AGENDA
TRANSPORTATION COMMITTEE
MONDAY, DECEMBER 27, 2021
8:30 AM
FIRST-FLOOR CONFERENCE ROOM
FREDERICK COUNTY ADMINISTRATION BUILDING
WINCHESTER, VIRGINIA
TC12-27-21CapitalImprovementPlanUpdate.pdf
TC12-27-21CountyProjectUpdates.pdf
TC12-27-21Other.pdf
1
Transportation Committee
Agenda Item Detail
Meeting Date: December 27, 2021
Agenda Section: Capital Improvement Plan Update
Title: Capital Improvement Plan Update
Attachments:
TC12-27-21CapitalImprovementPlanUpdate.pdf
2
2
Item 1: Capital Improvement Program Update
Topic Synopsis
Staff will present the recommended updates to the transportation section of the County’s Capital
Improvement Program. This is an annual update of the plan.
Recommended Action
Staff will be seeking a recommendation to the Board of Supervisors to adopt the updated plan.
3
Transportation Committee
The Transportation Committee continues to provide project requests for the CIP. Virginia State
Code allows for transportation projects to be included within a locality's CIP. Funding for
transportation project requests will likely come from a combination of state funds, developers,
revenue sharing, various other revenue programs and possibly local funds used to leverage those
funding sources.
The Transportation Committee has included 26 priority projects. As projects and applications are
developed, they could include all or a key portion a prioritized project. The top three priorities
include Route 277 widening and safety improvements (Phase 1), Exit 313 Bridge Replacement
and Capacity Improvements, and Renaissance Drive (Phase 2). The inclusion of the Eastern Road
Plan Improvements item at number 27 once again emphasizes the connection between the CIP
and potential proffered contributions made with rezoning projects which are aimed at mitigating
potential transportation impacts identified in the Comprehensive Plan.
Transportation Committee Project Priority List
Funded Priorities
PRIORITY 1 - Route 277 Widening and Safety Improvements (Ph 1)
Description: Construct a 4-lane divided roadway beginning at I-81 and continuing to Double
Church Road. Project would include realignment of Aylor Road to align with Stickley Drive.
Capital Cost: $42,144,000
Justification: This is a regional transportation improvement that will address congestion in the
Southern Frederick area and address development to the surrounding areas.
Construction Schedule: TBD
PRIORITY 2 – Exit 313 Bridge Replacement and Capacity Improvements
Description: Replace the structurally deficient bridge at Exit 313 and add limited capacity
improvements.
Capital Cost: $36,593,000
Justification: The bridge on Route 17/50/522 (Millwood Pike) Bridge over Interstate 81 at Exit
313 is reaching the end of its service life and needs to be replaced. The new bridge will feature
design elements that will accommodate future improvements to the Route 17/50/522 corridor
and future improvements to I-81. The interchange configuration will not change with this project.
Construction Schedule: TBD
4
PRIORITY 3 - Renaissance Drive, Phase 2
Description: Construct a connector road and Railroad Crossing between Route 11 and Shady Elm
Drive.
Capital Cost: $4,434,150
Justification: This is a transportation improvement that will address congestion at key po ints
along Route 11 and Apple Valley Drive. This project is identified in Secondary Road
Improvements Plan.
Construction Schedule: TBD
PRIORITY 4 - Route 277 right turn lane extension at Warrior Drive
Description: Extend right-turn lane for eastbound 277 at the intersection of Rt. 277 and Warrior
Drive. Installation of sidewalk for pedestrian safety and installation of pedestrian pedestal.
Capital Cost: $477,000
Justification: This improvement would be a significant safety upgrade to this intersection.
Construction Schedule: TBD
PRIORITY 5 – Route 7 STARS Study Project
Description: Consolidate turning movements at Blossom Drive/Millbrook Drive and Route 7 as
well as at First Woods Drive/Greenwood Road and Route 7 to reduce conflicts and improve
efficiency
Capital Cost: $1,000,000
Justification: This improvement would be a significant safety upgrade to these intersections.
Construction Schedule: TBD
PRIORITY 6 -Exit 317 Interchange Ramp Realignment Project
Description: Relocate the existing northbound exit ramp at I-81 Exit 317 and Route 11 to the
current location of the Redbud Road intersection. This project will include turn lane upgrades on
to the exit ramp from Route 11 North to I-81 northbound and removal of the signal that will be
made redundant by the realignment.
Capital Cost: $6,765,233
Justification: This improvement will upgrade traffic flow and safety through the interchange
area.
Construction Schedule: TBD
PRIORITY 7 – Route 11 @ Old Charlestown Road Roundabout installation
Description: Upgrade the temporary signal that is currently in place to the roundabout design
that VDOT has identified for this intersection.
