HomeMy WebLinkAbout02-05 Impact Analysis_IRAN "�LVAfW0 ADAMS DEVELOPMENT GROUP, INC. R EZ O NING Stonewall Magisterial District Frederick County, Virginia TM 44- ((A)) -75 59.71 Acres June 21, 2004 Revised August 27, 2004 Revised February 18, 2005 Current Owners: Adams Development Group, Inc. Contact Person: Evan Wyatt, AICP Greenway Engineering 151 Windy Hill Lane Winchester, VA 22602 540- 662 -4185 Greenway Engineering June 27, 2004 0, Adams Development Group, Inc. Revised August 27, 2004 Revised February 18, 2005 ADAMS DEVELOPMENT GROUP, INC. REZONING INTRODUCTION This report has been prepared for the purpose of assessing the impact on Fredrick County by the proffered rezoning of a 59.71 acres parcel owned by the Adams Development Group, Inc. The subject parcel is located on the west side of the Martinsburg Pike (US Route 11), near the intersection of Jordan Springs Road (Route 664) in the Stephenson area. Interstate 81 forms a boundary on the northwestern edge of the parcel, with the Winchester and Western Railroad rail line roughly paralleling the Interstate just inside this northwestern side of the property. The current zoning is B3, Industrial Transition District with approved proffers. The Adams Development Group, Inc. proposes to modify the proffer statement guiding the development of the 59.71 -acre parcel for the purpose of providing additional land uses, revising the maximum square footage of structural development for the proposed land uses, and to establish general parameters for the treatment of the stormwater management channel and wetlands preservation area. Basic information Location: Martinsburg Pike (US Route 11), near Jordan Springs Road (Route 664) Magisterial District: Stonewall Property ID Numbers: 44- ((A)) -75 Current Zoning: B3 Industrial Transition District with approved proffers Current Use: Unimproved Proposed Use: Office, Self- Service Storage, Wholesale Market Warehouse, Building materials and Lumber Store Proposed Zoning: B3 Industrial Transition District with modified proffers Total rezoning area: 59.71 acres Proposed build -out 555,000 square feet maximum #3949 /Impact Analysis Statement 2 Greenway Engineering 0 COMPREHENSIVE PLAN June 21, 2004 Adams Development Group, Inc. Revised August 27, 2004 Revised February 18, 2005 The proposed site is being developed in conformance with the Comprehensive Policy Plan, Northeast Land Use Plan. The subject property is to be developed in commercial and industrial transition land uses as depicted on page 6 -33.4 of the Comprehensive Policy Plan. 1. Urban Development Area Expansion of the Urban Development Area (UDA) beyond its existing boundary is not required by this application. 2. Sewer and Water Service Area Expansion of the Sewer and Water Service Area (SWSA) beyond its existing boundary is not required by this application. A. SUITABILITY OF THE SITE Access The subject site, tax parcels 44- ((A)) -75, is located on a manmade boundary created by Interstate 81 on the western edge of the tract and Martinsburg Pike (US Route 1 1) to the east. A single entrance on Martinsburg Pike (Route 11) is proffered to accommodate vehicular access to the subject site. Martinsburg Pike is a three lane arterial road providing for a single north and south travel lane and a center turn lane along the entire frontage of the subject site. The availability of rail along the northwest side of the subject site provides opportunities for rail service. Flood Plains The subject site is located on the FEMA NFIP map #510063-0115-B. The site is located as "Zone C ", area outside the 100 -year flood plain. Wetlands The National Wetlands Inventory Map indicates that there are no wetlands on the subject site. A wet weather stream exists along the southern portion of the subject site, which flows from the Payne Mobile Home Park through the property and under Martinsburg Pike to Hot Run. The wet weather stream has been determined to be a regulated waterway by the U.S. Army Corps of Engineers that is pristine. Therefore, the wetlands area will be enhanced through the use of riparian zone planting recommended by the Virginia Department of Forestry. #3949 /Impact Analysis Statement 3 Greenway Engineering Steep Slopes June 21, 2004 • Adams Development Group, Inc. Revised August 27, 2004 Revised February 18, 2005 There are no steep slopes (over 50 %) on this site. Mature Woodlands There are no woodlands on the subject site. Soil Types The following four soil types are identified in this property according to the Soil Survey of Fredrick County map sheet number 24 (USDA Soil Conservation Service). 