Loading...
030-03 RESOLUTION BY THE FREDERICK COUNTY BOARD OF SUPERVISORS The Board of Supervisors of Frederick County, in regular meeting on the 10th day of December 2003, adopted the following: WHEREAS, the streets in Camp at Mosby Station Section ill, described on the attached Additions Form SR-5A, fully incorporated herein by reference, are shown on plats recorded in the Clerk's Office ofthe Circuit Court of Frederick County; and WHEREAS, the Resident Engineer of the Virginia Department of Transportation has advised this 'Board that the streets meet the requirements established by the Subdivision Street Requirements of the Virginia Department of Transportation; and WHEREAS, the County and the Virginia Department of Transportation have entered into an agreement on June 9, 1993, for comprehensive stormwater detention which applies to this request for addition; and NOW, THEREFORE, BE IT RESOLVED, this Board requests the Virginia Department of Transportation to add the streets described n the attached Additions Form SR-5(A) to the secondary system of state highways, pursuant to 33,1-229, Code of Virginia, and the Department's Subdivision Street Requirements; and BE IT FURTHER RESOLVED, this Board guarantees a clear and unrestricted right-of-way, as described, and any necessary easements for cuts, fills and drainage; and 'BE IT FURTHER RESOLVED, that a certified copy of this resolution be forwarded to the Resident Engineer for the Virginia Department of Transportation. Richard C. Shickle, Chairman Aye Sidney A. Reyes Aye W. Harrington Smith, Jr. Aye Margaret B. Douglas Aye Lynda 1. Tyler Aye Robert M. Sager Aye Gina A. Forrester Aye PDRes. #31-03 U:\PatrickICommonlRoad ResolutionslCamp at Mosby Station 3Jes.wpd BOS Resolution No.: 030-03 In the County of Frederick By resolution of the goveming body adopted December 10, 2003 Thefollowing Form SR-5A is hereby attached and incorporated as part of the governing body's resolution for changes in the secondary system of state highways. A c.py T..~ S;god (C"oo. Off"'Q, ~ Report of Changes in the Secondary System of te Highays Form SR-5A Secondary Roads Division 5/1/99 Project/Subdivision The Camp At Mosby Station, Section 3 Type of Change: Addition The following additions to the Secondary System of State Highways, pursuant to the statutory provision or provisions cited, are hereby requested, the right of way for which, inclUding additional easements for drainage as required, is guaranteed: Reason for Change: Pursuant to Code of Virginia Statute: Route Number andlor Street Name ChancellorsviIle Drive, State Route Number 1440 Description: From: Route 1443 Addition, New subdivision street !j33.1-229 To: ,06 Mile East To Route 1444 A distance of: 0,06 miles, Right of Way Record: Filed with the Frederick County Courthouse on 6/25/2003, 030013611, with a width of 54' Chancellorsville Drive, State Route Number 1440 Description: From: Route 1444 To: ,03 Mile East Of Route 1444 A distance of: 0,03 miles, Right of Way Record: Filed with the Frederick County Courthouse on 6/25/2003, 030013611, with a width of 54' Cool Springs Drive, State Route Number 1443 Description: From: Route 636 To: .12 Mile WestTo Route 1445 A distance of: 0,12 miles, Right of Way Record: Filed with the Frederick Co, Courthouse on 6/25/2003, 030013611, with a width of 54' Description: From: Route 1445 To: .07 Mile West To Route 1440 A distance of: 0,07 miles, Right of Way Record: Filed with the Frederick Co, Courthouse on 6/25/2003, 030013611, with a width of 54' Description: From: Route 1440 To: ,12 Mile West Of Route 1440 A distance of: 0,12 miles, Right of Way Record: Filed with the Frederick Co, Courthouse on 6/25/2003, 030013611, with a width of 54' Page 1 0[2 Report of Changes in the Secondary System of State Highways Form SR-5A Secondary Roads Division 511/99 Perryville Court, State Route Number 1444 Description: From: Route 1440 To: .07 Mile West Of Route 1440 A distance of: 0.07 miles. Right of Way Record: Filed with the Frederick County Courthouse on 6/25/2003, 030013611, with a width of 54' Reams Station Court, State Route Number 1445 Description: From: Route 1443 To: .06 Mile North Of Route 1445 A distance of: 0.06 miles. Right of Way Record: Filed with the Frederick Co. Courthouse on 6/25/2003, 030013611, with a width of 54' Page 20[2 COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/665-6395 MEMORANDUM ~ TO: Board of Supervisors Patrick T. Davenport, Zoning AdrninistratoftiJ FROM: RE: Road Resolution for The Camp at Mosby Station, Section III DATE: November 21,2003 Attached is a road resolution and the SR-5A for 0.53 mile within The Camp at Mosby Station, Section III. Board of Supervisors' approval of this Resolution is necessary before the State will accept this road into the State Secondary Road System. Staffs recommendation is for approval. Staff is available to address your concerns. PTDlbhd Attachments 107 North Kent Street. Winchester, Virginia 22601-5000 3{..()?> /2-{O -<J] COMMONWEALTH of VIRGINIA Philip A. Shucet COMMISSIONER November 19, 2003 DEPARTMENT OF TRANSPORTATION EDINBURG RESIDENCY 14031 OLD VALLEY PIKE EDINBURG. VA 22824 JERRY A. COPP RESIDENT ENGINEER TEL (540) 984-5600 FAX (540) 984-5607 Mr. Jim Petry C/O Bowman & Glaize, L.C. P. O. Box 888 Winchester, VA 22604 Ref: The Camp at Mosby Station Subdivision, Section III Route 636, Frederick County Dear Jim: On November 3, 2003, VDOT accepted construction of all right-of-way improvements of the referenced development. By copy of this letter to Mr. Patrick Davenport, Frederick County Subdivision Administrator, we are providing him a legal description of these streets so the necessary Board of Supervisors' resolution may be prepared. For your information the total length of the proposed addition is .53 mile. Once we receive the signed and executed Board resolution in this office, the actual addition date can be established. However, assuming a February 1, 2004 addition date can be accomplished there will be a maintenance fee of$375.00 and the surety amount will be $9,000.00. The surety instrument should be dated from February 1, 2004 to February 1, 2005. To meet the February 1,2004 addition date, the required bond and maintenance fee will need to be in our office by January I, 2004. Should you have any questions, please do not hesitate to call me at (540) 535-1828. Sincerely, tkl. 4.'t/,,;~,~~~ Dave A. Heironimus Hwy. Permits & Subd. Specialist Sr. RECEIVED NOV 2 0 2003 FREDERICK COUNTY D AHlrf PLANNJ~G & DEVELOPMENT Enclosure xc: Mr. Bill Stover, Mr. Eric Lawrence, Mf~glffiitidi.L)~venport (wi original Form SR-5A) WE KEEP VIRGINIA MOVING