Loading...
HomeMy WebLinkAboutPCAgenda2026July11.Call to Order 2.Invocation 3.Pledge of Allegiance 4.Adoption of Agenda – Pursuant to established procedures, the Planning Commission should adopt the Agenda for the meeting. 5.Meeting Minutes 5.A.April 15, 2026 Meeting Minutes 6.Committee Reports 7.Citizen Comments 8.Public Hearings 8.A.Rezoning #05-26 for Busy Beez (Clear Brook Rentals, LLC) - (Mr. Bittner) Submitted to rezone +/- 0.56-acres from B2 (General Business) Zoning District with proffers to B2 (General Business) Zoning District with revised proffers. The property is located at 4489 Martinsburg Pike, Clear Brook, and is identified by Property Identification Number 33-A-93 in the Stonewall Magisterial District. 8.B.Rezoning #06-26 for Hopewell Highway Commercial Center (Winchester 131, LLC & Winchester 125, LLC) - (Mr. Klein) AGENDA PLANNING COMMISSION WEDNESDAY, JULY 1, 2026 7:00 PM THE BOARD ROOM FREDERICK COUNTY ADMINISTRATION BUILDING WINCHESTER, VIRGINIA PC07-01-26MinutesApril15.pdf PC07-01-26_REZ05-26_Redacted.pdf 1 Submitted to rezone +/- 40.48-acres acres from the RA (Rural Areas) Zoning District and the B2 (General Business) Zoning District to the B2 Zoning District and the IA (Interstate Area) Overlay District with proffers to develop commercial uses. The properties are located at 3425 Martinsburg Pike, Clear Brook, and north of Hopewell Road (Route 672), east of Interstate 81 and west of Martinsburg Pike (Route 11) and are identified by Property Identification Numbers 33-A-114A, 33-A-122, and 33-A-163 in the Stonewall Magisterial District. 8.C.Conditional Use Permit #02-26 for Lamar Rosenberry - (Mrs. Feltner) Submitted to utilize an existing detached garage for an Automotive Repair/Public Garage. The subject property is located at 730 Pack Horse Road, Winchester, and is identified with Property Identification Number 07-6-2 in the Gainesboro Magisterial District. 9.Other 9.A.Current Planning Applications 10.Adjourn PC07-01-26_ REZ06-26_TrafficImpactAnalysis_Redacted.pdf PC07-01-26_REZ06-26_Redacted.pdf PC07-01-26_CUP02-26_Redacted.pdf 2 Planning Commission Agenda Item Detail Meeting Date: July 1, 2026 Agenda Section: Meeting Minutes Title: April 15, 2026 Meeting Minutes Attachments: PC07-01-26MinutesApril15.pdf 3 Frederick County Planning Commission Page 4260 Minutes of April 15, 2026 MEETING MINUTES OF THE FREDERICK COUNTY PLANNING COMMISSION Held in the Board Room of the Frederick County Administration Building at 107 North Kent Street in Winchester, Virginia on April 15, 2026. PRESENT: Tim Stowe, Chairman/Red Bud District; Roger L. Thomas, Vice Chairman/Shawnee District; Charles Markert, Red Bud District; Elizabeth D. Kozel, Shawnee District; Thomas Bottorf, Opequon District; Justin Kerns, Stonewall District; Charles S. DeHaven III, Stonewall District; Betsy Brumback, Back Creek District; Jeff McKay, Back Creek District; Vaughn Whitacre, Gainesboro District; John J. Lamanna, Member at Large. ABSENT: Joseph M. Crane, Gainesboro District; Kevin Sneddon, Opequon District. STAFF PRESENT: Wyatt G. Pearson, Director; John A. Bishop, Assistant Director; M. Tyler Klein, Senior Planner; Shannon L. Conner, Administrative Guaranty Coordinator; Andrew R. Fox, County Attorney. CALL TO ORDER Chairman Stowe called the April 15, 2026 meeting of the Frederick County Planning Commission to order at 7:00 p.m. INVOCATION Pastor Bobby Alger from Crossroads Community Church delivered the invocation. PLEDGE OF ALLEGIANCE Commissioner Thomas led the Pledge of Allegiance. ADOPTION OF AGENDA Upon a motion made by Commissioner Thomas and seconded by Commissioner Kozel the Planning Commission unanimously adopted the agenda for this evening’s meeting. Minutes Upon motion made by Commissioner Markert and seconded by Commissioner Thomas, the Planning Commission unanimously adopted the minutes from the February 4, 2026 and February 18, 2026 meetings. ------------- 4 Frederick County Planning Commission Page 4261 Minutes of April 15, 2026 COMMITTEES Development Review and Regulations Committee – 03/26/26 Commissioner Kozel reported that the Committee was presented the proposal for Phase 1 of the Zoning Ordinance reorganization and the proposal for the Phase 1 Subdivision Ordinance. Members commented the changes were easier to use and the tables were great. Also presented was a proposal for Residential Buffer modification. The Committee was not in favor of the changes and would prefer to examine the change as a broader community design rather than the single change. The Committee noted more information will be needed along with a more comprehensive examination of the entire section Conservation Easement Authority – 03/26/26 Commissioner Markert reported the Planning Department has purchased a canopy with the County logo to be used for various events. He shared the list of upcoming events for the CEA. The Authority was presented an updated on the website status. Transportation Committee – 03/23/26 Chairman Stowe reported the Committee was presented an updated on SmartScale and current County projects. He noted that the Automated Enforcement of the speedzone cameras have been turned on and in effect now. Board of Supervisors – 04/08/26 Supervisor Orndorff, Board of Supervisor Liaison, reported the Board approved REZ #02- 26 of Plasters HVAC located at 161 Commonwealth Court. The Board revoked CUP #03-25 for (A Cut Above) 172 Fire House LLC and Barbara Singhas. ------------- CITIZEN COMMENTS Chairman Stowe called for citizen comments on any subject not currently on the Planning Commission’s agenda or any item that is solely a discussion item for the Commission. No one came forward to speak and Chairman Stowe closed the public comments portion of the meeting. ------------- 5 Frederick County Planning Commission Page 4262 Minutes of April 15, 2026 PUBLIC HEARING Ordinance Amendment to the Frederick County Code Chapter 165 Action – Recommend Approval M. Tyler Klein, Senior Planner, reported this item is for modifications to Chapter 165, Zoning Ordinance to reorganize the chapter, to remove any redundant and conflicting language, and to convert narrative standards into tables and graphics, where appropriate. The amendment also adds or modifies provisions and references from Chapter 22 of Title 15.2 of the Code of Virginia that are not codified in the current Zoning Ordinance. Caroline Vanterve, AICP, Principal Planner, of the Berkley Group came forward and shared a presentation of the elements of the update. Chairman Stowe called for anyone who wished to speak regarding the Public Hearing to come forward. No one came forward and the Public Hearing was closed for the public comment portion. Upon motion made by Commissioner Kozel and seconded by Commissioner Thomas BE IT RESOLVED, the Frederick County Planning Commission does unanimously recommend approval of modifications to the Ordinance Amendment to the Frederick County Code Chapter 165. Ordinance Amendment to the Frederick County Code Chapter 144 Action – Recommend Approval M. Tyler Klein, Senior Planner, reported this item is for modifications to Chapter 144, Subdivision Ordinance to reorganize the chapter, to remove any redundant and conflicting language, and to convert narrative standards into tables and graphics, where appropriate. The amendment also adds or modifies provisions and references from Chapter 22 of Title 15.2 of the Code of Virginia that are not codified in the current Subdivision Ordinance. Caroline Vanterve, AICP, Principal Planner, of the Berkley Group came forward and shared a presentation of the elements of the update. Chairman Stowe called for anyone who wished to speak regarding the Public Hearing to come forward. No one came forward and the Public Hearing was closed for the public comment portion. Upon motion made by Commissioner Kozel and seconded by Commissioner Thomas BE IT RESOLVED, the Frederick County Planning Commission does unanimously recommend approval of Ordinance Amendment to the Frederick County Code Chapter 144. ------------- 6 Frederick County Planning Commission Page 4263 Minutes of April 15, 2026 ADJOURNMENT No further business remained to be discussed, and a motion was made by Commissioner Thomas to adjourn the meeting. This motion was seconded by Commissioner Whitacre and unanimously passed. The meeting was adjourned at 7:50 p.m. Respectfully submitted, _________________________ Tim Stowe, Chairman _________________________ Wyatt G. Pearson, Secretary 7 Planning Commission Agenda Item Detail Meeting Date: July 1, 2026 Agenda Section: Public Hearings Title: Rezoning #05-26 for Busy Beez (Clear Brook Rentals, LLC) - (Mr. Bittner) Attachments: PC07-01-26_REZ05-26_Redacted.pdf 8 REZONING #05-26 Clearbrook Rentals, LLC Staff Report for the Planning Commission Prepared: June 22, 2026 Staff Contact: Eric Bittner, Planner II Executive Summary: Meeting Schedule Planning Commission: June 3, 2026 Planning Commission July 1, 2026 Action: Public Hearing; Deferred Action: Public Hearing, Pending Board of Supervisors: July 8, 2026 Action: Public Hearing; Pending Property Information Property Identification Number (PIN) 33-A-93 Address 4489 Martinsburg Pike, Winchester Magisterial District Stonewall Acreage +/- 0.56-acres Zoning & Present Land Use Zoning: B2 (General Business) with proffers Land Use: Commercial Proposed Zoning B2 with revised proffers Adjoining Property Zoning & Present Land Use North: RA (Rural Area) District Land Use: Vacant South: RA (Rural Area) District Land Use: Residential East: RA (Rural Area) District Land Use: Residential West: B3 (Industrial Transition) District Land Use: Automative Repair Proposed Use This is a request to rezone +/-0.56-acres from B2 (General Business) Zoning District with proffers to B2 Zoning District with revised proffers. The proposed proffers would enable “health care services” as a permitted use. Positives Concerns The proposed rezoning does not otherwise change the existing zoning or the property, B2, and remains in conformance with the Comprehensive Plan. The proposed rezoning does not further the land use policies of the NELUP and the designated long range land use category. 9 Page 2 of 4 The proposed Right-of-Way advances the Eastern Road Plan. Review Agency Comments: Review Agency Comment Date Comment Summary Status Virginia Department of Transportation (VDOT) 01/29/2026 “VDOT has no comments on the rezoning.” Frederick Water 2/18/2026 No comment Frederick County Inspections 2/3/2026 “No comment.” Frederick County Public Works 1/29/2026 “No comments- no proposed changes to grading or stormwater infrastructure.” Frederick County Fire Marshal 1/30/2026 “Approved, no existing fire department features to be removed without the permission of the Fire Official.” Frederick County Attorney 02/18/2026 No comment. Legal form. Planning & Zoning Staff Analysis: Site History: A rezoning application (REZ #05-01) was approved by the Board of Supervisors on September 12, 2001, which rezoned the property from the RA (Rural Area) Zoning District to B3 (Industrial Transition) Zoning District and B2 (General Business) Zoning District with proffers, restricting some uses, including health services, and providing a cash proffer to mitigate Fire and Rescue impacts. The existing structure was built in 2011 in conformance with an approved site plan, SP #27-10. The proposed rezoning would keep the zoning designation, B2, but amend the approved proffer statement to add “health care services” as a permitted use The proposed use was proffered out of 10 Page 3 of 4 being permitted in the previous rezoning but is otherwise already considered a permitted use in the B2 (General Business District). Comprehensive Plan Conformance: The Comprehensive Plan (adopted November 2021) and the Northeast Land Use Area Plan provide guidance on the future development of the subject property. The Plan identifies the subject properties with a “mixed use industrial office” (MUIO) land use designation and as being within the limits of the Urban Development Area (UDA). The Northeast Land Use Area Plan describes the future environment envisioned for the mixes use industrial office. “These areas are intended to develop with targeted growth sectors identified by the County’s Economic Development Authority (EDA), as well as similar industries that are likely to bring higher wages, professional and/or technology jobs. Uses which significantly contribute to air, noise, and light pollution as well as business that create large volumes of truck traffic are discouraged in these areas. Consideration of uses outside the identified targeted businesses should only be considered if they are secondary and complementary to these targeted businesses.” The intent of the B2 zoning district is described in §165-604.01 as: “…[providing] large areas for a variety of business, office and service uses. General business areas are located on arterial highways at major intersections and at interchange areas. Businesses allowed involve frequent and direct access by the general public but not heavy truck traffic on a constant basis other than that required for delivery of retail goods. General business areas should have direct access to major thoroughfares and should be properly separated from residential areas. Adequate frontage and depth should be provided, and access should be properly controlled to promote safety and orderly development. Nuisance factors are to be avoided. …” The proposal for additional allowed use (health care services) does not otherwise further the plan policy for MUIO and is not identified as an EDA targeted industry in the Comprehensive Plan. The B2 Zoning District is also not typically associated with the planned land use. However, given the existing zoning of the property is B2, the proposed rezoning does not otherwise modify the current use of the property as “commercial.” Transportation & Site Access: Martinsburg Pike is identified in the Eastern Road Plan as an “improved major collector,” as part of the rezoning, additional right-of-way for the ultimate condition is proffered to be dedicated. The property has no other road frontage. 11 Page 4 of 4 Proffer Statement, Generalized Development Plan (GDP), & Impact Analysis: Proffers (February 23, 2026) Staff Comment A) Land Use Restrictions Allows “Health Care Services, Including Skilled Nursing Facilities,” as a permitted use. B) Access Management Restricts access to a shared entrance. Proffers 10’ of ROW. C) Structural Development Limitation Restricts building size to 3,000 sq. Ft. D) Monetary Contributions to Offset Impact of Development The proffer statement fully implements the adopted Board of Supervisors policy on monetary proffers for commercial/industrial square footage. This is a rezoning requiring a public hearing. Following a public hearing, Staff are seeking a recommendation from the Planning Commission to forward to the Board of Supervisors on this rezoning application. 12 13 14 15 Greenway Engineering Busy Beez Daycare Rezoning File #2624J/MMW 1 PROFFER STATEMENT REZONING: RZ# General Business District (B2) with Proffers to Business General District (B2) with Revised Proffers PROPERTY: 0.56 acres +/-; Tax Parcels #33-((A))-92 & 33-((A))-93 RECORD OWNER: Timothy W. Johnson & Margo D. Johnson (TM# 33-A-92) Clear Brook Rentals, LLC (Timothy W. Johnson) (TM# 33-A-93) APPLICANT: Timothy W. Johnson & Margo D. Johnson and Clear Brook Rentals LLC (here-in after “the Applicant”) PROJECT NAME: Busy Beez Daycare Rezoning ORIGINAL DATE OF PROFFERS: May 9, 2001 REVISION DATE: October 1, 2010 April 8, 2026 May 7, 2026 Preliminary Matters Pursuant to Section 15.2-2296 Et. Seq. of the Code of Virginia, 1950, as amended, and the provisions of the Frederick County Zoning Ordinance with respect to conditional zoning, the undersigned Applicant hereby proffers that in the event the Board of Supervisors of Frederick County, Virginia, shall approve Rezoning Application #_____ for the rezoning of 1.89± acres from the Industrial Transition (B3) District with Proffers to the Industrial Transition (B3) District and Business General (B2) District with Revised Proffers, development of the subject property shall be done in conformity with the terms and conditions set forth herein, except to the extent that such terms and conditions may be subsequently amended or revised by the Applicant and such be approved by the Frederick County Board of Supervisors in accordance with the said Code and Zoning Ordinance. In the event that such rezoning is not granted, then these proffers shall be deemed withdrawn and have no effect whatsoever. These proffers shall be binding upon this Applicant and their legal successors, heirs, or assigns. These proffers are a conditional zoning amendment to Rezoning #0-10 of Timothy W. Johnson, approved by the Frederick County Board of Supervisors on November 10, 2010. The subject properties are more particularly described as the land owned by Clear Brook Rentals, LLC being all of Tax Map Parcel 33-((A))-93 and further described by 16 Greenway Engineering Busy Beez Daycare Rezoning File #2624J/MMW 2 Instrument No. 100001314, and the land owned by Timothy W. Johnson & Margo D. Johnson being all of Tax Map Parcel 33-((A))-92 and further described by Instrument No. 060001525, and are further described by the Boundary Survey Plat prepared by W. Stuart Dunn, L.S., dated June 6, 1996 and recorded as Deed Book 860 Page 1476 (see attached Boundary Survey Plat). PROFFERED CONDITIONS A.) Allowed Uses 1)The following land uses shall be permitted within the B-2, Business General District on tax map parcel 33-((A))-93: Broad casting and Content Providers. Services to buildings and Dwellings including Pest Control, Janitorial Services and Carpet Cleaning Services excluding Landscape Services and Production Sterilization. Personal and Household Goods Repair and Maintenance excluding Motorcycle Repair. Adult and Child day-care facilities. Religious, Grantmaking, Civic, Professional and Similar Originations. Self-service storage facilities. Public Administration and Government Support Buildings, including Fire and Ambulance Services. Public Utility excluding energy-generating facilities. Health Care Services including Skilled Nursing Facilities All other land uses within the B-2, Business General District shall not be permitted on tax map parcel 33-((A))-93 unless approved through a subsequent conditional zoning amendment. B.) Access Management 1.) Tax map parcels 33-((A))-93 shall be served by the existing commercial entrance on Martinsburg Pike (U.S. Route 11). 