Loading...
HomeMy WebLinkAbout030-26 (RezGibsonProperty(EstateOfMonteWoodGibsonJr)) ORDINANCE Action: PLANNING COMMISSION: September 16,2026 Work Session Held PLANNING COMMISSION: October 7, 2026 Recommended Denial BOARD OF SUPERVISORS October 28,2026 Approved AMENDING THE ZONING DISTRICT MAP REZONING#08-26 FOR GIBSON PROPERTY(ESTATE OF MONTIE WOOD GIBSON,JR.) WHEREAS,REZONING#08-26 for Gibson Property submitted to rezone+/-244.06-acres from the RA(Rural Areas)Zoning District to the Ml (Light Industrial)Zoning District with proffers. The property is located at 1787 Fairfax Pike and is generally north of Route 277 (Fairfax Pike) and west of Route 522 (Front Royal Pike)and is identified by Property Identification Numbers(PINs)87-3-B, 87-A-16B,and 87-A-94 in the Shawnee Magisterial District; and WHEREAS,the Frederick County Planning Commission held a work session on this rezoning on September 16, 2026,and took no action; and WHEREAS,the Frederick County Planning Commission held a public hearing on this rezoning on October 7,2026, and recommended denial; and WHEREAS,the Frederick County Board of Supervisors held a public hearing on October 28,2026; and WHEREAS, the Frederick County Board of Supervisors finds the approval of this rezoning to be in the best interest of public health, safety, and welfare,and in general conformance with the Comprehensive Plan; NOW,THEREFORE,BE IT ORDAINED by the Frederick County Board of Supervisors,that Chapter 165 of the Frederick County Code,Zoning,the Zoning District Map is amended in accordance with Rezoning#08-26 for Gibson Property submitted to rezone+/-244.06-acres from the RA(Rural Areas)Zoning District to the M 1 (Light Industrial)Zoning District with proffers dated October 27, 2026. The conditions voluntarily proffered in writing by the Applicant and the Property Owner are attached. This ordinance shall be in effect on the date of adoption. Passed this 28'day of October 2026 by the following recorded vote: John F. Jewell, Chairman Aye Jason C. Aikens Aye Albert L. Omdorff Aye Robert W. Wells No Michael D. Guevremont Aye Robert T. Liero Aye Gary R. Oates Aye A COPY ATTEST / Michael Bollhoefer ' Frederick County Adi�strator No. 030-26 1 U REZONING#08-26 Gibson Property(Estate of Montie Wood Gibson, Jr.) Staff Report for the Planning Commission Prepared: October 23, 2026 w. Staff Contact: M. Tyler Klein,AICP, Senior Planner Executive Summary: Meeting Schedule Planning Commission: September 16, 2026 J Action: Work Session held Planning Commission: October 7, 2026 Action: Recommended Denial Board of Supervisors: October 28, 2026 Action: Pending Property Information Property Identification Number PIN 87-3-13; 87-A-1613; 87-A-94 Address 1787 Fairfax Pike, White Post Magisterial District Shawnee Acreage +/- 244.06-acres Zoning & Present Land Use Zoning: RA(Rural Areas) Land Use:Agricultural Proposed Zoning M1 (Light Industrial Adjoining Property Zoning & Present Land Use North: RA(Rural Areas) District Land Use:Agricultural/Vacant M1 (Light Industrial District Warehouse/Distribution South: R4 (Residential Planned Community) Land Use: Vacant(Madison 277) R5 (Residential Recreational Residential (Lake Frederick) Community) District RA(Rural Areas) District Residential MH1 (Mobile Home Community) Mobile Home Community District Sand 's East: RA(Rural Areas) District Land Use: Residential/Vacant/Commercial; Clarke County Clarke County West: RA Rural Areas District Land Use: Residential/Vacant Proposed Use This is a request to rezone three (3)parcels totaling+/- 244.06-acres from the RA(Rural Areas)Zoning District to the M1 (Light Industrial Zoning District)with proffers (revised 10/22/26)to enable industrial development. Page 2 of 9 Positives Concerns The proposed zoning district, MI (Light The proffer statement does not fully address Industrial) is typically associated with the stated concerns from the Planning future land use designation for"industrial," Commission and/or how the proposal meets for which significant portions of the the intention of the "mixed-use industrial properties are designated. office" (MUIO) designation on portions of the properties along Route 277. Depending on The proposed rezoning generally aligns with what uses ultimately develop, the proposal broader Plan policy in support of may lack compatibility with the broader sub- opportunities for industrial development, a planning areas (Lake Frederick UDA) and the broad selection of employment opportunities, rural areas of Clarke County. expanding the County's industrial base in support of a low residential tax rate and The proposed improvements to Routes enhancing industrial development potential in 277/522/340 intersection (Proffer 2.8) are vicinity of Winchester Regional Airport and proposed to be installed within the existing Virginia Inland Port. ROW or in the event sufficient ROW does not exist they may install other such road The revised proffer statement includes improvements that are able to be installed architecture and site design commitments to within the existing ROW. This does not fully building form, materials, color palette, guarantee that improvements will mitigate all reduced(varying)building heights along impacts on this key intersection and primary roadways and in land bay A, potentially leave others (VDOT or the maximum building footprints of 80,000 SF in County)responsible for such improvements, land bay A, prohibiting loading docks along which are not currently planned, designed, or primary roadways and enhanced buffer and funded. screening requirements to further address Comprehensive Plan policies for "high-quality architecture and site design" a "mix of flexible uses." Transportation improvements proffered include dedication of right-of-way (ROW) for improvements to Route 277 (Fairfax Pike), future dedication of the planned collector road across the properties, and multiuse trails along primary roadways, are generally consistent with adopted Plan policy. The application also includes proffers to fully mitigate transportation impacts including regional transportation improvements (lanes) to the Double Tollgate intersection. Page 3 of 9 Review A2ency Comments: Review Agency Comment Comment Summary Status Date Virginia August 7, VDOT has reviewed the revised proffers Fully Department of August 26, [10/20/26] and take no exception to the addressed. Transportation September 30, proposed changes. (VDOT) October 20, 2026 See comment letters. Frederick Water June 12, 2026 The Impact Analysis Statement is silent on Not fully proposed water and sewer demands, and addressed. applicant responsibilities. The applications states that they—the Applicant- "understands and acknowledges the timing associated with the sanitary sewer connection and the effort required by the County to make that available". The applicant should provide proposed water and sewer demands, and clarification of the statement regarding"the effort required by the County regarding sanitary sewer". See comment letter Clarke County June 12, 2026 See comment letter Historic August 24, Following their review of this application, Partially Resources 2026 the HRAB recommended a addressed. Advisory Board commemorative marker for the Battle of (HRAB) Double Tollgate be sited on the property, that a Phase 2 Archeological Survey be conducted(if warranted by the Phase 1 Archeological Survey) and additional documenting and preservation of the architectural features of the Funkhouser Farmhouse be completed if developing the subject property identified with 87-3-A. See comment letter. Frederick County June 16, 2026 All future development shall comply with (FC)Fire Marshal the Frederick County Fire Prevention Code and all other applicable codes. FC Public Works June 2026 See comment letter Page 4 of 9 FC County July 2026 No Attorney comments. Planning & Zoning Staff Analysis: Comprehensive Plan Conformance: The Comprehensive Plan (adopted November 2021) and the Southern Frederick Area Plan (SOFRED, 2024)provide guidance on the future development of the subject properties. The Plan identifies the subject properties with a combination of "industrial" and "mixed-use industrial office"(MUIO)land use designations and as being within the limits of the sewer and water service area (SWSA). The MUIO designation is primarily along Route 277 (Fairfax Pike), intended to serve as a mixed-area and transition from residential uses (primarily Lake Frederick), south of Route 277. "The Route 277 Triangle Centers of Economy is designed to be a significant area of commercial and industrial opportunity that is fully supportive of the Frederick County Economic Development Authority's targeted goals and strategies. The intent of the mixed-use designation is to further enhance the County's commercial and industrial areas and to provide focus to the County's future regional employment centers. In specific areas a mix of flexible uses, with office uses in prominent locations is encouraged. Such areas are supported by substantial areas of industrial and commercial opportunity and provide for areas that are well designed with high-quality architecture and site design. It is the intent of such areas to promote a strong positive community image. Residential land uses are not envisioned in this area." The proposed zoning district, M1 (Light Industrial)is typically associated with the future land use designation for "industrial," for which the properties are primarily designated. Further, the proposed rezoning generally aligns with broader Plan policy contained in Chapter 4 — Business Development in support of opportunities for industrial development, ensuring a broad selection of employment opportunities and expanding the County's industrial base in support of low residential tax rate. However, no fiscal impact study was provided in support of the rezoning request. Contained in the area plan (SOFRED) are additional policies for potential industrial development noting for this area of the County an envisioned "mix of flexible uses" to fulfill the intention of the "mixed-use industrial office" (MUIO) designation on portions of the properties along Route 277. At a minimum, additional uses that might be noxious, unsafe, or disruptive as well as uses that generate higher traffic than what has been contemplated in the TIA should be further considered for exclusion and included in the proffer statement. In respect to Plan conformance, including alignment with the future land use may, general policies for business development and area plan specific policies, the proposal is only partially compliant. Page 5 of 9 Further, sensitivity should be given to the broader area and how a future large assembly of industrial development may impact other sub-planning areas and the rural areas of Clarke County. Specifically, the "Lake Frederick Urban Development Area" also described in SOFRED is immediately to the south, which is planned for future residential and neighborhood village (Lake Frederick and more recently the Madison 277 projects). The uses ultimately to be developed on the Gibson tracts or uses to be prohibited should be carefully selected and their potential impacts (noise, odor, vibration, traffic) on surrounding properties and ensure they are fully mitigated. At the September 16th work session and October 7th public hearing, the Planning Commission expressed a desire for the applicant to further evaluate land bay phasing with allowed and prohibited uses designated in the proffer statement. This could allow for unrestricted M1 (Light Industrial) Zoning District uses to-be-developed in the rear of the site that adjoins the existing Eastgate industrial park, and less intensive development (with smaller buildings, lower building height, limited uses)would be developed along Route 277 and Route 522 frontages. However, some of these concerns regarding allowed and prohibited uses may be further mitigated through the proffered building form included in Proffer 1 —Site Development. The reduced size and scale of the buildings may ultimately be better suited for flex-type uses, professional offices and services, and other technical trades and services rather than large warehouses and distribution type facilities.As proffered, for frontages along Routes 277 and 522 corridors, the applicant has prohibited loading dock visibility within 250-feet of the roadways and lowered the building height to a maximum height 45-feet within 100-feet of the roadways and/or capped building heights in Land Bay A as shown on the GDP(limited to a single-story 35' tall building, or a 45'tall multistory building, and a maximum outside building footprint of 80,000 SF)to be more harmonious with existing and planned residential and agricultural uses. Planned Transportation Improvements, Traffic Impacts and Site Access: The Plan also identifies planned transportation improvements on the subject properties including a "new major collector" road bisecting the site and multiuse trail connecting Route 277 to Route 522.Additionally, a multiuse trail is envisioned along Route 522 and Route 277 (Fairfax Pike)and future widening to Route 277 (improved minor arterial). The collector road right-of-way (ROW) is identified on the Generalized Development Plan and dedication is included in Proffer 2.8 Pedestrian accommodations (I 0-foot-widemultiuse trail) along Route 277 and Route 522 are also proffered. In this respect, the rezoning is compliant with Comprehensive Plan transportation policies. The Traffic Impact Study (revised July 30, 2026) notes that the "future with development" key regional intersections studied (Warrior Drive & Fairfax Pike — Intersection #1, & Route 522 & Fairfax Pike/Lord Fairfax Highway—Intersection 93) continue to fail: "Two of the regional intersections have level of service or queuing deficiencies due to existing or background related traffic volumes. To mitigate site-related impacts, the following improvements are recommended: at Intersection 1, convert the eastbound and Page 6 of 9 westbound left-turn phasing from protected-only to flashing yellow arrow operation; and at Intersection 3, add an exclusive eastbound left-turn lane and a second northbound left- turn lane." The revised proffer statement dated 10/20/26(2.8)only partially addresses these TIS recommended improvements to these regional intersections, noting that improvements are subject to availability of sufficient right-of-way. As proposed, the rezoning may not fully mitigate transportation impacts generated by development of the subiect properties. Four (4) points of site access are proposed to serve the +/-244-acres of industrial development; three (3) along Fairfax Pike, and one (1) along Front Royal Pike. The proximity of the proposed site entrance from Route 522 (Entrance D on GDP) to the intersection of Fairfax Pike/Route 522/Route 340 appears to run contrary to "access management" goals and strategies contained in the Comprehensive Plan(Chapter 5—Transportation). The proffers (2.9)include a requirement for a signal justification report(SJR) for site access points and to install any improvements warranted before occupancy of the first building. This proffer is satisfactory to both VDOT and County staff. Proffers Statement, Impact Analysis & Generalized Development Plan(GDP): Proffers (Revised October 22, 2026) Staff Comment Proffer 1.2, 1.3, 1.5, 1.6 and 1.8 has been proposed to further articulate how the proposal will implement Plan policy for "high-quality site design and architecture" and a"flexible mix of uses"including specifying a minimum of 3 architectural features or colors for buildings facing Routes 522 and 277; limiting use of EFIS to Proffer 1 — Site Development secondary structures and features; enhanced landscaping and screening including use of native species, larger plantings at time of installation and an earthen berm; reducing building heights along Route 277 and 522 and in Land Bay A; limiting total building footprint in Land Bay A to 80,000 SF; and prohibiting loading docks along primary roadways. Proffer 2.8 has been revised to specify that proposed improvements to the Routes Proffer 2 —Transportation 277/522/340 intersection are allowed to be installed within the existing ROW or in the event sufficient ROW does not exist they may Page 7 of 9 enter into a reasonable agreement with Frederick County and VDOT to install other such road improvements or lane additions that are able to be installed within the existing ROW. While VDOT offered no additional comments on this revised proffer, Planning and Development staff continues to have concern that this may not fully guarantee that improvements will mitigate all impacts to this key intersection. Proffer 3 —Water and Sewer No comment. Improvements Proffer 4 —Proffer Payments No comment. The proffer statement excludes the following uses: regional detention facilities; restaurants; restaurants with drive-thru; data centers. Significant portions of the subject property fronting Route 277 are identified as "mixed-use industrial/office (MUIO)" and as stated in the plan are intended for a"mix of flexible uses" of limited intensity. Depending on what uses ultimately develop, the proposal may lack compatibility with the broader area and does not address how a future large assembly of industrial development may impact other sub-planning areas (Lake Proffer 5—Limited Uses Frederick UDA) and the rural areas of Clarke County. However, some of the MUIO compatibility and allowed and prohibited uses concerns raised by the Planning Commission may be mitigated through the proffered building form included in Proffer 1 (described above) particularly along Route 277 corridor and within land bay A where the applicant has limited loading dock visibility and lowered the building heights and size to be more harmonious with existing and planned residential and agricultural uses. No comment. Proffer 6—Exclusion of Public Property from Proffers Page 8 of 9 No comment. Proffer 7— Severability Proffer 8—Binding Effect No comment. Proffer 9 —Escalator Clause. No comment. UJ CIA -j X ............ ........ lh� PUR-6 LC BOHLER// tiq .......... .... PLAN C-3 The included generalized development plan (GDP, revised October 20, 2026) depicts proposed site entrances (A, B, C & D), land bay A(new), buffer areas and future collector road ROW area. Planning Commission Summary&Action from September 16, 2026 Work Session: The Planning Commission held a work session on September 16, 2026, to discuss the proposed application with staff and the applicant representatives. The Commission discussed the following topics: • Transportation impacts and mitigations particularly for proposed site entrance locations (including the number of entrances & alignment), impacts to key intersections include Route 277/Route 522 and frontage improvements along Fairfax Pike; Page 9 of 9 • Concern over the inclusion of a waiver to allow for overhead utilities for all electrical infrastructure; • Consideration of use mix,particularly along Route 277, including additional proffered allowed and prohibited uses, and concern for a data center in the future at this location if not proffered as a restricted use; • Lack of building design, materials, modulation, height, buffers, screening and increased setbacks particularly along Route 277 and Route 522 frontages. The applicant was further directed to consider the discussion at the work session and key areas of concern and prepare a revised application submission for the public hearing. No action was taken by the Planning Commission. Planning Commission Summary &Action from October 7, 2026 Public Hearing: The Planning Commission held a public hearing on October 7, 2026. The primary discussion among the Commission focused on traffic,proffered transportation improvements, public utilities capacity and allowed/prohibited uses. Sixteen(16) speakers spoke in opposition to the proposed rezoning, citing concerns for increased traffic particularly at the Double Tollgate intersection; impacts to natural resources, residences, roadways; a lack of commitment to allowed and prohibited uses including data centers; water and sewer availability; building design; loss of rural and agricultural land; uncertainty with the feasibility of proffered transportation improvements; and need to halt this proposed development until after the new Comprehensive Plan is adopted(underway; anticipated adoption in fall 2027). The Planning Commission voted 11-2 (Commissioners DeHaven& Stowe—No)to recommend denial of the rezoning. Following a public hearing, staff is seeking a decision by the Board of Supervisors on this rezoning application. • 1 • • • • • • • • • • • • • • ROYAL•PIKl.' RRiERR�o�ai,r¢ulv�� J19 31A9fROM�YAL�PIKE� :�J UMIL S R 134 FROM ROYAL PIKE 1 + UN'W WR12S Ff1S 1 KATNLEEN CT 110 M�4 yyR�� RUN W 363 29d2 FROM JG46 fROM TLRRYS W RO�AL•VIMKE 4, � ROYAL►IK! RoyAL isa 132lTERRYS W �••' •u• 1:;- RUN LN RUNW 3201 259 294 WEIGHTS 2 FRONT fRNW.RoOYA AL PIKE J49 RIMR,RD S.PIK! KATHLElN CT 109 RL PIKF WWGHIS RUN W 1621KATNLElN Cl 323J FRONT. RUN W JS2 3200 FROM •'- � , ��193 ROYAL iROYAL PIKE 21d � KATNLEEv�Ci PIKE J2 NT! R•N6�EYMAN�W DURNEYMAN 206 IRON► AL►IKE 121 REARDON RD URNEYMANYN 260 WR/GFRS y �JrlA ilwil1: RD r WRIGi11S RUN W f I372 FROM 32d1.. %iAX PIKE RUN W ROYAL PIKE FRONT • R F RFAX206WRIGNIS3 - ROYAL PIKE 242 PIKE • • 2270FROM Ot, REARDON'— AIR v>FAIRFAX ROYAL III FAX PIKE SASSER LN KE ji,«+�, - PIKE 1677 r�169 fAlRfax fA1RfAX 16d1 t'L'J'8 7 A 168 ` 1�L"t w,�SASSER LN i1K! PIKE FAIRFAX 172 ISdd; 1675 FAIRFAX PIKE SASSER LN ; IRFAX PIKE Y - FRO �tKE '-r+, ROYAL PIKE ;� 180 SASSER ` �Sd'fROM_ RO ALrPIKE it 0 r Y: -_ J615 FROM r . �• ROYAL PIKE Y FRO N7: 1702 ROYAL PIKE FAIRFAX � PIKE IddO FAIRFAX�PIKE $ N 1902. IRFAX'PIKE j + 190d fAIRF%IX 3o3o FRONT ROYAL'PI R'• f!p' KE1KE. � '*3" 1954 FAIR PIKE��1998 !9 '�:•I'. • • 11 IFA1RFA�KE 2006 FA1RfAX PIKE \ ry��\ l 2030'PAI I ��47J PIKE 87 A 94 FAIRFAX,PIKE .v ♦ -�2154 ��F ` fA1RMx FAIR F PIKE PRCE 222 21d0 FAIRFAX •• ' ,� FAIRFAX PIKE • PIKE r • 1 • Gibson Property • Monte Wood • • Rezoning from RA to Ml Long Range Land Use Map "• ROYAGPIKE RrrrFD. D�alai,rleuNl IKE 319 WRIGHTS _ 2 MAN R DR RUNLN 32E� 106KATHLEENCT JIdJF OM Y WRIGHTS�3S3 29d2 FROM 11dTERRYS W ROYAL VIKE WRIGNIS RUNW. J046FROM a RUN W WRIGH73 .� ROYAL PIK[ ROYAL 16d 132LRRYS W �201/FROM `I '' & RUN LN .fir; ROYAL'PIKE J49 RATER RD e ` 239 291 WRIGNIS \ �•='` PIK! KATHLEENCT WRIGNTS ��� J200 FROM ' i RUN W 182 KATH FROM q. ,�N W J32 ^� ROYAL PIKL YAL i IOURNEYMAN W WRIGHiS d J244 FROM PIK 2 E RUN�W � ROYAI�PIKE �V � 10• y y %au URNEYMAN W J260,FROM" = •FRROYM�YALPIKE ••4r► 208 RO •}"� IEYMAN LN 260 E 121•RE.4 � WRIGHiS ' I WRIGMS RUN W RUN W 3372 FRONT. J2d1 i REARDONRD 59 QFAX PIK- 206 • ROYAL PIKE FRON'Fti•.•• •••, . 1379 WRIGHTS ROYALTPIKE FAIRf RUNW 1679 227FPONT S " : REARDONRD PIKE FAIRfAX PIKE ROYAL �- 1605 �AX' 1677ERE #l: PIKE �,SASSER•W - +�1''•. PIKE FAIRFAX •�. 169 tTr �P PIKE 1681 87 A Ilk, SASSER 1615 FAIRFAX IF fA1RFAX r' iN 172 •- L588 1678 PIKE 3111 }'�.,t SASSER W IRFAX fA1RfAX,� FROM DIKE PIKE '" F� -h, YALTIKE 180 SASSER i� J4Jd FRO— PIKE M RO ALr - ACS6. 15 FROM i 3508 1fi ROYAL PIKE FROM �1702 ' / ROYAL PIKE IRFAX � / OF we 1880 fAIRFAX�PIKE 1902 FAIRFAkPIKE • �1'1908 i FAIRfAX �F•PI KE ♦� 3636 FRONT ROYAL PIKE ''• • FAIRFA1hPIKE ' • �.1FAI FFIAXJPIKEE.�y. — �.2006'fA1Rf'AX�PIKE 2oso faIRFAXfPI�K.E 87 A 94 �Z JFAIRFAX PIKE �� •. • • �/� • 203 • �J 2154 F AX =PIKEX PI! 21d0• i,',„ �� �r MIRFAX °` PIKE • RWOO WAY •,r.s.••.. `. R WOOD WAY WAY' r 1 11 •11 :11 II .11 111 11 - / 40DSubmittal Deadline REZONING APPLICATION P/C Meeting FREDERICK COUNTY, VIRGINIA BOS Meeting 1. Property Owner(s) (please attach additional page(s) if more than two owners): Name. Estate of Montie Wood Gibson, Jr. Specific Contact Person if Other than Above. Debra D. Davis, Administrator Address: P.O. Box 187, White Post, VA 22663 Telephone: Email: Name: Specific Contact Person if Other than Above: Address: Telephone: Email: 2. Other Interested Parties (such as a contract purchaser) (please attach additional page(s) if necessary): Name. Real Estate Pursuits LC Specific Contact Person if Other than Above: Clark Tutwiler Address. 4100 Monument Corner Drive, Suite 300, Fairfax, VA 22030 Telephone: (703) 633-2684 Email: cutwiler@petersoncos.com 3. Law firm, engineering firm, or other person, if any, serving as the primary contact person for this application: Firm Name. Thomas Moore Lawson, P.C. Specific Contact Person at Firm: Thomas Moore Lawson, Esquire Address: P.O. Box 2740, Winchester, VA 22604 12 Telephone: (540) 665-0050 Email: tlawson@lsplc.com *Please note that, if a law firm, engineering firm, or other person, other than the owner of the property, will be acting on behalf of the owner and/or executing papers on behalf of the owner in connection with the rezoning, the owner will need to execute a power of attorney form granting the firm or person such authority. 4. Project Name: Gibson Property 5. Property Information: Property Identification Number(s): 87-3-B; 87-A-16B; 87-A-94 Total acreage of the parcel(s): 244.062 acres Total acreage of the parcel(s) to- 244.062 acres be-rezoned: Current zoning designation(s) and Rural Areas (244.062 acres) acreage(s) in each designation: Proposed zoning designation(s) Light Industrial (M1) (244.062 acres) and acreage(s) in each designation: Magisterial District(s): Shawnee Location - the property is located at (give street address(es) if assigned or otherwise exact location based on nearest road and distance from nearest intersection, using road names and route numbers): 1787 Fairfax Pike Is this property within '/2 miles of the Town of Stephens City, the Town of Middletown, the City of Winchester, Clarke County, or Shenandoah County (specify which): Yes, Clarke County 13 Adjoining Properties: Zoning: Use: North: Rural Areas, and M1 vacant, residential, and industrial South: Rural Areas, MH 1, R4, and R5 residential,mixed use,and mobile home park East: Rural Areas residential, commercial West: Rural Areas residential, vacant 6. Disclosure of real parties in interest. Virginia Code § 15.2-2289 provides that localities may by ordinance require any applicant for a zoning amendment to make complete disclosure of the equitable ownership of the real estate to be affected including, in the case of corporate ownership, the name of stockholders, officers, and directors, and in any case the names and addresses of all real parties of interest. Frederick County has, by County Code § 165-101 .09, adopted such an ordinance. For each business entity that is an owner or contract purchaser of the property, please list the name and address of each person owning an interest in, or who is an officer or director of, any entity that is an owner or contract purchaser of the property (you need not indicate the amount or extent of the ownership interest). Please note that this requirement does not apply to a corporation whose stock is traded on a national or local stock exchange and having more than 500 shareholders. see attached Please attach additional page(s) if necessary. 7. Signature(s): I (we), the undersigned, do hereby respectfully make application and petition the Frederick County Board of Supervisors to amend the zoning ordinance to change the zoning map of Frederick County, Virginia. I (we) authorize Frederick County officials to enter the property for site inspection purposes. 14 I (we) understand that the sign issued when this application is submitted must be placed at the front property line at least seven days prior to the Planning Commission public hearing and the Board of Supervisors public hearing and maintained so as to be visible from the road right-of-way until the hearing. I (we) hereby certify that this application and its accompanying materials are true and accurate to the best of my (our) knowledge. Owner: Date 51 i 1-910q& If signing on behalf of an entity, please state name of entity and your title: Debra D. Davis, Administrator of the Estate of Montie Wood Gibson, Jr. Owner: Date If signing on behalf of an entity, please state name of entity and your title: Other Applicant Party (if any): Date If signing on behalf of an entity, please state name of entity and your title: Daniel McCahan, Manager of MVP Management, LLC, Manager of Real Estate Pursuits LC If additional signature lines are necessary, such as if more than two people are owners, please use additional copies of this page. *A signed Power of Attorney form is required if someone is signing on the owner(s) behalf. 15 Signatures: I (we),the undersigned, have read the application, understand its intent, and do hereby respectfully make application to and petition the Frederick County Board of Supervisors to amend the Comprehensive Plan. Furthermore, I have the power to authorize and hereby grant permission to Frederick County officials and other authorized government agents on official business to enter the property as necessary to process this application. I (we)hereby certify that this application and its accompanying materials are true and accurate to the best of my (our) knowledge. Signed this day of Signature of Owner/Applicant Estate of Montie Wood Gibson, Jr., By: Debra D. Davis, Administrator Signed this day of G d Signatu o wner pp Kant Daniel Mccahan,Manager of MVP Management,LLC,Manager of Real Estate Pursuits LC Signed this day of Signature of Owner/Applicant If anyone other than the owner is signing, a Power of Attorney must be attached. Rezoning Application Supplement 6. Disclosure of Real Properties in Interest. JMP Perpetual Family Trust 4100 Monument Corner Drive, Suite 300 Fairfax,VA 22030 LEP Perpetual Trust 4100 Monument Corner Drive, Suite 300 Fairfax,VA 22030 Peterson 2020 Family Trust 4100 Monument Corner Drive, Suite 300 Fairfax,VA 22030 SBP Perpetual Trust 4100 Monument Corner Drive, Suite 300 Fairfax,VA 22030 WEP Perpetual Trust 4100 Monument Corner Drive, Suite 300 Fairfax,VA 22030 Adioinin2 Property Owners List Name and Property Identification Number Address Joan G. Hope 1681 Fairfax Pike Property # 87-A-16A White Post,VA 22663 Karl B. Williams 1679 Fairfax Pike Property # 87-A-16D White Post,VA 22663 Justin Green Brittin and Kelly Michelle Brittin 208 Wrights Run Lane Property # 87-4-5 White Post,VA 22663 Donald J.Ashley and Sue J.Ashley 352 Wrights Run Lane Property # 87-4-6 White Post,VA 22663 Randy Loker and Jessie Loker 353 Wrights Run Lane Property # 87-4-11 White Post,VA 22663 EIP Winchester Owner LLC Attn: Home Depot Prop Tax Dept 5362 Property #76-A-53G P.O. Box 105842 Atlanta, GA 30348 Brooke George and Kaleigh Wood 10200 NE 144th Street Property # 87-A-31 Jones, OK 73049 Jose J. Rodriguez 3260 Front Royal Pike Property # 87-A-53 Winchester,VA 22602 L F Franklin & Sons Inc. c/o W-L Construction& Paving Property # 87-A-80 P.O. Box 55038 Lexington, KY 40555 Bautista Minerva Hernandez 1824 26th Avenue East Property # 87-A-85C and 87-A-85D Bradenton, FL 34208 Madan K. Thapa, et al. 3508 Front Royal Pike Property # 87-A-86 and 87-A-87 Winchester,VA 22602 Patricia McKinney 531 N. Washington Street Property # 87-A-96 Falls Church,VA 22046 Larry Allen Sexton 3636 Front Royal Pike Property 9 87-A-88 Winchester,VA 22602 Royston Eshelman Properties P.O. Box 221 Property # 87-3-B 1 White Post,VA 22663 SEJ Asset Management& Investment Co c/o 7-Eleven Inc Property # 87-A-108 One Arts Plaza 1722 Routh Street, Suite 1000 Dallas, TX 75201 Gary W. & Sharon R. McDonald 514 Clark Road Property # 87-A-90 Stephens City,VA 22655 Wendi G. Simmons and Steve D. Simmons 2154 Fairfax Pike Property # 87-A-91 White Post,VA 22663 Shawn Joseph Britton 2142 Fairfax Pike Property # 87-A-93 White Post,VA 22663 Montie Gibson, Jr. P.O. Box 187 Property # 87-3-A White Post,VA 22663 Sandy's MHC LLC c/o The Carlyle Group Property # 87-A-95 9073 Nemo Street West Hollywood, CA 90069 Fairfax Pike LLC 225 Caldwell Lane Property# 87-A-95A and 87-A-95C Winchester,VA 22602 Hasnaa Ahmed Abdelnaby 1998 Fairfax Pike Property# 87-2-3A White Post,VA 22663 Van Metre Homes at Lake Frederick LLC 9900 Main Street, Suite 500 Property # 87-A-102 Fairfax,VA 22031 Frederick County Sanitation Authority d/b/a P.O. Box 1877 Frederick Water Winchester,VA 22604 Property# 87-A-102A Madison II LLC 558 Bennys Beach Road Property # 87-A-15 Front Royal,VA 22630 Royston Eshelman Properties P.O. Box 221 Property 9 27A-A-9 (Clarke County) White Post,VA 22663 PROFFER STATEMENT REZONING: RZ# 08-26 Rural Areas (RA) (244.062+/- acres) to Light Industrial (M1) (244.062+/- acres) PROPERTY: 244.062 Acres +/-; Tax Map Parcels 87-3-B, 87-A-16B, and 87-A-94 (collectively, the "Property") RECORD OWNER: Estate of Montie Wood Gibson, Jr. ("Owner") APPLICANT: Real Estate Pursuits LC ("Applicant") ORIGINAL DATE OF PROFFERS: August 21, 2026 REVISION DATE: September 21, 2026; September 29, 2026; October 7, 2026, October 22, 2026 The undersigned Owner and Applicant hereby proffer that the use and development of the above-referenced parcels, which are requested to be rezoned, shall be in strict conformance with the following conditions, which shall supersede all other proffers on the Property that may have been made prior hereto. In the event that the above-referenced MI conditional rezoning is not granted as applied for by Owner and Applicant, these proffers shall be deemed withdrawn and shall be null and void. Further, these proffers are contingent upon final rezoning of the Property with"final rezoning" defined as that rezoning which is in effect on the day following the last day upon which the Frederick County Board of Supervisors' (the `Board") decision granting the rezoning may be contested in the appropriate court. If the Board's decision is contested, and the Owner and Applicant elect not to submit development plans until such contest is resolved,the term final rezoning shall include the day following entry of a final court order affirming the decision of the Board which has not been appealed, or, if appealed, the day following which the decision has been affirmed on appeal. The headings of the proffers set forth below have been prepared for convenience or reference only and shall not control or affect the meaning or be taken as an interpretation of any provision of the proffers. The improvements proffered herein shall be provided at the time of development of that portion of the Property adjacent to or including the improvement or other proffered requirement, unless otherwise specified herein. The terms "Owner" and"Applicant" as referenced herein shall include within its meaning all future owners and successors in interest. When used in these proffers, the "Generalized Development Plan," shall refer to the plan entitled "Rezoning Plan" dated May 8, 2026 and revised through September- '40ctober 20, 2026 (the "GDP"), attached hereto and incorporated herein by reference as "Exhibit A," and shall include the following: 1. SITE DEVELOPMENT 1.1 Applicant shall develop the Property in substantial conformance with the GDP provided that minor modifications may be permitted during the Master Development Plan and final engineering process and as may be approved at the discretion of the Frederick County Planning Director. 1.2 The primary building material for all buildings on the Property shall be stone,wood, brick, architectural concrete masonry unit (e.g. regal stone, split face, precision ground face), precast concrete panels, site-cast/tilt up concrete panels, or metal panel of architectural grade and quality. EIFS may be used for secondary structures or architectural features. To create a varied fagade, the sides of all buildings on the Property which faee RetAe-522 an nor RetAe 277front Route 522 and/or Route 277 shall contain at least three of the following features: (i) varying building heights, (ii)varying building step-backs or recesses(iii)varying fenestration, (iv)changes in material, (v) changes in pattern; (vi) changes in texture, (vii) changes in color, (viii) varying accent materials, and (ix) varying decorative reveals or scoring. The buildings shall be painted a minimum of three (3) colors. 1.3 Applicant shall install a green space buffer in the general locations shown on the GDP and eight (8) foot tall berms on the property lines of the Property adjoining Route 277, and on the property line of Tax Map 87-3-B adjoining Route 522. The minimum plant size at the time of planting for the buffers fronting on Route 277 and Route 522 shall be o two 2) inch caliper for deciduous trees, eight (8) feet in height for evergreen trees, and thirty-six (36) inches in height for evergreen shrubs. The plantin, svee_, to be reviewed and approved at the of site plan, shall iffeltide a Fai* of st—i— ..hieh a+ least effe (1) N" a vafie�y e deeiduetis t+ee, at least One(1)Nlir-ginia native va.tiety ,,.,,.een 4ee, and at least one (1) Virginia native var- ot. of shPd43 At the time of site plan approval, Applicant will demonstrate that seventy percent (70%) of all required plantings will consist of native species. The remainder of the plantings will consist of non-invasive adapted species appropriate for the region and shall meet the requirements of Section 165-802.05 of the Frederick County, Virginia Zoning Ordinance. The berms shall not contain any construction trash or debris, and will contain a minimum thickness of twelve (12) inch topsoil. Landscaping shall be integrated into the slope and top of the eight (8) foot tall berms. Notwithstanding what is stated in this Section 1.3, Applicant may install six (6) foot berms on the property lines of Land Badjoining Route 277. 1.4 Existing overhead power lines on the Property may be relocated and may remain overhead. 1.5 Any portions of buildings that are within one hundred (100) feet of the right-of- way for Route 277 and Route 522 shall be a maximum height of forty-five (45) feet. In the event a portion of a building is constructed within the aforementioned one hundred (100) feet, that portion of the building shall not exceed forty-five (45) feet in height and a step back roof design may be utilized for increased roof heights that extend further than one hundred(100) feet into the Property. 2 1.6 All buildings on the Property within two hundred fifty (250) feet of Route 277 and Route 522 shall be installed with the building fronts primarily facing Route 277 and Route 522 and said buildings shall not have loading docks along the building fronts. This restriction shall not be interpreted as not allowing an opening in said buildings for vehicles and/or trucks to access or drive through the buildings for purposes, including, but not limited to, the loading and unloading of said vehicles/trucks inside the buildings. 1.7 Applicant shall cooperate with the owner of Clarke County, Virginia Tax Map Number 27A-A-14 (the "Clarke County Property") to install signage commemorating the Battle of Double Tollgate on the Clarke County Property. The signage shall be designed and written by the Shenandoah Valley Battlefields Foundation. If the owner of the Clarke County Property does not agree to the installation of such signage on the Clarke County Property, then this Proffer shall have no further force or effect. 1.8 Single story buildings in Land Bay A shall have a maximum building height of 35'. Multistory buildings in Land Bay A shall have a maximum building height of 45'. Any building in Land Bay A shall have a maximum outside building footprint of 80,000 square feet. 2. TRANSPORTATION 2.1 Design of the roadway system shall be substantially consistent with the GDP. Access to Route 522 from Tax Map No. 87-3-B shall be achieved by one (1) point of connection in the general location shown on the GDP marked as "D". Access to Fairfax Pike from Tax Map No. 87-3-B shall be achieved by two (2) points of connection in the general locations shown on the GDP marked as "B" and"C". Access to Fairfax Pike from Tax Map No. 87-A-16B shall be achieved by one(1)point of connection in the general location shown on the GDP marked as"A". The exact location and design of proffered improvements shall be subject to reasonable adjustment upon Master Development Plan and final engineering thereof, as approved and accepted by the County and the Virginia Department of Transportation ("VDOT"). 2.2 Applicant shall reserve a right-of-way along the Property frontage of Fairfax Pike to allow for the future dedication of the proposed 4-lane collector roadway as depicted on the Southern Frederick Land Use Plan Transportation with Trails Map dated November 10,2021. Said right-of-way shall be established at a point measured 52.5' from the existing center line of Fairfax Pike. Applicant shall dedicate the reserved right-of-way to the County and/or VDOT at the time the County and/or VDOT make written request for the same. 2.3 Applicant proffers to construct a 10'wide trail for the proj ect frontage along Fairfax Pike. 2.4 Applicant proffers to construct a 10' wide multi-use asphalt trail for the project along the western frontage of Route 522. 14K.5 Applicant proffers to acquire or guarantee the necessary right-of-wa.T�g Fairfax Pike for the road improvements that are required for its site entrances. 3 2.6 Applicant proffers to construct warranted left- and right-turn lanes at site entrances in the general location shown in the Traffic Impact Study. Applicant further proffers to construct all such entrances in the general location shown in the Traffic Impact Study of the Property; however,the exact location of all entrances shown in the Traffic Impact Study of the Property shall be designed and finalized during site plan approval. 2.67 All public streets and roads shall be designed and constructed in accordance with the applicable VDOT subdivision street requirements and subject to review and approval by the County and shall be subject to VDOT approval. 2.78 Provided there exists sufficient right-of-way, Applicant proffers to install an exclusive eastbound left-turn lane on Fairfax Pike at its intersection with Route 522 and a second northbound left-turn lane on Route 522 at its intersection with Fairfax Pike. Applicant proffers to make these improvements the o.flie,- of when warranted and requested by VDOT or before - If there is not sufficient right-of-way to install the aforementioned road improvements then Applicant proffers to install such improvements that do fit within the existing right-of-way and which are directed to be installed by VDOT and Frederick County. 2.99 In addition to the already existing site plan approval process,which includes,but is not limited to, a review and approval by VDOT and Frederick County for all such entrances connecting to the VDOT right-of-way, Applicant proffers to perform and submit a Signal Justification Report ("SJR") and to install such at grade road improvements required from the analysis of said SJR for Site Entrance A and Site Entrance D as labeled on the GDP and, under any circumstance, before the issuance of a Certificate of Occupancy for the first building on the Property. 2.910 Applicant reserves for a future dedication of right-of-way for the Comprehensive Plan collector road connecting in the location generally depicted on the GDP. Said reservation shall remain as long as Frederick County's Comprehensive Plan calls for and depicts a collector road in the aforesaid general location. In the event the Frederick County Comprehensive Plan is amended to remove any reference to the above-referenced major collector road then the requirement for Applicant to reserve said property shall cease and expire. 3. WATER AND SEWER IMPROVEMENTS 3.1 Any improvements to the public water and sewer infrastructure serving the Property that are triggered by pecific needs and uses of the development on the Property shall be installed by Applicant. 4. PROFFER PAYMENTS: 94.1 Applicant shall make a one-time payment to Frederick County for the purposes of fire and rescue services in the amount of$0.10 per square foot of any future building constructed on the Property. Said payment shall be made on or before the issuance of the Certificate of Occupancy for said building. 4 45. LIMITED USES 45.1. Applicant proffers that the Property shall not be developed for regional criminal justice, enforcement, and detention facilities. 45.2 Applicant proffers that the Property shall not be developed for a freestanding fast food restaurant and/or any restaurant that includes a drive-through window/food service. -5 5.3 Applicant proffers that of the uses which are not authorized in the Light Industrial (M1) zoning district, the Property will not be developed for a data center. 6. EXCLUSION OF PUBLIC PROPERTY FROM PROFFERS -56.1 Any portion of the Property hereafter dedicated for public street purposes (or otherwise conveyed to a public entity)shall,upon such dedication,be excluded from the terms and conditions of these Proffers and the remainder of the Property shall continue to be subject to the full force and effect of these Proffers. 67. SEVERABILITY 67.1 In the event any portion of these Proffers are subsequently determined to be illegal or unenforceable,the remaining Proffers shall continue in full force and effect. -78. BINDING EFFECT -78.1 These Proffers run with the land and shall be binding upon all heirs, executors, administrators, assigns, and successors in interest of Owner and Applicant. 99. ESCALATOR CLAUSE 99.1 In the event the monetary contributions set forth in these Proffers are paid to the County within twelve (12) months of the approval of this rezoning, as applied for by Applicant, said contributions shall be in the amounts as stated herein. Any monetary contributions set forth in these Proffers which are paid to the County after twelve (12)months following the approval of this rezoning shall be adjusted in accordance with the Urban Consumer Price Index ("CPI-U") published by the United States Department of Labor, such that at the time contributions are paid they shall be adjusted by the percentage change in the CPI-U from that date twelve (12) months after the approval of this rezoning to the most recently available CPI-U to the date the contributions are paid. [remainder of page intentionally left blank] 5 Respectfully submitted, ESTATE OF MONTIE WOOD GIBSON, JR. By: Debra D. Davis Its: Administrator STATE/COMMONWEALTH OF , AT LARGE CITY/COUNTY OF , to-wit: The foregoing instrument was acknowledged before me this day of , 2026, by Debra D. Davis, Administrator of the ESTATE OF MONTIE WOOD GIBSON, JR. NOTARY PUBLIC My commission expires: Registration number: 6 REAL ESTATE PURSUITS LC By: MVP Management, LLC Its: Manager By: Its: STATE/COMMONWEALTH OF , AT LARGE CITY/COUNTY OF , to-wit: The foregoing instrument was acknowledged before me this day of , 2026, by , of MVP Management, LLC, Manager of REAL ESTATE PURSUITS LC. NOTARY PUBLIC My commission expires: Registration number: 7 PROFFER STATEMENT REZONING: RZ# 08-26 Rural Areas (RA) (244.062+/- acres) to Light Industrial (M1) (244.062+/- acres) PROPERTY: 244.062 Acres +/-; Tax Map Parcels 87-3-B, 87-A-16B, and 87-A-94 (collectively, the "Property") RECORD OWNER: Estate of Montie Wood Gibson, Jr. ("Owner") APPLICANT: Real Estate Pursuits LC ("Applicant") ORIGINAL DATE OF PROFFERS: August 21, 2026 REVISION DATE: September 21, 2026; September 29, 2026; October 7, 2026, October 22, 2026 The undersigned Owner and Applicant hereby proffer that the use and development of the above-referenced parcels, which are requested to be rezoned, shall be in strict conformance with the following conditions, which shall supersede all other proffers on the Property that may have been made prior hereto. In the event that the above-referenced MI conditional rezoning is not granted as applied for by Owner and Applicant, these proffers shall be deemed withdrawn and shall be null and void. Further, these proffers are contingent upon final rezoning of the Property with"final rezoning" defined as that rezoning which is in effect on the day following the last day upon which the Frederick County Board of Supervisors' (the `Board") decision granting the rezoning may be contested in the appropriate court. If the Board's decision is contested, and the Owner and Applicant elect not to submit development plans until such contest is resolved,the term final rezoning shall include the day following entry of a final court order affirming the decision of the Board which has not been appealed, or, if appealed, the day following which the decision has been affirmed on appeal. The headings of the proffers set forth below have been prepared for convenience or reference only and shall not control or affect the meaning or be taken as an interpretation of any provision of the proffers. The improvements proffered herein shall be provided at the time of development of that portion of the Property adjacent to or including the improvement or other proffered requirement, unless otherwise specified herein. The terms "Owner" and"Applicant" as referenced herein shall include within its meaning all future owners and successors in interest. When used in these proffers, the "Generalized Development Plan," shall refer to the plan entitled "Rezoning Plan" dated May 8, 2026 and revised through October 20, 2026 (the "GDP"), attached hereto and incorporated herein by reference as "Exhibit A," and shall include the following: 1. SITE DEVELOPMENT 1.1 Applicant shall develop the Property in substantial conformance with the GDP provided that minor modifications may be permitted during the Master Development Plan and final engineering process and as may be approved at the discretion of the Frederick County Planning Director. 1.2 The primary building material for all buildings on the Property shall be stone,wood, brick, architectural concrete masonry unit (e.g. regal stone, split face, precision ground face), precast concrete panels, site-cast/tilt up concrete panels, or metal panel of architectural grade and quality. EIFS may be used for secondary structures or architectural features. To create a varied fagade, the sides of all buildings on the Property which front Route 522 and/or Route 277 shall contain at least three of the following features: (i) varying building heights; (ii) varying building step-backs or recesses (iii) varying fenestration; (iv) changes in material; (v) changes in pattern; (vi) changes in texture; (vii) changes in color; (viii) varying accent materials; and (ix) varying decorative reveals or scoring. The buildings shall be painted a minimum of three (3) colors. 1.3 Applicant shall install a green space buffer in the general locations shown on the GDP and eight (8) foot tall berms on the property lines of the Property adjoining Route 277, and on the property line of Tax Map 87-3-B adjoining Route 522. The minimum plant size at the time of planting for the buffers fronting on Route 277 and Route 522 shall be two (2) inch caliper for deciduous trees, eight(8) feet in height for evergreen trees, and thirty-six(36)inches in height for evergreen shrubs. At the time of site plan approval, Applicant will demonstrate that seventy percent (70%) of all required plantings will consist of native species. The remainder of the plantings will consist of non-invasive adapted species appropriate for the region and shall meet the requirements of Section 165-802.05 of the Frederick County, Virginia Zoning Ordinance. The berms shall not contain any construction trash or debris, and will contain a minimum thickness of twelve (12) inch topsoil. Landscaping shall be integrated into the slope and top of the eight (8) foot tall berms. Notwithstanding what is stated in this Section 1.3, Applicant may install six (6) foot berms on the property lines of Land Bay A adjoining Route 277. 1.4 Existing overhead power lines on the Property may be relocated and may remain overhead. 1.5 Any portions of buildings that are within one hundred (100) feet of the right-of- way for Route 277 and Route 522 shall be a maximum height of forty-five (45) feet. hi the event a portion of a building is constructed within the aforementioned one hundred (100) feet, that portion of the building shall not exceed forty-five (45) feet in height and a step back roof design may be utilized for increased roof heights that extend further than one hundred(100) feet into the Property. 1.6 All buildings on the Property within two hundred fifty (250) feet of Route 277 and Route 522 shall be installed with the building fronts primarily facing Route 277 and Route 522 and said buildings shall not have loading docks along the building fronts. This restriction shall not be interpreted as not allowing an opening in said buildings for vehicles and/or trucks to access or drive through the buildings for purposes, including, but not limited to, the loading and unloading of said vehicles/trucks inside the buildings. 2 1.7 Applicant shall cooperate with the owner of Clarke County, Virginia Tax Map Number 27A-A-14 (the "Clarke County Property") to install signage commemorating the Battle of Double Tollgate on the Clarke County Property. The signage shall be designed and written by the Shenandoah Valley Battlefields Foundation. If the owner of the Clarke County Property does not agree to the installation of such signage on the Clarke County Property, then this Proffer shall have no further force or effect. 1.8 Single story buildings in Land Bay A shall have a maximum building height of 35'. Multistory buildings in Land Bay A shall have a maximum building height of 45'. Any building in Land Bay A shall have a maximum outside building footprint of 80,000 square feet. 2. TRANSPORTATION 2.1 Design of the roadway system shall be substantially consistent with the GDP. Access to Route 522 from Tax Map No. 87-3-B shall be achieved by one (1) point of connection in the general location shown on the GDP marked as "D". Access to Fairfax Pike from Tax Map No. 87-3-B shall be achieved by two (2) points of connection in the general locations shown on the GDP marked as "B" and"C". Access to Fairfax Pike from Tax Map No. 87-A-16B shall be achieved by one(1)point of connection in the general location shown on the GDP marked as"A". The exact location and design of proffered improvements shall be subject to reasonable adjustment upon Master Development Plan and final engineering thereof, as approved and accepted by the County and the Virginia Department of Transportation ("VDOT"). 2.2 Applicant shall reserve a right-of-way along the Property frontage of Fairfax Pike to allow for the future dedication of the proposed 4-lane collector roadway as depicted on the Southern Frederick Land Use Plan Transportation with Trails Map dated November 10,2021. Said right-of-way shall be established at a point measured 52.5' from the existing center line of Fairfax Pike. Applicant shall dedicate the reserved right-of-way to the County and/or VDOT at the time the County and/or VDOT make written request for the same. 2.3 Applicant proffers to construct a 10'wide trail for the project frontage along Fairfax Pike. 2.4 Applicant proffers to construct a 10' wide multi-use asphalt trail for the project along the western frontage of Route 522. 2.5 Applicant proffers to acquire or guarantee the necessary right-of-way along Fairfax Pike for the road improvements that are required for its site entrances. 2.6 Applicant proffers to construct warranted left- and right-turn lanes at site entrances in the general location shown in the Traffic Impact Study. Applicant further proffers to construct all such entrances in the general location shown in the Traffic Impact Study of the Property; however,the exact location of all entrances shown in the Traffic Impact Study of the Property shall be designed and finalized during site plan approval. 3 2.7 All public streets and roads shall be designed and constructed in accordance with the applicable VDOT subdivision street requirements and subject to review and approval by the County and shall be subject to VDOT approval. 2.8 Provided there exists sufficient right-of-way, Applicant proffers to install an exclusive eastbound left-turn lane on Fairfax Pike at its intersection with Route 522 and a second northbound left-turn lane on Route 522 at its intersection with Fairfax Pike. Applicant proffers to make these improvements when warranted and requested by VDOT. If there is not sufficient right- of-way to install the aforementioned road improvements then Applicant proffers to install such improvements that do fit within the existing right-of-way and which are directed to be installed by VDOT and Frederick County. 2.9 In addition to the already existing site plan approval process,which includes,but is not limited to, a review and approval by VDOT and Frederick County for all such entrances connecting to the VDOT right-of-way, Applicant proffers to perform and submit a Signal Justification Report ("SJR') and to install such at grade road improvements required from the analysis of said SJR for Site Entrance A and Site Entrance D as labeled on the GDP and, under any circumstance, before the issuance of a Certificate of Occupancy for the first building on the Property. 2.10 Applicant reserves for a future dedication of right-of-way for the Comprehensive Plan collector road connecting in the location generally depicted on the GDP. Said reservation shall remain as long as Frederick County's Comprehensive Plan calls for and depicts a collector road in the aforesaid general location. In the event the Frederick County Comprehensive Plan is amended to remove any reference to the above-referenced major collector road then the requirement for Applicant to reserve said property shall cease and expire. 3. WATER AND SEWER IMPROVEMENTS 3.1 Any improvements to the public water and sewer infrastructure serving the Property that are triggered by specific needs and uses of the development on the Property shall be installed by Applicant. 4. PROFFER PAYMENTS: 4.1 Applicant shall make a one-time payment to Frederick County for the purposes of fire and rescue services in the amount of$0.10 per square foot of any future building constructed on the Property. Said payment shall be made on or before the issuance of the Certificate of Occupancy for said building. 5. LIMITED USES 5.1. Applicant proffers that the Property shall not be developed for regional criminal justice, enforcement, and detention facilities. 5.2 Applicant proffers that the Property shall not be developed for a freestanding fast food restaurant and/or any restaurant that includes a drive-through window/food service. 4 5.3 Applicant proffers that of the uses which are not authorized in the Light Industrial (M1) zoning district, the Property will not be developed for a data center. 6. EXCLUSION OF PUBLIC PROPERTY FROM PROFFERS 6.1 Any portion of the Property hereafter dedicated for public street purposes (or otherwise conveyed to a public entity)shall,upon such dedication,be excluded from the terms and conditions of these Proffers and the remainder of the Property shall continue to be subject to the full force and effect of these Proffers. 7. SEVERABILITY 7.1 In the event any portion of these Proffers are subsequently determined to be illegal or unenforceable,the remaining Proffers shall continue in full force and effect. 8. BINDING EFFECT 8.1 These Proffers run with the land and shall be binding upon all heirs, executors, administrators, assigns, and successors in interest of Owner and Applicant. 9. ESCALATOR CLAUSE 9.1 In the event the monetary contributions set forth in these Proffers are paid to the County within twelve (12) months of the approval of this rezoning, as applied for by Applicant, said contributions shall be in the amounts as stated herein. Any monetary contributions set forth in these Proffers which are paid to the County after twelve (12)months following the approval of this rezoning shall be adjusted in accordance with the Urban Consumer Price Index ("CPI-U") published by the United States Department of Labor, such that at the time contributions are paid they shall be adjusted by the percentage change in the CPI-U from that date twelve (12) months after the approval of this rezoning to the most recently available CPI-U to the date the contributions are paid. [remainder of page intentionally left blank] 5 Respectfully submitted, ESTATE OF MONTIE WOOD GIBSON, JR. By: Debra D. Davis Its: Administrator STATE/COMMONWEALTH OF , AT LARGE CITY/COUNTY OF , to-wit: The foregoing instrument was acknowledged before me this day of , 2026, by Debra D. Davis, Administrator of the ESTATE OF MONTIE WOOD GIBSON, JR. NOTARY PUBLIC My commission expires: Registration number: 6 REAL ESTATE PURSUITS LC By: MVP Management, LLC Its: Manager By: Its: STATE/COMMONWEALTH OF , AT LARGE CITY/COUNTY OF , to-wit: The foregoing instrument was acknowledged before me this day of , 2026, by , of MVP Management, LLC, Manager of REAL ESTATE PURSUITS LC. NOTARY PUBLIC My commission expires: Registration number: 7 REZONING PLANe L= � �i:g�Isg� III ii GIBSON PROPERTY =p �' ;� � m ;I PROPERTY ID: 87—A-16B, 87-3—B, 87—A-94 SHAWNEE DISTRICT FREDERICK COUNTY,VIRGINIA 111. 1 REZONING SUBMISSION APPLICANT REAL ESTATE PURSUITS LC '\ r 41M MONUMENTCORNER DRIVE;SUITE 300 ONION PROPERTY# / FF FAIRFAX,VA 22D30 R¢ONNIO I CONTACT:CIARK TUTMLER +vnn A'I, 703.63}2664 CTUIVALER®PETERSONCOS.COM REAL ESTATE LAND USE ATTORNEY PURSUITS Lc THOMAS MOORE LAWSON OF COUNSEL-WILUAMS MULLEN 4 , P.O.B-2740 NANCHESTER.VA 226D4 .e®eveoue . k CONTACT:THOMAS MOORE"=ON Y 5d0.66S0°�° BOHLER// TRANSPORTATION ENGINEER -- _ GO FAX,SLAOE 4114.G ATO ROAD:SUITE 65G - r...q_ F T KEVIN SITZ 33 CONFACT:KEVIN SIRMAN,P.E. Lae�T/ON-MM 5]t-26f-9)18 ���� CIVIL ENGINEER S Ge-mlimi 1 v OWNER OWNER OWNER BOHLERENGINEERING PARCEL B7-A.-78B PARCEL 87-3-B PARCEL 87-A-94 2BBUCKWEU PARK LANE,SUITE 2D1 mL Ae t m µ+ THE ESTATE OF MONTIE THE ESTATE OF MONTIE THE ESTATE OF MONTE WARRENTON,VA 2G1B6 CONTACT:KATON.VA ROBERTS 186 BYIeaMm4eW GbeonJ S812M1 1m.M. W.GIBSON JR. W.GIBSON JR W.GIBSON JR COVER nd a e® e+ PO BOX 187 PO BOX 187 PO BOX 18] )0}]099400 TdI -1AZ WHITE POST VA,22M WHITE POST VA,22W WMTE POST VA,22WS SHEET iNEET lNREY �C-1 1 Y g5 CD � CT) I J g��, LEGEND LLJ 3 k' 0 =8 $39e EI CD m oa „ o © a ® ,— N _ CNNVETABL '. Al �' Q,' u,.n '•'"�rv � m s REZONING SUBMISSION LINE LINE TABLE TABLE s ff CD CD r xl / I / k�\ 11 �/ GIBSON PROPER �Y REZONING REAL ESTATE PURSUITS LC BOHLERI r w�� H 2 ��m / 0 e AMOINENS k EXISTING CONDITIONS G2 A. n.E:xEw.x.,mx,xowi.x[ma,o®ae,xav'ao��.E.xo.or..s,.xiw� C�4 � �x�yy�� gg �x€i •// 11 i-� �5 � ��`- _`___ e..smu��sE.a�wr xuu�v.�x�scxwseur•,w�r.�.unr�snEr�wxs O C 4j // 1 — —. __-� � __— TM�m xmnsmuv�uEa�cwrrsm,cruxea„oano-nsx�anrFw,uxs 8� 1T— �` eaxrswvssnoomoxauw.,Eo s,�ar.ovoornwwvu nr�uEoss�aw� ,I. v �nx x,m.o rumxy rExcE a amwwcEsacsnms s,vm,as�arnem,w.Eeno.a Bsos-,E,aa xEnw..usornrwsnE s�woEsr�.�wwnosmes xnccoxonxcsw,mvoorvwxo xEmxuee.rsux�s 1L� \"`\\ �r�: A � ___ i zrnx�oxoxwoETMEx�anoxswreE _ , �oxx,.=oxx�oxxx�Exm�..�n.En.��xsx�.uox LLJ ti �Il\``r��• REZONING SUBMISSION �� -.� w,mwusse ��Y°•�,� ��\ \ I soEvam is euxuuu GIBSON PROPERTY REZONING�x REAL ESTATE PURSUITS LC x LAND BAY A L `\ BOHLER/% REZONING q PLAN o � xarcx iECENB a MOM* PC3 GIBSON PROPERTIES IMPACT ANALYSIS STATEMENT August 21, 2026 GENERAL SITE INFORMATION Location: This is an assemblage of three parcels located near the intersection of Route 522 and Fairfax Pike. Magisterial District: Shawnee District Tax Map Numbers: 87-3-13; 87-A-1613; 87-A-94 Current Zoning: RA (244.062 acres) Current Use: Undeveloped Proposed Zoning: MI, Light Industrial District with proffers Proposed Use: Warehousing/Distribution Facility/Industrial Park Total Rezoning Area: 244.062 +/- acres with proffers INTRODUCTION This statement has been prepared for the purpose of assessing the impact on Frederick County by the proffered rezoning of the properties identified as Tax Map Numbers 87-3-13, 87-A-1613, and 87-A-94 (collectively, the "Property") to MI (Light Industrial District). The subject parcels are situated near the intersection of Route 522 and Fairfax Pike. Portions of the eastern boundary of Tax Map Number 87-3-B adjoin Clarke County. The Property is currently zoned RA (Rural Areas). This application proposes to rezone the Property from RA (Rural Areas) to MI (Light Industrial District). Portions of the Property are currently residential and portions are vacant. COMPREHENSIVE POLICY PLAN Urban Development Area The Urban Development Area (UDA) defines the general area in which residential, commercial, industrial, and institutional land use development is encouraged in the County. The Property is located outside of the UDA. Impact Analysis Statement Gibson Properties Sewer and Water Service Area The Property is outside of the limits of the County's Urban Development Area (UDA),but is located within the limits of the Sewer and Water Service Area(SWSA). Comprehensive Plan Conformity The Southern Frederick Area Land Use Plan designates the Property for Industrial use. Given the Property's Comprehensive Plan designation as well as its proximity to Interstate 81, Interstate 66, Route 522, and the Virginia Inland Port, the Property is ideally situated for an industrial park use. Its proposed development pursuant to the M 1 District aligns with the goals of the Frederick County Comprehensive plan,notably by promoting the County's goal of enhancing commercial/industrial areas and providing focus to the County's future regional employment centers. USE OF SURROUNDING LAND The properties surrounding the Property include a variety of zoning districts and uses. Properties to the north are zoned Rural Areas, and M1 and include residential uses, and the Home Depot distribution facility. Properties to the south are zoned Rural Areas, MH1, R4, and R5 and include residential uses, future mixed use developments, and a mobile home park. Properties to the east are zoned Rural Areas and include residential uses, commercial uses, and agricultural uses. Properties to the west are zoned Rural Areas and include residential and agricultural uses. TRAFFIC Please refer to the Traffic Impact Analysis Statement for this rezoning dated July 30,2026 prepared by Gorove Slade. SEWER AND WATER FACILITIES The Sewer and Water Service Area(SWSA)defines the areas of the County to which public water and sewer services may be extended. The Property is located inside of the SWSA as defined by Frederick County Staff. Domestic water will be provided by Frederick Water, and Applicant understands and acknowledges the extension of water mains that will be required to serve this project. The water demand will vary based on industrial end user, however, +/- 60,000— 125,000 gallons per day of water demand is anticipated. Sanitary collection and treatment will also be provided by Frederick Water, and Applicant has been working with Frederick Water to complete and review concept designs for sanitary facilities to serve the Property. The sewer demand will vary based on industrial end user,however,+/- 50,000— 125,000 gallons per day of sanitary sewer demand is anticipated. POPULATION There will not be an increase in the Frederick County population as a result of this rezoning. 2 Impact Analysis Statement Gibson Properties ADDITIONAL DEMANDS There will be no demand on school facilities,public parks or recreational facilities, or other public facilities as a result of this rezoning. Solid waste generated by the activities on the Property will be collected in dumpster facilities and removed from the Property by commercial refuse carrier. Solid waste will be transferred to the Frederick County landfill for ultimate disposal by said carrier. The Proffers submitted with this rezoning application provide for a monetary contribution for fire and rescue services. STORMWATER IMPACTS Topographic relief on the Property generally follows a pattern that directs drainage towards the north of the Property. A complete stormwater management plan will be designed at the time of final engineering design. All associated stormwater quantity and quality measures will be designed in conformance with all applicable state and local regulations; therefore, site drainage and stormwater management impacts to adjoining properties and the community will be mitigated. ENVIRONMENTAL FEATURES AND IMPACTS There are limited wetlands and streams features on the Property. Applicant shall apply for wetlands permitting where disturbance is required for the intended development. There are no other environmental features that will constrain development of future M1 uses or such features will be managed during final engineering design in accordance with all applicable ordinances and regulations. HISTORIC STRUCTURES There are no historic structures or resources located on the Property. POSITIVE NET FISCAL IMPACT This rezoning will yield a positive net fiscal impact to the County because this rezoning will not result in any demands on the County's public schools, public parks, or other public facilities. Rather,the industrial uses will generate significant employment and revenue for the County in the form of real property taxes, business personal property taxes, utility taxes, and other taxes. OTHERIMPACTS Neither Owner nor Applicant anticipate any other impacts resulting from this rezoning. 3 Outlook '[External]'Re: Revised Gibson Proffers From Johnson,Joseph (VDOT) <JosephW.Johnson@vdot.virginia.gov> Date Tue 10/20/2026 3:42 PM To Tyler Klein <tklein@fcva.us> Cc John Bishop <jbishop@fcva.us> VDOT has reviewed the revised proffers and take no exception to the proposed changes. Joseph W. Johnson, PE Area Land Use Engineer/Edinburg Residency Virginia Department of Transportation 14031 Old Valley Pike/ Edinburg, VA 22824 Phone#540.534.3223 josephw.johnson vdot.virginia.gov From:Tyler Klein <tklein@fcva.us> Sent:Tuesday, October 20, 2026 3:04 PM To:Johnson,Joseph (VDOT) <josephw.johnson@vdot.virginia.gov> Cc: 181 Public131<jbishop@fcva.us> Subject: Revised Gibson Proffers Joe - confirming VDOT acceptance of revised proffer language? Can you let me know Wednesday AM so I can include with staff report to BOS for 10.28 public hearing? Thanks. M. Tyler Klein, AICP Senior Planner Department of Planning&Development Frederick County,Virginia 107 N. Kent Street Winchester,VA 22601 (540)722-8248 tklein@fcva.us Disclaimer: This correspondence is provided for informational purposes only and does not constitute a formal zoning determination or official action of Frederick County.All zoning determinations must be issued in writing by the Zoning Administrator. The Frederick County Planning and Development Department does not issue invoices directly to applicants for fees and will never request or accept payment by wire transfer. Outlook '[External]'Gibson Property - VDOT Response 9-30-2026 From Johnson,Joseph (VDOT) <JosephW.Johnson@vdot.virginia.gov> Date Wed 9/30/2026 9:03 AM To Tyler Klein <tklein@fcva.us>;John Bishop <j bishop @fcva.us> Cc Spielman,Joseph (VDOT) <joseph.spielman@vdot.virginia.gov> 0 2 attachments(561 KB) Proffers 9.29.26 RL.pdf, Proffers 9.29.26 Clean.pdf; Tyler/John, The latest version of the proffers for the Gibson Rezoning dated 9-26-2026 appears to address VDOT's previous comments on this application. I would offer the following notes on the provided transportation proffers: 1. Proffer 2.7 provides for the proposed off-site improvements at the intersection of Route 522/340/277 including a northbound dual-left turn lane on Route 522, westbound dual receiving lanes on Route 277, and a new dedicated eastbound left turn lane on Route 277. The language of the proffer is intended to provide some flexibility in the event that adequate right-of-way is not available to provide all of these improvements, but the use of the term "reasonable" provides a bit of uncertainty to the final scope of the improvements. I would also recommend that these improvements be completed as near to the start of the project as possible to ensure that there isn't a significant lag between site development and the installation of these transportation mitigations. 2. Proffer 2.8 provides a backstop for studying the need for signals at site entrances A and D but does not preclude VDOT from requiring these studies (and associated improvements) prior to the identified trigger as a part of the normal site plan process. Joseph W. Johnson, PE Area Land Use Engineer/Edinburg Residency Virginia Department of Transportation 14031 Old Valley Pike/ Edinburg, VA 22824 Phone#540.534.3223 josephw.johnson vdot.virginia.gov d COMMONWEALTH ALTH of V IBC NIA DEPARTMENT OF TRANSPORTATION 14031 Old Valley Pike Edinburg, Virginia 22824 August 26, 2026 Mr. John Bishop Frederick County Director of Planning 107 N. Kent St. Winchester, VA 22601 Re: Gibson Property Rezoning Dear Mr. Bishop: This addendum serves to supplement VDOT's original comment on the Gibson Property Rezoning, dated August 7, 2026. All comments in the original letter remain in full effect except as clarified below. Additional comments are provided in response to updated proffers submitted by the applicant on August 21, 2026. 1. The updated proffers include a trigger for the required Signal Justification Report(SJR) and associated entrance improvements tied to a building square footage threshold of 2,000,000 square feet. The SJR and associated improvements should be provided once a signal is warranted based on the actual uses proposed at the time of final site plan. A 2,000,000 square foot backstop would be acceptable; however, the improvements may be required sooner depending on the intensity of the uses proposed with the final site plan. 2. The proffer to construct improvements at the intersection of Route 522 and Route 340 is insufficient to guarantee mitigation will be provided by the developer. The proffer includes a caveat that these improvements would only be provided should sufficient right-of-way exist and it appears that the existing right-of-way may not accommodate the additional of a dedicated eastbound left-turn on Route 277 as well as an additional receiving lane on Route 277 for the second northbound left turn lane on Route 522/340. It should also be noted that these improvements would likely require replacement of the existing traffic signals at this intersection. It might be beneficial for the applicant to depict these intersection improvements within the rezoning documents to provide some level of confidence that they are of a scope that can be accomplished by the developer. Sincerely, Joseph W. Johnson, PE Area Land Use Engineer Edinburg Residency Virginia Department of Transportation VirginiaDOT.org WE KEEP VIRGINIA MOVING II COMMONWEALTH LT of VIRCj NIA DEPARTMENT OF TRANSPORTATION 14031 Old Valley Pike Edinburg,Virginia 22824 August 7, 2026 Mr. John Bishop Frederick County Director of Planning 107 N. Kent St. Winchester, VA 22601 Re: Gibson Property Rezoning Dear Mr. Bishop: The Virginia Department of Transportation(VDOT)has completed its review of the Gibson Property Traffic Impact Study (TIS), dated July 30, 2026,prepared in support of the rezoning request for the Gibson Property along Route 277 (Fairfax Pike) and Route 522/340. Based on our evaluation, VDOT is in general concurrence with the methodology, assumptions, and conclusions presented in the study. As part of our review, VDOT offers the following comments and recommendations for consideration by the Planning Commission/Board of Supervisors: 1. Western Parcel Entrance Alignment Requirement—During site plan development, VDOT will expect the proposed entrance serving the western portion of the Gibson Property to be aligned with the Madison Farm entrance located directly opposite on Route 277. This corridor already faces spacing constraints, and aligning these entrances is essential to limiting the number of future major intersections or traffic signals and preserving safe, efficient traffic operations. The applicant has not demonstrated that an entrance cannot be accommodated at this location. Accordingly, VDOT will consider this alignment necessary during the site plan development and review process. 2. Right-of-Way Dedication Along Route 277 -VDOT recommends that the applicant dedicate sufficient right-of-way along the project frontage to accommodate the ultimate U41) roadway section for Route 277, as identified in the Frederick County Comprehensive Plan. Securing this right-of-way at the rezoning stage is essential to support long-term corridor improvements. 3. Lack of Transportation Mitigations in Proffer Statement - Based on the proffer statement submitted to VDOT with the application, no transportation improvements or mitigations are being offered by the applicant. The TIS demonstrates significant delays at the intersection of Route 277 and Route 522/340, particularly during peak VirginiaDOT.org WE KEEP VIRGINIA MOVING Page 2 of 2 hours. Under future 2035 background conditions (without the project), the intersection is projected to operate at LOS F/F, with overall intersection delay at 109 sseconds in the AM and 161 seconds in the PM. With the development in 2035, intersection overall intersection delay increases to 147 seconds in the AM and 190 seconds in the PM. The TIS provides a mitigated scenario that includes an exclusive eastbound left turn lane and a second northbound left turn lane that improves overall intersection delay to 53 seconds in the AM (LOS D) and 94 seconds in the PM. Given these findings,VDOT cannot support the rezoning application without transportation mitigations that address the documented operational deficiencies. 4. Entrance Locations, Signalization, and Future Studies -All entrance locations, spacing, and configurations will be determined during the final site plan review process.No Signal Justification Reports (SJRs)have been provided with this rezoning application. The signal warrant analyses included in the TIS are preliminary and do not constitute an approved SJR. VDOT reserves the right to eliminate, relocate, or modify any entrance shown on the Generalized Development Plan(GDP) based on final engineering review, spacing requirements, and corridor operations. While VDOT concurs with the technical findings of the July 30, 2026 TIS, the rezoning application does not currently include the transportation commitments necessary to support safe and efficient operations along Route 277 and Route 522/340. VDOT recommends that the Board of Supervisors require the applicant to address the items outlined above as conditions of rezoning approval. Sincerely, Joseph W. Johnson, PE Area Land Use Engineer Edinburg Residency Virginia Department of Transportation VirginiaDOT.org WE KEEP VIRGINIA MOVING FREDERICK WATER 315 Tasker Road PH(540)868-1061 Eric R.Lawrence Stephens City,Virginia 22655 Fax(540)868-1429 Executive Director www.FrederickWater.com June 12, 2026 Thomas Moore Lawson PO Box 2740 Winchester, Virginia 22604 RE: Rezoning Application Comment Gibson Properties Rezoning Tax Map Numbers: 87-3-A; 87-3-13; 87-A-16B 294.14-acres Dear Mr. Lawson: Thank you for the opportunity to offer review comments on the Gibson Properties rezoning application package, Impact Analysis Statement dated May 27, 2026. Frederick Water offers comments limited to the anticipated impact/effect upon Frederick Water's public water and sanitary sewer system and the demands thereon. The project parcels 87-3-B and 87-A-16B are located within the sewer and water service area (SWSA), and therefore by county policy, Frederick Water's water and sewer services are available to access. A 12-inch water main parallels the south side of Route 277. A sanitary sewer force main was recently constructed on and in the vicinity of the project parcels; the force main was not sized to accommodate development of the subject properties and therefore may not have capacity to support this development. When the force main was being planned, designed, and constructed, the property owner did not support more intensive development and wanted to continue their agricultural interests with the potential for 4 residences. A parallel force main was designed but not constructed as projected demands for sewer service did not warrant the additional force main capacity. Project parcel 87-3-A is not currently within the SWSA and is therefore by county policy may not access the public water and sewer. Public water and sewer facilities are not in the vicinity of parcel 87-3-A. Water At Your Service Page 2 Gibson Properties rezoning application Thomas Moore Lawson June 12, 2026 The application's Impact Analysis Statement dated May 27, 2026, page 2, provides the application narrative regarding water and sewer facilities: "The Sewer and Water Service Area (SWSA) defines the areas of the County to which public water and sewer services maybe extended. Tax Map Numbers 87-3-A and 87-3-B are located inside of the SWSA as defined by Frederick County Staff. Domestic water will be provided by Frederick Water, and Applicant understands and acknowledges the extension of water mains that will be required to serve this project. Sanitary collection and treatment will also be provided by Frederick Water, and Applicant understands and acknowledges the timing associated with the sanitary sewer connection and the effort required by the County to make that available." The Impact Analysis Statement is silent on proposed water and sewer demands, and applicant responsibilities. The applications states that they — the Applicant- "understands and acknowledges the timing associated with the sanitary sewer connection and the effort required by the County to make that available". The applicant should provide proposed water and sewer demands, and clarification of the statement regarding "the effort required by the County regarding sanitary sewer". The applicant will need to ensure that adequate water and sanitary sewer conveyance and treatment system capacity is available to achieve the projected build-out of the project. It is the applicant's responsibility to fund the design, easement acquisition, and construction of the extensions of water and sewer services necessary to satisfy their proposed demands. Sanitary sewer infrastructure is sized reflective of anticipated flows. Gravity sewer is often easier to plan for as gravity will contribute to proper flow movement, and minimal flow is less troublesome. A sanitary sewer force main warrants much more scrutiny during design as flows through the force main must be pumped, and an oversized force main with inadequate flows can result in septic conditions. Such conditions contribute to sludge buildup, reduce flow capacity, internal corrosion, cycling fatigue, and odors. Force mains should be sized reflective of known or anticipated sanitary sewer flows. As noted above, a parallel sanitary sewer force main was designed but not constructed due to the lack of projected demands of additional sanitary sewer flow. This applicant will need to address its sanitary sewer requirements and solutions once its sanitary flow generation is more clearly known. The sewer demands and timing of when sewer demands will be realized should be considered by the applicant as they design and construct the sewer improvements necessitated by the development. If the appropriate sewer solution benefits a regional service and not solely the applicant's properties, then a partnership with other benefiting property owners and Frederick Water should be considered. Page 3 Gibson Properties rezoning application Thomas Moore Lawson June 12, 2026 Water and sanitary sewer improvements are to be constructed in accordance with Frederick Water standards and specifications. Easements will be required to accommodate infrastructure that is dedicated to Frederick Water. Please be aware that Frederick Water is offering these review comments without the benefit or knowledge of the proposed water and sewer demands for the site. Water supplies and sanitary sewer conveyance capacities change daily; with each new customer connection brings additional demands and generated flows. This letter does not guarantee system distribution, collection and/or treatment capacities to accommodate the development proposal. Thank you for the opportunity to offer review comments. Sincerely, Eric R. Lawrence Executive Director Page 2 Gibson Properties rezoning application Thomas Moore Lawson June 12, 2026 The application's Impact Analysis Statement dated May 27, 2026, page 2, provides the application narrative regarding water and sewer facilities: "The Sewer and Water Service Area (SWSA) defines the areas of the County to which public water and sewer services maybe extended. Tax Map Numbers 87-3-A and 87-3-B are located inside of the SWSA as defined by Frederick County Staff. Domestic water will be provided by Frederick Water, and Applicant understands and acknowledges the extension of water mains that will be required to serve this project. Sanitary collection and treatment will also be provided by Frederick Water, and Applicant understands and acknowledges the timing associated with the sanitary sewer connection and the effort required by the County to make that available." The Impact Analysis Statement is silent on proposed water and sewer demands, and applicant responsibilities. The applications states that they — the Applicant- "understands and acknowledges the timing associated with the sanitary sewer connection and the effort required by the County to make that available". The applicant should provide proposed water and sewer demands, and clarification of the statement regarding "the effort required by the County regarding sanitary sewer". The applicant will need to ensure that adequate water and sanitary sewer conveyance and treatment system capacity is available to achieve the projected build-out of the project. It is the applicant's responsibility to fund the design, easement acquisition, and construction of the extensions of water and sewer services necessary to satisfy their proposed demands. Sanitary sewer infrastructure is sized reflective of anticipated flows. Gravity sewer is often easier to plan for as gravity will contribute to proper flow movement, and minimal flow is less troublesome. A sanitary sewer force main warrants much more scrutiny during design as flows through the force main must be pumped, and an oversized force main with inadequate flows can result in septic conditions. Such conditions contribute to sludge buildup, reduce flow capacity, internal corrosion, cycling fatigue, and odors. Force mains should be sized reflective of known or anticipated sanitary sewer flows. As noted above, a parallel sanitary sewer force main was designed but not constructed due to the lack of projected demands of additional sanitary sewer flow. This applicant will need to address its sanitary sewer requirements and solutions once its sanitary flow generation is more clearly known. The sewer demands and timing of when sewer demands will be realized should be considered by the applicant as they design and construct the sewer improvements necessitated by the development. If the appropriate sewer solution benefits a regional service and not solely the applicant's properties, then a partnership with other benefiting property owners and Frederick Water should be considered. Page 3 Gibson Properties rezoning application Thomas Moore Lawson June 12, 2026 Water and sanitary sewer improvements are to be constructed in accordance with Frederick Water standards and specifications. Easements will be required to accommodate infrastructure that is dedicated to Frederick Water. Please be aware that Frederick Water is offering these review comments without the benefit or knowledge of the proposed water and sewer demands for the site. Water supplies and sanitary sewer conveyance capacities change daily; with each new customer connection brings additional demands and generated flows. This letter does not guarantee system distribution, collection and/or treatment capacities to accommodate the development proposal. Thank you for the opportunity to offer review comments. Sincerely, Eric R. Lawrence Executive Director Clarke County Department of Planning are Berryville-Clarke County Government Center 101 Chalmers Court, Suite B Berryville, VA 22611 TO: Tyler Klein FROM: Brandon Stidham, Planning Director RE: Comments on Gibson property rezoning DATE: June 12, 2026 Thank you for the opportunity to comment on the Gibson property rezoning application. Clarke County Planning Department staff does not have any comments at this time, however we would like to reserve the opportunity to comment on any possible transportation impacts after we are able to review VDOT's comments on this application. VDOT staff has offered to involve us in their review process. Please let me know if you have any questions. (540) 955-5132 www.darkecounty.uov .7 COUNTY of FREDERICK Department of Planning and Development ® 540/665-5651 Fax: 540/665-6395 August 24, 2026 Thomas Moore Lawson, Esquire Winchester Gateway LLC P.O box 2460 Winchester, VA 22604 RE: Request for Historic Resources Advisory Board (HRAB) Comments Gibson Property (REZ)Application Zoning: RA(Rural Area)District Property Identification Number(PIN): 87-A-16B, 87-3-A, 87-3-B Magisterial District: Shawnee Dear Mr. Lawson: The Frederick County Historic Resources Advisory Board (HRAB) considered the above referenced REZ application during their meeting on August 21, 2026. This application seeks to rezone+/-294.14 acres from RA(Rural Areas)to MI (Light Industrial). The properties are located between Rt. 277 and Rt. 522 in the Shawnee Magisterial District. The HRAB was advised by the Applicant that the property identified by PIN 87-3-A is intended to be removed from the application upon formal submittal Following their review of this application,the HRAB recommended a commemorative marker for the Battle of Double Tollgate be sited on the property, that a Phase 2 Archeological Survey be conducted (if warranted by the Phase 1 Archeological Survey) and additional documenting and preservation of the architectural features of the Funkhouser Farmhouse be completed if developing the subject property identified with 87-3-A. Thank you for the opportunity to provide a summary of the August 24th HRAB meeting. Please contact our office if you have any questions or concerns. Sincerely, Eric Bittner Planner II cc: Lucas Cooke, HRAB Chairman Tyler Klein, Senior Planner 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 .f ,.c COUNTY of FREDERICK Department of Planning and Development yycrn, 540/665-5651 Fax: 540/665-6395 June 18,2026 Thomas Moore Lawson,PC(tlawson@lsplc.com) P.O. Box 2740 Winchester,VA 22604 RE: Proposed Rezoning Application for Gibson Property(Estate of Monte Gibson,Jr.) Property Identification Numbers (PIN): 87-3-A,87-3-11, &87-A-16B Dear Mr. Lawson: Planning and Development staff had the opportunity to review the draft rezoning(REZ)application for the above project.This application seeks to rezone+/-294.14-acres from the RA(Rural Areas) zoning district to the M1 (Light Industrial) zoning district with proffers. The subject property is located generally north and west of the intersection of Route 277 (Fairfax Pike) and Route 522 in the Shawnee Magisterial District.Prior to formal submission to the County,please ensure that these comments and all review agency comments are adequately addressed. At a minimum, a letter describing how each of the agencies and their comments have been addressed should be included as part of the submission. • Comprehensive Plan Conformance.The Comprehensive Plan(adopted November 2021) and the Southern Frederick Area Plan(2024)provide guidance on the future development of the subject property. The Plan identifies the subject properties with "industrial" and "mixed-use industrial office"(MUIO)land use designations and as being within the limits of the sewer and water service area(SWSA). "The Route 277 Triangle Centers of Economy is designed to be a significant area of commercial and industrial opportunity that is fully supportive of the Frederick County Economic Development Authority's targeted goals and strategies. The intent of the mixed-use designation is to further enhance the County's commercial and industrial areas and to provide focus to the County's future regional employment centers. In specific areas a mix of flexible uses, with office uses in prominent locations is encouraged. Such areas are supported by substantial areas of industrial and commercial opportunity and provide for areas that are well designed with high quality architecture and site design. It is the intent of such areas to promote a strong positive community image. Residential land uses are not envisioned in this area." The proposed zoning district, M1 (Light Industrial) is typically associated with the future land use designation for"industrial,"for which the properties are partially designated. However, the proposal is silent on potential (or restricted uses) and how it would further County policy and the Economic Development Authorities targeted industries or the area plan envisioned "mix of flexible uses" and/or meets the intention of the "mixed-use industrial office" (MUIO)designation on portions of the properties along Route 277. At a Page 2 of 3 minimum, uses that might be noxious, unsafe, or disruptive as well as uses that generate higher traffic than what has been contemplated in the TIA should be considered for exclusion.Other elements of plan policy,such as"high quality architecture and site design" are absent or under-developed in the application materials. For example, EIFS (exterior insulation and finish system) specified as a primary building material in Proffer 1.2 is not typically considered "high quality." No building renderings, elevations, or conceptual layout of future buildings are provided to evaluate if policies regarding architecture and site layout are being met. In this respect,plan conformance is only partially achieved. Further,sensitivity should be given to the broader area and how a future large assembly of industrial development may impact other sub-planning areas and the rural areas of Clarke County. Specifically, the Lake Frederick Urban Development Area is immediately to the south, which is planned for future residential and neighborhood village (Lake Frederick and more recently the Madison Farms projects). The uses ultimately to be developed on the Gibson properties or uses to be prohibited, should be carefully selected and their potential impacts(noise,odor,vibration,traffic)be fully mitigated. Given the surrounding area is primarily residential and agricultural, enhanced buffering and screening, lower building heights, and increased building setbacks may be appropriate mitigation measures for potential impacts and address the Plan policy for high-quality architecture and site design. The subject property identified with PIN 987-3-A does not have a future land use designation and is outside of the limits of the SWSA. The property is otherwise planned to remain"rural."A concurrent CPPA request for this parcel did not receive consensus for further study. • Transportation &Traffic Analysis. • The Plan also identifies planned transportation improvements on the subject properties including a "new major collector" road and multiuse trail connecting Route 277 to Route 522. Additionally, a multiuse trail is envisioned along Route 522 and Route 277 (Fairfax Pike) and future widening to Route 277 (improved minor arterial). While the collector road right-of-way (ROW) is proffered, the other planned transportation improvements outlined above are missing from application materials, including the GDP and proffer statement. • The Traffic Impact Study(May 8, 2026)notes that the"future with development" key regional intersections studied (Intersections 41 & 43) continue to fail, and because there is no known transportation improvements planned, "no improvements are proposed as a result of the Gibson development."This is grossly inadequate as it is long-standing policy in Frederick County that developments shall fully mitigate potential impacts to adjoining transportation infrastructure. Special attention should be paid to what improvements,as ultimately warranted by VDOT, could accommodate improvements to Route 522 & Fairfax Pike/Lord Fairfax Highway(Intersection 93). • A signal justification report (SJR), as noted in the TIS for Route 522 (and Site Entrances 44&45)and the western site entrance*on Fairfax Pike(Route 277; Site Page 3 of 3 Entrance 41), should be completed as part of the preliminary comment period, reviewed and approved by VDOT prior to acceptance of the application for public hearings. Uncertainty about the improvements necessary for a particular development and timing of when those improvements are needed raises concern for staff about the appropriateness of the proposal at this location. *Staff notes the approved Madison 277 proffer statement (REZ #07-25) also contemplates a SJR and potential traffic signal at their site entrance on Route 277. This applicant is advised to reach out to the Madison 277 owner(Dave Madison) and coordinate on how the cost and installation of a potential signal at this location could be shared among both projects, and the trigger (timing) of such improvement. • Proffer Statement. The following comments are offered on the proffer statement dated 2026. • Provide a"Original Date of Proffers." • The proffer statement does not contemplate allowed or prohibited uses and the potential impacts to adjoining properties and roadways or mitigation measures. • Proffer 2 does not fully address level of service(LOS)failures,traffic impacts,and planned transportation improvements outlined in the Comprehensive Plan to adjoining roadways. Specifically, the TIS notes turn lanes for points-of-access to/from Route 522, and these are not expressly listed in the proffer statement. • Other Application Materials & Fee. Based on the fees adopted by the Board of Supervisors,the application fee for this CUP application would be $32,207. • Agency Comments.Agency comments are attached. Once the application is "complete," and the fee is paid it will also need to go to the Historic Resources Advisory Board(HRAB) prior to scheduling for public hearing. All the above comments and reviewing agency comments should be appropriately addressed before staff can accept this application for a public hearing. The Applicant should verify with Planning &Development staff application completeness prior to final submission. Please feel free to contact me with questions regarding this application. Sincerely, M. Tyler Klein,AICP Senior Planner Attachments:Agency Comment Letters a Frederick County Fire and Rescue Department ,r+f1fySMARSH{j,,: Office of the Fire Marshal Q��►c►c caG 1080 Coverstone Drive v. Winchester, VA 22602 Phone: 540-665-6350 Fax: 540-678-4739 %+F REso� fmo@fcva.us Plan Review Rezoning Status: Approved Business Name Gibson Property 1787 Fairfax Pike White Post, Virginia 22663 Other: Printed Date: 06/16/2026 Thomas Moore Lawson. P.C. General Information Received Date: 05/20/2026 Occupancy Type: Residential Review Begin Date: 06/16/2026 Property Use: Review End Date: 06/16/2026 Activity Number: 1056080 Hours: 1.0000 Review Cause: Application Activity Details Project Name Rezoning from Rural Areas to Light Industrial (M1) Comments: All future development shall comply with the Frederick County Fire Prevention Code and all other applicable codes. / ! '/" Adam Hounshell Lieutenant/Assistant Fire Marshal Page 1 of 1 REQUEST FOR REZONING COMMENTS Project Name: Gibson Property Acreage: 294.14-acres PIN(S): 87-3-A-,87-3-B,&87-A-16B Address (or general location): Generally north of Route 277(Fairfax Pike);generally east and west of Route 522; 3615 Front Royal Pike&1787 Fairfax Pike Existing Zoning District: RA(Rural Areas) Proposed Zoning District: M1 (Light Industrial) Staff Name (Email Address): M.Tyler Klein(tklein@fcva.us) Agency Name Completing Comments (select one): ,a Frederick Water a Virginia Department of Transportation a,Winchester Regional Airport n Virginia Department of Health a Historic Resources Advisory Board Frederick County(FC) Public Schools ✓ FC Public Works n FC Inspections n FC Fire Marshal n FC Parks & Recreation n FC County Attorney Other(Specify): Reviewer Name (Email Address): wilder fcva.us Review Agency Comments: *Comments that may not fit in the box should be attached to the cover sheet on agency or department letterhead. A comprehensive review shall occur at the time of site plan submission. We offer no additional comments at this time. Resubmission to address comments requested?Y F-1 or N F v Gibson Property Rezoning Agency Comment & Response Matrix Rezoning from RA (Rural Areas)to M1 (Light Industrial)—PINs 87-3-B, 87-A-16B& 87-A-94—244.062 acres Shawnee Magisterial District, Frederick County, Virginia SeniorFrederick County Department of Planning & Development— M. Tyler Klein, 1 •M ment A• • Response I. Comprehensive Plan Conformance 1 The proposed M1 (Light Industrial) district is silent on Applicant has revised the potential or restricted uses and on how the proposal would proffers to delete M1 by right further County policy, the Economic Development uses of regional criminal Authority's targeted industries, or the area plan's envisioned justice, enforcement, and "mix of flexible uses" and "mixed-use industrial office" detention facilities, and (MUIO) designation along Route 277. At a minimum, uses freestanding fast food and/or that might be noxious, unsafe, or disruptive, and uses any restaurant that includes a generating higher traffic than contemplated in the TIA, drive-through window/food should be considered for exclusion. service. The TIA submitted by Applicant's traffic engineer has contemplated uses as directed by and agreed with the County's traffic agency, VDOT. Accordingly, it is submitted that the TIA does accurately address traffic impact being generated by this M1 site. 2 Plan policy elements such as "high quality architecture and Acknowledged and will be site design" are absent or under-developed. EIFS specified considered during site plan as a primary building material in Proffer 1.2 is not typically process once rezoned. considered high quality, and no building renderings, elevations, or conceptual layouts are provided to evaluate architecture and site layout. Plan conformance is only partially achieved. 