7C- Carbo- Oaklet -Rock outcrop complex 2 -15 percent slopes, covers approx. 5% of site 1413- Fredrick - Poplimento Loams 2 -7 percent slopes, covers approx. 40% of site 16C- Fredrick - Poplimento Loams, very rocky 7 -15 percent slopes, covers approx. 20% of site 29- Massanetta Loam, 0 -4 percent slopes, covers approx. 35% of site The 14B and 29 soil types are identified as prime agricultural soils according to Table 5, Prime Farmland ( Soil Survey of Fredrick County page 123). B. SURROUNDING PROPERTIES Adjoining property zoning and present use: North: Zoned RA District Use: Residential SFD /tnobile home South: Zoned MH 1 District Zoned M1 District Zoned RA District East: Zoned B3 District Zoned RA District West: Zoned RA District Use: Mobile home park Use: Commercial Use: Residential SFD Use: Industrial (APAC Virginia, Inc.) Use: Institutional (church) Use: Interstate Highway 81 Use: VDOT Rest area/Welcome Center 93949 /Impact Analysis statement 4 Greenway Engineering • C. TRANSPORTATION June 21, 2004 • Adams Development Group, Inc. Revised August 27, 2004 Revised February 18, 2005 The proposed rezoning has proffered a maximum aggregate of 555,000 square feet of building area, comprised of five specific categories of land uses on the 59.71 -acre parcel. An analysis of average daily traffic volumes is identified below utilizing Institute of Transportation Engineers ((ITE)) Trip Generation Manual, 7 t1 Edition volumes. Adams Commercial Center Land Use & Projected Traffic Volumes Land Use Square Footage ITE Code & Average Rate VPD Office 120,000 (710) 11.01 /1,000 sq ft 1,322 Self- Service Storage 140,000 (151) 2.50/1,000 sq ft 350 Building Materials & Lumber Store 25,000 (812) 51.60/1,000 sq ft 1,290 Wholesale Market 150,000 (860) 6.73/1,000 sq ft 1,010 Warehouse 120,000 (150) 4.96/1,000 sq ft 596 Totals: 555,000 4,568 The 2002 VDOT Daily Volume Jurisdiction Report 34 identifies Martinsburg Pike (Route 11) between Old Charles Town Road (Route 76 1) and Cedar Hill Road (Route 67 1) with 6,300 VPD. All vehicle trips entering and exiting the subject site will travel north or south on Martinsburg Pike to access Interstate 81 (N or S). The Winchester Area Transportation Study (WATS) does not call for improvements to Martinsburg Pike north of Old Charlestown Road (Route 761); however the Applicant's proffer provides for dedicated right -of -way to VDOT for the future widening of Martinsburg Pike and provides for a single commercial entrance location on Martinsburg Pike to facilitate good access management. Furthermore, the Applicant's proffer provides for a prorated share of the cost of signalization improvements in the area of Interstate -81 Exit 321 to assist in the mitigation of off -site transportation impacts. The previous proffer statement provided for a maximum square footage of development, which projected an average daily traffic generation impact of 4,603 VPD. The revised proffer has provided for a maximum square footage of development, which projects an average daily traffic generation impact of 4,568 VPD. This revision has been discussed with VDOT and it was agreed that the transportation proffers from the previous rezoning would be appropriate to mitigate transportation impacts with the revised traffic projections provided that the volume was equal to or less than the volumes utilized in the previous rezoning application. Please reference Information Compiled From ITE Trip Generation, 7` Edition #3949 /Impact Analysis statement Greenway Engineering June 21, 2004 Adams Development Group, Inc. Revised August 27, 2004 Revised February 18, 2005 D. SEWAGE CONVEYANCE AND TREATMENT The 59.71 -acre parcel is located within the Route 11 North Sewer and Water Service Area (SWSA). There is a newly constructed 8" sanitary sewer force main adjacent to the Winchester and Western Railroad running north to south through the property. Based on comparable discharge patterns, the