2.) The Applicant hereby proffers to dedicate required right-of-way along the Martinsburg Pike (U.S. Route 11) frontage of tax map parcel 33-((A))-93 to accommodate the future widening of this corridor. This one time right-of-way dedication shall not exceed 10 feet in width and shall occur subsequent to the final Martinsburg Pike design plan approval. The Applicant shall provide the required right-of-way dedication within 90 days of written request by Frederick County and/or VDOT. 17 Greenway Engineering Busy Beez Daycare Rezoning File #2624J/MMW 3 C.) Structural Development Limitation 1.) Tax map parcel 33-((A))-93 shall be limited to a maximum structural area of 3,000 square feet for all land uses, exclusive of self-service storage facilities, identified in Section A(1) of the proffer statement. D.) Monetary Contribution to Offset Impact of Development The Applicant hereby proffers that in the event rezoning application #_____ is approved, the undersigned will pay to the Treasurer of Frederick County, Virginia $0.10 per square footage of structural area developed subsequent to approval of this rezoning application. This monetary contribution is intended to offset impacts to fire and rescue services and will be paid prior to issuance of an occupancy permit for the first land use constructed on tax map parcel 33-((A))-93. Please refer to Page 4 and Page 5 of the Proffer Statement for Notarized Owner Signatures E.) Signatures The conditions proffered above shall be binding upon the heirs, executors, administrators, assigns and successors in the interest of the Applicant and owner of tax map parcel 33- ((A))-93. In the event the Frederick County Board of Supervisors grants this rezoning and accepts the conditions, the proffered conditions shall apply to the land rezoned in addition to other requirements set forth in the Frederick County Code. Respectfully Submitted: By: Timothy W. Johnson Date By: 18 Greenway Engineering Busy Beez Daycare Rezoning File #2624J/MMW 4 Margo D. Johnson Date Commonwealth of Virginia, City/County of To Wit: The foregoing instrument was acknowledged before me this day of 20 by Notary Public My Commission Expires E.) Signatures The conditions proffered above shall be binding upon the heirs, executors, administrators, assigns and successors in the interest of the Applicant and owner of tax map parcel 33- ((A))-92. In the event the Frederick County Board of Supervisors grants this rezoning and accepts the conditions, the proffered conditions shall apply to the land rezoned in addition to other requirements set forth in the Frederick County Code. Respectfully Submitted: By: Clear Brook Rentals LLC (Timothy W. Johnson) Date 19 Greenway Engineering Busy Beez Daycare Rezoning File #2624J/MMW 5 Commonwealth of Virginia, City/County of To Wit: The foregoing instrument was acknowledged before me this day of 20 by Notary Public My Commission Expires 20 21 22 23 24 25 26 27 28 29 Project Name: ________________________________________________ Acreage: ___________ PIN(s): __________________ Address (or general location): Existing Zoning District: ____________________________________________ Proposed Zoning District: ___________________________________________ Staff Name (Email Address): _________________________________________ Agency Name Completing Comments (select one): ____ Frederick Water ____ Virginia Department of Transportation ____ Winchester Regional Airport ____ Virginia Department of Health ____ Historic Resources Advisory Board ____ Frederick County (FC) Public Schools ____ FC Public Works ____ FC Inspections ____ FC Fire Marshal ____ FC Parks & Recreation ____ FC County Attorney ____ Other (Specify): ________________________ Resubmission to address comments requested? Y _____ or N _____ REQUEST FOR REZONING COMMENTS Reviewer Name (Email Address): _____________________________________________________ Review Agency Comments: *Comments that may not fit in the box should be attached to the cover sheet on agency or department letterhead. 30 Project Name: ________________________________________________ Acreage: ___________ PIN(s): __________________ Address (or general location): Existing Zoning District: ____________________________________________ Proposed Zoning District: ___________________________________________ Staff Name (Email Address): _________________________________________ Agency Name Completing Comments (select one): ____ Frederick Water ____ Virginia Department of Transportation ____ Winchester Regional Airport ____ Virginia Department of Health ____ Historic Resources Advisory Board ____ Frederick County (FC) Public Schools ____ FC Public Works ____ FC Inspections ____ FC Fire Marshal ____ FC Parks & Recreation ____ FC County Attorney ____ Other (Specify): ________________________ Resubmission to address comments requested? Y _____ or N _____ REQUEST FOR REZONING COMMENTS Reviewer Name (Email Address): _____________________________________________________ Review Agency Comments: *Comments that may not fit in the box should be attached to the cover sheet on agency or department letterhead. Busy Bee Daycare Proffer Amendment .56 33-A-93 4498 Martinsburg Pike B2(with proffers) B2(with Proffers) eric.bittner@fcva.us Andrew Fox (andrew.fox@fcva.us) The proffer statement meets the requirements of the Frederick County Zoning Ordinance and the Code of Virginia and is legally sufficient as proposed for recordation. I have not reviewed the substance of the proffers as to whether the proffers are suitable and appropriate for this specific development, as my understanding is that review is being undertaken by staff and the Planning Commission. 4 4 31 Project Name: ________________________________________________ Acreage: ___________ PIN(s): __________________ Address (or general location): Existing Zoning District: ____________________________________________ Proposed Zoning District: ___________________________________________ Staff Name (Email Address): _________________________________________ Agency Name Completing Comments (select one): ____ Frederick Water ____ Virginia Department of Transportation ____ Winchester Regional Airport ____ Virginia Department of Health ____ Historic Resources Advisory Board ____ Frederick County (FC) Public Schools ____ FC Public Works ____ FC Inspections ____ FC Fire Marshal ____ FC Parks & Recreation ____ FC County Attorney ____ Other (Specify): ________________________ Resubmission to address comments requested? Y _____ or N _____ REQUEST FOR REZONING COMMENTS Reviewer Name (Email Address): _____________________________________________________ Review Agency Comments: *Comments that may not fit in the box should be attached to the cover sheet on agency or department letterhead. Busy Bee Daycare Proffer Amendment .56 33-A-93 4498 Martinsburg Pike B2(with proffers) B2(with Proffers) eric.bittner@fcva.us Ryan Spielman joseph.spielman@vdot.virginia.gov VDOT has no comments on this proposed rezoning. 4 4 32 33 34 Project Name: ________________________________________________ Acreage: ___________ PIN(s): __________________ Address (or general location): Existing Zoning District: ____________________________________________ Proposed Zoning District: ___________________________________________ Staff Name (Email Address): _________________________________________ Agency Name Completing Comments (select one): ____ Frederick Water ____ Virginia Department of Transportation ____ Winchester Regional Airport ____ Virginia Department of Health ____ Historic Resources Advisory Board ____ Frederick County (FC) Public Schools ____ FC Public Works ____ FC Inspections ____ FC Fire Marshal ____ FC Parks & Recreation ____ FC County Attorney ____ Other (Specify): ________________________ Resubmission to address comments requested? Y _____ or N _____ REQUEST FOR REZONING COMMENTS Reviewer Name (Email Address): _____________________________________________________ Review Agency Comments: *Comments that may not fit in the box should be attached to the cover sheet on agency or department letterhead. Busy Bee Daycare Proffer Amendment .56 33-A-93 4498 Martinsburg Pike B2(with proffers) B2(with Proffers) eric.bittner@fcva.us 4/15/2026. John Lee. Johnathan.Lee@fcva.us Change of use permit application needs to be applied for and obtained. New C.O will be issued upon approval of permit. 4 4 35 36 37 Planning Commission Agenda Item Detail Meeting Date: July 1, 2026 Agenda Section: Public Hearings Title: Rezoning #06-26 for Hopewell Highway Commercial Center (Winchester 131, LLC & Winchester 125, LLC) - (Mr. Klein) Attachments: PC07-01-26_ REZ06-26_TrafficImpactAnalysis_Redacted.pdf PC07-01-26_REZ06-26_Redacted.pdf 38 39 Revised Traffic Impact Study Hopewell Highway Commercial Center Frederick County, VA November 2023 i Table of Contents EXECUTIVE SUMMARY ........................................................................................................................................................................ v Conclusions ............................................................................................................................................................................................. vii Recommendations ................................................................................................................................................................................ viii INTRODUCTION ................................................................................................................................................................................... 1 Proposed Rezoning Uses ......................................................................................................................................................................... 2 Proposed Site Trip Summary................................................................................................................................................................... 5 ROADWAY CONTEXT ........................................................................................................................................................................... 7 Zoning and Comprehensive Plan Conformance .................................................................................................................................... 7 VDOT Functional Plan .............................................................................................................................................................................. 9 Hopewell Road Relocated ....................................................................................................................................................................... 9 Access Management ............................................................................................................................................................................... 9 VDOT Chapter 527/870 Requirements ................................................................................................................................................ 11 CAPACITY ANALYSIS METHODOLOGY ........................................................................................................................................... 12 EXISTING CONDITIONS ...................................................................................................................................................................... 13 Existing Conditions Intersection LOS Analysis ...................................................................................................................................... 15 2027 SHORT-TERM TRAFFIC CONDITIONS ........................................................................................................................................ 18 Background Growth .............................................................................................................................................................................. 18 Other Development............................................................................................................................................................................... 18 Short-Term Traffic Volumes without Hopewell Highway Commercial Center .................................................................................. 18 Short-Term Conditions Intersection LOS Analysis without Site .......................................................................................................... 20 SHORT-TERM 2027 CONDITIONS WITH SITE ..................................................................................................................................... 23 Trip Generation ..................................................................................................................................................................................... 23 Trip Generation Sensitivity .................................................................................................................................................................... 23 Trip Distributions ................................................................................................................................................................................... 25 Short-Term Site Traffic Volumes ........................................................................................................................................................... 30 Hopewell Road Relocated Short-Term Diversions ............................................................................................................................... 30 Short-Term Traffic Volumes with Phase 1 Rezoning ........................................................................................................................... 30 Short-Term Conditions Intersection LOS Analysis with Phase 1 Site .................................................................................................. 33 2030 BUILD-OUT TRAFFIC CONDITIONS ............................................................................................................................................ 39 Build-out Traffic Volumes without Hopewell Highway Commercial Center ...................................................................................... 39 Build-Out Conditions Intersection LOS Analysis without Site ............................................................................................................. 39 BUILD-OUT 2030 CONDITIONS WITH SITE......................................................................................................................................... 43 Trip Generation ..................................................................................................................................................................................... 