Capital Cost: $5,167,722
5
Justification: This improvement will improve traffic flow and safety at th is intersection while
minimizing the impact to traffic throughput north and south on Route 11.
Construction Schedule: TBD
Unfunded Priorities
PRIORITY 8 - Planning, Engineering, Right-of-Way and Construction Work for Route 37
Description: This project would be to continue work on the Eastern Route 37 extension. More
specifically, to update the Environmental Impact Statement to the point of a new Record of
Decision and to update the 1992 design plans to address the current alignment, engin eering
guidelines, and possible interchange improvements. In addition, this allows for advanced
engineering, right-of-way purchase and construction.
Capital Cost: $811,125,000
Justification: This project moves the County closer to completion of a transportation
improvement that would benefit the entire County and surrounding localities.
Construction Schedule: TBD
PRIORITY 9 - Route 277 Widening and Safety Improvements (Ph 2)
Description: Construct a 4-lane divided roadway beginning at I-81 and continuing to Sherando
Park. Project would include realignment of Aylor Road to align with Stickley Drive.
Capital Cost: $27,500,977
Justification: This is a regional transportation improvement that will address congestion in the
Southern Frederick area and address development to the surrounding areas.
Construction Schedule: TBD
PRIORITY 10 - Redbud Road Realignment
Description: The funding of the Exit 317 Ramp realignment makes this realignment critical for
trips that currently use Redbud Road which total nearly 3,000 vehicles per day. VDOT has made
it a requirement for the ramp realignment to move forward.
Capital Cost: $5,988,146
Justification: This project is required to be underway in conjunction with or prior to the Exit 317
Ramp realignment and the Board has submitted a revenue sharing application to move it
forward. The application is currently under review.
Construction Schedule: TBD
PRIORITY 11 - Exit 317 Interchange Upgrade
Description: The funded ramp realignment project is one component of the overall needed
upgrade to the interchange at I-81 Exit 317. This project calls for the full upgrade of the
interchange.
6
Capital Cost: $35,000,000
Justification: This is a transportation improvement that will have significant impact on Eastern
Frederick County and is identified in the Eastern Road Plan. Staff is currently working with the
MPO and the Office of Intermodal Planning and Investment on a pipeline study to continue to
refine the application to increase its competitiveness for state funds.
Construction Schedule: TBD
PRIORITY 12 - Route 11 North Widening to 6 Lanes from Snowden Bridge Boulevard to Old
Charlestown Road
Description: Route 11 North of Snowden Bridge Boulevard is currently primarily a two -lane
roadway. This project would widen that facility to a 6-lane divided roadway with turn lanes where
appropriate.
Capital Cost: $30,656,329
Justification: This is a transportation improvement that will provide a significant capacity
upgrade to address congestion on the Route 11 Corridor. This project is identified in the adopted
Eastern Road Plan.
Construction Schedule: TBD
PRIORITY 13 - Brucetown Road/Hopewell Road Alignment and Intersection Improvements
Description: Realign Brucetown Road to meet Hopewell Road at Route 11. Improvements to this
intersection will address comprehensive planned development’s traffic generation in the area.
Capital Cost: $8,652,000
Justification: This is a transportation improvement that will have significant impact on the
Route 11 corridor. The location is identified by joint planning efforts between the County and
VDOT.
Construction Schedule: TBD
PRIORITY 14 - Valley Mill Road Realignment (West)
Description: This project would reduce or remove the intersection of Valley Mill Road and Route
7 and realign the roadway to a new intersection with Route 7 at Gateway Drive.
Capital Cost: TBD
Justification: The interchange area at I-81 Exit 315 where Valley Mill Road intersects is currently
one of the most congested areas in Frederick County. This improvement would result in better
spacing and fewer conflicting movements through the interchange area.
Construction Schedule: TBD
PRIORITY 15 – Route 7 Corridor Improvements from Exit 315 to Greenwood Road
Description: Spot improvements throughout the corridor to be determined through ongoing
study in coordination with VDOT.
Capital Cost: $5,407,500
7
Justification: The County is engaged in a STARS study with VDOT through the MPO. This study
will be used to identify key spot improvements to be addressed under this item.
Construction Schedule: TBD
PRIORITY 16 – Route 11 S Widening & Intersection Improvements from Wi nchester City Limits
to Opequon Church Lane
Description: Route 11 S, NB side widening and improvements to the intersection of Shawnee
Drive at Route 11 and Opequon Church Lane at Route 11
Capital Cost: $3,568,950
Justification: Transportation study conducted in conjunction with the MPO and VDOT
determined that these improvements would significantly improve congestion and safety in the
area. In addition, this improvement would promote the Comprehensive Plan vision for this area.
