HomeMy WebLinkAbout11-04 Applicationr �0�� a FiLECOPy
a COUNTY of FREDERICK
September 9, 2004
Mr. Evan Wyatt
151 Windy Hill Lane
Winchester, VA 22602
RE: REZONING #11 -04, ADAMS DEVELOPMENT GROUP
Dear Evan:
Department of Planning and Development
540/665 -5651
FAX: 540 /665 -6395
This letter serves to confirm action taken by the Frederick County Board of Supervisors at their
meeting of September 8, 2004. The above referenced application was approved to rezone 59.708
acres from RA (Rural Areas) District to B3 (Industrial Transition) District. The subject property is
located in the Stephenson Community, fronting the west side of Martinsburg Pike (Route 11), opposite
the intersection with Stephenson Road (Route 664), and is identified with Property Identification Number
44 -A -75, in the Stonewall Magisterial District.
The proffer that was approved as a part of this rezoning application is unique to this property and is
binding regardless of ownership. Enclosed is a copy of the adopted proffer statement for your
records.
Please do not hesitate to contact this office if you have any questions regarding the approval of this
rezoning application.
Sincerely,
Susan K. Eddy
Senior Planner
SKE/bhd
cc: /dams Development Group, Inc., HC 34, Box 30, Bloomery, WV 26817
/'ynda J. Tyler, Board of Supervisors, Stonewall District
John Light, Stonewall District Planning Commissioner
Xane Anderson, Real Estate
mmissioner of Revenue
em: .Charles S. DeHaven, Jr., Stonewall District Planning Commissioner
107 North Kent Street Winchester, Virginia 22601 -5000
This report is prepared by the Frederick County Planning Staff to provide information to the
Planning Commission and the Board of Supervisors to assist them in making a decision on this
application. It may also be useful to others interested in this zoning matter. Unresolved issues
concerning this application are noted by staff where relevant throughout this staff report.
Reviewed Action
Planning Commission: 08/18/04 Recommended Approval
Board of Supervisors: 09/08/04 P 4i g at
PROPOSAL: To rezone 59.708 acres from RA (Rural Areas) District to B3 (Industrial
Transition) District
LOCATION: The property is located in the Stephenson Community, fronting the west side of
Martinsburg Pike (Route 11), opposite the intersection with Stephenson Road (Route 664).
MAGISTERIAL DISTRICT: Stonewall
PROPERTY ID NUMBER(S): 44 -A -75
PROPERTY ZONING: RA (Rural Areas) District
PRESENT USE: Agricultural, undeveloped
ADJOINING PROPERTY ZONING PRESENT USE:
North:
South:
East:
West:
REZONING APPLICATION #11 -04
ADAMS DEVELOPMENT GROUP
Staff Report for the Board of Supervisors Meeting
Prepared: August 27, 2004
Staff Contact: Susan K. Eddy, Senior Planner
RA (Rural Areas) District
MH 1 (Mobile Home Community) District
Ml (Light Industrial) District
RA (Rural Areas) District
B3 (Industrial Transition) District
RA (Rural Areas) District
Use:
Use:
Use:
Use:
PROPOSED USES: Office, office /warehouse, warehouse, and self service storage
Residential
Residential
Residential
Residential
Industrial
Agricultural, Residential
Public Facility
REZ I I -04, Adams Development Group
Page 2
August 27. 2004
REVIEW EVALUATIONS:
Virginia Dept. of Transportation: The documentation within the application to rezone this property
appears to have a measurable impact on Route 11. This route is the VDOT roadway which has been
considered as the access to the property referenced. VDOT is satisfied that the transportation proffers
offered in the Adams Development Group Rezoning Application dated June 21, 2004 addresses
transportation concerns associated with this request. Before development, this office will require a
complete set of construction plans detailing entrance designs, drainage features, and traffic flow data
from the LT.E. Trip Generation Manual, Seventh Edition for review. VDOT reserves the right to
comment on all right -of -way needs, including right -of -way dedications, traffic signalization, and off -site
roadway improvements and drainage. Any work performed on the State's right -of -way must be covered
under a land use permit. This permit is issued by this office and requires an inspection fee and surety
bond coverage.
Fire Marshal: "Fire Lane No Parking" markings and signage required at all curbage not delineated as
parking, all fire hydrants, fire department connections and all normal and emergency access points to
the structure. Water supplies for firefighting shall meet the requirements of Frederick County Code
section 90 -4, for commercial properties. Plan approval recommended.
Frederick- Winchester Service Authority: No comments.
Public Works Department: 1) Refer to the wetlands discussion site suitability. The discussion
indicates that there are no wetlands depicted by the National Wetlands Inventory Map for the subject
site. However, our site visit revealed that there are several spring fed streams along the southern
property boundary. It is apparent that there are wetlands associated with these streams. Therefore, we
suggest that a wetlands delineation study be prepared for this site to insure that the development can
properly address this issue. 2) Under site drainage, the design of stormwater management facility
should be implemented in a manner that will avoid any disturbance of the existing streams and
associated wetlands. Also, consideration should be given to the use of oil separators or BMP facilities
to minimize the impact of stormwater runoff from parking areas on the spring fed streams. 3) Under
solid waste disposal, the comparison of a yearly disposal rate at build -out to the maximum landfill
capacity is not a realistic or valid comparison. The proposed build -out disposal rate represents an
approximate 16 percent increase in our yearly disposal at the landfill. This increase is relatively
significant considering our average increase of all combined development in Frederick, Clarke and the
City of Winchester has been approximately 3.5 percent per year.
