HomeMy WebLinkAbout14-04 ApplicationFebruary 14, 2005
Mr. Charles E. Maddox, Jr.
Patton Harris Rust Associates
11 E. Piccadilly Street, Suite 200
Winchester, VA 22601
RE: REZONING #14 -04, HAGGERTY PROPERTY
Dear Chuck:
This letter serves to confirm action taken by the Frederick County Board of Supervisors at their
meeting of February 9, 2005. The above referenced application was approved to rezone 111.56 acres
from RA (Rural Areas) District to RP (Residential Performance), with proffers. The subject property
is located adjacent and east of Eddys Lane (Route 820), approximately three miles east of Winchester
and 1.500 feet south of Route 7, and is identified with Property Identification Numbers 55 -A -212
and 55- A -212A, in the Red Bud Magisterial District.
The proffer that was approved as a part of this rezoning application is unique to this property and is
binding regardless of ownership. Enclosed is a copy of the adopted proffer statement, revision date
February 9, 2005 and signed on February 10, 2005, for your records.
Please do not hesitate to contact this office if you have any questions regarding the approval of this
rezoning application.
Michael T. Ruddy
Deputy Planning Director
MTR/bad
Enclosure
a �kff�FY,,.
COU
Department of Planning and Development
540/665 -5651
FAX: 540 /665 -6395
cc: The Canyon, LC, PO Box 3276, Winchester, VA 22601
Gina A. Forrester, Red Bud Magisterial District Supervisor
Pat Gochenour and Marie F. Straub, Red Bud Magisterial District Commissioners
Jane Anderson, Real Estate
101 North Kent Street, Suite 202 Winchester, Virginia 22601-5000
REZONING APPLICATION #14 -04
HAGGERTY PROPERTY
Staff Report for the Board of Supervisors
Prepared: February 3, 2005
Staff Contact: Michael T. Ruddy, Deputy Planning Director
This report is prepared by the Frederick County Planning Staff to provide information to the
Planning Commission and the Board of Supervisors to assist them in making a decision on this
application. It may also be useful to others interested in this zoning matter. Unresolved issues
concerning this application are noted hp staff where relevant throughout this staff report.
Reviewed Action
Planning Commission: 01/19/05 Recommended Approval
Board of Supervisors: 02/09/05 Pend+eef-
PROPOSAL: To rezone 111.56 acres from RA (Rural Areas) District to RP (Residential
Performance) District with proffers.
LOCATION: The property is located adjacent and east of Eddys Lane (Route 820), approximately
three miles east of Winchester and 1,500 feet south of Route 7. The subject site is further located
adjacent and south of the Opequon Wastewater Treatment Plant property and adjacent and west of
Opequon Creek, which forms the boundary of Clarke County.
MAGISTERIAL DISTRICT: Red Bud
PROPERTY ID NUMBER(S): 55 -A -212, 55- A -212A
PROPERTY ZONING: RA (Rural Areas) District
PRESENT USE: Agricultural /Vacant /Residential
ADJOINING PROPERTY ZONING PRESENT USE:
0
North: RA (Rural Area) Use: Municipal Water Reclamation Facility
Residential
South: RA (Rural Area) Use: Residential and Agricultural
East: Clarke County Use: Vacant and Agricultural
West: RA (Rural Area) Use: Residential and Agricultural
RP (Residential Performance) Vacant
PROPOSED USES: Residential (single- family detached homes and single family attached
townhomes, with a maximum number of 300 units).
Rezoning 14 -04 Haggerty Property
February 3, 2005
Page 2
REVIEW EVALUATIONS:
Virginia Dept. of Transportation: The proposed development put forth by PHR &A has an excellent
internal roadway system and a potential for putting forth a vital first step in a collector roadway
extending from Route 7 to Senseny Road that is critical in the County's future growth. This will need
to be addressed by Frederick County. VDOT is concerned that the existing road system cannot
accommodate this additional traffic. Unless the developer designs a collector roadway, obtains the
needed right -of -way for the collector roadway traffic and builds two lands of this roadway VDOT
cannot support this development as currently proposed If the developer(s) adopts the spine road with
a new crossover option on Route 7, VDOT will propose a cul -de -sac design for Route 820 at
approximately the 20 +00 location. Through inter parcel connectors connecting existing as well as
future development will have access to the proposed spine road to Route 7 or Route 657.
Fire Marshal: An emergency vehicle access should be diligently pursued which will allow a separate
access to the site during construction. Extension of municipal water supplies for firefighting shall meet
the requirements of Frederick County Code Section 90 -4. Plan approval recommended.
Department of Inspections: No comment required except that 100 year flood plan elevation shall be
identified on subdivision when submitted.
Frederick Winchester Service Authority: Please see the attached letter dated January 6, 2005,_from
Jesse W. Moffett, Executive Director.
Public Works Department: Please see the attached letter dated June 4, 2004, from Harvey E.
Strawsnyder, Jr., P.E., County Engineer.
Sanitation Authority: Will there be adequate water pressure and volume with only one supply line?
Will the "future water loop" referred to on the water and sewer layout drawing be required with "initial
construction Refer to Eastern States Engineering's revised master development for Channing Drive,
Phases 9 and 10, for water routing to the site.
Frederick- Winchester Health Department: Adequate water and sewer must be provided.
Frederick County Department of Parks Recreation: Plan appears to offer an appropriate proffer
to offset the impact this development will have on the parks and recreational services provided by the
county. Plan also indicates adequate open space and recreational units will be provided. However,
detailed information regarding open space and proposed recreational units (including trails) will be
required later in the review process.
Winchester Regional Airport: Please see attached letter dated May 13, 2004, from Serena. R.
Manuel, Executive Director.
Frederick County Public Schools: Please see the attached letter dated July 9. 2004, from Mr. Al
Orndorff, Assistant Superintendent For Administration.
Rezoning #14-04 Haggerty Property
February 3, 2005
Page 3
Historic Resources Advisory Board: Upon review of the proposed rezoning, it appears that the
proposal does not significantly impact historic resources and it is not necessary to schedule a formal
review of the rezoning application by the [ARAB. As you have indicated in your impact statement, the
Rural Landmarks Survey and the Comprehensive Policy Plan do not identify any significant historic
structures or battlefields located on or adjacent to the property.
Clarke County Planning Administrator: Please see attached letter dated December 21, 2004, from
Mr. Chuck Johnston. Planning Director, Clarke County.
Attornev for Planning Department: Please see attached letter dated November 23, 2004. from Mr.
Robert T. Mitchell, .Jr.
Planning Zoning:
1) Site History The original Frederick County Zoning Map (U.S.G.S. Stephenson Quadrangle)
identifies this parcel as being zoned A -1 Agricultural. The County's A -1 and A -2 agricultural
zoning districts were combined to form the RA (Rural Areas) District upon adoption of an
amendment to the Frederick County Zoning Ordinance on May 10, 1989. The corresponding
revision of the zoning neap resulted in the re- mapping of the subject properties and all other A -1
and A -2 zoned land to the RA (Rural Areas) District. Historically, this site was used for
agricultural activities and was primarily unimproved. A farmhouse and an agricultural building
still exist on the site today; however, active agricultural operations have evidently not occurred
on the property for several years.
2) Comprehensive Policy Plan
The Frederick County Comprehensive Policy Plan is an official public document that serves as
the community's guide for making decisions regarding development, preservation, public
facilities and other key components of community life. The primary goal of this plan is to
protect and improve the living environment within Frederick County. It is in essence a
composition of policies used to plan for the future physical development of Frederick County.
[Comprehensive Policy Plan. p. 1-1]
Land Use
The parcels comprising this rezoning application are located within the County's Urban
Development Area (UDA) and Sewer and Water Service Area (SWSA). The Urban
Development Area defines the general area in which more intensive forms of residential
development will occur. In addition, the Eastern Frederick County Long Range Land Use map
designates the general area in which the Haggerty property is located for residential land uses.
The average overall residential density of the Urban Development Area should not exceed three
units per acre. More specifically, the Zoning Ordinance stipulates that properties which contain
more than one hundred acres should not exceed four units per acre.
