Loading...
TCAgenda2022October241.Route 37 Study Update 1.A.Route 37 Study Update 2.Transportation Forum 2.A.Transportation Forum 3.SmartScale Application Funding 3.A.SmartScale Application Funding 4.County Project Updates 4.A.County Project Updates 5.Other 5.A.Other AGENDA TRANSPORTATION COMMITTEE MONDAY, OCTOBER 24, 2022 8:30 AM FIRST-FLOOR CONFERENCE ROOM FREDERICK COUNTY ADMINISTRATION BUILDING WINCHESTER, VIRGINIA TC10-24-22Route37StudyUpdate.pdf TC10-24-22TransportationForum.pdf TC10-24-22SmartScaleApplicationFunding.pdf TC10-24-22CountyProjectUpdates.pdf TC10-24-22Other.pdf 1 Transportation Committee Agenda Item Detail Meeting Date: October 24, 2022 Agenda Section: Route 37 Study Update Title: Route 37 Study Update Attachments: TC10-24-22Route37StudyUpdate.pdf 2 Item 1: Route 37 Study Update Topic Synopsis Staff has completed selection of a consultant for the Route 37 Phasing and Feasibility Study. Staff will update the Committee on the selection and next steps. Recommended Action NA 3 Transportation Committee Agenda Item Detail Meeting Date: October 24, 2022 Agenda Section: Transportation Forum Title: Transportation Forum Attachments: TC10-24-22TransportationForum.pdf 4 Item 2: Transportation Forum Topic Synopsis Staff will update the Committee on planning for this year’s transportation forum. Recommended Action NA 5 Transportation Committee Agenda Item Detail Meeting Date: October 24, 2022 Agenda Section: SmartScale Application Funding Title: SmartScale Application Funding Attachments: TC10-24-22SmartScaleApplicationFunding.pdf 6 Item 3: SmartScale Application Funding Topic Synopsis VDOT has contacted County staff regarding the possibility of advancing a portion of the local commitment that was a portion of local SmartScale allocations in FY 2023 as follows: Exit 317 DDI: $4,277,548 (full local leveraged funds is $6,525,894) Exit 313 Partial median U-turn: $2,134,318 (full local leveraged funds is $3,043,974) Route 522/Costello Intersection: $1,129,180 (full local leveraged funds is $1,430,130) As you are aware an approved SmartScale application results in actual funding approximately 5 to 6 years following the approval. If the County agrees to provide funding from their agreed upon match earlier, it has the impact of advancing overall project delivery by allowing engineering and possibly right of way to be completed utilizing local funds prior to the VDOT funds becoming available. For example, on the Exit 317 project, this has the impact of advancing the project by 3 years since the estimates for that project assume 3 years of preliminary engineering. The time savings has the additional benefit to the application of reducing the overall project cost because it results in fewer years of project cost inflation. Project cost inflation is required to be included in any application. Removing years of project cost inflation through this process also makes the project more competitive. Estimated project savings are as follows: Exit 317 Total Project Cost (2022): $30,080,605 Inflated Project Cost: $40,331,401 Inflated Project Cost with PE start in 2023: $37,589,735 Est. cost reduction with early PE start: $2,741,666 Exit 313 Total Project Cost (2022): $21,017,495 Inflated Project Cost: $26,915,217 Inflated Project Cost with PE start in 2023: $25,225,334 Est. cost reduction with early PE start: $1,689,883 522/Costello Total Project Cost (2022): $5,723,628 Inflated Project Cost: $7,150,653 Inflated Project Cost with PE start in 2023: $6,672,912 Est. cost reduction with early PE start: $477,741 Recommended Action Staff is seeking a recommendation to the Board of Supervisors to authorize staff to provide a letter of commitment to fund PE in FY 24, prior to 8/1/23. This letter would be added to the County’s SmartScale applications for the above referenced projects. Additional follow up actions would be required to finalize actual payment at the appropriate time. 7 Transportation Committee Agenda Item Detail Meeting Date: October 24, 2022 Agenda Section: County Project Updates Title: County Project Updates Attachments: TC10-24-22CountyProjectUpdates.pdf 8 Item 4: County Project Updates Renaissance Drive: Staff expects to receive draft plats for the crossing easement from CSX by the October meeting of the Transportation Committee and is working on the drainage license. Gainesboro Road/Route 522 Intersection Project: Staff is expecting to receive a draft of the Signal Justification report shortly after the mailing of this agenda and will update the Committee at the meeting. 9 Transportation Committee Agenda Item Detail Meeting Date: October 24, 2022 Agenda Section: Other Title: Other Attachments: TC10-24-22Other.pdf 10 Item 5: Other 11