Loading...
HomeMy WebLinkAbout14-04 Impact AnalysisHaggerty III. Impact Analysis A. Site Background and History Impact Analysis Statement The Haggerty site is comprised of two parcels totaling 111.56 acres. The site is located wholly within the Urban Development Area (UDA) and Sewer and Water Service Area (SWSA) of Frederick County, and is adjacent to the "Fu -Shep" component of the RP zoned Channing Drive project. As per the approved Master Development Plan for the "Fu -Shep" development, the residential use planned immediately adjacent to the Haggerty site will consist of single family small lot units. (See Figures 1 and 2). The site was historically used for agriculture; however, active farming has not occurred on the properties for many years. The farmhouse associated with the acreage still exists, although the majority of the site is unimproved. The path of proposed VA Route 37 traverses the site. The segment of the roadway that will ultimately pass through the project will establish the critical connection between Berryville Pike (Route 7) and Senseny Road (Route 657). The proposed development program for the Haggerty site reflects the importance of proposed VA Route 37 as a regional improvement through the dedication of required right -of -way and compatible project design. The site is not located within the boundaries of any small area plan included in the Comprehensive Policy Plan. The land use policies governing the UDA and suburban residential development provide the general guidance and justification for the transition of the site to suburban residential land uses. The requested rezoning from RA (Rural Areas) to RP (Residential Performance) will enable continued development within the UDA in accord with the Comprehensive Policy Plan. II' 0 HAGGERTY PROPERTY LOCATION MAP FREDERICK COUNTY, NRGIN/A gilbert w. Clifford associates a division of Patton, Harris, Rust Associates, pc 117 E. Picadilly St. Winchester, Virginia 22601 VOICE: (540) 667 -2139 FM: (540) 665 -0493 Figure 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 19 .1% 1 l J 1A f' I 1 r IV 22 en Spring v 24 I .e� f 1 lir 1 ,33 `ri v 34) rook ok s c et 29 30 i l ;1 A, ,32 o Hayfield d /f C: F Int Nain j i m 3' "1. enS +t d" on 2. y_ 35 c+ 42 �I 44 f r-+i i it 1-� i .r M Leetown r r. J r.R oUnt� III 7 fit'° ADA e� l r�c �t JML tit r 61 -Ly ti e j i \U 2 J 3 o i PROJECT AREA C .T i 66 d x s" NTS [72/20/04 HAGGERTY PROPERTY URBAN DEVELOPMENT AREA SEWER —WATER SERVICE AREA FREDERICK COUNTY, VIRGINIA gilbert w clifford associates o drylsion or Patton, Horns, Rust &Associates, pc 117 E. Picuddly Sl. wnc,,esier, Yrglnta 22601 VOICE: (540) 667 -2110 F0./. (540) 665-0493 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Haggerty Impact Analysis Statement B. Location and Access The Haggerty site is accessed from Valley Mill Road (Route 659) via Eddys Lane (Route 820), and is east and adjacent to the "Fu -Shep" property, a part of the RP (Residential Performance) zoned Channing Drive project, and south and adjacent to the Opequon Regional Wastewater Facility. The Haggerty site is bounded to the east by approximately 3,735 feet of the Opequon Creek that also serves as the Frederick County Clarke County boundary. (See Figure 3) Access planning for the Haggerty site and adjoining properties has been the subject of significant study for many years. Initial planning efforts began with the Twin Lakes proposal in 1989, which included a proposed north -south collector road to accommodate three tracts of land, two of which are now included in an adjacent master planned community (Giles and Fu -Shep properties). As originally conceived, this collector road would have directly connected Senseny Road with VA Route 7, thus providing a critical eastern access to Route 7 for a principal growth corridor of the UDA. Around the time of the Twin Lakes proposal, the concept of an eastern bypass (Route 37 east) was in the planning stages and the possibility of the collector road being an integral part of the Route 37 project was explored. Central to this study was the potential impact of such a roadway on the regional wastewater treatment facility managed by the Frederick Winchester Service Authority (FWSA). Following careful analysis and extensive discussion, the connector road project was generally supported by the FWSA; however, economic conditions in the early 1990's caused planning to stall. The concept of Charming Drive as a means of connecting the Senseny Road corridor with Route 7 was introduced by the developers of the Giles, Fu -Shep, Lynnhaven and Fieldstone subdivisions in the mid to late 1990's. Located further west than the collector road originally envisioned through the Twin Lakes project, Charming Drive is intended to connect Senseny Road with Greenwood Road and ultimately Route 7 via Valley Mill Road. This road project is now under construction. Haggerty Impact Analysis Statement Discussions with the FWSA concerning a connector road were resumed again in late 2003, beginning with a plan for a road providing access to the Haggerty site from Route 7 that would follow the general alignment of proposed VA Route 37. The proposed path of the access road would have ultimately crossed FWSA property in closer proximity to the facility's operable treatment plant units than was anticipated with the approved alignment of VA Route 37 (Alternate "C" see Figure 3). Not comfortable with this probable design outcome, the FWSA rejected the proposed roadway alignment to avoid potential facility expansion conflicts. The decision of the FWSA temporarily shifted the focus of transportation planning for the project to the site's existing access arrangement involving Eddys Lane (Route 820) and Valley Mill Road (Route 659). Analysis of this access scenario indicated that the scope of improvements necessary to support projected traffic would be problematic due to several factors, which include (1) the one lane bridge across Abrams Creek, (2) property owner requests to not improve the bridge, and (3) limited right -of -way availability along Eddys Lane and, in particular, at its intersection with ValleyMill Road. The outcome of these efforts was a return to the concept of a direct connection between the Haggerty site and VA Route 7. The transportation program proposed with this application includes the initial components of a collector road system intended to serve the eastemmost portion of the UDA. The key element of the proposed system is a "spine" collector road that is planned to traverse the Haggerty site from north to south and ultimately connect VA Route 7 and Senseny Road. The spine road will be constructed from VA Route 7 to the Haggerty site by the developer during the first phase of the development process. The spine road will be aligned to traverse the FWSA property further west than originally proposed in 2003, and will connect with VA Route 7 to form an at grade intersection opposite the planned juncture of the VA Route 37 entrance /exit ramp. The spine road will serve as the principal means of access for the proposed development and serve the local access needs of the easternmost portion of the UDA for the early year operation of VA Route 37. o\JPC� 'M\65 c�f1� H4GGERTY PROPERTY LOCATION AND ACCESS FREDERICK CDUNIY, NRG /N14 gilbert w. clifford associates a division of Patton, Harris, Rust Associates, pc 117 E Rainy St. Winchester, Virginia 22601 VOICE: (540) 667 -2139 FAX: (540) 665 -0493 Figure 3 Haggerty Environmental Features Total Project Area 111.56 Acres Area in Flood Plain 19.67 Acres 17.63% Area in Steep Slopes 0.00 Acres 0.0% Area in Wetlands, Lakes, Ponds 0.60 Acres 0.54% Total Area in Environmental Features 20.27 Acres 18.175% Haggerty Impact Analysis Statement C. Site Suitability The site does not contain conditions that would preclude or substantially hinder development activities. The following table provides an area summary of environmental features: The General Soil Map of the Soil Survey of Frederick County, Virginia indicates that the soils comprising the subject parcels fall under the Weikert- Berks Blairton soil association, with the particular geology being Martinsburg shale. Such geology is prevalent on land located east of Interstate 81 and is not identified as prime farmland. Topographic mapping for the site indicates a site typical of the Martinsburg shale region with steeply eroded side slopes and reasonably level plain areas. Typical of other properties within the Urban Development Area, this site has certain areas which have excellent potential for quality RP zoned cluster uses. Likewise, there are other areas that will appropriately be set aside for environmental and open space purposes. The Comprehensive Policy Plan envisions an overall density within the UDA not to exceed 3.0 dwelling units (DU) per acre, and the Zoning Ordinance permits a maximum project density of 4.0 units per acre on an RP -zoned parcel greater than 100 acres in size. The challenges presented by site characteristics and regional infrastructure demands suggest a lesser density of use for the Haggerty site. The following matrix outlines the aggregate development program proposed with this rezoning and further breaks down the project by land bay. The proposed land bay configuration is depicted on Figure 6. a" Land Bay #1 Land Bay #2 Land Bay #3 Land Bay #4 TOTAL Single Family, detached 62 0 38 0 100 Single Family, attached 146 0 64 0 200 Total Units 208 0 102 0 300 Land Area 31.38 12.48 47.7 20.0 111.56 DU Density 2.66 Haggerty Haggerty Rezoning Planned Development Program Dwelline Unit Mix Density Impact Analysis Statement »Land Bay Notes Land Bay #2 consists solely of the reserved righiofway fin- proposed Roa to 37. Land Bay #4 consists exclusively of reserved open .space. The mix of housing types proposed for this project was determined by several factors that significantlyinfluence site development, namely the Route 37 corridor that traverses the site, the flood plain and riparian systems, and the topographic features. The upland areas are suitable for a mixture of single family detached and attached residential uses. Dense evergreen buffers between areas of housing and the right of way are to be planted early in the process to attenuate light and sound issues presented by the ultimate construction and operation of VA Route 37. It is anticipated that these buffers will be mature by the time of actual construction of the roadway. The area most impacted by site constraints is downhill to the east of the VA Route 37 right of way. As such, fewer residential units are planned for this area. A mix of single family detached and attached units will comprise the area, which will be clustered to accommodate site features. Significant