With the more urban densities envisioned for development in the UDA the Comprehensive
Plan seeks to ensure that special effort is made to provide the infrastructure necessary to
Rezoning #14-04 Haggerty Property
February 3, 2005
Page 4
accommodate the desired land uses and densities. Further, as land is developed in the eastern
portion of the Urban Development Area, the Comprehensive Plan identifies the preservation of
the stream valleys as environmental open space is an important goal that contributes to the
protection of flood plains and water quality and provides a continuous system of green open
space.
Transporialion
The Frederick County Eastern Road Plan provides the guidance regarding future arterial and
collector road connections in the eastern portion of the County by identifying needed
connections and locations. Plans for new development should provide for the right -of -ways
necessary to implement planned road improvements and new roads shown on the road plan
should be constructed by the developer when warranted by the scale, intensity, or impacts of the
development. Existing roads should be improved as necessary by adjacent development to
implement the intentions of the plan (Comprehensive Plan 7 -6).
Route 37 is a road improvement need that is identified in the Eastern Road Plan and is a priority
in the County's Primary Road Improvement Plan. Accommodations for this new major arterial
road should be incorporated into the project. In an effort to provide a safe and efficient road
system, the County's transportation policy also seeks to identify new collector and arterial roads
that are needed in the general road plan and develop a means to reserve rights -of -way for these
roads. This policy is applicable when considering solutions to the transportation needs of this
particular section of the County.
New development in the Urban Development Area should only be approved when roads and
other infrastructure with sufficient capacity have been provided. The Comprehensive Plan
identifies that a level of service "C" should be maintained on roads adjacent to and within new
developments and that traffic analysis should be provided by the applicants to insure that needed
road improvements are identified in order to maintain or improve upon the level of service.
(Comprehensive Policy Plan 7 -5).
3) Site Suitability/Environment
The Haggerty site has been identified as a site typical of the Martinsburg Shale Region with
steeply eroded side slopes and reasonably level plain areas. This is an accurate identification
that presents challenges when planning the development program for this property and the
implementation of a variety of regional infrastructure needs. The Opequon Creek provides the
eastern border of the site. This feature and its associated floodplain warrant particular attention
and may also provide an opportunity for enhanced protection of the riparian corridor.
The area of this site in floodplain, wetlands, lakes, and ponds totals approximately twenty acres,
or eighteen percent of the 111.56 acre site. By current County definition this project contains no
steep slopes. The Comprehensive Plan identifies the preservation of the stream valleys as
Rezoning #14 -04 Haggerty Property
February 3, 2005
Page 5
environmental open space as an important goal that contributes to the protection of flood plains
and water quality and provides a continuous system of green open space. The application
proposes development of a greater intensity in the reasonably level open areas and offers areas
that will be set aside for environmental and open space purposes. In the area most impacted by
site constraints, downhill to the east of the Route 37 right -of -way, the residential uses will be
clustered to accommodate the site features and a significant amount of open space and park land
is proposed. This open space should be designed to effectively buffer the riparian nature of the
Opequon Creek and its minor tributaries.
The application identifies that the project reserves approximately twenty acres of open space
area adjacent to the FWSA property. This area contains environmental features, is bordered by
the Opequon Creek, and was previously identified as being available for public use, potentially
as a park site. The current application states that this acreage may be used by the FWSA for
enhanced buffering of the treatment facility or to support facility expansion. Recognizing the
above statement and given the character of this land and its location, it would be appropriate
for the application to secure the dedication of this land for public use by incorporating it into
the proffer statement for the application.
4) Potential Impacts
A. Transportation
Traffic Impact Analysis.
The Traffic Impact Analysis (TIA) prepared for this project projected that the mixed residential
development plan consisting of 300 units would generate 2, 833 vehicle trips per day. The
report was developed assuming that sole access to the project was provided to Route 7 via
Eddys Lane, Route 820, and Valley Mill Road, Route 659. The distribution and assignment of
the Haggerty property generated trips was placed onto the study area road network and an
analysis of the capacity and level of service for existing and future conditions was performed.
As is described in an upcoming section, the transportation approach was modified considerably,
in particular the site access. However, based upon discussions with the Virginia Department of
Transportation (VDOT), the conclusions of the report can comfortably be translated to the
intersection of the proposed collector road and Route 7. It is important to recognize that the
suggested improvements and lane geometry identi fied as being needed to maintain an acceptable
level of service should be fully implemented at the new intersection with Route 7 and should be
guaranteed with the Haggerty project.
Route 37.
The Haggerty rezoning application addresses the Route 37 major arterial road improvement
project identified in the County's Eastern Road Plan for Frederick County by proffering to fully
dedicate the right -of -way needed to accommodate this important road project through the
subject property. The 12.48 acres proffered to be dedicated is consistent with the location and
detail identified in the Route 37 Corridor Study Plans and would enable the ultimate
construction of Route 37 through the subject property. it is important to note that the proposed
Rezoning #14-04 Haggerty Property
February 3, 2005
Page 6
language regarding the land dedication ofthe Route 3 right of way contains a ten year sunset
cknse on the dedication ofthe right -of -way. The Comely should evaluate if such a swrse! clause
is appropriate given the magnitude of the road improvement the dedication would facilitate. A
is staff's belief that the timing of the dedication should he reevaluated with the .sunset clause
being eliminated.
Transportation approach.
The transportation needs in this area of Frederick County are recognized as are the traffic
impacts generated by this proposal. Of particular importance is the need for a north -south
collector road that would provide safe and convenient access between Senseny Road, Route
657. and Route 7. This may be considered a short term solution when compared to the
completion of Route 37. However, a collector road making a direct connection to Route 7 is an
important short term solution to Eastern Frederick County's transportation needs.
The original concept evaluated with this project proposed utilizing Eddys Lane, Route 820, and
Valley Mill Road east. Route 659, as the principal means of ingress and egress for the project
from Route 7. It was evident that the impacts associated with such an approach were
problematic without substantial improvements to Eddys Lane, Route 659, and Route 7. The
feasibility of this option as a means of addressing the access to the project was deemed to be
unacceptable. Further, the feasibility of this route as a viable collector road connection from
Route 7 to Route 657 was questionable. The applicant then pursued a thorough evaluation of the
transportation needs of this area and developed a responsive transportation program which is
described as follows.
The concept of a major collector road parallel to the Route 37 right -of -way with a direct
extension north to Route 7 and provisions for a continuation ofthe road to the southern property
line of the Haggerty property was developed and identified as a desirable solution to the
transportation needs of the project and the area. This approach was recognized as the preferred
transportation concept of the County provided there are no additional impacts to the present and
future function ofthe Opequon Water Reclamation Facility and that the ultimate construction of
Route 37 is not negatively impacted. The applicant has continued to work with the FWSA
regarding the road location and ensuring that the proposed program does not negatively impact
their facility. At their meeting on December 27, 2004, the FWSA provided an endorsement of
the concept provided that the needs of the FWSA as previously identified were addressed by the
applicant.
The described collector road connection has merit both as a solution to the projects
transportation needs before and after the construction of Route 37, and the broader
transportation needs of the County. The roadway connection linking the west and east sides of
the development has been located to recognize the ultimate construction of Route 37 and
consideration has been given to minimizing future construction costs associated with Route 37
and inconvenience to the future residents of the project. South of the Haggerty project, the
opportunity exists to continue this collector road concept to Route 657 in conjunction with
future plans for the adjoining property to the south of the Haggerty property. To the North,
Rezoning #14 -04 Haggerty Property
February 3, 2005
Page 7
discussions with VDOT indicate merit to an at grade intersection further west of the existing
median crossover on Route 7. This would be in direct alignment with the proposed eastern most
access to Route 37.
The transportation approach also provides for the reservation of a sixty foot right-of-way to the
adjoining properties to the west which would facilitate inter parcel connectivity, access to the
collector road, and accommodate future trips from the properties to the west in a coordinated
way. The proposed reservation o f this right -of -wary should he reduced 10.0J/feet to ensure that
a local street connection could be accommodated as opposed to a collector road. The intent of
the connection is to provide access to the Haggerty collector road fironr adjacent Adams
property.