43 Build-Out Site Traffic Volumes .............................................................................................................................................................. 45 Hopewell Road Relocated Build-Out Diversions .................................................................................................................................. 47 40 Revised Traffic Impact Study Hopewell Highway Commercial Center Frederick County, VA November 2023 ii Build-Out Traffic Volumes with Hopewell Highway Commercial Center Rezoning ........................................................................... 47 Build-Out Conditions Intersection LOS Analysis with Site ................................................................................................................... 47 2030 FUTURE CONDITIONS ALT. WITHOUT HOPEWELL ROAD RELOCATED WITH SITE .................................................................... 54 Alternative Site Assignments ................................................................................................................................................................ 54 Alt. 2030 Traffic Volumes with Hopewell Highway Commercial Center Rezoning ............................................................................ 54 Alternative 2030 Intersection LOS without Hopewell Rd Relocated .................................................................................................. 57 LONG-TERM 2036 CONDITIONS WITH SITE ....................................................................................................................................... 61 Long-Term Traffic Volumes with Hopewell Highway Commercial Center Rezoning ......................................................................... 61 Long-Term Conditions Intersection LOS Analysis with Site ................................................................................................................. 64 ACCESS IMPACTS ............................................................................................................................................................................... 68 On-Site Turn Lanes ................................................................................................................................................................................ 68 Roundabout LOS .................................................................................................................................................................................... 70 Route 11 Daily Signal Warrants ............................................................................................................................................................ 73 VJuST Analysis ........................................................................................................................................................................................ 74 LOS Comparisons with and without Hopewell Road Relocated ......................................................................................................... 79 CONCLUSIONS ................................................................................................................................................................................... 82 Recommendations .............................................................................................................................................................................. 83 APPENDICES Appendix A: Scoping Appendix B: Traffic Counts Appendix C: SYNCHRO Analysis – 2022 Existing Conditions Appendix D: Growth Trends Appendix E: SYNCHRO Analysis – 2027 Short-Term No-Build Conditions without Hopewell Rd Relocated Appendix F: Site Trip Generation Worksheets Appendix G: Short-Term Phase 1 Site Assignments Appendix H: Hopewell Road Relocated Diversions Appendix I: SYNCHRO Analysis – 2027 Short-Term Build Conditions with Ph 1 Site with Hopewell Rd Relocated Appendix J: SYNCHRO Analysis – 2030 ‘No-Build’ Conditions without Hopewell Rd Relocated Appendix K: Long-Term Build-Out Site Assignments Appendix L: SYNCHRO Analysis – 2030 Build Conditions with Site with Hopewell Rd Relocated Appendix M: SYNCHRO Analysis – 2030 Alternative Build Conditions without Hopewell Rd Relocated Appendix N: SYNCHRO Analysis – 2036 Long-Term Conditions with Site with Hopewell Rd Relocated Appendix O Turn Lane Worksheets Appendix P: VJuST intersection Worksheets Prepared by: Douglas R. Kennedy, PE Wan Chong, PE, PTOE 41 Revised Traffic Impact Study Hopewell Highway Commercial Center Frederick County, VA November 2023 iii LIST OF FIGURES FIGURE 1: SITE LOCATION .................................................................................................................................................................................. VI FIGURE 3: PROPOSED ACCESS PLAN (REVISED) ..................................................................................................................................................... 4 FIGURE 4: COUNTY COMPREHENSIVE TRANSPORTATION PLAN ................................................................................................................................ 7 FIGURE 5: PROPOSED COUNTY INTERSTATE ROAD IMPROVEMENT PLAN ................................................................................................................... 8 FIGURE 6: COUNTY PROPOSED COMPREHENSIVE TRANSPORTATION PLAN ................................................................................................................ 8 FIGURE 7: VDOT FUNCTIONAL PLAN .................................................................................................................................................................. 9 FIGURE 8: 2022 EXISTING TRAFFIC VOLUMES .................................................................................................................................................... 14 FIGURE 9: 2022 EXISTING LOS ........................................................................................................................................................................ 16 FIGURE 10: SHORT-TERM 2027 TRAFFIC VOLUMES WITHOUT HOPEWELL RD RELOCATED ....................................................................................... 19 FIGURE 11: SHORT-TERM 2027 LOS WITHOUT HOPEWELL RD RELOCATED ........................................................................................................... 21 FIGURE 12: COMMERCIAL USES GENERALIZED TRIP DISTRIBUTIONS ....................................................................................................................... 27 FIGURE 13: TRUCK STOP GENERALIZED TRIP DISTRIBUTIONS................................................................................................................................. 28 FIGURE 14: PASS-BY TRIP DISTRIBUTIONS .......................................................................................................................................................... 29 FIGURE 15: TOTAL PHASE 1 TRIPS .................................................................................................................................................................... 31 FIGURE 16: SHORT-TERM 2027 TRAFFIC VOLUMES W/ PHASE 1 SITE TRIPS........................................................................................................... 32 FIGURE 17A: SHORT-TERM 2027 LOS W/ SITE ................................................................................................................................................. 34 FIGURE 17B: SHORT-TERM 2027 IMPROVED LOS W/ SITE .................................................................................................................................. 37 FIGURE 18: BACKGROUND 2030 TRAFFIC VOLUMES W/ GROWTH WITHOUT HOPEWELL RD RELOCATED ................................................................... 40 FIGURE 19: BACKGROUND 2030 LOS WITHOUT HOPEWELL RD RELOCATED .......................................................................................................... 41 FIGURE 20: TOTAL SITE TRIPS........................................................................................................................................................................... 46 FIGURE 21: TOTAL 2030 TRAFFIC VOLUMES W/ HOPEWELL ROAD RELOCATED ...................................................................................................... 48 FIGURE 22A: TOTAL 2030 LOS W/ HOPEWELL ROAD RELOCATED ........................................................................................................................ 49 FIGURE 22B: TOTAL 2030 LOS IMPROVED W/ HOPEWELL ROAD RELOCATED ........................................................................................................ 52 FIGURE 23: ALTERNATIVE TOTAL SITE TRIPS ...................................................................................................................................................... 55 FIGURE 24: ALT. 2030 TRAFFIC VOLUMES WITHOUT RELOCATED HOPEWELL RD RELOCATED ................................................................................. 56 FIGURE 25: ALT. 2030 LOS WITHOUT RELOCATED HOPEWELL RD RELOCATED ..................................................................................................... 58 FIGURE 26: LONG-TERM 2036 TRAFFIC VOLUMES WITH GROWTH WITHOUT HOPEWELL RD RELOCATED ................................................................... 62 FIGURE 27: LONG-TERM 2036 TRAFFIC VOLUMES W/ SITE W/ HOPEWELL ROAD RELOCATED .................................................................................. 63 FIGURE 28: LONG-TERM 2036 LOS W/ SITE W/ HOPEWELL ROAD RELOCATED ..................................................................................................... 65 FIGURE 29: SHORT-TERM 2027 HOPEWELL ROAD RELOCATED CONCEPT ROUNDABOUT ......................................................................................... 71 FIGURE 30: LONG-TERM 2036 HOPEWELL ROAD RELOCATED/ REZONING SITE CONCEPT ROUNDABOUT ................................................................... 72 42 Revised Traffic Impact Study Hopewell Highway Commercial Center Frederick County, VA November 2023 iv LIST OF TABLES TABLE A: HOPEWELL HIGHWAY COMM. CTR. PROPOSED HOPEWELL RD OFF-SITE RECOMMENDATIONS .................................................................... VIII TABLE B: HOPEWELL HIGHWAY COMM. CTR. PROPOSED MARTINSBURG PIKE OFF-SITE RECOMMENDATIONS ............................................................... IX TABLE C: HOPEWELL HIGHWAY COMM. CTR. PROPOSED ON-SITE REGIONAL TRANSPORTATION RECOMMENDATIONS .................................................... X TABLE 1: HOPEWELL HIGHWAY COMMERCIAL CENTER TRAFFIC STUDY LAND USE ASSUMPTIONS ................................................................................ 2 TABLE 2: HOPEWELL HIGHWAY COMMERCIAL CENTER TRAFFIC TRIP GENERATION SUMMARY ..................................................................................... 6 TABLE 3: HOPEWELL ROAD RELOCATED DESIGN CHARACTERISTICS ........................................................................................................................ 10 TABLE 4: HOPEWELL ROAD RELOCATED ACCESS SPACING ..................................................................................................................................... 10 TABLE 5: 2022 INTERSECTION LEVEL OF SERVICE -EXISTING CONDITIONS ............................................................................................................... 17 TABLE 6: 2027 INTERSECTION LEVEL OF SERVICE -SHORT-TERM CONDITIONS WITHOUT SITE .................................................................................... 22 TABLE 7: HOPEWELL HIGHWAY COMMERCIAL CENTER PHASE 1 TRIP GENERATION.................................................................................................. 23 TABLE 8: HOPEWELL HIGHWAY COMMERCIAL CENTER PHASE 1 TRIP REDUCTIONS .................................................................................................. 25 TABLE 9: HOPEWELL HIGHWAY COMMERCIAL CENTER TRIP DISTRIBUTION ............................................................................................................. 26 TABLE 10A: 2027 BUILD INTERSECTION LOS – SHORT-TERM CONDITIONS WITH SITE WITH HOPEWELL RD REL. ........................................................ 35 TABLE 10B: 2027 BUILD INTERSECTION LOS – SHORT-TERM CONDITIONS W/ SITE W/ MITIGATION ........................................................................ 38 TABLE 11: 2030 INTERSECTION LEVEL OF SERVICE -BACKGROUND CONDITIONS WITHOUT SITE ................................................................................. 42 TABLE 12: HOPEWELL HIGHWAY COMMERCIAL CENTER TRIP GENERATION ............................................................................................................ 43 TABLE 13: HOPEWELL HIGHWAY COMMERCIAL CENTER TRIP REDUCTIONS ............................................................................................................. 44 TABLE 14A: 2030 BUILD INTERSECTION LOS – TOTAL CONDITIONS WITH SITE WITH HOPEWELL RD REL. .................................................................. 50 TABLE 14B: 2030 BUILD INTERSECTION LOS – TOTAL CONDITIONS WITH SITE WITH HOPEWELL RD REL. W/ MITIGATION ........................................... 53 TABLE 15: ALTERNATIVE 2030 INTERSECTION LOS – FUTURE CONDITIONS WITH SITE WITHOUT HOPEWELL RD REL. .................................................. 59 TABLE 16: 2036 BUILD INTERSECTION LOS – LONG-TERM CONDITIONS WITH SITE WITH HOPEWELL RD REL. ............................................................ 66 TABLE 17A: ROUTE 672 RELOCATED/HOPEWELL LANE TURN LANE SUMMARY ...................................................................................................... 68 TABLE 17B: ROUTE 672 RELOCATED /SITE ENTRANCE TURN LANE SUMMARY ........................................................................................................ 69 TABLE 17C: ROUTE 672 RELOCATED /NORTH CONNECTOR ROAD TURN LANE SUMMARY ........................................................................................ 69 TABLE 17D: US RTE. 11/ ROUTE 672 RELOCATED TURN LANE SUMMARY ............................................................................................................ 70 TABLE 18: US RTE. 11/ ROUTE 672 RELOCATED SHORT-TERM DAILY WARRANT SUMMARY .................................................................................... 73 TABLE 19A: I-81 SB/ ROUTE 672 VJUST CANDIDATE SCREENING ........................................................................................................................ 74 TABLE 19B: I-81 SB/ ROUTE 672 VJUST RESULTS ............................................................................................................................................. 75 TABLE 20A: ROUTE 672 RELOCATED /SITE ENTR VJUST CANDIDATE SCREENING .................................................................................................... 76 TABLE 20B: ROUTE 672 RELOCATED/SITE ENTR VJUST RESULTS ......................................................................................................................... 76 TABLE 21A: US RTE. 11/ROUTE 672 RELOCATED VJUST CANDIDATE SCREENING .................................................................................................. 77 TABLE 21B: US RTE. 11/ROUTE 672 RELOCATED SITE ENTR VJUST RESULTS ........................................................................................................ 78 TABLE 22A: I-81 LONG-TERM ROUTE 11 AM PEAK HOUR LOS SENSITIVITY WITH HOPEWELL HIGHWAY COMM. CTR ................................................ 80 TABLE 22B: I-81 LONG-TERM ROUTE 11 PM PEAK HOUR LOS SENSITIVITY WITH HOPEWELL HIGHWAY COMM. CTR. ............................................... 81 TABLE A: HOPEWELL HIGHWAY COMM. CTR. PROPOSED HOPEWELL RD OFF-SITE RECOMMENDATIONS .................................................................... 83 TABLE B: HOPEWELL HIGHWAY COMM. CTR. PROPOSED MARTINSBURG PIKE OFF-SITE RECOMMENDATIONS ............................................................. 84 TABLE C: HOPEWELL HIGHWAY COMM. CTR. PROPOSED ON-SITE REGIONAL TRANSPORTATION RECOMMENDATIONS ................................................. 