reviou sly stated in staff's :September 12, 2013 comment letter. this proffer'sDeaks in:,generdi could be constructed, as recreational. amen hies for the project, dods' not coi-nffiit, to A construct,, anything, 'Unlessthe, owner ;is "proffering A, s T c ppc fi dm&enlity, the pf6ffe,r should .be eliminated dnd the exact recreational 4unit itY y ,wQub -& be srecif e4 at the stag'e'.t. T,,hc, � proffer also !states, that walking. trails and sidewalks will be N4DP, provided. I vVifhihAheic6J unity,­ the trail il locations , should `be 1ocated on the GDP, Ptease-note ihat '. siaeWalk,,dofig r6advvays are required .by, County Co& 6. Proffer 6 —Phasi' n- g -. 'The revised YeV W, d phasing ,,prcMr states fha- t the applicant would need to apply, building permit for ,,50,000sf oI7 commercial in _ly fqf- and receive A rf trn order, to constructi'the first, 100 multifdrilily units: The proffer also states that this 50..O.O.Osf of commercial, area `would deed'to.: be constructed, before the applicant Oth . (?r.- greater could construct the '60 multifamily uniis; Th' -- i& , proffer &f er does hot. guatAntee, the, construction of, any commercial square foot to of&ei impacts from ,the ;ftst,''-')O'.O,i�e ideti'tial, units it sim p lyj guarantees that a building- permit for &coniffercial; ase'-w u. ld'be obiahW._ Xffibre appropriate—proffer should ad ess acqpisi , tion of a.,Cevtificate of Occupancy.fdr the commercial use, As written the offer Wbuld. allow' the construction of 599 multifamily units: and � -JO an) : townhouses Prior r,t&hhleicidl Aeve"lopment being ,constructed.. This,* 'consistent with the P _4tz suggested" p ha— ed; approach, 46, maintain `economj`c bdaxice, hor does , this phasing, proffer guarantee to offset impacts ff.6ffi 'residential uses., -,As written, the phasing,; proffer provides little if "any hdiefit to'the County aril de evelopment. 7,,. m i L xi4'U&'Development The: proposed R4, zoning, -�Qiigh( with. this t. rezoning a 61 cz(tiod,would,enable a mixed, use developmeiii. Bow,,Over therc� 4 e I "P. 1­11 ­__ 1. " _ ­ � - j ar no assurances -a -v iraii6eg within, the pioff�r statement that a, core/town center x, i1l,' be provided.: ro As'p proffered, ,the: development would be" a, traditional resid'entidf and afmerciaP pr%ee , Wi hAh6 uses, being :clearly separate from ne another;. Page 3:. " Mr. Thomas•Moore'Lawson_ RE R=ezoning.of'Ileriiagozommons - Sept'ember Other 8. Transportation• - Comments., Please note that 'trans6ortati6n,•coniments on the rezoning apphcafion from John Bishop, Deputy Director cif • Transportation, are being provided to :you irn -a separate letter-: 9'. Ageney Comments .:Pl'ease provide updated; agency comments from the j following; (based on.- the. updated ;proffer sttatement) Virginia D rtment of Transportation Frederic •County °Department of'Public Works,. Frederick County Fire Marshall; 'Frederick County'Department, of: Parks.and,Recreatiom Frederick County Samtaton.Authority, Frederick Winchester`lIedltl Department, Frederick County Public Schools; ;the local Fire and Rescue 'Company and the Frederick- Winchester, Sera "ice Authority., Once attorney comments are received by the Planning Departr iditt, Utl ey will. lie Torwarded to Your office.. Attornev comments are, required `for'''selieduliilg of the rezonmg,:application. Please feel free to contaet`me w- ith.questions regarding,this ~application: 'Sincerely, Candice E. Perkins; AICP Se ni(r Planner (,EP/pd tandi'e Perkins C r From:: Efic Lawtehd& Sept -Friday , S60tember'26 1014 f':11 AM Q 3o: 'Thomastaw'son" Gc: 'June Wilmot; ', John Rile' ' - Subject: RE. Heritage Good, morning Ty. ThAhk you for,the.vQ'icem.ail.updat,e. I under-stand you toniinue.topursue agency,cofriments and provide applicant' ,rQspqns'es to same, in,an effort to'satisfy th ISth, e,expe�ctbtions toschedule, this item for,th,e October Planning - Commission a 15t' 'meeting but will cancel the gencla. Staff has submitted the legal advertiserrilelpt-forQttober, zi�&Orfi'sement should We, hot be in receipt of thei prerequisite a-genda materials by 4--0.0 N,Monday, September 30. This:offers you additional time to obtain l:and, resoOnd,to the 'agenc,,y,"tomments. ,Staff h'as•encouraged the agencies to provide:you with their comments in hbpes -cif completing the application materials for inclusion on the VC.agehda. Thank you. -Eric From: EricLawrence Sent: Tuesday, September r'23; 2014.3•;49 PIVI To: 'Thomas Lawson! ..Cc: June ,WiImot;'John Riley "Subject: Heritage Corri'mons H i'T June and I just met,to discuss upc6ming'Planning "Commission age6das- the Heritage: Cornmons, project was also discussed. It was noted that.the,Cornmission a,n'd,Board heard abbut.the .project at the September 3rd Staff Appi icatio n Briefin& where comments:arid concerns were offered;, -So the Comrhis5ion do'es'n6tj need another work session on the project; the next step would be a Planning Commission publi&h6aring., in order to scheduler a Planning Commission public hearing on the Heritage -Com ons project, please submit,to the Planning Department.,the updated review agency ncy comments and your responses to,tKe unresolved concerns. The Comm issibh•Chairman requests that these materiMs be Included'in the meet,L ng',,agerlda. package. Uppplrec6ot-of these updated',re'view,agency-c . omments4and your responses, l will "b&able4o schedule the Planning Comrriission public hearing. 'The�,deadlln&for receipt of the" matehalsJn the Pi,arinirig pepartment-.an.d'ihe respective 'Planning Commission meeting dale, are•as,follows: Materials SUbmission.,deatiline. Planning Cornmission rqeeting'date SeOterTib6r26, 2014 October 15, 2014 October 10, 2014,@ 5:00'PM November 5,•2,014 October,24, 2014-@5:109 PIVI November'19,, 2014. Thanks. -Eric Erictawrence;:AICP Director;. Department of .lanningtand' Oevel6pment. Frederick.County; Virginia 107 N. Kent Street Winchester, - Virginia, 22601 540.665.56511 540.665:6395 fax elawrenc @fcva.Us www:fcva.- Wplgnning z LAWSON AND SILEK, P.L.C. 120 EXETER DRIVE, SUITE.200 POST OFFICE 60X2740 WINCHESTER; VA 22604 TELEPHONE: (540) 665 -0050 FACSIMILE: (540) 722 -4051 THOMAS,h'IOORE LAWSON °- TLAWSONraiLSPLC.COM September 26,20 14 " -Eric R. Lawrence, AICP, Director ,.Candice Perkins,; AICP, Senior Planner Frederick County Department of Planning & Development 1.07 North Kent Street Winchester, VA 2260 1 Re Heritage Commons Rezoning Application Our File No: 1050.001 'VIA E -MAIL AND HAND- DELIVERY Dear Candice and Eric: I am in receipt of Planning Staff's comments to the revised proffers dated September .18, 2014 relating to the above- referenced matter. In response to your numbered comments received by letter dated September 23, 2.014, I provide the following. 1. The .Applicant has intentionally incorporated by reference, a =chart reflecting the, minimum;and maximum percentage .of commercial and residential development proposed, within each land bay. The mix for all of those land - bays ,have ranges. We will not know the precise mix until actual build -out. Certainly one can conduct a calculation for minimums and maximums of 'residential and commercial for the entire Heritage Commons' site, and by our calculations the.. range of commercial development is 35 %a`'to 76 %O and the range of residential development' _is' -16% to 5.6 %. The Applicant prefers, however, and thinks it makes more sense if we tie it to'.the specific land bays as is contained in the _incorporated table. The last comment from Staff was that B 73 uses should be prohibited. To the contrary and at this point the Applicant wants to preserve with as much option as possible the ability to deliver commercial uses as a mix and to blend in with the residential. It should be noted there are design standards that are being proffered as part of this rezoning so in the event any commercial, including, but not limited to, B -3' is installed, it will need to fully comply with design standards so the -use will be harmonious with slrrounding ._development. FRONr.ROYAL ADDRESS: 'P.O. BOX 602, FRONT ROYAL, VIRGINIA 22630, T.ELEPHONF.: (540)635,9415 !:FACSIMILE: (540)635- 9421•- E- MAIL:'.ISILEKn LAWSONANDSII.EK.C.OM 1 Eric R. Lawrence, .AICP,.Director •Candice Perkins,. AICP, Senior- Planner September, 26,2014 Page 2 2. With regard to your 'co`mments about, `impacts -on community 'facilities, Staff s;.,,. initial statement is correct that the Market and. Fiscal Impact Analysis sliows ;a positive', fiscal gain to Frederick County. As a result, there- is no negative impact on community facilities.:..` : Staff 'si "comment ,seems 'to be more focused on the mix of the residential. vets- u--s co' rr"imercial.. Al l would `be well advised to remember that the, multi - family residential according to the , Stu Patz •Impact Analysis results in a net positive fiscal impact. As is results, even. '>f for discussion's sake only the. multi - family units were delivered there would, still be. a net, positive fiscal impact 1.6 the County and, therefore, to County facilities. A's you, have, noted, we have revised the proffer to provide- that there will be a minimum of 50,000 "square feet of commercial space developed for every 300 multi- family residential. units.. This, of course," enhances and adds to the positive'fiscaV - - 3 Ifft sp rise to this comment; I enclose a'copy of the updated. Stu Patz report. 4.-.- : .I' assume the ;reference to the removal of proffers, is referring to monetary proffers: that -were offered with the 2005 rezoning. Please. - understand. that this Applicant .is-notin -any way related to' °the former applicant, and the former, applicant no longer has an`y 'interest • in this; property... Further still, =the prior rezoning has, numerous aspects associated with it, including; but - - ;, not limited to, "the_fact that it proffers a road network and systems that are no, longer acceptable to VD"OT and_ also:, provided for a funding, mechanism" 'through a Community Development ' Authority; which has since" been amended as a result of a, failure of 'the ,original financing scheme Staff is correct that there are no Trion yary proffer payments called for in the rezoning `submitted for the Herita e Commons comrriumt As the Applicant understands:it, the suggested monetary proffers were created to address negative impacts' to the County 'that >would occur .as a "result 'of, ,a,,` roposed development. As stated above, the proposed "Heritage ,Commons; development has.. a net positive fiscal impact to the County, which means that the proposed development should" not require, a supplemental proffer payment: The Applicant would agree that, under the prior rezoning of 2005 the development proposed therein would have had >" negative° fiscal impacts aid, therefore; would call, for monetary payments. , " ver, the a merits. As stated above howe community proposed with this rezoning bears ,little, if any; resemblance to the rezoning "that was: submitted ,and approved in 2005.:; 5:,, The - comment to they proffer'suggests, that there. is no, commitment to constructing amenities.; In point of fact, the trails are a specific commitment of`the Applicant; one running along the side, of the; stream channel and also providing the possibility at. the Applicant's'' discretion of installing,. 4, second one., Staff'.has`pointed ouf'that sidewalks along the road systems are required by County Code. It is believed and, therefore, anticipated that there will be '`in u addition to °sidewalks a multi- modal. trail.provided as a result of the development of :the road' network, which is currently being, designed by F - erickA County's Engineer and. its engineering: firm, Pennoni Associates. The Applicant is not -in .a position to commit to the specifics of said road network, and. other related items, such. as ;multi - modal, trails, walkways; bike pa "ths, etc. because the Applicant does, not. control said. design = Eric R. Lawrence, A>GP,,Director Candice Perkins, AICP, Senor,Planner September 26; 2014 Page 3: In addition to the above, the market rate: multi- family units that have been approved - ;all include. separate recreational amenities. for each multi- family' project. The, definition of-markef'. , rate multi- family units includes significant investment in amenities for the occupant's of.said market rate communities such as work -out; facilities, pools an- d meeting and social areas within: a clubhouse; type structure. Those facilities will be, present and will be more,than adequate to : address therecreational needs of their residents.; - 6 The Applicant `i & pleased that Staff has ;reviewed the proffer;: which commits to constructin 50' 000 s care feet of commercial, for ever. 300: multi -famil resid g q y y ential =" .t.- .To the extent, there is any confusion to this commitment, the Applicant will be pleased to rephrase; but it is clear, that the intent of the proffer is lo, ,deliver a minimum of-"50,00,0 square feet 'of. - commercial development for every 300 multi .family. residential units To restate the commitment, the Applicant .is further willing to cornrriit; `that a second block of 3`00 multi = family; residential. units will only be .constructed;,,after 50,O-Q,0 ,square: feet, of commercial -has been constructed Further in.tliisparagraph there is a`comment drawing from the Stu Patz Impact Analysis gg g w of,'said anal s s that: there needs to. be. a roffered ' ., y ' g - - suarant e&,offs t .to address impacts from: residential uses. In point of fact,Jhe 'multi - family. p residential Uses per the Stu Patz report provide a positive' economic impact to- Frederick'County and, ;therefore; the Applicant does not understand the- .suggestion. that there needs to be a guarantee to "offset" said positive impact. 7 Staff has' correctly pointed out that 'the mix of development that is soughf by the Applicant at: the 'H'ertage Commons site has no specifics to it and that there, ,is no guarantee ;to a ° mix that will result in a. "core /town .center area. , The commitment; however; is that there will be ` a guaranteed mix' of residential and commercial ;_within the land bays and as proffered,. Whether, they will. be: delivered in the form of a "core/,town,.center area "' is not part- of this proffer,: 'I nd op d , the Applicant I s'.leery of making such a commitment because those are not' defined terms and _4y In fact, be subject to.iriterpretatiori. The Applicant believes and submits that it is,far better, therefore, to proffer, that within the Heritage: "Commons site there will, be commercial , and residential in close proximity which will, allow "for an opportunity to, live; work and. play in the .: same land: bay:, 8.. We° received updated comments from 1VIr. Bishop and will respond, accordingly, - 9. ' As we previously advised, we hand - delivered and. e- mailed revised Proffers to, the , - agencies that were requested for supplemental eoininent by. Planning on September 18, 2014 :o date; we have- only received responses /cornments::from; Parks &Recreation, Planning„ Frederick County Public Schools and Transportation.= We. have responded in writing,-to: all departments.. We will, of course; respond to any other comments that may, be "received from the other ggencies. , T - LAw.SON AND SILEKIPOL.Co- 120 EXETER DRIVE, SUITE 209 POST OFFICE. BOX27.40 WINCHESTER, VA 22604s TELEPHONE: (540),665-0050, .;FACSIMILE: ,i540) .722,-4051 I THOMAS MOORS LAWS:ON i TLAN'SON(i�LSPLCXIDIM September 26,20,=14 John A. Bishop, AlCP Deputy birector-TranspOrtatiob 'County of Frederick Department of Planning And Development 107 North Kent. Street; 'Suite' 202 Winchester; VA 22601 Re-, VIA E7MAIL AND HAND=DELIVERY- Dear John: Heritage,Comm'Ons Rezoning Anplicatibn Our File No. 1050.004' I am in receipt of your comments to the revised proffers dated September. 18, 20,14 relating to the above-referei . iced matter., . ..In response, to 'your . numbered .comments received by letter . dated September 24, ,20 14, 1 provide the following. You are correct,. the 6enera,lizedbevelopment Plan ("GDP") has not been revised with the'September .18, 20:14_profferrevisions. 2'. With regard1to your comment about the entrances. reflected on the 'GDP, all need to be- reminded that the road. and bridge -n ' etwor ' k runniiig,across not only. the Heritage Commons property, but also, across 'the adJ_ofn!q'g,(Q1aiz�), property 'is beirig-toriddcted as, a joint project between VDOT and Frederick County With the Frederick ,County ,Engineer having the primary .role- Of coordinating, the work- on_ the project,, including, but not limited to, the design n and erigineeripg.. The Applicant has intentionally erigagpd-.Pennoni Associates to prepare exhibits, such as th!6'GDP because - that .engineering firm is the firm* that hA.-s-been selected .bT Frederick C ou n ty and approve d by VDOT to design 'and engineer the above-referenced-road network. Any entrances reffected ih the' GDP are,jherefore,, shared with ik design team working with Frederick Cou�tify and VDOT. To 'the, extent any further consideration of those entrances needs to. occur, the Appl'i' cant-believes"that. is' 'being conducted by°lhe Frederick County /VDOT design team as. the. work'progr6sses. Certainly, the Applicant will defer to that process with regard to p ic- the* location of entrances, provided that there is. reasonable access to the Applicant's property. Likewise, the. suggestion't hat, all entrances shown on the GDP should be,.removed from the graphic is not appropriate. Clearly the,purpose of this road network, is not only to allow through,' traffic to and from the City of Winchester- and Rt. 522., but also to access.the Heritage Commons property: FRONTROYAL ADDRM:' P.O. BOX 602, FROSTROYAL, VIRGINIA 22630JELEPHONE:'(540)635-04 15.- FACSIMILE! (.546)635-9421 -,E-MAIO. JSILEK@"WSONANDSMEK.COM' John A. Bishop, Deputy' Director= Transportation - $eptember 26,, 2Q 114 Page 2 1- The Applicant understands that . Frederick, County Deputy Director of Transportation is, requesting, a 'determination from. VDOT as. to what, Jf anything, ought to be required by way. of further traffic study: As soon as that information, has been provided from VDOT, we a "ssume ;that will be forwarded to the Applicant. The. Applicant does appreciate the suggestion that "there be a development cap in order to "...keep trip' generation in line with what 'was considered_ at the previoil& 'rezoning." `The Applicant submits, however, 'that the development types and` •mix as submitted and included in the rezoning application 'should be all that. is required. The Applicant has intentionally restricted. residential unit; development to no greater than 1,200, but not capped, the commercial; which Would .include uses such as office and - retail• because those uses are:vefy,positive from a fiscal and :tax revenue perspective, to Frederick County. 