Frederick County Sanitation Authority (FCSA) has determined that 500 gallons /day per acre is a reasonable guide for estimating the sewer impact for this commercial and industrial transition site. Q =500 gallons /day /acre Q =500 gpd x 59.71 acres Q= 29,855 gpd The proposed zoning is estimated to add 29,855 gallons per day to the public sewage conveyance system and the Opequon Waste Water Treatment plant. The design capacity of the treatment plant is 8.4 million gallons per day, of which approximately 6.4 is currently being utilized. The total build -out of the proffered land uses would require approximately 1.5 percent of the available capacity at the Opequon Waste Water Treatment plant; therefore, adequate capacity is available for this development. E. WATER SUPPLY The 59.71 -acre parcel is located within the Route 11 North Sewer and Water Service Area (SWSA). There is an existing 10" water main in Martinsburg Pike (Route 11) and a newly constructed 20" water main adjacent to the Winchester and Western Railroad running north to south through the property. The existing water consumption patterns, Frederick County Sanitation Authority (FCSA) has determined that 1,000 gallons /day per acre quantity is reasonable to consider for the water impact analysis for this commercial and industrial transition site. Q =1000 gallons /day /acre Q =1000gpd X 59.71 acres for Q= 59,710 gpd The proposed uses will utilize an estimated 59,710 gallons of water per day. The Global Chemstone Quarry is one of three sources contributing to the blended water for the new 20- inch water main. This quarry, with 3.75 million gallons per day available capacity, is serviced by a water treatment facility providing approximately 2 million gallons per day of potable water. The projected water usage at build -out would account for less than 3 percent of this portion of the blended water sources. Adequate capacity is available for this development. 43949 /Impact Analysis Statement 6 Greenway Engineering 0 F. SITE DRAINAGE June 21, 2004 Adams Development Group, Inc. Revised August 27, 2004 Revised February 18, 2005 The 59.71 -acre parcel is gently sloped from the northwest to the southeast. The site generally drains southeasterly towards an intermittent stream (unnamed on USGS map) along the southern property line of the site. Stormwater management will be designed to allow for sheet flow through the paved areas serving the various uses to a stormwater management pond and then to be released to the existing natural stream system at an acceptable rate. The stream flows northeast, beneath Martinsburg Pike and into a small pond approximately a tenth of a mile northeast of the site. Stormwater management design will occur during the site development plan process, which will require approval by the Frederick County Engineer and the Virginia Department of Transportation. The design of the stormwater management facility will be implemented in a manner that will avoid any disturbance of the existing stream and any associated wetlands. The use of best management practice (BMP) facilities is proffered to minimize the impact from developed areas. The following calculations estimate the proposed storm water runoff for a ten -year flow (Reference: VDOT Drainage Manual): Existing C = 0.30 (pasture) Iio =4.6 in/hr (15min) A = 59.71 acres QIa= 82.40 cfs (Q = CIA) Proposed C = 0.90 (commercial) Lo= 5.5 in/hr (10 min) A = 59.71 acres Qio= 295.56 cfs (Q = CIA) Development of the subject site at maximum build -out will therefore result in an increased runoff of 213.16 cfs. A detailed stormwater evaluation shall be included with any site plan submittals. A detention pond and other stormwater management facilities will be built to control storm water discharge into the above referenced unnamed stream. G. SOLID WASTE DISPOSAL The impact on solid waste disposal facilities can be projected from an average annual business consumption of landfill volume figure of 5.4 cubic yards per 1,000 square feet of commercial floor area (Civil Engineering Reference Manual, 4 °i edition). The following figures show the increase in average annual volume (based on the proffered 555,000 square feet of total building area minus the 140,000 square feet proffered to self-service