85 43 44 45 Revised Traffic Impact Study Hopewell Highway Commercial Center Frederick County, VA November 2023 vii intersection at US Route 11. Background conditions without the site are included without the new collector road. • Proposed Build-out Condition for 2030 with the site build-out with the four-laned divided collector from I-81 NB exit ramp to US Route 11. Background conditions without the site is also included. • Alternative conditions for 2030 with the site developed with the densities as proposed but without the new collector road through the site. Based on previous scoping with VDOT, site access to Hopewell Road at Hopewell Lane would be restricted to a right in/out access only to the north, based on the off- set requirements from the existing limited access location at I-81. Therefore, all site trips inbound from the interstate would be required to continue east on Route 672, turn left at US Route 11, and turn left again into the site north of the Route 11 at-grade railroad crossing. For this alternative, selected turn lane improvements are added to US Route 11, although off-site R-O-W is limited. This alternative is provided to compare operations with the current County Comprehensive Plan Road alignment of Hopewell Road connected to Brucetown Road. The relocated alignment of Hopewell Road through the site is also shown in the updated County Comprehensive Transportation Plan. • Long-Term condition for 2036 with the site to reflect ultimate traffic projections for a build-out plus six- year scenario. The 2036 traffic scenario was used for turn lane warrant checks and the VDOT Junction Screening Tool (VJuST) alternative review. Conclusions The proposed project and future regional growth can be accommodated by the proposed road network with Hopewell Rd Relocated and recommended improvements. The existing road network would provide inferior operation without significant improvements and right-of-way acquisition at the US Route 11/existing Hopetown Rd/Brucetown Rd intersections. With the Hopewell Highway Commercial Center proposed Phase 1 uses, converting the conventional side- street stop control intersection at the I-81 South ramp at Hopewell Rd to a single-lane roundabout is recommended. A signal at US Route 11/Hopewell Rd Relocated, coordinated with the existing signal at Brucetown Rd, is also recommended, as well as NB and SB turn lanes on US Route 11 at Hopewell Rd Relocated. Hopewell Rd Relocated as a 2-lane roadway with turn lanes at intersections and a single lane roundabout for the main site entrances in the center of the site can accommodate the rerouted existing traffic and Phase 1 site trips in the short-term. The initial improvements also propose to lengthen the WB Hopewell Rd right turn lane at the I-81 North ramp junction. The proposed roundabouts at I-81 South Ramps/Hopewell Rd and Hopewell Rd Relocated/ Hopewell Highway Commercial Center entrance, and the conventional signal at US Route 11/Hopewell Rd Relocated were verified with the VJuST screening tool as the most appropriate intersection design option for each location. With project build-out, a separate right turn lane on the I-81 North exit ramp approach to Hopewell Rd is recommended in addition to the improvements recommended with project for Phase 1 to support the build- out of initial commercial uses for Land Bay 1. Hopewell Road Relocated should be widened to a 4-lane section between the main site entrance roundabout and the roundabout should be converted to a Turbo roundabout with project build-out. Revisions to the Route 11 operations are included for lane widths and proposed 46 47 48 49 Revised Traffic Impact Study Hopewell Highway Commercial Center Frederick County, VA November 2023 1 INTRODUCTION Pennoni is providing transportation support services to Winchester 131, LLC for the development northeast of the Hopewell Road/I-81 Exit 321 diamond interchange in Frederick County, Virginia. The proposed rezoning of existing farmland for approximately 39 acres would provide new commercial opportunities for the County and the US Route 11 corridor. The applicant has local interests in the area, and currently operates a truck facility in the southwest corner of the Hopewell Road/Martinsburg Pike signal at 3425 Martinsburg Pike. The proposed land use change includes a significant public street roadway network alternative to address the County Transportation Plan upgrades for Hopewell Road (Va. Route 672) from a two-lane section to a four- lane divided corridor west of US Route 11. After several scoping reviews with VDOT District, Residency and County Planning staff, a preferred roadway network concept was developed for consideration as part of the subject rezoning. Since the initial request, the Applicant has acquired the property and wishes to proceed with the land use change. The focus of the land use plan is to allow a new truck stop and convenience center be built adjacent to I-81 with access generally consistent with the VDOT Access Management guidelines. To satisfy VDOT collector road spacing and provide area for the new truck stop and associated auto-oriented convenience uses, the proposed access plan introduces a Relocated Hopewell Road corridor with a roundabout in the center of the site as the initial site access location east of I-81. This relocation allows the existing Hopewell Road at-grade railroad crossing to be eliminated and would extend Hopewell Lane north of Rte. 672 into the subject site to access the new road. Truck access is shown via an interparcel connector road north of the proposed roundabout and a new intersection is shown to US Route 11 along the site frontage. The traffic study scoping correspondence is included in Appendix A and the proposed land uses summarized in Table 1 below for the ultimate site build-out. These analyses followed the VDOT Traffic Impact Study scoping Methodology for trips over 5,000 VPD. VDOT commentd on the initial rezoning subssioon were received in August 2023 and a follow-up land use meeting occurred on September 26, 2023 to review the the technical elements. The meeting request is include in the Appendix. A seperate response letter to the VDOT comments received is attached with this submission. The scenarios analyzed in this study include: • Existing Conditions for 2022. • Proposed Short-Term Conditions for 2027 with the initial site for a truck stop and convenience center uses with the proposed two-lane extension of Hopewell Road Relocated through the site to a new intersection at US Route 11. Background conditions without the site are included without the new collector road. • Proposed Build-out Condition for 2030 with the site build-out with the four-laned divided collector from I-81 NB exit ramp to US Route 11. Background conditions without the site also included. • Alternative conditions for 2030 with the site developed with the densities as proposed but without the new collector road through the site. Based on previous scoping with VDOT, site access to Hopewell Road at Hopewell Lane would be restricted to a right in/out access only to the north, based on the off- set requirements from the existing limited access location at I-81. Therefore, all site trips inbound 50 51 52 53 Revised Traffic Impact Study Hopewell Highway Commercial Center Frederick County, VA November 2023 5 Proposed Site Trip Summary This study contains an assessment of the proposed development utilizing trip rates from the Institute of Transportation Engineers (ITE) Trip Generation 11th Edition to determine daily and peak hour project traffic for the new land uses. Project trip distributions are based on derived commercial orientation with 75-80 percent of the trips oriented to I-81. Utilizing this information, an assignment of peak hour project trips onto the local area roadway network are made for all adjacent roadway segments. Pass-by trips are shown for this rezoning, and diversions are shown for the new Hopewell Road Relocated link. The gross total driveway trip impacts are used for analyzing intersection level of service. No credit for internal uses between fast food, truck stop, and hotel uses are included, to be conservative. Therefore, site impacts are shown for the entire occupancy of the land bays. 54 55 56 57 58 59 Revised Traffic Impact Study Hopewell Highway Commercial Center Frederick County, VA November 2023 11 would be able to use the roundabout to make a U-turn to access I-81. The on-site roundabout was adjusted in footprint to accommodate WB-67 with the turbo design as part of the TIS revisions. VDOT Chapter 527/870 Requirements The analysis is formatted following the generalized VDOT 527 Traffic Study to summarize traffic assumptions. The proposed site activities do require a formal VDOT 527 study submission . As part of the requirements of VDOT’s Chapter 527/870 regulations, a traffic impact analysis must be submitted with any rezoning or special exception action if the site trip generation is over 5,000 vehicles per day. For the subject site, trip generation for the site does trigger additional Chapter 527/870 review for land use or site plan review based on the proposed commercial land uses. 60 61 Revised Traffic Impact Study Hopewell Highway Commercial Center Frederick County, VA November 2023 13 EXISTING CONDITIONS Turning movement counts were conducted at the existing study intersections on November 2, 2022, between the hours of 6 AM – 9 AM in the morning and 4 PM – 7 PM in the evening. The peak hours were determined to be between 7:30 AM – 8:30 AM in the morning and 4:45 PM – 5:45 PM in the evening. The existing AM and PM peak hour volumes at the existing study intersections are shown in Figure 8. The turning movement counts are included in Appendix B. 62 63 64 65 66 Revised Traffic Impact Study Hopewell Highway Commercial Center Frederick County, VA November 2023 18 2027 SHORT-TERM TRAFFIC CONDITIONS In evaluating the historical data from other resources, the ambient growth volumes had defaulted to an annual 2 percent growth on the regional roadways. Background Growth As scoped, as on historical data from VDOT, the growth between 2008 and 2021 was an average of approximately 2 percent per year on US Route 11 and I-81. The VDOT data is summarized in Appendix D. Other Development Based on the scoping, other programmed employment uses were identified but are not expected to generate significant changes on US Route 11, so the effective regional growth was maintained. Short-Term Traffic Volumes without Hopewell Highway Commercial Center The adjusted existing volumes traffic was compounded annually at 2 percent per year for five years from 2022 to 2027. Growth volumes are summarized in Figure 10. 67 68 69 70 71 72 Revised Traffic Impact Study Hopewell Highway Commercial Center Frederick County, VA November 2023 24 The ITE trip generation rates average equations were used for this TIS to account for the land uses noted above. Trips are shown for the maximum activities for the rezoning application. The actual trips are 13 -11 AM directional and 17 trips in/out higher than the July concept plan, equating to a 2 percent difference. Pass-By Trips Pass-by trips are trips that use the site but would be on the road network anyway. The Institute of Transportation Engineers (ITE) Trip Generation Manual Handbook, 10th Edition (2017), is the standard publication used to determine anticipated pass-by trips generated by a proposed site and are typically applied for commercial uses. Trips are shown as a percentage of commercial total trips and are shown as the lesser of the inbound or outbound trips for the use type for the peaks. The pass-by Trips are shown as being diverted from the existing roadway as increased in turns to the site and subtracted from throughs. The outbound trips are shown as returning to the roadway network (typically within the same hour) to continue to their destinations on the arterial roadway. For the Hopewell Highway Commercial Center (ClearBrook rezoning), the number of pass-by trips was derived from the ITE Trip Generation Handbook average pass- by trips, as updated with the 11th edition for the PM peak hour. Daily and AM pass-by rates are derived. Pass-by trips were allocated to the 3 types of commercial uses in Phase 1 in Table 8 as: • Truck Stop (LUC 950) – not included in the ITE updates. Used 1/3 for AM and PM peak hours • Fast Food Restaurant with drive through (LUC 934) - Used the PM average at 55% and reduced the AM and Daily to 50 and 45%, respectively. • Conv./Gas Destination retail (LUC 945) – Used the AM and PM pass-by rate percentages at 60 and 56%, respectively. The daily rates were rounded down to 50%. For the revision the trip generation for pass-by was updated to 240 trips inbound in Table 8 for the PM peak versus 253 trips in the 1st submission, but the site assignments were not changed. The PM peak trip generation change only decreased the pass-by trips by 13 inbound trips, or approximately 5 percent of the total driveway trip generation for the PM peak. Since the pass-by trip were shown added to the key intersection junctions, and the change was less than 10 percent of the total trips, the link vol umes for 2027 build scenario were not revised. Internal Trips Additionally, trip reductions for internal use between commercial uses are allowed. However, without employment activities, the application of ‘internal’ trips is shown with destinations among the land uses would be capped at 5 percent per VDOT guidance. Typically, internal trips are calculated between land uses initially based on the overall proximity/attractiveness of local trips using the NCHRP 684 report “Internal Trip Capture Estimation Tool” worksheet, as recommended by VDOT. No internal trips between the Land Bay 1 were included in the trip assignments. As outlined in Table 8, with pass-by trips, the external trips added to the roadway network would decrease peak hour trips by approximately 54 percent in the AM and 51 percent for the PM peak. 73 74 75 76 77 78 Revised Traffic Impact Study Hopewell Highway Commercial Center Frederick County, VA November 2023 30 Short-Term Site Traffic Volumes The external site trips for the truck stop and convenience uses were combined with the pass-by trips to determine the Phase 1 trips, as shown in Figure 15. Hopewell Road Relocated Short-Term Diversions With Hopewell Road relocated as proposed, the existing travel paths on Route 672 east of the interstate will be impacted. Pennoni included localized diversions to the base traffic volumes to account for these changes with the following reassignments to the existing traffic volumes: 1. With Hopewell Road closed at the existing at-grade railroad crossing, the turns to/from the existing gas/fuel center east of the railroad were diverted to turn to Route 11 and the new connector road access for west oriented destinations via intersection #9. Estimated turns based on the difference in counts from intersection #3 at Hopewell Lane and Intersection #4 at Route 11. 2. With Hopewell Road closed at the existing at-grade railroad crossing, the turns to/from the east at Hopewell Lane reassigned to the north to Hopewell Lane Extended (Intersection #6). 3. With Hopewell Road relocated east of I-81 divert local trips to/from the west at Hopewell Lane reassigned to the north to Hopewell Lane Extended (Intersection #6). 4. Reassign approximately 30 percent of the Brucetown Road signal (Intersection #5) to/from the south to the north to the Route 11 access at the Relocated collector for destinations west towards I-81. 5. With Hopewell Road closed at the existing at-grade railroad crossing, reassign the remaining turns to/from the east at Hopewell Road/Martinsburg Pike signal as throughs through signals #4 and #5 and add as turns at the Relocated Collector Road (Intersection #9). Trips based on throughs at Hopewell Lane. Southbound rights at intersection #4 diverted to right at intersection #9. The diversions are shown, with growth between 2022 and 2027 in Appendix Figure H1. Short-Term Traffic Volumes with Phase 1 Rezoning The adjusted existing volumes traffic was added with the site trips from Phase 1 to develop the short-term volumes with the rezoning, as summarized in Figure 16. 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 Revised Traffic Impact Study Hopewell Highway Commercial Center Frederick County, VA November 2023 45 corrections in Table 13 were adjusted to lookup the correct data (the PM default percentages previously using the AM percentages). For the report revision, the trip generation was updated but the assignments were not changed, as the trip generation increment for pass-by decreased by 7 inbound trips, or less than 5 percent. Build-Out Site Traffic Volumes The site volumes with the rezoning are summarized for the external trips in Appendix Figure K1 and for pass- by trips in Appendix K2. Note the PM pass-by volumes total 321 trips at the driveways, which is slightly higher than the updated trips in Table 13. However, the combination of the external trips and pass-by trips do equal the ITE trip generation estimates. Site trips are summarized for the Hopewell Highway Commercial Center rezoning in Figure 20. 