HomeMy WebLinkAboutPC 01-18-95 Meeting AgendaAGENDA FREDERICK COUNTY PLANNING COMMISSION The Old Frederick County Courthouse Winchester, Virginia JANUARY 18, 1995 7:00 P.M. CALL TO ORDER TAB 1) Bimonthly Report ...................................... A 2) Committee Reports .................................. a . B 3) Citizen Comments ..................................... C 4) Discussion Regarding Revised Recommendations for the Capital Improvements Plan(Mr. Tierney) ..................................... D 5) Informal Discussion with Ralph Gregory; Re: a B2 zoned parcel located on the west side of Route 11 South. (Mr. Tierney) .................... E 6) Informal Discussion with Bruce Welch; Re: a proposed veterinary hospital on the east side of Route 647. (Mr. Tierney) ....................... F 7) Other.............................................G M E M O R A N D U M TO: Frederick County Planning Commission FROM: Robert W. Watkins, Secretary SUBJECT: Bimonthly Report DATE: January 6, 1995 (1) Rezonin s Pending: (dates are submittal dates C. L. Robinson 03/30/94 BkCk RA to B3 Brown Lovett, Jr. 09/14/94 Ston RA to M1 James Carroll 10/07/94 Shaw RP to B2 Valley Mill Estates 11/10/94 Shaw RA to RP (2) Rezonin s A roved: dates are BOS meeting dates Frederick Mall 12/14/94 Shaw RA to RP Frederick Mall 12/14/94 Shaw RA to RP (3) Rezoninas Denied: „(dates are BOS meeting dates) None (4) Conditional Use Permits Pending: dates are submittal dates Mark Anderson & Veterinarian James Casey 12/08/94 Ston hospital/office (5) Conditional Use Permits Approved: dates are approval dates Robin Dassler 12/14/94 Gaines Private Dog Breeding Kennel (6) Conditional Use Permits Denied: dates are denial dates Joe Edmiston 12/14/94 BcCk Kennel 2 (7) Site Plans Pending: (dates are submittal dates) Wheatlands Wastewater Fac. Grace Brethren Church Flex Tech Lake Centre Garber Kraft General Foods Westminster Canterbury Federal Express Bank of Clarke Co. Lakeview Garden Apartments 09/12/89 Opeq Trmt.facil 06/08/90 Shaw Church 10/25/90 Ston Lgt. Industrial 05/15/91 Shaw Townhouses 07/26/94 Shaw Retail Commercial 10/06/94 Ston Addition 11/16/94 Gaines Duplex Housing 12/16/94 Shaw Warehouse 12/16/94 Shaw New Bank Branch 01/05/95 Shaw Apartments (8) Site Plans Approved: (dates are approval dates) Regency Lakes Sec. C 12/01/94 Ston Mobile Homes Taco Bell 12/09/94 Gaines Restaurant Preston Place Apt. II 12/09/94 Shaw Apartments Amoco Foam 12/09/94 Ston Outdoor Storage Cracker Barrell 12/21/94 Shaw Dining Addition Shenandoah Valley Baptist 01/05/95 Opeq Classroom Addition (9) Site Plans_ Approved: (dates are withdrawn dates) Red Star Express Lines 01/06/95 Ston (10) Subdivisions Pending: (dates are submittal dates) Briarwood Est. 01/04/94 Ston (11) Subdivisions Pending Final Admin. Approval:(PIC or HOS approval dates Abrams Point, Phase I Lake Centre Fredericktowne Est., Sec 9 Harry Stimpson 06/13/90 Shaw 06/19/91 Shaw 10/06/93 Opeq 10/26/94 Opeq (12) PMDP Pending: (dates are submittal dates) Fieldstone Heights 04/25/94 (13) PMDP Approved:_ (Dates are approval dates) Ston Saratoga Meadows 12/16/94 Shaw 3 (14) FMDP Pending Administrative Approval• (dates are BOS approval dates Battlefield Partnership James R. Wilkins III Star Fort 04/08/92 BaCk 04/14/93 Shaw 09/14/94 Gain (15) Board of Zoning Appeals Applications Pending: (submit. dates) Weber's Nursery 11/08/94 Ston Wilkins Dev. Corp. 12/27/94 Shaw (16) BZA Applications Approved• (approval dates) Burger King 11/23/94 Gain Burger King 11/23/94 Gain Amoco 11/23/94 Gain Amoco 11/23/94 Gain Holiday Inn 11/23/94 Opeq Holiday Inn 11/23/94 OPeq (17) BZA Applications Denied• Margaret Johnson 11/21/94 BaCk (18) PLANS REC D. FOR REVIEW FROM CITY OF WINCHESTER None 1E. PLANNING AND DEVE OPMENT - ACTIVITY REPORT #`72 (Dec. 5-30) 1. Plan Reviews Approyals, and Site Inspections: Evan Wyatt reviewed revisions to the Price Club site plan and revisions to the Shamrock Truck Terminal site plan. Evan Wyatt met with representatives of various engineering firms to review preliminary site plan sketches for a proposed office addition to Seaward International; a proposed office building for State Farm Insurance; and a proposed maintenance building at the landfill. Evan Wyatt conducted site inspections for the new addition to Southeastern Container and for the Urgent Care Facility. 2. Meetings Bob Watkins and Evan Wyatt attended a meeting with County Administrator John R. Riley,'Jr., Winchester City Manager Ed Daley, Economic Development Commission Director June Wilmot, and City Planning Director Tim Youmans to discuss the proposed update to the Civil War Battlefield Tour Network ISTEA Enhancement application. Evan Wyatt met with Extension Agent Gary DeOms and John Stelzl to continue work on the proposed Double Church and Refuge Church Agricultural and Forestal Districts. On December 20, Kris Tierney met with Tom Baker and G. W. Clifford & Associates representatives, Chuck Maddox and Steve Gyurisin, to discuss buffering for a potential B2 to B3 rezoning located near the interchange of Route 11 and Route 37 South. 3. GIS Clay Grant is working on a composite road and road name map of the County. Good progress is being made on map conversion to GIS. Re-establishment of contact with E.S.R.I. has begun to finalize conversion of tax parcel identification and Camra real estate files data to ArcInfo (GIS) use. 4. Departmental Jean Moore and Evan Wyatt completed a draft summary for streamlining the Frederick County site plan review process. Jean Moore has begun to collect data for the 1994 Annual Report. 5. Board of Zoning Appeals Jean Moore presented seven variance applications and one violation appeal to the Board of Zoning Appeals. 6. Other Evan Wyatt began work with Penske Trucking and Leasing Company regarding a proposed amendment to the M-1 District that would permit this use. Evan Wyatt assisted June Wilmot with presentation graphics for a meeting with the Mid Atlantic Distribution Corporation. COUNTY of FREDERICK Department of Planning and Development 703/665-5651 Fax 703/678-0682 MEMORANDUM TO: Planning Commission Members FROM: Kris C. Tierney, Deputy Planning Director SUBJECT: Proposed 1995-96 Capital Improvements Plan DATE: January 10, 1995 As most Commissioners are aware, the Comprehensive Plans and Programs Committee evaluates departmental CIP project requests. The 1995-96 Capital Improvements Plan was presented to the Planning Commission on January 4, 1995. As a result of recent School Board changes to their project requests, the CIP has been revised to reflect these changes. At their January 9, 1995 meeting, the Comprehensive Plans and Programs Committee re- evaluated and finalized their recommendation for the 1995-96 CIP. Materials related to the preparation of this recommendation along with the draft are attached. The following documents are attached: ► Cost Summary for the draft 1995-96 CIP. ► Project Summary for the draft 1995-96 CIP. This includes a brief outline of the project included in last years CIP, and those included in the draft 1995-96 CIP. ► The 1995-96 Capital Improvements Plan (CIP) as recommended by the Comprehensive Plans and Programs Committee at their meeting on January 4, 1995. Please contact myself or Eric Lawrence if you have any questions COST SUMMARY The proposed CIP contains 27 projects with a total project cost of $54,087,136. This figure includes the estimated debt service on all projects except the County Offices. The total does not include Sanitation Authority or Landfill projects which are paid for out of user fees and are