Loading...
HomeMy WebLinkAboutPC 03-02-22 Meeting Agenda1.Call to Order 2.Adoption of Agenda – Pursuant to established procedures, the Planning Commission should adopt the Agenda for the meeting. 3.Committee Reports 4.Citizen Comments 5.Public Hearings 5.A.Conditional Use Permit #02-22 for Redbud Run Solar, LLC - (Mr. Klein) Submitted to construct an approximately 263-acre +/- utility scale solar power generating facility. The subject properties are generally located east of Woods Mill Road (Rt. 660) and north of Pine Road (Rt. 661), approximately 0.5-mile north of Berryville Pike (Rt. 7) and are identified with Property Identification Numbers (PINs) 55- A-136, 55-A-137, 55A-1-19, 55A-1-21, 55-A-135, 55-A-134, 44-A-297, 44-A-294A, and 44-A-295 in the Stonewall Magisterial District. Pursuant to Code of Virginia Section 15.2-2316.6 et seq., a solar facility siting agreement, between Red Bud Run Solar, LLC and the Frederick County Board of Supervisors is also being considered. 6.Other 6.A.Current Planning Applications 7.Adjourn AGENDA PLANNING COMMISSION WEDNESDAY, MARCH 2, 2022 7:00 PM THE BOARD ROOM FREDERICK COUNTY ADMINISTRATION BUILDING WINCHESTER, VIRGINIA PC03-02-22CUP02-22_Redacted.pdf 1 Planning Commission Agenda Item Detail Meeting Date: March 2, 2022 Agenda Section: Public Hearings Title: Conditional Use Permit #02-22 for Redbud Run Solar, LLC - (Mr. Klein) Attachments: PC03-02-22CUP02-22_Redacted.pdf 2 CONDITIONAL USE PERMIT #02-22 Redbud Run Solar, LLC Staff Report for the Planning Commission Prepared: February 16, 2022 Staff Contact: M. Tyler Klein, AICP, Senior Planner This report is prepared by the Frederick County Planning Staff to provide information to the Planning Commission and the Board of Supervisors to assist them in making a decision on this request. It may also be useful to others interested in this zoning matter. Reviewed Action Planning Commission: 03/02/22 Pending Board of Supervisors: 04/13/22 Pending EXECUTIVE SUMMARY: This is a request for a Conditional Use Permit (CUP) to enable construction of an approximately 263- acre +/- utility scale solar power generating facility on RA (Rural Areas) Zoned property in the Stonewall Magisterial District. Should the Planning Commission find this use for a utility-scale solar power generating facility to be appropriate, Staff would suggest the following Conditions of Approval: 1. All review agency comments provided during the review of this application shall be complied with at all times. 2. An engineered site plan, in accordance with the requirements of Article VIII of the Fredrick County Zoning Ordinance, shall be submitted to and subject to approval by Frederick County prior to the establishment of the use. The site plan shall address addit ional regulations for specific uses outlined in §165-204.26 of the Frederick County Zoning Ordinance and be in general conformance with the Concept Plan, included with the CUP application, prepared by Greenway Engineering, dated January 18, 2022. 3. Pursuant to Code of Virginia §15.2-2241.2(B), the owner shall comply with the Decommissioning Plan, included with the CUP application, prepared by Oriden, and shall update the Decommissioning Plan every five (5) years. 4. At the time the project commences construction, the owner will make a $10,000 lump sum payment to the County. Further, at the time the project achieves commercial operation, the owner shall make a payment of $500 per Megawatt AC per year, with an annual escalator of 1.5%, to the County. These conditions shall be memorialized in a solar siting agreement with Frederick County, attached as Exhibit A of these Conditions, pursuant to Code of Virginia Section 15.2- 2316.6 et seq. 5. Batteries, for the purposes of mass storage of electricity that will eventually be transferred to the grid, shall not be used on the properties subject to this CUP. 6. Access to the site shall be limited to three (3) entrances from Woods Mill Road (Route 660), so to provide one (1) entrance to each solar array land bay. One (1) entrance from Pine Road 3 Page 2 CUP #02-22 – Redbud Run Solar, LLC February 16, 2022 (Route 661) to be used only during the period of construction shall also per permitted. Approval of the final site entrance locations from Woods Mill Road is subject to review and approval by the Virginia Department of Transportation at time of site plan. 7. Pile-driving of poles for solar arrays shall be limited to 8:00 a.m. to 5:00 p.m. Monday through Friday. All other construction activities are permitted 7:00 a.m. to 7:00 p.m. Monday through Friday and 7:00 a.m. to 5:00 p.m. on Saturday. No construction activities are permitted on Sundays or federal holidays. 8. Any expansion or modification of this land use will require the approval of a new CUP. Following this public hearing, it would be appropriate for the Planning Commission to offer a recommendation concerning this application to the Board of Supervisors. Any recommendation for approval should also include a statement affirming that the proposed solar facility is in substantial accord with the Comprehensive Plan. 4 Page 3 CUP #02-22 – Redbud Run Solar, LLC February 16, 2022 LOCATION: The properties are generally located east of Woods Mill Road (Route 660) and north of Pine Road (Route 661), approximately 0.5-mile north of Berryville Pike (Route 7). MAGISTERIAL DISTRICT: Stonewall PROPERTY ID NUMBERS: 55-A-136, 55-A-137, 55A-1-19, 55A-1-21, 55-A-135, 55-A-134, 44- A-297, 44-A-294A, and 44-A-295 PROPERTY ZONING & PRESENT USE: Zoned: RA (Rural Areas) Land Use: Agricultural, Forestal, Residential* & Vacant *Existing residential uses on proposed interconnection parcels only. ADJOINING PROPERTY ZONING & PRESENT USE: North: RA (Rural Areas) Use: Agricultural/Forestal/Residential South: RA (Rural Areas) Use: Agricultural/Forestal/Residential East: RA (Rural Areas) Use: Agricultural/Forestal/ Residential West: RA (Rural Areas) Use: Agricultural/Forestal/ Residential PROPOSED USE: This is a request for a Conditional Use Permit (CUP) to enable construction of an approximately 263-acre +/- utility scale solar power generating facility. REVIEW EVALUATIONS: Virginia Department of Transportation: We have completed our review of the Redbud Solar Glare Study. Based on the information provided by Pennoni, it is understood there will be no negative glare impacts to the users of the roadways. We are satisfied with the findings of this report and have no objections to the study. The only outstanding item to address is the previous comment which follows: The CUP and supplement identifies multiple entrance locations to serve the facility. Some for construction and some to be permanent. The supplement provided details on the sight distance for the proposed locations. You have identified an existing private entrance as “Alternative 1.” The sight distance profile and your supplement clearly show this entrance not meeting minimum sight distance requirements for safe access. In accordance with VDOT Access Management Regul ations (24VAC30-73) VDOT will not permit a commercial entrance without meeting minim um sight distance requirements. This entrance needs to be removed from the proposal. There are other locations proposed that meet minimum sight distance requirements and provide safe ingress/ egress for those coming to the facility as well as the motorist traveling on the roadway. See comment letter dated February 16, 2022. 5 Page 4 CUP #02-22 – Redbud Run Solar, LLC February 16, 2022 Frederick County Fire Marshal: Plans approved by Fire Marshal, Frederick County. See comment letter dated November 10, 2021. Frederick County Inspections: Conditional Use Permit for installation of solar arrays shall be designed per the 2018 Virginia Building Code, U-Utility Use Group. Solar panel installation not associated with publicly regulated utilities require permits. Plans submitted for permits may require the design to be sealed by a Registered Design Professional licensed in the State of Virginia. Arrays shall be designed for the applicable loads as required in Chapter 16 Virginia Building Code. Please note the requirements in Chapter 17 of Virginia Building Code for special inspection requirements on the type of structure (soil, concrete etc.). See comment letter dated October 9, 2021. Frederick County Public Works: We offer following comments: We will need to review comprehensive site plan including stormwater and erosion and sediment control. A Frederick County Land disturbance will need to be obtained prior to any site development. The stormwater and erosion and sediment control plans must comply with County Code Chapter 143 and Virginia Law & Regulations. See comment letter dated December 15, 2021. Winchester-Frederick County Health Department: The proposed project will not require an approved water supply or sewage disposal. See comment letter dated December 18, 2020. Historic Resources Advisory Board (HRAB): The Frederick County Historic Resources Advisory Board (HRAB) considered this Conditional Use Permit application during their meeting on November 16, 2021. This application seeks to construct a utility scale solar project located on three parcels of land that total 264 acres. The site is located on the eastern side of Woods Mill Road (Rt 660), north Pine Road (Rt. 661), approximately 0.5-mile north of Berryville Pike (Rt. 7) in Winchester. Following their review of this application, the HRAB recommended approval of the Conditional Use Permit. The HRAB in their review recommended that the Applicant consider the utilization of methods such as ground penetrating radar (GPR) or terrestrial light detection and ranging (LiDAR) to document the present of archeologic objects or sites. 6 Page 5 CUP #02-22 – Redbud Run Solar, LLC February 16, 2022 See comment letter dated December 3, 2021. Planning and Zoning: Proposal, Site Configuration & Interconnection The application proposes use of nine (9) properties totaling approximately 447-acres +/- of RA (Rural Areas) Zoning District property, primarily used for agriculture, to generate photovoltaic (solar) electricity. Approximately 263-acres the subject parcels (three (3) lots – all vacant/agricultural in use) will be utilized (disturbed) for the installation of rows of ground-mounted photovoltaic modules, commonly known as solar panels, other necessary equipment for facility operations, access paths, fencing and landscaping. The solar panels will generate up to 30-megawatts (MW) and will be interconnected, and the power generated by each solar panel will be combined , converted, and the voltage increased to allow delivery of the power to the nearby Redbud-Gaylord overhead transmission lines. The Impact Analysis Statement notes that interconnection applications were submitted to PJM Interconnection (“PJM”) and Rappahannock in July 2020 and studies are in progress. An Interconnection Agreement is expected to be executed for the Project in 2022. The proximity of the project to the existing transmission line was a significant factor in the selection of these properties for the development of the facility. The parcels outside for the 263-acres sited with solar arrays will be used only be used for underground interconnection (as shown on Sheet 3 of the Concept Plan). In protecting the viewshed and mitigate the visual impact to neighboring properties in the vicinity of the property the Applicant has proposed buffering and screening around the perimeter o f the property, in addition to maintaining existing mature woodlands (where feasible), to shield view of the facility from adjacent roadways, residences, and other agriculture uses. The proposed landscaping is a 10-foot (FT) wide planting strip (double row of 6-foot-tall evergreen trees) or at least 50-FT of mature woodlands. Additionally, the project as proposed does not include any batteries for the purposes of mass storage of electricity that will eventually be transferred into the grid. Small batteries will only be utilized as backup for solar tracker motors, substation, and associated equipment. Site Access & Transportation: Vehicular access to the site is proposed from Woods Mill Road (Route 660) to each of the project’s three (3) solar array land bays. A temporary construction entrance is proposed from Pine Road (Route 661). The proposed entrances are noted on Sheet 3 of the Concept Plan. The final entrance configuration will be determined at time of site plan review and be subject to VDOT review and approval. Additionally, as part of the Virginia Department of Transportation (VDOT) review, a Glare Assessment Report, was provided to analyze potential impacts of glare from the facility (solar arrays) to adjoining roadways (Woods Mill Road & Pine Road). The report notes the proposed project contains favorable topography with existing vegetation that provides natural concealment while minimizing the nature and extent of viewshed impacts [and] where existing vegetation does not exist 7 Page 6 CUP #02-22 – Redbud Run Solar, LLC February 16, 2022 or is otherwise insufficient, supplemental landscaping will be planted. Finally, the report concludes that coupled with the site’s favorable topography, the combination of tree preservation and new landscape plantings will mitigate potential visual impacts at adjacent roads. Staff notes Future Route 37 Bypass also bisects the site where solar arrays will be located. The future alignment is shown on the Concept Plan, Sheet 3, for reference purposes only. Comprehensive Plan Conformance: The Comprehensive Plan envisions this area of the County to remain primarily rural in nature and for rural areas to be preserved to ensure the economic viability of agricultural and forestal operations and that those lands are present for the use and enjoyment of future generations (Chapter II – Rural Areas). Further the plan specifically states as it relates to solar that utility scale solar facilities are typically passive uses with limited impacts to the environment and the rural character. Additionally, implementation of this use can facilitate the preservation of agricultural and rural land for future use once these sites are decommissioned, although the extent to which the use removes agricultural and rural land from current use should also be considered. Utility-scale solar facilities, when located in appropriate areas, can provide opportunities for landowne rs to recoup value from their property without subdividing. The Code of Virginia also enables localities implementing solar facilities to tax this utility infrastructure through the machinery and tools tax or revenue -share agreements with utility operators, generating additional tax revenue beyond the l and use assessment. This additional revenue can help the County offset impacts from residential development (Chapter IV – Business Development). The project, as proposed, is in accordance with Comprehensive Plan policies. The project will not adversely impact the rural character of the area or the adjoining agricultural and residential uses. The preservation of the underlying land through the solar facility siting agreement (discussed below) maintains the ability to use the property for agriculture in t he future if and when the facility is decommissioned. Maintaining the existing topography of the site, utilizing existing vegetation and planting new buffers to screen the facility will preserve the rural viewshed from adjoining properties. Further, the included Decommissioning Plan ensures a monetary guarantee to cover associated cost with the restoration of the land to it pre-development state and ability of the land to be use for agricultural purposes again (if so desired) in the future. Zoning Ordinance Conformance: Utility-scale solar power generating facilities are a permitted use in the RA (Rural Areas) Zoning District with an approved Conditional Use Permit (CUP). The Board of Supervisors added “uti lity- scale solar power generating facilities” to the Zoning Ordinance on January 8, 2020, including additional regulations for specific uses. These additional regulations further specify for utility-scale solar power generating facilities to prepare an eng ineered site plan and enter into a written agreem ent with Frederick County for facility decommissioning. The Zoning Ordinance requirements for “Public Utilities” including “utility-scale solar power generating facilities” (§165-204.26) specifies the Zoning Administrator has the authority to determine appropriate setbacks for lots. The Applicant has proposed setbacks for the solar arrays 8 Page 7 CUP #02-22 – Redbud Run Solar, LLC February 16, 2022 (panels) for this project as follows: 60-FT from road rights of way, 50-FT to 100-FT side/rear setbacks (from adjoining properties), and minimum 200-FT setbacks from Agricultural and Forestal Districts. The provided setbacks are noted and shown on Sheet 3 of the Concept Plan. Decommissioning Plan: A draft Decommissioning Plan included with the application materials (Attachment 7 – Impact Analysis Statement), satisfies requirements contained in §165-204.26 of the Zoning Ordinance, ensuring that in the event the facility is no longer in operation, the land will be