Planning Staff Comment: At the August 18, 2004 Planning Commission meeting. concern was
expressed over the applicant's description of wetlands on the site as included in the impact analysis
statement. The applicant revised the text ("the impact statement to address these concerns. The revised
impact statement dated August 27, 2004. (A. Suitability of the Site) now slates: it is anticipated that the
wet weather stream will be determined to be a regulated waterway by the U.S. Army Corps of
Engineers. Therefore, a wetlands analysis will be 'submitted in conjunction with the master
development plan for the subject' property to ensure that wetlands are identified and impacts are
adequately mitigated. The revised impact statement dated August 27, 2004, (F. Site Drainage) now
states: the design of the stormwater management facility will be implemented in a manner that will
REZ #1 I -04. Adapts Development Group
Page 3
August 27, 2004
avoid any disturbance of the existing scream and any associated wetlands. Consideration will be given
to the use of oil separators or BMP facilities to minimize the impact f •om parking areas. The revised
proffer statement dated August 19, 2004, also adds a proffer Stormwaler Quality Measures) that all
commercial site plans are designed to implement best management practices (BMP) to promote
stor n quality measures.
Planning Staff Comment: At the August 18. 2004 Planning Commission meeting, concern was
expressed over the applicant's description of solid waste disposal as included in the impact analysis
statement. The applicant revised the text of the impact statement to address these concerns. The
revised impact statement dated August 27, 2004. (G. Solid Waste Disposal) now stales: the annual
solid waste generation from this project is estimated to be 2,600 tons. This represents a 1.3%
increase in the solid waste received by the Municipal Solid Waste area of the Regional Landfill,
which currently averages 200.000 tons per year.
Sanitation Authority: No comment.
Historic Resources Advisors Board: The Frederick County Historic Resources Advisory Board
(HRAB) considered this rezoning proposal during their meeting of May 18, 2004. The 1 -IRAB reviewed
information associated with the Frederick County Rural Landmarks Survey Report as well as
information provided by the applicant. The Rural Landmarks Survey Report for Frederick County
identifies one historic structure. Kenilworth, within the immediate area around the 59.71 acre subject
parcel. Kenilworth is identified by the survey as being potentially significant. it is the intent of the
applicant to rezone this property to the B3 (Industrial Transition) Zoning District and construct a self
storage, office and warehouses. The FIRAB expressed great concern over the type of uses being
proposed so close to Kenilworth. They felt that these uses were inappropriate and would destroy the
viewsheds of Kenilworth and Martinsburg Pike. if this property is developed as a B3 use, the HRAB
suggests the following be considered to mitigate impacts on the historic resources: 1) Types of Uses:
The applicant should realize that Kenilworth is a key structure of Stephenson, and very significant to the
surrounding area. The HRAB felt that the uses being proposed with this application (self storage and
warehouses) were inappropriate and insensitive to the surrounding area. It was recommended that a use
that would better lit into the surrounding should be considered. 2) Screening and Setbacks: Intensive
screening to hide this proposed development from Kenilworth and Martinsburg Pike is highly
recommended along with additional setbacks off of Martinsburg Pike. 2a) Architecture: Commercial
buildings on this site should blend in and compliment the architecture used with Kenilworth. 2b)
Viewsheds: It was recommended that the viewsheds of Kenilworth and Martinsburg Pike not be
impacted by this application. Efforts should be taken to make this area look "less industrial
County Attorney: Proper legal form. Does not appear any legal issues.
Planning Zoning:
1) Site History
The original Frederick County Zoning Map (U.S.G.S. Stephenson Quadrangle) depicts the
zoning of the subject parcel as A -2 (Agricultural General) District. The County's agricultural
zoning districts were subsequently combined to form the RA (Rural Areas) District upon
REZ I I -04, Adams Development Group
Page 4
August 27, 2004
adoption of an amendment to the Frederick County Zoning Ordinance on May 10, 1989. The
entire 59.71 -acre site is presently zoned RA (Rural Areas) District.
2) Comprehensive Policy Plan
The Frederick County Comprehensive Policy Plan is an official public document that serves as
the community's guide for making decisions regarding development, preservation, public
facilities and other key components of community life. The primary goal of this plan is to
protect and improve the living environment within Frederick County. It is in essence a
composition of policies used to plan for the future physical development of Frederick County.
[Comprehensive Policy Plan, p. 1 -1J
Land Use
The subject parcel exists in a mixed land use area of Frederick County. APAC Virginia is
located on the east side of Martinsburg Pike (Route 11 N); Easy Living Mobile Home Park is
located to the south; the 1 -81 rest stop is located on the other side of 1 -81 to the west; and several
existing residences and the historic Kenilworth property are located to the north.
The subject parcel comprising this rezoning request is located within the boundaries of the
Northeast Land Use Plan NELUP), and is located wholly within the Sewer and Water Service
Area (SWSA). The NELUP envisions the area of the subject parcel as future business use.
