Loading...
HomeMy WebLinkAbout11-04 Impact AnalysisIMPACT STATEMENT ADAMS DEVELOPMENT GROUP, INC. REZONING Stonewall Magisterial District Frederick County, Virginia TM 44- ((A)) -75 59.71 Acres June 21, 2004 Revised August 27, 2004 Current Owners: Adams Development Group, Inc. Contact Person: Evan Wyatt, AICP Greenway Engineering 151 Windy Hill Lane Winchester, VA 22602 540- 662 -4185 Greenway Engineering ADAMS DEVELOPMENT GROUP, INC. REZONING INTRODUCTION This report has been prepared for the purpose of assessing the impact on Fredrick County by the proffered rezoning of a 59.71 acres parcel owned by the Adams Development Group, Inc. The subject parcel is located on the west side of the Martinsburg Pike (US Route 11), near the intersection of Jordan Springs Road (Route 664) in the Stephenson area. Interstate 81 forms a boundary on the northwestern edge of the parcel, with the Winchester and Western Railroad rail line roughly paralleling the Interstate just inside this northwestern side of the property. The current zoning is RA (Rural Areas) District. The Adams Development Group, Inc. proposes to rezone the 59.71 -acre parcel to B3 (Industrial Transition District) for the purpose of developing general warehouse, flex office warehouse, self storage warehouse, and office uses. (Reference Attachment 1. Adams Rezoning Existing Zoning and Location Map) Basic information Location: Magisterial District: Property ID Numbers: Current Zoning: Current Use: Proposed Use: Proposed Zoning: Total rezoning area: Proposed build -out June 21, 2004 Adams Development Group, Inc. Revised August 27, 2004 Rezoning #3949 7 Martinsburg Pike (US Route 11), near Jordan Springs Road (Route 664) Stonewall 44- ((A)) -75 RA District Unimproved Office, Office Warehouse, Warehouse, and Self service Storage Facility B3 District 59.71 acres 835,575 square feet maximum Greenway Engineering June 21, 2004 Adams Development Group, Inc. COMPREHENSIVE PLAN Revised August 27, 2004 Rezoning The proposed site is being developed in conformance with the Comprehensive Policy Plan, Northeast Land Use Plan. The subject property is to be developed in commercial and industrial transition land uses as depicted on page 6 -33.4 of the Comprehensive Policy Plan. 1. Urban Development Area Expansion of the Urban Development Area (UDA) beyond its existing boundary is not required by this application. 2. Sewer and Water Service Area Expansion of the Sewer and Water Service Area (SWSA) beyond its existing boundary is not required by this application. A. SUITABILITY OF THE SITE Access The subject site, tax parcels 44- ((A)) -75, is located on a manmade boundary created by Interstate 81 on the western edge of the tract and Martinsburg Pike (US Route 11) to the east. A single entrance on Martinsburg Pike (Route 11) is proposed to accommodate vehicular access to the subject site. Martinsburg Pike is a three lane arterial road providing for a single north and south travel lane and a center turn lane along the entire frontage of the subject site. The availability of rail along the northwest side of the subject site provides opportunities for rail service. Flood Plains The subject site is located on the FEMA NFIP map #510063- 0115 -B. The site is located as "Zone C", area outside the 100 -year flood plain. Wetlands The National Wetlands Inventory Map indicates that there are no wetlands on the subject site. A wet weather stream exists along the southern portion of the subject site, which flows from the Payne Mobile Home Park through the property and under Martinsburg Pike to Hot Run. It is anticipated that this wet weather stream will be determined to be a regulated waterway by the U.S. Army Corps of Engineers. Therefore, a wetlands analysis will be submitted in conjunction with the master development plan for the subject property to ensure that wetlands are identified and impacts are adequately mitigated. #3949 3 Greenway Engineering June 21, 2004 Adams Development Group, Inc. Revised August 27, 2004 Rezoning Steep Slopes There are no steep slopes (over 50 on this site. Mature Woodlands There are no woodlands on the subject site. Soil Types (Reference Attachment 2. Adams Rezoning Existing Soils Map) The following four soil types are identified in this property according to the Soil Survey of Fredrick County, map sheet number 24 (USDA Soil Conservation Service). 