returned to the pre- development condition with all solar infrastructure and related facilities removed, ensuring future viability of the land to resume agricultural operations. Further, proposed condition of approval #3 ensures that Frederick County would maintain a bond that is updated every five (5) years keep ing it up to date. Solar Siting Agreement: The applicant will also propose consideration before the Board of Supervisors a “solar siting agreement.” Solar siting agreements are outlined in the Code of Virginia § 15.2-2316.7; the code states any applicant for a solar project, or an energy storage project shal l give to the host locality written notice of the applicant's intent to locate in such locality and request a meeting. Such applicant shall meet, discuss, and negotiate a siting agreement with such locality. The siting agreement may include terms and conditions, including (i) mitigation of any impacts of such solar project or energy storage project; (ii) financial compensation to the host locality to address capital needs set out in the (a) capital improvemen t plan adopted by the host locality, (b) current fiscal budget of the host locality, or (c) fiscal fund balance policy adopted by the host locality; or (iii) assistance by the applicant in the deployment of broadband, as defined in § 56-585.1:9, in such locality. The solar siting agreement legislation took effect July 1, 2021 and applies only to projects submitted on or after January 1, 2021. For the Redbud Run Solar Project, the siting agreement specifies that at the time construction commences, the owner will make a $10,000 lump sum payment to Frederick County. In addition to this lump sum payment, the applicant will also pay the County $500 per megawatt AC per year, with an annual escalator of 1.5%. These conditions are memorialized in a solar siting agreement with Frederick County, pursuant to Code of Virginia Section 15.2-2316.6 et seq. Ultimately, approval of the siting agreement is an action of the Frederick County Board of Supervisors. Other Permitting: In addition to requirements contained in the Zoning Ordinance, the Applicant will pursue a “Permit- by-Rule” (PBR) application through the Virginia Department of Environmental Quality (DEQ). The PBR is a state-level administrative review and approval process for the siting of solar energy facilities in the Commonwealth, including environmental and cultural review and study. One component of the state required PBR review is local jurisdiction “approval” of solar project siting; this CUP application, if approved by the Frederick County Board of Supervisors, would satisfy that requirement enabling proceeding with PBR approval process for this project. STAFF CONCLUSIONS FOR THE 03/02/22 PLANNING COMMISSION MEETING: 9 Page 8 CUP #02-22 – Redbud Run Solar, LLC February 16, 2022 This is a request for a Conditional Use Permit (CUP) to enable construction of an approximately 263- acre +/- utility scale solar power generating facility on RA (Rural Areas) Zoned property in the Stonewall Magisterial District. Should the Planning Commission find this use for a utility-scale solar power generating facility to be appropriate, Staff would suggest the following Conditions of Approval: 1. All review agency comments provided during the review of this application shall be complied with at all times. 2. An engineered site plan, in accordance with the requirements of Article VIII of th e Fredrick County Zoning Ordinance, shall be submitted to and subject to approval by Frederick County prior to the establishment of the use. The site plan shall address additional regulations for specific uses outlined in §165-204.26 of the Frederick County Zoning Ordinance and be in general conformance with the Concept Plan, included with the CUP application, prepared by Greenway Engineering, dated January 18, 2022. 3. Pursuant to Code of Virginia §15.2-2241.2(B), the owner shall comply with the Decommissioning Plan, included with the CUP application, prepared by Oriden, and shall update the Decommissioning Plan every five (5) years. 4. At the time the project commences construction, the owner will make a $10,000 lump sum payment to the County. Further, at the time the project achieves commercial operation, the owner shall make a payment of $500 per Megawatt AC per year, with an annual escalator of 1.5%, to the County. These conditions shall be memorialized in a solar siting agreement with Frederick County, attached as Exhibit A of these Conditions, pursuant to Code of Virginia Section 15.2- 2316.6 et seq. 5. Batteries, for the purposes of mass storage of electricity that will eventually be transferred to the grid, shall not be used on the properties subject to this CUP. 6. Access to the site shall be limited to three (3) entrances from Woods Mill Road (Route 660), so to provide for one (1) entrance to each solar array land bay. One (1) entrance from Pine Road (Route 661) to be used only during the period of construction shall also per permitted. Approval of the final site entrance locations from Woods Mill Road is subject to review and approval by the Virginia Department of Transportation at time of site plan. 7. Pile-driving of poles for solar arrays shall be limited to 8:00 a.m. to 5:00 p.m. Monday through Friday. All other construction activities are permitted 7:00 a.m. to 7:00 p.m. Monday through Friday and 7:00 a.m. to 5:00 p.m. on Saturday. No construction activities are permitted on Sundays or federal holidays. 8. Any expansion or modification of this land use will require the approval of a new CUP. Following this public hearing, it would be appropriate for the Planning Commission to offer a 10 Page 9 CUP #02-22 – Redbud Run Solar, LLC February 16, 2022 recommendation concerning this application to the Board of Supervisors. Any recommendation for approval should also include a statement affirming that the proposed solar facility is in substantial accord with the Comprehensive Plan. 11 55 A 137 55 A 136 55A 1 19 55 A 134 55 A 135 44 A 294A 55A 1 21 44 A 297 44 A 295 250FIRSTWOODS DR 250FIRSTWOODS DR 146MERLOT DR134MERLOT DR128MERLOT DR120MERLOT DR236MORLYN DR245MORLYN DR 201MACKENZIE LN 224KEMPER CT 112BRADLEY CT 183STEEPWOOD LN 233BURNTFACTORY RD 380BURNTFACTORY RD 228BURNTFACTORY RD 163MORGANMILL RD139MORGANMILL RD 210MORLYN DR 209MACKENZIE LN 209KEMPER CT 223WOODS MILL RD 180PINE RD249MACKENZIE LN 232MACKENZIE LN 522BURNTFACTORY RD 271MORGANMILL RD 105SHIRAZ CT 221MERLOT DR216MERLOT DR 1551REDBUD RD 349WOODSMILL RD 263PINE RD 295PINE RD 319PINE RD 343PINE RD 417PINE RD 425PINE RD 425PINE RD 433PINE RD 385BURNTFACTORY RD 328MORGANMILL RD 359WOODSMILL RD 373PINE RD 367PINE RD 433BURNTFACTORY RD 529BURNTFACTORY RD 520BURNT FACTORY RD 1470REDBUD RD 1501REDBUD RD 1934JORDANSPRINGS RD 566BURNTFACTORY RD 1423REDBUD RD 451WOODSMILL RD 479WOODSMILL RD 417WOODS MILL RD 1896JORDANSPRINGS RD 1894JORDANSPRINGS RD 1890JORDANSPRINGS RD 1943JORDANSPRINGS RD 1347REDBUD RD 531WOODSMILL RD 1892JORDANSPRINGS RD 1840JORDANSPRINGS RD 1897JORDANSPRINGS RD 1863JORDAN SPRINGS RD 1301REDBUD RD 549WOODSMILL RD 527WOODSMILL RD 181WHETSTONE CT 157WHETSTONE CT 141WHETSTONE CT 125FEATHERSTONE CT 1801JORDANSPRINGS RD 1291REDBUD RD 1293REDBUD RD 563WOODS MILL RD 182WHETSTONE CT 120WHETSTONE CT 1763JORDANSPRINGS RD 269MORGANMILL RD 1203REDBUD RD 1263REDBUD RD 243FEATHERSTONE CT 168FEATHERSTONE CT 130FEATHERSTONE CT 181MOUNTAINVIEW DR 145MOUNTAINVIEW DR 1141REDBUD RD 1161REDBUD RD 1177REDBUD RD 240FEATHERSTONE CT 1696JORDANSPRINGS RD 1695JORDAN SPRINGS RD 198MOUNTAINVIEW DR 291RIVERDALE CIR 1105REDBUD RD 1071REDBUD RD 181SETTLERS LN 1586JORDANSPRINGS RD 1654JORDANSPRINGS RD 1681JORDANSPRINGS RD 255RIVERDALE CIR 1023REDBUD RD 133SETTLERS LN 743WOODS MILL RD 748WOODS MILL RD 138RIVERDALECIR 215RIVERDALECIR 768WOODS MILL RD 1564JORDAN SPRINGS RD 1575JORDAN SPRINGS RD 136HIGHVIEW RD 221SETTLERS LN 150SETTLERS LN 300WOODSMILL DR 849WOODSMILL RD 840WOODSMILL RD 1440JORDANSPRINGS RD 200HIGHVIEW RD 260HIGHBANKS RD 182HIGHVIEW RD 1073REDBUD RD 200SETTLERS LN 281WOODSMILL DR 358WOODSMILL DR 306WOODS MILL DR 896WOODS MILL RD 210HIGHBANKS RD 275HIGH BANKS RD 334HIGH BANKS RD 144LICK RUNCROSSING 341WOODSMILL RD 362WOODSMILL RD 1462JORDAN SPRINGS RD 187HIGHBANKS RD 229HIGHBANKS RD 261LICK RUNCROSSING 223LICK RUNCROSSING 235LICK RUN CROSSING 235LICK RUNCROSSING 1412JORDANSPRINGS RD 122HIDDEN PINES DR 180CUNNINGHAM LN 288MILBURN RD 270LICK RUNCROSSING 1373JORDAN SPRINGS RD 159HIDDENPINES DR 160HIDDENPINES DR 290LICK RUNCROSSING 289LICK RUNCROSSING 274LICK RUNCROSSING 1327JORDAN SPRINGS RD 234HIDDENPINES DR 300HIDDENPINES DR 348HIDDENPINES DR 1160JORDANSPRINGS RD 1160JORDANSPRINGS RD 1281JORDANSPRINGS RD 125HUMMINGBIRD LN 245HIDDENPINES DR 313HIDDEN PINES DR383HIDDEN PINES DR 154HUMMINGBIRD LN 220MONASTERYRIDGE 250MONASTERYRIDGE310MONASTERYRIDGE 350MONASTERYRIDGE 110DEVILS BACKBONE 367SNOWDENBRIDGE 163MONASTERYRIDGE170MONASTERYRIDGE 289MONASTERYRIDGE 271MONASTERYRIDGE 141OPEQUONWOODS CIR 562MILBURN RD 114JEWELBOX DR 324NORLANDKNOLL DR 268CHRISTMASTREE LN 266CHRISTMASTREE LN 161OPEQUONWOODS CIR318STARRY WAY DR 1054JORDAN SPRINGS RD 197OPEQUONWOODS CIR232NORLAND KNOLL DR 271PATCHWORK DR 1025JORDAN SPRINGS RD 269CHRISTMASTREE LN 106NOTIONS CT 136FARMHOUSE CT 918JORDANSPRINGS RD 941JORDANSPRINGS RD995JORDAN SPRINGS RD 216CHRISTMAS TREE LN 251CHRISTMAS TREE LN 280SABER LN S A N T AF E C TH A L OC TSE E S A WC TN O R T H U M B E R L A N D D R D E W E YW A YB A I L YW A Y C E N T I F O U R D R F A D I N GS T A R C TS T A R R YW A Y D RM E R L O T D RO P E Q U O NW O O D S C IR H U M M I N G B I R D L N P O I N S E T T I A W A Y L I N D Y W A Y C R O F T O N C T K E M P E R C T P A R K L A N D D R W H E T S T O N E C T P A T C H W O R K D R P A T R I O T S T F E A T H E R S T O N E C T R I V E R D A L E C I R IN T E R L A C E W A Y M O U N T A IN V IE W D R C U N N I N G H A M L N S E T T L E R S L NS N O W D E NB R ID G E B L V D H I G H V I E W R D J E W E L B O X D R N O R L A N D K N O L L D R W O O D S M I L L D R F I R S T W O O D S D R H I D D E N P I N E S D R M O R L Y N D R H I G H B A N K S R D L I C K R U N X I N G M A C K E N Z I E L N J O R D A N S P R I N G S R D M O R G A N M IL L R DB U R N T F A C T O R Y R D M O N A S T E R Y R I D G E R D R E D B U D R D P I N E R D W O O D S M I L L R D Application Sewer and Water Service Area Parcels Future Rt 37 Bypass B2 (General Business District) R4 (Residential Planned Community District) RP (Residential Performance District) Agricultural & Forestal Districts Red Bud µ Frederick County Planning & Development107 N Kent StWinchester, VA 22601540 - 665 - 5651Map Created: February 8, 2022 Stephenson RED B U D R DMILBURN RDWOODS MILL RDJORDAN SPR INGS RD PINE RD VALLEY MILL RD WOODS M ILL DR £¤11 ¬«7 0 1,600 3,200800 Feet CLARKECOUNTY C U P # 0 2 - 2 2 : R e d b u d R u n S o la r, L L CP IN s : 5 5 - A - 1 3 6 , 5 5 - A - 1 3 7 , 5 5 A - 1 - 1 9 , 5 5 A - 1 - 2 1 , 5 5 - A - 1 3 5 ,5 5 - A - 1 3 4 , 4 4 - A - 2 9 7 , 4 4 - A - 2 9 4 A , 4 4 - A - 2 9 5U tility S c a le S o la r F a c ilityZ o n in g M a p CUP #02-22 CUP #02-22 CUP #02-22CUP #02-22 CUP #02-22 CUP #02-22 CUP #02-22 CUP #02-22 CUP #02-22 12 55 A 137 55 A 136 55A 1 19 55 A 134 55 A 135 44 A 294A 55A 1 21 44 A 297 44 A 295 250FIRSTWOODS DR 250FIRSTWOODS DR 127MORGAN MILL RD 146MERLOT DR 128MERLOT DR134MERLOT DR 120MERLOT DR236MORLYN DR245MORLYN DR 201MACKENZIE LN 224KEMPER CT 112BRADLEY CT 183STEEPWOOD LN 233BURNTFACTORY RD 380BURNTFACTORY RD 228BURNTFACTORY RD 149MORGAN MILL RD 210MORLYN DR 209MACKENZIE LN 223WOODS MILL RD209KEMPER CT 180PINE RD249MACKENZIE LN 232MACKENZIE LN 522BURNTFACTORY RD 271MORGANMILL RD 105SHIRAZ CT 216MERLOT DR 221MERLOT DR 1551REDBUD RD 349WOODSMILL RD 263PINE RD 295PINE RD 319PINE RD 343PINE RD 417PINE RD 425PINE RD 425PINE RD 433PINE RD 385BURNTFACTORY RD 328MORGANMILL RD 359WOODSMILL RD 373PINE RD 367PINE RD 433BURNTFACTORY RD 529BURNTFACTORY RD 520BURNT FACTORY RD 1470REDBUD RD 1501REDBUD RD 1934JORDANSPRINGS RD 566BURNTFACTORY RD 1423REDBUD RD 451WOODSMILL RD 479WOODSMILL RD 417WOODS MILL RD 1896JORDANSPRINGS RD 1894JORDANSPRINGS RD 1890JORDANSPRINGS RD 1943JORDANSPRINGS RD 1347REDBUD RD 531WOODSMILL RD 1892JORDANSPRINGS RD 1840JORDANSPRINGS RD 1897JORDANSPRINGS RD 1863JORDAN SPRINGS RD 1301REDBUD RD 549WOODSMILL RD 527WOODSMILL RD 181WHETSTONE CT 157WHETSTONE CT 141WHETSTONE CT 125FEATHERSTONE CT 1801JORDANSPRINGS RD 1291REDBUD RD 1293REDBUD RD 563WOODS MILL RD 182WHETSTONE CT 120WHETSTONE CT 1763JORDANSPRINGS RD 269MORGANMILL RD 1203REDBUD RD 1263REDBUD RD 243FEATHERSTONE CT 168FEATHERSTONE CT 130FEATHERSTONE CT 181MOUNTAINVIEW DR 145MOUNTAINVIEW DR 1141REDBUD RD 1161REDBUD RD 1177REDBUD RD 240FEATHERSTONE CT 1696JORDANSPRINGS RD 1695JORDAN SPRINGS RD 198MOUNTAINVIEW DR 291RIVERDALE CIR 1071REDBUD RD 1105REDBUD RD 181SETTLERS LN 1586JORDANSPRINGS RD 1654JORDANSPRINGS RD 1681JORDANSPRINGS RD 255RIVERDALE CIR 1023REDBUD RD 133SETTLERS LN 743WOODS MILL RD 748WOODS MILL RD 138RIVERDALECIR 215RIVERDALECIR 768WOODS MILL RD 1564JORDAN SPRINGS RD 1575JORDAN SPRINGS RD 136HIGHVIEW RD 221SETTLERS LN 150SETTLERS LN 300WOODSMILL DR 849WOODSMILL RD 840WOODSMILL RD 1440JORDANSPRINGS RD 200HIGHVIEW RD 260HIGHBANKS RD 182HIGHVIEW RD 1073REDBUD RD 200SETTLERS LN 281WOODSMILL DR 358WOODSMILL DR 306WOODS MILL DR 896WOODS MILL RD 210HIGHBANKS RD 275HIGH BANKS RD 334HIGH BANKS RD 144LICK RUNCROSSING 341WOODSMILL RD 362WOODSMILL RD 1462JORDAN SPRINGS RD 187HIGHBANKS RD 229HIGHBANKS RD 261LICK RUNCROSSING 235LICK RUN CROSSING 235LICK RUNCROSSING 223LICK RUNCROSSING 1412JORDANSPRINGS RD 122HIDDEN PINES DR 180CUNNINGHAM LN 288MILBURN RD 270LICK RUNCROSSING 1373JORDAN SPRINGS RD 159HIDDENPINES DR 160HIDDENPINES DR 290LICK RUNCROSSING 289LICK RUNCROSSING 274LICK RUNCROSSING 1327JORDAN SPRINGS RD 234HIDDENPINES DR 300HIDDENPINES DR 348HIDDENPINES DR 1160JORDANSPRINGS RD 1160JORDANSPRINGS RD 1281JORDANSPRINGS RD 125HUMMINGBIRD LN 245HIDDENPINES DR 313HIDDEN PINES DR383HIDDEN PINES DR 154HUMMINGBIRD LN 220MONASTERYRIDGE 250MONASTERYRIDGE310MONASTERYRIDGE 350MONASTERYRIDGE 110DEVILS BACKBONE 367SNOWDENBRIDGE 163MONASTERYRIDGE170MONASTERYRIDGE 289MONASTERYRIDGE 271MONASTERYRIDGE 141OPEQUONWOODS CIR 562MILBURN RD 114JEWELBOX DR 324NORLANDKNOLL DR 268CHRISTMASTREE LN 266CHRISTMASTREE LN 161OPEQUONWOODS CIR318STARRY WAY DR 1054JORDAN SPRINGS RD 197OPEQUONWOODS CIR232NORLAND KNOLL DR 271PATCHWORK DR 1025JORDAN SPRINGS RD 269CHRISTMASTREE LN 106NOTIONS CT 136FARMHOUSE CT 918JORDANSPRINGS RD 941JORDANSPRINGS RD995JORDAN SPRINGS RD 216CHRISTMAS TREE LN 251CHRISTMAS TREE LN 280SABER LN S A N T AF E C TH A L OC TSE E S A WC TN O R T H U M B E R L A N D D R D E W E YW A YB A I L YW A Y C E N T I F O U R D R F A D I N GS T A R C TS T A R R YW A Y D RM E R L O T D RO P E Q U O NW O O D S C IR H U M M I N G B I R D L N P O I N S E T T I A W A Y L I N D Y W A Y C R O F T O N C T K E M P E R C T P A R K L A N D D R W H E T S T O N E C T P A T C H W O R K D R P A T R I O T S T F E A T H E R S T O N E C T R I V E R D A L E C I R IN T E R L A C E W A Y M O U N T A IN V IE W D R C U N N I N G H A M L N S E T T L E R S L NS N O W D E NB R ID G E B L V D H I G H V I E W R D J E W E L B O X D R N O R L A N D K N O L L D R W O O D S M I L L D R F I R S T W O O D S D R H I D D E N P I N E S D R M O R L Y N D R H I G H B A N K S R D L I C K R U N X I N G M A C K E N Z I E L N J O R D A N S P R I N G S R D M O R G A N M IL L R DB U R N T F A C T O R Y R D M O N A S T E R Y R I D G E R D R E D B U D R D P I N E R D W O O D S M I L L R D Application Sewer and Water Service Area Parcels Future Rt 37 Bypass µ Frederick County Planning & Development107 N Kent StWinchester, VA 22601540 - 665 - 5651Map Created: February 8, 2022 Stephenson RED B U D R DMILBURN RDWOODS MILL RDJORDAN SPR INGS RD PINE RD VALLEY MILL RD WOODS M ILL DR £¤11 ¬«7 0 1,600 3,200800 Feet CLARKECOUNTY C U P # 0 2 - 2 2 : R e d b u d R u n S o la r, L L CP IN s : 5 5 - A - 1 3 6 , 5 5 - A - 1 3 7 , 5 5 A - 1 - 1 9 , 5 5 A - 1 - 2 1 , 5 5 - A - 1 3 5 ,5 5 - A - 1 3 4 , 4 4 - A - 2 9 7 , 4 4 - A - 2 9 4 A , 4 4 - A - 2 9 5U tility S c a le S o la r F a c ilityL o c a tio n M a p CUP #02-22 CUP #02-22 CUP #02-22CUP #02-22 CUP #02-22 CUP #02-22 CUP #02-22 CUP #02-22 CUP #02-22 13 5 APPLICATION FOR CONDITIONAL USE PERMIT FREDERICK COUNTY, VIRGINIA ____________________________________________________________ _________________ *Please see Concept Plan for road frontages and property depths. ✔ Redbud Run Solar LLC Attn: Gary Verkleeren 106 Isabella Street, Suite 400, Pittsburgh, PA 15212 (412) 915-9017; Gary.Verkleeren@OridenPower.com JRW Properties & Rentals Inc., Ronald A. and Mary C. Lee, Allen R. Conner, Robert L. Williams, William M. Rexrode, Tonie Wallace The property is located east of Woods Mill Road (VA Route 660) and north of Pine Road (VA Route 661), approximately 0.5-mile north of Berryville Pike (VA Route 7). ** 477.42 See Attachment 1 55-A-136, 55-A-137, 55A-1-19, 55A-1-21, 55-A-135, 55-A-134, 44-A-297, 44-A-294A, 44-A-295 Stonewall RA, Rural Areas 14 6 consult with the Planning Dept. before completing Name and Property Identification Number Address See Sheet 2 of Concept Plan. Utility-scale solar power generating facility No new buildings are proposed to be constructed. Structures associated with the proposed use include mounted photovoltaic solar panels, skid-mounted inverters/transformers, and underground medium voltage interconnection lines. See Attachment 2. 