HomeMy WebLinkAbout13-04 CommentsSEP -20 -04 04:08PM FROM- GREENPJAY ENGINEERING P.C.
Mail to:
Frederick County
Department of Parks Recreation
107 North Vent Street
Winchester, Virginia, 22601
(540) 665 -5678
Applicant' s Name:
Mailing Address:
Location of property
Current zenin;: B2
Recreation Department.
Pks. Rec. Signature Date
Notice to Department of Park
Zoning requested: RP
5407229528
T -296
Rezoning Comments
�i9� illk.,� I' d,,ui,i;li� I "iii ��.;,pl Illf'I� ��V� 1 9Ih'��!4i� ^III X14 91i 41�.uif�.l° �V� Nip WIh II !It ��II "!lulu "h +lip iIV, �IJI'Pi!411t II�',16 dils Id P�.J1>IIIP
Frederick County Department of Parks Recreation
Band deliver to
Frederick County
Department of Parks Recreation
County Administration Bldg., 2 Floor
107 North Kent Street
Winchester, Virginia
1 d k l a th0' l rl OLIna bll as Ce. ..ately a5 possib eiI toiasSl t. 1�' ��I
�t1'p 1 u ii a '-�I li i:,G1 L iA a«....{. In nfwn rrls'nnlseatiOn��iQTML
teem Ens nee
Attn: Evan Wyatt. ATC
151 Windy Hill, Lane
Winchester, VA 22602
Westminster- Canterbury Dr_, approx 1,000' south of North Frederick Pike
TD
AUG 2 0 2004 I I I
By
Telephone: 540- 662 -4185
Acreage: 3.13
P 0 02 /002 F -625
8/
Department of Parks Recreation Comments:
Plan appears to meet open space and recreational unit requirements.
Also, the proposed proffer appears to address the impact this
development will have on the services provided by the Parks and
Recreation Please Return This Form to the Applicant
Mr. Evan Wyatt, AICP
Greenway Engineering
151 Windy Hill Lane
Winchester, Virginia 22602
HES /rls
Sincerely,
cc: Mark R. Cheran, Zoning and Subdivision Administrator
file
A: \westburyrezrom.w pd
September 21, 2004
hlcut
107 North Kent Street Winchester, Virginia 22601 -5000
CINTY of FREDERICK
Department of Public Works
540/665 -5643
FAX: 540/678 -0682
RE: Westbury Commons Rezoning
Frederick County, Virginia
Dear Evan:
We have completed our review of the proposed rezoning and offer the following comments:
1) Site Drainage: In addition to onsite stormwater management, it may be necessary to
implement some offsite improvements to protect the existing residential development
located cast of the proposed project. We definitely concur with your offer to control the
100 -year storm. Also, keep in mind that it will be necessary to consider the existing
upgradient detention pond located immediately to the south of your site.
2) Solid Waste Disposal: In the second sentence, correct the word daily to indicate yearly
volume. Also, consideration should be given to providing curbside trash pickup for this
proposed development.
Please contact me if you have any questions or need clarification concerning the above comments.
Harvey E. Strawsnyder, Jr., P.E.
Director of Public Works
Philip A. Shucet
COMMISSIONER
September 13, 2004
Mr. Andy Conlon
C/O Greenway Engineering
151 Windy Hill Lane
Winchester, VA 22602
Ref: Westbury Commons Rezoning
Route 1318
Frederick County
Dear Mr. Conlon:
The documentation within the application to rezone this property appears to have some measurable
impact on Route 1318. This route is the VDOT roadway which has been considered as the access to the
property referenced.
VDOT is satisfied that the transportation proffers offered in the Harvest Communities, Inc. rezoning
application dated August 16, 2004 addresses transportation concerns associated with this request.
Before development, this office will require a complete set of construction plans detailing entrance
designs, drainage features, and traffic flow data from the I.T.E. Trip Generation Manual, Seventh Edition
for review. VDOT reserves the right to comment on all right -of -way needs, including right -of -way
dedications, traffic signalization, and off -site roadway improvements and drainage. Any work performed
on the State's right -of -way must be covered under a land use permit. This permit is issued by this office
and requires an inspection fee and surety bond coverage.
Thank you for allowing us the opportunity to comment.
