Loading...
HomeMy WebLinkAboutPCWorkSessionAgenda2024February215:45 PM Work Session Call to Order Discussion Item(s) Rezoning #06-23 of Winchester Gateway, LLC Submitted to rezone +/- 34.26-acres of a +/- 71.85-acre parcel from the RA (Rural Areas) District to the M1 (Light Industrial) District with proffers. The property is located at the intersection of Apple Valley Road (Route 652) and Middle Road (Route 628) and is bounded by Route 37 to the west and is identified by Property Identification Number (PIN) 63-A-80I in the Back Creek Magisterial District. Adjourn to Regular Meeting AGENDA PLANNING COMMISSION WEDNESDAY, FEBRUARY 21, 2024 5:45 PM PURPLE ROOM FREDERICK COUNTY ADMINISTRATION BUILDING WINCHESTER, VIRGINIA PC02-21-24ApplicationBriefing_REZ06-23 _Redacted.pdf 1 Planning Commission Agenda Item Detail Meeting Date: February 21, 2024 Agenda Section: Discussion Item(s) Title: Rezoning #06-23 of Winchester Gateway, LLC Attachments: PC02-21-24ApplicationBriefing_REZ06-23 _Redacted.pdf 2 COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 MEMORANDUM TO: Frederick County Planning Commission FROM: Department of Planning & Development Staff SUBJECT: REZ #06-23 – Winchester Gateway, LLC. (work session) DATE: February 13, 2024 Introduction: This work session memo provides a summary of previous Planning Commission discussions from the public hearing on January 3, 2024, and includes additional information submitted by the applicant’s representative in response to Planning Commission comments for REZ #06-23 – Winchester Gateway, LLC. This proposal seeks to rezone +/- 34.26-acres of a +/-71.85-acre parcel from the RA (Rural Areas) District to the M1 (Light Industrial) District with proffers. Planning Commission Summary and Action from January 3, 2024, Meeting: The Planning Commission held a public hearing on January 3, 2024. The Planning Commissioners expressed several concerns with the proposed rezoning and directed the applicant to come back with a revised application. The applicant was to address: design and architectural standards for buildings, including specifying the type of building materials and limiting the height of all structures to 60-feet (FT); clarifying which M1 (Light Industrial) Zoning District uses would be allowed and proffering out uses that would have a detrimental impact on adjoining residential property; further analyzing traffic impacts on Apple Valley Road, Middle Road, and the intersections of Apple Valley Road/Route 11 and Apple Valley Road/Middle Road; extending the widening of Apple Valley Road along the length of the entire property frontage; inter-parcel access with the Blackburn Commerce Center; buffers and screening and providing a higher standard to protect neighboring residences; and reducing industrial noise created on-site. Two (2) members of the public spoke in opposition to the proposed application. The speakers expressed concerns with increased truck traffic west of the existing industrial area on Apple Valley Road, noise from industrial uses, and stated the proposed buffer and existing vegetation was insufficient to screen the use from adjoining residences. The Planning Commission unanimously recommended the rezoning application be tabled for 60 days and that the applicant work to improve the application and address their stated concerns. Applicant Response to Public Hearing Comments: The applicant has provided a response letter (dated February 6, 2024), revised generalized development plan (GDP, revised January 26, 2024) and other supporting exhibits to address some of the stated Planning Commission concerns regarding the rezoning application. Additional Staff Comments: A summary table of Planning Commissioner comments made at the January 3, 2024 public hearing discussion (summarized above) is provided. The table also includes the applicant response to some of those PC comments made and/or additional staff notes for