15 8 USE CODE: _______________________________________ RENEWAL DATE: ________________________________ SEE ATTACHED SIGNATURE SHEET SEE ATTACHED SIGNATURE SHEETS SEE ATTACHED SIGNATURE SHEETS SEE ATTACHED SIGNATURE SHEETS 16 ATTACHMENT 1 Project Parcels Tax Map Number Owner Acreage Zoning Record/ Instrument #Project Component 55-A-136 JRW Properties & Rentals Inc 128.99 RA DB591, PG630 Solar Arrays and Equipment 55-A-137 JRW Properties & Rentals Inc 134.00 RA DB591, PG630 Solar Arrays and Equipment 55A-1-19 JRW Properties & Rentals Inc 0.94 RA DB596, PG515 Facility Access 55A-1-21 Robert L. Williams 2.57 RA Inst. #030019313 Facility Access 55-A-135 Ronald A. & Mary C. Lee 6.00 RA DB867, PG1843 Underground Interconnection Line 55-A-134 Allen R. Conner 11.00 RA DB804, PG207 Underground Interconnection Line 44-A-297 Allen R. Conner 13.78 RA DB804, PG207 Underground Interconnection Line 44-A-294A Tonie Wallace Aitken 176.25 RA Inst. #02000485 Underground Interconnection Line / Point of Interconnection 44-A-295 William M. Rexrode 3.89 RA Inst #160002648 Underground Interconnection Line 17 Redbud Run Solar FacilityADJOINING PROPERTIESID Tax Map NumberOwnerMailing Address CityState Zip Assessed Acreage Zoning1 55A 3 AWHITACRE ROLAND W, WHITACRE LINDA W1392 JORDAN SPRINGS RD STEPHENSON VA 22656 0.9 RA2 55A 2 APERRY PATRICIA D1466 JORDAN SPRINGS RD STEPHENSON VA 22656 8.46 RA3 56 A 3HALLAM BENJAMIN P, HALLAM JEAN JOHNSON1586 JORDAN SPRINGS RD STEPHENSON VA 22656 54 RA4 55 5 5HAWKINS CYNTHIA D240 FEATHERSTONE CT STEPHENSON VA 22656 5.07 RA5 55 5 6FRAWLEY EDWARD J TRUSTEE, FRAWLEY ROSE MARIE TRUSTEE243 FEATHERSTONE CT STEPHENSON VA 22656 5.12 RA6 55 5 8HARTMAN ERIN M, HARTMAN BRIAN R172 WHETSTONE CT STEPHENSON VA 22656 5.04 RA755 5 9 PULLEN LARRY R, PULLEN ELIZABETH M TRUSTEES182 WHETSTONE CT STEPHENSON VA 22656 5.13 RA8 55 5 10BROWN BETTY181 WHETSTONE CT STEPHENSON VA 22656 5.15 RA9 55 8 1MITCHELL WALTER NEAL, MITCHELL ELIZABETH MARIE1896 JORDAN SPRINGS RD STEPHENSON VA 22656 10 RA10 55 A 137EADAMKIEWICZ SUSAN LYNN TRUSTEE, SUSAN LYNN ADAMKIEWICZ REV TRUST319 PINE RD STEPHENSON VA 22656 7.51 RA11 55 A 137DMCGUIRE MICHALE A, MCGUIRE NORMA J295 PINE RD STEPHENSON VA 22656 3 RA12 55 A 137ATRUSTEES OF EMMANUEL UNITED, METHODIST CHURCH2732 MARTINSBURG PIKE STEPHENSON VA 22656 0 RA13 55 A 137CBENNETT GEORGE P, BENNETT JUDITH A263 PINE RD STEPHENSON VA 22656 1.01 RA14 55 A 138SEMPELES STEPHANIE M180 PINE RD STEPHENSON VA 22656 21.5 RA15 55 A 139SEMPELES STEPHANIE M180 PINE RD STEPHENSON VA 22656 7.31 RA16 55 A 109AJENKINS BRYAN SCOTT1605 HANDLEY AVE WINCHESTER VA 22601 9.44 RA17 55 A 110JENKINS BETTE P1712 REAVES ST WINCHESTER VA 22601 1.75 RA18 55 A 111JENKINS JEFFREY G1631 REDBUD RD WINCHESTER VA 22603 6.18 RA19 55 A 112JENKINS GARLAND W, JENKINS BARBARA D393 WOODS MILL RD STEPHENSON VA 22656 10.03 RA20 55 A 112APEARSON WYATT G, PEARSON ARIELLE J417 WOODS MILL RD STEPHENSON VA 22656 1.11 RA21 55 A 124MENGEL THOMAS C TRUSTEE, MENGEL RACHAEL E TRUSTEE479 WOODS MILL RD STEPHENSON VA 226567.3RA22 55 A 125SIMKHOVITCH RONALD SR, SIMKHOVITCH VELMA2657 MARTINSBURG PIKESTEPHENSON VA 22656 5 RA23 55 A 126ASPEVAK IDA M, SPEVAK SAMUEL IPO BOX 3750 WINCHESTER VA 22604 2.45 RA24 55 A 127BDUNLAP EDITH MPO BOX 73 STEPHENSON VA 22656 1.12 RA25 55 A 127CFREDERICK COUNTY VIRGINIA107 N KENT ST WINCHESTER VA 22601 0.05 RA26 55 A 127J R W PROPERTIES & RENTALS INC13 S LOUDOUN ST WINCHESTER VA 22601 24.98 RA27 55 7 4JOHNS M LESLIE JR250 DEVILS BACKBONE OVERLOOK STEPHENSON VA 22656 23.22 RA28 55 7 3COMER RONALD L743 WOODS MILL RD STEPHENSON VA 22656 20.04 RA29 55A 1 1WOHL HEIDI2566 E PAULSTAN CTSARASOTA FL 34237 1 RA30 55A 1 2MYERS NATHAN LEE, MYERS KELSEY MARIE758 WOODS MILL RDSTEPHENSON VA 22656 0 RA31 55A 1 3ATKINSON JANET768 WOODS MILL RD STEPHENSON VA 22656 0 RA32 55A 1 4MUNDY MATTHEW W, MUNDY MELODY D776 WOODS MILL RD STEPHENSON VA 22656 4.5 RA33 55A 1 8WELCH KEVIN J830 WOODS MILL RD STEPHENSON VA 22656 1.28 RA34 55A 1 9WELCH KEVIN J830 WOODS MILL RDSTEPHENSON VA 22656 1.06 RA35 55A 1 10SHAFFER JEANNETTE P, DORSEY JEFFREY S142 BUCKINGHAM DR STEPHENS CITY VA 22655 0 RA36 55A 1 11SHAFFER JEANNETTE P, DORSEY JEFFREY S142 BUCKINGHAM DR STEPHENS CITY VA 22655 0 RA37 55A 1 12SHAFFER JEANNETTE P, DORSEY JEFFREY S142 BUCKINGHAM DR STEPHENS CITY VA 22655 0 RA38 55A 1 13FELTNER JEFFREY A, FELTNER ANTINEA R870 WOODS MILL RD STEPHENSON VA 22656 1.25 RA39 55A 1 14RUSSELL SHARON G, RUSSELL REBEKAH LPO BOX 115 WHITE POST VA 22663 1.2 RA40 55A 1 15FRICKE JOHN C JR, FRICKE CLARA M886 WOODS MILL RD STEPHENSON VA 22656 0 RA41 55A 1 16BORROR RANDY DAVID896 WOODS MILL RD STEPHENSON VA 22656 0 RA42 55A 1 17NEWLIN TINA906 WOODS MILL RD STEPHENSON VA 22656 1.11 RA43 55A 1 18JRW PROPERTIES & RENTALS INC13 S LOUDOUN ST WINCHESTER VA 22601 1.08 RA44 55A 1 20JRW PROPERTIES & RENTALS INC13 S LOUDOUN ST WINCHESTER VA 22601 0 RA45 55A 1 22ALEE RONALD ALLEN, LEE MARY CATHERINE1947 MARTINSBURG PIKE WINCHESTER VA 22603 1 RASource: Frederick County, VA GIS, 2022 DataATTACHMENT 218 Redbud Run Solar FacilityADJOINING PROPERTIES46 44 A 296CONNER HAROLD R, CONNER ALLEN R1010 WOODS MILL RD STEPHENSON VA 22656 0.46 RA47 44 A 297ACONNER ALLEN R1010 WOODS MILL RD STEPHENSON VA 22656 0.37 RA48 55 A 133HART DOROTHY L897 WOODS MILL RD STEPHENSON VA 22656 1.16 RA49 55 7 1SWEET MICHAEL L362 WOODS MILL DR STEPHENSON VA 22656 17.48 RA50 55 7 14AMEIER KEVIN R, MEIER JORDAN V274 LICK RUN CROSSING STEPHENSON VA 22656 6.39 RA51 44 A 31ASTEPHENSON ASSOCIATES LCPO BOX 2530 WINCHESTER VA 22604 386.24 R452 44 A 31BBROOKFIELD STEPHENSON VILLAGE LLC3201 JERMANTOWN RD STE 150 FAIRFAX VA 22030 18.05 R453 44 A 293BROOKFIELD STEPHENSON VILLAGE LLC3201 JERMANTOWN RD STE 150 FAIRFAX VA 22030 17.96 R454 44E 15 11569CBROOKFIELD STEPHENSON VILLAGE LLC3201 JERMANTOWN RD STE 150 FAIRFAX VA 22030 2.01 R455 44E 17 11764BBROOKFIELD STEPHENSON VILLAGE LLC3201 JERMANTOWN RD FAIRFAX VA 22030 2.9 R456 44E 17 11764ABROOKFIELD STEPHENSON VILLAGE LLC3201 JERMANTOWN RD FAIRFAX VA 22030 12.12 R457 44 A 294AITKEN TONIE WALLACE, C/O TONIE M WALLACE1160 JORDAN SPRINGS RD STEPHENSON VA 22656 55.67 RAB258 45 4 1 2FORTNEY CLARK D, FORTNEY BARBARA K1281 JORDAN SPRINGS RD STEPHENSON VA 22656 3.04 RP59 45 4 1 3CONLEY JOHN M, CONLEY K JUNEPO BOX 218 STEPHENSON VA 22656 3.07 RP60 45 4 1 4BELL CATHERINE SUE1373 JORDAN SPRINGS RD STEPHENSON VA 22656 3.08 RP61 45 4 1 5KIENE CAROLYN L1373 JORDAN SPRINGS RD STEPHENSON VA 22656 3.22 RP62 55A 3 BVEGA BRUNO G1384 JORDAN SPRINGS RD STEPHENSON VA 22656 0.56 RASource: Frederick County, VA GIS, 2022 DataATTACHMENT 255A-4-1-1Brian Keith Ash1412 Jordan Springs RdStephensonVA 2265619 CROFTONCT REDBUDRD JORDANSPRI NGSRDNORLANDKNOLLDR MORLYN DR PARKLAND DR MERLOT DRMORG A N MILLRDLAKE S EVERDR H I D D E N PINES DR WOODS MILL RDFEATHERSTONE C TMILBURNRDWOODSMILLDR HIGHBANKS RD RIVERDALECIR B U R N T F A CTORYRDDENNY LNSETTLERS LN H I GHVIE W RDMILLBROOKDRCAVALIE RLNPROS PECTDRMACKENZIELN LICKRUNXING MARQUISCT M ONASTERYRIDG E R DFIRSTWOODSDRP I N E R D DEVIL S BACKBONEOLOOK59 4035 32 17 60 58 44 328 7 49 61474662 1 24548 43 42 4139 3837 363433 27 31 30 9 29 26 4 5 6 24 8 22 10 19 20 13 18 1112 141615 57 57 51 21 50 23 52 54 53 56 55 Map Da ta So u rce: Frederick Co unty, VA. GIS Departme n t, 2021 Data. 2 0 1 9 A erial Im age .ADJOINERS EXHIBITREDBUD SOLAR FACILITYFREDERICK COUNTY, VIRGINIADATE: 01-18-2022PROJECT ID: 0844ODESIGNED BY: MEWSCALE:1 inch = 1,100 feet1,100 0 1,100 Feet Legend Adjoin ers In terco nnection Parcel s Solar Ar ray and Access Parcels Parcel B ound ary µREDBUD SOLAR FACILITYADJOINERS EXHIBITCIVIL ENG INEERING | L AND PLAN NIN G | GIS | LAND SU RVEYING | ENVIRON MENTAL | ANALYT IC AL LABO RATORY | QUALITY CONTRO L TESTIN G & INSPEC TION S WINCHESTER, VA | ASHBURN, VA | MARTINSBURG, WVCLARKECOUNTYSTONEWALL MAGISTERIAL DISTRICT20 WRIGHTSMILLRDNEILLRDJORDANSPRINGSRD MORLYN DRMERLOT DRMORG A N MILLRDHI D DEN PINES DR WOODS MILL RDFEATHERSTONE C TWOODSMILLDR HIGHBANKS RD RIVERDALECIR B U R N T F A C TORYRDCUNNINGHAMLN SETTLERS LN H I GHVIE W RDMACKENZIELN MONASTERYRI DG E RDLICKRUN XING R EDBUDRDFIRSTWOODSDRDEVILS BACKBO N EOLOOKPINE RD Map Da ta So u rce: Frederick Co unty, VA. GIS Departme n t, 2021 Data. 2 0 1 9 A erial Im age .ZONING & LOCATION EXHIBITREDBUD SOLAR FACILITYFREDERICK COUNTY, VIRGINIADATE: 01-18-2022PROJECT ID: 0844ODESIGNED BY: MEWSCALE:1 inch = 1,000 feet1,000 0 1,000 Feet Legend In terco nnection Parcel s Solar Ar ray and Access ParcelsParcel B ound aryFrederick Co unty Zon in g B2 (Bu sines s, Gen eral Distrist) R4 (Re sidential, Planned Community District) RA (R ural Area D istrict) RP (Residential, Performa nce District) µREDBUD SOLAR FACILITYZONING & LOCATION EXHIBITCIVIL ENG INEERING | L AND PLAN NIN G | GIS | LAND SU RVEYING | ENVIRON MENTAL | ANALYT IC AL LABO RATORY | QUALITY CONTRO L TESTIN G & INSPEC TION S WINCHESTER, VA | ASHBURN, VA | MARTINSBURG, WVCLARKECOUNTYËÊ7HARRYBYRDHWY ËÊ7 £¤52 2 ËÊ37 £¤1 1 §¨¦81 £¤17 £¤50 WINCHESTER SITE äSTONEWALL MAGISTERIAL DISTRICT21 22 23 24 25 26 27 28 1COVER SHEETAS SHOWN STONEWALL MAGISTERIAL DISTRICT FREDERICK COUNTY VICINITY MAP SCALE: 1" 2000' DEVELOPER REDBUD RUN SOLAR LLC, C/O ORIDEN LLC 106 ISABELLA STREET, SUITE 400 PITTSBURGH, PA 412-235-9112 STONEWALL MAGISTERIAL DISTRICTFREDERICK COUNTY1/18/2022 CM/ZJ 6 0844O Plan Revisions Date Comment 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF DESIGNED BY: FILE NO. SCALE: DATE: LIST OF SERVICES: CIVIL ENGINEERING I GIS I LAND SURVEYING I ENVIRONMENTAL I ANALYTICAL LABORATORY I QUALITY CONTROL TESTING & INSPECTIONS PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WVREDBUD RUN SOLAR PROJECTCONCEPT PLAN REDBUD RUN SOLAR PROJECT OWNERS Sheet List Table Sheet Number Revsion No Sheet Title 1 Cover Sheet 2 Project Area 3 Concept Development Plan 4 Sight Distance Evaluations 5 Sight Distance Evaluations 6 Sight Distance Evaluations 29 151 Windy Hill Lane Winchester, Virginia 22602 Telephone: (540) 662-4185 Fax: (540) 722-9528 www.greenwayeng.com FND 1971 E N G I N E E R I N GSHEET OFDESIGNED BY:FILE NO.SCALE:DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIA OFFICES IN: WINCHESTER, VA & MARTINSBURG, WV1" 500'2PROJECT AREA STONEWALL MAGISTERIAL DISTRICT FREDERICK COUNTY1/18/2022CM/ZJ60844OREDBUD RUN SOLAR PROJECT ADJOINER PARCEL TABLELEGENDPROJECT PARCELSPARCELSSUBJECT PARCEL TABLEID'SADJOINER PARCELTABLE ID'SPROJECT AREAREDBUD ENERGY FACILITY: ~30 MW SOLAR FACILITYGENERATION TIE LINETOTAL PROJECT PARCEL AREA: 476.6± AC.(APPROXIMATELY 150.5 ACRES FOR SOLARARRAYS)MAGISTERIAL DISTRICT: STONEWALLACREAGE/ZONING:RA DISTRICTEXISTING LAND USE: AGRICULTURAL &RESIDENTIALNOTES1.SOLAR ARRAY DEVELOPMENT LIMITS WILL BE SETBACK 50'-100' FROM EXTERNAL ROADS ANDPROPERTY LINES.2.SOLAR ARRAY DEVELOPMENT LIMITS WILL CONSIST OF GROUND-MOUNTED PHOTOVOLTAICMODULES AND CENTRAL INVERTERS.3.A 6' HIGH SECURITY FENCE WITH SIGNAGE/24-HOUR CONTACT INFORMATION WILL BE INSTALLEDAROUND BOUNDARY OF SOLAR ARRAY DEVELOPMENT.4.LIGHTING WILL BE LIMITED TO SAFETY AND SECURITY PURPOSES ONLY, ON AN AS NEEDEDBASIS.5.STORM WATER MANAGEMENT SHOWN FOR PLANNING PURPOSES. LOCATIONS AND ACCESSROADS TO BE REFINED DURING SITE DESIGN.6.ACCESS TO THE FACILITY WILL BE PROVIDED THROUGH THREE ENTRANCES LOCATED ONWOODS MILL ROAD (IDENTIFIED ON SHEET 3). ADDITIONALLY A TEMPORARY ENTRANCE WILL BEUTILIZED ALONG PINE ROAD TO ACCESS LAY DOWN AREAS DURING THE CONSTRUCTIONPROCESS.7.THE LANDSCAPE BUFFER PLANTINGS SHALL BE MAINTAINED IN GOOD HEALTH FOR THE LIFE OFTHE PROJECT. EXISTING VEGETATION PRESERVATION AREAS IDENTIFIED ON SHEET 3 SHALLREMAIN UNDISTURBED FOR THE LIFE OF THE PROJECT.PROJECT AREA PARCEL TABLERev. No.DateINTERCONNECTIONPARCELSDATA NOTES·PROJECT AREA PARCELS SHOWNPER GREENWAY SURVEYCONDUCTED 2021·LOCATIONS OF PARCELS, ANDROADS SHOWN PER FREDERICKCOUNTY GIS DATA30 TMEICSkid-4.2MWAC TMEICSkid-4.2MWAC TMEICSkid-4.2MWAC TMEICSkid-4.2MWAC TMEICSkid-4.2MWAC TMEICSkid-4.2MWAC TMEICSkid-4.2MWAC TMEICSkid-4.2MWAC MVMVMVMVMV MV MV MV MVMVMVMV MV MV MVMVMVMVMVMVMV MV MV MVMVMVMVMVMVMVMVMVMVMVMVXXXXXXXXXXXX XXXXXXX XXXXXXXXX X PROPOSED POLE MOUNTED POINT OFINTERCONNECTION WITH EXOVERHEAD ELECTRIC LINEPROPOSED EASEMENT FORUNDERGROUND MEDIUMVOLTAGE INTERCONNECTIONLINEPOTENTIAL LAYDOWNENTRANCEEX VEG TOREMAIN ASSCREENPROP.LANDSCAPEBUFFER "A"EX VEG TOREMAIN ASSCREENXXXXXXXX XXXX XXXXXXXXXXXXXEX VEG TOREMAIN ASSCREEN(TYP.)PROP.LANDSCAPEBUFFER "B"MVMVMVMVMVMVMVMVMVMVMV MVMVMVMVMVMVMV MV PROP.LANDSCAPEBUFFER "A"PROPOSED TEMPORARYLAY DOWN AREAS ANDLANDSCAPE BUFFER "A"PROPOSEDTEMPORARY LAYDOWN AREAXXXXX NORTHENTRANCEALTERNATIVE 1NORTHENTRANCEALTERNATIVE 2151 Windy Hill Lane Winchester, Virginia 22602 Telephone: (540) 662-4185 Fax: (540) 722-9528 www.greenwayeng.com FND 1971 E N G I N E E R I N GSHEET OFDESIGNED BY:FILE NO.SCALE:DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIA OFFICES IN: WINCHESTER, VA & MARTINSBURG, WV1" 400'3CONCEPT DEVELOPMENT PLAN STONEWALL MAGISTERIAL DISTRICT FREDERICK COUNTY1/18/2022CM/ZJ60844OREDBUD RUN SOLAR PROJECT PROPOSED ACCESS ROAD TYPICAL SECTIONLEGENDPROJECT AREAPARCELSLANDSCAPE BUFFER AREADELINEATED STREAMSWATER/PONDSSECURITY FENCEDELINEATED WETLANDSPROPOSED ACCESS ROADSRIPARIAN BUFFERSSOLAR ARRAY AREAPROPOSED SITE ENTRANCEEXISTING VEGETATION/TREELINEINTERCONNECTION PARCELSBUILDING RESTRICTION LINETYPICAL ROAD SECTION2% MIN14' MINCOMPACTED NATIVE SUBGRADE PERGEOTECHNICAL ENGINEERALL WEATHERSURFACE/BASE PERGEOTECHNICALENGINEERNTSSOLAR ARRAY PANEL DETAILSOLAR ARRAY CROSS SECTIONNTSRev. No.DateLANDSCAPE BUFFER "B"LANDSCAPE BUFFER "B"not to scaleDESCRIPTION :EXTEND EXISTING TREELINES USING SIMILAR DECIDUOUS AND EVERGREEN SPECIESLANDSCAPE BUFFER "B"EX TREELINEPROPERTY BOUNDARY/EASEMENT50'-100'1.DECIDUOUS TREES TO BE A MINIMUM 2” CALIPER AT PLANTING;EVERGREEN TREES TO BE A MINIMUM 4' HEIGHT AT PLANTING2.SPECIES, QUANTITIES AND PLANTING SPECIFICATIONS OFDECIDUOUS AND EVERGREEN TREES TO BE PROVIDED ON SITEPLANSOLAR ARRAY DEVELOPMENT LIMITS15' OC 15' OC PROPOSED STORM WATERMANAGEMENTPROPOSED MEDIUM VOLTAGE LINE8.9'VARIES34.2'19.1'LANDSCAPE BUFFER "A"LANDSCAPE BUFFER "A"not to scaleDESCRIPTION :PROVIDE DOUBLE ROW OF EVERGREEN TREES WITH INTERSPERSED DECIDUOUS SPECIESALONG PROPERTY LINE/ EASEMENTLANDSCAPE BUFFER "A"PROPERTY BOUNDARY50'-100'SOLAR ARRAY DEVELOPMENT LIMITS15' OC 1.EVERGREEN TREES TO BE APPROXIMATELY 6' HEIGHT AT PLANTING 2.SPECIES, QUANTITIES AND PLANTING SPECIFICATIONS OF EVERGREENAND DECIDUOUS TREES TO BE PROVIDED ON SITE PLANEX VEGETATION TO REMAINAS SCREENNOTES1.REDBUD RUN SOLAR PROJECT WILL INSTALL AN UNDERGROUND GENERATION-TIE LINEWITHIN AN EASEMENT ON TAX MAP PARCELS 44-A-297, 55-A-134, 55-A-135, 44-A-295 &44-A-294A.2.PROJECT WILL SUPPLY ELECTRICITY INTO THE RAPPAHANNOCK ELECTRIC CO-OP34.5KV ELECTRIC LINE.3.FUTURE ROUTE 37 EAST: THE FREDERICK COUNTY COMPREHENSIVE PLAN SHOWS THEPLANNED ALIGNMENT OF FUTURE ROUTE 37 EAST EXTENDING ACROSS THE PROJECTSITE. THE DEVELOPER WILL DESIGN THE FACILITY TO ACCOMMODATE POTENTIALCONSTRUCTION OF FUTURE ROUTE 37 EAST DURING THE FACILITY'S LIFE CYCLE. TOTHAT END, THE FOLLOWING DESIGN MEASURES WILL BE APPLIED:DATA NOTES·PROJECT AREA PARCELS SHOWN PER GREENWAY SURVEY CONDUCTED 2021·LOCATIONS OF PARCELS, AND ROADS SHOWN PER FREDERICK COUNTY GIS DATA·2' CONTOURS DEPICTED WITHIN PROJECT AREA PER LIDAR FLIGHT CONDUCTED BY GREENWAY ENGINEERING IN 2021.·DELINEATED STREAMS AND WETLANDS PER PENNONI SURVEY CONDUCTED 2020 AND 2021.·SOLAR PHOTOVOLTAIC PANELS LOCATED WITHIN THE PLANNED ROUTE 37 EASTCORRIDOR WILL BE PLACED TO ENABLE REMOVAL WITHOUT COMPROMISINGFACILITY OPERATION.·PERMANENT ENTRANCES TO THE FACILITY WILL BE LOCATED TO THE NORTH ANDSOUTH OF THE PLANNED ROUTE 37 EAST CORRIDOR TO AVOID THE NEED FORRELOCATION AND/OR REDESIGN.·INVERTER PADS, UNDERGROUND COLLECTION LINES, AND RELATEDIMPROVEMENTS WILL BE PLACED TO MINIMIZE THE NEED FOR RELOCATION.·UNDERGROUND COLLECTION LINES CROSSING THE PLANNED ROUTE 37 EASTCORRIDOR WILL BE APPROPRIATELY ENCASED TO SUPPORT CONTINUOUS ANDSAFE OPERATION IN THE EVENT OF ROAD CONSTRUCTION.RT. 37 STUDY AREAPROPOSED TEMPORARY LAYDOWN AREADEC.DEC.31 XXXXXXXXXXXXXXXXXXXXXXXXXX14.5' DRIVER EYE LOCATION 500' SIGHT LINE (45 MPH DESIGN SPEED) APPROXIMATE CENTER OF LANE EXISTING VEG TO REMAIN AS LANDSCAPE BUFFER 500' SIGHT LINE (45 MPH DESIGN SPEED) APPROXIMATE CENTER OF LANE PROPOSED LANDSCAPE BUFFER 630 632 634 636 638 640 642 644 15+01.4814+5014+0013+5013+0012+5012+0011+5011+0010+5010+00 9+50 9+00 8+50 8+00 7+50 7+006+50 6+00 5+50 5+01.53 3.5' EYEHEIGHT3.5' OBJECTHEIGHT3.5' OBJECTHEIGHT4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 610 615 620 625 630 635 640 645 650 655 610 615 620 625 630 635 640 645 650 655 5.20' CUT ELECTRIC LINE IMPACTED BY CUT, MAY REQUIRE POLE REPLACEMENT PROP GRADE EXISTING GRADE 500' SIGHT LINE EXISTING GRADE PROP GRADE 500' SIGHT LINE ENTRANCE 1 (WOODS MILL) SIGHT DISTANCE PROFILE 1/18/2022 CM/ZJ 0844O151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF DESIGNED BY: FILE NO. SCALE: DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WVFREDERICK COUNTY, VIRGINIASIGHT DISTANCE EVALUATIONSREDBUD RUN SOLAR PROJECTSTONEWALL MAGISTERIAL DISTRICTENTRANCE 1 AS SHOWN VICINITY MAP NOTES: 1.ANY BRUSH WITHIN THE ROW CONFLICTING WITH THE SIGHT LINE TO BE CLEARED. 