Loading...
HomeMy WebLinkAbout02-13 Impact AnalysisIMPACT ANALYS=IS STATEMENT FAIRFAX PIKENDO'TI LANE COMMERCIAL PROPERTIES REZONING Frederick County'Virginia Opequon Mag ster al` District Tax Parcet # 86 -A-14 and 86 -A -15 Aggregate Area of '3:61± acres January 25, 2013 Revised April 11, 2013 Current Owner: Bowman - Shoemaker, Companies, Inc. Elizabeth Properties,LC Contact Person: Evan A. Wyatt,,AICP Greenway Engineering 151 Windy Hill Lane Winchester, VA 22602 (540) -662 -4185 Greenway Engineering January 25,.2013 Fairfax;PikeNDOT Lane Rezoning Reyised April 11,3013 FAIRFAX PIKENDOT LANE COMMERCIAL, PROPE=RTIES REZONING INTRODUCTION This report has been prepared for the purpose of assessing-the, impact; to Frederick County by the rezoning of 3.61± acres, owned by .Bowman- Shoemaker Companies,, Inc., and Elizabeth,Properties, LC, 'identified, as Tax Map Parcels 86 -A -14 and 86- A -1-5. Tax Map 86 -A -15 is a 1.96± acre parcel, owned by Bowman - Shoemaker Companies, which 'is currently zoned 134, Neighborhood Business District. Tax Map 86 -A -14 is a 1.65± acre parcel owned by Elizabeth. Properties, LC, which is currently ,zoned B. -1., Neighborhood Business District. Both properties are currently undeveloped. The Owner desires, to rezone both parcels from the 134; Neighborhood Business District to B -2, Business General District with proffers. Basic Information: Location: North side of Fairfax Pike (Route 277) adjacent to VDOT Lane (Route 1018); approximately' /2 -mile east of Interstate 81.Exit 307. Magisterial District: Property ID Numbers Current Zoning: Current Use: Proposed -Zoning Total.,,Rezoning Area Proposed Development: Files #5510 03AW Opeguon District 86 =A -M and 86 -A -15 86 -A -14; B 1 District (L.65 ±; acres) :86;A -15; R1 District (1.96± acres) Undeveloped 86 -A -14: B -2 District (1.65± acres) with proffers 86 -A -15: B -2 `District (1.96± acres) with proffers 161± acres B -2 Business General District Commercial Retail,; Commercial Service; and /or Office Greenway Engiriceiirig January 25;;2013.. Fairfax Pikc%VDOT L, ne Rezoning Revised Apn1 11,;20.13 COMPREHENSIVE: OLICY, .PLAN Sewer and Water;Service Area Tax Map,Parcels 86 -A -14 and $6 -A -15 are currently Located within the Sewer and Water Service Area (SWSA). Therefore, the rezoning of this property for commercial land use is appropriate based on current policy. The 3:61± acre subject properties are currently zoned for neighborhood ,commercial land use, and have access to public'water and public sewer service. Therefore, the request to rezone, the subject .properties from B -1, Neighborhood Commercial District to B -2, Business General District will not require the expansion of the SWSA. or the extension of public water and. sewer infrastructure to serve the, subject properties-. '(Please =refer to the UDA and SWSA Map Exhibit.) Southern Frederick. Land-Use Plan Tax Map Parcels 86 -A- -14 and 86 -A -15 are a component of the Route 277 Triangle and Urban Center Land. Use Plan. 'This land use plan recommends the development of business and urban center land: uses along the north ;side of- Fairfax Pike (Route 277); between the Interstate SI Exit 307 interchange area and ' Double Church Road (Route 641). The -land use plan identifies the subject properties within a future urban center land use designation. The l�antl.' use plan states that the urban center is larger than the neighborhood commercial center with a larger commercial core, higher residential :., 'densities, and is ,designed around some; form of° public space or focal point. The 3.61 'acre subject properties have approximately 425' of frontage along Fairfax Pike and will have their primary point of access along 'VDOT Lane. The location, size, and dimension of the .subject properties are not conducive, to urban center design; therefore, the Owner intends to maintain a business land use designation for the property. The Owner's proposal provides right -of -.way dedication for the: planned widening of Fairfax 'Pike, the provision of inter- parcel access to direct traffic to VDOT Lane, and the provision of right - in/right -out access on, Fairfax Pike to facilitate, access management .control. Therefore, the Owner's request "is consistent, with the transportation goals of the Route 277 Triangle and Urban Center Land Use Plan, and provides ,for economic development land use to further support the goals of the plan. SUITABILITY OF THE SITE Flood_plains` Tax, Map Parcel's 86 -A -14 and 86 -A45 are located on FEMA ,NFIP Map #5.10063 -0200 B. This map, as well. as the Frederick County GIS database: delineates the subject properties as being outside of the 100 7year floodplain. Both mapping sources identify Stephens Run as the. closest floodplain area,, which is approximately 3/4 -mile southwest of the subject properties. Therefore; there will be no impacts to this environmental File #5540 1FnW Greenway, Engineering' January 25, 2013 Fairfax PikeNI)OT Lane.Rezoning Re,,vikd April 11. 