7C- Carbo Oaklet -Rock outcrop complex 2 -15 percent slopes, covers approx. 5% of site 14B- Fredrick Poplimento Loams 2 -7 percent slopes, covers approx. 40% of site 1 6C-Fredrick-Poplimento Loams, very rocky 7 -15 percent slopes, covers approx. 20% of site 29- Massanetta Loam, 0 -4 percent slopes, covers approx. 35% of site The 14B and 29 soil types are identified as prime agricultural soils according to Table 5, Prime Farmland (Soil Survey of Fredrick County, page 123). B. SURROUNDING PROPERTIES Adjoining property zoning and present use: North: Zoned RA District Use: Residential SFD /mobile home South: Zoned MH 1 District Use: Mobile home park Zoned M1 District Use: Commercial Zoned RA District Use: Residential SFD East: Zoned B3 District Use: Industrial (APAC Virginia, Inc.) Zoned RA District Use: Institutional (church) West: Zoned RA District Use: Interstate Highway 81 Use: VDOT Rest area/welcome center 43949 4 Greenway Engineering. C. TRANSPORTATION June 21, 2004 Adams Development Group, Inc. Revised August 27, 2004 Rezoning The proposed rezoning has proffered a maximum aggregate of 835,575 square feet of building area, comprised of four specific categories of land uses on the 59.71 -acre parcel. A traffic study of the proposal was performed by Kellerco, Incorporated. The results of this study (utilizing Institute of Transportation Engineers ((ITE)) Trip Generation Manual, 7` Edition), is as follows. Office (ITE code 710) Warehouse (ITE code 150) 43949 5 40,000sf 100% 659 VPD Office Warehouse (ITE code 710/150) 39,200sf 25% office 649 VPD 117,675sf 75% warehouse 783 VPD 492,500sf 100% 2,163 VPD Self- service Storage Facility (ITE code 151) 146,200sf 100% 349 VPD TOTAL 4,603 VPD Please reference Attachment 3. Adams Rezoning Traffic Study, Kellerco, February 17, 2004 The 2002 VDOT Daily Volume Jurisdiction Report 34 identifies Martinsburg Pike (Route 11) between Old Charles Town Road (Route 761) and Cedar Hill Road (Route 671) with 6,300 VPD. All vehicle trips entering and exiting the subject site will travel north or south on Martinsburg Pike to access Interstate 81 (N or S). The Winchester Area Transportation Study (WATS) does not call for improvement to Martinsburg Pike north of Old Charlestown Road (Route 761); however the applicant has proffered to dedicate right -of -way to VDOT for the future development of' an additional travel lane. (Reference Attachment 5. Adams Development Group, Inc. Generalized Development Plan) The applicant recognizes that all development impacts the transportation system beyond the limits of the subject property's road frontage. As a function of an applicant initiated rezoning request, Frederick County may accept proffers related to off -site improvements. Therefore, this applicant proffers to contribute a prorated share of the cost of signalization improvements in the area of Interstate -81 Exit 321. Greenway Engineerin June 21, 2004 Adams Development Group, Inc. D. SEWAGE CONVEYANCE AND TREATMENT The 59.71 -acre parcel is located within the Route 11 North Sewer and Water Service Area (SWSA). There is a newly constructed 8" sanitary sewer force main adjacent to the Winchester and Western Railroad running north to south through the property. Based on comparable discharge patterns, the Frederick County Sanitation Authority (FCSA) has determined that 500 gallons /day per acre is a reasonable guide for estimating the sewer impact for this commercial and industrial transition site. The proposed zoning is estimated to add 29,855 gallons per day to the public sewage conveyance system and the Opequon Waste Water Treatment plant. The design capacity of the treatment plant is 8.4 million gallons per day, of which approximately 6.4 is currently being utilized. The total build -out of the proffered land uses would require approximately 1.5 percent of the available capacity at the Opequon Waste Water Treatment plant; therefore, adequate capacity is available for this development. E. WATER SUPPLY Q =500 gallons /day /acre Q =500 gpd x 59.71 acres Q= 29,855 gpd The 59.71 -acre parcel is located within the Route 11 North Sewer and Water Service Area (SWSA). There is an existing 10" water main in Martinsburg Pike (Route 11) and a newly constructed 20" water main adjacent to the Winchester and Western Railroad running north to south through the property. The existing water consumption patterns, Frederick