2.PROJECT DESIGN CURRENTLY IN CONCEPTUAL STAGES AND SIGHT DISTANCE PROFILES HAVE BEEN DEVELOPED FROM AVAILABLE DATA INCLUDING GIS, AERIAL, FIELD WORK, AND OTHER RELEVANT SOURCES. SUBJECT TO VERIFICATION AND ADJUSTMENT DURING FINAL DESIGN. 4 6 Rev. No.Date 32 14.5' 500' SIGHT LINE (45 MPH DESIGN SPEED) 500' SIGHT LINE (45 MPH DESIGN SPEED) DRIVER EYE LOCATION APPROXIMATE CENTER OF LANE APPROXIMATE CENTER OF LANE PROPOSED LANDSCAPE BUFFER PROPOSED LANDSCAPE BUFFER 15+00.9814+5014+0013+5013+0012+5012+0011+5011+0010+5010+009+509+008+508+007+507+006+506+005+504+99.44 3.5' EYEHEIGHT3.5' OBJECTHEIGHT3.5' OBJECTHEIGHT4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 630 635 640 645 650 655 660 630 635 640 645 650 655 660 ENTRANCE 2 (WOODS MILL) SIGHT DISTANCE PROFILE PROP GRADE EXISTING GRADE 500' SIGHT LINE 500' SIGHT LINE EXISTING GRADE FREDERICK COUNTY, VIRGINIASIGHT DISTANCE EVALUATIONSREDBUD RUN SOLAR PROJECT151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF DESIGNED BY: FILE NO. SCALE: DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WVSTONEWALL MAGISTERIAL DISTRICTAS SHOWN 1/18/2022 CM/ZJ 0844O ENTRANCE 2 VICINITY MAP NOTES: 1.ANY BRUSH WITHIN THE ROW CONFLICTING WITH THE SIGHT LINE TO BE CLEARED. 2.PROJECT DESIGN CURRENTLY IN CONCEPTUAL STAGES AND SIGHT DISTANCE PROFILES HAVE BEEN DEVELOPED FROM AVAILABLE DATA INCLUDING GIS, AERIAL, FIELD WORK, AND OTHER RELEVANT SOURCES. SUBJECT TO VERIFICATION AND ADJUSTMENT DURING FINAL DESIGN. 65 Rev. No.Date 33 500' SIGHT LINE (45 MPH DESIGN SPEED) DRIVER EYE LOCATION ALT 2 APPROXIMATE CENTER OF LANE DRIVER EYE LOCATION ALT 1 APPROXIMATE CENTER OF LANE APPROXIMATE CENTER OF LANEAPPROXIMATE CENTER OF LANE 15+0114+5014+0013+5013+0012+5012+0011+5011+0010+5010+009+509+008+50 8+007+507+006+506+005+505+00.09 14+99.9014+5014+0013+5013+0012+5012+0011+50 11+0010+5010+00 9+509+008+508+007+507+006+506+005+504+99.04 14.5'14.5' 500' SIGHT LINE (45 MPH DESIGN SPEED) X X 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 605 610 615 620 625 630 635 640 605 610 615 620 625 630 635 640 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 610 615 620 625 630 635 640 610 615 620 625 630 635 640 ALTERNATIVE 2 ENTRANCE 3 (WOODS MILL) SIGHT DISTANCE PROFILE ALTERNATIVE 1 ENTRANCE 3 (WOODS MILL) SIGHT DISTANCE PROFILE (EXISTING PRIVATE ENTRANCE)3.5' OBJECTHEIGHT3.5' OBJECTHEIGHT3.5' OBJECTHEIGHT3.5' OBJECTHEIGHT3.5' EYEHEIGHT3.5' EYEHEIGHTPROP GRADE EXISTING GRADE 500' SIGHT LINE 500' SIGHT LINE EXISTING GRADE EXISTING PRIVATE ENTRANCE TO BE UTILIZED EXISTING GRADE 500' SIGHT LINE 500' SIGHT LINE EXISTING GRADEXX X EXISTING FENCE FREDERICK COUNTY, VIRGINIASIGHT DISTANCE EVALUATIONSREDBUD RUN SOLAR PROJECT151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF DESIGNED BY: FILE NO. SCALE: DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WVSTONEWALL MAGISTERIAL DISTRICT1/18/2022 CM/ZJ 0844O ENTRANCE 3 ALT 2 ENTRANCE 3 ALT 1 AS SHOWN NOTES: 1.ANY BRUSH WITHIN THE ROW CONFLICTING WITH THE SIGHT LINE TO BE CLEARED. 2.PROJECT DESIGN CURRENTLY IN CONCEPTUAL STAGES AND SIGHT DISTANCE PROFILES HAVE BEEN DEVELOPED FROM AVAILABLE DATA INCLUDING GIS, AERIAL, FIELD WORK, AND OTHER RELEVANT SOURCES. SUBJECT TO VERIFICATION AND ADJUSTMENT DURING FINAL DESIGN. VICINITY MAP ALT #2 ENTRANCE 3 ALT #1 ENTRANCE 3 6 6 Rev. No.Date 34 Frederick County Impact Analysis Statement for Conditional Use Permit Application Redbud Run Solar LLC 106 Isabella St, Suite 400 Pittsburgh, PA 15212 35 2 Table of Contents Project Narrative .........................................................................................................................................3 Description of the Owner ..............................................................................................................................3 Description of Property .................................................................................................................................3 Compliance with County Regulation .............................................................................................................5 Project Overview.........................................................................................................................................5 a.Facility Summary ..............................................................................................................................5 b.Construction Schedule ......................................................................................................................6 c.Operations and Maintenance Plan ...................................................................................................6 Impact Analysis ..........................................................................................................................................6 Ecological Resources ...................................................................................................................................7 a.Water Resources ..............................................................................................................................7 b.Protected Species .............................................................................................................................8 Cultural Resources .......................................................................................................................................8 Economics ....................................................................................................................................................9 Community Outreach ....................................................................................................................................9 Safety ..........................................................................................................................................................10 Traffic ..........................................................................................................................................................10 Prime Farmland ..........................................................................................................................................11 Visual ..........................................................................................................................................................11 Air & Noise ..................................................................................................................................................11 Consistency with Frederick County Comprehensive Plan ...................................................................12 Potential Route 37 East Bypass .................................................................................................................12 Decommissioning Plan ............................................................................................................................13 Project Contacts .......................................................................................................................................13 36 3 PROJECT NARRATIVE This Impact Analysis Statement has been prepared in support of a Conditional Use Permit (“CUP”) application submitted by Redbud Run Solar LLC (“Redbud Run Solar” or “Applicant”), a wholly owned subsidiary of Oriden LLC (“Oriden”, “Facility Owner” and “Operator”). Oriden is the renewable energy development arm and a group company of Mitsubishi Power Americas, Inc. (“MPA”). Redbud Run Solar plans to construct a small utility-scale solar energy facility (“Facility”) in Frederick County, Virginia. The proposed Redbud Run Solar project (“Project”) will have a project nameplate of up to 30 MWac and will be located on a tract of land containing approximately 263 acres of pasture and timberland adjacent to Woods Mill Road (VA Route 660), of which approximately 150 acres will be developed with solar panels and related facilities enclosed by security fencing. DESCRIPTION OF THE OWNER Oriden is comprised of a team of experienced renewable project development professionals that have over 3 GW of development and 752 MW of operational asset experience. Oriden is a full-service renewable energy developer from concept to operations, with capabilities spanning across site selection, environmental and regulatory permitting, interconnection, power marketing, project financing, EPC, and O&M. As a wholly owned subsidiary of Mitsubishi Heavy Industries, Ltd (“MHI”) and MPA, Oriden has access to a large balance sheet that is capable of supporting the Project’s financing requirements. Since its inception in 2019, Oriden has developed a diverse portfolio of solar photovoltaic (“PV”) and energy storage system (“ESS”) projects across the U.S. including a sizable near-term development pipeline with growth potential backed up by long-term financial commitments. Oriden’s first solar + energy storage project was constructed in late 2020 and currently has two other solar projects currently under construction that are slated to come online in early 2022. Together, the Oriden team members take pride in our 130 years of combined experience in the U.S. renewable energy industry. The team has taken a leading role in taking over 3 GW of renewable energy generation projects, as small as 1.5MW and as large as 370MW, from inception through development and into construction. Having navigated through the challenges of both early and late-stage developments, the team is well versed in the tasks required to overcome inevitable obstacles and advance projects into operations. DESCRIPTION OF PROPERTY The Project is located approximately 2 miles east of Interstate 81, roughly 0.5-miles north of Berryville Pike (VA Route 7) near the intersection of Woods Mill Road (VA Route 660) and Pine Road (VA Route 661) in the Stonewall Magisterial District. The Project consists of a total of nine (9) parcels. Two of the parcels, totaling approximately 263 acres, are under lease option for the solar Facility, and two are under lease option for Facility access. The other five parcels are easement agreements for an underground, medium 37 4 voltage electric line connecting the solar Facility to the pole-mounted Point of Interconnection (“POI”) located approximately 0.5-miles northwest of the site. The parcels comprising the CUP application are as follows: Project Parcels Tax Map Number Owner Acreage Zoning Project Component 55-A-136 JRW Properties & Rentals Inc 128.99 RA Solar Arrays and Equipment 55-A-137 JRW Properties & Rentals Inc 134.00 RA Solar Arrays and Equipment 55-A-1-19 JRW Properties & Rentals Inc 0.94 RA Facility Access (Entrance 3 - Alternative 2) 55-A-1-21 Robert L. Williams 2.57 RA Facility Access (Entrance 3 - Alternative 1) and Underground Single-Phase Electrical Service 55-A-135 Ronald A. & Mary C. Lee 6.00 RA Underground Interconnection Line 55-A-134 Allen R. Conner 11.00 RA Underground Interconnection Line 44-A-297 Allen R. Conner 13.78 RA Underground Interconnection Line 44-A-295 William M. Rexrode 3.89 RA Underground Interconnection Line 44-A-294A Tonie Wallace 176.25 RA Underground Interconnection Line / Pole-mounted Point of Interconnection The four parcels proposed for development with solar PV arrays, related equipment, and Facility access are zoned RA, Rural Areas District. The parcels proposed for solar PV arrays are currently in various forms of agricultural use, including pasture, hayfield, and forestland. One parcel proposed for Facility access (“Alternative 1”) includes an existing driveway, residence, and out-building. A second parcel proposed for Facility access (“Alternative 2”) is vacant with mature woodlands. The five parcels proposed for locating the underground interconnection line and pole-mounted POI are also zoned RA and currently contain residential uses or are vacant. 38 5 COMPLIANCE WITH COUNTY REGULATION In accordance with Section 165-401.03.CC. of the Frederick County Zoning Ordinance (“Zoning Ordinance”), a utility-scale solar power generating facility is permitted in the RA District with approval of a Conditional Use Permit (“CUP”). The Concept Plan submitted with the CUP application demonstrates compliance with applicable requirements of the RA District as well as other relevant provisions of the Zoning Ordinance, notably concerning protection of environmental features. Utility-scale solar power generating facilities are further subject to the Additional Regulations for Specific Uses applicable to Public Utilities. Specifically, Section 165-204.26.2. requires a facility developer to enter into a written decommissioning agreement and obtain site plan approval prior to establishment of the use, both of which will be completed for the Project. Moreover, the required site plan will address the technical design standards of relevant review agencies internal and external to Frederick County, thereby ensuring compliance with applicable County and state regulations. PROJECT OVERVIEW a.Facility Summary The Facility will utilize mounted photovoltaic solar panels to convert sunlight into direct current (“DC”) electricity, which will be converted to alternating current (“AC”) electricity via solar inverters. These solar inverters will consist of skid-mounted inverters/transformers, and the total facility capacity will be up to 30,000,000 Watts (AC). The Facility will consist of approximately 71,000 photovoltaic (“PV”) solar panels mounted on a solar racking system. The Project is expected to use a fixed tilt racking system. Fixed tilt panels will be installed in east to west rows, with the panels facing south. A preliminary site layout showing the approximate location and spacing of solar panels is provided as Attachment 1. The site layout will continue to be refined through the detailed engineering design phase. The inverters will balance the module output in terms of voltage and current in DC power and then invert the power into 630-volt AC power output. Each skid will hold inverters and one padmount transformer to transform the voltage to 34.5 kV. The Project will include the following key components: Rows of PV panels mounted on posts driven into the ground. Rows of panels are typically spaced 20-40 feet apart to minimize shading from each racking table. Each post is placed individually in an effort to minimize the amount of on-site grading. Redbud Run Solar is planning to build solar arrays on racks that would cover approximately 103.3 acres, or 39%, of the Facility area. Electrical collection and communications lines are either mounted on the racking, buried in conduits, or located on overhead utility poles. Communication and facility control system and related equipment. Unpaved on-site access roads 14-ft wide with sufficient turning radii, grassy and gravel driving aisles, and three entrances from Woods Mill Road allowing a maintenance vehicle to drive around the solar array. Chain link security fencing located around the perimeter of the solar array areas spaced 15ft-25ft from the racking tables. 