open spaces and park land are also planned in this general area. The transportation system planned for the project will be multi modal, consisting of internal roadways and trails that will interconnect the land bays and housing types, ensuring a fully unified and walkable development. The "spine" collector road and the future east -west collector will be located to facilitate a future bridge crossing by the limited access VA Route 37. Haggerty Impact Analysis Statement The Haggerty rezoning is a "mixed residential" proposal that is restricted by proffer to a maximum of 300 dwelling units. The mixture of actual housing types may vary during master plan preparation as allowed by RP district standards. The general housing mix outlined in the table above is presented for the purposes of estimating project impacts and preparation of the proffer statement. The proffer statement has been developed so that maximum impacts are predicted and effectively addressed, and any adjustment to housing types and /or quantities within land bays will not result in additional traffic, water and sewer use or solid waste generation. Further, the monetary contributions included in the proffer statement are established by unit type, thereby ensuring the accurate capture of capital facilities impacts regardless of the ultimate unit mix. Maintaining flexibility in the ultimate housing mix is essential to allowing project design to evolve pursuant to the outcomes of detailed analysis generated in subsequent phases of the design process. To ensure that a mix of housing types is achieved on the Haggerty site, the applicant has proffered that no more than 50% and no less than 20% of the project will develop as single family detached units. The final mix will be determined based upon its capacity to achieve the intended product of a high -quality master planned community. Land planning for the Haggerty project also reserves roughly 20 acres of open space area adjacent to the FWSA property. This acreage may be used by the FWSA for enhanced buffering of the treatment facility or to support facility expansion as needed to meet the increasing treatment requirements associated with the Chesapeake Bay Preservation Act. The following exhibits show the zoning context for the property (Figure 4), the characteristics of the site (Figure 5), planned project land bays (Figure 6), and the proposed Generalized Development Plan (GDP) for the project (Figure 7). —>ef Il Ori 4 ;n �tl Rqb i'ti I Laly HAGGERTY PROPERTY CURRENT AREA PLANNING MAP FREDERICK COUNTY, NRC /N/A gilbert w. clifford associates a division of Patton, Harris, Rust Associates, 117E Picodilly 5t. Winchester, Virginia 22601 VOICE: (540) 667 -2139 FAX: (540) 665 -0493 pc Figure 4 ENVIRONMENTAL PLAN KEY H GGERTY PROPERTY FREDERICK COUNTY, VIRGINIA OPOSED RT 37 ALIGNMENT ROUGH SOL ENVIRONMENTAL FEATURES AND PLAN FLOODPLA DL OS AREA �W TLAND gilbert w. ditiord associates o dins ion of Patton, Horris Rust Associates, pc 117 L Picadily St. Winchester, Virglnio 22601 VOICE: (540) 667 -2139 FAX: (510) 665-0493 Figure 5 HAGGERTY PROPERTY LAND BAY FREDERICK COUNTY, WRC /Nl4 gilbert w. clifford associates a division of Patton, Harris, Rust Associates, pc 117 E. Rcadlly St Winchester, Virginia 22601 4S1ICE: (540) 667 -2139 FAX: (540) 665 -0493 Figure 6 O P et 59 li 0 t N HAGGERTY PROPERTY GENERALIZED DEVELOPMENT PLAN FREDERICK COUNTY, NRC /N/A gilbert w. cliffard associates a division of Patton, Harris, Rust Associates, pc 117 E. Picadiy SL Winchester, Virginia 22601 VOCE: (540) 667 -2139 FAX: (540) 665 -0493 Figure 7 D. Traffic Transportation Background Haggerty Impact Analysis Statement Using traffic generation figures from the I.T.E. Trip Generation Manual, 7 Edition, the proposed mixed residential development plan is projected to produce 2,833 vehicle trips per day (VPD). The projected traffic will utilize a proposed "spine" collector road that will extend from the site across the adjoining FWSA property to form a direct connection with VA Route 7. Impacts to the Valley Mill Road corridor will be eliminated through this arrangement. The traffic impact analysis (TIA) prepared for this project shows that the transportation improvements proffered by the applicant will mitigate projected traffic impacts and result in acceptable and manageable level of service conditions on study area roads. The TIA report follows this summary section. Of strategic importance to achieving acceptable traffic conditions within the subject portion of the UDA is the provision of safe and convenient access to VA Route 7. At present, there are three points of connection to Route 7 from the Senseny Road corridor, namely Valley Mill Road (west) at I 81, Greenwood Road, and Valley Mill Road (east) near the Clarke County line Long -range transportation planning for this area provides for the additional connection of VA Route 37 at the location shown in Figure 8. The Haggerty site as well as several adjoining undeveloped tracts currently rely upon the indirect path of Eddys Lane (Route 820) and Valley Mill Road (east) to access VA Route 7. As noted in the Access and Location section of this analysis, transportation and land use planning in this area has included several concepts that would have enabled a direct link between these tracts and VA Route 7, none of which have come to fruition. Moreover, transportation