Retail, service, and office land uses are envisioned along the Martinsburg Pike Corridor, and
industrial uses are proposed adjacent to railroads. The proposal to rezone the 59.71 -acre site to
B3 (Industrial Transition) District, with the proffered GDP, is generally consistent with this land
use plan. The GDP illustrates offices along Martinsburg Pike (Route 11), self service storage
and office /warehouses uses in the center of the parcel, and warehousing in the rear beside the
existing railroad. [Comprehensive Policy Plan, page 6 -34 through 6 -38.5]
Transportation /Corridor Design Standards
The parcel comprising this rezoning application has frontage along Martinsburg Pike (Route 11
N). This roadway is classified as a major collector road and is a business corridor. Along
business corridors, the Comprehensive Policy Plan calls for landscape buffers between the road
and parking facilities to promote a more pleasant environment. A reduced number of entrances
to minimize traffic congestion, a bicycle trail, appropriate building materials, compatible uses,
and less visual clutter from signs are other corridor design standards encouraged by the
Comprehensive Policy Plan. [Comprehensive Policy Plan, page 6 -72]
Planning Staff Comment: At the August 18, 2004 Planning Commission meeting, staff noted that the
applicant had not proffered either enhanced landscaping or a buffer along Martinsburg Pike (Route 11
N). Such features have been proffered by numerous other rezonings along Martinsburg Pike (Route 11
N). The revised proffer statement dated August 19, 2004, adds a new proffer (G. Corridor Appearance
Enhancements), which provides a landscape strip along the Martinsburg Pike (Route 11 N) corridor
that includes a low -level berm, shrubs and deciduous flowering trees.
REZ #I 1 -04, Adams Development Group
Page 5
August 27, 2004
4) Potential Impacts
3) Site Suitabilitv /Environment
The applicant's Impact Analysis Statement indicates that there are no areas of Flood plains,
wetlands, steep slopes, or woodlands on the subject property. However, a natural waterway
exists along the southeast property line, and there may be some areas of wetlands associated
with it. Demonstration that all environmental features will be protected in accordance with
local and state regulations is required during the master development plan and site plan
processes.
The General Soil Map of the Soil Survey of Frederick County. Virginia indicates that a variety
of soil types exists on the 59.71 -acre site. These soil types include the following: Frederick
Poplimento Loams 2 -7% slopes, Massanetta Loam 0 -4% slopes, Frederick Poplimento Loams
very rocky 7 -15% slopes, and Carbo Oakley rock outcrop complex 2 -15% slopes. The former
two soil types are classified as prime farmland. The management of individual soil
characteristics must be demonstrated through the site engineering process associated with
subsequent development applications for the proposed project. [Soil Survey of Frederick
County]
A. Transportation
As noted in the applicant's Impact Analysis Statement, a traffic impact study of the proposed
rezoning was performed with this rezoning application. This study utilized the Institute of
Transportation Engineers (ITD) Trip Generation Manual for determining the maximum traffic
intensities for the proffered land uses. These proffered land uses include 40,000 square feet of
office. 156,875 square feet of warehouse /office, 492,500 square feet of warehouse, and 146,200
square feet of self service storage. A combined increase of4,603 VPD is projected for development
of the 59.71 -acre site under the proffered development pattern.
The 2002 VDOT Daily Volume Jurisdictional Report 34 indicates that there are currently 6,300 VPD
along the portion of Martinsburg Pike (Route I I N) which fronts the subject property. Based on the
proposed maximum traffic intensities, there would be an increase in traffic on Martinsburg Pike
(Route I I N) by 73.1 as a result of this rezoning.
The segment of Martinsburg Pike (Route 11 NO serving the subject parcel is comprised of two travel
lanes and a center turn lane. The applicants have proffered that access to the property will occur
through a single shared commercial entrance. Other transportation related proffers include the
installation of a right -turn deceleration lane and additional r -o -w dedication for possible future
widening. In addition, the applicants have agreed to contribute towards the cost of signalization
improvements in the area of Interstate 81 and Exit 321 to mitigate off -site transportation related
impacts.
VDOT Continent: VDOT has commented that they are satisfied with the transportation profers
offered by this rezoning application.
Rezoning #11 -04, Adams Development Group
Page 6
August 27, 2004
B. Sewer and Water
The Frederick County Sanitation Authority (FCSA) is authorized to serve the subject site with
public water and sewer due to its location within the SWSA. The FCSA is the agency
responsible for the operation and maintenance of the public water and sewer system to include
the Global Chemstone Quarry and the Opequon Waste Water Treatment Plant. The FCSA has
chosen to offer no comment concerning the impacts of the proposed rezoning.
At maximum possible build -out, the applicant projects that the proposed commercial area will
consume approximately 59,710 gallons per day (GPD) of water and generate an average daily
sewage flow of 29,855 GPD. An existing 20" water main running parallel with the Winchester
and Western Railroad, and a 10" water line running parallel with Martinsburg Pike (Route 11 N)
are located on the property. The applicant has also noted that an 8" sanitary sewer force main is
adjacent to the railroad.
The applicant indicates that the Opequon Waste Water Treatment Plant and the Global
Chemstone Quarry, in combination with other water sources. possesses adequate capacity to
accommodate the sewage flow and water demand projected with this proposal.
C. Historic Resources
As noted in the comments by the Historic Resources Advisory Board, the Kenilworth structure
is identified as a potentially significant historical structure and is potentially eligible for the state
and national register of historic places. A portion of the property is also located within the core
area of the Second Winchester Civil War Battlefield, according to the Study of Civil War Sites
In the Shenandoah Valley of Virginia, by the U.S. Department of Interior. This area is
identified as having retained its historical integrity.
5) Revised Proffer Statement Dated August 19, 2004
A) General Development Plan. The applicant has proffered to develop the subject
property in substantial conformance with the GDP. The GDP demonstrates a single
shared commercial entrance and the layout of the proposed land uses.
B) Permitted Uses. The proffer statement indicates that only office, office /warehouse,
warehouse. and self service storage land uses will be permitted on the property should
the rezoning be approved. Furthermore, a maximum square feet is proffered for each
of the four proffered land uses.