39 6 Stormwater, erosion and sedimentation control features and basins are located in the solar array areas based on preliminary civil engineering recommendations. Temporary construction staging areas. The Project will interconnect to the Redbud-Gaylord 34.5 kV Rappahannock Electric Cooperative (”Rappahannock”) line located approximately 0.5-mile northwest of the site. Power will be delivered to the POI via an underground medium voltage electric line within a 30-foot-wide easement. Interconnection applications were submitted to PJM Interconnection (“PJM”) and Rappahannock in July 2020 and studies are in progress. An Interconnection Agreement is expected to be executed for the Project in 2022. b.Construction Schedule Upon completion of all permitting requirements, construction of the Project is anticipated to take approximately nine to twelve months, from issuance of notice to proceed, to achieve commercial operation. Construction is anticipated to begin with civil site work in late 2022, with equipment installation to begin in early 2023. The proposed commercial operation date is December 2023 with final site restoration activities (e.g., site clean-up, finish grading, seeding, and mulching) to occur in early 2024. c.Operations and Maintenance Plan Redbud Run Solar is evaluating multiple Tier 1 O&M contractors for this Project. The contractor will have a dedicated team of field service engineers and technicians who actively oversee the quality and performance of the Project by using preventive, corrective, and predictive maintenance approaches. Each of these methods employs some or all of a number of services to include, but not limited to, performance monitoring and diagnostics, energy forecasting, warranty administration, and preventative maintenance, which could include module cleaning, IV Curve analysis, thermographic & aerial imaging, vegetation control, Supervisory Control and Data Acquisition (“SCADA”) systems, and parts replacement. The scope of O&M would further include scheduled and unscheduled maintenance. The scheduled maintenance is outlined by equipment manufacturer product manuals, and the unscheduled maintenance would involve fixing problems once they occur. Given Oriden’s capability to leverage the in-house knowledge of our team member’s past professional experience as both asset managers as well as operators, combined with preferred O&M firm’s vast experience and knowledge of O&M services, we are confident that the exacting specifications for facility performance will be met. IMPACT ANALYSIS In accordance with Section 165-103.02 of the Zoning Ordinance, the Board of Supervisors must consider several standards when deciding whether to approve a CUP request. The intent of these inter-related standards is to protect the health, safety, and welfare of County residents and ensure the proposed use will not adversely impact the surrounding community. The Project satisfies the standards for approval as follows: The Project is a passive land use that will be integrated into the landscape in a manner that is harmonious with the established rural character of the area. The Project will maintain the existing size and configuration of the subject parcels and will generally follow existing topography. By forestalling subdivision of the property, the Project will ensure that the established pattern of 40 7 development in this area is preserved. Additionally, the Project’s operation will not add traffic to the rural road network, nor will noise, light, or vibrations be generated, which will avoid disturbance to the existing rural character of the area. The Project’s passive nature will further promote its harmonious co-existence with surrounding properties. In addition to its lack of traffic-, noise-, light-, or vibration-related impacts, the Project’s design will avoid and minimize adverse effects to the viewsheds enjoyed in the surrounding area. Mature trees will be preserved along existing stream and drainage channels within the site as well as along site boundaries. Where existing vegetation does not exist or is otherwise insufficient, supplemental landscaping will be planted. The combination of tree preservation and new landscape plantings will mitigate potential visual impacts to surrounding properties and protect rural viewsheds. The Project will advance the goals and policies of the Frederick County Comprehensive Plan by establishing an interim use of agricultural land that will preempt residential subdivision and generate revenue for both the owner and County for the duration of the Project lease. By forestalling subdivision, the Project will preserve the subject acreage for future agriculture or other rural use and promote the directing of new residential growth away from the rural areas to the Urban Development Area (“UDA”). The Project will preserve the natural character of the subject acreage and surrounding area through site design that integrates and protects interconnected environmental resources, to include streams, riparian buffers, steep slopes, and mature vegetation. Such onsite resource protection supports the contiguity and cohesiveness of natural corridors that extend onto adjoining properties, thereby promoting the vitality of wildlife habitats and other ecosystems in the surrounding area and County overall. The Project is a passive use that will neither require nor impact public services. Project operations will not generate any daily vehicular traffic, as access will only be required for periodic maintenance activities. Such access will be provided by three entrances on Woods Mill Road, the existing condition of which is adequate to accommodate the Project’s limited vehicular trips. Installation of the Project entrances will further occur in accordance with applicable VDOT design and permitting requirements. The Project can be developed without impacting drainage conditions in the surrounding area and will be designed to comply with current County and state stormwater management requirements. The Project will therefore be adequately served by existing and planned infrastructure. The Project will conform to the applicable regulations of the RA, Rural Areas District. Notably, the required setbacks of the district are used to establish the perimeter boundaries of the solar array land bays, wherein all Project structures and equipment will be located. Moreover, setbacks have been increased voluntarily to 100 feet where possible in response to community feedback. A detailed analysis of Project impacts is provided in the following sections. ECOLOGICAL RESOURCES a.Water Resources Field surveys conducted by Pennoni in November 2020 and September 2021 identified stream and wetland resources within the Project area. The Project has been designed to avoid direct impacts to these sensitive 41 8 resources. Underground medium voltage electric lines will be installed below two perennial streams (unnamed tributaries to Opequon Creek) and one wetland via conventional bore to avoid impacts. A request for a Preliminary Jurisdictional Determination (“PJD”) was submitted to the U.S. Army Corps of Engineers (“USACE”) in August 2021. A supplemental PJD request for additional properties studied this Fall was submitted in October 2021. Whereas an applicant may pursue an Approved JD when the jurisdiction of a particular resource is in question, a PJD is typically pursued in instances where the applicant presumes all streams and wetlands delineated are under federal jurisdiction. USACE’s PJD is expected in February 2022. A copy of the PJD will be forwarded upon receipt. The streams identified within the Project area by Pennoni’s delineation differ from those depicted by County GIS data in certain areas. Based on established practice, the County will accept the results of the delineation as the basis for site design with submission of the PJD indicating concurrence of the U.S. Army Corps of Engineers with Pennoni’s findings. The CUP Concept Plan depicts stream resources per Pennoni’s delineation and applies required riparian buffers accordingly. No Federal Emergency Management Agency (“FEMA”) floodplains are within the Project area. Erosion and sediment control plans and stormwater management plans, designed in accordance with Virginia Department of Environmental Quality Erosion and Sediment Control Regulations and Stormwater Management Program Regulations, respectively, will be approved prior to any land-disturbing activity and the Project’s Building Permit issuance. No water supply or sewage facilities are needed for the Project. Routine maintenance, such as panel cleaning, may require water to be trucked in periodically. b.Protected Species Redbud Run Solar submitted a Project Review request to the Virginia Department of Conservation and Recreation (“DCR”) in September 2021. DCR’s response from October 2021 confirmed that no natural heritage resources have been documented within the Project boundary. DCR noted that the Project is partly within an area identified by the Virginia Natural Landscape Assessment as including interior forest habitat. This area received the lowest rating, indicating that it is least ecologically relevant. As recommended by DCR, Redbud Run Solar has designed the Project to minimize fragmentation by locating the facility primarily around existing open fields to minimize forest clearing, and by avoiding disturbance in natural forested riparian corridors throughout the site to provide connectivity for wildlife habitat. Redbud Run Solar also completed a review of the information and data available through the Virginia Department of Game and Inland Fisheries’ (“VDGIF”) Fish and Wildlife Information Service (“FWIS”) and Wildlife Environmental Review Map Service (“WERMS”). No sensitive resources were identified within the Project area. A copy of the protected species search results and consultations is provided as Attachment 2. CULTURAL RESOURCES Cardno was commissioned to review the Virginia Department of Historic Resources (“DHR”) CRIS and complete Cultural and Historic Resource fieldwork to allow the Project to meet the VA Department of 42 9 Environmental Quality (“DEQ”) Permit by Rule requirements. Cultural resource surveys were completed in May and September 2021, and the results were submitted to the DHR in December 2021. A Phase I Cultural Resource Identification Survey report (“Phase I Survey”) is provided as Attachment 3. Cardno’s Phase I Survey concluded that the Project site will not affect protected archaeological resources or sites that have historical, cultural, or sacred significance. The Phase I Survey further determined that the Project will not impact protected historic properties in the Project vicinity due to the combination of existing vegetation and topography. Virginia DEQ concurred with the survey methodology and findings in December 2021. A response from DHR is pending. ECONOMICS An analysis of the economic and fiscal impact was conducted by Mangum Economics, and the report is provided as Attachment 4. The Project would provide an estimated one-time pulse of economic activity to Frederick County during its construction phase supporting approximately 111 temporary construction jobs, $6.4 million in associated labor income, and $17.2 million in associated economic output (e.g., spending for food, lodging and other services). The estimated annual economic impact during operation of the Project would support approximately 2 jobs, $89,800 in associated labor income, and $236,100 in associated economic output. The Project will also make a significant fiscal contribution to Frederick County, through an estimated $0.5 million in state and local tax revenue from a one-time pulse of economic activity during Project construction. Over the anticipated 30-year operational life of the Facility, the Project is estimated to generate approximately $2.2 million in cumulative county revenue via real estate and machine and tool taxes, as compared to approximately $16,800 should the property remain in the current agricultural use. An analysis of the property values for adjoining properties was conducted by Kirkland Appraisals, and the report is provided as Attachment 5. The analysis concluded that the adjoining properties are well set back from the proposed solar panels. Most of the site has good existing landscaping for screening, and additional supplemental vegetation is proposed to supplement screening. The matched pair analysis shows no impact on home values due to abutting or adjoining a solar farm, as well as no impact to abutting or adjacent vacant residential or agricultural land where the solar farm is properly screened and buffered. The criteria that typically correlates with downward adjustments on property values (e.g., noise, odor, traffic) indicate that a solar farm is a compatible use for rural/residential transition areas and that it would function in a harmonious manner with this area. COMMUNITY OUTREACH Redbud Run Solarhas taken a proactive approach to engaging the local community. Conceptual Project design details have been shared with upwards of two dozen adjoining landowners, who have provided valuable feedback. Such feedback has generally been positive, particularly regarding the Project’s planned vegetative screening; avoidance of riparian corridors, streams, and wetlands; and minimal to no impact on traffic, noise, and other disruptions when compared to a residential subdivision. As a result of community feedback, Redbud Run Solar has voluntarily adopted a 100-foot side and rear setback where possible, which in many areas exceeds the Frederick County minimum Ordinance requirement of a 50-foot setback. A community open house will be held at Historic Jordan Springs in February 2022. 43 10 SAFETY As utility-scale solar developments are a relatively new type of development, it is common for communities to have questions about potential health and safety impacts. Solar technology has been in use and studied for decades, with wide scientific consensus that solar PV does not contribute to any significant health dangers to the surrounding community. Solar equipment and facilities are designed to strict electrical safety standards for safe operation. Product safety standards, installation requirements, and building codes for solar facilities are addressed by the National Fire Protection Agency’s National Electrical Code, the International Code Council’s International Fire Code, the International Association of Firefighters, and several other safety and product standards groups. Redbud Run Solar will use Crystalline-Silicon PV panels. The structural component of these panels primarily consists of glass, an aluminum frame, and common plastics, while the functioning component (typically less than 5% of the panel weight) includes the silicon PV cells and electric leads and wires. While the panels contain small amounts of lead in soldering, this soldering is sealed within the panel away from moisture to avoid corrosion. A damaged panel results in significantly decreased power generation and is promptly replaced. Furthermore, toxicity characteristic leaching procedure (“TCLP”) testing, which evaluates if heavily damaged panels in would leach hazardous substances in a landfill setting, does not indicate risks of leaching for Crystalline Silicon PV panels. The Project will also use inverters to convert the DC electricity from the panels to AC electricity for delivery to the power grid. This AC electricity produces electromagnetic fields at a very low frequency (i.e., low energy), which has less energy than radio waves, and is equally as harmless as the EMF generated by electricity and appliances within a home. The Project was submitted to the Federal Aviation Administration (“FAA”) for an aeronautical study. The FAA determinations received in February 2021 indicate the Project will not be a hazard to air navigation. Redbud Run Solar, in collaboration with the O&M contractor, will be fully responsible for the security of the facility, for maintaining consistent safety standards within the Project area, and for communicating with first responders in the event of an emergency. Local first responders will be given training regarding safety and system shutdown procedures. Security lighting may be used in select locations where needed, but overall, the Project will not be lit. TRAFFIC Three permanent entrances are proposed on Woods Mill Road (VA Route 660) to provide vehicular access to each of the Project’s solar array land bays. A temporary entrance is also proposed on Pine Road for use during the Project’s construction phase. Traffic generation will be greatest during Project construction but will drop precipitously once the Project is operational and will remain virtually non-existent thereafter. In fact, the Project will not generate any daily traffic, as vehicular access will be limited to periodic site visits by the O&M contractor. As such, the Project will have no discernable impact on Woods Mill Road or the surrounding rural road network. 