2613 feature by `the development of the: proposed commercial hand uses on these properties. (Please refer to the Environmental Features_MilD Exhibit '.) Wetlands Tax Map Parcels, 86-A-14. and 86 -A -15 do not contain wetland areas as demonstrated on the National Wetlands .Inventory (NWI) Maps as well, as information from the .Frederick County GIS Database. No evidence of wetlands features and vegetation,is °present ,on the property; therefore, the subject site is not impacted by wetland areas. (Please refer to the Environmental Features�Map Exhibit.) Steep Slopes Tax Map Parcels 86 -A -44 and 86 -A -15 are both gently rolling sites with slopes ranging, from 2 to 7 percent. The greatest topographic relief is within the northern .portion of tax map_ parcel 86- A -'1'4, which will.be required to be set aside as a buffer and screening area for�the benefit of`'the Freeton'T,ownhouse subdivision. There are no areas of steep slope as defined; therefore, there are no impacts to this environmental feature. (Please refer to the Environmental Features,Map Exhibit.) Woodlands .Tax Map Parcels 86 -A -14 and 86 -A -15 contain 'areas of mature vegetation throughout the northern and central portions of the site -. The development `of both properties for commercial' land- use and for the construction of the internal access drive wiltnecessitate ,the clearing, of all mature vegetation on both properties. However, commercial parcels will be required to comply with'4the landscaping requirerfientst of the ,Zoning Ordinance, which will' mitigate this impact. The Owner will attempt to utilize mature vegetation: along the rear property line of tax map parcel 86 -A -,14 for required buffer and screening for the benefit oU the- Freeton, Townhouse subdivision. • (Please= refer to the Aerial Overview Exhibit). Soil Types, The Soil Survey of Frederick .County, published by the USDA'Sol .Conser.vation Service was consulted -to determine soil types contained in Tax Map Parcels 86' -A -14 and 86 -A- 15. The subject properties contain the following soil types: 1C — Berks Channery Silt Loams: 7 -15 %'slope 38 — Blairton Silt Loams:.'2 -7 %6 slope 44B - Zoar. Silt Loams: 2 -7 % slope The Bl°airton Silt`Loam and Zoar',Silt Loam soil types are_ is- :classified as prime farmland soil. The primary soil types on Tax Map Parcels .86 -A44 and- ,86. .-A =15 are identified as moderate to severe due. to wetness and shrink -swell for small ,commercial. buildings; File #5510 /SAW 4 `Greenway) nginie ng• January; 25; 2013 Fairfax Pike /VDOT Lane Rezoning Revised April" 1'1 2013 .therefore'; geotechnical anal'ysis,, will be needed to, determinel if existing soils are appropriate for construction or if, select materials will be needed., However,, it is .noted that the soil' characteristics identified above are.--similar to, the soil types . found on roadways and developed eorrimercial properties along, this portion of the Fairfax Pike corridor. (Please refer to the Soils Map Exhibit.) Other Environmental Features Tax. Map .Parcels 8.6 -A -.14 and. 86 -A-,15 do not contain areas of: -lakes, ponds' or natural storm water retention areasas, defined'by the Frederick County'Zoning Ordinance. There are no environmental features present that create development constraints for the proposed commerc: al land uses on. these properties. '(Please refer'to the Aerial Overview Exhibit and the Envi "ronrnental Features Map Exh'ibi`t.) SURROUNDING PROPERTIES Adjoining property zoning and present use: North;_ Zoned.B 1, Neighborhood. Business District, Use: Apartment Zoned RP, Residential Performance District Use:, Townhomes. South: Zoned B2; B`usiness General District Use: Commercial East: Zoned: B 1, Neighborhood Business District . Use: Commercial' West: Zoned: 134, Neighborhood Business District Use:'! VDOT Yard Zoned: B2, Business General 'District Use:' Residential (Please refer to the Location and Zoning Map Exhibit) TRANSPORTATION Tax Map. Parcels 86 -A -14 and 86 -A -15 have approximately 365± feet of frontage along the north side of Fairfax Pike (Route _277); and tax map parcel 86 -A -15 has approximately 360 + - feet of' frontage along the .east side of VDOT Lane (Route 1018). Fairfax Pike is classified as a minor arterial