made a part of the CIP in the form of addendum. Of this amount, $30,728,806 would come from the County's General Fund over a five year period (not including debt service). As presently proposed, projects scheduled in the first year (1995-96 fiscal year) would have a total County cost of $13,037,950 excluding any debt service. PROJECT SUMMARY The draft 1995-96 CIP consists of 27 project requests from the County's various departments. Of these project requests, only five are new to the CIP. The remaining 26 were included in the 1994-95 CIP. The five new projects are: JW & Sherando High School Renovations, New Stonewall Elementary School, Administration Building Renovations, and Transportation/Maintenance/Central Warehouse facility requests from the School Board, and a Landfill Development Phase I, Cell D request from the Public Works Department. Listed below are the modifications that each county department has made in their project requests for inclusion in the 1995-96 CIP. Please note: the projects which were included in the .1994-95 CIP and again in the 1995-96 CIP are not discussed. School Board Projects Projects no longer included in the CIP: 1) Senseny Road Elementary School Roof Replacement -- Completed. 2) Frederick County Middle School Window Replacement and Air Conditioning -- Completed. 3) James Wood Middle School Partial Air Conditioning -- Completed. 4) James Wood Middle School Partial Roof Replacement -- Completed. Projects which are new to the CIP: 1) JW & Sherando High School Renovations. This project includes the construction of additions to James Wood and the Sherando High Schools, 2) New Stonewall Elementary School. This project involves the demolition of the existing building, and the construction of a new Stonewall School on the site. 3) Administration Building Renovations. This project involves the renovations of the Administration building so that it may be used as an elementary school. 4) Transportation/Maintenance/Central Warehouse facility. This project involves the construction of a facility on the Route 7 property to serve the School Board and the Frederick County needs. Parks and Recreation Projects All project requests for the 1994-95 CIP will be included in the 1995-96 CIP. Handley Library All project requests for the 1994-95 CIP will be included in the 1995-96 CIP. Airport Authority Projects no longer included in the CIP: 1) Taxiway Relocation -- Completed. 2) Construct T -Hanger Taxiway -- Completed. Sanitation Authority Projects Projects no longer included in the CIP: 1) Expansion of Parkins Mills Wastewater Treatment Plant -- Under Construction. Anticipated completion date: October 1996. 2) Frederick County Water Treatment Plant -- Complete. 3) Water Storage Tank at Authority Headquarters Site -- Completed. 4) Water Transmission Lines a) Route 522 Transmission Line I -- Completed. b) Route 522 Transmission Line II -- Completed. c) Route 50 Connector Line -- Completed. d) Stonewall Industrial Park / Lee Avenue Water Loop -- Completed. Landfill and Compactors Projects Projects no longer included in the CIP: 1) Landfill Closure, Existing 20 Acre Site -- Completed. 2) Landfill Development, 10 Acres -- Completed. Projects which are new to the CIP: 1) Landfill Development, Phase 1, Cell. This project was not included in the 1994-95 CIP. FREDERICK COUNTY CAPITAL L"FROVEMENT PROGRAADIING PROJECT EVALUATION PROCESS The attached forms were used to evaluate requested Capital Improvement Projects. The first form contains a list of seven evaluation criteria. Each criterion has been assigned a weight which reflects its relative importance when compared to the other criterion. The second form was used to record the rating which was given to each project. The projects are listed by department. Each project was reviewed against all of the criterion and was given a rating between zero and four. A score of four being the highest, indicating that the project most appropriately fits the criterion. The rating was then entered in the corresponding cell. The numeric figure to the right of the rating is the result of the rating being multiplied by the weight and the resulting score entered in this same cell. The scores which were given to the projects for each of the seven criteria were then totaled across the table and the total entered in the far right hand column. Only the resulting scores after the ranking is multiplied by the weight was totaled. These total scores were then used to assist in ranking projects. The higher the score, the greater the priority the project is given. Below is an example showing the total score derived for a hypothetical request for a new elementary school. The weights corresponding to the criteria are shown beneath the criterion. The ranking given to projects for each criterion has been entered to the left in the corresponding cell. The score (the rating multiplied by the weight) has then been entered to the right of the cell. The total score of 39 was arrived at by adding up the scores (the number to the right of each cell) for each individual criterion. FREDERICK COUNTY CAPITAL IMPROVEMENT PROJECTS EVALUA'T'ION FORM LISTED BY DEPARTMENT; IN ORDER OF DEPARTMENT PRIORITY CRITERION Conform to Health, Legally Distribute Economic Related Public and Comp. Plan Safety, Required Services Impact to Other Support TOTAL Welfare Projects WEIGHT 3 4 4 2 2 3 3 SCORE= RATING x WEIGHT SCHOOL SYSTEM New Elementary School 2/6 2/8 2/8 3/6 1/2 113 2/6 39 FREDERICK COUNTY CAPITAL IMPROVEMENT PROGRANEM11ING PROJECT EVALUATION CRITERIA TOPIC DESCRIPTION WEIGHT 1 Conformance to Does the Project conform to, or contribute Comprehensive Pian to the attainment of goals/objectives of the Comprehensive Plan? Is the Project 3 J1 consistent with established policies? 2 Public Health, Safety or Does the Project improve conditions Welfare affecting health safety or welfare? Does it 4 eliminate a clear health or safety risk? 3 Legal Requirement Is the Project required in order to meet a State or Federal mandate or some other 4 legal requirement? 4 Equitable Distribution of Does the Project meet a special need of Services some segment of the population that has been identified as needing assistance? 2 Would the Project provide equivalent services to a population group that is currently under served relative to other areas of the county? 5 Economic Impact Is the Project essential to, or would it encourage some form of economic development? Would the Project improve 2' the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? 6 Coordination with other Is the Project necessary for the successful Projects completion of other projects? Is the Project 3 part of a larger project? 7 Public Support Are county residents fully informed and supportive of the proposed Project? 3 1995 FREDERICK COUNTY CAPITAL IMPROVEMENT PROJECTS EVALUATION FORM LISTED BY DEPARTMENT; IN ORDER OF DEPARTMENT PRIORITY CRITERION Conform to Health, Legally Distribute Economic Related Public 35 and Comp. Plan Safety, Required Services Impact to Other Support TOTAL rySchool 216 Welfare 0/0 214 112 Projects 319 32 WEIGHT 3 4 4 2 2 3 3 32 �Y Renovations 3/9 2/8 0/0 2/4 _ . 1/2 113 ..,. 113 29 ntce/Wareh.... 2/6 21:8 D/U 1/2<. 21,J 4X13 113: 26 Closure of Cells A,B, Phase I 4/12 4/16 4/16 3/6 1/2 3/9 0/0 61 Landfill developmenthrrse�,e11 D 41G 4116 x:116: . 2f. 4 ` I /2 319 Landfill Development Phase II Cell A P 4 / 12 4 / 16 4/16 2/4 1/2 3 / 9 0 / 0 _. 59 -Now:,Coil pactorSite- .. 4 / I2 . 21;8 Q / 0 3 ! 