3 Sensitivity should be given to how a future large industrial Acknowledged and will be assembly may impact adjacent sub-planning areas and the considered during site plan rural areas of Clarke County. The Lake Frederick Urban process once rezoned. Development Area (Lake Frederick and Madison Farms) is immediately to the south. Enhanced buffering and screening, lower building heights, and increased building setbacks may be appropriate mitigation for noise, odor, vibration, and traffic impacts. 4 PIN 87-3-A has no future land use designation and is The referenced property has outside the SWSA; it is planned to remain "rural." A been removed from the concurrent CPPA request for this parcel did not receive rezoning application. consensus for further study. II. Transportation & Traffic Analysis 5 The Plan identifies planned transportation improvements on Applicant has proffered the property, including a new major collector road and sufficient right-of-way for the multiuse trail connecting Route 277 to Route 522, multiuse dedication of a contemplated trails along Route 522 and Route 277, and future widening future major collector road. of Route 277. While the collector road right-of-way is The right-of-way is proffered to proffered, the other planned improvements are missing from specifications which are similar the application materials, including the GDP and proffer to the Madison Farms rezoning statement. for the same potential future major collection road. The right-of-way is of sufficient width for 6 lanes along Route 522, 5' sidewalk along Route 277, and a 10' trail on west side of Route 522. 6 The Traffic Impact Study (May 8, 2026) notes that key Improvements to Intersections regional intersections (#1 and #3) continue to fail and, #1 and #3 are necessitated by because no transportation improvements are planned, none existing and background are proposed as a result of the Gibson development. This is conditions traffic. The TIA has grossly inadequate given long-standing County policy that been updated to identify the developments fully mitigate impacts to adjoining improvements needed to offset transportation infrastructure. Special attention should be the site's impact. Specifically, paid to improvements warranted at Route 522 and Fairfax at Fairfax Pike/Warrior Drive Pike/Lord Fairfax Highway (Intersection #3). (Int. #1), left turn phasing improvements have been identified in the updated TIA to offset the site's impact to background conditions. At Fairfax Pike/Route 522 (Int. #3), an exclusive EB left turn lane and a 2nd NB left turn lane have been identified as improvements that will offset the site's impact to background conditions. 7 A Signal Justification Report (SJR)— noted in the TIS for The Applicant has met with Route 522 (Site Entrances #4 and #5) and the western site and been coordinating closely entrance on Fairfax Pike/Route 277 (Site Entrance#1)— with VDOT about the SJR should be completed during the preliminary comment period process and timeline for this and reviewed and approved by VDOT prior to acceptance of project since receiving the application for public hearings. The approved Madison comments. VDOT has 277 proffer (REZ#07-25) also contemplates an SJR and concurred that the full SJR potential signal on Route 277; the applicant should review and approval can be coordinate with the Madison 277 owner (Dave Madison) on deferred to site plan review sharing the cost and installation of a potential signal and on and approval, given the TIS is the timing/trigger of that improvement. updated to include VJuST analysis of alternative/ innovative intersection configurations at the new proposed signalized entrance locations, Int# 6 and Int#9 (VJuST analysis). The revised TIS submission includes this additional analysis and includes a range of intersection configurations for recommendation, subject to a final future SJR review and approval during site plan. It should be clarified that the proposed western entrance on Rt 277 is proposed as aligned with the planned Lake Frederick entrance and no entrance is proposed across from the planned Madison Farm entrance. III. Proffer Statement 8 Provide an "Original Date of Proffers." Acknowledged. 9 The proffer statement does not contemplate allowed or Applicant has removed prohibited uses, the potential impacts to adjoining properties allowable uses of regional and roadways, or mitigation measures. criminal justice, enforcement, and detention facilities, and freestanding fast food and/or any restaurant that includes a drive-through window/food service from the Property. This is consistent with what has been recently proffered for another approved zoning to M1 in Frederick County. 10 Proffer 2 does not fully address level of service (LOS) See the responses to failures, traffic impacts, and the planned transportation Comments#6 and 7 above. improvements outlined in the Comprehensive Plan for adjoining roadways. Specifically, the TIS notes turn lanes for points of access to and from Route 522 that are not expressly listed in the proffer statement. IV. Other Application Materials & Fee 11 Based on the fees adopted by the Board of Supervisors, the Acknowledged. application fee for this application would be $32,207. V.Agency Comments 12 Agency comments are attached. Once the application is Consistent with an email dated complete and the fee is paid, it will also need to go to the July 2, 2026, the County Historic Resources Advisory Board (HRAB) prior to confirmed it has received all scheduling for public hearing. required agency comments to allow this rezoning to proceed to public hearing. The Applicant appeared before HRAB on August 21, 2026 and acknowledges the comments made during the meeting. Further, this application is on a strict timetable in order to be compliant with the requirements for the VEDP grant which requires all grant- eligible property to be fully zoned (M 1 industrial). As such, Applicant respectfully requests this matter be heard by the Frederick County Planning Commission at its hearing on September 2nd and the Board of Supervisors at its hearing on September 23,d Frederick • 2026) © Comment . . Response I. Service Area &Availability 1 Parcels 87-3-B and 87-A-16B are located within the Sewer Sanitary sewer computations and Water Service Area (SWSA), so by county policy water and a force main design will be and sewer services are available to access. A 12-inch water completed as required to main parallels the south side of Route 277. A sanitary sewer design a facility that can force main was recently constructed on and near the project accommodate the proposed parcels, but it was not sized to accommodate development development. Preliminary of the subject properties and may not have capacity to exhibits showing a plan of support this development. A parallel force main was approach have been circulated designed but not constructed because projected sewer to Frederick Water. demands did not warrant the additional capacity. Further, and as stated above, this property is the subject of an active VEDP grant which, if awarded, will provide funds for infrastructure improvements related to this property. Said infrastructure includes, but is not limited to, public water and sewer improvements. If Frederick Water is noting that its existing facilities may require some upgrades, the VEDP grant award would be most timely and be put to good use to make those required improvements. 2 Parcel 87-3-A is not currently within the SWSA and by The referenced property has county policy may not access public water and sewer. Public been removed from the water and sewer facilities are not in the vicinity of parcel 87- rezoning application. 3-A. II. Impact Analysis Statement 3 The Impact Analysis Statement dated May 27, 2026 is silent Applicant has attached a on proposed water and sewer demands and on applicant report prepared by Bohler, responsibilities. The applicant should provide proposed which addresses anticipated water and sewer demands and clarify the statement water and sewer demands for regarding "the effort required by the County"for sanitary this property. It should be sewer. noted these are anticipatory reports based on assumed buildout and uses. The actual consumption of water and sewer will undoubtedly change and will certainly be adjusted as actual users become known and the industrial property is developed. III.Applicant Responsibilities 4 The applicant must ensure adequate water and sanitary The Applicant will complete sewer conveyance and treatment system capacity is sanitary and water studies and available to achieve the projected build-out of the project. It designs to demonstrate is the applicant's responsibility to fund the design, easement adequate water and sanitary acquisition, and construction of the extensions of water and sewer conveyance and sewer services necessary to satisfy the proposed demands. treatment system capacity for the proposed development. 5 Sanitary sewer force mains warrant scrutiny during design; Sanitary sewer computations an oversized force main with inadequate flows can result in and a force main design will be septic conditions, sludge buildup, reduced flow capacity, completed as required to internal corrosion, cycling fatigue, and odors. The applicant design a facility that can must address its sanitary sewer requirements and solutions accommodate the proposed once its flow generation is more clearly known. If the development. Preliminary appropriate sewer solution benefits a regional service rather exhibits showing a plan of than solely the applicant's properties, a partnership with approach have been circulated other benefiting property owners and Frederick Water to Frederick Water. should be considered. IV. Standards & General 6 Water and sanitary sewer improvements are to be Water and sewer constructed in accordance with Frederick Water standards improvements will be proposed and specifications, and easements will be required for and constructed in accordance infrastructure dedicated to Frederick Water. These with Frederick Water comments are offered without the benefit of the proposed standards and specifications, water and sewer demands, and the letter does not and easements will be guarantee system distribution, collection, or treatment proposed per Frederick Water capacity for the development. requirements. Virginia Department of Transportation —VDOT Staunton District (June 10, _Fcomment A• • Response TIA Review Comments (1st Submission, TIA dated May 8, 2026) 1 The TIA conclusion indicates that the reported LOS and Improvements to Intersections queuing deficiencies at the study intersections are due to #1 and #3 are necessitated by existing or background traffic volumes and not the proposed existing and background site traffic. Regardless of the responsible party, the intent of conditions traffic. The TIA has the TIA is to provide future traffic conditions and the been updated to identify the improvements necessary to mitigate unacceptable improvements needed to offset conditions. The initial submission does not meet that intent the site's impact. Specifically, and is therefore incomplete. Revise the analysis and report at Fairfax Pike/Warrior Drive to present future scenarios that mitigate the reported traffic (Int. #1), left turn phasing conditions with the development. improvements have been identified in the updated TIA to offset the site's impact to background conditions. At Fairfax Pike/Route 522 (Int. #3), an exclusive EB left turn lane and a 2nd NB left turn lane have been identified as improvements that will offset the site's impact to background conditions. 2 The TIA indicates overcapacity conditions in all future-year As discussed with VDOT at the scenarios. Per TOSAM, overcapacity conditions require 7/13/26 meeting, with the microsimulation to evaluate operations and report MOEs. added improvements proposed However, if the new mitigated future scenarios (requested at Int. #1 and Int. #3, majority above) are no longer overcapacity, the currently reported of the movements are not future unmitigated MOEs will be acceptable. overcapacity, and microsimulation is not required. 3 The approved pre-scoping document indicated the The proposed Madison Farms westernmost site entrance on Route 277 would align as the and Lake Frederick entrances 4th leg of the planned Madison Farm development entrance on Route 277 presented two (recommended for signalization). The TIA instead shifted potential access locations for this entrance east to align with the future Lake Frederick the Gibson site's western entrance on Route 277, with a signal recommendation. This parcel. Although the concept would add two future signals on the Route 277 corridor, plan during scoping initially which is not desirable on a Minor Arterial connecting 1-81 to contemplated alignment with US 340/522 even if minimum spacing is met. What resulted Madison Farm's entrance, it in the change of the proposed entrance location? was subsequently determined that aligning the entrance with Lake Frederick would be preferable, as that development and entrance is further along and the proposed potential signal would provide greater benefit to the wider community including Lake Frederick residents. As noted V in the comment, entrance spacing standards would be met. 4 The current analysis does not support the recommended Per the meetings with VDOT future signals at study intersection 6 (site entrance 1) and on 7/13/26 and 7/23/26, full study intersection 9 (site entrances 4/5). An SJR must be SJR review and approval can submitted and approved at both locations for VDOT be deferred to site plan review acceptance of the TIA with these recommendations. Both and approval, given the TIS is recommended signal locations should also consider signal updated to include VJuST coordination in the future build year (including modeling the analysis of alternative/ proposed Madison Farms signal on Route 277 if the innovative intersection entrance cannot be adjusted per the comment above). configurations at the proposed signalized entrance locations, Int# 6 and Int#9 (VJuST analysis). The revised TIS submission includes this additional analysis and includes a range of intersection configurations for recommendation, subject to a final future SJR review and approval during site plan. As requested, under mitigated signalization scenarios, the proposed signal on Rt 277 is shown as coordinated with Madison Farm's signal in Synchro and the proposed signal on Rt 522 is shown as coordinated with the Rt 522/Rt 277 signal in Synchro. 5 Per the pre-scoping document, while the signalized The Maranto Manor Drive intersection of US 522 and Maranto Manor Drive is not a signal was not previously study intersection, the signal was to be included in the included in the Synchro model Synchro modeling as an Affected Traffic Signal. Because as it was confirmed with VDOT US 522 is on the VDOT Arterial Preservation Network, this that it is currently signal should be included in the modeling alongside the uncoordinated. However, as proposed new signal at site entrance #4 (study intersection discussed with VDOT on #9) to ensure proper evaluation. Signal coordination seems subsequent calls, it has been likely and may extend north to the signal at Tasker Road. added to the existing and future year Synchro networks in the resubmission for thoroughness. The signal is currently uncoordinated but has been changed to coordinated between Maranto Manor Drive and Tasker Drive for all future year analysis. 6 HCM 2000 outputs are reported for the signal at US The Intersection #3 phasing 522/340/Route 277 instead of HCM 6 due to non-NEMA has been updated accordingly phasing. Only the phase assignment in the timing plan is to allow HCM 6 to produce non-compliant; adjust it from Phase 3 to Phase 8 to make results. It is noted that HCM 6 the intersection NEMA compliant, then update the results to requires manual input for HCM 6 throughout the report per TOSAM requirements. RTOR reductions. The RTOR reduction was determined based on HCM 2000's methodology and has been updated for all signalized study intersections. This is noted as most intersections now show slightly improved results. 7 Update the Executive Summary and Conclusion sections to As discussed with VDOT, indicate the reported delay in seconds associated with each delay in seconds has been level of service, to better communicate the impacts on the added to all LOS F listed study intersections, approaches, or movements. descriptions in the Executive Summary and Conclusions. Frederick • Adam Hounshell, Marshal (June 16, 126 — Status: Approved Comment • • Response 1 All future development shall comply with the Frederick Acknowledged, future County Fire Prevention Code and all other applicable codes. development will comply with Frederick County Fire Prevention Code and other applicable codes. 1 A comprehensive review shall occur at the time of site plan Acknowledged. submission. No additional comments are offered at this time. (June 12,Clarke County Department of Planning — Brandon Stidham, Planning Director CommentTApplicant's Re 1 No comments at this time. Staff reserves the opportunity to Acknowledged. comment on possible transportation impacts after reviewing VDOT's comments on this application. VDOT staff has offered to involve Clarke County in their review process. Virginia Department of Transportation —VDOT Staunton District (August 7, # T om ment A• • Response TIA Review Comments (2"d Submission, TIA dated July 30, 2026) 1 Western Parcel Entrance Alignment Requirement—During Comment acknowledged. It is site plan development, VDOT will expect the proposed noted on the Rezoning Plan entrance serving the western portion of the Gibson Property that entrance locations shown to be aligned with the Madison Farm entrance located are approximate and to be directly opposite on Route 277. This corridor already faces determined at time of final site spacing constraints, and aligning these entrances is plan design. Locations to be in essential to limiting the number of future major intersections accordance with VDOT or traffic signals and preserving safe, efficient traffic spacing requirements. Access operations. The applicant has not demonstrated that an points may be added or entrance cannot be accommodated at this location. eliminated subject to VDOT Accordingly, VDOT will consider this alignment necessary approval at time of site plan. during the site plan development and review process. 2 Right-of-Way Dedication Along Route 277-VDOT Right-of-way dedication along recommends that the applicant dedicate sufficient right-of- Route 277 has been included way along the project frontage to accommodate the ultimate in the proffers. U41D roadway section for Route 277, as identified in the Frederick County Comprehensive Plan. Securing this right- of-way at the rezoning stage is essential to support long- term corridor improvements. 3 Lack of Transportation Mitigations in Proffer Statement- Transportation mitigations at Based on the proffer statement submitted to VDOT with the the intersection of Route 277 application, no transportation improvements or mitigations and Route 522/340 have been are being offered by the applicant. The TIS demonstrates included in the proffers, significant delays at the intersection of Route 277 and Route subject to sufficient right-of- 522/340, particularly during peak hours. Under future 2035 way. background conditions (without the project), the intersection is projected to operate at LOS F/F, with overall intersection delay at 109 seconds in the AM and 161 seconds in the PM. With the development in 2035, intersection overall intersection delay increases to 147 seconds in the AM and 190 seconds in the PM. The TIS provides a mitigated scenario that includes an exclusive eastbound left turn lane and a second northbound left turn lane that improves overall intersection delay to 53 seconds in the AM (LOS D) and 94 seconds in the PM. Given these findings, VDOT cannot support the rezoning application without transportation mitigations that address the documented operational deficiencies. 4 Entrance Locations, Signalization, and Future Studies—All Comment acknowledged. The entrance locations, spacing, and configurations will be commitment to perform and determined during the final site plan review process. No submit SJRs during site plan Signal Justification Reports (SJRs) have been provided with has been included in the this rezoning application. The signal warrant analyses proffers. included in the TIS are preliminary and do not constitute an approved SJR. VDOT reserves the right to eliminate, relocate, or modify any entrance shown on the Generalized Development Plan (GDP) based on final engineering review, spacing requirements, and corridor operations. . 551 CARL E. FRYE, ET UX 1 TO: DEED MONTIE W. GIBSON, JR. ET UX * .� sacK 4.60 35:1 QATE THIS DEED, made this 30th day of June, 1976, between Carl E. Frye and Anna Lee Frye, his wife, of the one part, hereinafter called the Grantors, and Montie W. Gibson, Jr. , and Pearl E. Gibson, his wife, of the other part, hereinafter called the Grantees. WITNESSETHs That for and in consideration of the sum of Ten Dollars ($10.00) , cash in hand paid, and other valuable considerat on receipt whereof is hereby acknowledged, the Grantors do grant and convey with General Warranty of Title unto the Grantees, jointly, .. as tenants by the entirety, with the common law right of survivor- ship, together with all rights, privileges and appurtenances there o belonging, all that certain tract of land, containing 93 Acres, more or less, situate near Double Toll Gate, on the North side of Virginia Secondary Highway No. 277 and on the Southwest side of S. U. S. Highway No. 522, partly in Greenway Magisterial District, Clarke County, Virginia, and partly in Shawnee Magisterial District, Frederick County, Virginia, and more particularly described as follows: All of that certain tract of land described as Tract "B" , according to a certain deed from Katie C. Funkhouser, widow, et als, to Charles Chamblin Funkhouser, dated February 11, 1952, of record in the Office of the Clerk of the Circuit Court of Frederick County, Virginia, in Deed Book 225, at Page 502, and in the Office of the Clerk of the Circuit Court of Clarke County, Virginia, in Deed Book 43, at Page 26, which is described as follows. TRACT "B" , located at Double Toll Gate, on the North side of Virginia Highway No. 277 and on the Southwest side of U. S. Highway No. 522, partly in Greenway District, Clarke County, Virginia, and partly in Shawnee (formerly Opequon) District, Frederick County, Virginia, and bounded and described as follows "Beginning at (1) a post on the North side of Road No. 277 and at the South- west corner of the Perry lot; thence with the West side of the Perry Lot N. 31 deg. E. 98 feet to (2) the point of intersection of the lines of 2 wire fences i thence with the North fence line of the Perry lot S 62-1/4 deg. E. 232 feet to (3) a post in a fence corner; thence with the east fence line of the Perry lot S. 29-1/2 deg. W. 106 feet uw orFIC:S to (4) a post at the Southeast corner of the Perry LANRICK AND WHIT[ lot and in the North line of Road No. 277; thence WINCN[ftLs.VINSINIA with the North line of Road No. 277 S. 63-1/2 deg. E. 146 feet to (5) a post at the Southwest corner of the well lot on the land of C. C. Funkhouseri thence with the west fence line of the land of C. C. Funkhouser N. 47 deg. E. 406 feet to (6) a post in the Southwest fence line of U. S. Highway No. 522; thence N. 25-1/2 deg. W. 945 feet to (7) a point near the County line and at the beginning of the newly con- r. 352 J. BOOK 4C*0 352. - structed portion of the Highwayi'thence N 34 deg. . W. 208 feet to (8) a post- on the Southwest side of U. S. Highway No. 522 and at the Northeast corner of the Riddick lot; thence around said lot S. 45 deg W. 212 feet to (a) a post, thence N 46 deg. W. 314 feet to (B) a post; thence with the West fence line of the Riddick 'lot N. 45 deg. E. 320 feet to (9) the Northeast corner of a large stone post on the South side of U. S. Highway No. 522; thence with the South side of U. S. Highway No. 522 for the following 4 courses , N 26 deg. W. 97 feet to (10) 3 highway stakes where a concrete Highway marker is to be set; thence N. 24 deg. W. 100 feet to (11) a post; thence N. 18 deg. W. 206 feet to (12) a braced post; thence N. 10 deg. W. 84 feet to (13) a post in a fence corner in the Southwest property line of U. S. Highway No. 522 and corner to the Brown farm; thence leaving the Highway and with the Brown farm for the following 3 courses, N. 38•-3/4 deg. W. -1610 feet to (14) a point 6 feet East of a post in a fence corner; thence S. 28 deg. W. 1462 feet to (15) a post in a fence corner at the corner of the woods; thence with the edge of the woods N 45-1/2 deg. W. 850 feet to (16) a post in a fence corner at the corner of the woods, a corner to the Brown farm in the line of the land of Cooke; thence with Cooke for the following 3 courses, S. 44-1/2 deg. W. 465 feet to (17) a post in a fence corner; thence S 44-3/4 deg. E. 1020 feet to (18) a post in a fence corner at the corner of the woods; thence S 28 deg. W. 172 feet to (19) a post at the Southeast fence corner of the land of Cooke and in the North line of Road No. 277; thence with the North line of Road No. 277 S. 61 deg. E. 2511 feet to the point of beginning, containing 102.54 acres, more or less;" 3 LESS: That certain parcel of land which was conveyed by Audrey F. Funkhouser, Executric of Charles C. Funkhouser, et al, to William Stuart Royston by deed bearing date of February 24, 1967, of recorded in the Office of the Clerk of the Circuit Court of Clarke County, Virginia, in Deed Book 78, at Page 33, to which said deed reference is here made, and which is described as follows: All that certain tract of land located at Double Toll Gate and situated partly in Greenway District of Clarke County, Virginia, and partly in Shawnee (formerly Opequon) District, of Frederick County, Virginia, bounded as follows: "Beginning at (1) a point on the North side of Old Road No. 277, said point being 5.9 feet South of an iron peg in a wire fence; thence with two new division lines through the land of C. C. Funkhouser N. 10 deg. 38 min. E. 429.6 feet to (2) an iron peg; thence N. 75 deg. 37 min. E. 320.0 feet to (3) an iron ` peg on the West side of U. S. Highway No. 522; thence with the West side of U. S. Highway No. 522 with the following three sub-chords S 11 deg. 03 min. E. 103.9 feet to (4) thence S. 11 deg. 24 min. E. 209.0 feet to (5) thence S 06 deg. 22 min. E. 438.5 feet to (6) thence S. 46 deg. 14 min. W 34.7 feet to (7) a Concrete Marker at a turn around at the end of Old Road No. 277;thence with the Highway right of way for the u■9MCss following two courses N 3 deg. 35 min. W. 58.8 feet LARRICK AND WHITE to (8) a Concrete Marker; thence N. 89 deg. 21 min. W. wINCNiiTEt.V1116194tA 115.2 feet to (9) , a Concrete Marker a corner to the land now or formerly Harrell; thence with said land (2) i 353 Z e r 4r�c 4SU PeU 353 for the following three courses N 29 deg. 17 min. E. 105.8 feet to (10) a post, thence N. 61 deg. 39 min. W. 232.0 feet to (11) the point of intersection of two fences; thence S 29 deg. 16 min. W. 98.7 feet to (12) a point on the Northeast side of Old Road No. 277, opposite a post corner to the land now or formerly Harrell; thence with the Northeast side of old Road No. 277 N. 60 deg. 13 min. W. 178.1 feet to the point of beginning, containing 5.13 acres, more or less, according to a plat and survey thereof made by Richard U. Goode, Certified Surveyor, under date of December 28, 1966; and being the same realty conveyed to the Grantors by deed of J. Frederick Larrick, Trustee, dated the 30th day of June, 1976, and to be recorded in the Clerk's office of the Circuit Court of Frederick County, Virginia, immediately preceding the recordation ~ of -this deed, and also to be recorded in the Clerk's office of the Circuit Court of Clarke County, Virginia, immediately preceding the recordatiorl.o€ this deed. This conveyance is made subject to the legally enforceable restrictive covenants,•conditions, building lines and rights of way, of record, if any, affecting the aforesaid realty. The Grantors covenant that they have the right to convey said realty to the Grantees; that the Grantees shall have quiet possession thereof, free from all encumbrances; that they have don no act to encumber said realty; and that they will execute such further assurances thereof as may be requisite. WITNESS the following signatures and seals: (SEAL) i (SEAL) STATE OF VIRGINIA, COUNTY OF FREDERICK, to-wit: _, 400000 , a Notary Public in and for LARAICK AND WRITE LAW ornct>t the State and County aforesaid, certify that Carl E. Frye and wlNCNt[r[II,runeu (31 I eooK 46 f;eE` 3S4 Anna Lee Frye, his wife, whose names are signed to the foregoing instrument, bearing date on the 30th day of June, 1976, have acknowledged the same before me in my State and County aforesaid. Given under my hand this 30th day of June, 1976. My commission expires J.cl y:•3 "ijJ� "J= was produce' to me oa tae T•.is nslrunlent of wntiug 19 7, rn at ?n d ay of .nsnt thereto anae ca i w.sa ind wls�t-i-^cartiiicata acknowl dg. ord. 'ax impas3d ny 5ao. 5 3-j4.1 of alvuit_ ted to r-a — pia, if a.se_sdble. D and 5�-5� have been p- a Clezlc. LAW LARRICR AND UNITE wIMCMtsun.♦IplI111A 190 F t BR645PG190 1� � THIS DEED, made and dated this day of April, 1987, by and between REGINALD von MOULTRI GRAFF, Single, and { GLORIA GRAFF KERN and WILBUR L. KERN, her husband, hereinafter # Grantors; and MONTIE W. GIBSON and PEARL E. GIBSON, husband i# and wife, hereinafter Grantees. K WITNESSETH: That for and in consideration of the sum a of Ten Dollars ($10.00) and other good and valuable consid- eration, the receipt of all of which is hereby acknowledged, the Grantors do hereby grant, bargain, sell and convey with general warranty of title, unto the Grantees, jointly, as tenants by the entireties, with common law right of survivor- ship, it being intended that the part of the one dying should t 6 then belong to the other, his or her heirs or assigns, the following described property and appurtenances thereunto belonging: i E All that certain parcel of land in ". opequon Magisterial District, Frederick ll� County, Virginia, lying and on the northeastern boundary line of State Route 277, containing 154.049 Acres, being more particularly described on the plat and survey of Lee A. Ebert, C.L.S., dated June 21, 1984, attached hereto and by this reference incorporated herein. This is a greater portion of the land conveyed to Reginald von Moultri Graff by deed dated February 23, 1942, in Deed Book 185, at Page 89, and a portion of the land conveyed to Conrad M. Graff by deed dated April 5, 1945, recorded in the Frederick County Circuit Clerk's Office in Deed Book 192, at Page 252, which land was then devised to Reginald von Moultri Graff and Gloria Graff Kern by Will recorded in Will Book 66, at Page 162. Florence N. Graff, mother of Gloria Graff Kern and Reginald von Moultri Graff, died on October 20, 1981, thereby vesting complete • title in the aforesaid properties in Reginald von Moultri Graff and Gloria Graff Kern. i Included in this conveyance are all mineral rights, EXCEPT, HOWEVER, the ,Grantees agree, for themselves and their heirs and assigns, as evidenced by their execution of this BKS45P& 191 Dead, that they will not release or transfer any mineral rights conveyed herein until the Purchase Money Deed of Trust executed by the Grantees and payable to Reginald M. Graff and C" Gloria G. Kern, dated /�'1�✓�' ` 1 2) 1987, and t recorded immediately following the recordation of this Deed, is paid in full. Reference is here made to the aforesaid instruments and the attachments and the references therein contained for a further and more particular description of the property hereby conveyed. This conveyance is made subject to all duly recorded and enforceable restrictions, easements and rights of way. The Grantors covenant that they have a right to convey said property to the Grantees; that they will execute such further assurances of title to said property as may be requisite; that they are seized in fee simple of the property conveyed; and that the Grantees shall have quiet possession of said property free from all encumbrances. WITNESS the following signatures and seals: (SEAL) (SEAL) Wil (SEAL) (SEAT) E (SEAL) 4 A Y f 192 STATE OF VIRGI?iIA , or , to-wit: !( 4 The foregoing instrument was acknowledged balora ma this e21— day of April, 1987, by Reginald von Moultri Graff, Gloria Graff Kern, Wilbur L. Kern, Montie W. Gibson, and Pearl E. Gibson. My Commission expires n ffx&2 . a f r � f s 193 _ f 12, r- Zw N e �OOtp RUFUS NEWGOME LAND o y�P Qo ?� W R V g '7 c ,� '�'' -g R BK 6 [ 9IRC M 3 i1Q - W H ITT INGTON p0 a f�'12 i1 D.G. 546 1 O P. 281 ; Np 4 15 ' Q V AA04, N .sae ,� � a• �+ c -' PI M ` � moo, 5 la 4 �--•gaol+ �p PIII i �O m O F- h 1526.09 / qC C �+► e S IYq re w a 2 8 3 `v ? ati =10 I wee A w R C Foae H 321 R .�,p'��"_�,�,!!! 2 3 s o �"► �'cr`y '' 2 154.049 ACRES UA all Y N O !t d tt u C6 it W O G► O in NO�t J W at 9 U 1r va . RT 2 20 2 , 77 Mop,. 194 The Accompanying Plat is a Survey of 1M"fS rqT1prtion of the Land conveyed to Reginald VanMoultrie Graff by Deed date 23 February, 11942 in Deed Book 185 Page 89. (ALSO NOTEe Deed to Conrad M. Graff dated 5 April 1945 in Deed Book 192 Page 252 and Conrad M. Graff will in Will Book 66 Page 162). The said Improves Land fronts the North- eastern Boundary Lines of Virginia Route 277 and lies in Opequon - District. Frederick County. Virginia& Beginning at (1). a post in the Northeastern Boundary Line of 3 Route 277, a corner to the Cooke Land, running with the Two Following Lines of the said Land N 480 57. 52" E - 1,353.19 ft. to (2), an iron Pin; thence S 380 18' 49" C - 414.89 ft. to (3). a post in the North- western Line of the Russell Lands thence with the said Line N 480 530 44" E - 1.083.27 ft. to (4). an iron pin in the Southwestern Line of the Place Lands thence with the Two Following Lines of the said Land N 420 560 20" W - 577.89 ft. to (5), an iron pin; thence N 400 05. 3p- E 810.66 ft. to (6), a 10- black oak tree corner to the Whittington E Land; thence with the Northwestern Line of the said Land N 410 21. 14" E 555.01 ft. to (7). a point in the Center Line of Wrights Run in the Southwestern Line of the Newcome Land - the said point being S 100 34- 06" W - 21.06 ft. from a double walnut trees thence with the Six Following Center Lines - Southwestern Lines of the Nevcome Land, the Rasters Land and the Lesko Land - N 480 34' 47" W - 237.86 ft. to (8)1 thence N 530 45' 50" W - 308.14 ft. to (9)s thence N 500 390 09" W - 249.17 ft. to (10)s thence N 740 05-54- W - 143.21 ft. to (11)1 thence N 640 17. 00" W 153.85 ft. to (12); thence N 670 34. 53" W - 75.35 ft. to (13). the Southwestern Line of the said Lesko Lands thence with the Western Line of the said Land N 210 100 45" E - 26.73 ft. to a white oak stump, and continuing N 210 18' 45" E - 540.32 ft., fn All, to (14), a post corner to the Rolling Knolls Estates; thence with the Two Following Lines of the said Land S 720 57. 54" W - 000.26 ft. to (15); thence N 450 43- 40" W - 108.50 ft. to (16). an iron pin (found) corner to theSnapp Subdivisions thence with the Southeastern Line of the said Land S 470 24, 04" W - 1,152.51 ft. to (17) , a concrete marker corner to the 19.171 Acre Southwestern Portions thence with the J Northeastern Line of the said Land, and continuing with the Northeastern Line of the 5.634 Acre Portion S 400 12. 10" E - 676.12 ft. to (10), Y an iron pins thence with the Southeastern Line of the said 5.634 Acre t a 1 195 Portion S 48o 359 00" W - 1,653.11 ft QiS iron pin in the Northeastern Boundary Line of Route2771 thence with� ths Three Folloviag Boundary Lines S 270 244 07•* E - 829.40 ft. to (20) . a concrete highway monuments thence with the Arc Line 648.19 ft. (Chord S 330 57. 07- E - 646.78 ft. - R. 2,835.00 ft.) to (21), a concrete highway monuments thence 3 400 30. 07" E - 103.68 ft. to the beginning. ti Also shown on the Plat is the Northern Virginia Dower Company R/W - Deed nook 283 Page 321. Also shown on the Plat is the Northern Virginia Power Company R/W - Deed S00% 213 Pages 306 and 307. Containing - - 154.049 Acres Surveyed - - - June 21, 1984 ! •f ? f P.u�e iInelru�eu�t of ritui9 Was produc�je�to me ou tilt, .nd With certiffcato o aclasowlextgmOld thereto aane:ed w•,a idvaittod t0 rocord. Taz im .•�� � Poyed by Sec. 5&,i4.1 of and 5&54 have been paid, if asse.wb• Cie f , 2 � � Q1397 Address: '�b lo'7 VCDv--( �77 aZ`�LQva. c� Consideration: $ 1-3 DO00 O'ssessed ' � I,300.co DEED THIS DEED, made and dated this -_&day of January, 2021, by and between TIMOTHY SCOTT FRYE, KEITH JAMES FRYE,and TERRY LYNN FRYE, being all the heirs at law of the Estate of Anna Lee Frye, parties of the first part, hereinafter called the Grantors, and MONTE GIBSON, JR., party of the second part, hereinafter called the Grantee. WITNESSETH: That for and in consideration of the sum of $10.00 cash in hand paid and other good and valuable consideration, the receipt of which is hereby acknowledged, the Grantors do hereby grant and convey, with General Warranty and English Covenants of Title, in fee simple, unto the Grantee, together with all rights, rights of way, privileges, improvements thereon and appurtenances thereto belonging, all the following described property,to-wit: TAX ID NUMBER: 87-A-94 All that certain lot or parcel of land, containing 0.18 acres, more or less,situate on the North.side of Virginia Highway No. 277, a short distance West of Double Tollgate, in the Opequon District of Frederick County, Virginia,and being more particularly describe by plat and survey of Richard Goode, dated April 28, 1966, and of record in the Office of the Clerk of the Circuit Court of Frederick County,.Virginia. AND BEING the same 9arcel of real estate conveyed unto Carl E. Frye, by Deed dated the 26 day of October, 1970, and of record in the aforesaid Clerk's Office in Deed Book 369, ay Page 692. Carl E. Frye died-testate, and by his Last Will and Testatment dated October 19, 1994, devised this property to his wife Anna Lee Frye. Anna Lee Frye died testate and by her Last Will and Testatment dated the 8t'day of April, 2002, devised this property to her three children, Terry Lynn Frye, Keith James Frye and Timothy Scott Frye, the grantors herein, in equal shares. Reference is hereby made to the aforesaid instruments, attachments and the references therein contained, for a more particular description of the property herein c-� conveyed. — This conveyance is made subject to all legally enforceable restrictive covenants, %-C. easements, and rights of way of record in.the aforesaid subject property. WITNESS the following signature(s) and seal(s): (SEAL) -ftMOTHY SCOTT FRY rantor SEAL KE 4AJN1J6=[(SEAL COMMONWEALTH OF VIRGINIA, AT LARGE City of Winchester, to-wit: The foregoing Deed was acknowledged before Notary Public in and for the aforesaid jurisdiction, by Timothy Cott Frye, this j day of January, 2021. Not bli My Commission expires: Notary ID: r-7 � 6/ ry « 0 ARY S PifiY COMMONWEALTH OF VIRGINIA,AT LARGE ` City of Winchester, to-wit: , The foregoing Deed was acknowledged before me, Notary Public in and for the aforesaid jurisdiction, by Keith James Frye,this L'day f anuary, 2021. -mil CD My Commission expires: 3i Notary ID• 7L1021 `�_' FUi3LIC REG.; 7010734 >' Pgjy CO"I.M.!SSIO?2 41 COMMONWEALTH OF VIRGINIA, AT LARGE City of Winchester, to-wit: v The foregoing Deed was acknowledged before me,M A26UQP.TTe— C - "� Notary Public in and for the aforesaid jurisdiction, by Terry Lynn Frye, this day January, i 2021. of ry fC My Commission expires: Notary ID: t� �UL C C70' mn This instrument was prepared by Clinton R. Ritter, Attorney at Law, 205 East Boscawen Street, Winchester, Virginia 22601, without the opportunity of a title examination. VIRGINIA: FREDERICK COUNTY.SCT. This Instrument of writing was produred to me an I - 2.5 .ZOa I at Ja:1'2 o. and with certificate acknowledgement thereto annexed was admitted to record. Tax imposed by Sec.58.1-802 of and 58.1-801 have been paid,if assessable. Clerk 8/21/26, 12:49 PM Untitled Page Frederick Home Frederick County Virginia L FF Ar 7vE Top Pay/Lookup Taxes Payment Home Personal Property Real Estate Dog Tags Pay Parking Violation Pay FOIA Charges Pay Planning Charges Other Payments ShoppingCart(0) Pin Options Inquiry of Real Estate Map Number: $7 3 B View Map Name: GIBSON MONTIE W JR • Account# Dept# Ticket# Seq# Due Date Detailed Information Amount(Click Below) Due ViewBill View Back 8026068 RE2024 15187 1 6/5/2024 2024 REAL ESTATE $0.00 of Bill ViewBill View Back 8026068 RE2024 15187 2 12/5/2024 2024 REAL ESTATE $0.00 of Bill ViewBill View Back 8026068 RE2025 15575 1 6/5/2025 2025 REAL ESTATE $0.00 of Bill ViewBill View Back 8026068 RE2025 15575 2 12/5/2025 2025 REAL ESTATE $0.00 of Bill ViewBill View Back 8026068 RE2026 15536 1 6/5/2026 2026 REAL ESTATE $0.00 of Bill 8026068 1RE20261 15536 2 12/7/2026 2026 REAL ESTATE 1 $0.00 Total Due: $0.00 Return to Search https://fctaxes.co.frederick.va.us/Applications/TR_PayTaxes/TicketsByMap.aspx 1/1 8/7/26,3:15 PM Untitled Page Frederick Home Frederick County Virginia Li,,,AT 7W rOP Pay/Lookup Taxes Payment Home Personal Property Real Estate Dog Tags Pay Parking Violation Pay FOIA Charges Pay Planning Charges Other Payments ShoppingCart(0) Pin Options Inquiry of Real Estate Map Number: 87 A 16B View Man Name: GIBSON MONTIE W JR Account# Dept# Ticket# Seq# Due Date Detailed Information(Click Amount Below) Due ViewBill View Back of Bill 1021912 RE2024 15185 1 6/5/2024 2024 REAL ESTATE $0.00 ViewBill View Back of 8029952 RE2024 15185 2 12/5/2024 2024 REAL ESTATE $0.00 Bill ViewBill View Back of 8029952 RE2025 15573 1 6/5/2025 2025 REAL ESTATE $0.00 Bill ViewBill View Back of 8029952 RE2025 15573 2 12/5/2025 2025 REAL ESTATE $0.00 Bill ViewBill View Back of 8029952 RE2026 15534 1 6/5/2026 2026 REAL ESTATE $0.00 Bill O Show Current Charges Due O Show All Charges Total Due: $0.00 Return to Search https://fctaxes.co.federick.va.us/Applications/TR_PayTaxes/TicketsByMap.aspx 1/1 8/21/26, 12:47 PM Untitled Page Frederick Hoene Frederick County Virginia LrF.AT rYE TOP Pay/Lookup Taxes Payment Home Personal Property Real Estate Dog Tags Pay Parking Violation Pay FOIA Charges Pay Planning Charges Other Payments ShoppingCart(0) Pin Options Inquiry of Real Estate Map Number: 87 A 94 View Map Name: GIBSON MONTE JR • Account# Dept# Ticket# Seq# Due Date Detailed Information Amount(Click Below) Due ViewBill View Back 8026045 RE2024 15181 1 6/5/2024 2024 REAL ESTATE $0.00 of Bill ViewBill View Back 8026045 RE2024 15181 2 12/5/2024 2024 REAL ESTATE $0.00 of Bill ViewBill View Back 8026045 RE2025 15571 1 6/5/2025 2025 REAL ESTATE $0.00 of Bill ViewBill View Back 8026045 RE2025 15571 2 12/5/2025 2025 REAL ESTATE $0.00 of Bill ViewBill View Back 8026045 RE2026 15532 1 6/5/2026 2026 REAL ESTATE $0.00 of Bill 8026045 1RE20261 15532 2 12/7/2026 2026 REAL ESTATE 1 $4.77 Total Due: a.77 Return to Search https://fctaxes.co.frederick.va.us/Applications/TR_PayTaxes/TicketsByMap.aspx 1/1 GOROVE SLADE Transportation Planners and Engineers TECHNICAL MEMORANDUM To: John A. Bishop Frederick County Planning and Development From: Erin B. Steel, P.E. Ariel Jarvis, P.E. Pratik Neupane Date: August 26,2026 Subject: Supplemental Traffic Analysis—Gibson Property(Removal of Landbay East of Rt 522) Frederick County,VA Introduction This supplemental analysis evaluates the proposed Gibson Property development in Frederick County,Virginia with the landbay east of Route 522 removed from the project.The Gibson development site is located northwest of the intersection of Route 522 and Fairfax Pike(Route 277)/Lord Fairfax Highway(Route 340). It is situated north of Fairfax Pike and west of Route 522. This analysis supplements the previously submitted Traffic Impact Study prepared for the Gibson Property,dated July 30,2026. Compared with the development program evaluated in the original study, the Iandbay east of Route 522, identified as Tax Map Parcel 87-3-A, has been removed from the proposed development.The project is now limited to Tax Map Parcels 87-A-16B and 87-3-B,which collectively comprise approximately 244.379 acres. The revised development program proposes up to 2.6 million square feet of industrial park use,representing the same proportion of development previously proposed on the Iandbays retained within the application. For purposes of this supplemental analysis, only the Future with Development 2035 and Future with Development 2041 conditions will be evaluated. All other analysis scenarios and assumptions from the original Traffic Study remain applicable and are therefore unchanged for this supplemental analysis. Figure 1 shows the site location and study intersections. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Supplemental Analysis—Gibson Property Page 2 August 26,2026 s N 5 y, 2 . , r t ' • 3 :, u tom• �. Legend Existing Study Intersection(s) 4 O< # Future Study Intersection(s) a U Site Location {� �► Site Entrance Figure 1: Site Location and Study Intersections with Removal of Eastern Landbay Projected Site Trip Generation In order to calculate the trips generated by the proposed development, the Institute of Transportation Engineers' (ITE) Trip Generation Manual, 12th Edition, publication was used to determine the total trips going into and out of the subject site during the AM and PM peak hours as well as the typical number of weekday daily trips. The projected trip generation for the proposed development is depicted in Table 1. Table 1: Projected Site Trip Generation—Proposed Use Peak Hour of the Adjacent Street; ITE 121h Ed. DailyCode Size AM Peak Hour PM Peak Hour In Out Total In Out Total Total Proposed Uses Industrial Park 130 kSF of GFA 377 113 490 148 382 530 6,112 Total 377 113 490 148 382 530 6,112 As shown in Table 1, the site is expected to generate approximately 490 trips during the AM peak hour, 530 trips during the PM peak hour, and 6,112 weekday daily trips on a typical weekday. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Supplemental Analysis—Gibson Property Page 3 August 26,2026 It should be noted that the revised development program proposes 2.6 million square feet of industrial park use, which is less than the 3.2 million square feet evaluated in the original Traffic Study. Because the revised program generates fewer site trips than the original development program, and the revised development program represents the same proportion of development on the remaining landbays, a rescoping of the study was not required. Distribution and Assignment of Vehicular Site Traffic The distribution and assignment of site-generated vehicular trips were based on existing traffic patterns,engineering judgment, the nature of the proposed development, and input and concurrence from Frederick County and VDOT staff during the scoping process. The directional distribution and site access assumptions are consistent with those used in the original Traffic Study. The site assignment for the peak hour trips is presented in Figure 2. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Supplemental Analysis—Gibson Property Page 4 August 26,2026 Will f i, SITE F SITE' t s" 7 9 r44 C ti s4` W 4 r U =' 0 218 �42 F 351116 1 F 37/124 F 34/13 _ Q o m i-M o o m �-113 0 .�v 0/D a`" o Fala Pixa ` ♦r , F.-Rke 4) ♦r , . � , _1WF— om J 9 Tg oa 9 a WO e a 312 g T 113/45—► 121/48--►3 9/32—► ON W- 0 24180 ON m E 95137 F 311 € 15R. Qo 9 4—15i50 n F 97/42 !—98138 j-010 I* ) Iy F1.11 Pax t f 5 `\I ON-� C 83133 4920 a 4920� -I" ► 29F36—► 19t8� Oq� e s LEGEND SNtly Intersection Existing 9aaEway One Way Travel Lane pry; Mour Traffic 2895 Lake Fre Eenck Entrance a Slte E„tre,ca 11139—, r Figure 2: Site Trips Assignment 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Supplemental Analysis-Gibson Property Page 5 August 26,2026 Future with Development (2035) Traffic Volumes The future with development traffic volumes were determined by adding the assigned site generated traffic volumes (Figure 2) to the 2035 Future Conditions without Development traffic volumes presented in the original Traffic Study. The 2035 Future Conditions with Development traffic volumes are depicted in Figure 3. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Supplemental Analysis—Gibson Property Page 6 August 26,2026 N SITE . s � � ���` - �'•• SITE e f 7 8 r Ar r AL 0 • G) §� 128,1M 33/45 a 5597 Z F t 6z3939 541923 �d`, 4-154261 ry 162n48 fir' 328 1O ,$ 109220 FNriaz Pb ` ♦F� FaYrie�Plke ♦F� FabFa�Pb ` ♦ _. Lie FieEerkk-- 146rA2 `�T 211/155 T 237266 `\I.Te 1471169 6411758—� 9 n 614l652—► 296206—► m y n e 390/167 20/45 243l482 9291 3 5 C 95li7.024 i 311 w 15/6 —$T7/ e � 1 4—694/1,101 F 69511.097 3665 a N 1 U .� 1 �.4 . b � m Rob ♦ aMa Plke 4) ♦F � ker ` FaYTa�PYe - az Me 54/168 'a' T^' 83133 4920,' 779/824—► 9051980--► 856960—► 21fi243� n 46/107� P rc 1 u 4 yy LEGEND Y' O Study lnbr-t— m� � Exle0n9 Roedwey One Wry T.-Lene Froencexe ♦ AMIPM Peek Hour T,e c TLek.Frederick Enhance 28195- 61b Entrance ADT Average Deily TnTic 1129 27 00 Figure 3:2035 Future Conditions with Development—Vehicular Traffic Volumes 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Supplemental Analysis—Gibson Property Page 7 August 26,2026 Future with Development (2035) Intersection Capacity and Queueing Analysis Intersection capacity analyses were performed for the 2035 Future Conditions with Development scenario at the study area intersections during the AM and PM peak hours. Synchro, version 11, was used to analyze the study intersections with results based on the HCM 6th methodology' presented in the TRB's Highway Capacity Manual(HCM)and analysis guidelines provided by the County. The analysis herein includes level of service (LOS), delay, and queue length comparisons for the turning movements analyzed. For the purposes of this analysis,the future peak hour factors(PHF)were based on the traffic counts,as applicable,and utilized on a by-intersection basis; PHF in the range of 0.92 to 1.00 were used for the future scenario, consistent with the scoping document.The heavy vehicle percentages(HV%)were the same as those used in the 2026 Existing Conditions and 2035 Future Conditions without Development scenario analyses in the original traffic study. The planned background improvements and the site-related improvements recommended for the 2035 analysis year in the original Traffic Study dated July 30, 2026 were carried forward and incorporated into this supplemental analysis. Hence, only the mitigated results are shown in Table 2, Table 3,and Table 4. The planned background improvements by others include: • Intersection 1 (Fairfax Pike and Warrior Drive): Extension of eastbound right turn lane (VDOT SMART SCALE project). • Intersection 2(Fairfax Pike and White Oak/Hudson Hallow Road):Addition of exclusive eastbound and westbound left-turn lanes on Fairfax Pike(by Madison Farm). The following future potential mitigations were identified under the Future with Development scenario: • Intersection 1 (Fairfax Pike and Warrior Drive): Conversion from "protected only" to "flashing yellow arrow" for eastbound left-turn and westbound left-turn movements. • Intersection 3 (Rt 522 and Fairfax Pike/Lord Fairfax Highway): Addition of an exclusive eastbound left-turn lane and a second northbound left-turn lane. • Intersection 6(Fairfax Pike and Lake Frederick Entrance/Site Entrance#1): Installation of a traffic signal*. • Intersection 9 (Rt 522 and Site Entrance#4): Installation of a traffic signal*. *It is noted that installation of traffic signals at Intersections 6 and 9 at site entrances are subject to VDOT review and approval through future Signal Justification Reports ("SJRs"). Preliminary signal warrant evaluations and VJuST analyses were performed as part of the original Traffic Study, dated July 30, 2026 to screen potential intersection control configurations. The ultimate configurations will be determined through the future SJRs. The results of the intersection capacity analyses from Synchro are presented in Table 2, Table 3, and Table 4 and graphically in Figure 4. The results are expressed in LOS and delay (seconds per vehicle) for overall signalized intersections and per approach and lane group for all study intersections. The 95th percentile queue lengths were also determined from Synchro and are expressed in feet. The detailed analysis worksheets of the 2035 Future Conditions with Development are contained in Appendix A. ' It should be noted that HCM 2000 methodology was used in lieu of HCM 6th if the HCM 6th methodology was not applicable. HCM 6th could not be applicable in such cases as nonstandard National Electrical Manufacturers Association(NEMA)configurations,shared lane configurations,placement of loop detectors, U-turns,etc. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Supplemental Analysis-Gibson Property Page 8 August 26,2026 Table 2: 2035 Future Conditions with Development-Intersection Capacity and Queuing Analysis Results Part 1 AM Peak Hour PM Peak Hour Effective Storage 50th% 95th% 50th% 95th% No. Intersection(Movement) Length(ft.) LOS Delay(s) Queue(ft.) Queue(ft.) LOS Delay(s) Queue(ft.) Queue(ft.) 1 Mitigation:Flashing Yellow Arrow on EBL and WBL movement Warrior Drive(NIS)&Fairfax Pike(E/W) Overall Intersection(Signalized) E 56.3 D 54 Eastbound Approach C 22.9 D 43.6 Eastbound Left 260 C 21.5 3 67 F 96.9 -186 #355 Eastbound Thru C 28.3 565 703 C 28.3 561 #806 Eastbound Right 500 B 12.9 165 241 A 7.9 0 57 Westbound Approach C 25.3 E 59.1 Westbound Left 270 C 22.9 61 90 C 20.8 67 #185 Westbound Thru C 27.2 494 #676 F 69.3 -765 #1006 Westbound Right 575 B 12.3 0 25 B 12.7 0 26 Northbound Approach D 51.9 E 72.9 Northbound Left 190 D 52.8 56 #130 D 46.7 120 #202 Northbound Thru/Right D 49.7 20 #86 F 99.9 -180 #351 Southbound Approach F 230.2 D 53.3 Southbound Left 150 D 48.2 46 90 D 43.7 61 110 Southbound Thru F 292.5 -322 #530 D 47.7 40 83 Southbound Right D 46 0 55 E 57.9 185 301 2 Hudson Hollow Road/White Oak Road&Fairfax Pike(EMI) Overall Intersection(Signalized) B 13.9 B 19.8 Eastbound Approach B 11.5 B 11.5 Eastbound Left 145 B 11.4 25 68 B 17.2 16 #107 Eastbound Thru B 11.6 126 408 B 10.4 124 370 Eastbound Right 90 A 5.9 0 0 A 5.6 0 7 Westbound Approach B 15.5 C 25.5 Westbound Left 125 A 7.9 0 3 A 6.9 3 11 Westbound Thru B 15.8 164 338 C 26.6 358 #708 Westbound Right 155 A 8.4 0 3 A 6.7 0 7 Northbound Approach C 21.2 C 28.3 Northbound Left/Thru/Right C 21.2 21 69 C 28.3 30 74 Southbound Approach C 22.1 C 28.8 Southbound Left/Thru/Right C 22.1 28 102 C 28.8 27 91 3 Mitigation:Addition of Exclusive EBL and second NBL turn lanes Route 522(NIS)&Fairfax Pike/Lord Fairfax Highway Overall Intersection(Signalized) D 53.2 F 90.4 Eastbound Approach E 69.1 F 98.7 Eastbound Left 250 E 60.3 170 #317 F 150.1 -263 #436 Eastbound Thru E 79.6 217 9403 E 58.1 154 #277 Eastbound Right 230 D 37.8 0 73 D 45.1 68 #236 Westbound Approach D 53.6 F 112.1 Westbound Left 500 D 44.8 75 128 D 40.2 152 237 Westbound Thru/Right E 58.4 144 222 F 147.3 -421 #630 Northbound Approach D 44.2 F 99.1 Northbound Left 565 E 60.3 115 #179 F 179.8 -185 #284 Northbound Thru C 34.8 172 232 D 53.5 251 #372 Northbound Right 250 C 29.2 0 41 C 33.8 0 20 Southbound Approach D 48.5 D 49.5 Southbound Left 125 E 72.2 60 #149 E 67.8 76 #152 Southbound Thru D 42.2 133 132 D 46.7 214 #341 Southbound Right 480 A 0 14 50 A 0 11 110 NOTES: [11 Effective storage length is based on the storage length plus one-half of the taper length per TOSAM guidelines. [21-:Volume exceeds capacity,queue is theoretically infinite. [31#:95th percentile queues(reported from Synchro)exceed capacity,actual queues may be longer.Queues shown are based on the maximum after two cycles. [4]m:95th percentile volume and queues(reported from Synchro)are metered by upstream signal. [5]Intersection 5 is analyzed using HCM 2000 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Supplemental Analysis-Gibson Property Page 9 August 26,2026 Table 3: 2035 Future Conditions with Development-Intersection Capacity and Queuing Analysis Results Part 2 Effective Storage 50th% 95th% 50th% 95th% No. Intersection(Movernent) Length(ft.) LOS Delay(s) Queue(ft.) Queue(ft.) LOS Delay(s) Queue(ft.) Queue(ft.) Synchro Synchro AM Peak Hour PM Peak Hour Route 522(NIS)&Lake Frederick Drive(E) Overall Intersection(Signalized) B 17.7 C 22.2 Eastbound Approach C 29.3 C 34.8 Eastbound Left C 30.8 68 153 D 38.2 104 181 Eastbound Right C 22.1 4 36 C 27.5 33 68 Northbound Approach B 15.2 C 20.9 Northbound Left 470 C 20.7 8 23 C 31.9 27 58 Northbound Thru B 14.9 ill 267 B 19.6 157 244 Southbound Approach B 17.8 C 20.4 Southbound Thru B 17.9 134 226 C 20.9 273 418 Southbound Right 295 B 13.2 0 25 B 13.8 0 46 Southbound U-Turn A 0 0 3 A 0 0 0 5 Route 522(NIS)&Tasker Road(E) Overall Intersection(Signalized) B 18.9 C 23.6 Eastbound Approach D 46.9 D 45 Eastbound Left D 49A 38 77 D 51.3 119 181 Eastbound Right 250 D 46.3 0 39 D 40.7 0 36 Northbound Approach B 13.8 B 18.1 Northbound Left 485 D 54.9 64 96 D 53.7 119 137 Northbound Thru A 1.9 27 28 A 3.8 56 75 Southbound Approach B 12.6 C 20.2 Southbound Thru B 13.4 103 162 C 21.9 205 311 Southbound Right 315 A 6.9 0 14 A 8.7 0 20 6 Mitigation:Install a Signal Lake Frederick Entrance/Gibson Site Entrance 1&Fairfax Pike(E/W) Overall Intersection(Signalized) A 7.3 A 9.8 Eastbound Approach A 2.1 A 2.1 Eastbound Left 150 A 4.5 8 m11 A 10 2 m6 Eastbound Thru A 1.9 109 119 A 1.9 134 272 Eastbound Right 150 A 0 0 m1 A 0.1 0 m5 Westbound Approach A 7 B 11.4 Westbound Left 150 A 3.3 5 12 A 2.8 7 14 Westbound Thru A 7.4 182 258 B 12.3 395 #686 Westbound Right 150 A 4.9 0 17 A 3.3 0 3 Northbound Approach D 38.3 D 40 Northbound Left D 38.6 67 #136 D 40.1 45 #121 Northbound Thru/Right C 33.5 0 0 D 36.4 0 0 Southbound Approach C 34.5 D 41.3 Southbound Left 50 C 34.5 15 41 D 41.5 58 #154 Southbound Thru/Right C 33.3 0 0 D 36.5 0 0 NOTES: [1]Effective storage length is based on the storage length plus one-half of the taper length per TOSAM guidelines. [21-:Volume exceeds capacity,queue is theoretically infinite. ]31#:95th percentile queues(reported from Synchro)exceed capacity,actual queues may be longer.Queues shorn are based on the maximum after tKo cycles. ]4]m:95th percentile volume and queues(reported from Synchro)are metered by upstream signal. [5]Intersection 5 is analyzed using HCM 2000 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Supplemental Analysis-Gibson Property Page 10 August 26,2026 Table 4: 2035 Future Conditions with Development-Intersection Capacity and Queuing Analysis Results Part 3 Effective Storage 50th% 95th% 50th% 95th% No. Intersection(Movernent) Length(ft.) LOS Delay(s) Queue(ft.) Queue(ft.) LOS Delay(s) Queue(ft.) Queue(ft.) AM Peak Hour PM Peak Hour Fairfax Pike(S)&Gibson Site Entrance 2(ENV) Overall Intersection(Unsignalized) Southbound Approach B 14.2 D 25.3 Southbound Right B 14.2 2.5 D 25.3 20 8 Fairfax Pike(S)&Gibson Site Entrance 3(ENV) Overall Intersection(Unsignalized) Eastbound Approach Eastbound Left 150 A 9.6 5 B _ 11.4 2.5 Southbound Approach E 41.1 F 117.6 Southbound Left F 52 5 F 145.9 37.5 Southbound Right 50 B 14 0 C 21.2 2.5 9 Mitigation:Install a Signal Route 522(NIS)&Gibson Site Entrance 4(E) Overall Intersection(Signalized) A 3.9 A 5.7 Eastbound Approach C 32.6 C 33.7 Eastbound Left C 32.6 9 28 C 33.9 31 70 Eastbound Right A 0.0 0 12 C 23.6 0 22 -------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Northbound Approach A 0.4 A 0.1 Northbound Left 300 A 4.4 0 m3 A 5.9 1 m1 Northbound Thru A 0.2 0 18 A 0 20 m22 Southbound Approach A 6.6 A &7 Southbound Thru A 6.7 0 188 A 8.8 72 235 Southbound Right 150 A 5.4 0 32 A 5.7 0 21 NOTES: [11 Effective storage length is based on the storage length plus one-half of the taper length per TOSAM guidelines. [21-:Volume exceeds capacity,queue is theoretically infinite. [31#:95th percentile queues(reported from Synchro)exceed capacity,actual queues may be longer.Queues show are based on the maximum after tuw cycles. [4]m:95th percentile volume and queues(reported from Synchro)are metered by upstream signal. [5]Intersection 5 is analyzed using HCM 2000 The capacity analysis results presented in Table 2, Table 3, and Table 4 indicate that the 2035 Future Conditions with Development supplemental analysis produces operational results that are similar to,or better than, those reported for the 2035 Future Conditions with Development scenario in the original Traffic Study. Therefore,no changes to the mitigation measures recommended in the original study are proposed for the build-out year. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Supplemental Analysis—Gibson Property Page 11 August 26,2026 Ail s - t �t 45" y 19 Lord AF � 6 . y 6 3 1Y � ® /D 5 DIF ® B/L 5 BIL kA Q e ILI a B,C a o w a FJF kA 10 Fauna,n�e� � =.mr.�•r�:. LaaFakla xigp»m FavY rtar PMe Fzelaz xRn<Y..,r.e A* CIF BfA RIB CID cc ►g a ILL &3 a EYE wee e m DiE L/L D/F I B/C B;C © CAD 6 Q 5 6 � a a ue aA a 1b u ae N Y � an " DID-11 �--r DID ;'I i / o/D O LEGEND a a Q Exlaanylnte—tion EM tlna RoaCwq One Wry Travel Lana ®�Zr, r0 Tr.M.C—d Dehce Ty PATH Movement Leval of Service AA AAYPM Approach Level of Service A MIP Overall Level of Service u Lake FmEerlck EnVance Q 4 9ackprounC Improvement ACICIC Site Acce 4IA Si.lmpeO —nt Figure 4:2035 Future Conditions with Development(Planning Year)- Level of Service Results 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Supplemental Analysis—Gibson Property Page 12 August 26,2026 Future with Development (2041 ) Traffic Volumes The 2041 Future Conditions with Development traffic volumes were developed by adding the assigned site-generated traffic volumes shown in Figure 2 to the existing traffic volumes,inherent traffic growth volumes,and planned background development traffic volumes presented in the original Traffic Study.The 2041 Future Conditions with Development traffic volumes are depicted in Figure 5. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Supplemental Analysis—Gibson Property Page 13 August 26,2026 N r :f i. 4 � SITE ../ SITE e ` ® _ 5 13-43 o^ ——7 rc �—571102 ... 641/865 •aF 552f947158@76 mE' r 3 162/148 r'jnI 3129 'r° "' m 1151232 " r Fatrla� � ` � FasOa Pw � 1 � IixE Favp�Ni w F.—P4oe ` ` ♦ ` FdL1A.Pla¢ 4) ♦ ` tdN¢F2dMCMDMe 4 1531z95 3 z2zn62,' $ r 23snes,' 147n69 660/782 g a 63OMS--I.A a X 3081212 ► a s iz a 3901167� S 21/47 ♦ 0 2491390- • 9r 9291— n 20 590 @1 2 510 1 @1 4M 1 91 480 1 ^ 5 rc° a 'L 95/37 $ 311 t—15/6 F 585/t.049 �—702/1,126 t—703/1,122 36/85 a a Fa Pw Fa P� _ TasL¢r RPaO , * laxP•¢ 8 � ♦ � Raz PwR Plke n T ss/no J''I � e3n3,' _ "c 'a � asrzo,' fioz e44 ► 92811.000 ► 879SM 226/252—W 46M 07 5 23 650 J^20 s 24770 01 LEGEND 5 OStudy Inten;e,Eon Esistin9 Road—y t One Way Travel Lane marwe f ?',II'!,I Peak Hour Tralrc 28/95 n rR LaMe Fretlenck Entrance Site Entrance 11/39 25 Average Daily Tram, 9 e 2"'::i_ Figure 5:2041 Future Conditions with Development(Design Year)—Vehicular Traffic Volumes 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Supplemental Analysis—Gibson Property Page 14 August 26,2026 Future with Development (2041 ) Intersection Capacity and Queueing Analysis Intersection capacity analyses were performed for the 2041 Future Conditions with Development scenario at the study area intersections during the AM and PM peak hours. Synchro, version 11, was used to analyze the study intersections with results based on the HCM 6th methodology presented in the TRB's Highway Capacity Manual(HCM)and analysis guidelines provided by the County. The analysis herein includes level of service (LOS), delay, and queue length comparisons for the turning movements analyzed. For the purposes of this analysis,the future peak hour factors(PHF)were based on the traffic counts,as applicable,and utilized on a by-intersection basis; PHF in the range of 0.92 to 1.00 were used for the future scenario, consistent with the scoping document.The heavy vehicle percentages(HV%)were the same as those used in the 2026 Existing Conditions and 2035 Future Conditions without Development scenario analyses. The planned background improvements and the site-related improvements recommended for the 2035 analysis year in the original Traffic Study were carried forward and incorporated into this supplemental analysis. The results of the intersection capacity analyses from Synchro are presented in Table 5, Table 6, and Table 7 and graphically in Figure 6. The results are expressed in LOS and delay (seconds per vehicle) for overall signalized intersections and per approach and lane group for all study intersections.The 95th percentile queue lengths were also determined from Synchro and are expressed in feet. The detailed analysis worksheets of the 2041 Future Conditions with Development are contained in Appendix B. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Supplemental Analysis-Gibson Property Page 15 August 26,2026 Table 5: 2041 Future Conditions with Development-Intersection Ca aci and Queuing Analysis Results Part 1 Effective Storage 50th% 95th% 50th% 95th% No. Intersection(Movernent) Length(ft.) LOS Delay(s) Queue(ft.) Queue(ft.) LOS Delay(s) Queue(ft.) Queue(ft.) Synchro Synchro AM Peak Hour PM Peak Hour Warrior Drive(N/S)&Fairfax Pike(E/W) Overall Intersection(Signalized) E 56.4 E 60.8 Eastbound Approach C 23.7 D 4&7 Eastbound Left 260 C 23 73 83 F ill -207 #379 Eastbound Thru C 29.4 576 732 C 30.2 582 #845 Eastbound Right 500 B 12.9 154 240 A 7.9 0 56 -------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Westbound Approach C 26.4 E 69.5 Westbound Left 270 C 24.3 58 95 C 22.2 66 #183 Westbound Thru C 28.3 500 #769 F 81.9 -806 #1050 Westbound Right 575 B 12.5 0 26 B 12.6 0 26 Northbound Approach D 51.9 E 76.7 Northbound Left 190 D 52.8 57 #128 D 46.8 120 #200 Northbound Thru/Right D 49.7 20 #87 F 107.5 -183 #351 Southbound Approach F 228.9 E 58.5 Southbound Left 150 D 48.2 49 93 D 43.8 64 115 Southbound Thru F 292.5 -346 #530 D 47.7 40 83 Southbound Right D 45.8 0 56 E 65.8 200 #345 2 Hudson Hollow Road/White Oak Road &Fairfax Pike(EMI) Overall Intersection(Signalized) B 14.4 C 21.8 Eastbound Approach 8 12.1 8 12.3 Eastbound Left 145 B 12.5 27 75 B 19.8 19 #129 Eastbound Thru B 12.1 135 #483 B 10.8 128 390 Eastbound Right 90 A 5.9 0 0 A 5.7 0 8 Westbound Approach 8 15.8 C 2&7 Westbound Left 125 A 8.2 0 3 A 7.1 3 12 Westbound Thru B 16 172 355 C 30 377 #744 Westbound Right 155 A 8.4 0 4 A 6.8 0 8 Northbound Approach C 21.5 C 2&6 Northbound Left/Thru/Right C 21.5 23 71 C 28.6 31 #80 Southbound Approach C 22.5 C 29.3 Southbound Left/Thru/Right C 22.5 31 107 C 29.3 30 97 3 Route 522(N/S)&Fairfax Pike/Lord Fairfax Highway Overall Intersection(Signalized) E 55.2 F 96.3 Eastbound Approach E 74.8 F 100.3 Eastbound Left 250 E 61.1 173 #321 F 154.1 -267 #442 Eastbound Thru F 89.7 230 #423 E 60.4 159 #287 Eastbound Right 230 D 37.9 0 74 D 47.8 85 #264 Westbound Approach D 54 F 126.5 Westbound Left 500 D 44.6 80 135 D 41.3 161 251 WestboundThru/Right E 59.3 148 229 F 168.6 -455 #668 Northbound Approach D 44.8 F 103.8 Northbound Left 565 E 60.5 117 #181 F 188.3 -190 #290 Northbound Thru D 35.7 177 238 E 56.5 260 #386 Northbound Right 250 C 29.6 0 46 C 34 0 24 -------------------------------------------------- ------------------------ ----------------------------------------------------------------------------------------------------------------------------------------- Southbound Approach D 49.3 D 52.1 Southbound Left 125 E 72.7 62 #152 E 68.1 78 #155 Southbound Thru D 43.1 137 138 D 49.7 217 #352 Southbound Right 1480 1 A 0 13 44 1 A 0 12 109 NOTES: ]11 Effective storage length is based on the storage length plus one-half of the taper length per TOSAM guidelines. [2]-:Volume exceeds capacity,queue is theoretically infinite. [3]#:95th percentile queues(reported from Synchro)exceed capacity,actual queues may be longer.Queues shown are based on the maximum after two cycles. [4]m:95th percentile volume and queues(reported from Synchro)are metered by upstream signal. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Supplemental Analysis-Gibson Property Page 16 August 26,2026 Table 6: 2041 Future Conditions with Development-Intersection Capacity and Queuing Analysis Results Part 2 AM Peak Hour PM Peak Hour Effective Storage 5Dth% 95th% 50th% 95th% No. Intersection(Movernent) Length(ft.) LOS Delay(s) Queue(ft.) Queue(ft.) LOS Delay(s) Queue(ft.) Queue(ft.) Synchro Synchro 4 Route 522(NIS)&Lake Frederick Drive(E) Overall Intersection(Signalized) B 17.7 C 22.3 Eastbound Approach C 29.4 D 35.1 Eastbound Left C 31 69 154 D 38.5 105 181 Eastbound Right C 22.4 5 39 C 27.8 33 68 Northbound Approach B 15.1 C 21 Northbound Left 470 C 20.9 8 23 C 32.4 27 58 Northbound Thru B 14.9 114 274 B 19.7 162 253 Southbound Approach B 17.8 C 20.6 Southbound Thru B 17.9 138 232 C 21.1 282 432 Southbound Right 295 B 13.1 0 25 B 13.7 0 46 Southbound U-Turn A 0 0 3 A 0 0 0 5 Route 522(NIS)&Tasker Road(E) Overall Intersection(Signalized) B 19.1 C 23.7 Eastbound Approach D 47 D 45.2 Eastbound Left D 49.5 39 78 D 51.8 120 184 Eastbound Right 250 D 46.3 0 39 D 40.7 0 37 Northbound Approach B 14 B 18.1 Northbound Left 485 D 54.9 66 100 D 53.3 121 140 Northbound Thru A 2 27 30 A 3.9 59 77 Southbound Approach B 12.7 C 20.4 Southbound Thru B 13.5 106 166 C 22.1 212 320 Southbound Right 315 A 6.9 0 14 A 8.8 1 22 6 Lake Frederick Entrance/Gibson Site Entrance 1&Fairfax Pike(ENV) Overall Intersection(Signalized) A 7.3 B 10.3 Eastbound Approach A 2.2 A 2.2 Eastbound Left 150 A 4.6 8 m11 B 10.9 2 m7 Eastbound Thru A 2.1 116 161 A 2.1 139 280 Eastbound Right 150 A 0 0 m1 A 0.1 0 m6 Westbound Approach A 7.1 B 12.3 Westbound Left 150 A 3.3 5 12 A 2.8 7 14 Westbound Thru A 7.5 186 263 B 13.3 419 #807 Westbound Right 150 A 4.9 0 17 A 3.3 0 3 Northbound Approach D 3&3 D 40 Northbound Left D 38.6 67 #136 D 40.1 45 #121 Northbound Thru/Right C 33.5 0 0 D 36.4 0 0 Southbound Approach C 34.5 D 41.3 Southbound Left 50 C 34.5 15 41 D 41.5 58 #154 Southbound Thru/Right I IC 33.3 0 0 1 D 36.5 0 0 NOTES: (11 Effective storage length is based on the storage length plus one-half of the taper length per TOSAM guidelines. ]2]-:Volume exceeds capacity,queue is theoretically infinite. ]3]#:95th percentile queues(reported from Synchro)exceed capacity,actual queues may be longer.Queues shown are based on the maximum after two cycles. ]4]m:95th percentile volume and queues(reported from Synchro)are metered by upstream signal. [5]Intersection 5 is analyzed using HCM 2000. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Supplemental Analysis-Gibson Property Page 17 August 26,2026 Table 7: 2041 Future Conditions with Development-Intersection Ca aci and Queuina Analysis Results Part 3 AM Peak Hour PM Peak Hour Effective Storage r r No. Intersection(Movernent) Length(ft.) LOS Delay(s) Queue(ft.) Queue(ft.) LOS Delay(s) Queue(ft.) Queue(ft.) Synchro Synchro 7 Fairfax Pike(S)&Gibson Site Entrance 2(ENV) Overall Intersection(Unsignalized) Southbound Approach 8 14.3 D 26.2 Southbound Right B 14.3 2.5 D 26.2 20 8 Fairfax Pike(S)&Gibson Site Entrance 3(ENV) Overall Intersection(Unsignalized) -------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Eastbound Approach Eastbound Left 150 A 9.6 5 B 11.6 2.5 Southbound Approach E 42.5 F 130.5 Southbound Left F 53.9 5 F 162.5 40 Southbound Right 50 B 14 0 C 21.9 2.5 9 Route 522(N/S)&Gibson Site Entrance 4(E) Overall Intersection(Signalized) A 3.9 A 5.8 Eastbound Approach C 32.6 C 33.7 Eastbound Left C 32.6 9 29 C 33.9 31 70 Eastbound Right A 0 0 12 C 23.6 0 22 Northbound Approach A 0.4 A 0.1 Northbound Left 300 A 4.4 0 m3 A 6 1 ml Northbound Thru A 0.2 0 17 A 0 21 m22 Southbound Approach A 6.7 A 8.9 Southbound Thru A 6.8 0 174 A 9 76 244 Southbound Right 150 A 5.4 0 24 A 5.7 0 21 NOTES: [1]Effective storage length is based on the storage length plus one-half of the taper length per TOSAM guidelines. [2]-:Volume exceeds capacity,queue is theoretically infinite. [31#:95th percentile queues(reported from Synchro)exceed capacity,actual queues may be longer.Queues shown are based on the maximum after two cycles. [41 m:95th percentile volume and queues(reported from Synchro)are metered by upstream signal. The capacity analysis results presented in Table 5, Table 6, and Table 7 indicate that the 2041 Future Conditions with Development supplemental analysis produces operational results that are similar to, or better than,those reported for the 2041 Future Conditions with Development scenario in the original Traffic Study. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Supplemental Analysis—Gibson Property Page 18 August 26,2026 z P• r SITE SITE s � t � 1 FIE EIE Z BIC '; Elf ^� BIC E o' gg B o OF U BIC r. d O W FJF I 1 � �C/D . A,A FartahP FtlRm pl Latl FaMaz HI w AA naz Fke naz FaMa� k A is G g, B B ► E t FED �I 1 I C/DI I f &A� o o AiA 5 U DID---* o V cic---;� 4i t3 ,7-1 r,/F elc 6 " a m QI U • A/A m mlk t T f F.I. k - s.�a .I. Tatd5e1x—e— AJAD/ • 1 I� � D/D=7;'*, o a A/A F D U B;BI DID Oil LEGEND aa O Existing inter—lion Ekistinp Roatlway �— One Way Travel Lane ,li/p T,.M.Control Devlce Type AM/PM Movems nt Level&Service AA=PM Approach Levsl of Service � I AMID Overell Level o/Servlee C/C dl Lake fntlanck Entrance Q Backprountl Improvement Sib Access Slte Improvement Figure 6:2041 Future Conditions with Development(Planning Year)- Level of Service Results 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Supplemental Analysis—Gibson Property Page 19 August 26,2026 Conclusion This supplemental analysis evaluated the revised Gibson Property development program following removal of the landbay east of Route 522 (Tax Map Parcel 87-3-A). The project is now limited to Tax Map Parcels 87-A-1613 and 87-3-B (approximately 244.379 acres),with development reduced proportionately from 3.2 million to 2.6 million square feet of industrial park use. Intersection capacity and queuing analyses for both the 2035 and 2041 Future Conditions with Development scenarios show operational results similar to, or better than, those reported in the original Traffic Study. Accordingly, the mitigation measures and improvements recommended in the original study remain sufficient,and no changes are warranted as a result of the reduced development scope. As noted in the original study, installation of traffic signals at Intersections 6 and 9 are subject to VDOT review and approval through future Signal Justification Reports("SJRs"). Preliminary signal warrant evaluations and VJuST analyses were performed as part of the original Traffic Study to screen potential intersection control configurations. The ultimate configurations will be determined through the future SJRs. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Transportation Technical Appendix Gibson Property- Supplemental Analysis Frederick County, Virginia G ROVE SLADE Transporta:ion Planners and Engineers Gibson Property Technical Appendix TABLE OF CONTENTS Appendix A—2035 Future Conditions with Development Supplemental Analysis—Capacity Analysis Worksheets Appendix B—2041 Future Conditions with Development Supplemental Analysis—Capacity Analysis Worksheets 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Gibson Property Technical Appendix A. 2035 Future Conditions with Development Supplemental Analysis — Capacity Analysis Worksheets 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Queues Future with Development AM 2035 Supplemental Analysis 1: Warrior Drive & Fairfax Pike Timing Plan:7 AM to 8 AM t ,� 41 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT SBR Lane Group Flow(vph) 159 697 424 176 677 139 85 101 73 299 167 v/c Ratio 0.60 0.85 0.48 0.67 0.88 0.16 0.62 0.44 0.22 1.04 0.36 Control Delay 23.2 42.7 13.1 25.5 45.4 2.0 58.5 25.3 37.9 116.3 7.8 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 23.2 42.7 13.1 25.5 45.4 2.0 58.5 25.3 37.9 116.3 7.8 Queue Length 50th(ft) 3 565 165 61 494 0 56 20 46 -322 0 Queue Length 95th(ft) 67 703 241 90 #676 25 #130 #86 90 #530 55 Internal Link Dist(ft) 593 4165 244 594 Turn Bay Length (ft) 260 500 270 575 190 150 Base Capacity(vph) 326 892 903 265 802 924 144 229 397 288 506 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.49 0.78 0.47 0.66 0.84 0.15 0.59 0.44 0.18 1.04 0.33 Intersection Summary Volume exceeds capacity,queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th Signalized Intersection Surffmlalrp with Development AM 2035 Supplemental Analysis 1: Warrior Drive & Fairfax Pike Timing Plan:7 AM to 8 AM --I. *-- t r'° ' . Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations + r + r + r Traffic Volume(veh/h) 146 641 390 162 623 128 78 25 68 67 275 154 Future Volume(veh/h) 146 641 390 162 623 128 78 25 68 67 275 154 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 0.99 0.99 0.98 0.95 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1841 1752 1796 1796 1722 1856 966 907 848 1870 1841 1781 Adj Flow Rate, veh/h 159 697 360 176 677 68 85 27 8 73 299 29 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 4 10 7 7 12 3 63 67 71 2 4 8 Cap,veh/h 312 941 956 280 906 888 140 102 30 294 204 247 Arrive On Green 0.06 0.54 0.54 0.06 0.53 0.53 0.09 0.15 0.15 0.05 0.11 0.11 Sat Flow,veh/h 1753 1752 1521 1711 1722 1537 920 670 198 1781 1841 1438 Grp Volume(v),veh/h 159 697 360 176 677 68 85 0 35 73 299 29 Grp Sat Flow(s),veh/h/In 1753 1752 1521 1711 1722 1537 920 0 868 1781 1841 1438 Q Serve(g_s),s 5.4 39.7 15.0 6.0 39.9 2.5 10.5 0.0 4.6 4.7 14.4 2.2 Cycle Q Clear(g_c),s 5.4 39.7 15.0 6.0 39.9 2.5 10.5 0.0 4.6 4.7 14.4 2.2 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.23 1.00 1.00 Lane Grp Cap(c),veh/h 312 941 956 280 906 888 140 0 132 294 204 247 V/C Ratio(X) 0.51 0.74 0.38 0.63 0.75 0.08 0.61 0.00 0.26 0.25 1.47 0.12 Avail Cap(c_a),veh/h 416 941 956 308 906 888 143 0 132 402 204 247 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.56 0.56 0.56 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay(d),s/veh 20.2 23.1 11.7 20.9 24.0 12.2 45.8 0.0 48.7 47.7 57.8 45.8 Incr Delay(d2),s/veh 1.3 5.2 1.1 2.0 3.2 0.1 7.0 0.0 1.1 0.4 234.7 0.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 2.1 16.6 5.4 2.3 15.9 0.9 2.7 0.0 1.1 2.1 20.0 0.8 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 21.5 28.3 12.9 22.9 27.2 12.3 52.8 0.0 49.7 48.2 292.5 46.0 LnGrp LOS C C B C C B D A D D F D Approach Vol,veh/h 1216 921 120 401 Approach Delay,s/veh 22.9 25.3 51.9 230.2 Approach LOS C C D F Timer-Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration(G+Y+Rc),s 16.3 74.2 13.1 26.4 14.9 75.7 18.5 21.0 Change Period(Y+Rc),s *8.7 *5.8 6.6 6.6 *6.8 5.8 6.6 6.6 Max Green Setting(Gmax),s *15 *60 14.4 12.4 * 10 67.2 12.4 14.4 Max Q Clear Time(g_c+I1),s 7.4 41.9 6.7 6.6 8.0 41.7 12.5 16.4 Green Ext Time(p-c),s 0.2 6.1 0.1 0.0 0.1 9.2 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 56.3 HCM 6th LOS E Notes User approved pedestrian interval to be less than phase max green. *HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Future with Development AM 2035 Supplemental Analysis 2: Hudson Hollow Road/White Oak Road & Fairfax Pike Timing Plan: 7 AM to 8 AM t Lane Group EBL EBT EBR WBL WBT WBR NBT SBT Lane Group Flow(vph) 229 667 22 3 588 36 97 228 v/c Ratio 0.55 0.66 0.02 0.01 0.76 0.05 0.42 0.60 Control Delay 10.7 14.5 0.1 4.3 21.9 0.5 23.9 17.8 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 10.7 14.5 0.1 4.3 21.9 0.5 23.9 17.8 Queue Length 50th(ft) 25 126 0 0 164 0 21 28 Queue Length 95th(ft) 68 408 0 3 338 3 69 102 Internal Link Dist(ft) 4165 4595 176 167 Turn Bay Length (ft) 145 90 125 155 Base Capacity(vph) 418 1132 1026 461 1083 959 453 645 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.55 0.59 0.02 0.01 0.54 0.04 0.21 0.35 Intersection Summary Queues Synchro 11 Report Gorove Slade Timing Plan: 7 AM to 8 AM HCM 6th Signalized Intersection Sur€ rp with Development AM 2035 Supplemental Analysis 2: Hudson Hollow Road/White Oak Road & Fairfax Pike Timing Plan: 7IAM to 8 AM --p- 4--- t I Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t r t r Traffic Volume(veh/h) 211 614 20 3 541 33 46 10 33 52 7 150 Future Volume(veh/h) 211 614 20 3 541 33 46 10 33 52 7 150 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1767 1752 1811 1870 1722 1737 1796 1752 1796 1826 1648 1707 Adj Flow Rate, veh/h 229 667 11 3 588 16 50 11 6 57 8 34 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 9 10 6 2 12 11 7 10 7 5 17 13 Cap,veh/h 414 943 826 333 776 663 259 51 19 193 39 67 Arrive On Green 0.09 0.54 0.54 0.00 0.45 0.45 0.14 0.14 0.14 0.14 0.14 0.14 Sat Flow,veh/h 1682 1752 1535 1781 1722 1472 1011 359 135 627 274 472 Grp Volume(v),veh/h 229 667 11 3 588 16 67 0 0 99 0 0 Grp Sat Flow(s),veh/h/In 1682 1752 1535 1781 1722 1472 1505 0 0 1373 0 0 Q Serve(g_s),s 3.9 15.5 0.2 0.0 15.5 0.3 0.0 0.0 0.0 1.5 0.0 0.0 Cycle Q Clear(g_c),s 3.9 15.5 0.2 0.0 15.5 0.3 1.9 0.0 0.0 3.4 0.0 0.0 Prop In Lane 1.00 1.00 1.00 1.00 0.75 0.09 0.58 0.34 Lane Grp Cap(c),veh/h 414 943 826 333 776 663 330 0 0 300 0 0 V/C Ratio(X) 0.55 0.71 0.01 0.01 0.76 0.02 0.20 0.00 0.00 0.33 0.00 0.00 Avail Cap(c_a),veh/h 414 1285 1126 489 1263 1080 758 0 0 714 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay(d),s/veh 9.8 9.4 5.9 7.9 12.5 8.3 20.9 0.0 0.0 21.5 0.0 0.0 Incr Delay(d2),s/veh 1.6 2.2 0.0 0.0 3.3 0.0 0.3 0.0 0.0 0.6 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 1.1 4.3 0.0 0.0 4.9 0.1 0.7 0.0 0.0 1.1 0.0 0.0 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 11.4 11.6 5.9 7.9 15.8 8.4 21.2 0.0 0.0 22.1 0.0 0.0 LnGrp LOS B B A A B A C A A C A A Approach Vol,veh/h 907 607 67 99 Approach Delay,s/veh 11.5 15.5 21.2 22.1 Approach LOS B B C C Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc),s 4.7 37.1 12.7 9.5 32.4 12.7 Change Period (Y+Rc),s 4.5 7.8 4.9 4.5 7.8 4.9 Max Green Setting(Gmax),s 5.0 40.0 25.0 5.0 40.0 25.0 Max Q Clear Time(g_c+I1),s 2.0 17.5 3.9 5.9 17.5 5.4 Green Ext Time(p-c),s 0.0 8.2 0.2 0.0 7.0 0.4 Intersection Summary HCM 6th Ctrl Delay 13.9 HCM 6th LOS B HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan: 7 AM to 8 AM Queues Future with Development AM 2035 Supplemental Analysis 3: Route 522 & Fairfax Pike/Lord Fairfax Highway * Timing Plan:7 AM to 8 AM --I. *-- I f Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT SBR Lane Group Flow(vph) 258 322 264 118 227 325 495 212 99 375 182 v/c Ratio 0.76 0.86 0.53 0.46 0.77 0.76 0.65 0.41 0.68 0.65 0.43 Control Delay 57.5 65.7 9.2 46.1 57.8 58.3 43.6 5.4 77.6 40.3 7.8 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 57.5 65.7 9.2 46.1 57.8 58.3 43.6 5.4 77.6 40.3 7.8 Queue Length 50th(ft) 170 217 0 75 144 115 172 0 59 133 14 Queue Length 95th(ft) #317 #403 73 128 222 #179 232 41 #150 133 52 Internal Link Dist(ft) 382 694 8434 2104 Turn Bay Length (ft) 250 230 500 565 250 125 480 Base Capacity(vph) 338 373 494 321 362 430 764 519 152 584 431 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.76 0.86 0.53 0.37 0.63 0.76 0.65 0.41 0.65 0.64 0.42 Intersection Summary # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th Signalized Intersection SurffmWrp with Development AM 2035 Supplemental Analysis 3: Route 522 & Fairfax Pike/Lord Fairfax Highway Timing Plan:7 AM to 8 AM --I. *-- t r'° ' . Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t r 1� tt r tt r Traffic Volume(veh/h) 237 296 243 109 154 55 299 455 195 91 345 167 Future Volume(veh/h) 237 296 243 109 154 55 299 455 195 91 345 167 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1767 1841 1663 1663 1767 1856 1722 1752 1707 1841 1618 1411 Adj Flow Rate, veh/h 258 322 36 118 167 46 325 495 36 99 375 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 9 4 16 16 9 3 12 10 13 4 19 33 Cap,veh/h 310 340 260 234 197 54 387 948 412 124 751 Arrive On Green 0.18 0.18 0.18 0.15 0.15 0.15 0.12 0.28 0.28 0.05 0.16 0.00 Sat Flow,veh/h 1682 1841 1409 1584 1333 367 3182 3328 1447 1753 3075 1196 Grp Volume(v),veh/h 258 322 36 118 0 213 325 495 36 99 375 0 Grp Sat Flow(s),veh/h/In 1682 1841 1409 1584 0 1701 1591 1664 1447 1753 1537 1196 Q Serve(g_s),s 16.2 19.0 2.4 7.5 0.0 13.4 11.0 13.7 2.0 6.2 12.2 0.0 Cycle Q Clear(g_c),s 16.2 19.0 2.4 7.5 0.0 13.4 11.0 13.7 2.0 6.2 12.2 0.0 Prop In Lane 1.00 1.00 1.00 0.22 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 310 340 260 234 0 252 387 948 412 124 751 V/C Ratio(X) 0.83 0.95 0.14 0.50 0.00 0.85 0.84 0.52 0.09 0.80 0.50 Avail Cap(c_a),veh/h 310 340 260 327 0 351 425 948 412 153 751 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.67 0.67 0.67 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 0.84 0.84 0.84 0.98 0.98 0.00 Uniform Delay(d),s/veh 43.2 44.3 37.5 43.1 0.0 45.6 47.3 33.0 28.8 51.6 39.9 0.0 Incr Delay(d2),s/veh 17.1 35.3 0.2 1.7 0.0 12.8 13.0 1.7 0.4 20.5 2.3 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 8.0 11.7 0.8 3.0 0.0 6.4 4.8 5.4 0.7 3.3 4.8 0.0 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 60.3 79.6 37.8 44.8 0.0 58.4 60.3 34.8 29.2 72.2 42.2 0.0 LnGrp LOS E E D D A E E C C E D Approach Vol,veh/h 616 331 856 474 Approach Delay,s/veh 69.1 53.6 44.2 48.5 Approach LOS E D D D Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration(G+Y+Rc),s 21.7 33.6 24.6 17.2 38.0 30.2 Change Period(Y+Rc),s 8.3 6.7 *8.3 *9.4 6.7 9.9 Max Green Setting(Gmax),s 14.7 19.1 *23 *9.6 23.1 20.3 Max Q Clear Time(g_c+I1),s 13.0 14.2 15.4 8.2 15.7 21.0 Green Ext Time(p-c),s 0.4 1.2 0.9 0.0 2.3 0.0 Intersection Summary HCM 6th Ctrl Delay 53.2 HCM 6th LOS D Notes *HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Unsignalized Delay for[SBR]is excluded from calculations of the approach delay and intersection delay. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Future with Development AM 2035 Supplemental Analysis 4: Route 522 & Lake Frederick Drive * I Timing Plan:7 AM to 8 AM I L t Lane Group EBL EBR NBL NBT SBU SBT SBR Lane Group Flow(vph) 160 100 40 841 2 664 62 v/c Ratio 0.51 0.18 0.11 0.52 0.01 0.60 0.11 Control Delay 37.1 6.4 9.6 14.2 8.0 23.2 5.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 37.1 6.4 9.6 14.2 8.0 23.2 5.7 Queue Length 50th(ft) 68 4 8 111 0 134 0 Queue Length 95th(ft) 153 36 23 267 3 226 25 Internal Link Dist(ft) 414 1077 8434 Turn Bay Length (ft) 470 275 295 Base Capacity(vph) 623 618 623 1981 638 1695 832 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.26 0.16 0.06 0.42 0.00 0.39 0.07 Intersection Summary Queues Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th Signalized Intersection Surffmlalrp with Development AM 2035 Supplemental Analysis 4: Route 522 & Lake Frederick Drive * I Timing Plan:7 AM to 8 AM -AI L t Movement EBL EBR NBL NBT SBU SBT SBR Lane Configurations r tt A tt r Traffic Volume(veh/h) 147 92 37 774 2 611 57 Future Volume(veh/h) 147 92 37 774 2 611 57 Initial Q(Qb),veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow,veh/h/In 1870 1752 1589 1648 1604 1707 Adj Flow Rate, veh/h 160 35 40 841 664 17 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 10 21 17 20 13 Cap,veh/h 223 246 286 1329 1060 503 Arrive On Green 0.13 0.13 0.04 0.42 0.35 0.35 Sat Flow,veh/h 1781 1485 1513 3214 3127 1447 Grp Volume(v),veh/h 160 35 40 841 664 17 Grp Sat Flow(s),veh/h/In 1781 1485 1513 1566 1523 1447 Q Serve(g_s),s 5.3 0.0 0.0 12.9 11.1 0.5 Cycle Q Clear(g_c),s 5.3 0.0 0.0 12.9 11.1 0.5 Prop In Lane 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 223 246 286 1329 1060 503 V/C Ratio(X) 0.72 0.14 0.14 0.63 0.63 0.03 Avail Cap(c_a),veh/h 730 668 721 2310 1998 949 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay(d),s/veh 25.7 21.8 20.5 13.8 16.6 13.1 Incr Delay(d2),s/veh 5.2 0.3 0.3 1.1 1.3 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 2.5 0.0 0.4 3.5 3.2 0.1 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 30.8 22.1 20.7 14.9 17.9 13.2 LnGrp LOS C C C B B B Approach Vol,veh/h 195 881 681 Approach Delay,s/veh 29.3 15.2 17.8 Approach LOS C B B Timer-Assigned Phs 2 4 5 6 Phs Duration(G+Y+Rc),s 36.4 16.3 13.0 31.7 Change Period(Y+Rc),s 10.5 8.7 10.5 10.5 Max Green Setting(Gmax),s 45.0 25.0 20.0 40.0 Max Q Clear Time(g_c+11),s 14.9 7.3 2.0 13.1 Green Ext Time(p-c),s 11.0 0.7 0.1 8.1 Intersection Summary HCM 6th Ctrl Delay 17.7 HCM 6th LOS B Notes User approved ignoring U-Turning movement. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Future with Development AM 2035 Supplemental Analysis 5: Route 522 & Tasker Road * I Timing Plan:7 AM to 8 AM -AI t Lane Group EBL EBR NBL NBT SBT SBR Lane Group Flow(vph) 56 223 171 590 553 79 v/c Ratio 0.41 0.51 0.52 0.24 0.34 0.07 Control Delay 55.7 10.3 58.8 2.0 14.3 1.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 55.7 10.3 58.8 2.0 14.3 1.4 Queue Length 50th(ft) 38 0 64 27 103 0 Queue Length 95th(ft) 77 39 97 28 162 14 Internal Link Dist(ft) 446 1419 813 Turn Bay Length (ft) 250 485 315 Base Capacity(vph) 313 720 615 2434 1634 1318 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.18 0.31 0.28 0.24 0.34 0.06 Intersection Summary Queues Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM Signalized Intersection Capacifukivadywill�h Development AM 2035 Supplemental Analysis 5: Route 522 & Tasker Road * I Timing Plan:7 AM to 8 AM -AI t Movement EBL EBR NBL NBT SBU SBT SBR Lane Configurations r r tt A tt r Traffic Volume(vph) 54 216 166 572 0 536 77 Future Volume(vph) 54 216 166 572 0 536 77 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 Total Lost time(s) 10.2 10.2 10.3 6.4 6.6 10.2 Lane Util.Factor 1.00 0.88 0.97 0.95 0.95 1.00 Frt 1.00 0.85 1.00 1.00 1.00 0.85 Flt Protected 0.95 1.00 0.95 1.00 1.00 1.00 Satd. Flow(prot) 1583 2733 3273 3195 2888 1583 Flt Permitted 0.95 1.00 0.95 1.00 1.00 1.00 Satd. Flow(perm) 1583 2733 3273 3195 2888 1583 Peak-hour factor, PHF 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Adj. Flow(vph) 56 223 171 590 0 553 79 RTOR Reduction(vph) 0 204 0 0 0 0 27 Lane Group Flow(vph) 56 19 171 590 0 553 52 Heavy Vehicles(%) 14% 4% 7% 13% 2% 25% 2% Turn Type Prot Prot Prot NA Prot NA pm+ov Protected Phases 7 4 1 6 5 2 7 Permitted Phases 4 2 Actuated Green, G (s) 9.6 9.6 11.1 83.8 62.2 71.8 Effective Green,g(s) 9.6 9.6 11.1 83.8 62.2 71.8 Actuated g/C Ratio 0.09 0.09 0.10 0.76 0.57 0.65 Clearance Time(s) 10.2 10.2 10.3 6.4 6.6 10.2 Vehicle Extension(s) 3.0 3.0 3.0 3.5 3.5 3.0 Lane Grp Cap(vph) 138 238 330 2434 1633 1033 v/s Ratio Prot c0.04 0.01 c0.05 0.18 c0.19 0.00 v/s Ratio Perm 0.03 v/c Ratio 0.41 0.08 0.52 0.24 0.34 0.05 Uniform Delay,d1 47.5 46.1 46.9 3.8 12.8 6.9 Progression Factor 1.00 1.00 1.14 0.44 1.00 1.00 Incremental Delay,d2 1.9 0.1 1.4 0.2 0.6 0.0 Delay(s) 49.4 46.3 54.9 1.9 13.4 6.9 Level of Service D D D A B A Approach Delay(s) 46.9 13.8 12.6 Approach LOS D B B Intersection Summary HCM 2000 Control Delay 18.9 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.37 Actuated Cycle Length(s) 110.0 Sum of lost time(s) 27.1 Intersection Capacity Utilization 49.1% ICU Level of Service A Analysis Period(min) 15 c Critical Lane Group HCM Signalized Intersection Capacity Analysis Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th Signalized Intersection SurffmWrp with Development AM 2035 Supplemental Analysis 5: Route 522 & Tasker Road Timing Plan:7 AM to 8 AM HCM 6th Edition methodology supports red clearance in the range of 0 to 6 seconds. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Future with Development AM 2035 Supplemental Analysis 6: Lake Frederick Entrance/Gibson Site Entrance 1 & Fairfax Pike Timing Plan:7 AM to 8 AM t �. Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT Lane Group Flow(vph) 90 847 50 39 627 103 133 105 32 26 v/c Ratio 0.17 0.67 0.05 0.10 0.52 0.10 0.67 0.23 0.17 0.05 Control Delay 3.1 8.3 0.2 3.9 11.1 1.8 50.7 1.2 33.0 0.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 3.1 8.3 0.2 3.9 11.1 1.8 50.7 1.2 33.0 0.2 Queue Length 50th(ft) 8 109 0 5 182 0 67 0 15 0 Queue Length 95th(ft) m11 119 m1 12 258 17 #136 0 41 0 Internal Link Dist(ft) 1336 1871 292 413 Turn Bay Length (ft) 150 150 150 150 50 Base Capacity(vph) 519 1279 1112 375 1232 1082 226 478 210 563 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.17 0.66 0.04 0.10 0.51 0.10 0.59 0.22 0.15 0.05 Intersection Summary # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Queues Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th Signalized Intersection Surffmtarp with Development AM 2035 Supplemental Analysis 6: Lake Frederick Entrance/Gibson Site Entrance 1 & Fairfax Pike Timing Plan:7 AM to 8 AM --I. *-- t r'° ' . Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t r + r 1 Traffic Volume(veh/h) 83 779 46 36 577 95 122 0 97 29 0 24 Future Volume(veh/h) 83 779 46 36 577 95 122 0 97 29 0 24 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 90 847 32 39 627 63 133 0 7 32 0 2 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap,veh/h 565 1290 1094 583 1247 1056 247 0 184 242 0 184 Arrive On Green 0.12 1.00 1.00 0.04 0.67 0.67 0.12 0.00 0.12 0.12 0.00 0.12 Sat Flow,veh/h 1781 1870 1585 1781 1870 1585 1415 0 1585 1409 0 1585 Grp Volume(v),veh/h 90 847 32 39 627 63 133 0 7 32 0 2 Grp Sat Flow(s),veh/h/In 1781 1870 1585 1781 1870 1585 1415 0 1585 1409 0 1585 Q Serve(g_s),s 1.2 0.0 0.0 0.5 14.3 1.2 7.8 0.0 0.3 1.8 0.0 0.1 Cycle Q Clear(g_c),s 1.2 0.0 0.0 0.5 14.3 1.2 7.9 0.0 0.3 2.1 0.0 0.1 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 565 1290 1094 583 1247 1056 247 0 184 242 0 184 V/C Ratio(X) 0.16 0.66 0.03 0.07 0.50 0.06 0.54 0.00 0.04 0.13 0.00 0.01 Avail Cap(c_a),veh/h 567 1290 1094 625 1247 1056 308 0 252 303 0 252 HCM Platoon Ratio 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.72 0.72 0.72 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay(d),s/veh 4.4 0.0 0.0 3.3 7.1 4.9 36.8 0.0 33.4 34.3 0.0 33.3 Incr Delay(d2),s/veh 0.1 1.9 0.0 0.0 0.3 0.0 1.8 0.0 0.1 0.2 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.3 0.7 0.0 0.1 4.2 0.3 2.8 0.0 0.1 0.6 0.0 0.0 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 4.5 1.9 0.0 3.3 7.4 4.9 38.6 0.0 33.5 34.5 0.0 33.3 LnGrp LOS A A A A A A D A C C A C Approach Vol,veh/h 969 729 140 34 Approach Delay,s/veh 2.1 7.0 38.3 34.5 Approach LOS A A D C Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration(G+Y+Rc),s 7.5 63.1 14.3 9.5 61.2 14.3 Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting(Gmax),s 5.0 53.0 13.5 5.1 52.9 13.5 Max Q Clear Time(g_c+11),s 2.5 2.0 9.9 3.2 16.3 4.1 Green Ext Time(p-c),s 0.0 7.1 0.1 0.0 4.4 0.0 Intersection Summary HCM 6th Ctrl Delay 7.3 HCM 6th LOS A HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th TWSC Future with Development AM 2035 Supplemental Analysis 7: Fairfax Pike & Gibson Site Entrance 2 Timing Plan:7 AM to 8 AM Intersection Int Delay,s/veh 0.1 Movement EBL EBT WBT WBR SBL SBR Lane Configurations t 1� r* Traffic Vol,veh/h 0 905 694 3 0 14 Future Vol,veh/h 0 905 694 3 0 14 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized None None None Storage Length - Veh in Median Storage,# 0 0 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 984 754 3 0 15 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 0 0 756 Stage 1 - - - Stage 2 - Critical Hdwy 6.22 Critical Hdwy Stg 1 - Critical Hdwy Stg 2 - Follow-up Hdwy 3.318 Pot Cap-1 Maneuver 0 0 408 Stage 1 0 0 - Stage 2 0 0 - Platoon blocked, % Mov Cap-1 Maneuver - - 408 Mov Cap-2 Maneuver Stage 1 Stage 2 Approach EB WB SIB HCM Control Delay,s 0 0 14.2 HCM LOS B Minor Lane/Major Mvmt EBT WBT WBR SBLn1 Capacity(veh/h) 408 HCM Lane V/C Ratio 0.037 HCM Control Delay(s) 14.2 HCM Lane LOS B HCM 95th %tile Q(veh) 0.1 HCM 6th TWSC Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th TWSC Future with Development AM 2035 Supplemental Analysis 8: Fairfax Pike & Gibson Site Entrance 3 Timing Plan:7 AM to 8 AM Intersection Int Delay,s/veh 0.5 Movement EBL EBT WBT WBR SBL SBR Lane Configurations t 1 r* Traffic Vol,veh/h 49 856 695 15 5 2 Future Vol,veh/h 49 856 695 15 5 2 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None None - None Storage Length 150 - 0 50 Veh in Median Storage,# - 0 0 0 - Grade, % - 0 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 53 930 755 16 5 2 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 771 0 0 1799 763 Stage 1 - - - 763 - Stage 2 - 1036 - Critical Hdwy 4.12 6.42 6.22 Critical Hdwy Stg 1 - 5.42 - Critical Hdwy Stg 2 - 5.42 - Follow-up Hdwy 2.218 3.518 3.318 Pot Cap-1 Maneuver 844 88 404 Stage 1 - 460 - Stage 2 - 342 - Platoon blocked, % Mov Cap-1 Maneuver 844 82 404 Mov Cap-2 Maneuver - 82 - Stage 1 431 Stage 2 342 Approach EB WB SIB HCM Control Delay,s 0.5 0 41.1 HCM LOS E Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 SBLn2 Capacity(veh/h) 844 82 404 HCM Lane V/C Ratio 0.063 0.066 0.005 HCM Control Delay(s) 9.6 52 14 HCM Lane LOS A F B HCM 95th %tile Q(veh) 0.2 0.2 0 HCM 6th TWSC Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Future with Development AM 2035 Supplemental Analysis 9: Route 522 & Gibson Site Entrance 4 II Timing Plan: 7 AM to 8 AM t t Lane Group EBL EBR NBL NBT SBT SBR Lane Group Flow(vph) 30 12 40 767 663 103 v/c Ratio 0.14 0.06 0.06 0.25 0.25 0.08 Control Delay 22.9 12.7 2.1 0.5 7.8 3.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 22.9 12.7 2.1 0.5 7.8 3.3 Queue Length 50th(ft) 9 0 0 0 0 0 Queue Length 95th(ft) 28 12 m3 18 188 32 Internal Link Dist(ft) 785 2104 3524 Turn Bay Length (ft) 300 150 Base Capacity(vph) 209 197 631 3109 2749 1252 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.14 0.06 0.06 0.25 0.24 0.08 Intersection Summary m Volume for 95th percentile queue is metered by upstream signal. Queues Synchro 11 Report Gorove Slade Timing Plan: 7 AM to 8 AM HCM 6th Signalized Intersection Surffmtarp with Development AM 2035 Supplemental Analysis 9: Route 522 & Gibson Site Entrance 4 * I Timing Plan:7 AM to 8 AM -AI Movement EBL EBR NBL NBT SBT SBR Lane Configurations r tt tt r Traffic Volume(veh/h) 28 11 37 706 610 95 Future Volume(veh/h) 28 11 37 706 610 95 Initial Q(Qb),veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow,veh/h/In 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 30 0 40 767 663 52 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 Cap,veh/h 60 53 552 2711 2027 904 Arrive On Green 0.03 0.00 0.08 1.00 0.57 0.57 Sat Flow,veh/h 1781 1585 1781 3647 3647 1585 Grp Volume(v),veh/h 30 0 40 767 663 52 Grp Sat Flow(s),veh/h/In 1781 1585 1781 1777 1777 1585 Q Serve(g_s),s 0.9 0.0 0.5 0.0 5.4 0.8 Cycle Q Clear(g_c),s 0.9 0.0 0.5 0.0 5.4 0.8 Prop In Lane 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 60 53 552 2711 2027 904 V/C Ratio(X) 0.50 0.00 0.07 0.28 0.33 0.06 Avail Cap(c_a),veh/h 178 159 663 2711 2027 904 HCM Platoon Ratio 1.00 1.00 2.00 2.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.67 0.67 1.00 1.00 Uniform Delay(d),s/veh 26.1 0.0 4.3 0.0 6.2 5.2 Incr Delay(d2),s/veh 6.4 0.0 0.0 0.2 0.4 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.5 0.0 0.1 0.1 1.2 1.2 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 32.6 0.0 4.4 0.2 6.7 5.4 LnGrp LOS C A A A A A Approach Vol,veh/h 30 807 715 Approach Delay,s/veh 32.6 0.4 6.6 Approach LOS C A A Timer-Assigned Phs 2 4 5 6 Phs Duration(G+Y+Rc),s 48.7 6.3 10.6 38.1 Change Period(Y+Rc),s 6.7 4.5 8.3 6.7 Max Green Setting(Gmax),s 38.3 5.5 5.7 24.3 Max Q Clear Time(g_c+11),s 2.0 2.9 2.5 7.4 Green Ext Time(p-c),s 5.0 0.0 0.0 3.7 Intersection Summary HCM 6th Ctrl Delay 3.9 HCM 6th LOS A Notes User approved volume balancing among the lanes for turning movement. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Future with Development PM 2035 Supplemental Analysis 1: Warrior Drive & Fairfax Pike Timing Plan:4:15 PM to 5:15 PM t ' ► 41 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT SBR Lane Group Flow(vph) 307 824 182 161 912 148 200 254 108 60 379 v/c Ratio 1.04 0.91 0.16 0.85 1.16 0.17 0.69 1.17 0.47 0.37 0.81 Control Delay 93.5 45.9 2.8 60.4 117.2 2.2 50.6 147.3 41.6 53.4 42.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 93.5 45.9 2.8 60.4 117.2 2.2 50.6 147.3 41.6 53.4 42.1 Queue Length 50th(ft) -186 561 0 67 -765 0 120 -180 61 40 185 Queue Length 95th(ft) #355 #806 57 #185 #1006 26 #202 #351 110 83 301 Internal Link Dist(ft) 593 4165 244 594 Turn Bay Length (ft) 260 500 270 575 190 150 Base Capacity(vph) 295 902 1123 192 785 888 289 218 251 176 470 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 1.04 0.91 0.16 0.84 1.16 0.17 0.69 1.17 0.43 0.34 0.81 Intersection Summary Volume exceeds capacity,queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection Surffmlalrp with Development PM 2035 Supplemental Analysis 1: Warrior Drive & Fairfax Pike * Timing Plan:4:15 PM to 5:15 PM --I. *-- I t Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t r + r + r Traffic Volume(veh/h) 282 758 167 148 839 136 184 86 148 99 55 349 Future Volume(veh/h) 282 758 167 148 839 136 184 86 148 99 55 349 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 0.99 0.99 1.00 0.98 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1870 1841 1870 1693 1841 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 307 824 105 161 912 69 200 93 101 108 60 299 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 4 2 14 4 2 2 2 2 2 2 2 Cap,veh/h 298 1002 1012 261 847 825 299 97 105 197 177 354 Arrive On Green 0.13 0.54 0.54 0.06 0.46 0.46 0.09 0.12 0.12 0.07 0.09 0.09 Sat Flow,veh/h 1781 1841 1585 1612 1841 1552 1781 814 884 1781 1870 1560 Grp Volume(v),veh/h 307 824 105 161 912 69 200 0 194 108 60 299 Grp Sat Flow(s),veh/h/In 1781 1841 1585 1612 1841 1552 1781 0 1698 1781 1870 1560 Q Serve(g_s),s 14.3 40.6 2.8 4.8 50.6 2.4 10.4 0.0 12.5 5.9 3.3 10.4 Cycle Q Clear(g_c),s 14.3 40.6 2.8 4.8 50.6 2.4 10.4 0.0 12.5 5.9 3.3 10.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.52 1.00 1.00 Lane Grp Cap(c),veh/h 298 1002 1012 261 847 825 299 0 202 197 177 354 V/C Ratio(X) 1.03 0.82 0.10 0.62 1.08 0.08 0.67 0.00 0.96 0.55 0.34 0.85 Avail Cap(c_a),veh/h 298 1002 1012 294 847 825 299 0 202 256 177 354 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.19 0.19 0.19 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay(d),s/veh 36.3 20.7 7.7 20.2 29.7 12.7 41.1 0.0 48.2 41.3 46.6 40.9 Incr Delay(d2),s/veh 60.6 7.6 0.2 0.6 39.6 0.0 5.6 0.0 51.7 2.4 1.1 17.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 12.8 17.6 1.0 1.8 29.6 0.9 5.4 0.0 8.2 2.8 1.6 9.4 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 96.9 28.3 7.9 20.8 69.3 12.7 46.7 0.0 99.9 43.7 47.7 57.9 LnGrp LOS F C A C F B D A F D D E Approach Vol,veh/h 1236 1142 394 467 Approach Delay,s/veh 43.6 59.1 72.9 53.3 Approach LOS D E E D Timer-Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration(G+Y+Rc),s 23.0 56.5 14.3 19.7 13.7 65.8 17.0 17.0 Change Period(Y+Rc),s *8.7 *5.8 6.6 6.6 *6.8 5.8 6.6 6.6 Max Green Setting(Gmax),s *14 *47 11.4 9.4 *9.2 54.2 10.4 10.4 Max Q Clear Time(g_c+I1),s 16.3 52.6 7.9 14.5 6.8 42.6 12.4 12.4 Green Ext Time(p-c),s 0.0 0.0 0.1 0.0 0.1 5.9 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 54.0 HCM 6th LOS D Notes User approved pedestrian interval to be less than phase max green. *HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Queues Future with Development PM 2035 Supplemental Analysis 2: Hudson Hollow Road/White Oak Road & Fairfax Pike Timing Plan:4:15 PM to 5:15 PM t Lane Group EBL EBT EBR WBL WBT WBR NBT SBT Lane Group Flow(vph) 158 665 46 29 942 46 80 238 v/c Ratio 0.68 0.61 0.05 0.06 0.96 0.05 0.62 0.61 Control Delay 26.1 13.2 1.0 3.8 38.6 1.1 48.2 16.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 26.1 13.2 1.0 3.8 38.6 1.1 48.2 16.7 Queue Length 50th(ft) 16 124 0 3 358 0 30 27 Queue Length 95th(ft) #107 370 7 11 #708 7 74 91 Internal Link Dist(ft) 4165 4595 176 167 Turn Bay Length (ft) 145 90 125 155 Base Capacity(vph) 232 1096 1016 486 985 898 272 654 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.68 0.61 0.05 0.06 0.96 0.05 0.29 0.36 Intersection Summary # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection Sur€ rp with Development PM 2035 Supplemental Analysis 2: Hudson Hollow Road/White Oak Road & Fairfax Pike Timing Plan:4:15 PM to 5:15 PM --p- 4--- t I Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t r t r Traffic Volume(veh/h) 155 652 45 28 923 45 45 22 12 27 31 174 Future Volume(veh/h) 155 652 45 28 923 45 45 22 12 27 31 174 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1870 1781 1870 1841 1826 1870 1870 1752 1870 1870 1841 1870 Adj Flow Rate, veh/h 158 665 28 29 942 26 46 22 3 28 32 29 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 2 8 2 4 5 2 2 10 2 2 4 2 Cap,veh/h 282 1068 950 426 1024 889 186 74 8 109 90 63 Arrive On Green 0.07 0.60 0.60 0.03 0.56 0.56 0.12 0.12 0.12 0.12 0.12 0.12 Sat Flow,veh/h 1781 1781 1585 1753 1826 1585 836 618 64 340 758 530 Grp Volume(v),veh/h 158 665 28 29 942 26 71 0 0 89 0 0 Grp Sat Flow(s),veh/h/In 1781 1781 1585 1753 1826 1585 1519 0 0 1628 0 0 Q Serve(g_s),s 2.5 16.4 0.5 0.4 32.1 0.5 0.0 0.0 0.0 0.7 0.0 0.0 Cycle Q Clear(g_c),s 2.5 16.4 0.5 0.4 32.1 0.5 2.6 0.0 0.0 3.3 0.0 0.0 Prop In Lane 1.00 1.00 1.00 1.00 0.65 0.04 0.31 0.33 Lane Grp Cap(c),veh/h 282 1068 950 426 1024 889 267 0 0 263 0 0 V/C Ratio(X) 0.56 0.62 0.03 0.07 0.92 0.03 0.27 0.00 0.00 0.34 0.00 0.00 Avail Cap(c_a),veh/h 289 1068 950 499 1064 924 607 0 0 649 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay(d),s/veh 14.8 8.8 5.6 6.8 13.7 6.7 27.8 0.0 0.0 28.1 0.0 0.0 Incr Delay(d2),s/veh 2.3 1.6 0.0 0.1 13.0 0.0 0.5 0.0 0.0 0.8 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 1.3 4.8 0.1 0.1 13.1 0.1 1.0 0.0 0.0 1.3 0.0 0.0 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 17.2 10.4 5.6 6.9 26.6 6.7 28.3 0.0 0.0 28.8 0.0 0.0 LnGrp LOS B B A A C A C A A C A A Approach Vol,veh/h 851 997 71 89 Approach Delay,s/veh 11.5 25.5 28.3 28.8 Approach LOS B C C C Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc),s 6.6 48.9 13.1 9.3 46.3 13.1 Change Period (Y+Rc),s 4.5 7.8 4.9 4.5 7.8 4.9 Max Green Setting(Gmax),s 5.0 40.0 25.0 5.0 40.0 25.0 Max Q Clear Time(g_c+I1),s 2.4 18.4 4.6 4.5 34.1 5.3 Green Ext Time(p-c),s 0.0 8.1 0.2 0.0 4.4 0.3 Intersection Summary HCM 6th Ctrl Delay 19.8 HCM 6th LOS B HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:415 PM to 5:15 PM Queues Future with Development PM 2035 Supplemental Analysis 3: Route 522 & Fairfax Pike/Lord Fairfax Highway * Timing Plan:4:15 PM to 5:15 PM --I. *-- I l". t Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT SBR Lane Group Flow(vph) 311 224 415 239 497 405 678 183 100 655 283 v/c Ratio 1.17 0.80 0.83 0.61 1.19 1.26 0.95 0.36 0.70 0.92 0.51 Control Delay 152.1 66.1 27.3 45.5 146.1 181.6 66.6 3.4 82.6 51.8 9.9 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 152.1 66.1 27.3 45.5 146.1 181.6 66.6 3.4 82.6 51.8 9.9 Queue Length 50th(ft) -263 154 68 152 -421 -185 251 0 76 212 10 Queue Length 95th(ft) #436 #277 #236 237 #630 #284 #372 20 #153 #341 111 Internal Link Dist(ft) 382 694 8434 2104 Turn Bay Length (ft) 250 230 500 565 250 125 480 Base Capacity(vph) 265 281 500 390 416 321 715 514 150 715 556 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 1.17 0.80 0.83 0.61 1.19 1.26 0.95 0.36 0.67 0.92 0.51 Intersection Summary Volume exceeds capacity,queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection SurffmWrp with Development PM 2035 Supplemental Analysis 3: Route 522 & Fairfax Pike/Lord Fairfax Highway * Timing Plan:4:15 PM to 5:15 PM --I. *-- I t Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t r 1� tt r tt r Traffic Volume(veh/h) 286 206 382 220 361 97 373 624 168 92 603 260 Future Volume(veh/h) 286 206 382 220 361 97 373 624 168 92 603 260 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1796 1811 1796 1781 1826 1796 1811 1781 1796 1826 1811 1870 Adj Flow Rate, veh/h 311 224 129 239 392 96 405 678 26 100 655 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 7 6 7 8 5 7 6 8 7 5 6 2 Cap,veh/h 269 285 239 396 331 81 325 767 345 123 723 Arrive On Green 0.16 0.16 0.16 0.23 0.23 0.23 0.10 0.23 0.23 0.14 0.42 0.00 Sat Flow,veh/h 1711 1811 1522 1697 1417 347 3346 3385 1522 1739 3441 1585 Grp Volume(v),veh/h 311 224 129 239 0 488 405 678 26 100 655 0 Grp Sat Flow(s),veh/h/In 1711 1811 1522 1697 0 1763 1673 1692 1522 1739 1721 1585 Q Serve(g_s),s 17.3 13.1 8.6 13.8 0.0 25.7 10.7 21.3 1.5 6.1 19.6 0.0 Cycle Q Clear(g_c),s 17.3 13.1 8.6 13.8 0.0 25.7 10.7 21.3 1.5 6.1 19.6 0.0 Prop In Lane 1.00 1.00 1.00 0.20 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 269 285 239 396 0 412 325 767 345 123 723 V/C Ratio(X) 1.16 0.79 0.54 0.60 0.00 1.18 1.24 0.88 0.08 0.81 0.91 Avail Cap(c_a),veh/h 269 285 239 396 0 412 325 767 345 152 723 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 0.85 0.85 0.85 0.91 0.91 0.00 Uniform Delay(d),s/veh 46.3 44.6 42.7 37.6 0.0 42.2 49.7 41.1 33.5 46.5 30.9 0.0 Incr Delay(d2),s/veh 103.7 13.6 2.4 2.6 0.0 105.1 130.1 12.3 0.4 21.5 15.9 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 14.9 6.8 3.3 5.9 0.0 22.8 10.1 9.6 0.6 3.1 7.2 0.0 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 150.1 58.1 45.1 40.2 0.0 147.3 179.8 53.5 33.8 68.0 46.8 0.0 LnGrp LOS F E D D A F F D C E D Approach Vol,veh/h 664 727 1109 755 Approach Delay,s/veh 98.7 112.1 99.1 49.6 Approach LOS F F F D Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration(G+Y+Rc),s 19.0 29.8 34.0 17.2 31.6 27.2 Change Period(Y+Rc),s 8.3 6.7 *8.3 *9.4 6.7 9.9 Max Green Setting(Gmax),s 10.7 23.1 *26 *9.6 23.1 17.3 Max Q Clear Time(g_c+I1),s 12.7 21.6 27.7 8.1 23.3 19.3 Green Ext Time(p-c),s 0.0 0.7 0.0 0.0 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 90.4 HCM 6th LOS F Notes *HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Unsignalized Delay for[SBR]is excluded from calculations of the approach delay and intersection delay. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Queues Future with Development PM 2035 Supplemental Analysis 4: Route 522 & Lake Frederick Drive * I Timing Plan:4:15 PM to 5:15 PM I t Lane Group EBL EBR NBL NBT SBT SBR Lane Group Flow(vph) 184 99 124 1035 1048 209 v/c Ratio 0.63 0.19 0.41 0.49 0.77 0.27 Control Delay 47.0 17.6 19.5 10.8 29.5 4.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 47.0 17.6 19.5 10.8 29.5 4.0 Queue Length 50th(ft) 104 33 27 157 273 0 Queue Length 95th(ft) 181 68 58 244 418 46 Internal Link Dist(ft) 414 1077 8434 Turn Bay Length (ft) 470 295 Base Capacity(vph) 480 520 502 2091 1438 805 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.38 0.19 0.25 0.49 0.73 0.26 Intersection Summary Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection Surffmlalrp with Development PM 2035 Supplemental Analysis 4: Route 522 & Lake Frederick Drive * I Timing Plan:4:15 PM to 5:15 PM -AI L t Movement EBL EBR NBL NBT SBU SBT SBR Lane Configurations r tt A tt r Traffic Volume(veh/h) 169 91 114 952 0 964 192 Future Volume(veh/h) 169 91 114 952 0 964 192 Initial Q(Qb),veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow,veh/h/In 1870 1722 1826 1781 1767 1870 Adj Flow Rate, veh/h 184 85 124 1035 1048 75 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 12 5 8 9 2 Cap,veh/h 243 286 275 1462 1422 672 Arrive On Green 0.14 0.14 0.06 0.43 0.42 0.42 Sat Flow,veh/h 1781 1459 1739 3474 3445 1585 Grp Volume(v),veh/h 184 85 124 1035 1048 75 Grp Sat Flow(s),veh/h/In 1781 1459 1739 1692 1678 1585 Q Serve(g_s),s 7.8 0.0 0.0 19.5 20.4 2.2 Cycle Q Clear(g_c),s 7.8 0.0 0.0 19.5 20.4 2.2 Prop In Lane 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 243 286 275 1462 1422 672 V/C Ratio(X) 0.76 0.30 0.45 0.71 0.74 0.11 Avail Cap(c_a),veh/h 570 554 617 1950 1719 812 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay(d),s/veh 32.5 26.8 30.5 18.2 18.9 13.6 Incr Delay(d2),s/veh 5.7 0.7 1.4 1.5 2.0 0.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 3.7 0.1 2.1 6.5 6.9 0.7 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 38.2 27.5 31.9 19.6 20.9 13.8 LnGrp LOS D C C B C B Approach Vol,veh/h 269 1159 1123 Approach Delay,s/veh 34.8 20.9 20.4 Approach LOS C C C Timer-Assigned Phs 2 4 5 6 Phs Duration(G+Y+Rc),s 44.2 19.4 15.2 43.6 Change Period(Y+Rc),s 10.5 8.7 10.5 10.5 Max Green Setting(Gmax),s 45.0 25.0 20.0 40.0 Max Q Clear Time(g_c+11),s 21.5 9.8 2.0 22.4 Green Ext Time(p-c),s 12.2 0.9 0.3 10.7 Intersection Summary HCM 6th Ctrl Delay 22.2 HCM 6th LOS C Notes User approved ignoring U-Turning movement. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Queues Future with Development PM 2035 Supplemental Analysis 5: Route 522 & Tasker Road * I Timing Plan:4:15 PM to 5:15 PM -AI t Lane Group EBL EBR NBL NBT SBT SBR Lane Group Flow(vph) 175 253 315 783 809 119 v/c Ratio 0.68 0.41 0.67 0.34 0.51 0.11 Control Delay 57.2 6.9 56.9 4.1 23.5 1.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 57.2 6.9 56.9 4.1 23.5 1.6 Queue Length 50th(ft) 119 0 119 57 205 0 Queue Length 95th(ft) 181 36 137 75 311 20 Internal Link Dist(ft) 446 1419 813 Turn Bay Length (ft) 250 485 315 Base Capacity(vph) 350 755 627 2286 1571 1178 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.50 0.34 0.50 0.34 0.51 0.10 Intersection Summary Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM Signalized Intersection Capacifukivadywill�h Development PM 2035 Supplemental Analysis 5: Route 522 & Tasker Road * I Timing Plan:4:15 PM to 5:15 PM -AI � t Movement EBL EBR NBL NBT SBU SBT SBR Lane Configurations r r tt A tt r Traffic Volume(vph) 168 243 302 752 0 777 114 Future Volume(vph) 168 243 302 752 0 777 114 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 Total Lost time(s) 10.2 10.2 10.3 6.4 6.6 10.2 Lane Util.Factor 1.00 0.88 0.97 0.95 0.95 1.00 Frt 1.00 0.85 1.00 1.00 1.00 0.85 Flt Protected 0.95 1.00 0.95 1.00 1.00 1.00 Satd. Flow(prot) 1770 2787 3335 3252 3374 1583 Flt Permitted 0.95 1.00 0.95 1.00 1.00 1.00 Satd. Flow(perm) 1770 2787 3335 3252 3374 1583 Peak-hour factor, PHF 0.96 0.96 0.96 0.96 0.92 0.96 0.96 Adj. Flow(vph) 175 253 315 783 0 809 119 RTOR Reduction(vph) 0 216 0 0 0 0 46 Lane Group Flow(vph) 175 37 315 783 0 809 73 Heavy Vehicles(%) 2% 2% 5% 11% 2% 7% 2% Turn Type Prot Prot Prot NA Prot NA pm+ov Protected Phases 7 4 1 6 5 2 7 Permitted Phases 4 2 Actuated Green, G (s) 16.1 16.1 15.6 77.3 51.2 67.3 Effective Green,g(s) 16.1 16.1 15.6 77.3 51.2 67.3 Actuated g/C Ratio 0.15 0.15 0.14 0.70 0.47 0.61 Clearance Time(s) 10.2 10.2 10.3 6.4 6.6 10.2 Vehicle Extension(s) 3.0 3.0 3.0 3.5 3.5 3.0 Lane Grp Cap(vph) 259 407 472 2285 1570 968 v/s Ratio Prot c0.10 0.01 c0.09 0.24 c0.24 0.01 v/s Ratio Perm 0.03 v/c Ratio 0.68 0.09 0.67 0.34 0.52 0.08 Uniform Delay,d1 44.5 40.6 44.7 6.4 20.7 8.7 Progression Factor 1.00 1.00 1.12 0.54 1.00 1.00 Incremental Delay,d2 6.8 0.1 3.5 0.4 1.2 0.0 Delay(s) 51.3 40.7 53.7 3.8 21.9 8.7 Level of Service D D D A C A Approach Delay(s) 45.0 18.1 20.2 Approach LOS D B C Intersection Summary HCM 2000 Control Delay 23.6 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.57 Actuated Cycle Length(s) 110.0 Sum of lost time(s) 27.1 Intersection Capacity Utilization 62.0% ICU Level of Service B Analysis Period(min) 15 c Critical Lane Group HCM Signalized Intersection Capacity Analysis Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection SurffmWrp with Development PM 2035 Supplemental Analysis 5: Route 522 & Tasker Road Timing Plan:4:15 PM to 5:15 PM HCM 6th Edition methodology supports red clearance in the range of 0 to 6 seconds. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Queues Future with Development PM 2035 Supplemental Analysis 6: Lake Frederick Entrance/Gibson Site Entrance 1 & Fairfax Pike Timing Plan:4:15 PM to 5:15 PM t ' ► Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT Lane Group Flow(vph) 36 896 116 92 1113 40 83 65 104 92 v/c Ratio 0.14 0.69 0.10 0.24 0.83 0.03 0.62 0.16 0.76 0.26 Control Delay 2.9 8.6 1.3 3.5 16.1 0.4 61.1 0.8 74.9 1.8 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 2.9 8.6 1.3 3.5 16.1 0.4 61.1 0.8 74.9 1.8 Queue Length 50th(ft) 2 134 0 7 395 0 45 0 58 0 Queue Length 95th(ft) m6 272 m5 14 #686 3 #121 0 #154 0 Internal Link Dist(ft) 1336 1871 292 413 Turn Bay Length (ft) 150 150 150 150 50 Base Capacity(vph) 249 1329 1163 382 1349 1167 133 410 136 353 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.14 0.67 0.10 0.24 0.83 0.03 0.62 0.16 0.76 0.26 Intersection Summary # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection Surffmtarp with Development PM 2035 Supplemental Analysis 6: Lake Frederick Entrance/Gibson Site Entrance 1 & Fairfax Pike Timing Plan:4:15 PM to 5:15 PM Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t r + r 1 1� Traffic Volume(veh/h) 33 824 107 85 1024 37 76 0 60 96 0 85 Future Volume(veh/h) 33 824 107 85 1024 37 76 0 60 96 0 85 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 36 896 77 92 1113 27 83 0 2 104 0 3 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap,veh/h 305 1323 1121 613 1356 1150 202 0 137 203 0 137 Arrive On Green 0.07 1.00 1.00 0.05 0.73 0.73 0.09 0.00 0.09 0.09 0.00 0.09 Sat Flow,veh/h 1781 1870 1585 1781 1870 1585 1414 0 1585 1415 0 1585 Grp Volume(v),veh/h 36 896 77 92 1113 27 83 0 2 104 0 3 Grp Sat Flow(s),veh/h/In 1781 1870 1585 1781 1870 1585 1414 0 1585 1415 0 1585 Q Serve(g_s),s 0.4 0.0 0.0 1.1 35.1 0.4 5.0 0.0 0.1 6.3 0.0 0.2 Cycle Q Clear(g_c),s 0.4 0.0 0.0 1.1 35.1 0.4 5.1 0.0 0.1 6.4 0.0 0.2 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 305 1323 1121 613 1356 1150 202 0 137 203 0 137 V/C Ratio(X) 0.12 0.68 0.07 0.15 0.82 0.02 0.41 0.00 0.01 0.51 0.00 0.02 Avail Cap(c_a),veh/h 358 1323 1121 635 1356 1150 202 0 137 203 0 137 HCM Platoon Ratio 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.68 0.68 0.68 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay(d),s/veh 9.8 0.0 0.0 2.7 8.1 3.3 38.7 0.0 36.4 39.3 0.0 36.4 Incr Delay(d2),s/veh 0.1 1.9 0.1 0.1 4.1 0.0 1.3 0.0 0.0 2.2 0.0 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.2 0.7 0.0 0.2 10.1 0.1 1.8 0.0 0.0 2.3 0.0 0.1 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 10.0 1.9 0.1 2.8 12.3 3.3 40.1 0.0 36.4 41.5 0.0 36.5 LnGrp LOS A A A A B A D A D D A D Approach Vol,veh/h 1009 1232 85 107 Approach Delay,s/veh 2.1 11.4 40.0 41.3 Approach LOS A B D D Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration(G+Y+Rc),s 9.0 66.0 12.0 7.4 67.6 12.0 Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting(Gmax),s 5.5 60.5 7.5 5.5 60.5 7.5 Max Q Clear Time(g_c+11),s 3.1 2.0 7.1 2.4 37.1 8.4 Green Ext Time(p-c),s 0.0 8.1 0.0 0.0 9.7 0.0 Intersection Summary HCM 6th Ctrl Delay 9.8 HCM 6th LOS A HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th TWSC Future with Development PM 2035 Supplemental Analysis 7: Fairfax Pike & Gibson Site Entrance 2 Timing Plan:4:15 PM to 5:15 PM Intersection Int Delay,s/veh 0.5 Movement EBL EBT WBT WBR SBL SBR Lane Configurations t 1� r* Traffic Vol,veh/h 0 980 1101 1 0 45 Future Vol,veh/h 0 980 1101 1 0 45 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized None None None Storage Length - Veh in Median Storage,# 0 0 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 1065 1197 1 0 49 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 0 0 1198 Stage 1 - - - Stage 2 - Critical Hdwy 6.22 Critical Hdwy Stg 1 - Critical Hdwy Stg 2 - Follow-up Hdwy 3.318 Pot Cap-1 Maneuver 0 0 226 Stage 1 0 0 - Stage 2 0 0 - Platoon blocked, % Mov Cap-1 Maneuver - - 226 Mov Cap-2 Maneuver Stage 1 Stage 2 Approach EB WB SIB HCM Control Delay,s 0 0 25.3 HCM LOS D Minor Lane/Major Mvmt EBT WBT WBR SBLn1 Capacity(veh/h) 226 HCM Lane V/C Ratio 0.216 HCM Control Delay(s) 25.3 HCM Lane LOS D HCM 95th %tile Q(veh) 0.8 HCM 6th TWSC Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th TWSC Future with Development PM 2035 Supplemental Analysis 8: Fairfax Pike & Gibson Site Entrance 3 Timing Plan:4:15 PM to 5:15 PM Intersection Int Delay,s/veh 1.3 Movement EBL EBT WBT WBR SBL SBR Lane Configurations t 1 r* Traffic Vol,veh/h 20 960 1097 6 17 5 Future Vol,veh/h 20 960 1097 6 17 5 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None None - None Storage Length 150 - 0 50 Veh in Median Storage,# - 0 0 0 - Grade, % - 0 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 22 1043 1192 7 18 5 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 1199 0 0 2283 1196 Stage 1 - - - 1196 - Stage 2 - 1087 - Critical Hdwy 4.12 6.42 6.22 Critical Hdwy Stg 1 - 5.42 - Critical Hdwy Stg 2 - 5.42 - Follow-up Hdwy 2.218 3.518 3.318 Pot Cap-1 Maneuver 582 44 227 Stage 1 - 287 - Stage 2 - 323 - Platoon blocked, % Mov Cap-1 Maneuver 582 42 227 Mov Cap-2 Maneuver - 42 - Stage 1 276 Stage 2 323 Approach EB WB SIB HCM Control Delay,s 0.2 0 117.6 HCM LOS F Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 SBLn2 Capacity(veh/h) 582 42 227 HCM Lane V/C Ratio 0.037 0.44 0.024 HCM Control Delay(s) 11.4 145.9 21.2 HCM Lane LOS B F C HCM 95th %tile Q(veh) 0.1 1.5 0.1 HCM 6th TWSC Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Queues Future with Development PM 2035 Supplemental Analysis 9: Route 522 & Gibson Site Entrance 4 I Timing Plan:4:15 PM to 5:15 PM -A *4\ I t Lane Group EBL EBR NBL NBT SBT SBR Lane Group Flow(vph) 103 42 16 1072 1023 41 v/c Ratio 0.42 0.16 0.04 0.42 0.43 0.04 Control Delay 26.7 9.7 1.5 0.9 8.0 4.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 26.7 9.7 1.5 0.9 8.0 4.6 Queue Length 50th(ft) 31 0 1 20 72 0 Queue Length 95th(ft) 70 22 m1 m22 235 21 Internal Link Dist(ft) 785 2104 3524 Turn Bay Length (ft) 300 150 Base Capacity(vph) 263 271 405 2580 2365 1071 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.39 0.15 0.04 0.42 0.43 0.04 Intersection Summary m Volume for 95th percentile queue is metered by upstream signal. Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection Surffmtarp with Development PM 2035 Supplemental Analysis 9: Route 522 & Gibson Site Entrance 4 * I Timing Plan:4:15 PM to 5:15 PM -AI Movement EBL EBR NBL NBT SBT SBR Lane Configurations r tt tt r Traffic Volume(veh/h) 95 39 15 986 941 38 Future Volume(veh/h) 95 39 15 986 941 38 Initial Q(Qb),veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow,veh/h/In 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 103 2 16 1072 1023 19 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 Cap,veh/h 134 119 369 2563 1957 873 Arrive On Green 0.08 0.08 0.04 1.00 0.55 0.55 Sat Flow,veh/h 1781 1585 1781 3647 3647 1585 Grp Volume(v),veh/h 103 2 16 1072 1023 19 Grp Sat Flow(s),veh/h/In 1781 1585 1781 1777 1777 1585 Q Serve(g_s),s 3.1 0.1 0.2 0.0 10.0 0.3 Cycle Q Clear(g_c),s 3.1 0.1 0.2 0.0 10.0 0.3 Prop In Lane 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 134 119 369 2563 1957 873 V/C Ratio(X) 0.77 0.02 0.04 0.42 0.52 0.02 Avail Cap(c_a),veh/h 243 216 496 2563 1957 873 HCM Platoon Ratio 1.00 1.00 2.00 2.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.09 0.09 1.00 1.00 Uniform Delay(d),s/veh 25.0 23.6 5.9 0.0 7.8 5.6 Incr Delay(d2),s/veh 9.0 0.1 0.0 0.0 1.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 1.6 0.1 0.0 0.0 2.3 0.4 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 33.9 23.6 5.9 0.0 8.8 5.7 LnGrp LOS C C A A A A Approach Vol,veh/h 105 1088 1042 Approach Delay,s/veh 33.7 0.1 8.7 Approach LOS C A A Timer-Assigned Phs 2 4 5 6 Phs Duration(G+Y+Rc),s 46.4 8.6 9.4 37.0 Change Period(Y+Rc),s 6.7 4.5 8.3 6.7 Max Green Setting(Gmax),s 36.3 7.5 5.0 23.0 Max Q Clear Time(g_c+11),s 2.0 5.1 2.2 12.0 Green Ext Time(p-c),s 7.8 0.0 0.0 4.7 Intersection Summary HCM 6th Ctrl Delay 5.7 HCM 6th LOS A HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Gibson Property Technical Appendix B. 2041 Future Conditions with Development Supplemental Analysis — Capacity Analysis Worksheets 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Queues Future with Development AM 2041 Supplemental Analysis 1: Warrior Drive & Fairfax Pike Timing Plan:7 AM to 8 AM t 41 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT SBR Lane Group Flow(vph) 166 717 424 176 697 147 85 101 76 299 175 v/c Ratio 0.63 0.85 0.47 0.68 0.89 0.17 0.63 0.46 0.23 1.10 0.38 Control Delay 24.7 42.6 12.6 26.2 46.7 2.0 59.4 26.2 38.6 134.2 7.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 24.7 42.6 12.6 26.2 46.7 2.0 59.4 26.2 38.6 134.2 7.7 Queue Length 50th(ft) 73 576 154 58 500 0 57 20 49 -346 0 Queue Length 95th(ft) 83 732 240 95 #769 26 #128 #87 93 #530 56 Internal Link Dist(ft) 593 4165 244 594 Turn Bay Length (ft) 260 500 270 575 190 150 Base Capacity(vph) 319 892 913 263 803 936 144 220 386 272 500 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.52 0.80 0.46 0.67 0.87 0.16 0.59 0.46 0.20 1.10 0.35 Intersection Summary Volume exceeds capacity,queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th Signalized Intersection Surfrje with Development AM 2041 Supplemental Analysis 1: Warrior Drive & Fairfax Pike Timing Plan:7 AM to 8 AM --I. *-- t r'° ' . Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations + r + r + r Traffic Volume(veh/h) 153 660 390 162 641 135 78 25 68 70 275 161 Future Volume(veh/h) 153 660 390 162 641 135 78 25 68 70 275 161 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 1.00 0.99 0.98 0.95 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1841 1752 1796 1796 1722 1856 966 907 848 1870 1841 1781 Adj Flow Rate, veh/h 166 717 362 176 697 73 85 27 7 76 299 29 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 4 10 7 7 12 3 63 67 71 2 4 8 Cap,veh/h 299 941 956 270 903 885 140 105 27 295 204 251 Arrive On Green 0.06 0.54 0.54 0.06 0.52 0.52 0.09 0.15 0.15 0.05 0.11 0.11 Sat Flow,veh/h 1753 1752 1521 1711 1722 1537 920 692 180 1781 1841 1438 Grp Volume(v),veh/h 166 717 362 176 697 73 85 0 34 76 299 29 Grp Sat Flow(s),veh/h/In 1753 1752 1521 1711 1722 1537 920 0 872 1781 1841 1438 Q Serve(g_s),s 5.6 41.7 15.1 6.0 42.1 2.8 10.5 0.0 4.5 4.9 14.4 2.2 Cycle Q Clear(g_c),s 5.6 41.7 15.1 6.0 42.1 2.8 10.5 0.0 4.5 4.9 14.4 2.2 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.21 1.00 1.00 Lane Grp Cap(c),veh/h 299 941 956 270 903 885 140 0 132 295 204 251 V/C Ratio(X) 0.55 0.76 0.38 0.65 0.77 0.08 0.61 0.00 0.26 0.26 1.47 0.12 Avail Cap(c_a),veh/h 400 941 956 298 903 885 143 0 132 402 204 251 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.55 0.55 0.55 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay(d),s/veh 21.4 23.6 11.8 21.9 24.7 12.4 45.8 0.0 48.7 47.8 57.8 45.6 Incr Delay(d2),s/veh 1.6 5.8 1.1 2.4 3.6 0.1 7.0 0.0 1.0 0.5 234.7 0.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 2.2 17.5 5.4 2.4 16.9 1.0 2.7 0.0 1.0 2.2 20.0 0.8 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 23.0 29.4 12.9 24.3 28.3 12.5 52.8 0.0 49.7 48.2 292.5 45.8 LnGrp LOS C C B C C B D A D D F D Approach Vol,veh/h 1245 946 119 404 Approach Delay,s/veh 23.7 26.4 51.9 228.9 Approach LOS C C D F Timer-Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration(G+Y+Rc),s 16.6 73.9 13.2 26.3 14.9 75.6 18.5 21.0 Change Period(Y+Rc),s *8.7 *5.8 6.6 6.6 *6.8 5.8 6.6 6.6 Max Green Setting(Gmax),s *15 *60 14.4 12.4 * 10 67.2 12.4 14.4 Max Q Clear Time(g_c+I1),s 7.6 44.1 6.9 6.5 8.0 43.7 12.5 16.4 Green Ext Time(p-c),s 0.2 5.9 0.1 0.0 0.1 9.2 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 56.4 HCM 6th LOS E Notes User approved pedestrian interval to be less than phase max green. *HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Future with Development AM 2041 Supplemental Analysis 2: Hudson Hollow Road/White Oak Road & Fairfax Pike Timing Plan: 7 AM to 8 AM t Lane Group EBL EBT EBR WBL WBT WBR NBT SBT Lane Group Flow(vph) 241 685 23 3 600 37 100 239 v/c Ratio 0.59 0.68 0.02 0.01 0.77 0.05 0.44 0.62 Control Delay 12.3 15.3 0.0 4.7 22.5 0.6 24.8 18.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 12.3 15.3 0.0 4.7 22.5 0.6 24.8 18.6 Queue Length 50th(ft) 27 135 0 0 172 0 23 31 Queue Length 95th(ft) 75 #483 0 3 355 4 71 107 Internal Link Dist(ft) 4165 4595 176 167 Turn Bay Length (ft) 145 90 125 155 Base Capacity(vph) 410 1119 1016 446 1065 943 435 638 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.59 0.61 0.02 0.01 0.56 0.04 0.23 0.37 Intersection Summary # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan: 7 AM to 8 AM HCM 6th Signalized Intersection Surffmtarp with Development AM 2041 Supplemental Analysis 2: Hudson Hollow Road/White Oak Road & Fairfax Pike Timing Plan:7 AM to 8 AM --I. *-- t r'° ' . Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t r + r Traffic Volume(veh/h) 222 630 21 3 552 34 47 11 34 54 7 158 Future Volume(veh/h) 222 630 21 3 552 34 47 11 34 54 7 158 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1767 1752 1811 1870 1722 1737 1796 1752 1796 1826 1648 1707 Adj Flow Rate, veh/h 241 685 12 3 600 16 51 12 7 59 8 39 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 9 10 6 2 12 11 7 10 7 5 17 13 Cap,veh/h 406 948 831 321 784 670 255 54 22 188 39 73 Arrive On Green 0.09 0.54 0.54 0.00 0.46 0.46 0.14 0.14 0.14 0.14 0.14 0.14 Sat Flow,veh/h 1682 1752 1535 1781 1722 1472 988 375 151 601 268 506 Grp Volume(v),veh/h 241 685 12 3 600 16 70 0 0 106 0 0 Grp Sat Flow(s),veh/h/In 1682 1752 1535 1781 1722 1472 1514 0 0 1374 0 0 Q Serve(g_s),s 4.2 16.4 0.2 0.0 16.2 0.3 0.0 0.0 0.0 1.7 0.0 0.0 Cycle Q Clear(g_c),s 4.2 16.4 0.2 0.0 16.2 0.3 2.0 0.0 0.0 3.8 0.0 0.0 Prop In Lane 1.00 1.00 1.00 1.00 0.73 0.10 0.56 0.37 Lane Grp Cap(c),veh/h 406 948 831 321 784 670 332 0 0 300 0 0 V/C Ratio(X) 0.59 0.72 0.01 0.01 0.77 0.02 0.21 0.00 0.00 0.35 0.00 0.00 Avail Cap(c_a),veh/h 406 1262 1105 475 1240 1060 745 0 0 700 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay(d),s/veh 10.1 9.6 5.9 8.2 12.6 8.3 21.2 0.0 0.0 21.8 0.0 0.0 Incr Delay(d2),s/veh 2.3 2.5 0.0 0.0 3.4 0.0 0.3 0.0 0.0 0.7 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 1.2 4.6 0.0 0.0 5.2 0.1 0.7 0.0 0.0 1.2 0.0 0.0 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 12.5 12.1 5.9 8.2 16.0 8.4 21.5 0.0 0.0 22.5 0.0 0.0 LnGrp LOS B B A A B A C A A C A A Approach Vol,veh/h 938 619 70 106 Approach Delay,s/veh 12.1 15.8 21.5 22.5 Approach LOS B B C C Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration(G+Y+Rc),s 4.7 37.9 13.0 9.5 33.1 13.0 Change Period(Y+Rc),s 4.5 7.8 4.9 4.5 7.8 4.9 Max Green Setting(Gmax),s 5.0 40.0 25.0 5.0 40.0 25.0 Max Q Clear Time(g_c+I1),s 2.0 18.4 4.0 6.2 18.2 5.8 Green Ext Time(p-c),s 0.0 8.3 0.2 0.0 7.1 0.4 Intersection Summary HCM 6th Ctrl Delay 14.4 HCM 6th LOS B HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Future with Development AM 2041 Supplemental Analysis 3: Route 522 & Fairfax Pike/Lord Fairfax Highway * Timing Plan:7 AM to 8 AM --I. *-- I / Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT SBR Lane Group Flow(vph) 260 335 271 125 234 328 507 218 101 386 183 v/c Ratio 0.74 0.86 0.53 0.48 0.78 0.79 0.69 0.43 0.70 0.70 0.43 Control Delay 55.3 65.1 9.0 46.4 58.3 60.8 45.7 6.0 77.7 42.7 7.8 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 55.3 65.1 9.0 46.4 58.3 60.8 45.7 6.0 77.7 42.7 7.8 Queue Length 50th(ft) 173 230 0 80 148 117 177 0 62 137 14 Queue Length 95th(ft) #321 #423 74 135 229 #181 238 46 #153 138 44 Internal Link Dist(ft) 382 694 8434 2104 Turn Bay Length (ft) 250 230 500 565 250 125 480 Base Capacity(vph) 351 388 509 321 362 417 737 510 151 561 423 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.74 0.86 0.53 0.39 0.65 0.79 0.69 0.43 0.67 0.69 0.43 Intersection Summary # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th Signalized Intersection SurffmWrp with Development AM 2041 Supplemental Analysis 3: Route 522 & Fairfax Pike/Lord Fairfax Highway Timing Plan:7 AM to 8 AM --I. *-- t r'° ' . Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations + r 1� tt r tt r Traffic Volume(veh/h) 239 308 249 115 158 57 302 466 201 93 355 168 Future Volume(veh/h) 239 308 249 115 158 57 302 466 201 93 355 168 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1767 1841 1663 1663 1767 1856 1722 1752 1707 1841 1618 1411 Adj Flow Rate, veh/h 260 335 39 125 172 49 328 507 33 101 386 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 9 4 16 16 9 3 12 10 13 4 19 33 Cap,veh/h 310 340 260 242 202 58 389 928 404 126 734 Arrive On Green 0.18 0.18 0.18 0.15 0.15 0.15 0.12 0.28 0.28 0.05 0.16 0.00 Sat Flow,veh/h 1682 1841 1409 1584 1322 377 3182 3328 1447 1753 3075 1196 Grp Volume(v),veh/h 260 335 39 125 0 221 328 507 33 101 386 0 Grp Sat Flow(s),veh/h/In 1682 1841 1409 1584 0 1699 1591 1664 1447 1753 1537 1196 Q Serve(g_s),s 16.4 20.0 2.6 8.0 0.0 13.9 11.1 14.3 1.9 6.3 12.7 0.0 Cycle Q Clear(g_c),s 16.4 20.0 2.6 8.0 0.0 13.9 11.1 14.3 1.9 6.3 12.7 0.0 Prop In Lane 1.00 1.00 1.00 0.22 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 310 340 260 242 0 259 389 928 404 126 734 V/C Ratio(X) 0.84 0.99 0.15 0.52 0.00 0.85 0.84 0.55 0.08 0.80 0.53 Avail Cap(c_a),veh/h 310 340 260 327 0 351 425 928 404 153 734 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.67 0.67 0.67 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 0.84 0.84 0.84 0.98 0.98 0.00 Uniform Delay(d),s/veh 43.3 44.7 37.6 42.9 0.0 45.4 47.2 33.7 29.3 51.6 40.5 0.0 Incr Delay(d2),s/veh 17.9 45.0 0.3 1.7 0.0 13.9 13.2 1.9 0.3 21.2 2.6 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 8.2 13.1 0.9 3.2 0.0 6.7 4.9 5.6 0.6 3.4 5.0 0.0 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 61.1 89.7 37.9 44.6 0.0 59.3 60.5 35.7 29.6 72.7 43.1 0.0 LnGrp LOS E F D D A E E D C E D Approach Vol,veh/h 634 346 868 487 Approach Delay,s/veh 74.8 54.0 44.8 49.3 Approach LOS E D D D Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration(G+Y+Rc),s 21.8 32.9 25.1 17.3 37.4 30.2 Change Period(Y+Rc),s 8.3 6.7 *8.3 *9.4 6.7 9.9 Max Green Setting(Gmax),s 14.7 19.1 *23 *9.6 23.1 20.3 Max Q Clear Time(g_c+I1),s 13.1 14.7 15.9 8.3 16.3 22.0 Green Ext Time(p-c),s 0.4 1.1 0.9 0.0 2.2 0.0 Intersection Summary HCM 6th Ctrl Delay 55.2 HCM 6th LOS E Notes *HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Unsignalized Delay for[SBR]is excluded from calculations of the approach delay and intersection delay. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Future with Development AM 2041 Supplemental Analysis 4: Route 522 & Lake Frederick Drive II Timing Plan: 7 AM to 8 AM t L t Lane Group EBL EBR NBL NBT SBU SBT SBR Lane Group Flow(vph) 160 100 40 859 2 678 62 v/c Ratio 0.51 0.18 0.11 0.53 0.01 0.60 0.11 Control Delay 37.4 7.1 9.6 14.3 8.0 23.3 5.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 37.4 7.1 9.6 14.3 8.0 23.3 5.7 Queue Length 50th(ft) 69 5 8 114 0 138 0 Queue Length 95th(ft) 154 39 23 274 3 232 25 Internal Link Dist(ft) 414 1077 8434 Turn Bay Length (ft) 470 275 295 Base Capacity(vph) 619 613 616 1972 630 1683 826 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.26 0.16 0.06 0.44 0.00 0.40 0.08 Intersection Summary Queues Synchro 11 Report Gorove Slade Timing Plan: 7 AM to 8 AM HCM 6th Signalized Intersection Surffrje with Development AM 2041 Supplemental Analysis 4: Route 522 & Lake Frederick Drive * I Timing Plan:7 AM to 8 AM -AI L t Movement EBL EBR NBL NBT SBU SBT SBR Lane Configurations r tt A tt r Traffic Volume(veh/h) 147 92 37 790 2 624 57 Future Volume(veh/h) 147 92 37 790 2 624 57 Initial Q(Qb),veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow,veh/h/In 1870 1752 1589 1648 1604 1707 Adj Flow Rate, veh/h 160 38 40 859 678 17 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 10 21 17 20 13 Cap,veh/h 223 246 284 1347 1074 510 Arrive On Green 0.13 0.13 0.04 0.43 0.35 0.35 Sat Flow,veh/h 1781 1485 1513 3214 3127 1447 Grp Volume(v),veh/h 160 38 40 859 678 17 Grp Sat Flow(s),veh/h/In 1781 1485 1513 1566 1523 1447 Q Serve(g_s),s 5.3 0.0 0.0 13.3 11.4 0.5 Cycle Q Clear(g_c),s 5.3 0.0 0.0 13.3 11.4 0.5 Prop In Lane 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 223 246 284 1347 1074 510 V/C Ratio(X) 0.72 0.15 0.14 0.64 0.63 0.03 Avail Cap(c_a),veh/h 723 662 715 2288 1979 940 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay(d),s/veh 25.9 22.0 20.7 13.8 16.6 13.1 Incr Delay(d2),s/veh 5.1 0.3 0.3 1.1 1.3 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 2.5 0.7 0.4 3.6 3.3 0.1 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 31.0 22.4 20.9 14.9 17.9 13.1 LnGrp LOS C C C B B B Approach Vol,veh/h 198 899 695 Approach Delay,s/veh 29.4 15.1 17.8 Approach LOS C B B Timer-Assigned Phs 2 4 5 6 Phs Duration(G+Y+Rc),s 37.0 16.4 13.0 32.2 Change Period(Y+Rc),s 10.5 8.7 10.5 10.5 Max Green Setting(Gmax),s 45.0 25.0 20.0 40.0 Max Q Clear Time(g_c+11),s 15.3 7.3 2.0 13.4 Green Ext Time(p-c),s 11.2 0.7 0.1 8.3 Intersection Summary HCM 6th Ctrl Delay 17.7 HCM 6th LOS B Notes User approved ignoring U-Turning movement. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Future with Development AM 2041 Supplemental Analysis 5: Route 522 & Tasker Road II Timing Plan: 7 AM to 8 AM t t Lane Group EBL EBR NBL NBT SBT SBR Lane Group Flow(vph) 57 233 175 600 562 80 v/c Ratio 0.41 0.52 0.53 0.25 0.34 0.07 Control Delay 55.8 10.3 58.6 2.2 14.4 1.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 55.8 10.3 58.6 2.2 14.4 1.4 Queue Length 50th(ft) 39 0 65 28 106 0 Queue Length 95th(ft) 78 39 100 31 166 14 Internal Link Dist(ft) 446 1419 813 Turn Bay Length (ft) 250 485 315 Base Capacity(vph) 313 728 615 2433 1629 1316 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.18 0.32 0.28 0.25 0.34 0.06 Intersection Summary Queues Synchro 11 Report Gorove Slade Timing Plan: 7 AM to 8 AM HCM Signalized Intersection Capacifukivadywill�h Development AM 2041 Supplemental Analysis 5: Route 522 & Tasker Road * I Timing Plan:7 AM to 8 AM -AI t Movement EBL EBR NBL NBT SBU SBT SBR Lane Configurations r r tt A tt r Traffic Volume(vph) 55 226 170 582 0 545 78 Future Volume(vph) 55 226 170 582 0 545 78 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 Total Lost time(s) 10.2 10.2 10.3 6.4 6.6 10.2 Lane Util.Factor 1.00 0.88 0.97 0.95 0.95 1.00 Frt 1.00 0.85 1.00 1.00 1.00 0.85 Flt Protected 0.95 1.00 0.95 1.00 1.00 1.00 Satd. Flow(prot) 1583 2733 3273 3195 2888 1583 Flt Permitted 0.95 1.00 0.95 1.00 1.00 1.00 Satd. Flow(perm) 1583 2733 3273 3195 2888 1583 Peak-hour factor, PHF 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Adj. Flow(vph) 57 233 175 600 0 562 80 RTOR Reduction(vph) 0 213 0 0 0 0 28 Lane Group Flow(vph) 57 20 175 600 0 562 52 Heavy Vehicles(%) 14% 4% 7% 13% 2% 25% 2% Turn Type Prot Prot Prot NA Prot NA pm+ov Protected Phases 7 4 1 6 5 2 7 Permitted Phases 4 2 Actuated Green, G (s) 9.6 9.6 11.2 83.8 62.1 71.7 Effective Green,g(s) 9.6 9.6 11.2 83.8 62.1 71.7 Actuated g/C Ratio 0.09 0.09 0.10 0.76 0.56 0.65 Clearance Time(s) 10.2 10.2 10.3 6.4 6.6 10.2 Vehicle Extension(s) 3.0 3.0 3.0 3.5 3.5 3.0 Lane Grp Cap(vph) 138 238 333 2434 1630 1031 v/s Ratio Prot c0.04 0.01 c0.05 0.19 c0.19 0.00 v/s Ratio Perm 0.03 v/c Ratio 0.41 0.09 0.53 0.25 0.34 0.05 Uniform Delay,d1 47.5 46.2 46.9 3.8 12.9 6.9 Progression Factor 1.00 1.00 1.14 0.47 1.00 1.00 Incremental Delay,d2 2.0 0.2 1.5 0.2 0.6 0.0 Delay(s) 49.5 46.3 54.8 2.0 13.5 6.9 Level of Service D D D A B A Approach Delay(s) 47.0 14.0 12.7 Approach LOS D B B Intersection Summary HCM 2000 Control Delay 19.1 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.38 Actuated Cycle Length(s) 110.0 Sum of lost time(s) 27.1 Intersection Capacity Utilization 49.3% ICU Level of Service A Analysis Period(min) 15 c Critical Lane Group HCM Signalized Intersection Capacity Analysis Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th Signalized Intersection Surffrje with Development AM 2041 Supplemental Analysis 5: Route 522 & Tasker Road Timing Plan:7 AM to 8 AM HCM 6th Edition methodology supports red clearance in the range of 0 to 6 seconds. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Future with Development AM 2041 Supplemental Analysis 6: Lake Frederick Entrance/Gibson Site Entrance 1 & Fairfax Pike Timing Plan:7 AM to 8 AM fi . Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT Lane Group Flow(vph) 90 872 50 39 636 103 133 105 32 26 v/c Ratio 0.18 0.69 0.05 0.11 0.52 0.10 0.67 0.24 0.17 0.05 Control Delay 3.1 8.5 0.2 4.0 10.9 1.7 50.7 1.2 33.0 0.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 3.1 8.5 0.2 4.0 10.9 1.7 50.7 1.2 33.0 0.2 Queue Length 50th(ft) 8 116 0 5 186 0 67 0 15 0 Queue Length 95th(ft) m11 161 m1 12 263 17 #136 0 41 0 Internal Link Dist(ft) 1336 1871 292 413 Turn Bay Length (ft) 150 150 150 150 50 Base Capacity(vph) 510 1279 1112 358 1232 1082 226 471 210 559 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.18 0.68 0.04 0.11 0.52 0.10 0.59 0.22 0.15 0.05 Intersection Summary # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Queues Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th Signalized Intersection Sur€orWrp with Development AM 2041 Supplemental Analysis 6: Lake Frederick Entrance/Gibson Site Entrance 1 & Fairfax Pike Timing Plan: 7IAM to 8 AM --p- 4--- 4- t I Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t r t r 1� Traffic Volume(veh/h) 83 802 46 36 585 95 122 0 97 29 0 24 Future Volume(veh/h) 83 802 46 36 585 95 122 0 97 29 0 24 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1 1870 Adj Flow Rate, veh/h 90 872 32 39 636 63 133 0 7 32 0 2 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap,veh/h 559 1290 1094 573 1247 1056 247 0 184 242 0 184 Arrive On Green 0.12 1.00 1.00 0.04 0.67 0.67 0.12 0.00 0.12 0.12 0.00 0.12 Sat Flow,veh/h 1781 1870 1585 1781 1870 1585 1415 0 1585 1409 0 1585 Grp Volume(v),veh/h 90 872 32 39 636 63 133 0 7 32 0 2 Grp Sat Flow(s),veh/h/In 1781 1870 1585 1781 1870 1585 1415 0 1585 1409 0 1585 Q Serve(g_s),s 1.2 0.0 0.0 0.5 14.6 1.2 7.8 0.0 0.3 1.8 0.0 0.1 Cycle Q Clear(g_c),s 1.2 0.0 0.0 0.5 14.6 1.2 7.9 0.0 0.3 2.1 0.0 0.1 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 559 1290 1094 573 1247 1056 247 0 184 242 0 184 V/C Ratio(X) 0.16 0.68 0.03 0.07 0.51 0.06 0.54 0.00 0.04 0.13 0.00 0.01 Avail Cap(c_a),veh/h 561 1290 1094 615 1247 1056 308 0 252 303 0 252 HCM Platoon Ratio 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.72 0.72 0.72 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay(d),s/veh 4.5 0.0 0.0 3.3 7.2 4.9 36.8 0.0 33.4 34.3 0.0 33.3 Incr Delay(d2),s/veh 0.1 2.1 0.0 0.0 0.3 0.0 1.8 0.0 0.1 0.2 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.3 0.7 0.0 0.1 4.3 0.3 2.8 0.0 0.1 0.6 0.0 0.0 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 4.6 2.1 0.0 3.3 7.5 4.9 38.6 0.0 33.5 34.5 0.0 33.3 LnGrp LOS A A A A A A D A C C A C Approach Vol,veh/h 994 738 140 34 Approach Delay,s/veh 2.2 7.1 38.3 34.5 Approach LOS A A D C Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc),s 7.5 63.1 14.3 9.5 61.2 14.3 Change Period (Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting(Gmax),s 5.0 53.0 13.5 5.1 52.9 13.5 Max Q Clear Time(g_c+I1),s 2.5 2.0 9.9 3.2 16.6 4.1 Green Ext Time(p-c),s 0.0 7.5 0.1 0.0 4.5 0.0 Intersection Summary HCM 6th Ctrl Delay 7.3 HCM 6th LOS A HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan: 7 AM to 8 AM HCM 6th TWSC Future with Development AM 2041 Supplemental Analysis 7: Fairfax Pike & Gibson Site Entrance 2 Timing Plan:7 AM to 8 AM Intersection Int Delay,s/veh 0.1 Movement EBL EBT WBT WBR SBL SBR Lane Configurations t 1� r* Traffic Vol,veh/h 0 928 702 3 0 14 Future Vol,veh/h 0 928 702 3 0 14 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized None None None Storage Length - Veh in Median Storage,# 0 0 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 1009 763 3 0 15 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 0 0 765 Stage 1 - - - Stage 2 - Critical Hdwy 6.22 Critical Hdwy Stg 1 - Critical Hdwy Stg 2 - Follow-up Hdwy 3.318 Pot Cap-1 Maneuver 0 0 403 Stage 1 0 0 - Stage 2 0 0 - Platoon blocked, % Mov Cap-1 Maneuver - - 403 Mov Cap-2 Maneuver Stage 1 Stage 2 Approach EB WB SIB HCM Control Delay,s 0 0 14.3 HCM LOS B Minor Lane/Major Mvmt EBT WBT WBR SBLn1 Capacity(veh/h) 403 HCM Lane V/C Ratio 0.038 HCM Control Delay(s) 14.3 HCM Lane LOS B HCM 95th %tile Q(veh) 0.1 HCM 6th TWSC Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th TWSC Future with Development AM 2041 Supplemental Analysis 8: Fairfax Pike & Gibson Site Entrance 3 Timing Plan:7 AM to 8 AM Intersection Int Delay,s/veh 0.5 Movement EBL EBT WBT WBR SBL SBR Lane Configurations t T r* Traffic Vol,veh/h 49 879 703 15 5 2 Future Vol,veh/h 49 879 703 15 5 2 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None None - None Storage Length 150 - 0 50 Veh in Median Storage,# - 0 0 0 - Grade, % - 0 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 53 955 764 16 5 2 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 780 0 0 1833 772 Stage 1 - - - 772 - Stage 2 - 1061 - Critical Hdwy 4.12 6.42 6.22 Critical Hdwy Stg 1 - 5.42 - Critical Hdwy Stg 2 - 5.42 - Follow-up Hdwy 2.218 3.518 3.318 Pot Cap-1 Maneuver 837 84 400 Stage 1 - 456 - Stage 2 - 333 - Platoon blocked, % Mov Cap-1 Maneuver 837 79 400 Mov Cap-2 Maneuver - 79 - Stage 1 427 Stage 2 333 Approach EB WB SIB HCM Control Delay,s 0.5 0 42.5 HCM LOS E Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 SBLn2 Capacity(veh/h) 837 79 400 HCM Lane V/C Ratio 0.064 0.069 0.005 HCM Control Delay(s) 9.6 53.9 14 HCM Lane LOS A F B HCM 95th %tile Q(veh) 0.2 0.2 0 HCM 6th TWSC Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Future with Development AM 2041 Supplemental Analysis 9: Route 522 & Gibson Site Entrance 4 II Timing Plan: 7 AM to 8 AM t t Lane Group EBL EBR NBL NBT SBT SBR Lane Group Flow(vph) 30 12 40 783 690 103 v/c Ratio 0.15 0.06 0.06 0.26 0.26 0.08 Control Delay 23.4 13.1 2.1 0.4 7.1 2.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 23.4 13.1 2.1 0.4 7.1 2.7 Queue Length 50th(ft) 9 0 0 0 0 0 Queue Length 95th(ft) 29 12 m3 17 174 24 Internal Link Dist(ft) 785 2104 3524 Turn Bay Length (ft) 300 150 Base Capacity(vph) 202 191 621 3109 2749 1252 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.15 0.06 0.06 0.25 0.25 0.08 Intersection Summary m Volume for 95th percentile queue is metered by upstream signal. Queues Synchro 11 Report Gorove Slade Timing Plan: 7 AM to 8 AM HCM 6th Signalized Intersection Surffmtarp with Development AM 2041 Supplemental Analysis 9: Route 522 & Gibson Site Entrance 4 * I Timing Plan:7 AM to 8 AM -AI Movement EBL EBR NBL NBT SBT SBR Lane Configurations r tt tt r Traffic Volume(veh/h) 28 11 37 720 635 95 Future Volume(veh/h) 28 11 37 720 635 95 Initial Q(Qb),veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow,veh/h/In 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 30 0 40 783 690 53 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 Cap,veh/h 60 53 540 2711 2027 904 Arrive On Green 0.03 0.00 0.08 1.00 0.57 0.57 Sat Flow,veh/h 1781 1585 1781 3647 3647 1585 Grp Volume(v),veh/h 30 0 40 783 690 53 Grp Sat Flow(s),veh/h/In 1781 1585 1781 1777 1777 1585 Q Serve(g_s),s 0.9 0.0 0.5 0.0 5.7 0.8 Cycle Q Clear(g_c),s 0.9 0.0 0.5 0.0 5.7 0.8 Prop In Lane 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 60 53 540 2711 2027 904 V/C Ratio(X) 0.50 0.00 0.07 0.29 0.34 0.06 Avail Cap(c_a),veh/h 178 159 650 2711 2027 904 HCM Platoon Ratio 1.00 1.00 2.00 2.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.64 0.64 1.00 1.00 Uniform Delay(d),s/veh 26.1 0.0 4.3 0.0 6.3 5.2 Incr Delay(d2),s/veh 6.4 0.0 0.0 0.2 0.5 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.5 0.0 0.1 0.1 1.2 1.2 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 32.6 0.0 4.4 0.2 6.8 5.4 LnGrp LOS C A A A A A Approach Vol,veh/h 30 823 743 Approach Delay,s/veh 32.6 0.4 6.7 Approach LOS C A A Timer-Assigned Phs 2 4 5 6 Phs Duration(G+Y+Rc),s 48.7 6.3 10.6 38.1 Change Period(Y+Rc),s 6.7 4.5 8.3 6.7 Max Green Setting(Gmax),s 38.3 5.5 5.7 24.3 Max Q Clear Time(g_c+11),s 2.0 2.9 2.5 7.7 Green Ext Time(p-c),s 5.2 0.0 0.0 3.8 Intersection Summary HCM 6th Ctrl Delay 3.9 HCM 6th LOS A Notes User approved volume balancing among the lanes for turning movement. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Future with Development PM 2041 Supplemental Analysis 1: Warrior Drive & Fairfax Pike Timing Plan:4:15 PM to 5:15 PM t ' ► 41 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT SBR Lane Group Flow(vph) 321 850 182 161 940 155 200 254 113 60 397 v/c Ratio 1.09 0.94 0.16 0.83 1.20 0.18 0.69 1.18 0.49 0.37 0.84 Control Delay 107.9 50.5 2.7 58.3 131.3 2.1 50.5 151.7 42.1 53.4 46.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 107.9 50.5 2.7 58.3 131.3 2.1 50.5 151.7 42.1 53.4 46.1 Queue Length 50th(ft) -207 582 0 66 -806 0 120 -183 64 40 200 Queue Length 95th(ft) #379 #845 56 #183 #1050 26 #200 #351 115 83 #345 Internal Link Dist(ft) 593 4165 244 594 Turn Bay Length (ft) 260 500 270 575 190 150 Base Capacity(vph) 295 901 1122 193 785 891 289 216 251 176 470 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 1.09 0.94 0.16 0.83 1.20 0.17 0.69 1.18 0.45 0.34 0.84 Intersection Summary Volume exceeds capacity,queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection Surfrje with Development PM 2041 Supplemental Analysis 1: Warrior Drive & Fairfax Pike Timing Plan:4:15 PM to 5:15 PM --I. *-- *4\ I t Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations + r + r + r Traffic Volume(veh/h) 295 782 167 148 865 143 184 86 148 104 55 365 Future Volume(veh/h) 295 782 167 148 865 143 184 86 148 104 55 365 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 0.99 0.99 1.00 0.98 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1870 1841 1870 1693 1841 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 321 850 104 161 940 72 200 93 101 113 60 317 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 4 2 14 4 2 2 2 2 2 2 2 Cap,veh/h 298 1002 1012 247 847 829 298 95 103 198 177 354 Arrive On Green 0.13 0.54 0.54 0.06 0.46 0.46 0.09 0.12 0.12 0.07 0.09 0.09 Sat Flow,veh/h 1781 1841 1585 1612 1841 1552 1781 814 884 1781 1870 1560 Grp Volume(v),veh/h 321 850 104 161 940 72 200 0 194 113 60 317 Grp Sat Flow(s),veh/h/In 1781 1841 1585 1612 1841 1552 1781 0 1698 1781 1870 1560 Q Serve(g_s),s 14.3 43.0 2.8 4.8 50.6 2.5 10.4 0.0 12.5 6.2 3.3 10.4 Cycle Q Clear(g_c),s 14.3 43.0 2.8 4.8 50.6 2.5 10.4 0.0 12.5 6.2 3.3 10.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.52 1.00 1.00 Lane Grp Cap(c),veh/h 298 1002 1012 247 847 829 298 0 197 198 177 354 V/C Ratio(X) 1.08 0.85 0.10 0.65 1.11 0.09 0.67 0.00 0.98 0.57 0.34 0.90 Avail Cap(c_a),veh/h 298 1002 1012 280 847 829 298 0 197 253 177 354 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.13 0.13 0.13 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay(d),s/veh 36.3 21.2 7.7 21.6 29.7 12.6 41.1 0.0 48.5 41.2 46.6 41.5 Incr Delay(d2),s/veh 74.8 8.9 0.2 0.6 52.2 0.0 5.7 0.0 59.0 2.6 1.1 24.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 14.0 18.8 1.0 2.0 32.6 0.9 5.4 0.0 8.6 2.9 1.6 10.7 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 111.0 30.2 7.9 22.2 81.9 12.6 46.8 0.0 107.5 43.8 47.7 65.8 LnGrp LOS F C A C F B D A F D D E Approach Vol,veh/h 1275 1173 394 490 Approach Delay,s/veh 48.7 69.5 76.7 58.5 Approach LOS D E E E Timer-Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration(G+Y+Rc),s 23.0 56.5 14.6 19.4 13.7 65.8 17.0 17.0 Change Period(Y+Rc),s *8.7 *5.8 6.6 6.6 *6.8 5.8 6.6 6.6 Max Green Setting(Gmax),s *14 *47 11.4 9.4 *9.2 54.2 10.4 10.4 Max Q Clear Time(g_c+I1),s 16.3 52.6 8.2 14.5 6.8 45.0 12.4 12.4 Green Ext Time(p-c),s 0.0 0.0 0.1 0.0 0.1 5.2 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 60.8 HCM 6th LOS E Notes User approved pedestrian interval to be less than phase max green. *HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Queues Future with Development PM 2041 Supplemental Analysis 2: Hudson Hollow Road/White Oak Road & Fairfax Pike Timing Plan:4:15 PM to 5:15 PM t Lane Group EBL EBT EBR WBL WBT WBR NBT SBT Lane Group Flow(vph) 165 679 48 30 966 48 83 248 v/c Ratio 0.75 0.62 0.05 0.06 0.98 0.05 0.66 0.63 Control Delay 33.9 13.8 1.1 4.0 44.6 1.2 50.6 17.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 33.9 13.8 1.1 4.0 44.6 1.2 50.6 17.4 Queue Length 50th(ft) 19 128 0 3 377 0 31 30 Queue Length 95th(ft) #129 390 8 12 #744 8 #80 97 Internal Link Dist(ft) 4165 4595 176 167 Turn Bay Length (ft) 145 90 125 155 Base Capacity(vph) 221 1092 1014 473 981 895 262 655 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.75 0.62 0.05 0.06 0.98 0.05 0.32 0.38 Intersection Summary # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection Sur€ rp with Development PM 2041 Supplemental Analysis 2: Hudson Hollow Road/White Oak Road & Fairfax Pike Timing Plan:4:15 PM to 5:15 PM --p- 4--- t I Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t r t r Traffic Volume(veh/h) 162 665 47 29 947 47 46 23 13 28 32 182 Future Volume(veh/h) 162 665 47 29 947 47 46 23 13 28 32 182 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1870 1781 1870 1841 1826 1870 1870 1752 1870 1870 1841 1870 Adj Flow Rate, veh/h 165 679 29 30 966 27 47 23 4 29 33 35 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 2 8 2 4 5 2 2 10 2 2 4 2 Cap,veh/h 266 1069 951 416 1027 892 184 76 10 106 87 71 Arrive On Green 0.07 0.60 0.60 0.03 0.56 0.56 0.12 0.12 0.12 0.12 0.12 0.12 Sat Flow,veh/h 1781 1781 1585 1753 1826 1585 822 622 83 324 715 586 Grp Volume(v),veh/h 165 679 29 30 966 27 74 0 0 97 0 0 Grp Sat Flow(s),veh/h/In 1781 1781 1585 1753 1826 1585 1527 0 0 1625 0 0 Q Serve(g_s),s 2.6 17.2 0.5 0.4 34.2 0.5 0.0 0.0 0.0 1.0 0.0 0.0 Cycle Q Clear(g_c),s 2.6 17.2 0.5 0.4 34.2 0.5 2.8 0.0 0.0 3.7 0.0 0.0 Prop In Lane 1.00 1.00 1.00 1.00 0.64 0.05 0.30 0.36 Lane Grp Cap(c),veh/h 266 1069 951 416 1027 892 270 0 0 265 0 0 V/C Ratio(X) 0.62 0.64 0.03 0.07 0.94 0.03 0.27 0.00 0.00 0.37 0.00 0.00 Avail Cap(c_a),veh/h 272 1069 951 487 1048 910 599 0 0 638 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay(d),s/veh 15.6 9.0 5.7 7.0 14.1 6.8 28.1 0.0 0.0 28.5 0.0 0.0 Incr Delay(d2),s/veh 4.1 1.8 0.0 0.1 15.9 0.0 0.5 0.0 0.0 0.8 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 1.5 5.1 0.1 0.1 14.6 0.1 1.1 0.0 0.0 1.5 0.0 0.0 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 19.8 10.8 5.7 7.1 30.0 6.8 28.6 0.0 0.0 29.3 0.0 0.0 LnGrp LOS B B A A C A C A A C A A Approach Vol,veh/h 873 1023 74 97 Approach Delay,s/veh 12.3 28.7 28.6 29.3 Approach LOS B C C C Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc),s 6.7 49.6 13.4 9.3 47.0 13.4 Change Period (Y+Rc),s 4.5 7.8 4.9 4.5 7.8 4.9 Max Green Setting(Gmax),s 5.0 40.0 25.0 5.0 40.0 25.0 Max Q Clear Time(g_c+I1),s 2.4 19.2 4.8 4.6 36.2 5.7 Green Ext Time(p-c),s 0.0 8.2 0.3 0.0 3.0 0.4 Intersection Summary HCM 6th Ctrl Delay 21.8 HCM 6th LOS C HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:415 PM to 5:15 PM Queues Future with Development PM 2041 Supplemental Analysis 3: Route 522 & Fairfax Pike/Lord Fairfax Highway * Timing Plan:4:15 PM to 5:15 PM --I. *-- I l". t Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT SBR Lane Group Flow(vph) 314 230 424 252 520 412 696 188 102 672 283 v/c Ratio 1.18 0.82 0.86 0.65 1.25 1.28 0.97 0.37 0.71 0.94 0.51 Control Delay 156.0 68.4 32.1 46.8 167.0 189.8 71.8 3.7 83.1 55.4 9.8 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 156.0 68.4 32.1 46.8 167.0 189.8 71.8 3.7 83.1 55.4 9.8 Queue Length 50th(ft) -267 159 85 161 -455 -190 260 0 78 215 12 Queue Length 95th(ft) #442 #287 #264 251 #668 #290 #386 24 #156 #351 110 Internal Link Dist(ft) 382 694 8434 2104 Turn Bay Length (ft) 250 230 500 565 250 125 480 Base Capacity(vph) 265 281 491 390 416 321 714 514 150 715 556 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 1.18 0.82 0.86 0.65 1.25 1.28 0.97 0.37 0.68 0.94 0.51 Intersection Summary Volume exceeds capacity,queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection SurffmWrp with Development PM 2041 Supplemental Analysis 3: Route 522 & Fairfax Pike/Lord Fairfax Highway Timing Plan:4:15 PM to 5:15 PM --I. *-- *4\ I t Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t r tt r tt r Traffic Volume(veh/h) 289 212 390 232 376 102 379 640 173 94 618 260 Future Volume(veh/h) 289 212 390 232 376 102 379 640 173 94 618 260 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1796 1811 1796 1781 1826 1796 1811 1781 1796 1826 1811 1870 Adj Flow Rate, veh/h 314 230 147 252 409 101 412 696 27 102 672 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 7 6 7 8 5 7 6 8 7 5 6 2 Cap,veh/h 269 285 239 396 330 82 325 763 343 125 723 Arrive On Green 0.16 0.16 0.16 0.23 0.23 0.23 0.10 0.23 0.23 0.14 0.42 0.00 Sat Flow,veh/h 1711 1811 1522 1697 1414 349 3346 3385 1522 1739 3441 1585 Grp Volume(v),veh/h 314 230 147 252 0 510 412 696 27 102 672 0 Grp Sat Flow(s),veh/h/In 1711 1811 1522 1697 0 1763 1673 1692 1522 1739 1721 1585 Q Serve(g_s),s 17.3 13.5 9.9 14.7 0.0 25.7 10.7 22.1 1.5 6.3 20.4 0.0 Cycle Q Clear(g_c),s 17.3 13.5 9.9 14.7 0.0 25.7 10.7 22.1 1.5 6.3 20.4 0.0 Prop In Lane 1.00 1.00 1.00 0.20 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 269 285 239 396 0 412 325 763 343 125 723 V/C Ratio(X) 1.17 0.81 0.61 0.64 0.00 1.24 1.27 0.91 0.08 0.82 0.93 Avail Cap(c_a),veh/h 269 285 239 396 0 412 325 763 343 152 723 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 0.84 0.84 0.84 0.90 0.90 0.00 Uniform Delay(d),s/veh 46.3 44.7 43.2 37.9 0.0 42.2 49.7 41.6 33.6 46.4 31.1 0.0 Incr Delay(d2),s/veh 107.8 15.7 4.6 3.3 0.0 126.4 138.7 15.0 0.4 22.0 18.7 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 15.2 7.1 4.0 6.3 0.0 25.3 10.5 10.2 0.6 3.2 7.7 0.0 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 154.1 60.4 47.8 41.3 0.0 168.6 188.3 56.5 34.0 68.3 49.8 0.0 LnGrp LOS F E D D A F F E C E D Approach Vol,veh/h 691 762 1135 774 Approach Delay,s/veh 100.3 126.5 103.8 52.3 Approach LOS F F F D Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration(G+Y+Rc),s 19.0 29.8 34.0 17.3 31.5 27.2 Change Period(Y+Rc),s 8.3 6.7 *8.3 *9.4 6.7 9.9 Max Green Setting(Gmax),s 10.7 23.1 *26 *9.6 23.1 17.3 Max Q Clear Time(g_c+I1),s 12.7 22.4 27.7 8.3 24.1 19.3 Green Ext Time(p-c),s 0.0 0.3 0.0 0.0 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 96.4 HCM 6th LOS F Notes *HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Unsignalized Delay for[SBR]is excluded from calculations of the approach delay and intersection delay. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Queues Future with Development PM 2041 Supplemental Analysis 4: Route 522 & Lake Frederick Drive * I Timing Plan:4:15 PM to 5:15 PM I t Lane Group EBL EBR NBL NBT SBT SBR Lane Group Flow(vph) 184 99 124 1058 1068 209 v/c Ratio 0.63 0.19 0.41 0.50 0.78 0.27 Control Delay 47.2 17.7 20.2 10.9 30.0 4.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 47.2 17.7 20.2 10.9 30.0 4.0 Queue Length 50th(ft) 105 33 27 162 282 0 Queue Length 95th(ft) 181 68 58 253 432 46 Internal Link Dist(ft) 414 1077 8434 Turn Bay Length (ft) 470 295 Base Capacity(vph) 476 517 495 2098 1426 801 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.39 0.19 0.25 0.50 0.75 0.26 Intersection Summary Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection Surffrje with Development PM 2041 Supplemental Analysis 4: Route 522 & Lake Frederick Drive * I Timing Plan:4:15 PM to 5:15 PM -AI L t Movement EBL EBR NBL NBT SBU SBT SBR Lane Configurations r tt A tt r Traffic Volume(veh/h) 169 91 114 973 0 983 192 Future Volume(veh/h) 169 91 114 973 0 983 192 Initial Q(Qb),veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow,veh/h/In 1870 1722 1826 1781 1767 1870 Adj Flow Rate, veh/h 184 86 124 1058 1068 75 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 12 5 8 9 2 Cap,veh/h 243 285 271 1481 1434 677 Arrive On Green 0.14 0.14 0.06 0.44 0.43 0.43 Sat Flow,veh/h 1781 1459 1739 3474 3445 1585 Grp Volume(v),veh/h 184 86 124 1058 1068 75 Grp Sat Flow(s),veh/h/In 1781 1459 1739 1692 1678 1585 Q Serve(g_s),s 7.8 0.0 0.0 20.1 21.0 2.2 Cycle Q Clear(g_c),s 7.8 0.0 0.0 20.1 21.0 2.2 Prop In Lane 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 243 285 271 1481 1434 677 V/C Ratio(X) 0.76 0.30 0.46 0.71 0.75 0.11 Avail Cap(c_a),veh/h 566 550 610 1935 1706 806 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay(d),s/veh 32.7 27.1 30.9 18.1 18.9 13.6 Incr Delay(d2),s/veh 5.8 0.7 1.4 1.5 2.2 0.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 3.7 1.9 2.2 6.7 7.1 0.7 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 38.5 27.8 32.4 19.7 21.1 13.7 LnGrp LOS D C C B C B Approach Vol,veh/h 270 1182 1143 Approach Delay,s/veh 35.1 21.0 20.6 Approach LOS D C C Timer-Assigned Phs 2 4 5 6 Phs Duration(G+Y+Rc),s 44.9 19.4 15.2 44.1 Change Period(Y+Rc),s 10.5 8.7 10.5 10.5 Max Green Setting(Gmax),s 45.0 25.0 20.0 40.0 Max Q Clear Time(g_c+11),s 22.1 9.8 2.0 23.0 Green Ext Time(p-c),s 12.3 0.9 0.3 10.6 Intersection Summary HCM 6th Ctrl Delay 22.3 HCM 6th LOS C Notes User approved ignoring U-Turning movement. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Queues Future with Development PM 2041 Supplemental Analysis 5: Route 522 & Tasker Road * I Timing Plan:4:15 PM to 5:15 PM -AI t Lane Group EBL EBR NBL NBT SBT SBR Lane Group Flow(vph) 177 263 320 798 825 120 v/c Ratio 0.68 0.42 0.67 0.35 0.53 0.11 Control Delay 57.4 6.8 56.4 4.3 23.9 1.8 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 57.4 6.8 56.4 4.3 23.9 1.8 Queue Length 50th(ft) 120 0 121 60 212 1 Queue Length 95th(ft) 184 37 140 78 320 22 Internal Link Dist(ft) 446 1419 813 Turn Bay Length (ft) 250 485 315 Base Capacity(vph) 350 763 627 2284 1565 1174 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.51 0.34 0.51 0.35 0.53 0.10 Intersection Summary Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM Signalized Intersection Capacifukivadywill�h Development PM 2041 Supplemental Analysis 5: Route 522 & Tasker Road * I Timing Plan:4:15 PM to 5:15 PM -AI � t Movement EBL EBR NBL NBT SBU SBT SBR Lane Configurations r*r* tt A tt r Traffic Volume(vph) 170 252 307 766 0 792 115 Future Volume(vph) 170 252 307 766 0 792 115 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 Total Lost time(s) 10.2 10.2 10.3 6.4 6.6 10.2 Lane Util.Factor 1.00 0.88 0.97 0.95 0.95 1.00 Frt 1.00 0.85 1.00 1.00 1.00 0.85 Flt Protected 0.95 1.00 0.95 1.00 1.00 1.00 Satd. Flow(prot) 1770 2787 3335 3252 3374 1583 Flt Permitted 0.95 1.00 0.95 1.00 1.00 1.00 Satd. Flow(perm) 1770 2787 3335 3252 3374 1583 Peak-hour factor, PHF 0.96 0.96 0.96 0.96 0.92 0.96 0.96 Adj. Flow(vph) 177 262 320 798 0 825 120 RTOR Reduction(vph) 0 225 0 0 0 0 45 Lane Group Flow(vph) 177 38 320 798 0 825 75 Heavy Vehicles(%) 2% 2% 5% 11% 2% 7% 2% Turn Type Prot Prot Prot NA Prot NA pm+ov Protected Phases 7 4 1 6 5 2 7 Permitted Phases 4 2 Actuated Green, G (s) 16.1 16.1 15.7 77.3 51.1 67.2 Effective Green,g(s) 16.1 16.1 15.7 77.3 51.1 67.2 Actuated g/C Ratio 0.15 0.15 0.14 0.70 0.46 0.61 Clearance Time(s) 10.2 10.2 10.3 6.4 6.6 10.2 Vehicle Extension(s) 3.0 3.0 3.0 3.5 3.5 3.0 Lane Grp Cap(vph) 259 407 475 2285 1567 967 v/s Ratio Prot c0.10 0.01 c0.10 0.25 c0.24 0.01 v/s Ratio Perm 0.04 v/c Ratio 0.68 0.09 0.67 0.35 0.53 0.08 Uniform Delay,d1 44.5 40.6 44.7 6.4 20.9 8.7 Progression Factor 1.00 1.00 1.11 0.55 1.00 1.00 Incremental Delay,d2 7.3 0.1 3.7 0.4 1.3 0.0 Delay(s) 51.8 40.7 53.4 3.9 22.1 8.8 Level of Service D D D A C A Approach Delay(s) 45.2 18.1 20.4 Approach LOS D B C Intersection Summary HCM 2000 Control Delay 23.7 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.58 Actuated Cycle Length(s) 110.0 Sum of lost time(s) 27.1 Intersection Capacity Utilization 62.7% ICU Level of Service B Analysis Period(min) 15 c Critical Lane Group HCM Signalized Intersection Capacity Analysis Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection Surffrje with Development PM 2041 Supplemental Analysis 5: Route 522 & Tasker Road Timing Plan:4:15 PM to 5:15 PM HCM 6th Edition methodology supports red clearance in the range of 0 to 6 seconds. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Queues Future with Development PM 2041 Supplemental Analysis 6: Lake Frederick Entrance/Gibson Site Entrance 1 & Fairfax Pike Timing Plan:4:15 PM to 5:15 PM t ' ► Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT Lane Group Flow(vph) 36 917 116 92 1140 40 83 65 104 92 v/c Ratio 0.16 0.70 0.10 0.25 0.85 0.03 0.62 0.16 0.76 0.27 Control Delay 3.1 8.6 1.3 3.6 17.4 0.4 61.1 0.8 74.9 1.9 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 3.1 8.6 1.3 3.6 17.4 0.4 61.1 0.8 74.9 1.9 Queue Length 50th(ft) 2 139 0 7 419 0 45 0 58 0 Queue Length 95th(ft) m7 280 m6 14 #807 3 #121 0 #154 0 Internal Link Dist(ft) 1336 1871 292 413 Turn Bay Length (ft) 150 150 150 150 50 Base Capacity(vph) 231 1329 1163 368 1349 1167 133 404 136 347 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.16 0.69 0.10 0.25 0.85 0.03 0.62 0.16 0.76 0.27 Intersection Summary # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection Surffmtarp with Development PM 2041 Supplemental Analysis 6: Lake Frederick Entrance/Gibson Site Entrance 1 & Fairfax Pike Timing Plan:4:15 PM to 5:15 PM Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t r t r 1 1� Traffic Volume(veh/h) 33 844 107 85 1049 37 76 0 60 96 0 85 Future Volume(veh/h) 33 844 107 85 1049 37 76 0 60 96 0 85 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 36 917 77 92 1140 27 83 0 2 104 0 3 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap,veh/h 288 1323 1121 605 1356 1150 202 0 137 203 0 137 Arrive On Green 0.07 1.00 1.00 0.05 0.73 0.73 0.09 0.00 0.09 0.09 0.00 0.09 Sat Flow,veh/h 1781 1870 1585 1781 1870 1585 1414 0 1585 1415 0 1585 Grp Volume(v),veh/h 36 917 77 92 1140 27 83 0 2 104 0 3 Grp Sat Flow(s),veh/h/In 1781 1870 1585 1781 1870 1585 1414 0 1585 1415 0 1585 Q Serve(g_s),s 0.4 0.0 0.0 1.1 37.3 0.4 5.0 0.0 0.1 6.3 0.0 0.2 Cycle Q Clear(g_c),s 0.4 0.0 0.0 1.1 37.3 0.4 5.1 0.0 0.1 6.4 0.0 0.2 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 288 1323 1121 605 1356 1150 202 0 137 203 0 137 V/C Ratio(X) 0.12 0.69 0.07 0.15 0.84 0.02 0.41 0.00 0.01 0.51 0.00 0.02 Avail Cap(c_a),veh/h 342 1323 1121 626 1356 1150 202 0 137 203 0 137 HCM Platoon Ratio 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.68 0.68 0.68 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay(d),s/veh 10.8 0.0 0.0 2.7 8.4 3.3 38.7 0.0 36.4 39.3 0.0 36.4 Incr Delay(d2),s/veh 0.1 2.1 0.1 0.1 4.9 0.0 1.3 0.0 0.0 2.2 0.0 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.3 0.8 0.0 0.2 10.9 0.1 1.8 0.0 0.0 2.3 0.0 0.1 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 10.9 2.1 0.1 2.8 13.3 3.3 40.1 0.0 36.4 41.5 0.0 36.5 LnGrp LOS B A A A B A D A D D A D Approach Vol,veh/h 1030 1259 85 107 Approach Delay,s/veh 2.2 12.3 40.0 41.3 Approach LOS A B D D Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration(G+Y+Rc),s 9.0 66.0 12.0 7.4 67.6 12.0 Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting(Gmax),s 5.5 60.5 7.5 5.5 60.5 7.5 Max Q Clear Time(g_c+11),s 3.1 2.0 7.1 2.4 39.3 8.4 Green Ext Time(p-c),s 0.0 8.5 0.0 0.0 9.7 0.0 Intersection Summary HCM 6th Ctrl Delay 10.3 HCM 6th LOS B HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th TWSC Future with Development PM 2041 Supplemental Analysis 7: Fairfax Pike & Gibson Site Entrance 2 Timing Plan:4:15 PM to 5:15 PM Intersection Int Delay,s/veh 0.5 Movement EBL EBT WBT WBR SBL SBR Lane Configurations t 1� r* Traffic Vol,veh/h 0 1000 1126 1 0 45 Future Vol,veh/h 0 1000 1126 1 0 45 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized None None None Storage Length - Veh in Median Storage,# 0 0 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 1087 1224 1 0 49 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 0 0 1225 Stage 1 - - - Stage 2 - Critical Hdwy 6.22 Critical Hdwy Stg 1 - Critical Hdwy Stg 2 - Follow-up Hdwy 3.318 Pot Cap-1 Maneuver 0 0 218 Stage 1 0 0 - Stage 2 0 0 - Platoon blocked, % Mov Cap-1 Maneuver - - 218 Mov Cap-2 Maneuver Stage 1 Stage 2 Approach EB WB SIB HCM Control Delay,s 0 0 26.2 HCM LOS D Minor Lane/Major Mvmt EBT WBT WBR SBLn1 Capacity(veh/h) 218 HCM Lane V/C Ratio 0.224 HCM Control Delay(s) 26.2 HCM Lane LOS D HCM 95th %tile Q(veh) 0.8 HCM 6th TWSC Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th TWSC Future with Development PM 2041 Supplemental Analysis 8: Fairfax Pike & Gibson Site Entrance 3 Timing Plan:4:15 PM to 5:15 PM Intersection Int Delay,s/veh 1.4 Movement EBL EBT WBT WBR SBL SBR Lane Configurations t 1 r* Traffic Vol,veh/h 20 980 1122 6 17 5 Future Vol,veh/h 20 980 1122 6 17 5 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None None - None Storage Length 150 - 0 50 Veh in Median Storage,# - 0 0 0 - Grade, % - 0 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 22 1065 1220 7 18 5 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 1227 0 0 2333 1224 Stage 1 - - - 1224 - Stage 2 - 1109 - Critical Hdwy 4.12 6.42 6.22 Critical Hdwy Stg 1 - 5.42 - Critical Hdwy Stg 2 - 5.42 - Follow-up Hdwy 2.218 3.518 3.318 Pot Cap-1 Maneuver 568 41 218 Stage 1 - 278 - Stage 2 - 316 - Platoon blocked, % Mov Cap-1 Maneuver 568 39 218 Mov Cap-2 Maneuver - 39 - Stage 1 267 Stage 2 316 Approach EB WB SIB HCM Control Delay,s 0.2 0 130.5 HCM LOS F Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 SBLn2 Capacity(veh/h) 568 39 218 HCM Lane V/C Ratio 0.038 0.474 0.025 HCM Control Delay(s) 11.6 162.5 21.9 HCM Lane LOS B F C HCM 95th %tile Q(veh) 0.1 1.6 0.1 HCM 6th TWSC Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Queues Future with Development PM 2041 Supplemental Analysis 9: Route 522 & Gibson Site Entrance 4 II Timing Plan:4:15 PM to 5:15 PM t t Lane Group EBL EBR NBL NBT SBT SBR Lane Group Flow(vph) 103 42 16 1093 1061 41 v/c Ratio 0.42 0.16 0.04 0.43 0.45 0.04 Control Delay 26.7 9.7 1.5 0.9 8.2 4.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 26.7 9.7 1.5 0.9 8.2 4.6 Queue Length 50th(ft) 31 0 1 21 76 0 Queue Length 95th(ft) 70 22 m1 m22 244 21 Internal Link Dist(ft) 785 2104 3524 Turn Bay Length (ft) 300 150 Base Capacity(vph) 263 271 389 2580 2365 1071 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.39 0.15 0.04 0.42 0.45 0.04 Intersection Summary m Volume for 95th percentile queue is metered by upstream signal. Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection Surffmtarp with Development PM 2041 Supplemental Analysis 9: Route 522 & Gibson Site Entrance 4 * I Timing Plan:4:15 PM to 5:15 PM -AI Movement EBL EBR NBL NBT SBT SBR Lane Configurations r tt tt r Traffic Volume(veh/h) 95 39 15 1006 976 38 Future Volume(veh/h) 95 39 15 1006 976 38 Initial Q(Qb),veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow,veh/h/In 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 103 2 16 1093 1061 19 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 Cap,veh/h 134 119 357 2563 1957 873 Arrive On Green 0.08 0.08 0.04 1.00 0.55 0.55 Sat Flow,veh/h 1781 1585 1781 3647 3647 1585 Grp Volume(v),veh/h 103 2 16 1093 1061 19 Grp Sat Flow(s),veh/h/In 1781 1585 1781 1777 1777 1585 Q Serve(g_s),s 3.1 0.1 0.2 0.0 10.5 0.3 Cycle Q Clear(g_c),s 3.1 0.1 0.2 0.0 10.5 0.3 Prop In Lane 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 134 119 357 2563 1957 873 V/C Ratio(X) 0.77 0.02 0.04 0.43 0.54 0.02 Avail Cap(c_a),veh/h 243 216 484 2563 1957 873 HCM Platoon Ratio 1.00 1.00 2.00 2.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.09 0.09 1.00 1.00 Uniform Delay(d),s/veh 25.0 23.6 6.0 0.0 7.9 5.6 Incr Delay(d2),s/veh 9.0 0.1 0.0 0.0 1.1 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 1.6 0.1 0.0 0.0 2.5 0.4 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 33.9 23.6 6.0 0.0 9.0 5.7 LnGrp LOS C C A A A A Approach Vol,veh/h 105 1109 1080 Approach Delay,s/veh 33.7 0.1 8.9 Approach LOS C A A Timer-Assigned Phs 2 4 5 6 Phs Duration(G+Y+Rc),s 46.4 8.6 9.4 37.0 Change Period(Y+Rc),s 6.7 4.5 8.3 6.7 Max Green Setting(Gmax),s 36.3 7.5 5.0 23.0 Max Q Clear Time(g_c+11),s 2.0 5.1 2.2 12.5 Green Ext Time(p-c),s 8.0 0.0 0.0 4.7 Intersection Summary HCM 6th Ctrl Delay 5.8 HCM 6th LOS A HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Traffic Impact Study Gibson Property Frederick County, Virginia May 8, 2026 Revised July 30, 2026 Prepared for: Peterson Companies 4100 Monument Corner Drive, Suite 300 Fairfax, VA 22030 OB.STFEL GC ROVE SLAC E Transportation Planners and Engineers Prepared by: GOROVE SLADE Transportation Planners and Engineers 4114 Legato Road, Suite 650, Fairfax, VA 22033 1140 Connecticut Ave NW, Suite 1010, Washington, DC 20036 4951 Lake Brook Drive, Suite 250, Glen Allen, VA 23060 300 E Main Street, Suite 360, Norfolk, VA 23510 4550 Montgomery Avenue, Suite 400, Bethesda, MD 20814 www.goroveslade.com This document, together with the concepts and designs presented herein, as an instrument of services, is intended for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization by Gorove/Slade Associates, Inc., shall be without liability to Gorove/Slade Associates, Inc. Traffic Impact Study—Gibson Property Page 3 July 30,2026 TABLE OF CONTENTS ExecutiveSummary.....................................................................................................................................................................7 Purpose of Report and Study Objectives.................................................................................................................................7 SiteLocation and Study Area...................................................................................................................................................7 Description of Proposed Development.....................................................................................................................................7 Principal Findings, Conclusions, and Proposed Mitigations.....................................................................................................7 Introduction ................................................................................................................................................................................13 Background Information: Proposed Development(Site& Nearby) ............................................................................................13 Descriptionof the Existing Site...............................................................................................................................................13 SiteLocation ......................................................................................................................................................................13 Location within Jurisdiction and Region .............................................................................................................................15 Existing Zoning and Long-Range Land-Use.......................................................................................................................16 ExistingRoadway Network.....................................................................................................................................................18 Planned Future Transportation Improvements.......................................................................................................................19 Roadway, Bicycle, and Pedestrian Improvements.............................................................................................................19 HistoricalCrash Data.............................................................................................................................................................19 Analysisof 2026 Existing Conditions..........................................................................................................................................21 ExistingTransit Services........................................................................................................................................................21 ExistingTraffic Volumes.........................................................................................................................................................21 Existing Intersection Capacity and Queueing Analysis...........................................................................................................24 Analysis of 2035 Future Conditions without Development.........................................................................................................28 InherentGrowth .....................................................................................................................................................................28 Approved Background Development(s)..................................................................................................................................28 Planned Transportation Improvements ..................................................................................................................................28 Future without Development Traffic Volumes(2035).............................................................................................................29 Future without Development Intersection Capacity and Queueing Analysis..........................................................................33 Analysis of 2035 Future Conditions with Development..............................................................................................................38 SiteDescription......................................................................................................................................................................38 ProposedSite Access............................................................................................................................................................38 ProjectedSite Trip Generation...............................................................................................................................................39 Distribution and Assignment of Vehicular Site Traffic.............................................................................................................39 Future with Development(2035)Traffic Volumes..................................................................................................................42 Future with Development Intersection Capacity and Queueing Analysis...............................................................................44 SpacingAnalysis........................................................................................................................................................ ...............52 TurnLane Warrant Analysis.......................................................................................................................................................53 Preliminary Signal Warrant Analysis.......................................................................................... ...............................................55 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 4 July 30,2026 Analysis of 2041 Future Conditions with Development(Planning Year).....................................................................................58 SiteDescription and Site Access ...........................................................................................................................................58 ProjectedSite Trip Generation...............................................................................................................................................58 Distribution and Assignment of Vehicular Site Traffic.............................................................................................................58 Inherent Growth &Planned Background Development..........................................................................................................58 Future with Development(2041)Traffic Volumes..................................................................................................................60 Future with Development Intersection Capacity and Queueing Analysis(2041)....................................................................62 Conclusion .................................................................................................................................................................................67 LIST OF FIGURES Figure1: Study Intersections Map..............................................................................................................................................15 Figure2: Regional Location.......................................................................................................................................................16 Figure 3: Frederick County Zoning Map.....................................................................................................................................17 Figure 4: Eastern Frederick County Long Range Use Plan Map................................................................................................18 Figure 5: 2026 Existing Conditions—Roadway Network Geometric Configuration and Traffic Control Devices........................22 Figure 6: 2026 Existing Conditions—Vehicular Traffic Volumes................................................................................................23 Figure 7: 2026 Existing Conditions—Level of Service Results ..................................................................................................27 Figure 8: Projected Inherent Regional Growth Traffic Volumes(2026 to 2035).........................................................................30 Figure 9: Total Background Development Volumes...................................................................................................................31 Figure 10:2035 Future Conditions without Development—Vehicular Traffic Volumes..............................................................32 Figure 11:2035 Future Conditions without Development—Level of Service Results................................................................37 Figure12: Rezoning Plan...........................................................................................................................................................38 Figure 13: Global Vehicular Direction of Approach (Site Trip Distribution).................................................................................40 Figure14: Site Trips Assignment...............................................................................................................................................41 Figure 15:2035 Future Conditions with Development—Vehicular Traffic Volumes...................................................................43 Figure 16:2035 Future Conditions with Development-Level of Service Results......................................................................51 Figure17: Spacing Analysis.......................................................................................................................................................53 Figure 18: Projected Inherent Regional Growth Traffic Volumes(2026—2041)........................................................................59 Figure 19:2041 Future Conditions with Development(Design Year)—Vehicular Traffic Volumes............................................61 Figure 20:2041 Future Conditions with Development(Planning Year) - Level of Service Results............................................66 LIST OF TABLES Table 1: Summary of Existing Road Network.............................................................................................................................18 Table 2: Crash Data Summary(January 2021 -December 2025)..............................................................................................19 Table 3: 2026 Existing Conditions—Intersection Capacity and Queuing Analysis Results(Part 1)...........................................25 Table 4: 2026 Existing Conditions—Intersection Capacity and Queuing Analysis Results(Part 2)...........................................26 Table 5: 2035 Future Conditions without Development—Intersection Capacity and Queuing Analysis Results(Part 1)...........34 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 5 July 30,2026 Table 6: 2035 Future Conditions without Development— Intersection Capacity and Queuing Analysis Results(Part 2)...........35 Table 7: Projected Site Trip Generation—Proposed Use(Peak Hour of the Adjacent Street; ITE 12th Ed.)