44 11 Two locations are under consideration for access to the northernmost land bay (Entrance 3 - Alternative 1 and Alternative 2). Alternative 1 would utilize an existing driveway. Alternative 2 would require construction of a new entrance. Sight distance profiles indicate that sight distance requirements at Alternative 1 would not be met due to topography and fencing on an adjacent property; however, Redbud Run Solar intends to apply for an exemption from the sight distance requirements based on planned traffic safety measures and the advantages of utilizing an existing entrance. Alternative 2 is included with the CUP application to enable its use in the event VDOT does not approve the sight distance exemption for Alternative 1. Sight distance requirements can be met as-is or with minimal site work at the other proposed permanent entrances on Woods Mill Road. Supporting information is included with the Concept Plan. PRIME FARMLAND Approximately 50.2 acres (19%) of the Project area consist of soils classified as prime farmland, portions of which will be used for solar arrays and related equipment. The interim nature of the Project will enable these soils to be returned to active agriculture upon decommissioning, should the owner choose to do so. VISUAL Solar panels are designed to absorb as much light as possible; they are dark in color and are treated in anti-reflective coating such that they only reflect approximately 2% of incoming light, less than soil or even wood shingles. Solar panels have been approved by the Federal Aviation Administration for installation on and around airports across the country because of their low reflectivity. That said, the Project’s design includes measures to minimize impacts to viewsheds enjoyed in the surrounding area. Mature trees and existing undergrowth will be preserved along existing stream and drainage channels within the site as well as along site boundaries at minimum depths ranging from 50 feet to 100 feet. Where existing vegetation does not exist or is otherwise insufficient, supplemental landscaping will be planted, notably along the Project’s frontage on Woods Mill Road. Such landscaping will consist of a double row of evergreen plantings six (6)-feet in height at time of installation, with the row closest to the road interspersed with deciduous plantings to create a more natural and aesthetically appealing visual screen. Coupled with the site’s favorable topography, the combination of tree preservation and new landscape plantings will mitigate potential visual impacts to surrounding properties and protect rural viewsheds. Visualizations of the Project from Woods Mill Road are provided in Attachment 6. AIR & NOISE As with any construction project using conventional equipment, limited emissions from the exhaust of construction equipment will occur during the construction phase of the Project. The Erosion and Sediment Control Plan will be adhered to, minimizing the potential for fugitive dust impacts during construction activities. Once construction is complete, an operating solar farm is not a source of air emissions. Temporary, elevated noise levels will occur during the construction phase of the Project, but once construction is complete, an operating solar farm includes inverters and transformers which emit only minimal noise during the day and are dormant at night. Inverters and transformers are located internally within the facility, away from adjoining properties. In addition, Redbud Run Solar has proactively taken steps to minimize and mitigate visual impacts of the Project through vegetative buffers and setbacks from property lines, which enhance Facility safety and security considerations as well as provide additional sound 45 12 dampening benefits as well. Therefore, adjoining landowners will not experience noise impacts as a result of facility operations. CONSISTENCY WITH FREDERICK COUNTY COMPREHENSIVE PLAN The Frederick County Comprehensive Plan (“Comprehensive Plan”) indicates that “utility-scale solar facilities are typically passive uses with limited impacts to the environment and rural character” that can “facilitate the preservation of agricultural and rural land for future use” and “provide opportunities for landowners to recoup value from their property without subdividing” (Chapter IV, p. 35). As such, the Comprehensive Plan is generally supportive of establishing this land use in appropriate areas, with the CUP process identified as the mechanism for ensuring that surrounding properties are protected from potential impacts. The topography and configuration of the Project site enable the proposed utility-scale solar facility to be established and operated without adverse impact to surrounding properties or the prevailing rural character of the area. Specifically, the terrain is such that the solar arrays can be effectively screened from view from Woods Mill Road and adjoining properties through a combination of existing mature vegetation and new landscape plantings. Additionally, streams and riparian corridors within the site include substantial areas of mature woodlands, the preservation of which will provide continuity to existing viewsheds after Project development. These unique characteristics combine to make the subject property an appropriate location for a utility-scale solar facility consistent with the Comprehensive Plan. The Project also represents an alternative means of revenue generation for the property owner that does not require residential subdivision, and further enables the owner to return the property to active agriculture after the lease term ends and the facility is decommissioned. These outcomes promote the inter-related goals and policies of the Comprehensive Plan concerning residential development and farmland preservation. Specifically, by forestalling subdivision of the property, the Project eliminates the potential for by-right residential development on 263 acres of rural land for the duration of the lease term (30 years). As such, the Project will facilitate direction of residential growth away from the rural areas and toward the UDA, where it is desired. Additionally, the required decommissioning process will enable the property to be returned to active agriculture, effectively preserving valuable farmland for future use. POTENTIAL ROUTE 37 EAST BYPASS The Comprehensive Plan includes a potential expansion of the Route 37 East Bypass, a portion of which crosses the proposed Project site. To the applicant’s knowledge, right-of-way has not been acquired and VDOT funding has not been allocated for the bypass expansion; however, the Comprehensive Plan indicates that it is a priority for the county’s long-term planning. Therefore, the facility design will accommodate potential construction of the future Route 37 East Bypass during the facility’s life cycle. To that end, the following design measures will be applied: Solar PV panels proposed within the planned Route 37 East Bypass corridor will be placed strategically to enable removal without compromising facility operation. Permanent entrances to the facility will be located to the north and south of the planned Route 37 East Bypass corridor to avoid the need for relocation and/or redesign. Inverter pads, underground collection lines, and related improvements will be placed to minimize the need for relocation. 46 13 Underground collection lines crossing the planned Route 37 East Bypass corridor will be appropriately encased during installation to support continuous and safe operation in the event of road construction. Redbud Run Solar will also commit to working with VDOT on ensuring the compatibility of the facility with the potential bypass, should the road’s construction ultimately move forward. DECOMMISSIONING PLAN At the end of the project’s life, the Project infrastructure will be decommissioned and removed. As added protection for Project landowners and the County, Redbud Run Solar will put financial security in place within ninety (90) days of achieving commercial operation ensuring that neither the County nor the landowners will bear responsibility for decommissioning or restoration. A decommissioning plan has been prepared for the Project and is provided in Attachment 7. This plan will be refined to include cost estimates prior to County review and approval of the Site Plan. PROJECT CONTACTS Gary Verkleeren Director, Construction & Development 106 Isabella Street, Suite 400 Pittsburgh, PA 15212 P: (412) 915-9017 E: Gary.Verkleeren@OridenPower.com Ali Trunzo Manager, Development 106 Isabella Street, Suite 400 Pittsburgh, PA 15212 P: (412) 230-6684 E: Ali.Trunzo@OridenPower.com Chris Mohn Principal / Director of Planning Greenway Engineering, Inc. 151 Windy Hill Lane Winchester, VA 22602 P: (540) 662-4185 E: CMohn@GreenwayEng.com 47 Decommissioning Plan Redbud Run Solar Project Frederick County, Virginia Redbud Run Solar LLC 106 Isabella St, Suite 400 Pittsburgh, PA 15212 48 2 Table of Contents 1. Introduction ............................................................................................................................................... 3 2. Decommissioning Process ........................................................................................................................ 3 Sequence of Activities ............................................................................................................................ 3 Timing for Decommissioning .................................................................................................................. 4 Partial Decommissioning ........................................................................................................................ 4 Completion of Decommissioning ............................................................................................................ 4 3. Decommissioning Cost Estimate .............................................................................................................. 4 4. Financial Security ...................................................................................................................................... 5 Default by the Facility Owner .................................................................................................................. 5 49 3 1. INTRODUCTION This Decommissioning Plan ("Plan") has been prepared for the Redbud Run Solar Project ("Project") located in Frederick County, Virginia ("County"), and shall be binding on each successor and assignee ("Facility Owner"). The purpose of the Plan is to describe the decommissioning process for the Project. Pursuant to this Plan, a Decommissioning Cost Estimate will be provided for County review prior to the Site Plan approval and updated every five (5) years during the Project Life. The proposed Project is located on approximately 263 acres, with approximately 150 acres proposed within the fence line. The Project will interconnect to the Rappahannock Electric Cooperative 34.5kV line, located approximately 0.5-mile north of the site. The Project is expected to operate for a minimum of 30 years based on the anticipated useful life of the facility equipment and warrantees thereof. 2. DECOMMISSIONING PROCESS The expected life of the Project is the period during which the facility can produce electrical energy ("Project Life"). The Project has been designed for a lifespan of 30 years or greater. At the end of the Project Life, or earlier in the event of abandonment of all or a portion of the Project, the Facility Owner shall decommission the Project, or a portion thereof. Most components of the Project are composed of valuable recyclable materials, including glass semiconductor material, steel, aluminum, and wiring, and will therefore be salvageable, recyclable, reusable, or resaleable. At the conclusion of the Project Life, these components are typically removed, dissembled (if applicable), packaged and shipped for re-sale or to a salvage/recycling facility or other processing facility where possible, or to a landfill for disposal. SEQUENCE OF ACTIVITIES The following sequence of activities is anticipated for decommissioning: 1. Access roads are repaired/reinforced as necessary to support heavy equipment traffic. 2. Sediment control systems are installed according to best management practices (“BMPs”) to control erosion and protect neighboring properties and sensitive resources. 3. The facility is disconnected from the utility power grid and solar arrays are de-energized. 4. Solar modules are disconnected, collected, and either shipped to another project, salvaged, or submitted to a collection and recycling program. 5. Electrical interconnection, wiring, and distribution cables are removed and recycled off-site by an approved recycler. Inert materials below a depth of 36 inches may be abandoned in place if removal would result in greater disturbance. 6. Array steel piles and racking are removed and recycled off-site by an approved metals recycler. Inert materials below a depth of 36 inches may be abandoned in place if removal would result in greater disturbance. 7. Electrical and electronic devices, including transformers and inverters are removed and recycled off-site by an approved recycler. 50 4 8. Concrete pads (if used for the transformers and inverter blocks) are removed and recycled and/or repurposed. 9. Fencing is removed and recycled off-site by an approved recycler. 10. Project access and internal roads can either remain onsite should the landowner choose to retain them, or be removed and the gravel repurposed either on- or off-site. 11. Unless agreed otherwise by the landowner, the Project site is restored to pre-construction conditions, to the extent feasible, by de-compacting subsoils (if required) and revegetating disturbed land. Restoration will be completed in consultation with the landowner(s) in accordance with applicable land use regulations in effect at the time of Decommissioning. The Project is not expected to generate hazardous materials. In the unlikely event that hazardous materials, as defined by federal, state and/or local laws, are encountered, the Facility Owner shall dispose of such materials in accordance with applicable federal, state and local laws and regulations. TIMING FOR DECOMMISSIONING Decommissioning will commence upon the earlier of: (i) Completion of the Project Life; or (ii) Abandonment of the Project or any portion thereof. If the Project or any portion thereof has ceased operations and is not maintained for a continuous period of longer than one (1) year and decommissioning is required before the end of the Project Life, the County may provide written notice of suspected abandonment to the Facility Owner. Upon receipt, the Facility Owner shall have a sixty (60) day period in which to refute the claim, remedy any problem, commence Decommissioning, or show why more than sixty (60) days is reasonably necessary to remedy the problem. If at the end of the sixty (60) day period the parties are unable to resolve amicably any dispute arising out of or in connection with this Decommissioning Plan, then such dispute shall be resolved by an action filed in the Circuit Court of Frederick County, Virginia. PARTIAL DECOMMISSIONING If Decommissioning is triggered for a portion, but not the entire Project, prior to the end of the Project Life, the Facility Owner shall commence and complete Decommissioning, in accordance with the Decommissioning Plan, for the applicable portion of the Project. If a portion of the Project is Decommissioned, the remaining portion of the Project would continue to be subject to this Decommissioning Plan. COMPLETION OF DECOMMISSIONING Decommissioning will be complete when the County Construction Official or County Engineer, or another party appointed by the County, determines that Decommissioning has been completed in accordance with this Decommissioning Plan by issuance of a letter to the Facility Owner. 3. DECOMMISSIONING COST ESTIMATE The Facility Owner shall provide an estimate of the cost to decommission the Project (the "Decommissioning Cost Estimate") prepared by a Virginia Licensed Engineer prior to Site Plan approval. The Decommissioning Cost Estimate will account for the gross estimated cost to perform 51 5 decommissioning and account for administrative and inflation factors as well as the estimated resale and salvage values associated with the Project equipment. A 10% reduction will be applied to the resale and salvage value. During the Project Life, the Facility Owner will provide an updated Decommissioning Cost Estimate to the County on every 5th year anniversary of the date when the Project first began to continuously deliver electric energy to the electric grid for commercial sales (the "Commercial Operation Date"). The updated Decommissioning Cost Estimate will account for inflation, cost and value changes, and advances in decommissioning technologies and approaches. 4. FINANCIAL SECURITY Financial security shall be in an amount equal to the Decommissioning Cost Estimate (the "Decommissioning Security"). The Decommissioning Security may be provided in the form of certified funds, cash escrow, bond, letter of credit, or parent guarantee, and will be provided within ninety (90) days of achieving Commercial Operation Date. The Facility Owner shall adjust the amount of the Decommissioning Security to match the updated Decommissioning Cost Estimate after each update during the Project Life. The Facility Owner will only be required to provide one instrument or obligation equal to the Decommissioning Security to satisfy its obligations to both the County and the landowner. If the Facility is owned by a public utility company or an independent power producer with an investment grade credit rating with Moody's or Standard and Poor's (a "Qualified Company"), no financial security will be required. This does not negate the Facility Owner’s financial security obligations to the landowner as established in the Lease Agreement. DEFAULT BY THE FACILITY OWNER If the Facility Owner is in default of its obligation to commence or complete Decommissioning, and such default remains uncured for more than sixty (60) days, each landowner shall have the right to commence Decommissioning activities within the area it owns. Nothing herein shall limit other rights or remedies that may be available to the County to enforce the obligations of the Facility Owner, including the County's zoning powers. 