HomeMy WebLinkAbout013-26 (OrdAmendmentDataCenterUseRemoval)• RESOLUTION
Action:
BOARD OF SUPERVISORS: August 12, 2026 Approved
DIRECTING THE PLANNING COMMISSION TO HOLD A PUBLIC HEARING
REGARDING CHAPTER 165, ZONING ORDINANCE
ARTICLE VI
USE MATRIX
PART 603. USE PERMISSIONS.
ARTICLE VII
ADDITIONAL REGULATIONS FOR SPECIFIC USES
PART 705-INDUSTRIAL USE STANDARDS.
ARTICLE XI
DEFINITIONS
PART 1105-USE TERMS.
WHEREAS, a proposal to amend Chapter 165 -Zoning Ordinance to remove data centers as a permi tted
and/or conditional use(§ 165-603.02) in certain z on ing districts and to remove other references to data centers,
including definitions (§165-1105.05) and additional regulations for specific us es (§165-705.01), has been
presented to the Board of Supervisors; and
WHEREAS, the Board of Supervisors discussed data centers and voted u nanimously to instruct staff to
prepare an authorizing resolution on July 8, 2026; and
WHEREAS, the Frederick County Board of Supervisors finds it appropriate and required by the pu blic
necessity, convenience, general welfare, and good zoning practice to direct the Frederick County Planning
Commission to ho ld a public hearing and make a recommendation to the Board regarding an amendment to
Chapter 165:
NOW, THEREFORE, BE IT RESOLVED by th e Frederick County Board of Supervisors, that the public
health, safety, general welfare, and good zoning practice requ ire that the Frederick County Planning
Commission ho ld a public hearing to consider changes to Chapter 165 to remove data centers as a permitted
and/or conditional use(§ 165-603.02) in certain zoning districts and to remove other references to data centers
including definitions (§ 165-1105 .05) and additional regulations for specific uses (§ 165-705 .0 I), and make a
recommendation to the Board of Supervisors thereon within 90 days after its next meeting after this resolution
is adopted.
Passed this August 12, 2026, by the following recorded vote:
John F. Jewell, Chairman Aye Jason C. Aikens Aye
Albert L. Orndorff Aye Robert W. Wells Aye
Michael D. Guevremont Aye Robert T. Liero Aye
Gary R. Oates Aye
No. 13-26
COUNTY of FREDERICK
Department of Planning and Development
540/ 665-5651
Fax: 540/ 665-6395
MEMORANDUM
TO: Frederick County Board of Supervisors
FROM: John Bishop, AICP, Planning Director
SUBJECT:
DATE:
Ordinance Amendment – Data Centers Removal
August 7, 2026
Proposal:
This is a proposal to amend the Chapter 165 - Zoning Ordinance to remove data centers as a permitted
and/or conditional use (§165-603.02) in certain zoning districts and to remove other references to
data centers including definitions (§165-1105.05) and additional regulations for specific uses
(§165-705.01).
Current Standard:
Data centers are presently permitted by-right only in the TM (Technology-Manufacturing Park)
Zoning District and as a conditional use in the B3 (Industrial Transition), M1 (Light Industrial) & M2
(Industrial General) Zoning Districts. A definition and additional regulations for specific uses are also
included in the Zoning Ordinance.
The current requirements for data centers were adopted by the Board of Supervisors in April 2025.
Summary & Requested Action:
The Board of Supervisors at its July 8, 2026, regular meeting discussed data center concerns and
instructed Planning and Development staff to prepare an authorizing resolution to remove data
centers from the Zoning Ordinance.
Staff are requesting authorization to proceed with ordinance amendment process, including reviewed
by the Development Review and Regulations Committee (DRRC) and advertising for public hearing
(dates TBD). This process first requires that the possible amendment be referred to the Planning
Commission for public hearing and a recommendation to the Board of Supervisors. The recommendation
must be returned to the Board within 90 days after the Commission’s next meeting.
Questions regarding the proposal may be directed to staff.
JB/pd
Attachment: 1.Draft Ordinance Amendment
2. Resolution to Authorize Public Hearing
Proposed Changes – Data Centers
July 15, 2026
Chapter 165 – Zoning Ordinance
ARTICLE VI
USE MATRIX
PART 603. USE PERMISSIONS.
Use Type
Primary Zoning Districts Use
Performance
Standards
RA RP MH1 R4 R5 MS B1 B2 B3 TM M1 M2 EM HE
P = Permitted CUP = Permitted w/Conditional Use Permit A = Accessory
Computing
Infrastructure
Providers, Data
Processing, and
Data Centers
CUP CUP P CUP CUP 165-705.01
ARTICLE VII
ADDITIONAL REGULATIONS FOR SPECIFIC USES
PART 705 – INDUSTRIAL USE STANDARDS.