discussion. The materials provided by the applicant do not address all the stated concerns brought by the Planning Commission (PC) at the January 3rd meeting. Further, the applicant’s response letter also requests additional clarification from the Planning Commission regarding some comments made on the application. Staff would note, no changes have been made to the 3 REZ #06-23 – Winchester Gateway (work session) February 13, 2024 Page 2 proffer statement (dated December 29, 2023) included with the January 3, 2024, public hearing materials. The proffer statement previously provided is also attached for reference. PC Comments Applicant Response (February 6, 2024)Additional Staff Comments Include design and/or architectural standards for buildings, including specifying the type of building materials and limiting the height of all structures to 60-feet (FT) PC comment not addressed. Clarify allowed uses permitted and proffer out uses that would have a detrimental impact on adjoining residential property (noise, odor, glare, traffic, vibrations, etc.) The County has recently amended its ordinance, moving away from the identification of uses following antiquated SIC code system. As a result, it appears that many of the M1 uses that had historically been deemed to be undesirable have, in fact, through this most recent ordinance amendment been dropped from M1. The applicant response does not appear to address stated concerns from the Planning Commission. Staff would clarify that the Board adopted a revision to the allowed uses table for the M1 Distirct (November 2023) did not remove any existing/allowed uses. Further, the adopted amendment expanded the allowed uses table for the M1 district to include: Storage Batteries and Primary Battery Manufacturing, and Waste Management & Remediation Services limited to glass, cardboard, and plastics recycling and excluding incinerators. Address traffic impacts along Apple Valley Road, Middle Road, and the intersection of Apple Valley Road and Route 11 and Apple Valley Road and Middle Road. PC comment not addressed. Widening of Apple Valley Road alongthe length of the property frontage It does not appear the three-lane section of road is warranted or needed for the zoning of the remaining porition of the applicants property to industrial. The applicant response does not appear to address stated concerns from the Planning Commission. No changes have been made to previously provided proffer statement or proposed improvements. VDOT in their December 2023 comments requested a three- lane section to match existing Blackburn Commerce Center frontage. Inter-parcel connection with Blackburn Commerce Center PC comment not addressed. Staff notes that conceptually the a potential inter-parcel connection is noted on GDP, however, the requirement for the connection is not proffered where it could be enforced or required. Extend the buffer around the point where the property fronts along middle road. Revised drawings depict the extension of that buffer. No changes to the previously provided proffer statement or proposed improvments. The applicant response does not appear to address stated concerns from the Planning Commission. From visits to the site, it is not clear to the applicant as to whether the sound that is current being heard by the residents is something that is at a particulary high decible level or rather may be something that is at a certain pitch. The applicant response not appear to address stated concerns from the Planning Commission, specifically to address industrial noise created on site by any of the allowed/proposed uses. Enhanced buffers and screening (exceeding zoning ordinance requirements) to protect neighboring residences and reduce industrial noise. 