County Sanitation Authority (FCSA) has determined that 1,000 gallons /day per acre quantity is reasonable to consider for the water impact analysis for this commercial and industrial transition site. Q =1000 gallons /day /acre Q= 1000gpd X 59.71 acres for Q= 59,710 gpd The proposed uses will utilize an estimated 59,710 gallons of water per day. The Global Chemstone Quarry is one of three sources contributing to the blended water for the new 20- inch water main. This quarry, with 3.75 million gallons per day available capacity, is serviced by a water treatment facility providing approximately 2 million gallons per day of potable water. The projected water usage at build -out would account for less than 3 percent of this portion of the blended water sources. Adequate capacity is available for this development. 43949 6 Revised August 27, 2004 Rezoning Greenway Engineering June 21, 2004 dams Development Group, Inc. F. SITE DRAINAGE Revised August 27, 2004 Rezoning The 59.71 -acre parcel is gently sloped from the northwest to the southeast. The site generally drains southeasterly towards an intermittent stream (unnamed on USGS map) along the southern property line of the site. Stormwater management will be designed to allow for sheet flow through the paved areas serving the various uses to a stormwater management pond and then to be released to the existing natural stream system at an acceptable rate. The stream flows northeast, beneath Martinsburg Pike and into a small pond approximately a tenth of a mile northeast of the site. Stormwater management design will occur during the site development plan process, which will require approval by the Frederick County Engineer and the Virginia Department of Transportation. The design of the stormwater management facility will be implemented in a manner that will avoid any disturbance of the existing stream and any associated wetlands. Consideration will be given to the use of oil separators or BMP facilities to minimize the impact from parking areas. The following calculations estimate the proposed storm water runoff for a ten -year flow (Reference: VDOT Drainage Manual): Existing Proposed C 0.30 (pasture) Iio =4.6 in/hr (15min) A 59.71 acres Qio= 82.40 cfs (Q CIA) C 0.90 (commercial) ho= 5.5 in/hr (10 min) A 59.71 acres Qlo= 295.56 cfs (Q CIA) Development of the subject site at maximum build -out will therefore result in an increased runoff of 213.16 cfs. A detailed stormwater evaluation shall be included with any site plan submittals. A detention pond and other stormwater management facilities will be built to control storm water discharge into the above referenced unnamed stream. G. SOLID WASTE DISPOSAL The impact on solid waste disposal facilities can be projected from an average annual business consumption of landfill volume figure of 5.4 cubic yards per 1,000 square feet of commercial floor area (Civil Engineering Reference Manual, 4 edition). The following figures show the increase in average annual volume (based on the proffered 835,575 square feet of total building area minus the 146,200 square feet proffered to self- service mini warehouse, yielding 689,375 square feet of qualifying area). AV 5.4 Cu. Yd. per 1,000 sq. ft. AV 5.4 Cu. Yd. x 689 (1,000 sq. ft.) AV 37,206 Cu Yd at build out/yr or 26,044 tons /yr #3949 7 Greenway Engineering June 21, 2004 Adams Development Group, Inc. Revised August 27, 2004 Rezoning The Municipal Solid Waste area of the Regional Landfill has a current remaining capacity of 13,100,000 cubic yards of air space. It is anticipated that the buildout of the subject site will occur over a 10 -year period. Therefore, the annual solid waste generation from this project is estimated to be 2,600 tons. This represents a 13% increase in the solid waste received by the Municipal Solid Waste area of the Regional Landfill, which currently averages 200,000 tons per year. H. HISTORICAL SITES AND STRUCTURES The Frederick County Rural Landmarks Survey identifies one structure within the immediate area of the subject property, that being Kenilworth (34 -113). The Frederick County Rural Landmarks Survey identifies Kenilworth as a property "potentially eligible for the state and national register of historic places" (page 250). The Generalized Development Plan depicts the one hundred foot wide full screen buffer the applicant will provide adjacent