As proposed by the applicant, the transportation approach appears to address the general needs
of the project and would provide the framework for an acceptable solution to the immediate
transportation needs of the area. To provide a complete solution, specific attention needs to be
paid to the detail of the connection to Route 7 described below. Recent discussions with VDOT
indicate their endorsement of the approach presented by the applicant. However, it should be
noted that V DOT share the concerns of the Planning Staff with regards to the lack of clarity on
the collector roads intersection with Route 7 and the completion of any associated
improvements, including the signalization.
It is reiterated that the suggested improvements and lane geometry identified in the TIA as being
needed to maintain an acceptable level of service should be fully implemented at the new
intersection of the collector road and Route 7 and should be guaranteed with the Haggerty
project. Failure to implement this critical component of the transportation program would
result in an unacceptable level of service at this significant intersection with Route 7 and a
conclusion that the transportation impacts associated with the Haggerty Property rezoning
have not been fully mitigated.
B. Sewer and Water
The Haggerty rezoning proposal is estimated to require approximately 50,000 gallons per day of
water usage and to generate a corresponding amount of wastewater flow. The Frederick County
Sanitation Authority will serve the property and the wastewater from the site will go to the
Opequon Regional Wastewater Facility.
Regional infrastructure needs have been identified in this area of the County and planned for by
the Frederick County Sanitation Authority with the Senseny Road Sewage Upgrade Program.
The needed improvements include a regional sewage pump station near the Opequon Creek and
an associated force main that would provide a direct connection with the Opequon Water
Reclamation Facility. The Haggerty application addresses the FCSA's needs by proffering the
dedication of the lands needed to accommodate the regional pump station and force main.
Water Service will be provided to this site from the adjacent development to the west. The
Rezoning #14 -04 Haggerty Property
February 3, 2005
Page 8
Haggerty application proposes the extension ofthe water main system beyond the limits of their
site to address a need ofthe FWSA and the Opequon Water Reclamation Facility. This facility
is presently served by an independent water system and the extension ofthe water system to this
facility would enhance their water supply service and provide them with improved fire
protection.
It has been noted previously that the applicant has discussed the potential dedication of'
approximately twenty acres of land adjacent to the FWSA property for potential open space or
public use. The acquisition of this property for public use is desirable and should be secured
with this application. It would enhance the operations of' the Opequon Water Reclamation
Facility and provide a significant buffer adjacent to the proposed road and residential
development. A buffer of 600 feet from the presently planned future treatment units has been
proffered by the applicant. This is consistent with current ordinance requirements. Clearly the
dedication ofthe area identified would significantly improve the effectiveness of any buffering
of the Opequon facility. The potential may exist for portions of this land to be jointly used for
open space or recreational purposes which further enhances the desirability of the property.
C. Historic Resources
The Rural Landmarks Survey of Frederick County includes the Haggerty 1 -louse #34 -398)
which is located at the center of the site on parcel 55- A -212A. However, the survey does not
identify this as a significant historic structure. Further, there are no battlefields located on or
adjacent to the property. Consequently, it appears that the proposal does not significantly impact
historic resources and it was determined that it was not necessary to schedule a formal review of
the rezoning application by the HRAB.
D. Community Facilities
The Frederick County Fiscal Impact Model is a tool that is used to identify the capital costs
associated with various types of proposals presented to the County. The projected
costs to Fire and Rescue_, Public Schools, Parks and Recreation, Library, Sheriffs Office, and
for the Administration Building are calculated and provided to the applicant for their
consideration.
In an effort to mitigate the impacts generated by the Haggerty project on the identified
community facilities, the applicant has proffered a pr unit monetary contribution in the amount
of $10,211 for each single family detached unit and $8,051 for each single family attached
townhouse unit. This is consistent with the capital costs identified in the Frederick County
Fiscal impact Model. In addition, the applicant has included an escalator clause in the proffer
statement that seeks to address the effects of inflation on the value of proffered monetary
contributions. It is desirable fin the escalator clause associated with the payment ("Proffers to
be initiated within a shorter lirnefr•ame. Eighteen months would bed appropriate and consistent
with other projects the County is farnilwr with.
Rezoning 14 -04 Haggerty Property
February 3, 2005
Page 9
5) Proffer Statement Dated December 20, 2004
A) General Development Plan.
The applicant has provided a Generalized Development Plan (GDP) for the Haggerty project, a
copy of which is included with the application and Proffer Statement. The GDP provides
guidance in the interpretation of the Proffer Statement and identifies specific proffered
improvements including the following: The proposed FCSA Regional Pump Station project (1),
the 600' buffer adjacent to the FWSA operations (2), the extension of the water main to the
FWSA property (3), the construction of the "spine" collector road from Route 7 to the southern
property line (4), the right -of -way for a future collector road to the properties to the west (5), the
right-of-way for Route 37 through the limits of the Haggerty property (6), and the construction
of landscape screen adjacent to the Route 37 right -of -way (7).
B) Residential Uses.
The applicant has proffered that residential development on the property shall not exceed three
hundred (300) residential units and that housing types shall be limited to single family attached
and single family detached units. Flexibility within an identified range has been maintained with
the actual mix of residential unit types. More specifically, the proffer statement states that single
family detached housing types shall comprise a minimum of 60 units, but shall not exceed a
maximum of 150 units. Conversely, this would represent that single family attached townhouse
units would comprise of a minimum of 150 units and a maximum of 240 units. The overall
residential density of this project is proposed to be 2.68 units per acre. Section 2.2 of the
.statement identifies a phased approach to the construction of[he residential development. The
reality of the approval process would suggest that the 36 month requirement of Section 2.3
would result in all of the units being built in a very short period of time. The intent of the
phasing is to ensure a steadier inclusion ofresidential units and residents into the County. It is
suggested that the 36 month condition is removed from the proffer .statement, and potentially
Section 2.3 in its entirety. This would assist in the mitigation of the impact ofa large influx of
new building permits in n short period of time.
C) Transportation.
As discussed previously in the report the applicant has proffered transportation improvements
consistent with the Generalized Development Plan that seek to address the impacts of the
project on the transportation system and enhance the regional transportation network. The
proffered improvements include the dedication of the right -of -way for Route 37, the
construction of a central collector road from Route 7 to the southern property line of the
Haggerty project parallel to the right -of -way for Route 37, the preservation ofa right of-way for
a future local street connection to the adjacent Adams property located to the west of the
Haggerty site, and the construction ofa landscape screen adjacent to the future Route 37. With
regards to the dedicated right- of- wayjbr Route 37, it would he appropriate for the applicant to
speciifv the actual width of the right -of -way and ensure that it is consistent with the right -of -way
dedicated for projects al the southern end of Route 3 7. It is also important to point out that the
proffered landscape screening adjacent to the Route 37 right -of -way does not eliminate the
road efficiency huffer requirements oldie Zoning Ordinance. The more intensive requirement
Rezoning #14 -04 Haggerty Property
February 3, 2005
Page 10
would be applicable.
It has been proffered by the applicant that the transportation improvements shall be initiated at
the outset of the development process unless otherwise specified in the Proffer Statement. Initial
review agency comments identified that critical transportation improvements designed to
accommodate the project, in particular those at the intersection of Route 7, should be completed
at the outset of the project. This is still desirable given the revised transportation approach. The
applicants proffer states that the collector road shall be constructed from Route 7 to the project
site prior to the issuance of the 51" building permit.
As noted previously, Staff and VDOT have identified that additional clarification should be
provided by the applicant regarding the improvements at the collector roads intersection with
Route 7. This clarification could be incorporated into the Proffer Statement.
D) Monetary Contribution.
The monetary contribution proffered to offset the impact to community facilities is based upon
the residential housing type with a total of $10,211 for each single family detached unit and
$8,051 for each single family attached townhouse unit being proffered by the applicant. This
monetary contribution to Frederick County is allocated within the proffer statement to the
address Fire and Rescue, Public Schools, Parks and Recreation, Library, Sheriff's Office, and
Administration Building needs. As mentioned previously, it is desirable for the escalator clause
associated with the payment of proffers to be initiated within a shorter timeframe. Eighteen
months would be appropriate and consistent with other projects the County is familiar with.