94 95 96 97 98 99 100 101 102 Revised Traffic Impact Study Hopewell Highway Commercial Center Frederick County, VA November 2023 54 2030 FUTURE CONDITIONS ALT. WITHOUT HOPEWELL ROAD RELOCATED WITH SITE With the future study area intersections as proposed, the scoping identified an issue if Hopewell Road were not relocated, what impacts would be experienced on Hopewell Road and US Route 11. The site access was adjusted to an alternative 2030 scenario with: • Right in/right out access for the site opposite Hopewell Lane, but with no left turn lanes into the site and maintaining the at-grade railroad crossing, • With added traffic on Hopewell Road, widening east of the railroad to US Route 11 for added stacking, • Adding turn lanes with off-site ROW between Brucetown Road and Hopewell Road, • Adding the Route 11 entrance as proposed for left turn access to the property, but without through trips to Route 672. The County Comprehensive Plan envisioned a 4-lane corridor with Route 673 realigned to connect directly to Brucetown Road. With the two adjacent railroad crossings and off-site ROW impacts to properties not included in this rezoning, this alternative was not modeled. Alternative Site Assignments Local traffic growth is shown as previously described. For the Hopewell Highway Commercial Center rezoning alternative access, the added trips were derived from the peak hour trips in Table 12 with build-out. Trips were assigned as outlined in the Appendix K3 and K4 with the same regional distributions as noted previously, but with no left turn on Hopewell Road into the site and no Hopewell Road Relocated. Site trips are summarized in Figure 23. Alt. 2030 Traffic Volumes with Hopewell Highway Commercial Center Rezoning Total peak hour and daily trips are shown for the study area intersections without Hopewell Road Relocated in Figure 24 for the alternative 2030 scenario. 103 104 105 106 107 108 109 Revised Traffic Impact Study Hopewell Highway Commercial Center Frederick County, VA November 2023 61 LONG-TERM 2036 CONDITIONS WITH SITE To access the site impacts to the existing roads, the site trips for the peak hours and daily conditions were developed and assigned to the local roadway network. Site trip generation and trip distribution calculations are outlined below, including a potential review of local traffic. Long-Term Traffic Volumes with Hopewell Highway Commercial Center Rezoning The adjusted existing volumes traffic was compounded annually at 2 percent per year for 14 years from 2022 to 2036. Volumes without the site are summarized in Figure 26. Volumes with the site are summarized in Figure 27. 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 Revised Traffic Impact Study Hopewell Highway Commercial Center Frederick County, VA November 2023 82 CONCLUSIONS The proposed project and future regional growth can be accommodated by the proposed road network with Hopewell Rd Relocated and recommended improvements. The existing road network would provide inferior operation without significant improvements and right-of-way acquisition at the US Route 11/existing Hopetown Rd/Brucetown Rd intersections. With the Hopewell Highway Commercial Center proposed Phase 1 uses, converting the conventional side- street stop control intersection at the I-81 South ramp at Hopewell Rd to a single-lane roundabout is recommended. A signal at US Route 11/Hopewell Rd Relocated, coordinated with the existing signal at existing Brucetown Rd, is also recommended, as well as NB and SB turn lanes on US Route 11 at Hopewell Rd Relocated. Hopewell Rd Relocated as a 2-lane roadway with turn lanes at intersections and a single lane roundabout for the main site entrances in the center of the site can accommodate the rerouted existing traffic and Phase 1 site trips in the short-term. The initial improvements also propose to lengthen the WB Hopewell Rd right turn lane at the I-81 North ramp junction. The proposed roundabouts at I-81 South Ramps/Hopewell Rd and Hopewell Rd Relocated/ Hopewell Highway Commercial Center entrance, and the conventional signal at US Route 11/Hopewell Rd Relocated were verified with the VJuST screening tool as the most appropriate intersection design option for each location. With project build-out, a separate right turn lane on the I-81 North exit ramp approach to Hopewell Rd is recommended in addition to the improvements recommended with project build-out of the Phase 1 uses. Hopewell Road Relocated should be widened to a 4-lane section between the main site entrance roundabout and the roundabout should be converted to a Turbo roundabout with project build-out. Detailed recommendations are presented in the following section. 131 132 133 134 REZONING #06-26 Hopewell Highway Commercial (Winchester 131, LLC & Winchester 125, LLC) Staff Report for the Planning Commission Prepared: June 26, 2026 Staff Contact: M. Tyler Klein, AICP, Senior Planner Executive Summary: Meeting Schedule Planning Commission: July 1, 2026 Action: Pending (Public Hearing) Board of Supervisors: August 12, 2026 Action: Pending (Public Hearing) Property Information Property Identification Number (PIN) 33-A-114A, 33-A-122, & 33-A-163 Address 3425 Martinsburg Pike Magisterial District Stonewall Acreage +/- 40.48 Zoning & Present Land Use Zoning: RA (Rural Areas) & B2 (General Business) Land Use: Vacant/Commercial Proposed Zoning B2 & IA (Interstate Area) Overlay District Adjoining Property Zoning & Present Land Use North: B3 (Industrial Transition) Land Use: Commercial/Vacant South: RA (Rural Areas)/B2 (General Business)/B3 Land Use: Commercial/Vacant East: B2/M1 (Light Industrial)/RA Land Use: Commercial/Industria/Residential West: B2/Interstate Land Use: Vacant/I-81 Proposed Use This is a request to rezone three (3) parcels totaling +/- 40.48-acres acres from RA (Rural Areas) Zoning District and the B2 (General Business) Zoning District to B2 Zoning District and the IA (Interstate Area) Overlay District with proffers to develop a truck stop and other interstate commercial uses. Positives Concerns The zoning district proposed, B2, is typically associated with the “business” land use designation for the subject properties listed in the Comprehensive Plan (“business”) and the proposal is partially compliment with plan The proposal does not fully address plan policy contained in the Northeast Land Use Plan (NELUP), specifically that commercial areas at Exit 321 will not only serve interstate travelers but also “surrounding residents” in 135 Page 2 of 8 policies about commercial uses at this interchange serving interstate travelers. The Generalized Development Plan (GDP) includes the plan envisioned pedestrian and frontage enhancements, including a 50’ wide landscape buffer with 10’ wide multipurpose trail, along adjoining roadways. the Clearbrook-Brucetown Rural Community Center. As proposed, the rezoning does not appear to serve “surrounding residents” in a meaningful way as the proposed use is a truck stop and accessory tractor truck and interstate uses. The transportation improvements and road realignment proposed (Proffer 2) imposes upon the County a transportation project priority and alignment not currently being pursued for grant funding. The applicant's proposed road system is designed specifically to enable their use, a truck stop and travel center. The proposed improvements in turn are designed to accommodate their use along with the existing traffic they would be rerouting through their parcel. Though the applicants project is seemingly unachievable without the new realignment concept, and in turn is creating the primary need for the proposed concept, the proffer pays only a portion of the cost associated with the changes. Some agency comments are unaddressed, including concerns raised by Parks and Recreation and the Fire Marshal . Specifically, the proposed realignment has the potential to negatively impact fire and rescue services in this area of the County. The application also does not address comments from the HRAB regarding potentially eligible resources, historic signage in Land Bay 3 and/or conducting a Phase II study. The application, as proposed, lacks high quality building materials and site design elements, including building and sign elevations and renderings, that are typically expected to accompany requests for new commercial areas at key interstate interchanges. Some of the building materials proffered, including dry-vit and EFIS, are not typically associated with high quality 136 Page 3 of 8 buildings, particularly commercial buildings at highly visible interchanges. Review Agency Comments: Review Agency Comment Date Comment Summary Status Virginia Department of Transportation (VDOT) 03/23/2026 See comment letter. Addressed. Frederick Water 03/23/2026 See comment letter. Addressed. Historic Resources Advisory Board (HRAB) 09/26/2023 “The HRAB recommended approval of the application and recommended that the applicant conduct a phase 2 architectural study of the Stine House (DHR ID#034-0931) prior to removal as well as proffer an interpretive sign in Land Bay 3 of the General Development Plan (GDP) about the Stine House.” See comment letter. Not addressed. Frederick County Attorney 12/3/2025 See comment letter. Fully Addressed. FC Fire Marshall 11/06/2025 “The Fire Marshal’s Office would like to express concerns about the commercial truck traffic at the intersection of Martinsburg Pike and Brucetown Road as not improvements are outlined on the provided plans. Any traffic back up at the intersection would delay fire and EMS apparatus leaving Clearbrook Volunteer Fire & Rescue while they are proceeding north onto Martinsburg Pike. These delays would be a result of narrow Not addressed. 137 Page 4 of 8 travel lanes and decreased turning radius.” FC Parks and Recreation 12/5/2025 “It appears the Hopewell Road alignment with Route 11 will only perpetuate the traffic issues faced by Clearbrook Park during periods of peak use.” See comment letter Not addressed. FC Public Works 12/12/2025 See comment letter. Planning & Zoning Staff Analysis: Comprehensive Plan Conformance: The Comprehensive Plan (adopted November 2021) and the Northeast Frederick Land Use Plan (NELUP, 2023) provide guidance on the future development of the subject property. The Plan identifies the subject properties with a “business” land use designation and as being within the limits of the Sewer and Water Service Area (SWSA), the Urban Development Area (UDA) and the Clearbrook and Brucetown Rural Community Center. Brucetown is one of the oldest communities located in the County and contains a number of significant historic structures. The plan further states: “Given that the Clearbrook-Brucetown Rural Community Center extends to I-81 in close proximity to Exit 321, it should be recognized that viable commercial uses in that area will likely need to meet the needs of interstate travelers as well as the surrounding residents.” While the property is proffered as largely unrestricted B2, a large portion of the property, if not all of the property, is seemingly intended for truck stop/travel center style uses intended to serve interstate travelers, with no indication of how the project will meet the needs of surrounding residents. In this respect, the proposed rezoning is only partially compliant with Comprehensive Plan policies. Transportation & Site Access: The Comprehensive Plan and NELUP envision significant transportation improvements at Exit 321 including split interchange/frontage road/ramp improvements for Interstate 81 and realignment of Hopewell Road (Route 672). The proximity of the intersections of Brucetown Road and Hopewell Road with Route 11 have created conflicts and congestion for the road network in this area. The alignment of the intersections for these roadways is a necessary improvement for this area. Access Management is a significant priority for the transportation network planned for 138 Page 5 of 8 this study area. Levels of Service (LOS) C or better are also promoted. As stated in the Plan, future development within the study area should only occur when an acceptable LOS has been achieved and key elements and connections identified in NELUP have been provided. Further, the NELUP states as it relates to transportation improvements: “A significant corridor appearance buffer is proposed along Martinsburg Pike, similar to what has been established for the Route 50 West corridor in the [Western Frederick] Land Use Plan. This corridor buffer consists of a 50-foot buffer area, landscaping, and bike path. Roadway designs should plan for multi-modal street designs that will take all users into consideration. A 10’ paved multipurpose path was constructed along the southbound section of Martinsburg Pike, as established along with the Rutherford Crossing development, and sidewalks are planned for the northbound section. Pedestrian and bicycle accommodations such as sidewalks and bicycle lanes should be provided along all primary and collector roadways within the SWSA. Bike paths or lanes should be constructed on the same grade as the adjacent roadway. Intersection accommodations should also include pedestrian refuge islands and pedestrian access signals.” The Generalized Development Plan (GDP) includes the plan envisioned pedestrian and frontage enhancements, including a 50’ wide landscape buffer with 10’ wide multipurpose trail, along adjoining roadways. However, it would be much preferred to have these corridor enhancements written (specified) in the proffer statement. While the proposal generally aligns these planned improvements, the proffered mechanism to implement them is only partially achieved. Proffer 2 - Transportation, as currently written, is inadequate. The transportation improvements and road realignment proposed (Proffer 2) imposes upon the County a transportation project priority* and alignment not currently being pursued for grant funding. The applicant's proposed road system is designed specifically to enable their use, a truck stop and travel center. Clearbrook Volunteer Fire and Rescue is also in the vicinity, and needs safe and efficient access to Route 11, Interstate 81, and points west. As is Carmeuse, which has significant heavy load truck traffic. The proposed improvements must not only accommodate their use but the existing traffic they would be rerouting through their parcel. Though the applicants project is seemingly unachievable without the new realignment concept, and in turn is creating the primary need for the proposed concept, the proffer pays only a portion of the cost associated with the changes. *Staff notes the County has allocated funding for improvements at the intersection of Hopewell Road, Martinsburg Pike (Route 11) and Brucetown Road through the VDOT FY27 Draft Six Year Improvement Program. This is separate and distinct project from the realignment scenario proposed with this rezoning. The proposed Hopewell Road realignment, included with the rezoning, while shown on County plans, including NELUP, is not included on the six-year improvement program at this time. 139 Page 6 of 8 Zoning Ordinance Conformance: In addition to the requested change in the zoning designation for portions of the property to B2, the proposal also seeks to overlay the property with the IA (Interstate Area) Overlay District. Qualifying uses include gasoline service stations (including travel centers/truck stops), eating and drinking establishments, and hotel and lodging establishments. The IA Interstate Area Overlay District (§165-505) is intended to: “Provide commercial businesses within an identified area the ability to utilize business signs that are in excess of the limits specified in § 165-809 of [the Zoning Ordinance.] This flexibility is provided to inform the traveling public of business service opportunities at specific interstate interchange areas. “ If the rezoning were to be approved, this property would be the first property north of Hopewell Road at this interchange to be allowed an Interstate Area Overlay Sign. The interstate sign could be up to 85’ tall, which is +/- 60’ taller than the base zoning allowance for the site (or 25’ maximum sign height along arterial roadways) and the sign face could be twice as large (up to 300 square feet in area vs. 150 SF maximum). While a service to interstate travelers, allowing an illuminated 85’ interstate sign could have a negative impact on surrounding residences, plan designated the Clearbrook and Brucetown Rural Community Center, and historic resources. Inclusion of proffered design standards for new commercial interstate signage may also be appropriate for staff to evaluate the proposal further. Proffer Statement, Generalized Development Plan (GDP), & Impact Analysis: Proffers (Revision Date May 2026) Staff Comment Proffer 1 – Development and Use of the Property The materials listed in Proffer 1.5.1 including dry-vit and EFIS, are not typically associated with “high quality buildings,” particularly commercial buildings at highly visible interstate interchanges. No comprehensive sign package, or other sign design standards have been provided to evaluate the appropriateness of being within the IA (Interstate Area) Overlay District. Proffer 2 – Transportation Proffer 2 is inadequate. The transportation improvements and road realignment proposed (Proffer 2) imposes upon the County a transportation project priority and alignment not currently being pursued for grant funding. 