to the Kenilworth property. Along the 504 foot shared property line this buffer will contain a six foot high berm and more than one hundred and fifty trees and bushes. (Reference Attachment 5. Adams Development Group, Inc. Generalized Development Plan) The subject site falls within the northwest corner of the core battlefield area boundary of the Second Winchester engagement (Stephensons Depot phase). However, due to the existing development surrounding the site, this area is identified as "having lost historic integrity I. OTHER IMPACTS The Frederick County Capital Facilities Fiscal Impact Model has been applied to the proffered development of 835,575 square feet of transitional industrial land use. The results of this model run indicate that the development of the subject site will provide a positive revenue source to Frederick County of $5,402,768 at build -out; however the model run indicates a fiscal impact to Fire and Rescue Services. Therefore, the applicant has proffered a monetary contribution $0.01 per square foot to adequately address the impact to Fire and Rescue Services for capital facilities costs which will generate a revenue of up to $8,355 at project build -out for Fire and Rescue Services. No other impacts are anticipated as a result of this rezoning proposal. Attachments 1. Adams Rezoning Existing Zoning and Location Map 2. Adams Rezoning Existing Soils Map 3. Adams Rezoning Traffic Study, performed by Kellerco, dated February 17, 2004 4. Adams Development Group, Inc. Proffer Statement 5. Adams Development Group, Inc. Generalized Development Plan #3949 8 To: Organ ization /Company: From: Date: Project Name /Subject: PHR +A Project file Number: TRAFFIC ASSESSMENT Evan Wyatt Greenway Engineering John F. Callow July 8, 2004 13079 -1 -0 STUDY AREA AND PROSED DEVELOPMENT Adams Office /Warehouse Rezoning Patton Harris Rust Associates, pc (PHR +A) has prepared this technical evaluation of the proposed rezoning for the Adams tract (59.71acres) in the Stephenson area of Frederick County north of Winchester, Virginia. The Adams tract is on the west side of Martinsburg Pike (Route 11) at Stephenson Road in Stephenson, Virginia The requested rezoning is for the purpose of developing general office, warehousing and mini warehousing land uses totaling approximately 835,575 square feet. The average daily trips from this site have been estimated to be less than 5,000 per day (4,603). The site would be served by a standard commercial entrance. The impact of this proposed development upon Route 11 will be minimalwith the present 3 -lane cross section accommodating a north and southbound lanes and a separate lane for left turns. The intersection of Old Charles Town Road has been proffered to be improved and signalized by the recently approved Stephenson Village Proj ect. The interchange of Route 11 and Interstate -81 has proffers and long-range plans associated with it. The Hopewell interchange with I -81 and the intersection of Route 11 with Hopewell Road/Brucetown Road has been studied recently by PHR +A in connection with a several proposed rezonings in the vicinity. The ramps serving the Interstate as well as the intersections on Route 11 are not signalized. The several studies have shown that the intersections formed by the ramps on Hopewell Road will maintain levels of service (LOS) `,`A'i and B" which should still be the case with the addition of new trips from the Adams Tract: =The intersection of Hopewell Road with Route 11 deteriorates from a LOS "C "toj an "E" with the stop sign) Traffic signalization returns the LOS to "C While Brucetown Road! intej m ti LOS's unsignalized, due to its close proximity to Hopewell it >jiay be desirable to sionali' this intersection coordinated with the Hopewell intersection. '.117U07.) ;W CONCLUSION The proposed rezoning of the Adams tract will be a minimal impact upon the Route 11 corridor in Stephenson, Virginia It is recommended that the best impact mitigation measure that the owners of the tract could offer is a signalization agreement with VDOT for the intersection of Hopewell road and Route 11. IMPACT STATEMENT ADAMS DEVELOPMENT GROUP, INC. REZONING Stonewall Magisterial District Frederick County, Virginia TM 44- ((A)) -75 59.71 Acres Contact Person: June 21, 2004 Current Owners: Adams Development Group, Inc. Evan Wyatt, AICP Greenway Engineering 151 Windy