6'i 1:/ 2 , ....1 f 3 1 t 3 34 Library Stonewall Road I 2/6 0/0 0/0 4/8 1/2 0/0 3/9 1 25 Aylor, Hoover Chiller Replacement 2/6 2/8 0/0 0/0 0/0 0/0 2/ 6 20 liltcewaySystem 3/9 2/8 0/0 2/4 1/2 1/3 3/9 35 �ehoolRenovntions 2/6 21;8. f'1Q 214:;: 12 1 /3 319 " 32; rySchool 216 218 0/0 214 112 113 319 32 Renovations ..:. 2J6 2%i8 Q.10:' 2/4 1:/2.. 113...':.319...:1 2 f 6 32 �Y Renovations 3/9 2/8 0/0 2/4 _ . 1/2 113 ..,. 113 29 ntce/Wareh.... 2/6 21:8 D/U 1/2<. 21,J 4X13 113: 26 Aylor, Hoover Chiller Replacement 2/6 2/8 0/0 0/0 0/0 0/0 2/ 6 20 liltcewaySystem 4/12 2/8 0/0 1/2 1/2 2/6 2/6 36 Tentris/Basketbal Complex CB 3 f 9 1 f.4 0'{ fl 3 / 6.' 1 {;;2 2161: I / 3. 30: Open Play Area at Water Tower - CB 3/9 1/4 0/0 2/4 1/2 2/6 2/6 31 Softball C6mpleY; � SP 3 / 9 0 /.0 010 1 12 1 ! 2 .2./ 6 2 f 6 25 ::: Ball Field Renovations 2/6 0/0 0/ 0 1/2 1/2 2/6 2/ 6 22 4 >: Pla .IArea 4 CB 1 y 3 /.9.. ! 1 / 4 0/O 316 . 1I<2 216 2/6 33 Support Faculties - CB 2/6 2/8 0/0 1/2 0/0 2/6 1/3 25 Soccer Complex ; 31 ,; 0 ! 0 0'I 4 3.16 112: 2<f 6 Tennis/PicnicArea - SP 3/9 0/0 0/0 1/2 0/0 2/6 2/6 23 Sh iter, Stage Seating - CB :3 / 9 : 0 TO 0 / 0 3.) 6 3 I' 6 ::216, 6 2 16 33 Park Land 3/9 0/0 0/0 4/8 1/2 1/3 2/6 28 Maintenance Compound'' l/ 3 I/ 4 0/ 0 0/ 0 1 12 1` f 3 i/ 3 15 P EAlxnercise/Oper Play - CB 3/9 1/4 0/0 2/4 1/2 2/6 2/6 31 P 3/90/0 010 3/6 31;5 .0/0 216 27 Nature Center 3/9 0/0 0/0 4/8 0/0 1/3 2/6 26 Land Acquisition 2/6 1/4 2/8 1/2 3/6 3/9 2/ 6 41 Aircraft Storage Hanger 216 0 / 0': 01 /; 0 4 / 8 4 /'8 2'/ 6 3 19 29' Upgrade Terminal Apron Lights P�' P g 2/ 6 2/ 8 0/ 0 3/6 3/6 1/3 2/6 29 FREDERICK COUNTY, VIRGINIA DRAFT Capital Improvements Plan 1995-96 Fiscal Year As Recommended by Comprehensive Plans and the Frederick County Programs Committee. Table of Contents INTRODUCTION ............................................ 1 PROJECT RECOMMENDATIONS .. 2 School Board 2 Parks and Recreation ............................ .......... 2 County Administration ..................................... 3 Handley Library ...................................... . . 3 Airport Authority ............. . . .. .... ......... ...... . . .. 3 Sanitation Authority . ........... ................ ..... . .... 4 Landfill and Compactor ..... 4 DRAFT 1995-96 CIP ............................... . .......... 5 PROJECT FUNDING ............... . .............. . .......... 6 APPENDIX: PROJECT DESCRIPTIONS .. .. ....... .. . Frederick County Sanitation Authority ..... .. , , , , , , , 7 Water Transmission Lines 7 Water and Sewer Lines ........... 7 Frederick County Public Works Department ..... , , ... ... , 9 Closure of Cells A and B, Phase I ............. . .. . ........ 9 Landfill Development: Phase I, Cell D . . ...... . ... .... . ... . . 9 Landfill Development: Phase II, Cell A ............ ....... , 9 New Compactor Site ........................... ... . . 10 Construction of Leachate Treatment Facility ............... . . . 10 Composting/Waste Inspection Facility .. ........... . . ..... . . 10 Expansion of Citizen's Convenience Area .......... . . ..... .. 11 Frederick County Public Schools .. ....... ............... 12 Eastern Frederick County New Elementary School .............. 4 12 Senseny Road Elementary School Air Conditioning/Renovations ... . .. 12 Robinson Elementary School Air Conditioning/Renovations ...... .. , 12 Stonewall Elementary School Air Conditioning/Renovations ..... ... 13 Buildings and Grounds Department Additions/Renovations ...... ... 13 Frederick County High School III .... ............. . .. 13 New School Transportation Garage .............. ..... .. 14 Robert E. Aylor Middle School and Bass Hoover Elementary School Chiller Replacement ............................ 14 Frederick County Parks and Recreation Department .... .... ...... .. 15 Bicycle Facility ......... ...... .................... 15 Tennis/Basketball Complex ..... ....................... 15 Open Play Area at Water Tower ..... ........ . ..... .... 15 Softball Complex .......................... ....... 16 Baseball Field Renovations . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 Open Play Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 Support Facilities . . . . . . . 17 . . . . . . . . . . . . . . . . . . . . . . . . . . . Soccer Complex . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Tennis/Picnic Area 17 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Shelter/Stage Seating 17 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ParkLand 18 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 Maintenance Compound and Office . . . . . . . . . . . . . . . . . . . . . . . 18 Exercise/Open Play/Picnic Complex . . . . . . . . . . . . . . . . . . . . . . . 18 Amphitheater . . . . . . . . . . . . . 19 . . . . . . . . . . . . . . . . . . . . . . . . Nature Center/Picnic Area 19 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Handley Regional Library . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Frederick County Library 20 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 CAPITAL IMPROVEMENTS PLAN FREDERICK COUNTY 1995-96 INTRODUCTION The Code of Virginia assigns the responsibility for preparation of plans for capital outlays to the local planning commissions. The Capital Improvements Plan (CIP) consists of a schedule for major capital expenditures for the County for the ensuing five years. The CIP is updated annually. Projects are removed from the plan as they are completed or as priorities change. The plan is intended to assist the County Board of Supervisors in preparation of the County budget. In addition to determining priorities for capital expenditures, the County must also ensure that projects contained within the CIP conform to the Comprehensive Policy Plan. The annual review process begins with the submission of capital expenditure requests from County departments and citizens in the fall of the year. These requests are evaluated by the Comprehensive Plans and Programs Committee, a subcommittee of the Planning Commission, using a list of seven evaluation criteria. Each criterion is assigned a weight which reflects the relative importance when compared to the other criterion. The Committee then meets with representatives of departments making expenditure requests and determines a recommended priority and amount for the various requests. This recommendation is passed to the Planning Commission which in turn makes a recommendation to the Board of Supervisors. The CIP is strictly advisory. Once adopted, project priorities may change throughout the year based on changing circumstances. It is also possible that particular projects may not'be funded during the year that is indicated in the CIP. The status of any project becomes increasingly uncertain the further in the future it is projected. Frederick County 1995-96 Capital Improvements Plan FA PROJECT RECOMMENDATIONS 1. School Board Projects The renovation of the James Wood Middle School air conditioning, in addition to its roof replacement, were completed during the summer of 1994. The replacement of the Senseny Road Elementary School roof was completed during the 1994-95 fiscal year. Renovations to Frederick County Middle School's windows, and the installation of air conditioning were completed during the 1994-95 fiscal year. The School Board proposes to build a Elementary School on the recently purchased Route 7 property. This school will have a capacity of approximately 700-750 students. Additions to James Wood and Sherando High Schools for approximately 300 students are also proposed. This project will replace the new county high school which had been planned in previous CIPS. A new school building is planned for the Stonewall School. Previously, the Stonewall School project was to include air conditioning/renovations. After further evaluations, the School Board proposes to close the existing school, and build a new school on the site. Renovations are proposed for Senseny Road elementary school. This project was included in past year CIPS, but was delayed due to budget considerations. Funding is being requested for a new transportation/maintenance/central warehouse facility. The project involves building the proposed structure(s) on the recently purchased property along Route 7. The existing maintenance facility has reached the point where it is difficult to house all of the school system's buses and still provide service to an increasing number of County vehicles from other departments, in particular the Sheriff's Office, as well as vehicles from Planning, Building, and Parks and Recreation. 