HomeMy WebLinkAbout014-26 (OrdAmendmentTMZoneRemoval)Proposed Changes – Data Centers
July 15, 2026
by the Zoning Administrator. The maximum height of the opaque screen
should correspond to the tallest piece of equipment being shielded from
view.
D.Setback & Screening Requirements.
(1)Structures must be set back at least 200 feet from the common property line when
adjoining land is zoned RA, RP, R4, R5 & MH1. Otherwise, the base zoning district
dimensional standards shall apply.
(2)A category C full screen type buffer shall be provided around the perimeter of the
property. If the adjoining property is zoned B3, TM, M1, or M2, no buffer is
required.
E.Noise and Noise Monitoring.
(1)The applicant shall submit an Environmental Noise Impact Assessment prepared by a
qualified full member of the Acoustical Society of America (ASA), a member of the
Institute of Noise Control Engineering (INCE), or a member of the National
Association of Acoustical Consultants (NCAC). The purpose of such noise impact
assessment, modeled in SoundPLAN, CadnaA, or accepted equivalent, shall model
anticipated noise levels as a result of facility operation and establish a baseline noise
level prior to approval of a rezoning or conditional use permit.
(2)A noise study certifying noise levels shall be conducted 12 months after the issuance
of the first Certificate of Occupancy (CO) and every five (5) years thereafter. Each
noise study shall be submitted for review to the Zoning Administrator and/or his/her
designee to assess the actual impact of the completed project.
a.The measurement of sound or noise pursuant to this section shall be as
follows:
1.The measurement of sound or noise shall be made with a Type 1 or
Type 2 sound level meter which meet the standards prescribed in ANSI
S1.4:2014, “Specification for Sound Level Meters.” The instruments
shall be maintained in calibration and good working order. A minimum
of three (3) sound level readings shall be taken. The average of these
readings will be used as the average sound level. If the background
noise is equal to the levels set forth in this section, three (3) dB shall
be subtracted out of the average sound level.
2.The slow meter response of the sound level meter shall be used to
determine that the average amplitude has not exceeded the dBA
readings or the limiting noise spectra set forth in this section.
3.Unless otherwise specified, the measurement shall be taken at the
property boundary on which such noise is generated.
b.Any additions, alterations, or expansion of a facility or its equipment shall
require a new noise impact assessment to be submitted and approved by the
Zoning Administrator.
c.If the post construction noise study exceeds the maximum noise level
permitted, additional noise mitigation strategies, improvements, or
operational changes shall be required.
(3)Any equipment necessary for cooling, ventilating, or otherwise operating the facility,
including power generators or other power supply equipment on the Property, whether
ground mounted or roof mounted, shall include the following noise mitigation
elements:
Proposed Changes – Data Centers
July 15, 2026
a.Low noise emission fans.
b. Acoustic wraps for compressors and oil separators; and
c.An acoustic perimeter, which may include a perimeter around a group of
individual chillers, which may be louvered or solid.
d.Other sound attenuation measures as approved by the Zoning Administrator.
The Owner shall provide documentation, in the form of technical specifications, photographs, and/or
engineered plans, of the above mitigation measures contained in (2) with each building permit for a data
center building on the Property and shall further provide documentation that such measures have been
installed concurrently with each occupancy.
ARTICLE XI
DEFINITIONS
PART 1105 – USE TERMS.
§165-1105.05. Data Centers. A premises in which the majority of the use is occupied by computers
and/or telecommunications and related equipment for processing, storing, or transferring information.
Infrastructure such as utility substations, power generators, and other supporting equipment may also be
included.