140 Page 7 of 8 The applicant's proposed road system is designed specifically to enable their use, a truck stop and travel center. The proposed improvements in turn are designed to accommodate their use along with the existing traffic they would be rerouting through their parcel. Though the applicants project is seemingly unachievable without the new realignment concept, and in turn is creating the primary need for the proposed concept, the proffer pays only a portion of the cost associated with the changes. While the Generalized Development Plan (GDP) includes the plan envisioned pedestrian and frontage enhancements, including a 50’ wide landscape buffer with 10’ wide multipurpose trail, along adjoining roadways, it would be much preferred to have these elements written out in the proffer statement. Proffer 3 – Fire and Rescue No comment. Proffer 4 – Water and Sewer No comment. Proffer 5 – Escalator Clause No comment. Generalized Development Plan The generalized development plan (GDP) revised July 31, 2023, is included below depicting site access, transportation improvements, road realignment, and commercial land bays. 141 Page 8 of 8 Following a public hearing, staff are seeking a recommendation from the Planning Commission to forward to the Board of Supervisors on this rezoning application. 142 143 144 145 Page 1 of 8 PROFFER STATEMENT WINCHESTER 131, LLC STONEWALL MAGISTERIAL DISTRICT +/- 40.48 acres Rezoning: #26-___ Record Owners: Winchester 131, LLC. and Winchester 125, LLC Applicant: Winchester 131, LLC. Property: TM# 33-A-114A, TM# 33-A-122 and TM# 33-A-163 comprising approximately of 40.48 acres (the “Property”) as shown on the Generalized Development Plan (“GDP”) titled “Hopewell Highway Commercial Center” dated October 2, 2024 and submitted contemporaneously herewith. Zoning: RA to B2 with accessory uses and IA (Interstate Area Overlay District) Project Name: Hopewell Highway Commercial Center Proffer Date: May ___, 2026 Preliminary Matters: Pursuant to VA. CODE §15.2-2296, et seq. and Frederick County Zoning Ordinance §165-102.06, the undersigned hereby proffers that the development and use of the Property shall be in substantial conformance with the following conditions. In the event this rezoning is granted as applied for by the Applicant and duly adopted by the Board of Supervisors of Frederick County, Virginia in conformity with applicable law, then these proffers shall supersede and replace in their entirety all other proffers made prior hereto with respect to the Property. In the event this rezoning is not granted as applied for by the Applicant, then these proffers shall be withdrawn upon the vote of the Board of Supervisors of Frederick County, Virginia to deny the application and shall be void and of no effect. These proffers are contingent upon the “final rezoning” of the Property with “final rezoning” defined as that rezoning which is in effect on the day following the last day upon which the decision of the Board of Supervisors of Frederick County, Virginia granting the application for this rezoning may be contested in an appropriate Court. If the decision to grant the application for this rezoning is contested, and the Applicant elects not to submit development plans until such contest is resolved, the term “final rezoning” shall include the day following entry of a final order by a Court of appropriate jurisdiction affirming the decision of the Board of Supervisors of Frederick County, Virginia or denying any appeal of such decision without further appeal. 146 Page 2 of 8 The headings of the proffers set forth herein are for reference only and shall not be used to interpret any provision of the proffers. All improvements shall be provided at the time of development of the portion of the Property served by such improvement unless stated otherwise below. References to the “Applicant” shall include the Applicant identified above and all future owners of, or successors in interest to, the Property after final rezoning of the Property as applied for by the Applicant. 1. DEVELOPMENT AND USE OF THE PROPERTY 1.1 The Property shall be developed in substantial conformance with the GDP and that certain transportation impact analysis titled “Revised Traffic Impact Study Hopewell Highway Commercial Center” by Pennoni Associates, Inc. dated November 28, 2023 (hereinafter referred to as the “TIS”) submitted as part of the application for this rezoning and shall be designed to establish interconnected Land Bays in conformance with the GDP. Upon submission of subsequent site or subdivision plans by the Applicant, minor changes and adjustments to the GDP may be made by the Applicant to road alignments; entrances; parking; dimensions and locations of storm water management facilities, including BMP facilities; building locations and configurations; and any other feature shown on the GDP, provided they conform with the submitted site or subdivision plans, meet the intent of these proffers, and are approved by the Director of Planning for Frederick County, Virginia. 1.2 The Property shall be developed in substantial conformance with the Northeast Frederick Land Use Plan (NELUP, 2023) to meet the needs of interstate travelers as well as the surrounding residents by: (a) making significant contributions of cash and road right of way toward the construction of needed transportation infrastructure in the Clearbrook- Brucetown Rural Community Center area; (b) allowing easier access to the Property so it can be developed for uses that will generate increased tax revenues to the County; (c) providing needed truck-related services and increase the range of B2 commercial services offered to the area residents; (d) providing a 50-foot landscape buffer area with a 10’ paved multipurpose path along Route 11 / Martinsburg Pike. 1.3 The Applicant requests that the western portion of the Property designated as “Land Bay 1” on the GDP be designated as an “IA” Interstate Overlay District. 1.4 The Applicant may develop the western portion of the Property designated as “Land Bay 1” and the portion designated as “Land Bay 3” on the GDP and use the same as a Highway Commercial Center for operation of a truck stop / travel center with parking and accessory services (including but not limited to, truck wash, truck repair and trailer parking uses) or any use by right or with a duly approved conditional use permit as permitted under the “B2” zoning district designation in Frederick County, Virginia. 147 Page 3 of 8 1.5 The Applicant will implement the following design and building materials standards for all uses on the Property designated: 1.5.1 The building facades facing Hopewell Road and Route 11 Martinsburg Pike shall be constructed of one or a combination of the following materials: architectural block, brick, cast stone, dry vit, EFIS, glass, metal cladding, stone, stucco, or wood. The materials will be presented to Frederick County with the building permitting process for review, comment and approval. 1.6 The Applicant may develop and use the portion of the Property designated as “Land Bay 2” for any use by right or with a duly approved conditional use permit as permitted under the “B2” zoning district designation in Frederick County, Virginia other than the following uses: 1.6.1 Gasoline Stations with or without Convenience Stores, excluding Fuel Dealers. 1.6.2 Amusement, Arts, Gambling, and Recreation Industries excluding Amusement Parks, Theme Parks, and Outdoor Shooting. 1.6.3 Commercial Sport and Recreation Clubs. 1.6.4 Adult and Child Day-Care facilities. 1.6.5 Model Homes Sales Offices. 1.6.6 Public Utilities excluding energy-generating facilities. 1.6.7 Conference/Event Center. 1.7 If the Applicant elects to develop the Property with any permitted use that results in a net new trip generation from the Property higher than that shown in the TIS, then, as part of any approval process for such use or uses, the Applicant will submit an updated transportation impact analysis to Frederick County, Virginia and the Virginia Department of Transportation for a determination whether adequate levels of service will exist for the transportation network serving the Property as a result of the Applicant’s intended use or uses at the time approval is sought. In the event Applicant’s intended use or uses for the Property would cause inadequate levels of service for the transportation network serving the Property at the time approval is sought, no use will be approved by Frederick County, Virginia unless the Applicant mitigates the additional impacts caused by the increased net new trip generation resulting from the intended use or uses for which the Applicant seeks approval to the satisfaction of the County. 1.8 In determining whether any proposed use or uses of the Property may have an impact that would cause the levels of service for the transportation network serving the Property at such time to be inadequate, the Applicant may use actual traffic counts for the then existing uses of the Property instead of the estimates used in the TIS to determine background traffic at the time approval is sought from the County. 1.9 No later than sixty (60) days after the issuance by the County of an initial occupancy permit for a truck stop / travel center use in Land Bay 1 on the GDP, the Applicant’s related 148 Page 4 of 8 entity, Winchester 125, LLC, which owns the property located at 3425 Martinsburg Pike designated as Frederick County Tax Map Parcel #33-A-163 (the “Old Stone Truck Stop Property”), will record in the County land records restrictions prohibiting on-site heavy vehicle and long-haul truck parking and prohibiting the operation of a service center on the property with more than one (1) high-speed, over-the-road diesel fuel pump system with a master and secondary satellite pump in order to fuel the vehicle on both sides. The Old Stone Truck Stop Property will only be subject to this proffer 1.9 and the restriction stated herein and will not be subject to any other proffers or restrictions associated with this rezoning application. Winchester 125, LLC joins in the tendering of these proffers only for the limited purpose of its agreement to be bound by the provisions of this proffer 1.9. 1.10 The Applicant will not be permitted to obtain any building permits for any uses permitted on the Property after final rezoning approval in conformity with its application for rezoning until the substantial completion of the relocation of Rt. 672 (Hopewell Road) and associated roadway improvements generally depicted in the GDP has occurred. 2. TRANSPORTATION 2.1 During the “Reservation Period” (defined below), Applicant will reserve a fifty foot (50’) right-of-way in the area designated on the GDP as “50’ RIGHT-OF-WAY RESERVATION” in Land Bay 1 (the “Reservation Area”) for dedication to, and use by, the County for future highway interchange improvements related to an interstate ramp service road serving Rt. 671 (Cedar Hill Road) as shown in the current Comprehensive Plan for Frederick County, Virginia as of the date of the adoption of these proffers. Applicant will not construct, install, or build any permanent structures or make any permanent improvements to the Property located within the Reservation Area during the Reservation Period. Notwithstanding the foregoing, Applicant may construct and install any and all non-permanent structures and improvements permitted by applicable law and use the Property within the Reservation Area without restriction during the Reservation Period so long as all non-permanent structures and improvements are removed and all uses of the Restricted Area cease prior to dedication of the Reservation Area to the County. The Applicant will dedicate the Reservation Area to the County within ninety (90) days after the final, unappealable approval by the County of a site plan for Land Bay 3 and a written request from the County for dedication of the Reservation Area. In the event the County does not request the dedication of the Reservation Area within ten (10) years from the date of the final rezoning of the Property in conformity with Applicant’s application for the same (the “Reservation Period”), or in the event the County removes the future highway interchange improvements related to an interstate ramp service road serving Rt. 671 (Cedar Hill Road) from the Comprehensive Plan for Frederick County, Virginia, then, in either event, Applicant will have no obligation to continue to reserve the Reservation Area for the benefit of the County and the Applicant may use the Reservation Area for all purposes permitted by law, including the construction, installation and building of permanent structures and permanent improvements. 149 Page 5 of 8 2.2 Applicant will contribute an amount equal to the lesser of: (a) twenty-five percent 25% of the total road design and construction costs necessary for the relocation of Rt. 672 (Hopewell Road) and associated roadway improvements as generally depicted in the GDP or (b) $3,500,000 toward design and construction costs necessary for the relocation of Rt. 672 (Hopewell Road) and associated roadway improvements as generally depicted in the GDP (the “Transportation Contribution”). The Transportation Contribution will be paid to the County as follows: 2.2.1 50% of the total design costs for the relocation and improvements will be paid by Applicant up to a maximum of $1,500,000 of the total Transportation Contribution within 45 days after the execution of the design contract and submission of the invoice for the design services showing the total amount due for the same. 2.2.2 The balance will be contributed upon substantial completion of all construction of the relocation and improvements within 45 days after receipt of invoice from the County for the same demand from the County 2.2.3 Applicant will allocate the costs to be paid for all improvements required by these proffers between each Land Bay by private agreement between the Applicant and any subsequent owner of a Land Bay. 2.2.4 Applicant will dedicate the right of way for all transportation improvements on the Property as generally depicted in the GDP at the time of submission of the site plan for Land Bay 1 or upon the commencement of the construction of the relocation and improvements and the written request of the County, whichever first occurs. 3. FIRE AND RESCUE Applicant will contribute to Frederick County, Virginia a sum equal to One Hundred Dollars ($100.00) per 1,000 gross square feet of constructed commercial building area as depicted on each final site plan approved by the County for fire and rescue purposes. The contribution will be made at the time of the issuance of the final certificate of occupancy for each such building constructed on the Property. 4. WATER AND SEWER 4.1 The Property will be served by public water and sewer. Applicant will, at its expense, design and construct all on-site and off-site improvements necessary to provide service for the demand generated by the development of the Property in accordance with all applicable 150 Page 6 of 8 laws, regulations and ordinances and the lawful requirements of the Frederick County Sanitation Authority (“Frederick Water”). 