Loading...
TC 05-23-22 Meeting Agenda1.I-81 Fund Update 1.A.I-81 Fund Update 2.Interstate, Primary, and Secondary Road Plan Updates 2.A.Interstate, Primary, and Secondary Road Plan Updates 3.County Project Updates 3.A.County Project Updates 4.Other 4.A.Other AGENDA TRANSPORTATION COMMITTEE MONDAY, MAY 23, 2022 8:30 AM FIRST-FLOOR CONFERENCE ROOM FREDERICK COUNTY ADMINISTRATION BUILDING WINCHESTER, VIRGINIA TC05-23-22I-81FundUpdate.pdf TC05-23-22InterstatePrimarySecondaryRoadPlanUpdates.pdf TC05-23-22CountyProjectUpdates.pdf TC05-23-22Other.pdf 1 Transportation Committee Agenda Item Detail Meeting Date: May 23, 2022 Agenda Section: I-81 Fund Update Title: I-81 Fund Update Attachments: TC05-23-22I-81FundUpdate.pdf 2 Item 1: I-81 Fund Update Topic Synopsis David Covington, I-81 Fund Program Delivery Director, will be presenting an update to the Committee regarding progress to date and upcoming Frederick County projects. Recommended Action NA 3 Transportation Committee Agenda Item Detail Meeting Date: May 23, 2022 Agenda Section: Interstate, Primary, and Secondary Road Plan Updates Title: Interstate, Primary, and Secondary Road Plan Updates Attachments: TC05-23-22InterstatePrimarySecondaryRoadPlanUpdates.pdf 4 Item 2: Interstate, Primary, and Secondary Road Plan Updates Topic Synopsis Staff is finalizing the updates to the Interstate, Primary, and Secondary Road Plan Updates and will be presenting them at the meeting. Attached for reference are the current versions of those plans. Recommended Action A recommendation from the Committee to the Board of Supervisors. 5 2021-2022 INTERSTATE ROAD IMPROVEMENT PLAN for FREDERICK COUNTY, VIRGINIA Frederick County Transportation Committee: 4/26/21 Frederick County Planning Commission: 5/5/21 Frederick County Board of Supervisors: 5/12/21 6 7 ¬«7 ¬«277 ¬«37 §¨¦81 §¨¦81 §¨¦66 §¨¦81 £¤11 £¤50 £¤50 £¤522 £¤522 £¤11 £¤50 £¤522 £¤11 £¤522 £¤522 £¤50 £¤11 £¤522 Winchester Middletown StephensCity 0 2.5 51.25 Miles 2021 - 2022Interstate Ro adImprovement Plan Widening Priorities Priority 2Widen I-81 fromExit 307 to Exit 313 Priority 1Widen I-81 fromExit 313 to Exit 317 Widen Remainder of I-81 SouthPriority 4Widen Remainder of I-81 NorthPriority 3 Priority 5 !(Exit 307 Ramp Relocation Interchange ImprovementPriorities Priority 3Exit 310 Phase II of theInterchange Upgrade!( Priority 1Exit 313 Bridge Reconstruction,Safety Improvements, andCapacity Expansion!( Priority 4 !(Exit 307 Safety and CapacityImprovements to Existing Locationand Promote Future Realignment Priority 2 Exit 317 Interchange Upgradeand Redbud Rd Realignment toAccomodate InterchangeUpgrade !( 8 9 2021-2022 PRIMARY ROAD IMPROVEMENT PLAN for FREDERICK COUNTY, VIRGINIA Frederick County Transportation Committee: 4/26/21 Frederick County Planning Commission: 5/5/2021 Frederick County Board of Supervisors: 5/12/21 10 All upgrades to primary system roadways that are not limited access should include implementation of access management principles to improve safety and efficiency wherever possible. 1)Route 37 Bypass A.Route 37 – Phase 1 Initiate final engineering and design, acquire right-of-way, and establish a construction phase schedule for the preferred alternative between existing Route 11 North and Route 7. B.Route 37 - Phase 2 Initiate final engineering and design, acquire right-of-way, and establish a construction phase schedule for the southern segment of the Route 37 Eastern Bypass from Interstate I-81 to Front Royal Pike (Route 522 South). C.Route 37 – Phase 3 Initiate final engineering and design, acquire right-of-way, and establish a construction phase schedule for the preferred alternative between Existing Route 37 around Stonewall Industrial Park to Route 11 North. D.Route 37 - Phase 4 Initiate final engineering and design, acquire right-of-way, and establish a construction phase schedule for the preferred alternative between Route 7 and Route 522. 2)Route 11 (North and South of Winchester) A)Establish an Urban Divided Six Lane System: From: Northern limits of the City of Winchester To: Intersection of Cedar Hill Road B)Establish an Urban Divided Four Lane System: From: Southern limits of the City of Winchester To: Renaissance Drive C)Establish an Urban Divided Four Lane System: From: Intersection of Cedar Hill Road To: West Virginia line 3)Route 37 Slip Ramps to Lenoir Drive Construct Ramps to allow traffic to enter and exit the southbound side of Route 37 from Lenoir Drive. 