It is noted that the Proffer Statement, potentially through the Generalized Development Plan,
could be modified to address the concerns identified in the staff report.
STAFF CONCLUSIONS FOR 01/19/05 PLANNING COMMISSION MEETING:
The Haggerty Rezoning Application is generally consistent with the goals of the Frederick County
Comprehensive Plan as described in the staff report. The staff report also identifies several impacts
generated by this rezoning request that have not been fully mitigated with the details of this application.
It may be appropriate for the applicant to modify the rezoning application and proffer statement, to
ensure that the impacts associated with this rezoning application, previously identified in this staff
report and noted below, are fully mitigated.
1) The proffer regarding the land dedication of the Route 37 right of way and the
desirability of the ten year sunset clause on the dedication of the right -of -way.
2) The implementation of the suggested improvements and lane geometry at the new
collector road intersection with Route 7, identified as being needed to maintain an
acceptable level of service, should be fully implemented and guaranteed with the
Haggerty project.
Rezoning #14 -04 Haggerty Property
February 3, 2005
Page 11
3) The dedication of the twenty acres of land for public use should be guaranteed by
incorporating it into the proffer statement for the Haggerty project.
These items, and any issues raised by the Planning Commission, should be addressed prior to the
decision of the Planning Commission.
PLANNING COMMISSION SUMMARY ACTION FROM THE O1/t9/05 MEETING:
The Planning Staff provided a detailed review of the application and concluded by advising that it may
be appropriate for the applicant to modify the rezoning application and proffer statement to ensure that
the impacts associated with this rezoning application were fully mitigated. Those impacts were
identified as: 1) The proffer regarding the land dedication of the Rt. 37 right -of -way and the desirability
of the ten -year sunset clause on the dedication of the right -of -way. 2) The implementation of the
suggested improvements and lane geometry at the new collector road intersection with Rt. 7, identified
as being needed to maintain an acceptable level of service, should be fully implemented and guaranteed
with the Haggerty project. 3) The dedication of the 20 acres of land for public use should be guaranteed
by incorporating it into the proffer statement for the Haggerty project.
Members of the Planning Commission wanted to see the sunset clause for the Rt. 37 dedication either
lengthened or eliminated. They also asked the applicant about the possibility of phasing the project out
to five years instead of three. The applicant was agreeable to eliminating the sunset clause; the
applicant also agreed to reducing the maximum number of dwelling units from 100 to 75 in any 12-
month period and lengthening the phasing of development from 36 months to 48 months. Concern
about the need for an additional school in this area was raised. The applicant responded that land was
available for public use; however, questions remained about whether the site was appropriate as a
school location. There was considerable discussion on the proposed north —south "spine" connector
road, including alternative locations and alignment, access to Rt. 7 and Rt. 37, traffic projections and
impacts, improvements proposed for Rt. 7, and construction out to Senseny Road.
Representatives of VDOT were available and were asked about the potential of using the Rt. 37 right
of -way as the bed for the north connector road to Rt. 7 and what type of connection would be required
for the crossover. VDOT responded that using the Rt. 37 road bed was probably not practical and that
two road systems would be needed, particularly for the homes being constructed to move out to Route 7
for access to Rt. 37. VDOT also noted that the cross -over connection will probably be a bridge fly-
over. In addition, VDOT was asked to comment on the letter received from the Clarke County Planning
Director, who expressed various concerns about increased traffic on Route 7. VDOT responded that the
Route 7 design was capable of handling the increased traffic.
One citizen, a property owner on Valley Mill Road, came forward to speak in favor of the proposed
rezoning. This citizen was in favor of the project and considered it a good example of smart growth in
the County. He thanked the developer, the engineer, VDOT, and his district supervisor for inviting him
to meetings involving this project and taking his concerns into consideration.
Members of the Planning Commission commented that the amount of time and agency cooperation
Rezoning #14 -04 Haggerty Property
February 3, 2005
Page 12
invested in this project had certainly provided a positive affect on the final results of the design. The
Planning Commission recommended approval of the rezoning by a majority vote with the amended
proffers that were offered by the applicant, which included eliminating the sunset clause on the Route
37 dedication; reducing the maximum number of dwelling units from 100 to 75 in any 12 -month period;
and lengthening the phasing of development from 36 months to 48 months. It is noted that impact items
2 and 3 identified in the staff report were not wholly addressed by the applicant and the Commission
during the meeting. The vote was as follows:
YES (TO APPROVE): Triplett, Kriz, Thomas, Light, Morris, Unger, Watt, Del-laven
NO: Gochenour, Straub
ABSTAIN: Manuel
(Note: Commissioner Ours was absent for this vote; Commissioner Rosenberry was absent from the
meeting.)
ADDITIONAL STAFF COMMENTS:
Subsequent to the Planning Commission meeting and recommendation, the applicant has provided the
County with a revised proffer statement, dated January 20, 2005, and modified Generalized
Development Plan (GDP). The revised proffer statement specifically reflects the approval of the
Planning Commission by eliminating sunset clause on the Route 37 dedication; reducing the maximum
number of dwelling units from 100 to 75 in any 12 -month period; and lengthening the phasing of
development from 36 months to 48 months.
In addition, the revised GDP includes an area designated as open space which seeks to guarantee that
significant elements of the site are preserved for environmental, recreational and open space purposes.
Future negotiations between the applicant, FWSA, and the Frederick County's Department of Parks and
Recreation may enable this designated land to be available for public use to the benefit of the
community.
The applicant has further modified the proffer statement to address the transportation concern relating to
the timing of the collector roads connection to Route 7. Previously, the proffer statement provided for
the collector road to be constructed from VA Route 7 to the project site prior to the issuance of the 51
building permit, This would have resulted in Eddy's Lane being used as the primary access to and from
the development for the initial phases of the project. The modification provides for the collector road to
be constructed from Route 7 to the project site prior to the first building permit for the project.
January 6, 2005
C. E. Maddox, Jr., P.E.
Senior Vice President
Gilbert W. Clifford Associates
117 East Piccadilly Street
Winchester, VA 22601
Dear Chuck:
Fderick- Winchester Servic. Authority
Post Office Box 43
Winchester, Virginia 22604
Office: 107 North Kent Street
County Office Complex
FVinchester, Virginia 22601
1 -540- 722 -3579
Reference: Roadway Proposal Opequon Water Reclamation Facility
This letter is to service as a follow up to your presentation and the FWSA Board's action regarding
the request for a road right of way across the Opequon Water Reclamation Facility site. The Board
approved by motion at its December 27, 2004 meeting, the acceptance of the preliminary roadway
layout and alignment.
In agreeing to accept this proposal for further consideration and final approval, the Board is
requested the following considerations:
cerely,
Deed remaining undeveloped portion of parcel south of the plant site and along the Opequon
Creek to the Frederick Winchester Service Authority.
With the construction of the roadway public water would be extended and tied into the
existing on -site water system of the Opequon facility.
Developer will design and construct a new plant entrance along the new roadway with
necessary fencing and gated entry. FWSA shall provide approval of plans and specifications
prior to construction. FWSA will provide specifications and reimburse developer for security
entrance system.
Developers will construct an earthen berm and pine buffer along new roadway.
Formal endorsement of roadway and its alignment from the County of Frederick and Virginia
Department of Transportation.
uN
J§rse W. Moffett
Executive Director
Frederick Winchester Service Authority
Cc: Frederick Winchester Service Authority Board Members
John R. Riley. County Administrator County of Frederick
Eric R. Lawrence Director Planning and Development
Maintaining and Promoting Ufa Vatuas o/ Ma Community tatoug4 Enviro00101n1
D JAN 6 2005
awatdsaip"
FREDERICK COUNTY
PLANNING DEVELOPMENT
Mr. Charles E. Maddox, Jr., P.E.
Vice President
Gilbert W. Clifford and Associates, Inc.
a division of Patton Harris Rust Associates, p.c.