road, while. VDOT .Lane is classified. as a local street. The Virginia ,Department of 'Transportation S'ix, Year Improvement Plan ($YIP) identifies funding for the widening of Fairfax Pike during,-FY14 -18. VDOT and -.County officials have met to discuss an :appropriate typical section °for. Fairfax Pike. VDOT representatives,;.have provided a preliminary geometric- road section -for the portion of Fairfax. Pike located along the subject property frontage. The typical section proposed along the fronfage of the - subject properties includes continuous pavement to provide for File #5510 /EAW -5 Greenway. Engineering January 25, 2013: Fairfax Pike /VDOT`Lane Rezoning Revised Apiil 1`l, 2013 two _eastbound - travel lanes; two westbound-travel' lanes, a .shared center turn lane, curb and gutter, and sidewalks. Additionally, this information depicts. the VDOT Lane intersection, shifting. to the west to align with_ the`western -most commercial entrance that serves the Food Lion Plaza commercial development: Fairfax,' Pike 'is classified as a minor arterial road and the speed limit is between 35 -45 mph. Therefore, the VDOT riminirnurim spacing standards of 470 -feet for full access cominerci'al entrances cannot be achieved for the subject properties due to distance .constraints .(tax parcel 86 -A -14 has approximately 1'75-±, feet of, frontage and tax parcel 86 -A -15 has approximately 1.90±-, feet of frontage). Greenway Engineering has' met with the County's Director of Transportation Planning and VDOT representatives "to discuss this and other access management matters, as well as traffic analysis information associated with commercial development on the subject properties.. 'These discussions support the provision of.a shared right -in /right -out commercial entrance on Fairfax Pike, a, full access commercial entrance serving tax parcel 86 -A -14 and tax parcel 86 -A -15, and a 50' ingress /egress easement across tax parcel 867A45' that provides inter- parcel connectivity to tax parcel 85- A -14. The property owner has prepared a. Generalized Development Plan (GDP) that is incorporated as part of the proffer' statement for the subject properties. The. GDP depicts the general location of commercial access along VDOT Lane, the general: location of ,the inter - parcel connectivity; the general' location of the shared right -in /right =out commercial access on Fairfax Pike, and the general location of the proposed Fairfax Pike right -of -way dedication area., Greenway Engineering met with the Frederick County. Transportation Planner to discuss the .proposed rezoning application and it was determined' that` a. Traffic Impact. Analysis (.TIA) study would not be,, equired for this process. VDOT has analyzed the Fairfax Pike corridor and determined; the appropriate lane geometry; which has been funded for preliminary engirieering design, right -of -way acquisition, and construction: Additionally, the proposed rezoning request is for a change in .commercial zoning from the "B -1 District to -the B:: -2 District, which is projected to create a modest increase in peak hour traffic volumes. Greenway Engineeri "ng" has prepared. information from the Frederick County GIS database that provides Floor -to Area (FAR) calculations for properties that are zoned B -1 District and B -2 District: within the immediate area of the :subject properties.. (Please refer to the Fairfax Pike & Adjoining Roads B 1 & B2. District FAR Data Map and Table Exhibit.) Analysis of this information suggests that the B -1 District property would yield approximately a 0.12 FAR, while, =the B -2 `District property would yield approximately a 0.20 FAR. Therefore, the: change in zoning would 'result in an increase of approximately 12;500 „square, -feet of "development on the :3.61± acre subject properties. It is anticipated that a, freestanding discount store will be initially developed as a result" of this rezoning application.