Hill Lane Winchester, VA 22602 540- 662 -4185 Greenway Engineering June 21, 2004 Adams Development Group, Inc. Rezoning ADAMS DEVELOPMENT GROUP, INC. REZONING INTRODUCTION This report has been prepared for the purpose of assessing the impact on Fredrick County by the proffered rezoning of a 59.71 acres parcel owned by the Adams Development Group, Inc. The subject parcel is 1 cated on the west side of the Martinsburg Pike (US Route 11), near the intersection of hz rings Road (Route 664) in the Stephenson area. Interstate 81 forms a boundary on the northwestern edge of the parcel, with the Winchester and Western Railroad rail line roughly paralleling the Interstate just inside this northwestern side of the property. The current zoning is RA (Rural Areas) District. The Adams Development Group, Inc. proposes to rezone the 59.71 -acre parcel to B3 (Industrial Transition District) for the purpose of developing general warehouse, flex office warehouse, self storage warehouse, and office uses. (Reference Attachment 1. Adams Rezoning Existing Zoning and Location Map) Basic information Location. Magisterial District: Property ID Numbers: Current Zoning: Current Use: Proposed Use: Proposed Zoning: Total rezoning area: Proposed build -out #3949 2 Martinsburg Pike (US Route 11), near Jordan Springs Road (Route 664) Stonewall 44- ((A)) -75 RA District Unimproved Office, Office /Warehouse, Warehouse, and Self service Storage Facility B3 District 59.71 acres 835,575 square feet maximum Greenway Engineering COMPREHENSIVE PLAN 1. Urban Development Area 2. Sewer and Water Service Area A. SUITABILITY OF THE SITE Access Flood Plains Wetlands Steep Slopes June 21, 2004 Adams Development Group, Inc. Rezoning The proposed site is being developed in conformance with the Comprehensive Policy Plan, Northeast Land Use Plan. The subject property is to be developed in commercial and industrial transition land uses as depicted on page 6 -33.4 of the Comprehensive Policy Plan. Expansion of the Urban Development Area (UDA) beyond its existing boundary is not required by this application. Expansion of the Sewer and Water Service Area (SWSA) beyond its existing boundary is not required by this application. The subject site, tax parcels 44- ((A)) -75, is located on a manmade boundary created by Interstate 81 on the western edge of the tract and Martinsburg Pike (US Route 11) to the east. A single entrance on Martinsburg Pike (Route 11) is proposed to accommodate vehicular access to the subject site. Martinsburg Pike is a three lane arterial road providing for a single north and south travel lane and a center turn lane along the entire frontage of the subject site. The availability of rail along the northwest side of the subject site provides opportunities for rail service. The subject site is located on the FEMA NFIP map #510063- 0115 -B. The site is located as "Zone C area outside the 100 -year flood plain. The National Wetlands Inventory Map indicates that there are no wetlands on the subject site. There are no steep slopes (over 50 on this site. #3949 3 Greenway Engineering Mature Woodlands There are no woodlands on the subject site. Soil Types (Reference Attachment 2. Adams Rezoning Existing Soils Map) The following four soil types are identified in this property according to the Soil Survey of Fredrick County, map sheet number 24 (USDA Soil Conservation Service). 7C- Carbo Oaklet -Rock outcrop complex 2 -15 percent slopes, covers approx. 5% of site 14B- Fredrick- Poplimento Loams 2 -7 percent slopes, covers approx. 40% of site 16C- Fredrick Poplimento Loams, very rocky 7 -15 percent slopes, covers approx. 20% of site 29- Massanetta Loam, 0 -4 percent slopes, covers approx. 35% of site The 14B and 29 soil types are identified as prime agricultural soils according to Table 5, Prime Farmland (Soil Survey of Fredrick County page 123). B. SURROUNDING PROPERTIES Adjoinirg property zoning and present use: North: Zoned RA District Use: Residential SFD /mobile home South: Zoned MH1 District Use: Mobile home park Zoned M1 District Use: Commercial Zoned RA District Use: Residential SFD East: Zoned B3 District Use: Industrial (APAC Virginia, Inc.) Zoned RA District Use: Institutional (church) West: Zoned RA District Use: Interstate Highway 81 Use: VDOT Rest area/welcome center #3949 4 June 21, 2004 Adams Development Group, Inc. Rezoning Green way