'The; Applicant also submits that the° ,significant road . network `being installed across its, property and across ,the'adjoining, property :is more than. adequate to accommodate. the Potential :maximum build out, which is described in the rezoning application. Indeed; the Applicant, is aware that VDOT ha_s conducted several traffic; studies of its, own that has resulted in the new road alignment, which is reflected in the GDP to include e dual lane traffic circle and, further, still, that thi's road network has been designed to accommodate `a detour of trips which 'is to .occur when the Rt: 50 bri•dge'that crosses .I -8 is removed -and reconstructed. To this end; the Applicant is curious ids, to what benefit a, traffic, study would provide: because if this road' network has already been deemed to be satisfactory•;to VDOT, what purpose would another traffic study serve? Certainly it would not serve `to, allow for the installation of a lesser .road network ,given the fact that Frederick County -and' VDOT have decided on the network. as depicted on the GDP. The Applicant commits to continuing to work with the .Frederick County Deputy Director of Transportations on these issues, .but: we would expect that•after there 'has been a thorough review of the traffic studies that were conducted with the original, rezoning: and the, subsequent traffic studies commissioned by VDOT that there has been more than, 'adequate study of this, road network and, that it,. more, than adequately .addresses impacts from not only this proposed development, but also the impacts,-that would.coine,from the.regiori as a,whole; q. References to the existing rezoning and proffer approved in 2005 makes the evaluation of this proposed. rezoning unnecessarily confusing .and' challenging. As .stated in response to previous•comments, the: existing rezoning.dnd proffer is fora much,differentproject• with different: aspects,, ,a 11. of which 'fora multitude of reasons are.not buildable. As it relates to transportation; •'the existing, proffer, :describes ,a road network that VDOT has determined is unacceptable. Therefore, to make: references to an existing proffer that calls for specific road installations as set forth 'in :the 2005 proffers is ,not especially •helpful `because VDOT does not approve ofaaid'road alignments and configurations. Instead; the Applicant has proffered to pay. the Frederick County sharej''of the road project described as ''part of the cost sharing agreement with. VDOT. It shout ,6e pointed out that as the final design work is 'completed there will be more definition, given'to alt parties. the Applicant.as to what the exact fi nal costs will be and the mechani "tri for the payment of''sarne.. The Applicant does agree that the -exact term. s of said John A., Bishop, Depu ty Director- Transportation 8e,ptemb eT '26,2014 - .. . ....... Page 3 agreement- will, be the subject of a separates agreement' between the =Applicant and Fred&rick County,.. 5; The :Applicant his not sure what is meant by this, comment ,about the bridge over I- -t improvements across the S I.• As the Applicant. understands the � cost ;sharing -proj'ec for = the road Heritage Commons property:,and the•-neighboring (Gldize) property, :it includes, u bridge which crosses 141 and connects to `revs Street in the City where -another project has been committed to and which would attach Tevis Street to the bridge. 6. This is again a reference to a prior, proffer. . All need t b 6, e reminded that there are no, CDA funds to pay for "any. transportation .improvements on -the Heritage .Commons property. The Applicant has comrhitted, to• paying Frederick County's share of the cost shafing agreement with VDOT to construct the road network, which is depicted. �onthe GDR. The 'final cost of said project I `is'. not,yet knowq". butjt'is ant I icipaled to be I i . n 11 excess of'T$10,000,000. The-Applicant's commitment to pay. Frederick County's share-of'same is fora -significant amount of money. To commi t. further still to pay additional sums, let 'alone an additional $ !,QQO,000, is not possible. Further still, given the'fact that a significant transportation network is being installed on the Applicant's property, which is being &signe&to address not only the impacts from the Heritage Commons property; but 'also, fromthe region as -a -whole., the Applicant does not understand why it Would-,be expected to a pay addition 1 sums; to address "impacts.7 7. Please see-pr : ior comments` to references approved in 2005.. Thank you for your continued- assistance and- cooperation.. If,'after' you have reviewed this lettef you have any ot,bervq'mments Or concerns, please;'clo not hesitate to contact me. TML.jk CO: R 150 -SPIS, LLC Heritage COmffioqs. LLC Candice Perkirft From::. EricCawrence Sent: Wednesday,^S'epfember'24 201.4 TV' To: Candice Perkins S'ub' 't; Fwd': Heritage Commons Sent`frofh-' h6he, Begin forwarded message from'Tbomas Lawson <tlawson(PIsPlc'com> Date September-23, 2014 at 4 58 P2,, I EDT V*: E- is Lawren_ce� <elawrenc @;fcva:us> i tt :,Admin. <ad'bw @Isplc corri> "Ador n. 1 <jkitflaus @.Isplc com> Subject. FU1/ Heritage Commons; From: Thomas Lawsorr ,[mailtoalawson @Isplc.com] Sent: Tuesday, September 23' 201`4 44:49 PM To: 'Eric Lawrence'' Gb :,'JuneWIft ot'; 'John Riley'; Admin.; Admin. 1 Subject: "RE Heritage Commons Thank you for your memo ,,and ;for,confirming,the October -15 Planning Commission. date. As'John,.Riley knows our developers have financial considerations that.mandate that,ihisxezo.ning needs to be heard land voted on::on'or before the .end of}cafendar,year 2014: If we go beyond't,hat.then l am afraid this property will need to sivtuallow °time�for another. developer to have interest'in the property and try to proceed; The October 15 PlanriingvComm.ission date, works -beca use 'it allows fort'he opportunity (if e .. •needed, :for one follow up meeting/ hearing before either:the Planning_Commission or Board of S,upervisors�. Interestingly, just,one; With regard to the deadline oUthis Friday to s..ubm fagency comments and our'reply to the; same you need to know'that theonly updated.agency'comments,l have received.are,fr.om th'e Planning Department, and'wetwillsend . a . replytomorrow orThur_day: I have sent reminder lettersto,Ahe:other reviewing agenci "es asking for their updated comments. if'they have,any. I would assume that it will not: be.h:eld, against the developer. /applicant if we'have not received agency commentsio,h or before your deadline:: ?` ' Thanks, everyone for their, consideration of this rezoning application., W06bUdi;rw2r'd toAhe hearing on October 15th. Ty From Eric Lawrence. [maiIto:elawrencCa�feya.us] .Sent. Tuesday;. September 23 201'4 3:49 PM. To: 'Thomas Lawson," Cc June Wilmot; JohnR. ley Subjects Hentagetornmons HFTy -. 1 June " an d , I just'met'to.discuss� upcoming Planning Commission agendas,:;the Heritage Commo'ns,project• was also discussed . It`Wa_s noted that; the Cor'rirriission;and Board.. ear d aboutthe project at the September 3 Staff A,pplica lM13riefing,"where comments °and concerns"were offere'd.,,.'So the Commission does: not need another work session on'the project; the nexisfep,would be a Planning Commission pubi,ie hearing., a. In order to`:schedule a Planning;Commission public hearing;on the Heritage,Comrnons�pro1ect, please submit- 1 o t_he Plan'ning'Departnent.the uypdated review agency comments;and your responses to the j unresolved:coneerns: 'Th'e Commission Chairm%Jh`requests tfiatthese "materials be included in the i meeting- agenda package. upon receipt of tfese.updated: review °agency comm your`responses, ;will be able to schedule, the Planning Commission public.hearing. Th:e deadli'nefor,receiptiof"tfie- materials in the Planning Department, and the respecti ,ve`Plann'ing,,Com,mission meeting date,- are`,as,follows: Materials °S'ubmission deadline;. Rlanning Commission meeting•dat'e Sepiember;,26, 2014 @ 12 OOP.M October 15, 2014 October 1Q, 2Q14, @.5:00 P,M November 5, 2014: October 24,,2014V 5:00 RM November 19, 2014 Thanks. . -Eric m Eric.Lawrence, 'AICP'- i Director,`Department of Planning and`Develo:pment Frederick ,County,`Virginip 1Q,7 N.,;Kent Street Winch- ester, Virginia 22:601. j 540;1565., 6395 faxs elawrenc@f -va:us_ www.fcvaus /planning' No V. in-o fo u-- n-d in this message::.' Checked'liy AUG - www avg.com " Version. 20,14.,0.4765 /, Virus: D atabase: 4b25 /8262' -. Release Date: 09/23/1'4 : ,a 2 From: Eric Lawrence Sent: Tuesday; September 23; 2014 3:49' PM To: 'Thomas Lawson''- Cc: June`W,ilniot; John Riley Subject: Heritage: Commons H i Ty.. June and I justrnet:todiscussupcoming Planning Commission agendas; the Heritage Commons project, was also discussed., It was noted that the'Commission,and Board heard about the project at the September 3`d Staff Application Briefing, where comments and concerns0Were offered. So the Commission does not,need another work session on the project; the, neztstep would be a Planning Commission public hearing.. In order to schedule a Planning Commission public hearing on the Heritage Commons project, please submit to, the Planning Department the updated review agency comments and,your responses to the unresolved concerns. The Commission Chairman requests that, these; materials: be, included in the meeting agenda package. Upon receipt of these updated review. agency comments and,your responses, I °will'be able to schedule the Planning Commission` public hearing. The deadline.for receipt of the materials'in-fhe Plar°ning;Depa-rtment, and the respective Planning Commission meeting date; are has follows Materials Submission deadline Planning Commission meetingdate. September 26 2014 . @ 12:OOP-M October 15,20-14 October 10, 2014 @ 5 :60,.PM Novembe=r 5, 1014 October 24,101.4 @ 5 :00 PM November 191, 2014 Thanks. -Eric. .k 'Eric Lawrence, AICP: Director, Department of Planning and Development Frederick County, Virginia r 107 N. Kent Street Winchester,., Virginia 22601 540.665.5651 ' 540:665.6395 fax elawrenc @fcva :us www:fcva.us /planning 2 Septenlber.23, 2014 COUNTY of 1F -Iw E7ICK'. Department of`P_lanning and Deyetopment 540!'665-5651 FAX': 5407665 =6395 Mr. Thomas Moore Lawson Lawson and Silek, .PLC. P Q,. Box 2740. s Wii ehester Virginia 22601 ,RE: Rezoning #02-1'4 of the Heritage Commons, Project (former Russell 150) Property Identification.Number ( PIN): 63-A4 50,,64= A1Q;,64 -A -12 Second Comment's. Dear'.,Mr: Lawson;; I have had. the opporturty 'to review the revised proffer for the Heritage Commons project dated, September 7; 2013 ;and" revised' September 1$; 2014. Staff's ,review comments ,are listed below for . your consideration. A revised `modification document and GDP were not provided with this 'submittal and therefore staff - s- previous comment .letter - dated',September 1, - 20.13 should also be referenced; Rezon ng'Comments 1-. Proffer I,. Uses; Density and Mix-. As stated in staff's September 1'2, 2013' comment letter, the proffer, should :show amaxirnum and - minimum percentage of commercial ;and residential acreage being proposed with,-,this rezoning. This area is proposed_ 'to consist, bf business7commercial. and °resi'dential land uses and therefore,-83 (Industrial Transition) uses, should be prohib9ted on the site. 2: Impact ;on Community Vacilities: As previouslystated Jh staffs September 12 2013 ,coMment.lefter, as °part of your rezoning package a market and fiscal impact analysis was submitted .that "showed a positive fiscal gain;, however; there is no proffered phasing', or, requirement that the commercial portion' be; constructed before the residential. The development impact model projects 'a negative impact of $13;062 per single family attached unit and $,1;1,339 per multifamily unit,on _ County capital facilities, Therefore', based on the .unit cap of proffer 2 "C', the potential impact' the, "residential units will have on County facilities" ,'is $43 °:9 million, The °,development,should' not, utilize the future,potential,tax contributions of the, commercial _landbays to offset the residential landbays without; phasing the commercial'to, be built in conjurietion, with the "residential,, 1'0,7 North Kent, Stree " t; Suite 202 " "W.inchester; :Virginia 22601 -5000 page 2' Mn Thomas porei Lawson RE Re"zonmg 61414 ritage'Commons September 23''201'4, 3: Updated fiscal: Impact Analysis: Staff was advised that the Fiscal Impact. Analysis yeas updated to address`inaccuracies in the input ,data. To date staff has not received a copy of,this updatedvdocumenf: 4. Monetary ,Proffers Omitted from New Rezoning. As stated. in staff s September `l2, 20'13 commeirit•- letter; it; should be; clarified why the new rezoning applcation'has removed the following previously ";proffered; monetary proffers: • $1;0;000 to,�Fire and_Rescue; $3;000.per unitfor Schools • $2,500 HOA stawup' proffer • 1 tr illion> for the ;,general transportation ffuind'($3,500 per, residential. unit) 5. Proffer 6 : Recreational Amenities. As prevously';stated °'in staffs September - 12, 2013 comment letter., this proffer "speaks in ,general' terms of what could, be, constructed as recreational amenities for 'the -project; but doses not, commit to-,_ constr".uct anything. Unless the :owner..is proffering a. specific amenity,, the °proffer should be efiminated and''. the exact, recreational unit type; woul'dtbe specif ed at the MOP stage': Th6ry roffer- also states that walking trails and sidewalks will be provided wi'thm the commumty;' the, frail locations .should be located -on the GDP. Please note that sidewalks along roadways are ~required by County Code. 6. Proffer 6L 0has in- g The revised phasing proffer states that the applicant would.. need to apply °for and eceive a, building, permit :.-.for 50 000'sf of commercial in order to construct'° the "first 300 multifamily- units. The proffer °also. states that this 50,000sf of commercial area. would, need to be constructed;:before the applicant could construct^ the 600 h` or, ;greater'° multifamily units. This, proffer does not guarantee the construction of :any commercial square footage :to offset impacts from -the first 300 residential units,.itsimply_ guarantees that a.Building permit for a commercial use would'be obtained. A. more, appropriate proffer should address acqui tion of :a C'erti`f Cate of °Occupancy for = the' commercial use. As written, the proffer would 'allow the construction of 59,9 multifamily units and 184 'townhouses -prior to any �comrnercial. development,aieing. constructed. This is riot eons stmt, :with the,, Patz• suggested phased approach 'to 4mamta n economic: balance, nor'does tl is`phasing.;proffer guarantee fo offsett impacts Trom residential, uses; As' written, "the• phasing proffer provides little if any benefit to the. County` and. development. : 7.. Mixed, U'se :,: evel'opment. The- proposed 'R4 ,zoning being, sought with this, rezoning, application �wou'ld enable a ,mixed:,use development; ,however„ there are no assurances within the proffer statement that a; core /town center area will be; provided. As;,proffered,, the development would be a ,traditional .residential and: co nmercial,project; with the uses being clearly separate from.one another. Page 3 Mr. Thomas Moore Lawson RE:`Rezoning of_ Heritagetommons September 23, 2014 Other 8. Transportation Comments. Please note that. transportation comments on the rezoning application from J&ff Bishop, Deputy 'Director of, Transportation, are being .provided to you in a separate letter: 9 Agency Comments; ' Pleease: provide updated agency comments from the following (based ' on the updated proffer statement): -Virginia Department of Transportation, ;Frederick County Department of 'Public: Works, Frederick County Fire Marshall, Frederick County Department of Parks and Recreation, Frederick County "Sanitation Authority ,,Frederick- Winchester.Health Department, Frederick County Public Schools, the local Fire' and Rescue :Company, and the Frederick- Winchester Service Authority. Once attorney comments, are received by the Planning Department, they will be forwarded to your off ce. Attorney comments are required for scheduling of the rezoning application. Please feel free to con"tact:me with questions regarding this appli'catior`. Sincerely, v Candice E. erP tns, ICP Senior Planner CEP /pd bec, John`R. Riley, Jr. Frederick County Board of `Supervisors LAwsoN AND SILEK, P.L.C. - in EXETER; DRIVE, z _, Sum 200. POST OFFicz'Box-2740 WIN R lidftR. VA-2244 - (540)'665 -0050 1: I , - _ TELEPHONE: FAcsuamx: (540) 7224051 THOMAS Moom,LAWSON • TILAWSDINALSPLCCOM September 23, 2014 Jason Robertson, Director Frederick., County Department of Parks & .Recreation 107 NordiKent-Street. Winchester,, VA 22601 Lloyd A. Ingram,, Transportation- Director ViTginia,Devartment of Transportation Edinburg Residency. 1404 Old Valley Pike. Edinburg, VA 22.8124 Harvey E. Str4ws.nyder,,Jr;, PR, Director,of Public Works Frederick County; Departinent of?ublic Work& 107 North Kent Street Winchester, VA 22601 Roderick B. Williams, Esquire Frederick, County Attorney 107 North ' Kent Street Winchester, VA226,01 K. Wayne Lee, Jr..,LEED-QA Coordinator. of Planning,and Development Frederick, County Public Schools 1415 Amherst St. P.0-B.OX35018. Winchester, VA.22604 Eric, Lawreric.e,AICP, . Director' Frederick County Departmeaof Planning. and Development -.107 North K6nt:Sireet. Suite 202 i 'Winchester, VAU2601 Re: Heritage Comnicifis'Rezoning Application Our File No. 1050.004 VIA. E -MAIL Dear Gentlemen: I received, zorrespondence today, from 'Mr. 'Strawsn -Director of Public, ',Works, yOer regarding'the. Proff6rs that Wdfe hand-delivered anrra'smeslthe e-led. to a few select,4geiicies on Thursday , point, that, Exhibits, A -and B were not, for review �and commentStra*srfyd ' er's lei. included dri the Proffers. Thr-e, reason they were: not included Jsl because they have, not been changed from the Last submittal; 'So? everyone does hot.needto up previous exhibits, however, Lenclose Exhi bits A and B. • Fjj077 ROYALAj=A=ftW0jj= 9=602, FRO , n ROYAL, 1FMG0LA226^TUMU=:'(50)635-9419 • FAMMUS: (S40)U5-%21 • &KAhz- Candice "Perkin$° From: Eric',Lawrence- r Sent Tuesday, September 23, 201443:49 PM Tos Thornaslawson' Cc� June Wilmot John Riley Subject: Herritage °Commons' A i '.Hi Ty. June,andil. ust met:to,discuss u comet Planni, 1 p. _' g ng Co', mmission.agenda's; the Heritage .Commons project was,also i discussed. It was noted that the Comm 'ssiontand%Board , hea`rd aboutahe, project at the,September 3 d Staff Application i Bnefmg,.where comments and concerris•werexoffered �So`the.Commission does:not, need another work session on the pro ect,,the nextste ..would be=' . j` p a Planning. Commission public hearing, In o.rd:er to- schedule a Plarming,:Commission publichear,ingwon the. Heritage Commons ;project;'please,submit;to the j daed ew agency, yor reonePlanning Deprtment the up e m sto the unresolved concerns: 'The; Commission. Chairman requeststhat these'materiaksbe included i'n the! _meeti' agenda,,package. I Upon, receipt�of these updated. review.agency comments and your- responses, hwill beable ,to schedule the Planning Commission public hearing The deadli "ne for _r: "eceipf ofthe materiak'jn the Planning Department; and the respective Plarining)Commission meeting d'ate,,a,re as follows: " MV serials Submission deadline Planning Corn.mission,mee.ting,date' September 26,2014 @ 12:000M' October 15, 2014, October 10;,2014 @ 5 ob PM November 5, 2014, October 2'4;.201'4 @ S:OO,PIVI .November 19; 2014 • a Thanks, " =E_ric _ r i _ Eric Lawrence, AICP Director.; Depar.:tment•of Planning•and:D'evelopment . ; ,Frederick County,'Virgini'a 107N Kent,-Street' W'i'ncheste.r;;`.Virgina 22,601 54Q.66 5,.