4 REZ #06-23 – Winchester Gateway (work session) February 13, 2024 Page 3 Requested Action: No action requested. This work session is for additional discussion on the proposed rezoning. The rezoning application will be brought back to the Planning Commission for action on March 6, 2024. MTK/pd Attachments: 1. County Response Letter & Exhibits 2. Proffer Statement (unchanged from 1/3/24 PC) 5 THOMASMOORELAWSON,P.C.*OFCOUNSEL-WILLIAMSMULLEN120EXETERDRIVE,SUITE200POSTOFFICEBox2740WINCHESTER,VA22604*THOMASMOORELAWSONTIAWSON(aISPLC.COiiITELEPHONE:(540)665-0050FACSIMILE:(540)722-4051February6,2024FrederickCountyDepartmentofPlanning&DevelopmentAttn:WyattPearson,DirectorofPlanningJohnBishop,AssistantDirectorTylerKlein,SeniorPlanner107NorthKentStreetSuite202Winchester,VA22601Re:WinchesterGatewayLLCRezoningOurFileNo.1503.001VIAE-MAILGentlemen:Attachedpleasefindthefollowingthreeadditionalexhibits(a)RoadWideningExhibit,(b)GeneralDevelopmentPlan,and(c)RoadWideningIllustrativeExhibittobeaddedtotheWinchesterGatewayrezoningfile.WeunderstandthereisscheduledajointworksessionofPlanningCommissionandBoardofSupervisorsonFebruary21,2024at6:00p.m.Wewouldaskthatthesematerialsbemadeavailableforthatworksessionand,ifatallpossible,bescannedinsotheycanalsobedisplayedonscreenduringthemeeting.Inaddition,wewouldaskthatacopyofthisletterbedeliveredtothoseattendingtheworksession.TheseexhibitswerepreparedinresponsetothecommentsreceivedfrommembersofthePlanningCommissionandpublicattheJanuary3,2024PlanningCommissionhearing.OneofthecommentsthatseemedtobeuniversalwastoextendthebufferaroundthepointwherethepropertyfrontsalongMiddleRoad.Youwillnotethereviseddrawingsdepicttheextensionofthatbuffer.Theotheritemthatwasdiscussedwastheextensionofathree-laneroadsectionacrosstheentirefrontageoftheWinchesterGatewaypropertytoitsintersectionwithMiddleRoad.Thisthree-lanesectionwouldbeidenticaltothethree-laneroadsectionthatwasinstalledontheportionofAppleValleyRoadfrontingtheTrexparcel.Asstatedatthehearing,however,andwasconfirmedbytheApplicant’strafficengineer,itdoesnotappearthethree-lanesectionofroadiswarrantedorneededforthezoningoftheremainingportionoftheApplicant’spropertytoindustrial.Furtherstill,the6 FrederickCountyDepartmentofPlanning&DevelopmentFebruary6,2024Page2ApplicantissensitivetothetworesidentswholiveinthehomesalongAppleValleyRoadandwhospokeinoppositiontowideningAppleValleyRoad.Theirconcernwasthatexpandingthewidthofthatroadwouldonlycausetheexistingtraffictogothatmuchfasteralongthestraightstretchofroad.TheApplicantlooksforwardtoreceivingsomeguidanceandrecommendationfromthePlanningCommissionforthisroad.Forthepurposesofaidingwiththediscussion,theattacheddrawingsdodepictexpansionofthewidthoftheroadallthewaytoMiddleRoadwithathree-lanesection.Wealsoheardcommentsaboutthepossibilityofreducingthenumberofpotentialusesforthesite.AswaspointedoutatthelastPlanningCommissionmeeting,weareawaretheCountyhasrecentlyamendeditsordinance,movingawayfromtheidentificationofusesfollowingtheantiquatedSICcodesystem.Asaresult,itappearsthatmanyoftheMlusesthathadhistoricallybeendeemedtobeundesirablehave,infact,throughthismostrecentordinanceamendmentbeendroppedfromMl.Intheevent,however,thoseattheworksessionbelievetherearesomeusesthatmaynotnecessarilybesuitableforthissite,theApplicantwouldliketoreceivethatfeedback.Accordingly,thisissueshouldbediscussedduringtheupcomingworksession.Finally,therewerediscussionsaboutnoisethatcouldbegeneratedbyzoningtheremainingportionoftheWinchesterGatewaypropertytoindustrialandtherewerecommentsaboutanoisethatiscurrentlyheardbynearbyresidentsandbelievedtobegeneratedbyoneoftheTrexfacilities.Wehaveprofferedanot-to-exceeddecibellevelatthepropertyline.Fromvisitstothesite,itisnotcleartotheApplicantastowhetherthesoundthatiscurrentlybeingheardbytheresidentsissomethingthatisataparticularlyhighdecibellevelorrathermaybesomethingthatisatacertainpitch.Thebottomlineisafterspendingtimeatthesite,wearenotabletonarrowdownthatsoundand,therefore,trytoderivesomelanguagetodescribeorotherwiseagreetoaproffertonothaveausethatmakessuchsound.Onceagain,ifthePlanningCommissioncouldprovidesomeguidanceonthatissue,itwouldbegreatlyappreciated.WelookforwardtotheworksessiononFebruary21StAsalways,shouldtherebeanyfurthercommentsorquestions,pleasedonothesitatetocontactme.TML:atdAttachmentscc:WinchesterGatewayLLC7 EX. Zoning Boundary (M1 & RA) Property Line Wetland "A" Delineated Wetland "DE" Wetland "FG" Off-Site Wetland "BC" Delineated Wetland "BC" Delineated Wetland "DE" Delineated Wetland "BC" Off-Site Wetland "BC" Delineated Wetland "BC" Delineated Wetland "HI" Spring 75' BRL 75 ' B R L 25' BRL 25' BRLEx. 