2. Parks and Recreation Projects Master Plans for the Clearbrook and Sherando parks were adopted in 1987, which describe a complete program for park improvements. These Master Plans reflect the recommendations of County residents and conforms to national standards as outlined in the Virginia Outdoor Plan. Several projects are planned in and around Sherando Park. The County was awarded an ISTEA Transportation Enhancement Program grant to build a Bikeway System. This 2.45 Frederick County 1995-96 Capital Improvements Plan 3 mile facility will serve several residential areas in southern Frederick County. The bicycle path has been designed to link the residential developments and park land on the north of Route 277 with Sherando Park and Sherando High School. In addition to other improvements at Sherando Park, two projects are planned that will be used by Sherando High School, the proposed soccer complex and softball complex. Several projects are planned for Clearbrook Park including a tennis/basketball facility, an open play area, support facilities that include landscaping and renovation of the existing entrance road, an exercise/picnic area, and a shelter with a sound stage and seating. In an effort to reduce the gap in provision of services to the western portion of the County, the Parks and Recreation Department is proposing to purchase park land in western Frederick County that will be the site of a nature center/picnic area. 3. County Administration The County's Administrative offices have been relocated to the Courthouse Associates building at 107 North Kent Street. This temporary relocation was necessary in order for the County to comply with the Americans with Disabilities Act. While the decision to remain within the City of Winchester's Downtown Historic District has been made, a permanent location for the County's Administrative offices has not been determined. 4. Handley Library As part of a master plan prepared for the Handley Library by a library consuitanting firm, it was recommended that a library be built in southeastern Frederick County. A library in this area would enable the Handley Library to provide service to the growing population in southern Frederick County. The Library would need a minimum of 4.5 acres of land. A 34,000 square foot building is proposed which could be expanded, in stages, ultimately to 50,000 square feet. S. Airport Authority An updated master plan for the Winchester Regional Airport was adopted in December of 1993. This plan contains recommendations regarding capital improvements to the airport in order to meet federal guidelines for airports the size of the Winchester Regional Airport and to provide better service to airport users. Construction is underway for two projects included in the 1994-95 Capital Improvements Plan. These projects, Taxiway Relocation and T -Hanger Taxiway, were required in order for the airport to meet federal design standards. Frederick County 1995-96 Capital Improvements Plan 4 The projects that the Airport Authority are proposing for the immediate future include a land acquisition of 34 acres which is needed to enhance aircraft operational safety during approach to the airport, construction of a 16 -unit T -Hanger, and upgrading the terminal apron lights. 6. Sanitation Authority Projects The Sanitation Authority is proposing two projects. They include four Water Transmission Lines and two Water and Sewer Lines. The Water Transmission lines will include providing service to Miller Heights, Bufflick Heights, Westview subdivision, and Route 50/Victory Road. The Water and Sewer Line project will provide service to a portion of Route 522 South and Boundary Lane. The Sanitation Authority Projects will not be funded directly through the CIP. These projects receive their funding through user fees. 7. Landfill and Compactor Projects The Public Works Department is proposing seven projects. They include: Closure of Cells A and B, Phase I Landfill Development - Cell D, Phase I Landfill Development - Cell A, Phase II New Compactor Site Leachate Treatment Facility New Composting/Waste Inspection Facility Expansion of Citizen's Convenience Area The Landfill project and the two cell development projects are all projects that the Landfill is required to undertake in order to comply with regulations imposed by the Department of Environmental Quality. The New Compactor Site project will be funded through the CIP. Funding for the six remaining Landfill projects are provided through the Landfill Enterprise Fund. rrederick County 1995-96 Capital f mprovements PIan FREDERICK COUNTY, VIRGINIA DRAFT CAPITAL IMPROVEMENTS PLAN 1995-96 County Priority Department Priority Protects COUNTY CONTRIBUTION —1995-96 1996-97 1997-98 1998 99 1999-2000 InteDebt Service est From ny 18.75Q B 29,000 -. A 6 5(111000 Contributions Total Project l ` Z 3 l s 1 1 Airport Land Acjuisition;; Bikeway System New Elei ientaiy-School : 18;750 29,000 750,Q00 65,000 TOTALS 13,037,950 13,608,000 1,284,000 1,717,856 1,081,000 15,393,580 46,122,386 54,087,136 A = Partial funding from Federal and State grants B — Partial funding from Federal Airport Improvement Program (FAIP) and State Commonwealth Airport Fund. (SCAF) grants C = Partial funding from ":ommonwealth Airport Fund (SCAF) grants D = Partial funding from State grants and local gifts E= Debt Sery tavailable at time of printing. New Compactor Site 60,000 70Q;000 4,668 674.< 11,86$674 1 I , 868,674 - 6: open Play Area ;CB60,000 206,000 60,000 10 Shelter Stage Seating CB 303 000 20Er;000 206,000: 2 < rVV & Sherando High School Renovations 5,000,4100 303,000 303,000 3 New Stonewall Elementary School 6,000,000 3' 'S63' 8,26(3;863 8;260,863 4; _. Admuiis#rattoiil3uildin Renovations g :: 3 784 aaQ.. 3,888,513 9 888,513 9888513 10 3 Open Play Area at Water Tower - CB . 188,000 425 Sa8 6 2a�<50$ - 6 �a9,508 131: Exereis610 en I'1a iCIi1C. ArearC P Y 0 8 12 2 Tennis/Basketball Complex CB 505 000 -8I,000 28100:0. 13 5 Senseny Road Element :Reno . . 1500000 505,000 5 0 14 2 Aircraft Storage Hanger _ ... .::... .:.: 250 000 97;8,450.:; 2,47$;450 _ . 2478,45.x' 15 3 ? > Tpgrade Terniinal Apron Lights 1;200 0,000 250,000 16 11 Park Land C : 17 141 .,. Am hitheater 1093,00 0 91093000 1 036,000 18 6 Transportation/ tenance/Warehouse 663;000 s � 663,000 P3 I5 : ,am Mature Center begin E 0 1 ....:, New Library 41$:x00 418;000 4-1.8;000 1 4.. Softball (vmplex:- SP 455OQ0 46. 856 D 465,856 7,658,556 22 7 Support Facilities - CB 90 000 455NO 455,000 23 $ : SvEcer Complex <" -; 604 a(3Q 403,0043' 24 9 Tennis/Picnic Area SP 578,000 10 07aa0 I ,aq.7,00a 25' S -1 Bali Field Renovations 199,(1(30 578,000 578,000 26 7 Aylor, Hoover Chiller Replacement .. 