C) Transportation. Transportation proffers include the restriction of more than one
commercial entrance off of Martinsburg Pike (Route 11 N), construction of a right -turn
deceleration lane, contribution of 20' of additional right -of -way to VDOT for future
possible road improvements, and agreement to contribute towards the cost of off -site
signalization in the area of Interstate 81 and Exit 321.
Rezoning #11-04, Adams Development Group
Page 7
August 27, 2004
D) Outdoor Storage Buffer. The applicant proffers to preserve a continuous strip of
existing vegetation on the west side of the Winchester and Western Railroad for
screening purposes.
Planning Staff Comment: A Category C Zoning Buffer is required along the properly
line which adjoins the Easy Living Mobile Home Community (MH1 District). The
Planning Commission agreed, at its August 18, 2004meeting that 50' woodland strip
may he used to meet the screening requirements of this zoning buffer. However, a
minimum of 100' buffer area (75' inactive and 25' active) would still be required by the
Zoning Ordinance, and is shown on the proffered GDP.
E) North Buffer. The applicants have proffered to utilize the 6' high berm opaque
screening option along the north property line.
F) South Buffer. The applicants have proffered to utilize the 6' tall fence as the opaque
screening option along the south property line.
G) Corridor Appearance Enhancements. The applicant has proffered landscape
enhancements along Martinsburg Pike (Route 11 N) to include a 20' wide green
strip, a low -level earth berm. low -lying shrubs and a single row of deciduous
flowering trees.
H) Stormwater Quality Measures. The applicant has proffered that all commercial site
plans will be designed to implement best management practices (BMP) to promote
stormwater quality measures.
1) Monetary Contribution. A monetary contribution of $8,355.00 is offered by the
applicant for the purpose of impact mitigation for Frederick County Fire and Rescue
Services.
STAFF CONCLUSIONS FOR 08/18/04 PLANNING COMMISSION MEETING:
This application is a request to rezone 59.708 acres from the RA (Rural Areas) District to the B3
(Industrial Transition) District. It is proffered that only offices, office /warehouses, self service storage,
and warehousing land uses will be permitted on the subject property. The 2003 Comprehensive Policy
Plan articulates the planned land use of the subject parcel through the policies of the Northeast Land
Use Plan (NELUP). This land use plan designates the subject parcel for business land uses. As
described in this staff report, the development program proposed through the requested rezoning is
generally consistent with the adopted land use policies of the Comprehensive Policy Plan. However,
further consideration of enhanced design features is encouraged.
PLANNING COMMISSION SUMMARY ACTION OF THE 08/18/04 MEETING:
The applicant's representative stated their intentions to add two additional items to their proffer
statement and, pending acceptance of those additions by the Planning Commission, would modify the
proffer statement before the Board of Supervisors' consideration of the pending rezoning. First, the
Rezoning #11-04, Adams Development Group
Page 8
August 27, 2004
inclusion of a stipulation that all commercial site plans be required to use best management practices for
storm water management quality; this narrative will be placed on the commercial site plans and will
specify the party responsible for maintenance of those facilities. Second, the inclusion of enhanced
design features along Martinsburg Pike (Rt. 11) as follows: designation of an additional 20 -foot green
strip on the other side of the 20 -foot dedicated right -of -way strip, with installation of a two -foot high
earthen berm, low -level landscaping on the berm, and deciduous flowering trees spaced on 30 -foot
centers along Martinsburg Pike (Rt. 11) frontage. The applicant's representative also stated their
intentions to use an area along the railroad tracks for outdoor storage; a request was made to allow the
use of an existing 50 -foot woodlands strip as the ordinance- required buffer for the outdoor storage area.
The applicant also indicated how he would address wetlands issues during the master development plan
and site plan stages.
One citizen, an adjoining property owner at the southeast corner of the Adams' property, was seeking
clarification on what the applicant would be installing next to his property with regards to any berms,
fencing, or landscaping. He was concerned that any redirection of water run -off may impact his
property.
A member of the Commission restated the concerns of the Historic Resources Advisory Board
regarding protection of the viewshed for the historic Kenilworth property and the core area of the
Second Winchester Civil War Battlefield.
Members of the Commission were concerned about the increased traffic impacts to Martinsburg Pike
(Rt. 11), especially considering the cumulative effect on Route 11 from the West Virginia line to
Stephenson, due to the large residential subdivision taking place in Berkeley County, West Virginia.
They inquired if trip generation requirements were considered for the site plan stage of development.
The applicant's representative noted that worst -case scenario trip generation figures, using maximum
square footage, were used for the traffic study and it was their opinion that actual counts would be less
than what was projected. The applicant's representative added that they anticipated VDOT's widening
of Martinsburg Pike (Rt. 11), which is why they included the dedicated right -of -way, the access
management control. and their participation in acquisition of a traffic signal.
Members of the Commission believed that areas of B3 Zoning were needed in the County and although
there were concerns about the traffic impacts to Martinsburg Pike, the Commission voted unanimously
to recommend approval of the rezoning with the additional two proffers offered by the applicant;
specifically, the inclusion of a stipulation that all commercial site plans be required to use best
management practices for storm water management quality and the inclusion of enhanced design
features along Martinsburg Pike (Rt. 11) as stated above. Additionally, the request to allow the use of
an existing 50 -foot woodlands strip as the ordinance- required buffer for the outdoor storage area was
also recommended for approval.
(Note: Commissioners Triplett and Kriz were absent from the meeting.)
