Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
023-26 (RezSilverwolfeLLC(AerogreenSolutionsLLC))
ORDINANCE Action- PLANNING COMMISSION September 16, 2026 Recommended Approval with conditions BOARD OF SUPERVISORS: October 14, 2026 Adopted AMENDING THE ZONING DISTRICT MAP REZONING#07-26 FOR SILVERWOLM LLC. (AEROGREEN SOLUTIONS,LLC.) WHEREAS,REZONING #07-26 of Silverwolfe, LLC(Aerogreen Solutions, LLC)submitted to rezone 8.84+/- acres from B3(Industrial Transition)Toning District with proffers to M2(Industrial General)Zoning District with proffers. The property is located at the corner of Martinsburg Pike and Woodside Road, Clear Brook and is identified by Property Identification Number 33-A-124A in the Stonewall Magisterial District;and WHEREAS,the Frederick County Planning Commission held a public hearing on this rezoning on September 16,2026,and recommended approval with conditions;and WHEREAS,the Frederick County Board of Supervisors held a public hearing on October 14,2026;and WHEREAS, the Frederick County Board of Supervisors finds the approval of this rezoning to be in the best interest of public health,safety,and welfare, and in conformance with the Comprehensive Plan; NOW,THEREFORE,BE IT ORDAINED by the Frederick County Board of Supervisors,that Chapter 165 of the Frederick County Code,Zoning,the Zoning District Map is amended in accordance with Rezoning#07-26 of Silverwolfe,LLC (Aerogreen Solutions,LLC)submitted to rezone 8.84+/-acres from B3(Industrial Transition) Zoning District with proffers to the M2 (Industrial General) Zoning District with proffers dated September 28, 2026. The conditions voluntarily proffered in writing by the Applicant and the Property Owner are attached. This ordinance shall be in effect on the date of adoption. Passed this 14'day of October 2026 by the following recorded vote: John F.Jewell,Chairman Aye Jason C.Aikens Aye Albert L.Omdorff Aye Robert W. Wells Aye Michael D. Guevremont Aye Robert'I', Liero Aye Gary R.Oates Recused A COPY 0,TTEST Michael Bollhoef Frederick County dministratar No.023-26 14-00-1611 REZONING#07-26 Silverwolfe,LLC. (Aerogreen Solutions,LLC.) Staff Report for the Board of Supervisors Prepared: September 30,2016 Staff Contact: Amy Feltner, Planner Executive Summary: Meeting Schedule Planning Commission: September 16 2026 Action: Recommended Approval Board of Supervisors: October 14, 2026 Action: Pending Property Information Property Identification Number PIN 33-A-124A Address Corner of Martinsburg Pike (Route 11) & Woodside Road Route 671 Magisterial District Stonewall Acreage +/- 8.84 Zoning &Present Land Use Zoning: 133 (Industrial Transition)with proffers Land Use: Vacant Proposed Zoning M2 Industrial General with proffers Adjoining Property Zoning & Present Land Use North: RA Rural Area District Land Use: Vacant South: RA Rural Area District Land Use: Residential East: RA Rural Area District/Railroad Land Use: Residential/Railroad West: RA Rural Area District Land Use: Residential Proposed Use This is a request to rezone from B3 (Industrial Transition) District with proffers to M2 (Industrial General) District with proffers. The proposed rezoning proffers to limit the permitted use on the property to "Soap and Cleaning Compound Manufacturing& General Warehouse/Storage." Positives Concerns The proposed rezoning includes proffers that The proposed M2 zoning district would allow restrict the permitted uses on the property to a broader range of industrial uses than the "Soap and Cleaning Compound current B3 zoning. While the proffers limit Manufacturing& General the permitted uses on the property, the Warehouse/Storage"and establish limitations proposed zoning is not directly consistent on the amount of manufacturing and Page 2 of 7 warehouse space. Essentially, these with the Comprehensive Plan's "business" restrictions would limit the range and land use designation. intensity of uses that could otherwise be The property is also adjacent to established permitted within the M2 District. residential properties to the east, west, and The proposed rezoning is also expected to south. The potential impacts of the proposed result in reduced traffic volumes compared to industrial use on these residences should be the uses that could otherwise be permitted considered, including the effectiveness of under the current zoning on the parcel. proposed buffering and other site design measures. Review A2ency Comments: Review Agency Comment Comment Summary Status Date Virginia 07/15/2026 "VDOT has no comments. The Department of rezoning is expected to result in Transportation reduced traffic volumes compared to (VDOT) current zoning." Frederick County 6/11/2026 "No Comment from Public Works. A Public Works comprehensive review of the erosion and sediment control and stormwater management plan will take place at the time of site plan submittal." Frederick Water 7/15/2026 "Water and Sewer lines currently existing along the property's Martinsburg Pike frontage. The water and sewer demand proposed in the rezoning application (6,700 GPD and 450 GPD, respectively) could be accommodated by the existing infrastructure along the site's frontage. The applicant is responsible for funding and constructing any improvements warranted to facilitate water and sewer service for the property." Frederick County 6/30/2026 "Future development shall comply Fire Marshal with the Frederick County Fire Prevention Code and other applicable codes." Page 3 of 7 Frederick County 08/14/2026 "The proffer statement meets the Legal form. Attorney requirements of the Frederick County Zoning Ordinance and the Code of Virginia and is legally sufficient as proposed for recordation. I have not reviewed the substance of the proffers as to whether the proffers are suitable and appropriate for this specific development, as my understanding is that review is being undertaken by staff and the Planning Commission." Building 6/12/2026 "No Comment." Inspections GIS 8/12/2026 "No Comment at this time." Planning & Zoning Staff Analvsis: Site History: The current parcel was rezoned (REZ 908-06) from RA (Rural Area) District to B3 (Industrial Transition) District with proffers on March 14, 2007, and modified proffers amendment on March 13, 2013 (REZ #01-13). The parcel is currently vacant. Comprehensive Plan Conformance: The Comprehensive Plan (adopted November 2021) and the Northeast Frederick Land Use Plan (NELUP, 2023) provide guidance on the future development of the subject property. The Plan identifies the subject property as having a"business"land use designation. The property is within the Sewer and Water Service Area (SWSA) and outside the Urban Development Area(UDA). While the Comprehensive Plan clearly identifies the subject property as "business," The NELUP area plan identifies "significant areas for opportunities along the Martinsburg Pike, Hopewell Road, Cedar Hill Road, and areas west of Woodside Road" for commercial and industrial uses "strategically located with direct interstate and regional highway routes." §165-402.01 of the Frederick County Zoning Ordinance speaks to the intent of the General Industrial District use classification by shaping the intent of the zoning district intended to implement it. Page 4 of 7 "...fintended] to provide for a wide variety of heavy manufacturing, office and heavy traffic uses, including those which may not be compatible with nearby residential and general business areas." The rezoning generally typically associated with an `industrial'land use designation in the Comprehensive Plan. The NELUP clearly identifies this parcel with a"business"land use. The NEL UP does not directly speak to the subject parcel. The plan speaks to business uses "between Old Charlestown Road and Stephenson Road,west of the rail corridor may be well suited to meet the community needs of anchor retail." The subject parcel lies north of Stephenson Road just south of Cedar Hill Road and borders the future land use of Mixed Use Industrial\Office land use designation to the north. The applicant has attempted to address this concern by limiting the area of the facilities and restricting the proposed use. The proffer speaks to limit the maximum area to a 40,000 square foot facility and to proffer the specific use to "soap and cleaning compound manufacturing" and "general warehouse/storage." The property is located in an area that contains existing established residential properties to the east, west, and south. Existing residential uses are located along Martinsburg Pike, in close proximity to areas planned for more intensive uses. While many of these residential uses are planned to transition in the future to higher intensity uses, development applications should seek to mitigate their impact on these residences near term. The applicant has attempted to address this by providing an additional row of evergreen trees within the required Category C buffer to the east and south and the required corridor enhancement buffer along Martinsburg Pike. The Comprehensive Plan provides that building and the site should be of high duality to ensure an attractive view for both residents and visitors. Staff would note that the proffers do not address the building materials and/or high-quality design of the structure. Transportation & Site Access: The current proffer statement mirrors