Construction Schedule: TBD
PRIORITY 17 - Widening of Route 11 North to the West Virginia State Line
Description: Improve Route 11 to a divided 4 and 6-lane facility as detailed in the Eastern Road
Plan.
Capital Cost: $207,648,000
Justification: This is a regional transportation improvement that will address congestion over a
large area of the County and address development to the surrounding area. This project improves
the safety for the traveling public by reducing congestion and improving the f low of traffic.
Construction Schedule: TBD
PRIORITY 18 - Senseny Road Widening
Description: Widen Senseny Road to a 4-lane divided roadway. This project is not dependent
upon but is being coordinated with the implementation of Route 37, Channing Drive, and
development in the area.
Capital Cost: $72,460,500
Justification: This is a transportation improvement that will have significant impact on Eastern
Frederick County. This project is identified in the adopted Eastern Road Plan.
Construction Schedule: TBD
PRIORITY 19 - Senseny Road Turn lanes at the intersection of Senseny Road and Crestleigh Drive
Description: Improvements to the intersection of Senseny Road (657) and Crestleigh Drive to
include turn lanes and potential signalization. This project would add left and right turn lanes to
Senseny Road at the intersection of Crestleigh and potentially a full signalization of the
intersection.
Capital Cost: $2,756,288
Justification: This improvement would be a significant safety upgrade to this intersection.
Construction Schedule: TBD
8
PRIORITY 20 - Interstate 81, Exit 307 Relocation
Description: Construct a relocated Exit 307 interchange.
Capital Cost: $253,347,290
Justification: This is a regional transportation improvement that will address congestion in
many areas of the County and address coming development to the surrounding areas.
Construction Schedule: TBD
PRIORITY 21 - Warrior Drive Extension (south) including Brandy Lane Upgrade
Description: Construct a 4-lane divided roadway beginning at Route 277 where Warrior Drive
intersects from the north and continuing that roadway south and west to intersect with I -81 at
the location of the relocated Exit 307 interchange.
Capital Cost: $50,830,500
Justification: This is a regional transportation improvement that will address congestion in the
Southern Frederick area and address development to the surrounding areas.
Construction Schedule: TBD
PRIORITY 22 - Channing Drive Extension
Description: Construct a 4-lane divided roadway beginning at Senseny Road where Channing
Drive intersects from the north and continuing that roadway south to intersect with Route 50
East at Independence Drive.
Capital Cost: $48,667,500
Justification: This project has been identified in the Eastern Road Plan and will address
congestion in Eastern Frederick County and address development to the surrounding areas.
Construction Schedule: TBD
PRIORITY 23 - Inverlee Way
Description: Construct a 4-lane divided roadway beginning at Senseny Road and going south to
Route 50 East. This project is being planned in conjunction with improvements to Senseny Road
and surrounding development.
Capital Cost: $29,524,950
Justification: This is a regional transportation improvement that will address congestion and
provide an additional needed link between Senseny Road and Route 50 East.
Construction Schedule: TBD
PRIORITY 24 - Warrior Drive Extension from Route 37 Crosspointe south to existing terminus
Description: 4-lane roadway from the Route 37 extension in the Crosspointe Development south
to the existing terminus of Warrior Drive.
Capital Cost: $36,230,250
Justification: This improvement would be concurrent with a Route 37 extension and would
provide significant congestion relief at Exit 307 as well as Tasker Road at Exit 310.
9
Construction Schedule: TBD
PRIORITY 25- Jubal Early Drive Extension and Interchange with Route 37
Description: This project would extend Jubal Early Drive as a 4-lane facility from Winchester to
an interchange with Route 37. This would include a partial realignment of Merrimans Lane .
Capital Cost: TBD
Justification: This project would add additional east/west connectivity as well as reducing traffic
loads at the Route 50 and Cedar Creek Grade interchanges with Route 37 .
Construction Schedule: TBD
PRIORITY 26- Valley Mill Road Realignment (East)
Description: This project would reduce or remove the intersection of Valley Mill Road and Route
7 to the east and realign the roadway to a new intersection with Route 7 at Future Route 37.
Capital Cost: TBD
Justification: As the road network and approved development in this area develops this new
connection will provide a much more efficient and safer network for the community.
Construction Schedule: TBD
PRIORITY 27 - Frederick County Eastern Road Plan
Description: This project is intended to address all of the planned transportation improvements
in the County Comprehensive Plan, Eastern Road Plan that are not noted individually above.