275,000 - 27.-...12 :<: Maintenance Compound 171572 446 ,572 446,5 2 7 i 59,000:.:: j` 159 xQQ 4159000 TOTALS 13,037,950 13,608,000 1,284,000 1,717,856 1,081,000 15,393,580 46,122,386 54,087,136 A = Partial funding from Federal and State grants B — Partial funding from Federal Airport Improvement Program (FAIP) and State Commonwealth Airport Fund. (SCAF) grants C = Partial funding from ":ommonwealth Airport Fund (SCAF) grants D = Partial funding from State grants and local gifts E= Debt Sery tavailable at time of printing. M PROTECT FUNDING ► The projects included in the 1995-96 Capital Improvements Plan have a total cost of $54,087,136 of which Frederick County will contribute $30,728,806 over the next five year period of 1995-2000. This total does not include the interest from any debt service. By adding the projected debt service of $15,393,580, the total county contribution of the approved projects comes to $46,122,386. This total does not include any costs associated with the School Board's request for a Transportation/Maintenance/Central Warehouse facility. ► Proposed funding for the new County Offices will be obtained either through a moral obligation bond or general obligation bond. ► School projects are funded through loans from the Virginia Public School Authority. ► Sanitation Authority projects will be funded by the Sanitation Authority working capital funds and Virginia Resource Authority Revenue Bonds. ► Landfill projects are funded by retained funds generated by the landfill fees and coordinated by the Landfill Enterprise Fund. ► Funding for Parks and Recreation projects will come from the unreserved fund balance of the County. The Bicycle Facility project will be funded through a Recreational Access Fund grant, an ISTEA Transportation Enhancement Program grant, and a 20% match from the general fund. In order to carry out the remaining Parks and Recreation projects in this plan, the Parks and Recreation Commission needs to actively seek private sources of funding or cooperation. ► Funding for a Frederick County Library will involve a contribution from the County general fund, a bond, donation of land, and substantial fund raising efforts by the Library Board. Frederick County 1995-96 Capital Improvements Plan 7 APPENDIX: PROJECT DESCRIPTIONS Frederick County Sanitation Authority Sewer and Water Project Priority List PROJECT 1 Water Transmission Lines A) Miller Heights Water Distribution Line Description: Install 3,800 linear feet of eight -inch water line. Estimated Costs: $72,000 Construction Schedule: Contingent on availability of funds B) Bufflick Heights Water Distribution Line Description: Install 2,000 linear feet of eight -inch water line. Estimated Cost: $60,000 Construction Schedule: Begin and complete in FY -95. C) Westview Water Distribution Line Description: Install 1,100 linear feet of eight -inch water line. Estimated Cost: $33,000 Construction Schedule: Begin and complete in FY -95. D) Route 50 - Victory Road Water Loop Description: Install 5,500 linear feet of twelve -inch water main. Estimated Costs: $140,000 Construction Schedule: Begin and complete in FY -95. PROJECT 2 Water and Sewer Lines A) Route 522 South Sewer Description: Installation of approximately 14,300 linear feet of eight -inch pipe, 11,200 linear feet of twelve -inch pipe, 1,200 linear feet of six-inch force main, and 50 manholes. Estimated Cost: $72,000 Construction Schedule: Begin and complete in FY -96. B) Boundary Lane Water and Sewer Line Description: Install 1,400 linear feet of eight -inch water line Frederick County 1995-96 Capital Improvements Plan E'3 and 1,100 linear feet of eight -inch sewer line. Estimated Cost: Water $45,4000 Sewer $47,750 Total $92,250 Construction Schedule: Contingent on availability of funds. rreaenck county 1995-96 Capital Improvements Plan E Frederick County Public Works Department Landfill Project List PROJECT 1 Closure of Cells A and B, Phase I Description: This project encompasses the closure of Cells A and B, Phase I. This closure will be performed in accordance with the details and guidelines set forth in Permit #529. Capital Cost: $1,400,000 Justification: Required by the Department of Environmental Quality. Construction Schedule: Begin in FY -96 and may carry over into FY - 97. PROJECT 2 Landfill Development: Phase 1, Cell D Description: This project includes the development of approximately five acres of sanitary landfill space as outlined in permit #529, Phase I - Cell D. Capital Cost: $1,000,000 Justification: Required by the Department of Environmental Quality. The project will serve the citizens of Frederick and Clarke Counties as well as the City of Winchester fnr annrnvimatal., tk,A. tr. �,,,r . W -- ---- `... ..1.,.1... .,....a.a... �.,.� ,.... .. w 1VU, �eala. Construction Schedule: Begin in FY -95 and may carry over into FY - 96. PROJECT 3 Landfill Development: Phase I1, Cell A Description: This project includes the development of approximately five acres of sanitary landfill space as outlined in permit #529. Capital Cost: $1,000,000 Justification: Required by the Department of Environmental Quality. The project will serve the citizens of Frederick and Clarke Counties as well as the City of Winchester for approximately three to four years. Construction Schedule: Projected to begin in FY -98. Frederick County 1995-96 Capital Improvements Plan 10 PROJECT 4 New Compactor Site Description: This project includes the construction of a compactor site in the vicinity of the intersection of Middle Road and Marlboro Road to replace the container site on Middle Road. The development of a compactor site includes site grading, paving, construction of a concrete pad and a concrete retaining wall, and the installation of a trash compactor. In addition, it is anticipated that the site will be fenced and landscaped. Capital Cost: $51,000 Justification: This existing container site off of Middle Road is continuously being overrun causing an excessive amount of litter on adjacent property. This site is also experiencing a great amount of illegal dumping from contractors and citizens outside of Frederick County. The installation of a compactor site would afford the Landfill the opportunity to monitor the inflow of refuse, control illegal dumping and eliminate the unnecessary litter. Construction Schedule: Completion in FY -95. PROJECT 5 Construction of Leachate Treatment Facility Description: This project includes the construction of a treatment facility to treat and discharge leachate which is currently being collected and transported to Parkins Mill Treatment Plant for treatment. The facility would include an additional holding pond for biological treatment as well as a chemical processing station prior to discharge into the Opequon. Capital Cost: $150,000 Justification: The landfill is currently collecting the leachate in a 1.5 million gallon lined lagoon. The leachate is then pumped and hauled to Parkins Mills Treatment Plant for treatment. The projected economic analysis (25 year life) indicates that a treatment facility would provide a more economical treatment alternative after leachate production reaches a constant 3,000 gallons per day. Construction Schedule: Completion in FY -97. PROJECT 6 Composting/Waste Inspection Facility Description: This project will include the construction of a pole bunditig, approximately 60'x!20' in dimension to accommodate sludge 1-recterick County 1995-96 Capital Improvements Plan 11 composting and required random waste inspections. It is anticipated that the project will include a wood pole building, a 6 -inch concrete floor and an underlying leachate collection system. The project will be constructed on landfill property to take advantage of the existing leachate collection system. Capital Cost: $85,000 Justification: This project is considered necessary for the following reasons: 1) Composting sewage sludge would provide an economical source of needed topsoil used to cover closure areas. The landfill is currently maintaining 60 acres of closed landfill and anticipates an additional 90 acres over the life of the new expansion. Composting sewage sludge will assist us in meeting recycling mandates imposed by the Department of Environmental Quality. 