that which is proffered transportation improvements listed under REZ 01-13 & REZ 08-06 with the exception of a "12' lane onto Martinsburg Pike, Route 11, along the site road frontage" built to VDOT standards and an additional "10' strip of land dedicated to Commonwealth of Virginia" on Woodside Road. The proposed rezoning excludes these originallyzproffered items. Staff would like to note that VDOT did not note any negative impact on the removal of the additional 12'lane on Martinsburg Pike (turn lane) and the 10' dedicated strip on Woodside. Woodside Road is identified in the Comprehensive Plan for improvement as part of Eastern Road Plan and identified as an improved major collector with an 80'right-of-way. Currently, Woodside Road has a prescriptive easement of 15 feet in width. The applicant has proffered a dedication of Page 5 of 7 25' from the centerline of Woodside Road extending the entire frontage of the property. Martinsburg Pike currently has a dedicated right-of-way of 80' and any additional improvements needed for the commercial entrance onto Route I/Martinsburg Pike can and will be addressed at the site plan stage. Proffer Statement, Generalized Development Plan (GDP), &Impact Anal Proffers Staff Comment (May 22, 2026, rev. September 28, 2026) A) Land Use Restrictions Proffers "Soap and Cleaning Compound Manufacturing" and"General Warehouse/Storage"which limits the property use and any alternative use would require a new rezoning. B)Limits Gross Floor Area(GFA),Building Proffer states a maximum 40,000 square foot Height Limitation. facility (15,000 square foot Soap and Cleaning Compound Manufacturing& 25,000 square foot Warehouse). The revised proffer limits the height of the structure to 45 feet. C)Access Entrance from Martinsburg Pike is limited to one single entrance which remains unchanged from the original rezoning. The proffered single entrance on Woodside Road would be a change from the initial approved rezoning which permitted two entrances on Woodside Road. D) Design Standards The revised proffers contain minimal language to the construction materials or high-quality design of the facility. The property is located at highly visible location; the building and the site should be of high quality to ensure an attractive view for both residents and visitors. Following the Planning Commission meeting, the revised proffers address the building face fronting Martinsburg Pike, stating that it would not contain loading bays nor metal siding material. Page 6 of 7 Below is the Generalized Development Plan (GDP)revised September 15, 2026, which depicts the proposed (revised) land development and entrance locations. 4 ` t rcFaLwtAlLtf�•LLlfi L �• uY_NF4OEwN1 � c W rLsv,lxa •�•3= � �t NFIMfi[x hewn in�RelM.�wPx �[J ea iYC.k,a, SE vMxSY �w ` obexauwara bnnte P[W�,li PItGfAEsrc•IXEhxrwx 4", { aGMfL':P• �'+ FRM6§-'N CFlWM1LNRASAN�wrN i6E K9Kxr �.., Ptrfb M +no n` Sf,x�PFM LU Ld n I a � 1 tni�Lt LX 1 +.mffi � A , I: wouwsw�LeNlasnuu i I 'Z un xfl�fb Nw� [ F4eFrl1 51 � � [FxiENLtf _ `��-_i i�1 � I rf 'J'xYGtP49YMMA 1 I s m,En x. EI^� � ` !f J5E IL.e091PYL WE u®eFNrwL • ax Nnuw.sioetsrve fau�.un Z psi Y'" gJ I'wvh,w, bSEh fM -5 ' Y � Nmsites � uo en�saroL �� [Y1�z rrm«mL I 1 Kaw araxc Nx ,! u+� a�axrceru�nr� I 3 1 Ixx Nc msm,.r ex,cN �� �bi[b Na rwttwF.cXr ry w E 3 � ••�...�••.•. �..FA1WnCf a I � t5 65SiyW�; 2.v:E I CY.R>QQ2 @!LV[PBIrBL{FH< (� 1 t ---_____,___,bed________m_m________ 99{itnf Y �rC nCCis1e C"89sFF iufffl9W[u 4, I i sc , _is£ a� • tpaw s ateawu Preu,:l ••$�a at',tntaeirtx•- �� •� •� r�r o• �N�� iiY W• u9f Fl9bf Nlwt Pe F _.ffi Pr.Rm:REM113 1 N5w¢N m.1 03 e1NONW Feg990(ei uNn N_1e tdlb Ra Lee:Finalcrirtta 100 0 100 200 SCALE: 1" = 190' Planning & Zoning Staff Analysis: The Planning Commission held a public hearing during their regular meeting on September 16, 2026. Staff provided a revised proffer statement with a revised GDP received September 16,2026. The change incorporated an increase to the initial 10 feet to 25 feet of right-of-way dedicated along Martinsburg Pike. All other proffers remain unchanged. The Planning Commission inquired if the additional right-of-way was related to the 12-foot turn lane that was removed from the original approved proffers. Staff explained that the additional distance meets the Primary Road Improvement plan that had upgraded Martinsburg Pike from a Four-Through Lane to a Six-Through Lane with the adoption of the 2026-2027 Primary Road Improvement Plan June 10, 2026. All other road improvements, including any turn lanes and Woodside Road improvements, would be addressed at the site plan stage. The applicant understands these potential additional requirements. The Planning Commission discussed the impacts on the neighboring residential dwellings including height of the proposed structure, specific elements of the buffer requirements, and hours of operation, noting that while this may be a less intense use than the approved rezoning use, additional regulations may be warranted. Page 7 of 7 The Planning Commission wanted clarification of the allowed use and if the proposed use would be allowed under the current rezoning approval. The proposed use under the NAICS (North American Industrial Classification System) places this use as a chemical manufacturing industry and is currently only permitted in the M-2 (Industrial General)Zoning District. The applicant has proffered out all other uses permitted within the M-2 (Industrial General) Zoning District. The Planning Commission addressed the applicant with concerns of noise, specific species of plantings, specifics of the process and chemical operations,building materials,hours of operation, and the location of the loading bays. The applicant responded that mixing operations take place inside the building and the parking/loading area would be the source of noise. The applicant was not objectionable to proffering specific, high quality, building materials. Although the building orientation was not decided yet, the loading docks will not face Martinsburg Pike. The chemicals are all biodegradable and are mixed,packaged and ship to one specific industry where it is used as an ingredient to form a chemical. There are no hazardous chemicals process at this location. Hours of operation were discussed. Although the applicant could not recall the specific hours of operation, the business only operates Monday through Friday. There was no object to proffering the hours of operation. The Planning Commission recommended adding the following recommendations: 1. Structures may not exceed forty-five (45) feet in height. 2. The fence material shall be board-on-board fencing. All other fencing, including metal chain link fence, are prohibited. 3. The proffers shall reflect specific high-quality building material. 4. The proffers shall reflect a commitment to use only Virginia native planting species. 5. Loading bays cannot face Martinsburg Pike. 6. Hours of operation are limited to Monday-Friday, 8 a.m. to 5 p.m. The Planning Commission recommended approval of the proposed rezoning application with the additional recommendations. (11-0, McKay & Crane absent). Staff would note that the revised proffer statement received September 28, 2026, restricts landscape plantings to those of Virginia Native species only (D.3). All other items have been included in the proffer summary above. The revised proffers remain silent on other items recommended by the Planning Commission including the hours of operation, description of the high-quality building materials, and the commitment to exclude metal chain link fencing as recommended by the Planning Commission. This is a rezonin,-reguirin-a public hearin-. Following a public hearing, staff is seeking a decision from the Board of Supervisors on this rezoning application. REZ # 07 26: Silverwolfe, LLC (Aerogreen Solutions) PIN. 33 - A - 124A Rezoning from B3 to M2 Location Map r.r r ' .` r RE_I rut-26 _ 4a ;t r Ire Alt C l9(l vj ^ Clrrar&oak 9 inn 3468 r� Application � N Sewer and Water Service Area ? `� 9 F �D Parcels �• `r S i !l 1 C�. Frederick County Planning&Development 107 N Kent St Winchester.VA 22601 540-665-5651 0 50 100 200 300 400 Feet Map Created:August 13.2026 REZ # 07 - 26: S lverwolfe, LLC (Aerogreen Solutions) PIN: 33 - A - 124A Rezoning from B3 to M2 Zoning Map w - � 1 � ' F .7 ' - ' REI>�07-26 '�4 40 r +4 s• � ,F h :1 Application Clow B aok F Sewer and Water Seance Area RD CDParcels " 132(General Business Distract) r 83[industrial Transition District] p j EM(Extractive Manufacturing District) y N I � M1(Light Industrial Dbstnct) W F I s Frederick County Planning&Development 107 N Kent Si Winchester.WA 22601 so1p0 20t} 30t1 109 Feet 540-665-5651 ibtop Created:August 13,2026 REZ # 07 - 26: Silverwolfe. LLC (Aerogreen Solutions) PIN: 33 - A - 124A Rezoning from B3 to M2 Long Range Land Use Map r.r � 10 0© 11 dsrQ F REI#07-26 �PQ 9MMMOM rr Go ffim J«. Q] "Icatlan Sewer and Water Seance Area Q Parcels iv Char&oak Long Range Land Use .r > Business Mixed Use IndustriallOffice g r � a CDIndustrial CDExtractive Mining ^, WF Rural Community Center � �r S i !l 1 C�. Frederick County Planning&Development 107 N Kent St Winchester.VA 22601 540-665-5651 0 s0 100 200 300 400 Feet pap Created:August 13.2026 Greenway Enginect ing,Inc. May 22,2026 Acrogreen Solutions LLC Revised