Engineerir June 21, 2004 C. TRANSPORTATION Alms Development Group, Inc. Rezoning The proposed rezoning has proffered a maximum aggregate of 835,575 square feet of building area, comprised of four specific categories of land uses on the 59.71 -acre parcel. A traffic study of the proposal was performed by Kellerco, Incorporated. The results of this study (utilizing Institute of Transportation Engineers ((ITE)) Trip Generation Manual, 7th Edition), is as follows. Office (11E code 710) Warehouse (ITE code 150) #3949 5 40,000sf 100% 659 VPD Office Warehouse (ITE code 710/150) 39,200sf 25% office 649 VPD 117,675sf 75% warehouse 783 VPD 492,500sf 100% 2,163 VPD Self- service Storage Facility (ITE code 151) 146,200sf 100% 349 VPD TOTAL 4,603 VPD Please reference Attachment 3. Adams Rezoning Traffic Study; Kellerco, February 17, 2004 The 2002 VDOT Daily Volume Jurisdiction Report 34 identifies Martinsburg Pike (Route 1I) between Old Charles Town Road (Route 761) and Cedar Hill Road (Route 671) with 6,300 VPD. All vehicle trips entering and exiting the subject site will travel north or south on Martinsburg Pike to access Interstate 81 (N or S). The Winchester Area Transportation Study (WATS) does not call for improvement to Martinsburg Pike north of Old Charlestown Road (Route 761); however the applicant has proffered to dedicate right -of -way to VDOT for the future development of an additional travel lane. (Reference Attachment 5. Adams Development Group, Inc. Generalized Development Plan) The applicant recognizes that all development impacts the transportation system beyond the limits of the subject property's road frontage. As a function of an applicant initiated rezoning request, Frederick County may accept proffers related to off -site improvements. Therefore, this applicant proffers to contribute a prorated share of the cost of signalization improvements in the area of Interstate -81 Exit 321. Greenway Engineering E. WATER SUPPLY D. SEWAGE CONVEYANCE AND TREATMENT #3949 6 June 21, 2004 Adams Development Group, Inc. Rezoning The 59.71 -acre parcel is located within the Route 11 North Sewer and Water Service Area (SWSA). There is a newly constructed 8" sanitary sewer force main adjacent to the Winchester and Western Railroad running north to south through the property. Based on comparable discharge patterns, the Frederick County Sanitation Authority (FCSA) has determined that 500 gallons /day per acre is a reasonable guide for estimating the sewer impact for this commercial and industrial transition site. Q =500 gallons /day /acre Q =500 gpd x 59.71 acres Q= 29,855 gpd The proposed zoning is estimated to add 29,855 gallons per day to the public sewage conveyance system and the Opequon Waste Water Treatment plant. The design capacity of the treatment plant is 8.4 million gallons per day, of which approximately 6.4 is currently being utilized. The total build -out of the proffered land uses would require approximately 1.5 percent of the available capacity at the Opequon Waste Water Treatment plant; therefore, adequate capacity is available br this development. The 59.71 -acre parcel is located within the Route 11 North Sewer and Water Service Area (SWSA). There is an existing 10" water main in Martinsburg Pike (Route 11) and a newly constructed 20" water main adjacent to the Winchester and Western Railroad running north to south through the property. The existing water consumption patterns, Frederick County Sanitation Authority (FCSA) has determined that 1,000 gallons /day per acre quantity is reasonable to consider for the water impact analysis for this commercial and industrial transition site. Q =1000 gallons /day /acre Q= 1000gpd X 59.71 acres for Q= 59,710 gpd The proposed uses will utilize an estimated 59,710 gallons of water per day. The Global Chernstone Quarry is one of three sources contributing to the blended water for the new 20- inch water main. This quarry, with 3.75 million gallons per day available capacity, is serviced by a water treatment facility providing approximately 2 million gallons per day of potable water. The projected water usage at build -out would account for less than 3 percent of this portion of the blended water sources. Adequate capacity is available for this development. Greenway Engineering F. SITE DRAINAGE June 21, 2004 Adams Development Group, Inc. Rezoning The 59.71 -acre parcel