Sincerely
'x
Lloyd A. Ingram
Transportation Engineer
LAI/rf
Enclosure Comment Sheet
VirginiaDOT.org
WE KEEP VIRGINIA MOVING
COMMONWEALTH T of VIRGINIA
DEPARTMENT OF TRANSPORTATION
EDINBURG RESIDENCY
14031 OLD VALLEY PIKE
EDINBURG, VA22824
FAXED
IMP 1'r6 2004
JERRY A. COPP
RESIDENT ENGINEER
TEL (540)984 -5600
FAX (540)984-5607
Control number
RZ04 -0013
Project Name
Westbury Commons
Address
151 Windy Hill Lane
Type Application
Rezoning
Current Zoning
B2
Automatic Sprinkler System
No
Other recommendation
Emergency Vehicle Access
Not Identified
Siamese Location
Not Identified
Access Comments
Additional Comments
Plan Approval Recommended
Yes
Date received
8/17/2004
Tax ID Number
53-4-E 53-4-F
City
Winchester
Recommendations
Automatic Fire Alarm System Residential Sprinkler System
No
Requirements
Hydrant Location
Not Identified
Roadway /Aisleway Width
Adequate
Reviewed By
Timothy L. Welsh
Date reviewed
8/17/2004
Applicant
Greenway Engineering
Fire District
15
State
VA
Zip Applicant Phone
22602
Special Hazards
No
Rescue District
15
Election District
Gainesboro
Yes
Fire Lane Required
Yes
Date Revised
Emergency Vehicle Access Comments
Landscaping and other materials shalt be placed in a mariner as not to inhibit use or the entire driveway width to individual
dwelling units. Fire Hydrants shall comply with Frederick County Code section 90 -4.
540-662-4185
Dear Evan:
HES /rls
A: \west buryrezrom.wpd
Mr. Evan Wyatt, AICP
Greenway Engineering
151 Windy Hill Lane
Winchester, Virginia 22602
RE: Westbury Commons Rezoning
Frederick County, Virginia
September 21, 2004
We have completed our review of the proposed rezoning and offer the following comments:
I) Site Drainage: In addition to onsite stormwater management, it may be necessary to
implement some offsite improvements to protect the existing residential development
located east of the proposed project. We definitely concur with your offer to control the
100 -year storm. Also, keep in mind that it will be necessary to consider the existing
upgradient detention pond located immediately to the south of your site.
2) Solid Waste Disposal: In the second sentence, correct the word daily to indicate yearly
volume. Also, consideration should be given to providing curbside trash pickup for this
proposed development.
Please contact me if you have any questions or need clarification concerning the above comments.
Sincerely,
cc: Mark R. Cheran, Zoning and Subdivision Administrator
file
Harvey E. Strawsnyder, Jr., P.E.
Director of Public Works
107 North Kent Street Winchester, Virginia 22601 -5000
COUNTY of FREDERICK
Department of Public Works
540/665 -5643
FAX: 540/678-0682
etkAi Q�
RH TT Li SEP 2 i 2004
Sanitation Authority Comments:
Y
'mss r--
Sanitation Authority Signature Date: �k f
Notice to Sanitation Authority Please Return This Form to the Applicant
By
AUG
1 8
2004
0 1
Rezoning Comments
Frederick County Sanitation Authority
Mail to:
Frederick County Sanitation Authority
Sanitation Authority
Attn: Engineer
P.O. Box 1877
Winchester, Virginia 22604
(540) 868-1061
Hand deliver to:
Frederick County
Attn: Engineer
315 Tasker Road
Stephens City, Virginia
th information as` accurate.
heir review Attach a cop`,
ipact analy an d any e
Applicant Please fill
Sanitation Authority wit t
mad, p roffer statement, m
ormatron t
Current zoning: B2
WESTBURY COMMONS REZONING (Greenway File #4079)
Applicant's Name: Greenway Engineering Telephone: (540) 662 -4185
Attn.: Evan Wyatt, AICP
Mailing Address: 151 Windy Hill Lane
Winchester, VA 22602
Location of property: Westminster Canterbury Dr., approx. 1,000' south of North Frederick Pike
Zoning requested: RP Acreage: 3.13
L
Rezoning Comments
Frederick Winchester Service Authority
Mail to:
Frederick Winchester Service Authority
Attn: Jesse W. Moffett, Executive Director
P.O. Box 43
Winchester, Virginia 22604
(540) 722-3579
ort wit
tat
orma accurately
eft review ac
act analysis, a any o tt
>rder to asstst`th�
our appltcation for
er pertinent tnfcirmattonl?
Applicant's Name: Greenwav Engineering
Attn.: Evan Wyatt, AICP
Mailing Address:
Location of property: Westminster Canterbury Dr., approx. 1,000' south of North Frederick Pike
Current zoning: B2
Fred -Winc Service Authority Comments:
no axed
Fred -Winc Service Authority Signature Date:
Notice to Fred -Winc Service Authority FRease Return This Form to the Applicant
uatA.1r ejt1f64
Rv
151 Windy Hill Lane
Winchester, VA 22602
AUG 1 9 2004
Zoning requested: RP
Hand deliver to:
Fred -Winc Service Authority
Attn: Jesse W. Moffett
107 North Kent Street
Winchester, Virginia
WESTBURY COMMONS REZONING (Greenway File #4079)
Telephone: (540) 662 -4185
Acreage: 3.13
Department of Parks Recreation Comments:
Staff anticipates the residents of this community will have every
opportunity to benefit from the parks and recreational services offered
by Frederick County. To calculate this impact on Parks and Recreation
services, I would recommend we trust the formula included in the County
Impact Model.
