TCMinutes2023September25TRANSPORTATION COMMITTEE REPORT to the BOARD OF SUPERVISORS Monday, September 25, 2023 8:30 a.m. 107 NORTH KENT STREET, WINCHESTER, VIRGINIA ATTENDEES: Committee Members Present: Judith McCann-Slaughter Chairman (Voting), Gary Oates (Voting), Shontya Washington (Voting), Josh Ludwig (Voting), Kevin Kenney (Voting) and Lewis Boyer (Liaison Stephens City). Committee Members Absent: Charles DeHaven, Jr. (Voting). Staff Present: Assistant Director, John Bishop and Kathy Smith, Secretary. ACTION ITEMS: Camera Enforcement of Red Lights Discussion and Update: Staff provide the Committee with an overview of past efforts regarding the use of photo enforcement for red lights that outlined current practices and guidelines for the consideration of the matter. A private contractor engaged by the County would install and/or operate the system. The County may have installed systems at no more than one intersection per 10,000 residents therefore, the County may install the system at no more than 9 intersections. Upon a motion by Gary Oates, seconded by Shontya Washington, the Committee recommends that the Board authorize staff to draft an Ordinance that would allow for the use of photo red enforcement system. ITEMS FOR INFORMATION ONLY: Route 50 STARS Study Discussion: Brad Reed, VDOT give a presentation updating the Committee on the Route 50 (Northwestern Pike/Amherst Street) on the Strategically Targeted and Affordable Roadway Solutions (STARS) corridor improvement study. The study begins at the intersection of Northwestern Pike at the VDOT Area headquarters entrance and ends at the intersection of Amherst Street. The Committee was able to view the progress of the study as Staff begins preparation for the public involvement portion of the study effort and advancement through state transportation funding programs. Route 37 (Eastern Frederick Transportation) Update: Brian St. John, McCormick Taylor the firm conducting the study on behalf of the County, updated the Committee on the study progress. A web map has been created with the documentation of inventory and information materials on past studies that will be going live as well as stakeholder interviews have been completed. The target schedule for the study to be completed is for March 2024 in time for the SmartScale funding. It was recommended by Staff to combine the public outreach portion of the Eastern Frederick Transportation study with the transportation forum in the fall. After much discussion, the Committee recommended combining the completed study materials of the public outreach with the transportation forum, this will lay out a road map pieces of the funding and public understanding. County Project Updates: Renaissance Drive: The County’s contractor, W-L Construction and Paving Inc., has largely been engaged in site preparation. The updated agreements with CSX have been executed by the County and forwarded to CSX for final execution. Gainesboro Road/Route 522 Intersection Project: The signal justification report is undergoing additional modification at the request of VDOT. A resolution in support of a signalization intersection has been sent to the Board for adoption. Other: Ed Carter, VDOT gave a status of area projects on westbound Berryville Pike at the intersection Woods Mill Road with completion of a rumble strip, a solar “your speed” sign will be installed along with other safety improvements in the area. dentification of potential uses