alternatives that maintain reliance on Eddys Lane and Valley Mill Road to support the area's projected traffic growth have presented implementation challenges that compromise both the viability and desirability of such approaches. Haggerty Impact Analysis Statement The challenges presented by these access limitations prompted an extended period of study and deliberation involving the applicant, other area property owners, county planning staff, and VDOT. The outcome of this effort was the realization that a unique transportation approach was needed for the eastemmost portion of the UDA. The transportation program developed for the Haggerty tract therefore involves a broader scope and purpose than is customary for rezoning petitions of its scale and intensity. Indeed, the transportation program proposed with this application introduces a long -range strategy for infrastructure development that will accommodate future access and traffic demands anticipated for not only the I- laggertytract project, but the surrounding area as a whole. Proposed Transportation Program A collector road system is proposed through this application that will be designed to enable connections with future developments in the vicinity of the Haggerty site, and will further set the foundation for a direct connection between Senseny Road and VA Route 7. The project's internal road network will be oriented on a north -south spine road constructed generally parallel to the VA Route 37 right -of -way. The spine road is planned to provide exclusive access to the proposed development and will therefore be constructed from VA Route 7 to the site during the first phase of development activities, and will consist of two travel lanes and a center turn lane. The availability of the spine road connection with VA Route 7 allows elimination of the Eddys Lane entrance to the site and the exclusion of Eddys Lane and Valley Mill Road from the transportation programs proposed with this and future projects. As noted above, the internal road network serving the Haggerty project land bays will extend from the proposed spine road. Future projects in the area will also use the spine road for access from VA Route 7, and will therefore be expected to provide for the construction of collector road connections to the proposed roadway. To facilitate the expansion of the collector road system, the applicant will provide the right of way necessary to enable the east -west connection required to support future development west of Eddys Lane. The spine road will further be constructed to the south property boundary to enable its eventual extension to Senseny Road. Haggerty Impact Analysis Statement The proposed "spine" collector road will additionally offer the FWSA an alternative point of access for its treatment facility that will allow the elimination of the facility's existing entrance on VA Route 7. This will provide stoplight controlled turning movements for traffic generated by the treatment facility, which will enhance access management and traffic safety on the impacted segment of VA Route 7. Coordination of these access modifications will occur during the first phase of site planning for the Haggerty project. The proposed collector road system represents a substantial opportunity to advance traffic planning and improve traffic conditions within the eastemmost portion of the UDA. The central spine road will create an alternative path for north -south traffic movement that will complement Greenwood Road and Channing Drive, providing an additional outlet for the Senseny Road corridor. Moreover, the collector road system has been designed to ensure accommodation of trips generated by the future development of land located west of Eddys Lane, thereby ensuring that Eddys Lane and Valley Mill Road will avoid direct impacts from growth in the area. The proposed collector road system therefore offers a solution to the transportation dilemma that has historically impacted the subject site in particular and the easternmost portion of the UDA as a whole. Indeed, this approach fills a notable void in the Eastern Road Plan by introducing a viable road development strategy to the area and establishing a framework for its implementation. In addition to the referenced infrastructure improvements, the applicant has proffered to dedicate the right of way needed for the future construction of VA Route 37 through the site. It should be noted that this dedication of 12.48 acres of right -of -way, at no cost to Frederick County, has a measurable and significant effect on the applicant's development program. Despite this impact, the conceptual design of the project is compatible with both the immediate right -of -way reservation and the future construction and operation of VA Route 37. The proffered right -of -way dedication promotes attainment of a key regional transportation objective. Haggerty Impact Analysis Statement The transportation improvements proffered by the applicant are identified on the Generalived Development Plan (see Figure 7), and are labeled numerically to correspond with the text of the proposed Proffer Statement. 