..............................39 Table 8: 2035 Future Conditions with Development—Intersection Capacity and Queuing Analysis Results(Part 1)................45 Table 9: 2035 Future Conditions with Development—Intersection Capacity and Queuing Analysis Results(Part 2)................46 Table 10: 2035 Future Conditions with Development—Intersection Capacity and Queuing Analysis Results(Part 3).............47 Table 11: 2035 Future Conditions with Development—Intersection Capacity and Queuing Analysis Results(Part 4)..............48 Table 12: Minimum Spacing Standards for Commercial Accesses, Intersections, and Median Crossovers (RDM, Appendix F, Table2-2)...................................................................................................................................................................................52 Table13: Spacing Analysis Summary........................................................................................................................................52 Table 14: Right-Turn Lane Analysis for Two-Lane Roadway.....................................................................................................54 Table 15: Right-Turn Lane Analysis for Four-Lane Roadway.....................................................................................................54 Table 16: Left-Turn Lane Analysis for Two-Lane Roadway........................................................................................................54 Table 17: Left-Turn Lane Analysis for Four-Lane Roadway.......................................................................................................54 Table 18: Traffic Signal Warrant Using Average Daily Traffic Estimate(Source:Virginia MUTCD, Table 4C-V1).....................56 Table 19:ADT Signal Warrant Analysis.....................................................................................................................................57 Table 20: 2041 Future Conditions with Development—Intersection Capacity and Queuing Analysis Results(Part 1)..............63 Table 21: 2041 Future Conditions with Development—Intersection Capacity and Queuing Analysis Results(Part 2)..............64 Table 22: 2041 Future Conditions with Development—Intersection Capacity and Queuing Analysis Results(Part 3)..............65 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study-Gibson Property Page 6 July 30,2026 APPENDICES Appendix A-Scoping Guidance Appendix B-Turning Movement Counts Data Appendix C-Crash Data Appendix D-Level of Service Definitions Appendix E-2026 Existing Conditions-Capacity Analysis Worksheets Appendix F-Background Information Appendix G-2035 Future Conditions without Development-Capacity Analysis Worksheets Appendix H-2035 Future Conditions with Development-Capacity Analysis Worksheets Appendix I-2041 Future Conditions with Development-Capacity Analysis Worksheets Appendix J-VJuST Appendix K-Turn Lane Warrant Tables and Graphics 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 7 July 30,2026 Executive Summary Purpose of Report and Study Objectives This report presents the findings of a Traffic Impact Study(TIS) conducted for the proposed Gibson Property development(the Site/the Development/the Property). The proposed development site is situated northwest of the intersection of Route 522 and Fairfax Pike (Route 277)/Lord Fairfax Highway (Route 340), positioned north of Fairfax Pike and both east and west of Route 522 in Frederick County, Virginia. The site is identified by Tax Map #s 87-3-A, 87-3-13, and 87-A-16B and totals approximately 294.14 acres. The applicant proposes a rezoning on the entire site to M1 (Light Industrial District) and a Comprehensive Plan amendment on the parcel east of Route 522 (Tax map#87-3-A) in order to develop up to 3,200,000 SF of industrial uses.This study evaluates all parcels under the proposed rezoning and comprehensive plan amendment. This TIS was developed in accordance with the Virginia Department of Transportation (VDOT) and Frederick County transportation impact guidelines.The document was prepared in accordance with best professional practice and standards that assess the impact of a proposed development on the transportation system and recommends improvements to lessen or negate those impacts. Traffic operational analyses, as presented in this TIS, involves the evaluation of anticipated future roadway conditions with and without the proposed development and recommend transportation improvements to offset both the impacts of the increase in future traffic volumes and the changes in traffic operations due to the development.The analysis herein assists public officials and developers to balance interrelations between efficient traffic movements with necessary lane access. Site Location and Study Area The proposed development site is located northwest of the intersection of Route 522 and Fairfax Pike(Route 277)/Lord Fairfax Highway (Route 340), positioned north of Fairfax Pike and both east and west of Route 522. The site is identified by Tax Map #s 87-3-A, 87-3-13, and 87-A-16B in Frederick County,Virginia and totals approximately 294.14 acres.The vehicular study area includes five(5)existing intersections along Fairfax Pike and along Route 522. Description of Proposed Development The site is currently zoned RA(Rural Agricultural)with a Long Range Land Use of Industrial, Mixed Use Industrial/Office for the parcels west of Route 522 and Rural Area east of Route 522. The applicant proposes a rezoning on the entire site to M1 (Light Industrial District) and a Comprehensive Plan amendment on the parcel east of Route 522 (Tax map # 87-3-A) in order to develop up to 3,200,000 SF of industrial uses. Parcels 87-3-A and 87-A-16B are each currently occupied by one single-family detached house. This study evaluates all parcels under the proposed rezoning and comprehensive plan amendment. The site is anticipated to include up to 3,200,000 SF of Industrial uses with a build-out year of 2035. For the purposes of the traffic study, the Industrial Park use(ITE Land Use 130)was analyzed as that is representative of a mix of industrial uses. Access to the site will be provided via proposed entrances along Route 522 and Fairfax Pike. Principal Findings, Conclusions, and Proposed Mitigations Discussions regarding the study assumptions and relevant background information occurred with the Frederick County and VDOT staff during scoping discussions held on Tuesday, April 14, 2026. A copy of the signed scoping document guiding discussions is included in Appendix A. The analysis presented in this report supports the following assumptions and findings: • The following intersections were included for evaluation per the scoping document: 1. Fairfax Pike at Warrior Drive 2. Fairfax Pike at White Oak Road/Hudson Hollow Road 3. Fairfax Pike/Lord Fairfax Highway at Route 522 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 8 July 30,2026 4. Route 522 at Lake Frederick Drive 5. Route 522 at Tasker Road 6. Site entrances on Fairfax Pike and on Route 522 *See Supplemental Analysis summary below pertaining to the evaluation of the 1-81/Fairfax Pike ramps. • Existing Conditions (2026): o All approaches operate at LOS D by approach except for the following: ■ Fairfax Pike and Warrior Drive(Intersection#1): • The overall intersection operates at LOS F(delay of 98.9 sec)in AM Peak • Northbound approach operates at LOS E in both AM and PM Peak • Southbound approach operates at LOS F(delay of 333.1 sec) in AM Peak • Eastbound left exceeds available storage length in PM peak. • It is noted that this intersection provides access to Sherando High School and the AM peak hour LOS deficiencies are primarily attributed to the higher volumes processed during the school peak arrival time. • Future without Development(2035): o Future volumes were projected by applying regional growth to the regional roads and incorporation of six planned background developments including: ■ Madison 277 ■ Lake Frederick(remaining build out) ■ Sherando Green ■ Fairfax Downs ■ Enclave at Tasker Residential ■ Eastgate Commercial o The following planned transportation improvements was incorporated in the study: ■ Construction of exclusive left turn lanes on the eastbound and westbound approaches at the intersection of Fairfax Pike and White Oak Road/Hudson Hallow Road(study Intersection#2) ■ Improvements at Route 277(Fairfax Pike)at Warrior Drive(VDOT SMART SCALE project)to extend the eastbound right turn lane by another 200 feet with 200 foot taper o Under Future without Development (2035), the following intersections have approaches that operate below acceptable level of service: ■ Warrior Drive&Fairfax Pike(Intersection#1) • The overall intersection operates at LOS F(delay of 88.6 sec) in AM peak, and operates at LOS E in PM peak • Westbound approach operates at LOS E in the AM and PM peak 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 9 July 30,2026 • Northbound approach operates at LOS F(delay of 99.9 sec)in PM peak • Southbound approach operates at LOS F(delay of 312.3 sec) in AM peak • Westbound left exceeds available storage length on both AM and PM peaks, while eastbound left and northbound left exceed available storage length in PM peak only. It is noted the eastbound and westbound lefts have protected only phasing. • It is noted that this intersection provides access to Sherando High School as well as significant background traffic projected from Sherando Green retail and Fairfax Downs residential developments adjacent to the intersection. There are no known improvements planned as part of those developments to this intersection. ■ Route 522 &Fairfax Pike/Lord Fairfax Highway(Intersection#3) • Overall intersection operates at LOS F in the AM (delay of 108.6 sec) and PM (delay of 161.1 sec)peak hours • Eastbound approach operates at LOS F in the AM (delay of 249.9 sec)and PM peak(delay of 293.3 sec) • Westbound approach operates at LOS F(delay of 124.4 sec) in PM peak. • Northbound approach operates at LOS F(delay of 174.5 sec)in PM peak • Southbound approach operates at LOS E in PM peak • Northbound left exceeds available storage length in PM peak, while southbound left exceeds on both AM and PM peaks. ■ Fairfax Pike and Lake Frederick Entrance(Intersection#6) • Northbound approach operates at LOS F during both the AM (delay of 89.8 sec) and PM (delay of 295.5 sec)peak hours. • Future with Development(2035): o Under Future with Development (2035), the following intersections have approaches that operate below acceptable level of service: ■ Warrior Drive&Fairfax Pike(Intersection#1) • Overall intersection operates at LOS F(delay of 86 sec)in AM peak and LOS E in PM peak • Westbound approach operates at LOS E in the AM peak and LOS F (delay of 91.3 sec)in the PM peak • Northbound approach operates at LOS F(delay of 105.6 sec)in PM peak • Southbound approach operates at LOS F(delay of 307.2 sec)in the AM peak • Westbound left exceeds available storage length in both AM and PM peaks, while eastbound left and northbound left exceed available storage length in PM peak only. It is noted the eastbound and westbound lefts have protected only phasing. • This intersection fails due to existing and background volumes and is not caused by the proposed development. The intersection is projected to process significant additional traffic 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 10 July 30,2026 from nearby planned background developments of Sherando Green retail and Fairfax Downs residential. There are no known improvements planned as part of those developments to this intersection. • Mitigation: Left turn phasing change from"protected only"to"flashing yellow arrow" on eastbound and westbound approaches are recommended to mitigate the site impacts on this intersection and improve the delay and queuing at the intersection. With the above improvement in place, the eastbound and westbound left turn movements have significant reduction in delay and queuing.While the northbound approach remains at LOS F in the AM peak and the westbound approach and northbound approach operates at LOS E in the PM peak, the conditions are improved to be better than Future Conditions without Development(non-degradation). ■ Route 522 &Fairfax Pike/Lord Fairfax Highway(Intersection#3) • Overall intersection operates at LOS F in the AM (delay of 147.2 sec) and PM peak (delay of 189.8 sec). • Eastbound approach operates at LOS F in the AM (delay of 311.3) and PM peak (delay of 331.2 sec). • Westbound approach operates at LOS F (delay of 139.8 sec) in the PM peak. • Northbound approach operates at LOS F in the AM (delay of 111.7 sec)and PM peak(delay of 207.7 sec). • Southbound approach operates at LOS F (delay of 85.9 sec)in the PM peak. • Northbound left and eastbound right exceeds available storage length in PM peak, while southbound left exceeds available storage length in both AM and PM peaks. • This intersection fails under background projected conditions due to regional growth and planned background development traffic. • Mitigation:To mitigate site-related impacts,an exclusive eastbound left-turn lane and a second northbound left-turn lane are recommended. • With the above recommended improvements in place, the delay and queuing are significantly improved and notably all approaches operate at LOS D in the AM peak. The post-mitigated improvements show the following: • Overall intersection operates at LOS D in AM peak and LOS F (delay of 94.3 sec) in PM peak. • Eastbound approach operates at LOS E in AM peak and LOS F (delay of 107.6 sec)in PM peak. • Westbound approach operates at LOS F (delay of 114.4 sec) and Northbound approach operates at LOS F (delay of 101.4 sec) in PM Peak. • While some approaches operate at LOS E or F in the PM peak hour only,the delay and queuing are significantly improved with the above improvements and conditions are improved to be better than Future without Development (non- degradation). 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 11 July 30,2026 ■ Fairfax Pike and Lake Frederick Entrance/Site Entrance#1 (Intersection#6) • Northbound approach operates at LOS F during both AM(delay of 537.5 sec)and PM peak (delay of 1675.9 sec). • Southbound approach operates at LOS F during both AM(delay of 150.5 sec)and PM peak (delay of 1551.2 sec). • With a conventional traffic signal added at this location, the intersection operates at acceptable levels of service. Installation of a new traffic signal is subject to VDOT review and approval through a future Signal Justification Report ("SJR"). A preliminary signal warrant evaluation and VJuST analysis were performed as part of this study to screen potential intersection control configurations. A conventional traffic signal, thru-cut signal, roundabout, and two-way stop control were considered as possible intersection configurations. The ultimate configuration will be determined through the future SJR. It is noted that a roundabout is anticipated to require significant offsite right-of-way and was therefore not recommended for further consideration. ■ Fairfax Pike and Site Entrance#3(Intersection#8) • Southbound approach of the site access operates at LOS E in the AM peak and LOS F (delay of 130.5 sec) in the PM peak. The failing level of service is due to high through volumes on Fairfax Pike and not a result of high volumes from the entrance(17 peak hour left turn trips).The queuing for the southbound approach is 40 feet, indicating only 2 stacked vehicles. Hence, no mitigations are recommended. ■ Route 522 and Site Entrance#4(Intersection#9) • Eastbound approach and westbound approach operates at LOS E in the PM peak • With a conventional traffic signal added at this location, the intersection would operate at acceptable levels of service with acceptable queuing along Route 522. Installation of a new traffic signal is subject to VDOT review and approval through a future Signal Justification Report("SJR").A preliminary signal warrant evaluation and VJuST analysis were performed as part of this study to screen potential intersection control configurations. A conventional traffic signal, unsignalized continuous green-T, unsignalized restricted crossing U-turn (RCUT), and two-way stop control were considered as possible intersection configurations. The ultimate configuration will be determined through the future SJR. It is noted that an RCUT would result in additional U-turn traffic downstream along Route 522 including truck traffic from the proposed industrial use. It is also noted that a continuous green-T would not meet spacing and acceleration distance requirements and was therefore not recommended for further consideration. o The other site entrances operate at acceptable levels of service. • Future with Development(Planning Year 2041): o The planning year/plus 6 year analysis reveals similar results to the Future with Development 2035 analysis, and the intersections with failing level of service continuing to have approaches that fail.All of the intersections operating acceptably under 2035 continue to operate acceptably under 2041. Hence, no additional mitigations are recommended for 2041. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 12 July 30,2026 • *1-81 and Exit 307(Fairfax Pike) Ramps o As scoped with County and VDOT staff, a supplemental memo was provided separately, dated May 8, 2026, providing an evaluation of the projected traffic volumes at the 1-81/Fairfax Pike ramp intersections and the projected volume from this proposed site. As discussed with VDOT staff, this evaluation is separate from the Traffic Impact Study and provided for informational purposes. • Conclusions o This traffic impact study provides an evaluation of existing, future without development and future with development conditions at five regional intersections as well as the five site entrances. Two of the regional intersections have level of service or queuing deficiencies due to existing or background related traffic volumes. To mitigate site-related impacts, the following improvements are recommended: at Intersection 1, convert the eastbound and westbound left-turn phasing from protected-only to flashing yellow arrow operation; and at Intersection 3, add an exclusive eastbound left-turn lane and a second northbound left-turn lane. Proposed improvements at the site entrances include turn lanes where warranted and a traffic signal or other innovative intersection control, subject to future SJR, at the southern entrance on Route 522 and western entrance on Fairfax Pike. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 13 July 30,2026 Introduction This report presents the findings of a Traffic Impact Study(TIS)conducted for the proposed Gibson Property development(the Site/the Development/the Property), located north of Fairfax Pike(Route 277) and east and west of Route 522 in Frederick County,Virginia.The applicant proposes a rezoning on the entire site to M1 (Light Industrial District)and a Comprehensive Plan amendment on the parcel east of Route 522 in order to develop up to 3,200,000 SF of industrial uses. The following tasks were completed as part of this study effort: • Scoping discussions were held on Tuesday,April 14,2026 with VDOT and County staff to discuss the parameters of this study as well as any relevant background information.A copy of the scoping document guiding discussions is included in Appendix A. The application triggers the thresholds for a VDOT Chapter 870 study. • Existing conditions were observed in the field to verify roadway geometry, pedestrian and bicycle infrastructure, and traffic flow characteristics. • Turning Movement Counts (TMCs)were collected at the study intersections along Fairfax Pike at Warrior Drive, White Oak Road/Hudson Hollow Road, and at Route 522, as well as along Route 522 at Tasker Road and Lake Frederick Drive. Counts at the intersections of Warrior Drive/Fairfax Pike and Tasker Road/Route 522 were conducted on Thursday,April 16,2026,while counts at the other intersections were conducted on Thursday,April 9,2026.All counts were performed during the AM peak period (6:00 AM to 9:00 AM) and PM peak period (4:00 PM to 7:00 PM) to determine peak hour traffic conditions at the study intersections. • Future traffic conditions were estimated based on existing traffic volumes, regional growth, planned background improvements,approved developments in the area, and the proposed development plan. • Proposed site traffic volumes were derived based on the methodology outlined in the Institute of Transportation Engineers' (ITE) Trip Generation Manual, 121" Edition, publication, and were assigned to the road network based on the agreed upon direction of approach discussed during the aforementioned scoping discussions. • Intersection capacity and queueing analyses were performed for the identified study intersections for the 2026 Existing Conditions, 2035 Future without Development, 2035 Future with Development, and 2041 Future with Development during the weekday morning (AM), and weekday afternoon (PM) peak hours. The 2041 conditions (plus 6 years after build out) is for planning purposes only. • Intersection capacity and queuing analyses were performed using Synchro, version 11, with results based on the Transportation Research Board's (TRB) Highway Capacity Manual (HCM) methodology and in following the County's guidelines. The analysis herein includes level of service (LOS), delay, and queue length comparisons for the turning movements analyzed. Sources of data for this study include information provided by the Institute of Transportation Engineers (ITE), the Virginia Department of Transportation(VDOT), Frederick County, and the office files and field reconnaissance efforts of Gorove Slade. Background Information: Proposed Development (Site & Nearby) Description of the Existing Site Site Location The site is situated on three parcels that can be identified on the Frederick County Tax Map with the following Tax Map#s: 87- 3-A, 87-3-B, and 87-A-16B. Parcels 87-3-A and 87-A-16B are each currently occupied by one single-family detached house. Access to the site will be provided via the proposed entrances along Route 522 and Fairfax Pike. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 14 July 30,2026 The vehicular study area includes five (5) existing intersections as well as all future entrances on Route 522 and Fairfax Pike. The geographic scope of the study area was developed based on scoping discussions with VDOT and the County and are based on the regional intersections that are most to be impacted by the proposed development based on trip generation of the proposed use and distribution of that traffic through the road network. The study area includes more intersections to the west of the site along Fairfax Pike as the proposed site distribution is higher on Fairfax Pike as compared to the other roads. The existing study intersections are as follows: Intersection 1: Fairfax Pike at Warrior Drive Intersection 2: Fairfax Pike at White Oak Road/Hudson Hollow Road Intersection 3: Fairfax Pike/Lord Fairfax Highway at Route 522 Intersection 4: Route 522 at Lake Frederick Drive Intersection 5: Route 522 at Tasker Road In addition, all proposed entrances on Fairfax Pike and Route 522 were included for evaluation in future with development scenarios.An aerial of the study intersections is provided in Figure 1. An in-depth description of the roadways in the study vicinity is provided in the Existing Roadway Network section of this report. The results of the analysis and the traffic impacts associated with the proposed development are presented in the Conclusions section of this report. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 15 July 30,2026 4 09 Legend Existing Study Intersection(s) '4' t O Future Study Intersection(s) ti- na: _ . .. # Site Location lie r f-► Site Entrance Figure 1: Study Intersections Map Location within Jurisdiction and Region The site is located in the southern portion of the county, generally east of 1-81 and south of US Route 50. The site is bordered by Fairfax Pike to its south and Route 522 to its east and west.A regional aerial image of the Site is provided in Figure 2. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 16 July 30,2026 c c A y ` t r.% Legend Site Location ✓ .� Figure 2: Regional Location Existing Zoning and Long-Range Land-Use The site is situated on three parcels that can be identified on the Frederick County Tax Map with the following Tax Map#s: 87- 3-A, 87-3-13, and 87-A-16B. The parcels are currently zoned as RA (Rural Area District), with a Long-Range Land Use of Industrial, Mixed Use Industrial/Office for the parcels west of Route 522 and Rural Area for the parcel east of Route 522. The existing zoning is presented in Figure 3; the Long Range Land Use Plan is presented in Figure 4. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 17 July 30,2026 N '522 f� Figure 3: Frederick County Zoning Map (Source: Frederick County GIS, https://fredcogis.fcva.us/PlanningAccessTerminal/) 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 18 July 30,2026 Long Range Land Use Plan ��/�i •� v / Future Rt 37 Bypass • �� aUrban Development Area •''• Y♦S%/ ���•7. ��`• �� Sewer and Water Service Area �_ XX Airport Support Area _ \ • • • Landfill Support Area ' • •• • <Z>Business •1 •�` %% i 4O Mixed-Use ®Mixed Use Commercial\Office '���• rZ>Highway Commercial QB2/B3 Industrial ®Mixed Use Industrial\Office OV✓fl , ®Warehouse OHeavy Industrial 9phens 8 Q Extractive Mining City Employment / 2 0 Residential j Mobile Home Community Planned Unit Development ;( Urban Center ♦ • . �" •,1 Neighborhood Village > �' r • Ik Q Residential,4 u/a te �'�� 277= e /�-♦� QHigh-Density Residential,6 u/a • •:� :� QHigh-Density Residential, 12-16 u/a r..� :`a / '� 1 ORural Area �!�` • OCommercial Recreation ~��♦s• • •�� 0 Recreation �. ®Natural Resources&Recreation Park ®Environmentally Sensitive Areas /> •` Interstate Buffer / <::>Sensitive Natural Areas Olnstitutional L' Rural Community Center •� Vwn' / Figure 4: Eastern Frederick County Long Range Use Plan Map (Source: https://www.fcva.us/home/showpublisheddocument/23720/638748693950870000 ) Existing Roadway Network A description of the major roadways within the immediate vicinity of the Site is summarized in Table 1. Table 1: Surrimmy of Existing Road Network Roadway RTE# VDOT Classification SpLegal/Design Number of Lanes AADT AADT Year Road Segment Between k-factor Warrior Drive SC-719 Minor Arterial 25 Two Lane Undivided 7,278 2024 Fairfax Pike Centre Drive 10.59% S.Warrior Drive SC-720 25 Two Lane Undivided 990 2020 Dead End Fairfax Pike - Fairfax Pike VA-277 Minor Arterial 45 Two Lane Undivided 13,720 2024 Lexington Ct Warrior Drive 9.75% Hudson Hollow Road SC-636 45 Two Lane Undivided 1,700 2020 Spotswood Ct Fairfax Pike White Oak Road VA-622 45 Two Lane Undivided 3,000 2023 Fairfax Pike,Rte 277 Periwinkle PI 10.55% Fairfax Pike VA7277 Minor Arterial 55 Two Lane Undivided 8,698 2024 Maim Bdy Clarke Cnty/Frederick Cnty Rte 522 8.97% Stonewall Jackson Highway US-522 Minor Arterial 55 Four Lane Divided 13,383 2024 Lord Fairfax Highway Highland Corners Rd 8.54 Lord Fairfax Highway VA-240 Minor Arterial 55 Two Lane Undivided 8,757 2024 Stonewall Jackson Hwy Highland Comers Rd 8.75% Lake Frederick Drive SC-1434 25 Two Way Divided 3,200 2018 Rte 340 Rte 1434 Stonewall Jackson Highway US-522 Minor Arterial 55 Four Lane Divided 18,348 2024 Lake Frederick Drive Rte Change 8.49% Tasker Road SC-642 Major Collector 45 Four Lane Divided 7,178 2024 Front Royal Pike Rainville Rd 10.22% Front Royal Pike US-522 Minor Arterial 55 Four Lane Divided 13,167 2024 Bridgeport Ln Tasker Rd 8.95% 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 19 July 30,2026 Planned Future Transportation Improvements Roadway, Bicycle, and Pedestrian Improvements Based on the aforementioned scoping meeting following improvements are considered: • Improvements associated with approved background developments (Madison 277) • Improvements at Route 277(Fairfax Pike)at Warrior Drive(VDOT SMART SCALE project) Historical Crash Data Crash data at the existing study intersections were obtained from the VDOT website for the most recent five years. The crash data is summarized in Table 2.The crash data extracted from VDOT website is included in Appendix C. Table 2: Crash Data Summary(January 2021 -December 2025) By Year By Severity By Crash Type Intersection Number Property Crash Rate No. Intersection of Damage Injury Fatal Rear Angle Other (Crashes/million ADT Crashes 2021 2022 2023 2024 2025 Only Crashes Crashes Ends Crashes Types entering Crashes vehicles) 1 Fairfax Pike at Warrior Drive 19 0 4 9 4 2 17 2 0 14 1 4 0.59 17585 2 Fairfax Pike at White Oak 16 0 3 8 3 2 11 5 0 5 8 3 0.75 11665 Road/Hudson Hollow Road 3 Fairfax Pike/Lord Fairfax Highway 21 4 0 7 6 4 14 7 0 10 9 2 0.44 26245 at Route 522 4 Route 522 at Lake Frederick Drive 18 2 4 4 4 4 12 6 0 10 4 4 0.46 21265 5 Route 522 at Tasker Road 10 1 1 2 3 3 7 3 0 9 0 1 0.37 14910 The crash data included in Table 1 shows the following: • Fairfax Pike at Warrior Drive: o The intersection had a total of 19 crashes in the five-year period. The Intersection Crash Rate is 0.59 per million entering vehicles. o Of the total crashes, 17 of them were all property-damage only crashes while two(2)of them were injury crashes. o Of the total crashes, 14 was a rear end crash,one(1)was an angle crash,and four(4)were other types of crashes. • Fairfax Pike at White Oak Road/Hudson Hollow Road: o The intersection had a total of 16 crashes in the five-year period. The Intersection Crash Rate is 0.75 per million entering vehicles. o Of the total crashes, 11 were property-damage only crashes and five(5)were injury crashes. There were no fatal crashes at the intersection. o Of the total crashes,five(5)were rear end crashes, eight(8)were angle crashes, and three(3)were other types of crashes. o It is noted that improvements are planned as part of a proffered improvement by Madison 277 to add left turn lanes along Fairfax Pike which will provide safety improvements. • Fairfax Pike/Lord Fairfax Highway at Route 522: o The intersection had a total of 21 crashes in the five-year period. The Intersection Crash Rate is 0.44 per million entering vehicles. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 20 July 30,2026 o Of the total crashes, 14 were property-damage only crashes and seven (7)were injury crashes. There were no fatal crashes at the intersection. o Of the total crashes, 10 were rear end crashes, nine (9) were angle crashes, while two (2)were other types of crashes. • Route 522 at Lake Frederick Drive: o The intersection had a total of 18 crashes in the five-year period. The Intersection Crash Rate is 0.46 per million entering vehicles. o Of the total crashes, 12 were property-damage only crashes and six(6)were injury crashes. There were no fatal crashes at the intersection. o Of the total crashes, 10 were rear end crashes, four (4) were angle crashes, while four(4) were other types of crashes. • Route 522 at Tasker Road: o The intersection had a total of ten (10) crashes in the five-year period. The Intersection Crash Rate is 0.37 per million entering vehicles. o Of the total crashes, seven(7)were property-damage only crashes and three(3)were injury crashes.There were no fatal crashes at the intersection. o Of the total crashes, nine(9)were rear end crashes and one of them was other types of crashes. The crash rates shown for each intersection are calculated as crashes per one million entering vehicles (MEV), and were calculated based on the following formula: 1,000,000* #of Crashes Rateintersection - #of Years*365 (year)*ADTintersection The intersection ADT is calculated as the sum of ADTs on each leg, divided by 2. ADTs are taken from the existing volumes shown in Figure 6. For crash rate calculations,ADTs are assumed to remain constant over the crash analysis years, consistent with similar traffic studies approved by the County. It should be noted that according to the Institute of Transportation Engineers' (ITE) Transportation Impact Analysis for Site Development, a crash rate of 1.00/MEV or higher can be used as a threshold to identify intersections that may have an elevated crash rate due to operational, geometric, or other deficiencies. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 21 July 30,2026 Analysis of 2026 Existing Conditions In order to project future traffic conditions,it was necessary to determine existing vehicular traffic volumes to utilize as a baseline. For the purposes of this report and as agreed to by VDOT and County staff,2026 roadway conditions were to be considered as existing. Existing Transit Services The site is located within a 7.5-mile radius of the Winchester Regional Airport (OKV). The nearest bus stop is located near intersection of Valley Avenue and Cedar Creek Grade/Weems Lane. Existing Traffic Volumes In order to determine the weekday morning (AM) peak hour and weekday afternoon (PM) peak hour turning movement traffic volumes, turning movement counts (TMC) were collected at the study intersections. Counts at the intersections of Warrior Drive/Fairfax Pike and Tasker Road/Route 522 were conducted on Thursday, April 16, 2026, while counts at the remaining intersections were conducted on Thursday,April 9, 2026. From the turning movement counts,the following system peak hours were determined. • AM Peak Hour: 7:00 AM to 8:00 AM • PM Peak Hour: 4:15 PM to 5:15 PM The 2026 existing road network configuration is presented in Figure 5.The 2026 existing peak hour traffic volumes for the study intersections are illustrated in Figure 6. The published K-factors from VDOT's P4P website were used to estimate daily traffic volumes from the PM peak hour.The applied K-factors are presented in Table 1. For roadways without published values on the P4P website, a default K-factor of 10%was assumed.The existing count data is provided in Appendix B. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 22 July 30,2026 - N Ak r Y NV \ f •,ems i 4 6 Pike Fairfax Pike Lord Fairfax Hl,rih,aV Fairfax Pike Fairfax Pike Fairfax Pike t ® I LEGEND Existing Intersection Y Existing Roadway �— One Way Travel Lane AA Lake Frederick Drive Tasker Road �'r 0 Traffic Control Device Type Figure 5:2026 Existing Conditions-Roadway Network Geometric Configuration and Traffic Control Devices 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 23 July 30,2026 Ir i„ iLt eF < 1 hr � � v � rY xr � K highway - I \ f' '1 t 116/117 N o �-28/34 0 40172 N m m 3 F 301/426 e N €4—1781401 ry 4--641248 I a 2/23 m Mn100l202 96114NIy • Fairfax Pik l Farrax Pik_ Lad Fairfax Fartax Pike ♦ ` Fartax Pike 4) ♦ ` FaWl Pike I ♦ I' 116l211 ry 184/114—* < c o 32/45 cn Tuoi m 328/398—► ., 0p _ 259/204—► v N 209/90__10. o m m 329/41 0 18/41 = 98/131 f° E $ 3 i 4 19740 �l 11 580 LEGEND a m M o o g r? o o O Existing Intersection Existing Roadway One Way Travel Lane ake Frederick Drive T aSKe(ROW ` ♦ AM I'M Peak Hour Traffic T `) T ADT Average Daily Traffic 144/167- m m 21/42 n_ N f O 68176 " 160/145 d 5 rc17 17 540 rc 14 370 Figure 6:2026 Existing Conditions—Vehicular Traffic Volumes 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 24 July 30,2026 Existing Intersection Capacity and Queueing Analysis Intersection capacity and queuing analyses were performed for the 2026 Existing Conditions scenario at the study area intersections during AM and PM peak hours. Synchro,version 11,was used to analyze the study intersections with results based on HCM 6th methodology' presented in the Transportation Research Board's (TRB) Highway Capacity Manual (HCM) and analysis guidelines provided by the County. The analysis herein includes level of service(LOS), delay, and queue lengths. The existing signal timings for Study Intersections were obtained from the VDOT. These timings were incorporated into the Synchro analysis models. Existing peak hour factors observed in the field (overall intersection) were used, except where the field peak hour factor was less than 0.85, in which case a minimum value of 0.85 was applied, consistent with VDOT analysis guidelines. Per the scoping process with County staff, it would be considered acceptable and/or desirable to achieve an approach LOS D or better for traffic operations using HCM methodology. The results of the intersection capacity analyses from Synchro are presented in Table 3 and graphically in Figure 7. The 9511 percentile queue lengths were also determined from Synchro and are expressed in feet. The description of different LOS and delay are included in Appendix D. The detailed analysis worksheets of 2026 Existing Conditions are contained in Appendix E. 1 It should be noted that HCM 2000 methodology was used in lieu of HCM 6th if the HCM 6th methodology was not applicable.HCM 6th could not be applicable in such cases as nonstandard National Electrical Manufacturers Association(NEMA)configurations,shared lane configurations,placement of loop detectors,U-turns,etc. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study-Gibson Property Page 25 July 30,2026 Table 3: 2026 Existing Conditions-Intersection Capacity and Queuing Analysis Results Part 1 Intersection Movernmien Le ngth(ft.) Delay(s) Queue(ft.) LOS Delay(s) Queue(ft.) al Queue(ft.) 121 Queue(ft [21 MMM� AM Peak Hour PM Peak Hour Warrior Drive(N/S)&Fairfax Pike(E/VJ) Overall Intersection(Signalized) F 98.9 c 32.7 Eastbound Approach C 24.4 C 32.2 Eastbound Left 260 E 79.8 112 162 E 73.5 162 #288 Eastbound Thru B 15 285 330 B 12 181 375 Eastbound Right 280 B 12.4 233 270 A 6.2 1 17 Westbound Approach c 32.6 C 23.1 Westbound Left 270 F 94.3 91 #189 E 58.4 11 33 Westbound Thru B 16.7 257 321 C 23.3 295 370 Westbound Right 575 B 10.3 0 29 B 12.5 0 7 Northbound Approach E 56.1 E 55.8 Northbound Left 190 D 54.9 16 39 D 45.3 38 75 Northbound Thru/Right E 57.8 13 43 E 642 59 #112 Southbound Approach F 333.1 D 44.2 Southbound Left 150 D 51.5 33 64 D 462 56 102 Southbound Thru F 435.5 230 335 D 49.8 28 64 Southbound Right D 44.8 0 36 C 34.3 4 62 2 Hudson Hollow Road/White Oak Road &Fairfax Pike(ElW) Overall Intersection(Signalized) A 8.2 A 7.9 Eastbound Approach A 8 A 7.1 Eastbound LeftrFhru A 8 99 202 A 7.2 51 112 Eastbound Right 90 A 4.2 0 6 A 5 0 10 Westbound Approach A 5 A 7.1 Westbound Left/Thru A 5 28 60 A 7.2 67 133 Westbound Right 155 A 4.3 0 8 A 5 0 10 Northbound Approach B 14.6 B 12.3 Northbound Left/Thru/Right B 14.6 16 55 B 12.3 11 45 Southbound Approach B 14.7 B 12.5 Southbound Left/Thru/Right B 14.7 13 63 B 12.5 9 56 3 Route 522(N/S)&Fairfax Pike/Lord Fairfax Highway Overall Intersection(Signalized) c 34.1 D 45.2 Eastbound Approach D 37.3 D 49.7 Eastbound LeftfThru D 37.7 152 #300 D 50 101 168 Eastbound Right 230 C 26.3 0 0 D 392 0 18 Westbound Approach D 36.5 D 46.5 Westbound Left 500 D 37.9 64 124 D 35.7 140 234 Westbound Thru/Right C 34.9 51 109 D 53.5 233 #426 Northbound Approach c 32.9 D 42.1 Northbound Left 565 D 50.8 68 138 E 68.3 140 #298 Northbound Thru C 28.7 127 190 C 34.3 212 #314 Northbound Right 250 C 24.8 0 41 C 26.9 0 23 Southbound Approach C 32.6 D 47 Southbound Left 125 D 46.3 51 110 E 58.7 49 102 Southbound Thru C 292 105 161 D 45.5 200 #306 NOTES: [1]Effective storage length is based on the storage length plus one-hall of the taper length per TOSAM guidelines. (21#--95th percentile queues(reported from Synchro)exceed capacity;actual queues may be longer.Queues shown are based on the maximum a#er two cycles. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study-Gibson Property Page 26 July 30,2026 Table 4: 2026 Existing Conditions-Intersection Capacity and Queuing Analysis Results Part 2 AM Peak Hour PIVI Peak Hour Effective Storage r r No. Intersection(Movernent) Length(ft.) LOS Delay(s) Queue(ft.) LOS Delay(s) Queue(ft.) 4 Route 522(N/S)&Lake Frederick Drive(E) Overall Intersection(Signalized) _ B 18.3 c 20.1 Eastbound Approach c 27.4 c 31.2 Eastbound Left C 28.1 65 131 C 32.5 83 175 Eastbound Right B 19.5 0 23 C 21.2 3 33 -- ------- ----- ---- --- ---Northbound Approach B 16.2 B 1&5 Northbound Left 470 B 19.2 6 19 C 23.2 21 50 Northbound Thru B 16 71 174 B 17.9 100 165 Southbound Approach B 17.6 B 1&7 Southbound Thru B 17.7 95 153 B 19 144 234 Southbound Right 295 B 13.9 0 24 B 14.9 0 44 5 Route 522(N/S)&Tasker Road(E) Overall Intersection(Signalized) B 14.3 B 15.8 Eastbound Approach c 20.4 c 22.8 Eastbound Left C 20.6 6 24 C 23.4 14 44 Eastbound Right 250 C 20.3 0 25 C 22.6 0 25 Northbound Approach B 10.2 B 10.6 Northbound Left 485 C 22.6 18 39 C 23 29 62 Northbound Thru A 6.1 26 43 A 5.9 36 61 Southbound Approach B 16.6 B 19.7 Southbound Thru B 17.5 44 80 C 20.2 83 138 Southbound Right 315 B 10.3 0 12 1 B 11.1 0 11 NOTES: [1]Effective storage length is based on the storage length plus one-half of the taper length per TOSAM guidelines. [2]#:95th percentile queues(reported from Synchro)exceed capacity,actual queues may be longer.Queues shown are based on the maximum after two cycles. The capacity analysis results shown in Table 3 and Table 4 reveal that all intersections operate at level of service (LOS) D or better by approach under the existing (2026)conditions except the following: • Warrior Drive&Fairfax Pike(Intersection#1) O The overall intersection operates at LOS F in AM Peak O Northbound approach operates at LOS E in both AM and PM Peak O Southbound approach operates at LOS F in AM Peak O Eastbound left exceeds available storage length in PM peak. O It is noted that this intersection provides access to Sherando High School and the AM peak hour LOS deficiencies are primarily attributed to the higher volumes processed during the school peak arrival time. The Existing Conditions(2026)levels of service and lane configurations are summarized in Figure 7. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 27 July 30,2026 x T1 ,t 4 4 OF/D BIB CID o FIC O m A/A O `v CID D o e t BIB o A/A 2 o * 'o LL o B/C °0 ¢ !�CID FlE � � �A/A � � �D/D � Pike Fa rfax Pike Fairfa Pike_ Fairtax Pik Fairtax Pike Al Lord Fairta:H iglnxay Fairfax 3 I m W U B/A o o U) A/A----* `m C/D---i, 0 U `U E/E i B/B rr C/D ® BIB BIB LEGEND m m m O Existing Intersection Existing Roadway One Way Travel Lane Lake Fmderick rive as er o I/Z/0 Traffic Control Device Type AfA;PId Movement Level of Service cVi C/C U C/C � AM/PM Approach Level of Service U U BIC m m C/C U a AMIPM Overall Level of Service B/B Figure 7:2026 Existing Conditions-Level of Service Results 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study-Gibson Property Page 28 July 30,2026 Analysis of 2035 Future Conditions without Development This scenario analyzes the future without development conditions for the year 2035. Inherent Growth As specified in the scoping document, an annual linear growth rate of 0.5%was applied to all major movements on Route 522 and Hudson Hollow Road, while a rate of 1%was applied on Fairfax Pike, Warrior Drive, White Oak Road, and Tasker Road. The inherent regional growth volumes(for the period between 2026 and 2035)are illustrated in Figure 8. Approved Background Development(s) In addition to the applied inherent regional growth accommodating increased traffic demand, six(6)background development in the vicinity of the site was identified in the scoping discussions for inclusion in this study: • Madison 277 0 900 DU of Housing 0 17,000 SF of Retail 0 80,000 SF of Medical/Office Uses • Lake Frederick(Remaining Build Out) 0 199 DU of Single Family Detached(Age Restricted) 0 78 DU of Single Family Detached 0 385 DU of Single Family Attached • Sherando Green 0 93,900 SF of Shopping Plaza with Supermarket • Fairfax Downs 0 93 DU of Single Family Detached • Enclave at Tasker Residential 0 165 DU of Single Family Detached 0 154 DU of Single Family Attached • Eastgate Commercial 0 179,000 SF of Retail The total volume generated by background development is shown in Figure 9. Further details on each of the background developments, including trip generation,trip distribution and site location is provided in Appendix F. Planned Transportation Improvements The following transportation improvements were included for future 2035 conditions: • Improvements associated with approved background developments including: 0 Construction of exclusive left turn lanes on the eastbound and westbound approaches at the intersection of Fairfax Pike and White Oak Road/Hudson Hallow Road (study Intersection#2). 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study-Gibson Property Page 29 July 30,2026 • Improvements at Route 277 (Fairfax Pike) at Warrior Drive (VDOT SMART SCALE project) to extend the eastbound right turn lane by another 200 feet with 200 foot taper. Future without Development Traffic Volumes (2035) In order to forecast future roadway traffic volumes for the year 2035,the 2026 existing traffic volumes(Figure 6)were combined with the inherent growth traffic volumes (Figure 8) and the background development traffic assignment volume(Figure 9). The 2035 Future without Development traffic volumes are illustrated in Figure 10. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 30 July 30,2026 x N y . XAM: d 4 4V J �t Legend 4 Study Intersection l 4 � i Existing Roadway One Way Travel Lane AM/PM Peak Hour Traffic r.. Lake Frederick Entrance •m $ O ¢ O h E 1 Oil 1 0 3/3 rc 4/6 3 E— 27/38 N 4— 16136 t—6/22 o u�i 0/0 0/2 a ��IYr vIy 9/18 Fairfax Pike Fairfax Pik • Lord Fa-ir. +::, aidax Pike ♦ ( Fairfax Pike ♦ ` aidax Pike ♦ i 10/19 JA o 0 0 17/10 Jk r N 1Z � 2 3/4 m 30/36—► . 23/18—► i 1918—► °' Oro 23 2f4 0 9/12 m 3 = N _ N t—19/41 O N O O Oro Fairfax Pike Lake Freoenck Drive Tasker Road rtar,Pike 4 oro ara 28/20 oro p 1413—� R oro Figure 8: Projected Inherent Regional Growth Traffic Volumes (2026 to 2035) 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 31 July 30,2026 04. Ow A F Fai'fa.'Pike oe y 1., %1Q,Lord Pair'' Hi 6 ° AW ,�- Legend 4 O Study Intersection c �' � Existing Roadway . �� ` �— One Way Travel Lane -': AM/PM Peak Hour Traffic � Lake Frederick Entrance 0 2 3 • = 'L 0/0 0 0 'L 010 0 7/17 f—260/259 4—310/362 � to t—50/78 N1 oIy 66l134 �oI{r o 0/0 w ♦ 0/0 Fairfax Pike Fairfax Pike l Loid Farfaz"lah.av Fairfax Pike ♦ Fairfax Pike ♦ ` Faifax Pike 20/52 n�i 10/31 202237 M M o xe o 0 0 `o 170/279—► 211/382—► 0 59l76—► o 61/126 0 0/0—11, 112/159 3 i 6 m N 4—362/492 to o m o M o 36/85 1 Fairfax Pike Lake FreOerick Drive TOW Road ♦ Fairfax Pike 0/0 C W 31/122 O1 on `v 363/518—)1- N m N W � 24115 23/71 46/107 5 Figure 9:Total Background Development Volumes 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 32 July 30,2026 'r_ N 6 Legend y 4 O study Intersection f - Existing Roadway One Way Travel Lane AM/PM Peak Hour Traffic ADT Average Daily Traffic Lake Frederick Entrance re m�s 9,410 o O 4,430 ®1 22,320 m 126/128 v o 31/37 0 o m rr 51/95 0 t— 5881723 o N t-5041799 n Za m -12=48 N �rlry 1621148 nW 2@5 M mIy 109/220 Fairfax Pik Fair[&Pike � � Lard Falrfalc H-tnva Fairfax Pike ♦ ` Faidax Piles ♦ ` Fairfax Pike 146/282 m m v 211/155 v Nv o 0 237/286 o N 528l713—► m r. N % Mo 493/604 o ro m 287/174 N N m 390/167 a 20/45 219/302 6 040rE F--1 780 25 890 ® 24 950 1 19,050 N s m rn Q a0 °D C *—561/974 - u1Oi N n v o 36/85 Fairfar PiFi Lake FretlerekDrive ♦ Tacker Read T 4 ♦ Fairfax Pike T � I/► 144/167 J, o 0 54/168 e m 0 730/804—► m 92/91-� ,N 1O 197/235 46/107 d 5 z- F 23.1701 P F3.280 Figure 10: 2035 Future Conditions without Development-Vehicular Traffic Volumes 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 33 July 30,2026 Future without Development Intersection Capacity and Queueing Analysis Intersection capacity analyses were performed for the 2035 Future Conditions without Development scenario at the study area intersections during the AM and PM peak hours. Synchro, version 11, was used to analyze the study intersections with results based on the HCM 6th methodology2 presented in the TRB's Highway Capacity Manual(HCM)and analysis guidelines provided by the County. The analysis herein includes level of service (LOS), delay, and queue length comparisons for the turning movements analyzed. For the purposes of this analysis,the future peak hour factors(PHF)were based on the traffic counts,as applicable,and utilized on a by-intersection basis; PHF in the range of 0.92 to 1.00 were used for the future scenario,consistent with scoping document. The heavy vehicle percentages (HV%) were the same as those used in the 2026 Existing Conditions scenario analysis. As discussed with VDOT staff during the 15t submission review, the intersection of Rt 522 and Maranto Manor Drive was coded in the Synchro analysis given its adjacency to Intersection#5 and was coded as coordinated in all future 2035 and 2041 analysis given that it may be coordinated in the future. It is noted Maranto Manor Drive was not scoped as a study intersection. Per the scoping process with County staff, it would be considered acceptable to achieve an approach LOS D or better for traffic operations using HCM methodology. The results of the intersection capacity analyses from Synchro are presented in Table 5 and Table 6 and graphically in Figure 11.The results are expressed in LOS and delay(seconds per vehicle)for overall signalized intersections and per approach and lane group for all study intersections. The 95t" percentile queue lengths were also determined from Synchro and are expressed in feet. The detailed analysis worksheets of the 2035 Future Conditions without Development are contained in Appendix G. Z It should be noted that HCM 2000 methodology was used in lieu of HCM 6th if the HCM 6th methodology was not applicable.HCM 6th could not be applicable in such cases as nonstandard National Electrical Manufacturers Association(NEMA)configurations,shared lane configurations,placement of loop detectors,U-turns,etc. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study-Gibson Property Page 34 July 30,2026 Table 5: 2035 Future Conditions without Development-Intersection Capacity and Queuing Analysis Results Part 1 AM Peak Hour PM Peak Hour Effective Storage r r No. Intersection(Movernent) Length(ft.) LOS Delay(s) Queue(ft.) Queue(ft.) LOS Delay(s) Queue(ft.) Queue(ft.) Synchro Synchro 1 Warrior Drive(N/S)&Fairfax Pike(EMI) Overall Intersection(Signalized) F 88.6 E 59.3 Eastbound Approach c 2&9 D 50.8 Eastbound Left 260 F 84.9 132 #242 F 128.2 -248 #418 Eastbound Thru C 23.9 425 523 C 25.9 497 #691 Eastbound Right 500 B 13.3 184 270 A 8.4 0 53 Westbound Approach E 6&6 E 58.9 Westbound Left 270 F 227.8 -192 #343 F 165.8 -140 #274 Westbound Thru C 30.1 471 608 D 40.6 -591 #826 Westbound Right 575 B 14.3 0 25 B 13.3 0 11 Northbound Approach D 53.1 F 99.9 Northbound Left 190 D 53.8 56 #133 D 53 123 #216 Northbound Thru/Right D 51.5 20 #96 F 148.5 -186 #351 Southbound Approach F 312.3 D 47.6 Southbound Left 150 D 49.9 41 83 D 44.8 60 110 Southbound Thru F 398.3 -340 #555 D 49 41 84 Southbound Right D 42.7 0 55 D 48.2 175 287 2 Hudson Hollow Road/White Oak Road &Fairfax Pike(EMI) Overall Intersection(Signalized) B 12.4 B 15 Eastbound Approach A 9.4 B 10.1 Eastbound Left 145 A 9.9 25 62 B 12.1 16 40 Eastbound Thru A 9.2 90 275 A 9.8 110 320 Eastbound Right 90 _ A 5.6 0 0 A 5.7 0 7 Westbound Approach B 14.6 B 17.7 Westbound Left 125 A 6.6 0 2 A 6.6 2 10 Westbound Thru B 14.8 147 287 B 18.3 270 #560 Westbound Right 155 A 8.2 0 _ 2 A 7 0 _ 3 Northbound Approach c -- 20.4 c 26 �- Northbound Left/Thru/Right C 20.4 20 69 C 26 30 #76 Southbound Approach c 20.7 c 26.2 Southbound Left/Thru/Right C 20.7 17 86 C 26.2 23 85 3 Route 522(N/S)&Fairfax Pike/Lord Fairfax Highway Overall Intersection(Signalized) F 108.6 F 161.1 Eastbound Approach F 249.9 F 293.3 Eastbound Left/Thru F 273 -541 #837 F 343 -534 #742 Eastbound Right 230 C 30.9 18 100 D 42.4 46 150 Westbound Approach D 43.9 F 124.4 Westbound Left 500 D 41.3 71 130 D 44.3 161 250 Westbound Thru/Right D 45.7 104 182 F 165 -433 #644 Northbound Approach D 53.1 F 174.5 Northbound Left 565 F 92.8 -174 #367 F 410.5 -410 #598 Northbound Thru C 34.1 143 214 D 48.2 251 #360 Northbound Right 250 C 29.2 0 46 C 33.9 0 25 Southbound Approach D 44.2 E 66.6 Southbound Left 125 E 55.3 61 #139 E 72.4 67 #136 Southbound Thru D 41.2 116 178 E 65.7 237 #350 NOTES: [1]Effective storage length is based on the storage length plus one-half of the taper length per TOSAM guidelines. [2]-:Volume exceeds capacity,queue is theoretically infinite. ]3]#:95th percentile queues(reported from Synchro)exceed capacity,actual queues may be longer.Queues shown are based on the maximum after two cycles. ]4]m:95th percentile volume and queues(reported from Synchro)are metered by upstream signal. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study-Gibson Property Page 35 July 30,2026 Table 6: 2035 Future Conditions without Development-Intersection Capacity and Queuing Analysis Results Part 2 AM Peak Hour PM Peak Hour Effective Storage r r No. Intersection(Movernent) Length(ft.) LOS Delay(s) Queue(ft.) Queue(ft.) LOS Delay(s) Queue(ft.) Queue(ft.) Synchro Synchro 4 Route 522(NIS)&Lake Frederick Drive(E) Overall Intersection(Signalized) B 18.3 c 21 Eastbound Approach c 29.2 c 33.1 Eastbound Left C 30.4 65 144 D 36.2 101 177 Eastbound Right C 21.3 0 31 C 25.6 27 62 Northbound Approach B 16.2 B 19.5 Northbound Left 470 C 20.2 7 23 C 28.8 27 58 Northbound Thru B 16 89 234 B 18.4 146 227 Southbound Approach B 17.6 B 19.4 Southbound Thru B 17.7 123 205 B 19.8 225 349 Southbound Right 295 B 13.3 0 25 B 14.1 0 45 Southbound U-Turn 0 3 5 Route 522(NIS)&Tasker Road(E) Overall Intersection(Signalized) B 18.9 c 24 Eastbound Approach D 46.9 D 45.1 Eastbound Left D 49.4 38 77 D 51.3 119 181 Eastbound Right 250 D 46.3 0 37 D 40.7 0 36 Northbound Approach B 14.2 B 19.3 Northbound Left 485 D 51.6 59 91 D 53.3 109 125 Northbound Thru A 3.3 40 62 A 5 67 94 Southbound Approach B 11.9 B 19.4 Southbound Thru B 12.8 85 136 C 21.1 193 293 Southbound Right 315 A 6.8 0 14 A 8.5 0 20 6 Lake Frederick Entrance(N)&Fairfax Pike(ENV) Overall Intersection(Unsignalized) Westbound Approach Westbound Left _ 150 A _ 9.8 5 B 10.9 13 Northbound Approach F 89.8 F�- 295.5 Northbound Left F 147.2 180.0 F $514.8 203.0 Northbound Right C 17.7 27.5 C 17.7 18 NOTES: (11 Effective storage length is based on the storage length plus one-half of the taper length per TOSAM guidelines. ]2]-:Volume exceeds capacity,queue is theoretically infinite. ]3]#:95th percentile queues(reported from Synchro)exceed capacity,actual queues may be longer.Queues shown are based on the maximum after two cycles. ]4]m:95th percentile volume and queues(reported from Synchro)are metered by upstream signal. [5]INT 5 is analysed using HCM 2000 The capacity analysis results shown in Table 5 and Table 6 reveal that the study intersections operate at level of service(LOS) D or better by approach in Future Conditions without Development(2035)except for the following intersections.- 0 Warrior Drive&Fairfax Pike(Intersection#1) o The overall intersection operates at LOS F in AM peak, and operates at LOS E in PM peak o Westbound approach operates at LOS E in the AM and PM peak o Northbound approach operates at LOS F in PM peak o Southbound approach operates at LOS F in AM peak o Westbound left exceeds available storage length on both AM and PM peaks,while eastbound left and northbound left exceed available storage length in PM peak only. It is noted the eastbound and westbound left has protected only phasing. o It is noted that this intersection provides access to Sherando High School as well as significant background traffic projected from Sherando Green retail and Fairfax Downs residential developments adjacent to the intersection. There are no known improvements planned as part of those developments to this intersection. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study-Gibson Property Page 36 July 30,2026 • Route 522 &Fairfax Pike/Lord Fairfax Highway(Intersection#3) o Overall intersection and eastbound approach operates at LOS F in the AM and PM peak hours o Eastbound approach operates at LOS F in the AM and PM peak o Westbound approach operates at LOS F in PM peak. o Northbound approach operates at LOS F in PM peak o Southbound approach operates at LOS E in PM peak o Northbound left exceeds available storage length in PM peak,while southbound left exceeds on both AM and PM peaks. o There are no known planned improvements by others at this intersection. o Fairfax Pike and Lake Frederick Entrance(Intersection#6) o Northbound approach operates at LOS F during both the AM and PM peak hours. The Future Conditions without Development(2035)levels of service and lane configurations are summarized in Figure 11. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study-Gibson Property Page 37 July 30,2026 I Lim SAM ALI r 's °r G` Legend OExisting Intersection 1 Existing Roadway � „� I �— One Way Travel Lane ®III[./p Traffic Control Device Type 4 AM/PM Movement Level of Service AM/PM Approach Level of Service AMIPM Overall Level of Service � ��• Lake Frederick Entrance Background Improvement F/DI C/C DIE ` FIE 2 Y BIB 3 ? FIF o e o B/B 0 o A/A w w rc C/D W8/B o I� D/F 118 F/F W �A/A mD/D Falrtax PlK Fairfax Pike L-Fairtax 111-e Fairfax PiKe FairM Pike Falrtax Pike ❑ FIF m A/B F/F--*-I C/C ► O a A/A B/A o 'o O A/A----* 2 C) C/D—y i U U D/F i C/C D/F -11 I BIB I BIB BIC BIC `am AB Fairfax Pik Lake FredenCK Unve Taker R 11 Fairfax Pike � CID---# ji D/D� C/C--* `U 21 DID 7� O 3 a 'U o 5 BI-B71 F B/B F/F Figure 11: 2035 Future Conditions without Development-Level of Service Results 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 38 July 30,2026 Analysis of 2035 Future Conditions with Development For the purposes of this study, full build out is anticipated for 2035-1 this scenario analyzes the future with full build development conditions for the year 2035. Site Description The proposed development site is located northwest of the intersection of Route 522 and Fairfax Pike(Route 277)/Lord Fairfax Highway (Route 340), positioned north of Fairfax Pike and both east and west of Route 522. The site is currently zoned RA (Rural Agricultural)with a Long Range Land Use of Industrial, Mixed Use Industrial/Office for the parcels west of Route 522 and Rural Area east of Route 522. The applicant proposes a rezoning on the entire site to M1 (Light Industrial District) and a Comprehensive Plan amendment on the parcel east of Route 522 (Tax map# 87-3-A) in order to develop up to 3,200,000 SF of industrial uses. Parcels 87-3-A and 87-A-16B are each currently occupied by one single-family detached house. The site is anticipated to include up to 3,200,000 SF of Industrial uses with a build-out year of 2035. For the purposes of the traffic study, the Industrial Park use(ITE Land Use 130)was analyzed as that is representative of a mix of industrial uses. Proposed Site Access Access to the site will be provided via three proposed entrances along Fairfax Pike and 3 proposed entrances along Route 522. One entrance on Fairfax Pike is proposed as a right-in/right-out only and the other two are proposed as full access. The westernmost entrance on Fairfax Pike is proposed to align with the planned entrance for Lake Frederick development. Two of the entrances on Route 522 are on opposite sides and aligned as one intersection. The entrances on Route 522 are proposed as full access with median breaks. The routing of traffic in the study also considers an interparcel connection between the two sites west of Route 522. A conceptual Layout for the Site is illustrated in Figure 12. -X11 CIO BOHLER// Ala Figure 12: Rezoning Plan For informational purposes only. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study-Gibson Property Page 39 July 30,2026 Projected Site Trip Generation In order to calculate the trips generated by the proposed development, the Institute of Transportation Engineers' (ITE) !Lip Generation Manual, 12t" Edition, publication was used to determine the total trips going into and out of the subject study site during the AM and PM peak hours as well as the typical number of weekday daily trips. The projected trip generation for the proposed development is depicted in Table 7. Table 7: Projected Site Trip Generation-Proposed Use Peak Hour of the Adjacent Street; ITE 1211 Ed. Daily In Out Out Total Total Proposed Use Industrial Park 130 3,200.0 kSF of GFA 442 132 574 175 451 626 7,336 Total Proposed Trips 442 132 574 175 451 626 7,336 As illustrated in the Table 7, the proposed development is expected to generate approximately 574 total trips during the AM peak hour, 626 total trips during the PM peak hour, and 7,336 total weekday daily trips during a typical weekday. Distribution and Assignment of Vehicular Site Traffic The distribution and assignment of the vehicular site generated trips were based on the existing traffic patterns, engineering judgement, the nature of the proposed development, and with the input and agreeance from County and VDOT staff during the scoping. The site direction of approach is depicted in Figure 13. The site assignment for the peak hour trips is presented in Figure 14. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com i WNW ��Or r Ile Awab � SO r '{� �, pairfax Pike.�f�" rood -t b 0 ayo 4oro �. a .y+ —lord paid :. ax Highway t J .i,�� •�^i Ape QG ® � Existing Study Intersection(s) y t Site Location Direction of ) � Approach EM•. • '•.• — • 1 1 1 .. . .. Traffic Impact Study—Gibson Property Page 41 July 30,2026 _ N J SIT SITE 6 1n SITE 9 !+`� 8 • F / E ' -2110 o 2/10 125 0 £4—42/134 3�--441144 v /—33113 ��I/$ ON g y 114 Ij r& ON • Fak Rk 4) FaH PW • Lq0 Filrtax H anal FR PAR ` ♦ F¢Hax Plk¢ ♦ ak6x PIY¢ ♦ Lake Fe¢deAlk DrN¢ Om-- _� � g a0J a gTg 5 28m 'eTS 41 STD 133M--]• 14357—►a 9132 0/0 0/0 i 23,78 010 92137 1 311 a '�14 6 ;=4—23175 4—102/69 4—104.6'.: 0/0 _ FeN1aNPk Fsrtax Pik N e � • ` I x iNe 0, �.. 81,33�' u S So eo 48/19 76130 1 1041124—1- 56/105 1 23110� p 0/0� e 4 �^ LEGEND 1n 5117 4-010 �_ n O smeylDeers¢<— N A� 15/52 �216 - E-M,g Roadway .� 1 �► sAe ka,e, 1 �► ske E l,a,_ , 4 one way T—el Lan¢ A Ak'.IM Peak H—Tragic _ Lake Frederick Entrance 27194—# I 010—. a n ry Si*Em.n- 11/38 '5 Figure 14: Site Trips Assignment 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study-Gibson Property Page 42 July 30,2026 Future with Development(2035) Traffic Volumes The future with development traffic volumes were determined by adding the assigned site generated traffic volumes (Figure 14) to the 2035 future conditions without development traffic volumes (Figure 10). The 2035 Future Conditions with Development traffic volumes are depicted in Figure 15. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 43 July 30,2026 ,f. 2 SI ITE SITE s n 8 I� r3i r' 4 61 4570 a s"' ^q 128/131 0 �-33/47 631100 5489431531361 'A nIj m 162/148 - n1 3129 '�Inr mIy . 109/220 • Fae MW 4) ♦ L -R • ( R M ( FWIPe ♦ ` FSNaas PlNp I ♦ FIa�M PaN: ♦ ONe Fre2ltN pFle 146262, 211/15s T O 265297 ^ M 1a9n69 n 6611766--► 63SUI d 296206—► m M ^ 39OM67 ^ 20145 242980 `" v 921'91 ry E g 2470�1 91 440 1k 8 g 92137 311 '-145 584/1,049 3 4—699/1,128 ^ &F 7O1/1.124 36/05 " a U • 4) y� FanNR 4) ( FaItWi RNe iaskerRme ♦ FaMaz PINe ♦ ` Fairtax PlNe Falaax Pllx 54/168-- 'R T� 81133 Y N �T Ise _ 41119 ^ 8=834—0- 930988—► 882196s—► 220245 1r' 46/107 v 4 020 9 24,230 0 24410 _ LEGEND gg t 1/2 t 5117 Oro T C O study lnL—U.n m A15/52 �2/6 Existing R,&",y 1 Iy Iy SIIe EnVdn[ 4 One Way Travel Lana Fretlerlc� SIM EnI e TSne ante ♦ ` ♦ ` A-'F'M Peek Hour TreRlkEc ntrance 2-4 J, m e site Entrance ao AMT AvenOe Dally Tre11ic 24130 2a 7i0 Figure 15: 2035 Future Conditions with Development-Vehicular Traffic Volumes 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 44 July 30,2026 Future with Development Intersection Capacity and Queueing Analysis Intersection capacity analyses were performed for the 2035 Future Conditions with Development scenario at the study area intersections during the AM and PM peak hours. Synchro, version 11, was used to analyze the study intersections with results based on the HCM 6th methodology3 presented in the TRB's Highway Capacity Manual(HCM)and analysis guidelines provided by the County. The analysis herein includes level of service (LOS), delay, and queue length comparisons for the turning movements analyzed. For the purposes of this analysis,the future peak hour factors(PHF)were based on the traffic counts,as applicable,and utilized on a by-intersection basis; PHF in the range of 0.92 to 1.00 were used for the future scenario, consistent with the scoping document.The heavy vehicle percentages(HV%)were the same as those used in the 2026 Existing Conditions and 2035 Future Conditions without Development scenario analyses. The results of the intersection capacity analyses from Synchro are presented in Table 8, Table 9, Table 10 and Table 11 and graphically in Figure 16. The results are expressed in LOS and delay (seconds per vehicle)for overall signalized intersections and per approach and lane group for all study intersections. The 95t" percentile queue lengths were also determined from Synchro and are expressed in feet. The detailed analysis worksheets of the 2035 Future Conditions with Development are contained in Appendix H. 3 It should be noted that HCM 2000 methodology was used in lieu of HCM 6th if the HCM 6th methodology was not applicable.HCM 6th could not be applicable in such cases as nonstandard National Electrical Manufacturers Association(NEMA)configurations,shared lane configurations,placement of loop detectors,U-turns,etc. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study-Gibson Property Page 45 July 30,2026 Table 8: 2035 Future Conditions with Development-Intersection Capacity and Queuing Analysis Results Part 1 AM Peak Hour PM Peak Hour Effective Storage Delay(s) 50th% 95th% Delay(s) 50th% 95th% No. Intersection(Movement) Length(ft.) LOS 121 Queue(ft.) Queue Synchro Synchro 1 Warrior Drive(N/S)&Fairfax Pike(EIW) Overall Intersection(Signalized) F 86 E 71.8 Eastbound Approach C 31.7 D 51.9 Eastbound Left 260 F 84.9 133 #241 F 128.2 -249 #420 Eastbound Thru C 29.8 572 726 C 29.3 561 #795 Eastbound Right 500 B 13.3 161 260 A 8.4 0 53 Westbound Approach E 67.7 F 91.3 Westbound Left 270 F 226.1 -192 #343 F 148.1 -140 #274 Westbound Thru C 32.2 505 #696 F 87.1 -804 #1047 Westbound Right 575 B 14.2 0 25 B 13.2 0 15 Northbound Approach D 53.2 F 105.6 Northbound Left 190 D 53.9 58 #128 D 53.1 123 #215 Northbound Thru/Right D 51.4 21 #96 F 160.1 -186 #351 Southbound Approach F 307.2 D 48.3 Southbound Left 150 D 50.1 50 94 D 44.8 63 114 Southbound Thru F 398.3 -371 #555 D 49 41 84 Southbound Right D 42.6 0 55 D 49.5 180 293 1 Mitigation:Flashing Yellow Arrow on EBL and WBL movement Warrior Drive(N/S)&Fairfax Pike(ENV) Overall Intersection(Signalized) E 56.4 E_ 56.5_ Eastbound Approach c 23.6 _.................__._._. _._.D 43.9 Eastbound Left 260 C 21.9 73 70 F 9&9 -186 #357 Eastbound Thru C 29.4 582 734 C 28.9 568 #820 Eastbound Right 500 B 12.9 165 243 A 7.9 0 57 Westbound Approach c 25.8 E 65.4 Westbound Left 270 C 24.4 60 103 C 21.2 67 #185 Westbound Thru C 27.5 500 #733 F 77.1 -791 #1034 Westbound Right 575 B 12.3 0 25 B 12.7 0 26 Northbound Approach D 51.9 E 73.6 Northbound Left 190 D 52.8 56 #129 D 46.7 120 #201 Northbound Thru/Right D 49.8 20 #86 F 101.4 -181 #351 Southbound Approach F 229.3 D 53.3 Southbound Left 150 D 48.2 47 92 D 43.7 62 i l l Southbound Thru F 292.5 -327 #530 D 47.7 40 B3 Southbound Right D 46 0 55 E 57.9 185 301 2 Hudson Hollow Road/White Oak Road&Fairfax Pike(ElW) Overall Intersection(Signalized) B 14.3 c 21.2 Eastbound Approach B 12 B 11.9 Eastbound Left 145 B 11.7 25 70 B 18.4 16 #118 Eastbound Thru B 12.2 136 #488 B 10.6 127 381 Eastbound Right 90 A 5.9 0 0 A 5.7 0 7 Westbound Approach B 15.7 C 27.8 Westbound Left 125 A 8.3 0 3 A 7 3 11 Westbound Thru B 16 170 351 C 29 375 #734 Westbound Right 155 A 8.4 0 3 A 6.7 0 8 Northbound Approach C 21.3 C 28.5 Northbound Left/Thru/Right C 21.3 21 69 C 28.5 30 74 Southbound Approach C 22.4 C 29.2 Southbound Left/Thru/Right C 22.4 30 105 C 29.2 29 94 NOTES: [1]Effective storage length is based on the storage length plus one-half of the taper length per TOSAM guidelines. (2]$:Delays(reported from Synchro)exceed 300 seconds in TWSC. [3]-:Volume exceeds capacity,queue is theoretically infinite. [4]#:95th percentile queues(reported from Synchro)exceed capacity,actual queues may be longer.Queues shorn are based on the maximum after tvLo cycles. [5]m:95th percentile volume and queues(reported from Synchro)are metered by upstream signal. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study-Gibson Property Page 46 July 30,2026 Table 9: 2035 Future Conditions with Development-Intersection Capacity and Queuing Analysis Results Part 2 AM Peak Hour �E PM Peak Hour No. I t ction(Move t) Length(.7 (21 Queue(ft.) Queue(ft.) LOS [21 Queue Iff's lih 131 [4][63 Synchro Synchro 3 Route 522(N/S)&Fairfax Pike/Lord Fairfax Highway Overall Intersection(Signalized) F 147.2 F 189.8 -------------------- Eastbound Approach F 311.3 F 331.2 Eastbound Leftrrhru F 349.5 -647 #921 F 409 -606 #820 Eastbound Right 230 C 33.6 35 129 D 45.7 84 #249 Westbound Approach D 44 F 139.8 Westbound Left 500 D 39.1 73 130 D 44.3 161 250 Westbound Thru/Right D 46.7 144 231 F 186.3 -465 #677 Northbound Approach F 111.7 F 207.7 Northbound Left 565 F 237.4 -315 #522 F 479.1 -460 #655 Northbound Thru D 38.5 174 248 E 55.2 263 9381 Northbound Right 250 C 31 0 46 C 34.8 0 25 Southbound Approach D 47.8 F 85.9 Southbound Left 125 E 59.7 68 #152 E 77.1 79 #168 Southbound Thru D 44.7 128 191 F 87.4 -282 #403 Southbound Right 480 A 0 0 33 A 0 0 77 3 Mitigation:Addition of Exclusive EBL and second NBL turn lanes Route 522(N/S)&Fairfax Pike/Lord Fairfax Highway Overall Intersection(Signalized) D 52.7 F 94.3 Eastbound Approach E 76.1 F 107.6 Eastbound Left 250 E 76.9 195 #369 F 166.6 -280 #457 Eastbound Thru E 79.6 218 #403 E 58.1 154 #277 Eastbound Right 230 D 37.8 0 73 D 45.0 67 #235 Westbound Approach D 54.0 F 114.4 Westbound Left 500 D 44.3 75 128 D 40.2 152 237 Westbound Thru/Right E 59.3 147 227 F 150.5 -427 #637 Northbound Approach D 44.4 F 101.4 Northbound Left 565 E 60.0 114 #177 F 179.6 -185 #284 Northbound Thru D 35.7 182 243 E 57.9 256 #380 Northbound Right 250 C 29.5 0 41 C 34.3 0 20 Southbound Approach D 35.5 D 54.1 Southbound Left 125 E 69.1 61 #151 E 70.3 80 #157 Southbound Thru C 26.6 136 186 D 51.5 231 #370 Southbound Right 480 A 0 25 81 A 0 24 126 4 Route 522(NIS)&Lake Frederick Drive(E) Overall Intersection(Signalized) B 17.7 c 22.4 Eastbound Approach C 29.3 D 35.1 Eastbound Left C 30.9 69 155 D 38.5 105 181 Eastbound Right C 22.2 4 38 C 27.8 33 68 Northbound Approach B 15 C 21.1 Northbound Left 470 C 20.9 8 23 C 32.4 27 58 Northbound Thru B 14.7 115 276 B 19.8 159 248 Southbound Approach B 17.8 C 20.6 Southbound Thru B 17.9 136 230 C 21.1 282 432 Southbound Right 295 B 13.2 0 25 B 13.7 0 46 NOTES: ]11 Effective storage length is based on the storage length plus one-half of the taper length per TOSAM guidelines- [2]$:Delays(reported from Synchro)exceed 300 seconds in TWSC. ]3]-:Volume exceeds capacity,queue is theoretically infinite. [4]#:95th percentile queues(reported from Synchro)exceed capacity,actual queues may be longer Queues shown are based on the maximum after two cycles. ]5]m:95th percentile volume and queues(reported from Synchro)are metered by upstream signal. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study-Gibson Property Page 47 July 30,2026 Table 10: 2035 Future Conditions with Development-Intersection Capacity and Queuing Analysis Results Part 3 Am Peak Hour Hour Effective Storage Delay(s) 50th% 51th Delay(s) 50th% 95th% No. Intersection(Movernent) Length(ft.) LOS (21 Queue(ft.) lue u e(' LOS [21 Queue(ft.) Queue(ft.) IT Synchro Synchro 5 Route 522(N/S)&Tasker Road(E) Overall Intersection(Signalized) B 19.2 c 23.9 Eastbound Approach D 46.9 D 45.0 Eastbound Left D 49.4 38 77 D 51.3 119 181 Eastbound Right -1250 D 46.3 0 39 D 40.7 0 36 Northbound Approach B 14.4 B 18.8 Northbound Left 485/485 D 52.7 61 96 D 52.3 119 139 Northbound Thru A 3.3 42 66 A 5.5 81 105 Southbound Approach B 12.7 C 20.3 Southbound Thru B 13.5 106 166 C 22.0 207 315 Southbound Right 315 A 6.9 0 14 A 8.8 1 21 6 Lake Frederick Entrance/Gibson Site Entrance 1&Fairfax Pike(ENV) Overall Intersection(Unsignalized) Eastbound Approach Eastbound Left 150 A 9.6 7.5 B 11.5 5.0 ------------------------------------------------------------------------------ -------------------------------.......... -----------......... ------........ ....................... ......... ------........ .......... ---.......... ........ --------....... .....-----------------......... ------........ Westbound Approach Westbound Left 150 B 10.2 5.0 B 11.1 12.5 Northbound Approach F $537.5 F $1675.9 Northbound Left F $949.1 350 F $2984.5 285 Northbound Thru/Right C 19.8 32.5 C 18.4 17.5 Southbound Approach F 150.5 F $1551.2 Southbound Left 50 F 268.3 75 F $2896.2 340 Southbound Thru/Right B 13 5 D 28 40 6 Mitigation:Install a Signal Lake Frederick Entrance/Gibson Site Entrance 1&Fairfax Pike(E/W) Overall Intersection(Signalized) A 7.2 B 10.3 Eastbound Approach A 2.1 A 2.1 Eastbound Left 150 A 4.6 8 ml l B 10.9 2 m6 Eastbound Thru A 2.0 117 122 A 1.9 139 275 Eastbound Right 150 A 0.0 0 m0 A 0.1 0 m5 Westbound Approach A 7.1 B 12.3 Westbound Left 150 A 3.3 5 12 A 2.8 7 14 Westbound Thru A 7.5 185 263 B 13.3 419 #807 Westbound Right 150 A 4.9 0 16 A 3.3 0 3 Northbound Approach D 38.3 D 39.9 Northbound Left D 38.6 67 #136 D 40.0 45 #121 Northbound Thru/Right C 33.5 0 0 D 36.4 0 0 Southbound Approach C 34.4 D 41.1 Southbound Left 50 C 34.5 14 39 D 41.2 56 #151 Southbound Thru/Right C 33.3 0 0 D 36.4 0 0 NOTES: ]1]Effective storage length is based on the storage length plus one-half of the taper length per TOSAM guidelines. [2]$:Delays(reported from Synchro)exceed 300 seconds in TWSC. ]3]-:Volume exceeds capacity,queue is theoretically infinite- [4]#:95th percentile queues(reported from Synchro)exceed capacity,actual queues may be longer.Queues shown are based on the maximum after two cycles. [51 m:95th percentile volume and queues(reported from Synchro)are metered by upstream signal. [6]INT 5 is analysed using HCM 2000 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study-Gibson Property Page 48 July 30,2026 Table 11: 2035 Future Conditions with Development-Intersection Capacity and Queuing Analysis Results Part 4 AM Peak Hour PM Peak Hour Effective Storage Delay(s) 50th% 95th% Delay(s) 50th% 95th% No. Intersection(Movement) Length(ft.) LOS [21 Queue(ft.) Queue Synchro Synchro 7 Fairfax Pike(S)&Gibson Site Entrance 2(E/W) Overall Intersection(Unsignalized) Southbound Approach B 14.2 D 26.1 Southbound Right B 14.2 2.5 D 26.1 20 8 Fairfax Pike(S)&Gibson Site Entrance 3(E/W) Overall Intersection(Unsignalized) Eastbound Approach Eastbound Left 150 A 9.6 5.0 B 11.6 2.5 Southbound Approach E 47.2 F 130.5 Southbound Left F 53.9 5 F 162.5 40 Southbound Right 50 B 14 0 C 21.9 2.5 9 Route 522(NIS)&Gibson Site Entrance 4 (ENV) Overall Intersection(Unsignalized) Eastbound Approach C 17.1 E 40.8 Eastbound Left/Thru C 19.8 10 F 52.1 80 Eastbound Right 50 B 10.5 2.5 B 12.8 7.5 Westbound Approach C 20.6 E 39 Westbound Left/Thru C 21.2 5 E 40 37.5 Westbound Right 50 B 10.9 0 B 12A 0 Northbound Approach Northbound Left 300 A 9.5 2.5 B 10.7 2.5 Southbound Approach Southbound Left 300 A 9.5 0 B 10.7 0 9 Mitigation:Install a Signal Route 522(NIS)&Gibson Site Entrance 4 (ENV) Overall Intersection(Signalized) A 4.5 B 11.9 Eastbound Approach D 53.6 D 51.2 Eastbound Left D 53.6 20 49 D 51.3 69 120 Eastbound Thru/Right A 0.0 0 0 D 45.7 0 0 Westbound Approach D 52.5 D 48.5 Westbound Left D 52-5 11 33 D 48.5 37 73 Westbound Thru/Right A 0.0 0 0 A 0 0 0 Northbound Approach A 0.4 A &4 Northbound Left 300 A 4.2 3 m3 A 7.0 1 m6 Northbound Thru A 0.2 2 m222 A 8.5 2 m292 Northbound Right 150 A 0.0 0 m6 A 5.9 0 m0 Southbound Approach A 6.3 A 9.6 Southbound Left 300 A 4 0 m2 A 6.9 0 ml Southbound Thru A 6.4 74 87 A 9.7 105 233 Southbound Right 150 A 5.3 0 1 A 6.6 0 1 10 Route 522(NIS)&Gibson Site Entrance 5(W) Overall Intersection(Unsignalized) Westbound Approach B 12.8 C 16.3 Westbound Left C 17.3 0 C 24.8 2.5 Westbound Right 50 B 11 0 B 13.3 2.5 Southbound Approach Southbound Left 300 A 9.5 2.5 B 11.2 0 NOTES: [1]Effective storage length is based on the storage length plus one-half of the taper length per TOSAM guidelines. (2]$:Delays(reported from Synchro)exceed 300 seconds in TWSC. [3]-:Volume exceeds capacity,queue is theoretically infinite. [4]#:95th percentile queues(reported from Synchro)exceed capacity,actual queues may be longer.Queues shorn are based on the maximum after tm cycles. [5]m:95th percentile volume and queues(reported from Synchro)are metered by upstream signal. The capacity analysis results shown in Table 8, Table 9, Table 10 and Table 11 reveal that the study intersections operate at level of service (LOS) D or better by approach in Future Conditions with Development (2035) except for the following intersections: o Warrior Drive&Fairfax Pike(Intersection#1) o Overall intersection operates at LOS F in AM peak and LOS E in PM peaks 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 49 July 30,2026 o Westbound approach operates at LOS E in the AM peak and LOS F in the PM peak o Northbound approach operates at LOS F in PM peak o Southbound approach operates at LOS F in the AM peak o Westbound left exceeds available storage length in both AM and PM peaks, while eastbound left and northbound left exceed available storage length in PM peak only. It is noted the westbound left has protected only phasing. o This intersection fails due to existing and background volumes and is not caused by the proposed development. The intersection is projected to process significant additional traffic from nearby planned background developments of Sherando Green retail and Fairfax Downs residential.There are no known improvements planned as part of those developments to this intersection. However, left turn phasing changed from "protected only" to "flashing yellow arrow"on eastbound and westbound approaches are proposed to mitigate the site impacts on this intersection. o Mitigation: Left turn phasing change from "protected only" to "flashing yellow arrow" on eastbound and westbound approaches are recommended to mitigate the site impacts on this intersection and improve the delay and queuing at the intersection. With the above improvement in place, the eastbound and westbound left turn movements have significant reduction in delay and queuing. While the northbound approach remains at LOS F in the AM peak and the westbound approach and northbound approach operates at LOS E in the PM peak, the conditions are improved to be better than Future Conditions without Development (non- degradation). o Route 522 &Fairfax Pike/Lord Fairfax Highway(Intersection#3) o Overall intersection operates at LOS F in the AM and PM peaks. o Eastbound approach operates at LOS F in the AM and PM peaks. o Westbound approach operates at LOS F in the PM peak. o Northbound approach operates at LOS F in the AM and PM peaks. o Southbound approach operates at LOS F in the PM peak. o Northbound left and eastbound right exceeds available storage length in PM peak, while southbound left exceeds available storage length in both AM and PM peaks. o This intersection fails under background projected conditions due to regional growth and planned background development traffic. o Mitigation:To mitigate site-related impacts,an exclusive eastbound left-turn lane and a second northbound left-turn lane are recommended. For this mitigated scenario, Intersection #3 was analyzed as coordinated with Intersection#9 based on feedback from VDOT review. o With the above recommended improvements in place,the delay and queuing are significantly improved and notably all approaches operate at LOS D in the AM peak. The post-mitigated improvements show the following: • Overall intersection operates at LOS D in AM peak and LOS F in PM peak. • Eastbound approach operates at LOS E in AM peak and LOS F in PM peak. • Westbound approach operates at LOS F and Northbound approach operates at LOS F in PM Peak. • While some approaches operate at LOS E or F in the PM peak hour only,the delay and queuing are significantly improved with the above improvements and conditions are improved to be better than Future without Development(non-degradation). 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 50 July 30,2026 • Fairfax Pike and Lake Frederick Entrance/Site Entrance#1 (Intersection#6) o Northbound Approach and Southbound Approach operates at LOS F during both AM and PM peak hours. o For this mitigated scenario, Intersection#6 was analyzed as coordinated with the Madison 277 entrance based on feedback from VDOT review. o With a conventional traffic signal added at this location, the intersection operates at acceptable levels of service. Installation of a new traffic signal is subject to VDOT review and approval through a future Signal Justification Report ("SJR").A preliminary signal warrant evaluation and VJuST analysis were performed as part of this study to screen potential intersection control configurations. A conventional traffic signal, thru-cut signal, roundabout, and two-way stop control were considered as possible intersection configurations. The ultimate configuration will be determined through the future SJR. It is noted that a roundabout is anticipated to require significant offsite right-of-way and was therefore not recommended for further consideration. o Fairfax Pike and Site Entrance#3(Intersection#8) o Southbound approach of the site access operates at LOS E in the AM peak and LOS F in the PM peak.The failing level of service is due to high through volumes on Fairfax Pike and not a result of high volumes from the entrance (17 peak hour trips).The queuing for the southbound approach is 40 feet,indicating only 2 stacked vehicles. Hence, no mitigations are recommended. o Route 522 and Site Entrance#4(Intersection#9) o Eastbound approach and westbound approach operates at LOS E in the PM peak o With a conventional traffic signal added at this location,the intersection would operate at acceptable levels of service with acceptable queuing along Route 522.Installation of a new traffic signal is subject to VDOT review and approval through a future Signal Justification Report ("SJR"). A preliminary signal warrant evaluation and VJuST analysis were performed as part of this study to screen potential intersection control configurations. A conventional traffic signal, unsignalized continuous green-T, unsignalized restricted crossing U-turn(RCUT), and two-way stop control were considered as possible intersection configurations. The ultimate configuration will be determined through the future SJR. It is noted that an RCUT would result in additional U-turn traffic downstream along Route 522 including truck traffic from the proposed industrial use. It is also noted that a continuous green-T would not meet spacing and acceleration distance requirements and was therefore not recommended for further consideration. The Future Conditions with Development(2035)levels of service and lane configurations are summarized in Figure 16. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 51 July 30,2026 » 2 SITE , ITE SITE s - � I f, 8 s I ` K Flo C/C D/D n B/C 1 EIE Z BIC 3 DIF 4 BIC ee E GF .—B/C p�L.1 S mI AIA Fee.P. F.-IN. tatl Faa6kR tkra Fmr6 Pae Fad.P. Fainax Rlm T llm Fn!tlakk Dma {� VF m BIB C/C B o E/E—► B'A - a 0 A/A� cZ D/D� tl C/L� 'U D/E C/C D/F B/C t CID - B/D _5. BIC 6 AIB a y e p All m LL E Y Al a I N -,� fD • r Tasks Hoak � Faa � Pik Fairla,Pke' � _,2�Fke 1 Pike FNR.M fJ � * AB a dl Q A/A ► 2 e ► ► D/D=:,� p ❑ a A/A o U z" 01 B/B DID A/A I LEGEND a AIA &B 0 Eklatinylntaraetlion rf I"► EaiabnB Roetlway �CIC f- One Way Travel are M'C Traffic Control Devlce Type AM'PM Movement Level of Service AM'PM Approach Level of Service DA/roD .\N . =,P ce LA.Fretleftlk Level of Sernlra ► Lake Fretledek Entrence 8etkpround Improvement Slte Aceeee r-A-7-A-1 I I 5 Site Improvement Figure 16: 2035 Future Conditions with Development- Level of Service Results 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 52 July 30,2026 Spacing Analysis A spacing analysis was conducted for the proposed site entrances based on VDOT's Road Design Manual (RDM)Appendix F, Table 2-2. Appendix F focuses on access management design standards for entrances and intersections.The minimum spacing standards are specified in Table 2-2 through Table 24. Table 2-2 provides guidance on the minimum spacing standards for commercial accesses, intersections, and median crossovers based on roadway functional classification and design speed. Tables 2-3 and 2-4 provide guidance on minimum spacing standards for accesses near interchange areas. Both Fairfax Pike and Route 522 are classified as Minor Arterials according to VDOT's Functional Classification,with a posted speed limit of 55 mph in the vicinity of the site. The applicable minimum spacing standards (centerline to centerline) per Appendix F, Table 2-2 are shown in Table 12. This spacing analysis evaluates the minimum spacing standards for the proposed site entrances.A comparison of the proposed and required spacing is provided in Table 13 and illustrated in Figure 17. Table 12: Minimum Spacing Standards for Commercial Accesses, Intersections,and Median Crossovers(RDM, ADDendix F.Table 2-2 Minimum Centerline to Centerline Spacing (Feet) Highway Design Speed (Type 1) (Type (Type 3) Functional Class ph) Signalized Unsigna ed Full Access (Type 4) or Full R 17 Intersection Intersection or Full Directional artial Access Crossover Crossov Principal Arterialk35;to 30 mph 1,050 880 440 250 ........................................................................................................................................ ..................................... 45 mph 1,320 1,050 565 305 ........................................................................................................................................ .....................................50mph 2,640 1,320 750 495 Minor Arterial 0 mph 880 660 355 200 5 to 45 mph 1,050 660 470 250 >t 50mph 1,320 1,050 555 425 Collector <_30 mph 660 440 225 200 ------35 to 45 mph.......................60................------......-----440................------......-----335................-----------------250---------------- .................................50mph 1,050 660 445 360 ............... ............................................................................................----------------- ---------------- Notes: 1.Based on the Virginia Department of Transportation's(VDOT)Road Design Manual(RDM),Appendix F Table 2-2 for Minimum Spacing Stan 2.Design speed for roadways with posted speed of 45 mph or less is at least equal to the posted speed.For roadways with a posted speed of 50 mph or higher,the design speed is at least 5 mph higher than the posted speed. Where design speed is not available,the posted speed should be used. Table 13: Spacing Analysis Summary Proposed Mininvirn Meets the Intersection(s)I Access Point(s) Type of Traffic Direction Adjacent Intersection Type of Traffic Distance Spacing Standard Control Control (ft-) Required (Yes/No) A Route 522 and Sasser Lane Partial Access South Route 522 and Site Entrance#5 Full Access 1,490 425 Yes B.Route 522 and Site Entrance#5 Full Access South Route 522 and Site Entrance#4 Signalized 1,035 555 Yes C.Route 522 and Site Entrance#4 Signalized South Route 522 and Highland Corners Road Unsignalized 1,330 1,050 Yes D.Route 522 and Site Entrance#4 Signalized South Route 522 and 3636 Entrance Partial Access 425 425 Yes E.Route 522 and Site Entrance#4 Signalized South Route 522 and Fairfax Pike/Lord Fairfax Highway Signalized 2,375 1,320 Yes F.Fairfax Pike and Double Tollgate Road Full Access West Fairfax Pike and Site Entrance#3 Full Access 665 555 Yes G.Fairfax Pike and Site Entrance#3 Full Access West Fairfax Pike and Site Entrance#2 Partial Access 930 425 Yes H.Fairfax Pike and Site Entrance#2 Partial Access West Fairfax Pike and 1867 Entrance Full Access 710 425 Yes I.Fairfax Pike and 1867 Entrance Full Access West Fairfax Pike and Site Entrance#1 Signalized 1,160 555 Yes J.Fairfax Pike and Site Entrance#1 Signalized West Fairfax Pike and Madison 277 Entrance Signalized 1,320 1,320 Yes K.Fairfax Pike and Site Entrance#1 Signalized East Route 522 and Fairfax Pike/Lord Fairfax Highway Signalized 4,850 1,320 Yes 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 53 July 30,2026 As shown in Table 13, all proposed site entrances would meet minimum spacing standards per VDOT'S RDM Appendix F. It is noted that signalized spacing was evaluated for Intersections #6 and #9 to evaluate the highest potential category if those entrances become signalized; however, spacing for the other innovative intersection types is further discussed in the VJuST section in Appendix J. "e t _ a 1 � 1490 ft. A 425(ft.Reqd.) h. { �.i 1035 ft. 555(ft.Reqd.) 1320 ft. B 1320(ft.Regd.) : . . 