July 29,2026 AEROGREEN SOLUTIONS LLC PROFFER STATEMENT REZONING: RZ#07-26 B-3, Industrial Transition District with proffers to M-2, Industrial General District with proffers PROPERTY: 8.84f acres Tax Map Parcel 33-A-124A(hereafter the "Property") RECORD OWNER: Silverwolfe, LLC (hereafter the"Owner") APPLICANT: Aerogreen Solutions,LLC (hereafter the "Applicant") PROJECT NAME: Aerogreen Solutions LLC Rezoning ORIGINAL DATE OF PROFFERS: May 22, 2026 REVISION DATE: July 29,2026 September 15, 2026 September 25, 2026 Prelimi&M Matters Pursuant to Section 15.2-2296 Et. Seq. of the Code of Virginia, 1950,as amended,and the provisions of the Frederick County Zoning Ordinance with respect to conditional zoning, the undersigned Owner hereby proffers that in the event the Board of Supervisors of Frederick County, Virginia, shall approve Rezoning Application # for the rezoning of a 8.84f-acre parcel from the B-2, Business General District to M-2,Industrial General District to establish 8.84t-acres of the property with proffers, development of the 8.84f-acre subject property shall be done in conformity with the terms and conditions set forth herein, except to the extent that such terms and conditions may be subsequently amended or revised by the Owner and such be approved by the Frederick County Board of Supervisors in accordance with the said Code and Zoning Ordinance. In the event that such rezoning is not granted, then these proffers shall be deemed withdrawn and have no effect whatsoever. These proffers shall be binding upon this Owner and their legal successors,heirs, or assigns. The Property, more particularly described as the land owned by Silverwolfe, LLC, being all of Tax Map Parcel 33-A-124A, as evident by Special Warranty Deed recorded as Instrument#060018520 and further described by Subdivision Plat prepared by Greenway Engineering and Surveying dated May 21, 1987 (see attached Survey Plat). File#0696BP 1 Greenway Enginect ing,Inc. May 22,2026 Acrogreen Solutions LLC Revised July 29,2026 PROFFER STATEMENT A) General Development Plan 1. The Applicant shall develop the Property in substantial conformance with the General Development Plan — Aerogreen Rezoning, prepared by Greenway Engineering, Inc., dated May 18, 2026 (the "GDP"), which is attached and included with this Proffer Statement as Exhibit A. 2. The content and components of the GDP may be adjusted to accommodate final design and engineering constraints without the need for new conditional rezoning approval by the Frederick County Board of Supervisors,provided said adjustments do not eliminate, relocate, or substantially alter the project components described herein. B. Land Use and Intensity Restrictions 1. The Owner hereby proffers that permitted uses on the Property shall be limited to the following: a. Soap and Cleaning Compound Manufacturing b. General Warehouse/Storage 2. The Owner hereby proffers that development of the Property shall not exceed a maximum gross floor area (GFA) of 40,000 square feet, subject to the following occupancy restrictions: a. Soap and Cleaning Compound Manufacturing use shall occupy a minimum of 15,000 square feet of GFA. b. General Warehouse/Storage use shall occupy a maximum of 25,000 square feet of GFA. 3. The Owner hereby proffers to a building height restriction of no greater than forty- five feet. 4. The Owner hereby proffers no bay doors shall be front facing on Martinsburg Pike. 5. The Owner hereby proffers no metal siding will be front facing on Martinsburg Pike_. File 40696BP 2 Greenway Enginect ing,Inc. May 22,2026 Acrogreen Solutions LLC Revised July 29,2026 C. Transportation 1. The Owner hereby proffers to limit access to the Property from Martinsburg Pike (US Route 11) to one commercial entrance as generally depicted on the GDP. The final entrance location and design will be subject to VDOT review and approval at time of site plan. 2. The Owner hereby proffers to limit access to the Property from Woodside Road (Route 671)to one commercial entrance as generally depicted on the GDP. The final entrance location and design will be subject to VDOT review and approval at time of site plan. 3. The Owner hereby proffers to provide for an inter-parcel connection along the southern boundary of the Property as generally depicted on the GDP. The final location of the inter-parcel connection shall be determined at time of site plan. 4. The Owner hereby proffers to a future dedicate of right-of-way along the Martinsburg Pike(US Route 11)frontage of the Property to the Commonwealth of Virginia as depicted on the GDP. The dedication area shall consist of a strip of land twenty-five (25) feet in width extending along the entire Martinsburg Pike frontage of the Property. The dedication shall happen within 90 days of the request from the Commonwealth of Virginia. 5. The Owner hereby proffers to dedicate right-of-way along the Woodside Road (VA Route 671) frontage of the Property to the Commonwealth of Virginia as depicted on the GDP_ The dedication area shall consist of strip of land twenty- five (25) feet in width measured from the centerline of Woodside Road and extending along the entire Woodside Road frontage of the Property. The dedication shall be completed prior to approval of the first site plan for the Property. 6. The Owner hereby proffers to record a twenty (20)-foot drainage, pedestrian, and utility easement along the frontage of Martinsburg Pike (US Route 11) to Federick County. The Owner shall retain the right to place the proffered split rail fence within this easement.Recordation of the easement shall be completed prior to approval of the first site plan for the Property. 7. The Owner hereby proffers to provide a monetary contribution of$75,000.00 to assist in funding planned transportation improvements along the Martinsburg Pike (US Route 11) corridor. This monetary contribution may be used unconditionally by Frederick County to fund such improvements and may be used as local match funding for any applicable transportation improvement grant or enhancement applications. This monetary contribution will be made to Frederick County prior to the issuance of the first occupancy permit for the Property. File#0696BP 3 Greenway Enginect ing,Inc. May 22,2026 Acrogreen Solutions LLC Revised July 29,2026 D. Site Design 1. The Owner hereby proffers to install an additional row of evergreen trees for a total of four rows of plantings m all areas required to provide a Zoning District Buffer per the Frederick County Zoning Ordinance as detailed on the GDP. 2. The Owner hereby proffers to provide a 50-foot-wide Corridor Enhancement Buffer along the Martinsburg Pike (US Route 11) frontage of the Property as depicted on the GDP. This buffer shall be subject to the following design standards: a. The buffer shall be planted with the components of a landscape screen as detailed on the GDP. Placement of plantings may be adjusted to accommodate utility and entrance crossings. Landscaping shall be installed prior to issuance of the first occupancy permit for the Property. b. A decorative split rail fence shall be installed in the buffer as detailed on the GDP. The split rail fence shall be installed prior to issuance of the first occupancy permit for the Property. 3. The Owner hereby proffers to plant Virginia Native species for landscaping for the Property. E. Monetary Contribution 1. The Applicant hereby voluntarily proffers a cash contribution to the Treasurer of Frederick County,Virginia,of$0.10 per building square foot to be disbursed to the Frederick County Fire and Rescue Department, to be paid prior to final site plan approval. The term"building square foot"shall be the combined floor area for each story. OWNER SIGNATURE ON FOLLOWING PAGE File#0696BP 4 Greenway Enginect ing,Inc. May 22,2026 Acrogreen solutions LLC Revised July 29,2026 Owner Signature The conditions proffered above shall be binding upon the heirs, executors, administrators, assigns and successors in the interest of the Applicant. In the event the Frederick County Board of Supervisors grants this rezoning and accepts the conditions, the proffered conditions shall apply to the land rezoned in addition to other requirements set forth in the Frederick County Code. Respectfully Submitted: Silverwolfe, LLC By: Authorized Agent Date Commonwealth of Virginia, City/County of To Wit.