52 Frederick County – Redbud Run Solar, LLC Solar Facility Siting Agreement Page 1 of 12 SOLAR FACILITY SITING AGREEMENT This Solar Facility Siting Agreement (“Agreement”), dated as of __(MONTH)__ __(DATE)__, 20__ (the “Effective Date”), is by and between Frederick County, Virginia, a political subdivision of the Commonwealth of Virginia (the “County”) and Redbud Run Solar LLC a Delaware limited liability company (“Applicant”). The County and Applicant are herein each a “Party” and collectively, the “Parties”. RECITALS WHEREAS, the Applicant intends to develop, install, build, and operate a ground-mounted solar photovoltaic electric generating facility (“Project ”) on certain parcel(s) of land identified as Frederick County Tax Map Parcels 55 A 137, 55 A 136, 55 A 1 19, 55 A 135, 55 A 134, 44 A 297, and 45 4 1 3 (collectively, the “Property”); WHEREAS, Pursuant to Chapter 22, Title 15.2, Article 7.3 of the Code of Virginia titled “Siting of Solar Projects and Energy Storage Projects” Applicant and the County may enter into a siting agreement (“Siting Agreement”) for solar facilities in those census tracts which meet the eligibility requirements for designation as a qualified opportunity zone by the U.S. Secretary of the Treasury via his delegation to the Internal Revenue Service; WHEREAS, the Project is located in census tract numbers 511.04 and 501 within Frederick County and eligible for a designation as an opportunity zone; WHEREAS, pursuant to Virginia Code §§ 15.2-2316.6 et seq., the Project is eligible for a Siting Agreement; WHEREAS, after negotiation between the County and the Applicant, the Parties desire to enter into this Agreement to mitigate certain potential impacts of the Project. WHEREAS, pursuant to Virginia Code § 58.1-2636, the County has not adopted an ordinance assessing a revenue share of up to $1,400.00 per megawatt, as measured in alternating current (AC) generation capacity of the nameplate capacity of the Solar Facility (“Solar Revenue Share”), but may choose to do so at a later date; WHEREAS, Pursuant to Virginia Code § 58.1-3660, if the County adopts the Solar Revenue Share, the solar photovoltaic (electric energy) systems associated with the Project, which are considered “certified pollution control equipment;” will be exempt from all state and local taxation pursuant to Article X, Section 6 (d) of the Constitution of Virginia (the “Tax Exemption”); WHEREAS, until such time as the County adopts a Solar Revenue Ordinance, such certified pollution control equipment will be subject to local machinery and tools taxation as provided by state law and local ordinances, including § 58.1-3660 (C) and (D), commonly known as the Machinery and Tools Tax Stepdown (“M&T Stepdown”); 53 Frederick County – Redbud Run Solar, LLC Solar Facility Siting Agreement Page 2 of 12 WHEREAS, the Applicant has agreed to the payments and financial terms contained herein; WHEREAS, pursuant to the requirement of Virginia Code § 15.2-2316.8 (B), the County has held a public hearing in accordance with subdivision A of Virginia Code § 15.2-2204 for the purpose of considering this Agreement, after which a majority of a quorum of the members of the Frederick County Board of Supervisors approved this agreement; NOW, THEREFORE, pursuant to Chapter 22, Title 15.2, Article 7.3 of the Code of Virginia, intending to be legally bound hereby and in consideration of the mutual covenants contained herein, the receipt and sufficiency of which are hereby acknowledged, the County and Applicant do hereby agree as follows: Article I Project Features, Conditions and Mitigation 1.CUP Conditions. The Applicant acknowledges and agrees that it is subject to all the terms and conditions contained in any conditional use permit (“CUP”) approved by the Board of Supervisors for the Project. The CUP approved by the Board on __(MONTH)__ __(DATE)__, 20__ is attached hereto as Exhibit B and is hereby incorporated herein. Violation by the Applicant or by any of Applicant’s agents, assigns, or successors in interest of any terms and conditions of the CUP or of any other applicable zoning requirements shall constitute a violation of this Agreement. 2.Annual Valuation of Real Property. As a condition precedent to County approval of this Agreement, Applicant agrees to provide County with current copies of a summary of the annual lease payment amounts for each parcel being leased for the Project. Applicant may redact any other information deemed confidential tax information or proprietary/trade secrets. Thereafter, should the payment terms be amended in any such lease agreements, the Applicant shall forthwith provide such information to the County. Applicant further agrees to include as a condition in any agreements transferring ownership of the Project entered into by Applicant a requirement that any successor in interest shall provide such information to the County. 3.Annual Valuation of Taxable Equipment; Updates. Prior to the Commercial Operation Date, Applicant agrees to provide County with a detailed list of capital equipment related to the Project, including but not limited to solar photovoltaic equipment proposed to be installed, whether or not it has yet been certified as pollution control equipment by the State Corporation Commission or Virginia Department of Environmental Quality, and lists of all other taxable tangible property related to the Project. Thereafter, on an annual basis, Applicant shall provide County with any updates to this information, including but not limited to all new or replacement solar panels and all other equipment located on the Property. Applicant agrees to provide the County all information it may in the future provide to the Virginia State Corporation Commission for the Commission’s use in valuing such property for taxation purposes. 54 Frederick County – Redbud Run Solar, LLC Solar Facility Siting Agreement Page 3 of 12 4.Decommissioning and Periodic adjustment of Surety Bond. The Parties agree that a surety bond to cover the costs of decommissioning Applicant’s facilities is required as a condition in the CUP. Further, the Applicant recognizes the protection this provides for the County taxpayers and does not desire to shift that expense to them should the Applicant or its successors or the landowner not be able to comply with the decommissioning requirements; and County recognizes that the surety bond is an expense to be incurred by the Applicant encumbering funds that could otherwise go directly towards investing in the Project or other potential projects. In recognition of these factors, the Parties desire for the bond and the costs for such to accurately reflect the associated decommissioning costs being insured. Therefore, the Applicant, or its successor, agrees to update the gross estimated costs of decommissioning every five years. The bond or surety amount shall be adjusted accordingly to ensure it accurately reflects the costs associated with decommissioning. 5. Right of Entry for Enforcement and Decommissioning. a. Enforcement. Applicant and the County acknowledge and agree that the County, its personnel and duly authorized agents shall have the express right of entry, subject to any of Applicant’s safety and facility policies, upon the Project parcels for the purposes of inspecting solar panels and all appurtenant facilities. The County shall provide twenty-four (24) hour notice to the Applicant prior to making such entry for any inspection or enforcement purposes. No prior notice shall be required to enter the Project in the event of an emergency that constitutes an immediate danger to life or property. b.Decommissioning. If the Applicant fails to decommission the Project at the end of the Project and usage thereof and subject to opportunity to cure, the County shall have unrestricted access the Project to effect any and all tasks, as necessary, to decommission solar panels and all appurtenant facilities and restore the parcels to substantially the same condition that existed prior to construction of the solar facilities, or as otherwise agreed with landowner, and as provided by Va. Code § 15.2-2241.2, as it may be amended through the Termination Date as defined in this Agreement. Such access rights shall remain in effect through decommissioning regardless of whether Va. Code § 15.2-2241.2 is repealed or otherwise limited in scope from the access rights it provides the County as of the date of execution of this Agreement. Article II Payment Structure 1.Capital Payments. a.After the Project has obtained commercial operation, except as otherwise provided herein, the Applicant shall make payments to the County as set forth on Schedule A attached hereto (each a “Payment” and collectively, the “Payments”). The Payments shall begin within thirty (30) days following the first January 1st 55 Frederick County – Redbud Run Solar, LLC Solar Facility Siting Agreement Page 4 of 12 following the commencement of Commercial Operation of the Project, the “Commercial Operation Date”. For the purposes of this Siting Agreement, the commencement of commercial operation will be the earlier of: i) ninety (90) days following the first delivery of energy to the transmission system (as communicated by Applicant and verified by the transmission system owner within ten (10) days following the first delivery of energy) or ii) the commercial operation date as established in the Applicant’s PJM Interconnection Services Agreement. b.Unless otherwise agreed through modification or termination of this Agreement as provided for herein, the Payments shall continue on January 31st of each year thereafter until the earlier of the following (the “Termination Date”): (i) the Applicant’s commencement of the decommissioning of all or a material portion of the Project, (ii) the cessation of commercial operation of the Project for a continuous period of longer than one (1) year, or (iii) the 45th calendar year of commercial electricity generation of the Project in which the final payment on Schedule A is shown. c.The Parties acknowledge that, other than the lump sum payment at the commencement of construction and except as otherwise provided herein, the Applicant’s obligation to make Payments shall be conditioned upon the Project beginning commercial operation. d.The Payments shall be made to the County in any year in one lump sum payment during the term of this Agreement. The Payments are separate and distinct from the amounts owed pursuant to any machinery and tools taxes on equipment pursuant to Article 2, Chapters 35 and 36 of Title 58.1 of the Code of Virginia and applicable County Ordinances, and all real estate taxes owed pursuant to Chapter 155 of the Frederick County, Virginia Code of Ordinances. 2.Statutory Structure of Payments; Statement of Benefit. The Applicant agrees that by entering into this Agreement, pursuant to Virginia Code § 15.2-2316.6 et seq., the Payments are authorized by statute and that it acknowledges, it is bound by law to make the Payments in accordance with this Agreement. The Parties acknowledge that this Agreement is fair and mutually beneficial to them both. As of the date of this Agreement, the County has not adopted a Solar Revenue Share Ordinance as provided under Virginia Code § 58.1-2636, and the Payments under this agreement are not conditioned upon the County adopting such ordinance. Should the County at a later date adopt a Solar Revenue Share Ordinance, the County acknowledges that payments under this Agreement shall be suspended until the County and the Applicant should mutually agree to modify and/or terminate this Agreement. Applicant acknowledges that this Agreement is beneficial to Applicant in allowing it to proceed with the installation of the Project with clear project design terms, which provide for mitigation of effects on the surrounding properties and the Frederick County community. Additionally, Applicant acknowledges that this Agreement provides for a clear and predictable stream of future payments to the County in values fair to both Parties. 3.Use of Payments by the County. The County plans to apply The Payments to critical 56 Frederick County – Redbud Run Solar, LLC Solar Facility Siting Agreement Page 5 of 12 infrastructure projects to improve citizen quality of life, including but not limited to expanding educational opportunities, health care (telehealth) and economic development through significant investments in broadband deployment throughout the County. Notwithstanding the above, the Payments may be used for any of the following purposes: (a) to fund the capital improvement program (CIP) of the County (b) to meet needs of the current fiscal budget of the County, (c) supplement or establish any fund for which the County maintains a balance policy; (d) support broadband funding, all as permitted § 15.2-2316.7. Article III Miscellaneous Terms 1.Term; Termination. This Agreement shall commence on the Effective Date and shall continue until the Termination Date. The Applicant shall have no obligation to make Payments after the Termination Date. The Payment due for the year in which the Project or material part thereof is decommissioned shall be prorated as of the Termination Date. The termination of this Agreement shall not limit the Applicant’s legal obligation to pay local taxes in accordance with applicable law at such time and for such period as the Project remains in operation. 2.Mutual Covenants. The Applicant covenants to the County that it will pay the County the amounts due hereunder when due in accordance with the terms of this Agreement, and will not seek to invalidate this Agreement, or otherwise take a position adverse to the purpose or validity of this Agreement. So long as Applicant is not in breach of this Agreement during its term, the County covenants to the Applicant that it will not seek to invalidate this Agreement or otherwise take a position adverse to the purpose or validity of this Agreement. 3.No Obligation to Develop. The Applicant has no obligation to develop the Project and this Agreement, except as otherwise provided, does not require any Payments until after the Commercial Operation Date. Any test energy or other energy produced prior to the Commercial Operation Date shall not trigger payment under this paragraph. It is understood that development of the Project by Applicant is contingent upon a number of factors including, but not limited to, regulatory approvals, availability and cost of equipment and financing, and demand for renewable energy and renewable energy credits. No election by the Applicant to terminate, defer, suspend or modify plans to develop the Project shall be deemed a default of Applicant under this Agreement. 4.Successors and Assigns. This Agreement will be binding upon the successors and assigns of the Applicant. If Applicant sells, transfers, leases or assigns all or substantially all of its interest in the Project, Applicant will require this Agreement to be assumed by and be binding on the purchaser, transferee or assignee. Upon such assumption, the sale, transfer, lease or assignment shall relieve the Applicant of all obligations and liabilities under this Agreement accruing from and after the date of sale or transfer, and the purchaser or transferee shall automatically become responsible under this Agreement. The Applicant shall execute such documentation as reasonably requested by the County to memorialize the assignment and assumption by the purchaser or transferee. 57 Frederick County – Redbud Run Solar, LLC Solar Facility Siting Agreement Page 6 of 12 5.Memorandum of Agreement. This Agreement or memorandum of this Agreement, in a form acceptable to the County Attorney, shall be recorded in the land records of the Clerk’s Office of the Circuit Court of the County of Frederick, Virginia. Such recordation shall be at the Applicant’s sole cost and expense and shall occur as soon as reasonably practicable after the full execution of this Agreement. If the Applicant chooses to not develop the Project, in its sole discretion, the County shall execute a release of the memorandum filed in the aforementioned Clerk’s Office. 6.Notices. Except as otherwise provided herein, all notices required to be given or authorized to be given pursuant to this Agreement shall be in writing and shall be delivered or sent by registered or certified mail, postage prepaid, by recognized overnight courier, or by commercial messenger to: Frederick County, Virginia 107 North Kent Street Winchester, Virginia 22601 Attn: County Attorney’s Office Redbud Run Solar, LLC c/o William Miller 106 Isabella Street, Suite 400 Pittsburgh, Pennsylvania 15212 The County and Applicant, by notice given hereunder, may designate any further or different persons or addresses to which subsequent notices shall be sent. 7. Governing Law; Jurisdiction; Venue. This Agreement shall be governed by and construed in accordance with the laws of the commonwealth of Virginia, without regard to any of its principles of conflicts of laws or other laws which would result in the applicable of the laws of another jurisdiction. The Parties hereto (a) agree that any suit, action or other legal proceeding, as between the Parties hereto, arising out of or relating to this Agreement shall be brought and tried only in the Circuit Court of Frederick County, Virginia, (b) consent to the jurisdiction of such court in any such suit, action or proceeding, and (c) waive any objection which any of them may have to the laying of venue or any such suit, action, or proceeding in such court and any claim that any such suit, action, or proceeding has been brought in an inconvenient forum. The Parties hereto agree that a final judgment in any such suit, action, or proceeding shall be conclusive and may be enforced in other jurisdictions by suit on the judgment or in any other manner provided by law. 8. N/A 9.Severability; Invalidity Clause. Any provision of this Agreement that conflicts with applicable law or is held to be void or unenforceable shall be ineffective to the extent of such conflict, voidness or unenforceability without invalidating the remaining provisions hereof, which remaining provisions shall be enforceable to the fullest extent permitted under applicable law. If, for any reason, including a change in applicable law, it is ever determined by any court or governmental authority of competent jurisdiction that this Agreement is invalid then the parties shall, subject to any necessary County meeting vote or procedures, undertake reasonable efforts to 58 Frederick County – Redbud Run Solar, LLC Solar Facility Siting Agreement Page 7 of 12 amend and or reauthorize this Agreement so as to render the invalid provisions herein lawful, valid and enforceable. If the Parties are unable to do so, and if the fundamental purpose and terms of this Agreement are no longer effective as mutually agreed between the Parties, this Agreement shall terminate as of the date of such determination of invalidity, and the Property and Project will thereafter be assessed and taxed as though this Agreement did not exist. The Parties will cooperate with each other and use reasonable efforts to defend against and contest any challenge to this Agreement by a third party. 