storage, yielding 415,000 square feet of qualifying area). AV = 5.4 Cu. Yd. per 1,000 sq. ft. AV = 5.4 Cu. Yd. x 415 (1,000 sq. ft.) AV = 2,241 Cu Yd at build- out /yr or 1,793 tons /yr #3949 /Impact Analysis Statement Greemvay Engineering 0 June 21, 2004 • Adams Development Group, Inc. Revised August 27, 2004 Revised February 18, 2005 The Municipal Solid Waste area of the Regional Landfill has a current remaining capacity of 13,100,000 cubic yards of air space. It is anticipated that the buildout of the subject site will occur over a 10 -year period. Therefore, the annual solid waste generation from this project is estimated to be 180 tons. This represents a 0.09% increase in the solid waste received by the Municipal Solid Waste area of the Regional Landfill, which currently averages 200,000 tons per year. H. HISTORICAL SITES AND STRUCTURES The Frederick County Rural Landmarks Survey identifies one structure within the immediate area of the subject property, that being Kenilworth (34 -113). The Frederick County Rural Landmarks Survey identifies Kenilworth as a property "potentially eligible for the state and national register of historic places" (page 250). The Generalized Development Plan depicts the one hundred foot wide full screen buffer the applicant will provide adjacent to the Kenilworth property. Along the 504 foot shared property line this buffer will contain a six foot high berm and more than one hundred and fifty trees and bushes. The subject site falls within the northwest corner of the core battlefield area boundary of the Second Winchester engagement (Stephensons Depot phase). However, due to the existing development surrounding the site, this area is identified as "having lost historic integrity ". L OTHER IMPACTS During the previous rezoning application, the Frederick County Capital Facilities Fiscal Impact Model was applied to the proffered development of 835,575 square feet of transitional industrial land use. The results of this model run indicated that the development of the subject site would provide a positive revenue source to Frederick County of $5,402,768 at build -out; however the model run indicates a fiscal impact to Fire and Rescue Services. Therefore, the applicant proffered a monetary contribution $0.01 per square foot to adequately address the impact to Fire and Rescue Services for capital facilities costs which would generate a revenue of up to $8,355 at project build -out for Fire and Rescue Services. The revised proffer statement reduces the maximum structural development to 555,000 square feet; therefore, the revised proffer statement increases the Fire and Rescue monetary contribution to $0.015 per square foot which would generate a revenue of up to $8,325 at project build -out. No other impacts are anticipated as a result of this rezoning proposal. #3949 /Impact Analysis Statement 8 Average Vehicle Trip Ends vs: 1000 Sq. Feet Gross Floor Area On a: Weekday Number of Studies: 16 Average 1000 Sq. Feet GFA: 273 Directional Distribution: 50% entering, 50% exiti rip Generation per 1000 Sq. Feet Gross Floor Area Average' Rate Range of Rates Standard Deviation 4.96 1.51 - 17.00 4.05 Data Plot and Equation 12,000 11.000 10,000 9,000 N c 9,000 W d H 7,000 d U L 8,000 d � 5,000 Q F 4,000 3,000 2.000 1,000 0 . - — - --- E -, x .. ........ ........ . . . .. ...................... `. a1 Warehousing (150) Average Vehicle Trip Ends vs: 1000 Sq. Feet Gross Floor Area On a: Weekday Number of Studies: 16 Average 1000 Sq. Feet GFA: 273 Directional Distribution: 50% entering, 50% exiti rip Generation per 1000 Sq. Feet Gross Floor Area Average' Rate Range of Rates Standard Deviation 4.96 1.51 - 17.00 4.05 Data Plot and Equation 12,000 11.000 10,000 9,000 N c 9,000 W d H 7,000 d U L 8,000 d � 5,000 Q F 4,000 3,000 2.000 1,000 0 . - — - --- — ......... . ...... _ -------- - ----- x x .. ........ ........ . . . .. ...................... ....... ..... ........... ...... X r 0 1000 2000 3000 X = 1000 Sq. Feet Gross Floor Area X Actual Data Points Fitted Curve - - - - -- Average Rate Fitted Curve Equation: T � 3.58(X) + 350.27 R = 0.82 Trip Generation, 7th Edition 199 Institute of Transportation Engineers , Mini- Warehouse (151) Average Vehicle Trip Ends vs: 1000 Sq. Feet Gross Floor Area On a: Weekday S; I ; Number of Studies: 14 Average 1000 Sq. Feet GFA: 56 Directional Distribution: 50% entering, 50% exiting Trip Generation per 1000 Sq. Feet Gross Floor Area Average Rate Range of Rates Standard Deviation 2.50 1.21 - 4.36 1.76 ulata riot ana 400-7 300 N C W a H d U > 200 N A 7 Q 100 x: 1 .................... ........................... . . ......:...............:.......I 0 F I I I 10 20 30 40 50 60 70 80 X = 1000 Sq. Feet Gross Floor Area X Actual Data Points Fitted Curve Fitted Curve Equation: Ln(T) =1.01 Ln(X) + 0.82 90 100 110 -- - -- Average Rate R = 0.73 Trip Generation, 7th Edition 227 Institute of Transportation Engineers X ......... .._'.... _ J. ......: _ X X. X . X. X ................ .......................... ..... ,....... ,. _.. _. _.___.... X X =� .X X Trip Generation, 7th Edition 227 Institute of Transportation Engineers General Office Building (710) Average Vehicle Trip Ends vs: 1000 Sq. Feet Gross Floor Area On a: Weekday Number of Studies: 78 Average 1000 Sq. Feet GFA: 199 Directional Distribution: 50% entering, 50% exiting Trip Generation per 1000 So. Feet Grncs Fh.,r ere, I Average Rate Range of Rates vM Standard Deviation 11.01 3.58 6.13 vdid r ana tquatlon N U w a F d v L d d a1 a) Q 15,00 14,001 13,001 12,00( 11,00( 10.00( 9,000 8,000 7.000 6,000 5,000 4,000 3,000 2,000 1,000 0 av� cuu Duu 600 700 800 900 1000 1100 1200 1300 X = 1000 Sq. Feet Gross Floor Area X Actual Data Points Fitted Curve - - -- -' Average Rate Fitted Curve Equation: LnM = 0.77 Ln(X) + 3.65 R = 0.80 Trip Generation, 7th Edition 1158 Institute of Transportation Engineers Builtng Materials and Lumfer Store (812) Average Vehicle Trip Ends vs: 1000 Sq. Feet Gross Floor Area On a: Saturday Number of Studies: 4 Average 1000 Sq. Feet GFA: 9 Directional Distribution: 50% entering, 50% exiting rip Generation per 1000 Sq. Feet Gross Floor Area Average Rate Range of Rates Standard Deviation 51.60 43.70 - 75.86 12.58 Data Plot and 1,100 r 1,000 900 N 800 a w` a F 700 (V U 600 41 N 500 Q II ~ 400 300 200 100 i Caution - Use Carefully - Small Sample Size 3 4 5 6 7 8 9 10 11 12 13 14 X = 1000 Sq. Feet Gross Floor Area Fitted Curve 15 16 17 18 19 20 X Actual Data Points Fitted Curve Equation: T = 36.75(X) + 137.21 Trip Generation, 7th Edition --- - -- Average Rate 1323 R = 1.00 Institute of Transportation Engineers I i Caution - Use Carefully - Small Sample Size 3 4 5 6 7 8 9 10 11 12 13 14 X = 1000 Sq. Feet Gross Floor Area Fitted Curve 15 16 17 18 19 20 X Actual Data Points Fitted Curve Equation: T = 36.75(X) + 137.21 Trip Generation, 7th Edition --- - -- Average Rate 1323 R = 1.00 Institute of Transportation Engineers A 0 0 Land Use: 860 Wholesale Market Independent Variables with One Observation i aa1 The following trip generation data are for independent variables with only one observation. This information is shown in this table only; there are no related plots for these data. Users are cautioned to use data with care because of the small sample size. Trip Size of Number Generation Independent of Independent Variable Rate Variable Studies Directional Distribution Emnlovees Weekday 8.21 250 1 50% entering, 50% exitin Weekday a.m. Peak 0.61 250 1 Not Available Hour of Adjacent Street Traff ic Weekday p.m. Peak 0.26 250 1 Not Available Hour of Adjacent Street Traff ic Weekday a.m. Peak 0.70 250 1 Not Available Hour of Generator Weekday p.m. Peak 0.64 250 1 Not Available Hour of Generator Saturday 1.94 250 1 50% entering, 50% exitin Saturday Peak Hour of 0.22 250 1 Not Available Generator Sunday 2.80 250 1 50% entering, 50% exitin Sunday Peak Hour of 0.28 250 1 Not Available Generator 1.000 Square Feet Gross Floor Area Weekday 6.73 305 1 50% entering, 50% exitin Weekday a.m. Peak 0.50 305 1 Not Available Hour of Adjacent Street Traff ic Weekday p.m. Peak 0.21 305 1 Not Available Hour of Adjacent Street Traff ic Weekday a.m. Peak 0.58 305 1 Not Available Hour of Generator Weekday p.m. Peak 0.52 305 1 - - Not - Available Hour of Generator Saturday 1.59 305 1 50% entering, 50% exitin Saturday Peak Hour of 0.18 305 1 Not Available Generator Sunday 2.30 305 1 50% entering, 50% exitin Sunday Peak Hour of 0.23 305 1 Not Available Generator Trip Generation, 7th Edition 1577 Institute of Transportation Engineers