- The.ITE.Manual, 7`h Edition, provides trafficprojections for this type of land use:. The ITE ,,Manual projects that the additional development potential would ''increase peal, hour volumes, by 68 VPD during the weekdays, by 96 VPD on. Saturdays, and by 92' VPD on Sundays. Therefore,, it is not anticipated that the change in zoning from the B -1 .File #5510 /LAW Greenway I ngineering January 25,J013 Fairfax °PikeNDOT Lane.Ruoning Reyi sed, Apnl. l 1,;2013- District to the B-2 District will have a° negative impact on the corridor improvements that are planned by VDOT.. SEWAGE CONVEYANCE AND TREATMENT The subject properties ,are located within the Sewer and Water Service Area,(SWSA) -. The Frederick County Sanitation Authority (FCSA) provides public sewer service to thi geographic area. of the .community, which provides treatment at the Parkins 'Mill Wastewater Treatment Facility -, The existing site conditions include a anitary sewer easement, which contains an 8 -inch gravity sewer line and an 8 -inch sewer force main. The site infrastructure. ,directs effluent from the 8 -inch sewer line to the Stephens Run .Lagoon pump station,Jwhich connects to a 15- inch, sewer transmission line to °the Parkins Mill, Wastewater Treatment Facility,. FGSA.has developed a"sewer usage calculation for planning purposes, whichprov'ides for residential commercial, and.,ind'ustrial land uses. A conceptual land plan has not been prepared for the subject properties; therefore, the County's rezoning application package suggests that "the. 3.61± acres has a maximum potential yield of :21 ;36'1 square feet of retail' development per acre, resulting in a maximum of 77,113' square .feet (0.49 FAR).f Therefore, the FCSA calculations for projected sewer demands forthe maximum deve'loprrient.potential retail development are as follows: Q =. 75 gpd / l ;000 .square .feet Q= 77,1,13.squa're feet/1,000 square feet = 77.11 Q = 77.11 x 75 gpd.= 5;783, gpd A conservative sewer demand projection for the subject properties is estimated to :direct 5;783 gallons per day to,`the, public sewage conveyanee system and treatment demand= at the. Parkins Mill Wastewater Treatment Facility. The, design capacity of the Parkins Mill- Wastewater Treatment Facility s,,5.0 million gallons per day. (MGD), with current usage; averaging 1.97 MG.D.. Therefore-, the; projected land use!. development will produce 5,783 d gp of effluent for treatryient, utilizing approximately 0.02% of the available capacity at this facility. This information demonstrates that the subject property can be developed With adequate sewer service with available capacity . for -treatment. (Please refer to the SW$A.MapZExhibit:) WATER SUPPLY The subj "ect properties are located, within the Sewer and Water. Service Area (SWSA): The Frederick County Sanitation Authority (FCSA) has developed water infrastructure within the proximity of the, subject. properties, which provides potable water to the commercial and residential land uses located to the north; south,.and.east of the.proposed development. An 8 -inch waterline exists on the south side of Fairfax. Pike (Route 277) File #5510/EAW Greenway Engineering Jannary _ 25, 2913 Fairfax PikeNDOT Lane Rezoning `Redised April 11, 2013 across from the subject properties; and a water line crossing, is in, place that serves the commercially zoned properties along VDOT Lane: A connection will be made to the 8- inch water line to provide service to the subject properties to ensure that adequate water flow .and. pressure are available for development. Land uses in this area of 'the County receive potable 'water from the James H. Diehl Water Filtration Plant located by the Stephens City quarries. The James H. Diehl Water Filtration Plant provides an. average of 3.4 Million Gallons per day (MGD), and can provide up to 4 MPG of potable water based on available pumping capacity. FCSA has developed a water usage calculation for planning purposes; which provides for residential, commercial, and 'industrial land uses. A conceptual land plan has ' not been prepared for the subject properties; therefore, the County's rezoning application ,package suggests, that the 3.61± acres has a maximum potential yield of 21,3,61 square feet, of retail development per acre, resulting 'in a maximum_ of 77,1.13 square feet ' (0.49 FAR). Therefore, the FCSA calculations for projected water demands for the-,maximum development potential retail development are as follows: Q = 75 gpd %1',000 square feet Q = 77;113 square feet/1,000 square feet = 77.-11 Q = 77.1:1 x 75 gpd' = 5,783 gpd A conservative water demand projection for the subject properties. is estimated, to `require 5,783 gallons, per day of potable water from the, FCSA water transmission system. Greenway Engineering obtained fire hydrant test data from FCSA at the Food. Lion Plaza commercial project, which demonstrates water flow at 1,1 °87 gpm and a residual pressure of 50 psi; therefore, there is °adequate water flow and pressure for development purposes. Future site plans for the subject properties will demonstrate appropriate water pressure based on their project demands; however, the information in, this section demonstrates . that the subject. property can ,be developed' with adequate water service with available