Following the required public hearing, a decision regarding this rezoning application by the Board
of Supervisors would be appropriate. The applicant should be prepared to adequately address all
concerns raised by the Board of Supervisors.
OUTPUT MODULE
APPLICANT: Adams Net Fiscal Impact
LAND USE TYPE 83 Costs of Impact Gedit. Credits to be Taken for Future Taxes Paid (NPV) Total Potential Adjustment For
REAL EST VAL $57 926 240 Required (entered in Cur. Budget Cur. Budget Cap. Future CfP/ Tax Credits Revenue- Nat Capital Net Cost Per
FIRE RESCUE 1 Capital Facilities col sum only) Oper Can Equip Expend/Debt S. Taxes, Other fUnadiusled) Cost Balanos Facilities Impact Dwaine Unll
Fire and Rescue Deparbnent 5301626 50 30 3301 626 1f01V/0!
Elementary Schools $0
Middle Schools S0 50 SO 50 30 30 3131V/01
High Schools 30
Parks and Recreation 30 30 30 $0 50 niDIV1O1
Public L&rary 50
Sheriff§ Offices 50 314,887 $0 50 514,887 314.867 $O $3 SDIV/01
SDIV /01
Administration Building 50 50 $0 $0 30 1/13IV/01
Other Miscellaneous Fadlifies 30 335,697 $39,411 575.108 575,106 50 DIV/0I
SUBTOTAL 5301,626 150,584 539,411 $0 589.996 589,996 5211,631 1ttrN/0f
LESS: NET FISCAL IMPACT 55,866823 55,866,823 85.868.823 1��• 8823 IV/01
NET CAP. FACILITIES IMPACT So 8pryal
NOTES: Model Run Date 04/19/04 CMM
INDEX: "1.0" If Cap. Equip Included 1.0
INDEX: t0' if Rev -Cost Bal, "0.0° if Ratio to Co Avg:
PLANNING OEPT PREFERENCES 1.0
Due to changing conditions associated with development in the County, the results of this
Output Module may not be valid beyond a period of 90 days from the model con date.
0.0
1.0
Rev -Cost Bal
Ratio to Co Avg
METHODOLOGY: 1. Capital fealties requirements are input to the first column as calculated in Iha model.
2. Net Fiscal Impact NPV from operations calculations is input in row total of second column
(zero if negative); included are the one -time taxes/fees for one year only at full value.
3, NPV of luaus apex cap equip taxes paid in third column as calculated in fiscal Impacts.
4. NPV of future capital expenditure taxes paid in fourth cal as calculated In fiscal impacts.
S. NPV of future taxes paid to bring curmM county up to standard for new facilities, as
calculated for each new facility.
6. Columns three through five are added as potential credits against the calculated capital
facilities requirements. These are adjusted for percent of costs covered by the revenues
from the project (actual, oraa ratio to avg. for all rasidental development).
NOTE: Proffer calculations do not Include include interest because they are cash payments up front. OEMs do Include bdarest if the protects are debt financed.
1.000
1.342
Project Description: Assumes 795,575 square feet of warehouse uses (includes 39,200 square feat of Oex tech) and 40,000 square feat of office uses on 59.71 acres zoned B3 District (PIN 44- A -75).
44 A 76A 44 A 76B
Mullins Conard
44 A 76B
Wilder
REZ# 11 04 Adams Development Group (44 A 75)
44 A 76A 44 A 76B
Mullins Conard
44 A 76B
Wilder
REZ# 11 04 Adams Development Group (44 A 75)
3.4 r
1
"d} !1
l .tfyt
V
d.. j 't
I•� f y. f f y Fr g T 4 V {.J C
F( t JY L n r; O� <.3 �s /r 4 r
4 c i v
t X1'° 15.. c a S a' a
t r r it F cJ y' r r ef
k r.., J l S M.•`. ,t 4 7
h,. Y et .v
F 'x ^.a
dr.
r
r•,
`�ael
t i �e
i.
5
F y
4y r
j 44" E
F 3 fide
na o fri' i1 A
1 4.. i ��j
1 �r 7 1 1`a��
t+ a
ar IC} lie
A, ff
f,�af'fh� <C ,A 'Sr� r r r
Ji� rfr to /t i
M '3.r 7 r v: ,,•4
r
ti:.
f
�l
j
r1'
r .x ;I 44• A 75A
F 44'
t Orndoff
Mullins
t r r f 5 r y ma
111 ,+R2� t• ♦O :ia �Fb}r{''
iT Y1t.
1 ryy ,5. e
1 wwwF��� jj,,�� t�
:�"p•i `GO 1 JrrY
t t
.i
"44
44U
-°'7t
76 4
n
i (t j�
S
�l''Y
�1
may
A 70
i' .t.