-665i 540:665 6395 afax' elawrenc @fcva:us wwwfcva.us tannin t I tandi'Ce Perkins" �Frorn: Thomas Lawson [tlawson @Isplc:com] Sent: Monday; September 3;42PM-_ Eric Lawrence jCC! Cahclice Perkins; Admin.;.Admin; 1 Subject: Heritage Commons' This is a follow-up to my voicemail of earlier today:. Please let-me -knowat your earliest convenience your comments to ursday, J am hoping the revisions to the proffers that "the, revised Proffers: that, were, hand delivered and.e- maile guarantee a,-mix'of commercial-d'evelooment along with the high density residential," as well as the payment for the road improvernep ts,.Will, be to all agen'Cles' siAisfad-ion. Of course i if there areany comments, I would like to have them well in advance of the,Octob& 15 Planning ,Commission meeting so we can. makewhatever revision's may be advisable. Finally, please confirm we do have a hearing before the Planning CQmtn,i'ssi6,n o'n: October 15; Thanks, Ty Thomas Wore Law_ son, Esquire Lawson and Si.lek, P.L.C.. P.O. Box 2,740 VVinchester;, VA 2204 Ph: 540-665-0.050 Fax: 540-722--4051. Email: tI6wson'(cDls0lc;cOm The information contained in this message is information intended, only:for'the use of individual or entity named above, and may be attorney /client' privileged; and.confidenflal'. If , the'' , re , ad , er, , of , thi& mes -sage is not the, intended recipient, you are hereby notified that any di§semineition, distribution or copying of this communication is strictly prohibited. If you have receivbd-this-, con irhunication, in error, p , lease, immediately notify us . by telephone and return the Original message to us at the above address. • LAWSON AND ­SIUK, P.L.C.` 120 EXETER DRIVE, SUITE 200 POST'OFFICE BOX 2740 WINCHESTER, VA' 22604 TELEPHONE: (540)665 -0050 FA61MILE: (540)122 -4051 September 128; 20114 6. THOMAS MWRE LAWSON •'rLAWSON Q LMCcCOM Jason Robertson, Director Roderick B. Williams, -Esquire Frederick County Department of Parks,, & Frederick' County Attorney Recreation 1 07 North Kent Street 107 North Kent Street Winchester, VA 22601 Winchester, VA:2260,1 Lloyd A. Ingram, Transportation Director Virginia Department of Transportation Edinburg Residency 14031 Old Valley Pike Edinburg, VA 22824 (via e -mail only) K. Wayne Lee, Jr., LEED G'A Coordinator of Planning.and Development Frederick County Public Schools 141:'5 ;Amherst =St. Winchester. VA 22604 Harvey E. Strawsynder, Jr., P.E., Eric. Lawrence, AICP Director Director of Public Works Frederick County Department of Planning and Frederick County Department of Public Works Development 107 North Kent Street 1,07 North, Kent Street, Suite 202 Winchester, VA 22601 Winchester; VA 22601. Re: Heritage Commons Rezoning Application Our File No. 1050.00 +1'. VIA E MAIL.AND" HAND - DELIVERY Dear Gentlemen: Enclosed please -find revised Proffers for the Heritage, Commons development. As you will recall we participated in a joint worksession with the Frederick County Board of ;Supervisors and Planning Cornnnission on September 3, 201'45 and we had a follow -up discussion with Eric Lawrence and' Candice Perkins. The. result is the enclosed revised. Proffers which the Planning Department has asked that we. send to you as reviewing agencies that are more effected by the { revised Proffers. We are intentionally hand - delivering this correspondence and revised Proffers as well as. e- mailing so that we "can get- a quick turnaround with your comments- We are tentatively scheduled .for a, Planning." Commission public hearing, on the rezoning on, October 1:5, 2014. 1 know that Eric, Candice;and I`want to have the benefit ofany revised comments from your agencies to the- Planning Commission members well in advance of'that•;public hearing. FRONT. RoveL ADDREM Post OMCE Box 602, FRONT RoVAL, VIRCINU 23630; TELEPHONE((540)635-9415,o FACSIpfILE: (54(1) 635 -9J21 ! E- A1AIlt7SiLEK fa�LAN50NANDSILEKCOAf 1 September 18, 2014 Page 2 Thank . you 'for, your-' assistance and cooperation. We look forward to receiving your comments. As always, if you, have. any questions or want to discuss your comments further, please do 'not hesitate to give me a call. 'Very Thom s ` oore Lawso T.ML:jk Enclosure cc: R 150 SPE, LLC Heritage Commons, LLC' WS ,N' AND, SITED,, PaoL Co 120 ExETER DRIVE, S01 ►.;;200 J'oST OFEI(E,Bpo ,2740 W1 C. V/A 22604' T,FLFPHO'F (540)'665- 0050 FACSIMILE (540)172-2405 HP 1 -8 2014 .D 'TIIQMAS A100RN LAWs6N •.TLAw✓ 6N41UN LGCOM September 1.8, 2014 Jason Robertson, Director . Roderick. R. Williams, Esquire Frederick County Department of Parks:& Frederick C:ounty,Attorney Recreation m I V `North Kent.. Street 107'NbrthKent Street. Winch'ester;'VA 22601 Winchester, VA.22'601 Lloyd ;A. Ingram, Transportation Director Virgihi'a Departmentof Tfansporta6o`h Edinburg Residency- 14,',031 Old Valley.`Pike Edinburg," VA 22824 (via, e -mail only) K. Wayne .Lee, Jr,LEED, GA Coordinator of'Planning, and Development .Frederick. COuntyPublic- Schools 1415, Amberst St; 'Winchester, VA 22404 Harvey E. Strawsynder, Jr., P E. Eric Lawrence, AICP, Director Director of Public Works Frederick Count yD:eparf'ment'.ofPlanning and Dev_elo, merit Frederick Country Department of Public Works p 107 North Kent Street 1' 07 North Kent Street, Suite 202, Winchester,'V,A 2 -260 "1 Winchester, VA 22'60,1 Re Heritage Commons Rezoni_ng'Application Our File N'01.,11'050.001 V'IA E'- MAIL : AND, HAND= DELI,VERY., Dear. Gentlemen: Enclosed please find revised Proffers for the .Heritage Commons deuel'opinent:, As you will recall. we participated in a joint worksession with, the Frederick County Board .of S.upervi'sors and .Planning Commission on September 3, 2014, and we, had a follow=,up discussion with Eric Lawrence and. Candice Perkins':, The ;result is the enclosed revised Prdfferg4 which the Planning De p artment has asked that we :send -to, you as ,reviewing agencies that are more effected by the revised `Proffers. We are 'intentionally hand- deliweth g'this correspondence and rev' sed Proffers as "well ,ass 0- mai'li'ig so that we can ;get A, quick turnaround with your cornn ents. 'We •are tentatively ,scheduled for a Planning Commission -public ;hear_ing on the rezoning :on October 15, 20:.4 4. I ;know that Erin, Candice, and I. "want, to have. "the benefit of any revised ,comments from your agencies to the Planning Commission members well in advance of that public, hearing. _ _ „_ ..__ + FRONT ,ROVALADDRESS :'.POST,OFFICE BOX�G02,FRONT_ROVAL, VIRGINIA 22630;'TELEPHONE�(5�0)G35, -9415 FACSIMIEE (SAO),G3$�9421 !E= MAIL:: fSILEK(a�1:AWSONANDSILEK.COM September 1 20,T4. Page 2 Thank you for your .assistance and' cooperation., We; forward' to receiving your comments. As ~always, .if you l a�.,& d y- questions or. want �to discuss +:'your comments, further; please do not`hesitateato. give,me a call;. Very_ -.,1 Thom s ogre Lawson' TML:jk, Encjosure cc: Rj5.0'SPE; =.LLC Heritage Commons, UQ I HERITAGE, COMMON& PRO -FFER. STATEMENT' REZONING: RZ#:,O"-1 =05 Rurdl,Areas (RA), Business General (02), and ResidentiA Perf4rmance (RP) to Residential Planned Community District (R4) PROPERTY:. -1,50.59, acres Tax, Map 'Parcels #63 -A -150, 64 and 64--A42 (collectively the "Property ") RECORD OWNER: APPLICANT PROJECT NAME; ORIGINAL DATE OF PROFFERS.. RE - - VIS1,0N'QATE(S')-.-1 Executive Summary, 150. SPE,LLC H'erifiage. Commons, LL.C' ( "Applicant ") Heritage Commons September 6, 2013 Augu'st,7, ,2014. September 18';.201,4 The Property was s originaffiv r.e,zorfej in September 2,005 -under the name of Russell B.O. `The.'Property has since changed owne�s h_ip an d the 'new ownef'wshesy to rezone the Property" to Residential Planned Community District (R4). The undersigned, Heritage. Coftirftofis,, LLC, its ,successors and assigns,, hereby, proffers -that the use and development of the subject, property shall be in ;strict ;accordance with the following conditions and I,shall supersede and replace; all oth& p-r,,.Qff&rs made prior hereto It 'I'S furtffer the, statement, and,, intent that with,,the acceptance of the proffers contained herein any and' all prior ofpr6rs: affecting this P­ o erty shall be-deemed null,. void, and, terminated. - In the event 'the above, - :referenced amendments are not granted, 'as ,applied for, bjy—Applicant; the below described proffers :shall be withdrawn Andbe null and void.. The .headings ',of, the ' proff'6'rs, set forth 'below .have been prepared for convenience, or reference: 'only and shall not control ','or ,affect .' r, be�.,ta'ken as an,iriter retation., of an-�, provision, ,the o p _ i provided tm-1 "devolo ment ,,f'the; p p ypffers. The improvements proffered herein; be,, pro g the e� of p­ of that'portion . of the ,s:fte:,adjacent,-to the improvement, rn ove nt, unless otherwise specified herein.. Ref6rences Made to the Mastet'Developmefit Plan, hereinafter "referred to as the, ,Generalized Development Plan ;dated Augqst 7, 20-14, as required. by the Frederick County Zoning Ordinance, are to be Inter preted to be references to the: spgcific, Generalized Development -A hereto ;,andi"I'h-c-or-p 6-rated herein, by reference as' "Exhibit A." Plan'slieets attache The exact, boundary and acreage ,.Of �each, land bay may be. shifted to a, reasonable degree At the . time. of si'te,,plan submission for each land bay in order to accommodate eqgineiering or design considerations. Applicant'is, sub- imtti_ng, a Generalized Development Plan, "Exh'ibit A. as part of'a'iezon ng, app "licat on.. The Geiieralized.:Development' Plan is provided in lieu of a Master"° Development Plan and contains all information deemed appropriate b_y the Frederick County Planning Department. TIfeT Generalized peveloprnent Plan does not, eliminate 'the requirement for a Master Development P1'an "for'the portion of the site to be- developed, which will be provided following. rezoning•, approval "of`the 150.59' + /- acre site.. DESIGN MODIFICATION: DOCUMENT- In order. for Apply can`t and ;Frederick. C "ounty to ".implement thi's .Residential Planned �.y i , i p Applicant y g Staff to Comrnunit. District rt will be am ,octant for" A : _licant and Frederick Count Planning have the opportunity to; anticipate andorporate ,and develop hew' design types and configurations: that may be. suitable. This is to include, the allowance for the, installation of multi family immedi`atefy adjacent and in some cases in the same structure as bus'i'ness (commercial) uses. A. Pursuant -to Article I, Amendments of the., Frederick Count °y Zoning Ordinance, the 'approval of -this Amended Proffer Statement 'constitutes, an amendment to the zoning ordinance;: 'which will 'a'llow for the implernentafion of the Residential Planned Community District. B. Applcant,has proffered' a "Design. Modification Document dated July 30, 2014, 'that- is,attached and incorporated hereto as "Exhibit R. In addition to, the above, by' approving the Amended Proffer 'Statement, the F'rederi"ek County Board of Supervisors agrees without need of any further 'Board of Supervisors. or Planning Department approval to any, modifications of any matter- which has been previously agreed to and therefore approved „by,, Frederick County: 'Further Nstill;,any;subrriitted revisions to the zp.proved Generalized. Development Plan, and' /or. any of its requir".errients for .any development zoned ,R4 which affect the .perimeter of the developments or which, would increase the overall density of the development shall require the Board of Supervisors? approval, if in the reasonable discretion of the Frederick County Planning Department, the Planning,'Department decides ;any requested: modification. should be:reviewed'by the Erederick Co "unty ;Board,of Supervisors, it may secure said approval by placing -this }matter .before: the Frederick County Board of Supervisors at `its next.regularly.•scheduled meeting,. However, and not withstanding what is,•stated_ above, once a modifcati'on has` `been` approved administratively, Appli'cante shall not;, be required to "seek approval, for any subsequent similar modification... ;2. USES DENSITY AND' MIX- A.. (,ly) Applicant shall' develop a mM of unit types that may-include single - family attached, multifamily, °gated single - family attached; gated multi'- family, shared residential, and commercial structures, off ce, and retail. The following list in (2) below contains, those uses which could exist within the Property. (2) The following list of Land Bays within' the, Land Bay Breakdown Table sets forth the general development parameters- on the Property and is consistent with the 2. ,proffered Generalized Development Plan identified as Exhib'i't A- "The developrnent will adhere to, the:land bay breakdown depicted in the GDP and`the Land$ay'Bre:akdown,Table. LAND BAY BREAKDOWN LAND POTENTIAL' . LAND USE APPROX.. RESIDENTIAL COMMERCIAL BAY ACREAGE MIN/.MAX, M'IN /MAX ACREAGE °%o ACREAGE %o 1 Uses allowed -. in B -t1.; B -2; B 3 7.5.`I acres 0 %0 MIN _, AC. 1000/o MIN. AC'. Districts and sDesign 0% MAX. AG 1.00% MAX. AC 'Modification Document,. 2 Uses allowed in B -11; B -1; B -3 8:03 acres,Q% 1VIIN., AC. 100% MIN -,AC, Districts and Design 0 % MA ,: AC 100 9/6,-MAX. AC' Modification Document 3 Uses °allo Wed ''in B=1., B--2;' 3; 9.73 aoies' 5% ,MIN: AC 5% MIN,. AC'. RP Districts and* Dcsi�gn 95% ° MAX. AC 95% o: MAX. AC Modification ;Document 4 Uses,allowed in B, 1;.B 2 -B -3. 2'1.94 acres. 0% .MIN.,AC'. 100% MIN. AC. Districts and'Desrgn. 07N MAX. AC 100 % MAX. AC Mbdificatiori Document; ' Uses allowed, in "B -1;° B 2; 1 -3; 29.91 acres 80% MIN. AC. 10% MIN. AC. .RP Districts and Design 90% ° MAX. AC 20% a MAX. AC' Modification Document 6 Uses allowed" im B -;1'; B -2; 13-,3 6.83 acres 69% MN_ AC., 10.0% M.N. .AC. Districts and Design 0% MAX..AC 100% 1VIAX. AC Modification Documem. 7' 'Uses atlowed'in B -1; 13-2-:13-3; 5195; acres 0 %:MIN'. AC'. 1.0N MlN. N. AC. ' RP Districts :and De,sigri 90 % MAX. AC 1.:00% MAX..AC- lVlodi "fication;Document - Buffalo O- n ace e S . ' p _ p � T rail System;., ,a'c'res N/A N/A Lick. 'Utilities; Road Crossings ;.Run 'The actual acreage;identi'fied for each'tand :Bay-is based on the b,ubbhe diagram calculated' on the proffered'Gei eralized'Development Plan and :may fluctuate based on final surveywuoik. B For purposes of calculating density pursuant to the .Frederick County Zoning Ordinance, all dedications ,and conveyances of land for public use and /or for the use of 'the developrnent'or any' Homeowners Association shall, be ~credited in said, calculations.. 3 C., There 9hall be a, unit cap, of 1,20.0 residential' ,units within Land Bays'3, 5,, acid 7. Applicant may develop and btffl&betweeq.one hundred fifty (1.56) ,and one -hundred, eighty-four 0' 4' townhouses on Property el built in Land �Ba 7. :8 _rty, and that' any townhouses: will only b . p -Y Ther& are no limiis drf they pere-entage or square feet of' business, , commercial, office and/or retail development-, as, referenced above. 3 CAPITAL FACILITY IMPACTS: . A 'jcant acknowledges -that Frederick Count mpae Applicant e i _y has adopted A fiscal, :1 t model. Applicant has attached an economic analvsis, which has 'been perfprm_ed, by S. Patz & Associates, Inc. ("S. Ratz")'. This. analysis confirms that the ptopq8ed uses within Heritage Commons willgenerate a net positive benefit. to Frederick County. As�d result thefb'Will-. not be, a -need -to make any payments toward Frederick Count V The specifics of the capital, 5 - efi!� County - y ser I ices,� � The �-P benefit to Frederick County arse 00M0000' annually. In the event of any suggestion that a Pay,ffiehi Ought. `to, he .made towards the :i m—pacts when factored, ifi- with the capital benefits to Frederick County y-as 'a result ,of the,.installafion offhe proposcd, uses;, if should be treated as an 'offset. As stated `in the S_ -Patz-, analysis f he= cani tal benefits of the proposed' u ses on the Property more than compensate Frederick CbuilAy'forany antieigaiedilm)aCf., 4., MULTI-MODAL TRANSPORTATION IMPROVEMENTS:' Applicalit agrees to 'instal l -,th6 road' network that is depleted on the Generallized meets Virginia Department of DeV-,,-e`l'6pi,hent 'Plan and, in' an �ilighmeftt and a form that * mee' 'V,*' ginia -Y"t ,geometric design standard's. Both, .Frederick, County and Ap Transportation ("VDOT"),geom"' ri pticarit a&no, dge 1h GeneratzedL,'Development- Plan, Exhibit A, is at the network-showri on, the 'i substantially similar to the road alignment , that was qppyQve-d In the original " The rezoning: ,,parties, recognize hat there will. be a new design and insiallatib-n-14hat will occur as a, result of a ,izO Revenue ;Sharing Agreement entered, into ;Eby and between VDOT' and Frederick County and also 4,separate agreement entered into `by and 'between: Frederick County and Applicant. Applicant does agree to participate, pursuall't to the "terms of said.agTpements.. in the design and funding: of the installation of the road hetw.otk,,,which 'shall he in substantial, c,6nf6rmance with the designs set forth fn..Exhibit A. Applicant does, agree ,to enter into an agreement' with., Frederick County to provide for they payment, of Frederick County's share- of fhe" .cost to construct the road Improvements, pri'the Property --the, R nt pursuant the ,of Revenue Sharing fig. Agreement, entered into yarid:between-,VDOT and Frederick County. The final design will ;be dictated. by VDOT' -dnd Ffe-derlck'County,,, b ut, - Appfi'canthas: been advi`sed by the ,en ginee r designingjfie toad that. it will ',have a:ten foot "(10").or �such pthero w ppropriawidth path ;to be used f6r bicycle/pedestrian accommodation. It should be .noted that Warrior. Drive is depicted on, the, Generalized Development Plan as a future road. to he :dedicated ,and installed to provide access to Land Bays 3 and 5. Applicant. .proffers to ded"ic;Ite a. at such tiin& as a de-dicatable! ( I 1.Q, metes- and bounds description) 'tract of land' has been - established and which,'shaill be, 8­agreed to, by Frederick County and,ff applicable VDOT. . It l�s�. anticipated ,that the :remain-i'n�g portion of Warrior Drive will be �installed - under 'a Revenue; Sharing Agroement: by and between VDOT and Frederick ,County and that-, as part,of , -thalanticipated Revenue Sharing. Agreement . that the exact alignment 21 wi]'l be determined acros's'the. Property to_ adjoin ng property, to the south. jt.i -s further anticipated that, payment for construction of' said road' will 6ceufz when ihe,connecto "n section, of Warr':or Drive has+ been dedicated by "the owner. of :the, pr.:o,perty to the south (`max Map Nos,. 0A 123A). Such dedication shall substantially conform vlhell,general location 4V, arrfor Drive �shown.on the, GDP. "Applicant further proffers:that;if will reasonably cooperate" with:Frederick County and VDOT to obtain a revenue sharing agreement for. the ,road'. Applicant proffers that it will -enter. into an agreement with 'Frederick County to' pay for Prederi,ck County's portion of the Revenue Shari=ng; Agreement with VDOT'. The ,fill design will be dretaied by VDOT and. Frederick County;, ,buf. Applicant :submits" that said design; will include a_; ten foot (10') wide bicycle /ped'estrian aeco , rnod'ation thc length of Warr for Drive , Several 'traffic, studies have been performed as part of th& . rezoning obtained by the =prior owner .of this property i'n 20.04 Said studies confirmed that: the road, network proffered in "the precious rezoning was more than adequate to address any "impacts= froth "the development of the "site. The current •proposed rezoning provides for - the development of high- density resi'd'ential on ;the Property 'in addition to commerciaf, the result of which will `be; a reduction in and internal capture o.f mo,'tor 'vehicl'e trips and "therefore ha. ve less of an .impact, on. the local and regional ,transportation.system. Applicant been .ad -Ned, of sarrie by Traffic Engineer who :performed, the roriginal TI'A.for tfie Russell 'I50 project ,(N :ote: The original Russell 156.proj,ect did not, include construction ,of the northern Y' road and connection to Route .522 ) The design proffered herein provides for° the installation of the northern, Y road and 'two connections to Route 522. Iii ad'dition`, Applicant has;rb'een made raware of and received copies of traff'c' studies performed by VDOT wh`iC'h'0nfir"m that the, revised "road al=ignment as. shown on., he ,attached, and incorporated GDP i's: more than sufficient to address,not ,only the impacts coming from and' being, generated by the proposed'developrnent of the Heritage Commons site but -also will accommodate anticipated through trips, as a, result of constructing ,through connections• (two from. Route 522 to the City of Winchester' at Teuis Drive'). It` should be noted that VDOT ;is proposing that, the, roads to be constructed across-the Property. and the adjoining. property"tol ,connect to the City of Winchester are intended•to be a detour "east -west connection road, that will be an essential component of the regional transportation system because VDOT intends, to te mvel,and : replace the existing bridge wh'i'ch,is, the 'east -west connection between the City of'Winchester: and Frederick County along, Route. ,50/ 17. r 5. S°TORMWATER QUALI.TY.IVIEAS;URES: Applicant ,hereby proffers that all .business (comrriercial) :and _r..esrdential site ,plans submitted to _Erect -rick County will :be designed to imblerrient, Low'�I"inpact Development ,(LID) and %or: B,est;lVlanagemenYPractices ('BMP) to; promote storinrrwateraqua_'lity` measures. A statement will be provided on each busi`ness,(c,othrrrercial) and residential site plan'i'dentifying the party-or parties responsible for :maintai'ning these LI,D and /or BMP facilities-,as a condition of'site plan Approval. Appl`i'cant. hereby proffers to establish a no disturbance easement within, the Ruffalo Lick .Run.