10.Entire Agreement. This Agreement and any schedules or exhibits constitute the entire agreement and supersedes all other prior agreements and understandings, both written and oral, between the parties hereto with respect to the subject matter hereof. No provision of this Agreement can be modified, altered or amended except in a writing executed by all parties hereto. 11.Force Majeure. A."Force Majeure Event" means the occurrence of: (i) an act of war (whether declared or not), hostilities, invasion, act of foreign enemies, terrorism or civil disorder; (ii) a strike or strikes or other industrial action or blockade or embargo or any other form of civil disturbance (whether lawful or not), in each case affecting on a general basis the industry related to the construction, operation, or maintenance of the solar facility, as for example but not in limitation, the interruption in the supply of replacement solar panels, and which is not attributable to any unreasonable action or inaction on the part of Applicant or any of its subcontractors or suppliers and the settlement of which is beyond the reasonable control of all such persons; (iii) specific incidents of exceptional adverse weather conditions in excess of those required to be designed for that are materially worse than those encountered in Frederick County during the twenty (20) years prior to the Effective Date; (iv) tempest, earthquake, or any other natural disaster of overwhelming proportions; disruption of operations resulting from any plane crashing into the solar facility to the extent that all or a substantial portion thereof it unable to generate electricity sufficient to meet Applicant’s payment obligations hereunder; (v) discontinuation of electricity supply, or unanticipated termination of a power purchase agreement; (vi) other unforeseeable circumstances beyond the control of the Parties against which it would have been unreasonable for the affected party to take precautions and which the affected party cannot avoid even by using its best efforts, including quarantines ordered by competent governmental authority in the event of a public health emergency, which in each case directly causes either party to be unable to comply with all or a material part of its obligations under this Agreement. 59 Frederick County – Redbud Run Solar, LLC Solar Facility Siting Agreement Page 8 of 12 B. Neither Party will be in breach of its obligations under this Agreement or incur any liability to the other Party for any losses or damages of any nature whatsoever incurred or suffered by that other (otherwise than under any express indemnity in this Agreement) if and to the extent it is prevented from carrying out those obligations by, or such losses or damages are caused by, a Force Majeure Event except to the extent that the relevant breach of its obligations would have occurred, or the relevant losses or damages would have arisen, even if the Force Majeure Event had not occurred. C. As soon as reasonably practicable following the date of commencement of a Force Majeure Event, and within a reasonable time following the date of termination of a Force Majeure Event, any Party invoking it will submit to the other Party reasonable proof of the nature of the Force Majeure Event and of its effect upon the performance of the Party's obligations under this Agreement. D. Applicant will, and will ensure that its Subcontractors will, at all times take all reasonable steps within their respective powers and consistent with Good Operating Practices (but without incurring unreasonable additional costs) to: (i) prevent Force Majeure Events affecting the performance of Applicant’s obligations under this Agreement; (ii) mitigate the effect of any Force Majeure Event; and (iii) comply with its obligations under this Agreement. E. The Parties will consult together in relation to the above matters following the occurrence of a Force Majeure Event. F. Should paragraph (A) apply as a result of a single Force Majeure Event for a continuous period of more than 180 days then the parties must endeavor to agree any modifications to this Agreement (including without limitation, determination of new revenue sharing payments) that are equitable having regard to the nature of the ability of Applicant to continue to meet its financial obligations to the County. G. For the avoidance of doubt, Force Majeure shall not include (a) financial distress nor the inability of either party to make a profit or avoid a financial loss, (b) changes in market prices or conditions, or (c) a party's financial inability to perform its obligations hereunder. 12.Third Party Beneficiaries. This Agreement is solely for the benefit of the Parties hereto and their respective successors and permitted assigns, and no other person shall have any right, benefit, priority or interest in, under or because of the existence of, this Agreement. 13.Comprehensive Plan. Pursuant to Virginia Code Ann. § 15.2-2316.9, by entering into this Agreement, the County acknowledges that by operation of law, the Project is deemed to be substantially in accord with the Frederick County Comprehensive Plan under Virginia Code Ann. § 15.2-2232. In support thereof, Applicant shall apply the design measures described in the 60 Frederick County – Redbud Run Solar, LLC Solar Facility Siting Agreement Page 9 of 12 Conditional Use Permit application within the portion of the Project crossed by the potential Route 37 East Bypass. 14.Construction. This Agreement was drafted with the input by the County and Applicant and no presumption will exist against any Party. 15.Counterparts; Electronic Signatures. This Agreement may be executed simultaneously in any number of counterparts, each of which shall be deemed to be an original, and all of which shall constitute but one and the same instrument. A signed copy of this Agreement delivered by facsimile, e-mail/PDF or other means of electronic transmission shall be deemed to have the same legal effect as delivery of an original signed copy of this Agreement. [signature page follows] 61 Frederick County – Redbud Run Solar, LLC Solar Facility Siting Agreement Page 10 of 12 IN WITNESS WHEREOF, the Parties hereto have caused this Agreement to be executed by the officers whose names appear below as of the Effective Date. REDBUD RUN SOLAR, LLC By: Name: Title: FREDERICK COUNTY, VIRGINIA By: Name: Title: Chairman, Board of Supervisors Approved as to form: By: __________________________ County Attorney 62 Frederick County – Redbud Run Solar, LLC Solar Facility Siting Agreement Page 11 of 12 SCHEDULE A ADDITIONAL VOLUNTARY PAYMENT SCHEDULE Applicant agrees to make the following additional Capital Payments, above and beyond its tax obligations: $10,000 lump sum payment at the commencement of construction $500 per Megawatt AC per year, starting from the Commercial Operation Date, with an annual escalator of 1.5% 63 Frederick County – Redbud Run Solar, LLC Solar Facility Siting Agreement Page 12 of 12 SCHEDULE B CONDITIONAL USE PERMIT 64 1602 Village Market Boulevard SE Suite 330 Leesburg, VA 20175 T: 703-449-6700 F: 703-449-6713 www.pennoni.com January 31, 2022 ORIDN 21002 Oriden Power 106 Isabella Street, Suite 400 Pittsburgh, PA 15212 Attention: Ali Trunzo, Development Manager RE: Glare Assessment Report Redbud Run Photovoltaic Solar Array Frederick County, Virginia Dear Ms. Trunzo, Pennoni is pleased to submit the enclosed Glare Assessment Report prepared for the Redbud Run Photovoltaic Solar Array in Frederick County, Virginia to assess the potential for glare impacts to motorists northbound on Woods Mill Road and east and west bound on Pine Road. The results of our study are summarized as follows: Project Background The Redbud Run Solar project (the Project) is a proposed small utility-scale solar energy facility with a project nameplate of up to 30 MWac. The Project is located on a tract of land containing approximately 263 acres of pasture and timberland adjacent to Woods Mill Road (VA Route 660) and Pine Road (VA Route 661), of which approximately 150 acres will be developed with solar panels and related facilities enclosed by security fencing. Pennoni performed a Glare Assessment Report utilizing ForgeSolar’s Solar Glare Hazard Analysis Tool (SGHAT) at the request of the Virginia Department of Transportation. This document assesses the results of the SGHAT modeling along with the Project setting and proposed mitigation measures (e.g., vegetation screening) to confirm that potential glare will not affect motorists on public roads adjacent to the Project. Project Setting and Proposed Screening The proposed Project contains favorable topography with existing vegetation that provides natural concealment while minimizing the nature and extent of viewshed impacts. These attributes were key contributors in assessing initial site feasibility. The Project is situated within a tract that is largely bordered by well-established trees. Solar arrays will adhere to the setbacks as specified in the Frederick County ordinances, with solar arrays no less than 60 feet from road rights-of-way. Setbacks have been increased voluntarily to 100 feet where possible in response to community feedback and to preserve mature trees along the site boundaries. Additionally, streams and riparian corridors within the site include substantial areas of mature woodlands, the preservation of which will screen significant portions of the solar arrays from surrounding viewsheds. There are no locations or instances due to the road alignment and southern facing solar panels where a motorist will be directly driving north or facing the primary orientation of the solar array. Where existing vegetation does not exist or is otherwise insufficient, supplemental landscaping will be planted. Such landscaping will consist of a double row of evergreen plantings six (6)-feet in height at time of 65 ORDIN 21002 January 31, 2022 Page 2 Oriden Power Redbud Run Glare Study installation, with the row closest to the road interspersed with deciduous plantings to create a more natural and aesthetically appealing visual screen. Coupled with the site’s favorable topography, the combination of tree preservation and new landscape plantings will mitigate potential visual impacts at adjacent roads. Pennoni understands that the proposed landscape screening will be included in the Project’s Concept Plan submitted to Frederick County as part of the Conditional Use Permit application. Modeling Analysis The SGHAT modeling software utilized was developed in conjunction with Sandia Laboratories and is the most widely accepted glare modeling tool on the market. Additional documentation and more detailed descriptions about the fundamental workings of the SGHAT software can be found at ForgeSolar.com. SGHAT modeling is subject to various assumptions and limitations as identified within the Assumptions section of the report. For example, the model does not account for physical obstructions including buildings, tree cover and other geographic obstructions, does not rigorously simulate detailed system geometry and assumes clear, sunny skies year-round. Any prominent features (vegetation, terrain, structures, screening etc.) blocking the view of the PV array from the observer will also block potential glare from the PV array to the observer. In addition, shade across the array from local site features, for example, a high tree line along the eastern or western perimeter of the site may cast extensive shadows during the early morning and late afternoon sun-hours (when the sun angle is lowest in the sky). The timing of this phenomenon happens to correspond significantly with the time periods in the model that are predicted to have the highest potential for glare impacts. The model ignores any row spaces or gaps in the actual array and treats the entire PV area as if it has the potential to produce glare. The design of the array will further limit glare due to the inter-row spacing configuration and the ability of one row to block the view of the row behind it from an observer. Conclusion Pennoni evaluated the results of the SGHAT modeling in the context of the model limitations and the Project setting. Based on our review and analysis, Pennoni is of the professional opinion that the terrain characteristics and existing mature vegetation combined with new landscape plantings can provide a sufficient visual barrier between the solar arrays and the observation paths (Woods Mill Road and Pine Road) to prevent potential glare impacts to motorists on public roads adjacent to the Project. Should you require additional information please contact me at 703-840-4812. Sincerely, PENNONI ASSOCIATES I Noursi, PE Senior Engineer Enclosures U:\Accounts\ORIDN\ORIDN21002 - Red Bud - VA\DOC PREP\GLARE STUDY\2022.01.31 ORIDN21002 Glare Study Opinion Letter.docx 66 Redbud Run Solar LLC Impact Analysis Statement for Conditional Use Permit Application Attachment 6 Visualizations 67 Prepared by Pennoni Redbud Run Solar Visualizations Woods Mill Road, Frederick County, Virginia 68 Redbud Run Solar Woods Mill Road – Location 1 Prepared by Pennoni 69 Redbud Run Solar Woods Mill Road – Location 1 Prepared by Pennoni 70 Redbud Run Solar Woods Mill Road – Location 2 Prepared by Pennoni 71 Redbud Run Solar Woods Mill Road – Location 2 Prepared by Pennoni 72 Redbud Run Solar Woods Mill Road – Location 3 Prepared by Pennoni 73 Redbud Run Solar Woods Mill Road – Location 3 Prepared by Pennoni 74 From:Timothy Rhodes To:Tyler Klein Cc:John Bishop; Chris Mohn; rhonda.funkhouser@vdot.virginia.gov; bradley.riggleman@vdot.virginia.gov Subject:"[External]"RE: Redbud Run Solar Project CUP: Glare Study Date:Wednesday, February 16, 2022 2:38:05 PM Attachments:image001.png Tyler,   We have completed our review of the Redbud Solar Glare Study.  Based on the information provided by Pennoni, it is understood there will be no negative glare impacts to the users of the roadways.  We are satisfied with the findings of this report and have no objections to the study.  The only outstanding item to address is the previous comment which follows:   The CUP and supplement identifies multiple entrance locations to serve the facility.  Some for construction and some to be permanent.  The supplement provided details on the sight distance for the proposed locations.  You have identified an existing private entrance as “Alternative 1.”  The sight distance profile and your supplement clearly show this entrance not meeting minimum sight distance requirements for safe access.  In accordance with VDOT Access Management Regulations (24VAC30-73) VDOT will not permit a commercial entrance without meeting minimum sight distance requirements.  This entrance needs to be removed from the proposal.  There are other locations proposed that meet minimum sight distance requirements and provide safe ingress/ egress for those coming to the facility as well as the motorist traveling on the roadway.   Please let me know if you have additional questions or concerns.   Thanks,   Timothy Rhodes VDOT~Land Development Engineer Clarke, Frederick, Shenandoah & Warren Counties 14031 Old Valley Pike Edinburg, VA. 22824 (540)-534-3206   From: Chris Mohn <cmohn@greenwayeng.com>  Sent: Monday, January 31, 2022 12:54 PM To: Tim Rhodes <timothy.rhodes@vdot.virginia.gov>; Tyler Klein (tklein@fcva.us) <tklein@fcva.us> Cc: John Bishop <jbishop@fcva.us> Subject: Redbud Run Solar Project CUP: Glare Study Importance: High   Tim and Tyler,   Attached for your review please find the glare study and corresponding summary letter for the Redbud Run Solar Project CUP application. 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 Planning Commission Agenda Item Detail Meeting Date: March 2, 2022 Agenda Section: Other Title: Current Planning Applications Attachments: 96