4850 ft. I c 1320(ft.Regd.) 425 ft. 1160 ft. K 425(ft.Regd.) 555(ft.Regd.) 1330 ft. H �� C 1050(ft.Regd.) 710 ft. 425(ft.Reqd.) G 930 ft. 2375 ft. Legend 425(ft.Regd.) F , E 1320(ft.Regd.) 665 ft. 555(ft.Regd.) �—► Site Entrance Madison 277 Entrance ` (Signalized) Figure 17: Spacing Analysis Turn Lane Warrant Analysis Left and right turn lane warrants are based on VDOT's Road Design Manual(RDM),Appendix F. In order to determine the need for exclusive left and/or right turn lanes or tapers at the site entrances, the 2035 Future Conditions with Development traffic volumes were utilized. Warrants for right-turn storage lanes on two-and four-lane highways at intersections are based on Figure 3-26 and Figure 3-27 in Appendix F. These figures provide a graphical representation for determining the necessity of a right turn lane by comparing the total volumes of a given approach with their respective right turn volumes. Warrants for left-turn storage lanes on two-lane highways are based on Figures 3-5 through 3-21 in Appendix F,while warrants for left-turn storage lanes on four-lane highways are based on Figure 3-3 in Appendix F. These figures provide graphical representations for determining the necessity of a left turn lane by comparing the advancing volumes of a given approach and 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 54 July 30,2026 the respective opposing volumes with respect to the percentage of left turning vehicles of the advancing volumes and the design speed of a given roadway. Fairfax Pike is a two-lane undivided roadway with a posted speed of 55 mph in the vicinity of the site, whereas Route 522 is a four-lane median divided roadway with a posted speed limit of 55 mph in the vicinity of the site. A summary of the right-turn lane warrant analysis for two-lane roadways and four-lane roadways is provided in Table 14 and Table 15, respectively,and the left-turn lane warrant analysis for two-lane roadways and four-lane roadways is provided in Table 16 and Table 17, respectively. Table 14: Right-Turn Lane Analysis for Two-Lane Roadway RightApproach Right Turn Minimum Right Minimum ThresholdStudy Scenario Volume Volume Turn Taper Turn Full Lane Treatment Threshold Intersection 6:WBR AM Peak 712 92 20 40 Full-width Lane and Taper Required Intersection 6:WBR PM Peak 1,171 37 20 40 Taper Required Intersection 7:WBR AM Peak 702 3 20 40 Not Warranted Intersection 7:WBR PM Peak 1,129 1 20 40 Not Warranted Intersection 8:WBR AM Peak 715 14 20 40 Not Warranted Intersection 8:WBR PM Peak 1,130 6 20 40 Not Warranted Table 15: Ri ht-Turn Lane Analysis for Four-Lane Roadway RightApproach Right Turn Minimum Right Minimum TaperStudy Scenario Volume Volume Turn . . Threshold Intersection 9: NBR AM Peak 801 53 16 69 Taper Required Intersection 9: NBR PM Peak 1,024 21 10 53 Taper Required Intersection 9:SBR AM Peak 705 92 19 75 Full-width Lane and Taper Required Intersection 9:SBR PM Peak 985 37 10 55 Taper Required Intersection 10: NBR AM Peak 740 6 18 73 Not Warranted Intersection 10: NBR AM Peak 1,084 2 10 48 Not Warranted As shown in Table 14,a full-width right turn lane and taper are warranted for the westbound right turn at Intersection 6,while no right turn lane is warranted at Intersections 7 and 8. As shown in Table 15, a taper is warranted for the northbound right turn at Intersection 9, a full-width right turn lane and taper are warranted for the southbound right turn at Intersection 9, and no right turn lane is warranted at Intersection 10. Right turn lanes will be provided at the proposed site entrances along Route 522 and where warranted on Fairfax Pike. Table 16: Left-Turn Lane Analysis for Two-Lane Roadway StudyScenario OpposingVol. Advancing Vol. Left Turn Vol. Left Turn% VDOT Figure Treatrnent Intersection 6:EBL PM Peak 712 933 81 8.68% Fig.3-11 Full-width Lane and Taper W arranted Intersection 6:EBL PM Peak 1,171 974 33 3.39% Fig.3-10 Full-width Lane and Taper Warranted Intersection 8:EBL PM Peak 1 715 1 930 1 48 1 5.16% 1 Fig.3-11 Full-width Lane and Taper Warranted Intersection 8:EBL PM Peak 1 1130 1 988 1 19 1 1.92% 1 Fig.3-10 Full-width Lane and Taper Warranted Table 17: Left-Turn Lane Analysis for Four-Lane Roadway Opposing Study Scenario Median Vol.(VPH) Vol. Turning Left Turn% Treatment Intersection 9:NBL AM Peak Divided 1 705 1 801 1 36 1 4.5% Full-width Turn Lane and Taper Warranted for Undivided and Divided Intersection 9:NBL PM Peak Divided 985 1,024 15 1.5% Not Warranted Intersection 9:SBL AM Peak Divided 801 705 2 0.3% Not Warranted Intersection 9:SBL PM Peak Divided 1,024 985 1 0.1 1 Not Warranted Intersection 10:SBL AM Peak Divided 740 720 17 2.4% Not Warranted Intersection 10:SBL PM Peak Divided 1,084 986 7 0.7% Not Warranted As shown in Table 16, a left turn lane is warranted for the eastbound left turns at Intersections 6 and 8.As shown in Table 17, a left turn lane is warranted for the northbound left turn at Intersection 9, while no left turn lane is warranted at Intersections 9 and 10 for the southbound left turns. Left turn lanes will be provided at the proposed full access site entrances along Fairfax Pike. Exclusive left turn lanes are already present along Route 522 under existing conditions. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 55 July 30,2026 Preliminary Signal Warrant Analysis This section presents a preliminary signal warrant analysis for the following intersection: • Fairfax Pike and Site Entrance#1/Lake Frederick Entrance—A traffic signal is recommended as a mitigation measure in the Future with Development(2035)conditions.PM peak traffic volumes from Figure 15 were utilized for this analysis. Fairfax Pike has a posted speed limit of 55 mph. • Route 522 and Site Entrance #4 — A traffic signal is recommended as a mitigation measure in the Future with Development(2035)conditions. PM peak traffic volumes from Figure 15 were utilized for this analysis. Route 522 has a posted speed limit of 55 mph. This warrant analysis was conducted using Table 4C-V1: Traffic Signal Warrant Using Average Daily Traffic Estimate from the Virginia MUTCD. Table 4C-V1 from the Virginia MUTCD is shown in Table 18. The results of the preliminary signal warrant analysis are shown in Table 19. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study-Gibson Property Page 56 July 30,2026 Table 18: Traffic Signal Warrant Using Average Daily Traffic Estimate(Source:Virginia MUTCD,Table 4C-V1) Table 4C-V1. Traffic Signal Warrant Using Average Daily Traffic Estimate (To be used only when traffic counts are not available, such as at a future intersection) Condition A-Minimum Vehicular Volume Number of lanes for Vehicles per day on major street Vehicles per day on higher-volume moving traffic on each minor-street approach (one approach (total of both approaches) direction only) Major Street Minor Street 100%3 80%° 70%` 560/0° 100%3 80%" 70%` 56 1 1 8.000 6,400 5,600 4.480 2.400 1.920 1.680 1344 2 or more 1 9.600 7.680 6.720 5.376 2.400 1.920 1.680 1.344 2 or more 2 or more 9.600 7.680 6.720 5.376 3,200 2,560 2.240 1.792 1 2 or more 18 .000 6.400 5.600 4,480 3.200 2.560 2 240 1 792 Condition B-Interruption of Continuous Traffic Number of lanes for Vehicles per day on major street Vehicles per day on higher-volume moving traffic on each minor-street approach (one approach (total of both approaches) direction only) Major Street Minor Street 100% 80%b 700io` 56%° 100%' 80%° 70%` 56%° 1 1 12,000 9.600 8.400 6.720 1.200 960 850 680 2 or more 1 14.400 11.520 10.080 8.064 1.200 960 850 680 2 or more 2 or more 14.400 11.520 10,080 8.064 1.600 1.280 1.120 89611 1 2 or more 12.000 9.600 8.400 6.720 1.600 1.280 1.120 896 Bask minimum hourly volume for urban areas °Used for combination of Conditions A and B after adequate consideration of other remedial measures in urban areas ` May be used when the major-street speed exceeds 40 mph or in an isolated community with a population of less than 10.000 °May be used for combination of Conditions A and B after adequate consideration of other remedial measures when the mapr-street speed exceeds 40 mph or in an isolated community with a population of less than 10.000 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study-Gibson Property Page 57 July 30,2026 Table 19: ADT Signal Warrant Analysis Number of lanes for moving Signal Warrant Requirements Estimated ADT traffic on each approach Signal Intersection Scenario Condition Major Street Minor Street Major Street Minor Street Warrant Major Street Minor Street (Both (One Direction (Both (One Direction Directions) Only) Directions) Only) 70%Thresholds Condition A 5,600 2,240 Intersection#6:Fairfax Future with Condition B 8,400 1,120 Pike and Site Entrance Development(2035) 1 2 or more 56%Threshold 23,913 2,010 YES #11Lake Frederick Entrance Condition A 4,480 1,792 Condition B 6,720 896 70%Thresholds Condition A 6,720 2,240 Intersection 9:Route 522 Future with 2 or more 2 or more Condition B 10,080 1,120 22,447 1,320 YES and Site Entrance#4 Development(2035) 56%Threshold Condition A 5,376 1,792 Condition B 8,064 896 Per the Virginia MUTCD,the following are the requirements for a traffic signal to be warranted at an intersection: • Either Condition A or Condition B for the 70%thresholds must be satisfied or., • Both Condition A and Condition B for the 56%thresholds must be satisfied As shown in Table 19, the preliminary signal warrants based on the estimated ADTs for the intersection of Fairfax Pike and Site Entrance#1/Lake Frederick Entrance, and Route 522 and Site Entrance#4 are satisfied under the Future with Development (2035) conditions. Please note that this analysis is a preliminary signal warrant analysis. A future, comprehensive Signal Justification Report would need to be submitted in accordance with VDOT guidelines to determine whether other signal warrants are satisfied and if signalization is warranted. Please also refer to the VJuST section in Appendix J,which provides a screening of other innovative intersection types at these two entrance locations. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 58 July 30,2026 Analysis of 2041 Future Conditions with Development (Planning Year) This scenario analyzes the future with development conditions for the planning year 2041 (plus 6 years from build out). Consistent with VDOT Chapter 870 guidelines a plus 6 year analysis provides information for regional planning purposes. Site Description and Site Access A description of the proposed development and the site access was provided in the earlier 2035 section of the report. Projected Site Trip Generation The trip generation for the site in the Planning Year conditions is consistent with the trip generation for the site in the build out year, as previously shown in Table 7. Distribution and Assignment of Vehicular Site Traffic The distribution and assignment of the vehicular site generated trips were based on the existing traffic patterns, engineering judgement, the nature of the proposed development, and with the input and agreeance from County and VDOT staff during the scoping.The site direction of approach was shown earlier in Figure 13.The site assignment for the peak hour trips was presented earlier in Figure 14. Inherent Growth & Planned Background Development As specified in the scoping document, an annual linear growth rate of 0.5%was applied to all major movements on Route 522 and Hudson Hollow Road, while a rate of 1%was applied on Fairfax Pike, Warrior Drive, White Oak Road, and Tasker Road. The inherent regional growth volumes(for the period between 2026 and 2041)are illustrated in Figure 18. All planned background developments shown in 2035 were utilized for 2041. The total background development traffic was shown in Figure 9. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 59 July 30,2026 s Legend y 4 - O Study Intersection Existing Roadway One Way Travel Lane AM/PM Peak Hour Traffic Lake Frederick Entrance •nz2 $ O rc O E 17/18 0 4/5 6/11 4—45164 N m t—27/60 t— 10/37 ro t mIy 0/0 °i co 0/3 N �b 15130 Fairfax Pike 1* Fairfax Pike Fairfax H.. airtax Pike � � ` Fairfax PiKe � � ` Farfax Pike 17132--+ o o l0/7 28/17 M N 5/7 49/60—► m 39/31—► 0 31/14—► m N 010 6 3/6 0 15/20 m t 3 a Of f—31/68 O O N O 0/0 Fairfax Pik Lake Fretlerick 5 ♦ Tasker Road , ♦ ax Pike 0/0 o r`,n 316 M ° N 47/35—► Oro �= 24/22-4 �= 0/0 Figure 18: Projected Inherent Regional Growth Traffic Volumes (2026-2041) 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study-Gibson Property Page 60 July 30,2026 Future with Development(2041) Traffic Volumes The 2041 future with development traffic volumes were determined by adding the inherent growth (Figure 18) and planned background development volumes(Figure 9)as well as the assigned site generated traffic volumes(Figure 14)to the existing volumes(Figure 6). The 2041 Future Conditions with Development traffic volumes are depicted in Figure 19. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 61 July 30,2026 Ar 1 z t�Y � ' 8 9.920 1 G) 4.flu ®1 21 63C I , 5 135n 45 0 3g/49 $ rc 'L 65l105 ;F 648882 _ € 559967 n '_^ o 757lS76 — ^ n 1621148 3/30 ^ fO m 115232 • F81Rax Plk � � F � � LIXOF rbiH ke ♦ I/�`^ F11-11 4) ♦ ` FBIf10X Plk¢ ♦ Lak¢FREe/ICM DM¢ � . - 15312 m T 222/162 a T I1D/ 267/300� O1 T 148/169 � � 68017 —► € 6524574--� a n 308212—� e 390/167 21f47 0 24Bld68 m m ' 92/91 d m 7 880 28 20 25 l80 O20 9W 1 2,470 1 440 �' $ 470 92137 3/1 14/6 59211,074 4—70711,153 Iy �—709/1,149 La fm 36/5$FaYlakF Faktak Pi r F. I ♦ FeRv Pike ♦ Faklak Pike FM.PNie 55l170 n 81f33 e S 48119 3 .Ctl 829/854—► @ 953/1,008—► 905989—e 230254� � 46/107� o 23930 4070 ® 2'vo Ia 10 LEGEND 112 a �—5117 �'—0/0 m n ® Stutly lnb —h— .jr 15152 216 Etlegng 8eatlway Ske En12M¢a: V le50¢Enl2nre tts el— One Way Travel Lane ` ^ttmcee4 r* * �� AMIPM Peek Hour Traffic _ LA.Fretlerlck Entrance 279 m4� n c�_► Slh Entrance 11fd8 fJ ^ ,p ^ ADT Avenge Daily Traffic S 4 780 4 770 Figure 19: 2041 Future Conditions with Development(Design Year)—Vehicular Traffic Volumes 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 62 July 30,2026 Future with Development Intersection Capacity and Queueing Analysis (2041) Intersection capacity analyses were performed for the 2041 Future Conditions with Development scenario at the study area intersections during the AM and PM peak hours. Synchro, version 11, was used to analyze the study intersections with results based on the HCM 6th methodology4 presented in the TRB's Highway Capacity Manual(HCM)and analysis guidelines provided by the County. The analysis herein includes level of service (LOS), delay, and queue length comparisons for the turning movements analyzed. For the purposes of this analysis,the future peak hour factors(PHF)were based on the traffic counts,as applicable,and utilized on a by-intersection basis; PHF in the range of 0.92 to 1.00 were used for the future scenario, consistent with the scoping document.The heavy vehicle percentages(HV%)were the same as those used in the 2026 Existing Conditions and 2035 Future Conditions without Development scenario analyses. The planned background and recommended due to site improvements outlined in the 2035 analysis year were carried forward for the 2041 analysis. The results of the intersection capacity analyses from Synchro are presented in Table 20,Table 21,and Table 22 and graphically in Figure 20. The 9511 percentile queue lengths were also determined from Synchro and are expressed in feet. The detailed analysis worksheets of the 2041 Future Conditions with Development are contained in Appendix I. °It should be noted that HCM 2000 methodology was used in lieu of HCM 6th if the HCM 6th methodology was not applicable.HCM 6th could not be applicable in such cases as nonstandard National Electrical Manufacturers Association(NEMA)configurations,shared lane configurations,placement of loop detectors,U-turns,etc. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study-Gibson Property Page 63 July 30,2026 Table 20: 2041 Future Conditions with Development-Intersection Capacity and Queuing Analysis Results Part 1 AM Peak Hour PM Peak Hour Effective Storage r r Synchro Synchro No. Intersection(Movernent) Length(ft.) LOS Delay(s) Queue(ft.) Queue(ft.) LOS Delay(s) Queue(ft.) Queue(ft.) Warrior Drive(N/S)&Fairfax Pike(E/W) Overall Intersection(Signalized) E 56.6 E 63.6 Eastbound Approach c 24.6 D 49.1 Eastbound Left 260 C 23.4 70 85 F 111.1 -206 #381 Eastbound Thru C 30.6 592 772 C 30.9 591 #860 Eastbound Right 500 B 13 157 243 A 7.9 0 56 Westbound Approach c 26.9 E 76.9 Westbound Left 270 C 26.3 56 #110 C 22.5 66 #183 Westbound Thru C 28.6 494 #784 F 91 -834 #1078 Westbound Right 575 B 12.4 0 26 B 12.6 0 26 --------------------------------------------------------------------- -------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Northbound Approach D 52 E 77.5 Northbound Left 190 D 52.9 58 #127 D 46.8 120 #200 Northbound Thru/Right D 49.8 21 #91 F 109.1 -183 #351 --------------------------------------------------------------------- -------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Southbound Approach F 228 E 58.5 Southbound Left 150 D 48.2 51 95 D 43.8 65 115 Southbound Thru F 292.5 -346 #530 D 47.7 40 83 Southbound Right D 45.8 0 56 E 65.8 200 #345 2 Hudson Hollow Road/White Oak Road &Fairfax Pike(EMI) Overall Intersection(Signalized) B 14.9 c 23.7 Eastbound Approach B 12.7 B 12.8 Eastbound Left 145 B 12.9 28 76 C 21.7 19 #129 Eastbound Thru B 12.8 147 #517 B 11 131 401 Eastbound Right 90 A 5.9 0 0 A 5.7 0 8 Westbound Approach B 16 c 31.9 Westbound Left 125 A 8.5 0 3 A 7.2 3 12 Westbound Thru B 16.2 178 368 C 33.4 396 #770 Westbound Right 155 A 8.4 0 3 A 6.8 0 8 Northbound Approach c 21.6 c 2&8 Northbound Left/Thru/Right C 21.6 23 72 C 28.8 31 77 Southbound Approach c 22.9 c 29.6 SouthboundLeft/Thru/Right C 22.9 34 ill C 29.6 32 100 3 Route 522(N/S)&Fairfax Pike/Lord Fairfax Highway Overall Intersection(Signalized) D 54.8 F 100.6 Eastbound Approach F 81.8 F 109.1 Eastbound Left 250 E 78.4 197 #371 F 170.9 -285 #462 Eastbound Thru F 89.7 231 #423 E 60.4 159 #287 Eastbound Right 230 D 37.8 0 75 D 47.5 83 #261 Westbound Approach D 54.4 F 128.9 Westbound Left 500 D 44.1 79 135 D 41.3 161 251 WestboundThru/Right E 60.1 152 235 F 171.9 -460 #671 Northbound Approach D 45 F 107 Northbound Left 565 E 60.2 116 #179 F 188.3 -190 #290 Northbound Thru D 36.6 186 250 E 62.2 -265 #394 Northbound Right 250 C 30 0 46 C 34.5 0 24 Southbound Approach D 36.5 E 57.5 Southbound Left 125 E 69.7 64 #155 E 70.6 81 #162 Southbound Thru C 27.8 140 188 E 55.5 234 #386 NOTES: [11 Effective storage length is based on the storage length plus one-half of the taper length per TOSAM guidelines. [2]-:Volume exceeds capacity,queue is theoretically infinite. [3]#:95th percentile queues(reported from Synchro)exceed capacity,actual queues may be longer.Queues shown are based on the maximum after two cycles. [4]m:95th percentile volume and queues(reported from Synchro)are metered by upstream signal. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study-Gibson Property Page 64 July 30,2026 Table 21: 2041 Future Conditions with Development-Intersection Capacity and Queuing Analysis Results Part 2 AM Peak Hour PM Peak Hour Effective Storage r r No. Intersection(Movernent) Length(ft.) LOS Delay(s) Queue(ft.) Queue(ft.) LOS Delay(s) Queue(ft.) Queue(ft.) Synchro Synchro 4 Route 522(N/S)&Lake Frederick Drive(E) Overall Intersection(Signalized) B 17.7 C 22.5 --------------------------------------------------------------------- -------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Eastbound Approach c 29.4 D 35.4 Eastbound Left C 31.1 70 155 D 38.8 105 182 Eastbound Right C 22.5 6 41 C 28 34 69 Northbound Approach B 15 c 21.2 Northbound Left 470 C 21 8 23 C 32.9 27 58 Northbound Thru B 14.7 118 284 B 19.8 164 256 Southbound Approach B 17.9 c 20.8 Southbound Thru B 18 141 232 C 21.3 290 #456 Southbound Right 295 B 13.1 0 25 B 13.7 0 46 5 Route 522(N/S)&Tasker Road(E) Overall Intersection(Signalized) B 19.5 C 24.4 Eastbound Approach D 46.9 D 45.2 Eastbound Left D 49.5 39 78 D 51.8 120 184 Eastbound Right 250 D 46.3 0 39 D 40.7 0 37 Northbound Approach B 14.9 B 19.5 Northbound Left 485 D 53.8 65 99 D 50.3 122 142 Northbound Thru A 3.6 26 102 A 7.2 130 77 Southbound Approach B 12.8 c 20.7 Southbound Thru B 13.6 108 170 C 22.4 214 323 Southbound Right 315 A 6.9 0 14 A 8.9 2 23 6 Lake Frederick Entrance/Gibson Site Entrance 1&Fairfax Pike(ENV) Overall Intersection(Signalized) B 11.1 B 10.9 Eastbound Approach A 9.4 � A 2.3 Eastbound Left 150 A 4.9 5 m5 B 12 2 m3 Eastbound Thru B 10 84 534 A 2.1 108 180 Eastbound Right 150 A 4.2 0 m0 A 0.1 0 m4 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Westbound Approach A 7.3 B 13.5 Westbound Left 150 A 7.2 5 12 A 2.8 7 14 Westbound Thru A 7.6 189 268 B 14.6 445 #839 Westbound Right 150 A 4.9 0 16 A 3.3 0 3 Northbound Approach D 3&3 �D 39.9 Northbound Left D 38.6 67 #136 D 40 45 #121 Northbound Thru/Right C 33.5 0 0 D 36.4 0 0 Southbound Approach c 34.4 D 41.1 Southbound Left 50 C 34.5 14 39 D 41.2 56 #151 Southbound Thru/Right I I C 33.3 0 0 1 D 36.4 0 0 NOTES: [1]Effective storage length is based on the storage length plus one-half of the taper length per TOSAM guidelines. [2]-:Volume exceeds capacity,queue is theoretically infinite. [3]#:95th percentile queues(reported from Synchro)exceed capacity,actual queues may be longer.Queues shown are based on the maximum after two cycles. ]41 m:95th percentile volume and queues(reported from Synchro)are metered by upstream signal. ]51 INT 5 is analysed using HCM 2000 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study-Gibson Property Page 65 July 30,2026 Table 22: 2041 Future Conditions with Development-Intersection Capacity and Queuing Analysis Results Part 3 AM Peak Hour PM Peak Hour Effective Storage 50th% 95th% 50th% 95th% No. Intersection(Movernent) Length(ft.) LOS Delay(s) Queue(ft.) Queue(ft.) LOS Delay(s) Queue(ft.) Queue(ft.) Synchro Synchro 7 Fairfax Pike(S)&Gibson Site Entrance 2(ENV) Overall Intersection(Unsignalized) Southbound Approach B 14.3 D 27 Southbound Right B 14.3 2.5 D 27 20 8 Fairfax Pike(S)&Gibson Site Entrance 3(ENV) Overall Intersection(Unsignalized) Eastbound Approach �� Eastbound Left 150 A 9.6 5 B 11.8 2.5 Southbound Approach E 49.6 F 140.8 Southbound Left F 56.7 5 F 175.5 42.5 Southbound Right 50 B 14.1 0 C 22.6 2.5 9 Route 522(N/S)&Gibson Site Entrance 4(EMI) Overall Intersection(Signalized) A 4.5 B 11.9 Eastbound Approach D 53.6 D 51.2 Eastbound Left D 53.6 20 49 D 51.3 69 120 Eastbound Thru/Right A 0 0 0 D 45.7 0 0 Westbound Approach D 52.5 D 4&5 Westbound Left D 52.5 11 33 D 48.5 37 73 WestboundThru/Right A 0 0 0 A 0 0 0 Northbound Approach A 0.3 A 8.5 Northbound Left 300 A 4.3 3 m3 A 7.1 1 m7 Northbound Thru A 0.2 2 m229 A 8.5 0 m293 Northbound Right 150 A 0 0 m6 A 5.9 0 m0 Southbound Approach A 6.4 A 9.8 Southbound Left 300 A 4 0 m2 A 7 0 ml Southbound Thru A 6.5 78 92 A 9.9 ill 241 Southbound Right 150 A 5.3 0 1 A 6.6 0 0 10 Route 522(N/S)&Gibson Site Entrance 5(W) Overall Intersection(Unsignalized) Westbound Approach B 13 c 16.5 Westbound Left C 17.6 0 D 25.4 2.5 Westbound Right 50 B 11.1 0 B 13.4 2.5 Southbound Approach 0.2 0.1 Southbound Left 300 A 9.6 2.5 B 11.3 0 NOTES: ]1]Effective storage length is based on the storage length plus one-half of the taper length per TOSAM guidelines. [2]-:Volume exceeds capacity,queue is theoretically infinite. [3]#:95th percentile queues(reported from Synchro)exceed capacity,actual queues may be longer.Queues shown are based on the maximum after two cycles. [4]m:95th percentile volume and queues(reported from Synchro)are metered by upstream signal. The capacity analysis results shown in Table 20,Table 21 and Table 22 reveal that the planning year/plus 6 year analysis reveals similar results to the Future with Development 2035 analysis, the intersections with failing level of service continuing to have approaches that fail.All of the intersections operating acceptably under 2035 continue to operate acceptably under 2041 except the following changes: O Warrior Drive&Fairfax Pike(Intersection#1) O Southbound approach operates at LOS E in PM peak. O Route 522 &Fairfax Pike/Lord Fairfax Highway(Intersection#3) O Southbound approach operates at LOS E in PM peak. O Eastbound approach operates at LOS F in AM peak. The Future Conditions with Development(2041)levels of service and lane configurations are summarized in Figure 20. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 66 July 30,2026 sITE 16 LA Lord Fa,rf., way ;41 5 I ITE � 3 r� w r ¢, i i r FIE I C/C DIE ^„ BBC 1 � EIE 2 BIC DIF 4 e�C W QQ *B'B Y � NA Wn mm a LL o 3 OF B/C a*D/F - �GCm , AIA— m , I D/D 1 YIrY ♦� - F�vx lr>A FeveO H Fii �.ytls �ea/Y LMe Re![ ♦ • 11 D�CIF f' ► Sic f ► DIF- ♦ GC—� BBB DIES B/A D o A/A� Cc� U E IC ='-E7 ;- CI CID - B-D BIC 6 - 8 ♦ BIB �) y p y aQ NA o� U !■ _AIS m u. vd GD� ♦♦ A9 CIC� U 2 A^ a o a s D D BID iD LEGEND e C!C BB O E-1"g lnteraacHon rI li r u E,*Wa Roetlwey ♦ GC j---CID T ,C T -1c ► ® �'£0 TrNll<Contrd Device Type VV AM1I'1'1.' MOvlmint Level 0l S-- AM'PM Approach Level of Sevice '� {� �-► MIP Overell LevN of Service � � Like Fretlerlck Entrance C�� • m�m Backpmuntl bprovement Silo Acceee /� SIY Improvement Figure 20: 2041 Future Conditions with Development(Planning Year) - Level of Service Results 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 67 July 30,2026 Conclusion The analysis presented in this report supports the following assumptions and findings: • The following intersections were included for evaluation per the scoping document: 1. Fairfax Pike at Warrior Drive 2. Fairfax Pike at White Oak Road/Hudson Hollow Road 3. Fairfax Pike/Lord Fairfax Highway at Route 522 4. Route 522 at Lake Frederick Drive 5. Route 522 at Tasker Road 6. Site entrances on Fairfax Pike and on Route 522 *See Supplemental Analysis summary below pertaining to the evaluation of the 1-81/Fairfax Pike ramps. • Existing Conditions (2026): o All approaches operate at LOS D by approach except for the following: ■ Fairfax Pike and Warrior Drive(Intersection#U • The overall intersection operates at LOS F(delay of 98.9 sec)in AM Peak • Northbound approach operates at LOS E in both AM and PM Peak • Southbound approach operates at LOS F(delay of 333.1 sec) in AM Peak • Eastbound left exceeds available storage length in PM peak. • It is noted that this intersection provides access to Sherando High School and the AM peak hour LOS deficiencies are primarily attributed to the higher volumes processed during the school peak arrival time. • Future without Development(2035): o Future volumes were projected by applying regional growth to the regional roads and incorporation of six planned background developments including: ■ Madison 277 ■ Lake Frederick(remaining build out) ■ Sherando Green ■ Fairfax Downs ■ Enclave at Tasker Residential ■ Eastgate Commercial o The following planned transportation improvements was incorporated in the study: ■ Construction of exclusive left turn lanes on the eastbound and westbound approaches at the intersection of Fairfax Pike and White Oak Road/Hudson Hallow Road (study Intersection#2) ■ Improvements at Route 277(Fairfax Pike)at Warrior Drive(VDOT SMART SCALE project)to extend the eastbound right turn lane by another 200 feet with 200 foot taper 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 68 July 30,2026 o Under Future without Development (2035), the following intersections have approaches that operate below acceptable level of service: ■ Warrior Drive&Fairfax Pike(Intersection#1) • The overall intersection operates at LOS F(delay of 88.6 sec) in AM peak, and operates at LOS E in PM peak • Westbound approach operates at LOS E in the AM and PM peak • Northbound approach operates at LOS F(delay of 99.9 sec)in PM peak • Southbound approach operates at LOS F(delay of 312.3 sec)in AM peak • Westbound left exceeds available storage length on both AM and PM peaks, while eastbound left and northbound left exceed available storage length in PM peak only. It is noted the eastbound and westbound lefts have protected only phasing. • It is noted that this intersection provides access to Sherando High School as well as significant background traffic projected from Sherando Green retail and Fairfax Downs residential developments adjacent to the intersection. There are no known improvements planned as part of those developments to this intersection. ■ Route 522 &Fairfax Pike/Lord Fairfax Highway(Intersection#31 • Overall intersection operates at LOS F in the AM (delay of 108.6 sec) and PM (delay of 161.1 sec)peak hours • Eastbound approach operates at LOS F in the AM (delay of 249.9 sec)and PM peak(delay of 293.3 sec) • Westbound approach operates at LOS F(delay of 124.4 sec) in PM peak. • Northbound approach operates at LOS F(delay of 174.5 sec) in PM peak • Southbound approach operates at LOS E in PM peak • Northbound left exceeds available storage length in PM peak, while southbound left exceeds on both AM and PM peaks. ■ Fairfax Pike and Lake Frederick Entrance(Intersection#6) • Northbound approach operates at LOS F during both the AM (delay of 89.8 sec) and PM (delay of 295.5 sec)peak hours. • Future with Development(2035): o Under Future with Development (2035), the following intersections have approaches that operate below acceptable level of service: ■ Warrior Drive&Fairfax Pike(Intersection#1) • Overall intersection operates at LOS F(delay of 86 sec)in AM peak and LOS E in PM peak • Westbound approach operates at LOS E in the AM peak and LOS F (delay of 91.3 sec)in the PM peak • Northbound approach operates at LOS F(delay of 105.6 sec)in PM peak 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 69 July 30,2026 • Southbound approach operates at LOS F(delay of 307.2 sec) in the AM peak • Westbound left exceeds available storage length in both AM and PM peaks, while eastbound left and northbound left exceed available storage length in PM peak only. It is noted the eastbound and westbound lefts have protected only phasing. • This intersection fails due to existing and background volumes and is not caused by the proposed development. The intersection is projected to process significant additional traffic from nearby planned background developments of Sherando Green retail and Fairfax Downs residential. There are no known improvements planned as part of those developments to this intersection. • Mitigation: Left turn phasing change from"protected only"to"flashing yellow arrow" on eastbound and westbound approaches are recommended to mitigate the site impacts on this intersection and improve the delay and queuing at the intersection. With the above improvement in place, the eastbound and westbound left turn movements have significant reduction in delay and queuing.While the northbound approach remains at LOS F in the AM peak and the westbound approach and northbound approach operates at LOS E in the PM peak, the conditions are improved to be better than Future Conditions without Development(non-degradation). ■ Route 522 &Fairfax Pike/Lord Fairfax Highway(Intersection#3) • Overall intersection operates at LOS F in the AM (delay of 147.2 sec) and PM peak(delay of 189.8 sec). • Eastbound approach operates at LOS F in the AM (delay of 311.3) and PM peak(delay of 331.2 sec). • Westbound approach operates at LOS F(delay of 139.8 sec) in the PM peak. • Northbound approach operates at LOS F in the AM(delay of 111.7 sec)and PM peak(delay of 207.7 sec). • Southbound approach operates at LOS F(delay of 85.9 sec)in the PM peak. • Northbound left and eastbound right exceeds available storage length in PM peak, while southbound left exceeds available storage length in both AM and PM peaks. • This intersection fails under background projected conditions due to regional growth and planned background development traffic. • Mitigation:To mitigate site-related impacts,an exclusive eastbound left-turn lane and a second northbound left-turn lane are recommended. • With the above recommended improvements in place, the delay and queuing are significantly improved and notably all approaches operate at LOS D in the AM peak. The post-mitigated improvements show the following: • Overall intersection operates at LOS D in AM peak and LOS F (delay of 94.3 sec) in PM peak. • Eastbound approach operates at LOS E in AM peak and LOS F(delay of 107.6 sec)in PM peak. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 70 July 30,2026 • Westbound approach operates at LOS F (delay of 114.4 sec) and Northbound approach operates at LOS F(delay of 101.4 sec) in PM Peak. • While some approaches operate at LOS E or F in the PM peak hour only,the delay and queuing are significantly improved with the above improvements and conditions are improved to be better than Future without Development (non- degradation). ■ Fairfax Pike and Lake Frederick Entrance/Site Entrance#1 (Intersection#6) • Northbound approach operates at LOS F during both AM(delay of 537.5 sec)and PM peak (delay of 1675.9 sec). • Southbound approach operates at LOS F during both AM(delay of 150.5 sec)and PM peak (delay of 1551.2 sec). • With a conventional traffic signal added at this location, the intersection operates at acceptable levels of service. Installation of a new traffic signal is subject to VDOT review and approval through a future Signal Justification Report ("SJR"). A preliminary signal warrant evaluation and VJuST analysis were performed as part of this study to screen potential intersection control configurations. A conventional traffic signal, thru-cut signal, roundabout, and two-way stop control were considered as possible intersection configurations. The ultimate configuration will be determined through the future SJR. It is noted that a roundabout is anticipated to require significant offsite right-of-way and was therefore not recommended for further consideration. ■ Fairfax Pike and Site Entrance#3(Intersection#8) • Southbound approach of the site access operates at LOS E in the AM peak and LOS F (delay of 130.5 sec) in the PM peak. The failing level of service is due to high through volumes on Fairfax Pike and not a result of high volumes from the entrance(17 peak hour left turn trips).The queuing for the southbound approach is 40 feet, indicating only 2 stacked vehicles. Hence, no mitigations are recommended. ■ Route 522 and Site Entrance#4(Intersection#9) • Eastbound approach and westbound approach operates at LOS E in the PM peak • With a conventional traffic signal added at this location, the intersection would operate at acceptable levels of service with acceptable queuing along Route 522. Installation of a new traffic signal is subject to VDOT review and approval through a future Signal Justification Report("SJR").A preliminary signal warrant evaluation and VJuST analysis were performed as part of this study to screen potential intersection control configurations. A conventional traffic signal, unsignalized continuous green-T, unsignalized restricted crossing U-turn (RCUT), and two-way stop control were considered as possible intersection configurations. The ultimate configuration will be determined through the future SJR. It is noted that an RCUT would result in additional U-turn traffic downstream along Route 522 including truck traffic from the proposed industrial use. It is also noted that a continuous green-T would not meet spacing and acceleration distance requirements and was therefore not recommended for further consideration. 0 The other site entrances operate at acceptable levels of service. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Traffic Impact Study—Gibson Property Page 71 July 30,2026 • Future with Development(Planning Year 2041): o The planning year/plus 6 year analysis reveals similar results to the Future with Development 2035 analysis, and the intersections with failing level of service continuing to have approaches that fail.All of the intersections operating acceptably under 2035 continue to operate acceptably under 2041. Hence, no additional mitigations are recommended for 2041. • *1-81 and Exit 307(Fairfax Pike) Ramps o As scoped with County and VDOT staff, a supplemental memo was provided separately, dated May 8, 2026, providing an evaluation of the projected traffic volumes at the 1-81/Fairfax Pike ramp intersections and the projected volume from this proposed site. As discussed with VDOT staff, this evaluation is separate from the Traffic Impact Study and provided for informational purposes. • Conclusions o This traffic impact study provides an evaluation of existing, future without development and future with development conditions at five regional intersections as well as the five site entrances. Two of the regional intersections have level of service or queuing deficiencies due to existing or background related traffic volumes. To mitigate site-related impacts, the following improvements are recommended: at Intersection 1, convert the eastbound and westbound left-turn phasing from protected-only to flashing yellow arrow operation; and at Intersection 3, add an exclusive eastbound left-turn lane and a second northbound left-turn lane. Proposed improvements at the site entrances include turn lanes where warranted and a traffic signal or other innovative intersection control, subject to future SJR, at the southern entrance on Route 522 and western entrance on Fairfax Pike. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Transportation Technical Appendix Gibson Property Frederick County, Virginia GOROVE SLADE Transportation Planners and Engineers Gibson Property Technical Appendix TABLE OF CONTENTS Appendix A—Scoping Guidance Appendix B—Turning Movement Counts Data Appendix C—Crash Data Appendix D—Level of Service Definitions Appendix E—2026 Existing Conditions—Capacity Analysis Worksheets Appendix F—Background Information Appendix G—2035 Future Conditions without Development—Capacity Analysis Worksheets Appendix H—2035 Future Conditions with Development—Capacity Analysis Worksheets Appendix I—2041 Future Conditions with Development—Capacity Analysis Worksheets Appendix J—VJuST Appendix K—Turn Lane Warrant Tables and Graphics 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Gibson Property Technical Appendix A. Scoping Guidance 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com THIS IS A CHAPTER 870 STUDY XVDOTofPRE-SCOPE OF WORK MEETING FORM Virginia Department Transportation Information on the Project Traffic Impact Analysis Base Assumptions The applicant is responsible for entering the relevant information and submitting the form to VDOT and the locality no less than three (3) business days prior to the meeting. if a form is not received by this deadline, the scope of work meeting may be postponed. Contact Information Consultant Name: Erin Steel,PE,Gorove Slade Tele: 703-787-9595 E-mail: esteel@gorovesiade.com Developer/Owner Name: Clark Tutwiler, Peterson Companies Tele: 703-633-2684 E-mail: Ctutwiler@Petersoncos.com Project Information Project Name: Gibson Property Locality/County: Frederick County The proposed development site is located northwest of the intersection of Route 522 and Project Location: Fairfax Pike (Route 277)/Lord Fairfax Highway(Route 340),positioned north of Fairfax (Attach regional and site Pike and both east and west of Route 522. The site is identified by Tax Map #s 87-3-A, specific location map) 87-3-13, and 87-A-16B in Frederick County, Virginia and totals approximately 283.32 acres. Submission Type Comp Plan ® REZ/CUP ® Site Plan ❑ Subd Plat ❑ The site is situated on three parcels that can be identified on the Frederick County Tax Map with the following Tax Map#s: 87-3-A,87-3-B, and 87-A-16B. The property totals approximately 283.32 acres with a Long Range Land Use of Industrial, Mixed Use Industrial/Office,and Rural Area.The site is currently zoned as Rural Areas District(RA). Project Description: (including details on the land The site is anticipated to include up to 3.2 million SF of Industrial uses with a build-out use,acreage,phasing,access year of 2032.For the purposes of the TIA,the industrial Park use(ITE Land Use 130)will location,etc. Attach additional sheet if necessary) be analyzed. Parcels 87-3-A and 87-A-16B are each currently occupied by one single-family detached house. Access to the site will be provided via the proposed entrances along Route 522 and Fairfax Pike. Residential ❑ Commercial ❑ Mixed Use ❑ Other Proposed Use(s): Other Use(s) (Check all that apply;attach ITE LU Code(s): 130 additional pages as necessary) Square Ft or Other Variable:3.2 million SF Total Peak Hour Trip Less than 100 ❑ 100-499 ❑ 500-999 Projection: ® 1,000 or more❑ Gibson Property Page 12 Traffic Impact Analysis Assumptions Study Period Existing Year: 2026 Build-out Year: 2035 Design Year: 2041 Study Area Boundaries North:Tasker Road South: Lake Frederick Drive (Attach map) West:Warrior Drive East: Route 522 External Factors That Could Affect Project New road connecting Route 522 and Fairfax Pike as shown on Eastern Frederick County (Planned road improvements, Road Plan (not funded--assumed to be constructed after the horizon year). other nearby developments) Consistency With The proposed development west of Route 522 is consistent with the Eastern Frederick Comprehensive Plan Land Use Plan.A Comprehensive Plan Amendment is required for the parcel east of (Land use,transportation plan) Route 522. Available Traffic Data VDOT Historical AADT Data (Historical,forecasts) Road Name: Lord Fairfax Highway Road Name: Fairfax Pike Trip Distribution (to/from the East) - 10% (to/from the West)-35% (Please refer to attached Road Name: Route 522 Road Name: Route 522 Figure Z) (to/from the North) -25% (to/from the South)-30% 0.5%(linear growth)on Route Peak Period for 522 and Hudson Study ®AM ®PM ❑SAT Annual Vehicle Trip Hollow Road (check all that apply) Growth Rate: 1%(linear growth) (See Note 4) on Fairfax Pike, Peak Hour of the Warrior Drive, Adj. AM: 574/PM: 626/Daily: 7,336 White Oak Road, (to be used in study) and Tasker Road 1. Fairfax Pike at Warrior Drive 6. All site entrances on Route 522 and Fairfax Pike Study Intersections Fairfax Pike at White Oak and/or Road Segments 2' Road Hudson Hollow Road 7' (Attach additional sheets as Fairfax Pike/Lord Fairfax Highway necessary) 3' at Route 522 8' (Please refer to attached Figure 1) 4. Route 522 at Lake Frederick Drive 9. S. Route 522 at Tasker Road 10. Trip Adjustment Internal allowance Reduction: Factors ❑Yes ® No Pass-by allowance Reduction: ❑Yes No Software Methodology ® Synchro ❑ HCS (v.2000/+) ❑ SIDRA ❑ CORSIM ❑ Other It is important for the applicant to provide sufficient information to county and VDOT staff so that questions regarding geographic scope, alternate methodology, or other issues can be answered at the scoping meeting. Gibson Property Page 13 Existing traffic signals that could be affected: 1.Fairfax Pike at Warrior Drive 2.Fairfax Pike at White Oak Road/Hudson Hollow Road Traffic Signal Proposed 3.Fairfax Pike/Lord Fairfax Highway at Route 522 or Affected 4. Route 522 at Lake Frederick Drive (Analysis software to be used, 5. Route 522 at Tasker Road progression speed,cycle length) 6• Route 522 at Maranto Manor Drive (Synchro network only) Analysis Software:Synchro Version 11 Results: HCM 6 Methodology(See Note 9) Queue Lengths to be Reported: 95th Percentile Improvements) • Improvements associated with approved background developments Assumed or to be + Improvements at Route 277 (Fairfax Pike)at Warrior Drive (VDOT SMART SCALE Considered project) • Madison Farms • Lake Frederick(Remaining Units) Background Traffic • Sherando Green Studies Considered • Fairfax Downs (Remaining Units) • Enclave at Tasker- Residential + Eastgate Plan Submission ❑ Master Development Plan(MDP) ®Generalized Development Plan(GDP) ❑ Preliminary/Sketch Plan ❑Other Plan type(Final Site,Subd. Plan) Additional Issues to be ® Queuing analysis ❑Actuation/Coordination ❑Weaving analysis Addressed ❑ Merge analysis ❑ Bike/Ped Accommodations ® Intersection(s) ❑ TDM Measures ❑ Other( } It is important for the applicant to provide sufficient information to county and VDOT staff so that questions regarding geographic scope, alternate methodology, or other issues can be answered at the scoping meeting. Gibson Property Page 14 NOTES on ASSUMPTIONS: 1. Synchro files/signal timings will be obtained from VDOT. 2. The scenarios to be included in the study are 2026 Existing Conditions,2035 Future without Development,2035 Future with Development,2041 Future without Development,and 2041 Future with Development.The study will analyze AM and PM peak hours for all above scenarios.The 2041 conditions will be for planning purposes only. 3. Existing turning movement counts will be collected at the study intersections. 4. A regional growth rate of 0.5%(linear growth) will be applied to the existing volumes of all major movements on Route 522 and Hudson Hollow Road,while a 1%(linear growth)will be applied to all major movements on Fairfax Pike, Warrior Drive, White Oak Road,and Tasker Road. The growth volumes will be balanced along the road network where appropriate. S. Existing peak hour factors will be based on the traffic counts and utilized on a by-intersection basis.Peak hours factors by intersection in the range of 0.85 to 1.00 will be used for existing scenario.Peak hour factors of 0.92 will be used for all future scenarios if the existing peak hour factor by intersection is less than 0.92, and for all new intersections. 6. Heavy vehicle percentages (HV%)will be based on existing counts.For any new intersection and at site entrances,the HV%will be based on a default Synchro value of 2.0%per movement on new approaches. 7. For any approach,a level of service (LOS) D or better would be considered as acceptable/desirable for traffic operations. Will show intersection,approach,and movement LOS. 8. 951h percentile queue lengths will be provided in addition to the capacity analyses.The queue lengths will be determined from Synchro 11. 9. HCM 6 methodology will be utilized in the capacity analyses where applicable; HCM 2000 methodology will be utilized if HCM 6 methodology is not applicable. 10. The direction of approach for primary site trips will be based on Figure 2. 11. Preliminary access management,turn lanes,and preliminary signal warrants will be assessed at the proposed site entrances,where appropriate.If a traffic signal is proposed at a site entrance,a Signal Justification Report (SJR)will be prepared and submitted to VDOT for approval as a separate document from the TIA. It is noted Route 522 is on the Arterial Preservation Network, 12. A narrative will be provided in the TIA explaining how the study intersections and directions of approach were determined. It is important for the applicant to provide sufficient information to county and VDOT staff so that questions regarding geographic scope, alternate methodology, or other issues can be answered at the scoping meeting. Gibson Property Page 15 13. A supplemental memorandum for the 1-81/Fairfax Pike ramps (Exit 307) will be provided with the TIA submission for informational purposes.The memorandum will summarize existing traffic counts and projected growth based on VDOT's Pipeline Study ST-23-08 for the 2054 design year.It will also outline the study's recommendations and evaluate the proposed Gibson development's share of future interchange growth identified in that study.The direction of approach for Gibson site trips at the ramps will be based on the figure below. •r 3 F � N O P S� o ■ . Legend CSO O Exit 307 Ramp Locations XX°,6 Direction of Approach Direction of Approach—I-8111Fairfax Pike Ramps It is important for the applicant to provide sufficient information to county and VDOT staff so that questions regarding geographic scope, alternate methodology, or other issues can be answered at the scoping meeting. Gibson Property Page 16 SIGNED: " "�' DATE: 04/28/2026 Applicant or Consultant PRINT NAME: Erin Steep PE Applicant or Consultant SIGNED: DATE: 2-0Zt-- "IDOTRresentative PRINT NAME: P Cl VDOT Repre.entative SIGNED: ' J ' DATE: 05/06/2026 Local Government Representative PRINT NAME: John A. Bishop Local Government Representative It is important for the applicant to provide sufficient information to county and VDOT staff so that questions regarding geographic scope, alternate methodology, or other issues can be answered at the scoping meeting. Gibson Property Page 17 Table 1: Historic Growth(Based on VDOT P4P Traffic Data) Published VDOT AADT Growth Rate Fairfax Pike Apprentice Lane Double Tollgate Road 8.538 8,950 9.664 8 950 8,661 6,698 0.4';: -0.7% -3.4% -1.4% 0.4!. Lord Fairfax Highway Double Tollgate Road Featherbed Road 8,274 7,582 8.037 8 037 8.155 8.757 1 A 3.7% 2 9'_ 4A%. 7.4-0, Route 522 Lord Fairfax Highway Highland Corners Road 13,479 15.485 16,720 15,485 13,325 13.383 -0.1': -3.6$L -7.2% -7 0% 0.41., Cn • •• • ell Ave Fairfax Pik., • 9. I • A all 3 t0rdcai rfax Highway Legend Existing Study Intersections) Site Location �+—► Site Entrance Figure 1: Site Location and Study Intersections It is important for the applicant to provide sufficient information to county and VDOT staff so that questions regarding geographic scope, alternate methodology, or other issues can be answered at the scoping meeting. Gibson Property Page 18 o N VV tat fit° .• � ti • 3zo� 0 x 3 1a� . , It A Legend r° Existing Study Intersection(sf Site Location �°j �► Slte Entrance XX% Direction of Approach Figure 2: Direction of Approach Table 2: ITE 1201 Edition Trip Generation-Peak Hour of the Adiacent Street DailyCode Size AM Peak Hour PM Peak Hour In Out Out Total Total Proposed Uses Industrial Park 130 kSF of GFA 442 132 574 175 451 626 7,336 Mote! 442 132 574 175 451 626 7,336 It is important for the applicant to provide sufficient information to county and VDOT staff so that questions regarding geographic scope, alternate methodology, or other issues can be answered at the scoping meeting. Gibson Property Page 9 La kt i t j ewm ti• a ruaun.�c ~�_ ..... BOMLERI - AfiZCWffM PLAN i � 1 Figure 3: Rezoning Plan (For Information Purpose Only) It is important for the applicant to provide sufficient information to county and VDOT staff so that questions regarding geographic scope, alternate methodology, or other issues can be answered at the scoping meeting. Gibson Property Technical Appendix B. Turning Movement Counts Data 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Type of peak hour being reported:User-Defined Method for determining peak hour:Total Entering Volume LOCATION: Warrior Dr--Fairfax Pike QC JOB#: 17563801 CITY/STATE: Stephens City,VA DATE:Thu,Apr 16 2026 443 250 Peak-Hour:7:00 AM—8:00 AM 47 8 a • Peak 15-Min:7:30 AM--7:45 AM a • 122 267 54� 8.2 3.7 1.9 450 * 116 J t 116 * 513 13.8f 43 J j f� t 2.6 f 8.8 328+ 30* 301 10.1 4- ( 11-6 773-0 329 1 or 96 -0 399 79 7 1 \'.� C 7.3 + 115 4 * QC -14 , F 692 62 5.8 66.1 TRUE DATA TO IMPROVE MOBILITY I 0 0 3 I J " a v 0 J t 0 014 L 0 ♦ f 0 0 7 2 o 0 0 ♦ :� f � J t N/A+ * N/A N/A w � �N/A a N/A N/A � 15-Min Count Warrior Dr Warrior Dr Fairfax Pike Fairfax Pike Hourly Period (Northbound) (Southbound) (Eastbound) (Westbound) Total Totals Beginning At Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U 6:00 AM 0 1 1 0 16 2 17 0 11 48 1 0 0 18 7 0 122 6:15 AM 0 1 0 0 12 4 17 0 9 64 4 0 0 28 3 0 142 6:30 AM 1 1 0 0 14 8 16 0 14 63 5 0 0 32 6 0 160 6:45 AM 3 4 0 0 23 25 26 0 23 60 16 0 4 25 6 0 215 639 7:00 AM 12 6 2 0 15 30 27 0 20 76 46 0 10 43 10 0 297 814 7:15 AM 11 6 10 0 14 77 34 0 22 62 102 0 21 49 34 0 442 1114 7:30 AM 2 4 3 0 11 108 31 0 18 101 121 0 46 88 32 0 565 1519 7:45 AM 2 2 2 0 14 52 30 0 56 89 60 0 19 121 40 0 487 1791 8:00 AM 9 1 0 0 14 5 43 0 31 61 13 0 0 59 10 0 246 1740 8:15 AM 4 1 3 0 16 3 32 0 25 71 11 0 0 50 6 0 222 1520 8:30 AM 3 1 1 0 19 3 32 0 32 77 6 0 0 47 12 0 233 1188 8:45 AM 2 2 0 0 13 2 51 0 42 58 4 0 0 63 8 0 245 946 Peak 15-Min Northbound Southbound Eastbound Westbound Total Flowrates Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U All Vehicles 8 16 12 0 44 432 124 0 72 404 484 0 184 352 128 0 2260 Heavy Trucks 8 12 8 4 8 8 8 32 8 4 32 4 136 Buses Pedestrians 4 0 0 8 12 Bicycles 0 0 0 8 0 0 0 0 0 4 0 0 12 Scooters Comments: Report generated on 4/20/2026 11:07 AM SOURCE:Quality Counts,LLC(http://www.qualitycounts.net)1-877-580-2212 Page 1 of 2 Type of peak hour being reported:User-Defined Method for determining peak hour:Total Entering Volume LOCATION: White Oak Rd/Hudson Hollow Rd --Fairfax Pike QC JOB#: 17547901 CITY/STATE: Frederick,VA DATE:Thu,Apr 9 2026 170 222 Peak-Hour:7:00 AM--8:00 AM 112 9 a • Peak 15-Min:7:30 AM--7:45 AM a • 124 6 40 129 16.7 5 .0 4 . -1 -P * . L M6 * 1MJ t M * 2M 11.8*8.7J j \ t10.7* 12 259+ G * 178 10 w #\/l *12.4 461-0 18 1 or 2 -0 328QC 93 w 5.6'1 i ! 0 W 9.1 1.% * e[- F a * a 0 26 83 7.7 72 TRUE DATA TO IMPROVE MOBILITV 0 0 0 0 010/* 0 j 0 L 0 • � * 0 0 7 i 0 o o 0 0 J aN/A �. LiN/A �• L N/A+ •• * N/A N/A+ *N/A a N/A N/A r 15-Min Count White Oak Rd/Hudson Hollow White Oak Rd/Hudson Hollow Fairfax Pike Fairfax Pike Rd Period Rd (Eastbound) (Westbound) Total Hour Beginning At (Northbound) (Southbound) Totals Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U 6:00 AM 1 2 10 0 3 3 0 0 5 61 1 0 0 6 1 0 93 6:15 AM 8 4 2 0 5 1 3 0 6 63 1 0 0 19 2 0 114 6:30 AM 7 3 13 0 3 1 2 0 4 67 1 0 1 28 1 0 131 6:45 AM 7 4 7 0 7 0 2 0 14 60 3 0 1 29 0 0 134 472 7:00 AM 5 4 4 0 3 1 9 0 22 62 0 0 0 35 1 0 146 525 7:15 AM 11 1 13 0 9 0 10 0 43 70 0 0 0 46 6 0 209 620 7:30 AM 1 15 1 7 0 17 3 63 0 75 59 9 0 1 41 13 0 304 793 7:45 AM 13 4 5 0 11 2 42 0 44 68 9 0 1 56 8 0 263 922 8:00 AM 6 2 2 0 1 4 11 0 11 64 3 0 1 39 0 0 144 920 8:15 AM 14 4 8 0 4 2 7 0 12 50 4 0 0 38 3 0 146 857 8:30 AM 6 4 6 0 4 3 9 0 10 53 4 0 1 49 6 0 155 708 8:45 AM 11 3 4 0 3 3 6 0 13 57 7 0 1 45 2 0 155 600 Peak 15-Min Northbound Southbound Eastbound Westbound Total Flowrates Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U All Vehicles 60 4 28 0 68 12 252 0 300 236 36 0 4 164 52 0 1216 Heavy Trucks 0 0 4 0 4 24 32 36 4 0 16 8 128 Buses Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Report generated on 4/20/2026 11:03 AM SOURCE:Quality Counts,LLC(http://www.qualitycounts.net)1-877-580-2212 Page 1 of 3 Type of peak hour being reported:User-Defined Method for determining peak hour:Total Entering Volume LOCATION: Rt 522--Fairfax Pike/Lord Fairfax Hwy QC JOB#: 17547903 CITY/STATE: Clarke,VA DATE:Thu,Apr 9 2026 404 463 Peak-Hour:7:00 AM--8:00 AM 16.1 9.3 a * Peak 15-Min:7:30 AM--7:45 AM a r 9 316 79 333 187 3.8 J i �. J ♦ �. 180 « 32 J 4I « 204 12.24. 9.4J jam\ t2S « 113 209+ Fosid « 64 38 w #\l «9.4 339 98 C 100 + 475 8 +16.3'1 `.., ! 16 + 7.4 �1=7 391 *7F al 10 12sF 514 685 17.7 1L1 TRUE DATA TO IMPROVE MOBILITY 0 0 0 � a ~ ;�A,, O J 'Lo o � � o o F— � o 0 0 J J ♦A v L J r N/A t L N/A+ •• « N/A ` N/A-0 ♦N/A 1 4r w ,ll T T r 1 P a N/A * [- -1 ^ N/A � 15-Min Count Rt 522 Rt 522 Fairfax Pike/Lord Fairfax Hwy Fairfax Pike/Lord Fairfax Hwy Hourly Period (Northbound) (Southbound) (Eastbound) (Westbound) Total Totals Beginning At Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U 6:00 AM 7 53 29 0 22 59 2 0 1 44 22 0 10 2 5 0 256 6:15 AM 7 49 26 0 19 77 1 0 3 52 30 0 11 9 1 0 285 6:30 AM 15 54 39 0 14 91 1 0 6 67 30 0 18 13 6 0 354 6:45 AM 13 76 27 0 19 80 1 0 3 56 22 0 21 18 8 0 344 1239 7:00 AM 24 88 56 0 18 89 3 0 10 53 15 0 11 9 7 0 383 1366 7:15 AM 21 82 42 0 22 76 1 0 7 57 23 0 24 21 7 0 383 1464 7:30 AM 27 122 49 0 19 73 3 0 12 55 30 0 33 16 9 0 448 1558 7:45 AM 35 99 40 0 20 78 2 0 3 44 30 0 32 18 17 0 418 1632 8:00 AM 11 77 48 0 15 86 1 0 5 39 31 0 30 20 14 0 377 1626 8:15 AM 22 84 30 0 24 84 3 0 6 38 34 0 41 24 7 0 397 1640 8:30 AM 23 107 34 0 18 72 0 0 7 43 22 0 30 21 10 0 387 1579 8:45 AM 27 97 39 0 14 77 2 1 4 27 32 0 23 19 11 0 373 1534 Peak 15-Min Northbound Southbound Eastbound Westbound Total Flowrates Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U All Vehicles 108 488 196 0 76 292 12 0 48 220 120 0 132 64 36 0 1792 Heavy Trucks 16 40 20 4 44 4 4 20 16 20 4 4 196 Buses Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Report generated on 4/20/2026 11:03 AM SOURCE:Quality Counts,LLC(http://www.qualitycounts.net)1-877-580-2212 Page 2 of 3 Type of peak hour being reported:User-Defined Method for determining peak hour:Total Entering Volume LOCATION: Rt 522--Lord Frederick Dr QC JOB#: 17547907 CITY/STATE: Clarke,VA DATE:Thu,Apr 9 2026 498 667 Peak-Hour:7:00 AM--8:00 AM 187 136 a • Peak 15-Min:7:30 AM--7:45 AM a 56 440 2L I L 12.5 195 0 .04 4. .04 4. 84 * 144 ! t 0 0 15.5 F L4 J / t 0 ♦ 0 0 + � 4. 0 0 +. \/ 4. 0 03 212+� 68 7 C 0 ♦ 0 4.2 w 1 7 C 0 0 28 521 0 F QC 2�4 17.1 1 508 549 18.3 173 TRUE DATA TO IMPROVE MOBILITV 0 0 0 � a � ;�, oj to 0 0 0 . . 0 o r o o o 0 0 J J ♦A �• L 1 JJ aN/A L ♦ � � t f � 1 t I I I , C • WA • � � ^ WA r 15-Min Count Rt 522 Rt 522 Lord Frederick Dr Lord Frederick Dr Hourly Period (Northbound) (Southbound) (Eastbound) (Westbound) Total Totals Beginning At Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U 6:00 AM 2 79 0 0 0 74 3 1 10 0 7 0 0 0 0 0 176 6:15 AM 1 78 0 0 0 120 2 0 17 0 16 0 0 0 0 0 234 6:30 AM 5 90 0 0 0 117 6 0 15 0 16 0 0 0 0 0 249 6:45 AM 9 117 0 0 0 116 13 0 15 0 21 0 0 0 0 0 291 950 7:00 AM 4 124 0 0 0 91 17 1 22 0 14 0 0 0 0 0 273 1047 7:15 AM 6 124 0 0 0 113 9 0 32 0 19 0 0 0 0 0 303 1116 7:30 AM 7 158 0 0 0 121 9 0 49 0 21 0 0 0 0 0 365 1232 7:45 AM 11 115 0 0 0 115 21 1 41 0 14 0 0 0 0 0 318 1259 8:00 AM 11 117 0 1 0 112 32 0 23 0 13 0 0 0 0 0 309 1295 8:15 AM 20 111 0 0 0 125 30 0 29 0 17 0 0 0 0 0 332 1324 8:30 AM 18 99 0 0 0 106 20 0 60 0 12 0 0 0 0 0 315 1274 8:45 AM 12 104 0 0 0 116 25 0 43 0 25 0 0 0 0 0 325 1281 Peak 15-Min Northbound Southbound Eastbound Westbound Total Flowrates Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U All Vehicles 28 632 0 0 0 484 36 0 196 0 84 0 0 0 0 0 1460 Heavy Trucks 4 108 0 0 64 0 0 0 8 0 0 0 184 Buses Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Report generated on 4/20/2026 11:03 AM SOURCE:Quality Counts,LLC(http://www.qualitycounts.net)1-877-580-2212 Page 3 of 3 Type of peak hour being reported:User-Defined Method for determining peak hour:Total Entering Volume LOCATION: Rt.522--Tasker Rd QC JOB#: 17563803 CITY/STATE: Stephens City,VA DATE:Thu,Apr 16 2026 342 371 Peak-Hour:7:00 AM--8:00 AM 21-6 12.9 + • Peak 15-Min:7:45 AM--8:00 AM + • 42 300 0L L 0 24.7 0 .0 + 4. 159 * 21 ! t 0 « 0 5 4.14.3 1 j \ t 04. 0 181+- 160 1 4r 0 + 0 5.5+ 4..4 / C 0 w 0 I-% * e F F 14 350 * a 12.9 460 467 QC 17.6 113 TRUE DATA TO IMPROVE MOBILITV ° I 0 0 0 J1 1 U 0j t ° ° i ' % i ° o . , . 0 o � r ° I � I J J +A �• � � JJ +A �• � ♦ � � t f � 1 1 1 t N/A A- N/A•• N/A I I 0. ♦N/A 11 1 w 1 + N/A * � � ^ N/A r 15-Min Count Rt.522 Rt.522 Tasker Rd Tasker Rd Period (Northbound) (Southbound) (Eastbound) (Westbound) Total Hourly Beginning At Totals Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U 6:00 AM 17 40 0 0 0 58 7 0 2 0 40 0 0 0 0 0 164 6:15 AM 14 53 0 0 0 84 5 0 2 0 34 0 0 0 0 0 192 6:30 AM 16 64 0 0 0 67 12 0 2 0 42 0 0 0 0 0 203 6:45 AM 20 68 0 0 0 72 10 0 3 0 29 0 0 0 0 0 202 761 7:00 AM 28 77 0 0 0 78 11 0 4 0 47 0 0 0 0 0 245 842 7:15 AM 24 87 0 0 0 84 13 0 4 0 38 0 0 0 0 0 250 900 7:30 AM 34 96 0 0 0 60 9 0 4 0 37 0 0 0 0 0 240 937 7:45 AM 1 31 90 0 0 0 78 9 0 9 0 38 0 0 0 0 0 255 990 8:00 AM 34 73 0 0 0 59 7 0 6 0 31 0 0 0 0 0 210 955 8:15 AM 32 58 0 0 0 61 5 0 8 0 26 0 0 0 0 0 190 895 8:30 AM 34 109 0 0 0 63 11 0 3 0 38 0 0 0 0 0 258 913 8:45 AM 22 99 0 0 0 68 9 0 5 0 30 0 0 0 0 0 233 891 Peak 15-Min Northbound Southbound Eastbound Westbound Total Flowrates Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U All Vehicles 124 360 0 0 0 312 36 0 36 0 152 0 0 0 0 0 1020 Heavy Trucks 8 56 0 0 72 0 4 0 16 0 0 0 156 Buses Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Report generated on 4/20/2026 11:07 AM SOURCE:Quality Counts,LLC(http://www.qualitycounts.net)1-877-580-2212 Page 2 of 2 Type of peak hour being reported:User-Defined Method for determining peak hour:Total Entering Volume LOCATION: Warrior Dr--Fairfax Pike QC JOB#: 17563802 CITY/STATE: Stephens City,VA DATE:Thu,Apr 16 2026 399 397 Peak-Hour:4:15 PM—5:15 PM 05 1.3 + * Peak 15-Min:5:00 PM--5:15 PM + • z73 38 ss 0.7 0 0 J + b r + V 760 * 211J t 117 557 2.54.1.9J t 0 ♦ 3A 398+ � 4- 426 3.5 0 4- 4 650+� 41 C 14 + 499QC 2.8+ 0 1 C 143 w 2.8 1.% f e[- F + * + 14 93 143 22 0.7 TRUE DATA TO IMPROVE MOBILITV 0 10 0 0 , * q. L Jl J0J t1 0 /* 3 L 0 • « 0 ,i 0 7 i p o � r � o 0 0 J J /A �• J J +A �• L ♦ J � t f � J t N/A+ •• N/A N/A w el N/A + N/A * � � ^ N/A r 15-Min Count Warrior Dr Warrior Dr Fairfax Pike Fairfax Pike Hourly Period (Northbound) (Southbound) (Eastbound) (Westbound) Total Totals Beginning At Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U 4:00 PM 9 9 3 0 13 9 77 0 44 98 3 0 9 102 24 0 400 4:15 PM 13 19 3 0 16 9 60 0 57 108 8 0 2 102 22 0 419 4:30 PM 16 16 1 0 14 9 67 0 36 93 13 0 6 123 25 0 419 4:45 PM 12 10 3 0 26 10 61 0 53 100 12 0 4 94 30 0 415 1653 5:00 PM 20 24 6 0 32 10 85 0 65 97 8 0 2 107 40 0 496 1749 5:15 PM 8 4 2 0 26 7 77 0 44 91 9 0 4 99 27 0 398 1728 5:30 PM 2 2 2 0 25 10 58 0 52 101 20 0 0 66 31 0 369 1678 5:45 PM 1 1 0 0 24 12 60 0 55 96 28 0 3 96 27 0 403 1666 6:00 PM 8 10 2 0 29 12 53 0 53 70 12 0 6 81 38 0 374 1544 6:15 PM 11 8 2 0 32 1 68 0 55 74 1 0 2 85 32 0 371 1517 6:30 PM 1 1 0 0 20 4 57 0 41 69 0 0 2 86 25 0 306 1454 6:45 PM 4 1 1 0 18 2 55 0 38 55 1 0 0 86 31 0 292 1343 Peak 15-Min Northbound Southbound Eastbound Westbound Total Flowrates Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U All Vehicles 80 96 24 0 128 40 340 0 260 388 32 0 8 428 160 0 1984 Heavy Trucks 0 0 0 0 0 0 0 8 0 0 12 0 20 Buses Pedestrians 0 0 0 4 4 Bicycles 0 0 0 0 0 0 0 0 0 0 0 4 4 Scooters Comments: Report generated on 4/20/2026 11:14 AM SOURCE:Quality Counts,LLC(http://www.qualitycounts.net)1-877-580-2212 Page 1 of 2 Type of peak hour being reported:User-Defined Method for determining peak hour:Total Entering Volume LOCATION: White Oak Rd/Hudson Hollow Rd --Fairfax Pike QC JOB#: 17547902 CITY/STATE: Frederick,VA DATE:Thu,Apr 9 2026 182 169 Peak-Hour:4:15 PM—5:15 PM os 24 a • Peak 15-Min:4:15 PM--4:30 PM a 132 28 2 22 0 3.6 0 3 ♦ d + �. 576 * 114 J 34 * 458 3.3 4.1.8 J j"^\ t 0 ♦ 4.1 i 204+ * 401 8.3 ,, 4.5 359-0 41 or 23 -0 236QC 5.6 2A 7 \`,, / C 4.3 - 7.2 4 21 # 4 9.5 92 74 33 4.1 TRUE DATA TO IMPROVE MOBILITV 0 0 0 0 /* 0 j 'L 0 010 L 0 • � ♦ 0 0 7 i 0 o o 0 0 J aN/A �. LiN/A �• L ♦ J � t f � J t N/A+ •• N/A N/A N/A a N/A N/A r 15-Min Count White Oak Rd/Hudson Hollow White Oak Rd/Hudson Hollow Fairfax Pike Fairfax Pike Rd Period Rd (Eastbound) (Westbound) Total Hour Beginning At (Northbound) (Southbound) Totals Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U 4:00 PM 10 7 0 0 6 8 23 0 24 53 12 0 7 106 15 0 271 4:15 PM 16 8 6 0 7 11 23 0 31 49 11 0 3 97 12 0 274 4:30 PM 8 4 1 0 5 6 51 0 27 61 6 0 6 83 12 0 270 4:45 PM 7 4 2 0 7 5 21 0 35 48 7 0 5 118 6 0 265 1080 5:00 PM 12 5 1 0 3 6 37 0 21 46 17 0 9 103 4 0 264 1073 5:15 PM 10 4 2 0 5 6 20 0 22 50 9 0 8 102 7 0 245 1044 5:30 PM 6 8 2 0 5 13 20 0 13 55 11 0 6 116 3 0 258 1032 5:45 PM 9 6 2 0 4 10 23 0 20 43 12 0 2 88 6 0 225 992 6:00 PM 8 3 3 0 2 6 15 0 24 46 11 0 6 86 5 0 215 943 6:15 PM 10 2 0 0 3 7 17 0 22 43 5 0 6 76 8 0 199 897 6:30 PM 8 2 2 0 3 7 23 0 21 46 6 0 2 63 6 0 189 828 6:45 PM 5 1 1 0 3 6 21 0 15 42 12 0 2 61 3 0 172 775 Peak 15-Min Northbound Southbound Eastbound Westbound Total Flowrates Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U All Vehicles 64 32 24 0 28 44 92 0 124 196 44 0 12 388 48 0 1096 Heavy Trucks 0 4 0 0 0 0 4 28 4 4 24 0 68 Buses Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Report generated on 4/20/2026 11:05 AM SOURCE:Quality Counts,LLC(http://www.qualitycounts.net)1-877-580-2212 Page 1 of 3 Type of peak hour being reported:User-Defined Method for determining peak hour:Total Entering Volume LOCATION: Rt 522--Fairfax Pike/Lord Fairfax Hwy QC JOB#: 17547904 CITY/STATE: Clarke,VA DATE:Thu,Apr 9 2026 588 667 Peak-Hour:4:15 PM—5:15 PM 5a 75 + * Peak 15-Min:4:30 PM--4:45 PM + r 12 510 66 0 6.1 4.5 .J + 4 r + v 441 * 45 J t 72 522 5 f 6.7 J j'� t 6.9 ♦ 6.5 go .0 Fo-%] * 248 5.6+ 4- 4.8 266 131 1 C 202 + 317 6.4+6.9 1 `, C &4-- 6 41 550 *1� QC 4 76 6.8 843 892 68 7.1 TRUE DATA TO IMPROVE MOBILITV 0 10 0 0 J11 � OJJ t0 o r o o o 0 0 N/A L L ♦ J � t f � (� J 1-t N/A A- •• N/A I I N/A-+ N/A t t 1 4r w 1 + N/A * � I ^ N/A r 15-Min Count Rt 522 Rt 522 Fairfax Pike/Lord Fairfax Hwy Fairfax Pike/Lord Fairfax Hwy Hourly Period (Northbound) (Southbound) (Eastbound) (Westbound) Total Totals Beginning At Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U 4:00 PM 40 118 38 2 13 118 3 0 12 20 33 0 61 62 17 0 537 4:15 PM 45 168 46 0 16 126 0 0 15 16 25 0 53 63 16 0 589 4:30 PM 44 164 46 0 18 130 6 0 13 30 41 0 58 59 18 0 627 4:45 PM 43 115 36 0 15 116 3 0 12 23 32 0 48 61 15 0 519 2272 5:00 PM 49 103 33 0 17 138 3 0 5 21 33 0 43 65 23 0 533 2268 5:15 PM 36 112 42 0 13 121 2 0 10 16 35 0 44 71 25 0 527 2206 5:30 PM 47 117 32 0 14 115 3 1 11 19 28 0 31 75 19 0 512 2091 5:45 PM 27 111 39 0 17 108 1 0 8 26 32 0 53 65 17 0 504 2076 6:00 PM 33 117 33 0 16 73 2 0 11 20 19 0 43 57 12 0 436 1979 6:15 PM 32 83 15 0 9 76 5 0 4 21 21 0 34 47 20 0 367 1819 6:30 PM 25 76 19 0 4 65 0 0 9 13 17 0 27 42 18 0 315 1622 6:45 PM 23 66 17 0 8 80 4 0 8 27 17 0 32 41 13 0 336 1454 Peak 15-Min Northbound Southbound Eastbound Westbound Total Flowrates Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U All Vehicles 176 656 184 0 72 520 24 0 52 120 164 0 232 236 72 0 2508 Heavy Trucks 8 48 0 0 48 0 0 8 16 24 12 4 168 Buses Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Report generated on 4/20/2026 11:05 AM SOURCE:Quality Counts,LLC(http://www.qualitycounts.net)1-877-580-2212 Page 2 of 3 Type of peak hour being reported:User-Defined Method for determining peak hour:Total Entering Volume LOCATION: Rt 522--Lord Frederick Dr QC JOB#: 17547908 CITY/STATE: Clarke,VA DATE:Thu,Apr 9 2026 a19 s57 Peak-Hour:4:15 PM—5:15 PM 6.8 6.3 + • Peak 15-Min:4:15 PM--4:30 PM 4,189 630 0 os 8.7 0 J + 4. L I L 281 * 167 d t 0 0 2.1 f 12 1 /' t 04. 0 0 + Fo-gol 4. 0 0 4. * 0 243 76 1 4r 0 + 0QC 4.5+118'1 / C 0 w 0 � + * F � + 75 [- 707 783 9.1 7.3 TRUE DATA TO IMPROVE MOBILITV 0 10 0 0 J 1 1 U 0j 0 0 0 0 . . 0 o r o 0 o 0 0 J J /A �• L 1 JJ +A L ♦ � � t f � 1 t N/A A- •• N/A * * N/A+ 1-N/A 1 4r I I I 1 P + N/A * � I ^ N/A r 15-Min Count Rt 522 Rt 522 Lord Frederick Dr Lord Frederick Dr Hourly Period (Northbound) (Southbound) (Eastbound) (Westbound) Total Totals Beginning At Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U 4:00 PM 22 161 0 1 0 168 46 0 43 0 16 0 0 0 0 0 457 4:15 PM 33 203 0 1 0 160 43 0 54 0 20 0 0 0 0 0 514 4:30 PM 20 189 0 0 0 180 38 0 57 0 25 0 0 0 0 0 509 4:45 PM 21 152 0 0 0 138 57 0 36 0 14 0 0 0 0 0 418 1898 5:00 PM 18 146 0 0 0 152 51 0 20 0 17 0 0 0 0 0 404 1845 5:15 PM 26 174 0 0 0 145 51 0 28 0 18 0 0 0 0 0 442 1773 5:30 PM 22 157 0 0 0 134 40 1 22 0 11 0 0 0 0 0 387 1651 5:45 PM 34 152 0 0 0 142 46 0 20 0 14 0 0 0 0 0 408 1641 6:00 PM 28 157 0 0 0 99 41 0 22 0 19 0 0 0 0 0 366 1603 6:15 PM 18 112 0 0 0 96 40 0 17 0 14 0 0 0 0 0 297 1458 6:30 PM 12 101 0 0 0 82 27 1 23 0 15 0 0 0 0 0 261 1332 6:45 PM 14 85 0 0 0 96 26 0 18 0 6 0 0 0 0 0 245 1169 Peak 15-Min Northbound Southbound Eastbound Westbound Total Flowrates Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U All Vehicles 132 812 0 4 0 640 172 0 216 0 80 0 0 0 0 0 2056 Heavy Trucks 8 60 0 0 60 4 0 0 8 0 0 0 140 Buses Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Report generated on 4/20/2026 11:05 AM SOURCE:Quality Counts,LLC(http://www.qualitycounts.net)1-877-580-2212 Page 3 of 3 Type of peak hour being reported:User-Defined Method for determining peak hour:Total Entering Volume LOCATION: Rt.522--Tasker Rd QC JOB#: 17563804 CITY/STATE: Stephens City,VA DATE:Thu,Apr 16 2026 531 sos Peak-Hour:4:15 PM—5:15 PM 6.8 105 + • Peak 15-Min:5:00 PM--5:15 PM + • 31 500 0L L 0 72 0 J + 4. r + V 209 * 42 ! t 0 « 0 3.8 4. 0 J �'^\ t 04. 0 0 0 0 + 4. 0 187+ 145 7 0 w 0 0 + 0 1 \`, C 0 . 0 -1 4 QC 4 178 463 * F 45 114 F 645 641 5.6 95 TRUE DATA TO IMPROVE MOBILITV ° I 0 0 0 J1 1 U 0j t0 ° i ' % i ° o . , . 0 o � r ° 0 o 0 0 I � I J J +A �• � � JJ +A �• � ♦ � � t f � 1 1 1 t N/A A- N/A•• N/A I I 0. ♦N/A 11 1 w 1 + N/A * � � ^ N/A r 15-Min Count Rt.522 Rt.522 Tasker Rd Tasker Rd Period (Northbound) (Southbound) (Eastbound) (Westbound) Total Hourly Beginning At Totals Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U 4:00 PM 48 107 0 0 0 152 7 0 10 0 39 0 0 0 0 0 363 4:15 PM 44 126 0 0 0 113 8 0 14 0 40 0 0 0 0 0 345 4:30 PM 51 120 0 0 0 123 10 0 8 0 32 0 0 0 0 0 344 4:45 PM 46 103 0 0 0 111 7 0 13 0 35 0 0 0 0 0 315 1367 5:00 PM 37 114 0 0 0 153 6 0 7 0 38 0 0 0 0 0 355 1359 5:15 PM 48 132 0 0 0 112 7 0 2 0 29 0 0 0 0 0 330 1344 5:30 PM 35 101 0 0 0 95 6 0 9 0 30 0 0 0 0 0 276 1276 5:45 PM 50 112 0 0 0 72 1 0 9 0 16 0 0 0 0 0 260 1221 6:00 PM 33 91 0 0 0 89 10 0 5 0 25 0 0 0 0 0 253 1119 6:15 PM 42 83 0 0 0 78 4 0 8 0 25 0 0 0 0 0 240 1029 6:30 PM 31 90 0 0 0 66 6 0 4 0 23 0 0 0 0 0 220 973 6:45 PM 29 59 0 0 0 95 3 0 1 0 17 0 0 0 0 0 204 917 Peak 15-Min Northbound Southbound Eastbound Westbound Total Flowrates Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U All Vehicles 148 456 0 0 0 612 24 0 28 0 152 0 0 0 0 0 1420 Heavy Trucks 16 48 0 0 48 0 0 0 0 0 0 0 112 Buses Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Report generated on 4/20/2026 11:14 AM SOURCE:Quality Counts,LLC(http://www.qualitycounts.net)1-877-580-2212 Page 2 of 2 Gibson Property Technical Appendix C. Crash Data StudyCrash Data in 2021 to December 2025) Document Pedestrain Work Zone Adverse Distracted Number Date Conditions 221825080 6/29/2022 O 1.Rear End 0 0 0 no no 222145169 8112022 O 2.Angle 0 0 0 no no 223475140 12/13/2022 O 1.Rear End 0 0 0 no . no 222845560 10/9/2022 - B 3.Head On 0 2 0 no no 231955279 7/14/2023 . O .1.Rear End 0 0 0 . no _A no 2334315045 51/2/2023 O 1.Rear End 0 0 0 no no 2351 /2023 O .1.Rear End 0 0 0 . no no 0 23365120 20 1/2727/2023 O 1.Rear End 0 0 0 no no 233395100 12/1/2023 O Ado 1.Rear End 0 � 0 � 0 no no 233405205 12/6/2023 - O 1.Rear End 0 0 0 no no 230695135 3/10/2023 O 1.Rear End 0 r 0 ' 0 yes no a 2314551:4 5/23/2023 O . ipe- nir fi.,., 0 0 0 no no aa�,o �.o� 23331521 11/26/2023 + O 1.Rear End 0 0 0 no no I 240545361 212-024 A 3.Head On 0 2 0 no no 241545251 5/30/2024 O 1.Rear End 0 0 0 no no a.r-xea Uoleci- 240985124 4/7/2024 O 0 0 0 no no nrr a,.a,r 242855190 10/11/2024 O 1. 1.Rear End 0 0 0 no no 250285256 1/27/2025 O 1.Rear End 0 0 0 no no 250855169 3/25/2025 O 1.Rear End 0 a no no StudyCrash Data in • 2021 to December 2025) Document Number Date Crash Severity Collsion Type Injury Persons Injured Fatalities Related Weather Driver Conditions 223215223 11/16/2022 ap O 1.Rear End 0 0 no Mn I 222475116 9/4/2022 O 2.Angle 0 0 0 no o 223225052 11/14/2022 O 3.Head On 0 0 0 no no 232335200 8/21/2023 B 1.Rear End 0 2 0 no no 233125428 11/6/2023 O 1.Rear End 0 0 0 no no 232485093 9/5/2023 O 1.Rear End 0 0 0 no no 231845225 7/2/2023 O 2.Angle 0 01 0 0 no no 232935291 10/20/2023 O 2.Angle 0 0 0 no no 0 no no 233045294 10/28 2023 • B 2.Angle 0 0 0 no no 232365149 8/24/2023 B 1.Rear End 0 * 1 0 no no 240775228 3/17/2024 B 3.Head On 0 3 0 no no 242835358 10/8/2024 B . 2.Angle 0 1 0 no _A no 241515407 5/30/2024 O 2.Angle 0 0 0 no no 250860012 3/26/2025 . O 3.Head On 0 0 0 no no 253070286 11/3/2025 O 2.Angle 0 0 0 no no 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Gibson Property Technical Appendix IntersectionCrash Data in Study 2021 to December 2025) Document Number Date Crash Severity Collsion Type Injury Persons Injured Fatalities Related Weathers Driver Condition 212235307 8/11/2021 up O 1.Rear End 0 0 yes no 210355031 2/2/2021 B 2.Angle 0 1 0 no no 212075395 7/25/2021 B 1.Rear End 0 1 0 no no 211345201 5/12/2021 O 1.Rear End 0 0 0 no no 233355285 12/1/2023 O 1.Rear End 0 . 0 0 yes no 233215300 11/14/2023 O 1.Rear End 0 0 0 no no 2317, 1 1 6/25/2023 O 1.Rear End 0 0 0 no no a.nxea�oleci- 232715131 9/26/2023 O 0 0 0 yes no nff Rn�iV 232885079 10/14/2023 O 2.Angle 0 0 . 0 yes . no 232265413 8/14/2023 O 1.Rear End 0 I 0 0 yes no 231925274 7/9/2023 O 1.Rear End 0 - 0 0 . no no 240785254 3/18/2024 O 2.Angle 0 0 _ 0 no no ry■ 242985315 10/23/2024 . B 2.Angle 0 2 0 no no 2406350:3 3/2/2024 O 2.Angle 0 0 0 no no 2406,509 2/28/2024 . O 2.Angle 0 0 0 yes no 242575270 /2 2 0 no no 243065425 0/1024 B 1.Rear gEnd 0le 0 1 0 no no 250785000 3/17/2025 O 2.Angle 0 0 0 no no 251470178 5/27/2025 B 2.Angle 0 1 0 yes no 251660159 6/15/2025 A 3.Head On 0 2 0 yes no 252650082 9/20/2025 O 1.Rear End 0 * 0 0 no no StudyCrash Data in • 2021 to December 2025) Document Peclestrain Work Zone DistractedAdverse Number Date Crash Severity Collsion Type Injury Persons Injured Fatalities Related Weather Driver Conditions 210415208 2/8/2021 O 1.Rear End 0 0 no no 211025207 4/9/2021 B 1.Rear End 0 1 0 no no 220565169 2/24/2022 O 1.Rear End 0 0 0 yes . no J 222725236 9,2912022 O 2.Angle 0 0 0 no no ry■ 223195357 11/15/2022 . O 1.Rear End 0 0 0 yes no 222035303 7/21/2022 A 10.Deer 0 1 0 no no 232505117 9/6/2023 B 2.Angle 0 2 0 no no 231855238 7/3/2023 B 2.Angle 0 1 0 yes no 232845209 10/11/2023 O i 2.Angle 0 0 0 no no 231315138 5/1/2023 - O 1.Rear End 0 0 0 no no 242495578 9/5/2024 O *1.Rear End 0 . 0 0 no no 242145186 7/30/2024 O 1.Rear End 0 0 0 yes no 241765241 6/24/2024 O 15.Backed Into 0 ` 0 0 no no 240405235 2/9/2024 O 1.Rear End 0 � 0 0 no no 250325061 1/28/2025 B 1.Rear End 0 2 0 no no 250355183 2/4/2025 O 1.Rear End 0 1 0 0 no no 251415080 4/9/2025 O a.rnff a oixea Hec[ �o -A0 0 no no 253115229 11/6/2025 C 10.Deer 0 1 0 no no 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Gibson Property Technical Appendix Crash Data in Study Intersection (January 2021 • December Document Number Date Crash Severity Collsion Type Injury Persons Injured Fatalities Related Weathers Driver Condition 212125117 7/31/2021 O 1.JEnd d 0 0 no no pwr 223085231 11/1/2022 B 1. d 0 1 0 no no 230345053 2/2/2023 � 0 �1. d 0 0 0 no no 231535244 6/2/2023 0 1 0 0 0 no no 240875266. 3/27/2024 C 1. nd 0 r 2 0 yes no 241485084 5/25/2024 O 1. nd 0 0 0 no no dM 243015337 10/16/2024 0 �°I. nd 0 . 0 0 no no 251900129 7/9/2025 0 1. nd 0 0 0 no no 252810102 10/6/2025 0 1. nd 0 0 0 no no 253210131 11/14/2025 C 1. nd 0 1 0 no no 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Gibson Property Technical Appendix D. Level of Service Definitions 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com GOROVE SLADE Transportation Planners and Engineers TECHNICAL MEMORANDUM Subject: Level of Service Definitions Introduction The purpose of this memorandum is to define the level of service(LOS)metric that commonly used as a measure of effectiveness (MOE)for traffic operations. All capacity analyses are based on the procedures specified by the Transportation Research Board's(TRB) Highway Capacity Manual (HCM), which is currently on its sixth edition. Level of service ranges from A to F. A brief description of each level of service for signalized and unsignalized intersections is provided below. Signalized Intersections Level of service is based upon the traffic volume present in each lane on the roadway,the capacity of each lane at the intersection and the delay associated with each directional movement. The levels of service for signalized intersections are defined below: • Level of Service A describes operations with very low average delay per vehicle, i.e., less than 10.0 seconds. This occurs when progression is extremely favorable, and most vehicles arrive during the green phase. Most vehicles do not stop. Short signal cycle lengths may also contribute to low delay. • Level of Service B describes operations with average delay in the range of 10.1 to 20.0 seconds per vehicle. This generally occurs with good progression and/or short cycle lengths. More vehicles stop than for LOS A, causing higher levels of average delay. • Level of Service C describes operations with delay in the range of 20.1 to 35.0 seconds per vehicle. These higher delays may result from fair progression and/or longer cycle lengths. Individual cycle failures may begin to appear at this level. The number of vehicles stopping is significant at this level although many still pass through the intersection without stopping. This is generally considered the lower end of the range of the acceptable level of service in rural areas. • Level of Service D describes operations with delay in the range of 35.1 to 55.0 seconds per vehicle. At LOS D, the influence of congestion becomes more noticeable. Longer delays may result from some combination of unfavorable progression, long cycle lengths, and/or high traffic volumes as compared to the roadway capacity. Many vehicles are required to stop and the number of vehicles that do not have to stop declines. Individual signal cycle failures, where all waiting vehicles do not clear the intersection during a single green time,are noticeable. This is generally considered the lower end of the range of the acceptable level of service in urban areas. • Level of Service E describes operations with delay in the range of 55.1 to 80.0 seconds per vehicle. These higher delay values generally indicate poor progression, long cycle lengths, and high traffic volumes. Individual cycle failures are frequent occurrences. LOS E has been set as the limit of acceptable conditions. • Level of Service F describes operations with average delay in excess of 80.0 seconds per vehicle. This is considered to be unacceptable to most drivers. This condition often occurs with over-saturation, i.e., when traffic arrives at a flow rate that exceeds the capacity of the intersection. It may also occur at high volumes with many individual cycle failures. Poor progression and long cycle lengths may also contribute to such delays. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Level of Service Definitions Page 2 Unsignalized Intersections At an unsignalized intersection,the major street through traffic and right-turns are assumed to operate unimpeded and therefore receive no level of service rating. The level of service for the minor street and the major street left-turn traffic is dependent on the volume and capacity of the available lanes, and, the number and frequency of acceptable gaps in the major street traffic to make a conflicting turn. The level of service grade is provided for each conflicting movement at an unsignalized intersection and is based on the total average delay experienced by each vehicle. The delay includes the time it takes a vehicle to move from the back of a queue through the intersection. The unsignalized intersection level of service analysis does not account for variations in driver behavior or the effects of nearby traffic signals. Therefore, the results from this analysis usually indicate worse levels of service than may be experienced in the field. The unsignalized intersection level of service descriptions are provided below: • Level of Service A describes operations where there is very little to no conflicting traffic for a minor side street movement, i.e., an average total delay of less than 10.0 seconds per vehicle. • Level of Service B describes operations with average total delay in the range of 10.1 to 15.0 seconds per vehicle. • Level of Service C describes operations with average total delay in the range of 15.1 to 25.0 second per vehicle. • Level of Service D describes operations with average total delay in the range of 25.1 to 35.0 seconds per vehicle. • Level of Service E describes operations with average total delay in the range of 35.1 to 50.0 seconds per vehicle. • Level of Service F describes operations with average total delay of 50 seconds per vehicle. LOS F exists when there are insufficient gaps of suitable size to allow a side street demand to cross safely through or enter a major street traffic stream. This level of service is generally evident from extremely long total delays experienced by side street traffic and by queuing on the minor approaches. It is important to note that LOS F may not always result in long queues but may result in adjustments to normal driver behavior. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Gibson Property Technical Appendix E. 2026 Existing Conditions — Capacity Analysis Worksheets 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Queues Timing Plan: 7 AM to 8 AM 1: Warrior Drive & Fairfax Pike EXAM Peak t 41 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT SBR Lane Group Flow(vph) 136 386 387 113 354 136 32 41 64 314 144 v/c Ratio 0.71 0.69 0.62 0.67 0.70 0.15 0.18 0.21 0.11 0.56 0.21 Control Delay 69.7 39.1 26.7 75.3 47.6 3.5 31.6 26.3 25.6 44.9 4.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 69.7 39.1 26.7 75.3 47.6 3.5 31.6 26.3 25.6 44.9 4.6 Queue Length 50th(ft) 112 285 233 91 257 0 16 13 33 230 0 Queue Length 95th(ft) 162 330 270 #189 321 29 39 43 64 335 36 Internal Link Dist(ft) 496 4165 244 340 Turn Bay Length (ft) 260 280 270 575 190 150 Base Capacity(vph) 212 919 663 169 812 908 209 215 605 562 692 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.64 0.42 0.58 0.67 0.44 0.15 0.15 0.19 0.11 0.56 0.21 Intersection Summary # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th Signalized Intersection Summary Timing Plan: 7 AM to 8 AM 1: Warrior Drive & Fairfax Pike * EX AM Peak � 4--- I t Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t r t r 1 t r Traffic Volume(veh/h) 116 328 329 96 301 116 27 18 17 54 267 122 Future Volume(veh/h) 116 328 329 96 301 116 27 18 17 54 267 122 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 1.00 1.00 0.98 0.95 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1841 1752 1796 1796 1722 1856 966 907 848 1870 1841 1781 Adj Flow Rate, veh/h 136 386 322 113 354 60 32 21 0 64 314 49 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Percent Heavy Veh, % 4 10 7 7 12 3 63 67 71 2 4 8 Cap,veh/h 161 1035 955 134 969 942 89 76 0 226 176 275 Arrive On Green 0.09 0.59 0.59 0.08 0.56 0.56 0.04 0.08 0.00 0.05 0.10 0.10 Sat Flow,veh/h 1753 1752 1521 1711 1722 1538 920 907 0 1781 1841 1431 Grp Volume(v),veh/h 136 386 322 113 354 60 32 21 0 64 314 49 Grp Sat Flow(s),veh/h/In 1753 1752 1521 1711 1722 1538 920 907 0 1781 1841 1431 Q Serve(g_s),s 9.9 15.0 13.0 8.5 14.7 2.1 4.1 2.8 0.0 4.2 12.4 3.7 Cycle Q Clear(g_c),s 9.9 15.0 13.0 8.5 14.7 2.1 4.1 2.8 0.0 4.2 12.4 3.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 Lane Grp Cap(c),veh/h 161 1035 955 134 969 942 89 76 0 226 176 275 V/C Ratio(X) 0.85 0.37 0.34 0.84 0.37 0.06 0.36 0.28 0.00 0.28 1.79 0.18 Avail Cap(c_a),veh/h 206 1035 955 134 969 942 143 87 0 310 176 275 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.98 0.98 0.98 1.00 1.00 0.00 1.00 1.00 1.00 Uniform Delay(d),s/veh 58.1 14.0 11.4 59.1 15.6 10.2 52.5 55.9 0.0 50.8 58.8 44.5 Incr Delay(d2),s/veh 21.7 1.0 1.0 35.2 1.0 0.1 2.4 1.9 0.0 0.7 376.7 0.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 5.3 5.8 4.7 4.9 5.7 0.7 1.0 0.7 0.0 1.9 24.2 1.4 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 79.8 15.0 12.4 94.3 16.7 10.3 54.9 57.8 0.0 51.5 435.5 44.8 LnGrp LOS E B B F B B D E A D F D Approach Vol,veh/h 844 527 53 427 Approach Delay,s/veh 24.4 32.6 56.1 333.1 Approach LOS C C E F Timer-Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration(G+Y+Rc),s 20.6 79.0 12.9 17.5 17.0 82.6 11.4 19.0 Change Period(Y+Rc),s *8.7 *5.8 6.6 6.6 *6.8 5.8 6.6 6.6 Max Green Setting(Gmax),s *15 *62 12.4 12.4 * 10 69.2 12.4 12.4 Max Q Clear Time(g_c+I1),s 11.9 16.7 6.2 4.8 10.5 17.0 6.1 14.4 Green Ext Time(p-c),s 0.1 3.5 0.1 0.0 0.0 5.7 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 98.9 HCM 6th LOS F Notes User approved pedestrian interval to be less than phase max green. *HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Timing Plan: 7 AM to 8 AM 2: Hudson Hollow Road/White Oak Road & Fairfax Pike EXAM Peak t Lane Group EBT EBR WBT WBR NBT SBT Lane Group Flow(vph) 521 21 211 33 98 200 v/c Ratio 0.73 0.03 0.23 0.04 0.33 0.49 Control Delay 15.9 2.2 6.9 2.4 17.7 12.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 15.9 2.2 6.9 2.4 17.7 12.2 Queue Length 50th(ft) 99 0 28 0 16 13 Queue Length 95th(ft) 202 6 60 8 55 63 Internal Link Dist(ft) 4165 4595 176 167 Turn Bay Length (ft) 90 155 Base Capacity(vph) 1056 1210 1334 1156 653 756 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.49 0.02 0.16 0.03 0.15 0.26 Intersection Summary Queues Synchro 11 Report Gorove Slade Timing Plan: 7 AM to 8 AM HCM 6th Signalized Intersection Summary Timing Plan: 7 AM to 8 AM 2: Hudson Hollow Road/White Oak Road & Fairfax Pike EXAM Peak --I. *-- `- t Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations +T r r Traffic Volume(veh/h) 184 259 18 2 178 28 44 10 29 40 6 124 Future Volume(veh/h) 184 259 18 2 178 28 44 10 29 40 6 124 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1767 1752 1811 1870 1722 1737 1796 1752 1796 1826 1648 1707 Adj Flow Rate, veh/h 216 305 9 2 209 15 52 12 2 47 7 11 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Percent Heavy Veh, % 9 10 6 2 12 11 7 10 7 5 17 13 Cap,veh/h 402 469 801 100 897 768 309 55 6 278 43 31 Arrive On Green 0.52 0.52 0.52 0.52 0.52 0.52 0.13 0.13 0.13 0.13 0.13 0.13 Sat Flow,veh/h 504 899 1535 3 1718 1472 1009 414 44 820 321 232 Grp Volume(v),veh/h 521 0 9 211 0 15 66 0 0 65 0 0 Grp Sat Flow(s),veh/h/In 1404 0 1535 1720 0 1472 1468 0 0 1373 0 0 Q Serve(g_s),s 7.9 0.0 0.1 0.0 0.0 0.2 0.0 0.0 0.0 0.1 0.0 0.0 Cycle Q Clear(g_c),s 10.3 0.0 0.1 2.5 0.0 0.2 1.3 0.0 0.0 1.4 0.0 0.0 Prop In Lane 0.41 1.00 0.01 1.00 0.79 0.03 0.72 0.17 Lane Grp Cap(c),veh/h 871 0 801 997 0 768 370 0 0 351 0 0 V/C Ratio(X) 0.60 0.00 0.01 0.21 0.00 0.02 0.18 0.00 0.00 0.19 0.00 0.00 Avail Cap(c_a),veh/h 1657 0 1666 1960 0 1598 1120 0 0 1057 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay(d),s/veh 6.6 0.0 4.2 4.8 0.0 4.3 14.4 0.0 0.0 14.4 0.0 0.0 Incr Delay(d2),s/veh 1.4 0.0 0.0 0.2 0.0 0.0 0.2 0.0 0.0 0.3 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 1.4 0.0 0.0 0.4 0.0 0.0 0.4 0.0 0.0 0.4 0.0 0.0 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 8.0 0.0 4.2 5.0 0.0 4.3 14.6 0.0 0.0 14.7 0.0 0.0 LnGrp LOS A A A A A A B A A B A A Approach Vol,veh/h 530 226 66 65 Approach Delay,s/veh 8.0 5.0 14.6 14.7 Approach LOS A A B B Timer-Assigned Phs 2 4 6 8 Phs Duration(G+Y+Rc),s 27.0 9.8 27.0 9.8 Change Period(Y+Rc),s 7.8 4.9 7.8 4.9 Max Green Setting(Gmax),s 40.0 25.0 40.0 25.0 Max Q Clear Time(g_c+I1),s 12.3 3.3 4.5 3.4 Green Ext Time(p-c),s 6.9 0.2 2.4 0.2 Intersection Summary HCM 6th Ctrl Delay 8.2 HCM 6th LOS A HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Timing Plan: 7 AM to 8 AM 3: Route 522 & Fairfax Pike/Lord Fairfax Highway * I EXAM Peak Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT SBR Lane Group Flow(vph) 265 108 110 114 118 430 205 87 347 10 v/c Ratio 0.77 0.25 0.54 0.47 0.55 0.51 0.38 0.53 0.61 0.02 Control Delay 53.6 1.4 50.3 37.7 50.7 35.4 5.0 55.6 41.2 0.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 53.6 1.4 50.3 37.7 50.7 35.4 5.0 55.6 41.2 0.1 Queue Length 50th(ft) 152 0 64 51 68 127 0 51 105 0 Queue Length 95th(ft) #300 0 124 109 138 190 41 110 161 0 Internal Link Dist(ft) 3900 694 8434 5712 Turn Bay Length (ft) 230 500 565 250 125 480 Base Capacity(vph) 387 459 417 468 242 941 577 186 716 466 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.68 0.24 0.26 0.24 0.49 0.46 0.36 0.47 0.48 0.02 Intersection Summary # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th Signalized Intersection Summary Timing Plan: 7 AM to 8 AM 3: Route 522 & Fairfax Pike/Lord Fairfax Highway EXAM Peak --I. *-- `- t Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations +T r 1 tt r tt r Traffic Volume(veh/h) 32 209 98 100 64 40 107 391 187 79 316 9 Future Volume(veh/h) 32 209 98 100 64 40 107 391 187 79 316 9 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1767 1841 1663 1663 1767 1856 1722 1752 1707 1841 1618 1411 Adj Flow Rate, veh/h 35 230 11 110 70 20 118 430 36 87 347 0 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Percent Heavy Veh, % 9 4 16 16 9 3 12 10 13 4 19 33 Cap,veh/h 42 279 248 163 136 39 151 698 304 112 602 Arrive On Green 0.18 0.18 0.18 0.10 0.10 0.10 0.09 0.21 0.21 0.06 0.20 0.00 Sat Flow,veh/h 242 1587 1409 1584 1321 377 1640 3328 1447 1753 3075 1196 Grp Volume(v),veh/h 265 0 11 110 0 90 118 430 36 87 347 0 Grp Sat Flow(s),veh/h/In 1829 0 1409 1584 0 1699 1640 1664 1447 1753 1537 1196 Q Serve(g_s),s 10.7 0.0 0.5 5.1 0.0 3.8 5.4 9.0 1.5 3.7 7.8 0.0 Cycle Q Clear(g_c),s 10.7 0.0 0.5 5.1 0.0 3.8 5.4 9.0 1.5 3.7 7.8 0.0 Prop In Lane 0.13 1.00 1.00 0.22 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 321 0 248 163 0 175 151 698 304 112 602 V/C Ratio(X) 0.82 0.00 0.04 0.67 0.00 0.51 0.78 0.62 0.12 0.78 0.58 Avail Cap(c_a),veh/h 477 0 368 517 0 554 300 1082 470 229 883 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay(d),s/veh 30.4 0.0 26.2 33.1 0.0 32.5 34.0 27.5 24.5 35.3 27.9 0.0 Incr Delay(d2),s/veh 7.3 0.0 0.1 4.8 0.0 2.3 16.8 1.3 0.2 11.0 1.2 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 5.0 0.0 0.2 2.1 0.0 1.6 2.6 3.3 0.5 1.8 2.7 0.0 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 37.7 0.0 26.3 37.9 0.0 34.9 50.8 28.7 24.8 46.3 29.2 0.0 LnGrp LOS D A C D A C D C C D C Approach Vol,veh/h 276 200 584 434 Approach Delay,s/veh 37.3 36.5 32.9 32.6 Approach LOS D D C C Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration(G+Y+Rc),s 15.4 21.7 16.2 14.3 22.8 23.4 Change Period(Y+Rc),s 8.3 6.7 *8.3 *9.4 6.7 9.9 Max Green Setting(Gmax),s 14.0 22.0 *25 *10 24.9 20.0 Max Q Clear Time(g_c+I1),s 7.4 9.8 7.1 5.7 11.0 12.7 Green Ext Time(p-c),s 0.3 2.0 0.7 0.1 2.9 0.8 Intersection Summary HCM 6th Ctrl Delay 34.1 HCM 6th LOS C Notes *HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Unsignalized Delay for[SBR]is excluded from calculations of the approach delay and intersection delay. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Timing Plan: 7 AM to 8 AM 4: Route 522 & Lake Frederick Drive I EX AM Peak 4\ t L* I Lane Group EBL EBR NBL NBT SBU SBT SBR Lane Group Flow(vph) 167 79 33 606 2 512 65 v/c Ratio 0.51 0.14 0.08 0.41 0.00 0.51 0.13 Control Delay 33.0 4.6 9.8 13.8 8.5 22.4 6.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 33.0 4.6 9.8 13.8 8.5 22.4 6.2 Queue Length 50th(ft) 65 0 6 71 0 95 0 Queue Length 95th(ft) 131 23 19 174 3 153 24 Internal Link Dist(ft) 414 1077 8434 Turn Bay Length (ft) 470 275 295 Base Capacity(vph) 671 643 690 2105 727 1824 892 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.25 0.12 0.05 0.29 0.00 0.28 0.07 Intersection Summary Queues Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th Signalized Intersection Summary Timing Plan: 7 AM to 8 AM 4: Route 522 & Lake Frederick Drive I EX AM Peak -A * L 4\ I Movement EBL EBR NBL NBT SBU SBT SBR Lane Configurations r tt A tt r Traffic Volume(veh/h) 144 68 28 521 2 440 56 Future Volume(veh/h) 144 68 28 521 2 440 56 Initial Q(Qb),veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow,veh/h/In 1870 1752 1589 1648 1604 1707 Adj Flow Rate, veh/h 167 16 33 606 512 12 Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 Percent Heavy Veh, % 2 10 21 17 20 13 Cap,veh/h 230 245 298 1055 894 424 Arrive On Green 0.13 0.13 0.04 0.34 0.29 0.29 Sat Flow,veh/h 1781 1485 1513 3214 3127 1447 Grp Volume(v),veh/h 167 16 33 606 512 12 Grp Sat Flow(s),veh/h/In 1781 1485 1513 1566 1523 1447 Q Serve(g_s),s 4.9 0.0 0.0 8.7 7.8 0.3 Cycle Q Clear(g_c),s 4.9 0.0 0.0 8.7 7.8 0.3 Prop In Lane 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 230 245 298 1055 894 424 V/C Ratio(X) 0.73 0.07 0.11 0.57 0.57 0.03 Avail Cap(c_a),veh/h 812 730 795 2569 2222 1055 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay(d),s/veh 22.9 19.3 19.0 14.9 16.5 13.8 Incr Delay(d2),s/veh 5.2 0.1 0.2 1.1 1.2 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 2.3 0.0 0.3 2.4 2.2 0.1 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 28.1 19.5 19.2 16.0 17.7 13.9 LnGrp LOS C B B B B B Approach Vol,veh/h 183 639 524 Approach Delay,s/veh 27.4 16.2 17.6 Approach LOS C B B Timer-Assigned Phs 2 4 5 6 Phs Duration(G+Y+Rc),s 29.0 15.8 12.5 26.6 Change Period(Y+Rc),s 10.5 8.7 10.5 10.5 Max Green Setting(Gmax),s 45.0 25.0 20.0 40.0 Max Q Clear Time(g_c+11),s 10.7 6.9 2.0 9.8 Green Ext Time(p-c),s 7.8 0.6 0.1 6.3 Intersection Summary HCM 6th Ctrl Delay 18.3 HCM 6th LOS B Notes User approved ignoring U-Turning movement. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Timing Plan: 7 AM to 8 AM 5: Route 522 & Tasker Road II EXAM Peak t t Lane Group EBL EBR NBL NBT SBT SBR Lane Group Flow(vph) 22 165 121 361 309 43 v/c Ratio 0.10 0.31 0.24 0.21 0.41 0.05 Control Delay 23.0 6.8 22.5 6.3 19.7 3.