•Siream Valle. :y, that is deOcted on the Generalized <Development. Plari. The purpose . of this no disturbance easement 'is "to prohibit �devel`oprrient a'ctiurties within the business. (commercial) and residential 1'and bays that. are located within the defined area. The only improvements that 5 ;may, occur within this no disturbancedeasement will include road crossings, util'i'ty i'nstall'ations; storrnwater mana'gemcnt, facilities, landscaping and walking trails. 6. RECREATIONAL AMENI.T,IES':, Applicanivproffers that;recrea'tional amenities will he provided within Land" Bays 5. and 7. The exact, amenities will be identihi'ed of the Mdster ,Develo,pment .Plan fo ensure conformity with ordmaiice requirements`. Applicant .also proffers °to install, walking uai'as and sidewalks within th(: ;community ;and to install a "ten-foot (1'0:'),. wide asph'al't ,or 'concrete .trail along the Buffalo .Lick Rah Stream Valley depicted, on Exhibit A, of which, the location will be identified on °the` 1Vlaster, Development `Plan, ..I:n addition, 'and at Applicant's discretion, Applicant may install a second ten foot' ( "10')''wide asphalt or concrete; trai "1 (on the-other ;side of Buffalo Lick Run Stream). In the event, the <Applicarit,does consfrueta second trail -, i't is intended that; the ten,- =foot (s10') '"wide °asphalt::or :.concrete trail(§) will .be owned and` "maintained by the: ,Heritage Commons HOA an_ d will 'be available -for public access AP- P 4i caht, shall construct pede`stri`an trails and /or sidewalk 'system's,, which connect, each recreation area 'to ;the residential land uses within the defined Land Bay. The final tocation and "the granting of aqy such_- easements "sand /or trails; shall be at the subdivision design plan stage. -Such trails; or, sidewalk'system §,hall be constructed of materials selected by Applicant provided thev are not:part,ofthe sidewalk system within the public nglit -of, -way. 7:- COMPREHENSIVE ;PLAN CONFOR VIITY , By accepting and approving this rezoning, application, the; :Frederick. County, Board of Supervisors; authorizes the location and provision of those public uses, facilities,, and uti =ties, speci'fi'cally referenced on the Generalized Development Plan,, 'in this Amended _Proffer Statement;, and on design plans; as, well as` the extension and construction of water and sewer lineseand facilities "and roads necessary, to serve, thisz Property,puisuant to Virginia Code, Section 15 2- 2232,�and the Frederick County .Code. 'The general .area of location,;for roads necessary to serve this Property are as shown on the Generalized Development Plan with the exact locations to•be determined based on final engineering- and as approved 'by Frederick County_ Acceptance ,of this; Amended Proffer :Statement constitutes approval' of the public uses,, _facilities, and! utilities land. their ;abili=ty to be developed. within -the, Land Bays identified; ,on ,Exhibit .A; and, ,hereby excepts. said. public. uses, facrliti °es„ and, utilities fiom, :further CompreheasiV Plan conformity, review: 8,., PHASING A. Applicant states and acknowledges; that the uses proffered to be iftstafled on' the Heritage: Cornmoriss Property are sigmticant and will take, a =considerable amount of time to develop and. install wi'the, Property:. Iris anticipated that the ''initial ruses .installed will be of a. commercial use and nature, anal •Applicant is 'com- mitted °to attempfing to, develop a multi- family component at the. initial commencement of development and, construction. I'n response to, commenter received from, the .County agencies, Applicant is. prepared to ,commit that no more than four, hundred (400) ,residential units will be developed aril built within the first two "(2) years 0 of develop- eni, `w th4he first,year co,_mme l'cing on ilie�date of`the approval. of the rezoning, The remaining;residential units will be proffered.to be- installed.with no morethan four hundred (40.0) residential units withiq 'the next two (2) .year term: following., and the, remaining residential units commencing, 'no earlier than two (2;) years; after theF corndeton of the eight hundredth (800`x'-); residential unit. B.. I"n .addition Applicant `proffers that on �or before the date that=Appl'icant applies for and receives a perini"t to construct, the 'first 30:0 multi= `farft l;y residential units Applicant s.hAl apply for.and obtain a permit to, construct" ,minimum.of50,00 "0 square feet of commercial (B_ =1,. B 2 or:B 3!:) property Likewise on- or before the date Applicant' applies -for and receives: a permit to construct the 6,00ti' or greater' multi = family residential units Applicant shall .have either previously constructed. or shall .apply -for 'and, obtain a permit to. construct an additional 50,000 ;square; feet of commercial (B " -1, B -2 'or 8 -3)' property. Appl` cant.makes this proffer to assure thavin addi'ti'on to the Land'B'ay, Breakdown and Proffers pertaining to uses;; "density, and mix that ` here shat'l be a guaranteed min'iriiurn :devel`opm`ent of commercial .prope'rty occurring, at the same time as development of rnulti=fami'ly .resi'd'ential units. [remainder of page: intentionally left blank] 7 SIGNATURE.PAGE, The eonditions :set or herein are the. proffers for Heritage Commons and supersede all previous proffer statements submitted for this Property, Res "pectfully su!brnitted', i HERITAGE COMMONS;, LLC By; Matthew' Milstead, Its:: Manager - COMMONWEALTHTQF VIRGINIA;AT LARGE COUNTY OF FREDERICK; to -wi"t The foregoing "instrument was acknowledged b_efgre me: is day of 2014'by Matthew Mi:lstead, Manager of.HERITAGE COMMONS; LLC,. NOTARY PUBLIC My commission expires;. -Reg stration,nurnber'' _� 8 R 150 SPE LL(. By Earl W. Cole, III Its,' Manager COMNIONWIJALTH OF VIRGINIA, AT LARGE COUNTY OF FREDERICK, to wIt_ r I ' The foregoing ,instrument "was acknowledged before in_e th'i's day of '201-4'by Earl W, Cole,: I;II,1VIanager of"R .1'5.0 SPE',, LLC'. NOTARY PUBLIC My,commission, expires:, Registration "_num_ber -, m -LAW °SON AND SILEK P:L,C I20"EXETER DRIVE, SUITE 200 POST OFFICE. Box 2740 ' W, I N CH ESTE R;. VAI V604, TELEPHONE: (540) 665 -0050, FACSIMILE: (540) 722 -4051 - THOM.AS,MOORE LAWSON • TLAWSON Q LSPLC.COM I - September 18,'2014 Jason Robertson, Director` Roderick;B.. Wilfiams, Esquire Frederick CountyDepartment,ofParks•& Frederick=.Couniy.Attorney- Recreation 107 .N6rth 'Kent Street W7 North Kent Street- Winchester, VA 22601 Winchester, VA 2260.1 c Lloyd'A. Ingram, Transporl`ation Director K.-Wayne. Lee „Jr., . LEED;_GA Virginia. Department of Trarispoitat ion Coordinator of Planning and Development Edinburg Residency Frederick County Public Schools 14:031 Old Valley Pike 1"415 Amherst St.. 1 Edinburg, VA22824 Winchester, VA. 226.04 (via.e=inail only) Harvey E Strawsynder, Jr:, R.I.,, Eric.Lawrence, AICP,:Diiector Director of Public. W'or_ks Frederick County Do artment'ofPlanning.and Frederick County Department of. Public. Works Development. 1:07 °North ,Kent Street 107 North .Kent; Street„ Suite. 202 r Winchester, VA 22601 Winchester, VA 22601 Re` Heritage Commons:Rezoning Application Our' File No. 1050.001 _ VIA E =MAIL• AND'HAND- DELIVERY DeAr.Genttemen: Enclosed please find; revised Proffers, for the Heritage Commons development. As you will ' recall we participated in a joint worksession with "the Frederick County`Soardof'Supervisors and !. Planning Commission - on September 3, 20.14, and Wye ' had a . follow -up discussion with Eric Lawrence and Candice Perkins. Tle'.result is the enclosed 'revised Proffers which the Planning I Department has,, asked' Ghat `we send to,' you as reviewing agencies; that are:. more effected by the revised Proffers: We are intentionally 'hand- delivering "this correspondence and revised Proffers as well as e- mailing so that We. can get, a 'quick turnaround with your comments. We are tentatively scheduled, for a Planning Commission public . hearing on the-rezoning on October 15, 2014. I. know that Erica Candice and T• want to have the benefit; of any revised comments from'your•agencies to the Planning Commission memhers well in. advance of that, public hearing. J I FRONT ROVAI:'ADDRESS: POST OFFICE BOX 602; FRONT ROYAL, VIRGINIA 22630, TELEPHONE: (540) 6319415 • FACSIMILE: (S40) 635.9421 !. E- MAH_'JSILEKOLAWSONANDSILEK.COFI September 18;'20:14 Page 2 Thank you for, your ;assistance and cooperation. ; We look forward "to receiving your. comments. As always, if you have any questions or want to- discuss your comments further, please do,not hesitate to give 'me =a call. Very. l_�_ ; Thom s oore Lawso TMLJ k Enclosure cc R 150 SPE,, LLC. Heritage Commons; LLC HERITAGE COMMONS PROFFER STATEMENT REZONING: +RZ #:01'05 - Rural Areas (RA), Business General (132), and Residential Performance (RP) to Residential Planned. Community Di'strict-(R4) PROPERTY:. 150.59 acres Tax Map Parcels #63-A-156, 64 -A =10: and 64 -A -1'2 (collectively the-"Prop'erty'?).. RECORD OWNER: R =50.SPE,:LLC APPLICANT': Heritage Commons; LLC: ( "Applicant" ) PROJECT NAME- Heritage- ,Commons ORIGINAL -DATE OF PROFFERS: September `6, 20113 REVIS'I;ON DATE(S): August 7, 2014,. September,,] 8;:2014. Executive Summary ! The Property was originally rezoned 'in ;September 2005 under •the name of 'Russell 150. The: Property has since-changed ownership. and, the. new' owner wishes to ;rezone the• Property to Residential Planned Community District (R4). The undersigned' Heritage Commons, LLC; its - successors' and assigns; :hereby proffers that the use; and •`development. of the subject property shall be in strict, accordance with the following tconditions and shall supersede and replace all other proffers made prior Hereto. ,It is further the statement and intent that with the acceptance of the proffers contained herein any and all, prior proffers: affecting. this'Property shall be deemed' null, void, and terminated:. In the .event 'the: above_ referenced amendments are not granted. as applied for'by Applicant, the below described proffers shall 'be. withdrawn and be null and void. The; headings of'the.,proffers .set forth below. have ,been prepared for .convenience &4 fdr ce only and.`shall not control or affect the meaning, or be taken as an interpretation, of'any provision .._; .. of',the proffers. The:irnprov6ihents•.proffered herein shall be' provrded at the time of development of 'that. portion of the ;site Adjacent to the. improvement,, unless otherwise,specified „herein. i R'eferences made, • to 'the Master Development ,Plan, hereinafter referred to as the Generalized Development Plan dated ,August 7, 2014, as required by the Frederick County Zoning O "rdinance, rare fo be interpreted to be references to the specific Generalized Development Plan sheets &tached hereto; and - incorporated herein by reference as, "Exhibit A." The 'exacf bouiidary and acreage:of each 'land bay may •be "shifted to a reasonable degree at the time of site plan submission for-,each land bay in order to, accommodate engineering or, :design: considerations, Candice,:Perkins J V 2Froms Jonathan Turkel Sent: Friday•,September 12.2diA 11:06 AM To, Candice Perkins, Subject: �H6� tage Commons Comments''Dr -_ .5 RE Her itage,Conmons:P;roffe'r;of dugust 21,.- 2014, Candice, .Consistent with the-comments a the Sept 3 jointPC, BOS wor,.k!session'involvirig Heritage Commons; Parks and- j Recreation, ias concerns Tegarding omission_s,from.the existing proffers, vague�and non - committal language and requested `items.. l Omitted': s p eritage Go;mmons version includes 10,= foot`wi,de, lan'es.o;n all interior roads; 2005 roller items orriitted in the. H i Parks and,R'ecreation would prefer Wsee 10rfootsha "red'Use path "s aiong all interior roads "and the i-81 bridge, however a, minimum of he,200510roffer`should bexeguired t&provide:adequate accornmodation.formulti.= modal.transportation.to occur.:; This is' particularly true for °the V1Fa "rri6r..p6ve..segm;ent; the southern end of Warriar'Dr. curre "ntl.V ving.10-footasl tired used "accommodation. e - Moroetarycontributions have not been addressed. Ae#O'dested; ® Bie =81 f beke /pd accomnodatio,n onthe 1 fy ver'brid eshould.p roVided' (urrently there are no such accommodations on any,ofthe "existing 1-8`1; bridges! so.niethmgthat is greatly needed: Vakue and Noritornmittai; ' . Language'that;suggestsnwh_at;': may '; happen, as in"'The:applicant:may also,,insfall,;an additional 10' wide 1 path..('p.1.7,)" are not he pful'i'n determiningwhat will happen as.a.condtion of';the proffer. Parks and Rareation would efer speculatiu&. language be left outfof'the` proffer< statement: Additionally,the Parks and Recreafion,departmentwould prefer -pr offer'statements to, ref rain -from listing •`recreation items required by ordinance and simply identify ,;items,ofrecreationaival,ue that,go beYond,ordinance. Text °in a proffer, statement that lists'items.a developer wih; hayp =. o do as ::required by code only serve;,to make actual: proffers more difficult to disting "uish, Thank, you; Jon Turkel Park and Stewardship Planner Frederick county Parks,andAecreation 1. 107 N': Kent St. Winchester •VA 22601 ;jt ( LfrkeI @.fcv&.us; 0:(540)722 =8300 . F:(5'40)665 687 1 C COUNTY of FREDERICK pa Department of Planning and Development' 540/665-5651 17 FAX: 5401665-6395 August 29, 20114 -Mr. Thom*asf Moore Lawson Lawso-h..an.&Silek, PI.C. 'P.O.,Box`1740 Winchester, and Fiscal lfta�ctt Analysis JMF14)'d the. Heritage RE: Market Project Dear Mr. Lawson: Staff has received comments concerning the submitted. Market.,arid Fiscat impacts Analyses dated Oct6ber-2013 for the Heritage Commons project from the Frederick County Treasurer's Office and-the Commi"s§ioner-ofthe Revenu'e,,`Ina'ccurades with the clata'are a0cillows: PPTRA was capped ,in, 2009 at 2007 levels. Monies for. PPTRA are included in the Personal ,Property Jax.FY 2014 amount ($41,143j379). There are ,no. additional monies for PPTRA from,the State bf­Virginia'f or vehicles .addbd, toAhe tax rolls. (Attached is a corrected amount for `additional personal property, tax revenue, based on the applicant,s cdl&Ulations, With only the PPTRA,amount correcterd). Page 45 - PPTRA is NOT in addition to the pers*onal property tax rate of $4,83 but a payment toward that for the qualifying taxpayer.: - This error makes all future calculationsi of personal property tax revenue in this'presentation INCORRECT' if they use these numbers,., Page 46'- We find 'that owhhouses'and apattryfents -do. NOT'hbve­12.3 vehicles average per householcl. Many are one oe two individuals or small.,chfl8ren per-dwelling,and oft,pq only one vehicle. �'An estimate.of- 1.6 would be. high. • _Page,47 - This (Ta bI 1 e -7), do.es.show a better number .for vehicles per unit but has 6 tax. value calculated ,. earlier in the document using incorrect information (See Page- 45 ,above). h 'higher Page "48 Persbnal pt6oerty* FF&E a. s s ownJs much on offices than we exp'e'rienced. -PILUs our V61U6 calculation/depreciati6n.rate on FF&E'is 30% not-40%. • Page .50; - Error in tax, rate - $0.58/$100 BPOL tax ONLY -applies to professional ,classifi,ations (doctors, architects; lawyers, ;and realtors) — our BPOL rate on most office,s. isl;$636/$100. 107 North Kent, Street, Suite 202, • Winchester, Virginia 12601-5000, ' Y i Page 2 Mr. Thomas 1vM66re Lawson RE.:, Heritage Commons August -29, 2014 Additional. Conceths • Page.36 - Under. °office space.. They admit'that medical office space is unlikely in their project. (Applies later-to my comments on the incorrect Business License figure used for their commercial sites.) • Page 37 - 13% vacancy rate admitted on existing offices - (my comments --some stood, emptyfor,inan.y months in the city-and at" the airport) • Page 37 (and elsewhere) -assumption is made'that the county office building will be on site and therefore employees-,and companies /businesses, dealing with-the 'county will be interested and available'for rentals and "for employee purchases of lunches etc. (undetermined). • Page 38 -Based on their °household inconie.(disposable or pre tax ?? ?)'they have calculated aVERY'high'expenditure rate on-site,(26%of the 15% convenience purchases) • Page 38,- Their business discussions include the page 17 assumption of'a county office building_ ;onsite`. • Page 39'- Assumption o', lun`ches,purchased at site is very:high. e Page 39 --They adm&thatthe, projected 15 year build out',is "speculative at best °. Yet they conti'nue:to use speculative calculatiori's to make`their case. . Page 43 - Townh' ou, se`values „areprobably ok if quality is.maintained `as projected. Apartment Values appear high: •: Page.44 - Values'ohl is page appear good on commercial but high on offices given our sales, analysis,in the county;.; '• P4ge ^49 -Table 9`- Restaurant: sale' is higher'thamwe experience on small locations,- if allure to be laege.sca le, full meal establishmentsor very popular fast food chains this figure MAY °be closer. Page'SO -- Restaurant;gross would only average these-numbers if high traffic and high end establishments-are located in the complex. • Page53 - Recordation /ownership rollover appears high.,.. ,. Page 3 Mr.. Thomas Moore- Lawson en age ommons August''29, :2014 Please feel free to. contact ,me With questions regarding this_application., Sincer Candice E. Perkins; AICP Senior Planner Attachment • '.gin - � � .., taxable personal use value - tax/,vehicle: new value, new tax 'lawson $ 42;0.15,61 -9.00 $ ,864,5`18,909:'47 $ 12;529.26 $ 23,392,127.59 $ 1,136,857.40 corrected pptra $ 28,388;932.00 . $ '584,134;403.29' $' "8;4:65.72 $ 15,805,491.75 $ 768,146.50 difference $ 368,710.50 4 LAWSON'AND SILEK, P.L.C. 120 E)CETER',DRIVE, SUITE 200 POST OirktuBOX 2740- WINCHESTER;`vA 22604 TELEPHONE: (540).6657,0050 FACSIrom:E: (540)'7224051 August 28, 2014 Mr-.. Gene E. Fisher Frederick County Board of Supervisors Shawnee `Ma' gisterial 'District 246 Bush Drive Winchester, VA 22602 Mr. J. Rhodes Marston Back Creek Magisterial District Frederick County Planning Commiission 107 N. Kent Street Winchester, VA 22601 Re', 'V IA E -MAIL Dear, Gentlemen: THOMAS MOORE`LAWSON 0 TLAWSONAMPLCADOM Mr. Robert A,Ress Frederick County Board of Supervisors. Gainesboro; MagisterialDistrict '348 ,Peeper Lane Winchester, VA 22603 8ric Lawrence, AICP Director, Dept_ of Planning and Development Frederick County„ Virginia 107 N'. Kent Street. Winchester, VA 22601 Heritage Commons. 