117 E. Piccadilly Street
Winchester, Virginia 22601
RE: Haggerty Rezoning
Frederick County, Virginia
Dear Chuck:
June 4, 2004
107 North Kent Street Winchester, Virginia 22601 5000
COUNTY of FREDERICK
We have completed our review of the proposed rezoning and offer the following
comments:
Department of Public Works
540/665 -5643
FAX: 540/678 -0682
1) Under the description of location and access, the narrative indicates 60 feet of road
frontage on Route 820 (Eddys Lane). This width does not appear to be sufficient
to accommodate a future major collection road as annotated on Figure 10. Please
indicate how the developer will address this issue.
2) Under the Traffic discussion, we concur with your conclusion that safe and
convenient access to Virginia Route 7 is paramount to the traffic improvements.
Also, we support your proposal to provide a stoplighted intersection at Route 7
and Route 656. According to the traffic study this will improve the level of service
at this intersection turn from an "F" to a "C" rating. However, we recommend
that this improvement occur at the initial phase of construction rather than in Phase
II as proposed in the proffer statement. This action will insure the safe and
convenient access for all phases of development.
3) As indicated in the proffer statement, improvements will be required to Eddys
Lane to accommodate the increase in traffic. The proffer statement indicates that
the applicant will provide minor road widening of Eddys Lane and Valley Mill
Road within currently available right -of ways including installation of dedicated
right -of -way and left turn lanes on Route 659 at the Virginia Route 7 intersection.
Eddys Lane is currently showing signs of pavement deterioration. Therefore, we
a
Haggerty Rezoning Comments
Page 2
June 4, 2004
HES /rls
A:lhaggertyrezcom.wpd
recommend that the above improvements be expanded to include a sufficient
overlay to accommodate the additional traffic loading. The improvements may
also require additional ditching and piping to accommodate storm drainage. The
narrative should indicate who will be responsible for obtaining the necessary right
of ways if the existing right -of -ways are not sufficient to accommodate the
proposed improvements to Eddys Lane and Valley Mill Road.
4) Figure 10 indicates a suggested interconnection between Charming Drive and
Eddys Lane. We realize that this connection is conceptual in nature especially with
the proposed cul -de -sac closure of Valley Mill Road to the west of the one way
bridge at Abrams Creek. If this connection is adopted, it will be necessary to
upgrade Eddys Lane beyond the improvements highlighted in the proffer
statement. Indicate if the applicant will implement these additional improvements
at the time of the construction of the interconnection roadway.
Please contact me if you have any questions regarding the above comments.
cc: Frederick County Planning and Development
file
Sincerely,
Harvey E.Wtrawsnyder, Jr., P.E.
Director of Public Works
Jan 06 05 04:39p
May 13, 2004
Dear Mr. Maddox:
S. R. Manuel
Executive Director
g. w.
Charles E. Maddox, Jr., P.E.
Gilbert W. Clifford and Associates
117 East Piccadilly Street, Suite 200
Winchester, Virginia 22601
Re: Rezoning Comments
Haggerty Property
Red Bud Magisterial District
clifford assoc.
540- 665 -0493
WINCHESTER REGIONAL AIRPORT
491 AIRPORT ROAD
WINCHESTER, VIRGINIA 22602
(540) 6622422
The Winchester Regional Airport Authority offers the following comment regarding the proposed
rezoning plan for the Bean Property.
Neither the location or the elevation of this site requires a 7460 -1 to be filed with the Federal
Aviation Administration, however it does lie within the air space of the Winchester Airport. Due
to its proximity to the airport, property owners may experience aircraft fly -over noise from aircraft
entering into or departing the flight pattem from the North.
Special considerations will not be requested by the Winchester Regional Airport.
Thank you for allowing us the opportunity to review this rezoning request.
Sincerely,
p.2
FREDERICK COUNTY
PLANNING DEVELOPMENT
J Vl. 1G.CVV1 V VJ7111
gemolle Wart c >,n u
Dv@6@ drools
0 it Big eC�ao �a
o%VLAit e a la €.seaF '.5, a E+0.
to ensure all students aneexcellent- education
Assistant Superintendent Al Omdortf
orndortaifrederick.k12,va.us
For Aoministration
Timothy Price
Gilbert W. clifford Assoc., Inc.
117 E. Piccadilly Street, Suite 200
Winchester, VA 22601
RE: Haggerty Rezoning
rL 4.. l.V. 1 VYIt\. .J\.11
July 9, 2004
O
Dear Mr. Price:
This letter is in response to your request for comments concerning the rezoning
application for the proposed Haggerty Property project. Based on the information provided, it is
anticipated that the proposed 150 single family, homes, 102 townhouses, and 48 multi family
units will yield 39 high school students, 35' middle school students, and 97 elementary school
students for a total of 171 new students upon -build -out, This does not tae nto consideration
any.. age restricted units since the application did not provide any specific numbers for those
units.
a
Significant residential _growth in rredericii County has resulted in the schools rools �,.r� s+ci dilly this
area having. student enrollments neanng_OT exceeding their practical capacity. The cumulative
impact of this project and others of similar nature, coupled with the number of approved,
ainneri residential lots in the area, will necessitate the future construction of new yndev f scrlool
facilities to accommodate-increased student enrollments,
The impact of this rezonin.g on current and future school needs should be considered
during the approval process.
Respectfully Yours,
traryLefitVZ
ATOThdorff
IIssistant Superint
Copy: William C. Dean, Ph. D., Superintendent of Schools
Steve Kapocsi, Administrative Assistant to the Superintendent
1415AmherhtStree1
P.0:Box 330@
Winchester. Virymit 22604.2546
mm.I.eder us
nt For Administration
540-8823BB9 elL 112
5;0545 -24'x9
54C-662-3e90 fax
CLARKE COUN1
21 December 2004
Charles E. Maddox, Jr.
Clifford Associates
117 East Piccadilly Street
Winchester, VA 22601
I4enrvv VA 22611
FREDERICK COUNTY
PLANNING DEVELOPMENT
RE: linggerry Property Rezoning Frederick County
Thank you for your request for comments on the above referenced request. Members of the
Clarke County Planning Commission, the County's engineer, and I have reviewed the material
provided and we have three minor issues and two major issues.
Minor Issues
1. There is an error in the chart titled "Planned Development Program" in section C., Site
Suitability: the chart shows 146 single family attached units in land bay 1 and 64 such units
in land bay 3 with a total of 200 such units. In addition, the chart states there will be 100
single family detached units.
2. The section titled "Proposed-Trip.Generation" states there will be 60 townhouses, 60
apartments, and 180 single- family detached units. This is different than the chart referenced
in item one. Which is con'ect?•
3. This project will increase the volume of traffic on Valley Mill Road by 45 In addition to
sight improvements, pavement width and construction improvements would seen warranted.
Major Issues
1. impact on Route 7.
This project, combined with all the other projects approved in the UGA by Frederick County,
is gradually causing the overloading of Route 7. Like the lobster that doesn't realize it is
being boiled to death by the slow increase in temperature, so the traffic volumes on Route 7
are gradually rising to levels that cannot be accommodated by a four -lane road, designed and
built almost 40 years ago without access limits. Current Frederick UGA traffic is causing
congestion today on Route 7 in Clarke County. We don't look forward to a 32% increase, to
about 36,000 trips a day, coming out of Frederick County by 2007.
Proffers for rezonings in the Frederick UGA should address such impacts. Such
proffers could include financial support for commuter bus operations and for park and
ride lots in Frederick County on this corridor.
Given the increase in traffic volumes on Route 7 from already approved development
in the UGA, it would seem unwise to consider action on any future rezoning requests
in this corridor until a plan is in place, with a funding mechanism, to address this
situation.
102 North Church Street Voice (540) 955-5132
www.co.darke.va.us Fax (540) 955 -4002
Haggerty Rezoning Comments
Page 2
2. impact on Opequon Creek.
Having more than a half -mile of frontage on the Opequon Creek, this project has a unique
opportunity to contribute to the long -term protection of this important resource. The
proposed 20 acres of public use, in reality, contain very little area of usable land; 75% of the
property being steep slopes, wetlands, and sewer treatment plant buffer. This land, combined
with the proposed open space along the Opequon and the unnamed creek on the southern
portion of the property should be placed under a permanent open space /riparian easement to
the Soil and Water Conservation District and/or other easement holding entity. Such open
space should include all land near these streams with slopes in excess of 15
Again, thank you for this opportunity. Please contact me if you have any questions or responses.