60' R/V FOR FUTURE ACCESS/ BY OTHERS fiti. HAGGERTY PROPERTY PLANNED AREA TRANSPORTATION NETWORK FREDERICK COUNTY, NRG /NG1 PROJECT SITE REZONE RA to RP FUTURE ROUTE 7 SEHSENY ROAD COLLECTOR (By others) gilbert w. clifford associates a division of Patton, Harris, Rust Associates, pc 117 E. Readily St Winchester, Wginia 22601 VOICE: (540) 667 -2139 FAX: (540) 665 -0493 Figure 8 HAGGERTY PROPERTY UDA TRANSPORTATION FUTURE PHASE FREDERICK COUNTY, NRGINM o°a S ey 60' R/W FOR a FUTURE ACCESS' BY OTHERS gilbert w. clifford associates a division of Patton, Harris, Rust Associates, pc 117 E. Picodilly SI Winchester, Virginia 22601 VOCE: (540) 667 -2139 FAR: (540) 665 -0493 Figure 88 's WINCHESTER AREA TRANSPORTATIONISTUDY —YEAR 2020 LONG RANGE ROADWAY IMPROVEMENTS FUNDS TO SE PROVIDED BY ANCHESTER MEDICAL CENTER RECONFIGURE ..._,CONNECTION 1 1 U2 REMOVE INTERCHANG U4 H GGERTY PROPERTY W4/5 STUDY FREDERICA/ COUNTY, VIRGINIA U4R 0 RAE ICALSECTION U6R PROJECT AREA filbert w. clifford associates o division nl Patton, Harris, Rust Associates, pc 917 E. PicadGly 51. Winchester, Virginia 22601 VOICE. (540) 667 -2130 FAY_ (540) 665 -0493 A Traffic Impact Analysis of the Haggerty Property P Located in: Frederick County, Virginia Prepared for: Dave Holliday 205 North Cameron Street Winchester, VA 22601 Prepared by: Patton Harris Rust Associates, pc Engineers. Surveyors. Banners. Landscape Architects. 208 Church Street, S.E Leesburg, Virginia 20175 T 703.777.3616 F 703.777.3725 September 22, 2004 OVERVIEW Report Summary Methodology Patton Harris Rust Associates, pc (PHR +A) has prepared this documcnt to present the traffic impacts associated with the proposed Haggerty Property development to be located southeast of the Route 7 (Berryville Pike) /Valley Mill Road (Route 659) intersection in Frederick County, Virginia. The proposed project will include a total of 180 single family detached units, 60 apartment units, and 60 townhouses with sole- access provided along the Eddy's Lane via Valley Mill Road. The development will be built -out in a single phase by the year 2007. PHR +A has provided Figure 1 to illustrate the location of Haggerty Property with respect to the surrounding roadway network. The traffic impacts accompanying the Haggerty Property development were obtained through a sequence of activities as the narratives that follow document: Assessment of background traffic including other planned projects in the area of impact, Calculation of trip generation for the proposcd Haggerty Property development, Distribution and assignment of the Haggerty Property generated trips onto the study area roadway network, Analysis of capacity and level of service using the newest version of the highway capacity software, HCS -2000, for existing and future conditions. EXISTING CONDITIONS PHR +A conducted AM and PM peak hour manual turning movement counts at the intersections of Route 7 /Valley Mill Road and Valley Mill Road /Eddy's Lane in Frederick County, Virginia. Additionally, PHR +A counted the eastbound u- turning volume at the intersection of Route 7 /Redbud Road since planned improvements would require this movement to be diverted to the Route 7 /Valley Mill Road intersection in the future. In order to determine the ADT (Average Daily Traffic) along the study arca roadway links, a conservative "k" factor (the ratio of PM peak hour traffic volumes to 24 -hour traffic volumes) of 10% was assumed. Figure 2 shows the existing ADT and AM /PM peak hour traffic volumes at the intersections of Route 7 /Valley Mill Road and Valley Mill Road /Eddy's Lane. Figure 3 shows the respective existing lane geometry and AM /PM peak hour levels of service. All traffic count data and HCS -2000 levels of service worksheets are included in the Appendix section of this report. A Traffic Impact Analysis of the Haggerty Property September 22, 2004 Page 1 F H Figure 1 Haggerty Property Vicinity Map A Traffic Impact Analysis of the Haggerty Property September 22, 2004 Page 2 1LTh r Figure 2 Existing Traffic Conditions A Traffic Impact Analysis of the Haggerty Property September 22, 2004 Page 3 No Scale 1 J4c 0 rn Unsignalized Intersection S (1)* Unsignalized Intersection lie p Weekday AM(Weekday PM) *Denotes Critical Unsignalized Movement r Hl± Figure 3 Existing Lane Geometry and Level of Service A Traffic Impact Analysis of the Haggerty Property September 22, 2004 Page 4 Code Land Use Amount In AM Peak Hour Out Total In PM Peak (lour Out Total ADT Red -Bud Run 210 Single Family Detached 300 units 55 165 219 182 107 288 3,000 Total 55 165 219 182 107 288 3,000 Toll Borthers- Eddy's Lane 210 Single Family Detached 80 units 16 49 65 55 32 88 800 Total 16 49 65 55 32 88 800 Other Developments along Channing Drive 210 Single Fancily Detached 300 units 55 165 219 182 107 288 3,000 230 Townhouse/Condo 130 units 11 53 64 50 25 75 1,131 820 Retail 120,000 SF 107 68 175 339 367 706 7,645 Total 172 286 458 570 498 1,069 11,776 Fieldstone Development 210 Single Family Detached 63 units 13 40 54 45 26 71 630 230 Townhouse/Condo 207 units 16 77 92 73 36 109 1,801 Total 29 117 146 118 62 180 2,431 Chadwell Property 210 Single Family Detached 30 units 8 23 30 23 13 36 300 Total 8 23 30 23 13 36 300 2007 BACKGROUND CONDITIONS PI -IR +A increased the existing traffic volumes along Route 7, Valley Mill Road and Eddy's Lane using a conservative growth rate of five percent (5 per year through Year 2007. The eastbound u- turning volumes from the Route 7 /Rcdbud Road intersection were then diverted to the intersection of Route 7 /Valley Mill Road to account for the planned improvements