- The foregoing instrument was acknowledged before me this day of 2©�by Notary Public My Commission Expires File#U6%BP 5 Greenway Enginect ing,Inc. May 22,2026 Acrogreen Solutions LLC Revised July 29,2026 Applicant Signature The conditions proffered above shall be binding upon the heirs, executors, administrators, assigns and successors in the interest of the Owner. In the event the Frederick County Board of Supervisors grants this rezoning and accepts the conditions, the proffered conditions shall apply to the land rezoned in addition to other requirements set forth in the Frederick County Code. Respectfully Submitted: Aerogreen Solutions,LLC By: Authorized Agent Date Commonwealth of Virginia, City/County of To Wit: The foregoing instrument was acknowledged before me this day of 20�by Notary Public My Commission Expires File#0696BP Greenway Engineering.Inc. May 22,2026 Aerogreen Solutions LLC Revised July 29,2026 AEROGREEN SOLUTIONS LLC PROFFER STATEMENT REZONING: RZ#07-26 B-3, Industrial Transition District with proffers to M-2,Industrial General District with proffers PROPERTY: 8.84f acres Tax Map Parcel 33-A-124A(hereafter the "Property") RECORD OWNER: Silverwolfe, LLC (hereafter the"Owner") APPLICANT: Aerogreen Solutions,LLC (hereafter the "Applicant") PROJECT NAME: Aerogreen Solutions LLC Rezoning ORIGINAL DATE OF PROFFERS: May 22, 2026 REVISION DATE: July 29,202+6 September 15, 2026 September 25, 2026 Preliminary Matters Pursuant to Section 15.2-2296 Et. Seq. of the Code of Virginia, 1950,as amended,and the provisions of the Frederick County Zoning Ordinance with respect to conditional zoning, the undersigned Owner hereby proffers that in the event the Board of Supervisors of Frederick County, Virginia, shall approve Rezoning Application # for the rezoning of a 8.84±-acre parcel from the B-2, Business General District to M-2,Industrial General District to establish 8.84f-acres of the property with proffers, development of the 8.84f-acre subject property shall be done in conformity with the terms and conditions set forth herein, except to the extent that such terms and conditions may be subsequently amended or revised by the Owner and such be approved by the Frederick County Board of Supervisors in accordance with the said Code and Zoning Ordinance. In the event that such rezoning is not granted, then these proffers shall be deemed withdrawn and have no effect whatsoever. These proffers shall be binding upon this Owner and their legal successors,heirs, or assigns. The Property, more particularly described as the land owned by Silverwolfe, LLC, being all of Tax Map Parcel 33-A-124A, as evident by Special Warranty Deed recorded as Instrument#060018520 and further described by Subdivision Plat prepared by Greenway Engineering and Surveying dated May 21, 1987 (see attached Survey Plat). File OD696BP l Greenway Engineering.Inc. May 22,2026 Aerogreen Solutions LLC Revised July 29,2026 PROFFER STATEMENT A) General Development Plan 1. The Applicant shall develop the Property in substantial conformance with the General Development Plan — Aerogreen Rezoning, prepared by Greenway Engineering, Inc., dated May 18, 2026 (the "GDP"), which is attached and included with this Proffer Statement as Exhibit A. 2. The content and components of the GDP may be adjusted to accommodate final design and engineering constraints without the need for new conditional rezoning approval by the Frederick County Board of Supervisors,provided said adjustments do not eliminate, relocate, or substantially alter the project components described herein. B. Land Use and Intensity Restrictions 1. The Owner hereby proffers that permitted uses on the Property shall be limited to the following: a. Soap and Cleaning Compound Manufacturing b. General Warehouse/Storage 2. The Owner hereby proffers that development of the Property shall not exceed a maximum gross floor area (GFA) of 40,000 square feet, subject to the following occupancy restrictions: a. Soap and Cleaning Compound Manufacturing use shall occupy a minimum of 15,000 square feet of GFA. b. General Warehouse/Storage use shall occupy a maximum of 25,000 square feet of GFA. 3. The Owner hereby proffers to a building height restriction of no greater than forty- five feet. 4. The Owner hereby proffers no bay doors shall be front facing on Martinsburg Pike. 5. The Owner hereby proffers no metal siding will be front facing on Martinsburg Pike. File#0696BP 2 Greenway Engineering.Inc. May 22,2026 Aerogreen Solutions LLC Revised July 29,2026 C. Transportation 1. The Owner hereby proffers to limit access to the Property from Martinsburg Pike (US Route 11) to one commercial entrance as generally depicted on the GDP. The final entrance location and design will be subject to VDOT review and approval at time of site plan. 2. The Owner hereby proffers to limit access to the Property from Woodside Road (Route 671)to one commercial entrance as generally depicted on the GDP. The final entrance location and design will be subject to VDOT review and approval at time of site plan. 3. The Owner hereby proffers to provide for an inter-parcel connection along the southern boundary of the Property as generally depicted on the GDP. The final location of the inter-parcel connection shall be determined at time of site plan. 4. The Owner hereby proffers to a future dedicate of right-of-way along the Martinsburg Pike(US Route 11)frontage of the Property to the Commonwealth of Virginia as depicted on the GDP. The dedication area shall consist of a strip of land twenty-five (25) feet in width extending along the entire Martinsburg Pike frontage of the Property. The dedication shall happen within 90 days of the request from the Commonwealth of Virginia. 5. The Owner hereby proffers to dedicate right-of-way along the Woodside Road (VA Route 671) frontage of the Property to the Commonwealth of Virginia as depicted on the GDP_ The dedication area shall consist of a strip of land twenty- five (25) feet in width measured from the centerline of Woodside Road and extending along the entire Woodside Road frontage of the Property_ The dedication shall be completed prior to approval of the first site plan for the Property. 6. The Owner hereby proffers to record a twenty (20)-foot drainage, pedestrian, and utility easement along the frontage of Martinsburg Pike (US Route 11) to Federick County. The Owner shall retain the right to place the proffered split rail fence within this easement.Recordation of the easement shall be completed prior to approval of the first site plan for the Property. 7. The Owner hereby proffers to provide a monetary contribution of$75,000.00 to assist in funding planned transportation improvements along the Martinsburg Pike (US Route 11) corridor. This monetary contribution may be used unconditionally by Frederick County to fund such improvements and may be used as local match funding for any applicable transportation improvement grant or enhancement applications. This monetary contribution will be made to Frederick County prior to the issuance of the first occupancy permit for the Property. File#0696SP 3 Greenway Engineering.Inc. May 22,2026 Aerogreen Solutions LLC Revised July 29,2026 D. Site Design 1. The Owner hereby proffers to install an additional row of evergreen trees for a total of four rows of plantings in all areas required to provide a Zoning District Buffer per the Frederick County Zoning Ordinance as detailed on the GDP. 2. The Owner hereby proffers to provide a 50-foot-wide Corridor Enhancement Buffer along the Martinsburg Pike (LJS Route 11) frontage of the Property as depicted on the GDP. This buffer shall be subject to the following design standards: a. The buffer shall be planted with the components of a landscape screen as detailed on the GDP. Placement of plantings may be adjusted to accommodate utility and entrance crossings. Landscaping shall be installed prior to issuance of the first occupancy permit for the Property. b. A decorative split rail fence shall be installed in the buffer as detailed on the GDP. The split rail fence shall be installed prior to issuance of the first occupancy permit for the Property. 3. The Owner hereby proffers to plant Virginia Native species for landscaping for the Property- E. Monetary Contribution 1. The Applicant hereby voluntarily proffers a cash contribution to the Treasurer of Frederick County,Virginia,of$0.10 per building square foot to be disbursed to the Frederick County Fire and Rescue Department, to be paid prior to final site plan approval. The tern"building square foot"shall be the combined floor area for each story. OWNER SIGNATURE ON FOLLOWING PAGE File#0696SP 4 Greenway Engineering.Inc. May 22,2026 Aerogreen Solutions LLC Revised July 29,2026 Owner Signature The conditions proffered above shall be binding upon the heirs,executors, administrators, assigns and successors in the interest of the Applicant. In the event the Frederick County Board of Supervisors grants this rezoning and accepts the conditions, the proffered conditions shall apply to the land rezoned in addition to other requirements set forth in the Frederick County Code. Respectfully Submitted: Silverwolfe, LLC By: Authorized Agent Date Commonwealth of Virginia, City/County of To Wit.- The foregoing instrument was acknowledged before me this day of 20_by Notary Public My Commission Expires File 0U696BP 5 Greenway Engineering.Inc. May 22,2026 Aerogrem Solutions LLC Revised July 29,2026 Applicant Signature The conditions proffered above shall be binding upon the Heirs,executors, administrators, assigns and successors in the interest of the Owner. In the event the Frederick County Board of Supervisors grants this rezoning and accepts the conditions, the proffered conditions shall apply to the land rezoned in addition to other requirements set forth in the Frederick County Code. Respectfully Submitted: Aerogreen Solutions,LLC By: Authorized Agent Date Commonwealth of Virginia, City/County of To Wit: The foregoing instrument was acknowledged before me this day of 20 by Notary Public My Commission Expires File#0696SP 6 Submittal Deadline REZONING APPLICATION P/C MeetingBOS Meeting FREDERICK COUNTY, VIRGINIA 1. Property Owner(s) (please attach additional page(s) if more than two owners): Name: Silverwolfe, LLC Specific Contact Person if Other than Above. Gary Oates Address: 1073 Redbud Rd, Winchester, VA 22603 Telephone. 