§165-705.01. Data Centers. [Reserved]
All data centers must meet the following requirements:
A.Prior to the approval of a rezoning application or conditional use permit the following shall
be provided:
(1)A site assessment to examine the sound profile of the data center on residential units
and schools located within 500 feet of the data center property boundary in
accordance with subsection E.
(2)A site assessment evaluating the effect of the proposed facility on (i) ground and
surface water resources, (ii) agricultural resources, (iii) parks, (iv) registered historic
sites, and (v) forestland on the data center site or immediately contiguous land.
(3)Details of any new or existing substations that will be used to serve the data center
and (ii) the anticipated transmission voltage required to serve the data center.
B.Generator testing and cycling shall be limited to weekdays (Monday to Friday) between the
hours of 8:00 a.m. to 5:00 p.m. Notwithstanding the foregoing, all noise generated by any on-
site generator shall comply with County Code §165-201.12.
C.Mechanical Equipment.
(1)Location. Ground mounted mechanical equipment shall be prohibited in the primary
setback.
(2)Screening. Ground mounted and roof top mechanical equipment shall be screened
from public roadways and adjoining properties on all sides.
a. Generators. All generators shall be enclosed with a manufacturer approved
enclosure or located within the primary structure.
b.Other Mechanical Equipment. An opaque screen shall be provided by
either the principal building, louvered wall, or equivalent screen approved
Proposed Changes – Data Centers
July 15, 2026
by the Zoning Administrator. The maximum height of the opaque screen
should correspond to the tallest piece of equipment being shielded from
view.
D.Setback & Screening Requirements.
(1)Structures must be set back at least 200 feet from the common property line when
adjoining land is zoned RA, RP, R4, R5 & MH1. Otherwise, the base zoning district
dimensional standards shall apply.
(2)A category C full screen type buffer shall be provided around the perimeter of the
property. If the adjoining property is zoned B3, TM, M1, or M2, no buffer is
required.
E.Noise and Noise Monitoring.
(1)The applicant shall submit an Environmental Noise Impact Assessment prepared by a
qualified full member of the Acoustical Society of America (ASA), a member of the
Institute of Noise Control Engineering (INCE), or a member of the National
Association of Acoustical Consultants (NCAC). The purpose of such noise impact
assessment, modeled in SoundPLAN, CadnaA, or accepted equivalent, shall model
anticipated noise levels as a result of facility operation and establish a baseline noise
level prior to approval of a rezoning or conditional use permit.
(2)A noise study certifying noise levels shall be conducted 12-months after the issuance
of the first Certificate of Occupancy (CO) and every five (5) years thereafter. Each
noise study shall be submitted for review to the Zoning Administrator and/or his/her
designee to assess the actual impact of the completed project.
a.The measurement of sound or noise pursuant to this section shall be as
follows:
1.The measurement of sound or noise shall be made with a Type 1 or
Type 2 sound level meter which meet the standards prescribed in ANSI
S1.4:2014, “Specification for Sound Level Meters.” The instruments
shall be maintained in calibration and good working order. A minimum
of three (3) sound level readings shall be taken. The average of these
readings will be used as the average sound level. If the background
noise is equal to the levels set forth in this section, three (3) dB shall
be subtracted out of the average sound level.
2.The slow meter response of the sound level meter shall be used to
determine that the average amplitude has not exceeded the dBA
readings or the limiting noise spectra set forth in this section.
3.Unless otherwise specified, the measurement shall be taken at the
property boundary on which such noise is generated.
b.Any additions, alterations, or expansion of a facility or its equipment shall
require a new noise impact assessment to be submitted and approved by the
Zoning Administrator.
c.If the post construction noise study exceeds the maximum noise level
permitted, additional noise mitigation strategies, improvements, or
operational changes shall be required.
(3)Any equipment necessary for cooling, ventilating, or otherwise operating the facility,
including power generators or other power supply equipment on the Property, whether
ground-mounted or roof-mounted, shall include the following noise mitigation
elements:
Proposed Changes – Data Centers
July 15, 2026
a.Low noise emission fans.
b. Acoustic wraps for compressors and oil separators; and
c.An acoustic perimeter, which may include a perimeter around a group of
individual chillers, which may be louvered or solid.
d.Other sound attenuation measures as approved by the Zoning Administrator.
The Owner shall provide documentation, in the form of technical specifications, photographs, and/or
engineered plans, of the above mitigation measures contained in (2) with each building permit for a data
center building on the Property and shall further provide documentation that such measures have been
installed concurrently with each occupancy.
ARTICLE XI
DEFINITIONS
PART 1105 – USE TERMS.
§165-1105.05. Data Centers. A premises in which the majority of the use is occupied by computers
and/or telecommunications and related equipment for processing, storing, or transferring information.
Infrastructure such as utility substations, power generators, and other supporting equipment may also be
included.