'Our File No. 1050:001. Thank you very much..for, traveling with Matt; Bruce. and me to look at mixed use developments -in Loudoun and`Frederick Counties. We very much appreciated the opportunity to meet, with you,all and show you first hand some examples of mixed use developments that are up and running. It is Edwusvery. difficult to try to describe something with words.. Certainly the best way to, show, someone ;is -to actually go out and see it firsthand. I know you -all have very busy schedules and we certainly appreciate you taking the °time out to visit:. We also, appreciated your comments about refining the proposal so. the County is assured that what is being proposed will, be developed in a manner consistent with what we, saw on Tuesday. With that' commitment we- need to retain flexibility. As we saw, there are numerous types' of mixed' communities and we do Tnot want to unnecessarily box out a particular type of desired development because we have written a proffer in a more restrictive way: Nevertheless, we are ;confident that as. we ,go forward with this proposal, we; will be able to come: up with the appropriate: balance of language that assures the�County of a;strong tax .positive development and a very attractive additional lifestyle option for the County's residents. FRO" ROYAL "Dun: ft-n O"xx B= 603; Faami Rona, vacmu 32670 • TXLAM l E: (340) 6359415 •FACHNIU:. (SM 6759431 • E- Min:, -L—Q— Umatl.t -m LAWSON AND "SILEK9 P.L.C. :120 ;EXETER DRIVE, SUITE 200 POST oFFIcE BOX-2740 WINCHESTER, VA 22604 TELEPHONE: (540);665-0050. FACSIMILE: (540)732-4051 August 28, 2014 TIIOMAs MOORE LAWSOO TLAWSON QALSPLC.COM Mr. Gene E. Fisher Mr. "Robert A. Hess Frederick County Board of Supervisors Frederick County Board of Supervisors Shawnee Magisterial District Gainesboro Magisterial District 246 Bush Drive 348, Peeper.Lane Winchester, VA 22602 Winchester, VA 22603 Mr. J. Rhodes :Marston Back Creek Magisterial "District Frederick County Planning `Commission 107 N. Kent Street Winchester., VA 22601 Re: VIA E -MAIL Dear Gentlemen: Eric 'Lawence, AICP Director, Dept. of`P lanning and Development Frederick 'County, Virginia 107 N. Kent Street. "Winchester,. VA 22601 Heritage Commons Our File No. 1050:00.1 Thank you very °much for traveling with Matt, Bruce and me to look at mixed use developments in'Loudoun and Frederick Counties. We very much appreciated the opportunity to meet with you,all and show'you first handsome examples of mixed use developments that are up and running. It 'is always very difficult to try to describe something with words.. Certainly the best way to show someone -is to actually go out and see it firsthand. I know you all have very busy schedules`and we certainly appreciate you taking the time out 'to visit.. We -also appreciated your comments about refining the proposal soy the County, is .assured that what is be_ ing proposed will be developed in a, manner consistent with what we saw on. Tuesday. With that commitment, we need to retain 'flexibility. As we saw, there are numerous types of mixed communities and we do not want to unnecessarily box out a particular type of desired development because we ,have" written a proffer - in aemore; restrictive way. Nevertheless, we are;confident that as we go forward with this proposal, we will be able to come up with the appropriate balance of language, that °assures the County of a:strong tax positive development and a very attractive additional lifestyle,option for the County's residents. FVWr Rona. ADDit =; FDEI onus Boil602, Fite" Roru, Vn=aA 32630 • TxLxm a: (M M63&9415- •. FACmmi: (540) 675-9131 • R-MAH : •••• •••�•'�Wtx171A10ffiIJDLCOM Eric. Lawrence From: Thomas Lawson <,tlawson: @Isplc:com> Sent: Thursday, Aogust 28,, 2014 424 Plvl To: Eric Lawrence; Robert, Hess; g,fishe"r @visuaIIink .corn; °Rhodes Marston Subject: Heritage Commons Attachments: Fisher Hess Marston Lawrence Jtr'08- `28- 14.pdf Ptease see the. attached. Thanks, Ty Thomas Moore Lawson, Esquire Lawson and Silek, P.L.C. P.O. Box 274:0 Winchester-, VA 22604 Phone: 540 -665' -0050_ . Fav1, 540. -722 =4051 E-mail: �tlawson(qlsplc.'com The - information contained in this message is;infohnation intended only for'the use of'the individual or entity named above, and may be: attorney /client privileged and confidential. If the reader of this: message, is not the intended recipient; you are, hereb,y'notified that any dissemination, distribution or copying of this; communication is stricdy'prohibited. If,you haw.-received this communication in error, please iminediately notify us by "telephone and return the original iiiessage to;us'at the above address. Thank you. _ 1 August 28, 20.14 Page 2 We look forward to working with you all. going forward. A& always, if you have any questions, Pleasedo not;hesitate4o contact Matt, Bruce or me. Very trul urs, Th' ore Lawson TML:atd cc: RI 50 SPE,,,LLC Heritage Commons,,LLC �., M E IVI ORAN:D U IVI i TO Winchester Star-and Northern Virginia, Daily FRAM: Eric: -R .Lawrence, AICI ,.Planning ir ecfor SUBJECT:: Tuesday; August 26°2014 too r-for CQ.unty officials,_ DATE , August 11.. 1614 Tfii's memorandum serves to inform the media that on Tuesday; :August 26; 20 :14, members "of the'Freder'ick Co:u_ my Board of.:Supervi'sorsand Pla'nning;Commission have been invited; -to i travel to Northern Virginia to visit 'various development projects to ;gain '_knowledge and and _ erstanding as.to the type of developrrient envisioned by a; rezo`ning9petition that will be considered 'by the bodies in the nett fe.vv'rno_nths. This`tourIs at `the invitation of the i al pIf " ntfor-therHentag-6 Commons, rezoning application. We; have not -been: informed of.'a starting, but will' notify,you ofi;t_he start,time once finalized . i by the; organizer: Please contact rrie with`any qu.estio:ns,. °Thaiik yo;u: i i 10.7North.Ke1t Street ®`Winchester; Virginia `22601.5.0.00, - From, Diane Walsh Sent:; Thursday, August;21 2014,1:40 PM' Eric, Lawrence• Subject. Notification of Tour- _, ,Attachments. Heritage Commons ',toUt.media'notificatibn (2):pdf' Tracking:' Recipient Delivery Eric. Lawrence Delivered 8 &T/1 014 1;;40 PM Alex +'Bridges m armstrongJ @wi n chesfetsta r� com, Th'eiattached' not fication,serves.to' inform the media tliat,on Tue'sday,;Aggust 26, 2014, members.'ofthe y p g aue b" invited to trauel;to North. ern t Frederick Count"Board of Su prviso`rsrand Plannin Commission h Virginia. Tf is tour'is at the'invitation o.f�the applicant for the Heritage Co;mmon"s rezoning application'. 4 Diane L ; Walsh, ; R deriek County Planning :Department r 107 North Kent'Streef, Suite 202 Winchester, VA, 22601 54x0- 665'=5'65''1, Fax: 5:40 -6'65' 6395 dwalshgfcva.us ' 1 9 1 FRONT .ROYAI,ADURF:S,S:PoorOE41ck Box 602,FRO\1ROYA1,VIRGINiA 22630• TFIXTuuNt :6(540)635- 9415•FACSINIR.E:( 540) 6359421•; E-J fAR: i.ISI1,FF(d.i,AwsosANnso.EK.COaI LAWSON AND SILEK, .120 EXETFR,DRn'E,'SUITE 200' POST OFFICE.Boz 3740' WINCIIEsrER, U.A,33604 TELEPHONE: (540) 005 -0050 FACSIN]II•E:J540) 722 -4051 - TII6A1AS; NIOORE 'LAWSON'''TLANA'SONna.LSPLC.COM August 21„ 2014 Mr.. Richard C. Shi'ckle; Chairman Mr. RobertA. Hess- Fr j .. ederick County Board 6f Supervisors> Frederick• County Board of Supervisors . 292 Green Spring Road. Gainesboro Magisterial'District ` Winches_ ter, VA 22603 348 Peeper' Lane Winchester,, VA 22603 Mr. Charles S.;Dehaven, Jr. Mr. Gene.E. Fisher- Frederick County Board of Supervisors Frederick County Board of Supervisors Stonewall Magisterial District ' Shawnee Magisterial District 2075 Martinsburg Pike 246'Brush _Drive Winchester; VA 22603' ' Winchester, VA 22602 Mr: Robert W. Wells - Mn Gary.A. Lofton Frederick County Board of Supervisors " Frederick. County Board-.* f Supervisors ,pequon Magisterial District Back Creek. Magisterial District. 5114 Laura Drive 7.11 Buffalo 1Vlarsh Road J, Stephens City, VA 2265.5 . Middletown, VA.. 22,645 . 1l Mr. Christopher E Collin's Ms. J.uiie Wilmot, Chairman Frederick County Board 'of Supervisors Member at Large ' Red Bud Magisterial District Frederick County Planning Commission 120 Sew -Court 107'N: `Kent Street Winchester-, VA 22602 Winchester, VA, 22601 Roger L. Thomas, Vice = Chairman , Mr. J. Rhodes; Marston Opequon Magisterial District. Back,Creek Magisterial District Frederick County Plarining°'Commission . Frederick County'P1anning Commission l`07'N. =KentSfreet-. 107 N. Kent Street Winchester; VA 2260.1, Winchester; VA 22601 Mr: Greg L. Unger ., Mr. Kevin W'. Kenney .,Back Creek Magi'steiial.Distn"ct Gainesboro Magisterial District ct . Frederi'ck :County Planning. Commission " Frederick County.. Planning Commission 107 N. Kent Street: 107-N. Kent` Street Winchester, VA 22601. Winchester, VA 22601 FRONT .ROYAI,ADURF:S,S:PoorOE41ck Box 602,FRO\1ROYA1,VIRGINiA 22630• TFIXTuuNt :6(540)635- 9415•FACSINIR.E:( 540) 6359421•; E-J fAR: i.ISI1,FF(d.i,AwsosANnso.EK.COaI August 2'1 -, 201:4 Page.2 _ IVIr.: Charles E. Triplett; Mr .Christopher Mohn Ganesbo'ro M_ag- isterial District: Red $iid Ma- gister " "_ial District-. FrederiekC,ounty Planning'Commssi`on, Frederick County Planning Comni'sson 1t50'.Lorie.WilTow Larie .. = 107 -N KentStreet Gore, VA 22637 W�eV22601 r (via U S Maid) Mr: Char=les, F. Dunlap _ Mr :Robbi'e Molden - "! Red Bud IVlagisterial District:_ _ Opequon Magisterial-District Frederi�k County Planning Commission. Fred'`er.`ick'Co i ,Plannfng,Commission 1.07,N'. Kent Street , 1,07N. ,Kerit',Street Winchester, VA226,0 4' Winchester; VA 2260:1. Mr. Lawrence R Ambrogi ss Mr. H Pai;ge,Manuel: Shawnee: Magisterial. District_ :. Shawnee !Magisferial 'bistrict Frederick "County Planning Co iih s ion. .. FrederickCounty, PI _ 'ann _rig Commission 107: N. ' Kentt Street ; . ' . f07• N. Kent Street W- in0hest' , VA 2260;1 _ Winchester; VA 226:0`1 Mr. Gary R. Oates . Mr. Stan Crockett,. . Stonewall Ma sterial.;District.. ; g , - Stonewall Ma.gi:sterial bistnct• Ere de _ok County PlariinmgEomnli:ss on FrederickCounty; Plan ing,Coimiss on. _ 1.0T N.:Kent Street -. 107 N, .'Kent Street Winchester, VA 2260;1. _ -• > -' Winchester, V, -22.661, • Rey Heritage Commons ,.. Our FH6 NO. 1050 00.1 - VIA E =MAIL Dear June, and. Gentlemen;; This is za friendly reminder' about the f eldc trip on August 26.th :for. the! members of the' ' Board of Supei_visors °.and Pl'anninR Commfssioii •to see sites n'Loudoiin and. Fairfax Counties:. which are .reflective,.of ' what,.the :developers plan `to''bring to, the Heritage Commons site 'in ' 'Frederick, County` I Have `heard, from one .Supervisor who. requested that, we depart-.after 1''0:0.0 a.m.. dize',to earlier meetings_ in the day; Wc' will;. therefo "re; I'eave °•a little a _bf.10.00 a.m. and. . depart from the Cameron Street lofat the'County office building. Iri order` to get .a better Aidea- of -how. many attendees `we will have; please let- me know if Y ou will'..be ,, able ;to poi "n -Us on August 26`h at 'TELEPHONE[ (540);6_65 -0050' I' SIMILE: ($4O) i22 -46$1. THOMAS;MOORE- ILANSON - TLAWSONnLSPLC.COM Mr. Richard C.. Shackle, Chairman Frederick County' .Board of Supervsos ;292. Green Spring Road• " Winchester VA 22603' August 21, Mr. Robert A Hess; r Frederick County;Board'of'Supervisors Gamesboro Magisterial District 3`48 ,Peeper :Lane. Winchester; VA22603 Mr Cliarles,S'.`Dehaven, Jr:' Mi.,Gene E, Fisher Frederick County Board of Supervisors Frederick Couni. Board<gf -Supervisors, Stonewall Magisterial District' . . Shawnee 1Vlagiste'ial District 2075.MartinsburgPke a 246 Bush Drive ' . -- Winchester, VA 22603: " . Winchester,. VA22602 f Mr. Robert W., Wells Mr. Gary,A. Lofton t Frederick CountyBoard,of'Superuisors Frederick County Board; of °Supervisors! -' ;O.pequori Mag sterial_District . Back''Creek�Mag steiral,District:. . 5J 14 Laura Drive 711. 'Buffalo Marsh Road, t Stephens City, VA,22655' - Middletown. VA 22645 . MV .. Christopher E. Collins Ms., June `Wilirioi, Chairman ,. Frederick County °Board of'Supervisors Member at barge, 1 % 1 Red Bud_Magisterial Nstrict Frederick County ;Planning, Commission K 120 iSesar Court WTN. Kenf Streei Winchester - --. VA 22602 Winchester, VA 2260,1 6 ::1V1r Roger L_; Thomas; Vice = Chairman, Mr J: Rhodes Marston Opequon Magisterial. District Back. Creek- Magi:sterra1.Dis1ri6t - Fred'erck County Planning .Commission Frederick County- Planning- Coininission 107N: Kent Street 167 N. Kent •S`treet Wrnche-s1ter'VA22601. Winchester VA.226 Mr Greg L. •Unger Mr. -Kevin ' W'. Kenney - Back Creek lVlagister -iaf iA i— t; 66nc§boro.Mag stern" bistr ct Frederick County 'P -.,laniiingTCommission, Frederick County Planning; Commission F 107 N. Kent�St "reef 107.N. Kent 'Street;. Winchester, VA.22601 Winchester, VA22601,: , - FROM 'ROl nl,P)II rSti POIrO]'i?ICFBOh6O2, FRO 'NIRO'AI VIRCIN In22630- TELEPIIoN ,( 540)6159415. FACSINILk _(540)6359421 EUAII.JSILFIK�!1AN ti0 \A \'Ii111.I:K.CO)1 _ August 21, 20`1:4 ' -_ , Pagen2' j 'Mt. Chafles1: Triplett- Mr, Christopher M;ohn. "i Gainesboio Magisterial District . Red'Bud Magisterial D'i`strict - :. Fr, dO'e k ,ounty Planning Commission Fredenck<COunty Plarming�Cornrni i n 160 "Lone'Willow Lane. 107N Kent Street: Gore, VA.22637 Winchester,'VA-22601' (V;ia U;S:• Maih)' M- Charles F;- Dunlap Mr.= Robbie Molden } Red Bud MagisterW,Qistric`t= Opequon'Magisterlal District 1 Frederick Courty'Planning.Commssori Frederick County,Planning Commission " .: 10__7 N:,,Kent Street' 1,07 N.,Kent Streei l " Winchester, VA-22604 Winchester," VA 22604 Mi Lawrence R. Ambrogi . Mr.. H. Paige Manuel' ' Shawnee "Magisterial' Districf .y Shaw:iiee:Magisterial District Frederick County'Plaranig omm ss on Frederick Cdl n Planning Commission -k .107 N. =Kent. Street 107 N Kent° Street . Winchester, VA 22601 Winchester;'VA -22601 W.0 alYR, Oates Mr. Stan Crockett Stonewall Magisterial District. Stonewall `1Vlagisterial D "istrict Frederick County Plammng Commission" Fredenck County Planning" Commission __ 107 N. Kent.Street 107`N Kent Street . Winchester; VA 22, 601 Win Nester;_ A 2260;1 Re Heritage Commons Our Fite'No. 1050.00:1 VIA "•E -MAIL a " -Dear June and:,Gbridemen This is °'a friendly remindei -' about' the. field trip on,. August;'26t1i for the- °members of ;the, ::Board of Supervisors and Planning_ •Commiss onto see sites m Loudoun" and Fairfax Counties. which, are reflective -:of what the' .developers plan' to bring, to the Heritage Commons site in Frederick County., I ,have heard from one :Supervisor who requested that ;we depart after. 10 :00 a:m due to earlier "meetings; dri, the day. `We ,will, °therefore, leavo'a little after:;,:10 00 a m , and " depart-'from iherCameron .Street lolA "the County office: building,. In order to get a better idea of how many attendees •we will have, please, let, me know if you will be able to join us on August Mt at 10 am. LAWS ON. AND: SILEK . RiL.C. 120 EXETER DRIVE, SUITE 200 PosT_0FFICEd3b,X'2_740 WINCHESTER, NIA 22604 TELEPHONE (540),665-0656 FACSIMILE: (540)'7224051 Mr.Richard C. Shickl*e, Chairrnan Frederick County Board of Supervisors 292 Green "Spring Road Winchester, VA 22603 Mr) Charles, S. Dehaven; Jr. Frederick County Board of Supervisors Stonewall Magisterial'Disirict, 2075 Martinsburg Pike Winchester, VA 22603 Mr. Robert W. Wells - Frederick '(ounty,Boqrd of Supervisors. Qppqiion Magisterial District 1 1'.4 Laura Drive Stephens -City, VA 22655. Mr.: Christopher-E.7 Collins Frederick ' County Board of'Supervisors. Red Bud Magisterial District 1`201 Sesar Court Wihchdstdr, VN22602 Mi, ;Roger L,. Thomas Vice- Chairman ..Opeqpon Magisterial District Frederi7ck,CoU'niy,Plannihg Commission 1107 N. KenvSfre6t Winc.hf_st_er.,,,VAi22601' Mr.,..Greg,L. . Unger ,Back Creek Magisterial District Frederic— k.County,p-lannirig Commission 1"107 X. Kent. Street Winchester; NA226.01 TIfdMAS N1_bORr LAWSON • TLAWSO'N a(LSPI.C.COM August, 19, 20,14 Mr. Robert A. Hess' . Frederick County B-6ard of Supervisors Gainesboro Magisterial District 34& Peeper Lane Winchester, VA``226'03 Mr. Genb'E; Fisher, Frederick -Cou'rity •Board of&pervisors S I hawnee Magisterial District 246 Bush Drive Winchester,, VA 22602- Mr. Gary-A, Lofton Frederick. CounfyBoard of;Supervi-sor's Back Creek Magisterial District 711 Buffalo M.Arsh,Roqd Middletown, VA.22 , 645 Ms. June Wilinot, Chairman Member-dt Large Ffed'efick County Plann . ing Commission 107 N. KentStreet Winchester, VA'22601 Mr. J'.1 Rhodes, ,Marston. (Back Creek Magisterial District Frederick County'flanning Commission 107 N. Kent Street, Winchester, VA 22601 Mn, Kevin'.W. Kenney . Gainesboto.MagIA&W -District FrpdefickCbuiftyPlannihg Commission 107 N., Kent, Street Winchester, VA.216.01,. FRONT ROYAL ADDRESS: POST OFFICE BOX 602, FRONT ROYAL. VIRGINIA 22630-TEI,EPItONE:-(540)635-9415,-,FAC.StFIILE: (540) 65-9421 • E-NIAIL:-JSILEK@LAWSO.NANDSILEK.COM F LAWS ON. AND: SILEK . RiL.C. 120 EXETER DRIVE, SUITE 200 PosT_0FFICEd3b,X'2_740 WINCHESTER, NIA 22604 TELEPHONE (540),665-0656 FACSIMILE: (540)'7224051 Mr.Richard C. Shickl*e, Chairrnan Frederick County Board of Supervisors 292 Green "Spring Road Winchester, VA 22603 Mr) Charles, S. Dehaven; Jr. Frederick County Board of Supervisors Stonewall Magisterial'Disirict, 2075 Martinsburg Pike Winchester, VA 22603 Mr. Robert W. Wells - Frederick '(ounty,Boqrd of Supervisors. Qppqiion Magisterial District 1 1'.4 Laura Drive Stephens -City, VA 22655. Mr.: Christopher-E.7 Collins Frederick ' County Board of'Supervisors. Red Bud Magisterial District 1`201 Sesar Court Wihchdstdr, VN22602 Mi, ;Roger L,. Thomas Vice- Chairman ..Opeqpon Magisterial District Frederi7ck,CoU'niy,Plannihg Commission 1107 N. KenvSfre6t Winc.hf_st_er.,,,VAi22601' Mr.,..Greg,L. . Unger ,Back Creek Magisterial District Frederic— k.County,p-lannirig Commission 1"107 X. Kent. Street Winchester; NA226.01 TIfdMAS N1_bORr LAWSON • TLAWSO'N a(LSPI.C.COM August, 19, 20,14 Mr. Robert A. Hess' . Frederick County B-6ard of Supervisors Gainesboro Magisterial District 34& Peeper Lane Winchester, VA``226'03 Mr. Genb'E; Fisher, Frederick -Cou'rity •Board of&pervisors S I hawnee Magisterial District 246 Bush Drive Winchester,, VA 22602- Mr. Gary-A, Lofton Frederick. CounfyBoard of;Supervi-sor's Back Creek Magisterial District 711 Buffalo M.Arsh,Roqd Middletown, VA.22 , 645 Ms. June Wilinot, Chairman Member-dt Large Ffed'efick County Plann . ing Commission 107 N. KentStreet Winchester, VA'22601 Mr. J'.1 Rhodes, ,Marston. (Back Creek Magisterial District Frederick County'flanning Commission 107 N. Kent Street, Winchester, VA 22601 Mn, Kevin'.W. Kenney . Gainesboto.MagIA&W -District FrpdefickCbuiftyPlannihg Commission 107 N., Kent, Street Winchester, VA.216.01,. FRONT ROYAL ADDRESS: POST OFFICE BOX 602, FRONT ROYAL. VIRGINIA 22630-TEI,EPItONE:-(540)635-9415,-,FAC.StFIILE: (540) 65-9421 • E-NIAIL:-JSILEK@LAWSO.NANDSILEK.COM August 1 -9,_ 2014 Page 3 Associates, Inc. fo. conduct an, economic study of the proposed uses for the Heritage Commons site and have confirmation from that. firm: that this is a much needed development for our community which -will not..only provide an alternative place, to live, work and play but generate tremendous revenues- and other benefits io Frederick County. As we have .done with. other projects which are bringing something new to Frederick County. the owners and developers thought it would be a good; idea to 'take a ",field trip" with members of the Board; of_Supervisors. and. Planning Commission to,show them examples of the unit types and development,that is' planned for.HeritageCommons. After all, welcan spend a lot of time trying to explain what: is being proposed, but there is no substitute for actually seeing the communities first hand We are .. proposing to take as many Supervisors, Planning Commissioners and Staff on,a tripto northern Virginia on Tuesday, August 26, 2014. Due to the anticipated number of public officials. its attendance we have already been in contact with members of the Frederick County .Plamling Department, and they have advised that they will send the. requisites notice io 'the local. newspapers to advise them of this-vi -sit and to invite them to attend the. trip if they are interested. So that we can °.,plan° for art `appropriate vehicle we would greatly appreciate it if you 'could `respond to meat your earliest convenience and let me know that you will be 'able to afteid. We would`anticipate'that the total trip would take no more than five hours which will allow a generous amount of time on the grounds of "the communities for a visit. Thank you for your assistance and 'cooperation. We look forward 'to the opportunity to show you these new communities. TML -.jk cc: R 150 'SPE, LLC .Heritage: Commonsk L-LC Frederick County Planning ,Department c 1, Eric, LaWitence From: Thomas" Lawson,. <,tlawson@lsplc:com> Sent :. Tuesday, August X19; 201412'08' PMT To: rschickle @fcva.us; Robert -Hess; Cora DeHaven; Gene Fisher; Robert Wells; -Gary Lofton; Chris Collins "wilmot22 @yerizo"n.net Roger.pamthomas @comcast °net; Rhodes Marston;. Greg Unger"; kkenney @cmiva:cgrn; cmohn @bowma'nconsulting.com; Chuck Dunlap; rsmo�lden@aol.com; clambrogi @,l:com; hpm @visualli.nk.com; oatesgr @aol.com; „ crockett@vit.org Cc-. Eric lawrence; Candice Perkins;.Admin:;:Admin. 