4.2 Applicant agrees to make such dedications and grants of easements to the County of Frederick, Virginia and Frederick Water (as applicable) necessary for the construction and maintenance of all improvements needed to provide public water and sewer service for the demand generated by the development of the Property in accordance with all applicable laws, regulations and ordinances and the lawful requirements of Frederick Water and at no cost to Frederick County or Frederick Water. All constructed water and sewer improvements will be conveyed and dedicated to Frederick Water no later than the time of their connection to the Frederick Water public water or public sewer system, as the case may be. 5. ESCALATOR CLAUSE In the event the monetary contributions contemplated under this Proffer Statement are paid to the County of Frederick, Virginia within eighteen (18) months after “final rezoning” (as defined herein above), said contributions will be in the amounts as stated herein. Any monetary contributions set forth in this Proffer Statement which are paid to the County of Frederick, Virginia more than eighteen (18) months after “final rezoning” (as defined herein above) shall be adjusted in accordance with the Urban Consumer Price Index (“CPI-U”) reported by the United States Department of Labor such that, at the time contributions are paid they shall be adjusted by the percentage change in the CPI-U from (i) the CPI-U as reported on that date which is twenty- four (24) months after the date of the “final rezoning” to (ii) the CPI-U as reported on the date of the most recently available CPI-U relative to the date on which the contributions are paid. Notwithstanding the foregoing, in no event shall the amount of contributions be adjusted by a factor greater than six percent (6%) per year, simple interest. [SIGNATURE ON FOLLOWING PAGE] 151 Page 7 of 8 Respectfully submitted this _______ day of____________, 2026. APPLICANT/OWNER: Winchester 131, LLC By:________________________________ Prakash Patel, Manager COMMONWEALTH OF VIRGINIA, AT LARGE FREDERICK COUNTY, To-wit: The foregoing instrument was acknowledged before me this _____ day of ___________, 2026, by Prakash Patel, as Manager for Winchester 131, LLC ____________________________________ NOTARY PUBLIC My commission expires: ______________________ Registration Number:________________________ 152 Page 8 of 8 Winchester 125, LLC By:________________________________ Prakash Patel, Manager COMMONWEALTH OF VIRGINIA, AT LARGE FREDERICK COUNTY, To-wit: The foregoing instrument was acknowledged before me this _____ day of ___________, 2026, by Prakash Patel, as Manager for Winchester 125, LLC ____________________________________ NOTARY PUBLIC My commission expires: ______________________ Registration Number:________________________ 153 12 REZONING APPLICATION FREDERICK COUNTY, VIRGINIA 1. Property Owner(s) (please attach additional page(s) if more than two owners): Name: Specific Contact Person if Other than Above: Address: Telephone Email: Name: Specific Contact Person if Other than Above: Address: Telephone Email: 2. Other Interested Parties (such as a contract purchaser) (please attach additional page(s) if necessary): Name: Specific Contact Person if Other than Above: Address: Telepho Email 3. Law firm, engineering firm, or other person, if any, serving as the primary contact person for this application: Firm Name: Specific Contact Person at Firm: Address: Submittal Deadline __________ P/C Meeting __________ BOS Meeting __________ Winchester 131 LLC Prakash Patel 5011 Piney Branch Road Fairfax, VA 22030 Prakash Patel 5011 Piney Branch Road Fairfax, VA 22030 Winchester 125 LLC Prakash Patel 5011 Piney Branch Road Fairfax, VA 22030 Pennoni Associates Inc. David Frank 117 E. Piccadilly St. Ste. 200 Winchester, VA 22601 154 13 Telephone: Email: *Please note that, if a law firm, engineering firm, or other person, other than the owner of the property, will be acting on behalf of the owner and/or executing papers on behalf of the owner in connection with the rezoning, the owner will need to execute a power of attorney form granting the firm or person such authority. 4. Project Name: 5. Property Information: Property Identification Number(s): Total acreage of the parcel(s): Total acreage of the parcel(s) to- be-rezoned: Current zoning designation(s) and acreage(s) in each designation: Proposed zoning designation(s) and acreage(s) in each designation: Magisterial District(s): Location - the property is located at (give street address(es) if assigned or otherwise exact location based on nearest road and distance from nearest intersection, using road names and route numbers): Is this property within ½ miles of the Town of Stephens City, the Town of Middletown, the City of Winchester, Clarke County, or Shenandoah County (specify which): ________________________________________________________________________ 540-771-2087 dfrank@pennoni.com Hopewell Road Highway Commercial Center TM33-A-114A & TM 33-A-122 & TM 33-A-163 +/- 40.48 +/- 38.99 AC TM 33-A-114A: (RA) 33.98 AC. TM 33-A-122:(RA) 5.01 AC TM 33-A-163 (B2) B2 +/- 38.99 AC. with proffers B2 +/- 1.49 AC. (UNCHANGED-subject to single proffer) Stonewall TM 33-A-114A: Corner lot Hopewell Road Rt. 672 and I-81, also traveling on Martinsburg Pike Rt. 11 no 155 14 Adjoining Properties: Zoning: Use: North: South: East: West: 6. Disclosure of real parties in interest. Virginia Code § 15.2-2289 provides that localities may by ordinance require any applicant for a zoning amendment to make complete disclosure of the equitable ownership of the real estate to be affected including, in the case of corporate ownership, the name of stockholders, officers, and directors, and in any case the names and addresses of all real parties of interest. Frederick County has, by County Code § 165-101.09, adopted such an ordinance. For each business entity that is an owner or contract purchaser of the property, please list the name and address of each person owning an interest in, or who is an officer or director of, any entity that is an owner or contract purchaser of the property (you need not indicate the amount or extent of the ownership interest). Please note that this requirement does not apply to a corporation whose stock is traded on a national or local stock exchange and having more than 500 shareholders. Please attach additional page(s) if necessary. 7. Signature(s): I (we), the undersigned, do hereby respectfully make application and petition the Frederick County Board of Supervisors to amend the zoning ordinance to change the zoning map of Frederick County, Virginia. I (we) authorize Frederick County officials to enter the property for site inspection purposes. B3 Vacant/Commercial RA/B2/B3 Vacant/Commercial B2/M1/RA Commercial/Industrial/Residential/Church B2 Vacant Prakash Patel -5011 Piney Branch Road Fairfax, VA 22030 156 157 16 Adjoining Property Owners Owners of property adjoining the land will be notified of the Planning Commission and the Board of Supervisors meetings. For this application, adjoining property is any property abutting the requested property on the side or rear or any property directly across a public right-of-way, a private right-of-way, or a watercourse from the requested property. The applicant is required to obtain the following information on each adjoining property including the parcel identification number. These can be obtained from Frederick County’s GIS Interactive Maps. *The Town of Stephens City, Middletown, the City of Winchester, Clarke County, or Shenandoah County shall be notified if the proposal is within ½ mile of their boundary. Name and Property Identification Number Address Name Property # Name Property # Name Property # Name Property # Name Property # Name Property # Name Property # Name Property # Name R&J Land Development LLC 33 A 123D Kristin & Derek Nickerson 33 A 122 Open Door Baptist Church Inc. 33 A 123B HCM LP LLP 33 A 114B Barbara Devers Trustee 33 A 120 Barbara Devers Trustee 33 A 119 Mid Atlantic Development Group LLC 33 A 117 Ali Lone-Kashmiree 33 A 117A Storage Solutions CB LLC 1631 Redbud Road Winchester, VA 22603 Zoning: B3, Use: Vacant 3599 Martinsburg Pike, Clear Brook, VA 22624 Zoning: RA Use: Res 281 Jeremiah Lane, Clear Brook VA 22624 Zoning: RA Use: Church 920 Hopewell Road, Clear Brook VA 22624 Zoning: B2 Use: Agri 510 S. Washington St., Winchester, VA 22601 Zoning: RA Use: Res 510 S. Washington St., Winchester, VA 22601 Zoning: RA Use: Vacant 25335 Diligence Court, Aldie, VA 20105 Zoning: B2, Use: Comm 3522 Martinsburg Pike, Clear Brook, VA 22624 Zoning: B2 Use: Comm 1520 Commerce St., Winchester, VA 158 17 Property # Name Property # Name Property # Name Property # Name Property # Name Property # 33 2 A Winchester 125 LLC 33 A 163 Clearbrook Real Estate LLC 33 A 164F Winchester 175 LLC 33A 164G Winchester and Western Railroad 33 A 155B O-N Minerals Chemstone Company 33-A-115A 5011 Piney Branch Rd., Fairfax, VA 22030 Zoning: B2, Use: Comm 22601 Zoning: M1, Use: Ind PO Box 147, Clear Brook, VA 22624 Zoning: B2/B3, Use: Comm 5011 Piney Branch Rd., Fairfax, VA 22030 Zoning: B2, Use: Comm 3 Summit Park Dr. Ste. 700 Independence, OH 44131, Zoning: M1, Use: Ind 6920 Pointe Inverness Way Ste. 301 Fort Wayne, IN 46804, Zoning:B2, Use:Comm 159 Frederick County, Virginia STATEMENT OF JUSTIFICATION AND IMPACT ANALYSIS FOR REZONING REVIEW AND APPROVAL OF THE Hopewell Highway Commercial Center TM 33-A-114A, TM 33-A-122 & TM 33-A-163 Stonewall Magisterial District July 2023 Revised October 2025 Prepared by: Pennoni Associates Inc 117 E. Piccadilly Street Suite 200 Winchester, Virginia 22601 Phone: 540-667-2139 160 July 2023 Revised October 2025 Hopewell Highway Commercial Center Rezoning STATEMENT OF JUSTIFICATION AND IMPACT ANALYSIS INTRODUCTION The properties totaling 38.99 acres with frontage on Route 672 Hopewell Road, Route 11 Martinsburg Pike and Interstate 81, identified as tax map parcels 33-A-114-A and 33-A-122, are ideally located for highway commercial land uses. This application seeks to rezone the Property from RA Rural Areas District to B2 General Business District. The site is located wholly within the Sewer and Water Service Area (SWSA) and is within the Clearbrook and Brucetown Rural Community Center. Rezoning the subject acreage to B2 will be consistent with the intended business land use envisioned for the subject property in the Northeast Frederick Land Use Plan (NELUP) of the Frederick County Comprehensive Plan. The location of the property is also ideally suited for the B2 commercial land use due to its location at an existing interstate interchange (exit 321) along I-81. The property is situated between Route 11 Martinsburg Pike and I-81 and west of the anticipated industrial and extractive mining land uses in the vicinity of the subject property proposed in the updated NELUP under consideration by the Board of Supervisors. The proposed B2 land uses will generate a significant increase in traffic volumes from the current agricultural land use. This application specifically proposes the development of a full-service travel center with trailer parking in the land bay adjacent Interstate 81. The traffic increases resulting from the new development will pull a significant number of trips from the interstate pass through vehicles and are proposed to be mitigated with the proffered transportation improvements. The applicant is confident that the proposed rezoning is consistent with the land use policies of the Comprehensive Plan, and development under the B2 zoning district will not result in negative net impacts to the county and surrounding community at large. Furthermore, the existing truck stop located on Route 11 Martinsburg Pike, identified as TM 33-A-163, will agree to prohibit the truck stop land use with the approval of the rezoning application. COMPREHENSIVE PLAN The subject property is identified on the Northeast Frederick Land Use Plan (NELUP), is wholly within the Sewer and Water Service Area (SWSA) and is within the Clearbrook and 161 July 2023- Rev October 2025 Hopewell Highway Commercial Center Rezoning Brucetown Rural Community Center. These documents are intended to serve as a guide for the intended future land uses within the SWSA and Community Center as properties within those growth boundaries develop. The NELUP, at the time of this application, is undergoing an update and is in review by the Frederick County Board of Supervisors. The subject property is clearly identified in the NELUP for a highway commercial land use and also depicts an alternative Hopewell Road realignment consistent with this application. LAND USE The subject property seeks to rezone from the RA district to the B2 district. The surrounding properties are of a variety of existing land uses. To the north are vacant, commercial contractor, retail, and residential property. Existing land uses to the east are industrial, retail and residential properties also fronting on Route 11 Martinsburg Pike. The surrounding properties to the south are a vacant power substation lot, and commercial properties. The subject property is bordered by Interstate 81 to the west and B2 zoned and an existing church beyond the Interstate Right-of-Way. The proposed B2 commercial land use of the subject property is in conformance with the Comprehensive Plan and, both, the current and proposed Northeast Land Use Plan. The proposed uses are compatible with the adjacent interstate and commercial/industrial land uses. The applicant will appropriately mitigate any impacts as a result of the increased land use intensity adjacent any remaining residential land uses adjacent the subject property. ACCESS AND TRANSPORTATION The proposed development is accessible to and situated adjacent a well-established transportation network which includes the existing Interstate 81 exit 321 interchange, Hopewell Road and Route 11 Martinsburg Pike. The comprehensive plan identifies the subject property as highway commercial and that an alternative design of Hopewell Road may be necessary for implementing the goals of the Comprehensive Plan. VDOT has reviewed and accepted Traffic Impact Study (TIS) for the development proposed by this rezoning application. This TIS identifies improvements that accommodate the increased traffic proposed in this application and benefit both the application and the regional road 162 July 2023- Rev October 2025 Hopewell Highway Commercial Center Rezoning network serving this area of the county. The planned improvements, including the re- alignment of Hopewell Road, are in conformance with the 2023 updated NELUP’s transportation plan. The proposed roadway improvements will provide access to the subject property off Hopewell Road with adequate intersection spacing between Interstate 81, the site access entrance roundabout, the proposed inter-parcel connector and Route 11. The project would also construct a new intersection for Hopewell Lane to maintain access to the Relocated Hopewell Road. Additionally, the project will mitigate increased traffic by constructing a roundabout at the southbound intersection ramps of Interstate 81 and Hopewell Road. These improvements as identified in the Traffic Impact Statement demonstrate that the increased traffic stemming from the development will be supported by the new roadway infrastructure. The accompanying Proffer Statement details how this development will mitigate the traffic impacts and the its contributions toward this regional infrastructure improvement. SITE SUITABILITY The proposed rezoning would not result in impact on areas of steep slopes, stream channels, lakes, ponds, flood plain, or known wetlands. Confirmation that there will not be impacted t existing wetlands is a requirement of the Site Plan application process. The property does not contain any significant trees or stands of trees, as it has been cultivated for most of its recent history. The soils present on-site are Oaklet silt loam and are considered prime farmland soils according to the Virginia Agricultural Model Map. The site generally slopes from 2-7% toward the east and southeast and will drain into the existing storm sewer conveyance systems established with the design and construction of Route 11 Martinsburg Pike. A small portion of the property drains to the northwest corner of the property and flows along the existing drainage channels constructed with Interstate 81. During the engineering phase of the project, a stormwater management plan will be created to adequately and effectively retain stormwater in a manner that will avoid negative impacts on adjacent properties. SEWAGE CONVEYANCE AND WATER SUPPLY 163 July 2023- Rev October 2025 Hopewell Highway Commercial Center Rezoning The subject property falls within the Sewer and Water Service Area (SWSA). Sewage flows generated by the site will discharge into the existing Frederick Water sanitary sewer facilities present on-site. The subject property will, at its expense, construct a sewage pump station that will tie into the existing Frederick Water service lines. The applicant will perform an analysis of the existing sewer and water facilities to be extended to the subject property. Use, access and extensions of these facilities will be coordinated with Frederick Water at the time of a future Site Plan application. All new facilities shall be constructed as necessary to fully support the proposed land uses. All facilities to be conveyed to Frederick Water will be designed and constructed to the Frederick Water standards and specifications. The development of the property will be limited by total traffic generated. It is estimated that the planned land uses from the traffic model approved by VDOT will generate up to 50,600 GPD. This is based on a travel center, 100 room hotel and two fast food establishments totaling approximately 8,500 SF in total floor area. HISTORIC SITES AND STRUCTURES On the recommendation of the Historic Resources Advisory Board, historical and environmental study of the Stine House will be performed prior to its removal. Additionally, an interpretive sign for Stine House will be placed in an appropriate location at time of Site Plan application. IMPACT ON COMMUNITY FACILITIES The development of the allowed uses under the proposed B2 zoning will result in a net positive fiscal impact for Frederick County. Additionally, it will remove one existing at grade railroad crossing in the transportation network. 