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 23.0 6.8 22.5 6.3 19.7 3.2 Queue Length 50th(ft) 6 0 18 26 44 0 Queue Length 95th(ft) 24 25 39 43 80 12 Internal Link Dist(ft) 446 1419 813 Turn Bay Length (ft) 250 485 315 Base Capacity(vph) 625 1179 1292 2815 2277 1231 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.04 0.14 0.09 0.13 0.14 0.03 Intersection Summary Queues Synchro 11 Report Gorove Slade Timing Plan: 7 AM to 8 AM HCM Signalized Intersection Capacity Analysis Timing Plan: 7 AM to 8 AM 5: Route 522 & Tasker Road * I EX AM Peak -AI L t Movement EBL EBR NBL NBT SBU SBT SBR Lane Configurations r r tt A tt r Traffic Volume(vph) 21 160 117 350 0 300 42 Future Volume(vph) 21 160 117 350 0 300 42 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 Total Lost time(s) 10.2 10.2 10.3 6.4 6.6 10.2 Lane Util.Factor 1.00 0.88 0.97 0.95 0.95 1.00 Frt 1.00 0.85 1.00 1.00 1.00 0.85 Flt Protected 0.95 1.00 0.95 1.00 1.00 1.00 Satd. Flow(prot) 1583 2733 3273 3195 2888 1583 Flt Permitted 0.95 1.00 0.95 1.00 1.00 1.00 Satd. Flow(perm) 1583 2733 3273 3195 2888 1583 Peak-hour factor, PHF 0.97 0.97 0.97 0.97 0.92 0.97 0.97 Adj. Flow(vph) 22 165 121 361 0 309 43 RTOR Reduction(vph) 0 143 0 0 0 0 26 Lane Group Flow(vph) 22 22 121 361 0 309 17 Heavy Vehicles(%) 14% 4% 7% 13% 2% 25% 2% Turn Type Prot Prot Prot NA Prot NA pm+ov Protected Phases 7 4 1 6 5 2 7 Permitted Phases 4 2 Actuated Green, G (s) 7.3 7.3 6.0 29.9 13.4 20.7 Effective Green,g(s) 7.3 7.3 6.0 29.9 13.4 20.7 Actuated g/C Ratio 0.14 0.14 0.11 0.56 0.25 0.38 Clearance Time(s) 10.2 10.2 10.3 6.4 6.6 10.2 Vehicle Extension(s) 3.0 3.0 3.0 3.5 3.5 3.0 Lane Grp Cap(vph) 214 370 365 1775 719 609 v/s Ratio Prot c0.01 0.01 0.04 c0.11 c0.11 0.00 v/s Ratio Perm 0.01 v/c Ratio 0.10 0.06 0.33 0.20 0.43 0.03 Uniform Delay,d1 20.4 20.3 22.0 6.0 17.0 10.3 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay,d2 0.2 0.1 0.5 0.1 0.5 0.0 Delay(s) 20.6 20.3 22.6 6.1 17.5 10.3 Level of Service C C C A B B Approach Delay(s) 20.4 10.2 16.6 Approach LOS C B B Intersection Summary HCM 2000 Control Delay 14.3 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.35 Actuated Cycle Length(s) 53.8 Sum of lost time(s) 27.1 Intersection Capacity Utilization 42.8% ICU Level of Service A Analysis Period(min) 15 c Critical Lane Group HCM Signalized Intersection Capacity Analysis Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th Signalized Intersection Summary Timing Plan: 7 AM to 8 AM 5: Route 522 & Tasker Road EX AM Peak HCM 6th Edition methodology supports red clearance in the range of 0 to 6 seconds. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Timing Plan: 4.15 PM to 5.15 PM 1: Warrior Drive & Fairfax Pike EX PM Peak t 41 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT SBR Lane Group Flow(vph) 240 452 47 16 484 133 69 93 100 43 310 v/c Ratio 0.83 0.40 0.04 0.15 0.61 0.15 0.26 0.57 0.41 0.25 0.48 Control Delay 62.3 16.3 2.3 51.5 30.3 0.8 35.5 58.0 41.1 49.6 6.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 62.3 16.3 2.3 51.5 30.3 0.8 35.5 58.0 41.1 49.6 6.3 Queue Length 50th(ft) 162 181 1 11 295 0 38 59 56 28 4 Queue Length 95th(ft) #288 375 17 33 370 7 75 #112 102 64 62 Internal Link Dist(ft) 496 4165 244 340 Turn Bay Length (ft) 260 280 270 575 190 150 Base Capacity(vph) 298 1146 1289 132 838 897 277 174 252 186 648 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.81 0.39 0.04 0.12 0.58 0.15 0.25 0.53 0.40 0.23 0.48 Intersection Summary # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection Summary Timing Plan: 4.15 PM to 5.15 PM 1: Warrior Drive & Fairfax Pike * IEX PM Peak --I. 4--- I t Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations + r + r t r Traffic Volume(veh/h) 211 398 41 14 426 117 61 69 13 88 38 273 Future Volume(veh/h) 211 398 41 14 426 117 61 69 13 88 38 273 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 0.98 0.98 0.99 0.98 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1870 1841 1870 1693 1841 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 240 452 29 16 484 59 69 78 8 100 43 45 Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 Percent Heavy Veh, % 2 4 2 14 4 2 2 2 2 2 2 2 Cap,veh/h 269 1127 1059 40 863 834 230 102 10 205 136 352 Arrive On Green 0.15 0.61 0.61 0.02 0.47 0.47 0.06 0.06 0.06 0.07 0.07 0.07 Sat Flow,veh/h 1781 1841 1585 1612 1841 1552 1781 1664 171 1781 1870 1552 Grp Volume(v),veh/h 240 452 29 16 484 59 69 0 86 100 43 45 Grp Sat Flow(s),veh/h/In 1781 1841 1585 1612 1841 1552 1781 0 1835 1781 1870 1552 Q Serve(g_s),s 14.5 13.9 0.7 1.1 20.8 2.0 3.9 0.0 5.1 5.7 2.4 2.6 Cycle Q Clear(g_c),s 14.5 13.9 0.7 1.1 20.8 2.0 3.9 0.0 5.1 5.7 2.4 2.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.09 1.00 1.00 Lane Grp Cap(c),veh/h 269 1127 1059 40 863 834 230 0 113 205 136 352 V/C Ratio(X) 0.89 0.40 0.03 0.40 0.56 0.07 0.30 0.00 0.76 0.49 0.32 0.13 Avail Cap(c_a),veh/h 280 1127 1059 135 863 834 283 0 157 237 160 372 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.85 0.85 0.85 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay(d),s/veh 45.8 10.9 6.2 52.9 21.0 12.3 44.6 0.0 50.8 44.4 48.4 34.2 Incr Delay(d2),s/veh 27.6 1.1 0.0 5.5 2.2 0.1 0.7 0.0 13.4 1.8 1.3 0.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 8.3 5.3 0.2 0.5 8.9 0.7 1.8 0.0 2.8 2.6 1.2 1.0 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 73.5 12.0 6.2 58.4 23.3 12.5 45.3 0.0 64.2 46.2 49.8 34.3 LnGrp LOS E B A E C B D A E D D C Approach Vol,veh/h 721 559 155 188 Approach Delay,s/veh 32.2 23.1 55.8 44.2 Approach LOS C C E D Timer-Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration(G+Y+Rc),s 25.3 57.4 14.0 13.4 9.5 73.2 12.7 14.6 Change Period(Y+Rc),s *8.7 *5.8 6.6 6.6 *6.8 5.8 6.6 6.6 Max Green Setting(Gmax),s *17 *46 9.4 9.4 *9.2 56.2 9.4 9.4 Max Q Clear Time(g_c+I1),s 16.5 22.8 7.7 7.1 3.1 15.9 5.9 4.6 Green Ext Time(p-c),s 0.1 4.4 0.0 0.1 0.0 4.4 0.0 0.1 Intersection Summary HCM 6th Ctrl Delay 32.7 HCM 6th LOS C Notes User approved pedestrian interval to be less than phase max green. *HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Queues Timing Plan: 4.15 PM to 5.15 PM 2: Hudson Hollow Road/White Oak Road & Fairfax Pike EX PM Peak t Lane Group EBT EBR WBT WBR NBT SBT Lane Group Flow(vph) 324 42 432 35 75 186 v/c Ratio 0.53 0.05 0.51 0.04 0.22 0.39 Control Delay 12.0 2.7 10.6 2.8 14.9 8.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 12.0 2.7 10.6 2.8 14.9 8.6 Queue Length 50th(ft) 51 0 67 0 11 9 Queue Length 95th(ft) 112 10 133 10 45 56 Internal Link Dist(ft) 4165 4595 176 167 Turn Bay Length (ft) 90 155 Base Capacity(vph) 1127 1406 1551 1405 815 959 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.29 0.03 0.28 0.02 0.09 0.19 Intersection Summary Queues Synchro 11 Report Gorove Slade Timing Plan:415 PM to 5:15 PM HCM 6th Signalized Intersection Summary Timing Plan: 4.15 PM to 5.15 PM 2: Hudson Hollow Road/White Oak Road & Fairfax Pike IEX PM Peak * Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations +1 r r Traffic Volume(veh/h) 114 204 41 23 401 34 43 21 10 22 28 132 Future Volume(veh/h) 114 204 41 23 401 34 43 21 10 22 28 132 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1870 1781 1870 1841 1826 1870 1870 1752 1870 1870 1841 1870 Adj Flow Rate, veh/h 116 208 20 23 409 17 44 21 2 22 29 30 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 2 8 2 4 5 2 2 10 2 2 4 2 Cap,veh/h 285 432 722 132 805 722 301 108 7 184 119 96 Arrive On Green 0.46 0.46 0.46 0.46 0.46 0.46 0.16 0.16 0.16 0.16 0.16 0.16 Sat Flow,veh/h 300 948 1585 36 1767 1585 755 677 44 281 749 605 Grp Volume(v),veh/h 324 0 20 432 0 17 67 0 0 81 0 0 Grp Sat Flow(s),veh/h/In 1248 0 1585 1803 0 1585 1477 0 0 1634 0 0 Q Serve(g_s),s 1.4 0.0 0.2 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 Cycle Q Clear(g_c),s 7.0 0.0 0.2 5.6 0.0 0.2 1.1 0.0 0.0 1.4 0.0 0.0 Prop In Lane 0.36 1.00 0.05 1.00 0.66 0.03 0.27 0.37 Lane Grp Cap(c),veh/h 717 0 722 937 0 722 416 0 0 399 0 0 V/C Ratio(X) 0.45 0.00 0.03 0.46 0.00 0.02 0.16 0.00 0.00 0.20 0.00 0.00 Avail Cap(c_a),veh/h 1727 0 1925 2278 0 1925 1248 0 0 1350 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay(d),s/veh 6.3 0.0 4.9 6.4 0.0 4.9 12.1 0.0 0.0 12.2 0.0 0.0 Incr Delay(d2),s/veh 1.0 0.0 0.0 0.8 0.0 0.0 0.2 0.0 0.0 0.2 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.7 0.0 0.0 1.0 0.0 0.0 0.3 0.0 0.0 0.4 0.0 0.0 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 7.2 0.0 5.0 7.2 0.0 5.0 12.3 0.0 0.0 12.5 0.0 0.0 LnGrp LOS A A A A A A B A A B A A Approach Vol,veh/h 344 449 67 81 Approach Delay,s/veh 7.1 7.1 12.3 12.5 Approach LOS A A B B Timer-Assigned Phs 2 4 6 8 Phs Duration(G+Y+Rc),s 22.8 10.1 22.8 10.1 Change Period(Y+Rc),s 7.8 4.9 7.8 4.9 Max Green Setting(Gmax),s 40.0 25.0 40.0 25.0 Max Q Clear Time(g_c+I1),s 9.0 3.1 7.6 3.4 Green Ext Time(p-c),s 4.3 0.2 5.5 0.3 Intersection Summary HCM 6th Ctrl Delay 7.9 HCM 6th LOS A HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Queues Timing Plan: 4.15 PM to 5.15 PM 3: Route 522 & Fairfax Pike/Lord Fairfax Highway } I EX PM Peak --I. -4- I I" Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT SBR Lane Group Flow(vph) 150 146 224 356 201 611 179 73 567 13 v/c Ratio 0.64 0.39 0.60 0.89 0.90 0.68 0.31 0.52 0.84 0.03 Control Delay 56.9 4.6 45.7 65.3 86.4 42.1 3.0 61.9 54.3 0.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 56.9 4.6 45.7 65.3 86.4 42.1 3.0 61.9 54.3 0.1 Queue Length 50th(ft) 101 0 140 233 140 212 0 49 200 0 Queue Length 95th(ft) 168 18 234 #426 #298 #314 23 102 #306 0 Internal Link Dist(ft) 3900 694 8434 5712 Turn Bay Length (ft) 230 500 565 250 125 480 Base Capacity(vph) 330 449 393 418 224 903 579 161 705 513 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.45 0.33 0.57 0.85 0.90 0.68 0.31 0.45 0.80 0.03 Intersection Summary # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection Summary Timing Plan: 4.15 PM to 5.15 PM 3: Route 522 & Fairfax Pike/Lord Fairfax Highway EX PM Peak --I. *-- `- t Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations +T r tt r tt r Traffic Volume(veh/h) 45 90 131 202 248 72 181 550 161 66 510 12 Future Volume(veh/h) 45 90 131 202 248 72 181 550 161 66 510 12 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1796 1811 1796 1781 1826 1796 1811 1781 1796 1826 1811 1870 Adj Flow Rate, veh/h 50 100 5 224 276 70 201 611 33 73 567 0 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 7 6 7 8 5 7 6 8 7 5 6 2 Cap,veh/h 63 126 161 377 312 79 233 902 406 93 676 Arrive On Green 0.11 0.11 0.11 0.22 0.22 0.22 0.14 0.27 0.27 0.05 0.20 0.00 Sat Flow,veh/h 594 1188 1522 1697 1405 356 1725 3385 1522 1739 3441 1585 Grp Volume(v),veh/h 150 0 5 224 0 346 201 611 33 73 567 0 Grp Sat Flow(s),veh/h/In 1781 0 1522 1697 0 1762 1725 1692 1522 1739 1721 1585 Q Serve(g_s),s 8.0 0.0 0.3 11.5 0.0 18.5 11.1 15.8 1.6 4.0 15.5 0.0 Cycle Q Clear(g_c),s 8.0 0.0 0.3 11.5 0.0 18.5 11.1 15.8 1.6 4.0 15.5 0.0 Prop In Lane 0.33 1.00 1.00 0.20 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 189 0 161 377 0 392 233 902 406 93 676 V/C Ratio(X) 0.80 0.00 0.03 0.59 0.00 0.88 0.86 0.68 0.08 0.78 0.84 Avail Cap(c_a),veh/h 365 0 312 435 0 451 248 902 406 178 776 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay(d),s/veh 42.6 0.0 39.1 34.0 0.0 36.7 41.3 32.0 26.8 45.6 37.7 0.0 Incr Delay(d2),s/veh 7.4 0.0 0.1 1.7 0.0 16.8 27.0 2.3 0.1 13.1 7.8 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 3.8 0.0 0.1 4.7 0.0 9.5 6.2 6.2 0.5 2.0 6.8 0.0 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 50.0 0.0 39.2 35.7 0.0 53.5 68.3 34.3 26.9 58.7 45.5 0.0 LnGrp LOS D A D D A D E C C E D Approach Vol,veh/h 155 570 845 640 Approach Delay,s/veh 49.7 46.5 42.1 47.0 Approach LOS D D D D Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration(G+Y+Rc),s 21.5 25.9 30.0 14.6 32.7 20.2 Change Period(Y+Rc),s 8.3 6.7 *8.3 *9.4 6.7 9.9 Max Green Setting(Gmax),s 14.0 22.0 *25 *10 24.9 20.0 Max Q Clear Time(g_c+I1),s 13.1 17.5 20.5 6.0 17.8 10.0 Green Ext Time(p-c),s 0.1 1.7 1.1 0.0 2.7 0.5 Intersection Summary HCM 6th Ctrl Delay 45.2 HCM 6th LOS D Notes *HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Unsignalized Delay for[SBR]is excluded from calculations of the approach delay and intersection delay. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Queues Timing Plan: 4.15 PM to 5.15 PM 4: Route 522 & Lake Frederick Drive II EX PM Peak t t Lane Group EBL EBR NBL NBT SBT SBR Lane Group Flow(vph) 186 84 103 767 700 210 v/c Ratio 0.58 0.14 0.28 0.40 0.61 0.31 Control Delay 39.2 6.4 12.4 10.4 24.2 4.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 39.2 6.4 12.4 10.4 24.2 4.2 Queue Length 50th(ft) 83 3 21 100 144 0 Queue Length 95th(ft) 175 33 50 165 234 44 Internal Link Dist(ft) 414 1077 8434 Turn Bay Length (ft) 470 295 Base Capacity(vph) 565 598 657 2065 1694 912 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.33 0.14 0.16 0.37 0.41 0.23 Intersection Summary Queues Synchro 11 Report Gorove Slade Timing Plan:415 PM to 5:15 PM HCM 6th Signalized Intersection Summary Timing Plan: 4.15 PM to 5.15 PM 4: Route 522 & Lake Frederick Drive I EX PM Peak -A * �4\ I t Movement EBL EBR NBL NBT SBU SBT SBR Lane Configurations r tt A tt r Traffic Volume(veh/h) 167 76 93 690 0 630 189 Future Volume(veh/h) 167 76 93 690 0 630 189 Initial Q(Qb),veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow,veh/h/In 1870 1722 1826 1781 1767 1870 Adj Flow Rate, veh/h 186 24 103 767 700 59 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 12 5 8 9 2 Cap,veh/h 247 297 338 1245 1144 540 Arrive On Green 0.14 0.14 0.06 0.37 0.34 0.34 Sat Flow,veh/h 1781 1459 1739 3474 3445 1585 Grp Volume(v),veh/h 186 24 103 767 700 59 Grp Sat Flow(s),veh/h/In 1781 1459 1739 1692 1678 1585 Q Serve(g_s),s 6.5 0.0 0.0 12.1 11.3 1.7 Cycle Q Clear(g_c),s 6.5 0.0 0.0 12.1 11.3 1.7 Prop In Lane 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 247 297 338 1245 1144 540 V/C Ratio(X) 0.75 0.08 0.30 0.62 0.61 0.11 Avail Cap(c_a),veh/h 683 655 759 2338 2061 973 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay(d),s/veh 27.0 21.0 22.6 16.8 17.9 14.7 Incr Delay(d2),s/veh 5.5 0.1 0.6 1.1 1.1 0.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 3.1 0.4 1.3 3.9 3.7 0.5 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 32.5 21.2 23.2 17.9 19.0 14.9 LnGrp LOS C C C B B B Approach Vol,veh/h 210 870 759 Approach Delay,s/veh 31.2 18.5 18.7 Approach LOS C B B Timer-Assigned Phs 2 4 5 6 Phs Duration(G+Y+Rc),s 34.5 17.7 14.7 32.7 Change Period(Y+Rc),s 10.5 8.7 10.5 10.5 Max Green Setting(Gmax),s 45.0 25.0 20.0 40.0 Max Q Clear Time(g_c+11),s 14.1 8.5 2.0 13.3 Green Ext Time(p-c),s 9.9 0.7 0.3 8.9 Intersection Summary HCM 6th Ctrl Delay 20.1 HCM 6th LOS C Notes User approved ignoring U-Turning movement. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Queues Timing Plan: 4.15 PM to 5.15 PM 5: Route 522 & Tasker Road I EX PM Peak t I Lane Group EBL EBR NBL NBT SBT SBR Lane Group Flow(vph) 44 151 185 482 521 32 v/c Ratio 0.19 0.31 0.37 0.25 0.60 0.04 Control Delay 27.2 7.4 25.7 6.2 22.5 3.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 27.2 7.4 25.7 6.2 22.5 3.3 Queue Length 50th(ft) 14 0 29 36 83 0 Queue Length 95th(ft) 44 25 62 61 138 11 Internal Link Dist(ft) 446 1419 813 Turn Bay Length (ft) 250 485 315 Base Capacity(vph) 604 1050 1138 2569 2303 1136 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.07 0.14 0.16 0.19 0.23 0.03 Intersection Summary Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM Signalized Intersection Capacity Analysis Timing Plan: 4.15 PM to 5.15 PM 5: Route 522 & Tasker Road * I EX PM Peak -AI L t Movement EBL EBR NBL NBT SBU SBT SBR Lane Configurations r r tt A tt r Traffic Volume(vph) 42 145 178 463 0 500 31 Future Volume(vph) 42 145 178 463 0 500 31 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 Total Lost time(s) 10.2 10.2 10.3 6.4 6.6 10.2 Lane Util.Factor 1.00 0.88 0.97 0.95 0.95 1.00 Frt 1.00 0.85 1.00 1.00 1.00 0.85 Flt Protected 0.95 1.00 0.95 1.00 1.00 1.00 Satd. Flow(prot) 1770 2787 3335 3252 3374 1583 Flt Permitted 0.95 1.00 0.95 1.00 1.00 1.00 Satd. Flow(perm) 1770 2787 3335 3252 3374 1583 Peak-hour factor, PHF 0.96 0.96 0.96 0.96 0.92 0.96 0.96 Adj. Flow(vph) 44 151 185 482 0 521 32 RTOR Reduction(vph) 0 132 0 0 0 0 20 Lane Group Flow(vph) 44 19 185 482 0 521 12 Heavy Vehicles(%) 2% 2% 5% 11% 2% 7% 2% Turn Type Prot Prot Prot NA Prot NA pm+ov Protected Phases 7 4 1 6 5 2 7 Permitted Phases 4 2 Actuated Green, G (s) 7.6 7.6 8.9 34.8 15.4 23.0 Effective Green,g(s) 7.6 7.6 8.9 34.8 15.4 23.0 Actuated g/C Ratio 0.13 0.13 0.15 0.59 0.26 0.39 Clearance Time(s) 10.2 10.2 10.3 6.4 6.6 10.2 Vehicle Extension(s) 3.0 3.0 3.0 3.5 3.5 3.0 Lane Grp Cap(vph) 228 359 503 1918 880 617 v/s Ratio Prot c0.02 0.01 0.06 c0.15 c0.15 0.00 v/s Ratio Perm 0.01 v/c Ratio 0.19 0.05 0.37 0.25 0.59 0.02 Uniform Delay,d1 23.0 22.5 22.5 5.8 19.1 11.1 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay,d2 0.4 0.1 0.5 0.1 1.1 0.0 Delay(s) 23.4 22.6 23.0 5.9 20.2 11.1 Level of Service C C C A C B Approach Delay(s) 22.8 10.6 19.7 Approach LOS C B B Intersection Summary HCM 2000 Control Delay 15.8 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.46 Actuated Cycle Length(s) 59.0 Sum of lost time(s) 27.1 Intersection Capacity Utilization 48.1% ICU Level of Service A Analysis Period(min) 15 c Critical Lane Group HCM Signalized Intersection Capacity Analysis Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection Summary Timing Plan: 4.15 PM to 5.15 PM 5: Route 522 & Tasker Road EX PM Peak HCM 6th Edition methodology supports red clearance in the range of 0 to 6 seconds. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Gibson Property Technical Appendix F. Background Information Enclave at Tasker Residential and Eastgate Commercial r r, 10 "ti+'�flj VL A. -• t,t .� �� ..� .�� .. �`►S,'r. +��'� .r• ''fit;~� '� '� -�'� ~1 'Y "'� E &.TZ a 1 ' JLegend ' Eastgate Enclave at Tasker a {►`, - ;�p7� \ Proposed Site Access Figure 1: Enclave at Tasker Residential and Eastgate Commercial Locations 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Gibson Property Technical Appendix Table 1: Trip Generation of Enclave at Tasker Residential Development WeekdayLand Use ITE Size Units AM Peak Hour PM Peak Hour Code In Out Out . . Single Family Detached 210 165 DU 31 85 116 95 58 153 1,597 Single Family Attached 215 154 DU 19 57 76 46 34 80 1,009 Subtotal 319 DU 50 142 192 141 92 233 2,606 Note:ITE Trip Generation Manual, 12t'Edition is used for site trip generation. 55% ' p R s ^ 4070 I S 'a 2% i• +R' \�J Y 7 7• , a fz' Figure 2: Enclave at Tasker Direction of Approach Note: The distribution of traffic is based on engineering judgment. Due to the presence of multiple access points for the Enclave at Tasker development,not all trips generated by this development are expected to pass through the study intersection. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Gibson Property Technical Appendix icy N 5 y � r 2 i I 6 3 .kyr '1• ,a.. r� Legend 4 O Study Intersection 4 • Existing Roadway F• 1 •�' ��, �— One Way Travel Lane AM/PM Peak Hour Traffic Lake Frederick Entrance �—0/0 o i 010 a 1/3 3 4-0/0 3 t—0/0 4-0/0 �o/ o 0/0 0 0y 0y 0/0 o m �I 0/0 Fairfax Pike • Farfax PikeFairfax Pike � ♦ � Fafrtaz Pike � ♦ � --. -3.Fi:e � ♦ �� 2/6 o 0 o Op o 0 0 0/0� o So 0 0/0—111� a 0/0—► 0 0/0—► o/o 0 0/0 oro Is F 4 6 f W 4-0/0 Falrralc Pike Lake Frederick Drive ♦ Tasker Road ♦ Fairfax Pike 0/0-,+ O T`° 3/2 NT O O O N O O 0/0—► u 0/0 ry 7/5 m 010 v tt Figure 3: Enclave at Tasker Trips Assignment 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Gibson Property Technical Appendix Table 2: Tri Generation of East ate Develo ment Land Use ITE Size Units AM Peak Hour PM Peak Hour Weekday .. In Out Out Total Total Retail(>150 K) 820 179 KSF 150 92 242 381 395 776 6,514 Pass-by Reductions-Retail(AM/PM/WKDY) -38 -23 -61 -95 -99 -194 -1,889 Site Trips with Reduction 179 KSF 113 69 182 286 296 582 4,625 Note:ITE Trip Generation Manual, 1211 Edition is used for site trip generation. Pass-by rates for Shopping Plaza with Supermarket use were based on ITE Land Use Code(LUC) 820. Since ITE does not provide pass-by rates for the AM or PM for LUC 820, both were assumed to be 25%percent, while 29%Is used for the Weekday. 0 r ; I-' 3,. 5% � O Figure 4: Eastgate Direction of Approach Note:The distribution of traffic is based on engineering judgment.Due to the presence of multiple access points for Eastgate development,not all trips generated by this development are expected to pass through the study intersection. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Gibson Property Technical Appendix 5 a• �:� \`� 6 fi •ft} "� 9 � �. 3 r ti 4 r Legend Study Intersection o , r y Existing Roadway r One Way Travel Lane AU PM Peak Hour Traffic Lake Frederick Entrance • a O `- � 0/0 o t-0/0 rc _-0/0 4— 0/0 4-0/0 4-0/0 0 0 0 0 0 0 3 o tl o r')0I o `o 0/0 0 'o o I`0 0/0 ` Q 0/0 Fe ea%Pike Fairfax PiKe Lorn Fairfax ; al Pike � ♦ � airrat Pike � ♦ � Fairfax Pike 010 o 0 0 0/0 o 0 0 0/0 o `o o' o 0 0 010-4. m 010—► 0 0/0--110. 0/0 0 0/0 0 010 E 3 rc a co t—0/0 � � m o o o 010 L+ Lake Fredenck Drive ♦ Tasker Road ♦ Fairfax Pike t 0/0 o 0 12/50 v v o 0 r ° 0/0—po. 0/0 N 12/50 m 010 5 tt tt Figure 5: Eastgate Pass-by Trips Assignment 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Gibson Property Technical Appendix N 5 ,i 3 Legend 4 Study Intersection j, Existing Roadway .k L One Way Travel Lane AM/PM Peak Hour Traffic Lake Frederick Entrance W 0,2 0 E Oro o 0/0 rc -6/14 o t— 0/0 y F 0/0 o rn t—Oro 3 n o o Oro o 0 0 0/0 o n in 0/0 1 y y 1 Fairfax Pik Fairfax PikeLrtl Faifa HIQhWa Fairfax Pike LI T♦ ` Fairfax Pike ♦ Fai rtax Pike I(7 T 1129 o 0 0 0/0 0 0 0 0/0 Oro—► 0/0—111. 0/0--► Oro 0 0/0 0/0 c 4—0"0 O M O N O r O 1n O 0'0 La eFretlerkk Dave I ♦ Tasker Roatl 4 ♦ Farfax Pike 4) aro o 17/71 a o M o 0ro-> Oro 5/23 0/0 LL M Figure 6: Eastgate Site Trips Assignment 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Gibson Property Technical Appendix Sherando Green OVA NN 'Fill ummw s~ // �_� Fly /// Mff MTV C: _ 1P1KE I . _ �* 1 1 F' t Rl OTC OL t1, i It..el Figure 7: Sherando Green Location Table 3: Trips Generation of Sherando Green dqF4Use Code Size Units AM Peak Hour PM Peak Hour Weekday In Out Out . _ Shopping Plaza with Supermarket 821 93.9 KSF 199 133 332 395 411 806 10,128 Pass-by Reductions-Retail(AM/PM/WKDY) -50 -33 -83 -99 -103 -202 -2,937 Site Trips with Reduction 93.9 KSF 149 100 249 296 308 605 7,191 Note:ITE Trip Generation Manual, 12'Edition is used for site trip generation. Pass-by rates for Shopping Plaza with Supermarket use were based on ITE Land Use Code(LUC) 821. Since ITE does not provide pass-by rates for the AM or PM for LUC 821,both were assumed to be 25%percent, while 29%Is used for the Weekday. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Gibson Property Technical Appendix a�o O . \o _ 'J r zr j- • ".J 1 :y Figure 8: Sherando Green Direction of Approach Note:As no traffic study was conducted for Sherando Green, the directional distribution assumptions were based on existing travel patterns,surrounding land uses, and engineering judgment. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Gibson Property Technical Appendix 7 5 +' iar - Legend 4 Study Intersection o t • i Existing Roadway One Way Travel Lane ••r AIJ Pill Peak Hour Traffic Lake Frederick Entrance O o O re. O 5 •� 0/0 0' 0/0 Oro ' 4 -25/-49 �r t 0/0 *__0/0 O O O O O O O O O 0 0 0 25/50 0 00 a 0/0 0 0` 0y Oro 4) � (* Fairfax Pike 4) Fairfax Pik LAftl Faif(a)f HI hWa Fairfax PIKe � ♦ ` airtaz Pllti � ♦ Fairfax Pike oro � e � 010 � Te Oro QQQ(/ O o 0 0 0 0 0 -25/49—► m -82—► -8/2--► 25/50 8 0/0�,i• 0 0/0 3 i � 6 a rc F oro 0 0 0 0 0 0 a GIs/ a a sIj 0 �oro • ` Fairfax Pik Lake Fretlen kOrrve ♦ 7.-,.ker oa ♦ Fai aXx xI e c 0/0 � � oro ' o a a o 0 0 a s 0 0 -0/2—► e 'rc Figure 9: Sherando Green Pass-by Trips 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Gibson Property Technical Appendix 5 ?4 3 . ,Y J •~ r 1 Legend 4 ' OStudy Intersection r - Existing Roadway One Way Travel Lane AM/PM Peak Hour Traffic r_ Lake Frederick Entrance ® o () 5 a �--Oro o �--0/0 Z 010 4—37174 t—59/118 4—7/15 m` oIy 37774 o oIy Oro M o oIy 0/0 Falrrax Pike Fairfax Pike LDrd FaifTax Hi 11, Faidax Pike ♦ Fairfax Plke ♦ ` Fairtax Pike ♦ `- 5/16 Txr C 10/31 o oT R 20/62 v oT lo/I 25/77—/ g N N 40/123—/ 0 5115—► N 30/59 o Oro 0 15146 t 3 5 5 rc rc tO O1 F—59/118 g to o o o EMI{/ o Oro • Fairfax PIk- Lae Frederick Drive TasKw Road Fairfax Pike 0/0 e Q 0/0 g o Q o � r 40/123—► 010 N oro v Oro 5 Figure 10: Sherando Green Site Trips Assignment 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Gibson Property Technical Appendix Fairfax Downs I � , •� �° ..� II I', r"' '-',.a 11 '{ UP[ 1 L11I, r LANO BAYA .% t 1�� I, � _ \ -�—�\..` r.r•� 1"x.coM"utcuLl �:-. ��W_ 1 AN Y B x xB LAND BAY C /; j 1...... I ,•— - OPEN --------------- SINGLE-FAMILY URBAN LOTS I Ol G SINGLE-FAMILYIURBAN LOTS / SPACE OF'J Il R , Q <� ..,,... ,,.....� I �. EA m'm«rcreurar.w —__ ARESINGLE-FAMILY �LVWL.-.R.YNURBANLOTS URBAN LOTS �SINGLE-- URBAN LOTS — x ,.wa...v..,. .,..�,.,nu..•... ..�. I —y III II �'i `�IW,.,�'.'°•w II SINGLEFAMILY _ 11 SMGLE-FAMILY URBAN LOTS_ _---- - URBAN LOTS EAL TI� �f t2 __ r wu•® a u SINGLE.FAMILY URBAN LOTS . au za eK o r�l - " +1 D E R E ..,v.w..., .... -...._. _ype - - f,..,.,. --- OPEN SPACE Figure 11: Fairfax Downs Land Use Plan Table 4: Trips Generation by Fairfax Downs Land Use ITE Size Units AM Peak Hour PM Peak Hour Weekday .. In Out . . Out . . Total Single Family Urban Lots Single Family Detached 210 93 DU 18 50 68 56 34 90 1,016 Subtotal 93 DU 18 50 68 56 34 90 1,016 Note:ITE Trip Generation Manual, 121 Edition is used for site trip generation. The number of units were referenced from the approved Master Development Plan. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Gibson Property Technical Appendix • 60 4 'tam �I _ � r .1 Figure 12: Fairfax Downs Direction of Approach Note:As no traffic study was conducted for Sherando Green, the directional distribution assumptions were based on existing travel patterns,surrounding land uses, and engineering judgment. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Gibson Property Technical Appendix N 5 ,i 3 Legend 4 Study Intersection j, Existing Roadway One Way Travel Lane AM/PM Peak Hour Traffic r Lake Frederick Entrance n 6 � ie d 0/0 8 4-0/0 0/0 F 4/10 4—720 4-1/3 f— 4/10 O �Or O f—OA N C OI O '0—0/0 • Fairfax Pike Fairrax Pike Lord Fairfax H hwa 'Fella% e � ♦ � Fairfax PKe � ♦ � a%Pike 2/1 � N m 0/0 rc o o '0 5/3 � o 0 9/6—► 18/12—► 8- 3/2—► 6/17 0 0/0 10/7 3 i f—7/20 12 OI O O �Nr O 010 4 • Fairfax Pik Lake Frederick Drive Tasker Road m 0/0 J4 a 0/0 Q e Q Q o _ o rn o 0 18/12 0/0—,, 010 0/0 m Figure 13: Fairfax Downs Site Trips Assignment 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Gibson Property Technical Appendix Lake Frederick(remaining build out) Wv A am V EKI Figure 14: Lake Frederick Master Development Plan LOT PHASING TABULATIONS PROPOSED PROPOSED SINGLE FAMILY SINGLE FAMILY DETACHED ATTACHED EXISTING LOTS TOTAL PHASE IA(AGE RESTRICTED) 0 197 PHASEIB 0 25 140womomw 165 PHASE IIA(AGE RESTRICTED) 0 0 79 79 PHASE IIB 0 178 PHASE III 0 0 193 193 PHASE IV(AGE RESTRICTED) 0 0 0 203 PHASE V(AGE RESTRICTED) 0 0 145 PHASE VIA AGE RESTRICTED 109 0 0 109 PHASE VI B 0 185 0 185 PHASE VI A(AGE RESTRICTED) 90 0 $ 0 PHASE VII B 0 200 0 200 PHASE VIII(AGE RESTRICTED)_ 128 0 94 222 PHASE IX(AGE RESTRICTED) 119 0 45 164 TOTAL 1 446 410 1274 2130 Figure 15: Lake Frederick Lot Phasing Tabulations 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Gibson Property Technical Appendix Table 5: Lake Frederick Site Trips Generation • Use ITE Size Units AM Peak - -- .. .. In Out Out Total Total Single Family Detached(Age Restricted) 251 199 DU 22 42 64 46 30 76 1,038 Single Family Attached 215 385 DU 53 159 212 121 91 212 2,529 Delta Single Family Detached 210 78 DU 16 42 58 47 30 77 895 Subtotal 662 DU 91 243 334 214 151 365 4,462 Notes:ITE Trip Generation Manual, 1211 Edition is used for site trip generation. The vacant area shown on Google Satellite imagery corresponds to Phases VIA, VIB, VITA,and VIIB. �` r7 err «.aft �� �' ryry; i�•�•;;� r Figure 16: Lake Frederick Direction of Approach Note: The direction of approach(DOA) was referenced from the memorandum titled"Lake Frederick Development—Fairfax Pike Site Access Evaluation."All trips traveling from the south to the northbound direction are assumed to use the existing entrance on Route 522, while all other trips are assumed to use the proposed new driveway on Fairfax Pike. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Gibson Property Technical Appendix N 1 j .Y�' � krY 7 •� - � :. f+1 I f•r � � I .,•f� J r Legend 4 O Study Intersection 4 Existing Roadway One Way Travel Lane N AM/PM Peak Hour Traffic •,r r_ Lake Frederick Entrance ZMA '-0/0 0 0/0 0/0 3 4— 122/76 4—122/76 4—9/21 0 0 0 f- 0/0 , 0/0 N 0 I, 0/0 • Fairfax Pike Fairfax Pike Land Fairfax Highway L Farfaa i e I t (* a ax e L1 1 ` a I 0/0�` o 0 0 0/0--, o 0 0 0 73/45� o 00 00`o CD 'o 0 46/107—► m 46/107—► 24/15—► 0/0in 0/0 0 0/0 3 y y rc & 4-0/0 0 0 0 o Nro o 36/85 Fairfax Pike Lake Frederick Dnve ♦ asker Road T 4 ♦ Fairfax Pike 4 T 0m� N_ 0 0m--+ Of r 0/0--)N. N O^I 24/15 0/0 46/107 r Figure 17: Lake Frederick Site Trips Assignment 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Madison Farms 277 Excerpts Madison Farms 277 Traffic Impact Study September 2024 Latest Revision June 2025 Site Generated Traffic Distributions and Assignments Trip distributions for the proposed development are based on recent traffic counts, the surrounding road network, local knowledge and engineering judgement and are consistent with the approved scoping document.The following trip distributions were assumed for the proposed development's site trips. Distribution To/From the North on US Route 522: 30% To/From the South on US Route 522 25% To/From the East on US Route 340: 10% To/From the West on Fairfax Pike (Route 277): 35% Total: 100% The peak hour vehicle trips shown in Table 5-1 were assigned to the public roadway network according to the directional distribution described above. Pass-by site trips are shown on Figure 5-1 and the new site generated trips are shown on Figure 5-2. 35 Madison Farms 277 Traffic Impact Study September 2024 Latest Revision June 2025 Table 5-1 Site Trip Generation DailyLand Use ITE Size Units AM Peak Hour PM Peak Hour LUC In Out Total In Out Total Development Program Land Bay 1 Residential Uses: Multifamily Housing(Low-Rise) 220 120 DU 14 46 60 45 27 72 845 Senior Adult Housing-Multifamily 252 150 DU 10 19 29 21 17 38 458 Sub-total Land Bay I Residential(270 units): 24 65 89 66 44 110 1,303 Commercial Uses: Fast-Food Restaurant with Drive-Through Window 934 4,000 SF 91 87 178 69 63 132 1,870 Pass-By Reduction(50%Weekday AM Peak&55%Weekday PM Peak) (46) (44) (89) (38) (35) (73) (935) Subtotal: 46 44 89 31 29 59 935 Coffee/Donut Shop with Drive-Through Window 937 5,000 SF 219 210 429 97 97 195 2,668 Pass-By Reduction(21(90%Weekday AM Peak&98%Weekday PM Peak) (197) (189) (386) (96) (96) (191) (2,401) Subtotal: 22 21 43 2 2 4 267 Strip Retail Plaza(<40K) 822 8,000 SF 11 8 19 33 33 66 567 Free-Standing Emergency Room 650 10,000 SF 6 6 11 7 8 15 249 Clinic 630 10,000 SF 22 5 28 11 26 37 393 Clinic(Family Medicine) 630 20,000 SF 45 10 55 22 52 74 752 Medical-Dental Office Building(Stand-Alone)(Outpatient Medical Facility) 720 20,000 SF 45 12 57 23 55 78 751 Medical-Dental Office Building(Stand-Alone) 720 20,000 SF 45 12 57 23 55 78 751 Sub-total land Bay 1 Commercial(90,500 s/): 241 117 358 152 260 412 4,667 Total Land Bay 1 Residential and Commercial Subtotal: 265 182 447 218 304 522 5,970 36 Madison Farms 277 Traffic Impact Study September 2024 Latest Revision June 2025 Table 5-1(continued) Site Trip Generation DailyITE AM Peak Hour PM Peak Hour Land Use Size Units LUC In Out Out Total Land Bay 2 Senior Adult Housing-Multifamily 252 360 DU 24 45 69 50 40 90 1,065 Land Bay 2 Residential Subtotal: 24 45 69 50 40 90 1,065 Land Bay 3 Single-Family Detached Housing 210 120 DU 22 66 88 74 44 118 1,193 Single-Family Attached Housing 215 150 DU 18 54 72 51 35 86 1,093 Land Bay 3 Residential Subtotal: 40 120 160 125 79 204 2,286 Land Bay 4 Open Space Only Net New Trips w 329 348 I&677 393 423 816 9,321 Notes: Trip Generation based on the Institute of Transportation Engineers'(ITE)Trip Generation Manual,11"Edition. Coffee Shop Pass-by reduction was based on ITE LUC 938,Coffee/Donut Shop with Drive-Through Window and No Indoor Seating. 37 0:\PROJECTS\9001-9500\9307 MADISON FARMS 277\GRAPHICS\MADISON FARMS REPORT GRAPHICS)07.17.2024).DWG 0/0 + • Ma¢4 10 �► ° A?p yLgN pR pRIVF » Alt 010 S FAlRFAX P1KE QD-► 010', 4%f Qd Pd�B 2 P� +yb tom' °`y � ?� 0 0,0�' ..a- °°3 ir►fr► 4 lag 9 +t+ wo h� °°'4 h? 6 2 -010 -100l-75 s 100,75 LAKE :45 s-►�, f► Figure 5-1 Pass-By Site Trips //—AMPEAKHOUR NORTH /_PM PEAK HOUR 000/000 Madison Farms 277 Frederick County,VA 38 0:\PROJECTS\9001-9500\9307 MADISON FARMS 277\GRAPHICS\MADISON FARMS REPORT GRAPHICS)07.17.2024).DWG 40+�►J.--* �l�p NTaMANo�oR'yE " Alt d6 sFAlRFAX P1KE y(L`- 11Y110 i 2 Qo 4P'4 tom' o`y s 3 ?� 0 t0W127: �JOy F� asa2 i 67l106 f11} � S 0 t+ 9 wo h�0M ums 7, h? 6 2 �—010 t 821N S 21-256 LAKE sw11e i 104n27 i FREDER/CK 1en6�, f► esn16 3 h f► DRIVE Figure 5-2 Slte Generated Trips //—AMPEAKHOUR NORTH /_PM PEAK HOUR 000/000 Madison Farms 277 Frederick County,VA 39 Gibson Property Technical Appendix G. 2035 Future Conditions without Development — Capacity Analysis Worksheets 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Queues Timing Plan: 7 AM to 8 AM 1: Warrior Drive & Fairfax Pike Future without Development AM 2035 t ' ► 41 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT SBR Lane Group Flow(vph) 159 574 424 176 639 137 85 101 64 299 167 v/c Ratio 0.82 0.69 0.48 1.33 0.87 0.16 0.62 0.44 0.20 1.09 0.34 Control Delay 82.9 33.1 15.1 237.3 46.9 2.1 58.5 25.6 38.8 130.8 7.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 82.9 33.1 15.1 237.3 46.9 2.1 58.5 25.6 38.8 130.8 7.4 Queue Length 50th(ft) 132 425 184 -192 471 0 56 20 41 -340 0 Queue Length 95th(ft) #242 523 270 #343 608 25 #133 #96 83 #555 55 Internal Link Dist(ft) 496 4165 244 594 Turn Bay Length (ft) 260 500 270 575 190 150 Base Capacity(vph) 204 919 888 132 812 868 146 228 360 275 496 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.78 0.62 0.48 1.33 0.79 0.16 0.58 0.44 0.18 1.09 0.34 Intersection Summary Volume exceeds capacity,queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th Signalized Intersection Summary Timing Plan: 7 AM to 8 AM 1: Warrior Drive & Fairfax Pike Future without Development AM 2035 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t r + r + r Traffic Volume(veh/h) 146 528 390 162 588 126 78 25 68 59 275 154 Future Volume(veh/h) 146 528 390 162 588 126 78 25 68 59 275 154 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 1.00 0.99 0.98 0.95 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1841 1752 1796 1796 1722 1856 966 907 848 1870 1841 1781 Adj Flow Rate, veh/h 159 574 384 176 639 63 85 27 8 64 299 33 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 4 10 7 7 12 3 63 67 71 2 4 8 Cap,veh/h 184 937 955 134 851 836 141 93 28 270 176 295 Arrive On Green 0.10 0.54 0.54 0.08 0.49 0.49 0.09 0.14 0.14 0.05 0.10 0.10 Sat Flow,veh/h 1753 1752 1521 1711 1722 1537 920 670 198 1781 1841 1431 Grp Volume(v),veh/h 159 574 384 176 639 63 85 0 35 64 299 33 Grp Sat Flow(s),veh/h/In 1753 1752 1521 1711 1722 1537 920 0 868 1781 1841 1431 Q Serve(g_s),s 11.6 29.5 16.3 10.2 38.8 2.5 10.6 0.0 4.7 4.1 12.4 2.5 Cycle Q Clear(g_c),s 11.6 29.5 16.3 10.2 38.8 2.5 10.6 0.0 4.7 4.1 12.4 2.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.23 1.00 1.00 Lane Grp Cap(c),veh/h 184 937 955 134 851 836 141 0 121 270 176 295 V/C Ratio(X) 0.87 0.61 0.40 1.31 0.75 0.08 0.60 0.00 0.29 0.24 1.70 0.11 Avail Cap(c_a),veh/h 206 937 955 134 851 836 143 0 121 354 176 295 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.59 0.59 0.59 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay(d),s/veh 57.3 20.9 12.1 59.9 26.4 14.2 46.9 0.0 50.2 49.4 58.8 42.6 Incr Delay(d2),s/veh 27.7 3.0 1.3 167.9 3.6 0.1 6.8 0.0 1.3 0.4 339.5 0.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 6.4 12.1 5.9 10.6 15.8 0.9 2.7 0.0 1.1 1.9 22.4 0.9 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 84.9 23.9 13.3 227.8 30.1 14.3 53.8 0.0 51.5 49.9 398.3 42.7 LnGrp LOS F C B F C B D A D D F D Approach Vol,veh/h 1117 878 120 396 Approach Delay,s/veh 28.9 68.6 53.1 312.3 Approach LOS C E D F Timer-Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration(G+Y+Rc),s 22.3 70.0 12.9 24.7 17.0 75.4 18.6 19.0 Change Period(Y+Rc),s *8.7 *5.8 6.6 6.6 *6.8 5.8 6.6 6.6 Max Green Setting(Gmax),s *15 *62 12.4 12.4 * 10 69.2 12.4 12.4 Max Q Clear Time(g_c+I1),s 13.6 40.8 6.1 6.7 12.2 31.5 12.6 14.4 Green Ext Time(p-c),s 0.1 6.0 0.1 0.0 0.0 8.7 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 88.6 HCM 6th LOS F Notes User approved pedestrian interval to be less than phase max green. *HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Timing Plan: 7 AM to 8 AM 2: Hudson Hollow Road/White Oak Road & Fairfax Pike Future without Development AM 2035 t Lane Group EBL EBT EBR WBL WBT WBR NBT SBT Lane Group Flow(vph) 229 536 22 2 548 34 94 219 v/c Ratio 0.52 0.54 0.02 0.00 0.74 0.05 0.41 0.55 Control Delay 9.4 11.5 0.1 4.0 20.9 0.4 23.8 14.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 9.4 11.5 0.1 4.0 20.9 0.4 23.8 14.3 Queue Length 50th(ft) 25 90 0 0 147 0 20 17 Queue Length 95th(ft) 62 275 0 2 287 2 69 86 Internal Link Dist(ft) 4165 4595 176 167 Turn Bay Length (ft) 145 90 125 155 Base Capacity(vph) 443 1170 1059 566 1143 1007 475 686 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.52 0.46 0.02 0.00 0.48 0.03 0.20 0.32 Intersection Summary Queues Synchro 11 Report Gorove Slade Timing Plan: 7 AM to 8 AM HCM 6th Signalized Intersection Summary Timing Plan: 7 AM to 8 AM 2: Hudson Hollow Road/White Oak Road & Fairfax Pike Future without Development AM 2035 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t r + r Traffic Volume(veh/h) 211 493 20 2 504 31 46 10 30 44 7 150 Future Volume(veh/h) 211 493 20 2 504 31 46 10 30 44 7 150 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1767 1752 1811 1870 1722 1737 1796 1752 1796 1826 1648 1707 Adj Flow Rate, veh/h 229 536 11 2 548 14 50 11 6 48 8 17 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 9 10 6 2 12 11 7 10 7 5 17 13 Cap,veh/h 445 930 815 426 749 640 247 48 17 212 40 41 Arrive On Green 0.10 0.53 0.53 0.00 0.44 0.44 0.13 0.13 0.13 0.13 0.13 0.13 Sat Flow,veh/h 1682 1752 1535 1781 1722 1472 973 378 133 746 315 322 Grp Volume(v),veh/h 229 536 11 2 548 14 67 0 0 73 0 0 Grp Sat Flow(s),veh/h/In 1682 1752 1535 1781 1722 1472 1484 0 0 1383 0 0 Q Serve(g_s),s 3.7 10.5 0.2 0.0 13.4 0.3 0.0 0.0 0.0 0.4 0.0 0.0 Cycle Q Clear(g_c),s 3.7 10.5 0.2 0.0 13.4 0.3 1.8 0.0 0.0 2.2 0.0 0.0 Prop In Lane 1.00 1.00 1.00 1.00 0.75 0.09 0.66 0.23 Lane Grp Cap(c),veh/h 445 930 815 426 749 640 312 0 0 293 0 0 V/C Ratio(X) 0.51 0.58 0.01 0.00 0.73 0.02 0.21 0.00 0.00 0.25 0.00 0.00 Avail Cap(c_a),veh/h 445 1383 1212 597 1360 1162 815 0 0 771 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay(d),s/veh 8.8 8.0 5.6 6.6 11.9 8.2 20.1 0.0 0.0 20.3 0.0 0.0 Incr Delay(d2),s/veh 1.0 1.2 0.0 0.0 3.0 0.0 0.3 0.0 0.0 0.4 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.9 2.6 0.0 0.0 4.1 0.1 0.6 0.0 0.0 0.7 0.0 0.0 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 9.9 9.2 5.6 6.6 14.8 8.2 20.4 0.0 0.0 20.7 0.0 0.0 LnGrp LOS A A A A B A C A A C A A Approach Vol,veh/h 776 564 67 73 Approach Delay,s/veh 9.4 14.6 20.4 20.7 Approach LOS A B C C Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration(G+Y+Rc),s 4.6 34.7 11.3 9.5 29.8 11.3 Change Period(Y+Rc),s 4.5 7.8 4.9 4.5 7.8 4.9 Max Green Setting(Gmax),s 5.0 40.0 25.0 5.0 40.0 25.0 Max Q Clear Time(g_c+I1),s 2.0 12.5 3.8 5.7 15.4 4.2 Green Ext Time(p-c),s 0.0 6.7 0.2 0.0 6.7 0.3 Intersection Summary HCM 6th Ctrl Delay 12.4 HCM 6th LOS B HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Timing Plan: 7 AM to 8 AM 3: Route 522 & Fairfax Pike/Lord Fairfax Highway * Future withoutDevelopment AM 2035 Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT SBR Lane Group Flow(vph) 570 238 118 185 239 459 212 97 365 182 v/c Ratio 1.65 0.54 0.50 0.68 1.07 0.64 0.43 0.61 0.66 0.44 Control Delay 334.0 13.7 47.3 50.4 124.5 41.3 6.2 63.6 45.3 5.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 334.0 13.7 47.3 50.4 124.5 41.3 6.2 63.6 45.3 5.3 Queue Length 50th(ft) -541 18 71 104 -174 143 0 61 116 0 Queue Length 95th(ft) #837 100 130 182 #367 214 46 #139 178 25 Internal Link Dist(ft) 1857 694 8434 5712 Turn Bay Length (ft) 230 500 565 250 125 480 Base Capacity(vph) 346 439 385 431 223 808 529 171 660 448 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 1.65 0.54 0.31 0.43 1.07 0.57 0.40 0.57 0.55 0.41 Intersection Summary Volume exceeds capacity,queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th Signalized Intersection Summary Timing Plan: 7 AM to 8 AM 3: Route 522 & Fairfax Pike/Lord Fairfax Highway Future without Development AM 2035 --I. -4- t /". Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations +T r 1 tt r tt r Traffic Volume(veh/h) 237 287 219 109 120 51 220 422 195 89 336 167 Future Volume(veh/h) 237 287 219 109 120 51 220 422 195 89 336 167 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1767 1841 1663 1663 1767 1856 1722 1752 1707 1841 1618 1411 Adj Flow Rate, veh/h 258 312 60 118 130 40 239 459 33 97 365 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 9 4 16 16 9 3 12 10 13 4 19 33 Cap,veh/h 173 209 299 204 167 51 243 751 326 123 489 Arrive On Green 0.21 0.21 0.21 0.13 0.13 0.13 0.15 0.23 0.23 0.07 0.16 0.00 Sat Flow,veh/h 815 985 1409 1584 1296 399 1640 3328 1447 1753 3075 1196 Grp Volume(v),veh/h 570 0 60 118 0 170 239 459 33 97 365 0 Grp Sat Flow(s),veh/h/In 1800 0 1409 1584 0 1695 1640 1664 1447 1753 1537 1196 Q Serve(g_s),s 20.0 0.0 3.3 6.6 0.0 9.2 13.7 11.7 1.7 5.1 10.7 0.0 Cycle Q Clear(g_c),s 20.0 0.0 3.3 6.6 0.0 9.2 13.7 11.7 1.7 5.1 10.7 0.0 Prop In Lane 0.45 1.00 1.00 0.24 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 382 0 299 204 0 218 243 751 326 123 489 V/C Ratio(X) 1.49 0.00 0.20 0.58 0.00 0.78 0.98 0.61 0.10 0.79 0.75 Avail Cap(c_a),veh/h 382 0 299 420 0 449 243 878 382 186 717 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay(d),s/veh 37.2 0.0 30.6 38.7 0.0 39.8 40.1 32.8 29.0 43.2 37.9 0.0 Incr Delay(d2),s/veh 235.8 0.0 0.3 2.6 0.0 5.9 52.8 1.3 0.2 12.1 3.4 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 33.4 0.0 1.1 2.6 0.0 4.0 8.7 4.5 0.6 2.5 4.0 0.0 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 273.0 0.0 30.9 41.3 0.0 45.7 92.8 34.1 29.2 55.3 41.2 0.0 LnGrp LOS F A C D A D F C C E D Approach Vol,veh/h 630 288 731 462 Approach Delay,s/veh 249.9 43.9 53.1 44.2 Approach LOS F D D D Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration(G+Y+Rc),s 22.3 21.7 20.5 16.0 28.0 29.9 Change Period(Y+Rc),s 8.3 6.7 *8.3 *9.4 6.7 9.9 Max Green Setting(Gmax),s 14.0 22.0 *25 *10 24.9 20.0 Max Q Clear Time(g_c+I1),s 15.7 12.7 11.2 7.1 13.7 22.0 Green Ext Time(p-c),s 0.0 1.8 1.0 0.0 2.8 0.0 Intersection Summary HCM 6th Ctrl Delay 108.6 HCM 6th LOS F Notes *HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Unsignalized Delay for[SBR]is excluded from calculations of the approach delay and intersection delay. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Timing Plan: 7 AM to 8 AM 4: Route 522 & Lake Frederick Drive I Future without Development AM 2035 * L 4\ I t Lane Group EBL EBR NBL NBT SBU SBT SBR Lane Group Flow(vph) 157 100 40 723 2 628 61 v/c Ratio 0.50 0.18 0.11 0.46 0.00 0.57 0.11 Control Delay 35.6 4.9 9.6 14.2 8.0 22.5 5.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 35.6 4.9 9.6 14.2 8.0 22.5 5.7 Queue Length 50th(ft) 65 0 7 89 0 123 0 Queue Length 95th(ft) 144 31 23 234 3 205 25 Internal Link Dist(ft) 414 1077 8434 Turn Bay Length (ft) 470 275 295 Base Capacity(vph) 637 630 644 2008 673 1733 849 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.25 0.16 0.06 0.36 0.00 0.36 0.07 Intersection Summary Queues Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th Signalized Intersection Summary Timing Plan: 7 AM to 8 AM 4: Route 522 & Lake Frederick Drive I Future without Development AM 2035 -A * L 4\ I t Movement EBL EBR NBL NBT SBU SBT SBR Lane Configurations r tt A tt r Traffic Volume(veh/h) 144 92 37 665 2 578 56 Future Volume(veh/h) 144 92 37 665 2 578 56 Initial Q(Qb),veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow,veh/h/In 1870 1752 1589 1648 1604 1707 Adj Flow Rate, veh/h 157 24 40 723 628 16 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 10 21 17 20 13 Cap,veh/h 218 242 292 1185 1024 486 Arrive On Green 0.12 0.12 0.04 0.38 0.34 0.34 Sat Flow,veh/h 1781 1485 1513 3214 3127 1447 Grp Volume(v),veh/h 157 24 40 723 628 16 Grp Sat Flow(s),veh/h/In 1781 1485 1513 1566 1523 1447 Q Serve(g_s),s 5.0 0.0 0.0 11.1 10.2 0.4 Cycle Q Clear(g_c),s 5.0 0.0 0.0 11.1 10.2 0.4 Prop In Lane 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 218 242 292 1185 1024 486 V/C Ratio(X) 0.72 0.10 0.14 0.61 0.61 0.03 Avail Cap(c_a),veh/h 751 686 741 2377 2056 976 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay(d),s/veh 25.1 21.1 19.9 14.9 16.5 13.2 Incr Delay(d2),s/veh 5.4 0.2 0.3 1.1 1.3 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 2.4 0.4 0.4 3.1 2.9 0.1 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 30.4 21.3 20.2 16.0 17.7 13.3 LnGrp LOS C C C B B B Approach Vol,veh/h 181 763 644 Approach Delay,s/veh 29.2 16.2 17.6 Approach LOS C B B Timer-Assigned Phs 2 4 5 6 Phs Duration(G+Y+Rc),s 32.9 15.9 12.9 30.4 Change Period(Y+Rc),s 10.5 8.7 10.5 10.5 Max Green Setting(Gmax),s 45.0 25.0 20.0 40.0 Max Q Clear Time(g_c+11),s 13.1 7.0 2.0 12.2 Green Ext Time(p-c),s 9.4 0.6 0.1 7.7 Intersection Summary HCM 6th Ctrl Delay 18.3 HCM 6th LOS B Notes User approved ignoring U-Turning movement. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Timing Plan: 7 AM to 8 AM 5: Route 522 & Tasker Road I Future without Development AM 2035 -At I Lane Group EBL EBR NBL NBT SBT SBR Lane Group Flow(vph) 56 203 165 567 474 79 v/c Ratio 0.41 0.48 0.51 0.23 0.29 0.07 Control Delay 55.7 10.4 55.5 3.4 13.6 1.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 55.7 10.4 55.5 3.4 13.6 1.4 Queue Length 50th(ft) 38 0 59 40 85 0 Queue Length 95th(ft) 77 37 91 62 136 14 Internal Link Dist(ft) 446 1419 813 Turn Bay Length (ft) 250 485 315 Base Capacity(vph) 313 704 615 2434 1638 1320 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.18 0.29 0.27 0.23 0.29 0.06 Intersection Summary Queues Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM Signalized Intersection Capacity Analysis Timing Plan: 7 AM to 8 AM 5: Route 522 & Tasker Road * I Future without Development AM 2035 -AI L t Movement EBL EBR NBL NBT SBU SBT SBR Lane Configurations r r tt A tt r Traffic Volume(vph) 54 197 160 550 0 460 77 Future Volume(vph) 54 197 160 550 0 460 77 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 Total Lost time(s) 10.2 10.2 10.3 6.4 6.6 10.2 Lane Util.Factor 1.00 0.88 0.97 0.95 0.95 1.00 Frt 1.00 0.85 1.00 1.00 1.00 0.85 Flt Protected 0.95 1.00 0.95 1.00 1.00 1.00 Satd. Flow(prot) 1583 2733 3273 3195 2888 1583 Flt Permitted 0.95 1.00 0.95 1.00 1.00 1.00 Satd. Flow(perm) 1583 2733 3273 3195 2888 1583 Peak-hour factor, PHF 0.97 0.97 0.97 0.97 0.92 0.97 0.97 Adj. Flow(vph) 56 203 165 567 0 474 79 RTOR Reduction(vph) 0 185 0 0 0 0 27 Lane Group Flow(vph) 56 18 165 567 0 474 52 Heavy Vehicles(%) 14% 4% 7% 13% 2% 25% 2% Turn Type Prot Prot Prot NA Prot NA pm+ov Protected Phases 7 4 1 6 5 2 7 Permitted Phases 4 2 Actuated Green, G (s) 9.6 9.6 10.9 83.8 62.4 72.0 Effective Green,g(s) 9.6 9.6 10.9 83.8 62.4 72.0 Actuated g/C Ratio 0.09 0.09 0.10 0.76 0.57 0.65 Clearance Time(s) 10.2 10.2 10.3 6.4 6.6 10.2 Vehicle Extension(s) 3.0 3.0 3.0 3.5 3.5 3.0 Lane Grp Cap(vph) 138 238 324 2434 1638 1036 v/s Ratio Prot c0.04 0.01 c0.05 0.18 c0.16 0.00 v/s Ratio Perm 0.03 v/c Ratio 0.41 0.07 0.51 0.23 0.29 0.05 Uniform Delay,d1 47.5 46.1 47.0 3.8 12.3 6.8 Progression Factor 1.00 1.00 1.07 0.80 1.00 1.00 Incremental Delay,d2 1.9 0.1 1.3 0.2 0.4 0.0 Delay(s) 49.4 46.3 51.6 3.3 12.8 6.8 Level of Service D D D A B A Approach Delay(s) 46.9 14.2 11.9 Approach LOS D B B Intersection Summary HCM 2000 Control Delay 18.9 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.33 Actuated Cycle Length(s) 110.0 Sum of lost time(s) 27.1 Intersection Capacity Utilization 48.4% ICU Level of Service A Analysis Period(min) 15 c Critical Lane Group HCM Signalized Intersection Capacity Analysis Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th Signalized Intersection Summary Timing Plan: 7 AM to 8 AM 5: Route 522 & Tasker Road Future without Development AM 2035 HCM 6th Edition methodology supports red clearance in the range of 0 to 6 seconds. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th TWSC Timing Plan: 7 AM to 8 AM 6: Lake Frederick Entrance & Fairfax Pike Future without Development AM 2035 Intersection Int Delay,s/veh 12.6 Movement EBT EBR WBL WBT NBL NBR Lane Configurations t r t r* Traffic Vol,veh/h 730 46 36 561 122 97 Future Vol,veh/h 730 46 36 561 122 97 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized None - None - None Storage Length 150 150 - 0 0 Veh in Median Storage,# 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 793 50 39 610 133 105 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 843 0 1481 793 Stage 1 - - - - 793 - Stage 2 - 688 - Critical Hdwy 4.12 6.42 6.22 Critical Hdwy Stg 1 - 5.42 - Critical Hdwy Stg 2 - 5.42 - Follow-up Hdwy 2.218 3.518 3.318 Pot Cap-1 Maneuver 793 138 389 Stage 1 - 446 - Stage 2 - 499 - Platoon blocked, % Mov Cap-1 Maneuver 793 - 131 389 Mov Cap-2 Maneuver - - 131 - Stage 1 446 Stage 2 475 Approach EB WB NB HCM Control Delay,s 0 0.6 89.8 HCM LOS F Minor Lane/Major Mvmt NBLn1 NBLn2 EBT EBR WBL WBT Capacity(veh/h) 131 389 793 HCM Lane V/C Ratio 1.012 0.271 0.049 HCM Control Delay(s) 147.2 17.7 9.8 HCM Lane LOS F C A HCM 95th %tile Q(veh) 7.2 1.1 0.2 Notes -:Volume exceeds capacity $: Delay exceeds 300s +:Computation Not Defined *:All major volume in platoon HCM 6th TWSC Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Timing Plan: 4.15 PM to 5.15 PM 1: Warrior Drive & Fairfax Pike Future without Development PM 2035 t 41 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT SBR Lane Group Flow(vph) 307 775 182 161 786 139 200 254 104 60 379 v/c Ratio 1.10 0.83 0.16 1.22 1.02 0.16 0.76 1.24 0.50 0.40 0.75 Control Delay 126.2 36.0 2.8 192.3 70.7 1.0 58.4 174.1 44.3 55.9 35.9 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 126.2 36.0 2.8 192.3 70.7 1.0 58.4 174.1 44.3 55.9 35.9 Queue Length 50th(ft) -248 497 0 -140 -591 0 123 -186 60 41 175 Queue Length 95th(ft) #418 #691 53 #274 #826 11 #216 #351 110 84 287 Internal Link Dist(ft) 496 4165 244 594 Turn Bay Length (ft) 260 500 270 575 190 150 Base Capacity(vph) 278 933 1132 132 769 870 264 205 218 159 505 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 1.10 0.83 0.16 1.22 1.02 0.16 0.76 1.24 0.48 0.38 0.75 Intersection Summary Volume exceeds capacity,queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection Summary Timing Plan: 4.15 PM to 5.15 PM 1: Warrior Drive & Fairfax Pike Future without Development PM 2035 * Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t r + r + r Traffic Volume(veh/h) 282 713 167 148 723 128 184 86 148 96 55 349 Future Volume(veh/h) 282 713 167 148 723 128 184 86 148 96 55 349 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 0.99 0.99 0.99 0.98 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1870 1841 1870 1693 1841 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 307 775 106 161 786 62 200 93 100 104 60 295 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 4 2 14 4 2 2 2 2 2 2 2 Cap,veh/h 280 997 994 135 830 808 274 84 90 187 160 382 Arrive On Green 0.16 0.54 0.54 0.08 0.45 0.45 0.09 0.10 0.10 0.07 0.09 0.09 Sat Flow,veh/h 1781 1841 1585 1612 1841 1552 1781 818 879 1781 1870 1557 Grp Volume(v),veh/h 307 775 106 161 786 62 200 0 193 104 60 295 Grp Sat Flow(s),veh/h/In 1781 1841 1585 1612 1841 1552 1781 0 1697 1781 1870 1557 Q Serve(g_s),s 17.3 36.7 2.9 9.2 45.0 2.2 9.4 0.0 11.3 5.8 3.3 9.4 Cycle Q Clear(g_c),s 17.3 36.7 2.9 9.2 45.0 2.2 9.4 0.0 11.3 5.8 3.3 9.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.52 1.00 1.00 Lane Grp Cap(c),veh/h 280 997 994 135 830 808 274 0 175 187 160 382 V/C Ratio(X) 1.10 0.78 0.11 1.19 0.95 0.08 0.73 0.00 1.11 0.56 0.38 0.77 Avail Cap(c_a),veh/h 280 997 994 135 830 808 274 0 175 218 160 382 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.45 0.45 0.45 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay(d),s/veh 46.3 19.9 8.2 50.4 28.9 13.3 43.4 0.0 49.3 42.3 47.5 38.9 Incr Delay(d2),s/veh 81.8 5.9 0.2 115.4 11.7 0.1 9.5 0.0 99.2 2.6 1.5 9.4 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 13.7 15.6 1.0 7.9 20.8 0.8 1.5 0.0 9.6 2.7 1.6 8.4 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 128.2 25.9 8.4 165.8 40.6 13.3 53.0 0.0 148.5 44.8 49.0 48.2 LnGrp LOS F C A F D B D A F D D D Approach Vol,veh/h 1188 1009 393 459 Approach Delay,s/veh 50.8 58.9 99.9 47.6 Approach LOS D E F D Timer-Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration(G+Y+Rc),s 26.0 55.5 14.1 17.9 16.0 65.5 16.0 16.0 Change Period(Y+Rc),s *8.7 *5.8 6.6 6.6 *6.8 5.8 6.6 6.6 Max Green Setting(Gmax),s *17 *46 9.4 9.4 *9.2 56.2 9.4 9.4 Max Q Clear Time(g_c+I1),s 19.3 47.0 7.8 13.3 11.2 38.7 11.4 11.4 Green Ext Time(p-c),s 0.0 0.0 0.0 0.0 0.0 7.2 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 59.3 HCM 6th LOS E Notes User approved pedestrian interval to be less than phase max green. *HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Queues Timing Plan: 4.15 PM to 5.15 PM 2: Hudson Hollow Road/White Oak Road & Fairfax Pike Future without Development PM 2035 t Lane Group EBL EBT EBR WBL WBT WBR NBT SBT Lane Group Flow(vph) 158 616 46 26 815 38 78 234 v/c Ratio 0.48 0.56 0.05 0.05 0.83 0.04 0.63 0.60 Control Delay 8.7 12.1 1.0 3.6 23.7 0.6 49.3 15.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 8.7 12.1 1.0 3.6 23.7 0.6 49.3 15.4 Queue Length 50th(ft) 16 110 0 2 270 0 30 23 Queue Length 95th(ft) 40 320 7 10 #560 3 #76 85 Internal Link Dist(ft) 4165 4595 176 167 Turn Bay Length (ft) 145 90 125 155 Base Capacity(vph) 331 1096 1016 526 993 904 270 664 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.48 0.56 0.05 0.05 0.82 0.04 0.29 0.35 Intersection Summary # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:415 PM to 5:15 PM HCM 6th Signalized Intersection Summary Timing Plan: 4.15 PM to 5.15 PM 2: Hudson Hollow Road/White Oak Road & Fairfax Pike Future without Development PM 2035 --p- 4--- t I Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t r t r Traffic Volume(veh/h) 155 604 45 25 799 37 45 22 10 24 31 174 Future Volume(veh/h) 155 604 45 25 799 37 45 22 10 24 31 174 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1870 1781 1870 1841 1826 1870 1870 1752 1870 1870 1841 1870 Adj Flow Rate, veh/h 158 616 28 26 815 21 46 22 2 24 32 23 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 2 8 2 4 5 2 2 10 2 2 4 2 Cap,veh/h 350 1032 918 441 975 846 194 75 5 112 101 57 Arrive On Green 0.07 0.58 0.58 0.03 0.53 0.53 0.12 0.12 0.12 0.12 0.12 0.12 Sat Flow,veh/h 1781 1781 1585 1753 1826 1585 832 630 43 318 847 479 Grp Volume(v),veh/h 158 616 28 26 815 21 70 0 0 79 0 0 Grp Sat Flow(s),veh/h/In 1781 1781 1585 1753 1826 1585 1505 0 0 1644 0 0 Q Serve(g_s),s 2.4 14.0 0.5 0.4 23.7 0.4 0.0 0.0 0.0 0.1 0.0 0.0 Cycle Q Clear(g_c),s 2.4 14.0 0.5 0.4 23.7 0.4 2.4 0.0 0.0 2.6 0.0 0.0 Prop In Lane 1.00 1.00 1.00 1.00 0.66 0.03 0.30 0.29 Lane Grp Cap(c),veh/h 350 1032 918 441 975 846 274 0 0 270 0 0 V/C Ratio(X) 0.45 0.60 0.03 0.06 0.84 0.02 0.26 0.00 0.00 0.29 0.00 0.00 Avail Cap(c_a),veh/h 359 1131 1006 529 1159 1006 660 0 0 712 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay(d),s/veh 11.2 8.5 5.7 6.5 12.4 6.9 25.5 0.0 0.0 25.6 0.0 0.0 Incr Delay(d2),s/veh 0.9 1.3 0.0 0.1 5.9 0.0 0.5 0.0 0.0 0.6 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.7 4.0 0.1 0.1 8.4 0.1 0.9 0.0 0.0 1.0 0.0 0.0 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 12.1 9.8 5.7 6.6 18.3 7.0 26.0 0.0 0.0 26.2 0.0 0.0 LnGrp LOS B A A A B A C A A C A A Approach Vol,veh/h 802 862 70 79 Approach Delay,s/veh 10.1 17.7 26.0 26.2 Approach LOS B B C C Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc),s 6.3 44.3 12.4 9.2 41.4 12.4 Change Period (Y+Rc),s 4.5 7.8 4.9 4.5 7.8 4.9 Max Green Setting(Gmax),s 5.0 40.0 25.0 5.0 40.0 25.0 Max Q Clear Time(g_c+I1),s 2.4 16.0 4.4 4.4 25.7 4.6 Green Ext Time(p-c),s 0.0 7.8 0.2 0.0 7.9 0.3 Intersection Summary HCM 6th Ctrl Delay 15.0 HCM 6th LOS B HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:415 PM to 5:15 PM Queues Timing Plan: 4.15 PM to 5.15 PM 3: Route 522 & Fairfax Pike/Lord Fairfax Highway } Future withoutDevelopment PM 2035 Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT SBR Lane Group Flow(vph) 500 328 239 481 372 663 183 93 618 283 v/c Ratio 1.66 0.69 0.65 1.23 1.79 0.89 0.35 0.66 0.94 0.53 Control Delay 340.9 19.3 50.3 163.2 403.9 58.6 3.7 72.7 69.4 8.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 340.9 19.3 50.3 163.2 403.9 58.6 3.7 72.7 69.4 8.6 Queue Length 50th(ft) -534 46 161 -433 -410 251 0 67 237 0 Queue Length 95th(ft) #742 150 250 #644 #598 #360 25 #136 #350 73 Internal Link Dist(ft) 1857 694 8434 5712 Turn Bay Length (ft) 230 500 565 250 125 480 Base Capacity(vph) 302 475 365 390 208 745 519 150 656 533 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 1.66 0.69 0.65 1.23 1.79 0.89 0.35 0.62 0.94 0.53 Intersection Summary Volume exceeds capacity,queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection Summary Timing Plan: 4.15 PM to 5.15 PM 3: Route 522 & Fairfax Pike/Lord Fairfax Highway Future without Development PM 2035 --I. i- *-- - I* /".. ' � r/ Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations +1 r tt r tt r Traffic Volume(veh/h) 286 174 302 220 348 95 342 610 168 86 569 260 Future Volume(veh/h) 286 174 302 220 348 95 342 610 168 86 569 260 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1796 1811 1796 1781 1826 1796 1811 1781 1796 1826 1811 1870 Adj Flow Rate, veh/h 311 189 99 239 378 93 372 663 29 93 618 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 7 6 7 8 5 7 6 8 7 5 6 2 Cap,veh/h 191 116 267 371 310 76 211 808 363 116 663 Arrive On Green 0.18 0.18 0.18 0.22 0.22 0.22 0.12 0.24 0.24 0.07 0.19 0.00 Sat Flow,veh/h 1093 664 1522 1697 1415 348 1725 3385 1522 1739 3441 1585 Grp Volume(v),veh/h 500 0 99 239 0 471 372 663 29 93 618 0 Grp Sat Flow(s),veh/h/In 1756 0 1522 1697 0 1763 1725 1692 1522 1739 1721 1585 Q Serve(g_s),s 20.0 0.0 6.6 14.6 0.0 25.0 14.0 21.2 1.7 6.0 20.2 0.0 Cycle Q Clear(g_c),s 20.0 0.0 6.6 14.6 0.0 25.0 14.0 21.2 1.7 6.0 20.2 0.0 Prop In Lane 0.62 1.00 1.00 0.20 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 308 0 267 371 0 386 211 808 363 116 663 V/C Ratio(X) 1.63 0.00 0.37 0.64 0.00 1.22 1.76 0.82 0.08 0.80 0.93 Avail Cap(c_a),veh/h 308 0 267 371 0 386 211 808 363 152 663 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay(d),s/veh 47.1 0.0 41.6 40.5 0.0 44.6 50.1 41.1 33.7 52.5 45.4 0.0 Incr Delay(d2),s/veh 295.9 0.0 0.9 3.8 0.0 120.4 360.4 7.0 0.1 19.8 20.3 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 33.8 0.0 2.5 6.4 0.0 23.5 26.9 9.1 0.6 3.2 10.0 0.0 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 343.0 0.0 42.4 44.3 0.0 165.0 410.5 48.2 33.9 72.4 65.7 0.0 LnGrp LOS F A D D A F F D C E E Approach Vol,veh/h 599 710 1064 711 Approach Delay,s/veh 293.3 124.4 174.5 66.6 Approach LOS F F F E Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration(G+Y+Rc),s 22.3 28.7 33.3 17.0 34.0 29.9 Change Period(Y+Rc),s 8.3 6.7 *8.3 *9.4 6.7 9.9 Max Green Setting(Gmax),s 14.0 22.0 *25 *10 24.9 20.0 Max Q Clear Time(g_c+I1),s 16.0 22.2 27.0 8.0 23.2 22.0 Green Ext Time(p-c),s 0.0 0.0 0.0 0.0 0.9 0.0 Intersection Summary HCM 6th Ctrl Delay 161.1 HCM 6th LOS F Notes *HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Unsignalized Delay for[SBR]is excluded from calculations of the approach delay and intersection delay. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Queues Timing Plan: 4.15 PM to 5.15 PM 4: Route 522 & Lake Frederick Drive } I Future without Development PM 2035 I t Lane Group EBL EBR NBL NBT SBT SBR Lane Group Flow(vph) 182 99 124 988 927 205 v/c Ratio 0.61 0.18 0.37 0.48 0.72 0.28 Control Delay 45.0 15.3 16.0 10.7 27.2 4.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 45.0 15.3 16.0 10.7 27.2 4.1 Queue Length 50th(ft) 101 27 27 146 225 0 Queue Length 95th(ft) 177 62 58 227 349 45 Internal Link Dist(ft) 414 1077 8434 Turn Bay Length (ft) 470 295 Base Capacity(vph) 503 540 550 2080 1507 832 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.36 0.18 0.23 0.47 0.62 0.25 Intersection Summary Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection Summary Timing Plan: 4.15 PM to 5.15 PM 4: Route 522 & Lake Frederick Drive I Future without Development PM 2035 -A * L 4\ I t Movement EBL EBR NBL NBT SBU SBT SBR Lane Configurations r tt A tt r Traffic Volume(veh/h) 167 91 114 909 0 853 189 Future Volume(veh/h) 167 91 114 909 0 853 189 Initial Q(Qb),veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow,veh/h/In 1870 1722 1826 1781 1767 1870 Adj Flow Rate, veh/h 182 75 124 988 927 70 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 12 5 8 9 2 Cap,veh/h 243 290 300 1447 1343 634 Arrive On Green 0.14 0.14 0.06 0.43 0.40 0.40 Sat Flow,veh/h 1781 1459 1739 3474 3445 1585 Grp Volume(v),veh/h 182 75 124 988 927 70 Grp Sat Flow(s),veh/h/In 1781 1459 1739 1692 1678 1585 Q Serve(g_s),s 7.3 0.0 0.0 17.5 16.9 2.1 Cycle Q Clear(g_c),s 7.3 0.0 0.0 17.5 16.9 2.1 Prop In Lane 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 243 290 300 1447 1343 634 V/C Ratio(X) 0.75 0.26 0.41 0.68 0.69 0.11 Avail Cap(c_a),veh/h 602 584 661 2058 1814 856 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay(d),s/veh 30.7 25.1 27.7 17.1 18.4 13.9 Incr Delay(d2),s/veh 5.5 0.6 1.1 1.2 1.4 0.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 3.4 0.0 2.0 5.7 5.6 0.6 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 36.2 25.6 28.8 18.4 19.8 14.1 LnGrp LOS D C C B B B Approach Vol,veh/h 257 1112 997 Approach Delay,s/veh 33.1 19.5 19.4 Approach LOS C B B Timer-Assigned Phs 2 4 5 6 Phs Duration(G+Y+Rc),s 42.1 18.8 15.1 40.1 Change Period(Y+Rc),s 10.5 8.7 10.5 10.5 Max Green Setting(Gmax),s 45.0 25.0 20.0 40.0 Max Q Clear Time(g_c+11),s 19.5 9.3 2.0 18.9 Green Ext Time(p-c),s 12.2 0.9 0.3 10.7 Intersection Summary HCM 6th Ctrl Delay 21.0 HCM 6th LOS C Notes User approved ignoring U-Turning movement. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Queues Timing Plan: 4.15 PM to 5.15 PM 5: Route 522 & Tasker Road I Future without Development PM 2035 -A *4\ I t Lane Group EBL EBR NBL NBT SBT SBR Lane Group Flow(vph) 175 245 295 704 778 119 v/c Ratio 0.68 0.40 0.65 0.31 0.49 0.11 Control Delay 57.1 6.9 56.7 5.4 22.7 1.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 57.1 6.9 56.7 5.4 22.7 1.6 Queue Length 50th(ft) 119 0 109 67 193 0 Queue Length 95th(ft) 181 36 125 94 293 20 Internal Link Dist(ft) 446 1419 813 Turn Bay Length (ft) 250 485 315 Base Capacity(vph) 350 749 627 2285 1590 1187 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.50 0.33 0.47 0.31 0.49 0.10 Intersection Summary Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM Signalized Intersection Capacity Analysis Timing Plan: 4.15 PM to 5.15 PM 5: Route 522 & Tasker Road * I Future without Development PM 2035 -AI L t Movement EBL EBR NBL NBT SBU SBT SBR Lane Configurations r r tt A tt r Traffic Volume(vph) 168 235 283 676 0 747 114 Future Volume(vph) 168 235 283 676 0 747 114 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 Total Lost time(s) 10.2 10.2 10.3 6.4 6.6 10.2 Lane Util.Factor 1.00 0.88 0.97 0.95 0.95 1.00 Frt 1.00 0.85 1.00 1.00 1.00 0.85 Flt Protected 0.95 1.00 0.95 1.00 1.00 1.00 Satd. Flow(prot) 1770 2787 3335 3252 3374 1583 Flt Permitted 0.95 1.00 0.95 1.00 1.00 1.00 Satd. Flow(perm) 1770 2787 3335 3252 3374 1583 Peak-hour factor, PHF 0.96 0.96 0.96 0.96 0.92 0.96 0.96 Adj. Flow(vph) 175 245 295 704 0 778 119 RTOR Reduction(vph) 0 209 0 0 0 0 46 Lane Group Flow(vph) 175 36 295 704 0 778 73 Heavy Vehicles(%) 2% 2% 5% 11% 2% 7% 2% Turn Type Prot Prot Prot NA Prot NA pm+ov Protected Phases 7 4 1 6 5 2 7 Permitted Phases 4 2 Actuated Green, G (s) 16.1 16.1 15.0 77.3 51.8 67.9 Effective Green,g(s) 16.1 16.1 15.0 77.3 51.8 67.9 Actuated g/C Ratio 0.15 0.15 0.14 0.70 0.47 0.62 Clearance Time(s) 10.2 10.2 10.3 6.4 6.6 10.2 Vehicle Extension(s) 3.0 3.0 3.0 3.5 3.5 3.0 Lane Grp Cap(vph) 259 407 454 2285 1588 977 v/s Ratio Prot c0.10 0.01 c0.09 0.22 c0.23 0.01 v/s Ratio Perm 0.04 v/c Ratio 0.68 0.09 0.65 0.31 0.49 0.08 Uniform Delay,d1 44.5 40.6 45.0 6.2 20.0 8.4 Progression Factor 1.00 1.00 1.11 0.75 1.00 1.00 Incremental Delay,d2 6.8 0.1 3.2 0.3 1.1 0.0 Delay(s) 51.3 40.7 53.3 5.0 21.1 8.5 Level of Service D D D A C A Approach Delay(s) 45.1 19.3 19.4 Approach LOS D B B Intersection Summary HCM 2000 Control Delay 24.0 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.55 Actuated Cycle Length(s) 110.0 Sum of lost time(s) 27.1 Intersection Capacity Utilization 60.6% ICU Level of Service B Analysis Period(min) 15 c Critical Lane Group HCM Signalized Intersection Capacity Analysis Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection Summary Timing Plan: 4.15 PM to 5.15 PM 5: Route 522 & Tasker Road Future without Development PM 2035 HCM 6th Edition methodology supports red clearance in the range of 0 to 6 seconds. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th TWSC Timing Plan: 4.15 PM to 5.15 PM 6: Lake Frederick Entrance & Fairfax Pike Future without Development PM 2035 Intersection Int Delay,s/veh 19.5 Movement EBT EBR WBL WBT NBL NBR Lane Configurations t r t r* Traffic Vol,veh/h 804 107 85 974 76 60 Future Vol,veh/h 804 107 85 974 76 60 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized None - None - None Storage Length 150 150 - 0 0 Veh in Median Storage,# 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 874 116 92 1059 83 65 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 990 0 2117 874 Stage 1 - - - - 874 - Stage 2 - 1243 - Critical Hdwy 4.12 6.42 6.22 Critical Hdwy Stg 1 - 5.42 - Critical Hdwy Stg 2 - 5.42 - Follow-up Hdwy 2.218 3.518 3.318 Pot Cap-1 Maneuver 698 -56 349 Stage 1 - 408 - Stage 2 - 272 - Platoon blocked, % Mov Cap-1 Maneuver 698 -49 349 Mov Cap-2 Maneuver - -49 - Stage 1 408 Stage 2 236 Approach EB WB NB HCM Control Delay,s 0 0.9 295.5 HCM LOS F Minor Lane/Major Mvmt NBLn1 NBLn2 EBT EBR WBL WBT Capacity(veh/h) 49 349 698 HCM Lane V/C Ratio 1.686 0.187 0.132 HCM Control Delay(s) $514.8 17.7 10.9 HCM Lane LOS F C B HCM 95th %tile Q(veh) 8.1 0.7 0.5 Notes -:Volume exceeds capacity $: Delay exceeds 300s +:Computation Not Defined *:All major volume in platoon HCM 6th TWSC Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Gibson Property Technical Appendix H. 2035 Future Conditions with Development — Capacity Analysis Worksheets 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Queues Timing Plan: 7 AM to 8 AM 1: Warrior Drive & Fairfax Pike Future with Development AM 2035 t ' ► 41 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT SBR Lane Group Flow(vph) 159 718 424 176 685 139 85 101 75 299 167 v/c Ratio 0.82 0.83 0.47 1.33 0.90 0.16 0.63 0.49 0.25 1.22 0.36 Control Delay 83.6 39.7 13.7 237.3 48.2 2.1 61.0 27.7 40.5 175.7 7.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 83.6 39.7 13.7 237.3 48.2 2.1 61.0 27.7 40.5 175.7 7.7 Queue Length 50th(ft) 133 572 161 -192 505 0 58 21 50 -371 0 Queue Length 95th(ft) #241 726 260 #343 #696 25 #128 #96 94 #555 55 Internal Link Dist(ft) 648 4165 244 594 Turn Bay Length (ft) 260 500 270 575 190 150 Base Capacity(vph) 204 919 910 132 812 895 143 208 340 245 476 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.78 0.78 0.47 1.33 0.84 0.16 0.59 0.49 0.22 1.22 0.35 Intersection Summary Volume exceeds capacity,queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th Signalized Intersection Summary Timing Plan: 7 AM to 8 AM 1: Warrior Drive & Fairfax Pike Future with Development AM 2035 --I. *-- t I"*' ' Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t r + r + r Traffic Volume(veh/h) 146 661 390 162 630 128 78 25 68 69 275 154 Future Volume(veh/h) 146 661 390 162 630 128 78 25 68 69 275 154 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 0.99 0.99 0.98 0.95 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1841 1752 1796 1796 1722 1856 966 907 848 1870 1841 1781 Adj Flow Rate, veh/h 159 718 385 176 685 67 85 27 6 75 299 30 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 4 10 7 7 12 3 63 67 71 2 4 8 Cap,veh/h 184 937 955 134 851 838 141 99 22 274 176 295 Arrive On Green 0.10 0.53 0.53 0.08 0.49 0.49 0.09 0.14 0.14 0.05 0.10 0.10 Sat Flow,veh/h 1753 1752 1521 1711 1722 1537 920 716 159 1781 1841 1431 Grp Volume(v),veh/h 159 718 385 176 685 67 85 0 33 75 299 30 Grp Sat Flow(s),veh/h/In 1753 1752 1521 1711 1722 1537 920 0 876 1781 1841 1431 Q Serve(g_s),s 11.6 42.0 16.4 10.2 43.4 2.7 10.6 0.0 4.4 4.9 12.4 2.2 Cycle Q Clear(g_c),s 11.6 42.0 16.4 10.2 43.4 2.7 10.6 0.0 4.4 4.9 12.4 2.2 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.18 1.00 1.00 Lane Grp Cap(c),veh/h 184 937 955 134 851 838 141 0 121 274 176 295 V/C Ratio(X) 0.87 0.77 0.40 1.31 0.81 0.08 0.60 0.00 0.27 0.27 1.70 0.10 Avail Cap(c_a),veh/h 206 937 955 134 851 838 143 0 121 354 176 295 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.55 0.55 0.55 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay(d),s/veh 57.3 23.8 12.1 59.9 27.6 14.1 47.1 0.0 50.2 49.5 58.8 42.5 Incr Delay(d2),s/veh 27.7 6.0 1.3 166.2 4.6 0.1 6.8 0.0 1.2 0.5 339.5 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 6.4 17.7 5.9 10.5 17.8 1.0 2.7 0.0 1.0 2.2 22.4 0.8 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 84.9 29.8 13.3 226.1 32.2 14.2 53.9 0.0 51.4 50.1 398.3 42.6 LnGrp LOS F C B F C B D A D D F D Approach Vol,veh/h 1262 928 118 404 Approach Delay,s/veh 31.7 67.7 53.2 307.2 Approach LOS C E D F Timer-Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration(G+Y+Rc),s 22.3 70.0 13.1 24.5 17.0 75.3 18.7 19.0 Change Period(Y+Rc),s *8.7 *5.8 6.6 6.6 *6.8 5.8 6.6 6.6 Max Green Setting(Gmax),s *15 *62 12.4 12.4 * 10 69.2 12.4 12.4 Max Q Clear Time(g_c+I1),s 13.6 45.4 6.9 6.4 12.2 44.0 12.6 14.4 Green Ext Time(p-c),s 0.1 5.9 0.1 0.0 0.0 9.7 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 86.0 HCM 6th LOS F Notes User approved pedestrian interval to be less than phase max green. *HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Timing Plan: 7 AM to 8 AM 2: Hudson Hollow Road/White Oak Road & Fairfax Pike Future with Development AM 2035 t Lane Group EBL EBT EBR WBL WBT WBR NBT SBT Lane Group Flow(vph) 229 691 22 3 596 36 98 230 v/c Ratio 0.55 0.68 0.02 0.01 0.77 0.05 0.42 0.61 Control Delay 11.1 15.5 0.1 4.3 22.3 0.5 23.7 18.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 11.1 15.5 0.1 4.3 22.3 0.5 23.7 18.6 Queue Length 50th(ft) 25 136 0 0 170 0 21 30 Queue Length 95th(ft) 70 #488 0 3 351 3 69 105 Internal Link Dist(ft) 4165 4595 176 167 Turn Bay Length (ft) 145 90 125 155 Base Capacity(vph) 413 1123 1019 442 1071 948 449 636 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.55 0.62 0.02 0.01 0.56 0.04 0.22 0.36 Intersection Summary # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th Signalized Intersection Summary Timing Plan: 7 AM to 8 AM 2: Hudson Hollow Road/White Oak Road & Fairfax Pike Future with Development AM2035 --p- .4- t I Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t r t r Traffic Volume(veh/h) 211 636 20 3 548 33 46 10 34 54 7 150 Future Volume(veh/h) 211 636 20 3 548 33 46 10 34 54 7 150 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1767 1752 1811 1870 1722 1737 1796 1752 1796 1826 1648 1707 Adj Flow Rate, veh/h 229 691 11 3 596 16 50 11 5 59 8 38 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 9 10 6 2 12 11 7 10 7 5 17 13 Cap,veh/h 408 946 829 316 781 668 265 52 17 190 39 72 Arrive On Green 0.09 0.54 0.54 0.00 0.45 0.45 0.14 0.14 0.14 0.14 0.14 0.14 Sat Flow,veh/h 1682 1752 1535 1781 1722 1472 1040 356 114 608 268 496 Grp Volume(v),veh/h 229 691 11 3 596 16 66 0 0 105 0 0 Grp Sat Flow(s),veh/h/In 1682 1752 1535 1781 1722 1472 1510 0 0 1371 0 0 Q Serve(g_s),s 4.0 16.6 0.2 0.0 16.0 0.3 0.0 0.0 0.0 1.8 0.0 0.0 Cycle Q Clear(g_c),s 4.0 16.6 0.2 0.0 16.0 0.3 1.9 0.0 0.0 3.7 0.0 0.0 Prop In Lane 1.00 1.00 1.00 1.00 0.76 0.08 0.56 0.36 Lane Grp Cap(c),veh/h 408 946 829 316 781 668 333 0 0 300 0 0 V/C Ratio(X) 0.56 0.73 0.01 0.01 0.76 0.02 0.20 0.00 0.00 0.35 0.00 0.00 Avail Cap(c_a),veh/h 408 1268 1111 470 1246 1065 748 0 0 704 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay(d),s/veh 10.0 9.7 5.9 8.2 12.6 8.3 21.0 0.0 0.0 21.7 0.0 0.0 Incr Delay(d2),s/veh 1.7 2.6 0.0 0.0 3.3 0.0 0.3 0.0 0.0 0.7 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 1.1 4.7 0.0 0.0 5.1 0.1 0.7 0.0 0.0 1.2 0.0 0.0 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 11.7 12.2 5.9 8.3 16.0 8.4 21.3 0.0 0.0 22.4 0.0 0.0 LnGrp LOS B B A A B A C A A C A A Approach Vol,veh/h 931 615 66 105 Approach Delay,s/veh 12.0 15.7 21.3 22.4 Approach LOS B B C C Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc),s 4.7 37.6 12.9 9.5 32.9 12.9 Change Period (Y+Rc),s 4.5 7.8 4.9 4.5 7.8 4.9 Max Green Setting(Gmax),s 5.0 40.0 25.0 5.0 40.0 25.0 Max Q Clear Time(g_c+I1),s 2.0 18.6 3.9 6.0 18.0 5.7 Green Ext Time(p-c),s 0.0 8.4 0.2 0.0 7.1 0.4 Intersection Summary HCM 6th Ctrl Delay 14.3 HCM 6th LOS B HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan: 7 AM to 8 AM Queues Timing Plan: 7 AM to 8 AM 3: Route 522 & Fairfax Pike/Lord Fairfax Highway * Future with Development AM 2035 Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT SBR Lane Group Flow(vph) 610 263 118 234 323 518 212 101 382 191 v/c Ratio 1.84 0.61 0.44 0.76 1.50 0.72 0.43 0.65 0.68 0.46 Control Delay 415.8 17.8 44.2 54.6 283.8 45.5 6.3 68.5 47.4 5.9 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 415.8 17.8 44.2 54.6 283.8 45.5 6.3 68.5 47.4 5.9 Queue Length 50th(ft) -647 35 73 144 -315 174 0 68 128 0 Queue Length 95th(ft) #921 129 130 231 #522 248 46 #152 191 33 Internal Link Dist(ft) 1857 694 8434 2104 Turn Bay Length (ft) 230 500 565 250 125 480 Base Capacity(vph) 332 430 370 416 215 778 518 165 636 440 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 1.84 0.61 0.32 0.56 1.50 0.67 0.41 0.61 0.60 0.43 Intersection Summary Volume exceeds capacity,queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th Signalized Intersection Summary Timing Plan: 7 AM to 8 AM 3: Route 522 & Fairfax Pike/Lord Fairfax Highway Future with Development AM 2035 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations +1 r 1 tt r tt r Traffic Volume(veh/h) 265 296 242 109 153 63 297 477 195 93 351 176 Future Volume(veh/h) 265 296 242 109 153 63 297 477 195 93 351 176 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1767 1841 1663 1663 1767 1856 1722 1752 1707 1841 1618 1411 Adj Flow Rate, veh/h 288 322 84 118 166 53 323 518 33 101 382 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 9 4 16 16 9 3 12 10 13 4 19 33 Cap,veh/h 173 194 287 249 201 64 234 722 314 127 486 Arrive On Green 0.20 0.20 0.20 0.16 0.16 0.16 0.14 0.22 0.22 0.07 0.16 0.00 Sat Flow,veh/h 849 949 1409 1584 1283 410 1640 3328 1447 1753 3075 1196 Grp Volume(v),veh/h 610 0 84 118 0 219 323 518 33 101 382 0 Grp Sat Flow(s),veh/h/In 1798 0 1409 1584 0 1693 1640 1664 1447 1753 1537 1196 Q Serve(g_s),s 20.0 0.0 4.9 6.7 0.0 12.3 14.0 14.2 1.8 5.6 11.7 0.0 Cycle Q Clear(g_c),s 20.0 0.0 4.9 6.7 0.0 12.3 14.0 14.2 1.8 5.6 11.7 0.0 Prop In Lane 0.47 1.00 1.00 0.24 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 367 0 287 249 0 266 234 722 314 127 486 V/C Ratio(X) 1.66 0.00 0.29 0.47 0.00 0.82 1.38 0.72 0.11 0.79 0.79 Avail Cap(c_a),veh/h 367 0 287 404 0 431 234 845 367 179 690 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay(d),s/veh 39.0 0.0 33.1 37.7 0.0 40.0 42.0 35.6 30.8 44.8 39.7 0.0 Incr Delay(d2),s/veh 310.4 0.0 0.6 1.4 0.0 6.7 195.3 2.9 0.2 14.9 5.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 40.1 0.0 1.7 2.6 0.0 5.4 18.0 5.6 0.6 2.8 4.5 0.0 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 349.5 0.0 33.6 39.1 0.0 46.7 237.4 38.5 31.0 59.7 44.7 0.0 LnGrp LOS F A C D A D F D C E D Approach Vol,veh/h 694 337 874 483 Approach Delay,s/veh 311.3 44.0 111.7 47.8 Approach LOS F D F D Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration(G+Y+Rc),s 22.3 22.2 23.7 16.5 28.0 29.9 Change Period(Y+Rc),s 8.3 6.7 *8.3 *9.4 6.7 9.9 Max Green Setting(Gmax),s 14.0 22.0 *25 *10 24.9 20.0 Max Q Clear Time(g_c+I1),s 16.0 13.7 14.3 7.6 16.2 22.0 Green Ext Time(p-c),s 0.0 1.8 1.1 0.0 2.7 0.0 Intersection Summary HCM 6th Ctrl Delay 147.2 HCM 6th LOS F Notes *HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Unsignalized Delay for[SBR]is excluded from calculations of the approach delay and intersection delay. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Timing Plan: 7 AM to 8 AM 4: Route 522 & Lake Frederick Drive II Future with Development AM 2035 t L* t Lane Group EBL EBR NBL NBT SBU SBT SBR Lane Group Flow(vph) 161 100 40 862 2 670 62 v/c Ratio 0.51 0.18 0.11 0.54 0.01 0.60 0.11 Control Delay 37.3 6.6 9.6 14.4 8.0 23.3 5.8 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 37.3 6.6 9.6 14.4 8.0 23.3 5.8 Queue Length 50th(ft) 69 4 8 115 0 136 0 Queue Length 95th(ft) 155 38 23 276 3 230 25 Internal Link Dist(ft) 414 1077 8434 Turn Bay Length (ft) 470 275 295 Base Capacity(vph) 621 616 620 1977 631 1690 830 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.26 0.16 0.06 0.44 0.00 0.40 0.07 Intersection Summary Queues Synchro 11 Report Gorove Slade Timing Plan: 7 AM to 8 AM HCM 6th Signalized Intersection Summary Timing Plan: 7 AM to 8 AM 4: Route 522 & Lake Frederick Drive I Future with Development AM 2035 -A * L 4\ I t Movement EBL EBR NBL NBT SBU SBT SBR Lane Configurations r tt A tt r Traffic Volume(veh/h) 148 92 37 793 2 616 57 Future Volume(veh/h) 148 92 37 793 2 616 57 Initial Q(Qb),veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow,veh/h/In 1870 1752 1589 1648 1604 1707 Adj Flow Rate, veh/h 161 36 40 862 670 17 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 10 21 17 20 13 Cap,veh/h 224 246 285 1354 1065 506 Arrive On Green 0.13 0.13 0.04 0.43 0.35 0.35 Sat Flow,veh/h 1781 1485 1513 3214 3127 1447 Grp Volume(v),veh/h 161 36 40 862 670 17 Grp Sat Flow(s),veh/h/In 1781 1485 1513 1566 1523 1447 Q Serve(g_s),s 5.3 0.0 0.0 13.2 11.2 0.5 Cycle Q Clear(g_c),s 5.3 0.0 0.0 13.2 11.2 0.5 Prop In Lane 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 224 246 285 1354 1065 506 V/C Ratio(X) 0.72 0.15 0.14 0.64 0.63 0.03 Avail Cap(c_a),veh/h 726 665 718 2298 1988 944 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay(d),s/veh 25.8 21.9 20.6 13.6 16.6 13.1 Incr Delay(d2),s/veh 5.2 0.3 0.3 1.1 1.3 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 2.5 0.0 0.4 3.6 3.2 0.1 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 30.9 22.2 20.9 14.7 17.9 13.2 LnGrp LOS C C C B B B Approach Vol,veh/h 197 902 687 Approach Delay,s/veh 29.3 15.0 17.8 Approach LOS C B B Timer-Assigned Phs 2 4 5 6 Phs Duration(G+Y+Rc),s 37.0 16.4 13.0 31.9 Change Period(Y+Rc),s 10.5 8.7 10.5 10.5 Max Green Setting(Gmax),s 45.0 25.0 20.0 40.0 Max Q Clear Time(g_c+11),s 15.2 7.3 2.0 13.2 Green Ext Time(p-c),s 11.3 0.7 0.1 8.2 Intersection Summary HCM 6th Ctrl Delay 17.7 HCM 6th LOS B Notes User approved ignoring U-Turning movement. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Timing Plan: 7 AM to 8 AM 5: Route 522 & Tasker Road II Future with Development AM 2035 t t Lane Group EBL EBR NBL NBT SBT SBR Lane Group Flow(vph) 56 227 171 594 565 79 v/c Ratio 0.41 0.51 0.52 0.24 0.35 0.07 Control Delay 55.7 10.3 56.6 3.5 14.4 1.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 55.7 10.3 56.6 3.5 14.4 1.4 Queue Length 50th(ft) 38 0 61 42 106 0 Queue Length 95th(ft) 77 39 96 66 166 14 Internal Link Dist(ft) 446 1419 813 Turn Bay Length (ft) 250 485 315 Base Capacity(vph) 313 723 615 2434 1634 1318 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.18 0.31 0.28 0.24 0.35 0.06 Intersection Summary Queues Synchro 11 Report Gorove Slade Timing Plan: 7 AM to 8 AM HCM Signalized Intersection Capacity Analysis Timing Plan: 7 AM to 8 AM 5: Route 522 & Tasker Road * I Future with Development AM 2035 -AI L t Movement EBL EBR NBL NBT SBU SBT SBR Lane Configurations r r tt A tt r Traffic Volume(vph) 54 220 166 576 0 548 77 Future Volume(vph) 54 220 166 576 0 548 77 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 Total Lost time(s) 10.2 10.2 10.3 6.4 6.6 10.2 Lane Util.Factor 1.00 0.88 0.97 0.95 0.95 1.00 Frt 1.00 0.85 1.00 1.00 1.00 0.85 Flt Protected 0.95 1.00 0.95 1.00 1.00 1.00 Satd. Flow(prot) 1583 2733 3273 3195 2888 1583 Flt Permitted 0.95 1.00 0.95 1.00 1.00 1.00 Satd. Flow(perm) 1583 2733 3273 3195 2888 1583 Peak-hour factor, PHF 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Adj. Flow(vph) 56 227 171 594 0 565 79 RTOR Reduction(vph) 0 207 0 0 0 0 27 Lane Group Flow(vph) 56 20 171 594 0 565 52 Heavy Vehicles(%) 14% 4% 7% 13% 2% 25% 2% Turn Type Prot Prot Prot NA Prot NA pm+ov Protected Phases 7 4 1 6 5 2 7 Permitted Phases 4 2 Actuated Green, G (s) 9.6 9.6 11.1 83.8 62.2 71.8 Effective Green,g(s) 9.6 9.6 11.1 83.8 62.2 71.8 Actuated g/C Ratio 0.09 0.09 0.10 0.76 0.57 0.65 Clearance Time(s) 10.2 10.2 10.3 6.4 6.6 10.2 Vehicle Extension(s) 3.0 3.0 3.0 3.5 3.5 3.0 Lane Grp Cap(vph) 138 238 330 2434 1633 1033 v/s Ratio Prot c0.04 0.01 c0.05 0.19 c0.20 0.00 v/s Ratio Perm 0.03 v/c Ratio 0.41 0.08 0.52 0.24 0.35 0.05 Uniform Delay,d1 47.5 46.2 46.9 3.8 12.9 6.9 Progression Factor 1.00 1.00 1.09 0.81 1.00 1.00 Incremental Delay,d2 1.9 0.2 1.4 0.2 0.6 0.0 Delay(s) 49.4 46.3 52.7 3.3 13.5 6.9 Level of Service D D D A B A Approach Delay(s) 46.9 14.4 12.7 Approach LOS D B B Intersection Summary HCM 2000 Control Delay 19.2 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.38 Actuated Cycle Length(s) 110.0 Sum of lost time(s) 27.1 Intersection Capacity Utilization 49.4% ICU Level of Service A Analysis Period(min) 15 c Critical Lane Group HCM Signalized Intersection Capacity Analysis Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th Signalized Intersection Summary Timing Plan: 7 AM to 8 AM 5: Route 522 & Tasker Road Future with Development AM 2035 HCM 6th Edition methodology supports red clearance in the range of 0 to 6 seconds. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th TWSC Timing Plan: 7 AM to 8 AM 6: Lake Frederick Entrance/Gibson Site Entrance 1 & Fairfax Pike Future with Development AM 2035 Intersection Int Delay,s/veh 66.1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t r* t r* 1 1� Traffic Vol,veh/h 81 806 46 36 584 92 122 0 97 28 0 24 Future Vol,veh/h 81 806 46 36 584 92 122 0 97 28 0 24 Conflicting Peds,#/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - None - None - None - None Storage Length 150 150 150 150 0 50 Veh in Median Storage,# - 0 - - 0 - - 0 - 0 Grade, % - 0 - - 0 - - 0 - 0 Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 88 876 50 39 635 100 133 0 105 30 0 26 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 735 0 0 926 0 0 1828 1865 876 1843 1815 635 Stage 1 - - - - - - 1052 1052 - 713 713 - Stage 2 - - 776 813 - 1130 1102 - Critical Hdwy 4.12 4.12 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - - 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 2.218 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 870 738 -59 73 348 58 78 478 Stage 1 - - 274 303 - 423 435 - Stage 2 - - 390 392 - 248 287 - Platoon blocked, % Mov Cap-1 Maneuver 870 738 -49 62 348 36 66 478 Mov Cap-2 Maneuver - - -49 62 - 36 66 - Stage 1 246 272 380 412 Stage 2 349 371 155 258 Approach EB WB NB SIB HCM Control Delay,s 0.8 0.5 $537.5 150.5 HCM LOS F F Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT EBR WBL WBT WBR SBLn1 SBLn2 Capacity(veh/h) 49 348 870 738 36 478 HCM Lane V/C Ratio 2.706 0.303 0.101 0.053 0.845 0.055 HCM Control Delay(s) $949.1 19.8 9.6 10.2 268.3 13 HCM Lane LOS F C A B F B HCM 95th %tile Q(veh) 14 1.3 0.3 0.2 3 0.2 Notes -:Volume exceeds capacity $: Delay exceeds 300s +:Computation Not Defined *:All major volume in platoon HCM 6th TWSC Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th TWSC Timing Plan: 7 AM to 8 AM 7: Fairfax Pike & Gibson Site Entrance 2 Future with Development AM 2035 Intersection Int Delay,s/veh 0.1 Movement EBL EBT WBT WBR SBL SBR Lane Configurations t T r* Traffic Vol,veh/h 0 930 699 3 0 13 Future Vol,veh/h 0 930 699 3 0 13 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized None None None Storage Length - Veh in Median Storage,# 0 0 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 1011 760 3 0 14 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 0 0 762 Stage 1 - - - Stage 2 - Critical Hdwy 6.22 Critical Hdwy Stg 1 - Critical Hdwy Stg 2 - Follow-up Hdwy 3.318 Pot Cap-1 Maneuver 0 0 405 Stage 1 0 0 - Stage 2 0 0 - Platoon blocked, % Mov Cap-1 Maneuver - - 405 Mov Cap-2 Maneuver Stage 1 Stage 2 Approach EB WB SIB HCM Control Delay,s 0 0 14.2 HCM LOS B Minor Lane/Major Mvmt EBT WBT WBR SBLn1 Capacity(veh/h) 405 HCM Lane V/C Ratio 0.035 HCM Control Delay(s) 14.2 HCM Lane LOS B HCM 95th %tile Q(veh) 0.1 HCM 6th TWSC Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th TWSC Timing Plan: 7 AM to 8 AM 8: Fairfax Pike & Gibson Site Entrance 3 Future with Development AM 2035 Intersection Int Delay,s/veh 0.5 Movement EBL EBT WBT WBR SBL SBR Lane Configurations t T r* Traffic Vol,veh/h 48 882 701 14 5 1 Future Vol,veh/h 48 882 701 14 5 1 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None None - None Storage Length 150 - 0 50 Veh in Median Storage,# - 0 0 0 - Grade, % - 0 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 52 959 762 15 5 1 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 777 0 0 1833 770 Stage 1 - - - 770 - Stage 2 - 1063 - Critical Hdwy 4.12 6.42 6.22 Critical Hdwy Stg 1 - 5.42 - Critical Hdwy Stg 2 - 5.42 - Follow-up Hdwy 2.218 3.518 3.318 Pot Cap-1 Maneuver 839 84 401 Stage 1 - 457 - Stage 2 - 332 - Platoon blocked, % Mov Cap-1 Maneuver 839 79 401 Mov Cap-2 Maneuver - 79 - Stage 1 429 Stage 2 332 Approach EB WB SIB HCM Control Delay,s 0.5 0 47.2 HCM LOS E Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 SBLn2 Capacity(veh/h) 839 79 401 HCM Lane V/C Ratio 0.062 0.069 0.003 HCM Control Delay(s) 9.6 53.9 14 HCM Lane LOS A F B HCM 95th %tile Q(veh) 0.2 0.2 0 HCM 6th TWSC Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th TWSC Timing Plan: 7 AM to 8 AM 9: Route 522 & Gibson Site Entrance 4 Future with Development AM 2035 Intersection Int Delay,s/veh 0.8 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations +' r +T r* ) tt r* ) tt r* Traffic Vol,veh/h 27 0 11 15 0 1 36 712 53 2 611 92 Future Vol,veh/h 27 0 11 15 0 1 36 712 53 2 611 92 Conflicting Peds,#/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized None None - None - None Storage Length 50 50 300 150 300 150 Veh in Median Storage,# 1 - 1 - - 0 - - 0 - Grade, % 0 - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 29 0 12 16 0 1 39 774 58 2 664 100 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 1133 1578 332 1188 1620 387 764 0 0 832 0 0 Stage 1 668 668 - 852 852 - - - - - - - Stage 2 465 910 - 336 768 - - - Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 4.14 Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 - - - Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 - - - Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 2.22 Pot Cap-1 Maneuver 158 108 664 144 102 611 845 796 Stage 1 414 455 - 321 374 - - - Stage 2 547 352 - 652 409 - - - Platoon blocked, % Mov Cap-1 Maneuver 152 103 664 136 97 611 845 796 Mov Cap-2 Maneuver 272 221 - 238 210 - - - Stage 1 395 454 306 357 Stage 2 521 336 639 408 Approach EB WB NB SIB HCM Control Delay,s 17.1 20.6 0.4 0 HCM LOS C C Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1WBLn2 SBL SBT SBR Capacity(veh/h) 845 272 664 238 611 796 HCM Lane V/C Ratio 0.046 0.108 0.018 0.069 0.002 0.003 HCM Control Delay(s) 9.5 19.8 10.5 21.2 10.9 9.5 HCM Lane LOS A C B C B A HCM 95th %tile Q(veh) 0.1 0.4 0.1 0.2 0 0 HCM 6th TWSC Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th TWSC Timing Plan: 7 AM to 8 AM 10: Route 522 & Gibson Site Entrance 5 Future with Development AM 2035 Intersection Int Delay,s/veh 0.2 Movement WBL WBR NBT NBR SBL SBT Lane Configurations r tt r ) tt Traffic Vol,veh/h 2 5 734 6 17 703 Future Vol,veh/h 2 5 734 6 17 703 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None None - None Storage Length 0 50 150 300 - Veh in Median Storage,# 1 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 2 5 798 7 18 764 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 1216 399 0 0 805 0 Stage 1 798 - - - - - Stage 2 418 - - Critical Hdwy 6.84 6.94 4.14 Critical Hdwy Stg 1 5.84 - - Critical Hdwy Stg 2 5.84 - - Follow-up Hdwy 3.52 3.32 2.22 Pot Cap-1 Maneuver 173 601 815 Stage 1 404 - - Stage 2 632 - - Platoon blocked, % Mov Cap-1 Maneuver 169 601 815 Mov Cap-2 Maneuver 295 - - Stage 1 404 Stage 2 618 Approach WB NB SIB HCM Control Delay,s 12.8 0 0.2 HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT Capacity(veh/h) 295 601 815 HCM Lane V/C Ratio 0.007 0.009 0.023 HCM Control Delay(s) 17.3 11 9.5 HCM Lane LOS C B A HCM 95th %tile Q(veh) 0 0 0.1 HCM 6th TWSC Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Timing Plan: 4.15 PM to 5.15 PM 1: Warrior Drive & Fairfax Pike Future with Development PM 2035 t 41 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT SBR Lane Group Flow(vph) 307 833 182 161 930 150 200 254 109 60 379 v/c Ratio 1.10 0.89 0.16 1.22 1.21 0.17 0.76 1.25 0.51 0.40 0.76 Control Delay 126.4 41.7 2.7 192.3 136.6 1.2 58.3 177.4 45.1 55.9 37.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 126.4 41.7 2.7 192.3 136.6 1.2 58.3 177.4 45.1 55.9 37.1 Queue Length 50th(ft) -249 561 0 -140 -804 0 123 -186 63 41 180 Queue Length 95th(ft) #420 #795 53 #274 #1047 15 #215 #351 114 84 293 Internal Link Dist(ft) 648 4165 244 594 Turn Bay Length (ft) 260 500 270 575 190 150 Base Capacity(vph) 278 933 1132 132 769 870 264 204 218 159 501 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 1.10 0.89 0.16 1.22 1.21 0.17 0.76 1.25 0.50 0.38 0.76 Intersection Summary Volume exceeds capacity,queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection Summary Timing Plan: 4.15 PM to 5.15 PM 1: Warrior Drive & Fairfax Pike Future with Development PM 2035 --I. 4--- `- t Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t r t r t r Traffic Volume(veh/h) 282 766 167 148 856 138 184 86 148 100 55 349 Future Volume(veh/h) 282 766 167 148 856 138 184 86 148 100 55 349 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 0.99 0.99 0.99 0.98 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1870 1841 1870 1693 1841 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 307 833 106 161 930 67 200 93 100 109 60 301 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 4 2 14 4 2 2 2 2 2 2 2 Cap,veh/h 280 997 994 135 830 812 273 82 88 192 160 382 Arrive On Green 0.16 0.54 0.54 0.08 0.45 0.45 0.09 0.10 0.10 0.07 0.09 0.09 Sat Flow,veh/h 1781 1841 1585 1612 1841 1552 1781 817 879 1781 1870 1557 Grp Volume(v),veh/h 307 833 106 161 930 67 200 0 193 109 60 301 Grp Sat Flow(s),veh/h/In 1781 1841 1585 1612 1841 1552 1781 0 1696 1781 1870 1557 Q Serve(g_s),s 17.3 41.7 2.9 9.2 49.6 2.4 9.4 0.0 11.0 6.0 3.3 9.4 Cycle Q Clear(g_c),s 17.3 41.7 2.9 9.2 49.6 2.4 9.4 0.0 11.0 6.0 3.3 9.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.52 1.00 1.00 Lane Grp Cap(c),veh/h 280 997 994 135 830 812 273 0 170 192 160 382 V/C Ratio(X) 1.10 0.84 0.11 1.19 1.12 0.08 0.73 0.00 1.14 0.57 0.38 0.79 Avail Cap(c_a),veh/h 280 997 994 135 830 812 273 0 170 218 160 382 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.14 0.14 0.14 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay(d),s/veh 46.3 21.1 8.2 50.4 30.2 13.1 43.4 0.0 49.5 42.1 47.5 39.1 Incr Delay(d2),s/veh 81.8 8.2 0.2 97.7 56.9 0.0 9.6 0.0 110.6 2.7 1.5 10.5 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 13.7 18.1 1.0 7.2 33.1 0.8 1.5 0.0 9.9 2.8 1.6 8.7 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 128.2 29.3 8.4 148.1 87.1 13.2 53.1 0.0 160.1 44.8 49.0 49.5 LnGrp LOS F C A F F B D A F D D D Approach Vol,veh/h 1246 1158 393 470 Approach Delay,s/veh 51.9 91.3 105.6 48.3 Approach LOS D F F D Timer-Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration(G+Y+Rc),s 26.0 55.5 14.4 17.6 16.0 65.5 16.0 16.0 Change Period(Y+Rc),s *8.7 *5.8 6.6 6.6 *6.8 5.8 6.6 6.6 Max Green Setting(Gmax),s *17 *46 9.4 9.4 *9.2 56.2 9.4 9.4 Max Q Clear Time(g_c+I1),s 19.3 51.6 8.0 13.0 11.2 43.7 11.4 11.4 Green Ext Time(p-c),s 0.0 0.0 0.0 0.0 0.0 6.3 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 71.8 HCM 6th LOS E Notes User approved pedestrian interval to be less than phase max green. *HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Queues Timing Plan: 4.15 PM to 5.15 PM 2: Hudson Hollow Road/White Oak Road & Fairfax Pike Future with Development PM 2035 t Lane Group EBL EBT EBR WBL WBT WBR NBT SBT Lane Group Flow(vph) 158 674 46 30 962 48 80 239 v/c Ratio 0.71 0.62 0.05 0.06 0.98 0.05 0.62 0.62 Control Delay 30.4 13.5 1.0 3.9 43.1 1.2 47.2 17.