1 Subject: Heritage�Commons Attachments: Board and PC ltr 8.19.14.pdf Please see the attached. Thank you. Thomas Moore Lawson,, Esquire Lawson and Silek, P:L.C. P.O. Box 2740 Winch "ester,'VA 22604 " Ph:540= 665 =0050" Fbx:. 540 -722 -4051 Email' tlawson(cDIsPIc.com The information contained in this message is information intended only for the. use of individ.ual'or entity named above,, and may be attorney /clien't privileged and confidential. If the reader of this message is not the intended recipient, you are hereby notified that any dissemination, distribution or copying of this communication is strictly prohibited. If you have received this'communication;ineeror, please immediately notify-.us by telephone, and -return the original message to us.at ' = Ahb above address. c 1, J LAWSONAND S1LEK9T.L.0,C. 1.20 EXETER DRIVE, SUITE 200 POST &FiCE.BOX2740 NVINCIIESTER,V 22604 TELEPHONE- •(540):6654650 F,VcsimiLE: (540).-1224051 Mr. Richard C. Shickile, Chairman Frederick, County Board of- Supervisors 292 Green, Spring Road Winchester, VA 22603 Mr—Charles S.Dehaven,Jr- '17,redefick County Board of Supery I isors Stonewall., Magiste'rhAl District 2075 MaptinsIbilra. Pike `Winchester, VA 21603 TUONIAS8106RELAWSON - TLAWSON nwLS11MCOM August 19, 2014. Mr., Robert' A. Hess Frederick County Board of'Supervisors Gainesboto Makisteriaf District 348, Peep.-er, Laile Winchester, VA 22603 Mr. Qgne%E;.Fis4pr • Frederick, County Board of Sup_ ervisor's Shawnee.Magisierial District 246 �Bush'Drive Winchesters VA 22602- Mr. , Robert W,', Wells 'Mr..Gary A; Lofton, r Frederick County Board,of Supervisors Frederick County Board of Supervisors A Opequon - Magisterial'District Back Creek, Magisterial. District 5114 LauraDrive 7121* Buff -lo MarshRoad Stephens City, VA Middletown, VA 22645 Mr. Christopher ECollins Ms. June Wilmot,'Chdirnian Frederick -County BQa rd of Supervisors Meml &,at Large Red Bud Magisterial District Frederick Count y Planning Commission 120:"Sp-sar- Court 1,07N. Kent,Stieet Winchester, VA 2260 Wincheste . r, VA 22601, ;Mr. Ro r L. Th6ffi.�s,'Vice-Chairman Roger rinan 'Mr. J. Rhodes Marston. `peqqoq.M.agj.sterial, District: Back Creek; Magisterial'Districf-- F r ' e pp' d 'ck Coypty Planhing Commission ft ed'erick County Planning Commission.' 01 , , . N. Kent Street. 107 N. Kent Street' Winchester, VA Winchester, VA 22601; ' M I r 6reg,L,. Vng&f Mr. Kevin W. K6rinqy, 8, ack -Qe'ek Magisterial District. 4 Gainesbofo Magisterial -District Frederick -County. Planning Commission Frederick, Count' Planning Commission County 1'67`'N. Kent Street .107 N.. Kent Street Winchester, VA 22601 Wirichester,,VA'2260 FRONT ROYAL'ADDRESS: POST OFFICE BOX 692; FRONT ROYAL,. VIRGINIA 22630• TEI.Ephon: (540) 635,941 5 • FACSIMILE: j.�40j 635942'1'-" E-AIAIL"JSILEK@LAWSONArfDSILEr-CONI August 19, 20,14 Page 2 Mt. Charles E. Triplett Gainesboro Magisterial. District, Frederick..County Planning.commission 15,0 Lone Willow Lane Gore, VA 22637 (via U.S. Mail), W., Charles, F. Dunlap. Red Bud'Magisterial District Frederick County `Pl'anning Commission 1.07 N.. Kent Street - Winchester, VA. 22601 Mr. Lawrence R. Ambrogi Shawnee Magistertal,Distrct Frederick County Pladn'irig Commission 107`N;. Keni-Street Winchester, VA 22601 , Mr. Gary R. Oates Stonewall Magisterial 'District Frederick County Planning Comm'i'ssion 107 N Kent Street', Winchester, VA 22601 ' VIA'E -MAIL Dear June and .Geiiffemen: M .r.,Christopher M6hn Red`Bud Magisterial District .Frederick County Planning Commission 107 N. Kent Street Winchester, VA,2260`I Mr. Robbie Molder Opequon Magi..kerial, District Frederick County Planning Commission 107 N. Kent: Street Winchester„ VA 226 01, Mr..H. Paige Ma►iuel_ 'Shawnee Magisterial District Frederick County. Planning Commission - 107 N. Kent. Street Winchester,;VA 22601'- .Mr. Stan Crockett Stonewall Magisterial District Frederick CountyPlahning Commissioir 1,07 N.' Kent Street Winchester, VA 22601 .. -Re Heritage. Commons - Our F'il'e No. 1050.001 As .you, kri'ow.I ngpresent, MMA ;Realty Capital; LLC ,and. R 15,0, SPE, LLC: with regard to the.property that R':150 owns w}iich was formerly. known as Russell'150 and which now has been . k. filed as' a rezoning under the ;riame:of Heritage Commons.- This property.hasl e'en embroiled for many,years in a:- series of .issues which include' failed 'development-, the termination 6f a: CDA, . claims from variouse lenders and- contractom and, most'. recently, claimed tax, issues. The oil ers of both -the: property and the- bonds are pleased that these issues are now, behin us, and we. have filed .'a rezoning °for Heritage Commons to allow for a modem and ecoriomically viable proiect to be constructed, on the; - Heritage. Commons site. This' incl`u`des :.much needed transportation improvements which; will connect Frederick. County and the City-of Winchester with a bridge crossing over 'Interstate 81. It will also bring viable commercial development as well as more urban living that-."' is a unit type that does not yet exist in Frederick County but is experiencing strong demand in `other parts of Virginia. The developers of the site `fiave�engaged Stuart. Patz,,& 0 August 19, 2014 Page 3 Associates, Inc. to conduct an economic study of-.the, propgsed,.uses,for the Heritage .Commons. site and have confirmation from that firm. that this is a :much needed development forour community whi& will fidf,,ofily provide an alternative place to live work and play ay but generate, tremendous revenues., andloffier, bene-fifs to.Frederi& County. As we have done With other projects which are bri nging something new to Frederick County. -the owners and .46ve lopeis,Aibught it, would. be, a good idea to take a "field trip" with members, of the Board of Supervisoifs and Planning Comi-ftission to show them examples of the unit types and develoipme4Jhat i's,plahned for Heritage Co-mm-Ons. - After all], wen can spend a lot of time -tf,'yiiig to explain.•what, is being proposed, but there is no substitute for actually, seeing the 'iies e -are proposing to take as . . many Supervisors, Planning communi first hand, W1, Commissioners and. Staff on d iripio northern Virginia on Tuesday, August 26, 20 14, Due to,the anticipated number of public., officials in attendance- we have,:• already :been in contact with members, of the Fred&Ick-.C­` nfy Mfining Department, and they',have advi'sed that they will send,ihe,tequi*site,notice't.'Q, the.lo'cd] newspapers to*adw tsethcrn of ihl*s, Visit and to invite them to attend the t6p ifthe'y are interested. So that, we can p r an, a' vehicle we would !an f6 ppropri gtat ready aw reciate it if,you could respond.. to me at your- earl iest'c6nve niefte and let me know you ll be a6lito.attend We would anticipdte: that the total trip Would take, no more than five hours which will- allowa, gprip,pous I amount of time on, the,gfounds Of thecomm'unities for a visit. Thank you for- your a§sli•tanceand cobperatibn.,' We ,look forward to the opportunity to show you these: new communities. T -jk, — ML. cc R 15,0 S.PE,ILILQ He'Jt' C!6 bhs�; LLC, T.� age .) omm'o Ffeder.*ck- C6unfv PlanningDepartment I. PIN 8 on b- � Mm Document Approval' Fo rm PLEASE REVIEW THE ATTACHED DOCUMENT. -IF THIS DOCUMENT MEETS' YOUR - APPROVAL PLEASE INITIAL AND PROVIDE, THE DATE AND TIME OF YOURAPPROVAL. IF THIS DOCUMENT DOES NOT MEET YOUR APPROVALPLEASE PROVIDE COMMENTS AS TO WHAT YO U'WO ULD LIKEM HA " VE COMPLETED. Initials D-Ate:&Tiffie (janD Mark -Dive Eric 1Mike John F1 COMMENTS:, i �S*'t f 2-q -S () t �b - C Ct. Received by Clerical $tAff(Date,& Time): (S Office on BlackboxTorm\Document Approval Form 07/.16/2014) r ads LAWSON AND SILEK, .P.L.C. AUG - 8 2014 III 120 EXETER DRIVE, SUITE 200 FREDERICK COUNTY POST OFFICE Box 2740 PLANNING AND DEVELOPMENT WINCHESTER, VA22604 - - - TELEPHONE: (540)665 -0050 F.ACSIMIL.E:1(540) 722 - 4051 THOMAS MOORE`L,AWSON • TLAWSON(a�LSPI,C.CONI ' e August 8, 2014, Eric R. Lawrence, AICP, Director Frederick County Department of Planning & Development 107 North Kent Street Winchester, VA 22601 • Re: Heritage'Commons Rezoning Application Our File.No. 1050.001 VIA HAND- DELIVERY Dear Eric: Enclosed please find the rezoning application for Heritage Commons. We will supplement the application with updated, original signature pages but for now have included scans of the signature pages. I look forward to finally having the opportunity to work with you on this rezoning. Thank you for your assistance and cooperation. If you have any questions, please: do not. hesitate to contact me. Very truly yours Tho s oore Lawson TML:jk Enclosure M R 15.0 SPE, LLC Heritage Commons, LLC FRONT ROYAL ADDRESS: P. �, BOX 602,'FRONT ROYAL, VIRGINIA 22630,'FF.LEPHONE:.(540)635- 9415• FACSIMILE: (540)635- 9421 • E- MAIL: JSILEK(1LAWSONANI SILF.K.COM Candice Perkins. From: Eric: Lawrence: Sent:: Tuesday July 29; 2014 3:32 PM` To.: Thomas Lawson' Cc' Candice Perkins Addmin_ Admin. 9 Subject: RE: PC schedule and submissionAeadlines Ty- The draftryou attached indicates revisions;in Janua "ry, ApeiI, and July'2014, but= tho "se` revised docurnentswerO not shared with'the, review agencies.,lt may'be.beneficial to pr; "ovide us;with,,a; redlined ve "rsion of-the proffer /mod do -ument so that.we`knowvhat has been changed since.our last review in O'ctober2013'. We. ,can .discuss furtheT at our meeting tomorrow. Thanks, From Thomas;L'aWSOn [mailto tlawsonOlspic.coni], Tuesday,., July" 29, --2- 14 3:14 PM`° ' : } To:.Eric Lawrence:` Cc .Candice; Perkins, Admin , Ad'mm. 1 1 Subject. RLa P.0 schedule -and su- omission deadlines G'. For tornorrow's meeting,;i:n case you_ dd,not,have these documents handy. enclosed; please find the current versions of the Proffers, Modificat ion, DocumentUand GDP. Thanks,;Ty From Eric Lawrence'[mailto:elawrencOfcva . us] Sent: Monday, July 28, 2Q14. 3.' -'55 PM To: Thomas :Lawson, Cc:- Candice; Perkins; 'Admin ', "A' dmin. 1'' Admin Admin. 1 Subject: RE: PC schedule and submission deadlines; Ok. Wednesday at °8 :30AM in the R, anning`Department. -Eric [' P Sent Monday, July, 28, 201' 14t2.22 PM nCa�ls Ic coin. To: Eric Lawrence t7c:1 Candice', Perkins, 'Admin "; 'Admin 1; Admin.;;, Admin. T Subject: RE RC`sched'uleand submission deadlines How,'-a bout, Wed nesday morning' at48 30 yd,6rr ,off ices ?Thanks, 'T From. Erie Lawrence irma lto elawrenc @fcva:us] Sent:y Monday, July 28; 2014~:12:1 "8 PM: To;; Thomas Lawson Cc: Candice: Per`kinsAdmin , Admin:,1 Subject RE_ PC schedule; "and'submission deadlines 'Hi Ty. :( Candice and`I are' both. availab`le; this Wednesday (J'uly 30;), morning; or Thursday (Y 1y 31) or Friday before 3PM. Let us C _. know when you would to •meett'o discuss th'i's rezoning "application - Eric. . ._ 4 t - .. ' � �, „ � , - n _ � t - �� � .. � '♦ � _ :. � _ _ a f .. .' I '3 Candice Perkins..` From:;':' Thomas Lawson [tlawson @Isplc.com] R Sent:, Thursday July 24,, 2014 ,5:05 PM- To. Eric; Lawrence C C. Candice Pe kms, Admin- ,;, Aamiri.1T Subject;: RE: PC schedule and,su'bmissiondeadlines 1 think a;work session-' ' I, had a meeting with John Riley earlier this week and he advised it may be a j'oin.:t work•session with Boa rd•of.Super>visors, and. Rlanning Corn niission. I know you area out this wee k' onvacation: Please get back=to mesas soon:-as you are back so-we,,can.try to schedule the •work session. in;early,August. Also, let me; know when you. and'` @andice "have:time` o, meet- toy "review again the rezoning, application. Thanks, Ty, From Eric'_ Lawrence '.[mailto:elawrenc @fcva; us] ' _ Sent , Thursday, July, 17; 2014" 1 AG PM; l To: Thomas,L6wson W Candice; Perkins,, Subject: PC schedule and submission deadlines Hi Ty, Following up on,your voicemail fiom yesterday regarding ,-your pending - submission of t_he Heritage Commons rezoning applications the next Plarihing.Co_mmissio"n meeting`s_schedUled f,,or August 20; 2014;: The deadline for complete reionmg applicatio:nsubm_issiori is July,25; 2014 to;be lieard by the,Planning Commission on August 20, 2014.: The Planning CommiSSign also will meet on.September 17 2014; thew "pplicafion submission deadline is August -22, 2014., " I;w:ould node that because of thercomplexity ofsthe- Heritage,Commons rezoning.. "proposal ,(i e.;R -4• and. associated, modifications docum6nt),,the:P.Ianning Commission may schedule an applicati "on!b,nefmg /work;session pri.or�to scheduling the public,hearing..,, This, briefing /.\ rpWsession en`ablesstaff•an'd PC,toagain the benefit'of a detailed• explanation <of.the;co.mplexities:of;an application, inadvance of`•tlepublie,hearing,;Once the.:complete applc_ation',is p submitted;, will confer with the Planning'Gomcnission Chairman to determine ifa briefing /wor "ksession is warranted: Eric, Lawrence,,AICP Director;; Department of °'P.lanni'ng.and Development , .Frederick County; Virginia 107.N. Ken,t,Street W,inchester,'Virginia 22601 540:`665.5651 540.'6.65.6395 ;fax; .elawrenc @fcva.us wwWJcva.us /pIannink, � No � "irus `found °in_ this message: - Checked by AVG www, avg com Version: 2Q14.0 ,4716`/ Virus;patabase: 3.986 %7869 - Release.Date: 07/17/14 t Candice Pe . !Sn ,. t: From Enc Lawrence Sent:; Thursday„ Ju17 ly „20141.40 PM To Thomas Lawson s' 'C Candice Perkins „•Subject: RC: chedule and submission deadlines - Follow m g u p n o,ur v oicemail from e,s, te'rday re a rdin g�yo urTpe nding suli ission o.f. the Her tage,Commons rezoning, C ust 20; 2014. The-deadlne forcomplete application,,the.next Planningommissionmeeting is scheduled for-Aug rezoning application•submission,:is Jaly.25, 2014'to be: heard. by thePlanning,'Commission on August 20, 2014. The Pla'nining Commissi 'onalso- will`meeton.Septembe'r• 17, 2014; tf e'application submission deadline 'is August 22, 2014. I would =note thaf because "of the,complexity ofthe.Heritag'e Commons rezoning proposal" (Le., R -4 and. associated . modifications doeument),jhe P_Iannmg-Comroission may schedule an application briefiing /work° session prior to scheduling the public hearing. This, briefing /work sessiomenables,staff and PC to�gain •th6tenefit,,of,a detailed ' exp''an mlextie:fn pli" aion, n vance _,ofhepub; 'h complete, is , t j subrnitte4,,T will "co'nfer with the Planniiag Commission Chairman to' determine if''a' briefing /work, session is warranted. -Erie f Eric' Lawrerice;,AICP { D:irector;'Depa`rtme'nt of,Planning�and•p °euelopment E Fireclericki County; Virginia 107 N.Xbnt Street Winchester,'Virgi`riia 22601 j ` 540.665.565'1 .540.665:6395:fax elaw'renc @.fcva us www 6a.us /planning i " - COUNTY of FREDERICK t .' - .. ' Depariinent of Planning.and Development- ,,Jw 5;40 %665 =56521 Fax: 54:0/ 665 -6395 Eric•R. Lawrence, AICP- _ Director January,' 29 2014 Thomas Moore Lawson - 120•Exeter'Drive Surte,200; h P ost Qffice,-Box2-,74.0 Winchester-, Virg ma 22604• f , _ I RE Heritage` Commons Rezoning Application. Dear Mr. Lawson: The'Heritage Commons rezoning applcation;was received in the Planning `Department off ce on Jariva y ;24, 201.4 at 4:30 P1V1; The tappl cation fe -e, wl _le referenced in the_ application ..submission „was,rece'ived' n the department on January, 28j,20.44. The rezoning application - submission did;not- include proof that-,all propertlaxes due and' payable to the County are, paid h that no delinq b pent taxes arc outstanding, a& required 'by-§165-102101B the Code of.Frederick County. Therefore,, the, rezoning, application submission is. rejected, and,retur'ned`to you. Enclosed is'the application packaget'as; submitted ,,ncludirigthe,application.;fee. Once • you s'ecure,proo '.'lliat all takes:,haue been satisfied,, we welcome the resubmission of the . rezoning application Sincere • .. •'`. - c lam. Eric-R Lawrence; AICP Director, D epartrr ent ofPlanning °and Development Eiicl'c sure, 'Cc: R 1.5,0 SPE, L I C 1:07`North.Kerit Street ® Winchester, Virginia 22601 -5000 ~ Candice`. Perkihs ` From: Candice Perkins Sent: Friday,,January 1;7, 2014'12:51 PM To: Ty Lawson, Cc; Eric_Lawrence Subject: RE: Heritage Commons rezoning Ty, The deadline fo,r the'February Sth meeting, was January 1&. The deadline for the February.19th meeting is +January 24`h Candice Perki sS AICP = Senior P, 1p;pner. F "6derick,Count,y,Depa,rtment of Planning & Development 107 North Kent Street, Winchester,; Virginia 22601 (540)'•665 -56' Sr (540) 665 --6395 (fax) cperkins @fcva.us: www.fcva.us From: Ty. Lawson [mailtoalawsdn@Ispic.com], Sent: Friday, January 17, 2014'12:11' PM ' To:. Candice Perkins Cc: Eric °.Lawrence; Admin. Subject: RE: Heritage Commons rezon, ing Please let me know the, deadlines for filing a rezoning if we wantJo make it''bn the February 5th'and the February 19th Planning, Commission agendas. Thanks,'Ty From: Candice Perkins-r[mai Ito: cperkinsOfcva us] Sent: Thursday, January 16, 2014 3 43 'PM To: Ty Lawson Cc: Eric Lawrence Subject: RE Heritage—Commons rezoning Ty We need one hard copy`of all required application materials and a CD /digital copy of all materials (pdf.for.mat). Let me. know ifyou have any questions: Candice Perkins, AICP Senior Planner Frederick County Department, of Planning- &_ Development 107 North -Kent Street Winchester, Virginia;.22601 (540) 665 -5651 (540) 665 -6395 (fax) cPerkins @fcva.us' 1 ww.w.fcva.usi" Feom; Ty Lawson [mailto:tlawson @1spit.com] Sent:,Thursday, January 16, 2014 3:10 PM To- Candice Perkins Cc:. Admin. Subject:.RE ;.,Heritage Commons rezoning Candice: Let me know as soon, :as you have this 'information. i Thanks, Ty 1 From -'Ty Lawson '[mai Ito: lawson@Ispic.com] Sent: Thursday, January. 