164 165 166 DEPARTMENT OF TRANSPORTATION Staunton/Edinburg Land Development 14031 Old Valley Pike Edinburg, VA 22824 Mr. Klein, This office has completed its review of the Hopewell Highway Commercial Center rezoning application submitted by Pennoni Associates, Inc., on behalf of Winchester 131, LLC. The application proposes to rezone the properties identified as Tax Map Numbers 33-A-114A, 33-A- 122, and 33-A-163 from the RA District to the B2 District. The combined acreage of the parcels is approximately 40.48 acres. We offer the following comments for the County’s consideration:  Traffic Impact Analysis (TIA): VDOT has reviewed the TIA submitted by the applicant and is in general concurrence with the conclusions presented. The applicant proposes a realignment of Hopewell Road to eliminate the existing split intersection at Brucetown Road (Route 672), Route 11, and Hopewell Road (Route 672), as well as the construction of a roundabout at the terminus of the southbound I-81 ramps to improve interchange operations.  Proffers: The current proffers provide for a total monetary contribution of $3,500,000 toward the transportation improvements identified on the Generalized Development Plan (GDP). As this amount is not anticipated to be sufficient to fully fund the proposed improvements, additional funding sources would be required to complete all identified projects.  While the developer’s proposed transportation improvements adequately address the transportation needs associated with this rezoning. VDOT is not advocating for or against this particular approach to solving the issues in this area. We appreciate the opportunity to review and comment on this rezoning request. Please contact us if you have any questions or need additional information. Thank you, Joseph W. Johnson, PE Area Land Use Engineer / Edinburg Residency Virginia Department of Transportation 14031 Old Valley Pike / Edinburg, VA 22824 Phone #540.534.3223 167 168 169 170 171 172 173 174 175 176 177 July 2023 Hopewell Highway Commercial Center Rezoning V SURVEY PLAT AND DEED 178 179 180 181 182 183 184 185 186 187 188 WINCHESTER 131, LLC – COMMUNITY MEETING MEMBERS’ COMMENTS MEMBER COMMENT Whit Wagner 251 Tyler Road Clearbrook, VA 22624 I am with CBVFD and would like to see Hopewell New Light connected to Brucetown. Nicholas Pinchot 2613 Martinsburg Pike Stephenson, VA 22656 Overall, I think it is a good plan that fits the area and offers improvements to some traffic concerns. Art Bragg P.O. Box 115 Brucetown, VA 22622 OK’ed by me Unknown Name Plan looks good. Not a fan of increased traffic. Not a fan of loss of rural farmland. Unknown Name Brucetown Road needs to be part of this plan (Realignment) for traffic and Fire Department concerns. Unknown Name I would like to see a site plan that included a detailed Travel Center. Lynelle & Greg McFarland 225 Sister Chipmunk Lane Clearbrook, VA 22624 Positive = possibility of improving the very congested intersection @ 81, 11, Brucetown Road and moving all large truck traffic. Negative = loss of farmland and strain on electric and water that will impact current residents L. Kitts 472 Waverly Road. Clearbrook, VA 22624 Look Great! Love Access Road to 81/Rt. 11 Todd Bragg 661 Walters Mill Ln. Stephenson, VA 22656 I think this is a great plan for Clearbrook area. Brian Miller GWFS K9 The folks at Sunoco (Old Stone Truck Stop) have supported our DOS K9 program for over 7 years. We bring in lots of business to other places in Frederick County. We totally support this new project. 189 190 191 192 193 Planning Commission Agenda Item Detail Meeting Date: July 1, 2026 Agenda Section: Public Hearings Title: Conditional Use Permit #02-26 for Lamar Rosenberry - (Mrs. Feltner) Attachments: PC07-01-26_CUP02-26_Redacted.pdf 194 CONDITIONAL USE PERMIT #02-26 Lamar Rosenberry Public Garage/Automotive Repair Staff Report for the Planning Commission Prepared: June 18, 2026 Staff Contact: Amy Feltner, Planner Executive Summary: Meeting Schedule Planning Commission: June 3, 2026 Planning Commission: July 1, 2026 Action: Postponed Action Action: Pending Board of Supervisors: July 8, 2026 Action: Pending Property Information Property Identification Number (PIN) 07-6-2 Address 730 Pack Horse Road Magisterial District Gainesboro Acreage +/-9.88 Zoning & Present Land Use Zoning: RA (Rural Areas) Land Use: Residence Adjoining Property Zoning & Present Land Use North: RA (Rural Areas) District Land Use: Residential South: RA (Rural Areas) District Land Use: Residential East: RA (Rural Areas) District Land Use: Residential/Vacant West : RA (Rural Areas) District Land Use: Residential Proposed Use This is a request for a Conditional Use Permit (CUP) for a public garage for automotive repair in the RA (Rural Areas) Zoning District. 195 Page 2 of 5 Review Agency Comments: Review Agency Comment Date Comment Summary Virginia Department of Transportation (VDOT) February 11, 2026 Approved – no negative impact on the transportation network. If the use increases or changes, an opportunity to review the CUP again would be necessary. Frederick-Winchester Health Department April 7, 2026 Approved – a 4-bedroom construction permit has been issued for the dwelling only. The drainfield installation should commence immediately. Frederick County (FC) Inspections February 23, 2026 Change of occupancy permit required, must meet Building Code and have accessible parking and route. FC Fire Marshal February 23, 2026 The business shall comply with the FC Fire Prevention Code. FC Public Works March 25, 2026 No comment. No proposed change to grading or to stormwater infrastructure. FC GIS February 9, 2026 No need for new road names or a separate address unless owner is requesting a separate address. Planning & Zoning: Application Proposal: This is a request for a conditional use permit (CUP) for a public garage for automotive repair in the RA (Rural Areas) Zoning District on +/-9.88-acres. The proposed repair garage will be operated inside an existing 28’ x 52’ area inside the existing structure (garage). The repairs and services will consist of preventive maintenance, computer diagnostics, and failed sensor/parts replacements. No engine or major automotive component overhauling will be conducted. Waste and scrap materials are stored inside the facility and recycled on a consistent basis. The hours of operation as proposed in the application are 8 a.m. – 5 p.m. Monday through Friday and by appointment only on Saturday and Sundays. The anticipated number of customers in the application are one (1) to two (2) customers daily, and 7-10 customers weekly. 196 Page 3 of 5 Staff Analysis: §165-304.02 of the Federick County Zoning Ordinance for Conditional Use Permits (CUP) states that the Planning Commission and Board shall consider the following standards when considering Conditional Use Permits: A. The conditional use shall not tend to change the character and established pattern of development of the area of the proposed use. • Public Garage is designed for use of servicing, repairing, or equipping motor vehicles. (§165-1105-04). The proposed use is permitted in the RA (Rural Area) District with an approved conditional use permit. The property is surrounded by other RA (Rural Area) zoned properties, which includes vacant agricultural and single-family detached residences. The property is zoned RA (Rural Area) and will not change the character and established development of the area. B. The conditional use shall be in harmony with and shall not adversely affect the use and enjoyment of surrounding properties. • The property is surrounded by other RA (Rural Area) zoned properties, which includes vacant agricultural and single-family detached residences. The proposed use will not adversely affect the use and enjoyment of the surrounding properties. C. The conditional use shall be in accord with the policies expressed in the Comprehensive Plan of the County and with the intent of this chapter. • The Comprehensive Plan identifies this area of the County as “rural” and is to remain agricultural in nature and is not part of any land use study. D. The conditional use shall not adversely affect the natural character and environment of the County. • The proposal would not adversely affect the nature and character of the environment of the County. No new structures are requested, and the operation is conducted inside an existing facility as proposed. E. The conditional use permit shall be approved only if adequate facilities, roads, safe access and drainage are provided. • The property is accessed via an existing private driveway located at 730 Pack Horse Road. F. The conditional use shall conform with all applicable regulations of the district in which it is located. • The Zoning Ordinance provides additional regulations for motor vehicle service uses, automotive repair shops, and public garages in §165-704.02. The additional regulation for specific uses is as follows: 197 Page 4 of 5 o All repairs shall take place within the enclosed structure. o All exterior storage of parts and equipment shall be screened from view of surrounding properties by an opaque fence or screen of at least six feet in height. o Inoperative vehicles shall be stored within a totally enclosed building or screened on all sides by a six-foot tall opaque element such as a fence, wall or berm. The sale of automobiles is prohibited. Staff conducted a site inspection on April 15, 2026. The parking area is currently screened on the north, east, and south side of the property with existing structures. Should the need to store vehicles in this area in the future, an opaque screening element will be provided on the western side of the parking area. The location and type of the screening will be noted on the illustrative sketch. Planning Commission Summary & Action from the June 3, 2026 Meeting: The Planning Commission recommended hearing the public hearing on July 1, 2026 at their regularly scheduled meeting. (9-0) (Roger Thomas, Jeff McKay, and Justin Kerns absent). Conditions of Approval: Should the Planning Commission find the public garage use to be appropriate, staff would suggest the following conditions for the CUP: 1. All review agency comments and requirements shall be complied with at all times. 2. The required drainfield/septic approval shall be inspected and approved by Virginia Department of Health prior to the establishment of the use. 3. An illustrative sketch plan shall be submitted to and approved by Frederick County and all improvements completed prior to the establishment of the use. 4. All automotive repair related activities, including repairs, shall occur entirely within an enclosed structure. Any exterior storage of parts and equipment shall be screened from view by an opaque fence or screen at least six (6) feet in height. 5. All parking areas shall have a gravel or hard surface. 6. The business is not permitted employees beyond those residing on the property. 7. The hours of operation shall be from 8 a.m. to 5 p.m. Monday through Friday. Saturday and Sunday by appointment only. 8. A maximum of three (3) vehicles awaiting service is permitted. 9. Any expansion or change of use shall require a new Conditional Use Permit. 198 Page 5 of 5 Following a public hearing, staff is seeking a recommendation from the Planning Commission to forward to the Board of Supervisors on this CUP application. 199 DOUBLEHITCH LNPACKHORSE RD07 6 2 161 DOUBLE HITCH LN 140 DOUBLE HITCH LN 776 PACK HORSE RD 600 PACK HORSE RD 527 PACK HORSE RD 142 DOUBLE HITCH LN 735 PACK HORSE RD 775 PACK HORSE RD 680 PACK HORSE RD µ Frederick County Planning & Development 107 N Kent St Winchester, VA 22601 540 - 665 - 5651 Map Created: April 16, 2026FILESCHAPEL DRDOUBLEHITCH LNSNAKE DRSHOCKEYSVILLERDPACK HORSE RD0 290 580145 Feet CUP # 02 - 26: Lamar Rosenberry PIN: 07 - 6 - 2 Repair Garage Zoning Map Application Parcels CUP #02-26 200 DOUBLEHITCH LNPACKHORSE RD07 6 2 161 DOUBLE HITCH LN 600 PACK HORSE RD 140 DOUBLE HITCH LN 776 PACK HORSE RD 680 PACK HORSE RD 142 DOUBLE HITCH LN 735 PACK HORSE RD 775 PACK HORSE RD 527 PACK HORSE RD µ Frederick County Planning & Development 107 N Kent St Winchester, VA 22601 540 - 665 - 5651 Map Created: April 16, 2026FILESCHAPEL DRDOUBLEHITCH LNSNAKE DRSHOCKEYSVILLERDPACK HORSE RD0 290 580145 Feet CUP # 02 - 26: Lamar Rosenberry PIN: 07 - 6 - 2 Repair Garage Location Map Application Parcels CUP #02-26 201 202 203 204 205 The plan is to repair automotive vehicles by appointment. Repairs will be done inside the main area of the enclosed structure. The structure is 48ftX52ft, however, the repair work will only be done in the main 28ftX52ft area. There is a dividing wall that separates the main area from a lean-to portion of the structure and that portion is 20ftX52ft and will be for personal use only. Waste and Scrap materials will be recycled on a consistent basis and or remain inside the main 28ftX52ft structure to maintain a clean and tidy exterior and interior of the facility. All inoperable vehicles that arrive will be stored inside the garage for the duration of the repairs and will be by appointment only. The repairs and services will consist of automotive preventive maintenance, computer diagnostics, and failed parts or sensor replacement. There will be no engines or major automotive components overhauled at this facility. Auto parts deliveries will happen during normal business hours with approximately 2 deliveries per day and or 12 per week depending on work load. UPS and FEDEX will also be normal delivery methods. Inoperable vehicles that arrive on light duty rollback by appointment and will be stored in the enclosed structure and during the repairs. No heavy-duty vehicles for deliveries will be needed for the repairs and services. There are vehicles and equipment on the property that are not associated with the business and are for personal use and for maintaining the farm. The arial imagery or satellite view from 2021 is not a good representation of the customer parking area orderliness that is planned. Operating a normal 8am-5pm, Monday – Friday, and or by appointment. Customers will arrive and leave from the designated parking area. 1-2 customers per day, possibly 7-10 customers per week. No employees and or hiring planned for the foreseeable future. There will be no advertising of the business or the address of the business to help maintain the ‘by appointment’ protocol. 206 207 208 209 210 211 212 213 214 Project Name:________________________________________________ Acreage (Disturbed Area Acreage): _______________________________ PIN(s): __________________ Address (or general location): Existing Zoning: ___________________________________________________ Proposed Conditional Use:___________________________________________ Staff Name (Email Address): _________________________________________ Agency Name Completing Comments (select one): ____ Frederick Water ____ Virginia Department of Transportation ____ Winchester Regional Airport ____ Virginia Department of Health ____ Historic Resources Advisory Board ____ Frederick County (FC) Public Schools ____ FC Public Works ____ FC Inspections ____ FC Fire Marshal ____ FC Parks & Recreation ____ FC County Attorney ____ Other (Specify): ________________________ Reviewer Name (Email Address): _____________________________________________________ Review Agency Comments: *Comments that may not fit in the box should be attached to the cover sheet on agency or department letterhead. Resubmission to address comments requested? Y _____ or N _____ REQUEST FOR CONDITIONAL USE PERMIT (CUP) COMMENTS 215 216 217 218 Planning Commission Agenda Item Detail Meeting Date: July 1, 2026 Agenda Section: Other Title: Current Planning Applications Attachments: 219