10" D.I.P. W/L Ex. 10" D.I.P. W/L Ex. 8" D.I.P. W/L Ex. Fire Hydrant (F-182) Static Pressure = 68 PSI Static Pressure = 1,233 GPM Residual Pressure = 54 PSI Test Date: 04/24/2007 Ex. Fire Hydrant (F-183) Static Pressure = 62 PSI Static Pressure = 1,198 GPM Residual Pressure = 51 PSI Test Date: 08/13/2012 Ex. Fire Hydrant (F-184) Static Pressure = 50 PSI Static Pressure = 1,140 GPM Residual Pressure = 46 PSI Test Date: 02/15/2005 Ex. 10" D.I.P. W/L FW 20" WL - ARV 200' INACTIVE BUFFERWITH CATEGORY C FULLSCREEN PER PROFFER200' INACTIVE DISTANCE BUFFER WITH CATEGORY C FULL SCREEN PER PROFFER. (V A R I A B L E W I D T H R I G H T - O F - W A Y ) V A R T E # 3 7 Existing Electric Transmission Line & Esmt. (Shown Approx.)Middle Road(VA SEC RTE #628)Property Line Ex. Pond PROP. PRIMARY ENTRANCE POTENTIAL INTER-PARCEL ACCESS PROP. PRIMARY/SECONDARY ENTRANCEEx. 8" D.I.P. W/LEx. 10" PVC W/LEx. 10" D.I.P. W/L PROP. APPLE VALLEY ROAD IMPROVEMENTS (SEE TYPICAL SECTION) INACTIVE CATEGORY C WITH FULL SCREEN BUFFER EX. RIGHT-OF-WAY & ROAD C/LEPEPSUBJECT PARCEL BOUNDARY/ BEGINNING OF BOUNDARYC/L 10' ROADSIDE DITCHEX. FENCEEX. GRADE 55' 45'10' 35'10'10'EX. RIGHT-OF-WAY& ROAD C/LEPC/L 10' ROADSIDE DITCH55' 45'10' 12'19'12'12'EPTHRU TURN THRU C/LPROP. PAVEMENT PROP. GRADE END OF BUFFER200'SUBJECT PARCEL BOUNDARY/ BEGINNING OF BOUNDARY75'CATEGORY C WITH FULLSCREEN BUFFERCATEGORY C WITH FULLSCREEN BUFFER151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF DESIGNED BY: FILE NO. SCALE: DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WVSCALE: 1" = 100' 100 0 100 200 1" = 100' 1GENERAL DEVELOPMENT PLANBLACKBURN PROPERTY REZONINGBACK CREEK MAGISTERIAL DISTRICTFREDERICK COUNTY, VIRGINIAJAN 26, 2024 EJG / RLK 1 0036E A. Total Site Area = 71.85 AC. (3,129,844.14 SF) B. Proposed Zoning 1. M1, Light Industrial C. Building Setbacks 1. Front Yard Primary & Arterial Highways = 75' 2. Front Yard Collector & Minor Streets = 75' 3. Side = 25' 4. Rear = 25' D. Floor Area Ratio (FAR) 1. Maximum Permitted = 1.00 (3,129,844.14 GSF) 2. Maximum Proposed = 0.30 (938,953 GSF) E. Landscaped Area (% of Lot) 1. Minimum = 25% (782,461 SF) F. Height 1. Maximum = 60 feet G. Buffer Requirements 1. 200-ft buffer with existing vegetation preserved per proffer 2. 75-ft Inactive category 'C' with full screen buffer Preliminary Design Criteria: LEGEND: APPROXIMATE LOCATION OF POTENTIAL ACCESS POINT EX. APPLE VALLEY ROAD TYPICAL SECTION PROP. APPLE VALLEY ROAD TYPICAL SECTION INACTIVE CATEGORY C WITH FULL SCREEN BUFFER 200' INACTIVE DISTANCE BUFFER WITH CATEGORY C FULL SCREEN PER PROFFER 8 EX. Zoning Boundary (M1 & RA) Property Line 75' BRL 75 ' B R L 25' BRL 25' BRLEx. 10" D.I.P. W/L Ex. 10" D.I.P. W/L Ex. 8" D.I.P. W/L Ex. Fire Hydrant (F-182) Static Pressure = 68 PSI Static Pressure = 1,233 GPM Residual Pressure = 54 PSI Test Date: 04/24/2007 Ex. Fire Hydrant (F-183) Static Pressure = 62 PSI Static Pressure = 1,198 GPM Residual Pressure = 51 PSI Test Date: 08/13/2012 Ex. Fire Hydrant (F-184) Static Pressure = 50 PSI Static Pressure = 1,140 GPM Residual Pressure = 46 PSI Test Date: 02/15/2005 Ex. 10" D.I.P. W/L FW 20" WL - ARV 200' INACTIVE BUFFERWITH CATEGORY C FULLSCREEN PER PROFFER200' INACTIVE DISTANCE BUFFER WITH CATEGORY C FULL SCREEN PER PROFFER. (V A R I A B L E W I D T H R I G H T - O F - W A Y ) V A R T E # 3 7 Existing Electric Transmission Line & Esmt. (Shown Approx.)Middle Road(VA SEC RTE #628)Property Line PROP. PRIMARY ENTRANCE POTENTIAL INTER-PARCEL ACCESS PROP. PRIMARY/SECONDARY ENTRANCEEx. 