described in the Existing Conditions section of this report. Additionally, PHR +A included all trips relating to specific future "other developments" located along Channing Drive and Valley Mill Road as obtained from the report titled: A Traffic Impact Analysis of Fieldstone, by PHR +A, dated November 21, 2003. Based upon the 7 Edition of the Institute of Transportation Engineers' (ITE) Trip Generation Report, PHR +A has provided Table 1 to summarize the 2007 "other developments" trip generation. Figure 4 shows the 2007 background ADT and AM /PM peak hour traffic volumes at the intersections of Route 7 /Valley Mill Road and Valley Mill Road /Eddy's Lane. Figure 5 shows the corresponding 2007 background lane geometry and levels of service. All HCS- 2000 levels of service worksheets are included in the Appendix section of this report. Table 1: Background Trip Generation A Traffic Impact Analysis of the Haggerty Property September 22, 2004 Page 5 r L H I1 Figure 4 2007 Background Traffic Conditions A Traffic Impact Analysis of the Haggerty Property September 22, 2004 Page 6 t No Scale 0 Suggested Improvements (B)C n( C) Signalized Intersection LOS =C(C) O e lle p h SITE c al Unsignalized Intersection Unsignalized Intersection Weekday AM(Weekday PM) *Denotes Critical Unsignalized Movement r H Figure 5 2007 Background Lane Geometry and Level of Service A Traffic Impact Analysis of the Haggerty Property September 22, 2004 Page 7 PROPOSED TRIP GENERATION PHR +A determined the number of trips entering and exiting the site based upon a total development of 180 single family detached units, 60 apartment units, and 60 townhouses. Using the 7 Edition of ITE's Trip Generation Report, Table 2 was prepared to summarize the trip generation results for the proposed Haggcrty Property development. Table 2: Proposed Trip Generation Code AM Peak Hour PM Peak Hour Land Use Amount In Out Total In Out Total ADT Haggerty Property 210 Single Family Detached 180 units 34 102 135 115 67 182 1,800 220 Apartment 60 units 7 27 33 33 18 51 511 230 Townhouse /Condo 60 units 6 28 34 26 13 40 522 Total 46 157 203 174 98 272 2,833 TRIP DISTRIBUTION AND TRW ASSIGNMENT The distribution of trips was based upon local travel patterns for the road network surrounding the proposed site. PHR +A utilized the trip distribution percentages shown in Figure 6 to assign the Haggerty Property trips (Table 2) throughout the study area roadway network. Figure 7 shows the respective development- generated AM /PM peak hour trips and ADT assignments. 2007 BUILD OUT CONDITIONS The Haggerty Property assigned trips (Figure 7) were added to the 2007 background traffic volumes (Figure 4) to obtain 2007 build -out conditions. Figure 8 shows the 2007 build -out ADT and AM /PM peak hour traffic volumes at the intersections of Route 7/ Valley Mill Road and Valley Mill Road /Eddy's Lane. Figure 9 shows the respective 2007 build -out lane geometry and AM /PM peak hour levels of service. All HCS -2000 levels of service worksheets are included in the Appendix section of this report. CONCLUSION The traffic impacts associated with the proposed Haggerty Property development are acceptable and manageable. The intersection of Valley Mill Road /Eddy's Lane will maintain acceptable levels of service "A" during 2007 build -out conditions. The intersection of Route 7 /Valley Mill Road will operate with levels of service of "F" during both the 2007 background and build -out traffic conditions indicating a negligible impact from the proposed development. The addition of a traffic signal during would increase the level of service to "C" or better. A Traffic Impact Analysis of the Haggerty Property September 22, 2004 Page 8 Figure 6 Trip Distribution Percentage A Traffic Impact Analysis of the Haggerty Property September 22, 2004 Page 9 7 Development Generated Trip Assignments A Traffic Impact Analysis of the Haggerty Property September 22, 2004 Page 10 r Figure 8 2007 Build out Traffic Conditions A Traffic Impact Analysis of the Haggerty Property September 22, 2004 Page 11 No Scale 0 `C) Si Intersection LOS =C(C) Suggested Improvements O lie p a1 :S(U)B a s .0F c(�* Unsignalized Intersection SITE m Unsignalized Intersection Weekday AM(Weckday PM) *Denotes Critical Unsignalized Movement F Figure 9 2007 Build -out Lane Geometry and Level of Service A Traffic Impact Analysis of the Haggerty Property September 22, 2004 Page 12 Haggerty Impact Analysis Statement E. Sewage Conveyance and Water Supply The Haggerty site exists within the designated Urban Development Area (UDA) and Sewer and Water Service Area (SWSA) of Frederick County (See Figure 10). The property is therefore entitled by policy to service by public water and sewer facilities. The site will be served by the Frederick County Sanitation Authority (FCSA) and the project will assist in implementation of the current Senseny Road sewage system upgrade program. The FCSA plans to implement a regional sewer pump station near Opequon Creek, which will lessen present sewer flows to the Frederick Heights interceptor and further relieve hydraulic overload conditions in the FWSA Abrams Creek interceptor line. Sites on the Haggerty site for both the regional pump station and the force main are provided by proffer thereby allowing direct access to a connection within the Opequon Regional Wastewater Treatment Facility. The