11 4)Route 277 (East of Stephens City) Upgrade of the overall corridor to a 4-lane divided system with improved access management and bicycle and pedestrian facilities. A)Establish an Urban Divided Four Lane System: From: Double Church Road To: Warrior Drive B)Establish an Urban Divided Four Lane System: From: Warrior Drive To: White Oak Road C)Establish an Urban Divided Four Lane System: From: White Oak Road To: Route 277 5)Route 7 – Establish a 6 Lane Cross Section: From: Exit 315 Interchange To: Future Route 37 Interchange 6)Route 50 East and West A)Establish a 6 Lane Cross Section: From: The Interchange at Exit 313 To: The Future Route 37 Interchange B)Establish a 6 Lane Cross Section: From: The Interchange with Route 37 To: Poorhouse Road 7)South Frederick County Parkway: From: Relocated Exit 307 To: Intersection with Route 277 approximately 1 mile west of the intersection of Route 277 and Route 522 This is a new planned roadway with limited access points serving a mixture of predominantly commercial and industrial development. There is a need to study this project in conjunction with the Exit 307 relocation and planning for Route 277 improvements noted in item 3. 12 Phasing of this project is not yet clearly defined; however general phasing would be from West to East with the clear first phase being from relocated Exit 307 to Warrior Drive. 8)Route 522 and Costello Drive Add additional left turn lane capacity on Route 522 southbound for turns onto Costello Drive. 9)Commuter Park and Ride Lots Establish a new park and ride facility along the Berryville Pike (Route 7) corridor. Work with the Northern Shenandoah Valley Regional Commission to determine appropriate locations for park and ride facilities at other strategic locations within the County’s Urban Development Area. For Park and Ride locations in Frederick County, the primary goal should be that they are situated in such a manner that they reduce traffic in Frederick County in addition to adjacent localities. 13 2A 2B 2C 1A 1B 1D 1C 3 5 4A 6A 6B 4B 4C 7 §¨¦81 §¨¦81 ¬«277 ¬«277 ¬«37 ¬«7 ¬«7 ¬«7 ¬«37 ¬«37 £¤50 £¤522 £¤11 £¤50 £¤522 £¤11 £¤522 £¤522 £¤11 £¤522 Winchester Stephens City 2021 - 2022Primary RoadImprovementPlan 0 1 20.5 Miles Route 37 Bypass Phases Priority 1A Priority 1B Priority 1C Priority 1D Route 11 North & South Priority 2A Priority 2B Priority 2C Lenoir Drive/Route 37 Slip Ramps Priority 3 Route 277 East of Stephens City Priority 4A Priority 4B Priority 4C Route 7 Priority 5 Route 50 Priority 6A Priority 6B South Frederick County Parkway Priority 7 Route 522 & Costello Dr !(Priority 8 Commuter - Park & Ride Lots !(Priority 9 2A 14 15 2021/22-2026/27 SECONDARY ROAD IMPROVEMENT PLAN for FREDERICK COUNTY, VIRGINIA Frederick County Transportation Committee: 4/26/21 Frederick County Planning Commission: 5/5/21 Frederick County Board of Supervisors: 5/12/21 16 17 ¬«277 ¬«37 ¬«7 ¬«7 ¬«7 ¬«37 §¨¦81 §¨¦81 £¤50 £¤522 £¤11 £¤50 £¤11 £¤522 £¤522 Winchester Stephens City Frederick CountyMajor RoadImprovement Projects2021/2022 thru 2026/2027 0 1 20.5 Milesµ 1 4 2 3 1. Redbud Rd Realignment 4. Renaissance Dr Phase II 3. Airport Rd Extension 2. East Tevis Street 18 19 §¨¦81 §¨¦81 §¨¦66 ¬«55 ¬«259 ¬«277 ¬«127 ¬«7 ¬«37 £¤50 £¤522 £¤522 £¤522 £¤11 £¤50 £¤50 £¤522 £¤11 £¤522 Winche ster Middletown Stephens City Frede rick CountyNon-Hardsurfaced RoadImprovement Projects2021/2022 thru 2026/2027 µ 0 4 82 Mi les 1. Laurel Grove Rd 2. Old Baltimore R d 3. Middle Fork Rd 4. Tim berlakes Ln 5. East Parkins Mill Rd 6. Fletcher Rd 7. Fishel Rd 8. Canterburg Rd 1 3 2 4 5 6 7 8 20 21 §¨¦81 §¨¦81 §¨¦66 ¬«55 ¬«259 ¬«277 ¬«127 ¬«7 ¬«37 £¤50 £¤522 £¤522 £¤522 £¤11 £¤50 £¤50 £¤522 £¤11 £¤522 Winche ster Middletown Stephens City SH AW NEE REDBUD STONEW ALL GAINESB ORO BACK CREEK OPEQUON Frederick CountyUnscheduledNon-Hardsurfaced RoadImprovement Projects2021/2022 thru 2026/2027 µ 0 4 82 Miles 1. Clark R d 2. Heishman Ln 3. Glaize Orchard Rd 4. South Timber Ridge Rd 5. Cougill Rd 6. Cattail R d 7. Hunting R idge R d 8. Huttle Rd 9. Ruebuck R d 10. Light Rd 11. McDonald R d 12. Grace C hurch Rd 13. Mount Olive R d 14. Gardners R d 15. Shockeysville Rd 16. Knob Rd 17. Mount Olive R d 7 4 15 10 3 6 14 9 12 16 17 13 11 2 1 5 8 22 23 Transportation Committee Agenda Item Detail Meeting Date: May 23, 2022 Agenda Section: County Project Updates Title: County Project Updates Attachments: TC05-23-22CountyProjectUpdates.pdf 24 Item 3: County Project Updates Renaissance Drive: Staff is working through the agreement and real estate process with CSX. There was a significant delay regarding concerns the CSX real estate division had with the drainage design even though it had been approved by the CSX consultant. However, this has now been reviewed and approved by the CSX Chief Engineer and procurement of the right of way easements and drainage license are proceeding. 25 Transportation Committee Agenda Item Detail Meeting Date: May 23, 2022 Agenda Section: Other Title: Other Attachments: TC05-23-22Other.pdf 26 Item 4: Other 27