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 30.4 13.5 1.0 3.9 43.1 1.2 47.2 17.1 Queue Length 50th(ft) 16 127 0 3 375 0 30 29 Queue Length 95th(ft) #118 381 7 11 #734 8 74 94 Internal Link Dist(ft) 4165 4595 176 167 Turn Bay Length (ft) 145 90 125 155 Base Capacity(vph) 222 1094 1015 479 983 896 272 652 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.71 0.62 0.05 0.06 0.98 0.05 0.29 0.37 Intersection Summary # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection Summary Timing Plan: 4.15 PM to 5.15 PM 2: Hudson Hollow Road/White Oak Road & Fairfax Pike Future with Development PM 2035 --p- 4--- t I Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t r t r Traffic Volume(veh/h) 155 661 45 29 943 47 45 22 12 28 31 174 Future Volume(veh/h) 155 661 45 29 943 47 45 22 12 28 31 174 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1870 1781 1870 1841 1826 1870 1870 1752 1870 1870 1841 1870 Adj Flow Rate, veh/h 158 674 28 30 962 27 46 22 3 29 32 31 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 2 8 2 4 5 2 2 10 2 2 4 2 Cap,veh/h 270 1070 952 421 1029 893 186 74 8 109 88 66 Arrive On Green 0.07 0.60 0.60 0.03 0.56 0.56 0.12 0.12 0.12 0.12 0.12 0.12 Sat Flow,veh/h 1781 1781 1585 1753 1826 1585 840 617 64 343 735 547 Grp Volume(v),veh/h 158 674 28 30 962 27 71 0 0 92 0 0 Grp Sat Flow(s),veh/h/In 1781 1781 1585 1753 1826 1585 1522 0 0 1625 0 0 Q Serve(g_s),s 2.5 16.9 0.5 0.4 33.7 0.5 0.0 0.0 0.0 0.9 0.0 0.0 Cycle Q Clear(g_c),s 2.5 16.9 0.5 0.4 33.7 0.5 2.6 0.0 0.0 3.5 0.0 0.0 Prop In Lane 1.00 1.00 1.00 1.00 0.65 0.04 0.32 0.34 Lane Grp Cap(c),veh/h 270 1070 952 421 1029 893 268 0 0 263 0 0 V/C Ratio(X) 0.58 0.63 0.03 0.07 0.94 0.03 0.27 0.00 0.00 0.35 0.00 0.00 Avail Cap(c_a),veh/h 276 1070 952 492 1054 915 602 0 0 642 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay(d),s/veh 15.4 8.9 5.6 6.9 14.0 6.7 28.0 0.0 0.0 28.4 0.0 0.0 Incr Delay(d2),s/veh 3.0 1.7 0.0 0.1 15.1 0.0 0.5 0.0 0.0 0.8 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 1.4 5.0 0.1 0.1 14.1 0.1 1.0 0.0 0.0 1.4 0.0 0.0 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 18.4 10.6 5.7 7.0 29.0 6.7 28.5 0.0 0.0 29.2 0.0 0.0 LnGrp LOS B B A A C A C A A C A A Approach Vol,veh/h 860 1019 71 92 Approach Delay,s/veh 11.9 27.8 28.5 29.2 Approach LOS B C C C Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc),s 6.7 49.4 13.2 9.3 46.8 13.2 Change Period (Y+Rc),s 4.5 7.8 4.9 4.5 7.8 4.9 Max Green Setting(Gmax),s 5.0 40.0 25.0 5.0 40.0 25.0 Max Q Clear Time(g_c+I1),s 2.4 18.9 4.6 4.5 35.7 5.5 Green Ext Time(p-c),s 0.0 8.2 0.2 0.0 3.3 0.4 Intersection Summary HCM 6th Ctrl Delay 21.2 HCM 6th LOS C HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:415 PM to 5:15 PM Queues Timing Plan: 4.15 PM to 5.15 PM 3: Route 522 & Fairfax Pike/Lord Fairfax Highway } Future with Development PM 2035 --I. � I I".. Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT SBR Lane Group Flow(vph) 547 413 239 501 405 688 183 109 679 312 v/c Ratio 1.81 0.82 0.65 1.28 1.95 0.93 0.35 0.75 1.04 0.56 Control Delay 404.5 27.5 50.3 183.0 471.5 64.3 3.7 81.8 89.8 8.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 404.5 27.5 50.3 183.0 471.5 64.3 3.7 81.8 89.8 8.7 Queue Length 50th(ft) -606 84 161 -465 -460 263 0 79 -282 0 Queue Length 95th(ft) #820 #249 250 #677 #655 #381 25 #168 #403 77 Internal Link Dist(ft) 1857 694 8434 2104 Turn Bay Length (ft) 230 500 565 250 125 480 Base Capacity(vph) 303 506 365 390 208 739 516 150 656 556 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 1.81 0.82 0.65 1.28 1.95 0.93 0.35 0.73 1.04 0.56 Intersection Summary Volume exceeds capacity,queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection Summary Timing Plan: 4.15 PM to 5.15 PM 3: Route 522 & Fairfax Pike/Lord Fairfax Highway * Future with Development PM 2035 --I. *-- I t Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations +1 r tt r tt r Traffic Volume(veh/h) 297 206 380 220 361 100 373 633 168 100 625 287 Future Volume(veh/h) 297 206 380 220 361 100 373 633 168 100 625 287 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1796 1811 1796 1781 1826 1796 1811 1781 1796 1826 1811 1870 Adj Flow Rate, veh/h 323 224 149 239 392 99 405 688 29 109 679 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 7 6 7 8 5 7 6 8 7 5 6 2 Cap,veh/h 182 126 267 371 308 78 211 774 348 134 663 Arrive On Green 0.18 0.18 0.18 0.22 0.22 0.22 0.12 0.23 0.23 0.08 0.19 0.00 Sat Flow,veh/h 1039 720 1522 1697 1407 355 1725 3385 1522 1739 3441 1585 Grp Volume(v),veh/h 547 0 149 239 0 491 405 688 29 109 679 0 Grp Sat Flow(s),veh/h/In 1759 0 1522 1697 0 1762 1725 1692 1522 1739 1721 1585 Q Serve(g_s),s 20.0 0.0 10.2 14.6 0.0 25.0 14.0 22.5 1.7 7.0 22.0 0.0 Cycle Q Clear(g_c),s 20.0 0.0 10.2 14.6 0.0 25.0 14.0 22.5 1.7 7.0 22.0 0.0 Prop In Lane 0.59 1.00 1.00 0.20 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 308 0 267 371 0 386 211 774 348 134 663 V/C Ratio(X) 1.78 0.00 0.56 0.64 0.00 1.27 1.92 0.89 0.08 0.81 1.02 Avail Cap(c_a),veh/h 308 0 267 371 0 386 211 774 348 152 663 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay(d),s/veh 47.1 0.0 43.1 40.5 0.0 44.6 50.1 42.6 34.6 51.9 46.1 0.0 Incr Delay(d2),s/veh 361.9 0.0 2.6 3.8 0.0 141.7 429.0 12.6 0.1 25.2 41.3 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 39.5 0.0 4.0 6.4 0.0 25.8 30.9 10.2 0.6 3.9 12.7 0.0 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 409.0 0.0 45.7 44.3 0.0 186.3 479.1 55.2 34.8 77.1 87.4 0.0 LnGrp LOS F A D D A F F E C E F Approach Vol,veh/h 696 730 1122 788 Approach Delay,s/veh 331.2 139.8 207.7 85.9 Approach LOS F F F F Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration(G+Y+Rc),s 22.3 28.7 33.3 18.2 32.8 29.9 Change Period(Y+Rc),s 8.3 6.7 *8.3 *9.4 6.7 9.9 Max Green Setting(Gmax),s 14.0 22.0 *25 *10 24.9 20.0 Max Q Clear Time(g_c+I1),s 16.0 24.0 27.0 9.0 24.5 22.0 Green Ext Time(p-c),s 0.0 0.0 0.0 0.0 0.2 0.0 Intersection Summary HCM 6th Ctrl Delay 189.8 HCM 6th LOS F Notes *HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Unsignalized Delay for[SBR]is excluded from calculations of the approach delay and intersection delay. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Queues Timing Plan: 4.15 PM to 5.15 PM 4: Route 522 & Lake Frederick Drive I Future with Development PM 2035 4\ t I Lane Group EBL EBR NBL NBT SBT SBR Lane Group Flow(vph) 184 99 124 1045 1068 210 v/c Ratio 0.63 0.19 0.41 0.50 0.78 0.27 Control Delay 47.2 17.7 20.2 10.8 30.0 4.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 47.2 17.7 20.2 10.8 30.0 4.0 Queue Length 50th(ft) 105 33 27 159 282 0 Queue Length 95th(ft) 181 68 58 248 432 46 Internal Link Dist(ft) 414 1077 8434 Turn Bay Length (ft) 470 295 Base Capacity(vph) 476 517 495 2098 1426 801 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.39 0.19 0.25 0.50 0.75 0.26 Intersection Summary Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection Summary Timing Plan: 4.15 PM to 5.15 PM 4: Route 522 & Lake Frederick Drive I Future with Development PM 2035 -A * L 4\ I t Movement EBL EBR NBL NBT SBU SBT SBR Lane Configurations r tt A tt r Traffic Volume(veh/h) 169 91 114 961 0 983 193 Future Volume(veh/h) 169 91 114 961 0 983 193 Initial Q(Qb),veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow,veh/h/In 1870 1722 1826 1781 1767 1870 Adj Flow Rate, veh/h 184 86 124 1045 1068 76 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 12 5 8 9 2 Cap,veh/h 243 285 271 1467 1434 677 Arrive On Green 0.14 0.14 0.06 0.43 0.43 0.43 Sat Flow,veh/h 1781 1459 1739 3474 3445 1585 Grp Volume(v),veh/h 184 86 124 1045 1068 76 Grp Sat Flow(s),veh/h/In 1781 1459 1739 1692 1678 1585 Q Serve(g_s),s 7.8 0.0 0.0 19.9 21.0 2.3 Cycle Q Clear(g_c),s 7.8 0.0 0.0 19.9 21.0 2.3 Prop In Lane 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 243 285 271 1467 1434 677 V/C Ratio(X) 0.76 0.30 0.46 0.71 0.74 0.11 Avail Cap(c_a),veh/h 566 550 610 1935 1706 806 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay(d),s/veh 32.7 27.1 30.9 18.3 18.9 13.6 Incr Delay(d2),s/veh 5.8 0.7 1.4 1.5 2.2 0.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 3.7 0.1 2.2 6.6 7.1 0.7 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 38.5 27.8 32.4 19.8 21.1 13.7 LnGrp LOS D C C B C B Approach Vol,veh/h 270 1169 1144 Approach Delay,s/veh 35.1 21.1 20.6 Approach LOS D C C Timer-Assigned Phs 2 4 5 6 Phs Duration(G+Y+Rc),s 44.6 19.4 15.2 44.1 Change Period(Y+Rc),s 10.5 8.7 10.5 10.5 Max Green Setting(Gmax),s 45.0 25.0 20.0 40.0 Max Q Clear Time(g_c+11),s 21.9 9.8 2.0 23.0 Green Ext Time(p-c),s 12.2 0.9 0.3 10.6 Intersection Summary HCM 6th Ctrl Delay 22.4 HCM 6th LOS C Notes User approved ignoring U-Turning movement. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Queues Timing Plan: 4.15 PM to 5.15 PM 5: Route 522 & Tasker Road I Future with Development PM 2035 -A4\ t I Lane Group EBL EBR NBL NBT SBT SBR Lane Group Flow(vph) 175 255 319 798 815 119 v/c Ratio 0.68 0.41 0.67 0.35 0.52 0.11 Control Delay 57.2 6.8 55.4 5.9 23.7 1.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 57.2 6.8 55.4 5.9 23.7 1.7 Queue Length 50th(ft) 119 0 119 81 207 1 Queue Length 95th(ft) 181 36 139 105 315 21 Internal Link Dist(ft) 446 1419 813 Turn Bay Length (ft) 250 485 315 Base Capacity(vph) 350 756 627 2286 1568 1176 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.50 0.34 0.51 0.35 0.52 0.10 Intersection Summary Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM Signalized Intersection Capacity Analysis Timing Plan: 4.15 PM to 5.15 PM 5: Route 522 & Tasker Road * I Future with Development PM 2035 -AI L t Movement EBL EBR NBL NBT SBU SBT SBR Lane Configurations r*r* tt A tt r Traffic Volume(vph) 168 245 306 766 0 782 114 Future Volume(vph) 168 245 306 766 0 782 114 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 Total Lost time(s) 10.2 10.2 10.3 6.4 6.6 10.2 Lane Util.Factor 1.00 0.88 0.97 0.95 0.95 1.00 Frt 1.00 0.85 1.00 1.00 1.00 0.85 Flt Protected 0.95 1.00 0.95 1.00 1.00 1.00 Satd. Flow(prot) 1770 2787 3335 3252 3374 1583 Flt Permitted 0.95 1.00 0.95 1.00 1.00 1.00 Satd. Flow(perm) 1770 2787 3335 3252 3374 1583 Peak-hour factor, PHF 0.96 0.96 0.96 0.96 0.92 0.96 0.96 Adj. Flow(vph) 175 255 319 798 0 815 119 RTOR Reduction(vph) 0 218 0 0 0 0 45 Lane Group Flow(vph) 175 37 319 798 0 815 74 Heavy Vehicles(%) 2% 2% 5% 11% 2% 7% 2% Turn Type Prot Prot Prot NA Prot NA pm+ov Protected Phases 7 4 1 6 5 2 7 Permitted Phases 4 2 Actuated Green, G (s) 16.1 16.1 15.7 77.3 51.1 67.2 Effective Green,g(s) 16.1 16.1 15.7 77.3 51.1 67.2 Actuated g/C Ratio 0.15 0.15 0.14 0.70 0.46 0.61 Clearance Time(s) 10.2 10.2 10.3 6.4 6.6 10.2 Vehicle Extension(s) 3.0 3.0 3.0 3.5 3.5 3.0 Lane Grp Cap(vph) 259 407 475 2285 1567 967 v/s Ratio Prot c0.10 0.01 c0.10 0.25 c0.24 0.01 v/s Ratio Perm 0.04 v/c Ratio 0.68 0.09 0.67 0.35 0.52 0.08 Uniform Delay,d1 44.5 40.6 44.7 6.4 20.8 8.7 Progression Factor 1.00 1.00 1.09 0.78 1.00 1.00 Incremental Delay,d2 6.8 0.1 3.7 0.4 1.2 0.0 Delay(s) 51.3 40.7 52.3 5.5 22.0 8.8 Level of Service D D D A C A Approach Delay(s) 45.0 18.8 20.3 Approach LOS D B C Intersection Summary HCM 2000 Control Delay 23.9 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.58 Actuated Cycle Length(s) 110.0 Sum of lost time(s) 27.1 Intersection Capacity Utilization 62.2% ICU Level of Service B Analysis Period(min) 15 c Critical Lane Group HCM Signalized Intersection Capacity Analysis Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection Summary Timing Plan: 4.15 PM to 5.15 PM 5: Route 522 & Tasker Road Future with Development PM 2035 HCM 6th Edition methodology supports red clearance in the range of 0 to 6 seconds. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th TWSC Timing Plan: 4.15 PM to 5.15 PM 6: Lake Frederick Entrance/Gibson Site Entrance 1 & Fairfax Pike Future with Development PM 2035 Intersection Int Delay,s/veh 205 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t r* t r* 1 1� Traffic Vol,veh/h 33 834 107 85 1049 37 76 0 60 94 0 83 Future Vol,veh/h 33 834 107 85 1049 37 76 0 60 94 0 83 Conflicting Peds,#/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - None - None - None - None Storage Length 150 150 150 150 0 50 Veh in Median Storage,# - 0 - - 0 - - 0 - 0 Grade, % - 0 - - 0 - - 0 - 0 Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 36 907 116 92 1140 40 83 0 65 102 0 90 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 1180 0 0 1023 0 0 2368 2343 907 2394 2419 1140 Stage 1 - - - - - - 979 979 - 1324 1324 - Stage 2 - - 1389 1364 - 1070 1095 - Critical Hdwy 4.12 4.12 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - - 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 2.218 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 592 679 -24 36 334 -23 32 245 Stage 1 - - 301 328 - 192 225 - Stage 2 - - 176 215 - 268 290 - Platoon blocked, % Mov Cap-1 Maneuver 592 679 - 13 29 334 - 16 26 245 Mov Cap-2 Maneuver - - - 13 29 - - 16 26 - Stage 1 283 308 180 195 Stage 2 96 186 203 272 Approach EB WB NB SIB HCM Control Delay,s 0.4 0.8 $ 1675.9 $ 1551.2 HCM LOS F F Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT EBR WBL WBT WBR SBLn1 SBLn2 Capacity(veh/h) 13 334 592 679 16 245 HCM Lane V/C Ratio 6.355 0.195 0.061 0.136 6.386 0.368 HCM Control Delay(s) $2984.5 18.4 11.5 11.1 $2896.2 28 HCM Lane LOS F C B B - F D HCM 95th %tile Q(veh) 11.4 0.7 0.2 0.5 13.6 1.6 Notes -:Volume exceeds capacity $: Delay exceeds 300s +:Computation Not Defined *:All major volume in platoon HCM 6th TWSC Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th TWSC Timing Plan: 4.15 PM to 5.15 PM 7: Fairfax Pike & Gibson Site Entrance 2 Future with Development PM 2035 Intersection Int Delay,s/veh 0.5 Movement EBL EBT WBT WBR SBL SBR Lane Configurations t 1� r* Traffic Vol,veh/h 0 988 1128 1 0 43 Future Vol,veh/h 0 988 1128 1 0 43 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized None None None Storage Length - Veh in Median Storage,# 0 0 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 1074 1226 1 0 47 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 0 0 1227 Stage 1 - - - Stage 2 - Critical Hdwy 6.22 Critical Hdwy Stg 1 - Critical Hdwy Stg 2 - Follow-up Hdwy 3.318 Pot Cap-1 Maneuver 0 0 217 Stage 1 0 0 - Stage 2 0 0 - Platoon blocked, % Mov Cap-1 Maneuver - - 217 Mov Cap-2 Maneuver Stage 1 Stage 2 Approach EB WB SIB HCM Control Delay,s 0 0 26.1 HCM LOS D Minor Lane/Major Mvmt EBT WBT WBR SBLn1 Capacity(veh/h) 217 HCM Lane V/C Ratio 0.215 HCM Control Delay(s) 26.1 HCM Lane LOS D HCM 95th %tile Q(veh) 0.8 HCM 6th TWSC Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th TWSC Timing Plan: 4.15 PM to 5.15 PM 8: Fairfax Pike & Gibson Site Entrance 3 Future with Development PM 2035 Intersection Int Delay,s/veh 1.4 Movement EBL EBT WBT WBR SBL SBR Lane Configurations t 1 r* Traffic Vol,veh/h 19 969 1124 6 17 5 Future Vol,veh/h 19 969 1124 6 17 5 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None None - None Storage Length 150 - 0 50 Veh in Median Storage,# - 0 0 0 - Grade, % - 0 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 21 1053 1222 7 18 5 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 1229 0 0 2321 1226 Stage 1 - - - 1226 - Stage 2 - 1095 - Critical Hdwy 4.12 6.42 6.22 Critical Hdwy Stg 1 - 5.42 - Critical Hdwy Stg 2 - 5.42 - Follow-up Hdwy 2.218 3.518 3.318 Pot Cap-1 Maneuver 567 41 218 Stage 1 - 277 - Stage 2 - 321 - Platoon blocked, % Mov Cap-1 Maneuver 567 39 218 Mov Cap-2 Maneuver - 39 - Stage 1 267 Stage 2 321 Approach EB WB SIB HCM Control Delay,s 0.2 0 130.5 HCM LOS F Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 SBLn2 Capacity(veh/h) 567 39 218 HCM Lane V/C Ratio 0.036 0.474 0.025 HCM Control Delay(s) 11.6 162.5 21.9 HCM Lane LOS B F C HCM 95th %tile Q(veh) 0.1 1.6 0.1 HCM 6th TWSC Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th TWSC Timing Plan: 4.15 PM to 5.15 PM 9: Route 522 & Gibson Site Entrance 4 Future with Development PM 2035 Intersection Int Delay,s/veh 3.5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations +T r +T r* ) tt r* ) tt r Traffic Vol,veh/h 94 0 38 52 0 2 15 988 21 1 947 37 Future Vol,veh/h 94 0 38 52 0 2 15 988 21 1 947 37 Conflicting Peds,#/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized None None - None - None Storage Length 50 50 300 150 300 150 Veh in Median Storage,# 1 - 1 - - 0 - - 0 - Grade, % 0 - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 102 0 41 57 0 2 16 1074 23 1 1029 40 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 1600 2160 515 1623 2177 537 1069 0 0 1097 0 0 Stage 1 1031 1031 - 1106 1106 - - - - - - - Stage 2 569 1129 - 517 1071 - - - Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 4.14 Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 - - - Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 - - - Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 2.22 Pot Cap-1 Maneuver -71 47 505 68 46 488 648 632 Stage 1 249 309 - 224 284 - - - Stage 2 474 277 - 509 295 - - - Platoon blocked, % Mov Cap-1 Maneuver -69 46 505 61 45 488 648 632 Mov Cap-2 Maneuver 173 152 - 158 147 - - - Stage 1 243 308 218 277 Stage 2 460 270 467 294 Approach EB WB NB SIB HCM Control Delay,s 40.8 39 0.2 0 HCM LOS E E Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1WBLn2 SBL SBT SBR Capacity(veh/h) 648 173 505 158 488 632 HCM Lane V/C Ratio 0.025 0.591 0.082 0.358 0.004 0.002 HCM Control Delay(s) 10.7 52.1 12.8 40 12.4 10.7 HCM Lane LOS B F B E B B HCM 95th %tile Q(veh) 0.1 3.2 0.3 1.5 0 0 Notes -:Volume exceeds capacity $: Delay exceeds 300s +:Computation Not Defined *:All major volume in platoon HCM 6th TWSC Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th TWSC Timing Plan: 4.15 PM to 5.15 PM 10: Route 522 & Gibson Site Entrance 5 Future with Development PM 2035 Intersection Int Delay,s/veh 0.2 Movement WBL WBR NBT NBR SBL SBT Lane Configurations r tt r* ) tt Traffic Vol,veh/h 6 17 1082 2 7 979 Future Vol,veh/h 6 17 1082 2 7 979 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None None - None Storage Length 0 50 150 300 - Veh in Median Storage,# 1 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 7 18 1176 2 8 1064 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 1724 588 0 0 1178 0 Stage 1 1176 - - - - - Stage 2 548 - - Critical Hdwy 6.84 6.94 4.14 Critical Hdwy Stg 1 5.84 - - Critical Hdwy Stg 2 5.84 - - Follow-up Hdwy 3.52 3.32 2.22 Pot Cap-1 Maneuver 80 452 589 Stage 1 255 - - Stage 2 543 - - Platoon blocked, % Mov Cap-1 Maneuver 79 452 589 Mov Cap-2 Maneuver 188 - - Stage 1 255 Stage 2 535 Approach WB NB SIB HCM Control Delay,s 16.3 0 0.1 HCM LOS C Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT Capacity(veh/h) 188 452 589 HCM Lane V/C Ratio 0.035 0.041 0.013 HCM Control Delay(s) 24.8 13.3 11.2 HCM Lane LOS C B B HCM 95th %tile Q(veh) 0.1 0.1 0 HCM 6th TWSC Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Gibson Property Technical Appendix 2035 Future Conditions with Development—Capacity Analysis Worksheets with Mitigation 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Queues Gibson Property 1: Warrior Drive & Fairfax Pike Future with Development AM 2035 Mitigation t ' ► 41 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT SBR Lane Group Flow(vph) 159 718 424 176 685 139 85 101 75 299 167 v/c Ratio 0.60 0.87 0.47 0.70 0.88 0.16 0.62 0.45 0.23 1.06 0.37 Control Delay 23.4 44.2 13.1 28.6 45.8 2.0 58.7 25.6 38.1 122.6 7.8 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 23.4 44.2 13.1 28.6 45.8 2.0 58.7 25.6 38.1 122.6 7.8 Queue Length 50th(ft) 73 582 165 60 500 0 56 20 47 -327 0 Queue Length 95th(ft) 70 734 243 103 #733 25 #129 #86 92 #530 55 Internal Link Dist(ft) 593 4165 244 594 Turn Bay Length (ft) 260 500 270 575 190 150 Base Capacity(vph) 323 892 904 255 802 928 144 226 393 282 502 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.49 0.80 0.47 0.69 0.85 0.15 0.59 0.45 0.19 1.06 0.33 Intersection Summary Volume exceeds capacity,queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th Signalized Intersection Summary Gibson Property 1: Warrior Drive & Fairfax Pike Future with Development AM 2035 Mitigation --I. *-- t I" . Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t r + r + r Traffic Volume(veh/h) 146 661 390 162 630 128 78 25 68 69 275 154 Future Volume(veh/h) 146 661 390 162 630 128 78 25 68 69 275 154 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 0.99 0.99 0.98 0.95 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1841 1752 1796 1796 1722 1856 966 907 848 1870 1841 1781 Adj Flow Rate, veh/h 159 718 363 176 685 68 85 27 8 75 299 29 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 4 10 7 7 12 3 63 67 71 2 4 8 Cap,veh/h 307 941 956 270 906 888 140 102 30 294 204 247 Arrive On Green 0.06 0.54 0.54 0.06 0.53 0.53 0.09 0.15 0.15 0.05 0.11 0.11 Sat Flow,veh/h 1753 1752 1521 1711 1722 1537 920 670 198 1781 1841 1438 Grp Volume(v),veh/h 159 718 363 176 685 68 85 0 35 75 299 29 Grp Sat Flow(s),veh/h/In 1753 1752 1521 1711 1722 1537 920 0 868 1781 1841 1438 Q Serve(g_s),s 5.4 41.8 15.1 6.0 40.7 2.5 10.5 0.0 4.6 4.8 14.4 2.2 Cycle Q Clear(g_c),s 5.4 41.8 15.1 6.0 40.7 2.5 10.5 0.0 4.6 4.8 14.4 2.2 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.23 1.00 1.00 Lane Grp Cap(c),veh/h 307 941 956 270 906 888 140 0 132 294 204 247 V/C Ratio(X) 0.52 0.76 0.38 0.65 0.76 0.08 0.61 0.00 0.27 0.25 1.47 0.12 Avail Cap(c_a),veh/h 411 941 956 298 906 888 143 0 132 402 204 247 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.55 0.55 0.55 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay(d),s/veh 20.6 23.6 11.8 22.0 24.2 12.2 45.8 0.0 48.7 47.8 57.8 45.8 Incr Delay(d2),s/veh 1.4 5.8 1.1 2.4 3.3 0.1 7.0 0.0 1.1 0.5 234.7 0.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 2.1 17.5 5.4 2.4 16.2 0.9 2.7 0.0 1.1 2.2 20.0 0.8 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 21.9 29.4 12.9 24.4 27.5 12.3 52.8 0.0 49.8 48.2 292.5 46.0 LnGrp LOS C C B C C B D A D D F D Approach Vol,veh/h 1240 929 120 403 Approach Delay,s/veh 23.6 25.8 51.9 229.3 Approach LOS C C D F Timer-Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration(G+Y+Rc),s 16.3 74.2 13.1 26.4 14.9 75.6 18.5 21.0 Change Period(Y+Rc),s *8.7 *5.8 6.6 6.6 *6.8 5.8 6.6 6.6 Max Green Setting(Gmax),s *15 *60 14.4 12.4 * 10 67.2 12.4 14.4 Max Q Clear Time(g_c+I1),s 7.4 42.7 6.8 6.6 8.0 43.8 12.5 16.4 Green Ext Time(p-c),s 0.2 6.0 0.1 0.0 0.1 9.2 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 56.4 HCM 6th LOS E Notes User approved pedestrian interval to be less than phase max green. *HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Gibson Property 3: Route 522 & Fairfax Pike/Lord Fairfax Highway * Future with Development AM 2035 Mitigation --I. *-- I f t Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT SBR Lane Group Flow(vph) 288 322 263 118 234 323 518 212 101 382 191 v/c Ratio 0.85 0.86 0.53 0.45 0.78 0.77 0.69 0.41 0.69 0.66 0.45 Control Delay 66.3 65.8 9.2 45.7 58.0 59.4 45.0 5.4 73.5 37.2 11.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 66.3 65.8 9.2 45.7 58.0 59.4 45.0 5.4 73.5 37.2 11.3 Queue Length 50th(ft) 195 218 0 75 147 114 182 0 61 136 25 Queue Length 95th(ft) #369 #403 73 128 227 #177 243 41 #151 186 81 Internal Link Dist(ft) 382 694 8434 2104 Turn Bay Length (ft) 250 230 500 565 250 125 480 Base Capacity(vph) 338 373 494 321 363 422 761 518 153 583 430 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.85 0.86 0.53 0.37 0.64 0.77 0.68 0.41 0.66 0.66 0.44 Intersection Summary # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th Signalized Intersection Summary Gibson Property 3: Route 522 & Fairfax Pike/Lord Fairfax Highway Future with Development AM 2035 Mitigation --I. *-- `- t Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t r 1� tt r tt r Traffic Volume(veh/h) 265 296 242 109 153 63 297 477 195 93 351 176 Future Volume(veh/h) 265 296 242 109 153 63 297 477 195 93 351 176 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1767 1841 1663 1663 1767 1856 1722 1752 1707 1841 1618 1411 Adj Flow Rate, veh/h 288 322 36 118 166 53 323 518 35 101 382 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 9 4 16 16 9 3 12 10 13 4 19 33 Cap,veh/h 310 340 260 241 195 62 385 935 406 124 740 Arrive On Green 0.18 0.18 0.18 0.15 0.15 0.15 0.12 0.28 0.28 0.14 0.48 0.00 Sat Flow,veh/h 1682 1841 1409 1584 1283 410 3182 3328 1447 1753 3075 1196 Grp Volume(v),veh/h 288 322 36 118 0 219 323 518 35 101 382 0 Grp Sat Flow(s),veh/h/In 1682 1841 1409 1584 0 1693 1591 1664 1447 1753 1537 1196 Q Serve(g_s),s 18.5 19.0 2.4 7.5 0.0 13.9 10.9 14.6 2.0 6.1 9.4 0.0 Cycle Q Clear(g_c),s 18.5 19.0 2.4 7.5 0.0 13.9 10.9 14.6 2.0 6.1 9.4 0.0 Prop In Lane 1.00 1.00 1.00 0.24 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 310 340 260 241 0 257 385 935 406 124 740 V/C Ratio(X) 0.93 0.95 0.14 0.49 0.00 0.85 0.84 0.55 0.09 0.81 0.52 Avail Cap(c_a),veh/h 310 340 260 327 0 349 425 935 406 153 740 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 0.83 0.83 0.83 0.98 0.98 0.00 Uniform Delay(d),s/veh 44.1 44.3 37.5 42.7 0.0 45.4 47.3 33.7 29.1 46.5 24.1 0.0 Incr Delay(d2),s/veh 32.8 35.3 0.2 1.5 0.0 13.8 12.7 2.0 0.3 22.7 2.5 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 10.3 11.7 0.8 3.0 0.0 6.7 4.8 5.8 0.7 3.2 3.0 0.0 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 76.9 79.6 37.8 44.3 0.0 59.3 60.0 35.7 29.5 69.1 26.6 0.0 LnGrp LOS E E D D A E E D C E C Approach Vol,veh/h 646 337 876 483 Approach Delay,s/veh 76.1 54.0 44.4 35.5 Approach LOS E D D D Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration(G+Y+Rc),s 21.6 33.2 25.0 17.2 37.6 30.2 Change Period(Y+Rc),s 8.3 6.7 *8.3 *9.4 6.7 9.9 Max Green Setting(Gmax),s 14.7 19.1 *23 *9.6 23.1 20.3 Max Q Clear Time(g_c+I1),s 12.9 11.4 15.9 8.1 16.6 21.0 Green Ext Time(p-c),s 0.4 1.7 0.8 0.0 2.2 0.0 Intersection Summary HCM 6th Ctrl Delay 52.7 HCM 6th LOS D Notes *HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Unsignalized Delay for[SBR]is excluded from calculations of the approach delay and intersection delay. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Gibson Property 6: Lake Frederick Entrance/Gibson Site Entrance 1 & Fairfax Pilf@ture with Development AM 2035 Mitigation t ' ► Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT Lane Group Flow(vph) 88 876 50 39 635 100 133 105 30 26 v/c Ratio 0.17 0.69 0.05 0.11 0.52 0.09 0.67 0.24 0.16 0.05 Control Delay 3.0 8.2 0.2 4.0 10.8 1.7 50.7 1.2 32.8 0.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 3.0 8.2 0.2 4.0 10.8 1.7 50.7 1.2 32.8 0.2 Queue Length 50th(ft) 8 117 0 5 185 0 67 0 14 0 Queue Length 95th(ft) m11 122 m0 12 263 16 #136 0 39 0 Internal Link Dist(ft) 1336 1871 292 413 Turn Bay Length (ft) 150 150 150 150 50 Base Capacity(vph) 510 1279 1112 355 1232 1080 226 470 210 560 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.17 0.68 0.04 0.11 0.52 0.09 0.59 0.22 0.14 0.05 Intersection Summary # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Queues Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th Signalized Intersection Summary Gibson Property 6: Lake Frederick Entrance/Gibson Site Entrance 1 & Fairfax Pilf@ture with Development AM 2035 Mitigation --I. -'t *-- t Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations + r + r* 1 Traffic Volume(veh/h) 81 806 46 36 584 92 122 0 97 28 0 24 Future Volume(veh/h) 81 806 46 36 584 92 122 0 97 28 0 24 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 88 876 32 39 635 61 133 0 7 30 0 2 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap,veh/h 560 1291 1094 572 1247 1057 247 0 184 242 0 184 Arrive On Green 0.12 1.00 1.00 0.04 0.67 0.67 0.12 0.00 0.12 0.12 0.00 0.12 Sat Flow,veh/h 1781 1870 1585 1781 1870 1585 1415 0 1585 1409 0 1585 Grp Volume(v),veh/h 88 876 32 39 635 61 133 0 7 30 0 2 Grp Sat Flow(s),veh/h/In 1781 1870 1585 1781 1870 1585 1415 0 1585 1409 0 1585 Q Serve(g_s),s 1.2 0.0 0.0 0.5 14.6 1.1 7.8 0.0 0.3 1.6 0.0 0.1 Cycle Q Clear(g_c),s 1.2 0.0 0.0 0.5 14.6 1.1 7.9 0.0 0.3 2.0 0.0 0.1 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 560 1291 1094 572 1247 1057 247 0 184 242 0 184 V/C Ratio(X) 0.16 0.68 0.03 0.07 0.51 0.06 0.54 0.00 0.04 0.12 0.00 0.01 Avail Cap(c_a),veh/h 562 1291 1094 613 1247 1057 308 0 252 303 0 252 HCM Platoon Ratio 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.68 0.68 0.68 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay(d),s/veh 4.5 0.0 0.0 3.3 7.2 4.9 36.8 0.0 33.4 34.3 0.0 33.3 Incr Delay(d2),s/veh 0.1 2.0 0.0 0.0 0.3 0.0 1.8 0.0 0.1 0.2 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.3 0.7 0.0 0.1 4.3 0.3 2.8 0.0 0.1 0.6 0.0 0.0 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 4.6 2.0 0.0 3.3 7.5 4.9 38.6 0.0 33.5 34.5 0.0 33.3 LnGrp LOS A A A A A A D A C C A C Approach Vol,veh/h 996 735 140 32 Approach Delay,s/veh 2.1 7.1 38.3 34.4 Approach LOS A A D C Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration(G+Y+Rc),s 7.5 63.1 14.3 9.5 61.2 14.3 Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting(Gmax),s 5.0 53.0 13.5 5.1 52.9 13.5 Max Q Clear Time(g_c+11),s 2.5 2.0 9.9 3.2 16.6 4.0 Green Ext Time(p-c),s 0.0 7.5 0.1 0.0 4.5 0.0 Intersection Summary HCM 6th Ctrl Delay 7.2 HCM 6th LOS A HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Gibson Property 9: Route 522 & Gibson Site Entrance 4 Future with Development AM 2035 Mitigation -A --I. 4--- I* t Lane Group EBL EBT WBL WBT NBL NBT NBR SBL SBT SBR Lane Group Flow(vph) 29 12 16 1 39 774 58 2 664 100 v/c Ratio 0.29 0.03 0.15 0.00 0.06 0.26 0.04 0.00 0.24 0.08 Control Delay 55.1 0.2 49.3 0.0 1.8 2.7 1.1 4.0 5.5 0.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 55.1 0.2 49.3 0.0 1.8 2.7 1.1 4.0 5.5 0.1 Queue Length 50th(ft) 20 0 11 0 3 2 0 0 74 0 Queue Length 95th(ft) 49 0 33 0 m3 m222 m6 m2 87 1 Internal Link Dist(ft) 785 554 2104 1225 Turn Bay Length (ft) 300 150 300 150 Base Capacity(vph) 296 571 306 555 664 2934 1340 609 2738 1261 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.10 0.02 0.05 0.00 0.06 0.26 0.04 0.00 0.24 0.08 Intersection Summary m Volume for 95th percentile queue is metered by upstream signal. Queues Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th Signalized Intersection Summary Gibson Property 9: Route 522 & Gibson Site Entrance 4 Future with Development AM 2035 Mitigation Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 1� 1 tt r tt r Traffic Volume(veh/h) 27 0 11 15 0 1 36 712 53 2 611 92 Future Volume(veh/h) 27 0 11 15 0 1 36 712 53 2 611 92 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 29 0 0 16 0 0 39 774 40 2 664 65 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap,veh/h 114 64 0 114 64 0 579 2587 1154 559 2484 1108 Arrive On Green 0.03 0.00 0.00 0.03 0.00 0.00 0.06 1.00 1.00 0.00 0.70 0.70 Sat Flow,veh/h 1418 1870 0 1418 1870 0 1781 3554 1585 1781 3554 1585 Grp Volume(v),veh/h 29 0 0 16 0 0 39 774 40 2 664 65 Grp Sat Flow(s),veh/h/In 1418 1870 0 1418 1870 0 1781 1777 1585 1781 1777 1585 Q Serve(g_s),s 2.2 0.0 0.0 1.2 0.0 0.0 0.7 0.0 0.0 0.0 7.6 1.4 Cycle Q Clear(g_c),s 2.2 0.0 0.0 1.2 0.0 0.0 0.7 0.0 0.0 0.0 7.6 1.4 Prop In Lane 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 114 64 0 114 64 0 579 2587 1154 559 2484 1108 V/C Ratio(X) 0.26 0.00 0.00 0.14 0.00 0.00 0.07 0.30 0.03 0.00 0.27 0.06 Avail Cap(c_a),veh/h 363 393 0 376 410 0 680 2587 1154 695 2484 1108 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 0.00 0.59 0.59 0.59 1.00 1.00 1.00 Uniform Delay(d),s/veh 52.4 0.0 0.0 51.9 0.0 0.0 4.2 0.0 0.0 4.0 6.1 5.2 Incr Delay(d2),s/veh 1.2 0.0 0.0 0.6 0.0 0.0 0.0 0.2 0.0 0.0 0.3 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.8 0.0 0.0 0.5 0.0 0.0 0.2 0.1 0.0 0.0 2.2 0.4 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 53.6 0.0 0.0 52.5 0.0 0.0 4.2 0.2 0.0 4.0 6.4 5.3 LnGrp LOS D A A D A A A A A A A A Approach Vol,veh/h 29 16 853 731 Approach Delay,s/veh 53.6 52.5 0.4 6.3 Approach LOS D D A A Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration(G+Y+Rc),s 8.6 86.8 14.6 11.8 83.6 14.6 Change Period(Y+Rc),s 8.3 6.7 10.9 8.3 6.7 *11 Max Green Setting(Gmax),s 8.7 52.3 23.1 9.7 51.3 *24 Max Q Clear Time(g_c+I1),s 2.0 2.0 4.2 2.7 9.6 3.2 Green Ext Time(p-c),s 0.0 5.4 0.0 0.0 4.5 0.0 Intersection Summary HCM 6th Ctrl Delay 4.5 HCM 6th LOS A Notes *HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Gibson Property 1: Warrior Drive & Fairfax Pike Future with Development PM 2035 Mitigation t ' ► 41 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT SBR Lane Group Flow(vph) 307 833 182 161 930 150 200 254 109 60 379 v/c Ratio 1.04 0.92 0.16 0.84 1.18 0.17 0.69 1.17 0.47 0.37 0.81 Control Delay 93.5 47.5 2.8 59.8 126.2 2.2 50.5 148.9 41.6 53.4 42.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 93.5 47.5 2.8 59.8 126.2 2.2 50.5 148.9 41.6 53.4 42.1 Queue Length 50th(ft) -186 568 0 67 -791 0 120 -181 62 40 185 Queue Length 95th(ft) #357 #820 57 #185 #1034 26 #201 #351 111 83 301 Internal Link Dist(ft) 593 4165 244 594 Turn Bay Length (ft) 260 500 270 575 190 150 Base Capacity(vph) 295 901 1122 192 785 889 289 217 251 176 470 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 1.04 0.92 0.16 0.84 1.18 0.17 0.69 1.17 0.43 0.34 0.81 Intersection Summary Volume exceeds capacity,queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection Summary Gibson Property 1: Warrior Drive & Fairfax Pike Future with Development PM 2035 Mitigation --I. 4--- `- t I" . Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t r t r t r Traffic Volume(veh/h) 282 766 167 148 856 138 184 86 148 100 55 349 Future Volume(veh/h) 282 766 167 148 856 138 184 86 148 100 55 349 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 0.99 0.99 1.00 0.98 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1870 1841 1870 1693 1841 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 307 833 105 161 930 70 200 93 101 109 60 299 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 4 2 14 4 2 2 2 2 2 2 2 Cap,veh/h 298 1002 1012 256 847 826 299 96 105 197 177 354 Arrive On Green 0.13 0.54 0.54 0.06 0.46 0.46 0.09 0.12 0.12 0.07 0.09 0.09 Sat Flow,veh/h 1781 1841 1585 1612 1841 1552 1781 814 884 1781 1870 1560 Grp Volume(v),veh/h 307 833 105 161 930 70 200 0 194 109 60 299 Grp Sat Flow(s),veh/h/In 1781 1841 1585 1612 1841 1552 1781 0 1698 1781 1870 1560 Q Serve(g_s),s 14.3 41.5 2.8 4.8 50.6 2.4 10.4 0.0 12.5 6.0 3.3 10.4 Cycle Q Clear(g_c),s 14.3 41.5 2.8 4.8 50.6 2.4 10.4 0.0 12.5 6.0 3.3 10.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.52 1.00 1.00 Lane Grp Cap(c),veh/h 298 1002 1012 256 847 826 299 0 201 197 177 354 V/C Ratio(X) 1.03 0.83 0.10 0.63 1.10 0.08 0.67 0.00 0.96 0.55 0.34 0.85 Avail Cap(c_a),veh/h 298 1002 1012 289 847 826 299 0 201 256 177 354 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.14 0.14 0.14 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay(d),s/veh 36.3 20.9 7.7 20.7 29.7 12.7 41.1 0.0 48.3 41.3 46.6 40.9 Incr Delay(d2),s/veh 60.6 8.0 0.2 0.5 47.4 0.0 5.6 0.0 53.1 2.4 1.1 17.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 12.8 18.0 1.0 1.9 31.4 0.9 5.4 0.0 8.3 2.8 1.6 9.4 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 96.9 28.9 7.9 21.2 77.1 12.7 46.7 0.0 101.4 43.7 47.7 57.9 LnGrp LOS F C A C F B D A F D D E Approach Vol,veh/h 1245 1161 394 468 Approach Delay,s/veh 43.9 65.4 73.6 53.3 Approach LOS D E E D Timer-Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration(G+Y+Rc),s 23.0 56.5 14.4 19.6 13.7 65.8 17.0 17.0 Change Period(Y+Rc),s *8.7 *5.8 6.6 6.6 *6.8 5.8 6.6 6.6 Max Green Setting(Gmax),s *14 *47 11.4 9.4 *9.2 54.2 10.4 10.4 Max Q Clear Time(g_c+I1),s 16.3 52.6 8.0 14.5 6.8 43.5 12.4 12.4 Green Ext Time(p-c),s 0.0 0.0 0.1 0.0 0.1 5.7 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 56.5 HCM 6th LOS E Notes User approved pedestrian interval to be less than phase max green. *HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Queues Gibson Property 3: Route 522 & Fairfax Pike/Lord Fairfax Highway } Future with Development PM 2035 Mitigation -11 --1' *-- I f t Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT SBR Lane Group Flow(vph) 323 224 413 239 501 405 688 183 109 679 312 v/c Ratio 1.22 0.80 0.83 0.61 1.20 1.26 0.97 0.36 0.75 0.95 0.54 Control Delay 168.0 66.1 27.1 45.5 149.6 181.6 70.2 3.4 85.3 59.6 10.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 168.0 66.1 27.1 45.5 149.6 181.6 70.2 3.4 85.3 59.6 10.2 Queue Length 50th(ft) -280 154 67 152 -427 -185 256 0 80 231 24 Queue Length 95th(ft) #457 #277 #235 237 #637 #284 #380 20 #157 #370 126 Internal Link Dist(ft) 382 694 8434 2104 Turn Bay Length (ft) 250 230 500 565 250 125 480 Base Capacity(vph) 265 281 499 390 416 321 712 513 150 715 578 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 1.22 0.80 0.83 0.61 1.20 1.26 0.97 0.36 0.73 0.95 0.54 Intersection Summary Volume exceeds capacity,queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection Summary Gibson Property 3: Route 522 & Fairfax Pike/Lord Fairfax Highway Futures with Development PM 20I35 Mitigation --I. *-- I t Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t r tt r tt r Traffic Volume(veh/h) 297 206 380 220 361 100 373 633 168 100 625 287 Future Volume(veh/h) 297 206 380 220 361 100 373 633 168 100 625 287 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1796 1811 1796 1781 1826 1796 1811 1781 1796 1826 1811 1870 Adj Flow Rate, veh/h 323 224 128 239 392 99 405 688 26 109 679 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 7 6 7 8 5 7 6 8 7 5 6 2 Cap,veh/h 269 285 239 396 329 83 325 748 336 133 723 Arrive On Green 0.16 0.16 0.16 0.23 0.23 0.23 0.10 0.22 0.22 0.15 0.42 0.00 Sat Flow,veh/h 1711 1811 1522 1697 1407 355 3346 3385 1522 1739 3441 1585 Grp Volume(v),veh/h 323 224 128 239 0 491 405 688 26 109 679 0 Grp Sat Flow(s),veh/h/In 1711 1811 1522 1697 0 1762 1673 1692 1522 1739 1721 1585 Q Serve(g_s),s 17.3 13.1 8.5 13.8 0.0 25.7 10.7 21.9 1.5 6.7 20.8 0.0 Cycle Q Clear(g_c),s 17.3 13.1 8.5 13.8 0.0 25.7 10.7 21.9 1.5 6.7 20.8 0.0 Prop In Lane 1.00 1.00 1.00 0.20 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 269 285 239 396 0 412 325 748 336 133 723 V/C Ratio(X) 1.20 0.79 0.53 0.60 0.00 1.19 1.24 0.92 0.08 0.82 0.94 Avail Cap(c_a),veh/h 269 285 239 396 0 412 325 748 336 152 723 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 0.84 0.84 0.84 0.91 0.91 0.00 Uniform Delay(d),s/veh 46.3 44.6 42.6 37.6 0.0 42.2 49.7 41.9 34.0 45.9 31.2 0.0 Incr Delay(d2),s/veh 120.3 13.6 2.3 2.6 0.0 108.4 129.9 16.0 0.4 24.4 20.2 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 16.1 6.8 3.3 5.9 0.0 23.2 10.1 10.2 0.6 3.5 7.9 0.0 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 166.6 58.1 45.0 40.2 0.0 150.5 179.6 57.9 34.3 70.3 51.5 0.0 LnGrp LOS F E D D A F F E C E D Approach Vol,veh/h 675 730 1119 788 Approach Delay,s/veh 107.6 114.4 101.4 54.1 Approach LOS F F F D Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration(G+Y+Rc),s 19.0 29.8 34.0 17.8 31.0 27.2 Change Period(Y+Rc),s 8.3 6.7 *8.3 *9.4 6.7 9.9 Max Green Setting(Gmax),s 10.7 23.1 *26 *9.6 23.1 17.3 Max Q Clear Time(g_c+I1),s 12.7 22.8 27.7 8.7 23.9 19.3 Green Ext Time(p-c),s 0.0 0.2 0.0 0.0 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 94.3 HCM 6th LOS F Notes *HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Unsignalized Delay for[SBR]is excluded from calculations of the approach delay and intersection delay. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Queues Gibson Property 6: Lake Frederick Entrance/Gibson Site Entrance 1 & Fairfax Pilf@ture with Development PM 2035 Mitigation t ' ► Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT Lane Group Flow(vph) 36 907 116 92 1140 40 83 65 102 90 v/c Ratio 0.15 0.69 0.10 0.24 0.84 0.03 0.63 0.16 0.76 0.26 Control Delay 3.1 8.8 1.3 3.5 17.2 0.4 61.5 0.8 74.6 1.8 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 3.1 8.8 1.3 3.5 17.2 0.4 61.5 0.8 74.6 1.8 Queue Length 50th(ft) 2 139 0 7 419 0 45 0 56 0 Queue Length 95th(ft) m6 275 m5 14 #807 3 #121 0 #151 0 Internal Link Dist(ft) 1336 1871 292 413 Turn Bay Length (ft) 150 150 150 150 50 Base Capacity(vph) 233 1330 1164 378 1352 1169 132 405 135 345 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.15 0.68 0.10 0.24 0.84 0.03 0.63 0.16 0.76 0.26 Intersection Summary # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection Summary Gibson Property 6: Lake Frederick Entrance/Gibson Site Entrance 1 & Fairfax Pilf@ture with Development PM 2035 Mitigation --I. -'t *-- t Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t r + r 1 1� Traffic Volume(veh/h) 33 834 107 85 1049 37 76 0 60 94 0 83 Future Volume(veh/h) 33 834 107 85 1049 37 76 0 60 94 0 83 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 36 907 77 92 1140 27 83 0 2 102 0 2 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap,veh/h 288 1323 1121 609 1356 1150 203 0 137 203 0 137 Arrive On Green 0.07 1.00 1.00 0.05 0.73 0.73 0.09 0.00 0.09 0.09 0.00 0.09 Sat Flow,veh/h 1781 1870 1585 1781 1870 1585 1415 0 1585 1415 0 1585 Grp Volume(v),veh/h 36 907 77 92 1140 27 83 0 2 102 0 2 Grp Sat Flow(s),veh/h/In 1781 1870 1585 1781 1870 1585 1415 0 1585 1415 0 1585 Q Serve(g_s),s 0.4 0.0 0.0 1.1 37.3 0.4 5.0 0.0 0.1 6.2 0.0 0.1 Cycle Q Clear(g_c),s 0.4 0.0 0.0 1.1 37.3 0.4 5.1 0.0 0.1 6.3 0.0 0.1 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 288 1323 1121 609 1356 1150 203 0 137 203 0 137 V/C Ratio(X) 0.12 0.69 0.07 0.15 0.84 0.02 0.41 0.00 0.01 0.50 0.00 0.01 Avail Cap(c_a),veh/h 342 1323 1121 630 1356 1150 203 0 137 203 0 137 HCM Platoon Ratio 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.66 0.66 0.66 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay(d),s/veh 10.8 0.0 0.0 2.7 8.4 3.3 38.7 0.0 36.4 39.2 0.0 36.4 Incr Delay(d2),s/veh 0.1 1.9 0.1 0.1 4.9 0.0 1.3 0.0 0.0 1.9 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.3 0.7 0.0 0.2 10.9 0.1 1.8 0.0 0.0 2.2 0.0 0.0 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 10.9 1.9 0.1 2.8 13.3 3.3 40.0 0.0 36.4 41.2 0.0 36.4 LnGrp LOS B A A A B A D A D D A D Approach Vol,veh/h 1020 1259 85 104 Approach Delay,s/veh 2.1 12.3 39.9 41.1 Approach LOS A B D D Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration(G+Y+Rc),s 9.0 66.0 12.0 7.4 67.6 12.0 Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting(Gmax),s 5.5 60.5 7.5 5.5 60.5 7.5 Max Q Clear Time(g_c+11),s 3.1 2.0 7.1 2.4 39.3 8.3 Green Ext Time(p-c),s 0.0 8.3 0.0 0.0 9.7 0.0 Intersection Summary HCM 6th Ctrl Delay 10.3 HCM 6th LOS B HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Queues Gibson Property 9: Route 522 & Gibson Site Entrance 4 Future with Development PM 2035 Mitigation -A --I. 4--- I} I". t Lane Group EBL EBT WBL WBT NBL NBT NBR SBL SBT SBR Lane Group Flow(vph) 102 41 57 2 16 1074 23 1 1029 40 v/c Ratio 0.60 0.11 0.32 0.01 0.04 0.44 0.02 0.00 0.44 0.04 Control Delay 59.7 0.6 46.8 0.0 5.9 9.5 0.2 9.0 9.1 0.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 59.7 0.6 46.8 0.0 5.9 9.5 0.2 9.0 9.1 0.1 Queue Length 50th(ft) 69 0 37 0 1 2 0 0 105 0 Queue Length 95th(ft) 120 0 73 0 m6 m292 m0 m1 233 1 Internal Link Dist(ft) 785 554 2104 1225 Turn Bay Length (ft) 300 150 300 150 Base Capacity(vph) 296 495 297 505 416 2456 1148 394 2359 1109 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.34 0.08 0.19 0.00 0.04 0.44 0.02 0.00 0.44 0.04 Intersection Summary m Volume for 95th percentile queue is metered by upstream signal. Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection Summary Gibson Property 9: Route 522 & Gibson Site Entrance 4 Future with Development PM 2035 Mitigation } --I. 4--- `- t Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 1� 1 tt r tt r Traffic Volume(veh/h) 94 0 38 52 0 2 15 988 21 1 947 37 Future Volume(veh/h) 94 0 38 52 0 2 15 988 21 1 947 37 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 102 0 2 57 0 0 16 1074 14 1 1029 24 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap,veh/h 193 0 142 191 168 0 380 2393 1067 347 2335 1042 Arrive On Green 0.09 0.00 0.09 0.09 0.00 0.00 0.02 0.67 0.67 0.00 0.66 0.66 Sat Flow,veh/h 1418 0 1585 1415 1870 0 1781 3554 1585 1781 3554 1585 Grp Volume(v),veh/h 102 0 2 57 0 0 16 1074 14 1 1029 24 Grp Sat Flow(s),veh/h/In 1418 0 1585 1415 1870 0 1781 1777 1585 1781 1777 1585 Q Serve(g_s),s 7.8 0.0 0.1 4.2 0.0 0.0 0.3 15.6 0.3 0.0 15.4 0.6 Cycle Q Clear(g_c),s 7.8 0.0 0.1 4.3 0.0 0.0 0.3 15.6 0.3 0.0 15.4 0.6 Prop In Lane 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 193 0 142 191 168 0 380 2393 1067 347 2335 1042 V/C Ratio(X) 0.53 0.00 0.01 0.30 0.00 0.00 0.04 0.45 0.01 0.00 0.44 0.02 Avail Cap(c_a),veh/h 363 0 333 374 410 0 506 2393 1067 486 2335 1042 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 0.00 0.09 0.09 0.09 1.00 1.00 1.00 Uniform Delay(d),s/veh 49.1 0.0 45.6 47.6 0.0 0.0 7.0 8.4 5.9 6.9 9.1 6.6 Incr Delay(d2),s/veh 2.2 0.0 0.0 0.9 0.0 0.0 0.0 0.1 0.0 0.0 0.6 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 2.9 0.0 0.1 1.5 0.0 0.0 0.1 4.6 0.1 0.0 4.9 0.2 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 51.3 0.0 45.7 48.5 0.0 0.0 7.0 8.5 5.9 6.9 9.7 6.6 LnGrp LOS D A D D A A A A A A A A Approach Vol,veh/h 104 57 1104 1054 Approach Delay,s/veh 51.2 48.5 8.4 9.6 Approach LOS D D A A Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration(G+Y+Rc),s 8.5 80.8 20.8 10.2 79.0 20.8 Change Period(Y+Rc),s 8.3 6.7 10.9 8.3 6.7 *11 Max Green Setting(Gmax),s 8.7 52.3 23.1 9.7 51.3 *24 Max Q Clear Time(g_c+I1),s 2.0 17.6 9.8 2.3 17.4 6.3 Green Ext Time(p-c),s 0.0 7.9 0.2 0.0 7.5 0.1 Intersection Summary HCM 6th Ctrl Delay 11.9 HCM 6th LOS B Notes *HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Gibson Property Technical Appendix I. 2041 Future Conditions with Development — Capacity Analysis Worksheets 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com Queues Gibson Property 1: Warrior Drive & Fairfax Pike Future with Development AM 2041 t ' ► 41 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT SBR Lane Group Flow(vph) 166 739 424 176 704 147 85 101 78 299 175 v/c Ratio 0.63 0.87 0.47 0.70 0.89 0.16 0.64 0.47 0.24 1.12 0.38 Control Delay 24.6 44.1 12.8 29.1 46.4 2.0 60.9 26.7 39.0 139.3 7.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 24.6 44.1 12.8 29.1 46.4 2.0 60.9 26.7 39.0 139.3 7.7 Queue Length 50th(ft) 70 592 157 56 494 0 58 21 51 -346 0 Queue Length 95th(ft) 85 772 243 #110 #784 26 #127 #91 95 #530 56 Internal Link Dist(ft) 593 4165 244 594 Turn Bay Length (ft) 260 500 270 575 190 150 Base Capacity(vph) 320 892 912 253 807 942 141 215 383 268 498 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.52 0.83 0.46 0.70 0.87 0.16 0.60 0.47 0.20 1.12 0.35 Intersection Summary Volume exceeds capacity,queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th Signalized Intersection Summary Gibson Property 1: Warrior Drive & Fairfax Pike Future with Development AM 2041 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t r + r + r Traffic Volume(veh/h) 153 680 390 162 648 135 78 25 68 72 275 161 Future Volume(veh/h) 153 680 390 162 648 135 78 25 68 72 275 161 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 0.99 0.99 0.98 0.95 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1841 1752 1796 1796 1722 1856 966 907 848 1870 1841 1781 Adj Flow Rate, veh/h 166 739 366 176 704 74 85 27 7 78 299 29 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 4 10 7 7 12 3 63 67 71 2 4 8 Cap,veh/h 295 941 956 259 903 886 140 105 27 296 204 251 Arrive On Green 0.06 0.54 0.54 0.06 0.52 0.52 0.09 0.15 0.15 0.05 0.11 0.11 Sat Flow,veh/h 1753 1752 1521 1711 1722 1537 920 692 180 1781 1841 1438 Grp Volume(v),veh/h 166 739 366 176 704 74 85 0 34 78 299 29 Grp Sat Flow(s),veh/h/In 1753 1752 1521 1711 1722 1537 920 0 872 1781 1841 1438 Q Serve(g_s),s 5.6 43.9 15.3 6.0 42.8 2.8 10.5 0.0 4.5 5.0 14.4 2.2 Cycle Q Clear(g_c),s 5.6 43.9 15.3 6.0 42.8 2.8 10.5 0.0 4.5 5.0 14.4 2.2 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.21 1.00 1.00 Lane Grp Cap(c),veh/h 295 941 956 259 903 886 140 0 132 296 204 251 V/C Ratio(X) 0.56 0.79 0.38 0.68 0.78 0.08 0.61 0.00 0.26 0.26 1.47 0.12 Avail Cap(c_a),veh/h 395 941 956 287 903 886 143 0 132 402 204 251 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.54 0.54 0.54 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay(d),s/veh 21.7 24.1 11.8 23.2 24.9 12.3 45.9 0.0 48.7 47.7 57.8 45.6 Incr Delay(d2),s/veh 1.7 6.5 1.2 3.1 3.7 0.1 7.0 0.0 1.0 0.5 234.7 0.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 2.2 18.5 5.5 2.6 17.2 1.0 2.7 0.0 1.0 2.3 20.0 0.8 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 23.4 30.6 13.0 26.3 28.6 12.4 52.9 0.0 49.8 48.2 292.5 45.8 LnGrp LOS C C B C C B D A D D F D Approach Vol,veh/h 1271 954 119 406 Approach Delay,s/veh 24.6 26.9 52.0 228.0 Approach LOS C C D F Timer-Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration(G+Y+Rc),s 16.6 73.9 13.2 26.3 14.9 75.6 18.5 21.0 Change Period(Y+Rc),s *8.7 *5.8 6.6 6.6 *6.8 5.8 6.6 6.6 Max Green Setting(Gmax),s *15 *60 14.4 12.4 * 10 67.2 12.4 14.4 Max Q Clear Time(g_c+I1),s 7.6 44.8 7.0 6.5 8.0 45.9 12.5 16.4 Green Ext Time(p-c),s 0.2 5.9 0.1 0.0 0.1 9.1 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 56.6 HCM 6th LOS E Notes User approved pedestrian interval to be less than phase max green. *HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Gibson Property 2: Hudson Hollow Road/White Oak Road & Fairfax Pike Future with Development AM 2041 t Lane Group EBL EBT EBR WBL WBT WBR NBT SBT Lane Group Flow(vph) 241 709 23 3 608 37 101 241 v/c Ratio 0.60 0.70 0.02 0.01 0.77 0.05 0.43 0.63 Control Delay 12.8 16.3 0.0 4.7 22.9 0.6 24.5 19.5 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 12.8 16.3 0.0 4.7 22.9 0.6 24.5 19.5 Queue Length 50th(ft) 28 147 0 0 178 0 23 34 Queue Length 95th(ft) 76 #517 0 3 368 3 72 111 Internal Link Dist(ft) 4165 4595 176 167 Turn Bay Length (ft) 145 90 125 155 Base Capacity(vph) 404 1113 1010 426 1052 933 434 628 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.60 0.64 0.02 0.01 0.58 0.04 0.23 0.38 Intersection Summary # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th Signalized Intersection Summary Gibson Property 2: Hudson Hollow Road/White Oak Road & Fairfax Pike Future with Development AM 2041 --I. *-- t I" .. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations + r + r Traffic Volume(veh/h) 222 652 21 3 559 34 47 11 35 56 7 158 Future Volume(veh/h) 222 652 21 3 559 34 47 11 35 56 7 158 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1767 1752 1811 1870 1722 1737 1796 1752 1796 1826 1648 1707 Adj Flow Rate, veh/h 241 709 12 3 608 16 51 12 6 61 8 44 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 9 10 6 2 12 11 7 10 7 5 17 13 Cap,veh/h 400 951 833 305 789 675 261 55 19 184 38 79 Arrive On Green 0.09 0.54 0.54 0.00 0.46 0.46 0.15 0.15 0.15 0.15 0.15 0.15 Sat Flow,veh/h 1682 1752 1535 1781 1722 1472 1016 373 132 581 257 534 Grp Volume(v),veh/h 241 709 12 3 608 16 69 0 0 113 0 0 Grp Sat Flow(s),veh/h/In 1682 1752 1535 1781 1722 1472 1521 0 0 1373 0 0 Q Serve(g_s),s 4.3 17.5 0.2 0.0 16.6 0.3 0.0 0.0 0.0 2.1 0.0 0.0 Cycle Q Clear(g_c),s 4.3 17.5 0.2 0.0 16.6 0.3 2.0 0.0 0.0 4.1 0.0 0.0 Prop In Lane 1.00 1.00 1.00 1.00 0.74 0.09 0.54 0.39 Lane Grp Cap(c),veh/h 400 951 833 305 789 675 335 0 0 301 0 0 V/C Ratio(X) 0.60 0.75 0.01 0.01 0.77 0.02 0.21 0.00 0.00 0.38 0.00 0.00 Avail Cap(c_a),veh/h 400 1245 1091 456 1224 1046 736 0 0 691 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay(d),s/veh 10.3 9.9 5.9 8.5 12.8 8.3 21.3 0.0 0.0 22.1 0.0 0.0 Incr Delay(d2),s/veh 2.5 2.9 0.0 0.0 3.4 0.0 0.3 0.0 0.0 0.8 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 1.3 5.1 0.0 0.0 5.4 0.1 0.7 0.0 0.0 1.3 0.0 0.0 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 12.9 12.8 5.9 8.5 16.2 8.4 21.6 0.0 0.0 22.9 0.0 0.0 LnGrp LOS B B A A B A C A A C A A Approach Vol,veh/h 962 627 69 113 Approach Delay,s/veh 12.7 16.0 21.6 22.9 Approach LOS B B C C Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration(G+Y+Rc),s 4.7 38.4 13.2 9.5 33.6 13.2 Change Period(Y+Rc),s 4.5 7.8 4.9 4.5 7.8 4.9 Max Green Setting(Gmax),s 5.0 40.0 25.0 5.0 40.0 25.0 Max Q Clear Time(g_c+I1),s 2.0 19.5 4.0 6.3 18.6 6.1 Green Ext Time(p-c),s 0.0 8.4 0.2 0.0 7.2 0.5 Intersection Summary HCM 6th Ctrl Delay 14.9 HCM 6th LOS B HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Gibson Property 3: Route 522 & Fairfax Pike/Lord Fairfax Highway Future with Development AM 2041 --I. *-- t t Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT SBR Lane Group Flow(vph) 290 335 270 125 242 326 530 218 103 392 192 v/c Ratio 0.84 0.88 0.54 0.47 0.79 0.79 0.72 0.43 0.71 0.70 0.45 Control Delay 65.1 68.1 9.1 45.9 58.7 60.6 46.6 6.0 74.5 38.5 11.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 65.1 68.1 9.1 45.9 58.7 60.6 46.6 6.0 74.5 38.5 11.4 Queue Length 50th(ft) 197 231 0 79 152 116 186 0 64 140 26 Queue Length 95th(ft) #371 #423 75 135 235 #179 250 46 #155 188 79 Internal Link Dist(ft) 382 694 8434 2104 Turn Bay Length (ft) 250 230 500 565 250 125 480 Base Capacity(vph) 344 380 503 321 363 417 734 508 151 560 423 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.84 0.88 0.54 0.39 0.67 0.78 0.72 0.43 0.68 0.70 0.45 Intersection Summary # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th Signalized Intersection Summary Gibson Property 3: Route 522 & Fairfax Pike/Lord Fairfax Highway Future with Development AM 2041 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations + r 1� tt r tt r Traffic Volume(veh/h) 267 308 248 115 157 65 300 488 201 95 361 177 Future Volume(veh/h) 267 308 248 115 157 65 300 488 201 95 361 177 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1767 1841 1663 1663 1767 1856 1722 1752 1707 1841 1618 1411 Adj Flow Rate, veh/h 290 335 37 125 171 56 326 530 34 103 392 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 9 4 16 16 9 3 12 10 13 4 19 33 Cap,veh/h 310 340 260 248 200 65 388 915 398 126 723 Arrive On Green 0.18 0.18 0.18 0.16 0.16 0.16 0.12 0.27 0.27 0.14 0.47 0.00 Sat Flow,veh/h 1682 1841 1409 1584 1274 417 3182 3328 1447 1753 3075 1196 Grp Volume(v),veh/h 290 335 37 125 0 227 326 530 34 103 392 0 Grp Sat Flow(s),veh/h/In 1682 1841 1409 1584 0 1692 1591 1664 1447 1753 1537 1196 Q Serve(g_s),s 18.7 20.0 2.4 8.0 0.0 14.4 11.0 15.1 1.9 6.3 10.0 0.0 Cycle Q Clear(g_c),s 18.7 20.0 2.4 8.0 0.0 14.4 11.0 15.1 1.9 6.3 10.0 0.0 Prop In Lane 1.00 1.00 1.00 0.25 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 310 340 260 248 0 265 388 915 398 126 723 V/C Ratio(X) 0.93 0.99 0.14 0.50 0.00 0.86 0.84 0.58 0.09 0.81 0.54 Avail Cap(c_a),veh/h 310 340 260 327 0 349 425 915 398 153 723 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 0.83 0.83 0.83 0.98 0.98 0.00 Uniform Delay(d),s/veh 44.2 44.7 37.6 42.5 0.0 45.2 47.3 34.4 29.6 46.4 24.9 0.0 Incr Delay(d2),s/veh 34.2 45.0 0.2 1.6 0.0 14.9 12.9 2.2 0.4 23.3 2.8 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 10.5 13.1 0.8 3.2 0.0 7.0 4.8 6.0 0.7 3.3 3.2 0.0 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 78.4 89.7 37.8 44.1 0.0 60.1 60.2 36.6 30.0 69.7 27.8 0.0 LnGrp LOS E F D D A E E D C E C Approach Vol,veh/h 662 352 890 495 Approach Delay,s/veh 81.8 54.4 45.0 36.5 Approach LOS F D D D Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration(G+Y+Rc),s 21.7 32.6 25.5 17.3 36.9 30.2 Change Period(Y+Rc),s 8.3 6.7 *8.3 *9.4 6.7 9.9 Max Green Setting(Gmax),s 14.7 19.1 *23 *9.6 23.1 20.3 Max Q Clear Time(g_c+I1),s 13.0 12.0 16.4 8.3 17.1 22.0 Green Ext Time(p-c),s 0.4 1.6 0.8 0.0 2.1 0.0 Intersection Summary HCM 6th Ctrl Delay 54.8 HCM 6th LOS D Notes *HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Unsignalized Delay for[SBR]is excluded from calculations of the approach delay and intersection delay. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Gibson Property 4: Route 522 & Lake Frederick Drive I Future with Development AM 2041 * �4\ I t Lane Group EBL EBR NBL NBT SBU SBT SBR Lane Group Flow(vph) 161 100 40 879 2 684 62 v/c Ratio 0.51 0.18 0.11 0.54 0.01 0.60 0.11 Control Delay 37.8 7.4 9.6 14.5 8.0 23.1 5.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 37.8 7.4 9.6 14.5 8.0 23.1 5.6 Queue Length 50th(ft) 70 6 8 118 0 141 0 Queue Length 95th(ft) 155 41 23 284 3 232 25 Internal Link Dist(ft) 414 1077 8434 Turn Bay Length (ft) 470 275 295 Base Capacity(vph) 613 609 616 1964 620 1667 819 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.26 0.16 0.06 0.45 0.00 0.41 0.08 Intersection Summary Queues Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th Signalized Intersection Summary Gibson Property 4: Route 522 & Lake Frederick Drive I Future with Development AM 2041 -A * L 4\ I t Movement EBL EBR NBL NBT SBU SBT SBR Lane Configurations r tt A tt r Traffic Volume(veh/h) 148 92 37 809 2 629 57 Future Volume(veh/h) 148 92 37 809 2 629 57 Initial Q(Qb),veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow,veh/h/In 1870 1752 1589 1648 1604 1707 Adj Flow Rate, veh/h 161 39 40 879 684 17 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 10 21 17 20 13 Cap,veh/h 224 246 283 1370 1079 512 Arrive On Green 0.13 0.13 0.04 0.44 0.35 0.35 Sat Flow,veh/h 1781 1485 1513 3214 3127 1447 Grp Volume(v),veh/h 161 39 40 879 684 17 Grp Sat Flow(s),veh/h/In 1781 1485 1513 1566 1523 1447 Q Serve(g_s),s 5.4 0.0 0.0 13.6 11.6 0.5 Cycle Q Clear(g_c),s 5.4 0.0 0.0 13.6 11.6 0.5 Prop In Lane 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 224 246 283 1370 1079 512 V/C Ratio(X) 0.72 0.16 0.14 0.64 0.63 0.03 Avail Cap(c_a),veh/h 720 659 711 2277 1969 935 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay(d),s/veh 26.0 22.1 20.8 13.6 16.6 13.1 Incr Delay(d2),s/veh 5.1 0.4 0.3 1.1 1.3 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 2.5 0.7 0.4 3.7 3.3 0.1 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 31.1 22.5 21.0 14.7 18.0 13.1 LnGrp LOS C C C B B B Approach Vol,veh/h 200 919 701 Approach Delay,s/veh 29.4 15.0 17.9 Approach LOS C B B Timer-Assigned Phs 2 4 5 6 Phs Duration(G+Y+Rc),s 37.6 16.5 13.0 32.4 Change Period(Y+Rc),s 10.5 8.7 10.5 10.5 Max Green Setting(Gmax),s 45.0 25.0 20.0 40.0 Max Q Clear Time(g_c+11),s 15.6 7.4 2.0 13.6 Green Ext Time(p-c),s 11.5 0.7 0.1 8.3 Intersection Summary HCM 6th Ctrl Delay 17.7 HCM 6th LOS B Notes User approved ignoring U-Turning movement. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Gibson Property 5: Route 522 & Tasker Road } I Future with Development AM 2041 -AI t Lane Group EBL EBR NBL NBT SBT SBR Lane Group Flow(vph) 57 237 175 604 574 80 v/c Ratio 0.41 0.52 0.53 0.25 0.35 0.07 Control Delay 55.8 10.2 57.6 3.8 14.5 1.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 55.8 10.2 57.6 3.8 14.5 1.4 Queue Length 50th(ft) 39 0 65 26 108 0 Queue Length 95th(ft) 78 39 99 102 170 14 Internal Link Dist(ft) 446 1419 813 Turn Bay Length (ft) 250 485 315 Base Capacity(vph) 313 731 615 2433 1629 1316 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.18 0.32 0.28 0.25 0.35 0.06 Intersection Summary Queues Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM Signalized Intersection Capacity Analysis Gibson Property 5: Route 522 & Tasker Road * I Future with Development AM 2041 -AI L t Movement EBL EBR NBL NBT SBU SBT SBR Lane Configurations r r tt A tt r Traffic Volume(vph) 55 230 170 586 0 557 78 Future Volume(vph) 55 230 170 586 0 557 78 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 Total Lost time(s) 10.2 10.2 10.3 6.4 6.6 10.2 Lane Util.Factor 1.00 0.88 0.97 0.95 0.95 1.00 Frt 1.00 0.85 1.00 1.00 1.00 0.85 Flt Protected 0.95 1.00 0.95 1.00 1.00 1.00 Satd. Flow(prot) 1583 2733 3273 3195 2888 1583 Flt Permitted 0.95 1.00 0.95 1.00 1.00 1.00 Satd. Flow(perm) 1583 2733 3273 3195 2888 1583 Peak-hour factor, PHF 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Adj. Flow(vph) 57 237 175 604 0 574 80 RTOR Reduction(vph) 0 216 0 0 0 0 28 Lane Group Flow(vph) 57 21 175 604 0 574 52 Heavy Vehicles(%) 14% 4% 7% 13% 2% 25% 2% Turn Type Prot Prot Prot NA Prot NA pm+ov Protected Phases 7 4 1 6 5 2 7 Permitted Phases 4 2 Actuated Green, G (s) 9.6 9.6 11.2 83.8 62.1 71.7 Effective Green,g(s) 9.6 9.6 11.2 83.8 62.1 71.7 Actuated g/C Ratio 0.09 0.09 0.10 0.76 0.56 0.65 Clearance Time(s) 10.2 10.2 10.3 6.4 6.6 10.2 Vehicle Extension(s) 3.0 3.0 3.0 3.5 3.5 3.0 Lane Grp Cap(vph) 138 238 333 2434 1630 1031 v/s Ratio Prot c0.04 0.01 c0.05 0.19 c0.20 0.00 v/s Ratio Perm 0.03 v/c Ratio 0.41 0.09 0.53 0.25 0.35 0.05 Uniform Delay,d1 47.5 46.2 46.9 3.8 13.0 6.9 Progression Factor 1.00 1.00 1.11 0.87 1.00 1.00 Incremental Delay,d2 2.0 0.2 1.5 0.2 0.6 0.0 Delay(s) 49.5 46.3 53.8 3.6 13.6 6.9 Level of Service D D D A B A Approach Delay(s) 46.9 14.9 12.8 Approach LOS D B B Intersection Summary HCM 2000 Control Delay 19.5 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.38 Actuated Cycle Length(s) 110.0 Sum of lost time(s) 27.1 Intersection Capacity Utilization 49.6% ICU Level of Service A Analysis Period(min) 15 c Critical Lane Group HCM Signalized Intersection Capacity Analysis Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th Signalized Intersection Summary Gibson Property 5: Route 522 & Tasker Road Future with Development AM 2041 HCM 6th Edition methodology supports red clearance in the range of 0 to 6 seconds. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Gibson Property 6: Lake Frederick Entrance/Gibson Site Entrance 1 & Fairfax Pike Future with Development AM 2041 t ' ► Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT Lane Group Flow(vph) 88 901 50 39 643 100 133 105 30 26 v/c Ratio 0.17 0.71 0.05 0.11 0.52 0.09 0.69 0.24 0.17 0.05 Control Delay 2.0 8.2 0.2 3.8 10.5 1.7 53.6 1.4 33.6 0.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 2.0 8.2 0.2 3.8 10.5 1.7 53.6 1.4 33.6 0.2 Queue Length 50th(ft) 5 84 0 5 189 0 67 0 14 0 Queue Length 95th(ft) m5 534 m0 12 268 16 #136 0 39 0 Internal Link Dist(ft) 737 2471 292 413 Turn Bay Length (ft) 150 150 150 150 50 Base Capacity(vph) 512 1279 1112 345 1232 1080 218 455 203 549 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.17 0.70 0.04 0.11 0.52 0.09 0.61 0.23 0.15 0.05 Intersection Summary # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Queues Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th Signalized Intersection Summary Gibson Property 6: Lake Frederick Entrance/Gibson Site Entrance 1 & Fairfax Pike Future with Development AM 2041 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t r t r 1 Traffic Volume(veh/h) 81 829 46 36 592 92 122 0 97 28 0 24 Future Volume(veh/h) 81 829 46 36 592 92 122 0 97 28 0 24 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 88 901 32 39 643 62 133 0 7 30 0 2 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap,veh/h 555 1291 1094 389 1247 1057 247 0 184 242 0 184 Arrive On Green 0.06 0.69 0.69 0.04 0.67 0.67 0.12 0.00 0.12 0.12 0.00 0.12 Sat Flow,veh/h 1781 1870 1585 1781 1870 1585 1415 0 1585 1409 0 1585 Grp Volume(v),veh/h 88 901 32 39 643 62 133 0 7 30 0 2 Grp Sat Flow(s),veh/h/In 1781 1870 1585 1781 1870 1585 1415 0 1585 1409 0 1585 Q Serve(g_s),s 1.2 24.5 0.5 0.5 14.8 1.2 7.8 0.0 0.3 1.6 0.0 0.1 Cycle Q Clear(g_c),s 1.2 24.5 0.5 0.5 14.8 1.2 7.9 0.0 0.3 2.0 0.0 0.1 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 555 1291 1094 389 1247 1057 247 0 184 242 0 184 V/C Ratio(X) 0.16 0.70 0.03 0.10 0.52 0.06 0.54 0.00 0.04 0.12 0.00 0.01 Avail Cap(c_a),veh/h 557 1291 1094 431 1247 1057 308 0 252 303 0 252 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.68 0.68 0.68 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay(d),s/veh 4.8 7.9 4.2 7.1 7.2 4.9 36.8 0.0 33.4 34.3 0.0 33.3 Incr Delay(d2),s/veh 0.1 2.2 0.0 0.1 0.4 0.0 1.8 0.0 0.1 0.2 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.3 7.3 0.1 0.1 4.4 0.3 2.8 0.0 0.1 0.6 0.0 0.0 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 4.9 10.0 4.2 7.2 7.6 4.9 38.6 0.0 33.5 34.5 0.0 33.3 LnGrp LOS A B A A A A D A C C A C Approach Vol,veh/h 1021 744 140 32 Approach Delay,s/veh 9.4 7.3 38.3 34.4 Approach LOS A A D C Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration(G+Y+Rc),s 7.5 63.1 14.3 9.5 61.2 14.3 Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting(Gmax),s 5.0 53.0 13.5 5.1 52.9 13.5 Max Q Clear Time(g_c+11),s 2.5 26.5 9.9 3.2 16.8 4.0 Green Ext Time(p-c),s 0.0 7.1 0.1 0.0 4.6 0.0 Intersection Summary HCM 6th Ctrl Delay 11.1 HCM 6th LOS B HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th TWSC Gibson Property 7: Fairfax Pike & Gibson Site Entrance 2 Future with Development AM 2041 Intersection Int Delay,s/veh 0.1 Movement EBL EBT WBT WBR SBL SBR Lane Configurations t T r* Traffic Vol,veh/h 0 953 707 3 0 13 Future Vol,veh/h 0 953 707 3 0 13 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized None None None Storage Length - Veh in Median Storage,# 0 0 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 1036 768 3 0 14 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 0 0 770 Stage 1 - - - Stage 2 - Critical Hdwy 6.22 Critical Hdwy Stg 1 - Critical Hdwy Stg 2 - Follow-up Hdwy 3.318 Pot Cap-1 Maneuver 0 0 401 Stage 1 0 0 - Stage 2 0 0 - Platoon blocked, % Mov Cap-1 Maneuver - - 401 Mov Cap-2 Maneuver Stage 1 Stage 2 Approach EB WB SIB HCM Control Delay,s 0 0 14.3 HCM LOS B Minor Lane/Major Mvmt EBT WBT WBR SBLn1 Capacity(veh/h) 401 HCM Lane V/C Ratio 0.035 HCM Control Delay(s) 14.3 HCM Lane LOS B HCM 95th %tile Q(veh) 0.1 HCM 6th TWSC Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th TWSC Gibson Property 8: Fairfax Pike & Gibson Site Entrance 3 Future with Development AM 2041 Intersection Int Delay,s/veh 0.5 Movement EBL EBT WBT WBR SBL SBR Lane Configurations t 1 r* Traffic Vol,veh/h 48 905 709 14 5 1 Future Vol,veh/h 48 905 709 14 5 1 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None None - None Storage Length 150 - 0 50 Veh in Median Storage,# - 0 0 0 - Grade, % - 0 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 52 984 771 15 5 1 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 786 0 0 1867 779 Stage 1 - - - 779 - Stage 2 - 1088 - Critical Hdwy 4.12 6.42 6.22 Critical Hdwy Stg 1 - 5.42 - Critical Hdwy Stg 2 - 5.42 - Follow-up Hdwy 2.218 3.518 3.318 Pot Cap-1 Maneuver 833 80 396 Stage 1 - 452 - Stage 2 - 323 - Platoon blocked, % Mov Cap-1 Maneuver 833 75 396 Mov Cap-2 Maneuver - 75 - Stage 1 424 Stage 2 323 Approach EB WB SIB HCM Control Delay,s 0.5 0 49.6 HCM LOS E Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 SBLn2 Capacity(veh/h) 833 75 396 HCM Lane V/C Ratio 0.063 0.072 0.003 HCM Control Delay(s) 9.6 56.7 14.1 HCM Lane LOS A F B HCM 95th %tile Q(veh) 0.2 0.2 0 HCM 6th TWSC Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Gibson Property 9: Route 522 & Gibson Site Entrance 4 Future with Development AM 2041 -A --I. 4--- I* t Lane Group EBL EBT WBL WBT NBL NBT NBR SBL SBT SBR Lane Group Flow(vph) 29 12 16 1 39 789 58 2 691 100 v/c Ratio 0.29 0.03 0.15 0.00 0.07 0.27 0.04 0.00 0.25 0.08 Control Delay 55.1 0.2 49.3 0.0 1.8 2.8 1.2 4.0 5.6 0.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 55.1 0.2 49.3 0.0 1.8 2.8 1.2 4.0 5.6 0.1 Queue Length 50th(ft) 20 0 11 0 3 2 0 0 78 0 Queue Length 95th(ft) 49 0 33 0 m3 m229 m6 m2 92 1 Internal Link Dist(ft) 785 554 2104 1225 Turn Bay Length (ft) 300 150 300 150 Base Capacity(vph) 296 562 306 551 647 2934 1340 598 2738 1261 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.10 0.02 0.05 0.00 0.06 0.27 0.04 0.00 0.25 0.08 Intersection Summary m Volume for 95th percentile queue is metered by upstream signal. Queues Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th Signalized Intersection Summary Gibson Property 9: Route 522 & Gibson Site Entrance 4 Future with Development AM 2041 } --I. *-- t /".. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 1� 1 tt r tt r Traffic Volume(veh/h) 27 0 11 15 0 1 36 726 53 2 636 92 Future Volume(veh/h) 27 0 11 15 0 1 36 726 53 2 636 92 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 29 0 0 16 0 0 39 789 40 2 691 65 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap,veh/h 114 64 0 114 64 0 565 2587 1154 552 2484 1108 Arrive On Green 0.03 0.00 0.00 0.03 0.00 0.00 0.06 1.00 1.00 0.00 0.70 0.70 Sat Flow,veh/h 1418 1870 0 1418 1870 0 1781 3554 1585 1781 3554 1585 Grp Volume(v),veh/h 29 0 0 16 0 0 39 789 40 2 691 65 Grp Sat Flow(s),veh/h/In 1418 1870 0 1418 1870 0 1781 1777 1585 1781 1777 1585 Q Serve(g_s),s 2.2 0.0 0.0 1.2 0.0 0.0 0.7 0.0 0.0 0.0 8.0 1.4 Cycle Q Clear(g_c),s 2.2 0.0 0.0 1.2 0.0 0.0 0.7 0.0 0.0 0.0 8.0 1.4 Prop In Lane 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 114 64 0 114 64 0 565 2587 1154 552 2484 1108 V/C Ratio(X) 0.26 0.00 0.00 0.14 0.00 0.00 0.07 0.31 0.03 0.00 0.28 0.06 Avail Cap(c_a),veh/h 363 393 0 376 410 0 666 2587 1154 688 2484 1108 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 0.00 0.56 0.56 0.56 1.00 1.00 1.00 Uniform Delay(d),s/veh 52.4 0.0 0.0 51.9 0.0 0.0 4.2 0.0 0.0 4.0 6.2 5.2 Incr Delay(d2),s/veh 1.2 0.0 0.0 0.6 0.0 0.0 0.0 0.2 0.0 0.0 0.3 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.8 0.0 0.0 0.5 0.0 0.0 0.2 0.1 0.0 0.0 2.3 0.4 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 53.6 0.0 0.0 52.5 0.0 0.0 4.3 0.2 0.0 4.0 6.5 5.3 LnGrp LOS D A A D A A A A A A A A Approach Vol,veh/h 29 16 868 758 Approach Delay,s/veh 53.6 52.5 0.3 6.4 Approach LOS D D A A Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration(G+Y+Rc),s 8.6 86.8 14.6 11.8 83.6 14.6 Change Period(Y+Rc),s 8.3 6.7 10.9 8.3 6.7 *11 Max Green Setting(Gmax),s 8.7 52.3 23.1 9.7 51.3 *24 Max Q Clear Time(g_c+I1),s 2.0 2.0 4.2 2.7 10.0 3.2 Green Ext Time(p-c),s 0.0 5.5 0.0 0.0 4.7 0.0 Intersection Summary HCM 6th Ctrl Delay 4.5 HCM 6th LOS A Notes *HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th TWSC Gibson Property 10: Route 522 & Gibson Site Entrance 5 Future with Development AM 2041 Intersection Int Delay,s/veh 0.2 Movement WBL WBR NBT NBR SBL SBT Lane Configurations r tt r ) tt Traffic Vol,veh/h 2 5 748 6 17 728 Future Vol,veh/h 2 5 748 6 17 728 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None None - None Storage Length 0 50 150 300 - Veh in Median Storage,# 1 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 2 5 813 7 18 791 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 1245 407 0 0 820 0 Stage 1 813 - - - - - Stage 2 432 - - Critical Hdwy 6.84 6.94 4.14 Critical Hdwy Stg 1 5.84 - - Critical Hdwy Stg 2 5.84 - - Follow-up Hdwy 3.52 3.32 2.22 Pot Cap-1 Maneuver 166 593 805 Stage 1 396 - - Stage 2 622 - - Platoon blocked, % Mov Cap-1 Maneuver 162 593 805 Mov Cap-2 Maneuver 288 - - Stage 1 396 Stage 2 608 Approach WB NB SIB HCM Control Delay,s 13 0 0.2 HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT Capacity(veh/h) 288 593 805 HCM Lane V/C Ratio 0.008 0.009 0.023 HCM Control Delay(s) 17.6 11.1 9.6 HCM Lane LOS C B A HCM 95th %tile Q(veh) 0 0 0.1 HCM 6th TWSC Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM Queues Gibson Property 1: Warrior Drive & Fairfax Pike Future with Development PM 2041 t 41 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT SBR Lane Group Flow(vph) 321 859 182 161 959 158 200 254 114 60 397 v/c Ratio 1.09 0.95 0.16 0.83 1.22 0.18 0.69 1.18 0.49 0.37 0.84 Control Delay 107.9 52.2 2.7 58.3 141.1 2.1 50.5 152.5 42.2 53.4 46.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 107.9 52.2 2.7 58.3 141.1 2.1 50.5 152.5 42.2 53.4 46.1 Queue Length 50th(ft) -206 591 0 66 -834 0 120 -183 65 40 200 Queue Length 95th(ft) #381 #860 56 #183 #1078 26 #200 #351 115 83 #345 Internal Link Dist(ft) 593 4165 244 594 Turn Bay Length (ft) 260 500 270 575 190 150 Base Capacity(vph) 295 901 1122 193 785 893 289 215 251 176 470 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 1.09 0.95 0.16 0.83 1.22 0.18 0.69 1.18 0.45 0.34 0.84 Intersection Summary Volume exceeds capacity,queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection Summary Gibson Property 1: Warrior Drive & Fairfax Pike Future with Development PM 2041 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations + r + r + r Traffic Volume(veh/h) 295 790 167 148 882 145 184 86 148 105 55 365 Future Volume(veh/h) 295 790 167 148 882 145 184 86 148 105 55 365 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 0.99 0.99 1.00 0.98 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1870 1841 1870 1693 1841 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 321 859 104 161 959 74 200 93 101 114 60 317 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 4 2 14 4 2 2 2 2 2 2 2 Cap,veh/h 298 1002 1012 243 847 830 298 94 102 198 177 354 Arrive On Green 0.13 0.54 0.54 0.06 0.46 0.46 0.09 0.12 0.12 0.07 0.09 0.09 Sat Flow,veh/h 1781 1841 1585 1612 1841 1552 1781 814 884 1781 1870 1560 Grp Volume(v),veh/h 321 859 104 161 959 74 200 0 194 114 60 317 Grp Sat Flow(s),veh/h/In 1781 1841 1585 1612 1841 1552 1781 0 1698 1781 1870 1560 Q Serve(g_s),s 14.3 43.9 2.8 4.8 50.6 2.6 10.4 0.0 12.6 6.3 3.3 10.4 Cycle Q Clear(g_c),s 14.3 43.9 2.8 4.8 50.6 2.6 10.4 0.0 12.6 6.3 3.3 10.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.52 1.00 1.00 Lane Grp Cap(c),veh/h 298 1002 1012 243 847 830 298 0 196 198 177 354 V/C Ratio(X) 1.08 0.86 0.10 0.66 1.13 0.09 0.67 0.00 0.99 0.58 0.34 0.90 Avail Cap(c_a),veh/h 298 1002 1012 276 847 830 298 0 196 252 177 354 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.09 0.09 0.09 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay(d),s/veh 36.3 21.4 7.7 22.0 29.7 12.6 41.1 0.0 48.6 41.2 46.6 41.5 Incr Delay(d2),s/veh 74.8 9.4 0.2 0.5 61.3 0.0 5.7 0.0 60.5 2.6 1.1 24.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 14.0 19.3 1.0 2.0 34.7 0.9 5.4 0.0 8.6 2.9 1.6 10.7 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 111.1 30.9 7.9 22.5 91.0 12.6 46.8 0.0 109.1 43.8 47.7 65.8 LnGrp LOS F C A C F B D A F D D E Approach Vol,veh/h 1284 1194 394 491 Approach Delay,s/veh 49.1 76.9 77.5 58.5 Approach LOS D E E E Timer-Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration(G+Y+Rc),s 23.0 56.5 14.7 19.3 13.7 65.8 17.0 17.0 Change Period(Y+Rc),s *8.7 *5.8 6.6 6.6 *6.8 5.8 6.6 6.6 Max Green Setting(Gmax),s *14 *47 11.4 9.4 *9.2 54.2 10.4 10.4 Max Q Clear Time(g_c+I1),s 16.3 52.6 8.3 14.6 6.8 45.9 12.4 12.4 Green Ext Time(p-c),s 0.0 0.0 0.1 0.0 0.1 4.8 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 63.6 HCM 6th LOS E Notes User approved pedestrian interval to be less than phase max green. *HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Queues Gibson Property 2: Hudson Hollow Road/White Oak Road & Fairfax Pike Future with Development PM 2041 t Lane Group EBL EBT EBR WBL WBT WBR NBT SBT Lane Group Flow(vph) 165 688 48 31 987 50 83 249 v/c Ratio 0.75 0.63 0.05 0.07 1.01 0.06 0.65 0.63 Control Delay 34.0 14.1 1.2 4.0 50.2 1.3 49.6 17.9 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 34.0 14.1 1.2 4.0 50.2 1.3 49.6 17.9 Queue Length 50th(ft) 19 131 0 3 396 0 31 32 Queue Length 95th(ft) #129 401 8 12 #770 8 77 100 Internal Link Dist(ft) 4165 4595 176 167 Turn Bay Length (ft) 145 90 125 155 Base Capacity(vph) 221 1092 1013 465 980 894 264 652 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.75 0.63 0.05 0.07 1.01 0.06 0.31 0.38 Intersection Summary # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection Summary Gibson Property 2: Hudson Hollow Road/White Oak Road & Fairfax Pike Future with Development PM 2041 --p- .4- t I Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t r t r Traffic Volume(veh/h) 162 674 47 30 967 49 46 23 13 29 32 182 Future Volume(veh/h) 162 674 47 30 967 49 46 23 13 29 32 182 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1870 1781 1870 1841 1826 1870 1870 1752 1870 1870 1841 1870 Adj Flow Rate, veh/h 165 688 29 31 987 28 47 23 4 30 33 38 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 2 8 2 4 5 2 2 10 2 2 4 2 Cap,veh/h 253 1069 952 411 1030 894 185 76 10 106 84 75 Arrive On Green 0.07 0.60 0.60 0.03 0.56 0.56 0.12 0.12 0.12 0.12 0.12 0.12 Sat Flow,veh/h 1781 1781 1585 1753 1826 1585 827 621 83 323 688 610 Grp Volume(v),veh/h 165 688 29 31 987 28 74 0 0 101 0 0 Grp Sat Flow(s),veh/h/In 1781 1781 1585 1753 1826 1585 1531 0 0 1621 0 0 Q Serve(g_s),s 2.6 17.7 0.5 0.5 36.0 0.6 0.0 0.0 0.0 1.2 0.0 0.0 Cycle Q Clear(g_c),s 2.6 17.7 0.5 0.5 36.0 0.6 2.8 0.0 0.0 3.9 0.0 0.0 Prop In Lane 1.00 1.00 1.00 1.00 0.64 0.05 0.30 0.38 Lane Grp Cap(c),veh/h 253 1069 952 411 1030 894 271 0 0 265 0 0 V/C Ratio(X) 0.65 0.64 0.03 0.08 0.96 0.03 0.27 0.00 0.00 0.38 0.00 0.00 Avail Cap(c_a),veh/h 258 1069 952 479 1040 903 594 0 0 632 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay(d),s/veh 16.1 9.1 5.7 7.1 14.5 6.8 28.3 0.0 0.0 28.7 0.0 0.0 Incr Delay(d2),s/veh 5.6 1.9 0.0 0.1 18.8 0.0 0.5 0.0 0.0 0.9 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 1.6 5.3 0.1 0.1 16.0 0.1 1.1 0.0 0.0 1.5 0.0 0.0 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 21.7 11.0 5.7 7.2 33.4 6.8 28.8 0.0 0.0 29.6 0.0 0.0 LnGrp LOS C B A A C A C A A C A A Approach Vol,veh/h 882 1046 74 101 Approach Delay,s/veh 12.8 31.9 28.8 29.6 Approach LOS B C C C Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc),s 6.8 50.0 13.5 9.3 47.4 13.5 Change Period (Y+Rc),s 4.5 7.8 4.9 4.5 7.8 4.9 Max Green Setting(Gmax),s 5.0 40.0 25.0 5.0 40.0 25.0 Max Q Clear Time(g_c+I1),s 2.5 19.7 4.8 4.6 38.0 5.9 Green Ext Time(p-c),s 0.0 8.2 0.3 0.0 1.6 0.4 Intersection Summary HCM 6th Ctrl Delay 23.7 HCM 6th LOS C HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:415 PM to 5:15 PM Queues Gibson Property 3: Route 522 & Fairfax Pike/Lord Fairfax Highway Future with Development PM 2041 -11 --1' *-- t f t Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT SBR Lane Group Flow(vph) 326 230 422 252 523 412 705 188 111 696 312 v/c Ratio 1.23 0.82 0.86 0.65 1.26 1.28 0.99 0.37 0.76 0.97 0.54 Control Delay 172.1 68.4 31.6 46.8 169.8 189.8 75.9 3.7 86.2 64.0 10.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 172.1 68.4 31.6 46.8 169.8 189.8 75.9 3.7 86.2 64.0 10.1 Queue Length 50th(ft) -285 159 83 161 -460 -190 -265 0 81 234 25 Queue Length 95th(ft) #462 #287 #261 251 #671 #290 #394 24 #162 #386 99 Internal Link Dist(ft) 382 694 8434 2104 Turn Bay Length (ft) 250 230 500 565 250 125 480 Base Capacity(vph) 265 281 491 390 416 321 710 512 150 715 578 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 1.23 0.82 0.86 0.65 1.26 1.28 0.99 0.37 0.74 0.97 0.54 Intersection Summary Volume exceeds capacity,queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection Summary Gibson Property 3: Route 522 & Fairfax Pike/Lord Fairfax Highway Future with Development PM 2041 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t r tt r tt r Traffic Volume(veh/h) 300 212 388 232 376 105 379 649 173 102 640 287 Future Volume(veh/h) 300 212 388 232 376 105 379 649 173 102 640 287 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1796 1811 1796 1781 1826 1796 1811 1781 1796 1826 1811 1870 Adj Flow Rate, veh/h 326 230 145 252 409 104 412 705 27 111 696 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 7 6 7 8 5 7 6 8 7 5 6 2 Cap,veh/h 269 285 239 396 328 83 325 744 335 135 723 Arrive On Green 0.16 0.16 0.16 0.23 0.23 0.23 0.10 0.22 0.22 0.15 0.42 0.00 Sat Flow,veh/h 1711 1811 1522 1697 1404 357 3346 3385 1522 1739 3441 1585 Grp Volume(v),veh/h 326 230 145 252 0 513 412 705 27 111 696 0 Grp Sat Flow(s),veh/h/In 1711 1811 1522 1697 0 1762 1673 1692 1522 1739 1721 1585 Q Serve(g_s),s 17.3 13.5 9.8 14.7 0.0 25.7 10.7 22.6 1.5 6.8 21.7 0.0 Cycle Q Clear(g_c),s 17.3 13.5 9.8 14.7 0.0 25.7 10.7 22.6 1.5 6.8 21.7 0.0 Prop In Lane 1.00 1.00 1.00 0.20 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 269 285 239 396 0 412 325 744 335 135 723 V/C Ratio(X) 1.21 0.81 0.61 0.64 0.00 1.25 1.27 0.95 0.08 0.82 0.96 Avail Cap(c_a),veh/h 269 285 239 396 0 412 325 744 335 152 723 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 0.84 0.84 0.84 0.90 0.90 0.00 Uniform Delay(d),s/veh 46.3 44.7 43.2 37.9 0.0 42.2 49.7 42.3 34.1 45.8 31.5 0.0 Incr Delay(d2),s/veh 124.5 15.7 4.3 3.3 0.0 129.8 138.7 19.9 0.4 24.8 24.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 16.5 7.1 3.9 6.3 0.0 25.6 10.5 10.9 0.6 3.5 8.4 0.0 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 170.9 60.4 47.5 41.3 0.0 171.9 188.3 62.2 34.5 70.6 55.5 0.0 LnGrp LOS F E D D A F F E C E E Approach Vol,veh/h 701 765 1144 807 Approach Delay,s/veh 109.1 128.9 107.0 57.5 Approach LOS F F F E Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration(G+Y+Rc),s 19.0 29.8 34.0 17.9 30.9 27.2 Change Period(Y+Rc),s 8.3 6.7 *8.3 *9.4 6.7 9.9 Max Green Setting(Gmax),s 10.7 23.1 *26 *9.6 23.1 17.3 Max Q Clear Time(g_c+I1),s 12.7 23.7 27.7 8.8 24.6 19.3 Green Ext Time(p-c),s 0.0 0.0 0.0 0.0 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 100.6 HCM 6th LOS F Notes *HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Unsignalized Delay for[SBR]is excluded from calculations of the approach delay and intersection delay. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Queues Gibson Property 4: Route 522 & Lake Frederick Drive I Future with Development PM 2041 4\ t t Lane Group EBL EBR NBL NBT SBT SBR Lane Group Flow(vph) 184 99 124 1067 1089 210 v/c Ratio 0.63 0.19 0.42 0.51 0.80 0.27 Control Delay 47.5 18.0 21.0 10.9 30.6 4.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 47.5 18.0 21.0 10.9 30.6 4.0 Queue Length 50th(ft) 105 34 27 164 290 0 Queue Length 95th(ft) 182 69 58 256 #456 46 Internal Link Dist(ft) 414 1077 8434 Turn Bay Length (ft) 470 295 Base Capacity(vph) 473 514 488 2104 1419 798 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.39 0.19 0.25 0.51 0.77 0.26 Intersection Summary # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection Summary Gibson Property 4: Route 522 & Lake Frederick Drive I Future with Development PM 2041 -A * L 4\ I t Movement EBL EBR NBL NBT SBU SBT SBR Lane Configurations r tt A tt r Traffic Volume(veh/h) 169 91 114 982 0 1002 193 Future Volume(veh/h) 169 91 114 982 0 1002 193 Initial Q(Qb),veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow,veh/h/In 1870 1722 1826 1781 1767 1870 Adj Flow Rate, veh/h 184 87 124 1067 1089 76 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 12 5 8 9 2 Cap,veh/h 242 285 267 1484 1445 682 Arrive On Green 0.14 0.14 0.06 0.44 0.43 0.43 Sat Flow,veh/h 1781 1459 1739 3474 3445 1585 Grp Volume(v),veh/h 184 87 124 1067 1089 76 Grp Sat Flow(s),veh/h/In 1781 1459 1739 1692 1678 1585 Q Serve(g_s),s 7.9 0.0 0.0 20.5 21.7 2.3 Cycle Q Clear(g_c),s 7.9 0.0 0.0 20.5 21.7 2.3 Prop In Lane 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 242 285 267 1484 1445 682 V/C Ratio(X) 0.76 0.31 0.46 0.72 0.75 0.11 Avail Cap(c_a),veh/h 562 546 603 1921 1693 800 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay(d),s/veh 33.0 27.3 31.4 18.3 19.0 13.5 Incr Delay(d2),s/veh 5.8 0.7 1.5 1.6 2.3 0.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 3.7 2.0 2.2 6.9 7.3 0.7 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 38.8 28.0 32.9 19.8 21.3 13.7 LnGrp LOS D C C B C B Approach Vol,veh/h 271 1191 1165 Approach Delay,s/veh 35.4 21.2 20.8 Approach LOS D C C Timer-Assigned Phs 2 4 5 6 Phs Duration(G+Y+Rc),s 45.3 19.5 15.2 44.6 Change Period(Y+Rc),s 10.5 8.7 10.5 10.5 Max Green Setting(Gmax),s 45.0 25.0 20.0 40.0 Max Q Clear Time(g_c+11),s 22.5 9.9 2.0 23.7 Green Ext Time(p-c),s 12.3 0.9 0.3 10.4 Intersection Summary HCM 6th Ctrl Delay 22.5 HCM 6th LOS C Notes User approved ignoring U-Turning movement. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Queues Gibson Property 5: Route 522 & Tasker Road I Future with Development PM 2041 -A4\ t t Lane Group EBL EBR NBL NBT SBT SBR Lane Group Flow(vph) 177 265 324 813 830 120 v/c Ratio 0.68 0.42 0.67 0.36 0.53 0.11 Control Delay 57.4 6.8 53.6 7.8 24.1 1.9 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 57.4 6.8 53.6 7.8 24.1 1.9 Queue Length 50th(ft) 120 0 122 130 214 2 Queue Length 95th(ft) 184 37 142 77 323 23 Internal Link Dist(ft) 446 1419 813 Turn Bay Length (ft) 250 485 315 Base Capacity(vph) 350 764 627 2284 1560 1172 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.51 0.35 0.52 0.36 0.53 0.10 Intersection Summary Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM Signalized Intersection Capacity Analysis Gibson Property 5: Route 522 & Tasker Road * I Future with Development PM 2041 -AI � t Movement EBL EBR NBL NBT SBU SBT SBR Lane Configurations r r tt A tt r Traffic Volume(vph) 170 254 311 780 0 797 115 Future Volume(vph) 170 254 311 780 0 797 115 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 Total Lost time(s) 10.2 10.2 10.3 6.4 6.6 10.2 Lane Util.Factor 1.00 0.88 0.97 0.95 0.95 1.00 Frt 1.00 0.85 1.00 1.00 1.00 0.85 Flt Protected 0.95 1.00 0.95 1.00 1.00 1.00 Satd. Flow(prot) 1770 2787 3335 3252 3374 1583 Flt Permitted 0.95 1.00 0.95 1.00 1.00 1.00 Satd. Flow(perm) 1770 2787 3335 3252 3374 1583 Peak-hour factor, PHF 0.96 0.96 0.96 0.96 0.92 0.96 0.96 Adj. Flow(vph) 177 265 324 812 0 830 120 RTOR Reduction(vph) 0 226 0 0 0 0 44 Lane Group Flow(vph) 177 39 324 813 0 830 76 Heavy Vehicles(%) 2% 2% 5% 11% 2% 7% 2% Turn Type Prot Prot Prot NA Prot NA pm+ov Protected Phases 7 4 1 6 5 2 7 Permitted Phases 4 2 Actuated Green, G (s) 16.1 16.1 15.9 77.3 50.9 67.0 Effective Green,g(s) 16.1 16.1 15.9 77.3 50.9 67.0 Actuated g/C Ratio 0.15 0.15 0.14 0.70 0.46 0.61 Clearance Time(s) 10.2 10.2 10.3 6.4 6.6 10.2 Vehicle Extension(s) 3.0 3.0 3.0 3.5 3.5 3.0 Lane Grp Cap(vph) 259 407 482 2285 1561 964 v/s Ratio Prot c0.10 0.01 c0.10 0.25 c0.25 0.01 v/s Ratio Perm 0.04 v/c Ratio 0.68 0.10 0.67 0.36 0.53 0.08 Uniform Delay,d1 44.5 40.6 44.6 6.5 21.1 8.8 Progression Factor 1.00 1.00 1.05 1.04 1.00 1.00 Incremental Delay,d2 7.3 0.1 3.7 0.4 1.3 0.0 Delay(s) 51.8 40.7 50.3 7.2 22.4 8.9 Level of Service D D D A C A Approach Delay(s) 45.2 19.5 20.7 Approach LOS D B C Intersection Summary HCM 2000 Control Delay 24.4 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.59 Actuated Cycle Length(s) 110.0 Sum of lost time(s) 27.1 Intersection Capacity Utilization 62.9% ICU Level of Service B Analysis Period(min) 15 c Critical Lane Group HCM Signalized Intersection Capacity Analysis Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection Summary Gibson Property 5: Route 522 & Tasker Road Future with Development PM 2041 HCM 6th Edition methodology supports red clearance in the range of 0 to 6 seconds. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Queues Gibson Property 6: Lake Frederick Entrance/Gibson Site Entrance 1 & Fairfax Pike Future with Development PM 2041 t Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT Lane Group Flow(vph) 36 928 116 92 1167 40 83 65 102 90 v/c Ratio 0.17 0.71 0.10 0.25 0.86 0.03 0.63 0.16 0.76 0.26 Control Delay 2.5 6.7 0.7 3.7 18.7 0.4 61.5 0.9 74.6 1.9 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 2.5 6.7 0.7 3.7 18.7 0.4 61.5 0.9 74.6 1.9 Queue Length 50th(ft) 2 108 0 7 445 0 45 0 56 0 Queue Length 95th(ft) m3 180 m4 14 #839 3 #121 0 #151 0 Internal Link Dist(ft) 737 2471 292 413 Turn Bay Length (ft) 150 150 150 150 50 Base Capacity(vph) 213 1330 1164 363 1352 1169 132 398 135 340 Starvation Cap Reductn 0 7 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.17 0.70 0.10 0.25 0.86 0.03 0.63 0.16 0.76 0.26 Intersection Summary # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection Summary Gibson Property 6: Lake Frederick Entrance/Gibson Site Entrance 1 & Fairfax Pike Future with Development PM 2041 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t r + r 1 1� Traffic Volume(veh/h) 33 854 107 85 1074 37 76 0 60 94 0 83 Future Volume(veh/h) 33 854 107 85 1074 37 76 0 60 94 0 83 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 36 928 77 92 1167 27 83 0 2 102 0 2 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap,veh/h 272 1323 1121 600 1356 1150 203 0 137 203 0 137 Arrive On Green 0.07 1.00 1.00 0.05 0.73 0.73 0.09 0.00 0.09 0.09 0.00 0.09 Sat Flow,veh/h 1781 1870 1585 1781 1870 1585 1415 0 1585 1415 0 1585 Grp Volume(v),veh/h 36 928 77 92 1167 27 83 0 2 102 0 2 Grp Sat Flow(s),veh/h/In 1781 1870 1585 1781 1870 1585 1415 0 1585 1415 0 1585 Q Serve(g_s),s 0.4 0.0 0.0 1.1 39.7 0.4 5.0 0.0 0.1 6.2 0.0 0.1 Cycle Q Clear(g_c),s 0.4 0.0 0.0 1.1 39.7 0.4 5.1 0.0 0.1 6.3 0.0 0.1 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 272 1323 1121 600 1356 1150 203 0 137 203 0 137 V/C Ratio(X) 0.13 0.70 0.07 0.15 0.86 0.02 0.41 0.00 0.01 0.50 0.00 0.01 Avail Cap(c_a),veh/h 325 1323 1121 622 1356 1150 203 0 137 203 0 137 HCM Platoon Ratio 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.66 0.66 0.66 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay(d),s/veh 11.9 0.0 0.0 2.7 8.7 3.3 38.7 0.0 36.4 39.2 0.0 36.4 Incr Delay(d2),s/veh 0.1 2.1 0.1 0.1 5.8 0.0 1.3 0.0 0.0 1.9 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.3 0.8 0.0 0.2 11.8 0.1 1.8 0.0 0.0 2.2 0.0 0.0 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 12.0 2.1 0.1 2.8 14.6 3.3 40.0 0.0 36.4 41.2 0.0 36.4 LnGrp LOS B A A A B A D A D D A D Approach Vol,veh/h 1041 1286 85 104 Approach Delay,s/veh 2.3 13.5 39.9 41.1 Approach LOS A B D D Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration(G+Y+Rc),s 9.0 66.0 12.0 7.4 67.6 12.0 Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting(Gmax),s 5.5 60.5 7.5 5.5 60.5 7.5 Max Q Clear Time(g_c+11),s 3.1 2.0 7.1 2.4 41.7 8.3 Green Ext Time(p-c),s 0.0 8.7 0.0 0.0 9.4 0.0 Intersection Summary HCM 6th Ctrl Delay 10.9 HCM 6th LOS B HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th TWSC Gibson Property 7: Fairfax Pike & Gibson Site Entrance 2 Future with Development PM 2041 Intersection Int Delay,s/veh 0.5 Movement EBL EBT WBT WBR SBL SBR Lane Configurations t 1� r* Traffic Vol,veh/h 0 1008 1153 1 0 43 Future Vol,veh/h 0 1008 1153 1 0 43 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized None None None Storage Length - Veh in Median Storage,# 0 0 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 1096 1253 1 0 47 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 0 0 1254 Stage 1 - - - Stage 2 - Critical Hdwy 6.22 Critical Hdwy Stg 1 - Critical Hdwy Stg 2 - Follow-up Hdwy 3.318 Pot Cap-1 Maneuver 0 0 210 Stage 1 0 0 - Stage 2 0 0 - Platoon blocked, % Mov Cap-1 Maneuver - - 210 Mov Cap-2 Maneuver Stage 1 Stage 2 Approach EB WB SIB HCM Control Delay,s 0 0 27 HCM LOS D Minor Lane/Major Mvmt EBT WBT WBR SBLn1 Capacity(veh/h) 210 HCM Lane V/C Ratio 0.223 HCM Control Delay(s) 27 HCM Lane LOS D HCM 95th %tile Q(veh) 0.8 HCM 6th TWSC Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th TWSC Gibson Property 8: Fairfax Pike & Gibson Site Entrance 3 Future with Development PM 2041 Intersection Int Delay,s/veh 1.5 Movement EBL EBT WBT WBR SBL SBR Lane Configurations t 1 r* Traffic Vol,veh/h 19 989 1149 6 17 5 Future Vol,veh/h 19 989 1149 6 17 5 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None None - None Storage Length 150 - 0 50 Veh in Median Storage,# - 0 0 0 - Grade, % - 0 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 21 1075 1249 7 18 5 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 1256 0 0 2370 1253 Stage 1 - - - 1253 - Stage 2 - 1117 - Critical Hdwy 4.12 6.42 6.22 Critical Hdwy Stg 1 - 5.42 - Critical Hdwy Stg 2 - 5.42 - Follow-up Hdwy 2.218 3.518 3.318 Pot Cap-1 Maneuver 554 38 210 Stage 1 - 269 - Stage 2 - 313 - Platoon blocked, % Mov Cap-1 Maneuver 554 37 210 Mov Cap-2 Maneuver - 37 - Stage 1 259 Stage 2 313 Approach EB WB SIB HCM Control Delay,s 0.2 0 140.8 HCM LOS F Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 SBLn2 Capacity(veh/h) 554 37 210 HCM Lane V/C Ratio 0.037 0.499 0.026 HCM Control Delay(s) 11.8 175.5 22.6 HCM Lane LOS B F C HCM 95th %tile Q(veh) 0.1 1.7 0.1 HCM 6th TWSC Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Queues Gibson Property 9: Route 522 & Gibson Site Entrance 4 Future with Development PM 2041 -A --I. 4--- I* t Lane Group EBL EBT WBL WBT NBL NBT NBR SBL SBT SBR Lane Group Flow(vph) 102 41 57 2 16 1096 23 1 1067 40 v/c Ratio 0.60 0.11 0.32 0.01 0.05 0.45 0.02 0.00 0.45 0.04 Control Delay 59.7 0.6 46.8 0.0 6.3 9.9 0.2 8.0 9.1 0.