6B a
Tk t w
r
A76
0WiIder-
at
Y
4T
k�'
Y
i
nWlti
'se v r
a ter r i'
fit•
1 t .S" R 5 Y{a�
';S '}t t t y �S i
Q..• 4 ]L'�
C
9 r
Y
y f
7�
F
V
,U
p`
cl
r
�.4r
\4s roe`
4 o
c
y q q
e '�a
•vy x
V b t
T�
.I� .,e !J'j� ;G e ores s r
l 44 p s i c J
r! f Payne \mo^ r •.�s" �/`Y\n 1"q r
"at/x� e (vet
p
h T le
Y P •fG6• F f.'r'
.3 O p
-v
i
dk
Wt. y
n
l jy
;,s
F S.
r •-.9. a'
f P jet "•r'R"r'
4,� `r'=+
FJi "7
__3Sss'' 1 '6y�l+ <6 r, t f
J �t y r ppµ R
3 r'�.. -"is i r}•� t K%. t rf�
\t`a> L �'i y N� n +.r rf >"i' tF t �4 �11
sr. 4•d I "t a z 1�fe i .'i!r
4 f
t�f
r °<rr,�
r�
/%4
`,�F` 1/2
y
r
PP
f
y
.rN
/Srt'4 v ie G
v 10
1 4
w
r
e r
v� Y J i4 1',
1
1
J
r4 iyit
494
REZ# 11 04 Adams Development Group (44 A 75)
0 1 2 4 6 8
t�
F
w�ta
I l l l 1 t
s Miles
AMENDMENT
Action:
PLANNING COMMISSION: August 18, 2004 Recommended Approval
BOARD OF SUPERVISORS: September 8, 2004 APPROVED DENIED
AN ORDINANCE AMENDING
THE ZONING DISTRICT MAP
REZONING #1 1 -04 OF ADAMS DEVELOPMENT GROUP
WHEREAS, Rezoning #11-04 of Adams Development Group, submitted by Greenway Engineering,
to rezone 59.708 acres from the RA (Rural Areas) District to the B3 (Industrial Transition) District. The
subject property is located in the Stephenson Community, fronting the west side of Martinsburg Pike
(Route 11), opposite the intersection with Stephenson Road (Route 664), and is identified by Property
Identification Number 44 -A -75 in the Stonewall Magisterial District; and
WHEREAS, the Planning Commission held a public hearing on this rezoning on August 18, 2004;
and
WHEREAS, the Board of Supervisors held a public hearing on this rezoning on September 8, 2004;
and
WHEREAS, the Frederick County Board of Supervisors finds the approval of this rezoning to be in
the best interest of the public health, safety, welfare, and in conformance with the Comprehensive
Policy Plan;
NOW, THEREFORE, BE IT ORDAINED by the Frederick County Board of Supervisors that
Chapter 165 of the Frederick County Code, Zoning, is amended to revise the Zoning District Map to
change 59.708 acres from the RA (Rural Areas) District to the B3 (Industrial Transition) District, as
described by the application and plat submitted, subject to the attached conditions voluntarily proffered
in writing by the applicant and the property owner.
PDRes #20 -04
Richard C. Shickle, Chairman
Gina A. Forrester
Lynda J. Tyler
PDRes #20 -04
This ordinance shall be in effect on the date of adoption.
Passed this 8th day of September, 2004 by the following recorded vote:
Barbara E. Van Osten
Gary Dove
Bill M. Ewing
A COPY ATTEST
John R. Riley, Jr.
Frederick County Administrator
Date Received a
BOS Hearing Date j
To be completed by Planning
Zoning Amendme.
PC Hearing Date
Staff
The following information shall be provided by the applicant:
All parcel identification numbers, decd book and page numbers may be obtained from the Office of
the Commissioner of Revenue, Real Estate Division, 107 North Kent Street, Winchester.
1. Applicant:
Name: Greenway Engineering
Address: 151 Windy Hill Lane
Winchester VA 22602
2. Property Owner (if different than above)
REZONING APPLICATION FORM
FREDERICK COUNTY, VIRGINIA
Name: Adams Development Group, Inc.
Attn.: Robert Adams
Address: HC 34 Box 30
Bloomery WV 26817
3. Contact person if other than above
Name: Evan A. Wyatt, AJCP
4. Checklist: Check the following items that have been included with this application.
Location map
Plat
Deed to property
Verification of taxes paid
Telephone: (540) 662 -4185
Telephone: (540) 539 -3599
Telephone: (540) 662 -4185
Agency Comments
Fees
Impact Analysis Statement
Proffer Statement
44 -A -2
44 -A -3
44 -A -60
44 -A -61
44 -A -62
44 -A -63
44 -A -64
44 -A -70
44 -A -71
44 -A -72
44 -A -74
44 -A -75A
44 -A -76
44 -A -76A
44 -A -76B
44 -A -76C
44 -A -76D
44 -A -89
44 -A -89A
44 -1 -D
5. The Code of Virginia allows us to request full disclosure of ownership in relation to
rezoning applications.
Please list below all owners or parties in interest of the land to be rezoned:
Adams Development Group Inc.
6. A) Current Use of the Property: Agricultural, undeveloped (59.71 acres)
13) Proposed Use of the Property: Industrial transition uses
7. Adjoining Property: Please see attached
PARCEL ID NUMBER
USE
Residential
Residential
Residential
Residential
Residenti al
Institutional church
Institutional church
Residential
Residential
Residential
Residential
Residential
Residential
Residential
Residential
Residential
Residential
Industrial
Residential
Commercial
ZONING
RA
RA
RA
RA
RA
RA
RA
RA
RA
RA
RA
RA
RA
RA
RA
RA
RA
MH1
RA
MH1
8. Location: The property is located at (give exact location based on nearest road and distance from
nearest intersection, using road names and route numbers):
North of the City of Wirchester, fronting on the west side of Martinsburg Pike (US Route
11). opposite the intersection with Road R oute 664
5 +20t /56n,
I/ 5 1 °V
tg
Acres
Current Zoning
Zoning Requested
59.708
RA
B3
59.708
Total acreage to be rezoned
Information to be Submitted for Capital Facilities Impact Model
In order for the Planning Staff to use its capital faciliths impact model, it is necessary for the
applicant to provide information concerning the specifics of the proposed use. Otherwise, the
planning staff will use the maximum possible density or intensity scenario for the proposed Zoning
District as described on Page 9 of the application package.
