Loading...
045-25 (2025-2030CapitalImprovementsPlan(CIP)) RESOLUTION 'M Action: PLANNING COMMISSION: January 15, 2025 Recommended Approval BOARD OF SUPERVISORS: January 22,2025 Public Hearing Held and Action Postponed BOARD OF SUPERVISORS: February 26, 2025 Adopted ADOPTING THE 2025-2030 CAPITAL IMPROVEMENTS PLAN (CIP) WHEREAS, the Frederick County Comprehensive Plans and Programs Committee (CPPC) discussed the 2025-2030 Capital Improvements Plan (CIP) at their regular meeting on December 16th, 2024. The CPPC recommended approval of the CIP and affinmed that the projects contained within the CIP are in confonnance with the Comprehensive Plan; and, WHEREAS, the Frederick County Planning Commission discussed the 2025-2030 CIP at their regular meeting on January 15th, 2025, and recommended approval of the CIP affirming that the projects contained within the CIP are in conformance with the Comprehensive Plan; and, WHEREAS,the Frederick County Board of Supervisors held a public hearing and discussed the CIP at their regular meeting on January 22"d, 2025; and WHEREAS, the Frederick County Board of Supervisors supports the priorities shown in the 2025-2030 CIP and has affinned the determination of the Planning Commission that the projects contained in the CIP conform to the Comprehensive Plan. NOW,THEREFORE,BE IT RESOLVED by the Frederick County Board of Supervisors as follows. The Frederick County Board of Supervisors hereby approves the 2025-2030 CIP for Frederick County, Virginia as an element of the Comprehensive Plan. Passed this 26th day of February 2025 by the following recorded vote: Josh E. Ludwig, Chairman Aye John F. Jewell Aye Heather H. Lockridge Aye Robert W.Wells Aye Blaine P. Dunn Aye Judith McCann-Slaughter Aye Robert T. Liero Aye A COPY ATTEST MEWEiiM Michael L. Bollhoefer Frederick County AdinhUisator No. 045-25 CO ��a COUNTY of FREDERICK w Department of Planning and Development 540/665-5651 Fax: 540/665-6395 MEMORANDUM TO: Frederick County Board of Supervisors FROM: Wyatt Pearson, Director of Planning & Development,AICP DATE: January 16th, 2025 RE: Public Hearing: 2025-2030 Capital Improvements Plan (CIP) The Capital Improvements Plan (CIP) is a document that consists of a schedule of major capital expenditures for the County for the ensuing five-year period. The CIP is intended to assist the Board of Supervisors in preparation of the County budget. In addition to determining priorities for capital expenditures, the County must also ensure that projects contained within the CIP conform to the Comprehensive Plan. Specifically, the projects are reviewed with considerations regarding health, safety, and the general welfare of the public, and the policies of the Comprehensive Plan. When the CIP is adopted, it becomes a component of the Comprehensive Plan with the intent of satisfying Virginia Code § 15.2-2232. The inclusion of projects on the CIP is in no way an indication that Frederick County will be undertaking these projects. The CIP is strictly advisory; it is intended for use as capital facilities planning document, not for requesting funding allocations. Once adopted, project priorities and cost estimates may change throughout the year based on changing circumstances. It is also possible that projects may not be funded during the year indicated in the CIP. The CIP is also updated annually, and projects are removed from the plans as they are completed or as priorities change. In keeping with changes in recent years, at the direction of the County Administrator, departments were advised that only projects that could be feasibly funded and started in the ensuing five-year period were to be included in the plan. The removal of projects outside of this timeframe resulted in a greatly reduced quantity of projects and total potential cost to the County. Additionally, Planning staff prepared the plan using ArcGIS StoryMap to improve the readability of the plan. CIP Components The CIP provides project priorities that are submitted by various County Agencies and tables that outline the projects and cost estimates. Within the tables, columns for each year show the funding needs that would be requested in the corresponding budget cycle. The tables are split into three general categories. Table I General County services; Table 2 Transportation; Table 3 Enterprise& External Funds (e.g. Landfill & Airport). 107 North Kent Street, Suite 202 9 Winchester, Virginia 22601-5000 2025-2030 CIP—Public Hearing January 16th, 2025 Page 2 The CIP includes projects from the following: Schools, Parks and Recreation, Regional Library, County Administration, Fire and Rescue, Sheriff's Office, Public Safety Communications, Transportation, Regional Landfill, and the Winchester Regional Airport. Background—Discussions The Comprehensive Plans and Programs Committee (CPPQ discussed the 2025-2030 draft CIP at their meeting on December 16th, 2024. The role of this committee in the CIP process is to ensure that the various departmental project requests are in conformance with the Comprehensive Plan. The CPPC agreed the CIP was in conformance with the Comprehensive Plan and engaged in discussion regarding the potential for funding these projects without violating the County's debt policies. The Planning Commission discussed the 2025-2030 draft CIP at their meeting on January 151h, 2025. A Planning Commission member offered objections to the Parks and Recreation proposal, specifically the recreation center project, and felt the justification for the project was lacking. Ultimately the CIP was recommended to the Board of Supervisors for approval with one of the members in attendance objecting. Conclusion This item is presented for public hearing, and Staff is seeking a recommendation from the Planning Commission on the draft 2025-2030 CIP to forward to the Board of Supervisors. If adopted, the CIP will become a component of the Comprehensive Plan, which would satisfy the review requirement of Section 15.2-2232 of the Code of Virginia, which states that no public facility shall be constructed unless said facility is a"feature shown"within a jurisdiction's comprehensive plan. Please contact the Planning Department should you have any questions regarding this information. WGP 1/8/25,9:05AM 2025-2030 Capital Improvement Plan F 2025-2030 Capital Improvement Plan ti S t Pr 2025-2030 Capital Improvement Plan Adopted by the Frederick County Board of Supervisors TBA https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 1/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Introduction Section §15.2-2239 of the Code of Virginia assigns the responsibility for preparation of plans for capital outlays to the local Planning Commissions. The Capital Improvement Plan (CIP) consists of a schedule for major capital expenditures for the County for the ensuing five years. The CIP is updated annually. Projects are removed from the plans as they are completed or as priorities change. The plan is intended to assist the Board of Supervisors in preparation of the County budget. In addition to determining priorities for capital expenditures, the County must also ensure that projects contained within the CIP conform to the Comprehensive Plan. Specifically, the projects are reviewed with considerations regarding the health, safety, and general welfare of the public, and the policies of the Comprehensive Plan. Once the CIP is adopted, it becomes a component of the Comprehensive Plan and provides a link between the documents and potential proffered contributions made with future rezoning projects. Furthermore, the listing of a given project in the CIP, and the CIP becoming a component of the Comprehensive Plan, is intended to satisfy the Code of Virginia § 15.2-2232. In developing the CIP, a variety of adopted policies are considered: • Comprehensive Plan Debt Management Policies • Capital and Reserve Fund Policies • Frederick County Public Schools New School Planning Additionally, the development of the CIP is a collaborative process that involves a variety of County Departments and Frederick County Public Schools (FCPS). Each County Department and FCPS prepare their requests and the https://storymaps.arcgis.com/stories/3ael 81 f0fa574e37b2b459b21 df7da8f/print 2/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Department of Planning and Development compiles those requests for review by the County Administrator. CIP Tables Y I Capital Improvement Plan ReqtiesU ComkribAkon Per Flocal Year M 35 3ML 2dQ1=11' Lb4.77,M& WWI M39 302M 70]0 TN.I ti.—I5 F!tq—d TYXI Q. .r11rw1S -EcIu-AEnhwd 6y bwpmd n1 =I 2-. DPWM1 ;YY214 fry M1 V—P1..n Yr wrmp fl.c.l Ms.i Trar2 TM A q-4 lnci P:ll�Schur 1. F. 1-4t.:cF d 52i 016'S: -1 i iV, 5R3 1512_ S;Y:W 1711 s'"I.T. SIM 14 135 S.'AM 1 La+x.n*Y� dl.Nna� 'YI luS 5 9 }]C SW 1M13 42.4wm Lw^va Ewn...lml ".+1E Fe.dao,� E29Hx55_ iti:th.5't 4„1_x5e i24ti'aG f18Agv: Yv 75VO,.2+ 1<};�#9.+.' Prlldp.4l..r n'.'-.,RraaYrr= S ;: F: aE,Mk?3,]�1 frail 631 jM9 G9kl" i7224- "r+.x. yp u.4, 4T{n ..1NI-01 173, 4:7.. i',^i y{1s_P-She:a ram•.�.,.v Sn F'm:(x '6- K STpp 71T. !4-0.1`.rk Ors 5 3.b.—L 5514 N3=430 W TA I WA T.awsC"diTMW I-a2y V kRM= V 12JAI U.-Man i)5FU. gS+1E+ewe+n abp F+v.C�'EKti•W+v i6.SbI. W #.NO. makft.ft mS;gaers,r l350 ti>IX yG } =irra-xda hw",aj Lts+v¢- 5}IndIX Yb'S'YC 4: W S}IO.SYI ! Slrww.lo Y•.T m¢si Mw+k9an 14 1. W a43k 'Fx+i4 L.Y.Tµi OC i; 14 M�01 W Y; f.nrgY.ud a70, ad00, � !L]D; M-ir.rw�C.1 L rlr 5_ -V 51.5 xC i:Y_-=(16C !]dffi 96[- 5 x FILM n9a :an� -0 .}M•[^.14...�L�,' 9t+.l... 1.,R1 1. ..+;ka, ryZ '9udY Adtnnsll.alon erx 41[a d'rrsa krrrn�.1 S 51.'OQ•a0C S: Y aFk 1`rm:x, 5: .4A EEI yrw, y_ a•.. �Mz A.•d .-_ ;-.Y li 93GR]OC S_ '6] SC 3{' '12W3!1 6C nRa 6a• laouaoc la0p90C S: L: at'. SEAM H 5 IW k'O,a[iY-,%ddV.!"I.44aA PW.ffi Wft YtlL+•a- .w1 iMd lk.rW, https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 3/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan ?i5=iOe6 a:.E.$]rr" 31.'7•YO2d 21294M 202t.2 W Tiulfiriili B�p.Y'11+;81d is Rdnkcdh r&,cnt 1twl.4s rfirent Z 1 A Et iS& r-. F;n5RwLm d1 s. sdq's.,f7 �bdarnI n- .. St21ksm 51 lul- '.:.J.!.J M LY DIX u,l.�Fixo..ar , ,e,, V. i- #r #.Lrl ::t.YP. Fe. sr. #sYESGl9 mnl]h�au R.pYa+rri 6lv!f.lriur eel.;fi+.nnrw SP+,))@ dd IMTx194 1+I A�9.p---T�.h.m.a jri Q*.k 5 4Y.ti:: S6rA:lGA *m7 #Eli.$1. 'vdon 19 dppr>LLap.rs.rr.R.L'•g•.ad tlrrt..l.rs.s f•� I .t e?:. }:r1 #a d4#.7Lc 7B Psprirpsa[ "al W14J3IM L7jm. 0-1wam S:.d1n mill hfgxap+�Rr{L}remrtLL Tdo.ar,hm.f1Z,15-+ kmay.s l4�,dl4vr.�dh.ry"d.ar +'eSYJ..�:' :.e $•mod 5.0 '1S ldT.3m $Alin.,:Sy„1-"a.xrl lhLpYSIS"TEAk,Ty p{.}+1 dpS.}}ulf.1" !m+8''4310-'aarlr ..*mn•3r.lM6tlE iFsi IS+4r70d 1#1S.Om Iltivatd M.•sw}r 5_ 4!.'VC S`.+14.]30 :An1g d�o-}anir�g4we+re.w=T4hr.A1ti.J�,x�+a+ 1..1 FFrlh lifts_. #I&MAI 1i 'd13hm k T2.1163A mn21:NYC k. 7] R k 51 LIM W Sr 9MOm 20 T~.AIIOL.y *2' . PG FQ B- R1,A M auNn'm su FJ.0w2'l9 r Rp.rl. 1 imm at kc-Ow 4A&VA w 1a lsnx>•+c -11Ylar'81 :UXM - S,'k " xw w iz V #z Loll £aL�nxFPP�tws-Bn� Sr #n4 vl K V. 174. r>,.'xnn.? 5'. 1' 5•dt.�yry dnr H1 6 5 h.rtlr+Yi�r- Zll1I 3]L6:1a1 Tom. r,t rr; r,:.+5 n-.. ._ ...z�c.rt: +w_ :.. .- .,,::'•.. <,: : smrp+r ;: Tah.l mr lJl N WANRMJ RNjf,71 61t#phhi 0 M 4AN hlrt ikwh bilr'Ipi o,-Wand 6,dM • 21JTE�#1336 fiJlil,211;'F .7�'f- +�##-e�'7' $d39-lll4` Iur.al L.ui1S E>f}>�ri FY9S CF7'a51 IF>'P F1r i�39 _ [Fx 20; Year Plat €Icpenws EZw €Wi."d 6lld PPk f'41R;�1'wr Yii.I Mi�P'J VNT1. Va®r7 p 1131�F6rNpry F�n p{vcrmrv.-tw Scar rarndl9F+rranua 1l.'.,..Pr�l $d s1R. .�'E'-?XS IF]Et 3n '76}.ltil ri.Yl Y:I Prwit 1T INN T"..tu.'..�E.��a..nx'lu..r Ork bS7a.ow so 157C.00 S R ,rrdJCsuwy lnpc'snnti sl.m u w WI 111.3E9 w E.1117 Irltr NrW WM RcVgV+ 17:2AM 11.1D4 #C #':.+iz M }¢,ie?,rJ)Q so d.ub.11 L!6w C.v .rwn Road,rl:arr bnG lff.�67;ich si to tj 347 je,]wmi w R..1b.d 4�4 Aw.14'rrr+r T.�.SA.17o4 Sn YMwcm 0 �.n..n.,44.W.1 Faa.522'+aAw.lan lJ,.¢.aJn i7.iW,C617si 12 iil so W.I&L'i-L7 uI Cs111 r lri.rr7urq.upp-.d. T.L,}1dP® VA;Ixa $0 S3t5;404 Pod so S3UMCM Sh P.,a-�S-22w-t_Lwom a."1,4kru.vlah llpprldu si WRICLIDW ifl. w so N-I}n..ptd.LL--Upa- j:14!l}71 1?13I!VJ SI 3FI, 1a w S1,7G0u Su g111pp N11:�dO1-mogm.1-rgrms1 FTi1X}0 1e'37 'Md4. 50 W #xdoDm i{I Lrn.r}x'NU N dukun LW,,,.UL Id2Pu0 5713 53w w su 151.CCU w Rnri.11 5 SSYcnxry.rtl�lun+..w W.ruYion Yrgx.wru.ri.. kG:'44r[Iailc,C7}L;&lC'7V#Irxrt Cd AA U W W Vl: Sera nxl Ep1,?a16oa #L,il9 000 Sn .nng..r.l.nc_�rt:®,s.;rY.l,a•ainr..�y..m upqud. SO KI1 so #yz 4}} 1J, z+.LO #1.SJ5dPG4 1G St Sl{OW 19]R Sr s':_:L9{'f•G S} �* ii i33#M ii9k119 ". 411'pd01i higNWhod Ih Lh5 oa&hp Llhaldr L. r.Sppir uitla Uf 8 Nhk Ni�.r:Krllr_A{Iu;0.9Y wll hY rulrwd hpi ttYnhMlrrl oipw irJl.L393,Sfi.pv:r53luHi 3F rA133 iMs9G[419fY+Jr6WNd 1YIbAo"7{E'i+13 Q!';1.141Ar1.SpG�SCi4 n d1k CP t5 ncl an r1d M]11LLn Ihil pnndalkk W u'1}rn 16e 581@F.'ru+m ry'1WO Irnia3e. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 4/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Table 3-Winchester Raeortifl Airport-UP Requests Qufiikribution Per Fiscal Year �lS 4RR 13- 6'Xd 7�4 -3U tl 342A:�7 4 �426-N30 7r�iae€„OSA5 El f F4FY.91k {F.r 26) FY Z} IF Y 281 IF 20) ITT 3DI YUir Plan KApen n Eaal 1-u,*.�etlBLPrn osrdFr,arii,es Yo-ar3 Tow 4 Yaar3 5170CIJU8 31rmew 5®CG]t@4 aE271:3 iSB,4r10,9Y0 :4 F uvwdrUo PIep t0 $] wDw 1r71 S11 10,}14 8-L EI{7tit Wr,o�ls - {pp S`1�5.C40 Sa Al5{ 5{ 11,140"D y} K%WrR*hUpclaq S S4 #&XI�1-` WAII4 R,rM Is32'AehaWialnn ^'? Fa 5{ 5�0:}{4 3il4.7AIn S,'4J5.C}} §EoST5a50l it - ... 1i Alrpnl prgaqt�will W WOO 4Y Qar1ritmhvnz from f*44 4.-Naw.amd I Q4wGmrrwrU Too Iv,*parliw rrwY nclWa aprObvith3m"m Fredc",Cwkt,Sh,enanda ih,and Warren Counlues.and Gha Ghy of SP irI;hc56er, , I r � James Wood High School Addition Frederick County Public Schools Projects *Note:All locations are approximate https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 5/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Fourth High School Description: This new high school project is proposed to serve students in grades 9-12 with a program capacity of 1,285 students and a core capacity of 1,600 students, and will address overcrowding and anticipated growth in high school student enrollment in the school division. The site is located at the end of Justes Drive behind Admiral Byrd MS. This school will be designed similar to the renovations at James Wood HS, with a variety of learning spaces to meet the needs of a variety of learning styles and to impart skills necessary in today's working world. Planning and design should take 14 months. Construction should take 36 months. This project should be complete and the school open in August of 2029. Capital Cost: $149,104,825 Justification: This project will address overcrowding and https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 6/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan projected growth in high school student enrollment in the school division for more than ten years. Completion of this project will assist in maintaining State-recommended teacher- to-student ratios, assist in providing necessary services to special needs population, and assist in accommodating students and staff with disabilities. This facility will employ approximately 180 staff members, including administration, clerical, teachers, aides, cafeteria staff, and custodial staff. Many factors will contribute to cost performance: the performance of the building envelope, the HVAC systems chosen, the presence or absence of renewable energy sources, lighting, etc. These items will be discussed and decisions made during design. To minimize maintenance costs, part of the design process is to select proven, durable, low maintenance materials. This facility will require a renovation at 40 years. With proper maintenance and a timely renovation, this facility should last 75 to 80 years. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 7/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Middletown Elementary School Expansion Description: Middletown ES opened in 1989 and has served continuously as a K-5 elementary school since that time. The school contains 70,281 square feet and has a program capacity of 527 students. As of November 8, 2024, the school has 640 students. Ten general education classrooms, 1 special education classroom, a teacher planning room, and a gymnasium will be added. The existing gym will be renovated into additional art and music classrooms, and the cafeteria will be expanded. Planning and design should take 9 months. Construction should take 24 months. This project should be complete and the expansion open in August of 2028. Capital Cost: $22,400,000 Justification: Middletown Elementary School is in good condition; however, growth in the southeast area of the county needs to be addressed through the addition of classrooms to the facility. Completion of this project will assist in maintaining State-recommended teacher-to-student ratios, assist in providing necessary services to special needs population, and assist in accommodating students and staff with disabilities. The expansion will employ 11 additional https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 8/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan teachers and other staff members necessary to support the additional students and teachers. Many factors will contribute to cost performance: the performance of the building envelope, the HVAC systems chosen, the presence or absence of renewable energy sources, lighting, etc. These items will be discussed and decisions made during design. To minimize maintenance costs, part of the design process is to select proven, durable, low maintenance materials. This facility will require a renovation at 40 years. With proper maintenance and a timely renovation, this facility should last 75 to 80 years. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 9/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Jordan Springs Elementary School Expansion Description: Jordan Springs ES opened in 2020 and serves as a K-5 elementary school. The school contains 84,375 square feet and has a program capacity of 500 students. As of November 8, 2024, the school has 660 students. Twelve general education classrooms and a gym expansion will be added. Two resource rooms will be relocated, and the dining area expanded. Planning and design should take 9 months. Construction should take 24 months. This project should be complete and the expansion open in August of 2028. Capital Cost: $13,600,000 Justification: Both recent and expected growth in the attendance zone will need to be addressed through two strategies: the addition of classrooms to the facility and an attendance zone rezoning. Neither strategy alone is sufficient to address enrollment growth at JSES. Completion of this project will assist in maintaining State-recommended teacher- to-student ratios, assist in providing necessary services to special needs population, and assist in accommodating students and staff with disabilities. The expansion will employ 12 additional teachers and other staff members necessary to support the additional students and teachers. Many factors will contribute to cost performance: the performance of the building envelope, the HVAC systems chosen, the presence or absence of renewable energy sources, lighting, etc. These items will be discussed and decisions made during design. To minimize maintenance costs, part of the design process is to select proven, durable, low maintenance materials. This https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 10/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan facility will require a renovation at 40 years. With proper maintenance and a timely renovation, this facility should last 75 to 80 years. Powered by Esri https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 11/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Bass-Hoover Elementary School Renovation Description: Bass-Hoover ES opened in 1975 and serves as a K-5 elementary school. The school contains 75,257 square feet and has a program capacity of 580 students. As of November 8, 2024, the school has 610 students. A school specific renovation is proposed, which would include a mixture of light and heavy renovations to the entire facility except recent work done by Facilities Services. No renovation will be done to the kindergarten addition. Capital Cost: $20,621,715 Justification: Bass-Hoover Elementary School is 49 years old and is overcrowded, which places additional stress on facility infrastructure. The open concept design limits safety barriers and instructional functionality. Operation and maintenance costs are high due to aging infrastructure. Renovations are needed to a number of areas to ensure the economical and efficient operations of the school for years to come. https://storymaps.arcgis.com/stories/3ael 81 f0fa574e37b2b459b21 df7da8f/print 12/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Apple Pie Ridge Elementary School Renovation Description: Apple Pie Ridge ES opened in 1974 and serves as a K-5 elementary school. The school contains 65,120 square feet and has a program capacity of 509 students. As of November 8, 2024, the school has 388 students. A school specific renovation is proposed, which would include a mixture of light and heavy renovations to the entire facility except recent work done by Facilities Services and the kindergarten area, which was renovated in 2008. Planning and design should take 9 months. Construction should take 24 months. Capital Cost: $19,024,121 Justification: Apple Pie Ridge Elementary School is 50 years old. The open concept design limits safety barriers and instructional functionality. Operation and maintenance costs are high due to aging infrastructure. Renovations are needed to a number of areas to ensure the economical and efficient operations of the school for years to come. Completion of this project will assist in maintaining State-recommended teacher- https://storymaps.arcgis.com/stories/3ael 81 f0fa574e37b2b459b21 df7da8f/print 13/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan to-student ratios, assist in providing necessary services to special needs population, and assist in accommodating students and staff with disabilities. To minimize operating costs, part of the design process is to improve the performance of the building envelope, the HVAC systems, lighting, etc. Costs might be further reduced through the use of renewable energy sources. To minimize maintenance costs, part of the design process is to select proven, durable, low maintenance materials. With proper maintenance, this facility should last 40 or more years. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 14/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Onsite Traffic Safety Improvements Description: AES, GES, IHES and GMES are experiencing ongoing traffic safety concerns that require more than operational funds allow. Proposed improvements include driveway queuing capacity, efficient site arrangement, and safe access to public roads. Planning and design should take 9 months. Construction work that would block traffic flows would ideally occur during summer breaks, with other work occurring in between. If done 2 sites at a time, construction should take 2 summers. Capital Cost: $2,364,184 Justification: Traffic safety concerns at these school sites have been going unmet for some time, and so have been combined into a single capital project. This work is needed to provide sites that are as safe as practicable. Currently we experience traffic backups/overloads and conflicting traffic flows at these sites during arrival and dismissal. We are concerned that frustration with the current situation will lead some drivers and walkers to make bad decisions. Completion of this project will assist in maintaining State-recommended teacher-to- student ratios, assist in providing necessary services to special needs population, and assist in accommodating students and staff with disabilities. With proper maintenance, these improvements will last the life of the parking lot. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 15/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Pickleball Courts Parks & Recreation Projects *Note:All locations are approximate https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 16/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Recreation Center Description: The Recreation Center would be approximately 44,000 square feet and include an indoor area large enough to accommodate a minimum of two basketball courts and an indoor turf field. The court area would also be designed for utilization by indoor soccer, baseball, softball, wrestling, volleyball, pickleball, and badminton with the installation of in-floor sleeves and drop curtains or partitions. This area could also be used for special events such as dances, proms, music events, or craft, shows, thus providing a flexible facility for a multitude of activities to take place at one time. The facility would also house a fitness equipment room, multi- purpose rooms, office, storage, and locker rooms. Location is TBD, however the assumption is that the facility and support infrastructure would be built on County owned property. Capital Cost: $13,210,000 Justification: Demand is the primary justification for this project. Since its inception, the Parks and Recreation Department has relied significantly on the use of the county https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 17/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan public schools to house recreation programs. This arrangement adequately addressed Recreation Center needs for a time, however the department currently offers over 250 sections of programs, creating a situation where the department is limited in its ability to meet the programming and facility needs of the county residents. A Recreation Center facility will facilitate the department to meet citizen programming demands and provide the area with a facility to attract new businesses to the community. This facility would be available to all area residents. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 18/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Spray-ground Sherando Park Description: Spray-ground addition to Sherando Park is envisioned as a 10-15 feature pad. Intended to supplement existing playgrounds and other recreation-based activities at the parks, the spray-ground would similarly be free to the public. Location at the park would be separate from the existing pool and dictated by infrastructure availability including but not limited to, parking, water, sewer, and electricity. Capital Cost: $700,000 Justification: Spray-grounds are a popular summer activity for all ages, but particularly well suited for youth. Visitors to the parks have expressed an interest in additional activities and spray-grounds are identified as a need in the Parks and Recreation Community Survey. This facility would be available to all area residents and be of similar size and scope as the Clearbrook Park spray-ground. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 19/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Sherando Park Area 3 Development Description: This project completes the development vision for the SW area of Sherando Park located north of Rt 277. This vision is outlined in the 2016 North Sherando Park Master https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 20/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Plan update. Included are rectangular play fields, a shared use trail segment, roadway and parking, playground, and restroom. The project also includes completion of the Sherando Park Softball Complex. Capital Cost: $4,140,430 Justification: This facility would provide recreational opportunities for the entire Frederick County area and allow separation between youth and adult sport participants who currently often play in close proximity. These additional fields are needed to meet the high demand for rectangular and diamond play fields. Additionally, the completion of the softball complex will allow for tournament use. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 21/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Abrams Creek Trailhead Parking Description: This project is in support of the Abrams Creek Trail and provides a trailhead and parking along Meade Drive to access the Abrams Creek Trail. Parking is envisioned to have 21 spaces including handicap parking. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 22/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Capital Cost: $300,000 Justification: Access to the Abrams Creek Trail is necessary for trail users to enjoy the trail. Additionally, having a "logical termini" for the Abrams Creek Trail is a necessary component to receive VDOT funding and support. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 23/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Abrams Creek Trail Description: 10' wide, asphalt, shared-use trail along Abrams Creek. From Senseny Road to Channing Drive. It is estimated the trail will have six bridge stream crossings and will be approximately 3 miles in length. As outlined below, the project is envisioned in three phases of approximately 1 mile each. Each phase will have logical beginning and ending points and be usable trail sections in themselves. Phase 1 from Senseny Road to Woodstock Lane is funded and underway. Phase 2 from Woodstock Lane to Woody's Place, and Phase 3 from Woody's Place to Channing Drive need to be planned and constructed. Design plans are nearing completion and phase 1 construction anticipated to begin in FY26. FY26 funding request represents cost escalation from initial grant award and is fully funded through the VDOT HSIP program. Phase II anticipated to obtain state funding with design to begin in FY28 and construction two years later. Phase III design to occur in FY30 with construction to follow two years later. Capital Cost: $4,448,236 Justification: This facility would provide recreational opportunities for residents and provide an alternate means of entering and exiting the City of Winchester from Eastern Frederick County. This project is intended to meet the needs of the community as identified in the 2022 Frederick County Parks and Recreation Community Survey, and the 2017 Virginia Outdoors Plan Survey. https://storymaps.arcgis.com/stories/3ael 81 f0fa574e37b2b459b21 df7da8f/print 24/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Old Charlestown Road Park Development Description: Old Charlestown Road Park is planned for a 24- acre parcel situated on land proffered by the Snowden Bridge development located adjacent to the development and Jordan https://storymaps.arcgis.com/stories/3ael 81 f0fa574e37b2b459b21 df7da8f/print 25/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Springs Elementary School. The park is to include three rectangular athletic fields suitable for league play. Fields, restroom, shelter, playground, hard surface courts, and parking are part of the park concept. Site plan is currently being finalized. LWCF grant (50/50 award) anticipated through DCR grant program. Construction award anticipated in FY26. Capital Cost: $5,581,400 Justification: The overall park design is informed by the Snowden Bridge (formerly Stephenson Village) rezoning proffer of 2003 and public input sessions associated with the park master planning process in 2020. Existing rectangular field space is in high demand from the community and there are no public rectangular fields in the north of Frederick County. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 26/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Clearbrook Park Parking Expansion Description: Parking expansion at the main Clearbrook Park parking lot to include the addition of 129 parking spaces. Cost estimate and preliminary design work completed. Site plan/construction document completion and construction award anticipated to occur in one fiscal year. Cost estimate and preliminary design work completed. Site plan/construction document completion and construction award anticipated to occur in one fiscal year. Capital Cost: $330,000 Justification: The addition is planned for the north side of the existing parking area. Demand during peak summer times and throughout the Winter Wonderland light show have demonstrated that additional parking is needed. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 27/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Sherando NW Parking Expansion Description: Parking expansion for the Sherando Park Warrior Drive entrance of 38 spaces. Cost estimate and preliminary design work completed. Site plan/construction https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 28/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan document completion and construction award anticipated to occur in one fiscal year. Capital Cost: $310,000 Justification: The addition is planned for the east side of the existing parking area. Existing demand and the addition of recreation facilities has demonstrated that additional parking is needed. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 29/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Sherando Park Soccer Restroom Description: Addition of a restroom at the soccer complex at Sherando Park. Restroom is planned to provide facilities to support the restrooms currently being used at the pool complex. Restroom is anticipated to include two female and two male stalls with the entire building being approximately 12' x 20' in size. Capital Cost: $424,000 Justification: The proposed restroom would be placed adjacent to soccer fields at the Sherando Park soccer complex. The addition of the restroom facility in this location would limit the need for existing users to cross Splash Ave to access the restroom facilities at the pool. The size of the proposed restroom is intended to handle restroom needs for most times while the pool restroom would still provide an option when at full capacity. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 30/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Sherando Lake Trail Description: This project would add approximately 3,200 linear feet of trail around the Sherando Park lake to create a lake loop trail. The trail would be Win width and asphalt https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 31/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan paved. Design to be completed in first year of funding with construction award to occur in the following fiscal year. Capital Cost: $405,000 Justification: Walking is identified as the top recreational activity and need in the community. The addition of access to more areas along the Sherando Park lake would also provide more places for fishing. A loop around the lake would provide a scenic and enjoyable place to walk. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 32/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Bowman Playground Description: The proposed playground near the Amphitheater on the Bowman Library campus. The playground would accommodate play for children aged 2-12 in an area of approximately 4,000 square feet. Design to be completed in first year of funding with construction award to occur in the following fiscal year. Capital Cost: $420,000 Justification: The location for the proposed playground would be across the trail to the east of the amphitheater. The playground is envisioned to be well suited for play among all children, with an emphasis on accessibility. The outdoor space at the Bowman Library meets a park need identified in the area, and the addition of a playground continues to provide the opportunity to meet that need. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 33/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Playground Replacements - Clearbrook and Frederick Heights Park Description: This project would replace older existing playgrounds at Clearbrook and Frederick Heights Parks. The https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 34/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan playgrounds would accommodate play for children aged 2-12 in an area of approximately 4,000 square feet. Design and construction award to occur in one fiscal year. Capital Cost: $355,000 Justification: The proposed project would replace the oldest playgrounds in the Parks and Recreation inventory. These playgrounds are nearing the end of their useful lives, are increasingly in need of repair, and are more difficult to repair due to the limited availability of parts. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 35/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Bowman Library Handley Regional Library Project *Note:All locations are approximate https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 36/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Frederick County Library Branch - Gainesboro Description: Proposed new 2,000 square foot (SF) to 4,000 SF library branch with initial parking for at least 10 vehicles in the Gainesboro Magisterial District near Route 50 or Route 522. The library would contain a small commuter collection, books on hold for easy pick up, rental laptops/hotspots, internet stations, notary services, fax/scan/remote printing, a meeting room, and more. The new library would serve a sizeable population of Frederick County that is not being served. The library will provide materials and programming for citizens from toddlers to senior citizens. It will also provide recreational and educational materials, and be a prime source for homework help as it will be open nights and weekends when school libraries are closed. A small meeting room is envisioned for local groups to use as well as for children's story times and other events such as local history talks. The library would be estimated to open in FY29. Capital Cost: $969,903 Justification: This branch would serve citizens in an area that has been underserved by the Handley Library system. In FY 24, there were a total of 488,529 hard copy and electronic resources checked out, demonstrating the high use of library resources. Residents in the Gainesboro area must drive over 20 minutes each way to check out or return materials, attend early literacy classes, and use meeting rooms and other services the library provides. Many senior citizens use public libraries and for many, the library is their primary social outlet where they can volunteer, and visit daily or weeks as there is no cost and the staff is friendly and helpful. Public libraries also serve an important recreational and educational source for children. The summer reading program this year registered nearly 1,746 preschoolers and school-age children https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 37/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan system-wide, as well as over 450 adults (up to pre COVID-19 levels). Several thousand books and gifts were donated as reading incentives. Frederick County Administration Building https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 38/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan County Administration Projects *Note:All locations are approximate Powered by Esri County Office Annex (Former Sunnyside Plaza Shopping Center) Description: This project entails the demolition of the mostly vacant Sunnyside shopping center, which is roughly 30 years old, has 64,000 SF of floor area, and is located on approximately 10 acres that the County owns. The construction of a new building (size to be determined) would accommodate the relocation of certain county departments from the 107 N. Kent Street complex to address existing and future space needs of county departments. Capital Cost: $1,000,000 https://storymaps.arcgis.com/stories/3ael 81 f0fa574e37b2b459b21 df7da8f/print 39/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Justification: This capital facility will allow for more improvements to general government facilities and services for the benefit of the residents of Frederick County and will meet the increasing need for office space, meeting space, and government services in an accessible location. Furthermore, a new, modern office building could serve as a catalyst for redevelopment in the area. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 40/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri General Government Capital Expenditures Description: This project consists of a revolving fund in the amount of$1,000,000 for the benefit of General Government Capital Expenditures for purchasing capital equipment for governmental agencies and to allow for improvements to general government facilities. Such expenditure may be less than the established $100,000 departmental threshold. It was determined that the inclusion of such a project would be beneficial in ensuring that the significant capital expense is identified in the County's capital planning and budget process. This project is for the benefit of County Governmental Entities participating in the CIP but does not include individual Volunteer Fire & Rescue Companies. Capital Cost: $1,000,000 Justification: The inclusion of this capital expenditure fund for purchasing capital equipment for governmental agencies and to allow for improvements to general governmental facilities will enable the County to meet the requirements of the Code of Virginia with regards to the collection and disbursement of cash proffers accepted on behalf of the governmental entities. Funds will ultimately be used to improve conditions affecting health, safety, or welfare, which will be evaluated at the time of each project/request. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 41/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Regional Landfill Regional Landfill Projects https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 42/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri CDD Landfill Area 2 Cell A Expansion Description: The project will provide Construction/Demolition Debris (CDD) refuse disposal capacity for the next 10 - 15 years. The area of development is approximately 10 acres. Rough grading must be done, which involves removing over 500,000 cubic yards of rock and soil. Then, an approved bottom liner containment system will be constructed in conformance with approved DEQ plans. This project will take 3 years to complete. The project will be funding by the Landfill Enterprise budget. Funding is available. Work began on the project in 2024 and will be completed by 2028. The project is required to comply with state mandates to provide approved landfill for refuse disposal. By providing landfill, we can safely dispose of solid wastes from our region. The cost to operate and maintain landfill are included in the landfill budget. After waste is placed in a cell, spread and compacted, soil cover is provided. The tipping fees are based on the costs to operate landfill. The estimated useful life of Cell A is 10 - 15 years. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 43/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Capital Cost: $12,500,000 Justification: The need for this project is to provide a CDD refuse disposal for our regional area which include Frederick and Clarke Counties along with City of Winchester. This project is required to comply with state mandates to provide approved landfill for refuse disposal. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 44/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan 0 i Powered by Esri MSW Landfill Gas Wellfield Expansion, Cell 3A Description: This project is for expansion of the landfill methane gas wellfield collection system. As waste decays, it emits gases. Methane gas is collected to manage odors coming from landfill and also to provide a source of fuel for our Landfill Gas Energy Plant that generates 2 megawatts (MW) of power that is sold on the PGM power grid. Funding is available in the Landfill Enterprise fund. Construction of the gas wellfield is anticipated in 2026. Landfill gas must be collected to comply with state air permit requirements. The ongoing maintenance and operations costs are approximately $4,000 per year. The revenue from the energy plant is over $300,000 per year. Capital Cost: $350,000 Justification: As more refuse/trash is disposed of, the resulting gases from the waste must be collected to control odors, provide fuel to the energy plant, and to comply with state air permit requirements. The gas collection system safely collects and eliminates the landfill gas, which poses a threat to human health and safety. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 45/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan i Powered by Esri Tire Recycling Building Description: Public Works is currently working with the Northern Shenandoah Valley Regional Commission (NSVRC) and the Regional Tire program (RTOP) in purchasing a tire https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 46/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan shredding machine. It may require the construction of a 20,000 square foot building. Once tire processing equipment is purchased, it would be stored in a building at the landfill. The building would be funded by Landfill Enterprise fund or other arrangement with NSVRC. The anticipated ongoing maintenance and operations costs for building would be paid for by RTOP tire program funds. The life of the building is 50 years or more. Capital Cost: $600,000 Justification: The building is not mandated to be built. However, it would be much safer for our employees to work under a roof. The overall tire recycling operation improves human health and safety but providing a safe way to dispose of used tires. https://storymaps.arcgis.com/stories/3ael 81 f0fa574e37b2b459b21 df7da8f/print 47/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Round Hill Fire &Rescue Fire & Rescue Projects *Note:All locations are approximate https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 48/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan 0 Maxar i Powered by Esri Station 21 Apparatus Replacement - Ambulance 10-1 Description: This project will be a Type I Custom Advanced Life Support Ambulance for station 10. This will be a four wheeled drive ambulance with Advance Life Support capabilities and equipment for the transport of acutely ill patients. This will be replacing their current Ambulance 10-1 that is need of replacement due to age and condition. This apparatus order would be placed in FY 30 with construction on the vehicle would not be started until FY31 and delivered during FY32. The current fire apparatus construction market is seeing 12 to 24 months for completion of orders due to back logs from supply chain and pandemic issues. This apparatus would incur annual maintenance and operation costs of $4,000 to $7,000 per year. The apparatus has a 10-year life expectancy as a front-line apparatus and then would serve as a reserve apparatus for the fleet. Capital Cost: $603,750 Justification: The current Ambulance 10-1 needs replacement as it has met the criteria set forth in the Frederick County Fire and Rescue Apparatus Replacement Plan. This plan addresses the age, mileage, engine hours, out of service time, and repair costs over the life of the apparatus. The largest portion of our emergency response for the Fire and the Rescue Department deals with emergency medical responses. Having a reliable https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 49/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan and functional unit to treat our patients in and to safely transport them to the hospital is imperative for our operation. The current apparatus needs replacement due to many factors that are addressed in the Fire and Rescue Apparatus Replacement Plan. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 50/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Station 11 Renovation Description: The construction of a new addition to house larger living quarters for the accommodations of additional staffing to meet the needs of the area. During the addition other upgrades to the existing station will be performed such as roof replacement, replacement of original windows, and waterproofing of the exterior concrete-masonry walls. This project if funded would be started in FY 27 with design from a architect and then construction would take place. Capital Cost: $1,215,500 Justification: The stations in the Frederick County Fire and Rescue System were evaluated by a contracted architect to evaluate each individual station's current condition and future needs. They looked at the living quarters to include sleeping areas, kitchens, shower and bathroom facilities. They also assessed the structural components of the buildings along, mechanical systems in the building, roof coverings, and the apron/parking areas. This project includes the recommendations of the architect and the system to meet future needs. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 51/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan i Powered by Esri Station 11 Apparatus Replacements - Ambulance 11-2 and Brush Ambulance 11-2 Replacement https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 52/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Description: This project will be a Type I Custom Advanced Life Support Ambulance for station 11. This will be a four wheeled drive ambulance with Advance Life Support capabilities and equipment for the transport of acutely ill patients. This will be replacing their current Ambulance 11-2 that is need of replacement due to age and condition. This apparatus order would be placed in FY 30 with construction on the vehicle would not be started until FY31 and delivered during FY32. The current fire apparatus construction market is seeing 12 to 24 months for completion of orders due to back logs from supply chain and pandemic issues. This apparatus would incur annual maintenance and operation costs of $4,000 to $7,000 per year. The apparatus has a 10-year life expectancy as a front-line apparatus and then would serve as a reserve apparatus for the fleet. Capital Cost: $603,750 Justification: The current Ambulance 11-2 needs replacement as it has met the criteria set forth in the Frederick County Fire and Rescue Apparatus Replacement Plan. This plan addresses the age, mileage, engine hours, out of service time, and repair costs over the life of the apparatus. The largest portion of our emergency response for the Fire and the Rescue Department deals with emergency medical responses. Having a reliable and functional unit to treat our patients in and to safely transport them to the hospital is imperative for our operation. The current apparatus needs replacement due to many factors that are addressed in the Fire and Rescue Apparatus Replacement Plan. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 53/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Brush 11 Replacement Description: This project will be a NFPA 1901 approved Brush Unit. This vehicle will serve a special purpose in the fire and rescue system. This apparatus will be constructed on a standard single axle vehicle with four-wheel drive capabilities. This apparatus will have a minimum 75gpm pump with a minimum of 100 gallons of water and a class A foam system for fire suppression efforts. This apparatus will be specially designed to respond to wildland incidents. The Fire and Rescue system has many areas across the county that is not easily accessible to regular fire apparatus. This apparatus will allow us a quicker and more efficient response to these incidents. This apparatus order would be placed in FY 28 with construction on the vehicle would be started in FY28 and delivered either by FY 28/29. This apparatus would incur annual maintenance and operation costs of$2,000 to $4,000 per year. The apparatus has a 20-year life expectancy as a front-line apparatus and then would serve as a reserve apparatus for the fleet. Capital Cost: $225,000 https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 54/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Justification: The current Brush 11 has met its life expectancy as set forth by the Frederick County Fire and Rescue Apparatus Replacement Program. This special apparatus would allow for a prompt, efficient response to fires that occur in the remote access areas. Frederick County has many subdivisions that have been identified by the Virginia Department of Forestry as extreme potential of wildland urban interface incidents. This is when a wildland fire leads to the spread of the fire to multiple structures and typically results in catastrophic property loss and can lead to many fatalities as well. With this apparatus it will allow our crews to be better equipped to combat these fires to help prevent catastrophic loss of property and life. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 55/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Station 12 Renovation Description: The original fire station buildings are structurally deficient and will need to be demolished to make way for the construction of a new addition. This addition will allow for new living facilities to be added along with upgrades to the current kitchen facilities and replacement of the existing roof on the existing station. This will project will coincide with approved increase in assigned staffing for the station. This project, if funded, would move forward with an architect to develop drawings and plans for the additions and renovations. This would be started in FY 26. Capital Cost: $1,810,000 Justification: The stations in the Frederick County Fire and Rescue System were evaluated by a contracted architect to evaluate each individual station's current condition and future needs. They looked at the living quarters to include sleeping areas, kitchens, shower and bathroom facilities. They also assessed the structural components of the buildings along, mechanical systems in the building, roof coverings, and the apron/parking areas. This project includes the recommendations of the architect and the system to meet future needs. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 56/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Station 12 Apparatus Replacement - Engine Tanker Description: This project will be a NFPA 1901 approved fire Engine to be placed in Station 12. The fire engine will be a custom-built fire engine on a single axle with the minimum https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 57/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan fire pump of 1,500 gpm and 1,500 gallons of water. This fire engine will be designed to hold five firefighters and be equipped with a class A foam system along with many other firefighting equipment. This will be replacing their current engine that is need of replacement due to age and condition. This apparatus order would be placed in FY 28 with construction on the vehicle would not be started until FY30 and delivered during FY31. The current fire apparatus construction market is seeing 24 to 36 months for completion of orders due to back logs from supply chain issues. This apparatus would incur annual maintenance and operation costs of$5,000 to $10,000 per year. The apparatus has a 15- year life expectancy as a front-line apparatus and then would serve as a reserve apparatus for the fleet. Capital Cost: $1,650,000 Justification: The current Engine Tanker 12 needs replacement as it has met the criteria set forth in the Frederick County Fire and Rescue Apparatus Replacement Plan. This plan addresses the age, mileage, engine hours, out of service time, and repair costs over the life of the apparatus. This apparatus is the backbone of the emergency response system to provide firefighting capabilities to the citizens of the County. Without this apparatus the ability to deliver fire protection will be greatly hampered. The current apparatus is need of replacement due to many factors that are addressed in the Fire and Rescue Apparatus Replacement Plan. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 58/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Station 13 Apparatus Replacements - Engine, Tanker, Ambulance 13-2 Engine 13 Replacement https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 59/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Description: This project will be a NFPA 1901 approved fire Engine to be placed in Station 13. The fire engine will be a custom-built fire engine on a single axle with the minimum fire pump of 1,500 gpm and 750 gallons of water. This fire engine will be designed to hold five firefighters and be equipped with a class A foam system along with many other firefighting equipment. This will be replacing their current engine that is need of replacement due to age and condition. This apparatus order would be placed in FY 26 with construction on the vehicle would not be started until FY27 and delivered during FY29. The current fire apparatus construction market is seeing 18 to 24 months for completion of orders due to back logs from supply chain issues. The anticipated ongoing maintenance and operation costs are $5,000 to $10,000 a year. The life expectancy is 15 years of front line service and then the apparatus would be moved to reserve status and eventually sold. Capital Cost: $1,200,000 Justification: The current Engine 13 needs replacement as it has met the criteria set forth in the Frederick County Fire and Rescue Apparatus Replacement Plan. This plan addresses the age, mileage, engine hours, out of service time, and repair costs over the life of the apparatus. This apparatus is the backbone of the emergency response system to provide firefighting capabilities to the citizens of the County. Without this apparatus the ability to deliver fire protection will be greatly hampered. The current apparatus is need of replacement due to many factors that is addressed in the Fire and Rescue Apparatus Replacement Plan. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 60/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Tanker 13 Replacement Description: This project will be to purchase an NFPA 1901 compliant Tanker with a commercial cab to serve the district protected by Fire Station 13. This tanker would be a tandem axle commercial cab apparatus that would have a minimum of 2,500 gallons of water and a 1250 gallons per minute fire pump on the apparatus. This piece of apparatus serves the vital fire ground function of bringing water to the areas that are not served by fire hydrants for firefighting operations. The current tanker assigned to Station 13 has met the replacement requirements set forth by the Fire and Rescue Apparatus Replacement Plan. This apparatus order would be placed in FY 28 with construction on the vehicle would not be started until FY29 and delivered during FY30. The current fire apparatus construction market is seeing 18 to 24 months for completion of orders due to back logs from supply chain issues. This apparatus would incur annual maintenance and operation costs of$5,000 to $10,000 per year. The apparatus has a 15-year life expectancy as a front-line apparatus and then would serve as a reserve apparatus for the fleet. Capital Cost: $770,000 https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 61/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Justification: The current Tanker 13 needs replacement as it has met the criteria set forth in the Frederick County Fire and Rescue Apparatus Replacement Plan. This plan addresses the age, mileage, engine hours, out of service time, and repair costs over the life of the apparatus. This apparatus is a requirement in the rural setting of Frederick County to deliver water to the fire scene for extinguishment of the fire. Without this apparatus the ability to deliver enough water to the fire scene would be impossible. The current apparatus needs replacement due to many factors that are addressed in the Fire and Rescue Apparatus Replacement Plan. Ambulance 13-2 Replacement Description: This project will be a Type I Custom Advanced Life Support Ambulance for station 13. This will be a four wheeled drive ambulance with Advance Life Support capabilities and equipment for the transport of acutely ill patients. This will be replacing their current Ambulance 13-2 that is need of replacement due to age and condition. This apparatus order would be placed in FY 27 with construction on the vehicle would not be started until FY28 and delivered https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 62/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan during FY29. The current fire apparatus construction market is seeing 12 to 24 months for completion of orders due to back logs from supply chain issues. This apparatus would incur annual maintenance and operation costs of$4,000 to $7,000 per year. The apparatus has a 10-year life expectancy as a front-line apparatus and then would serve as a reserve apparatus for the fleet. Capital Cost: $525,000 Justification: The current Ambulance 13-2 needs replacement as it has met the criteria set forth in the Frederick County Fire and Rescue Apparatus Replacement Plan. This plan addresses the age, mileage, engine hours, out of service time, and repair costs over the life of the apparatus. The largest portion of our emergency response for the Fire and the Rescue Department deals with emergency medical responses. Having a reliable and functional unit to treat our patients in and to safely transport them to the hospital is imperative for our operation. The current apparatus needs replacement due to many factors that are addressed in the Fire and Rescue Apparatus Replacement Plan. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 63/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Station 14 Renovation Description: This project includes the construction of a new living quarters addition to house additional volunteer and career staffing. This would address bathrooms, showers, locker rooms and sleeping quarters. The station had a recent addition of apparatus space financed by the volunteers leadership. In this addition process we will also address upgrades to the apron area and parking lot improvements needed. The design and construction of this project would start in FY 29. Capital Cost: $945,600 Justification: The stations in the Frederick County Fire and Rescue System were evaluated by a contracted architect to evaluate each individual station's current condition and future needs. They looked at the living quarters to include sleeping areas, kitchens, shower and bathroom facilities. They https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 64/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan also assessed the structural components of the buildings along, mechanical systems in the building, roof coverings, and the apron/parking areas. This project includes the recommendations of the architect and the system to meet future needs. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 65/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Station 14 Apparatus Replacements - Tanker, Ambulance 14-1, and Attack Tanker 14 Replacement Description: This project will be to purchase an NFPA 1901 compliant Tanker with a commercial cab to serve the district protected by Fire Station 14. This tanker would be a tandem axle commercial cab apparatus that would have a minimum of 2,500 gallons of water and a 1250 gallons per minute fire pump on the apparatus. This piece of apparatus serves the vital fire ground function of bringing water to the areas that are not served by fire hydrants for firefighting operations. The current tanker assigned to Station 14 has met the replacement requirements set forth by the Fire and Rescue Apparatus Replacement Plan. This apparatus order would be placed in FY 26 with construction on the vehicle would not be started until FY27 and delivered during FY28. The current fire apparatus construction market is seeing 18 to 24 months for completion of orders due to back logs from supply chain issues. This apparatus would incur annual maintenance and operation costs of$5,000 to $10,000 per year. The apparatus has a 15-year life expectancy as a front-line apparatus and then would serve as a reserve apparatus for the fleet. Capital Cost: $700,000 Justification: The current Tanker 14 needs replacement as it has met the criteria set forth in the Frederick County Fire and Rescue Apparatus Replacement Plan. This plan addresses the age, mileage, engine hours, out of service time, and repair costs over the life of the apparatus. This apparatus is a requirement in the rural setting of Frederick County to deliver water to the fire scene for extinguishment of the fire. Without this apparatus the ability to deliver enough water to the fire scene would be impossible. The current apparatus needs https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 66/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan replacement due to many factors that are addressed in the Fire and Rescue Apparatus Replacement Plan. Ambulance 14-1 Replacement Description: This project will be a Type I Custom Advanced Life Support Ambulance for station 14. This will be a four wheeled drive ambulance with Advance Life Support capabilities and equipment for the transport of acutely ill patients. This will be replacing their current Ambulance 14-1 that is need of replacement due to age and condition. This apparatus order would be placed in FY30 with construction on the vehicle would not be started until FY31 and delivered during FY32. The current fire apparatus construction market is seeing 12 to 24 months for completion of orders due to back logs from supply chain issues. This apparatus would incur annual maintenance and operation costs of$4,000 to $7,000 per year. The apparatus has a 10-year life expectancy as a front-line apparatus and then would serve as a reserve apparatus for the fleet. Capital Cost: $603,750 https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 67/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Justification: The current Ambulance 14-1 needs replacement as it has met the criteria set forth in the Frederick County Fire and Rescue Apparatus Replacement Plan. This plan addresses the age, mileage, engine hours, out of service time, and repair costs over the life of the apparatus. The largest portion of our emergency response for the Fire and the Rescue Department deals with emergency medical responses. Having a reliable and functional unit to treat our patients in and to safely transport them to the hospital is imperative for our operation. The current apparatus needs replacement due to many factors that are addressed in the Fire and Rescue Apparatus Replacement Plan. Attack 14 Replacement Description: This project will be a NFPA 1901 approved Wildland Urban Interface Vehicle. This vehicle will serve a special purpose in the fire and rescue system. This apparatus will be constructed on a commercial single axle vehicle with four-wheel drive capabilities. This apparatus will have a minimum 1000gpm pump with a minimum of 500 gallons of water and a class A foam system for fire suppression efforts. This apparatus will also carry the standard structural and https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 68/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan wildland firefighting equipment to include fire hose, ladders, hand tools, and saws. This apparatus will be specially designed to respond to structural incidents and wildland incidents. The Fire and Rescue system has many areas across the county that is not easily accessible to regular fire apparatus. This apparatus will allow us a quicker and more efficient response to these incidents. These apparatuses also become very important during inclement weather. This apparatus order would be placed in FY 29 with construction on the vehicle would not be started until FY31 and delivered during FY32. The current fire apparatus construction market is seeing 24 to 36 months for completion of orders due to back logs from supply chain issues. This apparatus would incur annual maintenance and operation costs of$5,000 to $8,000 per year. The apparatus has a 20-year life expectancy as a front-line apparatus and then would serve as a reserve apparatus for the fleet. Capital Cost: $808,500 Justification: The current Attack 14 has met its life expectancy and beyond by standards set forth in the Frederick County Fire and Rescue Apparatus Replacement Process. This special apparatus would allow for a prompt, efficient response to fires that occur in the remote access areas. A large majority of our stations west of Rt. 37 are in these areas. The normal larger fire apparatus will either not make it in these areas or are very limited in the ability to function in these areas. Currently the needs are addressed by "Attack Trucks". These apparatuses have served a purpose over the years in Frederick County, but today have outlived their usefulness for many reasons but mainly of size of pump and water capacity and equipment storage needs. Today's fires burn a faster and hotter rate than the fires of the 70's and 80's when these current apparatuses were built. This requires more water and pump capacity of our units. Frederick County has many subdivisions that have been identified by the Virginia https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 69/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Department of Forestry as extreme potential of a wildland urban interface incidents. This is when a wildland fire leads to the spread of the fire to multiple structures and typically results in catastrophic property loss and can lead to many fatalities as well. With this apparatus it will allow our crews to be better equipped to combat these fires to help prevent catastrophic loss of property and life. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 70/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Station 15 Apparatus Replacements - Engine and Ambulance 15-1 Engine 15 Replacement Description: The current Engine 15 needs replacement as it has met the criteria set forth in the Frederick County Fire and Rescue Apparatus Replacement Plan. This plan addresses the age, mileage, engine hours, out of service time, and repair costs over the life of the apparatus. This apparatus order would be placed in FY 28 with construction on the vehicle would not be started until FY30 and delivered during FY31. The current fire apparatus construction market is seeing 24 to 36 months for completion of orders due to back logs from supply chain and pandemic issues. This apparatus would incur annual maintenance and operation costs of$5,000 to $10,000 per year. The apparatus has a 15 year life expectancy as a front-line apparatus and then would serve as a reserve apparatus for the fleet. Capital Cost: $1,320,000 Justification: This apparatus is the backbone of the emergency response system to provide firefighting capabilities to the citizens of the County. Without this apparatus the ability to deliver fire protection will be greatly hampered. The current apparatus is need of replacement due to many factors that is addressed in the Fire and Rescue Apparatus Replacement Plan. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 71/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Ambulance 15-1 Replacement Description: This project will be a Type I Custom Advanced Life Support Ambulance for station 15. This will be a four wheeled drive ambulance with Advance Life Support capabilities and equipment for the transport of acutely ill patients. This will be replacing their current Ambulance 15-1 that is need of replacement due to age and condition. This apparatus order would be placed in FY 30 with construction on the vehicle would not be started until FY31 and delivered during FY32. The current fire apparatus construction market is seeing 12 to 24 months for completion of orders due to back logs from supply chain and pandemic issues. This apparatus would incur annual maintenance and operation costs of $4,000 to $7,000 per year. The apparatus has a 10-year life expectancy as a front-line apparatus and then would serve as a reserve apparatus for the fleet. Capital Cost: $603,750 Justification: The current Ambulance 15-1 needs replacement as it has met the criteria set forth in the Frederick County Fire and Rescue Apparatus Replacement Plan. This plan addresses https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 72/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan the age, mileage, engine hours, out of service time, and repair costs over the life of the apparatus. The largest portion of our emergency response for the Fire and the Rescue Department deals with emergency medical responses. Having a reliable and functional unit to treat our patients in and to safely transport them to the hospital is imperative for our operation. The current apparatus needs replacement due to many factors that are addressed in the Fire and Rescue Apparatus Replacement Plan. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 73/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Station 16 Replacement Description: The current station has meet and exceeded its life expectancy. A new 15,000 square foot station would be constructed on a new site that will need to be acquired. The new site will allow for improved access/egress and will allow for more efficient response times. The current station sits along a rail line and has two difficult intersections to gain access to North Frederick Pike. This will also allow for the accommodation of additional volunteer and career staffing. The land acquisition would take place in FY 28 with the design and start of construction to being in FY 29. The completion of the project is projected for in FY 31. This station would see the same yearly maintenance cost that we see at Station 15 and 21. Capital Cost: $7,166,666 Justification: The stations in the Frederick County Fire and Rescue System were evaluated by a contracted architect to evaluate each individual station's current condition and future needs. They looked at the living quarters to include sleeping areas, kitchens, shower and bathroom facilities. They also assessed the structural components of the buildings along, mechanical systems in the building, roof coverings, and the apron/parking areas. This project includes the recommendations of the architect and the system to meet future needs. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 74/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Station 16 Apparatus Replacements - Tanker, Ambulance 16-1, Ambulance 16-2, Attack, Brush, and Tower https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 75/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Tanker 16 Replacement Description: This project will be to purchase an NFPA 1901 compliant Tanker with a commercial cab to serve the district protected by Fire Station 16. This tanker would be a tandem axle commercial cab apparatus that would have a minimum of 2,500 gallons of water and a 1,250 gallons per minute fire pump on the apparatus. This piece of apparatus serves the vital fire ground function of bringing water to the areas that are not served by fire hydrants for firefighting operations. The current tanker assigned to Station 16 has met the replacement requirements set forth by the Fire and Rescue Apparatus Replacement Plan. This apparatus order would be placed in FY 26 with construction on the vehicle would not be started until FY27 and delivered during FY28. The current fire apparatus construction market is seeing 18 to 24 months for completion of orders due to back logs from supply chain issues. This apparatus would incur annual maintenance and operation costs of$5,000 to $10,000 per year. The apparatus has a 15-year life expectancy as a front-line apparatus and then would serve as a reserve apparatus for the fleet. Capital Cost: $700,000 Justification: The current Tanker 16 needs replacement as it has met the criteria set forth in the Frederick County Fire and Rescue Apparatus Replacement Plan. This plan addresses the age, mileage, engine hours, out of service time, and repair costs over the life of the apparatus. This apparatus is a requirement in the rural setting of Frederick County to deliver water to the fire scene for extinguishment of the fire. Without this apparatus the ability to deliver enough water to the fire scene would be impossible. The current apparatus needs replacement due to many factors that are addressed in the Fire and Rescue Apparatus Replacement Plan. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 76/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Ambulance 16-1 Replacement Description: This project will be a Type I Custom Advanced Life Support Ambulance for station 16. This will be a four wheeled drive ambulance with Advance Life Support capabilities and equipment for the transport of acutely ill patients. This will be replacing their current Ambulance 16-1 that is need of replacement due to age and condition. This apparatus order would be placed in FY29 with construction on the vehicle would not be started until FY30 and delivered during FY31. The current fire apparatus construction market is seeing 12 to 24 months for completion of orders due to back logs from supply chain issues. This apparatus would incur annual maintenance and operation costs of$4,000 to $7,000 per year. The apparatus has a 10-year life expectancy as a front-line apparatus and then would serve as a reserve apparatus for the fleet. Capital Cost: $575,000 Justification: The current Ambulance 16-1 needs replacement as it has met the criteria set forth in the Frederick County Fire and Rescue Apparatus Replacement Plan. This plan addresses https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 77/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan the age, mileage, engine hours, out of service time, and repair costs over the life of the apparatus. The largest portion of our emergency response for the Fire and the Rescue Department deals with emergency medical responses. Having a reliable and functional unit to treat our patients in and to safely transport them to the hospital is imperative for our operation. The current apparatus needs replacement due to many factors that are addressed in the Fire and Rescue Apparatus Replacement Plan. Ambulance 16-2 Replacement Description: This project will be a Type I Custom Advanced Life Support Ambulance for station 16. This will be a four wheeled drive ambulance with Advance Life Support capabilities and equipment for the transport of acutely ill patients. This will be replacing their current Ambulance 16-2 that is need of replacement due to age and condition. This apparatus order would be placed in FY 26 with construction on the vehicle would not be started until FY27 and delivered during FY28. The current fire apparatus construction market is seeing 12 to 24 months for completion of orders due to back logs from supply chain issues. This apparatus would incur https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 78/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan annual maintenance and operation costs of$4,000 to $7,000 per year. The apparatus has a 10-year life expectancy as a front-line apparatus and then would serve as a reserve apparatus for the fleet. Capital Cost: $500,000 Justification: The current Ambulance 16-2 needs replacement as it has met the criteria set forth in the Frederick County Fire and Rescue Apparatus Replacement Plan. This plan addresses the age, mileage, engine hours, out of service time, and repair costs over the life of the apparatus. The largest portion of our emergency response for the Fire and the Rescue Department deals with emergency medical responses. Having a reliable and functional unit to treat our patients in and to safely transport them to the hospital is imperative for our operation. The current apparatus needs replacement due to many factors that are addressed in the Fire and Rescue Apparatus Replacement. Attack 16 Replacement https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 79/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Description: This project will be a NFPA 1901 approved Wildland Urban Interface Vehicle. This vehicle will serve a special purpose in the fire and rescue system. This apparatus will be constructed on a commercial single axle vehicle with four-wheel drive capabilities. This apparatus will have a minimum 1000gpm pump with a minimum of 500 gallons of water and a class A foam system for fire suppression efforts. This apparatus will also carry the standard structural and wildland firefighting equipment to include fire hose, ladders, hand tools, and saws. This apparatus will be specially designed to respond to structural incidents and wildland incidents. The Fire and Rescue system has many areas across the county that is not easily accessible to regular fire apparatus. This apparatus will allow us a quicker and more efficient response to these incidents. These apparatuses also become very important during inclement weather. This apparatus order would be placed in FY 29 with construction on the vehicle would not be started until FY30 and delivered during FY32. The current fire apparatus construction market is seeing 24 to 36 months for completion of orders due to back logs from supply chain and pandemic issues. This apparatus would incur annual maintenance and operation costs of $5,000 to $8,000 per year. The apparatus has a 20-year life expectancy as a front-line apparatus and then would serve as a reserve apparatus for the fleet. Capital Cost: $808,500 Justification: The current Attack 16 has met it's life expectancy and beyond as set forth by the Frederick County Fire and Rescue Apparatus Replacement Program. This special apparatus would allow for a prompt, efficient response to fires that occur in the remote access areas. A large majority of our stations west of Rt. 37 are in these areas. The normal larger fire apparatus will either not make it in these areas or are very limited in the ability to function in these areas. Currently the needs are addressed by "Attack Trucks". These https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 80/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan apparatuses have served a purpose over the years in Frederick County, but today have outlived their usefulness for many reasons but mainly of size of pump and water capacity and equipment storage needs. Today's fires burn a faster and hotter rate than the fires of the 70's and 80's when these current apparatuses were built. This requires more water and pump capacity of our units. Frederick County has many subdivisions that have been identified by the Virginia Department of Forestry as extreme potential of a wildland urban interface incidents. This is when a wildland fire leads to the spread of the fire to multiple structures and typically results in catastrophic property loss and can lead to many fatalities as well. With this apparatus it will allow our crews to be better equipped to combat these fires to help prevent catastrophic loss of property and life. Brush 16 Replacement Description: This project will be a NFPA 1901 approved Brush Unit. This vehicle will serve a special purpose in the fire and rescue system. This apparatus will be constructed on a standard single axle vehicle with four-wheel drive capabilities. This apparatus will have a minimum 75gpm https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 81/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan pump with a minimum of 100 gallons of water and a class A foam system for fire suppression efforts. This apparatus will be specially designed to respond to wildland incidents. The Fire and Rescue system has many areas across the county that is not easily accessible to regular fire apparatus. This apparatus will allow us a quicker and more efficient response to these incidents. This apparatus order would be placed in FY 28 with construction on the vehicle would be started in FY28 and delivered either by FY 28/29. This apparatus would incur annual maintenance and operation costs of$2,000 to $4,000 per year. The apparatus has a 20-year life expectancy as a front-line apparatus and then would serve as a reserve apparatus for the fleet. Capital Cost: $225,000 Justification: Brush 16 has beyond its life expectancy as set forth by the Frederick County Fire and Rescue Department Apparatus Replacement Program. This special apparatus would allow for a prompt, efficient response to fires that occur in the remote access areas. Frederick County has many subdivisions that have been identified by the Virginia Department of Forestry as extreme potential of wildland urban interface incidents. This is when a wildland fire leads to the spread of the fire to multiple structures and typically results in catastrophic property loss and can lead to many fatalities as well. With this apparatus it will allow our crews to be better equipped to combat these fires to help prevent catastrophic loss of property and life. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 82/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Tower 16 Replacement Description: This project will be an NFPA 1901 approved aerial device to replace the current Tower 16. The aerial apparatus will have a minimum 95ft aerial device on the apparatus. The aerial device will carry a large complement of ground ladders and other specialized tools for firefighting operations. The aerial device will be on a custom chassis and hold five firefighters. This apparatus order would be placed in FY 27 and delivered during FY29/30. The current fire apparatus construction market is seeing 24 to 48 months for completion of orders due to back logs from supply chain issues. This apparatus would incur annual maintenance and operation costs of$6,000 to $12,000 per year. The apparatus has a 15-year life expectancy as a front-line apparatus and then would serve as a reserve apparatus for the fleet. Capital Cost: $2,300,000 Justification: The current Tower 16 needs replacement as it has met the criteria set forth in the Frederick County Fire and Rescue Apparatus Replacement Plan. This plan addresses the age, mileage, engine hours, out of service time, and repair https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 83/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan costs over the life of the apparatus. The aerial apparatus serves many vital functions to a fireground and the citizens. This apparatus will allow for the immediate rescue of trapped individuals on upper floors. This apparatus will allow for the quick and safely delivered master streams to upper regions of a structure and to those structures that are too dangerous for our firefighters to enter due to the imminent threat of collapse. The apparatus also carries a large array of firefighter equipment to include but not limited to portable ground ladders, saws, ventilation fans, rope and rescue equipment, and salvage and overhaul equipment to protect property from further damage. The current apparatus needs replacement due to many factors that are addressed in the Fire and Rescue Apparatus Replacement Plan. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 84/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Station 17 Replacement Description: This would be a total replacement of the current Station 17. This project would require land acquisition, and a new 12,000 square foot station built on the site. The station would be moved due to the current stream that runs through the property and to allow for more efficient response times to the citizens. In FY 27 a site study would be completed to locate the best area for the station and then the acquisition of the land. The station design and build would not take place until after the FY 30. This station would incur the annual maintenance costs that we see at Station 15 and Station 21. Capital Cost: $1,500,000 Justification: The stations in the Frederick County Fire and Rescue System were evaluated by a contracted architect to evaluate each individual station's current condition and future needs. They looked at the living quarters to include sleeping areas, kitchens, shower and bathroom facilities. They also assessed the structural components of the buildings along, mechanical systems in the building, roof coverings, and the apron/parking areas. This project includes the recommendations of the architect and the system to meet future needs. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 85/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Station 17 Apparatus Replacements - Tanker and Ambulance 17-1 Tanker 17 Replacement https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 86/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Description: This project will be to purchase an NFPA 1901 compliant Tanker with a commercial cab to serve the district protected by Fire Station 17. This tanker would be a tandem axle commercial cab apparatus that would have a minimum of 2,500 gallons of water and a 1250 gallons per minute fire pump on the apparatus. This piece of apparatus serves the vital fire ground function of bringing water to the areas that are not served by fire hydrants for firefighting operations. The current tanker assigned to Station 17 has met the replacement requirements set forth by the Fire and Rescue Apparatus Replacement Plan. This apparatus order would be placed in FY 30 with construction on the vehicle would not be started until FY31 and delivered during FY32. The current fire apparatus construction market is seeing 18 to 24 months for completion of orders due to back logs from supply chain issues. This apparatus would incur annual maintenance and operation costs of$5,000 to $10,000 per year. The apparatus has a 15-year life expectancy as a front-line apparatus and then would serve as a reserve apparatus for the fleet. Capital Cost: $845,250 Justification: The current Tanker 17 needs replacement as it has met the criteria set forth in the Frederick County Fire and Rescue Apparatus Replacement Plan. This plan addresses the age, mileage, engine hours, out of service time, and repair costs over the life of the apparatus. This apparatus is a requirement in the rural setting of Frederick County to deliver water to the fire scene for extinguishment of the fire. Without this apparatus the ability to deliver enough water to the fire scene would be impossible. The current apparatus needs replacement due to many factors that are addressed in the Fire and Rescue Apparatus Replacement Plan. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 87/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Ambulance 17-1 Replacement Description: This project will be a Type I Custom Advanced Life Support Ambulance for station 17. This will be a four wheeled drive ambulance with Advance Life Support capabilities and equipment for the transport of acutely ill patients. This will be replacing their current Ambulance 17-1 that is need of replacement due to age and condition. This apparatus order would be placed in FY 29 with construction on the vehicle would not be started until FY30 and delivered during FY31. The current fire apparatus construction market is seeing 12 to 24 months for completion of orders due to back logs from supply chain issues. This apparatus would incur annual maintenance and operation costs of$4,000 to $7,000 per year. The apparatus has a 10-year life expectancy as a front-line apparatus and then would serve as a reserve apparatus for the fleet. Capital Cost: $575,000 Justification: The current Ambulance 17-1 needs replacement as it has met the criteria set forth in the Frederick County Fire and Rescue Apparatus Replacement Plan. This plan addresses https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 88/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan the age, mileage, engine hours, out of service time, and repair costs over the life of the apparatus. The largest portion of our emergency response for the Fire and the Rescue Department deals with emergency medical responses. Having a reliable and functional unit to treat our patients in and to safely transport them to the hospital is imperative for our operation. The current apparatus needs replacement due to many factors that are addressed in the Fire and Rescue Apparatus Replacement Plan. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 89/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Station 18 Apparatus Replacement - Ambulance 18-2 Description: This project will be a Type I Custom Advanced Life Support Ambulance for station 18. This will be a four wheeled drive ambulance with Advance Life Support capabilities and equipment for the transport of acutely ill patients. This will be replacing their current Ambulance 18-2 that is need of replacement due to age and condition. This apparatus order would be placed in FY 29 with construction on the vehicle would not be started until FY30 and delivered during FY31. The current fire apparatus construction market is seeing 12 to 24 months for completion of orders due to back logs from supply chain issues. This apparatus would incur annual maintenance and operation costs of$4,000 to $7,000 per year. The apparatus has a 10-year life expectancy as a front-line apparatus and then would serve as a reserve apparatus for the fleet. Capital Cost: $575,000 Justification: The current Ambulance 18-2 needs replacement as it has met the criteria set forth in the Frederick County Fire and Rescue Apparatus Replacement Plan. This plan addresses the age, mileage, engine hours, out of service time, and repair costs over the life of the apparatus. The largest portion of our emergency response for the Fire and the Rescue Department deals with emergency medical responses. Having a reliable and functional unit to treat our patients in and to safely transport them to the hospital is imperative for our operation. The current apparatus needs replacement due to many factors https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 90/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan that are addressed in the Fire and Rescue Apparatus Replacement Plan. Powered by Esri Station 19 Renovation https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 91/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Description: This project will include the construction of two additions. The first addition would be for new modern apparatus bays to house the apparatus. This station is limited to the apparatus that can be bought or station there due to the height of the bay doors and the length of the station. The second addition would be to address additional living quarters to assist with the future planned increase in staffing needed at the station. This project would go to design and construction in FY 28. Capital Cost: $1,700,500 Justification: The stations in the Frederick County Fire and Rescue System were evaluated by a contracted architect to evaluate each individual station's current condition and future needs. They looked at the living quarters to include sleeping areas, kitchens, shower and bathroom facilities. They also assessed the structural components of the buildings along, mechanical systems in the building, roof coverings, and the apron/parking areas. This project includes the recommendations of the architect and the system to meet future needs. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 92/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Station 19 Apparatus Replacements - Tanker, Ambulance 19-1, Attack, and Brush Tanker 19 Replacement Description: This project will be to purchase an NFPA 1901 compliant Tanker with a commercial cab to serve the district protected by Fire Station 19. This tanker would be a tandem axle commercial cab apparatus that would have a minimum of 2,500 gallons of water and a 1,250 gallons per minute fire pump on the apparatus. This piece of apparatus serves the vital fire ground function of bringing water to the areas that are not served by fire hydrants for firefighting operations. The current tanker assigned to Station 19 has met the replacement requirements set forth by the Fire and Rescue Apparatus Replacement Plan. This apparatus order would be placed in FY 26 with construction on the vehicle would not be started until FY27 and delivered during FY28. The current fire apparatus construction market is seeing 18 to 24 months for https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 93/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan completion of orders due to back logs from supply chain issues. This apparatus would incur annual maintenance and operation costs of$5,000 to $10,000 per year. The apparatus has a 15-year life expectancy as a front-line apparatus and then would serve as a reserve apparatus for the fleet. Capital Cost: $700,000 Justification: The current Tanker 19 needs replacement as it has met the criteria set forth in the Frederick County Fire and Rescue Apparatus Replacement Plan. This plan addresses the age, mileage, engine hours, out of service time, and repair costs over the life of the apparatus. This apparatus is a requirement in the rural setting of Frederick County to deliver water to the fire scene for extinguishment of the fire. Without this apparatus the ability to deliver enough water to the fire scene would be impossible. The current apparatus needs replacement due to many factors that are addressed in the Fire and Rescue Apparatus Replacement Plan. Ambulance 19-1 Replacement https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 94/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Description: This project will be a Type I Custom Advanced Life Support Ambulance for station 19. This will be a four wheeled drive ambulance with Advance Life Support capabilities and equipment for the transport of acutely ill patients. This will be replacing their current Ambulance 19-1 that is need of replacement due to age and condition. This apparatus order would be placed in FY 27 with construction on the vehicle would not be started until FY28 and delivered during FY29. The current fire apparatus construction market is seeing 18 to 24 months for completion of orders due to back logs from supply chain issues. This apparatus would incur annual maintenance and operation costs of$4,000 to $7,000 per year. The apparatus has a 10-year life expectancy as a front-line apparatus and then would serve as a reserve apparatus for the fleet. Capital Cost: $525,000 Justification: The current Ambulance 19-1 needs replacement as it has met the criteria set forth in the Frederick County Fire and Rescue Apparatus Replacement Plan. This plan addresses the age, mileage, engine hours, out of service time, and repair costs over the life of the apparatus. The largest portion of our emergency response for the Fire and the Rescue Department deals with emergency medical responses. Having a reliable and functional unit to treat our patients in and to safely transport them to the hospital is imperative for our operation. The current apparatus needs replacement due to many factors that are addressed in the Fire and Rescue Apparatus Replacement Plan. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 95/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Attack 19 Replacement Description: This project will be a NFPA 1901 approved Wildland Urban Interface Vehicle. This vehicle will serve a special purpose in the fire and rescue system. This apparatus will be constructed on a commercial single axle vehicle with four-wheel drive capabilities. This apparatus will have a minimum 1000gpm pump with a minimum of 500 gallons of water and a class A foam system for fire suppression efforts. This apparatus will also carry the standard structural and wildland firefighting equipment to include fire hose, ladders, hand tools, and saws. This apparatus will be specially designed to respond to structural incidents and wildland incidents. The Fire and Rescue system has many areas across the county that is not easily accessible to regular fire apparatus. This apparatus will allow us a quicker and more efficient response to these incidents. These apparatuses also become very important during inclement weather. This apparatus order would be placed in FY 27 with construction on the vehicle would not be started until FY29 and delivered during FY30. The current fire apparatus construction market is seeing 24 to 36 months for completion of orders due to back logs from supply chain and pandemic issues. This apparatus https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 96/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan would incur annual maintenance and operation costs of $5,000 to $8,000 per year. The apparatus has a 20-year life expectancy as a front-line apparatus and then would serve as a reserve apparatus for the fleet. Capital Cost: $735,000 Justification: The current Attack 19 has met its life expectancy and beyond due to the requirements set forth by the Frederick County Fire and Rescue Apparatus Replacement Program. This special apparatus would allow for a prompt, efficient response to fires that occur in the remote access areas. A large majority of our stations west of Rt. 37 are in these areas. The normal larger fire apparatus will either not make it in these areas or are very limited in the ability to function in these areas. Currently the needs are addressed by "Attack Trucks". These apparatuses have served a purpose over the years in Frederick County, but today have outlived their usefulness for many reasons but mainly of size of pump and water capacity and equipment storage needs. Today's fires burn a faster and hotter rate than the fires of the 70's and 80's when these current apparatuses were built. This requires more water and pump capacity of our units. Frederick County has many subdivisions that have been identified by the Virginia Department of Forestry as extreme potential of a wildland urban interface incidents. This is when a wildland fire leads to the spread of the fire to multiple structures and typically results in catastrophic property loss and can lead to many fatalities as well. With this apparatus it will allow our crews to be better equipped to combat these fires to help prevent catastrophic loss of property and life. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 97/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Brush 19 Replacement Description: This project will be a NFPA 1901 approved Brush Unit. This vehicle will serve a special purpose in the fire and rescue system. This apparatus will be constructed on a standard single axle vehicle with four-wheel drive capabilities. This apparatus will have a minimum 75gpm pump with a minimum of 100 gallons of water and a class A foam system for fire suppression efforts. This apparatus will be specially designed to respond to wildland incidents. The Fire and Rescue system has many areas across the county that is not easily accessible to regular fire apparatus. This apparatus will allow us a quicker and more efficient response to these incidents. This apparatus order would be placed in FY 29 with construction on the vehicle would be started in FY28 and delivered either by FY 29/30. This apparatus would incur annual maintenance and operation costs of$2,000 to $4,000 per year. The apparatus has a 20-year life expectancy as a front-line apparatus and then would serve as a reserve apparatus for the fleet. Capital Cost: $236,250 https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 98/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Justification: The current Brush 19 has met its life expectancy according to the Frederick County Fire and Rescue Apparatus Replacement Program. This special apparatus would allow for a prompt, efficient response to fires that occur in the remote access areas. Frederick County has many subdivisions that have been identified by the Virginia Department of Forestry as extreme potential of wildland urban interface incidents. This is when a wildland fire leads to the spread of the fire to multiple structures and typically results in catastrophic property loss and can lead to many fatalities as well. With this apparatus it will allow our crews to be better equipped to combat these fires to help prevent catastrophic loss of property and life. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 99/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Station 20 Renovation Description: This project would be an addition for living quarters. This will expand on the kitchen area, showers/bathrooms, locker rooms and sleeping areas. The project will also address the replacement of the entire roof covering on the existing station. This project would be started in FY 30 with design and construction. Capital Cost: $1,005,000 Justification: The stations in the Frederick County Fire and Rescue System were evaluated by a contracted architect to evaluate each individual station's current condition and future needs. They looked at the living quarters to include sleeping areas, kitchens, shower and bathroom facilities. They also assessed the structural components of the buildings along, mechanical systems in the building, roof coverings, and the apron/parking areas. This project includes the recommendations of the architect and the system to meet future needs. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 100/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Station 20 Apparatus Replacements - Tanker, Ambulance 20-2, Rescue Squad, and Brush Tanker 20 Replacement https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 101/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Description: This project will be to purchase an NFPA 1901 compliant Tanker with a commercial cab to serve the district protected by Fire Station 20. This tanker would be a tandem axle commercial cab apparatus that would have a minimum of 2,500 gallons of water and a 1250 gallons per minute fire pump on the apparatus. This piece of apparatus serves the vital fire ground function of bringing water to the areas that are not served by fire hydrants for firefighting operations. The current tanker assigned to Station 20 has met the replacement requirements set forth by the Fire and Rescue Apparatus Replacement Plan. This apparatus order would be placed in FY 29 with construction on the vehicle would not be started until FY30 and delivered during FY31. The current fire apparatus construction market is seeing 18 to 24 months for completion of orders due to back logs from supply chain issues. This apparatus would incur annual maintenance and operation costs of$5,000 to $10,000 per year. The apparatus has a 15-year life expectancy as a front-line apparatus and then would serve as a reserve apparatus for the fleet. Capital Cost: $805,000 Justification: The current Tanker 20 needs replacement as it has met the criteria set forth in the Frederick County Fire and Rescue Apparatus Replacement Plan. This plan addresses the age, mileage, engine hours, out of service time, and repair costs over the life of the apparatus. This apparatus is a requirement in the rural setting of Frederick County to deliver water to the fire scene for extinguishment of the fire. Without this apparatus the ability to deliver enough water to the fire scene would be impossible. The current apparatus needs replacement due to many factors that are addressed in the Fire and Rescue Apparatus Replacement Plan. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 102/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Ambulance 20-2 Replacement Description: This project will be a Type I Custom Advanced Life Support Ambulance for station 20. This will be a four wheeled drive ambulance with Advance Life Support capabilities and equipment for the transport of acutely ill patients. This will be replacing their current Ambulance 20-2 that is need of replacement due to age and condition. This apparatus order would be placed in FY 27 with construction on the vehicle would not be started until FY28 and delivered during FY29. The current fire apparatus construction market is seeing 12 to 24 months for completion of orders due to back logs from supply chain issues. This apparatus would incur annual maintenance and operation costs of$4,000 to $7,000 per year. The apparatus has a 10-year life expectancy as a front-line apparatus and then would serve as a reserve apparatus for the fleet. Capital Cost: $525,000 Justification: The current Ambulance 20-2 needs replacement as it has met the criteria set forth in the Frederick County Fire and Rescue Apparatus Replacement Plan. This plan addresses https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 103/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan the age, mileage, engine hours, out of service time, and repair costs over the life of the apparatus. The largest portion of our emergency response for the Fire and the Rescue Department deals with emergency medical responses. Having a reliable and functional unit to treat our patients in and to safely transport them to the hospital is imperative for our operation. The current apparatus needs replacement due to many factors that are addressed in the Fire and Rescue Apparatus Replacement Plan. Rescue Squad 20 Replacement Description: This project will be a NFPA 1901 approved rescue engine to replace the current Rescue Engine 20. The rescue squad will carry a large compliment specialized rescue tools for vehicle extrication, technical rescues, hazardous materials equipment, and specialized tools for firefighting operations. This apparatus order would be placed in FY 28 with construction on the vehicle would not be started until FY30 and delivered during FY31. The current fire apparatus construction market is seeing 18 to 24 months for completion of orders due to back logs from supply chain and pandemic issues. This apparatus would incur annual maintenance and https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 104/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan operation costs of$6,000 to $12,000 per year. The apparatus has a 15-year life expectancy as a front-line apparatus and then would serve as a reserve apparatus for the fleet. Capital Cost: $1,500,000 Justification: The current Rescue Engine 20 needs replacement as it has met the criteria set forth in the Frederick County Fire and Rescue Apparatus Replacement Plan. This plan addresses the age, mileage, engine hours, out of service time, and repair costs over the life of the apparatus. The rescue engine serves a unique and specialized function in the fire service as it brings a multitude of equipment for specialized rescues. The tools that are carried by this apparatus are vital to the many operations that we conduct every day. This apparatus meets the replacement needs that are set forth in the Fire and Rescue Replacement plan. Brush 20 Replacement Description: This project will be a NFPA 1901 approved Brush Unit. This vehicle will serve a special purpose in the fire and rescue system. This apparatus will be constructed on a https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 105/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan standard single axle vehicle with four-wheel drive capabilities. This apparatus will have a minimum 75gpm pump with a minimum of 100 gallons of water and a class A foam system for fire suppression efforts. This apparatus will be specially designed to respond to wildland incidents. The Fire and Rescue system has many areas across the county that is not easily accessible to regular fire apparatus. This apparatus will allow us a quicker and more efficient response to these incidents. This apparatus order would be placed in FY 29 with construction on the vehicle would be started in FY29 and delivered either by FY 29/30. This apparatus would incur annual maintenance and operation costs of$2,000 to $4,000 per year. The apparatus has a 20-year life expectancy as a front-line apparatus and then would serve as a reserve apparatus for the fleet. Capital Cost: $236,250 Justification: The current Brush 20 has met its life expectancy as set forth by the Frederick County Fire and Rescue Apparatus replacement program. This special apparatus would allow for a prompt, efficient response to fires that occur in the remote access areas. Frederick County has many subdivisions that have been identified by the Virginia Department of Forestry as extreme potential of wildland urban interface incidents. This is when a wildland fire leads to the spread of the fire to multiple structures and typically results in catastrophic property loss and can lead to many fatalities as well. With this apparatus it will allow our crews to be better equipped to combat these fires to help prevent catastrophic loss of property and life. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 106/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Station 21 Apparatus Replacements - Engine, Ambulance 21-1, Rescue Squad Engine 21 Replacement https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 107/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Description: This project will be a NFPA 1901 approved fire Engine to be placed in Station 22. The fire engine will be a custom-built fire engine on a single axle with the minimum fire pump of 1,500 gpm and 750 gallons of water. This fire engine will be designed to hold five firefighters and be equipped with a class A foam system along with many other firefighting tools and equipment. This apparatus order would be placed in FY 26 with construction on the vehicle would not be started until FY28 and delivered during FY29. The current fire apparatus construction market is seeing 24 to 40 months for completion of orders due to back logs from supply chains. The anticipated maintenance and operation costs is $5,000 to $10,000 per year. The life expectancy for this apparatus is for 15 years as front line service and then would be moved the reserve fleet. Capital Cost: $1,200,000 Justification: The current Engine 21 needs replacement as it has met the criteria set forth in the Frederick County Fire and Rescue Apparatus Replacement Plan. This plan addresses the age, mileage, engine hours, out of service time, and repair costs over the life of the apparatus. This apparatus is the backbone of the emergency response system to provide firefighting capabilities to the citizens of the County. Without this apparatus the ability to deliver fire protection will be greatly hampered. The current apparatus is need of replacement due to many factors that is addressed in the Fire and Rescue Apparatus Replacement Plan. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 108/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Ambulance 21-1 Replacement Description: This project will be a Type I Custom Advanced Life Support Ambulance for station 21. This will be a four wheeled drive ambulance with Advance Life Support capabilities and equipment for the transport of acutely ill patients. This will be replacing their current Ambulance 21-1 that is need of replacement due to age and condition. This apparatus order would be placed in FY 28 with construction on the vehicle would not be started until FY29 and delivered during FY30. The current fire apparatus construction market is seeing 12 to 24 months for completion of orders due to back logs from supply chain issues. This apparatus would incur annual maintenance and operation costs of$4,000 to $7,000 per year. The apparatus has a 10-year life expectancy as a front-line apparatus and then would serve as a reserve apparatus for the fleet. Capital Cost: $550,000 Justification: The current Ambulance 21-1 needs replacement as it has met the criteria set forth in the Frederick County Fire and Rescue Apparatus Replacement Plan. This plan addresses https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 109/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan the age, mileage, engine hours, out of service time, and repair costs over the life of the apparatus. The largest portion of our emergency response for the Fire and the Rescue Department deals with emergency medical responses. Having a reliable and functional unit to treat our patients in and to safely transport them to the hospital is imperative for our operation. The current apparatus needs replacement due to many factors that are addressed in the Fire and Rescue Apparatus Replacement Plan. Rescue Squad 21 Replacement Description: This project will be a NFPA 1901 approved rescue squad to replace the current Rescue Squad 21. The rescue will carry a large compliment specialized rescue tools for vehicle extrication, technical rescues, hazardous materials equipment, and specialized tools for firefighting operations. This apparatus order would be placed in FY 27 with construction on the vehicle would not be started until FY29 and delivered during FY23. The current fire apparatus construction market is seeing 24 to 36 months for completion of orders due to back logs from supply chain and pandemic issues. This apparatus would incur annual maintenance and https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 110/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan operation costs of$6,000 to $12,000 per year. The apparatus has a 15-year life expectancy as a front-line apparatus and then would serve as a reserve apparatus for the fleet. Capital Cost: $1,500,000 Justification: The current Rescue Squad 21 needs replacement as it has met the criteria set forth in the Frederick County Fire and Rescue Apparatus Replacement Plan. This plan addresses the age, mileage, engine hours, out of service time, and repair costs over the life of the apparatus. The rescue squad serves a unique and specialized function in the fire service as it brings a multitude of equipment for specialized rescues. The tools that are carried by this apparatus are vital to the many operations that we conduct every day. This apparatus meets the replacement needs that are set forth in the Fire and Rescue Replacement plan. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 111/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri New Station 22 Description: Fire Station 22 will be a three-bay drive through fire station that will house upon opening an Engine, Ambulance, and Tanker. It will also allow for the expansion of apparatus to include brush fire apparatus and other potential needed apparatus for the area as growth will determine. The fire station will provide 24-hour coverage and will require living quarters for up to 12 firefighters. The living quarters will provide a physical training area, laundry/decontamination facilities, kitchen/dining areas, private sleeping quarters, locker room, bathroom, and office areas. The fire station will also include designed areas and props for training inside and outside of the fire station. The fire and rescue department is currently working on a location feasibility study for station 22. Once this is completed by early 2023 the next phase would be the acquisition of the land (if necessary) where the study indicates the county would best improve response times and coverage with the placement of the new fire station. In 2024 the plan would be to secure an architect to design a fire station for the area with a start of construction in the winter of 24/25. This would put the construction completed in the 2027-time frame. The station will incur yearly maintenance cost for up keep of the station https://storymaps.arcgis.com/stories/3ael 81 f0fa574e37b2b459b21 df7da8f/print 112/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan and for utilities. The estimated life expectancy for the station is 50 to 75 years. Capital Cost: $7,500,000 Justification: This station will serve the Route 522/Route 277 area of Frederick County. This area of the county has seen rapid growth in the past five years. The travel distance from the closest county fire station is greater than the current recommended time and distance models from the Insurance Services Office (ISO), the National Fire Protection Association (NFPA) and other accepted fire department and emergency medical standards. The purpose of this station is to decrease the travel time it takes to get to the citizens of Frederick County in that area. This station would provide timely service to the citizens of Frederick County in the southeastern region of the county. With every minute of delay in structural fires, it allows the fire to more than double in size. With the construction features used today this will lead to total loss fire with high potential loss of life as well for the public and the crews operating at the incident. With emergency medical response every second is valuable time when treating highly acute patients with strokes, heart attacks, and other severe medical conditions. Every second that the patient is left not treated leaves irreversible damage to the patient. This fire station will allow for those times to be reduced significantly. https://storymaps.arcgis.com/stories/3ael 81 f0fa574e37b2b459b21 df7da8f/print 113/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri New Station 22 Apparatus - Engine 22 Description: This project will be a National Fire Protection Association (NFPA) 1901 approved fire Engine to be placed in Station 22. The fire engine will be a custom-built fire engine https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 114/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan on a single axle with the minimum fire pump of 1,500 gpm and 750 gallons of water. This fire engine will be designed to hold five firefighters and be equipped with a class A foam system along with many other firefighting tools and equipment. This apparatus order would be placed in FY 24 with construction on the vehicle would not be started until FY25 and delivered during FY27. The current fire apparatus construction market is seeing 18 to 24 months for completion of orders due to back logs from supply chain and pandemic issues. The Engine will incur yearly maintenance cost for servicing that can range $3,000.00 to $7,000.00 a year. The apparatus plan for the Fire and Rescue Department has this apparatus lasting 15 years as a first line apparatus. The Engine would then be moved to reserve status for couple years prior to being sold. Capital Cost: $20,785 Justification: This station will serve the Route 522/Route 277 area of Frederick County. This area of the county has seen rapid growth in the past five years. The travel distance from the closest county fire station is greater than the current recommended time and distance models from ISO, NFPA and other accepted fire department and greater than the current recommended time and distance models from ISO, NFPA and other accepted fire department and emergency medical standards. The purpose of this station is to decrease the travel time it takes to get to the citizens of Frederick County in that area. https://storymaps.arcgis.com/stories/3ael 81 f0fa574e37b2b459b21 df7da8f/print 115/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri New Station 23 Description: Fire Station 23 will be a three-bay drive through fire station that will house upon opening an Engine, Ambulance. It will also allow for the expansion of apparatus https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 116/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan to include brush fire apparatus and other potentially needed apparatus for the area as growth will determine. The fire station will provide 24-hour coverage and will require living quarters for up to 12 firefighters. The living quarters will provide a physical training area, laundry/decontamination facilities, kitchen/dining areas, private sleeping quarters, locker room, bathroom, and office areas. The fire station will also include designed areas and props for training inside and outside of the fire station. The future location of the fire station will be determined by utilization of time and distance travel models for the population densities of the area. In the FY 26 budget year we would pursue the purchase of land in this area. The design and construction of the station will not take place until after FY 30. The availability of land in this area is becoming more difficult due to growth in the area. This station will incur the annual maintenance cost that Station 15 and Station 21 currently experience. It is estimated that this building life span is 50 to 75 years. Capital Cost: $1,500,000 Justification: This station will serve the Fort Collier area of Frederick County. This area of the county has seen rapid growth in the past five years. The travel distance from the closest county fire station is greater than the current recommended time and distance models from ISO, NFPA and other accepted fire department and emergency medical standards. The purpose of this station is to decrease the travel time it takes to get to the citizens of Frederick County in that area. This station would provide timely and cost-effective service to the citizens of Frederick County in the northwest region of the county just about the City of Winchester line. Every minute of delay in structural fires allows the fire to more than double in size. With the construction features used today this will lead to total loss fire with high potential of loss of life as well for the public and the crews operating at the incident. With emergency medical response every second is https://storymaps.arcgis.com/stories/3ael 81 f0fa574e37b2b459b21 df7da8f/print 117/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan valuable time when treating highly acute patients with strokes, heart attacks, and other severe medical conditions. Every second that the patient is left not treated leaves irreversible damage to the patient. This fire station will allow for those times to be reduced significantly. Public Safety Building https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 118/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Sheriff's Office Project *Note:All locations are approximate 0 Commonwealth of Virginia, Maxar 1,000 ft i I Powered by Esri Pole Barn Storage Building Description: Approximately 4,500 SF pole barn for storage of specialty vehicles and equipment. Capital Cost: $200,000 Justification: The storage pole barn would help maintain the quality of the vehicles and equipment by protecting them from sunlight and other extreme weather conditions when not in use. https://storymaps.arcgis.com/stories/3ael 81 f0fa574e37b2b459b21 df7da8f/print 119/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Communications Project https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 120/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan 0 Powered by Esri Project 25 Public Safety Radio Network Description: Purchase, construction, and deployment of Association of Public-Safety Communications Officials (APCO) Project 25 (P25) radio communications system will support mission-critical public safety communications within the County. This system will provide radio and paging communications for the Frederick County Sheriff's Department, Frederick County Fire & Rescue, volunteer fire & rescue companies, and the Department of Public Safety Communications. Frederick County's current public safety radio system was originally designed as a mobile-only Public Works system approximately 40 years ago. Since that time, law enforcement, fire and emergency medical services have expanded and in the late 1980s to early 1990s, the system was designated as the County's public safety radio system; however, the system was not redesigned for public safety use. The new radio system will be P25 compliant and will replace the existing radio system. P25 is the current standard developed and accepted by the Department of Homeland Security to ensure emergency radio systems and equipment are capable of interoperability of emergency communications https://storymaps.arcgis.com/stories/3ael 81 f0fa574e37b2b459b21 df7da8f/print 121/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan between local, state, and federal public safety professionals. The County's existing public safety radio system does not meet the P25 standard. The new radio system will be a 10-site configured as a single simulcast cell providing coverage to the service areas and operating conditions for Frederick County, Winchester, and the I-81 corridor. Nine sites will be located within Frederick County and one site will be co-located in Shenandoah County. Capital Cost: $10,003,717 Justification: The County's public safety radio system today consists primarily of conventional very-high frequency (VHF) repeaters, base stations and voted receivers operating from six sites within the county. All repeaters operate in the narrowband analog mode. With each repeater operation on a separate conventional frequency, users must switch channels manually to access the appropriate repeater depending on their location within the county. The currently exists a lack of radio coverage and unreliable performance in many areas within the County. The existing radio system's design is insufficient to provide reliable public-safety-grade performance. Performance on the existing system can vary for different functional users (e.g. law enforcement or fire) depending on the location, frequency, and radio site with which they are affiliated. In addition, the system design includes single points of failure that can leave emergency responders with no reliable way to be dispatched or to communicate for an extended period of time, if a failure occurs. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 122/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Construction of Crossover Boulevard https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 123/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Transportation Committee Projects *Note:All locations are approximate Powered by Esri Exit 313 Bridge Replacement and Capacity Improvements Description: Replace the structurally deficient bridge at Exit 313 and add limited capacity improvements. Capital Cost: $63,353,000 Justification: The bridge on Route 17/50/522 (Millwood Pike) over Interstate 81 at Exit 313 is reaching the end of its service life and needs to be replaced. The new bridge will feature design elements that will accommodate future improvements to the Route 17/50/522 corridor and future improvements to I- https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 124/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan 81. The interchange configuration will not change with this project. by Powered by Esri https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 125/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Route 277 Right Turn Lane Extension at Warrior Drive Description: Extend right-turn lane for eastbound Route 277 at the intersection of Route 277 and Warrior Drive. Installation of sidewalk for pedestrian safety and installation of pedestrian pedestal. Capital Cost: $570,000 Justification: This improvement would be a significant safety upgrade to this intersection. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 126/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Commonwealth of Virginia, Maxar Powered by Esri Route 7 STARS Study Improvements Description: Strategically Targeted Affordable Roadway Solutions (STARS) Study to analyze consolidation of turning movements at Blossom Drive/Millbrook Drive and Route 7 as well as First Woods Drive/Greenwood Road and Route 7 to reduce conflicts and improve efficiency. Capital Cost: $1,238,000 Justification: The study will provide insight as to the best ways to significantly improve safety at these intersections. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 127/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Exit 317 Interchange Ramp Realignment Description: Relocate the existing northbound exit ramp at I- 81 Exit 317 and Route 11 to the current location of the Redbud Road intersection. This project will include turn lane upgrades on to the exit ramp from Route 11 North to I-81 northbound and removal of the signal that will be made redundant by the realignment. NOTE: VDOT is combining this project with the Exit 317 Interchange upgrade and will be completing as 1 project. Capital Cost: $6,944,000 Justification: This improvement will upgrade traffic flow and safety through the interchange area. https://storymaps.arcgis.com/stories/3ael 81 f0fa574e37b2b459b21 df7da8f/print 128/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Route 11 at Old Charlestown Road Roundabout Description: Upgrade the temporary signal that is currently in place to the roundabout design that VDOT has identified for this intersection. https://storymaps.arcgis.com/stories/3ael 81 f0fa574e37b2b459b21 df7da8f/print 129/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Capital Cost: $6,357,000 Justification: This improvement will improve traffic flow and safety at this intersection while minimizing the impact to traffic throughout north and south on Route 11. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 130/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Redbud Road Realignment Description: The funding of the Exit 317 ramp realignment makes this realignment critical for trips that currently use Redbud Road, which total nearly 3,000 vehicles per day. VDOT requires the Redbud Road realignment in order for the Exit 317 interchange ramp realignment to move forward. Capital Cost: $5,988,146 Justification: This project is required to be underway in conjunction with or prior to the Exit 317 ramp realignment. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 131/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Gainesboro Road at Route 522 Intersection Upgrade Description: This project seeks to upgrade the entrance points into Frederick County Middle School and Gainesboro Elementary School where they access the state road system and improve the intersection of Gainesboro Road and Route 522 to accommodate the traffic shift that will be involved as the schools relocate their primary access point to Gainesboro Road. Capital Cost: $7,100,000 Justification: This project will improve the safety of traffic in the vicinity of the schools as well as school traffic itself. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 132/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Exit 317 Interchange Upgrade Description: This project seeks to upgrade the existing interchange configuration from a traditional diamond interchange to a diverging diamond interchange. This project https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 133/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan will work in coordination with the Exit 317 interchange ramp realignment and the Redbud Road realignment projects for the overall upgrades to the operations of Exit 317. NOTE: VDOT has combined this project with the Exit 317 NB Ramp realignment project so this will be done concurrently. Capital Cost: $37,590,000 Justification: This project will improve safety and improve overall traffic flow through increased capacity and reduced conflicts with left turning traffic accessing the interchange. https://storymaps.arcgis.com/stories/3ael 81 f0fa574e37b2b459b21 df7da8f/print 134/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Route 522 and Costello Drive Intersection Upgrade Description: This project will implement a double left turn onto Costello Drive from Route 522 southbound as well as reduce conflicting movements from the hotel at that intersection. Capital Cost: $6,673,000 Justification: This project will increase capacity, reduce backups, and improve safety. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 135/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Warrior Drive Pedestrian Upgrades Description: Add pedestrian accommodations for approximately 0.76 miles along Warrior Drive. Funding to come from VDOT Transportation Alternatives Program (TAP). Capital Cost: $1,798,128 Justification: This project will significantly increase connectivity in the area by filling in key gaps. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 136/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Valley Mill Road Pedestrian Upgrades Description: Add pedestrian accommodations along Valley Mill Road for approximately 0.11 miles. Funding to come from VDOT Transportation Alternatives Program (TAP). https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 137/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Capital Cost: $739,697 Justification: This project will significantly increase connectivity in the area by filling in key gaps. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 138/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Inverlee Way Pedestrian Upgrades Description: Add pedestrian accommodations along Inverlee Way for approximately 0.15 miles from Millwood Pike to Kinross Drive. Funding to come from VDOT Transportation Alternatives Program (TAP). Capital Cost: $572,172 Justification: This project will significantly increase connectivity in the area by filling in key gaps. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 139/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Route 11 S Widening & Intersection Improvements from Winchester City Limits to Opequon Church Lane Description: This project includes widening of Route 11 South from the Winchester City Limits to Opequon Church Lane along with intersection improvements. This project will facilitate easier flow of traffic through a congested area and increase the efficiency of intersections to prevent backups. NOTE: Staff intends, with Board approval, to submit an additional revenue sharing application to seek more state funds in the summer of 2025. Capital Cost: $4,717,951 Justification: This project would reduce delays and congestion on Route 11, which is a heavily traveled North- South corridor. https://storymaps.arcgis.com/stories/3ael 81 f0fa574e37b2b459b21 df7da8f/print 140/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Warrior Drive Extension (South) including Brandy Lane Upgrade Description: The Warrior Drive extension would add a north- south connection in the vicinity of Sherando High School and https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 141/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan provide upgrades to Brandy Lane. NOTE: Staff intends, with Board approval, to submit an additional revenue sharing application to seek more State funds in the summer of 2025. Capital Cost: $6,515,527 Justification: This project would provide a key connection between the residential areas east of Stephens City to the existing Warrior Drive segment. https://storymaps.arcgis.com/stories/3ael 81 f0fa574e37b2b459b21 df7da8f/print 142/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Hopewell Road and Brucetown Road Realignment Description: This project would align Hopewell Road and Brucetown Road to intersect with each other at Route 11. Capital Cost: $10,000,000 Justification: Hopewell Road and Brucetown Road intersect at Route 11 and are currently offset by roughly 150', which creates significant safety challenges at the intersection as well as slows down the movement of vehicles. Aligning these two roads would greatly improve the operational efficiency of the intersection and mitigate safety concerns. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 143/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Construction of New Airport Terminal Winchester Regional Airport Projects *Note:All locations are approximate https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 144/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Taxiway "A" Relocation Description: This project will relocate taxiway "A" (approximately 5,500' long by 35' wide) within airport owned property to help achieve the overall goal to meet Federal Aviation Administration (FAA) airport standards for weather minimums and airport design criteria. Capital Cost: $28,000,000 Justification: This project would bring the airport into compliance with current design standards for runway/taxiway separation distances, thereby enhancing the safety of airport operations. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 145/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Northside Site Prep Description: This project involves site preparation for roughly 30 acres of land approved for aeronautical use. Capital Cost: $1,800,000 Justification: The approved Airport Master Plan designates this area for development. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 146/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri BIL Eligible Projects Description: The funds will be used to support development projects on the airport's approved master plan, including an environmental assessment, taxiway lighting, and other https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 147/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan applications. Capital Cost: $1,180,000 Justification: The Bipartisan Infrastructure Law (BIL) provides funding to public airports that must be fully allocated within a 5-year period. https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 148/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Master Plan Update Description: The Master Plan update will include future development, aviation forecasts, community impact, and needs assessment. The airport Master Plan was last updated in 2005. Capital Cost: $800,000 Justification: The Master Plan update will ensure continued compliance with the Comprehensive Plan, Regional Development Plans, and the Statewide Aviation System Plan. The Master Plan includes an approved Airport Layout Plan (ALP), which is a requirement under the Federal Aviation Administration's Airport Improvement Program (AIP). https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 149/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan Powered by Esri Runway 14/32 Rehabilitation Description: This project includes the asphalt rehabilitation for the airport's sole 5,500' x 100' runway. The project will likely entail a mill and overlay of the entire surface. Runway was last rehabilitated in 2011. Work will be programmed over two years to include a design phase and construction phase. Routine operation &maintenance will be akin to other airport pavements. Asphalt runways typically have useful life around 20 years. Capital Cost: $600,000 Justification: The project ensures runway is rehabilitated prior to reaching the end of its useful life. Federal Grant Assurance #19 Operations and Maintenance, states in part, "The airport and all facilities which are necessary to serve the aeronautical users of the airport, other than facilities owned or controlled by the United States, shall be operated at all times in a safe and serviceable condition and in accordance with the minimum standards as may be required or prescribed by applicable Federal, state, and local agencies for maintenance and operation." The project also helps mitigate the possibility of a catastrophic failure and also ensures the https://storymaps.arcgis.com/stories/3ael 81 f0fa574e37b2b459b21 df7da8f/print 150/151 1/8/25,9:05AM 2025-2030 Capital Improvement Plan viability of a critical transportation asset for all aircraft served by the airport. Story map produced by Frederick County Department of Planning and Development Created November 2024 www.fcva.us https://storymaps.arcgis.com/stories/3ael 81 fOfa574e37b2b459b21 df7da8f/print 151/151