2) the proposed composting facility can also be used for the random waste inspections required by the landfill's new permit. Construction Schedule: Completion FY -96 PROJECT 7 Expansion of Citizen's Convenience Area Description: This project will include an expansion area to accommodate an additional 50 cubic yard open top container. This expansion will include an extension of the existing retaining wall and concrete slab, relocation of existing fencing, minor grading and paving. Capital Cost: $25,000 Justification: This expansion is needed to accommodate the increased influx of bulky items such as furniture, construction debris, and other wood products. Currently, there is a 50 cubic yard container which is continuously being overrun on weekends and holidays. Construction Schedule: Completion in FY -96. Frederick County 1995-96 Capital Improvements Plan 12 Frederick County Public Schools Project Priority List PRIORITY 1 Eastern Frederick County New Elementary School Description: The construction of an 585 student capacity elementary school in eastern Frederick County will be needed to provide increased school capacity due to continued growth in the elementary school-age population. In addition, this facility would be helpful in eliminating the need for the current and any additional modular classrooms that may be needed at Stonewall and Senseny Road Elementary Schools through the adjustment of attendance zone boundaries. Capital Cost: $7,200,000 Justification: The proposed elementary school in eastern Frederick County will serve a student population of 585 students from kindergarten through the fifth grade. Construction Schedule: Begin in FY -95 and complete in FY -96. PRIORITY 2 Additions to James Wood and Sherando High Schools Description: This project involves the construction of additions to James Wood and Sherando High Schools for approximately 300 students each. Capital Cost: $5,000,000 Justification: The construction of these additions would replace the need for an entirely new county high school. The additions will serve the population of Frederick County by increasing the capacity of each county high school to 1500 students. Construction Schedule: Begin in FY -95 and complete in FY -97. PRIORITY 3 New Stonewall Elementary School Description: This project includes the closing of Stonewall school at the end of the 1995-96 school year; demolition of the current Stonewall School; and the construction of a new Stonewall Elementary School on the current site. The new structure is proposed to have approximately 58,000 square feet of space. Capital Cost: $6,000,000 Justification: This project will serve a total of 585 students in grades Frederick County 1995-96 Capital Improvements Plan 13 K-5. Construction Schedule: Begin in FY -96 and complete in FY -97. PRIORITY 4 Administrative Building Renovations Description: This project involves the renovation of the school administrative office to an elementary school. Renovations will enable the building to be converted back to an elementary school of approximately 58,000 square feet. Amenities included in this renovation will bring the school to a level of amenities similar to other county elementary schools. Capital Cost: $3,784,000 Justification: The renovated school will handle 550 students. The elementary school will serve students in grades K-5. Construction Schedule: Begin and complete in FY -96. PRIORITY 5 Senseny Road Elementary School Air Conditioning/Renovations Description: This project involves the installation of air conditioning and renovations at Senseny Road Elementary School. Capital Cost: $1,500,000 Justification: This project will serve a total of 595 students in grade K-5. Construction Schedule: Begin in FY -96 and complete in FY -97. PRIORITY 6 Transportation/Maintenance/Central Warehouse Facility Description: The Proposed facility would provide a combined facility for the transportation/maintenance/central warehouse facility needs of the school division and Frederick County. Capital Cost: no cost figures Justification: The Buildings and Grounds Department provides maintenance and repair services for all county school facilities which serve over 9,000 students. Construction Schedule: Begin and complete in FY -97. Frederick County 1995-96 Capital Improvements Plan 14 PRIORITY 7 Robert E. Aylor Middle School and Bass Hoover Elementary School Chiller Replacement Description: This project involves the replacement of the aging chiller systems. The chillers should be replaced because the current refrigerate (R-11) will no longer be manufactured and it will be more expensive to convert the existing chillers to handle the new required refrigerant than to replace these units. Capital Cost: $275,000 Justification: The new chillers will be more efficient which will result in a significant energy savings to the school division. Construction Schedule: Begin and complete in FY -96. Frederick County 1995-96 Capital Improvements Plan 15 Frederick County Parks and Recreation Department Project Priority List PRIORITY 1 Bicycle Facility Description: A 2.45 mile bicycle facility to serve several residential areas in southern Frederick County. This bicycle facility has been designed to link the developments and parks land on the north side of Rt. 277 with Sherando Park and the high school on the south side of Rt. 277. Capital Cost: $65,000 Justification: The initial trail development will provide a direct benefit for the 642 planned or completed housing units, with the potential future expansion of the trail system impacting over 3,000 housing units. Construction Schedule: Begin in FY -95. PRIORITY 2 Tennis/Basketball Complex Description: This project consists of an assortment of athletic facilities to compliment the existing Clearbrook Park. It includes: 8 lighted tennis courts, 2 racquetball courts, -2 basketball courts, picnic shelter, and parking. Capital Cost: $505,000 Justification: Because Clearbrook Park is a regional facility, these facilities will be available to all county residents. Currently, there are no tennis, racquetball, or basketball courts in the Clearbrook Park area. Construction Schedule: Begin and complete in FY -95. PRIORITY 3 Open Play Area at Water Tower Description: This project consists of an assortment of athletic facilities to compliment the existing Clearbrook Park. It includes: parking spaces, picnic shelter, 6 horseshoe pits, croquet, shuffleboard, volleyball court, and landscaping. Capital Cost: $188,000 Justification: This play area will be available to all Frederick County residents and reduce the gap between the number of existing play areas and the number needed to meet minimum standards. Frederick County 1995-96 Capital Improvements Plan 16 Construction Schedule: Begin and complete in FY -95. PRIORITY 4 Softball