540-667-2001 Email: Name: Specific Contact Person if Other than Above: Address: Telephone: Email: 2. Other Interested Parties (such as a contract purchaser) (please attach additional page(s) if necessary): Name. Aerogreen Solutions, LLC Specific Contact Person if Other than Above. Bob Patel Address. 1285 Brucetown Rd, Clear Brook, VA 22624 Telephone: Email: bob.patel@aerogreen.us 3. Law firm, engineering firm, or other person, if any, serving as the primary contact person for this application: Firm Name. Greenway Engineering, Inc Specific Contact Person at Firm. Marisa Whitacre Address. 151 Windy Hill Ln, Winchester, VA 22602 12 Telephone. 540-662-4185 Email. mawhitacre@greenwayeng.com *Please note that, if a law firm, engineering firm, or other person, other than the owner of the property, will be acting on behalf of the owner and/or executing papers on behalf of the owner in connection with the rezoning, the owner will need to execute a power of attorney form granting the firm or person such authority. 4. Project Name: Aerogreen Solutions Rezoning 5. Property Information: Property Identification Number(s): 33-A-124A Total acreage of the parcel(s): 8.84 Total acreage of the parcel(s) to- 8.84 be-rezoned: Current zoning designation(s) and B3, 8.84 acreage(s) in each designation: Proposed zoning designation(s) M2, 8.84 and acreage(s) in each designation: Magisterial District(s): Stonewall Location - the property is located at (give street address(es) if assigned or otherwise exact location based on nearest road and distance from nearest intersection, using road names and route numbers): The property is on the east side of Martinsburg Pike and south of Woodside Rd Is this property within '/2 miles of the Town of Stephens City, the Town of Middletown, the City of Winchester, Clarke County, or Shenandoah County (specify which): no 13 Adjoining Properties: Zoning: Use: North: RA Vacant South: RA Residential East: EM Mining Operation West: RA Residential 6. Disclosure of real parties in interest. Virginia Code § 15.2-2289 provides that localities may by ordinance require any applicant for a zoning amendment to make complete disclosure of the equitable ownership of the real estate to be affected including, in the case of corporate ownership, the name of stockholders, officers, and directors, and in any case the names and addresses of all real parties of interest. Frederick County has, by County Code § 165-101.09, adopted such an ordinance. For each business entity that is an owner or contract purchaser of the property, please list the name and address of each person owning an interest in, or who is an officer or director of, any entity that is an owner or contract purchaser of the property (you need not indicate the amount or extent of the ownership interest). Please note that this requirement does not apply to a corporation whose stock is traded on a national or local stock exchange and having more than 500 shareholders. Please attach additional page(s) if necessary. 7. Signature(s): I (we), the undersigned, do hereby respectfully make application and petition the Frederick County Board of Supervisors to amend the zoning ordinance to change the zoning map of Frederick County, Virginia. I (we) authorize Frederick County officials to enter the property for site inspection purposes. 14 I (we) understand that the sign issued when this application is submitted must be placed at the front property line at feast seven days prior to the Planning Commission public hearing and the Board of Supervisors public hearing and maintained so as to be visible from the road right-of-way until the hearing. I (we) hereby certify that this appfication and its accompanying materials are true and accurate to the best of my(our) knowledge. Owner: P11&A(5L;u Date If si;in on behalf of an entity, please state name of entity and your title- Owner: Y Owner: Date If signing on behalf of an entity, please state name of entity and your title: Other Applicant Party(if any): _ Now_ Date 8/12/26 If signing on behalf of an entity, please state name of entity and your title: Aereogreen Solutions, LLC (President) If additional signature lines are necessary, such as if more than two people are owners, please use additional copies of this page. *A signed Power ofAttorney farm is required if someone is signing on the owner(s)behalf. 15 Adjoining Property Owners Owners of property adjoining the land will be notified of the Planning Commission and the Board of Supervisors meetings. For this application, adjoining property is any property abutting the requested property on the side or rear or any property directly across a public right-of-way, a private right-of-way, or a watercourse from the requested property. The applicant is required to obtain the following information on each adjoining property including the parcel identification number. These can be obtained from Frederick County's GIS Interactive Maps. *The Town of Stephens City, Middletown, the City of Winchester, Clarke County, or Shenandoah County shall be notified if the proposal is within % mile of their boundary. Name and Property Identification Number Address Name MV Winchester, LLC 794 Center ST, Herndon, VA 20170 Property#33-A-125 Name Elaine F Magee 3703 Martinsburg Pike, Clear Brook, VA Property#33-A-125A 22624 Name John F Butler 3721 Martinsburg Pike, Clear Brook, VA Property#33-A-125B 22624 Name Zachary J Cook 2060 Cedar Hill Rd, Clear Brook, VA Property#33-A-126 22624 Name Frederick County Sanitation Authority PO Box 1877, Winchester, VA 22604 Property#33-A-129 Name Frederick County Sanitation Authority PO Box 1877, Winchester, VA 22604 Property#33-A-131 Name Jack & Sandra Robinson 2140 Woodside Rd, Clear Brook, VA Property#33-A-124B 22624 NameO-N Minerals (Chemstone Company) 692 Pointe Inverness Way STE 301, Fort Property#34-A-11 A Wayne, IN 46804 Name Frederick A Stronko 3656 Martinsburg Pike, Clear Brook, VA 2 16 Property#33-A-124D Name Property# Name Property# Name Property# Name Property# Name Property# 17 CYOMo� Special Limited Power of Attorney e County of Frederick, Virginia Frederick Planning Website: www1cya.us b Department of Planning & Development,County of Frederick,Virginia 107 North Kent Street,Winchester, Virginia 22601 Phone (540) 665-5651 Facsimile (540) 665-6395 Know All Men By These Presents That: Silverwolfe LLC-Gary Oates Name of Property OwnerlApplicant Please note. If the property ownerlapplicant is an entity,the name of the entity should appear above. Ifmultiple persons own the property or are applicants,an executed power of attorney from each owner will be needed. 1073 Redbud Rd,Winchester,VA 22603 540-667-2001 Mailing Address of Property Owner/Applicant Telephone dumber as owner of,or applicant with respect to,the tract(s)or parcel(s)of land in Frederick County, Virginia,identified by following property identification numbers: 33-A-124A do hereby make,constitute,and appoint: Greenway Engineering,Inc Name of Attorney-In-Fact 151 Windy Hill Ln,Winchester,VA 22602 W-662-4185 Mailing Address of Attorney-In-Fact Telephone Number to act as my true and lawful attorney-in-fact for and in my name,place,and stead,with the same full power and authority X would have if acting personally,to file and act on my behalf with respect to application with Frederick County,Virginia for the following,for the above identified property: ✓ Rezoning Subdivision Conditional Use Permit ✓ Site Plan Master Development Plan(prelim.or final) Variance or Zoning Appeal Subdivision Appeal or Waiver/Exception and,further,my attorney-in-fact shall have the authority to offer proffered conditions and to make amendments to previously approved proffered conditions except as follows: This appointment shall expire one year from the day that it is signed,or at such sooner time as I otherwise rescind or modify it. Signature Title(if signing 1 behalf of an entity) 2244sr<-,a P'" .Sl-rr,hl 1.1.e- State of ,CountyXky of arII -,To wit: I, (b a„ alku a Notary Public in and for the jurisdiction aforesaid,certify that the perscq who signed the foregoing instrument pers pally appeared before me and has acknowledged the same before me in the jurisdiction aforesaid this day of 2fl-_* my Commission Expires: _; , �?4Q4 No ublic COREY BLAKE CA%Mt�tion tuber: NOTARY PUBLIC Commonwealth of Virginia My Commission Expires June 30,2026 AEROGREEN SOLUTIONS, LLC REZONING IMPACT ANALYSIS STATEMENT Tax Parcel 33-A-124A Stonewall Magisterial District Frederick County, Virginia I �mj May 22, 2026 Current Owner: Silverwolfe,LLC Contact Person: Marisa Whitacre Greenway Engineering,Inc. 151 Windy Hill Lane Winchester,VA 22602 540-6624185 Greenway Engineering,Inc. May 22,2026 Aerogreen Solutions LLC Rezoning AEROGREEN SOLUTIONS, LLC REZONING IMPACT ANALYSIS STATEMENT INTRODUCTION This report has been prepared for the purpose of assessing the impact on Fredrick County by the proffered rezoning of a parcel totaling approximately 8.84± acres from B3, Industrial Transition District to the M2, Industrial General District. The subject property is identified as Tax Parcel 33-A-124A and owned by Silverwolfe, LLC. The assemblage is adjacent and east of Martinsburg Pike (U.S. Route 11) and adjacent and south of Woodside Road (VA