The Traffic Impact Analysis does not identify the levels of traffic on the proposed
Route 37. If the volumes on Route 37 will be less than Route 7, then the ramps at
their intersection should be reversed, with the signals on 37 instead of on 7, or there
should be a full movement interchange.
Charles Johnston
Planning Administrator
Copy: Mike Ruddy, Frederick County Planning Department
Frederick County Board of Supervisors
Frederick County Planning Commission
Clarke County Board of Supervisors
Clarke County Planning Commission
Rick Travers. View Engineers
11/2B/2064.. 17:41 5406656395
WILB UR. C HALL 118.9 2.1 B 7 2.>
THOMAS V.. MONAHAN UO24 1999)
SAMUEL D. ENGLE
0. LELANO MAHAN
ROBERT t MITCHELL, JA:
JAN+EtrA' KL-ENKAR
S rc,c -4 .JACKSON
DENNIS J.- McLouGMLIN. JR.
HALL, MONAHAN, ENGLE,- -MAHAN MITCHELL
Mr: Michael -T. Ruddy, -AICP,
Deputy_firector
I tc
it-k- ounty Department of
Planning and Development
1-07 North Kent Street
Winchester, VA 22601
Dear Mike:
A PARiNE4iwn pf PROrESBIONAL CORPOMTONF.
A TTORNEY,S AT LAW
1 7 En5T wMNCT STRCET
LEESSU#G, VNGNN.
TELEPHONE 703
November 23, 2004
FRED CD PLANNING DEP PAGE 02/03
O Enter OYscAW_N STREET
M'ING E VROIN,1
TELEPHONE 2.0 0!T?.T!oO
I5W Seat-ASO*
E -HAIL I.:ry.r ehoOmenaMn.eem
PLEASE REPLY TO:
P.. 0. Box 948
WINCHESTER, VIRGINIA 22804.0840
-RAND DELIVERED
Re: The Canyon,_LC (Haggerty Property) Prmposeri Proffer Statement
I have reviewed -the above referenced Proposed Proffer Statement. It is my
opinion. that the F pasednP* offer- Statement -isins_ formmneet the requirements
of the Frederick 2orttug OJdivaucc gad the Code of Virginia, subject to the
following:
1. In Proffer No. 11.2, it-should be stated when-the-lands and easements
wilfle provided; for example, within thirty (30) days of a written
request by -the FCSA.
2. In Proffer No.- 13.1,ia b •Transportationseetion, the statement is
made that "It is the Applicant's intent to priva€ely fund the work
required of tliic prn}ect'r Leannotdetermine the purpose of this
statemen the proffer, as. the rernaina prefers in the
Transportation section state that A provide" the
v-ar ous-transportatfon-iii provements tdzut fia3,
3.- In Proffer No: 13:6; it s- houldbe-expressly stated, that the Applicant
will survey and plat the- rigitt -of way -for VA Route 37, if that is the
case.
11/28/2004 17:41 5406656395
RTM /glh
Mr. Michael-T. Ruddy
Fredetick County Department of
Planning and Development
November 23, 2004
Page 2
FRED CO PLANNING DEP PAGE 03/03
HALL, MONAHAN, ENGLE., MAHAN MITCHELL
I have no-t re-viewedthe ciahsta, ce of theprnffers aita whether the proffers
are suitable and appropriate for the property, as it is my understanding that that
review will he lane by tie staff and Commission.
If thrreare-arryguestions concerning the foregoing, please contact me.
lrobert T. Mitchell,
Rezoning 14 04 HAGGERTY PROPERTY
(53 A 212 55 A 212A
RIGGLEMAN L'1SA'ANN
4v rhr
y Y
Rezoning 14 04 HAGGERTY PROPERTY
(53 A 212 55 A 212A
Action:
PLANNING COMMISSION: January 19. 2005 Recommended Approval
BOARD OF SUPERVISORS: February 9. 2005 APPROVED DENIED
PDRes #05 -05
AMENDMENT
AN ORDINANCE AMENDING
THE ZONING DISTRICT MAP
REZONING #14-04 FOR THE HAGGERTY PROPERTY
WHEREAS, Rezoning #14 -04 for the Haggerty Property, submitted by Patton Harris Rust
Associates, to rezone 111.56 acres from RA (Rural Areas) District to RP (Residential Performance)
District. This property is located adjacent and east of Eddys Lane (Route 820), approximately three miles
east of Winchester and 1,500 feet south of Route 7. The subject site is further located adjacent and south of
the Opequon Wastewater Treatment Plant property and adjacent and west of Opequon Creek, which forms
the boundary of Clarke County, in the Red Bud Magisterial District, and is identified by Property
Identification Numbers (PINS) 55A -212 and 55- A -212A.
WHEREAS, the Planning Commission held a public hearing on this rezoning on January 19, 2005;
and
WHEREAS, the Board of Supervisors held a public hearing on this rezoning on February 9, 2005; and
WHEREAS, the Frederick County Board of Supervisors finds the approval of this rezoning to be in
the best interest of the public health, safety, welfare, and in conformance with the Comprehensive
Policy Plan;
NOW, THEREFORE, BE IT ORDAINED by the Frederick County Board of Supervisors that
Chapter 165 of the Frederick County Code, Zoning, is amended to revise the Zoning District Map to
change 111.56 acres from RA (Rural Areas) District to RP (Residential Performance) District, as
described by the application and plat submitted, subject to the attached conditions voluntarily proffered
in writing by the applicant and the property owner.
Richard C. Shickle, Chairman
Gina A. Forrester
Lynda J. Tyler
Gene E. Fisher
PDRes #05 -05
This ordinance shall be in effect on the date of adoption.
Passed this 9th day of February, 2005 by the following recorded vote:
Barbara B. Van Osten
Gary Dove
Bill M. Ewing
A COPY ATTEST
John R. Riley, .Ir.
Frederick County Administrator
Date Tlme Destination
x immediate IX Result Report Feb. 92005 4:O1PM x x'
Feb. 9. 4:OOPM 97224051 GO ES>
Mode TXtime Page Result User Name
Fax Header)
1 P. 8 OK 0507
Batch M Memory L Send later 4 Forwarding
ECM S Standard D Detail F Fine
Reduction x LAN Fax Delivery O RX Notice Ren•
A RX Notice
Flle
No.
FAX TRANSMISSION
TO: SRIG FOK f -ry L±4- w50-r...)
COMPANY:
FAX 7 2.Z qos f
Department of Planning and Development
107 North Kent Street, Suite 202 Winchester, Virginia 22601 -5000
Telephone: 540/665 -5651 FAX: 540 /665 -6395
Date: .2 q o 5
Number of Pages (including cover sheet)
Remarks:
H4.4S Ei2-1 ?IC°
SSA rr (M t 1-J T
From the desk of:
COUNTY of FREDERICK
s
CLARKE COUNTY
2 December 2004
Charles E. Maddox, Jr.
Clifford Associates
117 East Piccadilly Street
Winchester, VA 22601
RE: Haggerty Properly Rezoning Frederick County
DEC 2 3 2004
FREDERICK COUNTY
PLANNING DEVELOPMENT
CLARJIC
Thank you for your request for comments on the above referenced request. Members of the
Clarke County Planning Commission, the County's engineer, and I have reviewed the material
provided and we have three minor issues and two major issues.
Minor Issues
1. There is an error in the chart titled "Planned Development Program" in section C., Site
Suitability: the chart shows 146 single- family attached units in land bay 1 and 64 such units
in land bay 3 with a total of 200 such units. In addition, the chart states there will be 100
single family detached units.
2. The section titled "Proposed Trip Generation" states there will be 60 townhouses, 60
apartments, and ISO single- family detached units. This is different than the chart referenced
in item one. Which is correct?
3. This project will increase the volume of traffic on Valley Mill Road by 45 In addition to
sight improvements, pavement width and construction improvements would seem warranted.