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 59.7 0.6 46.8 0.0 6.3 9.9 0.2 8.0 9.1 0.1 Queue Length 50th(ft) 69 0 37 0 1 0 0 0 111 0 Queue Length 95th(ft) 120 0 73 0 m7 m293 m0 m1 241 0 Internal Link Dist(ft) 785 554 2104 1225 Turn Bay Length (ft) 300 150 300 150 Base Capacity(vph) 296 491 297 503 401 2456 1148 386 2359 1109 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.34 0.08 0.19 0.00 0.04 0.45 0.02 0.00 0.45 0.04 Intersection Summary m Volume for 95th percentile queue is metered by upstream signal. Queues Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th Signalized Intersection Summary Gibson Property 9: Route 522 & Gibson Site Entrance 4 Future with Development PM 2041 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 1� 1 tt r tt r Traffic Volume(veh/h) 94 0 38 52 0 2 15 1008 21 1 982 37 Future Volume(veh/h) 94 0 38 52 0 2 15 1008 21 1 982 37 Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow,veh/h/In 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 102 0 2 57 0 0 16 1096 14 1 1067 24 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap,veh/h 193 0 142 191 168 0 366 2393 1067 339 2335 1042 Arrive On Green 0.09 0.00 0.09 0.09 0.00 0.00 0.02 0.67 0.67 0.00 0.66 0.66 Sat Flow,veh/h 1418 0 1585 1415 1870 0 1781 3554 1585 1781 3554 1585 Grp Volume(v),veh/h 102 0 2 57 0 0 16 1096 14 1 1067 24 Grp Sat Flow(s),veh/h/In 1418 0 1585 1415 1870 0 1781 1777 1585 1781 1777 1585 Q Serve(g_s),s 7.8 0.0 0.1 4.2 0.0 0.0 0.3 16.0 0.3 0.0 16.2 0.6 Cycle Q Clear(g_c),s 7.8 0.0 0.1 4.3 0.0 0.0 0.3 16.0 0.3 0.0 16.2 0.6 Prop In Lane 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c),veh/h 193 0 142 191 168 0 366 2393 1067 339 2335 1042 V/C Ratio(X) 0.53 0.00 0.01 0.30 0.00 0.00 0.04 0.46 0.01 0.00 0.46 0.02 Avail Cap(c_a),veh/h 363 0 333 374 410 0 492 2393 1067 478 2335 1042 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 0.00 0.09 0.09 0.09 1.00 1.00 1.00 Uniform Delay(d),s/veh 49.1 0.0 45.6 47.6 0.0 0.0 7.1 8.5 5.9 7.0 9.2 6.6 Incr Delay(d2),s/veh 2.2 0.0 0.0 0.9 0.0 0.0 0.0 0.1 0.0 0.0 0.6 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 2.9 0.0 0.1 1.5 0.0 0.0 0.1 4.8 0.1 0.0 5.1 0.2 Unsig. Movement Delay,s/veh LnGrp Delay(d),s/veh 51.3 0.0 45.7 48.5 0.0 0.0 7.1 8.5 5.9 7.0 9.9 6.6 LnGrp LOS D A D D A A A A A A A A Approach Vol,veh/h 104 57 1126 1092 Approach Delay,s/veh 51.2 48.5 8.5 9.8 Approach LOS D D A A Timer-Assigned Phs 1 2 4 5 6 8 Phs Duration(G+Y+Rc),s 8.5 80.8 20.8 10.2 79.0 20.8 Change Period(Y+Rc),s 8.3 6.7 10.9 8.3 6.7 *11 Max Green Setting(Gmax),s 8.7 52.3 23.1 9.7 51.3 *24 Max Q Clear Time(g_c+I1),s 2.0 18.0 9.8 2.3 18.2 6.3 Green Ext Time(p-c),s 0.0 8.1 0.2 0.0 7.8 0.1 Intersection Summary HCM 6th Ctrl Delay 11.9 HCM 6th LOS B Notes *HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. HCM 6th Signalized Intersection Summary Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th TWSC Gibson Property 10: Route 522 & Gibson Site Entrance 5 Future with Development PM 2041 Intersection Int Delay,s/veh 0.2 Movement WBL WBR NBT NBR SBL SBT Lane Configurations r tt r* ) tt Traffic Vol,veh/h 6 17 1102 2 7 1014 Future Vol,veh/h 6 17 1102 2 7 1014 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None None - None Storage Length 0 50 150 300 - Veh in Median Storage,# 1 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 7 18 1198 2 8 1102 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 1765 599 0 0 1200 0 Stage 1 1198 - - - - - Stage 2 567 - - Critical Hdwy 6.84 6.94 4.14 Critical Hdwy Stg 1 5.84 - - Critical Hdwy Stg 2 5.84 - - Follow-up Hdwy 3.52 3.32 2.22 Pot Cap-1 Maneuver 75 445 577 Stage 1 249 - - Stage 2 531 - - Platoon blocked, % Mov Cap-1 Maneuver 74 445 577 Mov Cap-2 Maneuver 183 - - Stage 1 249 Stage 2 524 Approach WB NB SIB HCM Control Delay,s 16.5 0 0.1 HCM LOS C Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT Capacity(veh/h) 183 445 577 HCM Lane V/C Ratio 0.036 0.042 0.013 HCM Control Delay(s) 25.4 13.4 11.3 HCM Lane LOS D B B HCM 95th %tile Q(veh) 0.1 0.1 0 HCM 6th TWSC Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Gibson Property Technical Appendix J. VJuST 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com VJuST Analysis—Gibson Property Appendix J Page 1 Preliminary VJuST Analysis — Intersections #6 and #9 The VDOT Junction Screening Tool (VJuST) was utilized to consider and screen innovative intersection configurations that address mobility and safety issues. This analysis is based on the Future with Development(2035)traffic volumes.As shown in Table 1, Fairfax Pike and Site Entrance#1/Lake Frederick Entrance (Intersection #6)was evaluated for a conventional traffic signal, thru-cut signal, roundabout (single lane and hybrid), and two-way stop control. As shown in Table 6, configurations considered for Route 522 and Site Entrance#4(Intersection#9)included a conventional traffic signal, unsignalized Continuous Green-T, unsignalized Restricted Crossing U-Turn (RCUT), and two-way stop control. Table 2, Table 3, Table 4, and Table 5 show the results for Intersection #6 and Table 7 and Table 8 show the results for Intersection#9. Table 1:VJuST Possible Confi urations for Intersection#6 VDOT Junction • • Possible Configurations Indicate with a"Y"or"N"if each intersection or interchange configuration should or should not be considered. Use the information links for guidance.Then,click the"Show/Hide Configurations button"to hide the worksheets for the configurations that will not be considered. # lintersections I Information Consider? Justification Signalized Intersections 1 Conventional Y 2 Bowtie Link N Right-of-way restrictions identified 3 Center Turn Overpass Link N Not feasible for roadway facility type 4 Continuous Green-T Link N Not feasible for roadway facility type 5 Echelon Link N Not feasible for roadway facility type 6 Full Displaced Left Turn Link N Not feasible for roadway facility type 7 Median U-Turn Link N Not feasible for roadway facility type 8 Partial Displaced Left Turn Link N Not feasible for roadway facility type 9 Partial Median U-Turn Link N Not feasible for roadway facility type 10 Quadrant Roadway WE Link N Right-of-way restrictions identified 11 Quadrant Roadway N-W Link N Right-of-way restrictions identified 12 Quadrant Roadway S-E Link N Right-of-way restrictions identified 13 Quadrant Roadway S-W Link N Right-of-way restrictions identified 14 Restricted Crossing U-Turn Link N Not feasible for roadway facility type 15 Single Loop Link N Right-of-way restrictions identified 16 Split Intersection Link N Right-of-way restrictions identified 17 Thru-Cut Link Y Unsignalized Intersections 18 50 Mini Roundabout Link N Not feasible for roadway facility type 19 75 Mini Roundabout Link N Not feasible for roadway facility type 20 Roundabout Link Y 21 Two-Way Stop Control Y # Interchanges Information Consider? Justification 22 Traditional Diamond Link N Not feasible for roadway facility type 23 Contraflow Left Link N Not feasible for roadway facility type 24 Displaced Left Turn Link N Not feasible for roadway facility type 25 Diverging Diamond Link N Not feasible for roadway facility type 26 Double Roundabout Link N Not feasible for roadway facility type 27 Michigan Urban Diamond Link N Not feasible for roadway facility type 28 Partial Cloverleaf Link N Not feasible for roadway facility type 29 Single Point Link N Not feasible for roadway facility type 30 Single Roundabout Link N Not feasible for roadway facility type 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com VJuST Analysis—Gibson Property Appendix J Page 2 Table 2: VJuST Intersection#6 Results AM Peak Hour y. . oyxh �L e O Qua �k Q�a� Notes Conventional 0.67 $$ Thru-Cut 0.65 28 $$ Roundabout 0.78 8 $$ Two-Way Stop Control 1.91 48 $ Table 3: VJusT Intersection#6 Results for Hybrid Roundabout AM Peak Hour �L � e .0 Lo Qe c Qua Notes Accommodation Compared to WeighteclTotal PlanningLevel Ty .MPL� m��j, Conventional Conflict Points Cost Category Roundao Table 4: VJuST Intersection#6 Results PM Peak Hour �xh �L e CIA Notes Type WIN' V/C Compared to Conflict Points Cost Category Conventional Conventional - 0.83 48 $$ Thru-Cut 0.80 28 $$ Roundabout 1.00 8 $$ Two-Way Stop Control 4.02 48 $ 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com VJuST Analysis—Gibson Property Appendix J Page 3 Table 5:VJuST Intersection#6 Results for Hybrid Roundabout PM Peak Hour Intersection Results \Lo* e e _A 0�0 Notes V/C Conflict ]j Points Cost Category Type Dir M Arnurn Weighted Total Planning Level Roundabout 0.50 1 8 1 $$ Table 6:VJuST Possible Configurations for Intersection#9 VDOT Junction • • Possible Configurations Indicate with a"Y"or"N"if each intersection or interchange configuration should or should not be considered. Use the information links for guidance.Then,click the"Show/Hide Configurations button"to hide the worksheets for the configurations that will not be considered. # lintersections I Information Consider? Justification Signalized Intersections 1 Conventional Y 2 Bowtie Link N Unable to accommodate magnitude of traffic volumes 3 Center Turn Overpass Link N Not feasible for roadway facility type 4 Continuous Green-T Link Y 5 Echelon Link N Right-of-way restrictions identified 6 Full Displaced Left Turn Link N Right-of-way restrictions identified 7 Median U-Turn Link N Unable to accommodate traffic patterns 8 Partial Displaced Left Turn Link N Unable to accommodate traffic patterns 9 Partial Median U-Turn Link N Unable to accommodate traffic patterns 10 Quadrant Roadway WE Link N Right-of-way restrictions identified 11 Quadrant Roadway N-W Link N Right-of-way restrictions identified 12 Quadrant Roadway S-E Link N Right-of-way restrictions identified 13 Quadrant Roadway S-W Link N Right-of-way restrictions identified 14 Restricted Crossing U-Turn Link Y 15 Single Loop Link N Right-of-way restrictions identified 16 Split Intersection Link N Right-of-way restrictions identified 17 Thru-Cut Link N Unsignalized Intersections 18 50 Mini Roundabout Link N Not feasible for roadway facility type 19 75 Mini Roundabout Link N Not feasible for roadway facility type 20 Roundabout Link N 21 Two-Way Stop Control Y # Interchanges Information Consider? Justification 22 Traditional Diamond Link N Not feasible for roadway facility type 23 Contraflow Left Link N Not feasible for roadway facility type 24 Displaced Left Turn Link N Not feasible for roadway facility type 25 Diverging Diamond Link N Not feasible for roadway facility type 26 Double Roundabout Link N Insufficient intersection spacing 27 Michigan Urban Diamond Link N Not feasible for roadway facility type 28 Partial Cloverleaf Link N Not feasible for roadway facility type 29 Single Point Link N Not feasible for roadway facility type 30 Single Roundabout Link N Not feasible for roadway facility type 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com VJuST Analysis—Gibson Property Appendix J Page 4 Table 7:VJuST Intersection#9 Results AM Peak Hour Intersection Results �L 1. e o° Low Qea �k Qua Notes Maxim Accommodation Weighted Total Planning Level Type Dir V/CuM1 Compared to Conflict Points Cost Category ................... Conventional 0.27 48 SS Continuous Green-T 0.27 12* SS Restricted Crossing U-Turn 0.22 20 $$ Two-Way Stop Control 0.20 48 $ Table 8:VJuST Intersection#9 Results PM Peak Hour Intersection Results �L �e aT1 p o` CP°� Qeae hay` Q�a� Notes Maximum Accommodation WeighteclTotal PlanningLevel Type Dir V/C Compared to Conflict Points Cost Category Conventional ................... Conventional 0.40 48 $$ ............. Continuous Green-T 0.39 12 $$ Restricted Crossing U-Turn 0.28 20 $$ Two-Way Stop Control 0.47 48 $ Two-Way Stop Control Intersection capacity analysis was performed using Synchro 11 based on the Highway Capacity Manual(HCM)6t"methodology. Analysis was performed for the AM and PM peak hours under the Future with Development Conditions (2035)assuming two- way stop control. Figure 15 of traffic study shows the peak hour volumes for the study intersections.A peak hour factor of 0.92 was used, consistent with VDOT analysis guidelines, for the future study intersections. The uniform PHF by intersection was used, consistent with TOSAM guidelines. The results of the intersection capacity analysis with two-way stop control are summarized in Table 9. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com VJuST Analysis-Gibson Property Appendix J Page 5 Table 9: Two-Way Stop Control Intersection Capacity Analysis 2035 DelayAM Peak Hour PM Peak Hour Effective Storage Delay(s) 95th% No. Intersection(Movernent) Length(ft.) LOS [21 Queue(ft.) LOS [21 Queue(ft.) Synchro Synchro 6 Lake Frederick Entrance/Gibson Site Entrance 1&Fairfax Pike(E/W) Overall Intersection(Unsignalized) Eastbound Approach Eastbound Left 150 A 9.6 7.5 B 11.5 5.0 - --- --- --- --- --- ------------- ------------------- Westbound Approach Westbound Left 150 B 10.2 5.0 B 11.1 12.5 Northbound Approach F $537.5 F $1675.9 Northbound Left F $949.1 350 F $2984.5 285 Northbound Thru/Right C 19.8 32.5 C 18.4 17.5 Southbound Approach F 150.5 F $1551.2 Southbound Left 50 F 268.3 75 F $2896.2 340 Southbound Thru/Right B 13 5 D 28 40 9 Route 522(N/S)&Gibson Site Entrance 4 (ENV) Overall Intersection(Unsignalized) Eastbound Approach c 17.1 -�� E 40.8 Eastbound Left/Thru C 19.8 10 F 52.1 80 Eastbound Right 50 B 10.5 2.5 B 12.8 7.5 Westbound Approach c 20.6 -�� E 39 Westbound Lef/Thru C 21.2 5 E 40 37.5 Westbound Right 50 B 10.9 0 B 12.4 0 Northbound Approach Northbound Left 300 A 9.5 2.5 B 10.7 2.5 Southbound Approach Southbound Left 300 A 9.5 0 B 10.7 0 NOTES: [1]Effective storage length is based on the storage length plus one-half of the taper length per TOSAM guidelines- [2]$:Delays(reported from Synchro)exceed 300 seconds in TWSC. [3]-:Volume exceeds capacity,queue is theoretically infinite. [4]#:95th percentile queues(reported from Synchro)exceed capacity;actual queues may be longer.Queues shown are based on the maximum after two cycles. [5]m:95th percentile volume and queues(reported from Synchro)are metered by upstream signal. As shown in Table 9 , at Intersection#6, the two-way stop control configuration results in LOS F during both the AM and PM peak hours for the northbound and southbound approaches. At Intersection#9, this configuration operates at LOS E during the PM peak hour for the eastbound and westbound approaches. With the proposed development program, two-way stop control is not recommended at Intersection#6 due to the unacceptable levels of service during both peak hours. Lower density levels or lower trip uses would be necessary for two-way stop control to be further considered at Intersection #6. Two-way stop control may be further considered for Intersection #9, as its performance is only slightly below acceptable levels during one peak hour. Conventional Signal Intersection capacity analysis was performed using Synchro 11 based on the Highway Capacity Manual(HCM)6th methodology. Analysis was performed for the AM and PM peak hours under the Future with Development Conditions(2035)considering a full- color,full-movement traffic signal. Figure 15 of the traffic study shows the peak hour volumes for the study intersections.A peak hour factor of 0.92 was used, consistent with VDOT analysis guidelines, for the future study intersections. The uniform PHF by intersection was used, consistent with TOSAM guidelines. The results of the intersection capacity analysis with a conventional signal are shown in Table 10. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com VJuST Analysis-Gibson Property Appendix J Page 6 Table 10: Conventional Signal Intersection Capacity Analysis 2035 AM Peak Hour PM Peak Hour Effective Storage Delay(s) 50th% 95th% Delay(s) 50th% 95th% No. Intersection(Movenlent) Length(ft.) LOS 121 Queue(ft.) Queue(ft.) LOS 121 Queue(ft.) Queue(ft.) Synchro Synchro 6 Mitigation:Install a Signal Lake Frederick Entrance/Gibson Site Entrance 1&Fairfax Pike(E/W) Overall Intersection(Signalized) A 7.2 B 10.3 Eastbound Approach A 2.1 A 2.1 Eastbound Left 150 A 4.6 8 mll B 10.9 2 m6 Eastbound Thru A 2.0 117 122 A 1.9 139 275 Eastbound Right 150 A 0.0 0 m0 A 0.1 0 m5 Westbound Approach A 7.1 B 12.3 Westbound Left 150 A 3.3 5 12 A 2.8 7 14 Westbound Thru A 7.5 185 263 B 13.3 419 #807 Westbound Right 150 A 4.9 0 16 A 3.3 0 3 Northbound Approach D 38.3 D 39.9 Northbound Left D 38.6 67 #136 D 40.0 45 #121 Northbound Thru/Right C 33.5 0 0 D 36.4 0 0 Southbound Approach C 34.4 D 41.1 Southbound Left 50 C 34.5 14 39 D 41.2 56 #151 Southbound Thru/Right C 33.3 0 0 D 36.4 0 0 9 Mitigation:Install a Signal Route 522(N/S)&Gibson Site Entrance 4 (ENV) Overall Intersection(Signalized) A 4.5 B 11.9 Eastbound Approach D 53.6 D 51.2 Eastbound Left D 53.6 20 49 D 51.3 69 120 Eastbound Thru/Right A 0.0 0 0 D 45.7 0 0 Westbound Approach D 52.5 D 4&5 Westbound Left D 52.5 11 33 D 48.5 37 73 Westbound Thru/Right A 0.0 0 0 A 0 0 0 Northbound Approach A 0.4 A 8.4 Northbound Left 300 A 4.2 3 m3 A 7.0 1 m6 Northbound Thru A 0.2 2 m222 A 8.5 2 m292 Northbound Right 150 A 0.0 0 m6 A 5.9 0 m0 Southbound Approach A 6.3 A 9.6 Southbound Left 300 A 4 0 m2 A 6.9 0 ml Southbound Thru A 6.4 74 87 A 9.7 105 233 Southbound Right 150 A 5.3 0 1 A 6.6 0 1 NOTES: [1]Effective storage length is based on the storage length plus one-half of the taper length per TOSAM guidelines. (2]$:Delays(reported from Synchro)exceed 300 seconds in TWSC. [3]-:Volume exceeds capacity,queue is theoretically infinite. [4]#:95th percentile queues(reported from Synchro)exceed capacity,actual queues may be longer.Queues shorn are based on the maximum after tw cycles. [5]m:95th percentile volume and queues(reported from Synchro)are metered by upstream signal. As shown in Table 11, with a conventional signal, both intersections operate at acceptable levels of service during both peak hours. Additionally, the queues for the turning movements are anticipated to be accommodated within the proposed storage lanes. Since the intersections operate acceptably with the conventional signal, this configuration is recommended for further consideration at both intersections. Restricted Crossing U-Turn (RCUT) An RCUT alternative was evaluated only for Intersection #9, as insufficient right-of-way and lack of a median preclude this configuration at Intersection#6. Under this configuration, left-turn movements from the eastbound and westbound approaches at Intersection#9 are rerouted as right turns followed by U-turns at Intersection #10 and at the intersection of Route 522 and Highland Corners Road, respectively. Intersection capacity analysis was performed using Synchro 11 based on the Highway Capacity Manual(HCM)6th methodology. Analysis was performed for the AM and PM peak hours under the Future with Development Conditions (2035) assuming an RCUT. Figure 1 shows the peak hour volumes for the study intersections.A peak hour factor of 0.92 was used, consistent with VDOT analysis guidelines,for the future study intersections.The uniform PH by intersection was used, consistent with TOSAM guidelines. The results of the intersection capacity analysis with an RCUT are shown in Table 11. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com VJuST Analysis—Gibson Property Appendix J Page 7 10 t Legend OStudy Intersection ♦" Existing Roadway f-- One Way Travel Lane ' 11 AM,Prd Peak Hour Traffic Site Entrance . O 21.730 10 20,850 H Q 21,550 N I'- o 16/54 m �—5/17 0 5/5 m o rr mt`oo c� 2/B m L i I It, IQ N 5/5 Iy ♦ Site Entran, I Site Entrance=5 • L+ Highland Corners Road Site Entrance � A � � ♦ � I ig hl,nl 1,rn,rs Roa �- T T rf1 N N N N co N tl') co CO 5/5 1n N el In O 38/132 5/5 o ® o 5 5 22 1721,210 1 & r 20 610 Figure 1: Future with Development Conditions (2035)Peak Hour Volume Note:Traffic volumes for Highland Corners Road at Route 522 were not collected. Given that it is a low-volume roadway, an estimated 5 vehicles for each movement have been assumed to use this approach for VJuST screening purposes. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com VJuST Analysis-Gibson Property Appendix J Page 8 Table 11: RCUT Capacity Analysis 2035 Intersection#9 AM Peak Hour PM Peak Hour Effective Storage No. Intersection(Movernent) Length(ft.) LOS .- . .- . 9 Route 522(N/S)&Gibson Site Entrance 4(E/W) Overall Intersection(Unsignalized) Eastbound Approach B 10.9 C 15.5 Eastbound Thru A 0 A 0 Eastbound Right 50 B 10.9 5 C 15.5 30 Westbound Approach B 11.2 B 14.2 Westbound Thru A 0 A 0 Westbound Right 50 B 11.2 2.5 B 14.2 10 Northbound Approach 0.4 0.1 Northbound Left 300 A 9.5 2.5 B 11.0 2.5 Southbound Approach 0 0 Southbound Left 300 A 9.7 0 B 11.2 0 10 Route 522(N/S)&Gibson Site Entrance 5(W) Overall Intersection(Unsignalized) Westbound Approach B 13 C 18.3 Westbound Left C 18.1 0 D 32.4 2.5 Westbound Right 50 B 11 0 B 13.3 2.5 Northbound Approach Northbound U-Turn B 12.9 2.5 C 19.6 17.5 Southbound Approach Southbound Left 300 A 9.5 2.5 B 11.2 0 11 Route 522(N/S)&Highland Corner Road Overall Intersection(Unsignalized) Eastbound Approach C 15.1 D 26 Eastbound Left/Thru/Right C 15.1 2.5 D 26 5 Westbound Approach C 16.5 D 25.8 Westbound Left/Thru/Right C 16.5 2.5 D 25.8 5 Northbound Approach Northbound Left 285 A 9.0 0.0 B 10.9 0 Southbound Approach Southbound U-Turn/Left 260 B 14 7.5 C 24.6 40 NOTES: [1]Effective storage length is based on the storage length plus one-half of the taper length per TOSAM guidelines. As shown in Table 11, with an RCUT configuration, the intersection operates at acceptable levels of service during both peak hours. Additionally, the queues for the turning movements are anticipated to be accommodated within the proposed storage lanes. Since the intersection operates acceptably with the RCUT, this configuration is recommended for further consideration at Intersection#9. Continuous Green-T A Continuous Green-T configuration was evaluated for Intersections #9 and #10. For evaluation purposes, the east leg of Intersection#9 was assumed to be removed, and the intersection was analyzed as operating with only the west leg serving as the site entrance. This configuration is not recommended due to spacing constraints. According to the AASHTO Green Book (Chapter 10), approximately 1,900 feet of acceleration lane would be required along Route 522. As shown in Figure 2 , the acceleration lane for Intersection#10 would extend beyond Intersection#9, while the acceleration lane for Intersection#9 would extend beyond 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com VJuST Analysis-Gibson Property Appendix J Page 9 Intersection #10. Therefore, due to these conflictinq spacing and functional requirements, this configuration is not recommended for further consideration. SITE SITE It 17 LO 1900 ft. 10 9 1900 ft. Legend • MOM r, �► Site Entrance �' .� '�i� Required Merge -- Lane Figure 2: Continuous Green-T Merge Lane Spacing Evaluation Thru-Cut Signal A Thru-Cut configuration was evaluated for Intersection#6; however, it is noted there are identified right-of-way constraints. In this context, the minor street movements at the site entrance and Lake Frederick entrance would be restricted to right and left turns only, while the mainline traffic would continue like a conventional intersection. With fewer traffic signal phases, a thru-cut can be more operationally efficient compared to a conventional traffic signal. Implementation of this configuration would require the addition of channelized traffic islands,which may not be able to be accommodated within the available right-of-way. On the north side of the intersection, the proposed Gibson site entrance is in close proximity to the property line, limiting any potential widening. The south side of the intersection serves the Lake Frederick development and is not controlled by the Applicant. As a 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com VJuST Analysis—Gibson Property Appendix J Page 10 result, the geometric requirements for a Thru-Cut configuration cannot be feasibly achieved at Intersection#6 without acquiring offsite right-of-way. Because the right-of-way constraints are considered less significant compared to a roundabout, a Thru-Cut may be further considered for Intersection#6. Roundabout A roundabout configuration was evaluated for Intersection#6; however, it is not recommended for further consideration due to significant right-of-way constraints. Both a single-lane configuration and a hybrid configuration with two lanes on Fairfax Pike were screened as part of the analysis. Implementation of a roundabout would require significant space to accommodate the inscribed circle diameter, central island, splitter islands, and appropriate entry and exit geometry. Although the intersection spacing requirements for a roundabout are anticipated to be met, the roundabout footprint cannot be accommodated within the available right-of-way. On the north side of the intersection, the proposed Gibson site entrance is in close proximity to the property line, limiting opportunities for expansion. The south side of the intersection serves the Lake Frederick development and is not controlled by the Applicant. As a result,the required footprint for a roundabout cannot be feasibly achieved at Intersection #6 without acquiring significant and costly offsite right-of-way as shown in Figure 3, therefore it is not recommended for further consideration. ,. .::. i ' Proposed Gibson Site Entrance ' N,. to2F�j - y � 7 Potential impact to off-site property due to approach geornetry Planned Lake e. .� � Frederick Entrance 9c lil y �. II Impacts to off-site properties t 44, t # d, �► - 4. Figure 3: Impacts of installing Roundabout 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com VJuST Analysis—Gibson Property Appendix J Page 11 VJuST Findings Summary Intersection of Fairfax Pike and Site Entrance#1/Lake Frederick Entrance (Intersection#6): Two-Way Stop Control(TWSC)operates at a significantly higher volume-to-capacity(v/c)ratio than the other alternatives during both peak hours. However,depending on the ultimate development program and density,the v/c ratio could potentially be lower. In the AM peak hour, the v/c ratios are 0.67 for the conventional signal, 0.65 for the Thru-Cut, 0.78 for the single-lane roundabout, 1.91 for TWSC,and 0.39 for the hybrid roundabout with 2 lanes on EB-WB direction. Similarly, in the PM peak hour, the v/c ratios are 0.83 for the conventional signal, 0.80 for the Thru-Cut, 1.0 for the single-lane roundabout,4.02 for TWSC,and 0.50 for the hybrid roundabout. While the conventional signal, thru-cut, and hybrid roundabout all have a lower v/c, the hybrid roundabout would have significantly higher cost and significantly offsite right-of-way impacts, and was therefore removed from the recommended alternatives. The VJuST results for Intersection#6 are presented in Table 2, Table 3, Table 4 and Table 5. The following intersection types are recommended for further consideration: • Conventional Signalized Intersection • Thru-Cut Signal • Two-Way Stop Control (under lower density levels or lower trip uses) Intersection of Route 522 and Site Entrance#4(Intersection#9): The conventional signal and Continuous Green-T operate at a slightly higher v/c ratio than the other alternatives during the AM peak hour,with v/c ratios of 0.27 for the conventional signal, 0.27 for the Continuous Green-T, 0.22 for the RCUT, and 0.20 for TWSC. In contrast,during the PM peak hour,the TWSC operates at the highest v/c ratio among the alternatives,with v/c ratios of 0.40 for the conventional signal, 0.39 for the Continuous Green-T, 0.28 for the RCUT, and 0.47 for TWSC. The VJuST results for Intersection#9 are presented in Table 7 and Table 8. The following intersection types are recommended for further consideration: • Conventional Signalized Intersection • Restricted Crossing U-Turn(RCUT) • Two-Way Stop Control This VJuST analysis was performed as part of this study to screen other potential intersection control types. However, a comprehensive Signal Justification Report will be prepared during the site plan development process to determine the appropriate intersection configuration for each intersection. 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com VJuST Analysis for Intersection of Fairfax Pike and Site Entrance#1 (AM Peak) VDOT Junction • • Input Worksheet Project Title: Gibson Property E-W Facility: Fairfax Pike N-5 Facility: Site Entrance 1 Date: July 8,2026 VolumeTraffic Volume(veh/hr) Direction U-Turn/Left Through Right Truck 41+� r+ Percent(%) Eastbound 81 806 46 8.001/. Westbound 36 584 92 12.20% Northbound 1 122 0 97 2.00% Southbound 1 28 0 1 24 2.00% Adjustment Factor 0.80 0.95 0.85 Sug ested I U-0.8 L-0.95 0.85 Truck to PCE Factor 11 Suggested=2.00 E2.00] Critical Lane Volume 1600 JL Equivalent Passenger Car Volume Volume(pc/hr) U-Turn/Left Through Right Approach Eastbound 87 870 50 1007 Westbound 40 655 103 798 Northbound 124 0 99 223 Southbound 29 1 0 24 53 Left-turn Adjustment Factor Conversion of left-turning vehicles to equivalent through vehicles Right-turn Adjustment Factor Conversion of right-turning vehicles to equivalent through vehicles U-turn Adjustment Factor Conversion of U-turning vehicles to equivalent through vehicles Truck to PCE Factor 1 truck=X Passenger Car Equivalents Critical Lane Volume Sum Limit Saturation value far critical lane volume sum at an intersection ­ AM DOT 29 VDOT Junction • • Possible Configurations Indicate with a"Y"or"N"if each intersection or interchange configuration should or should not be considered.Use the information links for guidance. Then,click the"Show/Hide Configurations button"to hide the worksheets for the configurations that will not be considered. # I Intersections Information Consider? Justification Signalized Intersections 1 Conventional Y 2 Bowtie Link N Right-of-way restrictions identified 3 Center Turn Overpass Link N Not feasible for roadway facility type 4 Continuous Green-T Link N Not feasible for roadway facility type 5 Echelon Link N Not feasible for roadway facility type 6 Full Displaced Left Turn Link N Not feasible for roadway facility type 7 Median U-Turn Link N Not feasible for roadway facility type 8 Partial Displaced Left Turn Link N Not feasible for roadway facility type 9 Partial Median U-Turn Link N Not feasible for roadway facility type 10 Quadrant Roadway WE Link N Right-of-way restrictions identified 11 Quadrant Roadway N-W Link N Right-of-way restrictions identified 12 Quadrant Roadway S-E Link N Right-of-way restrictions identified 13 Quadrant Roadway S-W Link N Right-of-way restrictions identified 14 Restricted Crossing U-Turn Link N Not feasible for roadway facility type 15 Single Loop Link N Right-of-way restrictions identified 16 Split Intersection Link N Right-of-way restrictions identified 17 Thru-Cut Link Y Unsignalized Intersections 18 50 Mini Roundabout Link N Not feasible for roadway facility type 19 75 Mini Roundabout Link N Not feasible for roadway facility type 20 Roundabout Link Y 21 Two-Way Stop Control Y # Interchanges Information Consider? Justification 22 Traditional Diamond Link N Not feasible for roadway facility type 23 Contraflow Left Link N Not feasible for roadway facility type 24 Displaced Left Turn Link N Not feasible for roadway facility type 25 Diverging Diamond Link N Not feasible for roadway facility type 26 Double Roundabout Link N Not feasible for roadway facility type 27 Michigan Urban Diamond Link N I Not feasible for roadway facility type 28 Partial Cloverleaf Link N Not feasible for roadway facility type 29 Single Point Link N Not feasible for roadway facility type 30 Single Roundabout Link N Not feasible for roadway facility type %%/DOT 30 VDOT Junction • • Directional Questions and Base Lane Configuration Before entering a base number of through lanes for each direction,answer all applicable directional question for each intersection or interchange configuration selected for consideration.Navigate to the lane configuration worksheet for example diagrams,if provided. Intersections Question Direction Bowtie N/A N/A Continuous Green-T N/A N/A Echelon N/A N/A Median U-Turn N/A N/A Partial Displaced Left Turn N/A N/A Partial Median U-Turn N/A N/A Restricted Crossing U-Tur, N/A N/A Single Loop N/A N/A Split Intersection N/A N/A Thru-Cut Select the roadway where through traffic is permitted from the EB W B drop-down list.See example diagrams. Interchanges Question Direction All N/A N/A Base Number of Through Lanes Enter a base number of through lanes for each direction.The number of through lanes entered will populate on each non-roundabout lane configuration worksheet.This tool also allows the user to enter the number of through lanes on the lane configuration worksheets directly.This base number may be overwritten on individual lane configuration worksheets.Turn lanes,shared lanes,and channelized lanes must still be entered in each lane configuration worksheet. Eastbound 1 Westbound 1 Northbound 1 Southbound 1 ­ AM DOT 31 VDOT Junction • • Results Worksheet General Information Project Title: Gibson Property EW Facility: Fairfax Pike NS Facility: Site Entrance 1 Date: July 8,2026 V,u S T Volumes(veh/hr) U-Turn/Left Throug Right VDOT Junction Screening Tool Eastbound 81 806 81 46 Westbound 36 584 81 92 Northbound 122 0 81 97 Southbound 28 0 81 24 General Instructions:All intersection and interchange configurations have a default assumption of one exclusive lane per movement.No results shall be interpreted until the user has verified the lane configurations on each worksheet. Intersection Results C.° e� rv°�• Qea had Quo Notes &TYP V/C Conventional Conflict Points Cost Category IF Accommodation Conventional - 0.67 $$ Thru-Cut - 0.65 71 128 $$ Roundabout 0.78 8 7E $$ Two-Way Stop Control L 1.91 48 $ *The continuous green-T is the only three-legged innovative intersection in this tool.To compare the continuous green-Tto other innovative intersections,conflicts corresponding with the fourth leg must be removed.This has been done for the conventional intersection.Conflict point diagrams for three-legged and four-legged conventional intersections have been provided on the conventional intersection worksheet for reference. VDOT 32 Lo e� o� l o Notes Diamond17rr.mm.dation Type Dir Maximum Compared to Weighted Total Planning Level V/C Traditional Conflict Points Cost Category Information Congestion The maximum v/c ratio represents the worst v/c of all zones that make up an intersection. Pedestrian Compares the potential of each design to accommodate pedestrians based on safety,wayfinding,and delay.Potential is qualitatively defined as better(+),similar(blank cell),or worse(-)than a conventional intersection or traditional diamond interchange. Safety Weighted Total=(2 x Crossing Conflicts)+Merging Conflicts+Diverging Conflicts Planning Level Costs Cost category estimates for each intersection/interchange alternative. Some alternatives have choices that affect the resulting cost category (e.g.requirement of a new bridge)that can be configured on the individual input worksheets. VDOT 33 W ntional Conventional DESIGN AND RESULTS Gibson Property Critical Lane Volume Sum Enter the lane J209-1J99 1400-1599 onfigurations in the Fairfax Pike yellow celIs.Site Entrance VOLUME/CAPACITY RATIO: 1 July 8,2026 N SB Critical Vol 147 EW Split? FALSE NS Split? FALSE W E S I I I I PCPs PCPs PCPs Zone 5 EB Critical Vol ' J o Zone 5 0 V/C 747 ® �g --ritical Vol R 912 77 Z� 1 r � — — PWa PWa PWa 4. NB Critical Vol 159 I I N—This diagram does not reflect the actual lane configuration of the intersection Safety-Conflict Point Diagram Safety-Conflict Point Diagram(Three Legs) Planning Level Cost Oyylr(jtl0 Conflict Type Coum •Onerynp Conflict Type I Coum C r Crossing 16 Mer9� Crossing 3 J J Cross •Are new lanes and/or Merging 8 Merging 3 pavement needed? Yes Diverging 8 Diverging 3 a Cost category 1 if na new pavement needed, r - • Total 32 Total 9 else cost cateogy 2. a Assumes ezistlng two -waystopcontolorall- Conflict Type Weight Conflict Type Weight waystopcontrol • • - Crossing 2 � O Crossing 2 Merging 1 r Merging 1 Diverging 1 • Diverging 1 48 12 VDOT JUNCTION SCREENING TOOL —.i.n 34 ♦ Thru-Cut pon Thru-Cut Proiea xam« Gibson Property Critical Lane Volume Sum the lane aaliry: 1209-1J99 1d00-1599 ations in the Fairfax Pike ow cel Is. ""'ry Site Entrance 1 VOLUME I CAPACITY RATIO: 1 July 8,2026 N g6 Critical Vol 105 North arrow directions will EW Split? FALSE W C appearoncethedirectional NS split? FALSE G question has been answered on the Input Warksheet. s ! b PCPM1 P7PM1 P7PM1 Zone 5 B '�. c EB critical Vol a J a Zone 5 747 "x P.o-�neal Vol 912 4 EB Z R P121 PCPM1 Pct1h ` ; ` 4 1! 1 Ir 1 I NB Critical Vol B 131 Nae:This diagram does no[reflect the actual lane configuration of the intersection • Safety-Conflict Point Diagram o [onflictT Co. m,° .aan,a:are �Oiverg'sp Type aumretylw. . ni�ea°ad�m crafty Merging Cro sing g 7right—, reet through traffic does not need to re-enter the each cm IcslPcrl Jm P Cro>vang I nfrom the majorstreet to completethe desired mMerging 6 .There are nou-turn crossover intersections on the major °< amNe ae-.cDiverging 6 d°a p - cnrectmregh n,°.ren,ene.mw<anwicalNhn,WcPa.c 11Total 20 al through volumes were split evenlyw left-turnsand °mcam�aca°�m�rm°urfifen.own,e" P emn /�.:. 0.. LC..fli.tTyp. Weight Merging2Planning Level Cost 1 $ $ y�remayNo°cn mc= Cost Category atyesa tana°"aemo"my°t-lri"c::a"amacaamo pcmrarea-oeasa�nh.e»"m�re°na°a-"r qmac nm,arioa°rtrsremo-ca.ea<phh aaa ae�-:m---aed°ssr. mqP.xm"-ew aPv lek aaeamm meia g""�mp hrs�Ocr crerni"ao u y 2 28 •Assumes conversion from conventional signal. VDOTJUNCTION SCREENING TOOL Ver1.n 35 Roundabout Roundabout Roundabout axones oarawruru.omer ww.swn nmrvuwurwre ear cam., ,�,�wn,,,,es„m E,rce.me nee�m eves on:vme t ® mw.e, r 14 rd Z t W E plum SB 5 SB ,tr Zone 4 s cc �p Awl- .® W OF s m NB =o s _ y NB • Safely-Conflict Point Diagram Assumptions • Planning Level Cost $ $ r— r •t- ���oe s .oRwMzia�r.�,um emap�,a,.A=wrap m,.o :�.• .n e,,gouKmuemsaw„���wmaev. ww B Two-Way Stop Corrtrol(TWSC( Two-Way Stop COMroI(LWSC( --y—P c.—I(msc) mw JE S-ty-C—ld P-t olaera. Hybrid Roundabout VDOT Junction Screening Tool Results Worksheet General Information Project Title: Gibson Property EW Facility: Fairfax Pike NS Facility: Site Entrance 1 Date: July 8,2026 �,u S T Volumes(veh/hr) U-Turn/Left Throug Right VDOT Junction Screening Tool Eastbound 81 806 81 46 Westbound 36 584 81 92 Northbound 122 0 81 97 Southbound 28 0 81 24 General Instructions:All intersection and interchange configurations have a default assumption of one exclusive lane per movement.No results shall be interpreted until the user has verified the lane configurations on each worksheet. Intersection Results Accommodation Type C.° e� Notes WTYI V/C Conventional Conflict Points Cost Category Dir Maximum Compared to Weighted Total Planning Level Roundabout - 0.39 $$ .The continuous green-T is the only three-legged innovative intersection in this tool.To compare the continuous green-Tto other innovative intersections,conflicts corresponding with the fourth leg must be removed.This has been done for the conventional intersection.Conflict point diagrams for three-legged and four-legged conventional intersections have been provided on the conventional intersection worksheet for reference. XVDOT 32 Lo e� o� l o Notes Diamond17rr.mm.dation Type Dir Maximum Compared to Weighted Total Planning Level V/C Traditional Conflict Points Cost Category Information Congestion The maximum v/c ratio represents the worst v/c of all zones that make up an intersection. Pedestrian Compares the potential of each design to accommodate pedestrians based on safety,wayfinding,and delay.Potential is qualitatively defined as better(+),similar(blank cell),or worse(-)than a conventional intersection or traditional diamond interchange. Safety Weighted Total=(2 x Crossing Conflicts)+Merging Conflicts+Diverging Conflicts Planning Level Costs Cost category estimates for each intersection/interchange alternative. Some alternatives have choices that affect the resulting cost category (e.g.requirement of a new bridge)that can be configured on the individual input worksheets. VDOT 33 Roundabout Roundabout ROUndabout ixx axoxrs oarawxuruomxr ww.swn rwrnmrreiwurwse —.' cow �� crcer,�uxesxm gx.x,xxs xme t mm a ^K' M rmrs...ww.ue •. nm F;r i ®x® N r z net Ip W+E � 5BY a«T x= 5 SB r s 2 e4c s cc 0 _ p' Q' MIN- o ® 0............. .............. 9 �� coNB p, w Z.n.s a y NB n....• _ �LLIO • Safely-Conflict Point Diagram Assumptions • Planning Level Cost $ $ r— r •t- ���oe s oRwMzia�r..xum ema�a�=xra�m:.o �.• u. � a:%u.w„anemx„��„anom.sv-�mo� B VJuST Analysis for Intersection of Fairfax Pike and Site Entrance#1 (PM Peak) VDOT Junction • • Input Worksheet Project Title: Gibson Property E-W Facility: Fairfax Pike N-S Facility: Site Entrance 1 Date: July 8,2026 VolumeTraffic Volume(veh/hr) Direction U-Turn/Left Through Right Truck 41+1 f+ Percent(%) Eastbound 33 834 107 6.401/. Westbound 85 1049 37 5.00% Northbound 76 0 60 2.005/. Southbound 94 0 83 2.00% Adjustment Factor 0.80 0.95 0.85 Suggested U-0.8 L-0.95 0.85 Truck to PCE Factor Suggested=2.00 2.00 Critical Lane Volume 1600 JL Equivalent Passenger Car Volume Volume(pc/hr) U-Turn/Left Through Right Approach Eastbound 35 887 114 1036 Westbound 1 89 1101 39 1229 Northbound 1 78 0 61 139 Southbound 1 96 1 0 85 181 Left-turn Adjustment Factor Conversion of left-turning vehicles to equivalent through vehicles Right-turn Adjustment Factor Conversion of right-turning vehicles to equivalent through vehicles U-turn Adjustment Factor Conversion of U-turning vehicles to equivalent through vehicles Truck to PCE Factor 1 truck=X Passenger Car Equivalents Critical Lane Volume Sum Limit Saturation value far critical lane volume sum at an intersection ­ AM DOT 29 VDOT Junction • • Possible Configurations Indicate with a"Y"or"N"if each intersection or interchange configuration should or should not be considered.Use the information links for guidance. Then,click the"Show/Hide Configurations button"to hide the worksheets for the configurations that will not be considered. # I Intersections Information Consider? Justification Signalized Intersections 1 Conventional Y 2 Bowtie Link N Right-of-way restrictions identified 3 Center Turn Overpass Link N Not feasible for roadway facility type 4 Continuous Green-T Link N Not feasible for roadway facility type 5 Echelon Link N Not feasible for roadway facility type 6 Full Displaced Left Turn Link N Not feasible for roadway facility type 7 Median U-Turn Link N Not feasible for roadway facility type 8 Partial Displaced Left Turn Link N Not feasible for roadway facility type 9 Partial Median U-Turn Link N Not feasible for roadway facility type 10 Quadrant Roadway WE Link N Right-of-way restrictions identified 11 Quadrant Roadway N-W Link N Right-of-way restrictions identified 12 Quadrant Roadway S-E Link N Right-of-way restrictions identified 13 Quadrant Roadway S-W Link N Right-of-way restrictions identified 14 Restricted Crossing U-Turn Link N Not feasible for roadway facility type 15 Single Loop Link N Right-of-way restrictions identified 16 Split Intersection Link N Right-of-way restrictions identified 17 Thru-Cut Link Y Unsignalized Intersections 18 50 Mini Roundabout Link N Not feasible for roadway facility type 19 75 Mini Roundabout Link N Not feasible for roadway facility type 20 Roundabout Link Y 21 Two-Way Stop Control Y # Interchanges Information Consider? Justification 22 Traditional Diamond Link N Not feasible for roadway facility type 23 Contraflow Left Link N Not feasible for roadway facility type 24 Displaced Left Turn Link N Not feasible for roadway facility type 25 Diverging Diamond Link N Not feasible for roadway facility type 26 Double Roundabout Link N Not feasible for roadway facility type 27 Michigan Urban Diamond Link N I Not feasible for roadway facility type 28 Partial Cloverleaf Link N Not feasible for roadway facility type 29 Single Point Link N Not feasible for roadway facility type 30 Single Roundabout Link N Not feasible for roadway facility type %%/DOT 30 VDOT Junction • • Directional Questions and Base Lane Configuration Before entering a base number of through lanes for each direction,answer all applicable directional question for each intersection or interchange configuration selected for consideration.Navigate to the lane configuration worksheet for example diagrams,if provided. Intersections Question Direction Bowtie N/A N/A Continuous Green-T N/A N/A Echelon N/A N/A Median U-Turn N/A N/A Partial Displaced Left Turn N/A N/A Partial Median U-Turn N/A N/A Restricted Crossing U-Tur, N/A N/A Single Loop N/A N/A Split Intersection N/A N/A Thru-Cut Select the roadway where through traffic is permitted from the EB W B drop-down list.See example diagrams. Interchanges Question Direction All N/A N/A Base Number of Through Lanes Enter a base number of through lanes for each direction.The number of through lanes entered will populate on each non-roundabout lane configuration worksheet.This tool also allows the user to enter the number of through lanes on the lane configuration worksheets directly.This base number may be overwritten on individual lane configuration worksheets.Turn lanes,shared lanes,and channelized lanes must still be entered in each lane configuration worksheet. Eastbound 1 Westbound 1 Northbound 1 Southbound 1 ­ AM DOT 31 VDOT Junction • • Results Worksheet General Information Project Title: Gibson Property EW Facility: Fairfax Pike NS Facility: Site Entrance 1 Date: July 8,2026 V,u S T Volumes(veh/hr) U-Turn/Left fmRight VDOT Junction Screening Tool Eastbound 33 834 33 107 Westbound 85 1049 33 37 Northbound 76 0 33 60 Southbound 94 0 33 83 General Instructions:All intersection and interchange configurations have a default assumption of one exclusive lane per movement.No results shall be interpreted until the user has verified the lane configurations on each worksheet. Intersection Results C.° e� rv°�• Qea had Quo Notes &TYP V/C Conventional Conflict Points Cost Category IF Accommodation Conventional - 0.83 $$ Thru-Cut - 0.80 1 28 $$ Roundabout 1.00 EW 8 70 $$ Two-Way Stop Control I L 4.02 48 $ *The continuous green-T is the only three-legged innovative intersection in this tool.To compare the continuous green-Tto other innovative intersections,conflicts corresponding with the fourth leg must be removed.This has been done for the conventional intersection.Conflict point diagrams for three-legged and four-legged conventional intersections have been provided on the conventional intersection worksheet for reference. VDOT 32 Lo e� o� l o Notes Diamond17rr.mm.dation Type Dir Maximum Compared to Weighted Total Planning Level V/C Traditional Conflict Points Cost Category Information Congestion The maximum v/c ratio represents the worst v/c of all zones that make up an intersection. Pedestrian Compares the potential of each design to accommodate pedestrians based on safety,wayfinding,and delay.Potential is qualitatively defined as better(+),similar(blank cell),or worse(-)than a conventional intersection or traditional diamond interchange. Safety Weighted Total=(2 x Crossing Conflicts)+Merging Conflicts+Diverging Conflicts Planning Level Costs Cost category estimates for each intersection/interchange alternative. Some alternatives have choices that affect the resulting cost category (e.g.requirement of a new bridge)that can be configured on the individual input worksheets. VDOT 33 Conventional Conventional DESIGN AND RESULTS —­1N...: Gibson Property Critical Lane Volume Sum Enter the lane acmty: 1200 14UU-1599 configurations in the Fairfax Pike yellow cells. ""'ty Site Entrancef VOLUME/CAPACOY July 8,2026 RATIO: 0.83 N SB Critical Vol 173 EW Split? FALSE NS split? FALSE W+ Z, E S JO 1 I "c"° "`0di" Zone 5 00 1320 + L N° EBCritical Vol n J o Zone 5 1138 ~ W B Critical Vol �► R 13Z� 981 m� _ FCP� P1P� PCP —_— ■ ■ NB Critical Vol 182 I I Note:This diagram does not reflect the actual Ian onfiguration of the intersection Safety-Conflict Point Diagram Safety-Conflict Point Diagram(Three Legs) Planning Level Cost pp�.eryrt0 Conflict Type Count •E, Bq p Conflict Type C.U. t t Crossing 16 Mef9 Crossing 3 J J C—mg Are new lanes and/or Yes Merging 8 Merging 3 pavement needed? Diverging 8 Diverging 3 •Cost category 1 if no new pavement needed, r l — -O • • Total 32 Total 9 else cost cateogry 2. •Assumes-isdng two-waystopcontolorall- Conflict Type Weight Conflict Type Weight way stop control • • \'� -� Crossing 2 O • Crossing 2 Imo— Merging 1 r Merging 1 Diverging 1 • Diverging 1 48 12 VDOTIUNC ION SCREENING TOOL Vec i.n 34 ♦ L Cut ♦ Thru-Cut Proiea xam« Gibson Property Critical Lane Volume Sum Enter the lane aaliry: 1200-1J99 taoo-tsxx configurations in the Fairfax Pike yellow cells. NS ai1,W: Site Entrance 1 VOLUME I CAPACITY RATIO: 0'$0 July 8,2026 N SB Cri[ical Vol 101 North arrow directions will EW Sp FALSE W C appear once the directional NS Splilit?t? FALSE G question has been answered on the lnpur Worksheet. s ! b PCPh PCPh PCPh Zone 5 B 1283 m L N. EBCritic.IVnl J a Zone 5 0.80 V/C 1138 0 8~ W B Critical Vol �' t't �► x 1283 r 9R1 EB Z R W Pcph p.pph pcph tt I I I I NB Critical Vol B 145 Note:This diagram does not reflect the actual lane configuration of the intersection • Safety-Conflict Point Diagram Conflict Type Co.m eymeN ni�.�a0�m _m a .b°...tyre Cro sing g aMirm-treetthrough trafficri—nm—ritore-enterthe each .m I�IPerl Jmp� t movem�'on from the major street to complete the desired r� a�u° llh me —gh-1 Merging 6 —C There are no u-turn crossover intersections on the major r°< amNe ae-wNl°w< M. Diverging 6 street. e nree<mreoch m°.remene.mw<onwi calNn�mPko� a°a/°r an.ewav°etw°nalreaavapwru II Total 20 .The original through volumes were split evenly to lek-turns and °me:mr a"n°rm�t nr°urfifea�wme" p emll � ,aa�n°eal c ":aeae°":mr right-turns. ' ZWe'ghtipe a________._ Planning Level Cost 1 (�1 $ � -�rymme"mr:ern° •Cost Category 2 28 •Assumes conversion from conventional signal. "" " h VDOT JUNCTION SCREENING TOOL Ver1.n 35 Roundabout Roundabout Roundabout axones nmrvuwunors nm �E � �y sseo N z ea 1 m w+E 5B IX 5 -v ..SB skik✓ ...R 1 " 2on., O .s vno vic s � 0 m m a: � 3 O � W ^ NB Q ® W =o $ T Z-2 y NB • Safely-Conflict Point Diagram Assumptions • Planning Level Cost $ $ •m..o.9 '�- r •t- ���oe s :oRwMzia�r..sum emap�,anw.�ra�m,.o 6 Two-Way Stop Corrtrol(TWSC( Two-Way Stop COMroI(LWSC( --y—P c.—I(msc) ll JE ���� Ejum re REM S-ty-C—ld P-t olaera. Hybrid Roundabout VDOT Junction Screening Tool Results Worksheet General Information Project Title: Gibson Property EW Facility: Fairfax Pike INS Facility: Site Entrance 1 Date: July 8,2026 V,u S T Volumes(veh/hr) U-Turn/Left Right VDOT Junction Screening Tool Eastbound 33 834 33 107 Westbound 85 1049 33 37 Northbound 76 0 33 60 Southbound 94 0 33 83 General Instructions:All intersection and interchange configurations have a default assumption of one exclusive lane per movement.No results shall be interpreted until the user has verified the lane configurations on each worksheet. Intersection Results Accommodation C.° e� Notes &TYP V/C Conventional Conflict Points Cost Category Dir Maximum Compared to Weighted Total Planning Level Roundabout - 0.60 $$ .The continuous green-T is the only three-legged innovative intersection in this tool.To compare the continuous green-T to other innovative intersections,conflicts corresponding with the fourth leg must be removed.This has been done for the conventional intersection.Conflict point diagrams for three-legged and four-legged conventional intersections have been provided on the conventional intersection worksheet for reference. XVDOT 32 Lo e� o� l o Notes Diamond17rr.mm.dation Type Dir Maximum Compared to Weighted Total Planning Level V/C Traditional Conflict Points Cost Category Information Congestion The maximum v/c ratio represents the worst v/c of all zones that make up an intersection. Pedestrian Compares the potential of each design to accommodate pedestrians based on safety,wayfinding,and delay.Potential is qualitatively defined as better(+),similar(blank cell),or worse(-)than a conventional intersection or traditional diamond interchange. Safety Weighted Total=(2 x Crossing Conflicts)+Merging Conflicts+Diverging Conflicts Planning Level Costs Cost category estimates for each intersection/interchange alternative. Some alternatives have choices that affect the resulting cost category (e.g.requirement of a new bridge)that can be configured on the individual input worksheets. VDOT 33 Roundabout Roundabout Roundabout ixx axoxes oarawxuruomxr ww.swn urnmrvuwurwse —_.' c �� crcers�uxesxm ex.xs xxs xme t mm a m F rar.,.t.. .,�w N 14 4r 2 ne 1 W+E 5B z xa 0 1 �o �............. .............. ' & NB Z.n.s x 1 2 t • Safely-Conflict Point Diagram Assumptions • Planning Level Cost $ $ r— r •t- ��moe s .oRwMzia�r..xum ema�a�=xra�m.o �.• u. � a%u.w„anemx„��„anom.sv-�mo� B VJuST Analysis for Intersection of Route 522 and Site Entrance#4 (AM Peak) • • • • Input Worksheet Project Title: Gibson Property E-W Facility: Site Entrance 4 N-S Facility: Rte. 522 Date: July 10,2026 VolumeTraffic Volume(veh/hr) Direction U-Turn/Left Through Right Truck 41+1 & Percent(%) Eastbound 27 0 it 2.00% Westbound 15 0 1 2.00% Northbound 36 712 53 9.305/. Southbound 2 611 92 16.10% Adjustment Factor 0.80 0.95 0.85 Suggested U-0.8 L-0.95 0.85 Truck to PCE Factor Suggested=2.00 2.00 Critical Lane Volume 1600 JL Equivalent Passenger Car Volume Volume(pc/hr) U-Turn/Left Through Right Approach �. L Eastbound 28 0 11 39 Westbound 15 0 1 16 Northbound 39 778 58 875 Southbound 2 1 709 107 818 Left-turn Adjustment Factor Conversion of left-turning vehicles to equivalent through vehicles Right-turn Adjustment Factor Conversion of right-turning vehicles to equivalent through vehicles U-turn Adjustment Factor Conversion of U-turning vehicles to equivalent through vehicles Truck to PCE Factor 1 truck=X Passenger Car Equivalents Critical Lane Volume Sum Limit Saturation value far critical lane volume sum at an intersection ­ AM DOT 29 VDOT Junction • • Possible Configurations Indicate with a"Y"or"N"if each intersection or interchange configuration should or should not be considered.Use the information links for guidance. Then,click the"Show/Hide Configurations button"to hide the worksheets for the configurations that will not be considered. # I Intersections Information Consider? Justification Signalized Intersections 1 Conventional Y 2 Bowtie Link N Unable to accommodate magnitude of traffic volumes 3 Center Turn Overpass Link N Not feasible for roadway facility type 4 Continuous Green-T Link Y 5 Echelon Link N Right-of-way restrictions identified 6 Full Displaced Left Turn Link N Right-of-way restrictions identified 7 Median U-Turn Link N lUnable to accommodate traffic patterns 8 Partial Displaced Left Turn Link N Unable to accommodate traffic patterns 9 Partial Median U-Turn Link N Unable to accommodate traffic patterns 10 Quadrant Roadway WE Link N Right-of-way restrictions identified 11 Quadrant Roadway N-W Link N Right-of-way restrictions identified 12 Quadrant Roadway S-E Link N Right-of-way restrictions identified 13 Quadrant Roadway S-W Link N Right-of-way restrictions identified 14 Restricted Crossing U-Turn Link Y 15 Single Loop Link N Right-of-way restrictions identified 16 Split Intersection Link N Right-of-way restrictions identified 17 Thru-Cut Link N Unsignalized Intersections 18 50 Mini Roundabout Link N Not feasible for roadway facility type 19 75 Mini Roundabout Link N Not feasible for roadway facility type 20 Roundabout Link N 21 Two-Way Stop Control Y # Interchanges Information Consider? Justification 22 Traditional Diamond Link N Not feasible for roadway facility type 23 Contraflow Left Link N Not feasible for roadway facility type 24 Displaced Left Turn Link N Not feasible for roadway facility type 25 Diverging Diamond Link N Not feasible for roadway facility type 26 Double Roundabout Link N Insufficient intersection spacing 27 Michigan Urban Diamond Link N I Not feasible for roadway facility type 28 Partial Cloverleaf Link N Not feasible for roadway facility type 29 Single Point Link N Not feasible for roadway facility type 30 Single Roundabout Link N Not feasible for roadway facility type %%/DOT 30 VDOT Junction • • Directional Questions and Base Lane Configuration Before entering a base number of through lanes for each direction,answer all applicable directional question for each intersection or interchange configuration selected for consideration.Navigate to the lane configuration worksheet for example diagrams,if provided. Intersections Question Direction Bowtie N/A N/A Continuous Green-T Select the direction associated with the"stem"of the T- EB intersection from the drop-down list.See example diagrams. Echelon N/A N/A Median U-Turn N/A N/A Partial Displaced Left Turn N/A N/A Partial Median U-Turn N/A N/A Restricted Crossing U-Turn Select the roadway with the U-turns from the drop-down list. N B-SB Single Loop N/A N/A Split Intersection N/A N/A Thru-Cut N/A N/A Interchanges Question Direction All N/A N/A Base Number of Through Lanes Enter a base number of through lanes for each direction.The number of through lanes entered will populate on each non-roundabout lane configuration worksheet.This tool also allows the user to enter the number of through lanes on the lane configuration worksheets directly.This base number may be overwritten on individual lane configuration worksheets.Turn lanes,shared lanes,and channelized lanes must still be entered in each lane configuration worksheet. Eastbound 1 Westbound 1 Northbound 2 Southbound 2 ­ AM DOT 31 VDOT Junction • • Results Worksheet General Information Project Title: Gibson Property EW Facility: Site Entrance 4 NS Facility: Rte.522 Date: July 10,2026 VJ u 5 T Volumes(veh/hr) U-Turn/Lett VDDT Junction Screening Tool Eastbound 27 0 27 11 Westbound 15 0 27 1 Northbound 36 712 27 53 Southbound 2 611 27 92 General Instructions:All intersection and interchange configurations have a default assumption of one exclusive IL lane per movement.No results shall be interpreted until the user has verified the lane configurations on each worksheet. Intersection Results IA�7 C.° e� Notes Conventional - 0.27 48 $$ Continuous Green-T - 0.27 12* $$ Restricted Crossing U-Turn - 0.22 20 $$ Two-Way Stop Control 0.20 48 $ *The continuous green-T is the only three-legged innovative intersection in this tool.To compare the continuous green-Tto other innovative intersections,conflicts corresponding with the fourth leg must be removed.This has been done for the conventional intersection.Conflict point diagrams for three-legged and four-legged conventional intersections have been provided on the conventional intersection worksheet for reference. VDOT 32 Lo e� o� l o Notes Diamond17rr.mm.dation Type Dir Maximum Compared to Weighted Total Planning Level V/C Traditional Conflict Points Cost Category Information Congestion The maximum v/c ratio represents the worst v/c of all zones that make up an intersection. Pedestrian Compares the potential of each design to accommodate pedestrians based on safety,wayfinding,and delay.Potential is qualitatively defined as better(+),similar(blank cell),or worse(-)than a conventional intersection or traditional diamond interchange. Safety Weighted Total=(2 x Crossing Conflicts)+Merging Conflicts+Diverging Conflicts Planning Level Costs Cost category estimates for each intersection/interchange alternative. Some alternatives have choices that affect the resulting cost category (e.g.requirement of a new bridge)that can be configured on the individual input worksheets. VDOT 33 Conventional Conventional DESIGN AND RESULTS —­1Nam.: Gibson Property Critical Lane Volume Sum Enter the lane acmty: 1200-1399 140U-1599 configurations in the Site Entrance 4 yellow cells. Rte.522 VOLUME/CAPACOY RATIO: July 10,2026 N SB Critical Vol 391 EW Split? FALSE NS split? FALSE W E S I I I I I Zone 5 1 ,e <L N. EB Critical Vol e J a Zone 5 V/C 30 ® —g W B Critical Vol 29 _ PCPN P1PN PCPN NB Critical Vol 396 I I Note:This diagram does not reflect the actual Ian onfiguration of the intersection Safety-Conflict Point Diagram Safety-Conflict Point Diagram(Three Legs) Planning Level Cost pprer Conflict Type Coum •D-9ay Conflict Type Coum t t Crossing 16 1Mef9 Crossing 3 J J C—g •Are new lanes and/or Yes Merging 8 Merging 3 pavement needed? Diverging 8 Diverging 3 •Cost category 1 if no new pavement needed, r l — -O • • Total 32 Total 9 else costc.teogry 2. •Assumes ex isting--..ystopcontolorall- Conflict Type Weight ZC..fl!.t Weight way stopCrossing 2 O 2 Merging 1 r 1 Diverging1 1 48 12 VDOT JUNCTION SCREENING TOOL Ver i.n 34 Continuous Green-T Intersection Continuous Green-T Intersection Gibson Property Step 1:Enterthe MY: 1200-1399 tm9-t599 lane configurations Site Entrance 4 in the yellow cells. Rte.522 1 July 10,2026 E EB wB SB I ..f EW Split? FALSE NS Split? TRUE N S W �nntinn ns North arrow directions will �'•, 6re nMov ent a ppear once the directions l I NB question has been answered on the Input Workaheet. cg RCrlto IVoI J a Zones �� NB Cdti� SB a :1i� �r •• 1 I pcph pcph pcph EB Zone 5 ER C,it-1 Val Continuous 29 green Movement t v/c Note:This diagram does not reflect the actual lane configuration of the intersection Safety-Conflict Point Diagram Planning Level Cost $ $ •Di,crgmg Conflict Type Courrc C ost Category Wrgmg Crossing 3 conversion from conventional signal. C mg Merging 3 Diverging 3 Total 9 Conflict Type Weight Crossing 2 /� Merging 1 Diverging 1 12 VDOT JUNMON SCREENING TOOL Ver i.n 35 Restricted Crossing U-Turn(RCUT)Intersection Restricted Crossing U-Turn(RCUT)Intersection DESIGN AND RESULTS DATA INPUT AND CONFIGURATION P roject Name: Critical Lane Volume Sum Enter the lane SB Gibson Property configurations in the ewFaciliry: Site Entrance 4 12oa-tass yellow cells. NS Facility: PCP. P.P. P.P. Rte.522 VOLUME I CAPACITY t Date: July 10,2026 RATIO: Zone 1 -nzi6neTae PCPM1 W +E S North arrow directions will appea e the dire i...I Zone 1 qae rion has been answ red on the In put Wodcaheet. g n' N. �es8 Zone3 �� Wn6 v2 t Zone 3 a a J 6ne ae PCPM1 PCPM1 ................... I t0I rza PCPM1 PCPM1 J Zone 4 P aM1 EB NB EB Critical Vol NB Critical V; Zone 4 s 403 Zone 2 --vlc Zone 2 rzgea,e P`PM1 P=vn v=vn v=v. Nate:This diagram does not reflex the actual lane Lo, - configuration of the intersection NB t f Safety-Conflict Point Diagram Assumptions Planning Level Cost $ $ Diverging •^ Conflict Type Count e7his worksheet uses the CLV methodology for calculations at Cost Category3 'ng ? D • Crossing 2 I"ed zones.These calculations are based on •Assumes conversion from conventional signal. Crossing j sagna n passenger pMerging 8 rs per hour. * Diverging 8 •This worksheet uses the HCM,6th Edition methodology for J 1 Q calculations at unsignalized zones.These calculations are based �— Totnl 18 n vehicles per hour. O. O - Conflict Type Weight O Crossing 2 b Merging 1 l,I Diverging 1 �1 20 VDOT JUNCOON SCREENING TOOL 1-- 36 Two-Way Stop Corrtrol(TWSC( Two-Way Stop COMroI(LW SC( --y—P c.—I(msc) FE re REM_ 12__ S-ty-C.—P-t-g— —p— VJuST Analysis for Intersection of Route 522 and Site Entrance#4 (PM Peak) • • • • Input Worksheet Project Title: Gibson Property E-W Facility: Site Entrance 4 N-5 Facility: Rte. 522 Date: July 10,2026 VolumeTraffic Volume(veh/hr) Direction U-Turn/Left Through Right Truck 41+ jj & Percent(%) Eastbound 94 0 38 2.00% Westbound 52 0 2 2.00% Northbound 15 988 21 7.505/. Southbound 1 947 1 37 1 5.80% Adjustment Factor 0.80 0.95 0.85 Suggested U-0.8 L-0.95 0.85 Truck to PCE_Factor Suggested=2.00 2.00 Critical Lane Volume 1600 JL Equivalent Passenger Car Volume Volume(pc/hr) U-Turn/Left Through Right Approach *i 4_4 L #/ Eastbound 96 0 39 135 Westbound 1 53 0 2 55 Northbound 16 1062 23 1101 Southbound 1 1 1002 39 1042 Left-turn Adjustment Factor Conversion of left-turning vehicles to equivalent through vehicles Right-turn Adjustment Factor Conversion of right-turning vehicles to equivalent through vehicles U-turn Adjustment Factor Conversion of U-turning vehicles to equivalent through vehicles Truck to PCE Factor 1 truck=X Passenger Car Equivalents Critical Lane Volume Sum Limit Saturation value far critical lane volume sum at an intersection ­ AM DOT 29 VDOT Junction • • Possible Configurations Indicate with a"Y"or"N"if each intersection or interchange configuration should or should not be considered.Use the information links for guidance. Then,click the"Show/Hide Configurations button"to hide the worksheets for the configurations that will not be considered. # I Intersections Information Consider? Justification Signalized Intersections 1 Conventional Y 2 Bowtie Link N Unable to accommodate magnitude of traffic volumes 3 Center Turn Overpass Link N Not feasible for roadway facility type 4 Continuous Green-T Link Y 5 Echelon Link N Right-of-way restrictions identified 6 Full Displaced Left Turn Link N Right-of-way restrictions identified 7 Median U-Turn Link N lUnable to accommodate traffic patterns 8 Partial Displaced Left Turn Link N Unable to accommodate traffic patterns 9 Partial Median U-Turn Link N Unable to accommodate traffic patterns 10 Quadrant Roadway WE Link N Right-of-way restrictions identified 11 Quadrant Roadway N-W Link N Right-of-way restrictions identified 12 Quadrant Roadway S-E Link N Right-of-way restrictions identified 13 Quadrant Roadway S-W Link N Right-of-way restrictions identified 14 Restricted Crossing U-Turn Link Y 15 Single Loop Link N Right-of-way restrictions identified 16 Split Intersection Link N Right-of-way restrictions identified 17 Thru-Cut Link N Unsignalized Intersections 18 50 Mini Roundabout Link N Not feasible for roadway facility type 19 75 Mini Roundabout Link N Not feasible for roadway facility type 20 Roundabout Link N 21 Two-Way Stop Control Y # Interchanges Information Consider? Justification 22 Traditional Diamond Link N Not feasible for roadway facility type 23 Contraflow Left Link N Not feasible for roadway facility type 24 Displaced Left Turn Link N Not feasible for roadway facility type 25 Diverging Diamond Link N Not feasible for roadway facility type 26 Double Roundabout Link N Insufficient intersection spacing 27 Michigan Urban Diamond Link N I Not feasible for roadway facility type 28 Partial Cloverleaf Link N Not feasible for roadway facility type 29 Single Point Link N Not feasible for roadway facility type 30 Single Roundabout Link N Not feasible for roadway facility type %%/DOT 30 VDOT Junction • • Directional Questions and Base Lane Configuration Before entering a base number of through lanes for each direction,answer all applicable directional question for each intersection or interchange configuration selected for consideration.Navigate to the lane configuration worksheet for example diagrams,if provided. Intersections Question Direction Bowtie N/A N/A Continuous Green-T Select the direction associated with the"stem"of the T- EB intersection from the drop-down list.See example diagrams. Echelon N/A N/A Median U-Turn N/A N/A Partial Displaced Left Turn N/A N/A Partial Median U-Turn N/A N/A Restricted Crossing U-Turn Select the roadway with the U-turns from the drop-down list. N B-SB Single Loop N/A N/A Split Intersection N/A N/A Thru-Cut N/A N/A Interchanges Question Direction All N/A N/A Base Number of Through Lanes Enter a base number of through lanes for each direction.The number of through lanes entered will populate on each non-roundabout lane configuration worksheet.This tool also allows the user to enter the number of through lanes on the lane configuration worksheets directly.This base number may be overwritten on individual lane configuration worksheets.Turn lanes,shared lanes,and channelized lanes must still be entered in each lane configuration worksheet. Eastbound 1 Westbound 1 Northbound 2 Southbound 2 ­ AM DOT 31 VDOT Junction • • Results Worksheet General Information Project Title: Gibson Property EW Facility: Site Entrance 4 NS Facility: Rte.522 Date: July 10,2026 V,u S T Volumes(veh/hr) U-Turn/Left Through Right VDOT Junction Screening Tool Eastbound 94 0 94 38 Westbound 52 0 94 2 Northbound 15 988 94 21 Southbound 1 947 94 37 General Instructions:All intersection and interchange configurations have a default assumption of one exclusive lane per movement.No results shall be interpreted until the user has verified the lane configurations on each worksheet. Intersection Results IA�7 C.° e� Notes Conventional - 0.40 48 $$ Continuous Green-T - 0.39 12* $$ Restricted Crossing U-Turn 0.28 20 $$ Two-Way Stop Control 0.47 48 $ *The continuous green-T is the only three-legged innovative intersection in this tool.To compare the continuous green-Tto other innovative intersections,conflicts corresponding with the fourth leg must be removed.This has been done for the conventional intersection.Conflict point diagrams for three-legged and four-legged conventional intersections have been provided on the conventional intersection worksheet for reference. VDOT 32 Lo e� o� l o Notes Diamond17rr.mm.dation Type Dir Maximum Compared to Weighted Total Planning Level V/C Traditional Conflict Points Cost Category Information Congestion The maximum v/c ratio represents the worst v/c of all zones that make up an intersection. Pedestrian Compares the potential of each design to accommodate pedestrians based on safety,wayfinding,and delay.Potential is qualitatively defined as better(+),similar(blank cell),or worse(-)than a conventional intersection or traditional diamond interchange. Safety Weighted Total=(2 x Crossing Conflicts)+Merging Conflicts+Diverging Conflicts Planning Level Costs Cost category estimates for each intersection/interchange alternative. Some alternatives have choices that affect the resulting cost category (e.g.requirement of a new bridge)that can be configured on the individual input worksheets. VDOT 33 Conventional Conventional DESIGN AND RESULTS —­1Nam.: Gibson Property Critical Lane Volume Sum Enter the lane acmty: 1200-1399 140U-1599 configurations in the Site Entrance 4 yellow cells. Rte.522 VOLUME/CAPACOY RATIO: I 1 July 10,2026 N SB Critical Vol 532 EW Split? FALSE NS split? FALSE W E S JO I 1 IZone 5 ' N. EBairicalvcl J a "ne103 ry g W B Critical Vol R � 102 _ 79 PCPN P.PPN PCPN —_— + ■ f+ NB Critic Vol 518 I I Note:This diagram does not reflect the actual Ian onfiguration of the intersection Safety-Conflict Point Diagram Safety-Conflict Point Diagram(Three Legs) Planning Level Cost pprer Conflict Type Count E, eq p Conflict Type C.U. t t Crossing 16 1Mef9 Crossing 3 J J C—g Are new lanes and/or Yes Merging 8 Merging 3 pavement needed? Diverging 8 Diverging 3 •Cost category 1 if no new pavement needed, r l — -O • • Total 32 0 Total 9 else cost cateogry 2. •Assumes-isdng two-waystopcontolorall- Conflict Type Weight Conflict Type Weight way stop control • • \'� -� Crossing 2 O O Crossing 2 Imo— Merging 1 r Merging 1 Diverging 1 • Diverging 1 48 12 VDOT JUNCTION SCREENING TOOL Ver i.n 34 Continuous Green-T Intersection Continuous Green-T Intersection RNS Gibson Property Step 1:Enterthe 1200-1399 1000-1s99 ne configurations Site Entrance 4 in theyellow cells. Rte.522 1 July 10,2026 E EB wB SB S EW Spllt7 FALSE ��^ NS Spllt7 TRUE N S W �nntinn ns �'•, Green Mov ent North--directions will AAA V/C em appearoncethedirectional r NB question has been answered on the Input Workaheet. .c g Q — — SBC,1oal Vol o Zone 5 S NB NBCrleralvt I 0 ^ 1•ir SB — a — _ — :f r •J J I pcph pcph pcph I I EB Zone 5 EB C,it—1 vol Continuous 101 green Movement I •• vJc I vJc Note:This diagram does not reflect the actual lane configuration of the intersection Safety-Conflict Point Diagram Planning Level Cost $ $ •Di,ergmg Conflict Type Count C ost Category M1"ergmy Crossing 3 conversion from conventional signal. C mg Merging 3 Diverging 3 Total 9 Conflict Type Weight Crossing 2 Merging 1 ' Diverging 1 12 VDOT JUNMON SCREENING TOOL Ver i.n 35 Restricted Crossing U-Turn(RCUT)Intersection Restricted Crossing U-Turn(RCUT)Intersection DESIGN AND RESULTS DATA INPUT AND CONFIGURATION Project Name: Gibson Property Critical Lane Volume Sum Enter the lane SB con figurations in the ew Facility: rF Site Entrance 4 1200-139s yellow cells. NS Facility: P=Ph P=Ph V=Ph Rte.522 VOLUME/CAPACDY t Date: July 10,2026 RATIO: N / Zone 1 (1\ F-a 4neiia P=Ph W +E Si,� North arrow directions will Sur' appear once the directional Zone 1 A que rion has been answ red on the In put W=dcahee. �X rvo V/C J'NSBP=anZone 3 _ Y71 P=Ph P=Ph J Zone 4 P.P. EB NB ' Z EB Critical Vol NB Critical Vol Zone 4 142 544 '* v Zone 2 v/c Zone 2 9 ea=ce P=Ph t v/c P=vn v=vn v=vh Lo- NB t fNate:This diagram does not reflene configumfon fthe interseaion Safety-Conflict Point Diagram Assumptions Planning Level Cost $ $ Diverging •^ Conflict Type Count •This worksheet uses the CLV methodology for calculations at �Aswmes ost Category3 C ? D • Crossing 2 fed zones.These calculations are based on conversion from conventional signal. Crossing j sagna n passenger pMerging 8 rs per hour. * Diverging 8 •This worksheet uses the HCM,6th Edition methodology for Q b t calculations a unsignalized The se ese calculations are ased Totnl 18 n vehicles per hour. O. O - Conflict Type Weight O Crossing 2 b Merging l,I Diverging 1 �1 '. 20 VDOT JUNCOON SCREENING TOOL Ver J.e 36 Two-Way Stop Corrtrol(TWSC) Two-Way Stop COMroI(LWSC) --y—P c.—I(msc) FE s Elam REM S-ty C—ld P-t olaera. RCUT Analysis - Synchro Report HCM 6th TWSC Gibson Property 9: Route 522 & Gibson Site Entrance 4 Future with Development AM 2035-RCUT Intersection Int Delay,s/veh 0.6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations r* r* ) tt r* ) tt r* Traffic Vol,veh/h 0 0 38 0 0 16 36 739 53 2 626 92 Future Vol,veh/h 0 0 38 0 0 16 36 739 53 2 626 92 Conflicting Peds,#/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized None None - None - None Storage Length 300 150 300 150 Veh in Median Storage,# 1 1 0 - - 0 - Grade, % 0 0 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 0 41 0 0 17 39 803 58 2 680 100 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 340 402 780 0 0 861 0 0 Stage 1 - - - - - - - - Stage 2 - - - - Critical Hdwy 6.94 6.94 4.14 4.14 Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 2 - - - - Follow-up Hdwy 3.32 3.32 2.22 2.22 Pot Cap-1 Maneuver 0 0 656 0 0 598 833 776 Stage 1 0 0 - 0 0 - - - Stage 2 0 0 - 0 0 - - - Platoon blocked, % Mov Cap-1 Maneuver - - 656 - - 598 833 776 Mov Cap-2 Maneuver Stage 1 Stage 2 Approach EB WB NB SIB HCM Control Delay,s 10.9 11.2 0.4 0 HCM LOS B B Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity(veh/h) 833 656 598 776 HCM Lane V/C Ratio 0.047 0.063 0.029 0.003 HCM Control Delay(s) 9.5 10.9 11.2 9.7 HCM Lane LOS A B B A HCM 95th %tile Q(veh) 0.1 0.2 0.1 0 HCM 6th TWSC Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th TWSC Gibson Property 10: Route 522 & Gibson Site Entrance 5 Future with Development AM 2035-RCUT Intersection Int Delay,s/veh 0.3 Movement WBL WBR NBU NBT NBR SBL SBT Lane Configurations r A ft r ) tt Traffic Vol,veh/h 2 5 15 734 6 17 703 Future Vol,veh/h 2 5 15 734 6 17 703 Conflicting Peds,#/hr 0 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free Free RT Channelized - None - None - None Storage Length 0 50 310 150 300 - Veh in Median Storage,# 1 - - 0 - - 0 Grade, % 0 - - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 Mvmt Flow 2 5 16 798 7 18 764 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 1248 399 764 0 0 805 0 Stage 1 830 - - - - - - Stage 2 418 - - - Critical Hdwy 6.84 6.94 6.44 4.14 Critical Hdwy Stg 1 5.84 - - - Critical Hdwy Stg 2 5.84 - - - Follow-up Hdwy 3.52 3.32 2.52 2.22 Pot Cap-1 Maneuver 165 601 470 815 Stage 1 388 - - - Stage 2 632 - - - Platoon blocked, % Mov Cap-1 Maneuver 156 601 470 815 Mov Cap-2 Maneuver 276 - - - Stage 1 375 Stage 2 618 Approach WB NB SIB HCM Control Delay,s 13 0.3 0.2 HCM LOS B Minor Lane/Major Mvmt NBU NBT NBRWBLn1WBLn2 SBL SBT Capacity(veh/h) 470 276 601 815 HCM Lane V/C Ratio 0.035 0.008 0.009 0.023 HCM Control Delay(s) 12.9 18.1 11 9.5 HCM Lane LOS B C B A HCM 95th %tile Q(veh) 0.1 0 0 0.1 HCM 6th TWSC Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th TWSC Gibson Property 11: Route 522 & Highland Corner Rd Future with Development AM 2035-RCUT Intersection Int Delay,s/veh 0.6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBU SBL SBT SBR Lane Configurations ) tt r* ti� Traffic Vol,veh/h 5 0 5 5 0 5 5 791 5 27 5 627 5 Future Vol,veh/h 5 0 5 5 0 5 5 791 5 27 5 627 5 Conflicting Peds,#/hr 0 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Free RT Channelized None None - None - None Storage Length 285 150 260 Veh in Median Storage,# 1 1 0 - - 0 Grade, % 0 0 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 5 0 5 5 0 5 5 860 5 29 5 682 5 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 1193 1628 344 1279 1625 430 687 0 0 860 865 0 0 Stage 1 753 753 - 870 870 - - - - - - - - Stage 2 440 875 - 409 755 - - - - Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 6.44 4.14 Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 - - - - Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 - - - - Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 2.52 2.22 Pot Cap-1 Maneuver 142 101 652 123 101 573 903 408 774 Stage 1 368 416 - 313 367 - - - - Stage 2 566 365 - 590 415 - - - - Platoon blocked, % Mov Cap-1 Maneuver 131 92 652 114 92 573 903 437 437 Mov Cap-2 Maneuver 254 203 - 226 211 - - - - Stage 1 366 383 311 365 Stage 2 558 363 538 382 Approach EB WB NB SIB HCM Control Delay,s 15.1 16.5 0.1 0.7 HCM LOS C C Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity(veh/h) 903 366 324 437 HCM Lane V/C Ratio 0.006 0.03 0.034 0.08 HCM Control Delay(s) 9 15.1 16.5 14 HCM Lane LOS A C C B HCM 95th %tile Q(veh) 0 0.1 0.1 0.3 HCM 6th TWSC Synchro 11 Report Gorove Slade Timing Plan:7 AM to 8 AM HCM 6th TWSC Gibson Property 9: Route 522 & Gibson Site Entrance 4 Future with Development PM 2035-RCUT Intersection Int Delay,s/veh 1.2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations r r* ) tt r* ) tt r* Traffic Vol,veh/h 0 0 132 0 0 54 15 1082 21 1 999 37 Future Vol,veh/h 0 0 132 0 0 54 15 1082 21 1 999 37 Conflicting Peds,#/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized None None - None - None Storage Length 300 150 300 150 Veh in Median Storage,# 1 1 0 - - 0 - Grade, % 0 0 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 0 143 0 0 59 16 1176 23 1 1086 40 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 543 588 1126 0 0 1199 0 0 Stage 1 - - - - - - - - Stage 2 - - - - Critical Hdwy 6.94 6.94 4.14 4.14 Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 2 - - - - Follow-up Hdwy 3.32 3.32 2.22 2.22 Pot Cap-1 Maneuver 0 0 484 0 0 452 616 578 Stage 1 0 0 - 0 0 - - - Stage 2 0 0 - 0 0 - - - Platoon blocked, % Mov Cap-1 Maneuver - - 484 - - 452 616 578 Mov Cap-2 Maneuver Stage 1 Stage 2 Approach EB WB NB SIB HCM Control Delay,s 15.5 14.2 0.1 0 HCM LOS C B Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity(veh/h) 616 484 452 578 HCM Lane V/C Ratio 0.026 0.296 0.13 0.002 HCM Control Delay(s) 11 15.5 14.2 11.2 HCM Lane LOS B C B B HCM 95th %tile Q(veh) 0.1 1.2 0.4 0 HCM 6th TWSC Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th TWSC Gibson Property 10: Route 522 & Gibson Site Entrance 5 Future with Development PM 2035-RCUT Intersection Int Delay,s/veh 0.7 Movement WBL WBR NBU NBT NBR SBL SBT Lane Configurations r A ft r ) tt Traffic Vol,veh/h 6 17 52 1082 2 7 979 Future Vol,veh/h 6 17 52 1082 2 7 979 Conflicting Peds,#/hr 0 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free Free RT Channelized - None - None - None Storage Length 0 50 310 150 300 - Veh in Median Storage,# 1 - - 0 - - 0 Grade, % 0 - - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 Mvmt Flow 7 18 57 1176 2 8 1064 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 1838 588 1064 0 0 1178 0 Stage 1 1290 - - - - - - Stage 2 548 - - - Critical Hdwy 6.84 6.94 6.44 4.14 Critical Hdwy Stg 1 5.84 - - - Critical Hdwy Stg 2 5.84 - - - Follow-up Hdwy 3.52 3.32 2.52 2.22 Pot Cap-1 Maneuver 67 452 302 589 Stage 1 222 - - - Stage 2 543 - - - Platoon blocked, % Mov Cap-1 Maneuver 54 452 302 589 Mov Cap-2 Maneuver 138 - - - Stage 1 180 Stage 2 535 Approach WB NB SIB HCM Control Delay,s 18.3 0.9 0.1 HCM LOS C Minor Lane/Major Mvmt NBU NBT NBRWBLn1WBLn2 SBL SBT Capacity(veh/h) 302 138 452 589 HCM Lane V/C Ratio 0.187 0.047 0.041 0.013 HCM Control Delay(s) 19.6 32.4 13.3 11.2 HCM Lane LOS C D B B HCM 95th %tile Q(veh) 0.7 0.1 0.1 0 HCM 6th TWSC Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM HCM 6th TWSC Gibson Property 11: Route 522 & Highland Corner Rd Future with Development PM 2035-RCUT Intersection Int Delay,s/veh 1.4 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBU SBL SBT SBR Lane Configurations ) tt r* ti� Traffic Vol,veh/h 5 0 5 5 0 5 5 1014 5 94 5 1027 5 Future Vol,veh/h 5 0 5 5 0 5 5 1014 5 94 5 1027 5 Conflicting Peds,#/hr 0 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Free RT Channelized None None - None - None Storage Length 285 150 260 Veh in Median Storage,# 1 1 0 - - 0 Grade, % 0 0 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 5 0 5 5 0 5 5 1102 5 102 5 1116 5 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 1894 2450 561 1884 2447 551 1121 0 0 1102 1107 0 0 Stage 1 1333 1333 - 1112 1112 - - - - - - - - Stage 2 561 1117 - 772 1335 - - - - Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 6.44 4.14 Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 - - - - Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 - - - - Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 2.52 2.22 Pot Cap-1 Maneuver 43 31 471 43 31 478 619 285 626 Stage 1 162 221 - 223 282 - - - - Stage 2 480 281 - 358 221 - - - - Platoon blocked, % Mov Cap-1 Maneuver 30 19 471 30 19 478 619 290 290 Mov Cap-2 Maneuver 113 79 - 114 90 - - - - Stage 1 161 139 221 280 Stage 2 471 279 222 139 Approach EB WB NB SIB HCM Control Delay,s 26 25.8 0.1 2.1 HCM LOS D D Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity(veh/h) 619 182 184 290 HCM Lane V/C Ratio 0.009 0.06 0.059 0.371 HCM Control Delay(s) 10.9 26 25.8 24.6 HCM Lane LOS B D D C HCM 95th %tile Q(veh) 0 0.2 0.2 1.6 HCM 6th TWSC Synchro 11 Report Gorove Slade Timing Plan:4:15 PM to 5:15 PM Gibson Property Technical Appendix K. Turn Lane Warrant Tables and Graphics 4114 Legato Road / Suite 650 / Fairfax,VA 22033 / T 703.787.9595 goroveslade.com AASHTO/VDOT Left Turn Lane Warrant Assessment AssessmentLeft Turn Lane Warrant Two-Lane Highways Based on AASHTO/VDOT RDM Appendix F Background: Warrants for left-turn storage lanes on two-lane highways at unsignalized intersections are based on Figure 3-4 to Figure 3-21 in Appendix F of the Virginia Department of Transportation's(VDOT)Road Design Manual(RDM).The figures provide a graphical representation for determining the necessity of a left turn lane by comparing the advancing volumes of a given approach and the respective opposing volumes and are differentiated by design speed and percent left turning volume. Project Information: Project: Gibson Property TIA Project ID: Intersection(s)and Movement(s): Intersection 6:Madison Site Entrance/Gibson Site Entrance 1(N/S)&Fairfax Pike(ENV) Intersection 8:Fairfax Pike(S)&Gibson Site Entrance 3(E/W) Scenario: 2035 Future Conditions with Development ,Analysis: Gorove Slade Design Speed(mph): 50 (40,50,or 60?) Assessment Summary: Stu Opposing Vol. Advancing Left Turn Minimum y"....anjftF� Vol. Vol. Left Turn% Opposing VDOT ROM F Figure Treatment (VPH) Threshold Intersection 6:EBL AM Peak 712 933 81 8.6112 0 Fig.3-11 Full-width Lane and Taper Warranted Intersection 6:EBL PM Peak 1,171 974 33 3.39°� 0 Fig.3-10 Full-width Lane and Taper Warranted Intersection 8:EBL AM Peak 715 930 48 5.16% 0 Fig.3-11 Full-width Lane and Taper Warranted Intersection 8:EBL PM Peak 1,130 988 19 1.92% 0 Fig.3-10 Full-width Lane and Taper Warranted Gorove Slade VDOT RDM-F Figure 3-10 Warrant for Left Turn Storage Lanes on 2-Lane Highways at 50-mph & <5% Left Turns 1200 IntersectionWaFr$bt@N1 Peak Intersection 8:EBL RM Peak 1000 2 a � 800 0 c 0 a Q 600 C 400 P� TG d, P� 200 P94/r eo, Not Warranted 0 0 100 200 300 400 500 600 700 800 900 1000 VA,Advancing Volume(VPH) y=-5E-06x3+0.0092x2-7.3406x+2241.7 R2=0.9997 VDOT RDM-F Figure 3-11 Warrant for Left Turn Storage Lanes on 2-Lane Highways at 50-mph & 10% Left Turns 1000 Warranted 900 = 800 a E 700 Interaectlon bEBL AM Peak 0 600 c 0 a Q 500 0 400 — 300 GI 0! d 200 P9G� 100 PQ — Not Warranted 0 0 100 200 300 400 500 600 700 800 900 1000 VA,Advancing Volume(VPH) y=-9401n(x)+5831.E RI=0.9991 RDM Left Turn Lane Warrant Assessment Four-Lane Roadway Left Turn Lane Warrant Assessment Four-Lane Highways Background: Warrants for left-turn storage lanes on four-lane highways at unsignalized intersections are based on Figure 3-3 in Appendix F of the Virginia Department of Transportation's(VDOT) Road Design Manual(RDM).The figure provides a graphical representation for determining the necessity of a left turn lane for divided and undivied roadway conditions by comparing the left turning volumes of a given approach and the respective opposing traffic volume. Project Information: Project: Gibson Property TIA .......................................................................................................................................................................................................................................................................................................................................................................... Project ID: .......................................................................................................................................................................................................................................................................................................................................................................... Intersection(s)and Movement(s): Intersection 9:Route 522(N/S)8 Gibson Site Entrance 4/Gibson Site Entrance 5(E/W) .......................................................................................................................................................................................................................................................................................................................................................................... Intersection 10:Route 522(N/S)8 Gibson Site Entrance 6(W) .......................................................................................................................................................................................................................................................................................................................................................................... Scenario: 2035 Total Future Analysis: Gorove Slade Assessment Summary: OpposingInput Result Study Scenario Median Vol.(VPH) Vol. Vol. Left Turn% Treatment Intersection 9:NBL AM Peak Divided 705 1 801 1 36 1 4.5% 1 Full-width Turn Lane and Taper Warranted(for Undivided and Divided) Intersection 9:NBL PM Peak Divided 985 1 024 15 11' Not Warranted Intersection 9:SBL AM Peak Divided 801 705 2 0.3% Not Warranted Intersection 9:SBL PM Peak Divided ��740 024 985 1 0.1% Not Warranted Intersection 10:SBL AM Peak Divided 720 17 2.4% Not Warranted Intersection 10:SBL PM Peak Divided 1,084 986 7 0.7% Not Warranted VDOT Road Design Manual Figure 3-3 (Left Turn Warrant for 4 Lane Highways) 1800 At-Grade,Unsignalized Intersections 1600 1400 1200 Intersection 10:S M Peak 1000 •Inters 9:SBL PM Peak Intersectio :NBL PM Peak 800 •Intersection 9:.BL AM Peak •Intersection 10:SBL A ak Intersection 9:NBL AM Peak 600 400 200 No Left-Turn Lane Required Warran[Four-Lane Undivided Warrant Four-Lane Divided 0 _. 0 10 20 30 40 50 60 70 80 90 100 Left Turning Volume(vph) y=-0.0425x'+3.1819x'-118.75x+1750.2 R'=0.9982 y=-0.0039x'+0.5494x�-46.92x+1778.3 R'=0.9991 Gor-e Slade Transportation Engineers and Planners VDOT Road Design Manual Figure 3-3 (Left Turn Warrant for 4 Lane Highways) 1800 At-Grade,Unsignalized Intersections S=Storage Length Required 1600 1400 1200 L Q- t se io 1 P e 1000 In r Etc e 0 rn E 800 me sec'on 9: BL A P k c 01t On P k a a O 600 400 Ll d 5 � � n 0 200 �o d A 7 � N N 0 0 100 200 300 400 500 600 Left Turning Volume(vph) RDM Right Turn Lane Warrant Assessment Two-Lane Highway Right Turn Lane Warrant Assessment Two-Lane Highways Based on NCHRP Report 279/VDOT RDM Appendix F "Intersection Channelization Guide" Background: Warrants for right-turn storage lanes on two-lane highways at unsignalized intersections are based on Figure 3-26 in Appendix F of the Virginia Department of Transportation's(VDOT)Road Design Manual (RDM).This figure provides a graphical representation for determining the necessity of a right turn lane and/or taper by comparing the total volumes of a given approach with their respective right turn volumes. Project Information: Project: Gibson Property TIA ............................................................................................................................................................................................................................................................................................................................................................. Project ID: ............................................................................................................................................................................................................................................................................................................................................................. Intersection(s)and Movement(s): Intersection 6:Madison Site Entrance/Gibson Site Entrance 1 (N/S)&Fairfax Pike(E/W) ............................................................................................................................................................................................................................................................................................................................................................. Intersection 7:Fairfax Pike(S)&Gibson Site Entrance 2(E/W) .................................................................................................................................................................................................................................................................... Intersection 8:Fairfax Pike(S)&Gibson Site Entrance 3(E/W) .................................................................................................................................................................................................................................................................... .................................................................................................................................................................................................................................................................... ............................................................................................................................................................................................................................................................................................................................................................. Scenario: 2035 Total Future ............................................................................................................................................................................................................................................................................................................................................................. Analyst: Gorove Slade RightApproach Right Turn Minimum Right Minimum TaperStudy Scenario Volume Volume Turn . . Threshold Intersection 6:WBR AM Peak 712 92 20 40 Full-width Lane and Taper Required Intersection 6:WBR PM Peak 1,171 37 20 40 Taper Required Intersection 7:WBR AM Peak 702 3 20 40 Not Warranted Intersection 7:WBR PM Peak 1,129 1 20 40 Not Warranted Intersection 8:WBR AM Peak 715 14 20 40 Not Warranted Intersection 8:WBR PM Peak 1,130 6 20 40 Not Warranted Right Turn Lane Warrant for 2-Lane Highways (VDOT RDM Appendix F Figure 3-26) 120 Full-width Turn Lane Ind Taper Required 100 Intersection6:WBR AP+Peak 0 = 80 CL a U L > 60 N E Required H 40 PI4 Peak x a 20 Intersection 8:WBR PM Peak Not warrantedlnters coon 7:WBR AM Peak ntersection8►WBRP Peak p Peak 0 200 400 600 800 1000 1200 PHF Approach Total,Vehicles Per Hour Gorove Slade Transportation Engineers and Planners RDM Right Turn Lane Warrant Assessment Four-Lane Highway Right Turn Lane Warrant Assessment Four-Lane Highways Based on NCHRP Report 279/VDOT RDM Appendix F "Intersection Channelization Guide" Background: Warrants for right-turn storage lanes on four-lane highways at unsignalized intersections are based on Figure 3-27 in Appendix F of the Virginia Department of Transportation's(VDOT)Road Design Manual (RDM).This figure provides a graphical representation for determining the necessity of a right turn lane and/or taper by comparing the total volumes of a given approach with their respective right turn volumes. Proiect Information: Project: ............................................................................................................................................................................................................................................................................................................................................................. ProjectlD: ..............................................................................................................i'o'n..........................................................................iie,..............................................S"it..................................................................................................... Intersections)and Movement(s): Intersection 9: Route 522(N/S)&Gibson Site Entrance 4/Gibson Site Entrance 5(E/W) ............................................................................................................................................................................................................................................................................................................................................................. Intersection 10:Route 522(N/S)&Gibson Site Entrance 6(W) ..................................................................................................................................................................................................................................................................... ..................................................................................................................................................................................................................................................................... ..................................................................................................................................................................................................................................................................... ............................................................................................................................................................................................................................................................................................................................................................. Scenario: 2035 Total Future ............................................................................................................................................................................................................................................................................................................................................................. Analyst: Gorove Slade Approach Right Turn Minimum Right Minimum Right Study Scenari Volume Volume Turn Taper Turn Full Lane Treatment Threshold Threshold M"L 'A Intersection 9: NBR AM Peak 801 53 16 69 Taper Required Intersection 9:NBR PM Peak 1,024 21 10 53 Taper Required Intersection 9:SBR AM Peak 705 92 19 75 Full-width Lane and Taper Required Intersection 9:SBR PM Peak 985 37 10 55 Taper Required Intersection 10: NBR AM Peak 740 6 18 73 Not Warranted Intersection 10: NBR AM Peak 1,084 2 10 48 Not Warranted Right Turn Lane Warrant for 4-Lane Highways (VDOT RDM Appendix F Figure 3-27) 120 Intersection 9:SBRAM Peak 100 Full-wid h Turn Lane and per 80 Required W a N N s I iterseGtic n 9:SBR PM Peak j 60 in N H 40 > Intersection 9:NBR PM Peak 2 a 20 Not 7arranted ♦ ntersedi n 10:NB AM Pe k 0 0 200 400 600 800 1000 1200 1400 1600 1800 2000 2200 2400 2600 2800 3000 3200 PHF Approach Total,Vehicles Per Hour Gorove Slade Transportation Engineers and Planners