Capital Cost: TBD
Justification: This project prepares the County for future development by addressing the
projects needed to support that development in a manner consistent with the Comprehensive
Plan.
Construction Schedule: N/A
10
Contribution Per Fiscal Year
Projects - Ranked by Agency 2021-2022 2022-2023 2023-2024 2024-2025 2025-2026 2026+
Long Range
Comprehensive
Plan Projects
County/VDOT/P
rivate
Contributions Notes
Total Project
Costs
Ensuing
Fiscal Year Year 2 Year 3 Year 4 Year 5
Beyond
Year 6+
Funded Priorities
Route 277, Fairfax Pike, Widening
and Safety Improvements (ph 1)$42,144,000 $42,144,000 E $42,144,000
Exit 313 Bridge Replacement and Capacity Improvements $36,593,000 $36,593,000 $36,593,000
Rennaisance Drive, Phase 2 $4,434,150 $4,434,150 E $4,434,150
Route 277 right turn extension Warrior Drive $477,000 $477,000 $477,000
Route 7 STARS Study Project $1,000,000 $1,000,000 $1,000,000
Exit 317 Interchange Ramp Realignment $6,765,233 $6,765,233 $6,765,233
Route 11 @ Old Charlestown Road Roundabout $5,167,722 $5,167,722 E $5,167,722
Unfunded Priorities
Route 37 Engineering & Construction $811,125,000 $811,125,000 E $811,125,000
Route 277, Fairfax Pike, Widening
and Safety Improvements (ph 2)$27,500,977 $27,500,977 E $27,500,977
Redbud Road Realignment $5,988,146 $5,988,146 E $5,988,146
Exit 317 Interchange Upgrade $35,000,000 $35,000,000 $35,000,000
Widening of Route 11 North (ph 1)$30,656,329 $30,656,329 E $30,656,329
Brucetown/Hopewell Realign.$8,652,000 $8,652,000 E $8,652,000
Valley Mill Road Realignment West E TBD
Route 7 Corridor Improvements Exit 315 to Greenwood $5,407,500 $5,407,500 $5,407,500
Route 11 S Widening and Intersection Improvements from
Winchester City Limits to Opequon Church Lane $3,568,950 $3,568,950 E $3,568,950
Widening of Route 11 North (ph2)$207,648,000 $207,648,000 E $207,648,000
Senseny Road Widening $72,460,500 $72,460,500 E $72,460,500
Senseny Road turn lanes/improvements Crestleigh Drive $2,756,288 $2,756,288 $2,756,288
I-81 Exit 307 Relocation with 4 ln connection to Double Church and
Stephens City Bypass $253,347,290 $253,347,290 E $253,347,290
Warrior Drive Extension (south)including Brady Lane upgrade $50,830,500 $50,830,500 E $50,830,500
Channing Drive Extension $48,667,500 $48,667,500 E $48,667,500
Inverlee Way $29,524,950 $29,524,950 E $29,524,950
Warrior Drive Extension (Crosspointe south)$36,230,250 $36,230,250 E $36,230,250
Jubal Early Drive Extension and Interchange with Route 37 E TBD
Valley Mill Road Realignment East E TBD
Eastern Road Plan Improvements TBD TBD E TBD
Total $96,581,105 $0 $0 $0 $0 $0 $1,629,364,180 $1,725,945,285 $1,725,945,285
Other Funding Sources: E= Partial funding anticipated through development & revenue sources
Table 2 - Transportation Projects - CIP Requests
The inclusion of transportation projects to the CIP is in no way an indication that Frederick County will be undertaking these projects. Funding
projects will continue to come from a combination of state and federal funds, developer contributions, and revenue sharing
11
Transportation Committee
Agenda Item Detail
Meeting Date: December 27, 2021
Agenda Section: County Project Updates
Title: County Project Updates
Attachments:
TC12-27-21CountyProjectUpdates.pdf
12
3
Item 2: County Project Updates
Crossover Boulevard aka Tevis Street Extension/Airport Road/I-81 Bridge:
Complete! Final bills are still coming in but expected to come to an end soon. Historic signage was
installed earlier this month as part of the agreement with the Shenandoah Valley Battlefield Foundation.
Renaissance Drive:
Staff is making progress with CSX but has recently learned of some minor final changes that need to be
made. We anticipate wrapping those up fairly quickly. Staff is also working with the owners of the
Carbaugh property to finalize right-of-way plats through their property.
13
Transportation Committee
Agenda Item Detail
Meeting Date: December 27, 2021
Agenda Section: Other
Title: Other
Attachments:
TC12-27-21Other.pdf
14
4
Item 3: Other
15