Major Issues
1. impact on Route 7.
This project, combined with all the other projects approved in the UGA by Frederick County,
is gradually causing the overloading of Route 7. Like the lobster that doesn't realize it is
being boiled to death by the slow increase in temperature, so the traffic volumes on Route 7
are gradually rising to levels that cannot be accommodated by a four -lane road, designed and
built almost 40 years ago without access limits. Current Frederick UGA traffic is causing
congestion today on Route 7 in Clarke County. We don't look forward to a 32% increase, to
about 36,000 trips a day, corning out of Frederick County by 2007.
Proffers for rezonings in the Frederick UGA should address such impacts. Such
proffers could include financial support for commuter bus operations and for park and
ride lots in Frederick County on this corridor.
Given the increase in traffic volumes on Route 7 from already approved development
in the UGA, it would seem unwise to consider action on any future rezoning requests
in this con until a plan is in place, with a funding mechanism, to address this
situation.
102 North Church Street Voice (540) 955 -5132
Berryville, VA 22611 www.co.clarke.va.us Fax (540) 955 -4002
January 6, 2005
C. E. Maddox, Jr., P.E.
Senior Vice President
Gilbert W. Clifford Associates
117 East Piccadilly Street
Winchester, VA 22601
Dear Chuck:
ely,
Ftderick- Winchester ServiccAuthority
Post Office Box 43
Jesse W. Moffett 1�
Executive Director
Frederick Winchester Service Authority
'Winchester, Virginia 22604
Office: 107 North Kent Street
County Office Complex
Winchester, Virginia 22601
1- 540 722 -3579
Reference: Roadway Proposal Opequon Water Reclamation Facility
This letter is to service as a follow up to your presentation and the FWSA Board's action regarding
the request for a road right of way across the Opequon Water Reclamation Facility site. The Board
approved by motion at its December 27, 2004 meeting, the acceptance of the preliminary roadway
layout and alignment.
In agreeing to accept this proposal for further consideration and final approval, the Board is
requested the following considerations:
Deed remaining undeveloped portion of parcel south of the plant site and along the Opequon
Creek to the Frederick Winchester Service Authority.
With the construction of the roadway public water would be extended and tied into the
existing on -site water system of the Opequon facility.
Developer will design and construct a new plant entrance along the new roadway with
necessary fencing and gated entry. FWSA shall provide approval of plans and specifications
prior to construction. FWSA will provide specifications and reimburse developer for security
entrance system.
Developers will construct an earthen berm and pine buffer along new roadway.
Formal endorsement of roadway and its alignment from the County of Frederick and Virginia
Department of Transportation.
Cc: Frederick Winchester Service Authority Board Members
John R. Riley. County Administrator County of Frederick
Eric R. Lawrence Director Planning and Development
Maintaining and Promoting Ma 'Mews of Ma Comnamity taronga Bnviron n antae StawardsAip"
Haggerty Rezoning Proffers
Chris,
Subject: Haggerty Rezoning Proffers
Date: Thu, 13 Jan 2005 15:09:35 -0500
From: "Ingram, Lloyd" Lloyd.Ingram @VDOT.Virginia.gov>
To: "'Christopher.Mohn phra.com" <Christopher.Mohn @phra.com>
CC: "Ingram, Lloyd" Lloyd .Ingram @VDOT.Virginia.gov
"Eric Lawrence (E- mail)" <elawrenc @co.frederick.va.us>
I have reviewed your proposed additions to the Haggerty Proffers. I feel the comments you
have provided address the concerns we reviewed with you during Tuesday's meeting
(01/11/2005).
We look forward to receiving the smooth version of the proffer package.
Have a good weekend.
Lloyd
Lloyd A. Ingram
Transportation Engineer
VDOT Edinburg Residency
Land Development
14031 Old Valley Pike
Edinburg, VA 22824
(540) 984-5611
(540) 984 -5607 (fax)
1 of 1 1/13/2005 4:19 PM
December 15, 2004
C. E. Maddox, Jr., P.E.
Senior Vice President
Gilbert W. Clifford Associates
117 East Piccadilly Street
Winchester, VA 22601
Dear Chuck:
Frederick- Winchester Service Auth
Post Office Box 43
Winchester, Virginia 22604
Office: 107 North Kent Street
County Office Complex
Winchester, Virginia 22601
1 -540- 722 -3579
DEC 2 3 2004
FREDERICK COUNTY
PLANNING DEVELOPMENT
Reference: Roadway Proposal Opequon Water Reclamation Facility
This letter is to service as a follow up to our meeting of December 7, 2004 with the Frederick County
Planning Department and as a response to your letter related to this roadway proposal. Clearly, this
proposal better addresses the concerns previously expressed by the Service Authority and it is worthy
of further discussion.
Vital to the Service Authority in considering any proposal is that it maintains adequate buffer between
the facility and future development, allows for retaining adequate adjoining property for potential
expansion, and ensures that abutting development is "best suited" as a neighbor to a wastewater
treatment operation.
With those concerns in mind, I believe that the Frederick Winchester Service Authority would be
willing to consider the proposed alignment and right of way request with the acceptance of the
following conditions, some of which were discussed at our meeting.
Deed remaining undeveloped portion of parcel south of the plant site and along the Opequon
Creek to the Frederick Winchester Service Authority.
With the construction of the roadway public water would be extended and tied into the existing
on -site water system of the Opequon facility.
Developer will design and construct a new plant entrance along the new roadway with
necessary fencing and gated entry. FWSA shall provide approval of plans and specifications
prior to construction. FWSA will provide specifications and reimburse developer for security
entrance system.
Developers will construct an earthen berm and pine buffer along new roadway.
Endorsements of roadway and its alignment from the County of Frederick and Virginia
Department of Transportation.
D: \Temp \Temporary Internet Files \OLK5 \Maddox 122104.doc
llnotts v&m.4onrrien4z1.9Lwandahq
December 23, 2004
Page 2
I realize that the rezoning request has not been submitted for consideration at this point. Submittal and
subsequent approval by the County of that request would be essential for obtaining finalized
agreement.
However, I would see no reason that the Board would be willing to accept a tentative agreement of
understanding should we receive acknowledgment that the above stated demands are acceptable to
the interested developers that you are representing,
Please feel free to contact me regarding this issue.
Sincerely,
Jesse W. Moffett
Executive Director
Frederick Winchester Service Authority
Cc: Frederick Winchester Service Authority Board Members
John R. Riley. County Administrator County of Frederick
Eric R. Lawrence Director Planning and Development
1THECANYONL'C�
s,y P:0.::BOX 2715 s>:i
0.' (540) 6672120 X2604
y.% r
County of Fredeii
�s u sc Si x u nfi red T ,�a Ei
'Six Thousand'Six Hundred Twenty Eight and•00 /1
u xs A6ounty o F rederick
4 k
AR
BANKr;tr
1041: B E R R YVI C LE, "AV E N U E
VWIINCHESTERtVA 22601„
k
;•68 532`[514
"00 LOO 20 1 :05 L405324 6068343" b 2
J
c
0
DOLLARS
The following information shall be provided by the applicant:
All parcel identification numbers, deed book and page numbers may be obtained from the Office of
the Commissioner of Revenue, Real Estate Division, 107 North Kent Street, Winchester.
1. Applicant:
Name: Patton Harris Rust Associates
Address: 117 E. Piccadilly Street, Suite 200
2. Property Owner (if different than above)
Name: The Canyon, LC
Address: P.O. Box 3276
Winchester, Virginia 22601
3. Contact person if other than above
Name: Charles E. Maddox, Jr.
4. Checklist: Check the folio
Location Map
Plat
Deed of property
Verification of taxes paid
REZONING APPLICATION FORM
FREDERICK COUNTY, VIRGINIA
Winchester, Virginia 22601
Agency Comments
Fees
Impact Analysis Statement
Proffer Statement
Telephone: 667 -2139
Telephone: 540- 667 -2120
Telephone: 667 -2139
ng items that have been included with this application.
The Canyon, LC
David B. Holliday
7. Adjoining Property: SEE ATTACHED.
PARCEL ID NUMBER
County.