connection location may include a new headworks facility that is presently under study by FWSA and FCSA. Water service to this site will be extended from the Senseny Road water system across the Fu -Shep development. Extension of the system will further provide water supply service, including fire protection, to the Opequon Regional Wastewater Facility, which is presently served by an independent system. Future phase development will allow looping this single line facility to increase flexibility and system redundancy. The following table provides a list of proposed uses and flow generation estimates for the purposes of impact analysis. The impact created by this rezoning is acceptable and manageable. Figure 11 shows the locations of utility infrastructure planned in this phase of study area development. Haggerty Haggerty Rezoning Water Use/ Wastewater Flow Summary Impact Analysis Statement Project Total: 50,000 gpd Demand Total Demand Unit Type No. of Units per Unit ME (gpd) Single Family Detached 100 200 20,000 Single Family, Attached (TH) 200 150 30,000 Haggerty Haggerty Rezoning Water Use/ Wastewater Flow Summary Impact Analysis Statement Project Total: 50,000 gpd Project Area Q SEWER WATER SERVICE AREA COUNTY ROADS /'v' Primary Class PARCELS HAGGERTY PROPERTY SEWER WATER SERVICE MAP FREDERICK COUNTY. VIRGINIA gilbert w. clifford associates a division of Patton, Harris, Rust Associates, pc 117 E. Picodl9y 9. Wlnchesler, Vrginio 22601 VOICE (540) 667 -2139 FAX.. (540) 665-0493 Figure 10A 0 a 0 HAGGERTY PROPERTY URBAN DEVEL OP/kfENT AREA MAP FREDERICK COUNTY, VIRGINIA gilbert w. Clifford as aciates a dirvision at Potion, Harris, Rust Associates, pc 117 E. PiaadiIly St. Winchester, Virginia 22601 VOICE: (540) 667 -2139 rAx: (540) 665 -0493 Figure ICB HAGGERTY PROPERTY WATER SEWER FREDERICK COUNTY, V /RG /N(A 1 gilbert w. clifford associates a division of Patton, Harris, Rust Associates, pc 117 E. Ficadilly St. Winchester, Virginia 22601 VOCE (540) 667 -2139 FAX: (540) 665 -0493 Figure 11 Haggerty Impact Analysis Statement F. Site Drainage Figure 12 shows the decentralized natural drainage pattern that exists on this site. The lack of drainage concentration allows the utilization of low impact type stormwater management techniques within the various sub sheds. The sub -sheds affected by development are both small and localized. Design practices will protect the natural swale areas to the maximum extent possible. Disturbance will be limited primarily by right angle road crossings. Adequate channel calculations will be provided to ensure that direct runoff is contained within the channel and post development velocities will be managed to protect the existing stream banks, including the Opequon Creek. An open space plan is shown on Figure 13 that depicts how site design will protect the natural drainage channels. Of note is the significant impact presented by the future construction of VA Route 37 on the site's stormwater management systems. This application includes a proffer allowing use of the project's open space by VDOT to implement effective E&S design at the time of VA Route 37 engineering and construction. Given the relatively low density proposed with this rezoning and the reservation of substantial open space within the sensitive drainage areas, the employment of low impact site design techniques will result in an acceptable and manageable drainage system for the Haggerty development. k O 0 HAGGERTY PROPERTY STORMWATER MANAGEMENT PLAN FREDERICK COUNTY, V /RGINIA gilbert w. clifford associates a division of Patton, Harris, Rust Associates, pc 117 E. PicadiIy St. Winchester, Virginia 22601 VOCE: (540) 667 -2139 FAX: (540) 665 -0493 Figure 72 FUTURE ROUTE 7- SEStCY REM CRLECTCR THY OTHERS) 0 O 0 H4GGERTY PROPERTY OPEN SPACE PLAN FREDERICK COUNTY, NRG /NL4 DENOTES OPEN SPACE gilbert w. clifford associates a division of Patton, Harris, Rust Associates, pc 117 E. Picadlly St. Winchester, Virginia 22601 VOICE: (540) 667 -2139 FM: (540) 665 -0493 Figure 13 Haggerty Impact Analysis Statement G. Solid Waste Disposal Facilities The 300 units comprising the Haggerty project will generate approximately 3,000 lbs. of solid waste per day (1.50 T /day). Solid waste from the project will be deposited in the Frederick County landfill following collection at citizen convenience /dumpster facilities or via private carrier(s) contracted by neighborhood residents. Haggerty Rezoning Solid Waste Generation Summary Total Waste 's) /day 3,000 Total Waste (tons) /day 1.50 Solid Unit Type No. of Units Waste Total Waste Generation 's) /day) Single Family Detached 100 12 1,200 Single Family, Attached (TH) 200 9 1,800 Haggerty Impact Analysis Statement G. Solid Waste Disposal Facilities The 300 units comprising the Haggerty project will generate approximately 3,000 lbs. of solid waste per day (1.50 T /day). Solid waste from the project will be deposited in the Frederick County landfill following collection at citizen convenience /dumpster facilities or via private carrier(s) contracted by neighborhood residents. Haggerty Rezoning Solid Waste Generation Summary Total Waste 's) /day 3,000 Total Waste (tons) /day 1.50 H Historic Sites and Structures Haggerty Impact Analysis Statement Research of the Final Environmental Impact Statement (FEIS) for Route 37, the Rural Landmarks Survey of Frederick County, and the 1992 