capacity. (Please refer to the SWSsA Map Exhibit.) SITE DRAINAGE Tax Map Parcels 86 -A -1.4 and 86 -A -15 are both gently rolling; sites with slopes ranging from 2 to 7 percent... The• sites generally drain northeast to southwest towards VDOT Lane where stormwater is directed to a drainage area located north of the Orndorff property to .a designed storm water management area within the CB Ventures, LLC development. It is envisioned that the subject properties will be designed to provide storm water management with appropriate capacities and treatment that will be directed to the existing storm water management area. The County Engineer will be .consulted during this process, and plans will be: prepared and submitted, for review-and sapprovai by the County Engineer prior, to tany new development activity on the. subject properties to ensure, that there are no negative impacts to the existing project. site and surrounding properties resulting from storm water management activities. (Please refer to the Environmental Features Map Exhibit.) File . #515,1OA -Aw Green way )Engineerin ,g, lanuary,,25,.2013 Fairfax Pike/VDOT Lane Rezoning Revised „April 11,_2013 SOLID. WASTE DISPOSAL The impact on solid; waste: disposal facilities can. be projected from an average annual commercial consumption of 5.4 - cubic`yards per 1,000` square feet of structural area (Civil Engineering Reference Manual, 4`'' Edition) The following figures show the increase in the average annual volume based: on a conservative development projection of 77;1,1.3 square feet (0.49 FAR) of commercial land use: for the entire acreage: AVV = 5.4 cu.. Yd: Per 1,000 sq. ft. commercial AAV = 5A cu: Yd. x.77.11 AAV = 41'.64 cu: Yd. at build out, or.291.5 tons at build out The Municipal Solid Waste area of the regional Landfill has a current remaining capacity of 13,100,000 cubic yards of air space, The potential development of`77,110 square feet of commercial land use will'generate approximately 291.5 tons of solid waste annually on average. This represents a 0.19% increase in the. annual solid waste received by the Municipal Solid Waste area of the Regional Landfill, which currently average 150,000 tons. per year; therefore,: this information demonstrates that the Regional Landfill has adequate capacity 1cr. accommodate °the solid waste 'impacts associated with, this proposal. Solid waste produced by the commercial land uses will be routed to the Regional Landfill by a commercial waste. hauler,; therefore, the County will. receive tipping fees associated with this land use to mitigate this impact. HISTORICAL SITES AND STRUCTURES The subject properties do not :contain structures deemed to be,historically significant,. nor are there. potentially significant structures adjacent to the subject property. Additionally, _the subject properties are not'located within defined battlefield areas or potential historic districts as demonstrated in the National Park Service Study �of- Civil War Sites in the Shenandoah Valley and. the .Frederick County Comprehensive Policy Plan. Therefore, the development of the commercial land uses on the subject properties will not negatively impact historic ;resources or viewsheds. (Please refer to the Historic Features -Map Exhibit.;). CONCLUSIONS' The rezoning of the 3;61± acre subject properties owned by Bowman-Shoemaker Companies,. Inc., and Elizabeth Properties, LC, is not anticipated to negatively impact public services sand will provide economic development. revenue that will benefit the County,. The subject_properties are currently zoned B -1 District; therefore, rezoning the subject, properties to the B =2 District -will provide the opportunity to create commercial Fie #5510/EAW Greenway, Gngineeiing January 25, 201=3 Ni6x Pike1VDOT Lane.Rezoning ,Revised April 1C1, 2013. land use that, is 'c,ompatible` with other land uses along the .Fairfax Pike (Route. 277) corridor. The Applicant has agreed to dedicate right- of -way that is sufficient in width to accommodate the future-widening- of'Fairfa) Pike; Wand has prepared a proffered access management plan that is, consistent with improvements discussed: with'VDOT and the County's Director of Transportation Planning. Additionally, the Owner has offered to provide, a monetary contribution to,,Frederick County for general fire and rescue, services to further mitigate impacts �assoc °ated with this project, 'Therefore, this rezoning proposal will provide for positive economic and transportation benefits to, Frederick County without impacting capital facilities or, services, provided bythe County..: Pile 45510/F_AW 10