Complex Description: This project consists of an assortment of athletic facilities to compliment the existing Sherando Park facilities. It includes: 2 lighted softball fields, parking, and landscaping. Capital Cost: $455,000 Justification: This facility would provide recreational opportunities for the entire Frederick County area. In addition to its use as a recreational facility, it will be used by the Frederick County school system. Construction Schedule: Begin and complete in FY -95. PRIORITY 5 Baseball Field Renovations Description: This project consists of an assortment of athletic facilities to compliment the existing Sherando Park facilities. It includes: renovation to 4 existing ball fields, renovation of the existing restrooms, access walks, and access road. Capital Cost: $199,000 Justification: This facility, presently serving as both youth baseball and adult softball fields, would be used by the "Little League" programs within the Sherando Park Service area. In addition to this use as a recreational facility, the athletic complex will also be used by the Frederick County school systein. Construction Schedule: Begin and complete in FY -96. PRIORITY 6 Open Play Area Description: This project consists of an assortment of athletic facilities to compliment the existing Clearbrook Park facilities. It includes: parking, the renovation of 5 picnic shelters, access paths, and landscaping. Capital Cost: $206,000 Justification: To provide recreational opportunities for the Clearbrook Park service area. Construction Schedule: Begin and complete in FY -96. rredenck County 1995-96 Capital Improvements Plan 17 PRIORITY 7 Support Facilities Description: This project consists of an assortment of athletic facilities to compliment the existing Clearbrook Park facilities. It includes: landscaping and the renovation of the exiting entrance road at the ball field complex. Capital Cost: $90,000 Justification: This facility would be used by the residents of Frederick County. Construction Schedule: Begin and complete in FY -96. PRIORITY 8 Soccer Complex Description: This project consists of an assortment of athletic facilities to compliment the existing Sherando Park facilities. It includes: 3 soccer fields, access paths, restrooms, plaza, 2 picnic shelters, landscaping, and the lighting of 5 fields. Capital Cost: $1,007,000 Justification: This facility would be used by the entire Frederick County area. In addition to its use as a recreational facility, the facility will also be used by the Frederick County school system. Construction Schedule: Begin and complete in FY -95. PRIORITY 9 Tennis/Picnic Area Description: This project consists of an assortment of athletic facilities to compliment the existing Sherando Park facilities. It includes: 3 tennis courts, 4 racquetball, restrooms, 4 picnic shelters, access road and paths. Capital Cost: $578,000 Justification: These facilities would be used by the Sherando Park service area and the southwestern part of Frederick County. Although tennis courts are being included at Sherando High School, the Commission feels that it is important to include three tennis courts on park property for the general public use while school courts are being used for school activities. Construction Schedule: Begin and complete in FY -97. Frederick County 1995-96 Capital Improvements Plan PRIORITY 10 Shelter/Stage Seating Description: This project consists of an assortment of athletic facilities to compliment the existing Clearbrook Park facilities. It includes: renovate existing restrooms, access paths, shelter/stage, and lake renovations. Capital Cost: $303,000 Justification: This facility would be used by the entire Winchester - Frederick County area. Construction Schedule: Begin and complete in FY -97. PRIORITY 11 Park Land Description: Park land acquisition. Capital Cost: $1,093,000 Justification: This project would be used by the entire Frederick County area. Construction Schedule: Begin and complete in FY -98. PRIORITY 12 Maintenance Compound and Office Description: This project is necessary to create an office and storage sheds in Sherando Park, Capital Cost: $159,000 Justification: This facility will enable the county to maintain its equipment and facilities in a more responsible and effective manner. Construction Schedule: Begin and complete in FY -99. PRIORITY 13 Exercise/Open Play/Picnic Complex Description: This project consists of an assortment of athletic facilities to compliment the existing Clearbrook Park facilities. It includes: an exercise area, 2 sand volleyball courts, 4 picnic shelters, a shelter deck, a mega playground, and access paths. Capital Cost: $281,000 Justification: This project would be used by the residents of Frederick County. Construction Schedule: Begin and complete in FY -99. Frederick County 1995-96 Capital Improvements Plan 19 PRIORITY 14 Amphitheater Description: This project consists of an assortment of athletic facilities to compliment the existing Sherando Park facilities. It includes: an amphitheater, lighting, sound system, access paths, parking, and landscaping. Capital Cost: $663,000 Justification: This facility would be used by the entire Winchester - Frederick County area. It would be available to Sherando High School for their use. Construction Schedule: Begin and complete in FY -99. PRIORITY 15 Nature Center/Picnic Area Description: This project will be located in western Frederick County and will consist of picnic shelters, play areas, a volleyball court, a nature center, nature trails, and parking. Capital Cost: 418,000 Justification: This facility will be used by all of Frederick County. Development of these facilities will be contingent upon the acquisition of park land in western Frederick County. Construction Schedule: Begin and complete in FY -99. rredernck County 1995-96 Capital Improvements Plan 20 Handley Regional Library Project List PROJECT Frederick County Library Description: A library in Frederick County will enable the Handley Regional Library to provide service to the growing population in Southern Frederick County and to provide adequate books, services, and seating for the population served by the regional system. On a lot of 7 acres, the building will be 34,000 square feet and will be expanded in stages ultimately up to 50,000 square feet. The consulting firm hired by the Handley Library Board to provide a master plan for the library through the year 2010 has estimated the construction costs, not including land or library materials costs but including furniture and equipment, would cost approximately $4,659,000. Books and other library materials for an adequate opening day collection of around 80,000 items would cost almost $3,000,000. The recommended site of the Frederick County Library is in the area east of Interstate 81 and between Route 522 and Route 277. Capital Cost: $465,856 Justification: The Handley Library currently has over 14,000 registered users from Frederick County. This number would rise dramatically with a new, convenient location. Construction Schedule: Begin planning and design activities in 1998- 1999, site preparation and construction for 1999-2000, and opening day 2000-2001. rredenck County 1995-96 Capital Improvements Plan COUNTY of FREDERICK Department of Planning and Development 703 / 665-5651 Fax 703 / 678-0682 TO: Planning Commission Members FROM: Kris C. Tierney, Deputy Planning Directok� RE: Informal Discussion with Mr. Ralph Gregory DATE: January 6, 1995 Attached is a letter from Mr. Gregory requesting time on the Commission's