9. Parcel Identification/Location: Parcel Identification Number 44 -A -75
Districts
Magisterial: Stonewall High School: James Wood High School
Fire Service: Clearbrook Middle School: James Wood Middle School
Rescue Service: Clearbrook Elementary School: Stonewall Elementary School
10. Zoning Change: List the acreage included in each new zoning category being requested.
11. The following information should be provided according to the type of rezoning
proposed:
Number of Units Proposed
Single Family hones: 0 Townhome: 0 Multi Family: 0
Non Residential Lots: 0 Mobile Home. 0 Hotel Rooms: 0
Square Footage of Proposed Uses
Office: 40,000 Service Station: 0
Retail: 0 Manufacturing: 0
Restaurant: 0 Warehouse: 492,500 sq ft
Other: 156 875 sq ft flex office/warehouse 146 200 sq ft self storage warehouse
12. Signature:
I (we), the undersigned, do hereby respectfully mace application and petition the Frederick
County Board of Supervisors to amend the zoning ordinance and to change the zoning map of
Frederick County, Virginia I (we) authorize Frederick County officials to enter the property
for site inspection purposes.
I (we) understand that the sign issued when this application is submitted must be placed at the
front property line at least seven days prior to the Planning Commissicn public hearing and
the Board of Supervisors' public hearing and maintained so as to be visible from the road
right -of -way until the hearing.
I (we) hereby certify that this application and its accompanying materials are true and accurate
to the best of my (our) knowledge.
Applicant: Greenway Engineering
By:
By:
Owner(s): Adams Development Group Inc.
R rt C. Adams, its President
Date: *it 3 /o4--
Date:
Planning Office, County of Frederick, Virginia, 107 North Kent Street, Winchester, Virginia 22601
Phone 540-665-5651
Facsimile 540 -665 -6395
Know All Men By These Presents: That I (We)
(Name) Robert C. Adams, president Adams Development(Phone) 540 539 -3599
Group
(Address) HC 34 Box 30 Bloomery, WV 26817
the owner(s) of all those tracts or parcels 01 land "Property') conveyed to me (us), by deed recorded in the
Clerk's Office of the Circuit Court of the County of Frederick, Virginia, by
Instrument No.030015420 on Page 0670 and is described as
Parcel: 44 Lot: 75 Block: A Section: Subdivision:
do hereby make, constitute and appoint:
(Name) Greenway Engineering (Phone) 540 662 -4185
(Address) 151 Windy Hill Lane Winchester, VA 22602
To act as my true and lawful attorney -in -fact for and in my (our) name, place and stead with full power and
authority I (we) would have if acting personally to file planning applications for my (our) above described
Property, including:
My attorney -in -fact shall have the authority to offer proffered conditions and to make amendments to
previously approved proffered conditions except as follows:
This authorization shall expire one year from the day it is signed, or until it is otherwise rescinded or
modified. Sin In witness thereof, I (we) have hereto set my (our) hand and seal this 9 day of 2001 i,
Signature(s)
Special Limited Power of Attorney
County of Frederick, Virginia
Rezoning (Including proffers)
Conditional Use Permits
Master Development Plan (Preliminary and Final)
Subdivision
Site Plan
State o f Virginia, City /County of Vie 2Y r
I,. -e S54 ca, I'1.w a Notary Public in and for the jurisdiction aforesaid, certify that the person(s)
who signed to the foregoing instrument and who is (are) known to me, pers�on?ally appeared before me
has acknowledged the same before me in the jurisdiction aforesaid this T'day oh_ p 200 i f
9 /)41-t r r)-- k„.L0 My Commission Expires: 'Th1PEM__'
J 'ry Public
To -wit:
VICINITY MAP
SURVEYORS CERTIFICATE
I, EDWARD W. DOVE, A DULY CERTIFIED LAND SURVEYOR IN THE COMMONWEALTH
OF VIRGINIA DO HEREBY CERTIFY THAT THE LAND SHOWN HEREON IS NOW IN
111E NAME OF THE ADAMS DEVELOPMENT GROUP. INC. AND WAS ACQUIRED BY THEM
BY DEED FROM BROWN LOVETT. JR. BY HIS ATTORNEY -IN -FACT, CATHERINE C.
LOVETT. THE DEED WAS DATED JULY 16, 2003, AND RECORDED AT INSTRUMENT
#030015420 AMONG THE LAND RECORDS OF FREDERICK COUNTY, VIRGINIA.
I FURTHER CERTIFY THAT THE SURVEY IS CORRECT TO THE BEST OF MY
KNOWLEDGE.
SURVEYOR
STATE OF VIRGINIA
COUNTY OF FREDERICK, TO -WT:
1, GREGORY R. SHAUGHNESSY A NOTARY PUBLIC IN AND FOR THE
STATE OF VIRGINIA AND COUNTY OF FREDERICK DO HEREBY CERTIFY THAT
T1 DAY PERSONALLY APPEARED BEFORE ME EDWARD W. DOVE, WHOSE
NAME IS SIGNED TO THE FOREGOING INSTRUMENT DATED 3RD DAY OF
SEPTEMBER, 2003, AND ACKNOWLEDGED THE SAME BEFORE ME IN MY STATE
AND COUNTY AFORESAID.
GIVEN UNDER MY HAND THIS 3RD DAY OF SEPTEMBER.