Route 671). (Please refer to the attached Location and Aerial Exhibits) Site Information: Location: East side of Martinsburg Pike (U.S. Route 11) and south side of Woodside Road(VA Route 671) Magisterial District: Stonewall District Property ID Number: 33-A-124A Current Zoning: B3, Industrial Transition District Current Use: Vacant/Undeveloped Proposed Zoning: M2, Industrial General District Total Rezoning Area: 8.84± acres Proposed Use: Chemical Manufacturing and General Warehouse/Storage File#0696BP—Impact Analysis Statement 2 Greenway Engineering,Inc. May 22,2026 Aerogreen Solutions LLC Rezoning COMPREHENSIVE POLICY PLAN Comprehensive Plan Conformity The 8.84± acre site is located wholly within the boundaries of the Northeast Land Use Plan (NELUP). The recent update to the NELUP, adopted by the Board of Supervisors on September 27, 2023, designates the future land use of the subject property as Business and it adjoins areas designated as Mixed Use Industrial/Office, Business, and Extractive Mining. (Please refer to the attached Planned Land Use Exhibit) The proposed rezoning to the M2 District is for the express purpose of enabling the relocation of Aerogreen Solutions LCC (Aerogreen) from its existing location on Brucetown Road to the subject property. Aerogreen is a manufacturer of cleaning solutions whose products are derived from the combination of water and varying concentrations of baking soda. The Zoning Administrator classifies Aerogreen's operation as a Chemical Manufacturing use, which is only permitted in the M2 District. While the M2 District properly aligns with the Industrial land use designation, locating Aerogreen's facility in a Business-designated area is appropriate given the benign nature of its operating activities and commitments to enhanced site design elements, to include a road corridor buffer and enhanced landscaping. These characteristics will be compatible with and complementary to the commercial character envisioned for the Martinsburg Pike corridor. Additionally, by permitting Aerogreen's move to a desirable location, the proposed rezoning will ensure the retention of an existing business in Frederick County thereby promoting realization of the fiscal benefits anticipated by the Business Development policies of the Comprehensive Plan. To further align the proposed M2 District rezoning with the Business land use designation, the proposed proffer statement restricts permitted land uses on the subject property to Chemical Manufacturing and Warehouse/Storage. No other uses permitted in the M2 District will be allowed to develop or operate on the subject property. Additionally, the proffer statement limits the intensity of development on the subject property by stipulating a maximum building size of 40,000 SF GFA, equivalent to a floor area ratio (FAR) of 0.10, of which 15,000 SF GFA will be occupied by Aerogreen's manufacturing facility and the remaining 25,000 SF GFA used for general storage/warehouse use. (Please refer to the proposed Proffer Statement) Sewer and Water Service Area The Sewer and Water Service Area (SWSA) generally aligns with the Urban Development Area (UDA) but also extends outside of the UDA to accommodate areas of the County in which only commercial and industrial development is desired, as is the case for most of the Martinsburg Pike (U.S. Route 11) corridor. The entirety of the 8.84±-acre subject property is located within the SWSA. (Please refer to the Planned Land Use Exhibit) File#0696131'—Impact Analysis Statement 3 Greenway Engineering,Inc. May 22,2026 Aerogreen Solutions LLC Rezoning SUITABILITY OF THE SITE Floodplains The 8.84± acre site is located on FEMA NFIP Map 951069CO150E. This map designates the site as Category C —Area of Minimal Flooding. The FEMA NFIP map identifies the nearest areas of floodplain located on the northeastern side of the Quarry, associated with Turkey Run; therefore, the subject property is not impacted by floodplain area. (Please refer to the attached Environmental Features Map Exhibit) Wetlands The 8.84± acre site does not contain wetland areas as demonstrated on the National Wetlands Inventory (NWI) Map and per the Frederick County GIS Database. No evidence of wetland features or vegetation is present on the property; therefore, the subject site is not impacted by wetland areas. (Please refer to the attached Environmental Features Map Exhibit) Steep Slopes The 8.84± acre site is predominately level with slopes ranging from 2 to 7 percent; therefore, the subject property is not impacted by areas of steep slopes. (Please refer to the attached Environmental Features Map Exhibit) Soil Types The Soil Survey of Frederick County, published by the USDA Soil Conservation Service, was consulted to determine soil types contained on the 8.84± acre site. The subject property contains the following soil types: 32B—Oaklet silt loam, 2-7% slopes: This is the only soil type present on the parcel. These soil types can be effectively managed through engineering design and do not pose any constraints for site development. Other Environmental Features The 8.84± acre subject property does not contain areas of lakes, ponds or natural storm water retention areas as defined by the Frederick County Zoning Ordinance. There are no environmental features present that create development constraints for the proposed land uses on this site. File#0696131'—Impact Analysis Statement 4 Greenway Engineering,Inc. May 22,2026 Aerogreen Solutions LLC Rezoning SURROUNDING PROPERTIES The zoning and present use of adjoining properties are as follows: North: RA, Rural Areas District Use: Vacant South: RA, Rural Areas District Use: Residential East: EM, Extractive Manufacturing Use: Mining Operation RA, Rural Areas District Use: Residential West: RA, Rural Areas District Use: Residential (Please refer to the attached Zoning and Aerial Exhibits) TRANSPORTATION The 8.84± acre site has approximately 629' of frontage along Martinsburg Pike (U.S. Route 11) and approximately 625' of frontage along Woodside Road (VA Route 671). The subject property was rezoned from the RA, Rural Areas District to the B3 District upon approval of Rezoning 918-06, Woodside Commercial Center by the Frederick County Board of Supervisors ("BOS") on March 14, 2007. The originally approved proffer statement was subsequently revised upon approval of Rezoning 401-13 by the BOS on March 13, 2013. The subject property is currently undeveloped. The revised proffer statement approved in 2013 ("approved proffers") limits land uses and development intensity on the subject property and further includes transportation commitments. Regarding land uses and intensity, the approved proffers limit the development to Gasoline Service Stations — identified as "high traffic" land uses - further applicable restrictions to establishment of a Gasoline Service Station (e.g., one business will be allowed to have retail fuel, twelve or fewer pumps no diesel fuel sales to over-the-road trucks and on two diesel fuel pumps). The approved proffers further prohibit development of Transportation by Air, Rental of Railroad Cars, Mobile Home Dealers, and Drive-In Movie Theatre on the subject property. However, there is no limitation on the development of other uses permitted in the B3 District. The proffered transportation commitments are based on a Traffic Impact Analysis (TIA) prepared by Patton Harris Rust and Associates for the original rezoning of the subject property from RA to B3. Completed in 2006, the TIA assumed a maximum development intensity of 75,000 square feet of Retail use. Based on rates published in the 7th Edition of the Institute of Transportation Engineer's (ITE) Trip Generation Report, the TIA indicated the proposed B3 zoning would generate 5,633 vehicle trips and distributed these trips across the surrounding road network to assess intersection impacts and identify needed mitigation measures. Notably, in addition to limiting points of access,the approved proffers provide for construction of additional 12-foot-wide travel lanes along the entire site frontage on both Martinsburg Pike (US Route 11) and Woodside Road(VA Route 671). File#069613P-Impact Analysis Statement 5 Greenway Engineering,Inc. May 22,2026 Aerogreen Solutions LLC Rezoning M2 Rezoning Proposal As stated previously, Aerogreen plans to construct a building on the subject property totaling 40,000 SF GFA, of which 15,000 SF GFA will be occupied by Aerogreen's manufacturing facility and the remaining 25,000 SF GFA used for general storage/warehouse use. The proposed proffer statement stipulates that the subject property will develop only with these uses and establishes these gross floor area values as the base development scenario (minimum manufacturing, maximum warehouse/storage). The proposed proffer statement would permit manufacturing to occupy the entirety of the 40,000 SF GFA building, which represents the most intensive development scenario vis-a-vis trip generation. No other uses permitted in the M2 District will be permitted to develop or operate on the subject property. Trip Generation Comparison The tables below compare trip generation attributable to the proposed M2 rezoning application with what would otherwise be possible if the subject property developed pursuant to the existing B3 zoning. The values used for these