is gently sloped from the northwest to the southeast. The site generally drains southeasterly towards an intermittent stream (unnamed on USGS map) along the southern property line of the site. Stormwater management will be designed to allow for sheet flow through the paved areas serving the various uses to a stormwater management pond and then to be released to the existing natural stream system at an acceptable rate. The stream flows northeast, beneath Martinsburg Pike and into a small pond approximately a tenth of a mile northeast of the site. Stormwater managemart design will occur during the site development plan process, which will require approval by the Frederick County Engineer and the VirginiaDepartment of Transportation. The following calculations estimate the proposed storm water runoff for a ten -year flow (Reference: VDOT Drainage Manual): Existing C 0.30 (pasture) Lo =4.6 in/hr (15min) A 59.71 acres Qio= 82.40 cfs (Q CIA) Development of the subject site at maximum build -out will therefore result in an increased runoff of 213.16 cfs. A detailed stormwater evaluation shall be included with any site plan submittals. A detention pond and other stormwater management facilites will be built to control storm water discharge into the above referenced unnamed stream. G. SOLID WASTE DISPOSAL AV 5.4 Cu. Yd. per 1,000 sq. ft. AV 5.4 Cu. Yd. x 689 (1,000 sq. ft.) AV 37,206 Cu Yd at build -out #3949 7 Proposed C 0.90 (commercial) Lo= 5.5 in/hr (10 min) A 59.71 acres Qio= 295.56 cfs (Q CIA) The impact on solid waste disposal facilites can be projected from an average annual business consumption of landfill volume figure of 5.4 cubic yards per 1,000 square feet of commercial floor area (Civil Engineering Reference Manual, 4' edition). The following figures show the increase in average annual volume (based on the proffered 835,575 square feet of total building area minus the 146,200 square feet proffered to self service mini warehouse, yielcing 689,375 square feet of qualifying a The Municipal Solid Waste area of the Regional Landfill has a current capacity of 13,100,000 cubic yards (13.1 Million Cu. Yd.) This capacity is more than adequate to accommodate the solid waste generated from this project. Greenway Engineering H HISTORICAL SITES AND STRUCTURES June 21, 2004 Adams Development Group, Inc. Rezoning The Frederick County Rural Landmarks Survey identifies one structure within the immediai area of the subject property, that being Kenilworth (34 -113). The Frederick County Rural Landmarks Survey identifies Kenilworth as a property "potentially eligible for the state and national register of historic places" (page 250). The Generalized Development Plan depicts the one hundred foot wide full screen buffer the applicant will provide adjacent to the Kenilworth property. Along the 504 foot shared property line this buffer will contain a six foot high berm and more than one hundred and fifty trees and bushes. (Reference Attachment 5. Adams Development Group, Inc. Generalized Development Plan) The subject site falls within the northwest corner of the core battlefield area boundary of the Second Winchester engagement (Stephensons Depot phase). However, due to the existing development surrounding the site, this area is identified as "having lost historic integrity I. OTHER IMPACTS The Frederick County Capital Facilities Fiscal Impact Model has been applied to the proffered development of 835,575 square feet of transitional industrial land use. The results of this model run indicate that the development of the subject site will provide a positive revenue source to Frederick County of $5,402,768 at build -out; however the model run indicates a fiscal impact to Fire and Rescue Services. Therefore, the applicant has proffered a monetary contribution $0.01 per square foot to adequately address the impact to Fire and Rescue Services for capital facilites costs which will generate a revenue of up to $8,355 at project build -out for Fire and Rescue Services. No other impacts are anticipated as a result of this rezoning proposal. Attachments 1. Adams Rezoning Existing Zoning and Location Map 2. Adams Rezoning Existing Soils Map 3. Adams Rezoning Traffic Study, performed by Kellerco, dated February 17, 2004 4. Adams Development Group, Inc. Proffer Statement 5. Adams Development Group, Inc. Generalized Development Plan #3949 8