Pks. Rec. Signature Date• l g,,m),) h }2/7/04
Notice to Department of Par Recreation Please Return This Form to the Applicant
Rezoning Comments
-7 7
Frederick County Department of Parks Recreation
Mail to:
Frederick County
Department of Parks Recreation
107 North Kent Street
Winchester, Virginia, 22601
(540) 665-5678
m eyle A t a yfo >m a hca ow ti 0 dray
an ]xsis an an ytaeh yothop yo
er pertmen fors
Applicant's Name:
Mailing Address:
Location of property:
Current zoning: B2
WESTBURY COMMONS REZONING (Greenway File #4079)
Greenway Engineering
Attn: Evan Wyatt, AICP
151 Windy Hill Lane
Winchester, VA 22602
Westminster Canterbury Dr., approx. 1,000' south of North Frederick Pike
Zoning requested: RP
Hand deliver to:
Frederick County
Department of Parks Recreation
County Administration Bldg., 2 Floor
107 North Kent Street
Winchester, Virginia
Telephone: 540- 662 -4185
Acreage: 3.13
13
DEC 0 9 2004
Administrative Assistant to
Visit us at www.frederick.klzva.us
the Superintendent kapocsis@frederick.k12va.us
Mr. Evan A. Wyatt
Greenway Engineering
151 Windy Hill Lane
Winchester, VA 22602
Dear Mr. Wyatt:
RE: Harvest Communities, Inc. Project
SMK:dkr
Frederick County Public Schools
cc: Dr. William C. Dean, Superintendent of Schools
ACI
540- 662 -3889 Ext 112
September 1, 2004
This letter is response to your request for comments concerning the rezoning application
for the proposed Harvest Communities, Inc. project located, fronting on the west side of
Westminster Canterbury Drive, approximately 1,000 feet south of the intersection of North
Frederick Pike. Based on the information provided that all parcels would be age restricted, there
would be no impact to the school population upon build -out.
Respectfully yours,
f
e -mail:
Stephen M. Kaposc
Administrative Assistant to the Superintendent
_J
1415 Amherst Street, Post Office Box 3508, Winchester, VA 22604 -2546
SEP 0 3 2004
By
FAX 540- 662 -3890
December 8, 2004
Mr. Evan Wyatt
Greenway Engineering
151 Windy Hill Lane
Winchester, VA 22602
RE: Third Preliminary Review Comments Westbury Commons Rezoning Proposal
Dear Evan:
Recreational Amenities
Generalized Development Plan
Sincerely,
C
Candice E. Perkins
Planner II
CEP /dlw
J
107 North Kent Street, Suite 202 Winchester, Virginia 22601 -5000
COUNTY of FREDERICK
Department of Planning and Development
540/665 -5651
FAX: 540/665 -6395
We recognize you have resubmitted the revised Westbury Commons rezoning proposal for review and for
forwarding to the County attorney. This correspondence is offered to clarify our position and to advise you that
the revised package has been forwarded to Bob Mitchell for his review.
The impact statement for this proposed rezoning maintains the request that the Planning Commission,
in conjunction with the Department of Parks and Recreations, to "consider a design and amount of
facilities proportional and appropriate to eleven age- restricted homes The Planning Department
maintains its position previously described regarding this issue. The Zoning Ordinance does not
provide for a waiver of this requirement and therefore, it is inappropriate to propose an alternative in
recreational facilities. As previously suggested by the Planning Department, if you feel that
clarification of an ordinance amendment is warranted, it would be appropriate to work with the DRRS
to evaluate this request.
On the GDP included with the impact statement it appears that the sole access to the community center
is through the trail network. This community center will have to meet all applicable county and state
requirements, including handicap accessibility. At this time it may be more appropriate to remove the
building from the GDP and provide a bubbled area that states "proposed community center location
The Master Development Plan and Subdivision processes will be used to ensure that all applicable
regulations for a community center will be addressed.