16;'2014.9::25 AM` To: 'cperkins @fcva.us' y Cc: Admin. Subject:: Heritage Commons rezoning "Candace We.are getting ready to file the rezoning-for the. former. Russell 150 (now Heritage Commons) property. _Please let me know how many copies you would like of the application and plats. Thanks, Ty Thomas Moore`Lawson, Esquire Lawson and 'Silek, .P.L.C., P:!O..Box' 2740 Winchester, VA 22604 Ph: 540`665= 0050 - Fax: 54,0; -722- 4051 Email:.tlawsonCcDlsplc.com The information contained m this r message is information intended only for the use of.indiidual or entity named above, and may attorney /client privileged.and confidential: If the reader of this message, is, not the..intended recipient, you are hereby notified that any dissemination,.distribution or copying of this commurncation,is strictly prohibited. If you have received tt is communication inerror, please immediately notify us bytelephone.arid return the original message to us at `the "above address. 2 Candice Perkins From' Eric; Law re- riee Thursday, Qctober 1,0, 2013 To, r Thomas;Lawson Candice ,Rerkins;'Thbrnas� "L " "awso'n John Riley =Subject:, Re;- Heritage•Commonss Hi' Ty:: We Will ,aecept ubrrii'ssion of the -- apphcadon wifhout-the •three preciously "identified review agency , comments;; When you.subm&the application please provide-the appl'icat'o6-fee: as, well as documentation;from f P P i_Y are. Paid to :date.. d the.Treasurer s Office that all. ro ert•, taxes a Please.do continue °to .pur'sue those outstanding agency corninents so:'that ,th'e Planning, Coirimssion aril Board, maybenefit from. theirnput:.durin'g •their respective hearings on this application. • •` Thanks ,. , ,. ;, ° Erie ' " • Sent ,from, iPlone; On Qct 1 "0 20,1,3,, :at 4:3:2 PM; "Thomas L' aw`son" <tl'awsonlsplccom> wrotet " As, ;afollow -up to my two prior.emails we are now attoctober 10�-" and •I :still have: not;received:' all agency comments,: Your: pnor.email advised that the deadline to file this rezoning is fomorrow: I would request_ th,af we be'•allowed to.go•ahead `and file: it and,, to the extent we receive comments that warrant a response after we. file, ,we will address `them atethat ti=me: Thank you Ior`your anticipated assistance and coop_etation:. Thomas'Mbore Lawson, ,Esquire; • Lawson sand Sile.k PI.C': Winchester VA 22604. Phone 540- 665 -0050 Fax 540 722 4051' 'E= mail:tlawson(a�lsplccom, 1 .. L .. T.he informatiori containedrrn this message Is information intended : only -for the.use offithe individual or. entity named atic. anci_ may be attorney__ /,cI- pnvileged,and confidential. If the reader of this:messagp; is; not the intended recipient, you ar ,hereby n_oi ibd;'that anydissemination, distribution -or cop.y,,.ing.of•, this, communication, is strictlyprohibited. If °you'haVe received this communica tion in error, please immediately notify us by telephonegand return the origin. °al message.fo us's, � the?above;,address.•Thankyou. �.' i 1 Candice :Perkins From:- Candice, Perkins . Sent: Friday,, October 94; 201;3 11;33` AM To! Ty Lawson Cc: ` Eric Lawrence; John Riley Subject: RE: Heritage.Commons, The 'submission date for the October,16t" Planning,`Commission meeting was.September.20t "., We have already sent out the.agenda for�the meeting and the legal advertisements for pubiic;heari'ngs started running on the.2 "d_ The.next deadfine, isjor the November 0 " Planniing".Cornmission meeting., In fegards'to. the agencies you haven't received comments.from;'l recommend contacting them directly'to request they issu'o their comments, by the filing' deadline. I believe:that'FCPS issued their comment earlier today. Candice Perkins, AICP 'Senior Planner Frederick County..Department of Planning & Development 1.017 North Kent'Street Winchester, Virginia 22601 (840) 665` -5651 (540) 665 -6395' (fax) cper.kin's @fcva:us, www.fcva.us From: Ty Lawson [mailtotlawson @Isplc:com] ' Sent: Friday, October 04; 2013 10:;00 AM To: Candice Perkins ` Cc: -Eric Lawrence; Joh•h Riley Subject: RE: Heritage Commons ' Thank you foryour e -mail. I was under;the impression that we were shooting for-an October 16 Planning Commission. A submittal date of the 11th does not seem to allow sufficient time for•that hearing. What ;Planning Commission hearing are you now targeting? means After all, 1•am waiting for the. agencies to resp q eyed to every what that y- happy ,utilize the- ,next'week to otnd tohrneeThe requestsSw,ere!handndel v re exactly agency with Secondl I will be ha to g, the exception of VDOT (we Fed Ex 'd next.Aay delivery to VDOT) and we, have followed up with reminders to ,the agencies., What more would you suggest we do to: collect these; comments? In "the interim, and:sowe.do not losevaluable#ime, I ask ihat.we:be allowed to file this °rezoning application and back fill I with comments a& they come in: If you have any other ideas, please let me know.. Thanks for you r.assistance and cooperation. I' Ty ? From Candice Perkins [mai Ito: eperkinsCafcyams] Sent' Friday, October 04; 2013 9:11 AM i To: Thomas Lawson i Cc: Eric. La Subject. „RE, Heritage,Commoris The next, rezoning submission deadline is October 11th, please.utilizesthe next week to gather the remaining items necessary to submit the rezoning package., 'Thank you, J Candice Perkins, A'ICP Senior Planner Frederick °County: Departmentof Planning & Development. 107 North Kent Street Winchester, Virgi'nia22601 (540) 665 -5651 i (540) 665 -6395 (fax) werkins@:fcva.us www.fcva.us From: Thomas, Lawson [mailtoalawsoriOlsple.com] Sent: Thursday, October 03, 2013 3:42 PM To: Candice Perkins; Eric Lawrence Cc: John Riley Subject: Heritage Commons Please see the attached correspondence: i i Thankyou. Thomas Moore Lawson, Esquire j Lawson and Slek, R.L.C. P.O. Box 2740 . Winchester-; VA 22604 i P- hone.: 54:0 - 665 -0050 Fax-- 540-722-4051 1 E -mail: tlawsonglsplc.com i i The information contained in this message is information iiitended'only_ for the use of the, individual or entity r named above„ and maybe attorney /6fient privileged and confidential:- If-the reader of 'this message is not the intended Ii communication ns,strictl re roh bited If you have recde ved this communication distribution, or copying of this recipient, p cation in error, please umriediately notify us by ,telephone and' return the, original message to us at:the 'above address. Thank you.. I . a I i .i i 2 T Candice. Perkins rror. T Lawson [flawson@ISPICc6m] ..8 Y Friday, October 04, 201_3 10-00 AM • Toni C-6ndice'Perlkins Eric.,L@Wrehce,- john Riley Subject: RE: H6rifage.,Commohs. ti Thank, you for your - email'. I was under the impression that, we: were shooting . for an,.October.1 16 Planning Commission. -A submittal date of the 1,1 th does not seem to "allow sufficient time for that hearing. What'Plaflning Commission .hearing are You n0w'targetiing? Secondly, I -Will be ;hcappy, to utilize the next week ,to gather the remaining items" but] am not, sure exactly what that means. After all, I:arrt'wailtind-fortho agencies to respond to me. Th6. requests were hancl�delivehad'to every agency with the.,excepticin-of VIDOT (we-Fed Ex'd.next day delivery to VIDOT),and'.we have fol.lowed-up with reminders to the agencies. What snore would you suggest we do, to collect these comments? In- the,iriterim', and so we do, not, lose valuable time, I a-sk-that We be allowed to,,file fhi-s.,rez-oni*ng'. application .and back fill with .comments as they come in. If you have any other ideas, please let me kno 'Thanks for your assistance and cooperation. Ty From: Candice Perkins [mailtbcperkins(Ocva.us] Sent: Friday; October 04, 2013 9,.-11,.AM . To:11fornas Lawson Cc: Eric,Lawrence SUbject:.RE:,,,Heritage Commons Ty,, The next, rezoning submission deadline' is October 11`h, please, utilize the nexuweek to.gather the remaining items necessar a _age'. V�to submit the, rezoning,p, ck Thank you, Candice Perkin's, AICP Senior Planner Frederick County Dep6rtmentof Plannin4g ye lopment 107 N.Prth,.K.erit Street Winchester Virg'inia'22601-, (540) 6655651 - (540) 665-6395. (fax) coerkins@fcva.us' www.fcva.bs'. From: Thomas Lavyson [h!jiIto-tIawson@)IspI( Sent: L ThbrsdaV, October 03, 20133 -42. _PM To: Candite'Perkiris! Eric; Lawrence Cc:, John.RJIey $fibj64#:_ Heritage C6mmo,ns Pl,eas.e, sere the attached correspoQclence. 1 Thank yon. =Thomas Moore Lawson, Esquire Lawson and Siek, P.L.C. P.O. Box 2740 _Winchester, VA 22604 Phone 540- 665 -0050 Fax: 540-722-405.1 E -mail: t!aWson@lsple.com The information contained in this message.is information intended only for the use of the, individual or entity named above, and maybe, attorney, /client privileged and confidential. If'the reader of this message is not the intended recipient, you are hereby notified .that any dissemination, distribution, or copying of this communication is,strictly prohibited. If 'you have received this communication in error, please immediately notify us by telephone and return the, original message to us, at the above address. Thank you. 2 a. Candice Perkins From; Candice. Perkins -tent - Friday Ocfober,,04„ 20,1.31011-AM To : P oiY,iasLawson Cc Eric.Lawrence Subject: RE' Heritage`C immons Ty,. The. next rezoningT`submissiom deadline;is'October 11`h, please. utilize the nextFweek`to; gat . her the remaining items necessary io submit the.rezoriing'oackage'. . Candice Peikins;:AICP' . s ,,Senibr,Mahn& Frederick County (iepa'rtmeni :of' Planning, &.Develop'ment 107' North Kent Street Winchester, Virginia 22601 (540)!665' 6395 (fax), cp&kihwcva:us. ww.w.fcva:us _ From: Thomas' Lawson, [mailtoflawson(&lsplecom] Sent: Thursday, October 03, 2013 3:42 PM Candice Perkins;, Eric�_Lawrence- Cc:i Jo6h Riley Subject: Heritage: Commons Please see the _attached correspondence:_ 'Thank you. ThomasMoore Lawson, Esquire Lawson and Silek, P.L.C. Winchester, VA 226004 Phone 54,0- 665 =0050 dx; 546- 122.4051 E= mail`: 'tlaws6nna , splc corn: The. information contained in g •,this,messa e'4S in_fonnation. ntended,only,for�therug of4the.indi�idual or,erit ty named above; and mFay 'be'aftorney /chent'pnvil`eged and eonf'dential, If the reader of this message is not °the; intended recipient, you are hereby notified #hat any dissemination, distnbufion or�copying of this communication, is strictlyprohibrted. If you have received this commumcation in error, please, immediately notify us Eby telephone'. and return the original message to use at_ ;the above address. Thank you. 1 LA- WSON AND S "ILEK, P;L.C. 120`EXETEWDRIVE SUITE ZOO' _ -POST OFFICE BOX'J740 WINCHESTER, "A i4O4> ' TELEPHONE: (540)66$ 0050; . ACSIMILE ($49).722-4051. ` THOMAS MOORS °L'AWSON O ^'TLAAVSONO,'LSPLcicomI. 4 October 3, 2013 'Eric R. Lawrence, AICP, Director Candice Perkins, AICR, Serior,,Planner Frederick County :Department °of Planning:.& Development. ` 107N Street; Winchester; VA 22601 " Re; Proposed Rezoning cf Heritage Commons'Project (f/.k/a'Russell f$- O)' OufTile No: 05,0.'00.,_V VIA E =MAIL Dear Candice'and Eric' We have received all of the agency review ,comments back .for the above - referenced rezoml g with the exception, of�ihe'following the City of Winchester, Millwood .Fire, Station; "the 1 Supermtend`erit of'Publi& Schools and''the? Airport: UVe ar`e ready to :;file .ti e rezoning application. at this time. So we ,do note lose our schedule, please let me. know if we may go ahead and,file, the f t application ;now. with the; comments 'we' have .received and supplement. once we, receive comments from the'remaining agencies lT_ hank you for: your continued'assistarice and" cooperation I'_look;forward to Bearing from You' Very my yo ' Th 2I ad�so TNIL �k •• cc� R:150 SPE, LI'C' John R.; Riley; Jr., Frederick, County Adininistrator aw ;M E, M O R A N D U _M, TO:: Eric R. Lawrer ee, AICP, Director Candice Perkins; AIC'P, Senior Planner. .-Frederick County Department of Planning &;Development:. FRO -M 'Thomas'Moore Lawson, Esquire DATE:; November 5,2Q;14 RE:1 Heritage Commons, Enclosed 'please: find the signed revised proffers for the. Heritage Commons rezoning. Also; enclosed please find a di'scl with our presentation for the Planning. Commission meeting this. evening. FREDERI std Ct0UNTY ;PLANNING AND- DEVELOPMENT - il LAWSON AND SILEK, P.L.C. 120 EXETER DRIVE, SUITE'200 POST OFFICE BOX 2740 WINCHESTER, VA 22604 TELEPHONE: (540) 665 -0050 FACSIMILE: (540) 722 -4051 THOMAS MOORE LAWSON • TLAWSONQ,)LSPLC.COM December 1,;201;4, Eric R. Lawrence, AICP, Director Candice Perkins, AICP, Senior Planner County of Frederick Department of Planning & Development 07 N". Kent.Streef Winchester, VA 22601 ' Re: Heritage Commons Rezoning Application Our File No. 1050.001 'VIA HAND- DELIVERY Dear Candice and Eric: As a follow -up to my e -mail of November 26, 2014, enclosed please .find the .original .proffers forHeri_tage Commons. As you know, this, current. version was also hand delivered to members of "the Board of Supervisors. Thank you: for your assistance and cooperation. If you have any questions or comments, please contact me immediately. u _ Vii/ Thoml. Lawson TML:atd Enclosures' CC.! R 150 SPE, LLC '— Heritage Commons, LLC` "QD - RECEIVED BY: SEC 1 "2014 (Seal) (Date) FREDLNiC;K COUNTY PLANNING AND DEVELOPMENT FRONT ROYAL ADDRESS: 'P.O. BOX 602, FRONT ROYAL, VIRCO4IA 22630, TELEPHONE: (540)635 -9415 • FACSIMILE: (540)635 - 9421.. �$ -MAIL: JSILEKQLAWSONANDSILEXCOM' - I1 �� V, D w C � Oit = N.oe m 0) Pca 231"� t!1 k- 3 z CJlSii -tom O � O r. own i w_+ a v loom � QA7 � a v O I1 �� V, co w COUNTY :of FREDERICK 4 nd Development e p artme D nt of Planning. a -- 540/665 -5651 „e _ FAXr540/665 =6395. NOTIFLCATION OF 'PUBLIC HEARING'', Novemb`er 26; 201`4 - TO THE APPLICANT(S) AND /OR ADJOINING PROPERTY OWNER(S) - RE; REZONING A'PPLIC <AT,ION #02 -14 FQR.HERITAGE COMMONS, L' LC Oii be'half of the,Frederick County- Board,of Superyisors; you,a-re.hereby notified of a pul, he being held on Wednesday, December LO,'2014,;at 7:00 p:m.'in the Board Room of the, Frederick . County Administration Building at 107 `North. Kent' Street; Winchester; Virginia to .consider the following application.;` - = Rezoning #02 -14 HERITAGE - COMMONS, LLC,.submitted by Lawson& Silek; PIG— to.rezone : : -- 96.28 + / =. acres, from 'B2 (B,usiness General) D strict:to R4 (Residential Planned Community) District,, 54 +/ acres from RP (Residential Performance) Districfto R4 (Resid'ential Planned'Conimunity) District v and .31 +/' acres'from`the RA. Rural Areas Districtto the R4. Residential Planned ( Cornmunity)District with ' o - ffers' The properties are 'located west of the, intersection & Front Royal Pike. (Route -522) and Air' ort:Road (Route `6.45)`And are'identifie 'by the Property Identification Numbers 63'-A4,50,64-A-.10, and 64 -A-12 'in `the -Shawnee ;Magisterial District. A copy, of the; application.will be available for revrew,at the Handley Library, the Bowman Library the week of the meeting, or at`the Department of P,lanningtand Development located.at.:107 North Kent - Street in Winchester, Virginia; qr by calling (5:40) 665-5651. You, can also visit us on 'the, e web at-. www.co.freder ck Va:'us F- Sincerely; _ Candice E.. Perkins AI Senior. Planner CEP /pd 107 North Kent Street, Suite 202 r• Winchester, Virginia 2260,1- 5000 " COUNTY of Department of `Planning and DevOoptn I e . n't 5401665-5651 FAX: 540/665-63.95 NOTIFICATION OF PUBLIC HEARING November 26., 2014 TO': THE APPLICANT(S) AND/OR ADJOINING PROPERTY OWNER(S) RE.: REZONING APPLICATION #02-14 FOR HERITAGE' COMMONS, LLC On behalf of the, Frederick County Board of Supervisors, you are h_ ereby notified of a public 'hearing being held on Wednesday,; - December 10; 2014, at 7-.,00.,p.m. in the. Board Room of the Frederick County Administration Building_ gat 107 North. Kent Street;. Winchester; Virginia nia to consider the following application: Rezoning #02-14 HERITAGE COMM"$, LUC, submitted byLawson & Silek-,,P.L.C. to,rezone 96.28+/-' acres from 92 (�usiness General District to P,4 Residential Planned Community) District, acres m Residential Perform District.to R4�(Residential'Planned Community) District 54+/� acre from RP (R. and .3 !+/:- acres from the RA (kural.Areas.) District b the R4 (Residential Planned Community).Distr6c.t with prioffers. The propertie's are located - West of the intersection of Front Royal Pike (Route 522) and Airp d t -Property IdOnti&ation Numbers 63-A-1 50,64-A-10, ort-Roa, (Route 645) and,�te:ide.n.iffed.by the and 64 -A -12 in the Shawnee hawilee Md'j stirial District. gi e A coPY of the application Will be availdble,for review at the Handley Library and the Bowman Library the week of the.meeting, qfdrihe'Vepattinent of Planning and Development located at 107 Notih Kent Street in Wihcfiester'Virginia, , or by calling (540) 665 -5651: You, can also visit us oil the Web. at: wwwwo,fredorick-.va-.us: Sincerely, Candice ,E �l , , E., Perkins Al Senior Planner CEP/pd 107 North Kent Street, `Suite 202 • Winchester, 'Virginia.2260 - .1-5000 This is to certify that the attached correspondence was mailed to the following on from the Department of Planning and;Development, Frederick Couniy, Vir hinia- A 11- 63 - A- - 150 - . R 150 SPE'LLC 621 E PRATT ST STE 600 NOTARY PUBLIC BALTIMORE MO ,2,1202 -3147 10- \ I R 150 SPE LLC 621 E PRATT ST STE 600 BALTIMORE MO 21202.3147 64 - A- - 12- R 150 SPE LLC 621 E PRATT ST STE 6.100 BALTIMORE MD ' 21202,3147 63 A- - 123 -A EFG INVESTMENTS LLC 340 W PARKINS MILL RD WINCHESTER VA 22602.4735 64 - A- 1. 9- FLG RESIDUAL TRUST PROPERTIES LLC PO BOX 888 WINCHESTER VA 22604.0888 64 - A- � 10 -A ` CALVARY CHURCH OF THE BRETHREN CIO. RICHARD E.KELLER . 578TRONT ROYAL PIKE WINCHESTER.VA 22602.7316 64 - BELT ARTHUR A BELT•JUANITA S - 20.1 .FRONT DR " . WINCHESTER VA 22602-4383 64 - A- - 14- SHEPARD MICHAEL S SHEPARD CHERYL, 179 GEORGE OR WINCHESTER VA 22602.4619 ._ 64 - A 18 MADISON II LLC '558 BENNYS BEACH RD: FRONT ROYAL VA 22630 64B - A -4. 91 YOUNG PHILIP T YOUNG.JUDY LYNN 655 FRONT ROYAL PIKE WINCHESTER VA 22602.7323 64B - A- - 73- CALVARY CHURCH OF THE BRETHREN CIO RICHARD -E KELLER 578 FRONT ROYAL PIKE WINCHESTER VA 22602 -7316 Candice E. Perkins, Senior Planner Frederick County,Planning Dept. STATE OF VIRGINIA COUNTY OF FREDERICK a Notary Public' in and for the State and County aforesaid, do hereby certify that.Candice E. Perkins, Senior Planner fort e Department of Planning and Development, whose .name is signed to the .foregoing, dated 11 a (o j I .has personally appeared before me and acknowledged the same in my State and County aforesaid. Given under my hand this day-of' fk> 2/� My commission expires on MRLA DEFTER NOTARY PUBLIC . REGISTRATION #'354474 FP MMONWEALTH OF VIRGINIA - NOTARY PUBLIC MYC OM1011SSION EXP,LRES OF'CEMBER 31; 2t _ ., \ I 1 .•X�CF. 0 V-e r. 648 .A 73 -B FLG RESIDUAL TRUST PROPERT,IE$r I CAMPFIELD LLC - PO BOX 888 WINCHESTER VA 22604 0888 648 - A- - 89 DOTSON•SCOTTIE D 371 CHIMNEY CIR MIDDLETOWN'VA 22645.2,170 64B - A- - 92 CONWAY GENEVE B CONWAY SHELTON RAY 667 FRONT ROYAL -PIKE WINCHESTER`VA 22602.M3- 64B - 4. E HEPNER DANIEL.K HEPNER ANGELA M 256 DEVLAND DR 22603 3512 WINCHESTER'VA 64B - 4- F . . I CROSEN TARA M 189 FRONT DR WINCHESTER VA 2.2602.4382 64B . 4- H SHANK ROBERT L SR SHANK PATRICIA A 185 FRONT'DR WINCHESTER VA 22602. 4382. 64B - 4- 8- H OTT 'BARBARA ANN ETALS CIO WAYNE GODLOVE 325'TEVIS ST WINCHESTER VA 22601 64B 4- - 9 -A ,1 MCFARLAND CHARLES C SR & ELENER L MCFARLAND CHARLES C JR 116 ROYAL AVE WINCHESTER VA 22602.7331 64B 4- - 10•A MCFARLAND, CHARLES C SR.