agenda to discuss a parcel currently zoned B-2 (Business General) which is situated on the west side of Route 11 just south of the Route 37 interchange. The surrounding property is all zoned B-2 except to the west which remains RA (Rural Areas). Mr. Gregory and his partners have a prospective purchaser for a lot near the rear (western portion) of their B-2 business park (which is currently vacant). The prospective user requires B-3 zoning and desires visibility from Route 11. If the parcel in question is rezoned to B-3 to accommodate the proposed use, then a category "B" buffer would be required where the parcel adjoins B-2 zoning. A "B" buffer requires either a 50 foot distance buffer with full landscape screen (includes a six foot high opaque fence wall or berm), a 100 foot buffer with a landscaped screen (same planting requirements as a full screen, but no fence required), or a 200 foot distance buffer with no visual screen. Because the user wants to be visible from Route 11 they do not wish to put in a visual screen along the eastern edge of the site. They could avoid this by placing a 200 foot distance buffer along the eastern side of the site, however, they feel this is excessive. Attached is a copy of the site layout along with a vicinity map. Please let me know if you have any questions. KCT/laf Attachments 9 North Loudoun Street P.O. Box 601 Winchester, VA 22601 Winchester, VA 22604 of cyOry s 11Vi-. ItL NO. January 5, 1995 jan. �:),yt Lti:it, r-.uz, GREGORY INVESTMENTS P. 0. BOX 520 STEPHENS CITY, VA_ S2655 703--869-3500 Mr. Kris Tierney Fred. CO- Planning & Development 9 N. Loudoun St. Winchester, Va_ 2:2601 Dear Kris; Per aur 'phone conversation of January 4, 1995, I would like to request: an informal discussion with the planning commission at their January 18th meeting, to discuss the zoning requirements on the site located in the Kernstown Business Park. Since this Constitutes ordinance change, I would like to know whether your department will support this change or not. If you are in support of this request, please send roe a note confirming such. Sincerely, Ralph Gregory j 1 A °� \ �< 1B 5` e 1 \ 7 *> 2 D �/// 10 c� 2 A � 11 C 15, 26 1 6M T40 l� / 2A 2CO11 71 /16 14 86C / e x,9,36 19 % B 6 �0 21 M / sir a 86 R 3 �' 5 2S 229-254 \ 2� �i ?? 9 86A WA �¢ BARTON SVILLE/ Location Map f or PIN: 75-A-21) PC Agenda -V W WHITE PINE SCREENING JAMES RIVER EQUIPMENT Site Development Plan FREDERICK COUNTY VIRGINIA Equipment Display Area Low Evergreen Shrubs (2-3') section "A -A" Not to Scale 25' 30' L 6' 'total Section Not to Scale 3- 30' -------------- 6' 0 a ue Fence 0 c J s' 3 1 Plant ever 10' v IU Section "C -C" Not to Scale COUNTY of FREDERICK Department of Planning and Development 703 / 665-5651 Fax 703 / 678-0682 n�n�a�triii�i. TO: Planning Commission Members FROM: Kris C. Tierney, Deputy Planning Directo� RE: Informal Discussion Regarding Possible B-2 Rezoning for Veterinary Hospital DATE: January 6, 1995 Attached is a letter form Mr. Bruce Welch, DVM discussing his desire to establish a veterinary hospital on the east side of Route 647. The property where Mr. Welch would like to locate is currently zoned RP (Residential Performance). B-2 (Business General) zoning would be required. Mr. Welch mentions that he would proffer out uses other than veterinary hospitals in pursuing a rezoning. The parcel in question is surrounded on three sides by RP zoning with B-2 zoning across Aylor Road. A plat of the parcel and location map are attached. Please let me know if there are any questions regarding this item. 9 North Loudoun Street Winchester, VA 22601 P.O. Box 601 Winchester, VA 22604 Planning Commission Members P.O. Box 601, 9 North Loudoun St. Winchester, VA 22601 Bruce E. Welch, DVM 1904 Double Church Road Stephens City, VA 22655 (703) 869-3559 January 5, 1995 Dear Planning Commission, My goal is to open a Veterinary Hospital offerring progressive medical and surgical care on a property at 689 Aylor Road (647) near Stephens City. While the property currently consists of 2.046 acres, I am interested in utilizing approximately .7 acres that will require rezoning to B-2. The purpose of appearing before the commission is to informally introduce my project and discuss relevant concerns and questions we may both need to consider. The property is located on Aylor Road just past Fredericktown drive, (between R. E. Aylor and Bass -Hoover) and has an exsisting 1 112 story brick and shingle dwelling constructed in the 1g50's. My hope is to construct an animal hospital beside this house which would be approximately 50-60 feet in width and 40-50 feet in depth. It will be single -story in design and have a professional appearance which will "fit in" with the surrounding homes and will likely staff two veterinarians. I have n o intentions of offerring boarding or kennel services. I also wish to proffer the rezoned property for veterinary utilization to insure the county and neighbors that the use of this property will remain constant and have minimal affects upon traffic, outdoor lighting, and appearance of this community. I have enclosed a 5/13/91 survey map with an estimated location of the affected area and would welcome the commissions opinions, ideas, questions, and concerns. Thank you for your time and consideration. Bruce E. Welch, DVM 6 7 �s e 35 0 �, �j174 173 � 1 `, a-`- 172, 3 10 5 4 8 13/ 16 18 6 7 12/ 6 17 �SQ 200 —�/[Bass Hoover 199 —71 ementer zoo los y 198.School P 1P 203 206 �Q� 197 202 L r10 20 213 �{� 1 201 214 Geo`° 1 215 2 208� 212 `j 216 3 209 211 217 � 3 8 4 210 5 171 172 173 174 J i 75j 176 oQ � 6 � S 6 �R 7 10 170 1 188 189 190 191 �-�% � 1681196 195 194 19 !�o� t sr Q 14 166 Q� 139 15�165 \ 4 22 21 20 1 \x ��,� /%%z 1617 ��• Frederektowne ts6) ' 18 // : r( �Q 1 � / � •fes \\ \ --S ��� � 60 37 4� �_� A / 1bKA5 C-1 '� 5 rol 36 P '' \ ,� 113 1 63 48 f f _1H S \ 1 79 I 6i 71 I" 80 64 6 Location Map for PIN: 75-A-38 PC Agenda m T; M C" 0 to ti >a to Lot 1 1 Fredericktowne, 1 Section Lot 2 Lot 3 TVC Box `J TVC Box` i Lo Telephone lr Bac S _•. Lot r ' TV Cable Bac j Telephone / Telephone Bac 0° 24' 44" E 431.00'' f Telephone BoxNOTES i. No Title Report Furnished, The property shown on this plat is that same property conveyed by Ernest W. Creek and Carolyn J. Creek, his •1 Story 'M° .., wife, to Wade E. Lautzenheiser and Karen D. Lautzenheiser, his Brick $ Shingle Siding _; 8 wife, by a deed dated September 30, 1985 and Res./5012 :, recorded in D.B.602, P.413. - Pole —"— ed { x �1 4 u � c 3. The property therm on this plat It looted in Zone •C", Porch2.2'S aC„ - as them on N9i0 Flood Inssnncs Rate Fite, Con "Ity-Panel o ,.-Deck i I dom au n Nu*er 610063 X00 8. eftect(ve date of July 17, 1976• f , 'O I- d • iv+ 2.046 ACRES i V 4• This property. is shown on Frederick Coact Tax m Assesafent Na No, . T 5- A -Perp 1 38. 6aa't. Ent. I = $ W LTH ®�,6 Poreh •1' .3' fWeu Frame Bldg. W, . Walk 192.2' -41 Tee Walk-)Garakge 36.2' Elliott Rltchfe. Jr D►, N �• LICENSE No ' i_ _ 1314 Lot I N14B• 26' 1T" L of 2 Lot 3 SUR 301 s .•Orainaye Eas�asn = HOUSE LOCATION �FrederieklaKne, Section one — — — _ — — — �--. -t' _ PROPERTY OF "This is to certify that on May 13, 1991,1 Wade E. _ Lautzellheiser made an accurate surrey of the premises O P E Q U O N DISTRICT shown hereon and that there are no easements or encroachments visibia of the ground other FREDERICK COUNTY, Y I R 61 N I A than those shown hereon.* SCALE : 1 " = 5 0 ' • MAY 13, lift RITCHIE SURVEYS F R E D E R I C K ..R 0 A D WINCHESTER,' VIRGINIA CertIII:d Correct To: Kevin J. A Pamela B. Mullen '