5. The Code of Virginia allows us to request full disclosure of ownership in relation to
rezoning applications.
Please List below all owners or parties in interest of the land to be rezoned:
6. A) Current Use of the Property: Unimproved /Vacant Residential
B) Proposed Use of the Property: Mixed Residential Development
USE ZONING
8. Location: The property is located at (give exact location based on nearest road and distance
from nearest intersection, using road names and route numbers).
Located adjacent and east ofEddys Lane (Route 820), approximately 3 miles
east of Winchester and 1,500 feet south of Route 7. The subject site is further
located adjacent and south of the Opequon Wastewater Treatment Plant property
and adjacent and west of Opequon Creek, which forms the boundary of Clarke
2
Acres
Current Zoning
Zoning Requested
111.56
RA
RP
111.56
Total acreage to be rezoned
Information to be Submitted for Capital Facilities Impact Model
In order for the Planning Staff to use its capital facilities impact model, it is necessary for the
applicant to provide information concerning the specifics of the proposed use. Otherwise, the
planning staff will use the maximum possible density of intensity scenario for the proposed Zoning
District as described on page 9 of the application package.
9. Parcel Identification /Location: Parcel Identification Number 55 -A -212 212A
Districts
Magisterial: Red Bud High School: James Wood
Fire Service: Greenwood Middle School: James Wood
Rescue Service: Greenwood Elementary School: Senseny Road
10. Zoning Change: List the acreage included in each new zoning category being requested.
11. The following information should be provided according to the type of rezoning proposed:
Number of Units Proposed
Single Family Home 100 Townhome 200 Multi- Family 0
Non Residential Lots NA Mobile Home NA Hotel Rooms NA
Square Footage of Proposed Uses
Office NA Service Station NA
Retail NA Manufacturing NA
Restaurant NA Warehouse NA
Other NA
3
12. Signature:
I (we), the undersigned, do hereby respectfully make application and petition the Frederick County
Board of Supervisors to amend the zoning ordinance and to change the zoning map of Frederick
County, Virginia. I (we) authorize Frederick County officials to enter the property for site
inspection purposes.
I (we) understand that the sign issued when this application is submitted must be placed at the front
property line at least seven days prior to the Planning Commission public hearing and the Board of
Supervisors' public hearing and maintained so as to be visible from the road right -of -way until the
hearing.
I (we) hereby certify that this application and its accompanying materials are true and accurate to
the best of my (our) knowledge.
Applicant(s)
Owner(s)
Patton
Associates
The Canyon, LC
Date 9/10/04
Date 9/10/04
4
ID
Name
Address
Zoning
Use
55 -A -209
Fu -Shep Farm Partnership
405 Briarmont Drive, Winchester, VA 22601
RA
Residential
55 -A -211
Fu -Shep Farm Partnership
405 Briarmont Drive, Winchester, VA 22601
RA
Vacant
55 -A -213
Fu -Shep Farm Partnership
405 Briarmont Drive, Winchester, VA 22601
RA
Vacant
55 -A -210
Goldie's LC
310 Eddy's Lane, Winchester, VA 22602
RA
Residential
55
Frederick Winchester
P.O. Box 433, Winchester, VA 22604
RA
Vacant
-4 -1
55 -4 -2
Steve Thomas Chadwell
6825 Valley Pike, Middletown, VA 22645
RA
Residential
55 -4 -3
Michael Edward McKee
283 Eddy's Lane, Winchester, VA 22602
RA
Residential
65 -A -195
Lisa Ann Mildred L Riggleman
2737 Senseny Road, Winchester, VA 22602
RA
Agricultural 4
12 -A -1
Robert A Ballantine
9910 Old Court Rd., Woodstock, VA 21163
RA
Agricultural
12 -A -2
Philip E Mary V Wine
305 Chapel Hill Rd., Cross Junction, VA22625
RA
Residential
56 -A -19
Frederick Winchester
P.O. Box 433, Winchester, VA 22604
RA
Vacant
56 -A -19
Crown Communications, Inc
PMB 353, 4017 Washington Rd., McCurray, PA 15317
RA
Local Government
Haggerty— Rezoning
Know All Men 13y Those Present: That I (We)
Special Limited Power of Attorney
County of Frederick, Virginia
Frederick Planning Web Site: www.co.frederick.va.us
Department of Planning Development, County of Frederick, Virginia,
107 North Kent Street, Winchester, Virginia 22601
Phone 540 -665 -5651 Facsimile 540 -665 -6395
(Name) The Canyon. LC (Phone) 667 -2120
(Address) P.O. Box 3276, Winchester, Virginia 22601
the owner(s) of all those tracts or parcels of land "Property") conveyed to me (us), by deed recorded in the
Clerk's Office of the Circuit Court of the County of Frederick, Virginia, by
Instrument Number 040014715 and is described as
Parcels: 212, 212A Lot: Block: A Section/Tax Map 55 Subdivision: N/A
do hereby make, constitute and appoint:
(Name) Patton Harris Rust Associates; Charles E. Maddox, Jr. (Phone) 667 -2139
al (Address) 117 E. Piccadilly Street, Suite 200. Winchester, Virginia 22601
To act as my true and lawful attorney -in -fact for and in my (our) name, place, and stead with full power and
authority I (we) would have if acting personally to file planning applications for my (our) above described
Property, including
X Rezoning (including proffers)
Conditional Use Permits
Master Development Plan (Preliminary and Final)
Subdivision
Site Plan
My attorney -in -fact shall have the authority to offer proffered conditions and to make amendments to previously approved proffered
conditions except as follows:
N/A
This authorization shall expire one year from the day it is signed, or until it is otherwise rescinded or
modified.
In witness thereof, I (we) have hereto set j our) hand and seal this 10 day of September 2004
Signature(s)
State of Virginia, City/County of A. ;V trkTi2.r ,To -wit: \Th\)VCAB 1 it t_
I AlCtri CL\ Or 04 ('N
la Notary Public in and for the jurisdiction
aforesaid, certify that the person(s) who signed to the foregoing instrument personally appeared before me
and has acknowledged the same before me in the jurisdiction aforesaid this 2,, 4 day of C y200 L(.
L--(1 rni.Or7Th
Notary Public
My Commission Expires:
fi r, I 3 2001
Haggerty Impact Analysis Statement
II. Summary and Justification
The Haggerty site lies wholly within the Urban Development Area (UDA) and Sewer and
Water Service Area (SWSA) of Frederick County, bordering approximately 3,735 feet of the
Opequon Creek that also serves as the Frederick County Clarke County boundary. The
site is accessed from Valley Mill Road (Route 659) via Eddys Lane (Route 820), and is east
and adjacent to the "Fu -Shep" property, a part of the RP (Residential Performance) zoned
Channing Drive project, and south and adjacent to the Opequon Regional Wastewater
Facility. The site further contains a substantial part of the route alignment of proposed VA
Route 37 (2,175 linear feet
The rezoning of the site for a mixed residential development is consistent with the vision of
the Comprehensive Policy Plan, which expressly calls for suburban residential uses to
predominate within the UDA. The site is generally located within an area designated for
residential land use on the Eastern Frederick County Long Range Land Use Plan map. By
using available land within the UDA, this rezoning promotes a dynamic housing market
within the county's designated growth area, and therefore advances the important goal of
reducing development pressure in the outlying rural areas.
The applicant is confident that the proposed rezoning includes a proffer program that will
appropriately and effectively mitigate the impacts of this development while simultaneously
contributing to the regional infrastructure network. The applicant's proposal provides a
significant foundation for long -term infrastructure improvements within the easternmost
portion of the UDA by reserving the rights of way for VA Route 37 and the planned
regional sewerage pump and force main system. This proposal further establishes a
collector road system that will ultimately provide a direct connection between VA Route 7
and Senseny Road, which will yield a tangible improvement to traffic conditions in the
easternmost portion of the UDA. The mixed residential land use envisioned for the site will
promote housing choice and result in a vibrant neighborhood that is consistent with the land
use policies of the Comprehensive Policy Plan. As such, this rezoning request merits
favorable consideration and approval.