& ELENER L„ MCFARLAND CHARLES C JR 116 ROYAL AVE WINCHESTER.VA 22602.7331 64B - 4- - 25 -J MUDD THOMAS S 179 FRONT DR 22602.4382 WINCHESTER VA 64B - 4- - 26-,, COURTNEY CHARLES A 161 FRONT OR WINCHESTER VA 22602,:4382 ,64B - 4- - ;27= COURTNEY CHARLES A y COURTNEY BETTY 161 FRONT DR WINCHESTER VA ' 22602 438 (a ) 64B - 4 8- COURT CHARLES A 161 FRONT DR WINCHESTER VA 22602.4382 64B - 4- - 29- 4 ' COURTNEY CHARLES A 161 FRONT OR WINCHESTER VA 22602.4382 t 64B - 4- - 30- OATES BONNIE JEAN MILLER MISTY DAWN 151 FRONT OR WINCHESTER VA 22602.4382 64B ;"4- 31 OATES BONNIE JEAN MILLER MISTY' DAWN 151 FRONT DR - -- 'WINCHESTEWVA 22602 4382 64B - 4- - 32- THE- BRINCEFIELD GROUP LLC PO BOX 337 i ASHTON MO 20861.03,37 64B -.4- 3j- THE BRINCEFIELD GROUP LLC PO' BOX 337 ASHTON MO 20861.0337 6413 -4- 34- YOWELL ERIC.P 149 ROYAL AVE WINCHESTER VA 226027330 64B` - 4= - 35- YOWELL.ERIC P 149 ROYAL AVE j WINCHESTER VA- 22602 -7,330 64B - 4'- - 36- KELLY JOHN -B JR =1, KELLY MARSHA J 137 ROYAL AVE ' WINCHESTER VA 22602.7330 - 6413 - 4- 37 KELLY JOHN B JR KELLY MARSHA J , 137 ROYAL AVE WINCHESTER VA 22602.7330 64B, - 4- - 36- -� HOTT CALVIN E 11. i HOTT DOROTHY "D' 131 ROYAL AVE WINCHESTER VA. 22602 64B - 4- - 39- HOTT CALVIN E II HOTT DOROTHY D 131 ROYAL AVE WINCHESTER VA 122602 (a ) i This is to certify that the attached' correspondence, was inai'led to the following 'on l I q • from the'Departmentof Planning and Development, Frederick Cou ty, irginia 64C A 9 WINCHESTER OUTDOOR 64C A 1 355 S POTOMA C ST GRIM RONALD E HAGERSTOWN'MD 21740 6032 GRIM MONICA 673 FRONT ROYAL PIKE LUCAS WILLIAM R 'WINCHESTER VA 22602 LUCAS KRISTA K 646' - A• — 2- 831 FRONT ROYAL PIKE EMBREE JOSEPH WINCHESTER VA: 22602 -4421 EMBREE LYNNETTE L 64C - V - 13- 687 FRONT ROYAL PIKE GIBSON MONTIE.JR WINCHESTER VA 22602.7323 ,.. B67 FRONT ROYAL PIKE WINCHESTER VA 22602 EMBREE.JOSEPH 646 - ­A1 13 -A EMBREE LY.NNETTE L GIBSON MONTIE JR 687 FRONT ROYAL PIKE l I 86T FRONT ROYAL PIKE WINCHESTER VA 22602.7323 WINCHESTER VA 22602 BARNARD E`DARLENE S- BARNARD CHARLES M CORNERSTONE LP LLP PO BOX 4585 PO BOX 2497• WINCHESTER VA WINCHESTER, VA 22604.1697 22604.45B5 j 64C - A- - 7 = WHITACRE ELWOOD H SR .721 FRONT ROYAL PIKE WINCHESTER VA 22602.4420 " Candice E. Perkins, Senior Planner Frederick County Planning Dept. STATE OF VIRGINIA COUNTY OF FREDERICK a Notary Public. in and for- the State and .County aforesaid; do hereby certifythat:Candice E. Perkins, Senior .Planner for Ihe Department of Planning and Development, whose name is signed to the foregoing; dated I • a Cn ;l has, personally, appeared .before.,me .and acknowledged the same in my State. and County aforesaid. hand 01>- L�-k- Given under my this ,day of 1 My commission expires on (- �2�iy� � )o 11 " PAMALA DEETER NOTARY PUBLIC REGISTRATION k'354474 COMMQNWEALTH OF VIRGINIA NOTARY PUBLIC_ MY COMMISSION EXPIRES DE;CEM_BN1'31, 2017 C3� 1 C:OiJNTY of FIZE'DERICK Department, of Planning sand Development _n 54 1104_ 5651... n3a _ FAX-540/665 5 . : ,NOTIFICAT ION OF PUBLIC HEARING N 00. be"24,20 1'4„ : Y. TO.: THE APPLIGANT(S) AND %OR ADJOINING PROPERTY.OV�'WNER(S;)` - RE:, 02 14 FOR I E.-RITAGE COMMOS, LLC TN I iOn behalf,' the Frederick County Pl "arming Cornmi'ssion; you are hereby. notified d a,publie hearing . 'Wedne "s di ay,'Noyember,= 5 2014; at ,7:00 p:'m rn the Board Room of'.the Frederick, County .Admrn _ being held on strat on Buileding: at 107. North:Kent'Street Winchester.'; Vrr&id to consider the fol_l`owing application: R`ezonmg #02= '14`HERITAGEfiCOIV MONS,`LLC = subrrii'tted by Laws'or & S`ifek, P,:L.C.46xe2one? _. _ z 9628 + /= acres;�from $2 (Business General) Drstrrct to:R4 (Residential Planned Community) :Drstrrct) :. 54 ±/ acres from' RP''Resrdentral Performance Di`strrct fo, R4 Residohtial:Pfanned Comrnunrty, District and: 31 + /- "acres:fromahe RA,'(Rura_1_ Areas;)' District to the R4 (Residential °Planned'Commumty) District with prqffers .Th` e pro--e-- rties;are located west of the, i`nterse`ction of Front Royal .Pike (ROute.;522),and Arrport.Road (Route 645) and "are identified by the Property Identrf cafroriNumbers 63 A =1 �0' 64 A 10 •- - and64 A -12 rrithe Shawnee,'Magisterial District;; A copy of the.applrcaton will -.be available for- .review at the 'Handley ";Library 'a -j B'owrnanLrbrary the week of the:rneeting, or at the Department of'Planri ngand" pe.velo)rment:located,at'1.0.7 North Kent Street,im Winchester; Virgiia,.or. by >calling ('54`Q),665.5'651. 'You can also -visit uson tlie;web.at`? : www.cofreder'.ck uaus. • r Candice E Perkins AICP r - S.enio°r Planner : 'CEP/pd 107 North `Kent Street, Suite 202 Winchester, Virginia 22601 °S.00Q NOTIFICATION OF; PUBLI:C HEARING October 24, 29"14 TO: THE APPLICANT(S) AND /OR. ADJOINING `PROPERTY Q WNER(S). RE: REZONING APPLICATION #02 =14 FORIHE'RITAGE CQMMQNS, LL'C O'n behalf of'the Frederick County Planning Commission, you; are. hereby nodfiecl of a public hearing being hel'd'' on, Wednesday, November 5 201.4, at 7:00 p -m: in the° Board Room of'the Frederick County Admmi_stration ,Building at 107 North 'Kent Street; Winc_'hester; Virgi nia. t o consider, the `following application: - r Rezonin #.02 =14 .HERITAGE COMMONS- LLC- a PN g ubrnrtted by, Lawson 8c �Si]ek, Inc., to rezone 96.28 + / acres from B2 (Business General),District to ,R4 (Residenti'al Planned. Comm pity), District r 5.4 ±/= acres' from. RP (Residential:Pe "rforinance,) Diktr'ict to R4 �(Resideintial':Planned Community) -Ck. District and ,3:1 + / -acres fromthe `RA (Rural Areas) District to the 94 (Residential P11 nned Community) District with'proffers. The properties areaoeated west;of'the intersection,of Front Royal Pike, (Route 522) and Airport Road•., oute, 645) and -are ident fied$b , the. Property 'Identification Numbers` 63 - -A- 150;64-A- I 0, and ,64- -A 12 in the Shawnee Magisterial, District.. A copy of the application will bce a- vailabletfor review at the Handle_ Library and the Bowman Library the 'week;of the ~meeting; or- at;the Department;of Planning and.D`evelo.pment,located at 107 Nortli,Kent Street,in Winchester, Virginia, or by calling (540) 665 - 56511., You. cam also:v s tus on:the web .at: www.co.,fiederck va;us. Sincerely; Candice E: Perkins AICP. Senior Planner CEP /pd, fr .. NOTIFICATION OF; PUBLI:C HEARING October 24, 29"14 TO: THE APPLICANT(S) AND /OR. ADJOINING `PROPERTY Q WNER(S). RE: REZONING APPLICATION #02 =14 FORIHE'RITAGE CQMMQNS, LL'C O'n behalf of'the Frederick County Planning Commission, you; are. hereby nodfiecl of a public hearing being hel'd'' on, Wednesday, November 5 201.4, at 7:00 p -m: in the° Board Room of'the Frederick County Admmi_stration ,Building at 107 North 'Kent Street; Winc_'hester; Virgi nia. t o consider, the `following application: - r Rezonin #.02 =14 .HERITAGE COMMONS- LLC- a PN g ubrnrtted by, Lawson 8c �Si]ek, Inc., to rezone 96.28 + / acres from B2 (Business General),District to ,R4 (Residenti'al Planned. Comm pity), District r 5.4 ±/= acres' from. RP (Residential:Pe "rforinance,) Diktr'ict to R4 �(Resideintial':Planned Community) -Ck. District and ,3:1 + / -acres fromthe `RA (Rural Areas) District to the 94 (Residential P11 nned Community) District with'proffers. The properties areaoeated west;of'the intersection,of Front Royal Pike, (Route 522) and Airport Road•., oute, 645) and -are ident fied$b , the. Property 'Identification Numbers` 63 - -A- 150;64-A- I 0, and ,64- -A 12 in the Shawnee Magisterial, District.. A copy of the application will bce a- vailabletfor review at the Handle_ Library and the Bowman Library the 'week;of the ~meeting; or- at;the Department;of Planning and.D`evelo.pment,located at 107 Nortli,Kent Street,in Winchester, Virginia, or by calling (540) 665 - 56511., You. cam also:v s tus on:the web .at: www.co.,fiederck va;us. Sincerely; Candice E: Perkins AICP. Senior Planner CEP /pd, i 0 This is '1 certify that the attached correspondence was mailed to the following on f d �L from the,Department.of Planning and Development, Frederick Cou ty, Virginia : 64 -A- - 11--' 63 - A- ' 150- 6 150 SPE.LLC 621 E PRATT ST STE 600 BALTIMORE MD 21202.3147 64' -.,A- - 10 R 150 SPE LLC 621 E PRATT ST STE 600 - BALTIMORE MO 21202,3147 64 - A- - 12 R 150 SPE LLC 621 E PRATT ST STE 600 BALTIMORE MD '21202.3147 63 - A - 123 -A EFG INVESTMENTS,LLC 340 W PARKINS MILL RD WINCHESTER VA 22602 -4735 64 - A- - '9- FLGRESIDUAL TRUST PROPERTIES LLC PO BOX 888 WINCHESTER'VA, 12604 -0888 64 - A- 10 -A CALVARY CHURCH OF THE BRETHREN C/0 RICHARD E KELLER 578 FRONT ROYAL PIKE -WINCHESTER VA 22602 7316 BELT ARTHUR `A 'BELT JUANITA S 201 FRONT OR WINCHESTER VA 22602.4383 64 A- - 1,4- SHEPARD MICHAEL S SHEPARD CHERYL 1.79.GEORGE OR WINCHESTER'VA 22602 -4619 64 - A- - 1.81 . MADISON II LLC 558 BENNYS BEACH -RD FRONT ROYAL'VA 22630 64B -A-4- 91- YOUNG PHILIP`T YOUNG JUDY LYNN 655 FRONT ROYAL PIKE WINCHESTER VA '22602.7323 64B - A- 73- i CALVARY CHURCHOF'THE BRETHREN CIO RICHARD E KELLER 578 FRONT ROYAL PIKE WINCHESTER VA 22602. 7.316 JCandice E. Perkins, Senior Planner Frederick County Planning Dept. - STATE OVVIRGINIA COUNTY OF. FREDERICK a Notary Public in and for the State and County aforesaid, do hereby certify that Candice E. Perkins, Senior. Planner'for the Department of Planning and Development, whose name is signed to the foregoing, dated J y IQ gllc/ , has personally appeared before me-and acknowledged the same in my State and County aforesaid.- Given under my hand this. 1�? 7 day of Ccsto- r� C�? ovv. M commission expire s on CJ Z �I °� 0 � � Y PAMALA DEETE NOTARY PUBLIC. NOTARY'PU130C - RE6ISTRATION # 354474 COMMONWEALTH OF VIRGINIA MY COMMISSION EXPIRES, DECEMBER 31, 2017 10 Uv er - 64B - 29- COU4WY'CHARLES A 64B - A- - 13 -B FL`G RESIDUAL TRUST PROP CI CAMPFIELD L"LC 161 FRONT DR _ PO BOX 8881 I WINCHESTER,VA 22602.4382 WINCHESTER,VA 22604..mO888' ` " 64B - 4.' - 30- 64B A 89 GATES BONNIE JEAN DOTSON'SCOTTIE,D' MILLER MISTY DAWN = 371 CHIMNEYCIR' 151,FRONT DR MIDDL•ETOWN VA 2264521,70, WINCHESTER VA 22602 -4382. 64B A' 92 6413%4— CONWAY GENEVE B > OA TES BONNIE JEAN CONWAY SHELTON RAY' MILLER MISTY DAWN - 667 FRONT ROYAL PIKE 15 :1 FRONT DR WINCHESTER VA- 2260277,.3213'-. „ WINCHESTERVA 22602.4382 64B -4- - E. 64B'; - 4- :, -32`. HEPNER DANIEL K m THE-BRINCEFIELOGROUP LLC. ' HEPNER ANGELA,M PO BOX 337, - 256 DEVLAND DR, t ASHTON MO 20861-0137 WINCHESTER "VA: 226013512 64B 4 H 64B, - 47 .337 THE'BRINCEFIELD'GROUP LLC SHANK ROBERT L SR'- PO BOX 337- .. a K:.PAT RICIA A' SHAN ' "- ASHTON MD 20861 -0337 18.5 FR'ONT`DR WINCHESTER VA. 22602 -4382 6413'• 4- —34 -- 646'7-4- '8- .. Y.OWELL ERIC;,P^ " HOTT BARBARA ANN.ETALS ; 149 ROYAL AVE - CIO WAYNE GOOLOVE WINCHESTER =VA 22602.7330 325 TEVIS'ST � '6413 - 4- - 35, YOWELL ERIC P WINCHE S TER 'VA 260 =1' - 149ROYALAVE 646 =•4 9 A WINCHESTER VA 22602= 7330': MCFARLAND CHARLES C SR & ELENER L,� 64B 4 36. MCFARL'AND,,CHARLES C ill KELLY JOHN B JR itAI YAL AVE .. `. 'KELLY MARSHA.J WINCHESTER VA. 122602 -7331 • ;; ; 137 ROYAL AVE ;64B = 4L: 10 A % '.. WINCHESTER VA: 22602.7330 MCFARLAND CHARLES CeSR & ELENER'L 6413 :4 37 MCFARLAND CHARLES CAR KELLY JOHN B JR . 116 ROYAL AVE KELLY MARSHA.J WINCHESTER VA 22602 =7331 131 ROYAL AVE ' 64B -:4 25 J WINCHESTER'VA 2260241330 THOMAS: S S .. ' . ' M9 6413 -;4, .. 38 R DR HOTT`CALVIN Ell ° WINCHESTER VA 22602.43.82 HOTT DOROTHY':D i_ 64B - 4� - 26 - 131, ROYAL AVE -.COURTNEY CHARLES A 161 FRONT DR WINCHESTER VA WINCHESTER, VA 22602.4382 -4 , ?, 64B 39 HOTT CALVIN E II 6413" 4-, 27 ` COURTNEY CHARLES,A, . H OTT DOROTHY D COURTNEY BETTY 131 ROYAL.AVE 16:1 FRONT DR WINCHESTER VA 22602 . WINCH—ESTER-VA 22602.4382 64C . GRIM RONALD E 6413 4 28 GRIM MONICA A`, •.- - 673' FRONT`ROYAL PIKE 161�FRONTDRARLES WINCHESTER VA 226024382' WINCHESTER VA 22602 64C' - A- 2- EMBREE JOSEPH . EMBREE°LYNNETTE -L 687 FRONT ROYAL PIKE WINCHESTER`VA 22602.7323 This is to, certify that the attached correspondence. was mailed to the following on ref from the Department of Planning:and'Development, Frederick Co ,ginia 64C - A- 13 -A 64C -V - 3- GIBSON MONTIE JR 67 FRONT ROYAL PIKE' I EMBREE JOSEPH 8 " EMBREE CYNNETTE L 687 FRONT ROYAL PIKE WINCHESTER.VA .22602 � 64C - 1- • 15- _ , WINCHESTER VA 22602.7323 CORNERSTONE LP LLP 64C A 4- PO BOX 2492 BARNARD EDARLENE S WINCHESTER VA 22604.1697 BARNARD CHARLES M ' PO BOX 4585 WINCHESTER VA 22604 -4585' 64C - A- - 7 WHITACRE ELWOOD H SR 721 FRONT ROYAL PIKE WINCHESTER VA 22602 -4420 j '64C - A= - '9 I WINCHESTER OUTDOOR 355 S POTOMAC ST . HAGERSTOWN MD 21740.6032 11- LUCAS WILLIAM R LUCAS KRISTA K 831 FRONT ROYAL PIKE r WINCHESTER-VA 22602.4421 64C - A, - 13 1 GIBSON MONTIE JR .J 867 FRONT ROYAL PIKE WINCHESTER VA 22602 Candice E.. Per ins, r Planner Frederick County Planning Dept. STATE OF VIRGINIA COUNT- OF FREDERICK , a Notary, .Public in and for the State and County afore "said; ;do hereby certrfy:tfiat Candice E. Perkins, Senior Planner for the'D. partment'of Planning and Development, whose" name is. signed to• the foregoing, dated is a 4.� I , has personally appeared before: me: and; acknowledged the same in my State and- County 'aforesad. Given, under my hand this a,y4 day of 4(%-QA a �J °l My commission expires on p 1.� ,3 PA`MALA DEETER NOTARY PUBLIC NOTARY PUBLIC REGISTRATION H 354474 CO:NIMONWfALTH OF VIRGINIA N1Y.,COMMISSION. EXPIRES DECEMiBE,R,31, 2017 , O 41GK k c�G!y. - 4W . _ - GOUNT Y of FREDERICK fylW'/ Departrrierit of Planning; and :Development -540[,605:,5651 1738 - - - FAX:' 540/645- -6395 - ADVERTISE'MENT'u LEGAL.AD . ` 'To W inche s Star Advertising; Department FOR PUBLICATION;; Wednesday, October 1; :20,14; rand Wednesday;' October, 8, 20't4 TYPE OF AD: Legal. Ad DATE: September26, 20:1:4, s c" 4co, N,03TICE. OU UBLIC HEARING- 4` The public Feder r Commission, v 'hold hearing on W,,ednesday,, O tobe-2014 a 7 00p m ,-in he B ard Roorn of the e Freder;ck• County Administration Building, at 1:07 North Kent. Street; Winchester; Virginia; to.consi'derthe following: PUBLIC HEARING R_ezonmg 02 -14 Heritage Comm °ons; LL C., submitted by Lawson and Srl'ek, P.L.C., to rezone 96.28 + /= acres, from BS (Business G:erieral),'District, to R4 "(Residential. Planned Community) .D`istrict`and 5,4+/-,acres 9. w from.RP ( Resideential Performance) District;:to R4 (Residential Planned Community) District and :3.1 +/= acres from ,the RA (Rural Areas)` District to the R4 (Residential T, janned,Cdffirflunity.)t District, with proffers: The properties, are located west of t_he intersection of Front- Royal Pike (Route= 522) :and Airport Road '(Route r _ n645) and, are identified by -the Property Identi`fi`cati`on Numbers, 63 A :150, 64 -A -10, and 64- A -`,12 in the .'Shawnee, Magisterial District". Interested citizens may appear, before the Commission to speak on the above item. A co ry. of the agenda y pp p py will, be, mailable . at- the Handley Library and •the B:o man Library the week of the meeting. Further information, "he uding. a copy of the, agenda, may be obtained. at the Department of Planning: and, Development=; 107 North °Kent Strect, Winchester, - Virginia, or by calling (54.0) 665 = 565;1., You "can ;al'so visit- us! onthe; web at ywww:fcva:us /PCagendas: Eric R. Lawrence, AICP, Plammn' g: Director: i . 1`07 North Kent Street, Suite. 202 Winchester„ Virginia 22601 =5000` t -'� � _ k' . � � T 1 4 N,O TICE :4 PUBLIC HEAR[ NG The, F_rederi'ck. .County Planning Cornrnisson will hold, a public hearing .;on. Vl/ednesday, Dctob,er, 15, 201`4, at 7!00, p m ; i,n We Board Room of the l= reder�ck :County.Admini traton Building at 1:07 North. Kent Street, `Win.chester;; Virginia, to consider the' follo wing, PUBLIC HEARING Rezoning #02 -14 ,Heritage CO `,LL.0 submitted by Lawson and. Silok; P L C:, 'to 'rezone .96`:28 + /- acres from ;BS (Bus,ne`ss General) District to R4 (Res'iden;tial Planned Community) District .and � `54 ±% acres "from RIP - -,(,Residential_° Perforrnance�) ,District to. R4 (Res'idential: :Plann:ed Gornmunity) District and , 31 +/- acres from_ the° RA (Rural° Areas), ,District; to the , "134 (r ResidOntial Planned °Community) Distncf with proffers The. rnes °ar_e 'I,ocate.d west'of the inter- .)rope section. of, ` Front 'Ro.yal P.i.ke (Route, 5.22); =and: Airport° Road (Route 645) ­ and are :identified- by the Property 4denti #_ cation) r;Numbers '63- A- 1,50, 64,A 10,, and 64 A 12 in -the Shawnee Magisterial, D:istrict�. Interested`. citizens may appear before the Commission to speak on the above 'item ., A copy of ,,thTe agenda ,will be �ayailable at `the ;Handley Library, and the Bowman Library the', week of ,the m eeting Further 'information, inclu.din a co" of thee.a en= g pY g . ' ndA, may bwe obtained at the Department of Planning:, and.,,= Development, 1.07 ,North ` 'Kent Street, -Winchester, Virginia, '`or by calling (640): "665. = 5651, You can also visit us ,o:n- the web at: www.:fcua. us/PCo�oendas. _Eric R..Lawrence, A'LCP, Planning Director NMI E :OFF x; PUBLIC HEARING Thee road- erick Count Plannin y g Coffi is'sion,= will hold a public hearing on W ednesday, October 1,5,�2014 fat*. P c e 7:0' m p in the ;Bo_ard Room of ..ah 0 Frederick County, Administration Bui,lding, at 1.07 North Kent 'Street,, Winchester;, Ui 4 cc� . rg_inJa, °to ,consider the following: PUB!LI'C 'HEARING ;Rezonin.,g 02.14. Heritage Commons; 1 L.L.-Cl. ,submitted b y Lawson and .Sil:ek, P L.C., to -rezon;e 96.28 + %= acres from RS (:Business General) District to. R4 (Residents "aI Planned _Comm' _ -ity)- District and 54 +/ acres from RP Residential:' District to P,erfo�rmancek) ' , _R4 (Reside,ntial . 4 Planned Co�rnmunity ') D'is ` tnct; and .31. +/ acres' from tlie; ,RA (Rural Areas) District .t,h,e R4 ('Residentra,l P1a,nne�d CommunitV District with proffbrs' Thee properties .are `located wrest, iof th;e' inte_r- section .of Front Ro, al Pike Route, 522.,; y an`d, Airport Road (Route 64.5) and are `identified;. by - lh.6c Property Jdentification N'umb'ers 63 -A =150; _047A anal `;.6'4 =A. 1 2—in "the Shawnee, Magisterial District':, Interested otizens r -ay appear befoto fhe` "Comrn`issio;n to; speak on the, above ite_m_: ,A copy of:the:.agenda will be avail "ableat the Handley "L'ibrary and the; Bowrnai. Library, the week of :the meefing. Further f , i:nfb mate, lj, rnoluding a copy Df the ag.en= da, :may be: obtained �at'the Department of P arming °and', Development, 107 North- _ _ Kyent Street, Winchester, Virginia;, ,or --y- :. c �9 (r �) - allin 540 665 56'51. You can also visit° USI I on the, web at: www fcva.,us /PCagendas,. En,c :R. LaWrenc -e, `AICP, Planning Director w s o RE DEPT. OF GEOGRAPMONF'ORMATION SYSTEMS FREDERICK COUNTY, VIRGINIA 16 "I DATE RECEIVED: ),COMPLETION DATE: REQUESTING AQENT`. -1 Department,. Agency, or Company:_ Mailing and/or Billing Address: Telephony: FAX: E- mail. Address: ESTIMATED COST OF PROJECT: DESCRIPTION OF REQUEST: (Write additional information on back ,of request) �e.�ZOa�f1� ba -I,y luc ,ARP �i� �;fa.c3� rn�%►tU(l5 LUC DIGIT AL: PAPER: FAX: E= MAIL. °Z SIZES COLOR: BLACKfWHITE: NUMBER OF COPIES; STAFF MEMBER: HOURS REQUIRED: COMPLETION DATE: MATERIALS: DATE OF PICK- UP/DELIVERY; AMOUNT DUE: AMOUNT PAID: AMOUNT BILLED; CHECK NON METHOD OF PAYMENT: . Frederick County GIS, 107North Kent Street, Winchester, VA,22601, (540)665- 5651) 'N DEPT. OF GEOGRAPHIC ,INFORMATION SYSTEMS r FREDERICK COUNTY; VIRGINIA GIS' 1l7APPING, GRA]PI�ICS WORK.. QUST S / y DATE RECEIVED 8. d REQUESTED COMPLETION DATE: H REQUESTING AGENT:_ Department, Pgency , or gom P any - Mailin g and/or Billie Address:" . Telephony:: FAX: E -mail Address: ESTIMATED COST OF PROJECT: DESCRIPTION OF REQUEST: (Write additional' information on back of request)' LL(, DIGITAL: 6 PAPER: FAX: E- MAIL-: bey - iA SIZES: - COLOR: BLACK/WHITE: NUMBER OF "COP.IES:_ STAFF MEMBER: HOB REQUIRED: COMPLETION DATE: MATERIALS: DATE OF PICK- UP%DELIVERY: AMOUNT DUE: AMOUNT PAID " AMOUNT BILLED:- METHOD OF PAYMENT:- CHECK NO.# . Frederick County. GIS, 107 North Kent Street; Winchester, VA'22604. (540)665 -5651)