MY COMMISSION EXPIRES NOVEMBER 30, 2005.
NOTARY PUBLIC
BOUNDARY SURVEY
ON THE
PROPERTY OF
THE ADAMS DEVELOPMENT
GROUP, INC.
INSTRUMENT #030015420
STONEWALL DISTRICT
FREDERICK COUNTY, VIRGINIA
THIS PLAT HAS BEEN PREPARED WITHOUT THE BENEFIT OF A HOE REPORT I DATE: JULY 29, 2003
AND DOES NOT NECESSARILY INDICATE ALL ENCUMBRANCES ON THE PROPERTY.
SCALE: 1" 400'
OWNER: THE ADAMS DEVELOPMENT GROUP, INC.
W.O. D2014
FLOOD NOTE
ZONE C COMMUNITY NO: 510063 PANEL: 0110 B DATE: 7 -17 -78
ASSOIATES
3078 SHAWNEE DRIVE
P.O. BOX 2033
WINCHESTER, VIRGINIA 22601
(540)667 -1103
ENGINEERS
PLANNERS
SURVEYORS
1 OF 2
dovei nc ®visuallink.com
44 TH
1 I
r
x
U EDWARD W. DOVE 9
CERT. NO.
54- 17 -3(A) 964
t9 i suW4
N 5529'14"
DEMON= MEMO
NSI. .01000N10
ID ®RA
OE M3flF1NL
N 53'29'14"
62.22'
PAYNE O L A RUIN B
OEB7) BOOK 381 PG 225
ZONED M1
USE COMMERICAL
POST
242.44'
S s
r
NNIE S T 00 0 raw L
US E t RF
70'17'26
U.S. ROUTE 11 1 4060'
VW VARIES
RF
CL OF
RAILROAD TRACKS .22
SANITARY
MANHOLE
FENCE
PARCEL B
207029.4 SO. FT.
4.753 ACRES
PARCEL A
3.393,839.800
54.955 ACRES
5 76 21'26" W
73.30'
S 70'36'46" W
94.54'
29'31'26 W
47.75'
S 2759'06"
165.49'
POST
OFMil DEED BOON w FR 100N 62'08'46" W
ZONED MSOMMiTW. 186.36' .43 E:
USE h
a'
rV
O
1
EMMANUE! CHURCH
BOUNDARY SURVEY
ON THE
PROPERTY OF
THE ADAMS DEVELOPMENT
GROUP, INC.
INSTRUMENT ¢030015420
STONEWALL DISTRICT
FREDERICK COUNTY. VIRGINIA
BARN
RS
V
7• 87
t R.
WATER
VALVES
S 24'31'46" W
182.63
POST
0,
01
u
APAC PROPERTY
01
0
m
u VDH MONUMENT
to CRNDOFF CHARLES W
0 DEM BOOK 415 PG 217
ZONED RA
USE R'SIDEN11A1
POST
MU.JJNS DEBORAH A
BOOK 647 PG 310
ZONED RA
USE RESIDENI'.AL
WILDER ANN H
DEEM) BOCK. 415 PG 443
ZC+1ED RA
USE RESiDEYi+A1
OST
VDH
ONUMENT
35.26'
S 70'58'30" E
CONA.RD FLORENCE H
OM/ BOOK 415 PG 490
ZONED RA
USE RESIDEYDAL
:EFT CORC1NY L
J We 010000101
ZONED RA
USE RESIDE^i1TAL
THIS Is TO CERTIFY THAT ON rVLY 29, 2003
1 MADE AN ACCURATE SURVEY OF 1HE PREMISES
5H0101 HEREON, AND THAT MERE ME NO EASE-
MENTS OR ENCROACHMENTS VISIBLE ON THE
GROUND OTHER THAN THOSE SHOWN HEREON.
NOTES:
1. TAX ASSESSMENT MAP NO. 44 -A -75
2. CURRENT INSTRUMENT IN CHAIN CF TILE IS
4030015420
3. RE.. RERAN FOUND. RS" REBAR TO RE SET
MIS PLAT HAS BEEN PREPARED WITHOUT THE BENEFIT Of A TIRE REPORT DATE: JULY 29, 2003
AND D06 NOT NECESSARILY NDICAIE ALL ENCUMBRANCES ON THE PROPERTY.
SCALE: 1" 400'
OWNER: THE ADAMS DEVELOPMENT GROUP, INC.
W.O. D2014
FLOOD NOTE
ZONE C COMMUNITY NO: 510063 PANEL' 0110 B
DATE: 7 17 -78
ASSCCIATES
3078 SHAWNEE DRIVE
P.O. BOX 2033
WINCHESTER, VIRGINIA 22601
(540)667 -1103
ENGINEERS
PLANNERS
SURVEYORS
2 OF 2
doveinc ®visuc Ilink.com
EDWARD W. DOVE
CERT. NO.
54- 17 -3(A) 964
l `7 /i /G' O
9'10 SURV
AREA TABULATION
BUILDING AREA
rK %9.wc, OU
MH -I BUFFER LEGEND
192 500 S F
ZONED
r�
492,500 SF
WAREHOUSE
S OTHER SIDE OR R
146 200 SF
SELF TORAGE
156,875 SF
OFFICE WAREHOUS
40,000
OF
ZONING BUFFER LEGEND
CATEGORY WC FL, ACREPI
ILLS SCREFN AIR Swirss
il lf
Fl-
im
DO FO
DOT 20'
DEDICATION
FOR
FUTURE RT. 11
WIDENING
ro 9
orspcno 5099