projections were obtained from the Institute of Traffic Engineers (ITE) Trip Generation Manual, 12th Edition (ITETripGen), which is the source currently utilized by VDOT and Frederick County for preparation of transportation impact analysis statements. PROPOSED M2 ZONING—BASE DEVELOPMENT PROGRAM PROJECTED TRIP GENERATION Weekday Trip Generation ITE Rate ITE AM PM Total Land Use Projected Yield Code (avg. trips per peak Peak ADT 1,000 SF GFA Manufacturing 15,000 SF GFA 140 4.27 11 12 64 Warehouse 25,000 SF GFA 150 1.38 4 5 35 15 17 99 PROPOSED M2 ZONING—MAXIMUM DEVELOPMENT INTENSITY PROJECTED TRIP GENERATION Weekday Trip Generation ITE ITE Rate AM PM Total Land Use Projected Yield Code (avg. trips per peak Peak ADT 1,000 SF GFA Manufacturing 140,000 SF GFA 1 140 4.27 1 30 31 171 EXISTING B3 ZONING- PROJECTED TRIP GENERATION Weekday Trip Generation ITE ITE Rate AM PM Total Land Use Projected Yield Code (avg. trips per peak Peak ADT 1,000 SF GLA Shopping Plaza 75,000 SF 821 65.38 271 440 4,904 40k- 150k GLA File#0696131'—Impact Analysis Statement 6 Greenway Engineering,Inc. May 22,2026 Aerogreen Solutions LLC Rezoning As shown above, the projected trip generation for the proposed M2 zoning is significantly less than would be expected with development of uses entitled under the existing B3 zoning. Specifically, compared to the existing B3 zoning, the M2 rezoning would reduce the site's projected traffic generation by 96% (4,733 fewer trips) to 98% (4,805 fewer trips) based on the most intensive and least intensive development scenarios enabled by the proposed proffer statement, respectively. Ultimate site development under the proposed M2 zoning will generate nominal traffic and result in minimal impact on the surrounding road network, particularly in comparison to the existing B3 zoning. Indeed, the traffic generated by the Aerogreen facility already exists as part of the surrounding road network's background conditions. As such, the proposed rezoning will not cause any discernable change to traffic conditions at area intersections or on the roads in the vicinity of the subject property. Given the dramatic decrease in traffic generation attributable to the proposed M2 rezoning, the extent of any frontage improvements on Martinsburg Pike and/or Woodside Road can be appropriately limited to those necessary for safe and efficient site access. SEWAGE CONVEYANCE AND TREATMENT As previously stated, the subject property is located wholly within the Sewer and Water Service Area (SWSA) and is therefore entitled to be served by public sewer based on County Policy. Frederick Water is the provider of public sewer service within this area of the County. Aerogreen's manufacturing process does not generate any sewage/wastewater demand. Anticipated employee counts include eight (8) for Aerogreen's manufacturing use and ten (10) for the warehouse/storage use. As such, sewage/wastewater flow generated by the planned M2 development is projected to total 450 gallons per day (25 GPD per employee). Aerogreen will extend all sewer infrastructure required to serve the site. WATER SUPPLY As previously stated, the subject property is located wholly within the Sewer and Water Service Area (SWSA) and is therefore entitled to be served by public water based on County Policy. Frederick Water is the provider of public water service within this area of the County. Water demand generated by Aerogreen's manufacturing process is projected to total approximately 6,250 gallons per day (GPD). Water demand attributable to employees of both the manufacturing use and warehouse/storage use is projected to total approximately 450 gallons per day (25 GPD per employee). The total projected water demand for the rezoning is therefore approximately 6,700 GPD. Aerogreen will extend all water infrastructure required to serve the site. SITE DRAINAGE Topographic relief on subject parcels slopes from west to east towards the center of the property. A complete stormwater management plan will be designed at the time of final engineering design. All associated stormwater quantity and quality measures will be designed in conformance with all applicable state and local regulations; therefore, site drainage and stormwater management impacts will be fully mitigated. File#0696BP—Impact Analysis Statement 7 Greenway Engineering,Inc. May 22,2026 Aerogreen Solutions LLC Rezoning HISTORICAL SITES AND STRUCTURES The 8.84± acre site does not contain structures deemed to be historically significant, nor are there potentially significant structures adjacent to the subject property. The Frederick County Rural Landmarks Survey does not identify any historical landmarks on or near the property, therefore, the development of this property will not adversely impact any structures or their viewsheds. File#0696BP—Impact Analysis Statement 8 WARM MODERN , _ 125"x 320'BUILDING � 4SECT10NS�EQUALSPgCING BUILDING PLAN(TOP ViEM FRONT ELEVATIO14 SIDE ELEVATION &JAM= + ip k � ra I � A I�NILWORIH PP RIDES LEGa p LLC ON D_RA 5 use REsIDENruu �y s� I W iR W z Jn 1MpSSA-12S FREDERICK CNE9ANRAPON AIIIH La ZONED RA Vy n' ZONED H V OCI TMpITA-J2 USE_VACPM W n CUG=E MMUMBE DONALD EUGENZONE.ERLY MY Tl�eaaA-1B1 V PQ ZONED:RA L�� 1 FREOERICK COIINIY SANNATION AUIR m USE_ RESIDENTIAL 7 ZONED=M 9 '® ® &< USE:VACANT x a I OpOSIOpRp �` YQ I 5'SIDEWAIK \AR�Tf eI I ' •• 50'It CORRIDOR 11 ' C I ENHANCEMENT \ TMKK13A-1"D g ¢p BUFFER ROBINSONJACKFASPNDRA FUL NMTOµVECEM I IEEE DETAIL) -WOm TION --�_ ZONSIX 21'FROM ICA / I WROW CENTERLINE TNHq A124B DEDICATION ROBINSON ZONED F R�DRAA - 1 /2O' USE RESIDENTIAL - I UDLItt TMp33A125B I EASEMENT ZONED:RA USE ZONED ON.MINERALS(CHHEMSTONECOMPANYI Q z �_U TM%03A-124 / r ZONED_EM - O SMACRE9 USE INDUSTRIAL m y Z IXZONING:@ TMN33A-1255 I PROP.ZONING M2 � �� v a� MAGEEELAINE FTRUSTEE d J /'� I 00 ZONING DISTRICT BUFFER B THEEWNE FMAGEE REV O T5'INACTIVE J w H Z LIVING TRUST I ��� N ZONED:RA y ` 25 ACTNE CORRIDOR j U) UI IISE. REBIgLNIIPI I FULL MOVEMENT mEsrn�wxry vx TwNLCxcE WO z Z Y ENTRANCE N U Is® -EYE�BREEN wW Z Q W �a Oww Z w N z. -- i SSIDEWALK • O ZMINGDISTRICTBUFFER O LL --------------------- g cn,<coxr-xm N.uecxeEHmmrexce r--------------FUTURE No. �N Rwms W INTERPARCEL Cal 1W ZONING DISTRICT BUFFER CONNECTOR ca WAWETENCE Q ]S INAcmE ®=EYERCREEN 25'ACDVE I t �EGI d A ®31 I + 1 �®®®® fa * WOIIS 1TN'3.'tA125 ®®* EfV WTNCHESTER LLC ZONED:RA use RESIDENTIAL Previous Rezoning with Proffers:REZ-0113 1 Mwa A 1ND REZ-18O6 °av aox STRONKOFREDERICKABUNH USE RESIDENTIAL100 0 100 200 BF SCALE: 1" = 100' REQUEST FOR REZONING COMMENTS Project Name: Silverwolfe,LLC Acreage: 8.84 PIN(s): 33-A-t 24A Address (or general location): Located at the comer of MarUnsviile Pike and Woodside Road Existing Zoning District:. 133(Industrial Transition) Proposed Zoning District- M2(Industrial General) Staff Name(Email Address)- alight@fcva.us Agency Name Completing Comments(select one): Frederick Water Virginia Department of Transportation Winchester Regional Airport Virginia Department of Health Historic Resources Advisory Board Frederick County (FC) Public Schools FC Public Works FC Inspections FC Fire Marshal FC Parks& Recreation n FC County Attorney Other(Specify): Reviewer Name(Email Address): andrew-fox@fcva.us Review Agency Comments: 'Comments that may not fit in the box should be attached to the cover sheet on agency or department letterhead The proffer statement meets the requirements of the Ffedenck County Zoning Ordinance and the Code of Virginia and is legally sufficient as proposed for recordation. I have not reviewed the substance of the proffers as to whether the proffers are suitable and appropriate for this specific development,as my understanding is that review is being undertaken by staff and the Planning Commission- Resubmission to address comments requested? Y 0 or N 21 REQUEST FOR REZONING COMMENTS Project Name: Si'uenvolle,LX Acreage: 11.64 PIN(s): 33-A-124A Address(or general location): Located at the comer of Martinsburg Pike and Woodside Road Existing Zoning District: 83(Industrial Transition) Proposed Zoning District: M2(Industrial General) Staff Name (Email Address). ahghtcQfcva.us Agency Name Completing Comments (select one): Frederick Water Virginia Department of—ranspor ation Winchester Regional Airport Virginia Department of Health f�Historic Resources Advisory Board Frederick County(FC) Public Schools ✓ FC Public Works FC Inspections FC Fire Marshal FC Parks & Recreation FC County At orney Other(Specify): Reviewer Name(Ema I Address): hwhinock@fcva.us Review Agency Comments: 'Comments that may not 6t in the box should t o attached to the cover sheet on agency or department letterhead No comments from Public Works.A comprehensive review of the erasion and sediment control and stormwater management plan will lake place at the time of site plan submittal. Resubmission to address comments requested?Y or N REQUEST FOR REZONING COMMENTS Project Name: siiver%voife,LLC Acreage: 8.84 PIN(s): 33-R-124A Address for general location): Located at the comer of Martinsburg Pike and Woodside Road Existing Zoning District: 63(lndusirial Transition) Proposed Zoning District: nos(Industrial General) Staff Name(Email Address): alight@fcva.us Agency Name Completing Comments(select one): ✓�Frederick Water II Virginia Department of Transportation n Winchester Regional