8" D.I.P. W/LEx. 10" PVC W/LEx. 10" D.I.P. W/L PROP. APPLE VALLEY ROAD IMPROVEMENTS (SEE TYPICAL SECTION) SEGMENT 'B'SEGMENT 'A'SEGMENT 'C'EX. RIGHT-OF-WAY & ROAD C/LEPEPSUBJECT PARCEL BOUNDARY/ BEGINNING OF BOUNDARYC/L 10' ROADSIDE DITCHEX. FENCEEX. GRADE 55' 45'10' 35'10'10'EX. RIGHT-OF-WAY& ROAD C/LEPC/L 10' ROADSIDE DITCH55' 45'10' 12'19'12'12'EPTHRU TURN THRU C/LPROP. PAVEMENT PROP. GRADE END OF BUFFER200'SUBJECT PARCEL BOUNDARY/ BEGINNING OF BOUNDARY75'CATEGORY C WITH FULLSCREEN BUFFERCATEGORY C WITH FULLSCREEN BUFFER151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF DESIGNED BY: FILE NO. SCALE: DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WVSCALE: 1" = 100' 100 0 100 200 1" = 100' 1ROAD WIDENING EXHIBITBLACKBURN PROPERTY REZONINGBACK CREEK MAGISTERIAL DISTRICTFREDERICK COUNTY, VIRGINIAJAN 26,2024 EJG / RLK 1 0036E LEGEND: APPROXIMATE LOCATION OF POTENTIAL ACCESS POINT SEGMENT 'A' SEGMENT 'B' (INCLUDES SEGMENT 'A' SEGMENT 'C' (INCLUDES SEGMENT 'A & B ' A. Total Site Area = 71.85 AC. (3,129,844.14 SF) B. Proposed Zoning 1. M1, Light Industrial C. Building Setbacks 1. Front Yard Primary & Arterial Highways = 75' 2. Front Yard Collector & Minor Streets = 75' 3. Side = 25' 4. Rear = 25' D. Floor Area Ratio (FAR) 1. Maximum Permitted = 1.00 (3,129,844.14 GSF) 2. Maximum Proposed = 0.30 (938,953 GSF) E. Landscaped Area (% of Lot) 1. Minimum = 25% (782,461 SF) F. Height 1. Maximum = 60 feet G. Buffer Requirements 1. 200-ft buffer with existing vegetation preserved per proffer 2. 75-ft Inactive category 'C' with full screen buffer Preliminary Design Criteria: EX. APPLE VALLEY ROAD TYPICAL SECTION PROP. APPLE VALLEY ROAD TYPICAL SECTION EX. APPLE VALLEY ROAD TYPICAL SECTION PROP. APPLE VALLEY ROAD TYPICAL SECTION 9 10 PROFFER STATEMENT REZONING: RZ# _____________ Rural Areas (RA) and Light Industrial (M1) to Light Industrial (M1) Previously approved rezoning application #01-15 PROPERTY: 71.85 Acres +/-; Tax Map Parcel 63-A-80I (the “Property”) RECORD OWNER: Winchester Gateway LLC (“Owner”) ORIGINAL DATE OF PROFFERS: August 23, 2023 REVISION DATE(S): November 28, 2023 The undersigned Owner hereby proffers that the use and development of the above- referenced parcels, which are requested to be rezoned, shall be in strict conformance with the following conditions, which shall supersede all other proffers on the Property that may have been made prior hereto. In the event that the above-referenced M1 conditional rezoning is not granted as applied for by the Owner, these proffers shall be deemed withdrawn and shall be null and void. Further, these proffers are contingent upon final rezoning of the Property with “final rezoning” defined as that rezoning which is in effect on the day following the last day upon which the Frederick County Board of Supervisors’ (the “Board”) decision granting the rezoning may be contested in the appropriate court. If the Board’s decision is contested, and the Owner elects not to submit development plans until such contest is resolved, the term rezoning shall include the day following entry of a final court order affirming the decision of the Board which has not been appealed, or, if appealed, the day following which the decision has been affirmed on appeal. The headings of the proffers set forth below have been prepared for convenience or reference only and shall not control or affect the meaning or be taken as an interpretation of any provision of the proffers. The improvements proffered herein shall be provided at the time of development of that portion of the Property adjacent to or including the improvement or other proffered requirement, unless otherwise specified herein. The term “Owner” as referenced herein shall include within its meaning all future owners and successors in interest. 