National Park Service Study of Civil War Sites in the Shenandoah Valley of Virginia revealed that the Haggerty site does not contain any historic or potentially significant sites or structures. Moreover, the site is not located within the designated core area of any recorded Civil War battlefield. Development of the Haggerty site will not impact any potentially significant resources located in the surrounding community. It is noted that the Rural Landmarks Survey of Frederick County includes the Haggerty House 34 -398), which is located on the subject property. However, this structure is not identified as potentially significant and therefore does not warrant unique treatment or preservation. Given the absence of potentially significant resources on the site and the relative distance to any notable off -site resources, planning staff determined that review of this application by the Historic Resources Advisory Board (HRAB) was not necessary. Figure 14 shows historic sites or structures located in the vicinity of the Haggerty site. RURAL LANDMARKS POTENTIALLY NUMBER DESCRIPTION SIGNIFICANT 397 Adams House No 398 Haggerty House No 1150 Curter— Lee— Oomron House No 5 Milbank Yes HAGGERTY PROPERTY RURAL LANDMARK STUDY FREDERICK COUNTY, VIRC /NM gilbert w. clifford associates a division of Patton, Harris, Rust Associates, pc 117 E. 7cadiIly St. Winchester, Yrylnio 22601 VOICE (540) 667 -2139 FAX: (540) 665 -0493 Figure 14 ;s. s Single Family, Detached (per unit) Single Family, Attached (per unit) Fire and Rescue $889.00 $707.00 Public Schools $7,571.00 $5,881.00 Recreation Parks $1,288.00 $1,040.00 Library $213.00 $173.00 Sheriff's Office $50.00 $50.00 Administration Bldg. $200.00 $200.00 TOTAL $10,211.00 $8,051.00 Haggerty Impact Analysis Statement I. Impact on Community Facilities The Frederick County Fiscal Impact Model was run by planning staff to project the fiscal impact on community facilities attributable to the proposed rezoning. The applicant has offered per unit monetary contributions with the proffer statement equivalent to the calculated impacts to mitigate the effects on Frederick County. The total contribution is proffered to be allocated according to housing type as follows: An escalator clause is included with the proffer statement to mitigate the effects of inflation on the value of the proffered monetary contributions. This provision stipulates that any monetary contributions proffered by the applicant that are paid after 30 months from the date of rezoning approval will be adjusted pursuant to the Urban Consumer Price Index (CPI -U). I v FR E D L R I CK COUNTY IMPA CT MODEL 1 OUTPUT MODULE APPLICANT: LAND USE TYPE REAL EST. VAL FIRE 8 RESCUE Fire and Rescue Department EreMehlary' Schools Middle Schools High Schools Parks and Recreation oualic.Library Sheriffs Offices tridminis0aton Building puler Misztellanecus Facilities SUBTOTAL LESS:.NET FISC* IMPACT NET CAP. FACILITIES IMPACT Haggerty Net Fiscal Impact RP Costs 01: !mesa Credit 527,130.000 Re uira7 (entered m 4 Capital Fagilflies- col sum only) $230,176 $0 5844.259 SO. $1,1 14,491 $178.395 5865,999 51.044,394 5709,544 597,619 5397,616 589,809 589,809 560,879 $09,125 319,333 519333 413.134 540,911 535.822 SO 58355 $47,178 432;052 552,503 -10 5e SO 566.982 574,808 i 582,593 5157,401 5106,936 53.500,571 $282,026 5948,592 $117.298 $1, 4922,545 SO 50 50 If1DEX' ID' Ii, Cap. Equip Included 1.p 00 RevOost eel= D.508 INDEX: flit,' if Rev-ris: Bar, "0 0' it Ratio to Co Avg rL4SNI!NG Der r e PREFEREIICEE 10 1.0 Ratio to Cp Aim 0.679 METNODOLOGY: 1 paptal acih0es requirements are !net, tothe fuse c0lamn es faleulatQA rn the model. 2 N Far Impact NPV troth ciderabets calcu *tem f5 input 1n row tdtal at second column (z90 if nega6Jt). included ate Yheone -yme latrestte�e}} for One year OpLy al full value. 3. NPV of utre titer net dull taxes,pald in third cnlunjn as carculalel in Rs cal impads. 4. NPV of 'utre Capital e4pepdthire texts paid rourpt Gal as calculated in, rssial iinpacis. rt 5. NPV of future taxes peed to' bring cur,LY1l 0011110 up to standard for new facilites. as Falcululad for Bach new facility. e 6. Cotumhs three through five ale added as potential credits against the calwleted capital f auhtiris requirements, These are ad{usled k1r percent of costs covered by the revenues !ran the prclect (adult, or as ratio to avg. fa all iesitfengal development). NOTES Proffer caIGN b h0 dp P 5 n 1nl u e ude interest because they ave cash payments up front re Credits do include interest if the projects are debt financed. al' a NPTk LModeliiun,P}IE 1100/04 VP Project Description'. Assumes maximum number o1300 residential units an 112 acres (100 Single Family Detached and 2D0 Single Family Attached). Maximum density of 2.56 units per acre. Maximum density 012.68 units per acre. Due to changing caabtons as$Ociated with development in the Cutely. the results of this Output Module may not he valid beyond a period 019D days from the model run date. reads to be Taken_ la Future Taxes Paid (NPV1 Trial PoOenual AtAushlrent For Cur. Budget Cur. udget Cap. FulUre GIP/ 7 Ta;Credits Revenue Pper Cap Equip F,xppftdiDeht 5 Taxes, ate! 1UnirbiiSt1] Cost �alanoe t Net Capital Finalities Impact $230,176 5767 $1,933,114 16,446 5336,737 51,122 555.991 $187 55,659 530 $52.303 5175 S0 5a $2,578.025 58,595 $0 52,578.P25 1 Net Cost Pee Owelling_U nit 18.593