Airport n Virginia Department of Health n Historic Resources Advisory Board Frederick County(FC)Public Schools FC Public Works FC Inspections FC Fire Marshal FC Parks&Recreation FC County Attorney Other(Specify): Reviewer Name(Email Address): elawrence@fmderickwater.com Review Agency Comments: 'Comments that may not fit in the box should be attached to the cover sheet on agency or department lefferhead Water and sewer lines currently existing along the property's Martinsburg Pike road frontage. The water and sewer demands proposed in the rezoning application(6,70D GPD and 450 GPD,respectively) could be accommodated by the existing Infrastructure slang the site's frontage. The applicant is responsible for funding and constructing any improvements warranted to facilitate water and sewer service for the property. Resubmission to address comments requested?Y F1 or N_I .L REQUEST FOR REZONING COMMENTS Project Name: silverwolfe,LLC Acreage: 8.84 P I N(s): 33-b-1 24A Address(or general location): Located at the corner of Martinsburg Pike and Woodside Road Existing Zoning District: 83(Industrial Transition) Proposed Zoning district: M2(industrial General) Staff Name(Errail Address): alighta[_7fcva.us Agency Name Completing Comments (select one): =Frederick Water n Virginia department of Transportation Winchester Regional Airport Virginia department of Health n Historic resources Advisory Board .EJFrederick County(FC) Public Schools FC Public Works ✓�FC Inspections FC Fire Marshal n FC Parks& Recreation FC County Attorney Other(Specify): Reviewer Name(Email Address): Adam Hounshell fmo@fcva.us Review Agency Comments: 'Comments that may not fit in the box should be attached to the cover sheet on agency or department letterhead. See attached, Resubmission to address comments requested?Y or N Frederick County Fire and Rescue Department Office of the Fire Marshal 1080 Coverstone Drive s , Winchester,VA 22602 • Phone: 540-665-6350 Fax:540-678-4739 fmo@fcva.us Plan Review Rezoning Status: Approved Owner Silverwolfe LLC Martinsburg Pike Woodside Rd Clear Brook,Virginia 22624 Applicant Printed Date:06/30/2026 Aerogreen Solutions LLC eral Information Received Date: 06/08/2026 Occupancy Type: Outside or Special Review Begin Cate: 06/30/2026 Property Review End Date: 06/3012026 Property Use: Outside or special Hours: 1.5000 property Activity Number- 1066068 Review Cause: Application Project Name Rezonong-B3 to M2 Comments: Ail future development shall comply with the Frederick County Fire Prevention Code and other applicable codes, A am ouns e WM Lieutenant/Assistant Fire Marshal Page 1 of 1 a it L''d COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION STAUNTON DISTRICT-Edinburg Residency 14031 Old Valley Pike Stephen C.Brich,P.E.. Edinburq,VA 22824 COMMISSIONER (540)984-5601 July 15, 2026 Eric Bittner Frederick County Planning Department 107 N. Kent Street Winchester,VA 22601 Subject:VDOTComments-Aerogreen Solutions LLC Rezoning TM 33-A-124A Dear Mr. Bittner, The Virginia department of Transportation(VDOT) has reviewed the Aerogreen Solutions Rezoning application located at TM 33-A-124A. Our review has focused on potential transportation and roadway impacts associated with the proposed use. The following comments are provided for Frederick County's consideration: VDOT has no comments. The rezoning is expected to result in reduced traffic volumes compared to current zoning. These comments are being provided to Frederick County for inclusion with the overall Staff review of this application. VDOT will continue to coordinate with the County as needed to ensure that transportation impacts are addressed. Sincerely, J. Ryan Spielman Land Use Engineer Virginia Department of Transportation --Staunton District/Edinburg Residency WE KEEP'VIRGINIA MOVING REQUEST FOR REZONING COMMENTS �41 Project Name: Siiyerwolfe,LLc Acreage: 1.8a r IN(s): 33-A-124A Address(or general location): Located at the corner of Martinsburg Pike and Woodside Road Existing Zoning District: 63(Industflal Trraosition) Proposed Zoning District: M2{Industrial Genera[) Staff Name(Email Address): alight@fcva.us Agency Name Completing Comments (select one): n Frederick Water F-1 Virginia department of Transportation =Winchester Regional Airport F-1 Virginia Department of Health Historic Resources Advisory Board n Frederick County (FC) Public Schools II FC Public Works FC Inspections FC Fire Marshal FC Parks& Recreation FC County Attorney ., Other{Speclfyy: 6Is Reviewer Name(Email Address): 7/15/2026 Ethan Homesley ethan,homeslay@tcva.us Review Agency Comments: *Comments that may not fit in the box should be attached to the cover sheet on agency or department letterhead. No comment at this time.Gis will review streets at time of a site plan submission. Resubmission to address comments requested?Y Flor N i REQUEST FOR REZONING COMMENTS C)l MW Project Name: siNe-oile,LLC Acreage:. 1184 P IN(s): 33-A-124A Address(or general location): Located at the corner o!Martinsburg Pike and Woodside Road Existing Zoning District: 83(Industrial Transitlon) Proposed Zoning District: M2(industrial General) Staff Name{Email Address): aligniQ+c��.�5 Agency Name Completing Comments(select one): Frederick Water Virginia Department of Transportation II Winchester Regional Airport =Virginia department of Health n Historic Resources Advisory Board IFrederick County (FC)Public Schools FC Public Works ✓ FC Inspections FC Fire Marshal FC Parks&Recreation n FC County AtIorney n Other(Specify): Reviewer Name(Email Address). 6/12126 John Lee.Johna than.Lee i@fcva,us Review Agency Comments: 'Comments that may not R in the(sox should be attached to the cover sheet on agency or delaarlment letterhead. No comment_ Resubmission to address comments recuested?Y F-1 or N t' I J FNf5%�Vt97+ 151 Windy Hill Lane GREENWAY Winchester, VA 22602 ENGINEERING August 4, 2026 Amy Feltner Frederick County Planning and Development 107 N. Kent Street Winchester, VA 22601 RE: Aerogreen Solutions Rezoning Dear Ms. Feltner, Please see the following responses below to address your comments dated July 24, 2026 for the Proposed Aerogreen Solutions Rezoning located at PIN 33-A-124A. 1. Comprehensive Plan Conformance: The proposal is not compliant with the Comprehensive Plan. The M2 (Industrial General) Zoning District is not typically associated with planned land use, "business." The M2 Zoning Districts contains many of the most intense and impactful uses allowed in Frederick County and would otherwise not be a "transitional" district between "business and industrial areas", such as the existing zoning, B3. Staff recognize that the adjacent land use designation to the north, "Mixed-Use Industrial Office (MUIO)" is intended for more intense uses, however significant areas of"business" land use are planned around the subject property. Given the immediate adjacency to this future planned MUIO use, it could be appropriate to consider the rezoning at this location if the uses are limited and impacts are fully mitigated. Mitigation strategies should be considered for adjacent residential uses. Additionally, the County expects new industrial development exhibit high-quality architecture and site layout. The proposal does not speak to the design or siting of buildings, which could include certain building materials, renderings or elevations. The use irith this re-.nning as "snap and(leaning ce)inpenind naanaafiacturing " has ntinianal 11111Y(1ct on seirerl r lsteirwer atsage and cheinical Il'aste as the prodttcts lased f )1"111(111aaf(actaa'dn"S; (Y11L1ist of Irater and i,a1:Ying baking soda cNncentratiolls. Please .see attached ilhistl-caiil"e f( r building desi jrl. 2. Transportation: A sidewalk is also required along Woodside Road. The proposed proffer and GDP do not address the pedestrian accommodation. The dedicated right-of-way is not clear on the GDP. The GIMP has been rel,ised to shod' the sidewalk along Woodside Road and the dedication cif right- qf-wa)., has been updated. Engineers Surveyors Planners Environmental Scientists Telephone 540-662-4185 Fax 540-722-9528 www.greenwayeng.com File# 1 I Proffer Statement: a. Proffer A.2 should be removed. jtic'Ilioved b. Proffer BB.1 should be revised to use the NAILS use terminology as it relates to the specific manufacturing commodity. kk, 11.d'dl I s ' iY,ll� ;lilil ('lilclnin� ( }Illl�c�llllci c. Proffer B.2 should replace "Chemical Manufacturing"to align with the proposed manufacturing facility proposed. Rc%isod to "StY1j7 .111d1 Cleaning {'cutlpowid " d. Proffer C_6 remove monument sign from proposed 20 foot easement S1 Il Il:l`+ I-Ween R'IIII) edl 11-0111 ill"01)itwedl e:i-,L'iIICI7I e. Proffer D.2.c should be removed Prolfer rclllo%%t I Please do not hesitate to reach out if you have any questions. Sincerely, MONIkE Marisa Whitacre, Planning Manager Greenway Engineering COUNTY OF FREDERICK P.O.BOX 225 r WINCFIESTER,VA 22604-0225 C.WILLIAM ORNDOFF,IR Real Estate Taxes Paid for Tax Year 2026 Map Number: 33 A 124A Account#: 8006506 Sea# Owner Name Bill Uatc Tas Paid RE2026 39888 1 LLC ERWOLF'E 4/15/2026 8.84ACRES $2,291.19 RE2026 39888 LLC ERWOLFE 4/15/2026 8.84ACRES $2,291.19 Total Paid: $4,582,38 This amount represents payments applied during calendar year 2026. and does not include Penalty, interest or Credit Card Fees. Close Is Window Print This Page