1. Site Development 1.1 Owner proffers to develop the Property in substantial conformance with the Generalized Development Plan for Blackburn Property Rezoning dated May 15, 2023 by Greenway Engineering which is attached hereto and incorporated herein by reference as “Exhibit A” (“GDP”). 1.2 Development of the Property shall include the following building restrictions: 11 2 All loading docks shall be screened from view from all adjacent properties zoned RA and RP. 1.3 Development of the Property shall include the following landscape design features: Owner proffers to install a green space buffer between Apple Valley Road and the existing pond. The buffer will extend two hundred (200) feet from the edge of Apple Valley Road. The green space buffer is to be left undisturbed and remain in its natural state. In the event there exists a screening gap in the existing vegetation, plants and trees of native species shall be planted in said gap. The green space buffer may only be disturbed for installation and maintenance of utilities, and maintenance of the vegetation. The green space buffer shall be in general conformance with the location shown on the GDP. 2. Transportation 2.1 Owner proffers to construct not more than two full-movements entrances on Apple Valley Road in general conformance with the locations shown on the GDP. Owner also proffers to construct road improvements along Apple Valley Road which are generally consistent with the road improvements that were installed to the M1 property immediately adjacent to the west. This would include paving of two full lanes of travel with a center turn lane. It is anticipated that the road improvements shall be installed to the first entrance for the Property, which would be the westernmost entrance. In the event the second entrance is required to be installed, Owner proffers to install the aforementioned three lane road improvements on Apple Valley Road to the second entrance and at such time as a certificate of occupancy is issued for any industrial building constructed on the Property which pursuant to the ITE Manual generates more than two thousand VPD. Owner does not proffer to build any additional road improvements to extend across the remaining portions of Apple Valley Road to its intersection with Middle Road. 3. Fire and Rescue 3.1 Owner proffers to make a one-time payment to Frederick County for the purposes of fire and rescue services in the amount of $0.10 per square foot of any future building constructed on the Property. 4. Escalator 4.1 In the event the monetary contributions set forth in these Proffers are paid to Frederick County within eighteen (18) months of the approval of this rezoning, as applied for by Owner, said contributions shall be in the amounts as stated herein. Any monetary contributions set forth in these Proffers which are paid to the County after eighteen (18) months following the approval of this rezoning shall be adjusted in accordance with the Urban Consumer Price Index (“CPI-U”) published by the United States Department of Labor, such that at the time contributions are paid they shall be adjusted by the percentage change in the CPI-U from that date eighteen (18) months after the approval of this rezoning to the most recently available CPI-U to the date the contributions are paid, subject to a cap of six percent (6%) per year, non-compounded. 12 3 [remainder of page intentionally left blank] 13 4 Respectfully submitted, WINCHESTER GATEWAY LLC By: Winchester Advisors LLC Its: Manager By: Darius E. Saeidi Its: Manager STATE/COMMONWEALTH OF _________, AT LARGE CITY/COUNTY OF ____________, to-wit: The foregoing instrument was acknowledged before me this _____ day of ___________, 2023, by Darius E. Saeidi, Manager of Winchester Advisors LLC, Manager of WINCHESTER GATEWAY LLC. ____________________________________ NOTARY PUBLIC My commission expires: ______________________ Registration number: 14