Please feel free to contact one should you have any questions or concerns regarding this correspondence.
cc: Harvest Communities, Inc., Attn: Stuart Butler, 1.47 Creekside Lane, Winchester, VA 22602
WILBUR C. HALL N219210721
TROMAS V HONAHAN 11929-1999)
SAMUEL D. ENGLE
0. LELANO MAHAN
ROBERT T. MITCHELL, JN
JAMES A. KLENHAN
STEVEN F. JACKSON
Dear Mike:
HALL, MONAHAN, ENGLE, MAHAN MITCHELL
w RNaNEn9-IO LY MDEESs nrut 0OR Of{,ow
16 l WAR MARKET Sony
Lresev s. vnct,i
TELZ RUM L TM'O7T. IOW
ATTORNEYS AT LAW
December 20, 2004.
UUAND- DELIVERED
Michael T. Ruddy, AICP
Deputy Director
Frederick County Department of Planning
Development
107 North Kent Street
Winchester, VA 22601
o EST YOBC•WER STIEET
WINCHESTER. vines%
T CEMNTIE OlO6Ni'3LO
•HML I „.y. tWNNlw,an
Re: Harvest Communities, Inc. (Westbury Commons) Proposed
Proffer Statement
RW C REPLY To,
P. 0. Bon Bas
WINCHESTER, VIRGINIA 2200*064S
I have reviewed the above referenced proposed Proffer Statement. It is my
opinion that. the Proffer Statement is in a form to meet the requirements of the
Frederick County Zoning Ordinance and the Code of Virginia, subject to the
following:
1. I would suggest, for uniformity and easyreference purposes, that the
document be titled "Proposed Proffer Statement" and the statement of rezoning
request, property, record owner, etc., be summarized at the beginning (see, for
example, the Proposed Proffer Statement of Haggerty Property, recently reviewed).
2. In Paragraphs B.3 and D it is provided that the deeds to individual
lots wilt provide for maintenance responsibility for shared driveways (B.3) and for
the age -res tricted conditions (D). If the rezoning is granted, the owner wilt applyfor
and obtain subdivision approval, after which a document in the nature of a Deed of
Michael T. Ruddy
December 20, 2004
Page 2
HALL, MONAHAN, ENGLE, MAHAN S, MITCHELL
Subdivision and Declaration of Restrictive Covenants ("Declaration will be
recorded, which will record the subdivision plat, will set forth the restrictive
covenants on the property, and will provide for the property owners' association. It
is my recommendation that the proffers provide that, in addition to being set forth the
deeds to the individual lots, the subject provision will be set forth in lheDeclaralion.
3. It is also my recommendations that the proffers provide that the
maintenance responsibilities of the property owners' association [private street
(Paragraph C); pedestrian trail (Paragraph E); community commons area (Paragraph
F. I); full screen buffer (ParagraphF. 2); landscape buffer (ParagraphF.3)] will be set
forth in the Declaration. In this regard, it is not clear whether the fence referenced in
Paragraph. F. 3 is to be maintained by the property owners' association or the
individual lotowner, and that should be clarified. Also, it should also be specifically
provided that the property owners' association shall have the maintenance
responsibility for the community center building.
4. While the details of the pedestrian trail may be addressed at the
subdivision plat stage, I note that the generalized developmentplan(GDP) shows the
trail connecting at three points to private driveways. It would appear that a pedestrian
trail easement would need to beplacedon the three private driveways to connect the
trail to the private street, assuming it is not the intention to have the trails dead -end
at the driveways. It would probably be sufficient at this point to have the easements
shown on the generalized development plan.
5. With respect to the monetary proffer (Paragraph G), the purpose or
purposes of the monetary proffer should be detailed in the manner in which the
County intends to expend the funds, as the County is required to account for the
expenditure of the funds pursuant to Virginia Code §L5.2- 2303.2(C). (It is noted in
Paragraph I of the Impact Statement that the $1,000.00 per lot proffer is apparently
intended to address impacts to County Administration, Fire and Rescue, Public
Libraries, and Sheriff's Dept)
Michael T. Ruddy
December 20, 2004
Page 3
6. With respect to the community center depicted on the GDP, there
should be a. specific provision in the proffers that a community center shall be
constructed by the owner, and a statement of the timing of the construction (prior to
the sale of any lot You have noted that the GDP shows the community center
accessed only by the pedestrian trail system, but that the center will have to be
handicap accessible and provide parking, in addition to meeting other site planning
requirements. Accordingly, the proffer should also include language to the effect tbat
the community center shall be located as generally shown on the GDP, and will be
handicap accessible, provide for parking, and meet other requirements of County
ordinances.
I have not reviewed the proffers as to whether the proffers are suitable and
appropriate for the site, as it is by understanding that that review will be done by the
staff and the Planning Commission.
RT M/ks
HALL, MONAHAN, ENGLE, MAHAN MITCHELL
If there are any questions concerning the foregoing, please contact me.
File #4079/EAWajc
Review Agency Comments